Order 5090.5 Formulation of the National Plan of Integrated Airport Systems (NPIAS) and the Airports Capital Improvement Plan (ACIP)
Order 5090.5 establishes guidelines for managing and maintaining two federal plans that are essential to airport development: the National Plan of Integrated Airport Systems (NPIAS) and the Airports Capital Improvement Plan (ACIP). The Order also discusses the Office of Airports (ARP) NPIAS project database that supports these plans and its use for preparing the Secretary of Transportation’s biennial NPIAS Report. September 19, 2019: See also the errata for this Order.
Distribution: Electronic Initiated By: APP-400
SUBJ: Formulation of the NPIAS and ACIP
1. PURPOSE.
Order 5090.5 establishes guidelines for managing and maintaining two federal plans
that are essential to airport development: the National Plan of Integrated Airport Systems (NPIAS) and the Airports Capital Improvement Plan (ACIP). The Order also discusses the Office of Airports (ARP) NPIAS project database that supports these plans and its use for preparing the Secretary of Transportation’s biennial NPIAS Report.
The NPIAS identifies existing and proposed airports that are important to national air
transportation, and it provides a forward-looking estimate of the type and cost of eligible Airport Improvement Program (AIP) development needed to meet the needs of civil aviation.
The ACIP, a subset of the NPIAS plan for airport development, is the primary financial
planning tool for systematically identifying, prioritizing, and assigning funds to help meet the capital project needs of airports within the NPIAS. The ACIP also provides the basis for grant planning and management under the AIP.
2. AUDIENCE.
This Order applies to all FAA personnel that work with the NPIAS, ACIP, AIP, and Passenger Facility Charge (PFC) program, particularly those in the Office of Airports headquarters, regional and field offices. This Order is also available to airport sponsors; public agencies; planning agency sponsors; state, regional, and metropolitan aviation agencies; and airport-related organizations that work with the FAA in developing airport capital plans and identifying airports in the NPIAS.
3. DISTRIBUTION.
This Order is available on the FAA website. Visit the Orders & Notices web page.
4. CANCELLATION.
This Order cancels two Orders:
FAA Order 5090.3C, Field Formulation of the National Plan of Integrated Airport
Systems (NPIAS), December 4, 2000.
FAA Order 5100.39A, Airports Capital Improvement Plan, August 22, 2000.
ORDER NUMBER
5090.5
Effective Date: September 3, 2019
ii
5. EXPLANATION OF CHANGES.
This Order changes previous guidance by:
Combining the NPIAS and ACIP orders into a single document to enable a
comprehensive, orderly flow of airport development data—from planning through the identification of potential federal funding.
Differentiating what is required by law and what is recommended by policy. It
incorporates relevant legislative provisions, revised and added, in accordance with statutory changes since both Orders were last published independently in 2000.
Updating the requirements for airports requesting entry into and withdrawal from the
NPIAS, and it defines the roles of General Aviation airports in the NPIAS that were not defined in previous orders.
Updating the FAA’s Overall Development Objective concept to best capture project
details for all planning and financial assistance programs that ARP administers.
Revising the National Priority System (NPS) equation, the numerical system for prioritizing
airport development, to consider the airport’s role in the National Airport System.
6. LIMITATIONS.
This Order provides a process for airport development planning that encompasses the NPIAS and ACIP and which is applicable to both the AIP and the PFC programs. There may be language in this Order that conflicts with language contained in either Order 5100.38, Airport Improvement Program (AIP) Handbook (referred to throughout this Order as the AIP Handbook), or Order 5500.1, Passenger Facility Charge (PFC) (referred to throughout this Order as the PFC Order). In the event of such a conflict, the most recently issued language controls. This Order does not change or modify any regulatory or statutory requirements of the AIP or PFC programs. This Order is intended for the limited purpose of facilitating airport development planning as it relates to funding requests made through the AIP and PFC programs.
Stan Allison Acting Director, Office of Airport Planning and Programming
CONTENTS
Number Page
iii
Chapter 1. What do I Need to Know About this Order? … 1-1
1.1 Why is airport planning important? … 1-1
1.2 How does this Order advance the Airport Planning Process? … 1-2
1.3 What legislation is relevant to this Order? … 1-3
1.4 What FAA Office of Airports positions, offices, divisions, and branches does this Order reference? … 1-5
1.5 Supplemental guidance … 1-5
1.6 Referenced documents … 1-5
1.7 Limits to this Order … 1-6
1.8 What key terms are necessary for understanding this Order? … 1-7
1.9 General principles for using this Order … 1-7
Chapter 2. What is the NPIAS-ACIP Planning and Funding Process? … 2-1
2.1 Background … 2-1
2.2 What are the FAA’s goals for the Airport Planning Process? … 2-1
2.3 What is the National Plan of Integrated Airport Systems (NPIAS)? … 2-2
2.4 What is the Airport Capital Improvement Plan (ACIP)? … 2-4
2.5 What is the relationship between airport planning and funding programs? … 2-5
Chapter 3. How are NPIAS Airports Categorized and Selected? … 3-1
3.1 How are airports categorized in the NPIAS? … 3-1
3.2 What are the Airport categories used in the NPIAS? … 3-1
3.3 What are the initial screening requirements for a facility to be considered for inclusion in the NPIAS? … 3-4
3.4 What if an airport no longer qualifies for the NPIAS? … 3-10
CONTENTS
Number Page
iv
3.5 How does an airport request an FAA review for potential inclusion in the NPIAS? . 3-11
3.6 What are the criteria for withdrawal from the NPIAS? … 3-13
3.7 Are commercial space transportation facilities eligible for NPIAS inclusion? … 3-17
Chapter 4. How is the NPIAS Planned? … 4-1
4.1 Planning … 4-1
4.2 What are the requirements for projects to be included in the NPIAS? … 4-9
4.3 What is typical infrastructure for NPIAS airports? … 4-10
4.4 How do Airport Sponsors determine the appropriate timeframes for planning projects? … 4-18
Chapter 5. How is the ACIP Planned? … 5-1
5.1 What is the purpose of the ACIP? … 5-1
5.2 What timeframe is planned for in the ACIP? … 5-1
5.3 What is the FAA review process for airport sponsor CIPs? … 5-1
5.4 How are AIP funds assigned to the ACIP? … 5-2
5.5 Planning Ceilings … 5-3
5.6 What is the Annual Airport Capital Development Process? … 5-5
5.7 How are projects prioritized? … 5-7
Chapter 6. What is the Overall Development Objective-Capital Project System? … 6-1
6.1 What is the ODO-Capital Projects system? … 6-1
6.2 Creating Capital Projects … 6-6
6.3 How to define ODOs and Capital Projects through Work Codes … 6-10
Appendix A. Definitions … A-1
Appendix B. National Priority System Equation … B-1
CONTENTS
Number Page
v
Appendix C. NPIAS-ACIP Planning Calendar … C-1
Appendix D. References and Web Links … D-1
Appendix E. Work Codes … E-1
FIGURES
Number Page
Figure 2-1 Airport Capital Planning Process Flow Chart – NPIAS … 2-7
Figure 2-2 Airport Capital Planning Process Flow Chart – ACIP … 2-8
Figure 6-1 The ODO and Capital Projects Relationship … 6-3
Figure B-1 Projects in Order of Ranking by Survey of FAA Personnel (All Responses) … B-5
TABLES
Number Page
Table 1-1A Essential Airport Characteristics … 1-1
Table 1-1B Essential Airport System Characteristics … 1-1
Table 1-2 References to Sections (§) of Legislation and Regulation … 1-3
Table 1-3 Legislation Relevant to this Order … 1-4
Table 1-4 FAA Office of Airports Office, Divisions, and Branches … 1-5
Table 2-1 Relationship of NPIAS to Airport Planning Timeframes … 2-3
Table 3-1 Airport Categories … 3-2
Table 3-2 Nonprimary Airport Categories … 3-3
Table 3-3 Initial Screening Requirements for a Facility to be Considered for Inclusion in the
NPIAS … 3-5
Table 3-4 FAA Considerations in Reviewing NPIAS Entry Requests … 3-8
Table 4-1 Alternative Methods for Estimating Aircraft Operations … 4-6
Table 4-2 Project Planning Timeframes Used for NPIAS, ACIP, and AIP … 4-10
Table 4-3 Typical Airport Infrastructure for NPIAS Airports … 4-12
Table 4-4 Activity Levels That May Trigger Capacity Planning and Development … 4-16
Table 5-1 FAA Goals to be Addressed in Project Justifications … 5-10
Table 5-2 Projects Requiring Justifications … 5-10
CONTENTS
Number Page
vi
Table 6-1 ODO Data Requirements … 6-5
Table 6-2 Example of Maximum Federal Share Calculation … 6-6
Table 6-3 Capital Projects Data Elements … 6-8
Table 6-4 ODO and Capital Projects Descriptions … 6-11
Table A-1 Definitions … A-1
Table C-1 NPIAS Planning Process Approximate Key Dates and Responsibilities … C-1
Table C-2 ACIP Planning Process Approximate Key Dates and Responsibilities … C-2
Table D-1 References and Web Links … D-1
Table E-1 Airport Categories and Values … E-1
Table E-2 Purpose Code Values … E-1
Table E-3 Component Code Values … E-2
Table E-4 Type Code Values … E-3
CHAPTER 1. WHAT DO I NEED TO KNOW ABOUT THIS ORDER?
1.1 Why is airport planning important? An integrated system of public-use airports is critical to the national transportation system, a productive national economy, and international competitiveness. To best use available resources, planning must ensure we provide the safest, most efficient, and environmentally responsible aviation system in the world that meets the needs of the traveling public. All airports in the national airport system—and proposed changes to the system—must exhibit the essential attributes listed in Tables 1-1A and 1-1B.
Chapter 1. What do I Need to Know About this Order? › 1.1 Why is airport planning important?
Table 1-1A Essential Airport Characteristics
Airports Should Be Characteristics
Safe Developed and maintained to appropriate design standards.
Efficient Located to provide ease of access and enhance usage.
Affordable to both the users and the government
Relies primarily on producing self-sustaining revenue with minimal burden on the general revenues of the local, state, and federal government. As stated in Executive Order 12893, federal investment will be based on analysis of expected benefits and costs.
Flexible and expandable Can meet changes in demand and accommodate evolving needs, including but not limited to aircraft designs, airline service strategies, and aeronautical activities.
Permanent Ensures it will remain open for aeronautical use over the long term.
Compatible with surrounding communities
Maintains a balance between the needs of aviation, the environment, and the interests of neighboring areas.
Adaptable to new technology and airspace changes
Developed in concert with improvements to the air traffic control system and associated technological advancements.
Table 1-1B Essential Airport System Characteristics
Airport Systems Should Be Characteristics
Versatile
Supports a variety of critical national objectives, such as defense, emergency readiness, law enforcement, and postal delivery.
Extensive and efficient Provides as many people as possible with convenient access to air transportation.
1.2.3 How do ARP’s databases support airport capital planning? › 1.2.3.1 ARP uses internal and external databases for airport capital…
Airport Systems Should Be Characteristics
Integrated
Integrates a variety of categories of airports with other modes of transportation. National Transportation Policy establishes goals relating to an efficient intermodal transportation infrastructure to support economic competitiveness, enhance the population's standard of living and quality of life, and to reduce energy consumption and air pollution.
1.2 How does this Order advance the Airport Planning Process? The FAA develops guidance, such as this Order, by taking into account the attributes in Table 1-1, so the planning done by federal, state, and local agencies is effective and supports the continued availability of a national system of public-use airports. This Order provides guidance and policies for formulating, maintaining, and publishing the development plan for public-use airports known as the National Plan of Integrated Airport Systems (NPIAS). The Airports Capital Improvement Plan (ACIP) for funding NPIAS projects is a subset of the NPIAS.
1.2.1 What role does the NPIAS play in airport planning? The FAA uses the NPIAS to identify airports that have a role in the National Airspace System (NAS) and all potential, unfunded, and Airport Improvement Program (AIP) eligible airport development projects at those airports. The airport and project data collected on a continuous basis provides the basis for the publication of the FAA’s biennial NPIAS Report.
1.2.2 What role does the ACIP play in airport planning? The FAA formulates the ACIP to guide the assignment of Airport Improvement Program (AIP) funding to projects based on airport development needs identified in the NPIAS. Funding this development helps ensure that the NAS is safe, secure, and efficient; airports remain compatible with neighboring communities; and projects preserve existing infrastructure.
1.2.3 How do ARP’s databases support airport capital planning?
1.2.3.1 ARP uses internal and external databases for airport capital planning, at both the national and regional levels. The internal database known as System of Airports Reporting (SOAR) is used to compile, analyze, and prioritize eligible airport development for potential AIP funding; therefore, it is critical that the data is current and accurate. The FAA, airport sponsors, and planning agencies should provide the SOAR database with updated data as project information from federal, state, and local sources becomes better defined. Sections 2.3.2 and 4.1.7 discuss SOAR and the sources used to define eligible airport planning.
1.3 What legislation is relevant to this Order? › 1.3.1 Understanding legislative and regulatory references.
1.2.3.2 The SOAR database may include information from an airport sponsor’s capital improvement plan, but it does not guarantee funding. Similarly, the SOAR database may include numerical ratings of projects in the ACIP requesting financial assistance through the AIP. (The ACIP ratings are covered in Section 5.7.1.) These ratings, however, are not final determinations by the FAA and have no impact on the decision-making for PFC-funded projects. The raw data from these data sets (supporting both the NPIAS and ACIP, including quantitative project ratings) is deliberative—that is, the information is part of the FAA’s internal decision-making process, and so it is privileged from public disclosure.
1.3 What legislation is relevant to this Order? This Order is based on the NPIAS- and AIP-related provisions in 49 United States Code (U.S.C.) Chapter 471, the PFC-related provisions in 49 U.S.C. Chapter 401, and the regulatory provisions in 14 Code of Federal Regulations (C.F.R.) Parts 139, 150 158 and 1542.
1.3.1 Understanding legislative and regulatory references. Table 1-2 describes the formatting used in this Order for references to specific sections (§) of legislation and regulations.
Table 1-2 References to Sections (§) of Legislation and Regulation
Legislation (U.S.C.) Regulations (C.F.R.)
49 U.S.C. § 47101
The first two numbers indicate the chapter number.
U.S.C. = United States Code
§ = section
The numbers after § indicate the section number.
This reference, therefore, is to Chapter 49, U.S.C, Section 47101.
14 C.F.R. 123.321, or § 123.321
The first numbers indicate the section title
C.F.R. – Code of Federal Regulations
The numbers that follow C.F.R:
The numbers before and after the decimal indicate the section and subsection.
This reference, therefore, is Title 14 of the C.F.R., Part 123, Section 123.321.
Table 1-3 lists the legislative sources relevant to this Order.
Table 1-3 Legislation Relevant to this Order
Program Legislative Code Citation
The Airport Improvement Program
Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part B (Airport Development and Noise), Chapter 471 (Airport Development)
49 U.S.C. § 47101 through 47175 (Some sections in this range do not apply.)
The NPIAS Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part B (Airport Development and Noise), Subchapter I (Airport Improvement)
49 U.S.C. § 47103
Passenger Facility Charges
Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part A (Air Commerce and Safety), Subpart i (General)
49 U.S.C. § 40117
The Military Airport Program
Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part B (Airport Development and Noise), Subchapter I (Airport Improvement)
49 U.S.C. § 47118
The State Block Grant Program
Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part B (Airport Development and Noise), Subchapter I (Airport Improvement)
49 U.S.C. § 47128
Noise compatibility programs
Title 14 C.F.R. (Aeronautics and Space), Chapter I (Federal Aviation Administration, Dept. of Transportation), Subchapter I (Airports)
14 C.F.R. Part 150 Subparts A through C
Noise Title 49 U.S.C. (Transportation), Subtitle VII (Aviation Programs), Part B (Airport Development and Noise), Subchapter I (Noise Abatement)
49 U.S.C. § 47501 through 47507
Airport Security and Airport Security Programs
Title 49 C.F.R. (Transportation), Subtitle B (Other Regulations Relating to Transportation), Chapter XII (Transportation Security Administration, Department of Homeland Security), Subchapter C (Civil Aviation Security)
Rules governing the certification and operation of airports
Title 14 C.F.R. (Aeronautics and Space), Chapter I (Federal Aviation Administration, Dept. of Transportation), Part 139, Subchapter G (Certification of Airports)
14 C.F.R. Part 139 Subparts A through D
1.6 Referenced documents. › 1.6.2 Appendix D lists referenced documents and provides online links…
Program Legislative Code Citation
Passenger Facility Charges
Title 14 C.F.R. (Aeronautics and Space), Chapter 1 (Federal Aviation Administration, Dept. of Transportation), Subchapter I (Airports)
1.4 What FAA Office of Airports positions, offices, divisions, and branches does this Order reference? APP-1 refers to the Director of the Office of Airport Planning and Programming. Table 1-4 lists additional referenced offices, divisions, and branches. In this Order, ADO refers to the FAA Airports District Office that directly works with the sponsor. In regional offices that do not have ADOs, ADO refers to the FAA Office of Airports branch within the regional office that deals directly with the sponsors.
1.5 Supplemental guidance.
1.5.1 The FAA Office of Airports may issue additional guidance to supplement this Order and provide new or qualifying requirements.
1.5.2 For projects that involve block grant state sponsors, the ADO forwards the additional guidance to the appropriate contacts. See Advisory Circular 150/5100-21, State Block Grant Program.
1.6 Referenced documents.
1.6.1 The Order summarizes pertinent information from other sources, for example, statutes, regulations, FAA Orders, and guidance material when appropriate. In instances of possible discrepancies between the summaries and the source material cited, the original source always takes precedence. Readers should also check the most current versions of cited documents.
1.6.2 Appendix D lists referenced documents and provides online links for accessing them.
Table 1-4 FAA Office of Airports Office, Divisions, and Branches
Routing Code Office Name
AAS Office of Airport Safety and Standards
AAS-100 Airport Engineering Division
1.7 Limits to this Order. › 1.7.1 There may be paragraphs or definitions in this Order that…
Routing Code Office Name
AAS-300 Airport Safety and Operations Division
ACO Office of Airport Compliance and Management Analysis
ACO-100 Airport Compliance Division
APP Office of Airport Planning and Programming
APP-400 Airport Planning and Environmental Division
APP-500 Airports Financial Assistance Division
APP-510 Financial Analysis and Passenger Facility Charge Branch
APP-520 Airport Improvement Program Branch
ARP Office of Airports
ARP-1 Associate Administrator for Airports
ARP-10 Management Staff
AXX-600 Regional Division Director (Replace AXX with the applicable regional designation: AL, EA, CE, GL, NE, NM, SO, SW, or WP.)
1.7 Limits to this Order.
1.7.1 There may be paragraphs or definitions in this Order that conflict with Order 5100.38, Airport Improvement Program (AIP) Handbook, or FAA Order 5500.1, Passenger Facility Charge (PFC). In the event of such a conflict, the most recently issued language controls. The policy provided in this Order does not change policy or legislative requirements of either the AIP or PFC program, and to the extent there is a conflict, the most recent statutory or regulatory language controls. The policy is strictly for the purposes of planning airport development (referred to in this order as “development”) eligible for potential future funding through the AIP or PFC programs. The planning information provided through this process is also used to develop the NPIAS as required by 49 U.S.C. § 47103 and provide the details required by the FAA in preparing potential future funding through the AIP or the PFC programs.
1.9 General principles for using this Order. › 1.9.3 Regional Office Discretion.
1.7.2 For complete information on the AIP, see the current FAA Order 5100.38, Airport Improvement Program Handbook, on the Airport Improvement Program page of the FAA website.
1.7.3 For complete information on the PFC program, see the current FAA Order 5500.1, Passenger Facility Charge, on the PFC Program page of the FAA website.
1.8 What key terms are necessary for understanding this Order? Many words and phrases have specific, defined meanings within the context of this Order. Appendix A contains the definitions of terms used.
1.9 General principles for using this Order.
1.9.1 The FAA uses this Order for all projects funded under the AIP. The Order is the published policy required for airport development projects to be included in the NPIAS and ACIP. Except where options are specifically noted or where non-mandatory language (“should,” “may,” “desirable”) is used, the procedures and requirements are mandatory for FAA staff.
1.9.2 Requests to deviate from this Order. The Director of the Office of Airport Planning and Programming (APP-1) must approve any deviation from the procedures or requirements described. Send all requests for deviations to APP-1.
1.9.3 Regional Office Discretion. This Order has been developed to balance historical national policies and processes related to the NPIAS and ACIP with local concerns, to preserve flexibility for regional offices as needed. Regional offices have the latitude to establish local procedures as long as they meet the requirements of this Order (as well as statutory and regulatory requirements). Applying capital planning procedures consistently across the nation and the NAS safeguards federal investments and improves program efficiencies.
Page Intentionally Blank
2.2 What are the FAA’s goals for the Airport Planning Process? › 2.2.2 FAA priorities in administering the AIP.
CHAPTER 2. WHAT IS THE NPIAS-ACIP PLANNING AND FUNDING PROCESS?
2.1 Background.
2.1.1 Of the more than 19,000 private- and public-use landing areas in the U. S., about a third (26 percent) are open to the public. From these, the FAA identifies the public-use airports that are important to the national transportation system to include in the NPIAS. The NPIAS also identifies the type and cost of eligible development needed to improve these airports (and, in very limited instances, to build new ones) to meet the current and longterm needs of civil aviation.
2.1.2 Public-use airports in the NPIAS are eligible (with limited exceptions) for federal funds through the AIP. The FAA makes these investment decisions on the use of federal funding using structured selection criteria that help identify critical annual development needs within AIP funding levels. This annual internal process, which produces the ACIP, is used by the FAA to select projects for potential AIP funding. The ACIP allows the FAA to determine and fund the most critical airport development needs within AIP funding limits set by Congress through the authorization and appropriation processes. Commercial service airports may also qualify to apply to collect PFCs to fund airport capital projects through the Passenger Facility Charge Program.
2.2 What are the FAA’s goals for the Airport Planning Process?
2.2.1 Policy statements in authorizing legislation. The FAA’s authorizing legislation (codified in 49 U.S.C. Chapter 471) states that “it is the policy of the United States (1) that the safe operation of the airport and airway system is the highest aviation priority.” In accordance with statutory requirements, the FAA has established a planning process that emphasizes the following key areas to fulfill this policy:
Preserve existing airport infrastructure in a safe and functional operational condition
(if indeed that infrastructure is still needed to meet aeronautical demand).
Bring airport facilities into conformity with current standards (for facilities built
before current standards were in place).
Construct, modify, or expand facilities as necessary to meet demonstrated
aeronautical demand.
Enhance environmental sustainability.
Provide for a balanced system of airports that meet the roles and functions necessary
to support civil aeronautical demand.
2.2.2 FAA priorities in administering the AIP. In the administration of the AIP, the FAA gives the highest priority to projects that enhance safety and security at airports. Other major objectives are achieved by awarding
AIP funds to projects that maintain existing airport infrastructure and increase or maintain the capacity of existing facilities to accommodate increasing passenger and cargo demand. U.S. statutory provisions guide aviation policies that direct specific funding resources to achieve other ends:
2.3.2 The SOAR database. › 2.3.2.1 The SOAR database contains information on airport planning and…
Help minimize current and projected noise impacts.
Preserve and enhance capacity, safety, and security at primary and reliever airports.
Convert available former military air bases to civil use.
Support funding availability for nonprimary airports.
2.3 What is the National Plan of Integrated Airport Systems (NPIAS)? Per the requirements of Title 49 United States Code section 47103, the National Plan of Integrated Airport Systems (NPIAS) identifies existing and proposed airports that are considered significant to national air transportation and thus may be eligible to receive federal grants. The NPIAS is maintained by the FAA to assist in developing public-use airports by cataloging their unfunded needs. As required by law, the plan must specify the kind and estimated cost of the airport development considered necessary to provide a safe, efficient, and integrated system of public-use airports. This development must be adequate to meet the anticipated needs of civil aeronautics, the national defense requirements of the Secretary of Defense, and the United States Postal Service (49 U.S.C. § 47103).
2.3.1 Airport Improvement Program (AIP). The AIP provides grants to airport sponsors and public agencies for planning and developing public-use airports that are included in the NPIAS. In some cases, private owners and entities that the FAA has qualified as eligible sponsors receive AIP grants.
2.3.1.1 AIP eligibility. Project grant applications for AIP funding may only be proposed for public- use airports included in the NPIAS (49 U.S.C. § 47105(b)(2)). Project grant applications must comply with the parameters set forth in 49 U.S.C. § 47105(b) and project eligibility will be assessed in accordance with 49 U.S.C. Chapter 471. AIP eligible projects proposed to be funded outside the AIP and PFC programs, e.g., funded with state or local funds, should also be included in the NPIAS to provide a comprehensive view of the system needs.
2.3.2 The SOAR database.
2.3.2.1 The SOAR database contains information on airport planning and development for the approximate 3,300 existing and proposed airports the FAA has identified as important to national air transportation. The data is primarily obtained from the FAA’s annual requests for project information, airport inspections, and airport master plans and system plans that airport sponsors prepare (or have prepared by contracting with a planning consultant).
2.3.2 The SOAR database. › 2.3.2.3 Table 2-1 shows the relationship of the NPIAS timelines used…
The FAA reviews the sponsors’ data with a particular focus on the justification and timing of proposed development projects. Along with airport operators, sponsors include state and local planning agencies. The federally funded plans must be consistent with FAA forecasts of aeronautical activity, follow FAA guidelines, and be reviewed and accepted by FAA personnel familiar with local conditions.
2.3.2.2 Once a financial commitment is made to accomplish a development project (either through issuance of a grant, approval of an actual implementation date to begin PFC collections, or an agreement to fund through other sources), the project is no longer considered an unfunded need and is removed from the database’s estimates of needed development.
2.3.2.3 Table 2-1 shows the relationship of the NPIAS timelines used for planning. The X indicates the criteria that projects for which federal funding is sought must meet at various stages in the process. Project planning timelines are discussed further in Section 5.2. Near-term projects are included in the published NPIAS Report.
Table 2-1 Relationship of NPIAS to Airport Planning Timeframes
Criteria projects must meet at the
various stages in NPIAS-ACIP
Planning Process
NPIAS
Long Term
(11+ years)
Medium
Term
(6-10 years)
Near Term
(1-5 years)
Near Term ACIP
(1-3 years)
Eligible to be funded under AIP X X X X
Reasonable development for the airport to accomplish, with all pertinent preliminary activities (land acquisition, environmental analysis, Benefit-Cost Analysis, permitting, etc.)
N/A N/A X X
Justified by current use, forecasts, or design standards. Note: Justification will be verified by the FAA when assigning funding to a project (ACIP).
N/A N/A X X
2.4.2 Project inclusion. › 2.4.2.1 For a project to be included in the database, it must be…
2.3.3 Responsibilities.
2.3.3.1 The nine ARP regional offices are responsible for continuously maintaining their portion of the database, updating as new information becomes available. The minimum interval for making these updates is once a year, typically during the ACIP update cycle (see the informational NPIAS-ACIP planning calendar in Appendix C for typical update milestones).
2.3.3.2 APP-400 performs an annual review and a comprehensive review of the data once every two years in advance of the published report. The regions are notified in advance of the comprehensive review. Further information is in Appendix C.
2.3.4 Inclusion in the NPIAS. Chapter 3 discusses how the FAA identifies airports for inclusion in the NPIAS and the recommended development needed at NPIAS airports. Chapter 4 discusses how projects are planned and added to the database.
2.3.5 Publication of a Biennial NPIAS Report. Every two years, by the end of alternating fiscal years, the FAA publishes a report on the status of the national airport system that reflects each airport’s role in the system and identifies each airport’s proposed total development cost. The current report is available on the FAA Office of Airports website.
2.4 What is the Airport Capital Improvement Plan (ACIP)? The ACIP, a subset of the NPIAS, is a needs-based and financially constrained plan for funding development over a rolling 3-year period. (Rolling means that the start date of the 3-year term updates on a specific date every year so that the current year is the beginning of the term.) It serves as the basis for the distribution of AIP grant funds, and it emphasizes funding the highest priority projects. Chapter 5 provides additional information on the planning and composition of the ACIP.
2.4.1 Formulation of the ACIP. The FAA formulates the ACIP, with voluntary cooperation of airport sponsors, states, airport planning agencies, and metropolitan planning agencies, to guide the distribution of AIP funds based on the airport development identified in the database.
2.4.2 Project inclusion.
2.4.2.1 For a project to be included in the database, it must be eligible to receive AIP funding, even if a funding source has not been identified.
2.5.1.2 Uses of discretionary funding. › 2.5.1.2.1 Approximately two-thirds of discretionary funding is set…
2.4.2.2 Planned development regularly exceeds the available AIP funding for current and future years, and changes in airport operations or statutory requirements may impact the justification or eligibility of the proposed project.
2.4.2.3 The FAA, therefore, considers projects in the NPIAS as potential projects, making its investment decisions using structured selection criteria to identify critical development needs within AIP funding levels and limits set by the Congress. Through the annual ACIP process, the FAA systematically identifies, plans, and prioritizes airport planning and development projects for AIP funding to produce the Airport Capital Improvement Plan. Chapter 5 discusses how the FAA identifies, plans, and prioritizes projects in the ACIP.
2.5 What is the relationship between airport planning and funding programs? One of the products of airport planning is the Capital Improvement Plan (CIP), which identifies airport projects, defines funding requirements, and helps identify the applicable funding types. The FAA manages the AIP and PFC program to fund the qualified airport projects in CIPs.
2.5.1 Airport Improvement Program. As stated in Section 2.3, the AIP provides grants to airport sponsors and public agencies for planning and developing public-use airports that are included in the NPIAS. In some cases, private owners and entities that the FAA has qualified as eligible sponsors receive AIP grants.
2.5.1.1 Categories of funding. AIP funding splits into two categories and types of funding according to AIP legislation: apportioned funds (also known as entitlements) and discretionary funds. Apportioned funds are those designated under 49 U.S.C. § 47114, which are determined by formula and available to airport sponsors annually. Discretionary funds (49 U.S.C § 47115) are funds that remain after entitlement distributions and include a number of set-aside amounts for specific project types designated under 49 U.S.C § 47116 and 49 U.S.C § 47117.
2.5.1.2 Uses of discretionary funding.
2.5.1.2.1 Approximately two-thirds of discretionary funding is set aside for specific project types, such as noise mitigation and environmental projects, or airport types, such as airports in the Military Airport Program. The remainder is distributed to eligible projects based on project ranking and other factors. Specific details on the distribution of AIP funding are in Section 5.7. Further information on AIP funding categories is in the AIP Handbook.
2.5 What is the relationship between airport planning and funding programs? › 2.5.4 Airport planning process flowchart.
2.5.1.2.2 Programs and projects that may qualify to be funded under set-aside programs within the AIP, such as noise, environmental, Military Airport Program, or which are issued a Letter of Intent (LOI), must still be planned for within the NPIAS and ACIP to be eligible for AIP funding.
2.5.2 Passenger Facility Charge Program.
2.5.2.1 The PFC program authorizes a public agency to collect fees on paying passengers boarding an aircraft at a commercial service airport controlled by the public agency (49 U.S.C. § 40117(a) and 14 CFR 158.1). Public agencies use these fees to fund FAA-approved projects that preserve or enhance safety, security, or capacity, reduce noise, or enhance air carrier competition at airports the agency controls. PFC programs are authorized by 49 U.S.C. § 40117.
2.5.2.2 Most projects anticipated to be funded in whole or in part with PFCs are entered in the NPIAS if the project information is available and it is AIPeligible. Because airport public agencies may elect to use PFC funding for project elements as a development program progresses (or to reimburse projects undertaken previously), planning in advance for these projects in the NPIAS is not always possible. However, due to the number of projects that may eventually have both AIP and PFC funding, it is increasingly beneficial to have the project data in the consolidated NPIAS location.
2.5.3 AIP and PFC projects included in the NPIAS and the ACIP.
2.5.3.1 When should projects be entered or removed from the NPIAS and the ACIP? All unfunded AIP-eligible airport development projects should be included in the NPIAS to provide a comprehensive picture of development needs. Once a project has been funded with AIP, the projects are removed from the NPIAS. When the FAA approves PFC revenue for use on the project, the project is considered funded and removed from the NPIAS.
2.5.3.2 PFC projects are not included in the ACIP with exceptions. PFC projects generally are not included in the ACIP unless they are expected to be funded by a combination of PFC and AIP funds. Although a PFC project may be included in the ACIP, this does not grant the project a preference or priority when competing for AIP funding.
2.5.4 Airport planning process flowchart. Figure 2-1 and Figure 2-2 depict the NPIAS, ACIP, AIP and PFC actions that make up the airport capital planning process.
Figure 2-1 Airport Capital Planning Process Flow Chart – NPIAS
Figure 2-2 Airport Capital Planning Process Flow Chart – ACIP
3.2 What are the Airport categories used in the NPIAS? › 3.2.3 Airport categories defined in statute.
CHAPTER 3. HOW ARE NPIAS AIRPORTS CATEGORIZED AND SELECTED?
3.1 How are airports categorized in the NPIAS?
3.1.1 Approximately 65 percent of all public-use airports (roughly 3,300 airports) are included in the NPIAS. To help define the role of NPIAS airports, the airports are categorized based on aviation activity, geography, and public-interest measures.
3.1.2 Each year, APP-400 reviews the airports to determine if an airport meets the statutory definition of primary and nonprimary commercial service, and then makes appropriate adjustments the database to service level and hub classifications. The FAA publishes a list of commercial service airports annually on its website.
3.1.3 Every two years, in preparation for the publication of the NPIAS Report, APP-400 reviews the activity data for all NPIAS airports to determine if adjustments to an airport’s category are required. A critical component of this review is based aircraft data. Airport sponsors should maintain an accurate list of aircraft based at their airport on the FAA- supported website, BasedAircraft.com. Each airport’s aircraft list is validated against the FAA Aircraft Registry on a continuous basis.
3.2 What are the Airport categories used in the NPIAS?
3.2.1 Public Airport.
3.2.1.1 A public airport is an airport used or intended to be used for public purposes that is under the control of a public agency with the landing/takeoff area and the surface maneuvering area also publicly owned (49 U.S.C. § 47102(21)).
3.2.1.2 A public agency is a state, or a political subdivision of a state (e.g., county or local government, or a governmental agency established by a state), a tax supported organization, or an Indian tribe or pueblo (49 U.S.C. § 47102(20)).
3.2.2 Public-Use airport. A public-use airport is a public airport or a privately owned airport used for public purposes. Privately owned, public-use airports could be a reliever airport, or an airport determined by the Secretary of Transportation to have scheduled air carrier service with at least 2,500 passenger boardings a year (49 U.S.C. § 47102(22)).
3.2.3 Airport categories defined in statute. Airport categories in the NPIAS as defined in statute are shown below. Table 3-1 provides additional information on category criteria.
Commercial Service – publicly owned airport that has at least 2,500 annual
passenger boardings each calendar year and scheduled passenger service (49 U.S.C.
§ 47102(7)). Commercial service airports fall into two major categories: primary and nonprimary commercial service.
o Primary – a commercial service airport with more than 10,000 annual passenger
boardings (49 U.S.C §47102(16)). Primary airports comprise large, medium and small hubs as well as non-hub airports.
o Nonprimary – a public-use airport that provides scheduled commercial service to
between 2,500 and 10,000 passengers a year.
Reliever – an airport the Secretary of Transportation designates to relieve
congestion at a commercial service airport and to provide more general aviation access to the overall community (49 U.S.C. § 47102(23)).
General Aviation – a public-use airport that is located in a state and that, as
determined by the Secretary, does not have scheduled service or has scheduled service with less than 2,500 passenger boardings each year (49 U.S.C. § 47102(8)).
Table 3-1 Airport Categories
Airport Categories Criteria Known as:
Commercial Service
Public-owned airports with more than 2,500 annual enplanements (passenger boardings) and scheduled air carrier service
N/AN/A
Large Hub Receives 1% or more of the annual U.S. commercial enplanements Primary
Medium Hub Receives 0.25 to 1.0% of the annual U.S. commercial enplanements Primary
Small Hub Receives 0.05 to 0.25% of the annual U.S. commercial enplanements Primary
Nonhub Receives less than 0.05% but more than 10,000 of the annual U.S. commercial enplanements Primary
Nonprimary Commercial Service
Also referred to as nonhub nonprimary, these airports have scheduled passenger service and between 2,500 and 10,000 annual enplanements.
Nonprimary
Reliever
An airport designated by the Secretary to relieve congestion at a commercial service airport and to provide more general aviation access to the overall community.
Nonprimary
General Aviation
A public-use airport that does not have scheduled service or has scheduled service with less than 2,500 passenger boardings each year.
Nonprimary
3.2 What are the Airport categories used in the NPIAS? › 3.2.4 Nonprimary airport categories.
3.2.4 Nonprimary airport categories. The FAA has established categories for nonprimary airports serving mainly general aviation aircraft. Included in the nonprimary category are the airports eligible for Nonprimary Entitlement funding: Nonprimary Commercial Service, Reliever, and General Aviation airports. The types and characteristics of nonprimary general aviation airports are described in Table 3-2.
Table 3-2 Nonprimary Airport Categories
If a nonprimary
airport is classified as:
It fulfills this role in the system: And meets one of the following minimum
criteria for annual activity:
National Supports the national airport system by providing communities access to national and international markets throughout the U.S. National airports have very high levels of aviation activity with many jets and multiengine propeller aircraft.
5,000 or more instrument operations, 11 or more validated based jets and 20 or more international flights or 500 or more interstate departures; or
10,000 or more enplanements and at least 1 carrier enplanement by a large certificated air carrier; or
500 million pounds or more of landed cargo weight.
Regional Supports regional economies by connecting communities to regional and national markets. Located in metropolitan areas serving relatively large populations. Regional airports have high levels of activity with some jets and multiengine propeller aircraft
In a Metropolitan or Micropolitan Statistical Area, 10 or more domestic flights over 500 miles, 1,000 or more instrument operations, and 1 or more validated based jet or 100 or more validated based aircraft; or:
Nonprimary commercial service airport (requiring scheduled service) within a Metropolitan Statistical Area; or
Currently designated by the FAA as a Reliever with 90 or more validated based aircraft.
Local Supports local communities by providing access to markets within a state or immediate region. Local airports are most often located near larger population centers, but not necessarily in metropolitan or micropolitan areas. Most of the flying at local airports is piston aircraft in support of business and personal needs. These airports typically accommodate flight training, emergency services, and charter passenger service.
Public owned and 10 or more instrument operations and 15 or more validated based aircraft.
Public owned and 2,500 or more annual enplanements.
3.3 What are the initial screening requirements for a facility to be… › 3.3.1 Entry into the NPIAS is based on quantitative and qualitative factors.
If a nonprimary
airport is classified as:
It fulfills this role in the system: And meets one of the following minimum
criteria for annual activity:
Basic Provides a means for general aviation flying and links the community to the national airport system. These airports support general aviation activities such as emergency response, air ambulance service, flight training, and personal flying. Most of the flying at basic airports is self-piloted for business and personal reasons using propeller-driven aircraft. They often fulfill their role with a single runway or helipad, and minimal infrastructure.
Public owned with 10 or more validated based aircraft, or 4 or more validated based helicopters if a heliport.
Public owned located 30 or more miles from the nearest NPIAS airport.
Owned or serving a Native American community.
Identified and used by the U.S. Forest Service, U.S. Marshals, U.S. Customs and Border Protection (designated, international, or landing rights), U.S. Postal Service (air stops), or has Essential Air Service.
A new or replacement public owned airport that has opened within the last 10 years.
Unique circumstances related to special aeronautical use.
Unclassified Currently in the NPIAS but with limited activity and may not meet the essential airport attributes in Table 1-1. If the next review of an unclassified airport’s activity shows levels that meet the criteria for one of the classifications, that airport will be reclassified in the next published NPIAS.
N/A
3.3 What are the initial screening requirements for a facility to be considered for inclusion in the NPIAS?
3.3.1 Entry into the NPIAS is based on quantitative and qualitative factors. Quantitative data include the level of scheduled commercial service, number of revenue passenger boardings (enplanements), itinerant take-offs/landings (operations that arrive from outside the airport area or depart and leave the area), instrument approaches, and based aircraft. Qualitative factors include type of ownership (public or private), ability of the airport to meet the critical grant assurances (e.g., number 2 and 4), remoteness of the location, distance of travel to a comparable facility, type of traffic supported, and other available means of travel. The initial screening requirements for inclusion in the NPIAS are presented in Table 3-3; other factors the FAA considers are in Table 3-4.
Table 3-3 Initial Screening Requirements for a Facility to be Considered for
Inclusion in the NPIAS
Type of Airport Screening Requirement
An existing airport meeting the definition of a commercial service airport must be included in the NPIAS.
The airport must be publicly owned, publicly accessible, have scheduled air carrier service, and 2,500 or more annual passenger boardings.
An existing public-use general aviation airport or seaplane base must satisfy ALL the screening requirements at the time of request to be considered for inclusion.
Operated by a sponsor eligible to receive federal funds and meet obligations.
Used by 10 or more operational and airworthy aircraft based on the airport. The aircraft tail numbers must be provided and validated against the FAA Aircraft Registry.
Located at least 30 miles from the nearest NPIAS airport. The 30-mile calculation must consider all existing NPIAS airports within a 30-mile radius, even if it is in an adjacent state.
Demonstrates an identifiable role in the national system (such as a basic, local, regional, or national).
Included in a state or territory aviation system plan with a role similar to the federal role, and recommended by the airport’s state or territory aviation authority to be a part of the NPIAS.
A review by the FAA finds no significant airfield design standard deficiencies, compliance violations, or wetland or wildlife issues.
An existing public-owned airport that does not meet all of these criteria may be considered for inclusion using a “special justification” that it fulfills a unique role in the national system as identified in Table 3-2 under Basic (e.g., an isolated community, Native American). The airport would be considered Unclassified until it can meet the criteria for a role as shown in Table 3-2.
A public-owned airport that is co-located with a commercial space transportation facility may be considered for inclusion if the airport’s activities not related to space transportation (such as its based aircraft, annual operations, and types of aircraft operations) meet the NPIAS entry criteria. If an airport with commercial space activities is included in the NPIAS, commercial space related development is not eligible for AIP funding.
Type of Airport Screening Requirement
An existing public-use airport requesting inclusion as a reliever airport must satisfy ALL the screening requirements at the time of request to be considered for inclusion:
Operated by a sponsor eligible to receive federal funds and obligations.
Used by 100 or more operational and airworthy aircraft based on the airport property. The aircraft tail number must be provided and validated by the FAA against the FAA Aircraft Registry.
Relieves a large- or medium-hub airport that is operating at 60% or more of its capacity. The number of existing relievers already designated for the large- or medium-hub will be taken into account.
Demonstrates an identifiable role in the national system (such as national or regional) and submits information confirming the candidate airport’s ability to fulfill that role (e.g., feasibility to develop facilities to accommodate jets, compatible land-use, and available resources to maintain and improve the facility).
Included in a state system plan with a role similar to the federal role and recommended by the airport’s state or territory aviation authority to be a part of the NPIAS.
A review by the FAA finds no significant airfield design standard deficiencies, compliance violations, or wetland or wildlife issues.
Privately owned public-use airports may be considered for inclusion in the NPIAS if the FAA determines the airport meet all the reliever criteria identified above and serves a demonstrated critical role in the national system.
Type of Airport Screening Requirement
A proposed commercial service or general aviation public airport (replacement, supplemental, or additional) must provide evidence it will satisfy the criteria as shown in Table 3-2 and meet these additional requirements.
Demonstrates how the airport will meet the operational activity required (through a forecast validated by the FAA) within the first 5 years of operation. The operational activity at the new airport should not be based on attracting existing demand from other airports, unless there is a demonstrable deficiency in safety or standards at these other airports.
Provides enhanced facilities that will accommodate the current aviation activity and improve functionality as well as provide room for future development based on imminent justified demand.
Shows a Benefit-Cost Analysis rating of 1.0 or more. (Information on when and how to conduct a Benefit- Cost Analysis is in FAA Order 5100.38, Airport Improvement Program Handbook, and FAA Airport Benefit-Cost Analysis Guidance.)
Presents a detailed financial plan for the proposed airport to accomplish its construction and ongoing maintenance.
Level of local support/consensus is adequate to achieve the development of the new airport.
A proposed public-owned airport that does not meet all of the criteria may be considered for inclusion using a “special justification”; if it can demonstrate that, it will fulfill a unique role in the national system as identified in Table 3-2 (e.g., an isolated community, Native American).
An existing public-owned public-use heliport may be considered for inclusion in the plan if it makes a significant contribution to public transportation. It must satisfy these criteria at the time of request.
Operated by a sponsor eligible to receive federal funds and meet obligations.
Used by 4 or more operational and airworthy rotorcraft based at the heliport for at least 2 years prior to this request and 400 annual IFR Flights.
Be part of the state airport system plan.
Note: Private use heliports or special service heliports that primarily provide community services such as police patrol, traffic surveillance, or air ambulance transportation are not included in the NPIAS.
3.3 What are the initial screening requirements for a facility to be… › 3.3.2 The FAA, in its charge of the AIP, has the authority to identify…
3.3.2 The FAA, in its charge of the AIP, has the authority to identify factors when considering admitting an airport into the NPIAS to assure entry is in accordance with the statutory requirements “to provide a safe, efficient, and integrated system of public-use airports” (49 U.S.C. §47103(a)). Table 3-4 lists factors the FAA has considered and may consider in its administration of entry into the NPIAS.
Table 3-4 FAA Considerations in Reviewing NPIAS Entry Requests
Condition Considerations
For all candidate airports, can the sponsor demonstrate:
How financially self-reliant is the airport and how much reliance on federal funding does it anticipate?
Would any issues prevent the airport from accepting a grant (grant obligations) and complying with federal obligations?
Does the airport meet minimum federal design and safety standards?
What are the historic trends for the airport and community that it would serve (i.e., population, activity)?
Are the aircraft owners or users a diverse aeronautical group (i.e., majority of aircraft owned by one user that could lead to potential compliance issues)?
How many NPIAS airports are within a 30-mile radius of the airport requesting entry and what are their roles?
What is the airport’s potential federal role in the NAS: National, Regional, Local, or Basic airport?
Are there existing conditions (ownership, lease agreements, non-aeronautical activity on airport owned property, etc.) that would render the airport noncompliant?
Is there a special justification or unique purpose other than those identified in Table 3-3?
Can the proposed airport sponsor demonstrate that the airport has these characteristics?
o Safe and efficient?
o Developed and maintained to appropriate standards?
o Expandable and reasonably affordable to maintain and develop?
o Able to meet increased demand and accommodate new aircraft types?
o Permanent, with assurance that it will remain open for aeronautical use over the long term?
o Compatible with surrounding communities, maintaining a balance between the needs of aviation, the environment, and the requirements of the airport’s neighboring residents?
Condition Considerations
If this is a proposed airport (not yet constructed), can the proposed airport sponsor demonstrate:
3.3.5 Proposed new airports (replacement, supplemental, or additional);… › 3.3.5.2 The FAA has established a process for considering inclusion of…
How the airport will meet the operational activity criteria required for a proposed airport within the first 5 years of operation (through a forecast validated by the FAA)?
How the airport will meet unmet aviation demand without attracting existing demand from other airports, unless there is a demonstrable deficiency in safety or standards at the other airports?
3.3.3 Commercial service airports. All commercial service airports (see 3.2.3) must be included in the NPIAS. This applies to both primary and nonprimary commercial service airports. See Table 3-1 and Table 3-2 for a description of airport types in the NPIAS.
3.3.4 Nonprimary airports. Nonprimary airports (excluding those defined as commercial service) must be approved by the FAA at the ADO, regional, and headquarters level for inclusion in the NPIAS. The airport must meet all the criteria in Table 3-3 before it can be considered for inclusion.
3.3.5 Proposed new airports (replacement, supplemental, or additional); also referred to as “Planning placeholders”.
3.3.5.1 A proposed airport, also referred to as a “planning placeholder” for planning purposes, is one identified as a potential location for a future replacement, supplemental or additional airport which may or may not be built. Planning placeholders are identified as “New” in SOAR and the published NPIAS Reports.
3.3.5.2 The FAA has established a process for considering inclusion of planning placeholders in the NPIAS.
The ADO or regional office must notify APP-400 as soon as the ADO or
regional office becomes aware that a new airport is being considered and must update APP-400 regularly during the entire process.
When considering adding a new or replacement airport to the NPIAS,
the FAA must review the airport’s forecast activity and operations, intended role in its state system plan, required infrastructure, proximity to other federally funded airports, ability to comply with federal obligations, and eligibility of its proposed airport sponsor.
A proposed airport sponsor may undertake a feasibility study to examine
replacing a NPIAS airport without the FAA adding the proposed new airport to the NPIAS. APP-400 must review and concur with the need for the study prior to issuing any federal funding for a study. Upon
completion of the draft study, APP-400 must receive a copy for review and comment.
3.4 What if an airport no longer qualifies for the NPIAS? › 3.4.2 The AIP statute defines four types of projects that may be funded…
The airport must meet all the requirements in Table 3-3 before it can be
considered for inclusion as a new airport or for replacing an airport in the NPIAS, and it must have the support of the state or territory aviation authority or the state’s transportation agency or entity, as applicable. Support is defined as being included in the state aviation system plan. Before a new airport is added to the NPIAS, it must be approved by the Region Division Director and APP-1.
NPIAS airports that are to be replaced shall obtain approval for the
release of the old airport from outstanding federal obligations, including how the federal share will be reinvested, per the current version of the FAA Order 5190.6, Airport Compliance Manual.
3.3.5.3 Accepting a proposed site (planning placeholder) in the NPIAS does not represent actual approval of the proposed new airport, from either an airspace or environmental standpoint. It also does not represent any financial commitment related to AIP grants or PFC funds. After 5 years of inactivity, the FAA will revalidate the continued need for the new airport (planning placeholder) in the national plan.
3.4 What if an airport no longer qualifies for the NPIAS?
3.4.1 Once in the NPIAS, airports are not generally re-evaluated for continued inclusion. Their activity levels, however, are reviewed to verify their classification. In certain circumstances, such as a change in ownership or public accessibility, the FAA may reconsider an airport’s NPIAS inclusion or put restrictions in place on the types of AIP funding for which the airport might otherwise qualify.
3.4.2 The AIP statute defines four types of projects that may be funded at unclassified airports using only state apportionment funding (49 U.S.C. 47106(a)(7)). Specifically, the FAA may fund the following projects:
maintenance of the pavement of the primary runway;
obstruction removal for the primary runway;
rehabilitation of the primary runway; or
a project that the Secretary considers necessary for the safe operation of the airport.
3.4.3 Airports not meeting the minimal activity defined in Table 3-3 may remain in the NPIAS as “Unclassified” until they meet the NPIAS entry criteria and can be classified. The FAA may remove an Unclassified airport from the NPIAS if the airport is within 30 miles of another NPIAS airport and the sponsor is incapable of accepting or maintaining any new grant assurance obligations. The FAA will consult with the state or territory aviation agency before making a final determination. Activity information (as described in Table 3-2) is reviewed and validated by the FAA annually. It is the airport’s responsibility to ensure that at a minimum their based aircraft counts are accurate as reflected in their Airport Master Record (FAA Form 5010-1).
3.5.2 Existing airports. › 3.5.2.2 An airport sponsor requesting inclusion must also submit the…
3.5 How does an airport request an FAA review for potential inclusion in the NPIAS?
3.5.1 Submit a request for entry. Proposed airport sponsors submit a request for entry through the ADO or regional office, along with the required documentation to demonstrate how the airport meets the entry criteria described in Table 3-3. A standard template identifying the required information is available for this purpose, which the ADO or regional office can request from APP-400.
3.5.2 Existing airports.
3.5.2.1 Airport sponsors of existing non-NPIAS airports must submit a request demonstrating that the airport meets the entry criteria shown in Table 3-3 and the factors in Table 3-4. They may also submit other documentation they feel is relevant.
3.5.2.2 An airport sponsor requesting inclusion must also submit the following information to the ADO or regional office:
An opinion from the proposed airport sponsor’s attorney as to the legal
authority of the proposed airport sponsor to act as an eligible and qualified sponsor and carry out its responsibilities under the AIP statute.
A narrative describing the airport and its projected benefit to the
National Airspace System (NAS).
An existing conditions report or summary.
Its short-term (5-year) aviation activity forecast.
Enter all the operational and airworthy aircraft in the FAA-sponsored
website, BasedAircraft.com. The aircraft are validated against the FAA Aircraft Registry.
A description of what role the airport will fulfill, initially and in the long
term.
3.5.3 Proposed new airports (Planning Placeholders). › 3.5.3.3 If the purpose of a proposed airport is to replace an existing…
3.5.3 Proposed new airports (Planning Placeholders).
3.5.3.1 An airport sponsor of a proposed airport must submit to the ADO or regional office the items referenced in Table 3-3 for a proposed airport, along with a narrative describing the proposed airport, the reason for the request (replacement, new, supplemental), its projected benefit to the NAS, and address the factors in Table 3-4.
3.5.3.2 This narrative must also meet these requirements:
Confirm the proposed airport is for public-use and publicly owned.
Describe the role the proposed airport is intended to fulfill (National,
Regional, Local, or Basic).
Identify if the proposed airport is included in a state system plan and
recommended for inclusion in the NPIAS. If not included, does it have the support of its state aviation authority or state transportation agency or entity, as applicable?
Include a map showing surrounding NPIAS airports and explain how the
proposed airport will enhance the local as well as national system of airports.
Detail and highlight additional considerations such as:
Identifying that no obstructions exist in the traffic pattern,
Showing that approach/departure surfaces are clear,
Describing how the airport will be able to meet the FAA’s Airport
Design Standards,
Showing that land will be owned fee simple,1
Verifying that the airfield can meet 95% or more wind coverage, and
Proving how future growth can be accommodated.
3.5.3.3 If the purpose of a proposed airport is to replace an existing NPIAS airport that is unable to meet the current and future demand, then the existing obligated airport must close. (See Section 3.6.2.1 for more information about closure requirements for federally obligated airports.) In addition to NPIAS requirements, the closure also must conform to the requirements contained in
1 The AIP Handbook states, “The sponsor should normally acquire the fee simple interest in land needed to construct or protect airport use or development.” However, the Handbook also provides that, “Some lesser property interest may be acquired if that interest is legally sufficient for the purpose of the project or the acquisition is to a lesser property interest by a court order.”
3.6.1 What if an airport no longer wants to be in the NPIAS? › 3.6.1.1 Requesting removal from the NPIAS.
FAA Order 5190.6, Airport Compliance Manual, regarding the airport sponsor’s federal obligations.
3.5.3.4 The proposed airport sponsor may need to provide additional information on request.
3.5.4 How does the FAA evaluate NPIAS entry requests?
3.5.4.1 The FAA reviews the information at the ADO, regional, and headquarters levels. It assesses the information submitted and considers the type of airport and the factors listed in Table 3-3 and Table 3-4 using the established screening requirements to determine the airports that best serve the national interest. APP-400 leads the headquarter review, coordinating it with ACO, AAS, and APP-520. This may be a lengthy process.
3.5.4.2 The ADO and regional office evaluate the written request from the proposed airport sponsor. If the submission has merit and the ADO and regional office support the inclusion of the facility in the NPIAS, the package is sent to APP- 400 for headquarters review and coordination.
APP-400 reviews the entry request, and asks for additional clarification
from the ADO and regional office, if needed. If acceptable, APP-400 coordinates with appropriate ARP offices before submitting the request to APP-1 for final review and approval. If the submission is not acceptable, APP-400 provides a written explanation.
APP-1 reviews and approves/disapproves the request. The ADO or
regional office notifies the proposed airport sponsor of the decision. Only the FAA can approve an airport’s inclusion in the federal plan.
After 5 years of inactivity, the FAA will revalidate the continued need
for the new airport (planning placeholder) in the national plan.
3.6 What are the criteria for withdrawal from the NPIAS?
3.6.1 What if an airport no longer wants to be in the NPIAS?
3.6.1.1 Requesting removal from the NPIAS. A nonprimary airport that is in the current published National Plan of Integrated Airport Systems (NPIAS) may request removal from the NPIAS. The airport sponsor may initiate a request for the airport to be removed from the NPIAS. The airport sponsor must coordinate with the state aeronautical agency and the ADO. The FAA’s ADO and Region will coordinate with the Office of Airport Planning and Programming (APP) to perform an accurate and credible assessment of an airport prior to concurring it should be removed from the NPIAS.
3.6.1.1 Requesting removal from the NPIAS. › 3.6.1.1.1 Airport sponsor responsibilities.
3.6.1.1.1 Airport sponsor responsibilities. The airport sponsor requesting removal from the NPIAS must provide the following documentation to the ADO2 in one complete package.
1. Written statement on Facts and Circumstance - the written statement, supported by facts and documentation, should describe the circumstances that justify the request to remove the airport from the NPIAS. The written statement should include:
A written request for removal signed by the authorized
representative of the airport sponsor.
The reason for the removal request, including the facts and
circumstances that justify the request.
The present condition and present use of any property or facilities.
Statement from at least one individual from the requesting airport
sponsor certifying that the airport is not currently subject to federal obligations.
A description of how the sponsor acquired or obtained the
property.
A description of any notations on additional land holdings and land
use.
2. An airport with federal obligations3 seeking removal from the NPIAS must submit the documentation identified above in Item 1, in addition to the following information:
List of all AIP funded grants (from FAA, state, etc.).
Current and active obligations.
Statement justifying removal from NPIAS.
Statement explaining plans for compliance with ongoing federal
obligations.
3. Assessment of the Written Statement from State Aviation Authority - For classified airports, the State Aviation Authority may provide a
2 In this process, the FAA Airports District Office (ADO) assigned to oversee the airport subject to the removal request will be the designated as the local oversight office. In cases where the airport is located in a block grant state, the airport may coordinate with the state aeronautical agency as well. However, the FAA ADO with oversight over the applicable state’s block grant program will be the designated local oversight office and the airport must ultimately submit its request for NPIAS removal directly to the FAA. 3 However, if the airport is federally obligated and wishes to be released from those obligations, then there is a separate process prescribed by the Office of Airport Compliance (ACO). See relevant section(s) of the current version of FAA Order 5190.6, Airport Compliance Manual.
3.6.1.1 Requesting removal from the NPIAS. › 3.6.1.1.2 FAA role.
statement supporting the removal of the airport from the NPIAS and indicating how the airport will be reflected in the next update of the state aviation system plan.
3.6.1.1.2 FAA role. The FAA will review the airport sponsor’s claim that there are no federal obligations. It will also supplement the airport sponsor’s package with the following information:
1. General airport information and proximity to other airports - The FAA will identify all public-use airports within a 30-mile radius of the airport seeking removal (regardless of state borders) and will compile specific information on each airport:
Airport name and sponsor.
Current NPIAS airport. (Yes/No)
Driving Distance (miles) to airport requesting removal.
Nonprimary Airport Role (per most recent two published NPIAS
reports).
Physical infrastructure (runways and meet design standards).
Summary of activity levels including based aircraft, operations,
and community service provided.
2. The airport’s current and historical role in the system.
An unclassified airport requesting removal must meet the
following criteria:
o Must have been identified by the FAA as Unclassified for a minimum of four consecutive years (last two NPIAS Reports).
o Does not support a critical function in the national airport system.
A classified airport requesting removal must meet all of the
following criteria.
o Must have had declining aeronautical activity at the airport over the last 10 years and is now classified as Local or Basic.
o Does not support a critical function in the national airport system.
o Does not serve an irreplaceable role in the NAS and NPIAS. To demonstrate the airport is replaceable and its services and facilities are replicable, the airport must submit supporting documentation.
3.6.2.2 Non-federally obligated NPIAS airports. › 3.6.2.2.1 If a NPIAS airport is not federally obligated and wishes to…
3.6.1.1.3 Review process.
The ADO, regional, and headquarters (APP) offices will conduct a
thorough review of the information submitted and will assess whether the airport is a viable candidate for removal from the NPIAS. The assessment will include relevant input from the appropriate Regional Directorate and the Office of Airports, Airport Safety and Standards Directorate, to assure necessary safety measures are included.
The review team will provide its assessment to the Director of the Office
of Airports, Airport Planning and Programming Division (APP-1). The assessment will include a recommendation based on whether the proposed removal from the NPIAS can be accomplished, if there are any safety implications, and what the impact will be on the remaining system of airports (for example, whether the system can absorb the removal without undue stress).
3.6.1.1.4 APP planning determination for removal from NPIAS.
The Final APP Determination will depend on the role of the airport and
proposed future use, which may include conditional approvals. The FAA generally will not consider removal of a NPIAS airport that serves a unique role (e.g., serving a remote area or supporting critical functions), especially if there is no comparable alternative within its vicinity or if the airport is classified as either a National or Regional airport in the current published NPIAS report.
An airport sponsor will be notified of the APP Determination by the
Director of the Office of Airport Planning and Programming. If the FAA determines that the request is contrary to the public interest and therefore the agency cannot grant the request, APP-1 through the FAA’s ADO or regional airports division will advise the airport sponsor in writing of the denial.
3.6.2 What if a NPIAS airport wants to close?
3.6.2.1 Federally obligated airports. Federally obligated airports are those that have accepted federal assistance, either in the form of grants or property. Each type of obligation carries specific requirements. An airport may be obligated in more than one way. To request closing a federally obligated airport (this includes an airport that is being replaced, see Section 3.3.5), airport sponsors must follow the requirements contained in the current version of FAA Order 5190.6, Airport Compliance Manual, and any applicable Compliance Guidance Letters.
3.6.2.2 Non-federally obligated NPIAS airports.
3.6.2.2.1 If a NPIAS airport is not federally obligated and wishes to close, airport sponsors must provide a written request (after coordination with the
3.7 Are commercial space transportation facilities eligible for NPIAS… › 3.7.2 For information on the licenses required to operate a commercial…
designated state aeronautical agency) to the appropriate ADO or region for review and coordination. The request must provide information listed in Section 3.6.1.1.1(1), including the justification for closure, the anticipated impact on local, state, and national aeronautical activity, and the disposition of current users (i.e., the options that aeronautical users would have following the closure).
3.6.2.2.2 This process is necessary because even though the airport is not obligated, the FAA would still need to make an informed determination regarding the airport’s role in the national air transportation system (consistent with 49 U.S.C. §47103(a)).
3.6.2.2.3 Each request will be reviewed on a case-by-case basis. The FAA will review the information at the ADO, regional, and headquarters levels.
3.6.2.2.4 Once the FAA has made a determination, the remaining steps are:
The airport owner must submit a written request to the ADO along with
FAA Form 7480-1, Notice for Construction, Alteration and Deactivation of Airports, at least 90 days before deactivation so that the FAA may complete its review of the proposed closure. Form 7480-1 is accessible from Airports Forms page of the FAA website.
The FAA must publish a Notice of Permanent Closure in the Federal
Register (in accordance with 49 U.S.C. 46319(b)) and provide the date of official closure.
3.7 Are commercial space transportation facilities eligible for NPIAS inclusion?
3.7.1 Currently, there is no functional requirement to co-locate public-use airports and commercial space launch facilities. Sponsors proposing commercial space launch facilities on or adjacent to a public-use airport should contact APP-400 for guidance.
A public-owned airport that is co-located with a commercial space transportation
facility may be considered for inclusion in the NPIAS if the non-launch related aeronautical activity levels meet the NPIAS entry criteria outlined in this chapter.
Facilities that are not co-located with a public-owned airport and only support
spacecraft launch and recovery are not eligible to be in the NPIAS.
3.7.2 For information on the licenses required to operate a commercial space launch site, see 14 C.F.R. Part 420, Chapter III – Commercial Space Transportation, Federal Aviation Administration, Department of Transportation. (Legislation - Commercial Space Launch Act, 51 U.S.C. Ch. 509, §§ 50901-23 (2011)).
Page Intentionally Blank
4.1.2.3 States. › 4.1.2.3.1 A state’s airport system plan can determine how funding is…
CHAPTER 4. HOW IS THE NPIAS PLANNED?
4.1 Planning.
4.1.1 What is the FAA’s planning process for eligible airport development? Identifying the development needed to maintain the national airport system is derived from locally prepared airport master plans, state system plans, and capital improvement plans (CIPs). Each of these types of plans is discussed in this chapter. These planning documents consider all significant aviation requirements along with the current use, condition, and forecast activity of each airport.
4.1.1.1 Responsibilities.
FAA field offices review the locally prepared planning documents,
which follow a standard format specified in advisory circulars.
The FAA collaborates with airports to enter their eligible development
needs for the next 10 years into the NPIAS.
The FAA reviews the projects identified in the NPIAS to prioritize and
allocate AIP funding for development and track PFC funding. This process is described in Sections 4.1.8, 5.3, 5.4, 5.6, and 5.7.
4.1.2 Who needs to plan? The following sponsors, agencies, and other entities should incorporate planning into their development process.
4.1.2.1 Airport sponsors. Airport sponsors must have the legal authority and financial capacity to meet all federal requirements necessary to initiate an AIP funded project.
4.1.2.2 Local and regional planning agencies. These are entities usually authorized by state or local laws to engage in metropolitan area airport system planning. They include Metropolitan Planning Organizations (MPOs), Councils of Government, and Regional Planning Commissions.
4.1.2.3 States.
4.1.2.3.1 A state’s airport system plan can determine how funding is prioritized; provide information to make aviation planning and development decisions consistent with its state goals and objectives; and provide overall policy guidance and direction to individual airports, MPOs, and multi-state planning efforts. States can also provide the FAA with recommendations and supporting justification for inclusion of airports and projects in the NPIAS, address special studies on pertinent airport related issues, and support a continuing airport planning process. States vary in the level of airport planning, development, and regulation that they undertake. States with less
4.1.2 Who needs to plan? › 4.1.2.7 Co-sponsors.
involvement in their airports may have basic system plans, identifying airport roles, defining broad recommendations of project development, and providing justification and priorities for state funding.
4.1.2.3.2 States participating in the State Block Grant Program (49 U.S.C. § 47128) receive block grants through the FAA for airport master planning and development projects at eligible nonprimary airports in the state. The state then becomes the State Block Grant Sponsor.
4.1.2.4 State aviation authorities. State aviation authorities, state transportation agencies, or entities, as applicable, may also serve as the sponsor for one or more airports in the state for development and planning projects. Within the NPIAS, the work sponsored by the state is categorized by the airport, similar to that of nonblock grant states.
4.1.2.5 Public agencies. A public agency can be a state or a political subdivision of a state, a taxsupported organization, or an Indian tribe or pueblo.
4.1.2.6 Public agencies not controlling airports. Public agencies (cities, counties, authorities, or other entities) that do not currently control an airport, but are in the planning stages of acquiring or constructing a public-use airport, are recognized under AIP. They may not yet qualify, however, to be a sponsor for development purposes.
4.1.2.7 Co-sponsors. The FAA has determined that public agencies, either independently or jointly, meet the sponsorship requirements. When public agencies act as co-sponsors to propose a project or CIP, the ADO agrees to the co-sponsorship by issuing the grant. Each of the co-sponsors is individually bound to the terms and conditions of the grant agreement unless their respective rights and obligations with respect to an approved AIP project are otherwise set forth in a written agreement. The AIP Handbook provides specific details on how to establish the agreement between co-sponsors.
4.1.2.8 Airports in the Airport Investment Partnership Program. The sponsor of a NPIAS airport accepted into the Airport Investment and Partnership Program, formerly known as the Airport Privatization Pilot Program, under 49 U.S.C. 47134, whether the airport is fully or partially privatized under this section, is eligible for AIP grants. Accordingly, as required by statute (49 U.S.C. 47103), these airport sponsors should include planning for eligible airport development projects in their annual NPIAS planning processes.
4.1 Planning. › 4.1.4 What is the CIP’s role?
4.1.3 Why do airports need to plan?
4.1.3.1 To support more effective development. Airports in the NPIAS, no matter the size or role, need to plan. When done successfully, planning leads to more effective development, reduced costs, more streamlined environmental and permitting processes, and the flexibility to refine plans when conditions change. Planning should support the objective of developing an efficient system of airports for meeting current and forecast needs, consistent with local, state, and national goals.
4.1.3.2 Airport sponsors should complete these planning tasks as “best practices”:
Develop a long-term plan for the airport, outline a process to implement
that plan, and identify potential funding for the development.
Identify and develop strategies to meet current and future airport
development needs. This development should prepare the airport to meet forecast demand safely and efficiently.
Define development goals that are realistic and attainable, with due
consideration of economic and environmental sustainability. Development goals should include activity-level trigger points for future planning, consistent with Table 4-3 and Table 4-4. (Also, see the discussion of activity-level triggers in Section 4.3.5.)
Anticipate and prepare the airport for future challenges. Current
planning, for example, often considers the transition to satellite-based navigation systems and other equipment, procedures, and facilities to implement NextGen. Planning should also try to anticipate technical advances that will improve terminal functionality, change facility design, or accommodate new types of aircraft and new entrants to the national air transportation system.
Identify and resolve potential development issues to confirm the need
for projects and programs. The planning process should collect sufficient data on existing conditions and forecast needs to justify moving forward with development. Plans should provide for continued data collection to justify projects when they are identified in the ACIP.
Develop a CIP of eligible projects to be included within the NPIAS for
potential consideration in the ACIP and possible request for PFC funding.
4.1.4 What is the CIP’s role? Airport sponsors, planning agencies, and states use planning data to develop CIPs, which capture their airport’s long-, medium- and short-term development needs, estimated costs, and projected years of implementation. They serve as the basis for discussions with the FAA about federal funding needs.
4.1.5 What other activities, components, or criteria should effective… › 4.1.5.4 Stakeholder coordination.
Airport sponsors and states work with the FAA to develop their CIPs for inclusion in the database. PFC projects, which are part of an airport sponsor’s CIP, may also be included in the database, although not necessarily in the ACIP. (Section 2.5.3 discusses the conditions for inclusion of PFC projects.)
4.1.5 What other activities, components, or criteria should effective planning consider?
4.1.5.1 Intergovernmental coordination. As airport development often coincides with other development projects and government sponsors, the planning process should be continuing, cooperative, and comprehensive (49 U.S.C. § 47101(g)(1)). This “3-C” planning process is also used by Metropolitan Planning Organizations (MPOs) and other agencies for planning surface transportation programs. Airport plans and programs should be developed in coordination with other transportation planning and foster effective coordination between aviation planning and metropolitan planning (49 U.S.C. § 47101(g)). Airport capital develop planning partners include state aviation agencies, state transportation agencies, or other entities; airport management; 49 C.F.R., Part 1542 (Airport Security) regulatory agents; Part 139 (Airport Certification) inspectors; and metropolitan planning agencies, as applicable to the airport and region.
4.1.5.2 Anticipated technologies and trends that will affect the airport. In anticipation of satellite-based navigation systems and other technological developments in aeronautics, plans should be flexible. Policies, procedures, budgets, authorizations, and organizational arrangements may be expected to change during the transition to the Next Generation air traffic control system. The plans must also be consistent with the current National Airspace System architecture (49 U.S.C. § 47101(f)).
4.1.5.3 Intermodal planning activities to efficiently connect different forms of transportation. In accordance with 49 U.S.C. § 47101(g)(2) and the Clean Air Act Amendments of 1990, airports are encouraged to become involved in system planning. Federal Highway Administration funds are directed through the MPO. Federally funded airport access projects, therefore, should be coordinated with the MPO and listed in its transportation improvement program under 23 C.F.R. § 450.318 to promote seamless airport intermodal transfers. The FAA encourages airports to complete planning projects that are consistent with MPO system forecasts, ground access and air quality studies, and land use planning.
4.1.5.4 Stakeholder coordination. Successful planning engages airlines, other airport tenants, airport users, and the community in planning activities that may have an effect on their operations and environment. The FAA encourages active outreach efforts with both users and the public during the planning process (49 U.S.C. §§ 47105 and 47106).
4.1.7.1 Airport Master Plans. › 4.1.7.1.1 Aviation Activity Forecasts.
4.1.6 When do airports need to coordinate with the FAA?
4.1.6.1 Airport sponsors should proactively plan development projects. At a minimum, the airport sponsor should submit its CIP to the FAA annually. Depending on the complexity and coordination required, airport sponsors may need to provide project information to the FAA on a regular basis as planning continues or when circumstances change.
4.1.6.2 See Appendix C for timing and responsibilities of airport development planning actions. The development becomes part of the NPIAS if the FAA agrees with the eligibility and justification for the project(s) within the next five-year timeframe.
4.1.7 What federally funded planning documents and other sources are used to identify AIPeligible airport development to be included in the NPIAS? Planning documents are useful in identifying eligible airport development needed on or around the airport and in justifying the projects in the CIP. Depending on the type and magnitude of the project, planning documents could consist of acceptable adequate documentation (such as a pre-application for funding and project narrative) resulting from a collaborative planning effort. The planning documents, activities, and actions listed in this section provide detail to the FAA, local government and agencies, tenant airlines, and other stakeholders to define development programs and projects which are then captured in the NPIAS.
4.1.7.1 Airport Master Plans. Airport master plans are comprehensive studies that define the sponsor’s strategy for developing the airport, generally over a 20-year period. (These are defined in FAA Advisory Circular 150/5070-6, Airport Master Plans.) Master plans should document the overall development need, justify the proposed development, establish a realistic implementation schedule, provide sufficient project definition and detail to support cost estimates and environmental evaluations, propose an achievable financial plan, and establish a framework for continuing planning. The proposed development plan should satisfy local, state, and federal regulations. Along with a long-term vision for the airport, a master plan includes a forecast of aviation activity (including critical aircraft determinations), an Airport Layout Plan drawing set depicting existing features and proposed development, a near-term CIP, and Exhibit A (airport property map). The FAA enters key information from Airport CIPs into the SOAR database.
4.1.7.1.1 Aviation Activity Forecasts.
Aviation activity forecasts provide the basis for justifying the planning
and proposed development identified in the airport sponsor’s CIP. Aviation activity forecasts are typically prepared as part of a master plan project, but forecasts may also be updated independently as the first step in assessing the changes in activity on an airport’s needs. Forecasts
should be realistic, based on the most recent data available, and reflect the current and anticipated future conditions at the airport.
Table 4-1 identifies alternative methods for estimating total aircraft
operations for airports that do not have an airport traffic control tower (ATCT) or other means to track aviation activity. See AC 150-5000-17, Critical Aircraft and Regular Use Determination, for additional information on acceptable methods for documenting existing activity.
Table 4-1 Alternative Methods for Estimating Aircraft Operations
Method Description
Traffic Flow Management System Counts (TFMSC)
Completed Instrument Flight Rules (IFR) flight plan data is available for most airports, either towered or non-towered, from the FAA’s Aviation System Performance Metrics web site. IFR counts of jet and turboprop operations, once normalized, are considered representative of the total operations of these aircraft characteristics, which nearly always operate on IFR flight plans. This is useful for critical aircraft determinations, since jets and turboprops can often be the most demanding aircraft types operating at a general aviation airport.
Flight Tracking Systems
Data for an airport or commercially operated flight tracking system
Airport or aircraft operator reports
Aircraft landing fee reports, fuel sale records, aircraft operator logs, etc., if developed with a reliable and consistent methodology for data collection. To be useful, the logs would need to record the aircraft make and model.
ACRP Report 129: Evaluating Methods for Counting Aircraft Operations at Non-Towered Airports
See ACRP Report 129 for additional information about this method.
Based Aircraft Multiplier
(This method should only be used to estimate the number of annual operations once all other sources identified above have been reviewed. The multiplier cannot be used in determining critical aircraft.)
For basic general aviation airports, 250 annual operations per validated based aircraft.
For local general aviation airports, 350 annual operations per validated based aircraft.
Estimates should be in line with TAF (see section 4.1.7.1.1)
See based aircraft definition in Appendix A.
The FAA ADO or regional office approves aviation activity forecasts
(including the critical aircraft determination). Aviation activity forecasts
4.1.7 What federally funded planning documents and other sources are… › 4.1.7.5 Input from other federal agencies.
supplied by the airport sponsor should be consistent with the FAA’s Terminal Area Forecast (TAF) for the facility, as defined in current APP-400 guidance on forecast review and approval process. A link to this guidance and other information on forecasting aviation activity is on the Airport Planning and Capacity page of the FAA’s website. If the forecast is not consistent with the TAF, the ADO should consult with APP-400.
4.1.7.2 System plans. As summarized from AC 150/5070-7, Airport System Planning Process, states, regional or local planning agencies, or airport sponsors develop system plans. They define needs and coordinate plans for a group of airports within a given geographic area, recognizing each airport’s roles within the area. The system plan provides an agency the ability to look at the system of airports to gauge interactions, interdependencies, conflicts, or competition, as well as individual airport contributions and needs. System plans generally include near-term CIP recommendations that can be incorporated into the NPIAS. New airports proposed in system plans need to be based on demonstrable existing or forecast unmet demand.
4.1.7.3 Stand-alone plans. These types of plans focus on a particular issue or problem that an airport sponsor wants to solve or explore in more detail. Examples of stand-alone plans include Terminal Area Master Plans, program or project definition plans, and airfield geometry studies such as Runway Safety Action Team (RSAT) studies or Runway Incursion Mitigation (RIM) studies. These may result in additions to, refinements of, and reprioritization of elements within airport CIPs that can be incorporated into the NPIAS.
4.1.7.4 Inspections, assessments, and meetings. These activities may identify issues, recommend solutions, or identify broader issues that may require projects to improve airport safety, increase access, or abate noise concerns. These may result in changes to the airport CIP. Here are a few examples of these activities:
Runway Safety Action Team recommendations
Part 139, state, and airport safety inspections
Wildlife Hazard Assessments
Annual or ad-hoc meetings with sponsors or public agencies
Pavement Maintenance Management Plans
PFC Application Consultations
4.1.7.5 Input from other federal agencies. Agencies such as the Transportation Security Administration, Customs and Border Protection, U.S. Army Corps of Engineers, the Federal Highway
Administration, and Federal Transit Administration may be involved in related studies and be able to help an airport sponsor identify needs—such as upgrading infrastructure or anticipating mitigation requirements for environmental approval of a development project. These may result in changes to the airport CIP for AIP-eligible projects related to aviation use of the airport to be incorporated into the NPIAS. Projects that solely benefit another federal agency’s mission are prohibited from being funded under AIP.
4.1.9 Implementation timeframes. › 4.1.9.1 Long term (11 + years).
4.1.7.6 Legislative mandates. Mandates that address local or national concerns often inform CIPs. The enhanced security measures that followed the events of September 11, 2001, for example, resulted in airport sponsors adding new security projects to their CIPs.
4.1.7.7 Unforeseen events. Natural disasters such as earthquakes or flooding, or events such as premature pavement failure, may require near-term remedial projects and highlight other mid- or long-term projects to prevent damage from future events. These may result in changes to the airport CIP that can be incorporated into the NPIAS. AIP funds, however, cannot be used for disaster recovery without congressional authorization. They may be available for long-term preventive or protective measures. See the current version of the AIP Handbook.
4.1.8 What is the FAA’s involvement in the airport’s annual CIP submittals?
4.1.8.1 Meeting with airport sponsors. Before submitting their annual plans for final consideration, airport sponsors should meet and discuss them with the FAA ADO or regional office, or meet with state aviation officials if the airport is in a block grant state. An open discussion about the projects and types of funding desired by the airport sponsor provides the FAA or state planners with insight into the airport’s goals, objectives, and activity.
4.1.8.2 Reviewing project data to ensure it meets requirements. The FAA reviews an airport sponsor’s CIPs to verify it meets the criteria for inclusion in the NPIAS.
4.1.9 Implementation timeframes. AC 150/5070-6, Airport Master Plans, defines three timeframes for capital planning that are generally associated with airport master planning and development programs, as described below. The NPIAS contains airport development needed within the next 20 years.
4.1.9.1 Long term (11 + years). With more conceptual and less specific cost estimates and design details than near- and mid-term projects, long-term planning assumptions also tend to be re-evaluated more often as conditions change. This may involve new planning and studies before projects are implemented.
4.2 What are the requirements for projects to be included in the NPIAS? › 4.2.1 Near-term projects requirements.
4.1.9.2 Medium term (6 – 10 years). Although planning for this timeframe is typically not defined in the same detail as near-term projects, it is important to identify long lead-time items as specific as possible. These are needed to complete permits or documents that are required before construction can begin, for example, facility or programming definition reports and environmental studies.
4.1.9.3 Near term (1 – 5 years).
4.1.9.3.1 Planning for this timeframe has the highest level of detail in terms of project definition, cost, timing of implementation, and financial planning. Project justification, reasonableness, and eligibility must meet the requirements defined in the AIP Handbook.
4.1.9.3.2 The published NPIAS report identifies near-term development. ACIP further refines the projects in the 1- to 3-year timeframe.
4.2 What are the requirements for projects to be included in the NPIAS? To be included in the NPIAS, a project must meet the following criteria, as depicted in Table 4-2.
Be eligible. A project is eligible for federal funding if it meets the criteria defined in
the current AIP Handbook, which provides eligibility criteria for all types of projects. Eligibility is derived from statute.
Have sponsorship. A sponsor that is eligible and able to assume the responsibilities
defined in the grant must be proposing the project.
Have appropriate project timing, which is justified by airport planning, operational
requirements, and design standards.
4.2.1 Near-term projects requirements.
Provide justification for federal participation. A project is justified when it (1)
advances an AIP policy, (2) addresses an actual airport need within the next five years, and (3) has an appropriate scope of work. The FAA normally determines if a project is justified, based on existing or forecast activity levels.
Meet other regulatory requirements and FAA objectives (National Environmental
Policy Act (NEPA), Aeronautical Study, etc.).
4.3 What is typical infrastructure for NPIAS airports? › 4.3.1 Basic elements.
4.2.2 Similar, but distinct, requirements apply to projects funded under the PFC and AIP programs. For example, some terminal building projects such as constructing new baggage make-up areas are eligible for PFC but not AIP funds. See the requirements listed in FAA Order 5500.1 on the PFC Program page of the FAA’s website.
4.2.3 Near-term projects are published in the NPIAS Report.
4.2.4 Sponsors submit CIPs. Sponsors submit their CIPs for review to the FAA or state (if a block grant) as part of the master planning process or ongoing planning. CIPs are also reviewed and amended during annual CIP meetings with the FAA and/or state.
Table 4-2 Project Planning Timeframes Used for NPIAS, ACIP, and AIP
Projects must meet these
criteria
NPIAS
AIP
(Current
FY)
Long Term
(11+ years)
Medium
Term
(6-10 years)
Near Term
(1-5 years)
ACIP
(1-3 years)
Eligible to be funded under AIP X X X X X
Reasonable development for the airport to accomplish, with all pertinent preliminary activities (land acquisition, environmental analysis, Benefit-Cost Analysis, permitting, etc.)
N/A N/A X X X
Justified by current use, forecasts, or design standards N/A N/A X X X
Funding available N/A N/A N/A N/A X
4.3 What is typical infrastructure for NPIAS airports?
4.3.1 Basic elements. Typical airport infrastructure comprises basic elements common to airports in the national system and typical for airports in the NPIAS. The infrastructure required for an airport is affected by the type of activity and, to a lesser extent, the amount of activity the airport serves. Evaluating these basic elements helps the FAA and airport sponsors identify and plan for airport needs.
4.3.4 Typical airport infrastructure. › 4.3.4.2 Including these infrastructure elements in an airport’s…
4.3.2 Consistent with FAA Advisory Circulars and Orders. When considering development projects for their airport, sponsors should consult the FAA Advisory Circulars and Orders that govern the proposed infrastructure improvements. Links to key documents can be found in Appendix D.
4.3.3 Consistent with governing codes and regulations. Table 1-3 lists codes and regulations that are pertinent to airports and airport development. Citations are also noted throughout this order.
4.3.4 Typical airport infrastructure.
4.3.4.1 Table 4-3 describes typical airport infrastructure that may be found at the majority of airports in the NPIAS. The terms essential, desirable, and useful that are used to describe the infrastructure characteristics have these special meanings:
Essential – means an infrastructure element that is necessary for the
airport to function and perform as intended.
Desirable – means an infrastructure element that is recommended to
enhance airport functionality.
Useful – means an infrastructure element that is beneficial to the overall
performance of the airport.
4.3.4.2 Including these infrastructure elements in an airport’s development plan does not guarantee their eligibility—or indicate they have met the justification requirements— for federal funding.
Table 4-3 Typical Airport Infrastructure for NPIAS Airports
Note: Including the infrastructure elements in this table in an airport’s development plan does not guarantee their eligibility – or indicate that they have met the justification requirements – for federal funding.
Infrastructure
Element Infrastructure Characteristic References (Latest Version)
Airport Land
Essential to own all land for airfield development, terminal building area, runway safety areas, runway protection zones, object free areas, obstacle free zones, runway visibility zones, and approach aids.
Airport Improvement Program Grant Assurance #4, Good Title;
Airport Improvement Program Grant Assurance #21, Compatible Land Use;
Advisory Circular 150/5300-13, Airport Design
Desirable for the airport to control land use out to the 65 Decibel Day Night Average Sound Level (DNL) boundary.
14 CFR Part 150; Airport Improvement Program Grant Assurance #21, Compatible Land Use
Primary Runway
Essential to have a primary runway with clear approaches, runway safety areas, runway protection zones, object free areas, and obstacle free zones.
Advisory Circular 150/5300-13, Airport Design;
Advisory Circular 150/5325-4B, Runway Length Requirements for Airport Design
Crosswind Runway Desirable if wind coverage on the primary runway is less than 95%. Advisory Circular 150/5300-13, Airport Design
Lighting and Rotating Beacon
Type of lighting for runway and taxiway is justified by the runway usage and type of approach. Reflectors may be adequate depending on the runway usage.
Advisory Circular 150/5340-30, Design and Installation Details for Airport Visual Aids
Full Parallel Taxiway
Desirable for efficiency and improved instrument approach procedure minimums. May be essential depending on the type of airport and/or aircraft operations.
Advisory Circular 150/5300-13, Airport Design
Infrastructure
Element Infrastructure Characteristic References (Latest Version)
Continue reading ↓ 120 of 246 passages shown