Advisory Circular Current Issued Nov 10, 2004 APP-400 86 pages Copy saved Nov 18, 2026

AC 150/5070-7 The Airport System Planning Process

Provides guidance for effective airport system planning. Consolidated file includes Change 1 (dated 1/16/2015).

Official source ↗ Open PDF

Department of Transportation seal U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

Subject: The Airport System Planning Process

Date: 1/15/2015 Initiated by: APP-400

AC No: 150/5070-7 Change: 1

1. PURPOSE. This change addresses recommendations made by the Government Accountability Office (GAO) in 2009 to enhance FAA review of airport system planning studies. The GAO findings are documented in GAO Report 10-120, NATIONAL AIRSPACE SYSTEM, Regional Airport Planning Could Help Address Congestion If Plans Were Integrated with FAA and Airport Decision Making. This change also includes references to the FAA’s studies; General Aviation Airports: A National Asset (ASSET) and ASSET 2: In- Depth Review of 497 Unclassified Airports (ASSET 2) and incorporates minor edits to correct technical information since the previous publication. A full revision of this advisory circular is underway, and will provide a more comprehensive update.

2. APPLICABILITY. This change applies to all new system plan studies initiated after issuance of this change. In the case of system plans supported by Airport Improvement Program (AIP) grants, there are specific restrictions on eligible elements that may be included in the work scope. Please refer to the current version of FAA Order 5100.38, the AIP Handbook.

3. PRINCIPAL CHANGES. Revised text is shown by a vertical bar in the margins. Major changes include the following:

a. Adds a new checklist for FAA personnel to use when reviewing system plans. This

checklist emphasizes using existing worksheets in this AC to guide the scope and development of the system plan.

b. Identifies those elements of a system plan study that the system study sponsor must

coordinate with the FAA.

c. Recommends that system plan study sponsors ensure certain airport development

projects are reflected in the system plan and in other local, regional and state transportation plans. This change will assist the FAA in making its determination of consistency with existing plans of public agencies for development of areas surrounding the airport as required by 49 United States Code 47106(a) (1) and Executive Order 12372.

d. Updates web addresses throughout.

ii

PAGE CONTROL CHART

Remove Pages Dated Insert Pages Dated i–iv

1 5 8–11 13–21 23–31 33–38 39–53 55–56 58–62 64–75

11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004 11/10/2004

iii–vi

1 5 8-10 13–21 24–29 31–36 38–51 53–54 56–60 62–78

1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 1/15/2015 Elliott Black Director, Office of Airport Planning and Programming

Advisory Circular

U.S. Department of Transportation Federal Aviation Administration

Subject: THE AIRPORT SYSTEM

PLANNING PROCESS

Date: November 10, 2004 Initiated by: APP-400

AC No: 150/5070-7 Change: … 1. PURPOSE. This Advisory Circular (AC) provides guidance for use in accomplishing effective airport system planning.

2. CANCELLATION. This publication cancels two existing advisory circulars: Planning the State Aviation System (150/5050-3B), dated January 1989, and Planning the Metropolitan Airport System (150/5070-5), dated May 1970. It also incorporates guidance from a previously cancelled advisory circular, The Continuous Airport System Planning Process (150/5050-5), dated November 1975. Dennis E. Roberts, Director Office of Airport Planning and Programming

Consolidated to include Change 1

AC 150/5070-7 11/10/2004

ii

This page intentionally left blank.

iii

Table of Contents

CHAPTER 1 INTRODUCTION … 1 101. BACKGROUND … 1 102. APPLICATION … 2 103. INTENDED AUDIENCE … 3 104. ORGANIZATION OF ADVISORY CIRCULAR … 4 105. USEFUL REFERENCE MATERIALS … 4

CHAPTER 2 AIRPORT PLANNING PROCESS PHILOSOPHY … 5 201. PURPOSE OF AIRPORT SYSTEM PLANNING PROCESS … 5 202. GOALS OF PROCESS … 6 203. DISTINGUISHING CHARACTERISTICS OF AIRPORT SYSTEM PLANNING PROCESSES … 6 204. ROLE OF THE FAA … 7 205. ROLE OF THE STATE AVIATION AGENCY … 8 206. ROLE OF THE METROPOLITAN OR REGIONAL PLANNING AGENCY … 11 207. MULTI-STATE AVIATION SYSTEM PLANNING … 13 208. SYSTEM PLANNING AND THE NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS … 15 209. DEFINITION OF AIRPORT ROLES … 17 210. SYSTEM PLANNING FOR NON-NPIAS AIRPORTS … 18 211. RELATIONSHIP TO AIRPORT MASTER PLANS … 19 212. RELATIONSHIP TO AIRPORT CAPITAL IMPROVEMENT PLANS … 20 213. CONSIDERATION FOR COMPATIBLE LAND USE/ZONING REGULATIONS ... 20 214. SUPPORT FOR AIRPORT AND AIR SERVICE PRESERVATION … 21 215. INPUT TO INTER-MODAL TRANSPORTATION PLANNING PROCESS … 23 216. PLANNING STRATEGICALLY … 24

CHAPTER 3 AIRPORT SYSTEM PLANNING PRODUCTS … 25 301. AIRPORT SYSTEM PLAN REPORT … 25 302. INTERIM UPDATES: REVIEW AND REAPPRAISAL OF AIRPORT SYSTEM … 26 303. SPECIAL STUDIES … 27

CHAPTER 4 AIRPORT SYSTEM PLAN PROJECT DEVELOPMENT … 29 401. ISSUES … 29 402. GOALS AND OBJECTIVES OF THE PLAN … 29 403. STAKEHOLDERS AND THEIR ROLES … 31 404. LEGISLATIVE REQUIREMENTS … 31 405. CONSULTATION WITH THE FAA … 31 406. FORCE ACCOUNT VERSUS CONSULTANTS … 31 407. WORK SCOPE, COORDINATION PLAN, AND SCHEDULE … 33 408. INTERSTATE AND INTER-REGIONAL CONSIDERATIONS … 37 409. METHODOLOGIES TO BE USED … 37 410. DEFINE DETAIL FOR THE AIRPORT’S CAPITAL IMPROVEMENT PLANS … 39 411. IMPLEMENTATION PLAN … 40 412. TECHNICAL ADVISORY COMMITTEE … 40

iv

413. PUBLIC CONSULTATION … 41 414. AIP GRANT APPLICATION PROCESS … 41 415. FAA APPROVAL PROCESS … 42 416. PROJECT MANAGEMENT … 42

CHAPTER 5 ELEMENTS OF AN AIRPORT SYSTEM PLAN REPORT … 43 501. EXECUTIVE SUMMARY … 44 502. STUDY DESIGN … 44 503. STATE, REGIONAL, AND LOCAL AIRPORT ISSUES … 44 504. INVENTORY OF SYSTEM CONDITION AND PERFORMANCE … 44 505. SYSTEM GOALS AND PERFORMANCE MEASURES … 46 506. ACTIVITY FORECASTS … 47 507. SYSTEM REQUIREMENTS … 50 508. ENVIRONMENTAL CONSIDERATIONS … 51 509. ALTERNATIVES ANALYSIS … 52 510. IDENTIFICATION OF SYSTEM OF AIRPORTS … 53 511. INTER-MODAL INTEGRATION AND AIRPORT ACCESS … 53 512. PUBLIC CONSULTATION … 56 513. DEVELOPMENT PRIORITIES AND JUSTIFICATION … 57 514. POLICY AND INVESTIGATION RECOMMENDATIONS … 57 515. RECOMMENDED NPIAS CHANGES … 58

CHAPTER 6 REVIEW AND REEVALUATION OF AIRPORT SYSTEM PLANS .... 59 601. ADEQUACY OF CURRENT SYSTEM PLAN … 59 602. REVIEW WITH STAKEHOLDERS … 60 603. DESIGNATE ELEMENTS NEEDING REEVALUATION … 61 604. ASSESS SUCCESS OF SYSTEM PLANNING PROCESS … 61 605. INTERIM UPDATES … 61 606. DETERMINE NEED FOR FORMAL UPDATE … 62

CHAPTER 7 SPECIAL STUDIES … 63 701. DETERMINE SPECIAL STUDIES NEEDED … 63 702. FOLLOW PROJECT DEVELOPMENT STEPS … 66 703. IMPLEMENT RECOMMENDATIONS … 67 704. INCORPORATE SPECIAL STUDY FINDINGS INTO EXISTING AVIATION SYSTEM PLAN … 67

APPENDIX A LIST OF ACRONYMS … 69

APPENDIX B USEFUL REFERENCE MATERIALS … 71

APPENDIX C CHECKLIST FOR PROJECT DEVELOPMENT … 75

APPENDIX D CHECKLIST FOR ELEMENTS OF AN AIRPORT SYSTEM PLAN

REPORT … 76

APPENDIX E CHECKLIST FOR FAA COORDINATION AND REVIEW OF AN

AIRPORT SYSTEM PLAN REPORT … 77

v

List of Figures Figure 1: Integrated Airport System Planning … 1

Figure 2: Airport System Planning Process … 3

Figure 3: Distinguishing Characteristics of Airport System Planning … 7

Figure 4: Sample Map from a State Airport System Plan … 10

Figure 5: Sample Map of a Regional Airport System … 12

Figure 6: Sample Growth Chart from a Multi-State Airport System Plan … 15

Figure 7: A New Reliever Airport on Opening Day … 17

Figure 8: Sample Air Service Analysis Chart … 22

Figure 9: Sample Advisory Committee … 22

Figure 10: Sample Airport Ground Access Data Chart … 23

Figure 11: General Aviation Airport … 25

Figure 12: Airport System Plan Project—Approach … 29

Figure 13: Airport System Plan Project—Scoping … 33

Figure 14: Regional Demand Addressed in a Multi-State Airport System … 37

Figure 15: Airport System Plan Project—Implementation … 40

Figure 16: Elements of an Airport System Plan Report … 43

Figure 17: Inventory of System Condition and Performance … 44

Figure 18: Sample Inventory Map from a Regional Airport System Plan … 46

Figure 19: General Aviation Based Aircraft … 49

Figure 20: Inter-modal Access to an Air Carrier Airport … 54

Figure 21: Business Jets … 60

Figure 22: Sample from Pavement Management Study … 64

Figure 23: Economic Impact of Aviation Summary … 65

Figure 24: Sample Specific Objectives for an RNAV (GPS) Approach Procedures System

Plan … 66

vi

This page intentionally left blank.

Chapter 1 Introduction › 101. BACKGROUND

Chapter 1 Introduction

101. BACKGROUND

a. Federal law 49 USC 47102(9) defines “integrated airport system planning” as

“developing for planning purposes, information, and guidance to decide the extent, kind, location, and timing of airport development needed in a specific area to establish a viable, balanced, and integrated system of public-use airports.” This includes four main elements, which are illustrated in Figure 1: (1) system needs identification; (2) system-wide development cost estimate; (3) studies, surveys, and other planning actions to decide which aeronautical needs should be met by a system of airports; and (4) standards prescribed by a state, except standards for safety of approaches, for airport development at non-primary public-use airports.

b. The primary purpose of airport system planning is to study the performance and

interaction of an entire aviation system to understand the interrelationship of the member airports. The system evaluated in the plan can be the airports of a metropolitan area, a state, or several bordering states. The effort involves examining the interaction of the airports with the aviation user requirements, economy, population, and surface transportation of a specific geographic area. The system of airports may include all airports, heliports, spaceports (operations involving horizontally-launched reusable vehicles), and seaplane bases in the study area that contribute to the national transportation system, as well as those that serve state and local aviation needs.

c. The airport system planning process should be consistent with state or regional goals

for transportation, land use, and the environment. Overall, the planning process

Figure 1: Integrated Airport System Planning

Standards Prescribed

by State for Airport Development

at Non-Primary Public-Use Airports

System Needs

Identification

Airport System Plan

Studies, Surveys and

Other Actions to

Decide Which System Needs

Must Be Met

System-wide Development Cost Estimate

AC 150/5070-7 11/10/2004

includes the elements shown in Figure 2 and listed below. It is a dynamic process, which involves feedback from stakeholders throughout the effort.

1) Exploration of issues that impact aviation in the study area;

Chapter 1 Introduction › 102. APPLICATION

2) Inventory of the current system;

3) Identification of air transportation needs;

4) Forecast of system demand;

5) Consideration of alternative airport systems;

6) Definition of airport roles and policy strategies;

7) Recommendation of system changes, funding strategies, and airport development; and

8) Preparation of an implementation plan.

d. Although the process involves many varied elements, the final product should result

in the identification, preservation, and enhancement of the aviation system to meet current and future demand. The ultimate result of the planning process should be the establishment of a viable, balanced, and integrated system of airports.

e. Airport system planning documents the public-use airports (including heliports,

seaplane bases, and spaceports) and related facilities that are necessary to meet the current and future air transportation needs of a metropolitan, state, or multi-state area. It provides guidance on how to maximize the system benefits of airport investments and how to align Federal priorities with state and local objectives. The outcome of the process provides vital input into the aviation component of a comprehensive state or regional transportation plan.

102. APPLICATION

This advisory circular has the following applications in the system planning process:

a. Provides national guidance intended to improve the understanding and effectiveness

of the state and metropolitan airport system planning process.

b. Defines a systematic approach to planning the nation’s airport system, and identifies

the organization and elements of the airport system planning process, in accordance with the eligibility criteria for the Airport Improvement Program (AIP).

c. Enables state aviation agencies, metropolitan and regional planning agencies, airports,

consultants, and the Federal Aviation Administration (FAA), to flexibly define and develop products throughout the planning process, regardless of the variation in aviation programs. In order to maintain this flexibility, this advisory circular has not been written as a detailed “how to” guide to teach the basics of system planning.

Chapter 1 Introduction › 103. INTENDED AUDIENCE

11/10/2004 AC 150/5070-7

Figure 2: Airport System Planning Process

d. Updates previous guidance in response to changes in aviation technology and market

characteristics and incorporates advances in strategic planning, alternatives analysis, and information systems into the airport system planning process.

103. INTENDED AUDIENCE

The intended audience for this advisory circular includes the following:

a. State aviation agencies;

b. Metropolitan and regional planning organizations;

c. Consultants who perform system planning activities;

d. FAA Airports Offices: Headquarters, Regional, and Airports District Offices that

review and coordinate these types of projects;

e. Individual airport proprietors who work with state and local planning agencies to help

determine their role and development needs;

Definition of Airport Roles and Policy Strategies

Recommendation of System Changes, Funding Strategies and Airport Development

Consideration of Alternative Airport Systems

Exploration of Aviation Issues in Study

Identification of Air Transportation Needs

Preparation of an Implementation Plan

Forecast of System Demand

Inventory of Current System

AC 150/5070-7 11/10/2004

f. Members of the aviation industry who provide input into the study efforts, attend

meetings during the process, are interested in the plan for a specific region or airport, or who will use the development identified in the plan;

Chapter 1 Introduction › 105. USEFUL REFERENCE MATERIALS

g. Other Federal and state transportation and environmental agencies;

h. Municipal and county governments that need to be aware of the state or metropolitan

aviation plans; and

i. Members of the general public who want to understand the state’s or metropolitan

planning organization’s plans for the local aviation system.

104. ORGANIZATION OF ADVISORY CIRCULAR

This advisory circular is structured to guide the planner through the process and it:

a. Explains the philosophy behind the continuous airport system planning process. It

describes the products that result from the planning process; defines the procedures to be used in the development of a multi-state, individual state, or metropolitan area system plan project; and explains the elements that should be included in the report.

b. Discusses the review/reappraisal of the current airport system plan, describes the

steps involved in the determination of the need for and preparation of a special study, and evaluates the need for strategic planning to address future concerns in the state or metropolitan airport system.

c. Includes several appendices that provide a glossary (Appendix A), list of reference

materials (Appendix B), and checklists to assist a planning agency during the project development and report preparation phases of the airport system plan (Appendices C and D).

105. USEFUL REFERENCE MATERIALS

A list of advisory circulars that include specialized guidance on aviation planning can be found on the FAA’s web site at http://www.faa.gov/airports/resources/advisory_circulars/. A number of FAA Orders also provide guidance on the airport system planning process, and are found at http://www.faa.gov/airports/resources/publications/orders/. Appendix B provides an inventory of applicable FAA Advisory Circulars and Orders, and lists some additional FAA, DOT, other government, and academic reference materials that can provide assistance during the airport system planning process.

Chapter 2 Airport Planning Process Philosophy › 201. PURPOSE OF AIRPORT SYSTEM PLANNING PROCESS

Chapter 2 Airport Planning Process Philosophy

201. PURPOSE OF AIRPORT SYSTEM PLANNING PROCESS

a. The main purpose of the airport system planning process is to determine the type,

extent, location, timing, and cost of the airport development needed in a state or metropolitan area to establish a viable system of airports. The aviation planning agency and the FAA should use the findings of the planning process to guide them in making informed decisions regarding which local airport development proposals to consider for future review and support.

b. Other purposes of the airport system planning process vary by state or metropolitan

area and depend on a multitude of factors and the planning agency’s commitment of resources to aeronautical activities and airport development. One key factor in the process is the nature of existing state or local laws related to aviation, because these define the planning agencies’ responsibilities, authority, functions, and funding for airport activities. Other important factors include the state and regional goals and objectives regarding transportation, land use, and environmental matters.

c. The airport system planning process is an examination of system dynamics that leads

to the effective use of federal, state, metropolitan, and local aviation resources in developing an efficient network of airports for current and projected needs. The product of the process is a cost-effective plan of action to develop airports consistent with established goals and objectives. The process also results in the establishment of perspectives on aviation priorities, such as airport roles, funding, policy strategies, and system trends in activity level. The process ensures that aviation plans remain responsive to the overall air transportation needs of the state or metropolitan area, while identifying the roles and characteristics of existing and recommended new airports, and describing the overall development required at each, including timeframes and estimated project costs. More detailed design, and capital and environmental planning are accomplished under an individual airport’s master plan.

d. The FAA’s National Plan of Integrated Airport Systems (NPIAS) supports the FAA’s

strategic goals for safety, system efficiency, and environmental compatibility. The NPIAS reflects specific airport improvements that will contribute to the achievement of those goals. Metropolitan, state, and multi-state aviation system planning fits between the FAA’s national planning effort, as documented in the NPIAS, and the more comprehensive master plans prepared for individual airports. It feeds information “up” to be consolidated into the NPIAS and “down” to provide goals and development recommendations for individual airports. The airport system planning process also clarifies Federal, state, and local sponsor objectives, and helps make development of airports part of a regional transportation system.

e. Airport system plans should be consistent with the National Airspace System (NAS)

Architecture, which details operational concepts, mandatory schedules, system requirements, human and physical resources, and regulatory policies essential for maintaining the safety as well as capacity of the NAS.

Chapter 2 Airport Planning Process Philosophy › 203. DISTINGUISHING CHARACTERISTICS OF AIRPORT SYSTEM PLANNING PROCESSES

AC 150/5070-7 11/10/2004

202. GOALS OF PROCESS

a. The overall goal of any airport system planning process is to ensure that the air

transportation needs of a state or metropolitan area are adequately served by its system of airports, both now and in the future.

b. Airport system planning processes should result in products that can be used by the

planning organization or individual airport owner or the FAA in determining future airport development needs. Planning agencies, along with the FAA, should enter into the process committed to the goal of developing useable end products that will result in implementation of an aviation system that effectively meets user and community needs. The process should focus on the development of a thoughtful, wellcoordinated, and practical plan, including project scheduling, as well as on the interagency and public coordination needed to successfully put the plan into effect. An airport system plan should outline the organizational structure, authority, and responsibility for implementation and should provide a realistic assessment of needs and resources. The plan should also provide guidance and input for the preparation of airport master plans and airport capital improvement plans and serve as an important contribution to the National Plan of Integrated Airport Systems.

203. DISTINGUISHING CHARACTERISTICS OF AIRPORT SYSTEM PLANNING PROCESSES

Figure 3 below illustrates the characteristics that define a specific airport system planning study, as follows:

a. The most obvious distinguishing characteristic of an airport system planning process

is its geographic scope. The scope of the plan can include several adjacent states in a region, one individual state, or a specific metropolitan area.

b. A key attribute of a system planning study is the implementation authority that a

particular planning agency has been given. Most state aviation agencies can implement system recommendations using legislative and funding mechanisms.

A metropolitan planning agency may be able to influence airport development through persuasion, leadership, or non-aviation incentives such as surface transportation improvements. The agency may also influence development through regional planning approval processes. For a metropolitan planning organization in an air quality nonattainment area, air quality conformity (both transportation and general conformity) can be an important vehicle for implementing airport system plans, because airports undergoing major expansion using federal funds must demonstrate that their anticipated growth is reflected in air quality budgets in State Implementation Plans.

Multi-state planning efforts may include participation by local airports that have the direct ability to implement study recommendations at their own facilities.

c. Different planning entities each have their own perspectives on the airport system

planning process. The state aviation agency is typically (but not always) focused

Chapter 2 Airport Planning Process Philosophy › 204. ROLE OF THE FAA

11/10/2004 AC 150/5070-7

primarily on statewide aviation and the associated community of pilots, airports, airlines, and aviation system users. A metropolitan planning organization is more likely to be oriented to local aviation-related community development issues, surface access and transportation issues, as well as the role of air transportation in the larger multi-modal transportation system. Aviation is often a minor component of the agency’s overall planning responsibilities. An airport sponsor concentrates directly on the user needs and community concerns that are specific to its facility.

d. These distinctions affect the focus and methodologies used during the airport system

planning process. Understanding these distinctions and how they impact the scope of the system plan helps in deciding which studies should be conducted to meet the needs of each sponsor. Appreciating how state airport system planning relates to other airport planning activities at the metropolitan and local levels of government is important to the formulation of a productive continuous planning process. Planning for metropolitan areas should complement state and the local airport’s planning for those locations.

Figure 3: Distinguishing Characteristics of Airport System Planning

A study may encompass a metropolitan area, a state, or several adjacent states in a region.

Geographic Scope

The planning agency may be able to implement system recommendations

through legislative and funding

mechanisms, or need to rely on persuasion, leadership, and

non-aviation incentives.

Implementation Authority

A planning agency may tend

to focus primarily on the

aviation industry, pilots and aircraft owners, or view aviation

as part of community development.

Perspective

Chapter 2 Airport Planning Process Philosophy › 205. ROLE OF THE STATE AVIATION AGENCY

204. ROLE OF THE FAA

a. The FAA’s overall role in the airport system planning process is to provide technical

advice, financial support, expertise in Federal policy and legislative issues, and plan implementation guidance and support. The local FAA Airports Office (Regional Office or Airports District Office) participates in many of the process elements, including:

1) Reviewing and approving the scope of work (if the FAA is providing financial support for the work);

2) Monitoring adherence to Federal requirements;

3) Providing technical guidance on planning, engineering, financial, and environmental matters;

4) Coordinating access to technical assistance available from FAA Headquarters;

5) Coordinating access to technical assistance available from other areas, such as ATO (air traffic) and flight standards;

6) Assisting in and encouraging plan coordination with Federal agencies, such as the Federal Highway Administration (FHWA), Federal Railroad Administration (FRA) and Federal Transit Administration (FTA), as well as with state, regional and local planning and transportation agencies;

7) Approving forecasts and airport layout plans;

8) Coordinating funding recommendations among state agencies, metropolitan planning organizations, and airport sponsors.

9) Attending study meetings as necessary to review study progress and provide input;

10) Consulting with the system plan sponsor and airport sponsors on major elements of the system plan report to facilitate capital planning and updates to the National Plan of Integrated Airport Systems (NPIAS) to incorporate eligible, justified and feasible plan recommendations.

b. The FAA can be a valuable conduit in disseminating the results of airport system

planning to state and local planning agencies, airport sponsors and surface access planners. The FAA can provide financial assistance through the AIP for eligible and justified airport system planning projects. FAA Order 5100.38, AIP Handbook, provides more details on AIP project eligibility.

205. ROLE OF THE STATE AVIATION AGENCY

a. An aviation agency is typically authorized by state law to engage in airport system

planning. It is normally under the state’s aviation organization located within the Department of Transportation, an aeronautics commission, or another state planning agency. A planning agency means any agency designated by the FAA Administrator that is authorized by the laws of the state or states, or political subdivisions concerned, to engage in area wide planning for the areas in which FAA grant assistance is to be used.

An agency’s eligibility to receive AIP grants is defined in FAA Order 5100.38, AIP Handbook, under sponsor eligibility.

b. The state aviation agency’s role in airport planning, development, and regulation often

determines the scope of its system planning process. Depending on the involvement of the state agency, the airport system plan might include elements that:

1) Inform the state budgetary process with assessments of resource requirements, including timing and priorities;

2) Provide the state with information to facilitate elected officials in making aviation planning and development decisions consistent with state goals and objectives, and with an airport’s current Airport Layout Plan (ALP);

3) Provide individual airport sponsors with policy, technical direction, and American Society of Testing and Materials (ASTM) standards for master planning, along with budgetary guidelines;

4) Provide policy guidance and act as a management and coordination resource for metropolitan and multi-state planning efforts;

5) Assist in coordination with other state, regional, and local planning organizations having aviation-related interests.

6) Provide the FAA with recommendations and supporting justification for inclusion of airports and projects in the NPIAS;

7) Contain special studies that provide the aviation community and the general public with information on pertinent airport-related issues; and

8) Support a continuing airport planning process, ensuring that aviation issues are continually and effectively evaluated.

c. The factors considered in determining the scope of system planning for a particular state

include the aviation responsibilities vested in the agency by the state legislature; funding available to the state agency for administration and project development; staff size and capability; historical involvement of the agency in the continuous airport system planning process; aviation responsibilities of other state and local agencies; and the relationship of the state agency to the local FAA Airports Office and airport sponsors.

d. For states that play a larger role in airport issues and decisions, the system plan will be

more extensive, including a detailed capital improvement plan, a number of special studies, and regular plan updates. The process elements will be more comprehensive, and will address aviation-oriented objectives regarding safety, efficiency, level of service, and economic self-sufficiency. In most states with active aviation programs, a continuous airport system planning process is already in place, which resulted from the preparation of state aviation plans over time. In this role, the state’s process assesses the effects of changes on the variables and issues in the plan to maintain its responsiveness to current and forecast conditions, and allows for maintenance of accurate capital improvement

plans for the state’s airports. Figure 4 illustrates an example of an inventory map from an active state’s airport system plan, which takes a wide-ranging look at its airport needs. This map depicts the categories of North Dakota’s public airports.

Figure 4: Sample Map from a State Airport System Plan

Source: North Dakota Aeronautics Commission, 2003

e. For states with less involvement in the development of their airport systems, the plan is

likely to be basic, identifying airport roles and broad recommendations of project development, and providing justification and priorities for state funding.

f. Block grant states act as FAA’s agent in AIP grant administration for their non-primary

airports. They have responsibility for most financial, planning, environmental, engineering, compliance, and administration matters related to these grants. Airport system plans in these states often focus on issues that allow for the efficient planning and development of the airports included in the state block grant program.

g. All state aviation agencies, whether or not they are block grant states, can initiate

studies under the airport system planning process. They provide leadership throughout the process in managing the airport system planning projects, selecting the consultants and administering their contracts, and acting as an advocate for the state’s transportation objectives. For each system planning project, they ensure that time schedules are being met, work activities and coordination are accomplished satisfactorily, expenditures are reasonable and justified, and other performance goals are achieved. Many states also provide financial support for airport system planning projects, as well as for the airport development projects that result from the planning process.

Chapter 2 Airport Planning Process Philosophy › 206. ROLE OF THE METROPOLITAN OR REGIONAL PLANNING AGENCY

11/10/2004 AC 150/5070-7

206. ROLE OF THE METROPOLITAN OR REGIONAL PLANNING AGENCY

a. The role of metropolitan and/or regional planning organizations in the airport system

planning process is determined by their legislative authority and the aviation expertise they possess. Typical agencies authorized to conduct these studies are Metropolitan Planning Organizations (MPOs), Councils of Government (COGs), and Regional Planning Councils or Commissions (RPCs). These agencies are made up of representatives from local government and transportation authorities. The area included in a metropolitan planning organization’s airport system study should be coincident with its jurisdictional boundaries. The variation in the roles of metropolitan planning organizations in airport system planning is even more pronounced than that of state agencies. Consultations between the local FAA Airports Office, the state aviation agency, and local airports are needed to determine what role, if any, the regional or metropolitan planning organization will have in airport system planning for its region. The discussion can also include a review of the work items that are eligible for AIP funding.

b. Nationwide, some of these agencies manage airport system planning studies for their

area; are proponents for aviation enhancement and preservation in the region; identify critical regional aviation issues; and act as the contact point for regional surface access, air quality, and land use planning studies. Many work to increase the accessibility and mobility options available to travelers and shippers, including enhancing the integration of the entire regional transportation system. These agencies can act as a catalyst in implementing airport system components, resolving local conflicts, promoting airport development funding priorities, and proposing the distribution of grants among eligible projects. They also may define a specific metropolitan area in a state that stands alone or a major metropolitan area that spans a multi-state region that would benefit from special aviation studies. These special studies are conducted in such areas as aviation-related environmental impacts (i.e., noise, air quality, and environmental justice), airport economic impacts, airport physical capacity, regional airspace analysis, and airport ground access. Figure 5 shows the complexity of airport categories considered in the Delaware Valley Regional Airport System, which includes parts of Delaware, New Jersey and Pennsylvania.

AC 150/5070-7 11/10/2004

Figure 5: Sample Map of a Regional Airport System

Source: Delaware Valley Regional Planning Commission

c. Metropolitan planning should not be considered a separate effort, but should

complement the ongoing state airport system planning process. Demand forecasts in the metropolitan airport system plan should be reviewed for incorporation in, or compatibility with, the state system plan. In some cases, where a state planning agency focuses on general aviation, they can defer to the regional planning organization to prepare forecasts for commercial airports in a metropolitan area. Regional and metropolitan planning organizations and state agencies should work closely together to assign responsibilities and roles, and to agree upon a process of sharing data and feeding project recommendations to the FAA to consider for inclusion in the NPIAS. It is important that the local FAA Airports Office be an active participant in this coordination effort. To ensure that state and metropolitan aviation plans are adequately integrated, state agencies should participate in the technical advisory committee meeting of metropolitan system plans and vice versa. Through airport advisory committees, individual airports should also participate in the metropolitan airport system planning process. Representatives of individual airports can identify issues, constraints, and opportunities at their airports and provide updates on the status of development projects.

d. Where metropolitan areas span several states, the regional planning agency should

also consider the relationships among the various state airport system plans. Multistate metropolitan systems are not always identified in individual state airport system plans; metropolitan planning studies can exist separately and should complement each state planning document, assisting with regional priorities for the state’s

Chapter 2 Airport Planning Process Philosophy › 207. MULTI-STATE AVIATION SYSTEM PLANNING

recommendations. Because metropolitan areas are often a center of aviation activity, their facility recommendations should be reflected in the state’s plan. In some cases, metropolitan planning organizations may not make specific facility recommendations, but instead present a range of options.

e. The factors to be considered in determining the appropriate role of a particular

metropolitan or regional planning organization in airport system planning include the aviation responsibilities vested in the agency by the state legislature, the funding available to the MPO for administration and project development, its staff size and capability, historical involvement of the agency in the continuous airport system planning process; aviation-related responsibilities of other state and local planning agencies, and the relationship of the MPO to the state aviation agency, the local FAA Airports Office, and airport sponsors. Surface transportation, airport access facilities, and land use impacts are important elements to consider in the metropolitan airport planning and project development process.

f. Airport system planning in areas that include large or medium hub airports (airports

that have 0.25 percent or more of annual U.S. enplanements) can be conducted by a metropolitan or regional planning organization when that agency has the interest in and capability to conduct such planning. These metropolitan airport system plans may differ in the coverage of unique capacity and airspace issues that are present in a region with a large or medium hub airport.

g. When a metropolitan or regional planning agency acts as a sponsor for an AIP grant, it

continuously monitors the system planning project, and selects a consultant, when applicable. Similar to a state aviation agency’s responsibilities under an AIP project, the metropolitan or regional planning agency ensures that time schedules are being met, work activities and coordination are accomplished satisfactorily, deliverables are useable, expenditures are reasonable and justified, and other performance goals are achieved.

h. To gain a greater understanding of the role of metropolitan planning agencies in the

overall transportation planning process for a region, planners should review a briefing book entitled The Metropolitan Transportation Planning Process: Key Issues, which was published jointly by FHWA and FTA. It can be accessed at http://www.planning.dot.gov/documents/briefingbook/bbook.htm.

207. MULTI-STATE AVIATION SYSTEM PLANNING

a. In certain large metropolitan areas, the air service market extends beyond state borders

to include multiple airports in adjacent states. Some of the airports may be located outside the jurisdiction of a specific metropolitan planning agency, thereby requiring cooperation among multiple state and metropolitan areas to address regional demand. The techniques and elements found in metropolitan or state airport system planning also apply to a multistate study, except that there may be a number of parties (state agencies, MPOs, local entities, individual airports, and others) more actively involved in the planning. The roles of each party should be determined prior to the start of the planning effort. For example, the multi-state airport system planning studies done for

the New England Region are a collaborative effort of the six state aviation agencies, passenger jet service airports, FAA, and the New England Council. The sponsors for the AIP grant are Massport and the Massachusetts Aeronautics Commission.

b. A lead planning agency can organize and conduct a multi-state airport system planning

study, or the work can be accomplished by various state and regional planning agencies. However, the work must be coordinated to ensure that the separate studies are completed concurrently, with consistent data and analysis.

c. A multi-state airport system planning study should inventory the regional airport

system and facilities. It also should identify regional air transportation demand, assign demand to airports, prepare forecasts, determine the opportunity to recapture traffic leakage at a local airport, consider how air service and general/recreational aviation changes might impact the regional system, study interconnectivity with other transportation modes, and identify specific issues from a regional perspective. The total aviation demand should be distributed geographically, through a review of demographic data, passenger surveys, and various other data. Once the demand is distributed, it can be allocated to individual airports in the system, based on such factors as airport location, ease of access, level of services, and costs of air service.

d. Airport sponsors in the study area should use the findings and recommendations from

the study to agree on an implementation plan and airport roles, and to recommend a development plan that will serve as a guideline for the allocation of Federal, state, and local funds.

e. Since the airports in a multi-state system function together to meet regional air

transportation demand, one airport may serve as a transcontinental and international airport while others support short-haul regional service. As an alternative to adding airfield or terminal capacity at a congested airport, a multi-state aviation system plan can look at the practicality of assigning present and future demand to underutilized airports that serve the regional air transportation market. However, before attempting such an approach, the planners must evaluate the size and nature of regional passenger and cargo demand; the factors that would cause such demand to divert to other airports; and the institutional, economic, and political barriers that need to be overcome to permit development of a regional system of airports. Planners should also forecast the ability of an airport(s) to maintain a suitable airline schedule that would ensure passenger convenience, adequate levels of service, and competitive fares. As an example, Figure 6 shows the average annual passenger growth rates at the airports in the New England states surrounding Boston Logan Airport from 1995-2000.

f. The development of alternate airports should enhance airline profitability and be

compatible with their route systems. Only after these market issues are understood would it be appropriate to assign demand to and plan development at an alternate airport. The introduction of new service at underutilized airports in a large metropolitan region often results in sudden shifts in activity. Reliable market information is important in such studies. These data can be obtained from travel agent surveys, travel offices of large local corporations, properly conducted passenger

Chapter 2 Airport Planning Process Philosophy › 208. SYSTEM PLANNING AND THE NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

surveys, and the Department of Transportation’s Bureau of Transportation Statistics household surveys. The study should also consider general aviation service and demand, particularly with regard to the development of reliever airports. Such a plan may require coordination with a number of state aviation planning and environmental offices when airports are in multiple states.

Figure 6: Sample Growth Chart from a Multi-State Airport System Plan

Source: New England, At the Forefront of Building a Regional Aviation System (2002), sponsored by Massport and the Massachusetts Aeronautics Commission

208. SYSTEM PLANNING AND THE NATIONAL PLAN OF INTEGRATED AIRPORT SYSTEMS

a. Airport planning in the United States is performed at several levels of government.

The FAA is responsible for the development and maintenance of a national system of airports, which is identified in the National Plan of Integrated Airport Systems (NPIAS). The NPIAS Report to Congress includes a listing by state and role of those public-use airports important to the national air transportation system. The airports are publicly owned facilities, except those privately owned airports that are designated as relievers by the FAA. The report is updated and published by the FAA and provided to Congress on a biennial basis. An airport must be included in the NPIAS to be eligible for Federal financial assistance under the Airport Improvement Program. The NPIAS report also lists the cost of eligible and justified development over a five-year period for each airport. Central to the NPIAS is a condition and performance report on the national airport system, which focuses on the availability of airports to the nation’s citizens, safety of the system, surface access to airports, pavement condition, environmental performance, airfield capacity, and financial performance.

b. Most of the data and analysis in the NPIAS is based upon an individual airport’s

master plans and its capital improvement plans (CIP); state and metropolitan airport system plans; and national forecasts. The state system plan includes airport locations considered important to state air transportation objectives, as well as those that are of sufficient national interest to be incorporated into the NPIAS. An important function of the state planning process is to identify airports that meet national interest criteria but which might not be identified as such by the FAA alone. To ensure that the NPIAS appropriately reflects airport system plans developed at the state and metropolitan level, aviation planners need to have a clear understanding of the criteria that define national interest, NPIAS entry, and development. These criteria are identified in FAA Order 5090.3, Field Formulation of the National Plan of Integrated Airport Systems (NPIAS).

c. In cooperation with the aviation community, the FAA completed two top-down

reviews of the existing network of general aviation facilities included in the NPIAS. The results of these efforts are contained in the May 2012 report entitled “General Aviation Airports: A National Asset” and the March 2014 report entitled “ASSET 2: In-Depth Review of 497 Unclassified Airports.”1 These reports document the airport roles and aeronautical functions these facilities provide to the national airport system and introduced new federal categories for general aviation airports. These federal roles should be referenced in state or metropolitan system plans.

d. Prior to the start of the state or metropolitan system planning process, the planning

agency should reach agreement with the appropriate local FAA Airports Office on how the plan recommendations will be incorporated into the NPIAS. This step is vital in the “feeding up” process, and how well this is achieved is an indication of the effectiveness of the airport system planning process. FAA participation in these state and metropolitan planning studies is essential to the development of an accurate and up-to-date NPIAS.

e. System plans and special studies play a part in the development of airport role,

condition, and performance information for the NPIAS. However, airport system plan recommendations on capital development at individual airports or at a system of airports are usually secondary to master plan information.

f. The FAA coordinates the NPIAS with its national Airports Capital Improvement

Program (ACIP). The FAA’s ACIP serves as its primary planning tool for

1 This report included a new system for classifying nonprimary airports, which the FAA then incorporated into the NPIAS Report to Congress. A subsequent update of this Advisory Circular will more fully incorporate that system of classification; in the meantime, however, AIP-funded state system plans must provide at least a cross-reference to the new ASSET classifications. The ASSET report is available online at no cost at http://www.faa.gov/airports/planning_capacity/ga_study/.

Chapter 2 Airport Planning Process Philosophy › 209. DEFINITION OF AIRPORT ROLES

systemically identifying, prioritizing, and assigning funds to critical airport development and associated capital needs for the National Airspace System (NAS). The ACIP data provides greater detail than the NPIAS, including the anticipated sources of funding for specific development expected to start within the next three to five years. The FAA, in cooperation with the state and regional aviation planning agencies, and individual airport sponsors, formulates the national ACIP, which provides the basis for distribution of AIP grant funds. The FAA uses its National Priority System (NPS), a combination of quantitative and qualitative evaluation of airport development, to establish and justify AIP expenditures. The NPS categorizes airport development in accordance with agency goals and objectives. Further guidance on the development of the ACIP and use of the NPS can be found in FAA Order 5100.39, Airports Capital Improvement Plan.

Figure 7 shows the location of a new NPIAS reliever airport built in Virginia that was an outcome of the state airport system and master planning processes. The Stafford Regional Airport, a reliever to Reagan Washington National Airport, opened in December 2001.

Figure 7: A New Reliever Airport on Opening Day

Source: Photo of Stafford Regional Airport in Virginia provided by the FAA Washington Airports District Office

209. DEFINITION OF AIRPORT ROLES

a. In the NPIAS, airports are grouped into two major categories: primary and

nonprimary.

1) Primary airports are defined as public airports receiving scheduled air carrier service with 10,000 or more enplaned passengers per year. Primary airports

Chapter 2 Airport Planning Process Philosophy › 210. SYSTEM PLANNING FOR NON-NPIAS AIRPORTS

are grouped into four categories defined in statute: large, medium, small, and nonhub.

2) Nonprimary airports are mainly used by general aviation aircraft. Included in the nonprimary category are nonprimary commercial service airports (public airports receiving scheduled passenger service and between 2,500 and 9,999 enplaned passengers in a given year); general aviation airports; and reliever airports. A general aviation airport is defined as a public airport that does not have scheduled commercial service or that has scheduled service with less than 2,500 passenger boardings in a given year2 or a privately owned airport with scheduled air carrier service. A high-capacity public-use general aviation airport in a major metropolitan area that relieves airport congestion at a congested commercial service airport and provides general aviation access to the community can be designated as a reliever in the NPIAS by the FAA. Nonprimary airports are grouped into five categories defined through the ASSET studies: national, regional, local, basic, and unclassified.

b. In the airport system planning process, some states or metropolitan planning

organizations may use different definitions of airports from those found in the NPIAS in an effort to classify current and forecast local aviation needs. They may use terminology such as business class, recreational, local service, general utility, or basic utility to describe individual airport roles. For consistency, especially in determining airport funding categories, the NPIAS definition of airport roles should be adhered to in airport system planning documents. While we do not require the use of the ASSET categories in a state system plan, the state system plan must at least provide a crosswalk indicating how the NPIAS and ASSET roles line up with their state categories. In addition, the state or planning agency can develop “standard” airport amenities associated with the state’s classification system, which could provide a given level of service for the airport class and a methodology for prioritizing funds on improvements to meet the “standards.”

210. SYSTEM PLANNING FOR NON-NPIAS AIRPORTS

a. During the airport system planning process, many states and metropolitan organizations

include non-NPIAS airports that are privately owned, public-use facilities. Publicly owned, public-use airports that have too little activity to qualify for inclusion in the NPIAS are also examined. However, during this process, most do not evaluate airports that are only for private use. While most privately owned, public-use airports are not eligible for Federal (and sometimes state) financial aid, they constitute an existing resource that may warrant eventual conversion to public ownership to meet aviation

2 This definition was established in the 2012 FAA Modernization and Reform Act—49 USC 47102(8).

Chapter 2 Airport Planning Process Philosophy › 211. RELATIONSHIP TO AIRPORT MASTER PLANS

needs and/or to ensure their longevity. The planning agency should coordinate with the local FAA Airports Office to decide the criteria to be used in determining which airports will be included in the system plan.

b. Airports that are not included in the NPIAS should be included in system planning

projects that are funded by an AIP grant only to the extent that they play an essential role in the state or metropolitan airport system, or affect airspace considerations related to NPIAS airports. Work on non-NPIAS airports is limited to nominal data collection and analysis tasks, such as general inventories, forecasting, or facility requirements. Other system planning tasks involving more significant costs, such as pavement or obstruction surveys, should not be included in the scope of the project. The local FAA Airports Office can provide additional guidance on eligible AIP work at non-NPIAS airports.

211. RELATIONSHIP TO AIRPORT MASTER PLANS

a. An airport master plan is a detailed, long-term development plan for an individual

airport. They are typically prepared to support the modernization or expansion of existing airports, or the creation of new airports. Typically, operators of individual airports prepare airport master plans, usually with the assistance of consultants. In some cases, depending on the complexity of an airport, state aviation agencies may prepare airport master plans for multiple general aviation facilities under one AIP system planning grant. Information from special analyses and studies at multiple airports developed by states or regional planning agencies can be useful in the master planning process and may decrease master planning resource requirements for individual airports. Conversely, state and metropolitan airport system plans should incorporate information from individual airport master plans to reduce duplication. In some instances, details provided in an individual airport’s new master plan might facilitate the need for a revision to its role in the current state system plan. Airport master planning efforts involve collecting data, inventorying existing facilities, forecasting demand, determining facility requirements, evaluating alternative development plans, , detailing long-range development plans and financial implementation schedules for a specific airport, and preparing an Airport Layout Plan (ALP) drawing set. The approved ALP is a key output of the master planning process. The ALP is required by the AIP grant assurances; and it serves as a record of aeronautical requirements, both current and future, and as a reference for local community deliberations on land use and zoning proposals, and budget issues.

b. State and regional airport system plans can provide information, direction, and policy

guidance for airport master planning. The state or metropolitan plan identifies an airport’s present and future role in the system, giving direction for improvements needed to meet the requirements of its aeronautical role. An airport system plan provides forecasts (at least for NPIAS airports) to be considered as a basis during the master planning process, describes the roles of various airports and the distribution of traffic among them, and provides an estimate of the future development warranted. Of importance to an individual airport operator is the extent and priority of financing capital improvements indicated in the state system plan’s development program.

Chapter 2 Airport Planning Process Philosophy › 213. CONSIDERATION FOR COMPATIBLE LAND USE/ZONING REGULATIONS

c. Often communities, airport sponsors, or other aviation interests propose development

of a new airport to replace or supplement existing airports in a community. Sometimes airport system plans—state and metropolitan—are used to conduct general site selection, feasibility, or risk assessment studies for these new airport proposals. Preparation of the airport master plan is accomplished once the sponsor for the new facility has been determined.

d. The FAA considers plans of public agencies authorized to plan for the development

of the area surrounding the airport, including regional aviation systems plans, when making its determination of reasonable consistency under 49 U.S.C. 47106(a)(1), Project Grant Application Approval Conditioned on Satisfaction of Project Requirements, and Executive Order 12372, Intergovernmental Review of Federal Programs. System plan study sponsors should ensure that the system plan reflects major runway, apron, and terminal building projects identified in airport master plans and supported by system plan analysis.

212. RELATIONSHIP TO AIRPORT CAPITAL IMPROVEMENT PLANS

a. An airport’s Capital Improvement Plan (CIP) is the compilation of proposed projects

for an individual airport for a three- to five-year period, and includes costs, priorities, AIP eligibility, and expected funding sources for each element.

b. The state or regional system planning document shows the timing for and estimated

costs of proposed airport development. It provides a mechanism to assist in the preparation of an airport’s CIP for the facilities included in the plan, incorporating the objectives of the state, and concentrating on funding priorities that are consistent with its aviation goals and policies. The state should rely, when possible, on the development and schedules recommended in individual airport master plans, because they are more detailed than those prepared in a system planning process. The state can evaluate an individual airport CIP and put those development items into the system plan that are consistent with its definition of airport roles, address identified aviation needs, and support realistic funding scenarios. In cases where no airport master plan exists or the plan is outdated, the state should develop airport capital improvement requirements for the facility using current planning methodologies and standards, found in FAA’s Airport Master Plan Advisory Circular.

213. CONSIDERATION FOR COMPATIBLE LAND USE/ZONING REGULATIONS

a. Land use control and zoning requirements are functions of state or local governments.

Planners should recognize the vital need for compatible land use requirements around airports, and these should be considered throughout the state or metropolitan area during the airport system planning process. Local communities should be encouraged to implement land use and zoning regulations in an effort to preserve and protect their local airport facilities. Compatible land use in the vicinity of an airport is necessary to protect the public’s health and welfare, while preserving the airport’s capability to efficiently meet aviation transportation needs.

Chapter 2 Airport Planning Process Philosophy › 214. SUPPORT FOR AIRPORT AND AIR SERVICE PRESERVATION

b. Communication among the state and metropolitan aviation organizations, local

community planners, and the local FAA Airports Office concerning proposed airport development is vital in enacting compatible land use initiatives and zoning regulations. This can be accomplished by including representatives of these organizations in a technical group during the system planning study. Through this coordination, recommended airport development programs and policies can be verified for consistency with local economic, environmental, land use and zoning, and surface transportation plans.

c. The complexity of compatible land use issues varies by airport location. Often, the

local community establishes regulations specific to its area, based on general guidance from the FAA, or with the strong support and detailed recommendations from the state aviation agency. Some state or metropolitan aviation agencies work directly with their local legislative bodies to implement limits on tall structures or zoning laws that increase aviation safety by protecting against both the construction of tall structures and development of incompatible land uses around airports.

d. General land use studies to consider the impact of airport development on the

environment and the protection of airports from neighboring areas may be included in the airport system plan scope. These efforts are limited to area-wide applications or specific classes of airports.

214. SUPPORT FOR AIRPORT AND AIR SERVICE PRESERVATION

a. Gaining the support of the local community and legislative representatives to preserve

or enhance a particular airport is critical in establishing a viable system of airports. Because airport system planning evaluates the performance of the state or metropolitan system by considering the interrelationship of its member airports, the resulting report defines the role of public-use airports in meeting current and future air transportation needs. When a justified need is shown in the most recent airport system plan, gaining the support of the local community to preserve and develop an airport is much easier.

b. State or metropolitan aviation agencies often prepare air service studies as an aid and

inducement for airlines when they consider use of alternative airports and revisions to their flight schedules. This work is not part of an AIP-funded state system plan and must not be included.

c. Figure 8 is an illustration from an air service study conducted for the Minnesota Office

of Aeronautics in partnership with the Wisconsin Bureau of Aeronautics. This air service study was initially intended to identify long-term capital improvement needs directly linked to an expanded role for perimeter airports located just outside the Minneapolis-St. Paul metropolitan area. As part of the effort, the Minnesota Office of Aeronautics established an Advisory Committee, which was made up of the parties listed in Figure 9 below.

AC 150/5070-7 11/10/2004

Figure 8: Sample Air Service Analysis Chart

Source: Tier 2 Air Service Study, Minnesota Office of Aeronautics, June 2003

Figure 9: Sample Advisory Committee

 FAA

 Minnesota Office of Aeronautics

 Wisconsin Bureau of Aeronautics

 Metropolitan Council

 Metropolitan Airports Commission

 Chippewa Valley Regional Airport

 Duluth International Airport

 Rochester International Airport

 St. Cloud Regional Airport

Source: Minnesota Office of Aeronautics

The Tier 2 Air Service Study began as a detailed analysis. However, its most successful result was the regular meetings of the Advisory Committee, where the members sat together and discussed how to better cooperate, strengthen their respective business centers, and jointly market airport resources. Through this study, the state and metropolitan planning agencies, and the regional airports yielded a better interregional system of airports that meets the local communities’ air service needs.

Chapter 2 Airport Planning Process Philosophy › 215. INPUT TO INTER-MODAL TRANSPORTATION PLANNING PROCESS

11/10/2004 AC 150/5070-7

215. INPUT TO INTER-MODAL TRANSPORTATION PLANNING PROCESS

a. An airport should be viewed as an element of the larger transportation system that

serves a community, metropolitan area, or state. Ground access to an airport is critical to its effective operation. Agencies responsible for the development of highways, railroads, and transit can be helpful in improving surface access to an airport for passengers, air cargo operations, and congestion reduction. An early dialogue between aviation interests and surface transportation agencies is vital to ensure that highway and transit improvements are coordinated with airport expansion plans. Similarly, significant airport development projects should be coordinated with the appropriate state and metropolitan transportation planning agencies, especially if the plans may affect surface access and movement of air cargo. State and regional system planners should be aware of the parties involved in surface transportation planning, their roles, and funding availability. These parties include the Federal Transit Administration, Federal Highway Administration, Federal Railroad Administration, state highway departments, local bus and rail transit agencies, private transportation providers, metropolitan planning organizations, and other city and county transportation agencies. Airport sponsors, working with state and metropolitan planning organizations, should also be active participants in development of statewide and metropolitan transportation plans and transportation improvement programs.

Figure 10 below, prepared by the Southern California Association of Governments (SCAG), identifies the projects and related funding needed for efficient access to the ten commercial airports in the region from its 2030 Aviation Plan. Individual airport needs were determined by forecast growth in airport-related traffic added to forecast background and through traffic, capacity of existing ground access facilities, and related factors. SCAG included these airport ground access data in its Regional Transportation Plan.

Figure 10: Sample Airport Ground Access Data Chart

Source: 2004 Regional Transportation Plan Update – Airport Ground Access, Appendix D6 –Technical Approach, Southern California Association of Governments (SCAG).

Chapter 2 Airport Planning Process Philosophy › 216. PLANNING STRATEGICALLY

b. In December 1996, the FAA and FHWA produced a report entitled “Inter-modal

Ground Access to Airports: A Planning Guide,” which is available on-line at: http://ntl.bts.gov/DOCS/AGAPP.html. Although dated, it presents a step-by-step process for ground access planning, discusses surveys and data collection, examines alternative ways of addressing ground access issues and describes access implementation plans.

c. Metropolitan planning organizations in air quality non-attainment or maintenance

areas are required by Federal law to prepare regional transportation plans (RTPs) every three years, or every five years if they are not in those areas. The regulations require inclusion of access to airports in the RTP as a factor to be explicitly considered, analyzed as appropriate, and reflected in the planning process products. Some states, such as California, even have more specific requirements for addressing regional airport issues in an RTP that is prepared by an MPO.

216. PLANNING STRATEGICALLY

a. Planners need to look beyond the known, the familiar, and the foreseen to be prepared

for challenges and opportunities that will occur as the result of changes in air transportation demand and supply, technology, and legislative requirements. They need to think strategically and to establish a flexible, dynamic airport system planning process, recognizing that risk is a reality of planning. This strategic evaluation can be achieved during a system plan update or can be accomplished through a separate special study. A methodology for strategic planning during the airport system planning process includes looking ahead to consider potential problems or opportunities; and then determining data collection procedures, problem analysis, the stakeholders that may be involved, areas of impact, range of feasible alternatives, and an action plan. This strategy allows the planning agency to be more flexible in altering an airport’s role; better able to assess strengths, weaknesses, and risks in the plan’s assumptions; and more responsive in adapting their airport system development to future changes in the aviation industry and airline market conditions.

b. As part of strategic planning, a state or metropolitan aviation planning agency can

develop its own strategy that defines and documents its role in the continuous airport system planning process. The strategy may involve establishing an overall airport system planning philosophy, setting goals and objectives for the process, and defining the scope of involvement that the agency will have in maintaining a successful continuous airport system plan. A final product can be a realistic three to five-year funding scenario for the agency’s system planning projects, which should be coordinated with the local FAA Airports Office.

Chapter 3 Airport System Planning Products › 301. AIRPORT SYSTEM PLAN REPORT

Chapter 3 Airport System Planning Products

301. AIRPORT SYSTEM PLAN REPORT

a. An airport system plan report is a document that identifies the system of airports that

meets the air transportation needs of a state, metropolitan area, or multi-state region. The state airport system plan report (or where applicable, a multi-state or metropolitan airport system plan report) is the guiding document for assigning a current and future role to each airport and in determining development needs, expressed in estimated costs and implementation schedules, based on priorities and likely funding sources. Figure 11 shows the newly built Cantrell Field Airport (KCXW) in Conway Arkansas, which opened in September, 2014.

Figure 11: General Aviation Airport

Source: City of Conway. Photo of the new Cantrell Field Airport (KCXW) in Conway, Arkansas.

The functions of an airport system plan are to:

1) List the airports included in the state plan and explain their role and functions within the state airport system, as well as to recommend the development of new airports. The plan must identify how the state categories align with the NPIAS and ASSET roles..

2) Describe the airports (including LOCID), their physical and operational features, ownership status, surface access, and aviation services and use.

Chapter 3 Airport System Planning Products › 302. INTERIM UPDATES: REVIEW AND REAPPRAISAL OF AIRPORT SYSTEM

3) Identify issues, constraints, and opportunities for the system of airports.

4) Describe the 5-, 10-, and 20-year capital development programs required to maintain and improve each system airport to meet future demand, including timing and estimated costs. Where applicable, information from metropolitan area airport system plans should be incorporated into the state plan.

5) Provide a framework and policy guidance for airport master planning. The state plan identifies each airport’s present and future aeronautical role in the system. It incorporates the development programs of individual airport master plans to the extent they are consistent with the airport’s state-defined role.

6) Provide state, regional, and FAA planners with a forecast to reference when reviewing individual airport master plan reports. Forecasting the air service and general aviation demand/activity is essential for determining system-wide needs using FAA design criteria.

7) Provide an analysis of airport development and financial information needed to update the NPIAS database, and identify airports that have not been previously identified by the FAA, but meet national interest criteria. Also, collect and validate aviation activity data for use by States and the FAA in evaluating the current and future role of each airport.

8) Provide input to surface access agencies during the comprehensive transportation process.

9) Provide the aviation industry and the general public with information on relevant aviation issues within the context of a system planning study.

10) Assist state and local policymakers in preparing recommendations on compatible land use and tall structures zoning regulations.

11) Prepare special initiatives to address aviation issues on an ongoing basis.

302. INTERIM UPDATES: REVIEW AND REAPPRAISAL OF AIRPORT SYSTEM

a. Interim updates are a critical element of the state or metropolitan area continuous

airport system planning process. They initially involve a reevaluation of the basic airport system plan report in relation to existing conditions in the local airport system. A reevaluation will be necessary when planners identify changes or constraints that affect the validity of the existing plan. Specific examples of areas that may need frequent updates include pavement condition surveys, obstruction analysis, design

Chapter 3 Airport System Planning Products › 303. SPECIAL STUDIES

standards review, and airport capital improvement plans. Other elements, such as inventory, forecasts for low activity airports, and NPIAS roles, may not require as regular reappraisals. Some rural airports may not experience significant facility or demand changes until well beyond five years. Therefore, the level of analysis of plan elements will depend on the specific factors that have prompted the reevaluation.

b. Depending on the complexity of the state or metropolitan airport system, and the

changes in the national or local aviation environment, interim updates of the airport system plan may be necessary every two to five years.

303. SPECIAL STUDIES

a. The examination of new issues relevant to airport systems analysis can be

accomplished within the framework of a state or metropolitan planning organization’s continuous airport planning process or as a separate special study. Such studies may be supplemental to the standard elements of a system plan.

b. The FAA, metropolitan or regional government, or state system planners may request

a special study to obtain data or conduct an analysis more efficiently than through the production of multiple airport master plans.

c. Special studies may include, but are not limited to, air service, air cargo operations,

standards reviews, safety area analyses, business jets access, satellite navigation and GPS, environmental or drainage inventories, surface access, economic impact, obstruction analysis or photogrammetry, general aviation security, aircraft traffic counts, and pavement management. Additional examples and policy guidance for these types of studies can be found in Chapter 7 of this document.

d. Airport sponsors do not always have the authority to study new airports as a means to

supplement or replace capacity-constrained airports. They may have little interest in carrying out a study of a new airport that they will not control, or even may consider as a potential competitor. However, special studies conducted as part of an airport system plan may be used in concert with master plans to evaluate airfield capacity alternatives for a metropolitan area. In these cases, the system plan can be used to examine the feasibility of building a new airport. In addition, system plans can be used to study transportation alternatives not within the jurisdiction of the airport sponsor, such as rail alternatives.

This page intentionally left blank.

Chapter 4 Airport System Plan Project Development › 402. GOALS AND OBJECTIVES OF THE PLAN

Chapter 4 Airport System Plan Project Development

Airport system plan project development can be divided into three major components: approach; scoping; and implementation. Appendix C provides a Checklist for Project Development that may be used by the planning agency and the local FAA Airports Office to help ensure that each of the major steps are completed.

Figure 12 illustrates the key steps in the project approach component. The first steps, which include identification and ranking of issues, determination of broad goals and specific objectives, deciding on the stakeholders involved in the planning process, and analysis of legislative requirements, should be initially defined by the planning agency and then agreed to in consultation with the FAA. The FAA should also be consulted on the determination as to what work will be accomplished by the planning agency in-house (by force account) and what by a consultant.

Figure 12: Airport System Plan Project—Approach

401. ISSUES

Planners should identify and discuss major aviation-oriented problems, including issues that airports in the state or region face now and those issues that are expected to impact aviation in the future. Items to consider should include issues internal to aviation, such as airport ownership, project financing, revenues and expenses, the level and type of air service and general/recreational aviation activities, changes to approach procedures; as well as issues caused by outside influences, such as environmental and land use requirements, airspace considerations, surface access, or public controversy regarding airport development. Issues to consider may go beyond state boundaries, depending upon the location of relevant airports. Multi-state aviation planning studies will always consider issues that affect areas across state boundaries.

402. GOALS AND OBJECTIVES OF THE PLAN

a. The project evaluation should begin with a general statement of goals with respect to

aviation and airports.

Decision: Force Account vs. Consultant

Identification

and Ranking

of Issues

Determination of

Goals and Specific Objectives

Consultation

with FAA

Decision on Stakeholders and Their Roles

Analysis of

Legislative Requirements

AC 150/5070-7 11/10/2004

b. Although such a broad statement will often be applicable from state to state, more

specific objectives and the performance criteria to be used to determine how well these objectives are met may vary significantly. The previous issues identified should then be ranked by order of importance relative to the goals and objectives of the study.

c. Some examples of broad statements of goals to be identified during the airport system

plan project development are:

1) To provide for the timely development of airports that will meet the air transportation needs and economic goals of the system planning study area;

2) To develop a system of airports that provides a high degree of safety to the users, while at the same time providing adequate levels of service in terms of reliability and efficiency;

3) To maximize the economic benefits from the development of the airport system;

4) To develop an airport system whose attributes are consistent with, and integrated into, the state’s or metropolitan area’s long-range comprehensive planning policies and plans, particularly with respect to surface transportation and land use;

5) To minimize the airport system’s environmental impact; and

6) To develop safe and efficient airports, which are built and maintained to appropriate design standards, and meet long-range aviation needs.

d. Some examples of more specific objectives, consistent with the goals, are:

1) Adequately assessing air service, general aviation, cargo, security, and surface access needs;

2) Maintenance, inventory, and update of aviation activity data and information about socioeconomic and environmental factors;

3) Review and validation of data affecting the airport system plan;

4) Reappraisal and modification of the airport system plan to account for the impact of changing aviation industry conditions;

5) Development of a mechanism for ensuring the successful interchange of information between system planning studies for a multi-state region, an individual state, a metropolitan area, airport master plans, the NPIAS, and each airport’s capital improvement plans;

6) Development of improved aircraft approach procedures; and

Chapter 4 Airport System Plan Project Development › 406. FORCE ACCOUNT VERSUS CONSULTANTS

7) Consideration of public comment to ensure awareness of the role the community believes that the airports play in the area’s transportation system.

403. STAKEHOLDERS AND THEIR ROLES

a. When formulating the project, planners should decide which stakeholders will be

involved and what roles they will play. Interested parties should include the state aviation agency, metropolitan and regional planning organizations, airport sponsors, FAA representatives, airlines and other aircraft operators, aviation industry groups, elected officials, other state transportation and environmental agencies, consultants, tribal organizations and local community groups.

b. The roles of the stakeholders in the process should include project formulation,

project management, analysis and documentation, public coordination, information dissemination, and implementation.

404. LEGISLATIVE REQUIREMENTS

a. In developing the study, planners should identify existing and proposed state and local

legislative requirements that might affect airports and their development. Such requirements might include compatible land use around airports, tall structures zoning, state aviation funding, and airport or pilot licensing.

b. Specific legislation may also define the role that the state or metropolitan agency will

play in the system planning process and the authority that the agency has in implementing airport development, such as channeling. State channeling of Federal airport grants varies nationwide, and can include specific channeling of Federal funds and/or AIP grant approvals. It is generally based on enabling state legislation rather than on Federal law.

405. CONSULTATION WITH THE FAA

a. State or metropolitan aviation agencies should hold a conference with local FAA

Airports Office representatives to discuss a new project under its system planning process and how it fits in with previous planning work. The discussion should include specific goals and objectives, as well as the approach, stakeholders, estimated project costs and schedule, and expected final study products.

b. For first-time sponsors, the FAA should discuss grant assurances, project eligibility,

and procedures for requesting Federal funding under AIP.

406. FORCE ACCOUNT VERSUS CONSULTANTS

a. Force Account

1) A force account arrangement is one in which a sponsor proposes to accomplish work with its own personnel and must be approved by the FAA prior to the work beginning.. The requirements for obtaining FAA approval to use a force account

are detailed in the AIP Handbook. A state, metropolitan, or regional planning agency may request permission to accomplish work under a force account. The justification for performing the work under force account should provide documentation that the in-house staff has the necessary experience, as well as the time and qualifications, to do the work in a timely, thorough, and competent manner, and that the costs are reasonable.

2) When the state, metropolitan, or regional planning agency is committed to maintaining a continuous airport system planning process, staff involvement is necessary in all activities.

b. Consultants

1) The initial airport system planning study, as well as updates to the plan, often require the assistance of consultants, who bring special expertise in the use of current aviation planning methodologies. Consultant services may also be necessary to help with reevaluations and reappraisals and in the performance of special studies. Local FAA Airports Office staff assist the sponsor in understanding the requirements for selection of a consultant and with the development of the scope of work, negotiations, type of contract, mandatory provisions of Federal grants, and determination of reasonableness of fees. For additional information on the topic of consultant selection, see AC 150/5100-14, Architectural, Engineering, and Planning Consultant Services for Airport Grant Projects.

After hiring a consultant (or deciding to perform the work in-house), the next component in the airport system plan project development is to complete the scoping that provides the basis for the plan. These steps are illustrated in Figure 13 and include preparation of scope of work, coordination plan, and project schedule; examination of interstate or inter-regional considerations; selection of methodologies to be used; and defining the details for the preparation of airport capital improvement plans. Each of these steps is described in the paragraphs below.

Chapter 4 Airport System Plan Project Development › 407. WORK SCOPE, COORDINATION PLAN, AND SCHEDULE

Figure 13: Airport System Plan Project—Scoping

407. WORK SCOPE, COORDINATION PLAN, AND SCHEDULE

a. The scope of the planning process will be largely dependent on whether the planning

agency is beginning the airport system planning process or is building on an existing plan. The structure and scope of work in the planning study should be designed according to the system of airports being examined and should identify specific issues and clear attainable goals, select appropriate work elements, and specify the level of effort needed for each activity. It should also define the planning approach to be used, techniques and methods, resources, work allocation, schedule, cost, financing, products, study area, public involvement, and implementation plans. Please refer to the current version of FAA Order 5100.38, AIP Handbook, for specific restrictions on eligible elements that may be included in the work scope. Appendix D contains a Checklist for Elements of an Airport System Plan, which can be used by the planning agency and the FAA during the preparation of a project scope to determine which elements should be included in the plan.

b. During the scoping process for an airport system planning project, the planning

agency, selected consultant, and the FAA should begin with a “brainstorming session,” where they identify pertinent issues involved in the airport system’s development. If issues are identified early in the process, planners can devise strategies for dealing with them, resulting in a plan that can be successfully implemented. The project scoping team should have broad representation so that all relevant issues will be identified. Some issues may be so comprehensive that they require a separate special study as part of the airport system planning process.

c. The planning agency and the selected consultant should agree on the scope of

services to be provided, including identification of the areas and major components to be studied, a description of the job activities required to accomplish the work, and the anticipated format of the end product. A detailed work scope should show that cohesive, complete, and usable plans or other products will be produced. The scope should be sufficiently detailed so that the consultant can prepare a reasonable cost estimate. Where the scope of the project is too large or complex to be accomplished in a reasonable period of time under a single planning grant, the project may need to be conducted in several phases. Each phase should result in a useable product. The

Airport System Plan Project—Scoping

Airport System Plan Project—Scoping

Define Detail for

Airport Capital Improvement Plans

Airport System Plan Project—Scoping

Determination of

Scope of Work, Coordination Plan

and Schedule Airport System Plan Project—Scoping

Examination of

Interstate and

Inter-regional Considerations Airport System Plan Project—Scoping

Selection of Methodologies

planners and the consultant should agree on schedules showing milestones for the completion of each technical product, as well as coordination and review. Deadlines should be realistic, based on the effort involved in preparing the document and the planning agency’s information requirements. The planning agency, consultant, and local FAA Airports Office should agree on target dates and should be aware of their responsibilities in meeting the project schedule. Decision points during the project should be clearly identified and all parties should recognize the importance of timely decision making.

d. A basic airport system plan scope of work may include a wide range of items. Airport

system plan projects should include only those of the following elements or activities required to produce a plan that meets the needs of the planning agency (multi-state, state, region, or metropolitan area), and that will be beneficial in the development of a viable system of airports. The scope of work may include the following items:

1) Study designs that identify the framework, parties involved, organizational arrangements, major airport problems to be resolved, specific objectives, scope of work, time schedules, and cost breakdowns for projects;

2) General site inspections, inventories and surveys of airports, user preferences, and secondary socioeconomic data;

3) Forecasting to justify proposed airport development in terms of aviation activity levels and aircraft mix, limited to simple methods and assumptions that establish the demand for aircraft operations, based aircraft, passengers, cargo, and ground access;

4) Analysis of airfield, terminal area, and surface access to determine airport capacity values, identify causes of delay, analyze alternatives, or provide input to a capacity enhancement plan. Most system plans will not require a detailed capacity analysis, and should use the data from individual airport master plans, when possible. However, a simple determination of the overall capacity of the individual airports included in the system plan can be accomplished, using the concepts defined in FAA Advisory Circular 150/5060-5, Airport Capacity and Delay;

5) Analysis of airspace capacity, based on the availability of air navigation aids, communication facilities, and the presence of natural or man-made obstructions that affect the use of airspace; this analysis should be limited to that needed to support airport system development;

6) Facility requirements determination, including analysis of the suitability, possibilities for expansion, and safety deficiencies of existing airports; the general location and need for land bank programs or new airports; and the compatibility of airports with surface access plans and comprehensive planning;

7) Analysis of a reasonable number of alternative airport systems, including feasibility and sensitivity analysis, contingency plans and the evaluation of safety, efficiency, environmental impacts3, energy considerations, and cost;

8) Preparation and adoption by the sponsor of the airport system plan (for specific forecast periods) of airport role assignment, design type, major facilities, and cost estimates;

9) General land use, noise, air quality, and other environmental studies to consider the impact of airport development on the environment and the protection of airports from incompatible uses in neighboring areas;

10) Development and implementation of land use compatibility plans and projects by state (or local unit of government) for large and medium hub airports that have not submitted a noise compatibility program within the past 10 years. The state must have the authority to plan and adopt land use control measures, including zoning, in and around the large or medium hub airport, and must have the airport owner agree to work cooperatively with it during the development of the plan.

11) Schedules of plan implementation, describing the staging of airport land acquisition and development based on aviation demand forecasts;

12) A system plan should only collect financial data needed to make broad recommendations about the airport system and its development. A financial plan should identify the portions of the development costs that could be covered by AIP grants, passenger facility charges, state grants, and other sources. Information on the potential for financing capital projects with general funds or through bond financing should be noted.

13) An airport system plan is not intended to audit each individual airport in order to determine its financial condition, but should describe the overall financial health of the airport system and make recommendations to address problem areas.

3 This reference to environmental impacts does not mean that the system plan needs to include a full analysis pursuant to NEPA; rather, the system plan should identify and consider significant environmental issues that may affect the fundamental viability of a proposed project. Moreover, inclusion of a particular project in the system plan does not represent environmental approval under NEPA, and does not (in and of itself) represent adequate justification for a proposed project during subsequent environmental review. See Section 508 for further details.

14) Capital improvement plans are normally a compilation of individual airport CIPs, screened for compliance with state or metropolitan goals, and airport role definitions, and should be provided in electronic form for downloading to the NPIAS consistent with FAA requirements;

15) Documentation of the eligibility of airports meeting the entry criteria for inclusion in the NPIAS including their role;

16) Study coordination and reports, including public meetings and community involvement sessions;

17) Continuous planning activities that relate to elements of ongoing or existing airport system plans;

18) Airport surface access programs and plans that indicate proposed routes to central business districts or arterials. The work should be based on other airport access studies that take into account traffic demand, existing and potential access problems, surface transportation facilities, heliports, and remote terminals. In addition to ground access, the plan should consider access to airport facilities and passenger convenience;

19) Preparation of state standards for development at non-primary airports;

20) Site selection and feasibility studies of the general area (excluding the specific airport area) for new, replacement, supplemental, or joint-use airports, where existing public airport sponsors agree to participate or an area-wide agency has been required or authorized by state or local law to do the planning;

21) Acquisition, licensing, and use of commercially available computer software including simulation models and other applications, when required for an approved planning purpose;

22) Economic studies to measure the benefit of interrelated developments in the network of airports and their impact on airport activity;

23) Identification of appropriate airport sponsorship arrangements (such as for a new airport), airports whose ownership structures may raise concerns, and where interagency agreements are needed;

24) Policy analysis for specific airport development proposals, such as for state aviation taxes or land use policies;

25) Performance indicators or priority systems for pavement management and capital improvement plans; or

26) Involvement in master plan projects at one or more airports. In such cases, the affected individual airport sponsors should agree, in writing, to the scope of work.

11/10/2004 AC 150/5070-7

408. INTERSTATE AND INTER-REGIONAL CONSIDERATIONS

a. When formulating the project scope of work, the sponsor should be aware that

Chapter 4 Airport System Plan Project Development › 409. METHODOLOGIES TO BE USED

airports benefit and affect surrounding states or regions. Some of the aviation demand of the specific state or region under study, including residents’ demand for commercial air service and general aviation facilities, as well as the business community’s need for air cargo services, may be met by airports in adjacent states.

b. Multi-state aviation system planning studies generally include large metropolitan

areas, where the air service demand extends across state borders to multiple airports. Since one or more of the airports are usually located outside the jurisdiction of a single metropolitan planning agency, multiple state and metropolitan areas must cooperate to address regional demand and implement the recommended airport development plans. Figure 14 shows the importance of regionalization in Boston Logan’s market area.

Figure 14: Regional Demand Addressed in a Multi-State Airport System

Source: New England, At the Forefront of Building a Regional Aviation System, sponsored by Massport and the Massachusetts Aeronautics Commission

409. METHODOLOGIES TO BE USED

a. The airport system planning process should be thorough and analytical. There should

be no ambiguity in its analysis and recommendations, since these may be used to justify project entry in the NPIAS or in prioritizing airport project development. Where possible, the use of established tools and methods, such as FAA’s forecast or benefit/cost analysis (BCA) methodologies, is encouraged. Normally, development of a BCA to justify AIP discretionary dollars is not accomplished under a system plan,

so the local FAA Airports Office should be consulted in this case. A discussion on forecast methodologies is included in Paragraph 506. The FAA Airport Benefit-Cost Analysis Guidance, prepared by the agency’s Office of Aviation Policy and Plans in December 1999, can be found at http://www.faa.gov/airports/aip/bc_analysis/During the development of an appropriate approach, planners (and their consultants) should consider what data are available, what uncertainties must be accommodated, and what information they must get from the study.

b. During the scoping process, the planning agency should, in concert with the local

FAA Airports Office, define its role in the development of forecasts. Forecasts for individual airports under a system plan are used to update the NPIAS, make adjustments to the FAA’s terminal area forecasts (TAF), determine the timing of project development, and act as the basis for a benefit/cost analysis. In lieu of individual airport forecasts, in some cases it may be appropriate to develop based aircraft, activity, or enplanements forecasts for a metropolitan area within the state.

c. Methodologies used in analysis should be appropriate for the application and should

be selected during project formulation. A system plan can evaluate demand and aviation activity for the state or region being studied, and then determine a methodology for allocating it among the airports serving that area. There are a number of forecasts available, so to the extent that they meet the requirements of the system planning project, they should be incorporated into the process. For towered airports, the system level aviation forecast can rely on airport-generated forecasts if they are current and approved by the FAA. For non-towered airports, the system level aviation forecast should use simple methods such as trend analysis, but may use the TAF. The accuracy of baseline master plan forecasts for non-towered airports may be improved through aircraft counting programs.

d. Various airfield and airspace simulation models are available for analyzing airfield

capacity and delay. When a daily schedule of aircraft operations is entered, these models provide estimates of airfield delay for various runway configurations and airfield improvements. Such modeling is time consuming and expensive and is normally done only as part of a master plan for a large hub airport with a capacity problem, but can be used in analyzing system-wide capacity issues. Advisory Circular 150/5060-5, Airport Capacity and Delay, provides simple methods for determining the annual capacity (Annual Service Volume) of an airfield. Given the range of airfield, airspace, landside and terminal modeling and simulation tools available, the project sponsor should consult the FAA Airports Office during project scoping for approval to use a specific tool for the system planning analysis.

e. The fundamental airport system planning process should include a methodology to

address unforeseen events that could affect the analyses and conclusions of a system plan developed by the state or metropolitan planning agency. The methodology should identify changes or trends, identify affected airports, determine possible impacts, and develop alternative action plans and an implementation plan for future challenges and opportunities. The alternative action plans should account for changes in air carrier routes and alliances, airport competitors, the national and local economy, and

Chapter 4 Airport System Plan Project Development › 410. DEFINE DETAIL FOR THE AIRPORT’S CAPITAL IMPROVEMENT PLANS

technology. Various scenarios may consider the impact on small communities of the loss of access to airline hubs or the conversion of regional carrier fleets to regional jets, the impact of a reduced fare structure for hub-and-spoke airports on air service at those airports, the creation of a new ground transportation corridor through a region, the impact of local or state land use initiatives, the growth of air taxis as a means of providing communities with access to the national air transportation system, the increase in movements and efficiency of air cargo operations, introduction of new airlines, or the decline in available flights as the result of a weak national economy.

For example, consider the introduction of service by a low-cost carrier at a secondary airport that previously had no significant air carrier service. This could attract a significant volume of traffic from the other air carrier airports in the region, and would require unanticipated airport development at the secondary airport in question, while also impacting the traffic growth and the development needs at the existing commercial service airports. Developing a response to this could change the state or regional system plan basic elements, recommended airport development, or airport roles.

410. DEFINE DETAIL FOR THE AIRPORT’S CAPITAL IMPROVEMENT PLANS

a. An airport’s Capital Improvement Plan (CIP) is a compilation of projects planned for a

particular airport for the next three-to-five years and includes the priority, costs, and expected funding sources for each project. Airport capital improvement planning may be accomplished as part of a state or metropolitan airport system plan or as part of an airport’s master plan. During the scoping effort, representatives of the planning agencies, the local FAA Airports Office, and individual airports should discuss the degree of detail to include in the airport capital improvement plans that will be developed as part of a specific airport system plan. They should also decide how the CIPs will be used as the basis for proposed project-level input into the NPIAS and in the prioritization of projects to request AIP funding.

b. The schedules for proposed airport development listed in a CIP that are directly related

to forecast demand levels can be tied to such levels, rather than dates, since the dates when demand actually reaches forecast levels can be difficult to predict far in advance.

The final component in airport system plan project development is the series of steps that lead to implementation. These are shown in Figure 15 below.

Figure 15: Airport System Plan Project—Implementation

411. IMPLEMENTATION PLAN

a. The airport system plan should outline the organizational structure, authority, and responsibility for implementation of its recommendations, along with a realistic assessment of needs and available resources. The recommendations should reflect the technical and financial analyses in the report. Planners should give appropriate consideration to the desires of airport operators, users, and local communities. The plan should describe the processes to be followed to ensure the adoption of appropriate land use controls, ground transportation plans, and airport sponsorships.

Chapter 4 Airport System Plan Project Development › 412. TECHNICAL ADVISORY COMMITTEE

b. The implementation plan should be formally adopted by the aviation planning

agency. There should be a reasonable degree of confidence prior to the adoption of the plan that the state and individual airports will generally have the financial capability to undertake the proposed airport development.

c. The plan should have a list of action items, and descriptions of each action item, responsible parties, schedule, financial requirements, special conditions, and approvals that must be obtained, and a means of determining the effectiveness of the recommendations. The plan should be coordinated with all affected parties. The planning agency is responsible for tracking progress and ensuring a successful implementation.

d. The implementation plan should also identify further planning or analysis that may

be required in connection with specific locations or projects, and establish clear timetables for required environmental reviews under NEPA prior to unconditional approvals of projects shown on individual ALP updates or proceeding with subsequent steps.

412. TECHNICAL ADVISORY COMMITTEE

a. Meaningful dialogue with the various stakeholders helps identify the challenges and

opportunities that should be examined during the course of the study. For system planning projects, a Technical Advisory Committee (TAC) may be appropriate to

Figure 15: Airport System Plan Project—Implementation

Adoption of Implementation

Plan

Project Management

Establishment of Technical Advisory

Committee

FAA Approval

Process

Determination of

Process

Application for

AIP Grant

Public Consultation

Chapter 4 Airport System Plan Project Development › 414. AIP GRANT APPLICATION PROCESS

ensure that the plan analysis is thorough and that the results are adequately documented and disseminated. The committee should have a representative of each party that is likely to be affected by study recommendations, and should reflect the complexity of the project scope. It should include representatives of the state aviation agency, metropolitan or regional planning organization, FAA, air carrier and general aviation airports, airlines and other aircraft operators, and, depending on the scope of the project, state or local transportation agencies, municipalities, state economic development offices, as well as Federal and state environmental resource agencies.

b. Members of the TAC should be identified in the initial development of the scope of

work, and their names and affiliations listed in reports prepared during the planning project. A list of key individuals and organizations expected to work on the project, along with their responsibilities, should also be included in those documents.

c. Depending on the timing of the establishment of the Technical Advisory Committee,