Order 5100.38D Airport Improvement Program Handbook
Change 1 reflects legislation and policy as of September 30, 2018, including the transition to 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. The changes in the Handbook also reflect feedback from industry stakeholders over the last 4 years. Change 1 to the Handbook does not reflect changes due to FAA Reauthorization Act of 2018 (Public Law 115-254) or Program Guidance Letter 17-01, "Aircraft Rescue and Firefighting (ARFF) Equipment Above Minimum Part 139 Index Requirements". These changes will be included in subsequent updates to the AIP Handbook. Note: A handbook revision is expected by summer 2027.
National Policy
Effective date: February 26, 2019
ORDER 5100.38D, Change 1
SUBJ: Airport Improvement Program Handbook
1. PURPOSE.
This Handbook provides guidance and sets forth policy and procedures used in the administration of the Airport Improvement Program.
2. DISTRIBUTION.
This Handbook is located on the FAA Office of Airports website (see Appendix B for link) where it is available to all interested parties.
3. CANCELLATION.
This Handbook cancels the following order:
• FAA Order 5100.38D, Airport Improvement Program Handbook (dated September 30, 2014).
4. EXPLANATION OF CHANGES.
This Handbook replaces the above order with updated information that reflects current legislation and policy as of September 30, 2018, with the exception of Program Guidance Letter (PGL) 17-01. The changes in this Handbook reflect feedback from industry stakeholders over the last 4 years. It does not include changes in FAA Reauthorization Act of 2018 (Public Law 115-254), which will initially be addressed in the form of PGLs and then in a subsequent update of the AIP Handbook itself. The FAA Office of Airports has streamlined this Handbook and replaced guidance with references where there is a more appropriate source of guidance (such as in other orders or advisory circulars). This includes deleting guidance on airport planning, capital planning, labor rates, and civil rights. The references appear as the basic publication numbers without any suffix. The intent is for the reader to use the latest version of the referenced publications.
The Office of Airports is issuing Change 1 to this Handbook to:
• Incorporate PGLs issued up to, but not including PGL 17-01.
• Reflect the transition to 2 Code of Federal Regulations (CFR) part 200, which became effective on December 19, 2014.
• Incorporate legislation from the authorization extensions following the expiration of the FAA Modernization and Reform Act of 2012 (Public Law 112-95), which includes the following:
o The Airport and Airway Extension Act of 2015 (Public Law 114-55) enacted September 30, 2015.
o The Airport and Airway Extension Act of 2016 (Public Law 114-141) enacted March 30, 2016.
o The FAA Extension, Safety, and Security Act of 2016 (Public Law 114-190) enacted July 15, 2016.
o The Disaster Tax Relief and Airport and Airway Extension Act of 2017 (Public Law 115-63) enacted September 29, 2017.
o The Consolidated Appropriations Act, 2018 (Public Law 115-141) enacted March 23, 2018.
• Include provisions from the following appropriation:
o The Consolidated Appropriations Act of 2016 (Public Law 114-113), enacted December 18, 2015.
o The Consolidated Appropriations Act of 2017 (Public Law 115-31) enacted May 5, 2017.
o The Consolidated Appropriations Act, 2018 (Public Law 115-141) enacted March 23, 2018.
Note: The FAA Reauthorization Act of 2018 (Public Law 115-254) enacted on October 5, 2018 is not incorporated in Change 1. These changes, as well as those from PGL 17-01, will be included in subsequent updates to the AIP Handbook.
Vertical bars in the margins indicate the substansive text revisions made in Change 1. The FAA Office of Airports will publish a separate summary of changes as a companion document to Change 1. Non-substantive formatting, grammar, and wording changes were made throughout Change 1, which requires FAA Order 5100.38D to be replaced by Change 1 in its entirety, and are not marked.
Original signed by: Robin K. Hunt
Robin K. Hunt Acting Director, Office of Airport Planning and Programming
iii
Table of Contents
Chapter 1. What do I need to know about this order? … 1-1
1-1. This Order Is Called the Handbook … 1-1 1-2. Purpose of the Handbook … 1-1 1-3. Handbook Audience … 1-1 1-4. Handbook Location on the Internet … 1-1 1-5. Publications this Handbook Cancels … 1-1 1-6. Relevant AIP Legislation (Referred to as the Act) … 1-1 1-7. AIP Transition to 2 CFR part 200 … 1-2 1-8. Format for References to the Act … 1-4 1-9. Broad Objective of the Act … 1-4 1-10. The Act is a Permissive Statute … 1-4 1-11. Aviation Priorities in the Act … 1-5 1-12. List of Handbook References (with Links to the Associated Websites) … 1-5 1-13. General Principles of this Handbook … 1-5 1-14. Warning on Taking Handbook Text Out of Context … 1-6 1-15. Use of the Term Airports District Office (ADO) … 1-6 1-16. Use of the Phrase ADO has the option … 1-6 1-17. FAA Office of Airports Positions/Divisions/Branches Referenced in this Handbook … 1-6 1-18. Location of Handbook Definitions … 1-7 1-19. Process for Handbook Changes … 1-7 1-20. Supplemental Guidance and Standard Operating Procedures … 1-7 1-21. New Handbook Layout and Format … 1-7
Chapter 2. Who can get a grant? … 2-1
2-1. Grant Recipients are Referred to as Sponsors … 2-1 2-2. Type of Sponsors … 2-1 2-3. Type of Projects Each Sponsor Type Can Receive in a Grant … 2-2 2-4. Grant Assurances – Definition and Which Ones to Use … 2-5 2-5. Grant Assurances – Duration and Applicability … 2-9 2-6. Sponsor Qualification Criteria … 2-14 2-7. State Sponsorship Benefits … 2-20 2-8. Sponsorship Determination Process … 2-20 2-9. Transfer of Sponsorship … 2-20 2-10. Conflicting Grant Requests from More than One Entity … 2-21
Chapter 3. What projects can be funded? … 3-1
Section 1. List of 16 Requirements for Project Funding … 3-1
3-1. List of 16 Requirements for Project Funding … 3-1
Section 2. Project Eligible … 3-2
3-2. The Act Establishes the General Types of Eligible Projects … 3-2 3-3. Project Requirement Tables (in the Appendices by Project Type) … 3-2 3-4. Prohibited Project and Unallowable Cost Tables … 3-2 3-5. Only Specific Equipment is Eligible under the Act … 3-2 3-6. Eligibility of Maintenance, Rehabilitation, Reconstruction, and Replacement Projects … 3-2 3-7. Difference between AIP and Passenger Facility Charge (PFC) Eligibility … 3-6
Section 3. Project Justified … 3-7
3-8. Three Basic Tests for Project Justification … 3-7 3-9. Justification Requirements for Safety and Security Projects … 3-8 3-10. Justification Requirements for Unclassified Airport Projects … 3-8 3-11. The Use of Critical Aircraft for Justification … 3-9
iv
3-12. Useful Life Test for Equipment and Facilities … 3-9 3-13. Benefit-Cost Analysis (BCA) for NAVAIDs and Weather Reporting Equipment … 3-10 3-14. BCAs for Capacity Projects Using Discretionary Funds … 3-10 3-15. BCAs for All Other Projects … 3-12
Section 4. Project on Airport Property (with Good Title) … 3-12
3-16. On-Airport Property Requirements … 3-12
Section 5. Project on Airport Layout Plan … 3-14
3-17. Airport Layout Plan Requirement … 3-14
Section 6. Intergovernmental Review and Airport User Consultation Complete … 3-15
3-18. Intergovernmental Review … 3-15 3-19. Consultation with Airport Users … 3-16
Section 7. FAA Environmental Finding Complete … 3-17
3-20. Environmental Finding Requirements … 3-17
Section 8. Usable Unit of Work Obtained … 3-17
3-21. Usable Unit Requirements (and Phased Project Conditions) … 3-17
Section 9. FAA Standards Met … 3-18
3-22. Mandatory FAA Standards … 3-18 3-23. Modification to FAA Standards (or Specifications) … 3-19 3-24. Standards that Exceed those of the FAA … 3-20 3-25. Eligibility Differences between the Handbook and the Advisory Circulars … 3-23 3-26. Approval and Use of State Standards … 3-23 3-27. Projects with No FAA Standard … 3-24 3-28. ADO Review of Plans and Specifications … 3-24
Section 10. Project Procured Correctly … 3-25
3-29. Importance of 2 CFR §§ 200.317-200.326 (Formerly 49 CFR § 18.36) … 3-25 3-30. Sponsor Procurement Requirements … 3-26 3-31. Summary Table of Mandatory/Optional ADO Procurement Review … 3-26 3-32. Bid Protests and Appeals … 3-29 3-33. Procurement Protests and Appeals after the Contract Award … 3-31 3-34. Bonding that Does Not Meet the Minimum Requirements … 3-31 3-35. Noncompetitive Proposals (Including Sole Source and Inadequate Number of Qualified Sources) … 3-32 3-36. Limited Noncompetitive Proposal Situations (ALCMS Modifications, One Manufacturer, Sponsor Preferred, Prohibited LED Lighting) … 3-32 3-37. Change Orders, Supplemental Agreements, and Contract Modifications … 3-34 3-38. Contract Clauses and Contract Provisions Required for AIP Grants … 3-34 3-39. Contracts Containing Ineligible and/or Non-AIP Funded Work (Including Proration) … 3-34 3-40. Contracts Containing Requirements that May Reduce the Number of Potential Bidders … 3-36 3-41. Contracts Containing Work that Exceeds FAA Standards … 3-36 3-42. Consultant Contracts (Qualifications Based with Negotiated Price) … 3-37 3-43. Design-Build and Construction Manager-at-Risk Contracts … 3-37 3-44. Engineering Materials Arrestor System (EMAS) … 3-38 3-45. Bid Alternates (Including Life Cycle Cost Analysis Alternates) and Bid Additives … 3-39 3-46. Bidding Asphalt and Concrete Alternates … 3-39 3-47. Buy American Requirements … 3-39 3-48. DOT Office of Inspector General (OIG) Notification of Potential Procurement/Bid Improprieties … 3-40 3-49. Escalator Clauses … 3-41
v
3-50. Plans and Specifications Review … 3-41 3-51. Pre-award Review of Contracts … 3-41 3-52. Sponsor’s Procurement System … 3-42 3-53. Force Account Work … 3-42 3-54. Value Engineering … 3-44 3-55. Indefinite Delivery (Task Orders) Extensions for Construction Services … 3-45 3-56. Indefinite Delivery (Task Orders) Extensions for Consultant Services … 3-45 3-57. Suspension or Debarment of Persons or Companies … 3-45
Section 11. Cost Allowable … 3-46
3-58. Allowable Cost Legislation and Policy … 3-46 3-59. Unallowable Cost Table … 3-47 3-60. Administrative Costs … 3-47 3-61. Indirect Costs … 3-49 3-62. Architectural Enhancements Costs … 3-51 3-63. Benefit-Cost Analysis (BCA) Costs … 3-51 3-64. Construction Costs … 3-52 3-65. Construction Project Signs Costs … 3-52 3-66. Computer Software and Data Subscription Costs … 3-52 3-67. Disadvantaged Business Enterprise (DBE) Plan Updates … 3-52 3-68. Drainage Costs … 3-53 3-69. Duct Bank Costs for Ineligible Facilities … 3-53 3-70. Energy Efficiency (Green/Sustainable) Improvement Costs … 3-53 3-71. Engineering and Architectural (A/E) Costs … 3-54 3-72. Environmental Finding Costs … 3-55 3-73. Equipment Leasing (instead of Purchase) Costs … 3-55 3-74. Facility Impeding an AIP Development Project – Costs to Rebuild or Relocate in Another Location … 3-55 3-75. Flight Check … 3-61 3-76. Force Account Costs … 3-62 3-77. Geographic Information System (GIS) Data Collection … 3-62 3-78. Heated Airfield Pavement … 3-63 3-79. Historic Building Costs … 3-63 3-80.
Hydrant Fuel Lines and Pit Costs … 3-63 3-81. Land Acquisition Costs … 3-63 3-82. Legal Fees and Settlement Costs … 3-66 3-83. Lighted X’s and Other Runway Closure Markings Costs … 3-67 3-84. Nonroad Diesel Engines … 3-67 3-85. Normally Unallowable Costs that are Necessary to Carry Out the Project … 3-68 3-86. Project Formulation Costs … 3-68 3-87. Reimbursable Agreements with Other Federal Agencies … 3-69 3-88. Safety Management System (SMS) and Safety Risk Management (SRM) Costs … 3-69 3-89. Secondary Electrical Power Supply Costs … 3-70 3-90. Seismic Standards … 3-71 3-91. Site Preparation Costs for Ineligible Work … 3-71 3-92. Spare Part Costs … 3-71 3-93. Sponsor Furnished Materials or Supplies … 3-72 3-94. Temporary Construction Costs … 3-74 3-95. Thermoplastic Markings … 3-75 3-96. Used Equipment Costs … 3-75 3-97. Utility Costs … 3-75 3-98. Value Engineering … 3-76
Section 12. Costs Necessary (Allowable Cost Rule #1) … 3-76
3-99. Requirements for Costs to be Necessary … 3-76
vi
Section 13. Costs Incurred after Grant Executed (Allowable Cost Rule #2) … 3-76
3-100. Rules for Reimbursing Project Costs Prior to the Grant (or LOI) Execution Date … 3-76
Section 14. Costs Reasonable (Allowable Cost Rule #3) … 3-81
3-101. Sponsor Requirements … 3-81 3-102. ADO Review Requirements … 3-84 3-103. Documentation of ADO Determination … 3-84
Section 15. Costs Not in Another Federal Grant (Allowable Cost Rule #4) … 3-85
3-104. Requirement for Costs to Not be in Another Federal Grant … 3-85
Section 16. Costs within Federal Share (Allowable Cost Rule #5) … 3-85
3-105. Allowable Federal Share Requirement … 3-85
Section 17. No Unreasonable Delay in Completion … 3-85
3-106. Requirement for No Unreasonable Delay in Project Completion … 3-85
Chapter 4. What AIP funding is available? … 4-1
4-1. Legislation Needed to Issue AIP Grants (Authorization/Appropriation) … 4-1 4-2. Airport and Airway Trust Fund (Source of AIP) … 4-1 4-3. Calendar Year Used for Passenger Boardings, Entitlements, and Cargo Landed Weight … 4-1 4-4. Categories of AIP Funding (Including Calculations and Legislative References) … 4-1 4-5. Types of Potential Funding by Airport Type (Including Airport Type Definitions) … 4-7 4-6. Airports that Can Use Each Fund Type (Funding Restrictions by Airport Type) … 4-14 4-7. Project Restrictions by Fund Type … 4-18 4-8. Fund Expiration Time Frames by Airport and Fund Type … 4-22 4-9. Federal Share by Airport Type (Including Exceptions) … 4-23 4-10. Federal Share Exception for States with Large Amounts of Public Land … 4-27 4-11. Transfer of Entitlement Funds between Airports … 4-28 4-12. Use of Donations (or Previously Acquired Land) as the Sponsor Share … 4-31 4-13. Budget Augmentation (Combining Funds between Different Federal Programs) … 4-39
Chapter 5. How does the grant process work? … 5-1
Section 1. Basic Grant Steps … 5-1
5-1. Basic Grant Steps … 5-1
Section 2. Pre-Grant Actions … 5-1
5-2. Introduction … 5-1 5-3. Identification of Potential Projects by Sponsors and ADO … 5-2 5-4. Early Coordination between ADO and Sponsor … 5-4 5-5. ADO Verification of Sponsor Eligibility … 5-5 5-6. ADO Verification that All Project Requirements Will Be Met … 5-5 5-7. ADO Verification that Airport Layout Plan is Current … 5-5 5-8. ADO Notification to New Sponsors of Flood Insurance Requirements … 5-6 5-9. ADO Notification and Verification of Sponsor Civil Rights Requirements … 5-6 5-10. ADO Verification that Risk Level Determination is Current … 5-7 5-11. ADO Review of Open Grant Status … 5-7 5-12. ADO Verification that Competition Plan is Current … 5-7
Section 3. Grant Programming … 5-8
5-13. Introduction … 5-8 5-14. Project Evaluation Report and Development Analysis (PERADA) Completion … 5-8 5-15. Grant Programming … 5-8
vii
5-16. Congressional Notification … 5-8 5-17. Sponsor Notification … 5-9
Section 4. Grant Application, Offer, and Acceptance … 5-9
5-18. Introduction … 5-9 5-19. Grant Application Package Submittal … 5-9 5-20. Grant Application Review … 5-12 5-21. Reservation of Funds … 5-13 5-22. Grant Offer … 5-14 5-23. Grant Acceptance … 5-23 5-24. The FAA Office of Finance and Management, FAA Accounts Payable Section B (AMK-314) Notification … 5-23
Section 5. ADO Grant Oversight … 5-23
5-25. ADO Oversight (and Required Sponsor Documentation) Based on Sponsor Risk Level … 5-23 5-26. Requirement to Include a Copy of FAA Determinations in the Grant File … 5-24 5-27. Statutory Requirement for ADO Project Oversight … 5-24 5-28. Safety Risk Management (SRM) Panels … 5-24 5-29. Construction Safety Phasing Plans … 5-24 5-30. Predesign, Prebid, and Preconstruction Conferences … 5-24 5-31. Equipment Photographs … 5-24 5-32. Construction Photographs … 5-25 5-33. Construction Management Programs … 5-25 5-34. Notices to Proceed … 5-25 5-35. Change Orders, Supplemental Agreements, and Contract Modifications … 5-25 5-36. Periodic Inspections … 5-30 5-37. Construction Progress and Inspection Report … 5-30 5-38. Meetings for Planning and Environmental Study Grants … 5-30 5-39. Forecasts in Planning or Environmental Projects … 5-30 5-40. Performance Report (formerly called Quarterly Performance Report) … 5-30 5-41. Annual Reporting of Residential Population Benefits … 5-32 5-42. Final Inspection … 5-32
Section 6. Grant Payments … 5-32
5-43. Summary of Payment Request Requirements and Limitations … 5-32 5-44. Requirements and Process for Using the Current DOT Electronic Payment System … 5-33 5-45. Requirements for Frequency of Payment Requests and Expenditure Rate … 5-33 5-46. Requirements for Approving Payment within the Last 10% of the Federal Share … 5-34 5-47. Requirements for Payment Requests to be Based on Incurred Costs … 5-34 5-48. Requirements for Reducing or Withholding Payments … 5-35 5-49. Limitations for Contract Retainage … 5-36 5-50. Limitations for Contractor Disputed Costs … 5-38 5-51. Limitations for Land Acquisition Costs … 5-38 5-52. Requirements for Avoiding Improper Payments … 5-38 5-53. Requirements for Financial Reporting (Standard Forms 425, 271, and 270) … 5-40 5-54. Requirements for Retaining/Providing Supporting Documentation … 5-40
Section 7. Grant Amendments … 5-40
5-55. Criteria for Amending a Grant … 5-40 5-56. Procedure for the ADO to Process an Amendment … 5-50
Section 8. Grant Closeouts … 5-51
5-57. Grant Closeout Steps and Requirements … 5-51 5-58. Block Grant Closeout … 5-56
viii
Section 9. Grant Suspension and/or Termination … 5-57
5-59. Reasons for Possible Grant Suspension or Termination … 5-57 5-60. Suspension of a Grant … 5-57 5-61. Termination for Cause … 5-58 5-62. Termination for Convenience … 5-59
Section 10. Post-Grant Actions … 5-59
5-63. Sponsor Records Retention … 5-59 5-64. ADO Records Retention … 5-60 5-65. Reopening Grants … 5-60 5-66. Audit Requirements … 5-60 5-67. Disposal of AIP Funded Equipment … 5-62 5-68. Disposal of Excess/Unneeded AIP Funded Land (and ADO/Sponsor Tracking) … 5-63
Chapter 6. What special AIP programs are available? … 6-1
Section 1. Letters of Intent (LOI) … 6-1
6-1. LOI Overview … 6-1 6-2. LOI Funding Rules and Policy … 6-1 6-3. LOI in the Context of an Airport’s Overall Capital Program … 6-3 6-4. LOI Project Criteria by Airport Type … 6-4 6-5. LOI Approval/Disapproval Process … 6-7 6-6. Sponsor LOI Submission Requirements … 6-9 6-7. LOI Evaluation Criteria … 6-12 6-8. LOI Offer Package … 6-12 6-9. LOI Grant Administration … 6-14 6-10. LOI Amendments … 6-14 6-11. LOI Closeout … 6-15 6-12. Revising, Suspending, or Terminating an LOI … 6-15
Section 2. State Block Grant … 6-15
6-13. General … 6-15 6-14. Limited State Flexibility … 6-15 6-15. Responsibilities Retained by the FAA … 6-15 6-16. Legislative History and List of Participants … 6-16 6-17. State Block Grant Program Application … 6-17 6-18. FAA Selection of State Block Grant Participants … 6-18 6-19. Memorandum of Agreement … 6-19 6-20. Grant Assurances … 6-19 6-21. Criteria for an Airport to be in the State Block Grant Program … 6-20 6-22. ADO Right to Issue Grants Directly to Airports in the State Block Grant Program … 6-20 6-23. Decision Authority for Discretionary Funds … 6-20 6-24. Grant Federal Share … 6-21 6-25. Grant and Amendment Processes … 6-21 6-26. Transfer of AIP Funding between Airports … 6-21 6-27. Project Eligibility and Allowable Costs … 6-21 6-28. Project Administrative Costs … 6-22 6-29. Program Administration Costs … 6-22 6-30. Required Timeframe to Issue Subgrants … 6-22 6-31. Grant/Project Oversight … 6-22 6-32. Grant Payments … 6-22 6-33. Grant Closeout … 6-22 6-34. Program Review by the FAA … 6-22 6-35. Accounting and Audits … 6-22 6-36. Suspension/Termination of a Grant Issued under the State Block Grant Program … 6-23 6-37. Suspension of a State from the State Block Grant Program … 6-23
ix
6-38. Removal or Voluntary Withdrawal from the State Block Grant Program … 6-23
Section 3. Military Airport Program … 6-24
6-39. General … 6-24 6-40. AIP Funding … 6-24 6-41. Designation Authority … 6-24 6-42. Original MAP Designation Duration … 6-24 6-43. Redesignation Duration … 6-24 6-44. Requirements … 6-24 6-45. Typical MAP Projects … 6-27 6-46. Use of Regular AIP on a MAP Designated Airport … 6-28 6-47. MAP Funding Limitations … 6-28 6-48. Reimbursement with Discretionary … 6-28 6-49. Application Process … 6-28
Section 4. Innovative Finance Demonstration Program … 6-29
6-50. Legislative History and References … 6-29 6-51. Program Rules … 6-29
Section 5. Voluntary Airport Low Emission Program (VALE) … 6-30
6-52. Legislative History … 6-30 6-53. Legislative References … 6-31 6-54. Purpose and General Overview … 6-31 6-55. Available Guidance … 6-31 6-56. Application and Grant Process … 6-32 6-57. Project Funding Requirements … 6-32
Section 6. Zero Emission Vehicle and Infrastructure Pilot Program … 6-32
6-58. Legislative History … 6-32 6-59. Legislative References … 6-32 6-60. Purpose … 6-33 6-61. Available Guidance … 6-33 6-62. Application and Grant Process … 6-33 6-63. Project Funding Requirements … 6-33
Section 7. Program to Increase Energy Efficiency of Airport Power Sources … 6-33
6-64. Legislative History … 6-33 6-65. Legislative References … 6-33 6-66. Purpose … 6-34 6-67. Available Guidance … 6-34 6-68. Application and Grant Process … 6-34 6-69. Funding and Federal Share … 6-34 6-70. Project Funding Requirements … 6-34
Section 8. Airport Development Rights Pilot Program … 6-34
6-71. Legislative History … 6-34 6-72. Rules of the Pilot Program … 6-34
Section 9. Redevelopment of Airport Properties Pilot Program … 6-39
6-73. Legislative History … 6-39 6-74. Purpose … 6-39 6-75. Availability of Guidance … 6-39
Appendix A. Definitions of Terms Used in this Handbook … A-1
A-1. Definitions of Terms Used in this Handbook … A-1
x
Appendix B. References and Web Links … B-1
B-1. References and Web Links … B-1
Appendix C. Prohibited Projects and Unallowable Costs … C-1
C-1. Examples of General Prohibited Projects/Costs (for All Types of Projects) … C-1 C-2. Examples of Construction Prohibited Projects/Costs … C-6 C-3. Examples of Equipment Prohibited Projects/Costs … C-14 C-4. Examples of Land Prohibited Projects/Costs … C-18 C-5. Examples of Noise Mitigation Prohibited Projects/Costs … C-19 C-6. Examples of Planning or Environmental Prohibited Projects/Costs … C-21
Appendix D. Miscellaneous Projects … D-1
D-1. How to Use This Appendix … D-1 D-2. Airfield Needs Requirement for Revenue Producing Aeronautical Support Facilities … D-1 D-3. Project Requirements … D-1
Appendix E. Planning Projects … E-1
E-1. How to Use This Appendix … E-1 E-2. Conditions for Posting Planning Documents on the Internet … E-1 E-3. Disclaimer for AIP Funded Planning Studies … E-1 E-4. Stand-Alone Master Plan and System Plan (Metropolitan and State) Projects … E-1 E-5. Project Requirements Table … E-4
Appendix F. New Airport Projects … F-1
F-1. How to Use This Appendix … F-1 F-2. Project Requirements Tables … F-1
Appendix G. Runway Projects … G-1
G-1. How to Use This Appendix … G-1 G-2. Secondary, Crosswind and Additional Runways … G-1 G-3. Pavement Condition Index Requirements for Airfield Pavement Projects … G-2 G-4. Project Requirements Tables … G-3
Appendix H. Taxiway Projects … H-1
H-1. How to Use This Appendix … H-1 H-2. Taxiway Types (and Associated AIP Funding Rules) … H-1 H-3. Pavement Condition Index Requirements for Airfield Pavement Projects … H-2 H-4. Project Requirements Tables … H-2
Appendix I. Apron Projects … I-1
I-1. How to Use This Appendix … I-1 I-2. Non-Exclusive Use Available for Public Aircraft Parking/Access … I-1 I-3. Apron in Front of a Building … I-1 I-4. Pavement Condition Index Requirements for Airfield Pavement Projects … I-1 I-5. Project Requirements Tables … I-2
Appendix J. Airfield Marking, Signage, and Lighting Projects … J-1
J-1. How to Use This Appendix … J-1 J-2. Eligibility of Pavement Marking as a Stand-Alone Project … J-1 J-3. Eligibility of Sign Panel Replacement as a Stand-Alone Project … J-1 J-4. Airport Lighting Control Panel Modification … J-2 J-5. Certified Lighting Equipment for which there is Only a Single Manufacturer … J-3 J-6. Lighting for Pavement that Exceeds FAA Design Standards … J-3 J-7. Project Requirements Table … J-3
xi
Appendix K. Navigational Aid (NAVAID) and Weather Reporting Equipment Projects … K-1
K-1. How to Use This Appendix … K-1 K-2. Installation of Instrument Landing Systems (ILS) … K-1 K-3. Transfer of Equipment to the FAA Air Traffic Organization (ATO) … K-1 K-4. Required FAA Air Traffic Organization (ATO) Coordination … K-2 K-5. Designated Instrument Runway Requirement … K-2 K-6. NAVAID and Weather Reporting Equipment Communication Requirements … K-2 K-7. Compass Calibration Pad … K-2 K-8. Airside Service Roads to Access AIP Eligible NAVAIDs … K-2 K-9. Project Requirements Table … K-2
Appendix L. Safety and Security Equipment Projects … L-1
L-1. How to Use This Appendix … L-1 L-2. Justification for Safety and Security Equipment … L-1 L-3. Safety Equipment beyond 14 CFR part 139 Requirements … L-1 L-4. Use of Safety and Security Equipment … L-1 L-5. Off-Airport Storage of ARFF Equipment … L-1 L-6. Radios and Communication Equipment … L-2 L-7. Security Equipment beyond 49 CFR part 1542 Requirements … L-2 L-8. Sensitive Security Information … L-2 L-9. Project Requirements Table … L-2
Appendix M. Other Equipment Projects … M-1
M-1. How to Use This Appendix … M-1 M-2. Project Requirements Table … M-1
Appendix N. Terminal Building Projects … N-1
N-1. How to Use This Appendix … N-1 N-2. Eligibility of Terminals Non-Commercial Service Airports … N-1 N-3. Public-Use and Movement of Passengers/Baggage Requirements … N-1 N-4. Revenue Producing Eligibility and Conditions for Terminal Buildings … N-2 N-5. Safety, Security, and Access Needs Met … N-3 N-6. Terminal Areas Related to Security (Landside, Sterile, and Secured) … N-3 N-7. Prorated Areas and High Cost Eligible/Ineligible Items … N-4 N-8. Terminal Area Impacted by an AIP Eligible Terminal Project … N-4 N-9. Typical Eligible Areas/Equipment within a Terminal Building … N-4 N-10. Additional Eligible Terminal Areas/Equipment at Nonhub Primary and Nonprimary
Airports … N-7 N-11. Terminal Building Funding Rules by Airport Type … N-8 N-12. Project Requirements Tables … N-10
Appendix O. Other Building Projects … O-1
O-1. How to Use This Appendix … O-1 O-2. Aircraft Rescue & Firefighting Building Costs at 14 CFR part 139 Airports … O-1 O-3. Project Requirements Tables … O-2
Appendix P. Roads and Surface Transportation Projects … P-1
P-1. How to Use This Appendix … P-1 P-2. Project Requirements Tables … P-1
Appendix Q. Land Projects … Q-1
Q-1. How to Use This Appendix … Q-1 Q-2. General Eligibility Requirements … Q-1 Q-3. Applicable Land Orders, Regulations, and Advisory Circulars … Q-1 Q-4. Appraisal Requirement … Q-1
xii
Q-5. Good Title Requirements for Land and Easement Acquisition … Q-2 Q-6. Acceptable Land Interests … Q-2 Q-7. Logical Boundaries … Q-3 Q-8. Uneconomic Remnants … Q-3 Q-9. Disposal of Excess Land … Q-3 Q-10. Purchasing Land from a State/Local Public Agency … Q-3 Q-11. Project Requirements Tables … Q-4
Appendix R. Noise Compatibility Planning/Projects … R-1
R-1. How to Use This Appendix … R-1 R-2. General Eligibility Requirements (The Four Types of Justification) … R-1 R-3. Noncompatible Land Uses … R-1 R-4. Not all 14 CFR part 150 Measures are Eligible … R-2 R-5. Reduction Due to Aircraft Noise Associated with the Airport … R-2 R-6. Eligible Noise Contour Threshold (or the Use of a Lower Local Standards) … R-2 R-7. Required Validation of the Noise Exposure Maps … R-2 R-8. Interior Noise Level Requirements … R-3 R-9. Block Rounding … R-4 R-10. Neighborhood Equity … R-4 R-11. Pre- and Post-Testing Criteria for Noise Insulation Projects … R-5 R-12. Conditions for Posting Planning Documents on the Internet … R-7 R-13. Disposal of Excess/Unneeded AIP Funded Noise Land (and ADO/Sponsor Tracking) … R-8 R-14. Project Requirements Tables … R-8
Appendix S. Environmental Planning/Mitigation Projects … S-1
S-1. How to Use This Appendix … S-1 S-2. Conditions for Posting Planning Documents on the Internet … S-1 S-3. Project Requirements Tables … S-1
Appendix T. Military Airport Program Projects … T-1
T-1. How to Use This Appendix … T-1 T-2. Project Requirements Tables … T-1
Appendix U. Sponsor Procurement Requirements (Including 2 CFR §§ 200.317-200.326 (formerly 49 CFR § 18.36)) … U-1
U-1. Appendix Layout … U-1 U-2. Sponsor Force Account Costs … U-1 U-3. Sponsor Furnished Material or Supplies … U-1 U-4. Buy American Requirements … U-1 U-5. Suspension or Debarment of Persons or Companies … U-1 U-6. Terminology Used in Industry … U-2 U-7. Prohibited Light Emitting Diode (LED) Lighting … U-2 U-8. Why 2 CFR §§ 200.317-200.326 is Reproduced in This Appendix … U-3 U-9. 2 CFR § 200.317 - Procurements by States … U-3 U-10. 2 CFR § 200.318 - General Procurement Standards … U-3 U-11. 2 CFR § 200.319 - Competition … U-7 U-12. 2 CFR § 200.320 - Methods of Procurement to be Followed … U-10 U-13. 2 CFR § 200.320(a) - Procurement by Micro-Purchases … U-11 U-14. 2 CFR § 200.320(b) - Procurement by Small Purchase Procedures … U-12 U-15. 2 CFR § 200.320(c) - Procurement by Sealed Bids (Formal Advertising) … U-13 U-16. 2 CFR § 200.320(d) - Procurement by Competitive Proposals … U-16 U-17. 2 CFR § 200.320(e) - Reserved … U-21 U-18. 2 CFR § 200.320(f) - Procurement by Noncompetitive Proposals … U-21 U-19. 2 CFR § 200.321 - Contracting with Small and Minority Businesses, Women’s
Business Enterprises, and Labor Surplus Area Firms … U-24 U-20. 2 CFR § 200.322 - Procurement of Recovered Materials … U-25
xiii
U-21. 2 CFR § 200.323, Contract Cost and Price … U-26 U-22. 2 CFR § 200.324 - Federal Awarding Agency or Pass-Through Entity Review … U-28 U-23. 2 CFR § 200.325 - Bonding Requirements … U-30 U-24. 2 CFR § 200.326 - Contract provisions … U-31
Appendix V. Revenue Sources for the Airport and Airway Trust Fund … V-1
V-1. General … V-1
Appendix W. Competition Plans … W-1
W-1. Legislative History … W-1 W-2. Purpose … W-1 W-3. Covered Airports … W-1 W-4. Prohibition on Grant Execution … W-1 W-5. Requirements for Initial Plan Submittal and Updates … W-2 W-6. Initial Competition Plan Contents … W-3 W-7. Competition Plan Update Contents … W-7 W-8. Sponsor Guidance … W-7 W-9. Plan Review Process … W-7 W-10. Additional FAA Actions … W-8 W-11. Plan Development Eligibility … W-8
Appendix X. Buy American Guidance … X-1
X-1. General Sponsor Buy American Requirements … X-1 X-2. Other Buy American and Buy America Requirements … X-1 X-3. Changes Orders and Buy American Requirements … X-1 X-4. Buy American Waiver Process and Delegation … X-1 X-5. National Buy American Waiver … X-3 X-6. Definitions … X-4
Appendix Y. Federal Share at Public Land State Airports … Y-1
Y-1. General Federal Share Definition … Y-1 Y-2. Public Land States Definition … Y-1 Y-3. History of the Public Land Share Formula … Y-2 Y-4. Calculating the Federal Share in Public Land States Using the Part ‘b’ and Part ‘c’
Formulas … Y-3 Y-5. Part ‘b’ Formula … Y-3 Y-6. Part ‘c’ Calculation (the Grandfather Rule) … Y-9 Y-7. Public Land State Federal Share Results … Y-10
Appendix Z. Establishment and Category Upgrade Policy for Instrument Landing Systems (ILS) Z-1
Z-1. Background … Z-1 Z-2. Use of RNAV Approaches Instead of Cat I ILS Systems … Z-1 Z-3. FAA Air Traffic Organization (ATO) Funding for Cat I ILSs … Z-1 Z-4. AIP Funding for Cat I ILSs … Z-2 Z-5. AIP or ATO Funding of Cat II/III ILSs … Z-2 Z-6. AIP Transition from ILS to RNAV … Z-2
xiv
List of Tables and Figures
Table of Contents … iii List of Tables and Figures … xiv Table 1-1 AIP Related Legislation … 1-2 Table 1-2 Crosswalk between 2 CFR part 200 and Previous OMB Circulars (see Appendix B for
link to the website containing these crosswalks) … 1-3 Table 1-3 Examples of Differences Where 2 CFR part 200 is Addressing Grant Program
Administration … 1-3 Table 1-4 Differences Between AIP Policy and 2 CFR part 200 … 1-4 Table 1-5 FAA Office of Airports Key Positions … 1-6 Table 1-6 FAA Office of Airports Divisions and Branches … 1-7 Table 1-7 Handbook Chapters … 1-8 Table 1-8 Handbook Appendices … 1-9 Table 2-1 Types of Sponsors … 2-1 Table 2-2 Types of Projects that May be Included in a Grant (by Sponsor Type) … 2-3 Table 2-3 Statutory Basis for Grant Assurances … 2-6 Table 2-4 Applicable Grant Assurances (by Sponsor and Project Type) … 2-6 Table 2-5 Duration and Applicability of Grant Assurances (Airport Sponsors) … 2-10 Table 2-6 Duration and Applicability of Grant Assurances (Planning Agency Sponsors) … 2-11 Table 2-7 Duration and Applicability of Grant Assurances (Non-Airport Sponsors Undertaking
Noise Compatibility Program Projects) … 2-12 Table 2-8. Duration and Applicability of Grant Assurances (Aviation Block Grant Program)* … 2-13 Table 2-9 Legal and Financial Requirements for Public Agencies … 2-15 Table 2-10 Legal and Financial Requirements for Private Entities … 2-16 Table 2-11 Additional Criteria, Requirements, and Considerations for Specific Sponsorship
Situations … 2-17 Table 3-1 The 16 General Requirements for Project Funding … 3-1 Table 3-2 Differences between Maintenance, Rehabilitation, Reconstruction, and Replacement
Projects … 3-3 Table 3-3 Examples of Maintenance, Rehabilitation, Reconstruction, and Replacement Projects … 3-4 Table 3-4 Three Basic Tests to Determine if a Project is Justified … 3-7 Table 3-5 Examples of Projects Not Meeting the Basic Justification Tests … 3-7 Table 3-6 Safety and Security Projects Proposals Requiring Additional ADO Review … 3-8 Table 3-7 Minimum Useful Life … 3-10 Table 3-8 Projects Where the FAA Has Determined if a BCA is Required … 3-11 Table 3-9 BCA Process … 3-12 Table 3-10 Eligible Off-Airport Projects … 3-13 Table 3-11 Projects Requiring Intergovernmental Review … 3-15 Table 3-12 Key Requirements for Intergovernmental Review … 3-15 Table 3-13 Airport User Consultation Requirements … 3-16 Table 3-14 Requirements for Grants that will Not Result in a Usable Unit of Work … 3-17 Table 3-15 Examples of Acceptable and Unacceptable Grant Descriptions … 3-18 Table 3-16 Examples of Modifications of Standards that Must Not be Considered for AIP Funded
Projects … 3-20 Table 3-17 Limited Circumstances Where Work Exceeding FAA Standards May be Funded with
AIP … 3-20 Table 3-18 Funding Examples for Work Exceeding FAA Standards … 3-21 Table 3-19 Requirements for the Use of State Standards … 3-23 Table 3-20 Required Content for Engineer’s Reports … 3-25 Table 3-21 Summary Table of Mandatory/Optional ADO Procurement Review … 3-26 Table 3-22 ADO Review Requirements for Bid Protest and Appeals … 3-29 Table 3-23 Additional Actions for Bid Protests that are a Federal Concern … 3-30 Table 3-24 ADO Review Requirements for Bonding that Does Not Meet the Minimum
Requirements … 3-31 Table 3-25 Procurement Rules for Limited Noncompetitive Proposal Situations … 3-32
xv
Table 3-26 ADO Review Requirements for Contracts Containing Ineligible or Non-AIP Funded
Work … 3-35 Table 3-27 Examples of Being in the Federal Government’s Best Interest … 3-36 Table 3-28 Examples Where the Number of Potential Bidders May be Reduced … 3-36 Table 3-29 Unique Consultant Contract Methods … 3-37 Table 3-30 Typical Steps for an RSA Project with EMAS … 3-38 Table 3-31 Circumstances Requiring OIG Notification … 3-40 Table 3-32 Situations Where the ADO has the Option to Conduct a Pre-Award Review … 3-41 Table 3-33 Sponsor Force Account Submittal Requirements … 3-43 Table 3-34 Sponsor Force Account Documentation Requirements … 3-43 Table 3-35 Other Sponsor Force Account Requirements … 3-44 Table 3-36 ADO Requirements Regarding Suspension or Debarment … 3-46 Table 3-37 Resources to Determine if a Project Cost is Necessary and Allowable … 3-47 Table 3-38 Five Basic Requirements to Determine a Cost is Allowable … 3-47 Table 3-39 Administrative Costs Examples and Requirements … 3-48 Table 3-40 Requirements for Indirect Costs … 3-50 Table 3-41 Allowability Examples for Architectural Treatments … 3-51 Table 3-42 Drainage Proration Example … 3-53 Table 3-43 Criteria for Energy Efficiency Improvement Costs … 3-54 Table 3-44 Examples of Engineering and Architectural Costs … 3-54 Table 3-45 Allowability of Costs to Rebuild or Relocate Facility Impeding an AIP Development
Project … 3-56 Table 3-46 Examples of Allowability of Costs for Facilities Impeding an AIP Project … 3-59 Table 3-47 GIS Data Collection Cost Requirements … 3-62 Table 3-48 Common Allowable Land Costs and Associated Restrictions … 3-64 Table 3-49 Allowability of Costs for Facilities on AIP Acquired Land … 3-66 Table 3-50 Requirements for Legal Fees and Settlement Costs … 3-67 Table 3-51 Examples of Unallowable Costs Necessary to Carry Out a Project … 3-68 Table 3-52 Examples of Project Formulation Costs … 3-68 Table 3-53 Allowable SRM Costs … 3-70 Table 3-54 Reasons for an ADO to find a Primary Power Supply Extremely Unreliable … 3-70 Table 3-55 Allowability Examples of Site Preparation for Ineligible Facilities … 3-71 Table 3-56 Spare Part Requirements … 3-72 Table 3-57 Rules for Sponsor Furnished Materials or Supplies … 3-73 Table 3-58 Examples of Allowable Temporary Construction … 3-74 Table 3-59 Utility Costs Proration Example … 3-76 Table 3-60 Rules for Reimbursing Project Costs Prior to the Grant Execution Date … 3-77 Table 3-61 Sponsor Assumption of Risk … 3-78 Table 3-62 Legislative Requirements that Must be Met for FAA to Consider Reimbursement
Based on Climate-Related Conditions … 3-78 Table 3-63 Implementation Requirements that Must be Met for FAA to Consider Reimbursement
Based on Climate-Related Conditions … 3-79 Table 3-64 Alternative Funding Requirements that Must be Met for FAA to Consider
Reimbursement Based on Climate-Related Conditions … 3-80 Table 3-65 Request Requirements that Must be Met for FAA Consideration of Reimbursement
Based on Climate-Related Conditions … 3-81 Table 3-66 APP-500 Acknowledgement Process for Requests for Reimbursement Based on
Climate-Related Conditions … 3-81 Table 3-67 Sponsor Requirements for Cost Reasonableness … 3-82 Table 3-68 Documentation of ADO Cost Reasonableness Determinations … 3-84 Table 4-1 AIP Funds by Category, Type, and Calculation … 4-2 Table 4-2 Fiscal Year 2017 Final Funding Breakdown by Fund Type … 4-7 Table 4-3 Airport Type Criteria and Potential Funding Types … 4-8 Table 4-4 Airports that Can Use Each Fund Type … 4-14 Table 4-5 Project Restrictions by Fund Type … 4-18 Table 4-6 Expiration of AIP Funds … 4-22
xvi
Table 4-7 Federal Share by Airport Type (Including Exceptions) … 4-23 Table 4-8 Federal Shares by Airport Classification in Public Land States … 4-27 Table 4-9 Requirements to Transfer Entitlement Funds between Airports … 4-29 Table 4-10 Summary of Tables Containing Requirements for using Donations for the Sponsor’s
Share … 4-31 Table 4-11 General Requirements for Offsetting the Sponsor Share of a Grant … 4-31 Table 4-12 Value of Items Used to Offset the Sponsor Share … 4-33 Table 4-13 Process to Offset the Sponsor Share of a Grant … 4-35 Table 4-14 Example Calculations for Offsetting the Sponsor Share of a Grant … 4-36 Table 4-15 Instances of Allowable Budget Augmentation … 4-39 Table 5-1 The Basic Steps in the Grant Process … 5-1 Table 5-2 The Major Pre-Grant Actions … 5-2 Table 5-3 Important Potential Projects for ADO/Sponsor Discussion … 5-3 Table 5-4 Common Key Steps in the Grant Process … 5-4 Table 5-5 Sponsor Civil Rights Requirements … 5-6 Table 5-6 Grant Application Contents … 5-10 Table 5-7 Grant Offer Package … 5-14 Table 5-8 Requirements for All Grant Agreement Types … 5-15 Table 5-9 Specific Requirements by Grant Agreement Type … 5-15 Table 5-10 Examples of Grant Descriptions … 5-18 Table 5-11 Summary of Sponsor Certifications … 5-21 Table 5-12 Examples of Actions Specifically Excluded from Sponsor Certification … 5-22 Table 5-13 Steps and Requirements for Sponsor Grant Acceptance … 5-23 Table 5-14 Types of Contract Changes … 5-26 Table 5-15 Sponsor and ADO Requirements for Contract Changes … 5-27 Table 5-16 Examples of Change Orders that Can and Cannot be Approved by the ADO for AIP
Participation … 5-28 Table 5-17 Examples of Changes to Professional Services Agreements that Can and Cannot be
Approved by the ADO for AIP Participation … 5-29 Table 5-18 Performance Report Requirements by Project Type … 5-31 Table 5-19 Grant Payment Request Requirements and Limitations … 5-32 Table 5-20 Conditions the Sponsor Must Meet for Advance Payments … 5-35 Table 5-21 Situations Where an ADO Would Reduce or Withhold a Sponsor Payment Request … 5-36 Table 5-22 Contract Retainage Limitations … 5-37 Table 5-23 Examples of Improper Payments … 5-38 Table 5-24 ADO Remediation Actions for Improper Payments … 5-39 Table 5-25 Sponsor Remediation Actions for Improper Payments … 5-39 Table 5-26 Criteria for an ADO to Amend a Grant … 5-41 Table 5-27 Grant Amendment Limits for Increases … 5-46 Table 5-28 Examples of Grant Amendments with Land Increases for a Nonprimary Airport … 5-48 Table 5-29 Appropriate Amendment Formats … 5-49 Table 5-30 Amendment Steps … 5-50 Table 5-31 Project Physical Completion Requirements … 5-52 Table 5-32 Grant Administration Closeout Requirements … 5-53 Table 5-33 Closeout Processing Steps … 5-55 Table 5-34 Block Grant Closeout Requirements … 5-56 Table 5-35 Examples
of Reasons for Grant Suspension or Termination … 5-57 Table 5-36 Examples of Documents that a Sponsor Must Retain … 5-60 Table 5-37 Requirements for AIP Audits by Entity … 5-61 Table 5-38 Criteria for Disposing or Replacing AIP Funded Equipment … 5-62 Table 5-39 Order of Precedence for Applying Sale Proceeds of AIP Funded Land … 5-64 Table 6-1 LOI Funding Rules and Policy … 6-1 Table 6-2 Three Overlapping Sets of Capital Data in the LOI Review … 6-3 Figure 6-1 Three Overlapping Sets of Capital Data in the LOI Review … 6-4 Table 6-3 LOI Project Criteria by Airport Type … 6-5 Table 6-4 LOI Approval/Disapproval Process … 6-7
xvii
Table 6-5 Sponsor LOI Submission Requirements … 6-9 Table 6-6 Evaluation Criteria for LOI Requests … 6-12 Table 6-7 LOI Offer Contents … 6-13 Table 6-8 History of the State Block Grant Program … 6-16 Table 6-9 State Block Grant Participants … 6-17 Table 6-10 State Block Grant Application Information … 6-18 Table 6-11 State Block Grant Selection Criteria … 6-19 Table 6-12 Criteria for an Airport to be in the State Block Grant Program … 6-20 Table 6-13 AIP Funding Transfer Rules for the State Block Grant Program … 6-21 Table 6-14 MAP Requirements … 6-25 Table 6-15 Examples of Projects That May Not Be Suitable for MAP Funding … 6-28 Table 6-16 Innovative Finance Demonstration Program Legislative History … 6-29 Table 6-17 Innovative Finance Demonstration Program Rules … 6-29 Table 6-18 VALE Legislative References … 6-31 Table 6-19 Zero Emission Vehicle and Infrastructure Pilot Program Legislative References … 6-32 Table 6-20 Program to Increase the Energy Efficiency of Airport Power Sources Legislative
References … 6-33 Table 6-21 Rules for the Airport Development Rights Pilot Program … 6-35 Table 6-22 Required Sponsor’s Attorney Certification Language … 6-38 Table 6-23 Requirements for the Instrument Recording the Purchase of Airport Development
Rights … 6-38 Table A-1 Definition of Terms Used in This Handbook … A-1 Table B-1 References and Web Links … B-1 Table C-1 Examples of General Prohibited Projects/Costs for All Project Types … C-1 Table C-2 Examples of Prohibited Projects/Costs for Construction … C-6 Table C-3 Examples of Prohibited Projects/Costs for Equipment … C-14 Table C-4 Examples of Prohibited Projects/Costs for Land … C-18 Table C-5 Examples of Prohibited Projects/Costs for Noise Mitigation … C-19 Table C-6 Examples of Prohibited Projects/Costs for Planning or Environmental … C-21 Table D-1 Miscellaneous Project Requirements … D-1 Table E-1 Eligible Stand-Alone Planning Projects … E-1 Table E-2 Planning Project Requirements … E-4 Table F-1 New Airport Work Codes … F-1 Table F-2 New Airport Project Requirements … F-1 Table G-1 Runway Types and Eligibility … G-1 Table G-2 Pavement Condition Index Requirements for Airfield Pavement Projects … G-2 Table G-3 Distinctions between Construct, Extend, Widen, Strengthen, Rehabilitate, Shift, and
Remove … G-3 Table G-4 Runway Work Codes … G-3 Table G-5 Runway Project Requirements … G-4 Table H-1. Pavement Condition Index Requirements for Airfield Pavement Projects … H-2 Table H-2 Distinctions between Construct, Extend, Widen, Strengthen, Rehabilitate, Shift, and
Remove … H-3 Table H-3 Taxiway Work Codes … H-3 Table H-4 Taxiway Project Requirements … H-4 Table I-1 Pavement Condition Index Requirements for Airfield Pavement Projects … I-1 Table I-2 Distinctions between Construct, Expand, Strengthen, and Rehabilitate … I-2 Table I-3 Apron Work Codes … I-2 Table I-4 Apron Project Requirements … I-3 Table J-1 Eligibility of Stand Alone-Projects for New and Faded Marking … J-1 Table J-2 Eligibility of Stand-Alone Projects for Sign Panel Replacement … J-2 Table J-3 Airfield Marking, Signage, and Lighting Work Codes … J-3 Table J-4 Airfield Signage and Lighting Project Requirements … J-4 Table K-1 NAVAID and Weather Reporting Equipment Work Codes … K-3 Table K-2 NAVAID and Weather Reporting Equipment Project Requirements … K-3 Table L-1 Requirements for Off-Airport Storage of ARFF Vehicles … L-1
xviii
Table L-2 Safety and Security Equipment Project Requirements … L-3 Table M-1 Other Equipment Project Requirements … M-1 Table N-1 Public-Use Requirements for Terminal Buildings … N-1 Table N-2 Movement of Passengers and Baggage Requirements … N-2 Table N-3 Revenue Producing Eligibility and Conditions for Terminal Buildings … N-3 Table N-4 Terminal Eligibility Proration Calculation … N-4 Table N-5 Typical Eligible Areas/Equipment within a Terminal Building … N-5 Table N-6 Additional Eligible Terminal Areas/Equipment at Nonhub Primary and Nonprimary
Airports … N-7 Table N-7 Terminal Building Funding Rules by Airport Type … N-8 Table N-8 Terminal Work Codes … N-10 Table N-9 Terminal Project Requirements … N-11 Table O-1 Allowable Costs for Areas in an ARFF Building at 14 CFR part 139 Certificated
Airports … O-1 Table O-2 Distinctions between Construct, Expand, Modify, Improve, and Rehabilitate … O-2 Table O-3 Other Building Project Requirements (Other than Terminals) … O-3 Table P-1 Distinctions between Construct, Expand, Modify, Improve, and Rehabilitate … P-1 Table P-2 Road and Surface Transportation Work Codes … P-1 Table P-3 Roads and Surface Transportation … P-2 Table Q-1 Good Title Requirements for Land and Easement Acquisition … Q-2 Table Q-2 Types of Land Interests … Q-3 Table Q-3 Land Work Codes … Q-4 Table Q-4 Land Project Requirements … Q-4 Table R-1 General Eligibility Requirements for Noise Compatibility Projects … R-1 Table R-2 Block Rounding Requirements … R-4 Table R-3 Requirements for Neighborhood Equity … R-5 Table R-4 Pre- and Post-Testing Criteria for Noise Insulation Projects … R-6 Table R-5 Noise Compatibility Planning/Project Work Codes … R-8 Table R-6 Noise Compatibility Planning/Project Requirements … R-8 Table S-1 Environmental Planning/Mitigation Project Requirements … S-1 Table T-1 Distinctions between Construct, Expand, Modify, Improve, and Rehabilitate … T-1 Table T-2 Military Airport Program Project Requirements (for typical projects) … T-2 Table U-1 Sponsor Requirements Regarding Suspension or Debarment … U-2 Table U-2 AIP Handbook Clarification of 2 CFR § 200.317 - Procurements by States … U-3 Table U-3 AIP Handbook Clarification of 2 CFR § 200.318 - General Procurement Standards … U-6 Table U-4 AIP Handbook Clarification of 2 CFR § 200.319 - Competition … U-9 Table U-5 AIP Handbook Clarification of 2 CFR § 200.320 - Methods of Procurement to be
Followed … U-10 Table U-6 AIP Handbook Clarification of 2 CFR § 200.320(a) - Procurement by Micro-Purchases … U-12 Table U-7 AIP Handbook Clarification of 2 CFR § 200.320(b) - Procurement by Small Purchase
Procedures … U-12 Table U-8 AIP Handbook Clarification of 2 CFR § 200.320(c) - Procurement by Sealed Bids
(Formal Advertising) … U-14 Table U-9 AIP Handbook Clarification of 2 CFR § 200.320(d) - Procurement by Competitive
Proposals … U-17 Table U-10 AIP Handbook Clarification of 2 CFR § 200.320(f) - Procurement by Noncompetitive
Proposals 2 CFR § 200.320(f) - Procurement by Noncompetitive Proposals … U-22 Table U-11 AIP Handbook Clarification of 2 CFR § 200.321, Contracting with Small and Minority
Businesses, Women’s Business Enterprises, and Labor Surplus Area Firms … U-25 Table U-12 AIP Handbook Clarification of 2 CFR § 200.322 - Procurement of Recovered
Materials … U-26 Table U-13 AIP Handbook Clarification of 2 CFR § 200.323 - Contract Cost and Price … U-27 Table U-14 AIP Handbook Clarification of 2 CFR § 200.324 - Federal Awarding Agency or Pass-
Through Entity Review … U-30 Table U-15 AIP Handbook Clarification of 2 CFR § 200.325 - Bonding requirements … U-31
xix
Table U-16 AIP Handbook Clarification of 2 CFR § 200.326 - Contract Provisions
2 CFR § 200.326 - Contract provisions … U-34 Table V-1 Revenue Sources for the Airport and Airway Trust Fund … V-1 Table W-1 Airports Falling Under the Competition Plan Requirements … W-1 Table W-2 Completion Plan and Update Requirements … W-2 Table W-3 Required Initial Competition Plan Content … W-3 Table W-4 Required Competition Plan Update Content … W-7 Table X-1 General Sponsor Buy American Requirements … X-1 Table X-2 Criteria by Buy American Waiver Type … X-2 Table X-3 Buy American Specific Definitions … X-4 Table Y-1 Federally-Controlled Acreage in Public Land States … Y-1 Table Y-2 Federal Shares by Airport Classification in Public-Land States Between 1970 and
1980 … Y-3 Table Y-3 Yes/No Test for Part ‘b’ Calculation … Y-4 Table Y-4 Part ‘b’ Calculation Results (see Table Y-5 for columns marked *) … Y-4 Table Y-5 Column Notes for Table Y-4 … Y-8 Table Y-6 Part ‘c’ Calculation … Y-10
xx
This page has been intentionally left blank.
Chapter 1. What do I need to know about this order?
Chapter 1. What do I need to know about this order? › 1-6. Relevant AIP Legislation (Referred to as the Act).
1-1. This Order Is Called the Handbook.
Throughout this document, we refer to this order (FAA Order 5300-38D, Change 1, Airport Improvement Program Handbook) as the Handbook.
1-2. Purpose of the Handbook.
This Handbook provides guidance and sets forth policies and procedures for the Airport Improvement Program (AIP).
1-3. Handbook Audience.
All FAA organizations that work with the Airport Improvement Program will use this Handbook, in particular, the FAA Office of Airports (ARP) headquarters and field offices. This Handbook will also be publicly available to airports, consultants, state agencies and others associated with the Airport Improvement Program.
1-4. Handbook Location on the Internet.
You can find this Handbook on the FAA Office of Airports website (see Appendix B for link).
1-5. Publications this Handbook Cancels.
a. FAA Order 5100.38C, AIP Handbook, dated June 28, 2005.
b. FAA Order 5100.20C, Programming Control and Reporting Procedures Grant-In-Aid Program, dated December 7, 1999.
1-6. Relevant AIP Legislation (Referred to as the Act).
The contents of this Handbook are based on the AIP related legislation contained in the United States Code (USC). Throughout this Handbook, the AIP related legislation under Title 49 is referred to as the Act. This legislation is shown in Table 1-1. Previously, AIP was authorized by the Airport and Airway Improvement Act of 1982 (Public Law 97-248), which Congress repealed in 1994 and recodified as Title 49 § 47101, et seq. (Public Law 103-272).
14 CFR part 151 (Federal Aid to Airports) and 14 CFR part 152 (Airport Aid Program) were regulations for previous programs that existed prior to AIP and do not apply to AIP.
Chapter 1. What do I need to know about this order? › 1-7. AIP Transition to 2 CFR part 200.
Table 1-1 AIP Related Legislation
The USC contains…
Which contains…
Which contains…
Which contains…
That Authorizes…
Under Sections (§)…
Title 49 (Transportation)
Subtitle VII (Aviation Programs)
Part B (Airport Development and Noise)
Chapter 471 (Airport Development)
The Airport Improvement Program
49 USC § 47101 through 49 USC § 47175
Most, but not all, sections within this range apply.
Title 49 (Transportation)
Subtitle VII (Aviation Programs)
Part B (Airport Development and Noise)
Chapter 475 (Noise)
Noise compatibility planning and projects
49 USC § 47501 through 49 USC § 47507
Most, but not all, sections within this range apply.
Title 49 (Transportation)
Subtitle VII (Aviation Programs)
Part C (Financing)
Chapter 481 (Airport and Airway Trust Fund Authorizations).
The FAA to have contract authority to issue grants
49 USC § 48103
Title 49 (Transportation)
Subtitle VII (Aviation Programs)
Part A (Air Commerce and Safety)
Chapter 445 (Facilities, Personnel, and Research)
The FAA to install an instrument landing system with AIP funds that can be turned over to the FAA for operation and maintenance
49 USC § 44502(e)
1-7. AIP Transition to 2 CFR part 200.
2 CFR part 200 became effective for AIP on December 19, 2014. This version of the Handbook contains the correct 2 CFR part 200 references and text. 2 CFR part 200 includes the requirements formerly contained in OMB Circular A-102 (administrative); OMB Circular A-87 (cost principles); and OMB Circulars A-89 and A-133 (audit requirements) for Federal awards. Available crosswalks between 2 CFR part 200 and these OMB circulars are listed in Table 1-2 (see Appendix B for link to the website containing these crosswalks). 2 CFR part 200 also includes the requirements formerly contained in 49 CFR § 18.36.
There are some differences between 2 CFR part 200 and AIP policy. On occasion, the AIP statute contains certain requirements (or lack thereof) which do not permit application of a part of 2 CFR part 200. Wherever this occurs, it will be noted in this Handbook. Some of the
differences occur where 2 CFR part 200 is addressing grant program administration. These differences are due principally because of the types of grant programs that are covered by 2 CFR part 200. Examples are included in Table 1-3. Some of the differences between AIP policy and 2 CFR part 200 are listed in Table 1-4.
Table 1-2 Crosswalk between 2 CFR part 200 and Previous OMB Circulars (see
Appendix B for link to the website containing these crosswalks)
The following crosswalk… Addresses the following AIP related policy…
a. Uniform Guidance Crosswalk from
Predominant Source in Existing Guidance
Summary crosswalk for all OMB circulars (including A-89 which does not have detailed crosswalks)
b. Uniform Guidance Crosswalk to Predominant
Source in Existing Guidance
Summary crosswalk for all OMB circulars in reverse order from above (including A-89 which does not have detailed crosswalks)
c. Uniform Guidance Cost Principles Text
Comparison
Includes a detailed crosswalk for OMB Circular A-87
d. Uniform Guidance Audit Requirements Text
Comparison
Includes a detailed crosswalk for OMB Circular A-133
e. Uniform Guidance Administrative
Requirements Text Comparison
Includes a detailed crosswalk for OMB Circular A-102
Table 1-3 Examples of Differences Where 2 CFR part 200 is Addressing Grant
Program Administration
Examples include…
a. The Federal Highway Administration (FHWA) issues grants for a state’s grant programs. The state
Departments of Transportation then issue subgrants and administer the FHWA grant funding (this is similar to the FAA AIP Block Grant Program).
b. AIP is a project grant program. AIP grants are written for a specific grant project. AIP grants do not
allow a sponsor to use AIP to fund administration of the grant program, or to pay for sponsor overhead costs that are not specifically and directly related to a grant.
Chapter 1. What do I need to know about this order? › 1-10. The Act is a Permissive Statute.
Table 1-4 Differences Between AIP Policy and 2 CFR part 200
AIP Policy (which governs)
2 CFR part 200 AIP Policy
Costs to recover improper payments are not allowable.
2 CFR § 200.428 considers costs incurred recovering improper payments to be allowable costs. Costs to recover improper payments are part of grant program administration. AIP does not fund program administration. However, some Federal grant programs are allowed to use grant funds for administration. These agencies do not have any other source of local funds, and must use grant funds to recover improper payments.
49 USC § 47110(b)(1) indicates all costs paid with AIP funds must be necessary to carry out the project. It is the sponsor’s responsibility to recover improper payments without using AIP funding to carry out the work effort.
1-8. Format for References to the Act.
Specific references to sections (§) of the Act are provided in the form of 49 USC § XXXXX. It is useful to note that the first three numbers in the section reference are always the chapter number.
1-9. Broad Objective of the Act.
The Act’s broad objective is to help in developing a nationwide system of public-use airports that meets the current needs and the projected growth of civil aviation.
1-10. The Act is a Permissive Statute.
The key nature of the Act is that it is a permissive statute, rather than a mandatory or prohibitory one. Put more simply, if the AIP statute does not provide the authority to fund an action or an item, that action or item cannot be funded under AIP.
A permissive statute does not contain a comprehensive list of mandatory or prohibited actions. Rather, a permissive statute gives permission to do certain things. As such, an airport is not required to construct some or all of the items that are allowed under AIP, but may do so provided that the FAA determines that the items are justified at that airport.
This is not a concept exclusive to AIP. This is a rule that stems from Federal appropriations law, which applies to Federal agencies. The Government Accountability Office’s (GAO) Principles of Federal Appropriations Law, Third Edition (commonly referred to as the Red Book) states that “A Federal agency is a creature of law and can function only to the extent authorized by law” (Atlantic City Electric Co. v. Federal Energy Regulatory Commission, 295 F.3d 1, (D.C. Cir. 2002)). The Supreme Court (United States v. MacCollom, 426 U.S. 317, 321 (1976)) has upheld this notion by stating “[T]he established rule is that the expenditure of public funds is
Chapter 1. What do I need to know about this order? › 1-13. General Principles of this Handbook.
proper only when authorized by Congress, not that public funds may be expended unless prohibited by Congress.”
1-11. Aviation Priorities in the Act.
49 USC § 47101 lists the policy directives and aviation priorities of the United States. These priorities include:
a. Providing a safe and secure airport and airway system.
b. Minimizing airport noise impacts on nearby communities.
c. Developing reliever airports, cargo hub airports, and intermodalism.
d. Protecting natural resources.
e. Reducing aircraft delays.
f. Converting former military air bases to civil use or improving joint-use airports.
g. Carrying out various other projects to ensure a safe and efficient airport system.
1-12. List of Handbook References (with Links to the Associated Websites).
Appendix B contains a list of the documents referenced in this Handbook. Links for these references are also provided in the Appendix B (they are not given again in the Handbook) and were current on the Handbook publication date. Each reference is also followed by a brief summary of what the document contains and how it relates to AIP. The versions of these reference documents are not given (use the current version of the document).
1-13. General Principles of this Handbook.
The contents of this Handbook are based on principles below:
a. The Use of the AIP Handbook is Mandatory. The Handbook is the published policy for AIP. Except where options are specifically noted or where non-mandatory language is used, the procedures and requirements are mandatory. The Director of the Office of Airport Planning and Programming (APP-1) must approve any deviation from the procedures or requirements. All requests for deviations must be sent to APP-1 for processing.
b. Use of the Term FAA Policy. The term FAA policy denotes policy that the FAA Office of Airports has established for AIP where there is not a direct statutory reference in the Act .
c. Regional Office Discretion. Unless set procedures are necessary to achieve national standardization in grant program administration, regional offices may adjust procedures that are not dictated by legislation, rule, this Handbook, other published Federal policy, or reasons beyond the FAA’s control.
Chapter 1. What do I need to know about this order? › 1-17.
d. Reference to Other Guidance. The Handbook summarizes pertinent information from other guidance material when appropriate to relieve users from needing to reference another document. The source documents, rather than this Handbook, are the authoritative technical sources; however, this Handbook is the authoritative source on AIP, including eligibility.
1-14. Warning on Taking Handbook Text Out of Context.
There may be paragraphs in this Handbook that appear to conflict with the general requirements for eligibility, justification, or program administration. This is usually due to legislative exceptions for a specific project or location. These exceptions do not amend, change, or modify the general guidance and requirements. These exceptions do not apply to other situations and must not be taken out of context.
1-15. Use of the Term Airports District Office (ADO).
For the purposes of this Handbook, we are using ADO to reference the FAA Office of Airports office that directly works with the sponsor. In regional offices that do not have ADOs, the use of the term ADO refers to the FAA Office of Airports branch within the regional office that deals directly with the sponsors.
1-16. Use of the Phrase ADO has the option.
For the purposes of this Handbook, the phrase, the ADO has the option indicates situations where there is a choice to be made and that the ADO will make the choice.
1-17. FAA Office of Airports Positions/Divisions/Branches Referenced in this Handbook.
A list of the key positions within the FAA Office of Airports is contained in Table 1-5 and a list of the divisions and branches within the FAA Office of Airports is contained in Table 1-6. The routing codes for many of these positions, divisions, and branches are used throughout this Handbook.
Table 1-5 FAA Office of Airports Key Positions
Routing Code Position Name
ARP-1 Associate Administrator
AAS-1 Director, Airport Safety and Standards
APP-1 Director, Airport Planning and Programming
ACO-1 Director, Airport Compliance and Management Analysis
AXX-600 Regional Division Manager (AXX meaning the regional designation of AAL, AEA, ACE, AGL, ANE, ANM, ASO, ASW, or AWP)
Table 1-6 FAA Office of Airports Divisions and Branches
Chapter 1. What do I need to know about this order? › 1-21. New Handbook Layout and Format.
Routing Code Organization Name
AAS-100 Airport Engineering Division
AAS-300 Airports Safety and Operations Division
ACO-100 Airport Compliance Division
APP-400 Airport Planning and Environmental Division
APP -500 Airports Financial Assistance Division
APP-510 Financial Analysis and Passenger Facility Charge Branch
APP-520 Airport Improvement Program Branch
1-18. Location of Handbook Definitions.
Definitions are an important part of this Handbook. As with any large program, there are many words and phrases that have specific, defined meanings within the program. Appendix A contains the definitions of terms used in this Handbook.
1-19. Process for Handbook Changes.
APP-500 will continue to issue program guidance letters (PGLs) for short-term policy guidance between Handbook changes. In addition, APP-500 has the option to issue official numbered changes to the Handbook. The ADOs have the option to forward these PGLs to block grant state sponsors or others impacted by the PGLs.
1-20. Supplemental Guidance and Standard Operating Procedures.
The FAA Office of Airports has the option of issuing additional guidance, such as FAA Office of Airports Standard Operating Procedures (see Appendix B for link) as well as other formats, to supplement this Handbook. The ADOs have the option to forward the additional guidance to block grant state sponsors or others impacted by the guidance.
1-21. New Handbook Layout and Format.
The format of this version of the Handbook is significantly altered from the FAA Order 5100.38C, AIP Handbook.
a. Chapters. The chapters are reduced and are organized in question format as shown in Table 1-7. This allows the reader to more easily identify the chapter they need to reference.
b. Appendices. Detailed information and long lists were moved to the appendices to simplify the main body of the Handbook. For instance, while Chapter 3 provides the general requirements that each project must meet in order to be considered for AIP funding, the project specific requirements have been split out into appendices and are in tabular format for easier reference. Where a paragraph from an appendix is referenced, the reference will be in the form, Paragraph X-##. A list of the appendices is provided in Table 1-8.
Table 1-7 Handbook Chapters
Chapters in this handbook include…
Chapter 1. What do I need to know about this order?
Chapter 2. Who can get a grant?
Chapter 3. What projects can be funded?
Chapter 4. What AIP funding is available?
Chapter 5. How does the grant process work?
Chapter 6. What special AIP programs are available?
Table 1-8 Handbook Appendices
Appendices in this handbook include…
Appendix A. Definitions of Terms Used in this Handbook
Appendix B. References and Web Links
Appendix C. Prohibited Projects and Unallowable Costs
Appendix D. Miscellaneous Projects
Appendix E. Planning Projects
Appendix F. New Airport Projects
Appendix G. Runway Projects
Appendix H. Taxiway Projects
Appendix I. Apron Projects
Appendix J. Airfield Marking, Signage, and Lighting Projects
Appendix K. Navigational Aid (NAVAID) and Weather Reporting Equipment Projects
Appendix L. Safety and Security Equipment Projects
Appendix M. Other Equipment Projects
Appendix N. Terminal Building Projects
Appendix O. Other Building Projects
Appendix P. Roads and Surface Transportation Projects
Appendix Q. Land Projects
Appendix R. Noise Compatibility Planning/Projects
Appendix S. Environmental Planning/Mitigation Projects
Appendix T. Military Airport Program Projects
Appendix U. Sponsor Procurement Requirements (Including 2 CFR §§ 200.317-200.326 (formerly 49 CFR § 18.36))
Appendix V. Revenue Sources for the Airport and Airway Trust Fund
Appendix W. Competition Plans
Appendix X. Buy American Guidance
Appendix Y. Federal Share at Public Land State Airports
Appendix Z. Establishment and Category Upgrade Policy for Instrument Landing Systems (ILS)
This page has been intentionally left blank.
Chapter 2. Who can get a grant?
2-1. Grant Recipients are Referred to as Sponsors.
A recipient of an AIP grant is normally called a sponsor.
2-2. Type of Sponsors.
For AIP purposes, sponsors are broken down into the specific types shown in Table 2-1. This table also lists each of the entities that may qualify under each sponsor type.
Chapter 2. Who can get a grant? › 2-2. Type of Sponsors.
Table 2-1 Types of Sponsors
For the following type of sponsor…
Only the following entities may qualify…
a. Airport sponsors Public agency owning (or leasing from another government entity) a public-use airport. A state; a political subdivision of a state (such as a city, municipality, or state agency); a tax-supported organization; or an Indian tribe or pueblo are all considered public agencies.
Private entity owning a public-use airport.
State acting as a sponsor for one or more specific airports in the state.
Indian tribe or pueblo owning or leasing a public-use airport.
The Secretary of the Interior, during fiscal years 2012-2018 for Midway Island Airport per Section 186(d) of the Vision 100 – Century of Aviation Reauthorization Act (Public Law 108-176) as amended by Section 102 of Division M, Title I of the Consolidated Appropriations Act, 2018 (Public Law 115-141).
The Republic of the Marshall Islands, Federated States of Micronesia, and Republic of Palau (or political subdivision) during fiscal years 2012-2018 (per 49 USC § 47115(j)).
b. Sponsors that are not currently
airport owners (in the planning stages of acquiring or constructing the airport)
Public agency not owning or leasing a public-use airport.
c. Sponsors that are not currently
airport owners (after the planning is complete and before the airport is open)
Public agency not owning or leasing a public-use airport.
d. Planning agency sponsors Metropolitan planning agency.
State planning agency.
Council of governments.
Chapter 2. Who can get a grant? › 2-3. Type of Projects Each Sponsor Type Can Receive in a Grant.
Table 2-1 Types of Sponsors
For the following type of sponsor…
Only the following entities may qualify…
e. Noise compatibility project
sponsors that are not airport owners
Public agency not owning or leasing a public-use airport.
f. State block grant sponsor State approved by the FAA to be in the State Block Grant Program.
g. Sponsors for compatible land
use planning or compatible land use projects per 49 USC § 47141
State or local government around Medium or Large Hub Airports (if the airport has not submitted a Noise Compatibility Program to the FAA or updated the Noise Compatibility Program within the past ten years).
h. Sponsors that are acquiring
airport development rights from a privately-owned public-use airport under the pilot program in 49 USC § 47138(a)
State or a political subdivision of a state (such as a city, municipality, or state agency) in the same state as the airport.
i. Sponsors designated under 49 USC § 47118(h) Federal agency owning an FAA designated safety critical airport.
2-3. Type of Projects Each Sponsor Type Can Receive in a Grant.
For each sponsor type, Table 2-2 lists the entities that qualify for that sponsor type and the types of projects they may receive in a grant.
Table 2-2 Types of Projects that May be Included in a Grant (by Sponsor Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
a. Airport sponsors Public agency owning (or leasing from another government entity) a publicuse airport. A state; a political subdivision of a state (such as a city, municipality, or state agency); a taxsupported organization; or an Indian tribe or pueblo are all considered public agencies.
Private entity owning a public-use airport.
State acting as a sponsor for one or more specific airports in the state.
Indian tribe or pueblo owning or leasing a public-use airport.
The Secretary of the Interior, during fiscal years 2012-2018 for Midway Island Airport per Section 186(d) of the Vision 100 – Century of Aviation Reauthorization Act (Public Law 108- 176) as amended by Section 102 of Division M, Title I of the Consolidated Appropriations Act, 2018 (Public Law 115-141).
The Republic of the Marshall Islands, Federated States of Micronesia, and Republic of Palau (or political subdivision) during fiscal years 2012- 2018, per 49 USC § 47115(j).
Airport master planning
Airport development
Noise compatibility planning
Noise compatibility projects
When a state is acting as a sponsor for more than one airport within the state, this is often referred to as a various locations grant.
Note: Per Public Law 108-176, the Secretary of the Interior may only receive Airport Development grants for Midway Island.
b. Sponsors that are not
currently airport owners (in the planning stages of acquiring or constructing the airport)
Public agency not owning or leasing a public-use airport.
Planning grants associated with acquiring or establishing a publicuse airport
c. Sponsors that are not
currently airport owners (after the planning is complete and before the airport is open)
Public agency not owning or leasing a public-use airport.
Acquisition of existing airports
Acquisition of land in anticipation of constructing a new airport
Initial airport development
d. Planning agency
sponsors
Metropolitan planning agency.
State planning agency.
Council of governments.
System planning
Table 2-2 Types of Projects that May be Included in a Grant (by Sponsor Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
e. Noise compatibility
project sponsors that are not airport owners
Public agency not owning or leasing a public-use airport.
Noise compatibility planning
Noise compatibility projects
f. State block grant sponsor
State approved by the FAA to be in the State Block Grant Program.
A state block grant for funds to be issued in subgrants to airports in the State Block Grant Program for:
Airport master planning
Airport development
Noise compatibility planning
Noise compatibility projects
g. Sponsors for compatible
land use planning or compatible land use projects per 49 USC § 47141
State or local government around Medium or Large Hub Airports (if the airport has not submitted a Noise Compatibility Program to the FAA or updated the Noise Compatibility Program within the past ten years).
Compatible land use planning and compatible land use projects
h. Sponsors that are
acquiring airport development rights from a privately-owned public-use airport under the pilot program in 49 USC § 47138(a)
State or a political subdivision of a state (such as a city, municipality, or state agency) in the same state as the airport.
Acquisition of airport development rights
Chapter 2. Who can get a grant? › 2-4. Grant Assurances – Definition and Which Ones to Use.
Table 2-2 Types of Projects that May be Included in a Grant (by Sponsor Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
i. Sponsors designated under 49 USC § 47118(h)
Federal agency owning an FAA designated safety critical airport.
A project to preserve or enhance minimum airfield infrastructure if the project meets all of the following criteria:
The project is necessary to (1)
meet the minimum safety and emergency operational requirements established under 14 CFR part 139.
The project is necessary to (2)
support emergency diversionary operations for transoceanic flights in locations that meet the following criteria:
(a) Locations within United
States jurisdiction or control.
(b) Locations where there is
a demonstrable lack of diversionary airports within the distance or flight-time required by regulations governing transoceanic flights.
2-4. Grant Assurances – Definition and Which Ones to Use.
When airport owners or sponsors, planning agencies, or other organizations accept AIP funds, they must agree to certain obligations. These obligations are called grant assurances. The grant assurances require the recipients to maintain and operate their facilities safely and efficiently and in accordance with specified conditions, while some grant assurances state conditions that must occur before a grant is issued, or are specific to implementation of grant projects. These grant assurances are either included in the grant or are specifically incorporated by reference. The assurances are based on the legislation shown in Table 2-3.
Table 2-3 Statutory Basis for Grant Assurances
The following statutory reference…
Does the following…
49 USC § 47105 Gives the requirements for the FAA to approve a grant application.
49 USC § 47106 Permits the FAA to give a grant if the FAA is satisfied that a number of specific project requirements will be met.
49 USC § 47107 Requires the FAA to obtain written assurances from sponsors concerning current and future airport operations.
There are three sets of grant assurances (Airport Sponsors, Planning Agency Sponsors, and Non- Airport Sponsors Undertaking Noise Compatibility Program Projects) for AIP funded projects that are not issued through the State Block Grant Program. In addition, there are Aviation Block Grant Program Assurances that apply only to State Block Grant Program sponsors (see Paragraph 6-20). For each sponsor type, Table 2-4 lists the entities that qualify for that sponsor type, the types of projects they may receive a grant for, and the set of grant assurances they must follow.
The current versions of the assurances can be obtained from the FAA Office of Airports website (see AIP Grant Assurances link in Appendix B).
Table 2-4 Applicable Grant Assurances (by Sponsor and Project Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
And must follow this set of grant assurances…
a. Airport sponsors Public agency owning (or leasing from another government entity) a public-use airport. A state; a political subdivision of a state (such as a city, municipality, or state agency); a tax-supported organization: or an Indian tribe or pueblo are all considered public agencies.
Private entity owning a public-use airport.
State acting as a sponsor for one or more specific airports in the state.
Airport master planning
Airport development
Noise compatibility planning
Noise compatibility projects
Note: When a state is acting as a sponsor for more than one airport within the state, this is often referred to as a various locations grant.
Airport Sponsors
Table 2-4 Applicable Grant Assurances (by Sponsor and Project Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
And must follow this set of grant assurances…
Indian tribe or pueblo owning or leasing a publicuse airport.
The Secretary of the Interior, during fiscal years 2012-2018 for Midway Island Airport per Section 186(d) of the Vision 100 – Century of Aviation Reauthorization Act (Public Law 108-176) as amended by Section 102 of Division M, Title I of the Consolidated Appropriations Act, 2018 (Public Law 115-141).
The Republic of the Marshall Islands, Federated States of Micronesia, and Republic of Palau (or political subdivision) during fiscal years 2012-2018 per 49 USC § 47115(j).
b. Sponsors that are
not currently airport owners (in the planning stages of acquiring or constructing the airport)
Public agency not owning or leasing a public-use airport.
Planning grants associated with acquiring or establishing a public-use airport
Planning Agency Sponsors
c. Sponsors that are
not currently airport owners (after the planning is complete and before the airport is open)
Public agency not owning or leasing a public-use airport.
Acquisition of existing airports
Acquisition of land in anticipation of constructing a new airport
Initial airport development
Airport Sponsors
d. Planning agency
sponsors
Metropolitan planning agency.
State planning agency.
System planning Planning Agency Sponsors
Table 2-4 Applicable Grant Assurances (by Sponsor and Project Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
And must follow this set of grant assurances…
e. Noise compatibility
project sponsors that are not airport owners
Public agency not owning or leasing a public-use airport.
Noise compatibility planning
Noise compatibility projects
Non-Airport Sponsors Undertaking Noise Compatibility Program Projects
f. State Block Grant Program sponsor
State approved by the FAA to be in the State Block Grant Program.
Planning
Airport development
Noise compatibility planning
Noise compatibility projects
Aviation Block Grant Program See Paragraph 6- 20 to see how these relate to subgrant assurance obligations.
g. Sponsors for
compatible land use planning or compatible land use projects per 49 USC § 47141
State or local government around Medium or Large Hub Airports (if the airport has not submitted a Noise Compatibility Program to the FAA or updated the Noise Compatibility Program within the past ten years).
Compatible land use planning and compatible land use projects
Non-Airport Sponsors Undertaking Noise Compatibility Program Projects
h. Sponsors that are
acquiring airport development rights from a privatelyowned public-use airport under the pilot program in 49 USC § 47138(a)
State or a political subdivision of a state (such as a city, municipality, or state agency) in the same state as the airport.
Acquisition of airport development rights
None (per FAA policy)
Chapter 2. Who can get a grant? › 2-5. Grant Assurances – Duration and Applicability.
Table 2-4 Applicable Grant Assurances (by Sponsor and Project Type)
For the following type of sponsor…
Only the following entities may qualify…
And may only receive grants for the following types of projects…
And must follow this set of grant assurances…
i. Sponsors designated under 49 USC § 47118(h)
Federal agency owning an FAA designated safety critical airport.
A project to preserve or enhance minimum airfield infrastructure if the project meets all of the following criteria:
The project is (1)
necessary to meet the minimum safety and emergency operational requirements established under 14 CFR part 139.
The project is (2)
necessary to support emergency diversionary operations for transoceanic flights in locations that meet the following criteria:
(a) Locations within
United States jurisdiction or control, or
(b) Locations where
there is a demonstrable lack of diversionary airports within the distance or flighttime required by regulations governing transoceanic flights.
None.
49 USC § 47118(h) specifically exempts these sponsors from normal AIP requirements.
2-5. Grant Assurances – Duration and Applicability.
The duration and applicability for each set of grant assurances (Airport Sponsor, Planning Agency Sponsor, Non-Airport Sponsors Undertaking Noise Compatibility Program Projects, and Aviation Block Grant Program) are listed in Table 2-5, Table 2-6, Table 2-7, and Table 2-8, respectively. Note that the grant assurance numbers are different between these four sets of grant assurances.
Table 2-5 Duration and Applicability of Grant Assurances (Airport Sponsors)
Assurances that… Include (by assurance # if applicable)…
a. Must be met
before a grant is offered
#2 Responsibility and Authority of the Sponsor
#3 Sponsor Fund Availability
#4 Good Title
#6 Consistency with Local Plans
#7 Consideration of Local Interest
#8 Consultation with Users
#9 Public Hearings
#12 Terminal Development Prerequisites
b. Apply until the
grant is closed
#1 General Federal Requirements (except for 49 CFR part 23)
#10 Air and Water Quality Standards
#14 Minimum Wage Rates
#15 Veteran’s Preference
#16 Conformity to Plans and Specifications
#17 Construction Inspection and Approval
#18 Planning Projects
#32 Engineering and Design Services
#33 Foreign Market Restrictions
#34 Policies, Standards, and Specifications
#35 Relocation and Real Property Acquisition
c. Apply for three
years after the grant is closed
#13 Accounting System, Audit, and Record Keeping Requirements
#26 Reports and Inspections
Table 2-5 Duration and Applicability of Grant Assurances (Airport Sponsors)
Assurances that… Include (by assurance # if applicable)…
d. Apply for the
useful life of the project (not to exceed 20 years from the grant acceptance date) except in the case of a land acquisition grant, for which the useful life is indefinite and the assurance obligations do not expire.
#5 Preserving Rights and Powers
#11 Pavement Preventive Maintenance (This applies to all of the airfield
pavement on the airport, not just the specific pavement in the grant.)
#19 Operations and Maintenance
#20 Hazard Removal and Mitigation
#21 Compatible Land Use
#22 Economic Nondiscrimination
#24 Fee and Rental Structure
#27 Use by Government Aircraft
#28 Land for Federal Facilities
#29 Airport Layout Plan
#36 Access by Intercity Buses
#37 Disadvantaged Business Enterprises (See 49 CFR parts 23 and 26, since
certain program requirements may extend the obligation beyond the 20 year period, while the DBE requirements for the project apply until the project is closed.)
#38 Hangar Construction
#39 Competitive Access
e. Last for as long
as the airport is owned and operated as an airport
#23 Exclusive Rights
#25 Airport Revenue
#30 Civil Rights
#31 Disposal of Land
Table 2-6 Duration and Applicability of Grant Assurances (Planning Agency
Sponsors)
Assurances that… Include (by assurance # if applicable)…
a. Must be met
before a grant is offered
#2 Responsibility and Authority of the Sponsor
#3 Sponsor Fund Availability
#5 Consistency with Local Plans
b. Apply until the
grant is closed
#1 General Federal Requirements (except for 49 CFR part 23)
#4 Preserving Rights and Powers
Table 2-6 Duration and Applicability of Grant Assurances (Planning Agency
Sponsors)
Assurances that… Include (by assurance # if applicable)…
#7 Planning Projects
#9 Civil Rights
#10 Engineering and Design Services
#11 Foreign Market Restrictions
#12 Policies, Standards, and Specifications
#13 Disadvantaged Business Enterprises (See 49 CFR parts 23 and 26, since
certain program requirements may extend the obligation beyond the 20 year period)
c. Apply for three
years after the grant is closed
#6 Accounting System, Audit, and Record Keeping Requirements
#8 Reports and Inspections
The three year duration for record keeping is a requirement of The Single Audit Act of 1984, Public Law 98-502 (as amended in 1996, Public Law 104-156, as amended and recodified at 31 USC § 7501 et seq.) and 2 CFR § 200.333- 200.337.
Table 2-7 Duration and Applicability of Grant Assurances (Non-Airport Sponsors
Undertaking Noise Compatibility Program Projects)
Assurances that… Include (by assurance # if applicable)…
a. Must be met
before a grant is offered
#2 Responsibility and Authority of the Sponsor
#3 Sponsor Fund Availability
#4 Good Title
#6 Consistency with Local Plans
#7 Consideration of Local Interest
b. Apply until the
grant is closed
#1 General Federal Requirements
#9 Minimum Wage Rates
#10 Veteran’s Preference
#11 Conformity to Plans and Specifications
#12 Construction Inspection and Approval
#18 Engineering and Design Services
#19 Foreign Market Restrictions
#21 Relocation and Real Property Acquisition
Table 2-7 Duration and Applicability of Grant Assurances (Non-Airport Sponsors
Undertaking Noise Compatibility Program Projects)
Assurances that… Include (by assurance # if applicable)…
c. Apply for three
years after the grant is closed
#8 Accounting System, Audit, and Record Keeping Requirements
#16 Reports and Inspections
d. Apply for the
useful life of the project (not to exceed 20 years from the grant issuance date) except in the case of a land acquisition grant, for which the useful life is indefinite and the assurance obligations do not expire.
#5 Preserving Rights and Powers
#13 Operations and Maintenance
#14 Hazard Prevention
#15 Compatible Land Use
#22 Disadvantaged Business Enterprises (See 49 CFR parts 23 and 26, since
certain program requirements may extend the obligation beyond the 20 year period), while the DBE requirements for the project apply until the project is closed.
e. Last for as long
as the airport is owned and operated as an airport
#17 Civil Rights
#20 Disposal of Land
Table 2-8. Duration and Applicability of Grant Assurances (Aviation Block Grant
Program)*
Assurances that… Include (by assurance # if applicable)…
a. Must be met
before a grant is offered
#7 State Resources
b. Apply until the
grant is closed
#1 Incorporated in Grant Agreement
#2 General Federal Requirements
#6 Environmental Responsibilities
c. Apply for three
years after the grant is closed
#3 Program Reporting
Chapter 2. Who can get a grant? › 2-6. Sponsor Qualification Criteria.
Table 2-8. Duration and Applicability of Grant Assurances (Aviation Block Grant
Program)*
Assurances that… Include (by assurance # if applicable)…
d. Last for as long
as the state is in the Block Grant Program
#5 Compliance Requirements
e. Meets the
duration of the following assurances: Airport Sponsors and Non-Airport Sponsors Undertaking Noise Compatibility Program Projects
#4 Obligated to Standard Assurances
* Block grant states must ensure that subrecipients are obligated to the applicable grant assurances by attaching the appropriate set(s) of grant assurances to each subgrant. In addition, block grant states that perform actions for the subrecipient that are beyond their block grant state administrative responsibilities must comply with all sponsor assurances associated with those actions.
2-6. Sponsor Qualification Criteria.
For an ADO to issue a grant, the FAA must first determine that the sponsor is able to assume the responsibilities defined in the grant. Details of this requirement are outlined in 49 USC § 47105, § 47106 and § 47107. The general sponsorship criteria are different for public agencies and private entities. The criteria for public agencies are listed in Table 2-9 and for private entities are listed in Table 2-10. Additional criteria, requirements, and considerations that apply to specific sponsorship situations are listed in Table 2-11. These requirements do not apply to Federal agency sponsors of an FAA designated safety critical airport eligible under 49 USC § 47118(h).
Table 2-9 Legal and Financial Requirements for Public Agencies
The criteria are…
a. Per 49 USC § 47105(b)(2), a sponsor must be proposing a project for a public-use airport included in
the current National Plan of Integrated Airport Systems (NPIAS).
b. Per 49 USC § 47106(a)(3), a sponsor must be financially able to assume and carry out the sponsor’s
duties in the AIP project application and grant agreements. This includes being able to finance the sponsor share of grants. Per FAA policy, if a public sponsor has an open grant from a Federal agency that requires compliance with 2 CFR part 200 Subpart E (OMB Circulars A-87, Cost Principles for State, Local, and Indian Tribal Governments and OMB Circulars A-102, Grants and Cooperative Agreements with State and Local Governments), this requirement is met. Otherwise, the ADO must work with ACO-100 to make this determination.
c. Per 49 USC § 47106(b)(1), the sponsor, another public agency, or the Federal government must
have good title to the areas of the airport used or intended to be used for the landing, taking off, or surface maneuvering of aircraft. Per FAA policy, if the good title requirement is not met prior to the grant being issued, the acquisition of good title must be in process. Also per FAA policy, the sponsor can meet this good title requirement by leasing from another public agency that holds good title, provided that the duration of the lease is at least as long as the useful life of the project. (A lease from a private entity does not provide good title.)
d. Per 49 USC § 47106(a)(5), a sponsor must legally have the authority to act as a sponsor.
The sponsor must not be encumbered by any existing agreements that would prevent it from acting as a sponsor. Legal authority to be a public sponsor comes from its state authorizing legislation, also called state enabling legislation. The authorizing legislation must clearly provide the sponsor the authority to carry out the obligations and responsibilities of sponsorship. Per FAA policy, the sponsor must provide a copy of the state authorizing legislation to the ADO prior to the sponsor applying for its first grant. Per FAA policy, the ADO has the option to require an opinion from the sponsor’s attorney regarding whether the sponsor has the legal authority to act as a sponsor.
e. Per 49 USC § 47106(d), if a sponsor has previously received a grant, the sponsor must be in
compliance with its current grant obligations. The ADO and regional office must obtain a list of the sponsors that are not in compliance from ACO-100.
f. Per 49 USC § 47107(d), the sponsor must be able to maintain and operate the airport as a public-use airport to FAA standards.
g. Per 2 CFR part 180, a sponsor must not be suspended or debarred by the Federal government.
Table 2-10 Legal and Financial Requirements for Private Entities
The criteria are…
a. Per 49 USC § 47105(b)(2), a sponsor must be proposing a project for a public-use airport included in
the current National Plan of Integrated Airport Systems (NPIAS).
b. Per 49 USC § 47102(26)(B), the sponsor must be the private owner of a public-use airport.
49 USC § 47102(22)(B) defines a privately-owned airport as a public use airport if it is used or intended to be used for public purposes and meets one of the following conditions:
(1) Is a reliever airport. The FAA defines which airports are privately owned reliever airports in the
current version of FAA Order 5090.3, Field Formulation of the National Plan of Integrated Airport Systems (NPIAS).
(2) The FAA has determined that the airport has at least 2,500 passenger boardings each year and
receives scheduled passenger aircraft service.
c. Per 49 USC § 47106(b), the sponsor must have good title to the airport property. Per FAA policy, if
the good title requirement is not met prior to the grant being issued, the acquisition of good title must be in process. Also per FAA policy, the sponsor can meet this good title requirement by leasing from a public agency that holds good title, provided that the duration of the lease is at least as long as the useful life of the project.
d. Per 49 USC § 47107(d), the sponsor must be able to maintain and operate the airport as a public-use
airport to FAA standards.
e. Per 49 USC § 47106(a)(3), a sponsor must be financially able to assume and carry out the sponsor’s
duties in the AIP project application and grant agreements.
If a private sponsor can provide documentation that a certified public accounting firm has determined they are financially able to assume and carry out the sponsor duties, this requirement has been met. The certified public accounting firm must have reviewed the sponsor’s financial documentation and affirmed the sponsor has sufficient funds on hand, or a combination of funds and agreements with airport tenants, that will provide adequate income to finance the sponsor share and costs of operating/maintaining the airport for at least 10 years in the future. Otherwise, the ADO must have obtained concurrence from ACO-100 to proceed.
f. Per 49 USC § 47106, a sponsor must legally have the authority to act as a sponsor.
The sponsor must not be encumbered by any existing agreements that would prevent it from acting as a sponsor. The ADO may require an opinion of the sponsor’s attorney of its legal authority to act as a sponsor and carry out its responsibilities under the grant agreement.
g. Per 49 USC § 47106(d), if a sponsor has previously received a grant, the sponsor must be in
compliance with its current grant obligations.
The ADO and regional office may obtain a list of the sponsors that are not in compliance from ACO- 100.
h. Per 2 CFR part 180, a sponsor must not be suspended or debarred by the Federal government.
Table 2-11 Additional Criteria, Requirements, and Considerations for Specific
Sponsorship Situations
For the following sponsorship situation…
The additional criteria, requirements, and considerations apply…
a. A state acting as a
sponsor for one or more specific airports (Note: When a state is acting as a sponsor for more than one airport within the state, this is often referred to as a various locations grant.)
49 USC § 47105(a)(1)(B) allows state sponsorship of development and (1)
planning projects for one or more airports provided:
(a) The sponsor of each airport consents in writing to the state
sponsorship.
(b) There is administrative merit and aeronautical benefit to the state
sponsorship. Per FAA policy, the ADO makes this determination.
(c) There is written documentation that the state will comply with the
required grant conditions and assurances. Per FAA policy, the ADO makes this determination.
49 USC § 47102(27) defines a state as a state of the United States, the (2)
District of Columbia, Puerto Rico, the Virgin Islands, American Samoa, Guam, and the Trust Territory of the Pacific Islands (Republic of the Marshall Islands, the Federated States of Micronesia, the Commonwealth of the Northern Mariana Islands, the Republic of Palau).
This sponsorship type is not the State Block Grant Program. (3)
The state must provide the signed copy of FAA Form 5100-128, (4)
Agreement on State Sponsorship and Airport Sponsor Obligations (see the AIP Forms link in Appendix B) to the ADO with the grant application and the ADO must approve or disapprove any changes or addendum to the agreement.
b. A state approved by
the FAA to be in the block grant program
State block grant sponsorship is restricted to states selected for the State (1)
Block Grant Program as discussed in Section 2 of Chapter 6.
Under the State Block Grant Program, the state is the sponsor. The state (2)
then issues subgrants to the airports that are included in the program.
c. A public agency not
owning or leasing a public-use airport
During the acquisition or establishment of an airport, the regional division (1)
manager must have made two separate sponsor designations.
First, the regional division manager may designate a public agency as a (2)
sponsor for a planning grant to acquire or establish a public-use airport.
Second, if the regional division manager, ADO, and the sponsor decide to (3)
continue with the airport acquisition or establishment, the regional division manager must separately designate that the sponsor is legally and financially able to assume the responsibilities of a sponsor. This is because the Planning Agency Sponsors Assurances are less extensive than the Airport Sponsors Assurances.
Table 2-11 Additional Criteria, Requirements, and Considerations for Specific
Sponsorship Situations
For the following sponsorship situation…
The additional criteria, requirements, and considerations apply…
d. A metropolitan
planning agency or a state planning agency
A planning agency sponsor must be authorized by the laws of the state (1)
(or states or political subdivisions concerned) to engage in area-wide planning for the areas in which the grant funding is to be used.
Typical state agencies that may qualify as a planning agency sponsor are (2)
planning offices, aeronautics commissions, and departments of transportation.
Typical metropolitan planning agencies include metropolitan planning (3)
organizations, councils of government, and regional planning commissions.
e. Entities acting as
sponsor agents (including channeling act states)
A public agency may act as an agent of the sponsor without being (1)
considered a co-sponsor. These agents are not true sponsors or cosponsors, but they do play a role in the AIP grant process.
Channeling is the most common type of agent agreement. State (2)
channeling of Federal airport grants occurs in various forms within numerous states. Normally, when an airport is in a channeling act state, the sponsor submits payment request information to the state, who then submits the request to the FAA. In this case, the FAA makes payments to the state, and the state then distributes the payment to the sponsor. In some cases, the state may also provide technical oversight and review, which may include state submittal of grant applications and/or closeout requests. This is based on state enabling legislation, rather than Federal law. In many cases, the state also signs the grant agreements. Channeling agreements based on state enabling legislation do not need approval from the ADO.
Except for channeling act agreements, other agent-sponsor agreements (3)
require prior ADO review and regional division manager approval in order to be valid. These agreements are rare and must include the terms, conditions, powers, responsibilities, and relationship of the agent to the sponsor. The agreement may be in the form of a resolution or ordinance, and a copy of the agreement, along with regional division manager’s concurrence, must be kept on file in the ADO.
Table 2-11 Additional Criteria, Requirements, and Considerations for Specific
Sponsorship Situations
For the following sponsorship situation…
The additional criteria, requirements, and considerations apply…
f. Two or more entities acting as cosponsors
The FAA has determined that the public agencies either independently (or (1)
jointly) meet the sponsorship requirements. The ADO agrees to the cosponsorship by issuing the grant.
Each of the co-sponsors is individually bound to the terms and conditions (2)
of the grant agreement unless their respective rights and obligations are otherwise set forth in a written agreement. The agreement must, as a minimum, set forth:
(a) The responsibilities of each cosponsor to the other(s) with respect to
the accomplishment of the proposed development, operation, and maintenance of the airport;
(b) The obligations which each will assume to the United States:
(c) The names of the sponsor or sponsors who will accept the grant
agreement; and
(d) The names of the sponsor or sponsors who will accept receipt of and
disburse grant payments.
Channeling act states are not considered to be co-sponsors, they are (3)
sponsor agents even if they sign the grant agreement.
Any two or more public agencies may submit a request to the FAA to co- (4)
sponsor a project. The FAA will consider the relationship of the proposed cosponsors to the airport.
The FAA is not a party to a co-sponsorship agreement. Therefore, (5)
disagreements between co-sponsors must be addressed at a local or state level, as appropriate.
g. Sponsors for
compatible land use planning or compatible land use projects per 49 USC § 47141
The sponsor has authority to plan and adopt land use compatibility plans (1)
and control measures, including zoning, in the planning area in and around the airport.
The sponsor and the airport must enter into a written agreement to (2)
prepare the compatible land use plan cooperatively.
h. Sponsors that are
acquiring airport development rights from a privatelyowned public-use airport under the pilot program in 49 USC § 47138(a)
The additional sponsor requirements are contained in Section 8 of (1)
Chapter 6, which covers the airport development rights pilot program.
Chapter 2. Who can get a grant? › 2-9. Transfer of Sponsorship.
2-7. State Sponsorship Benefits.
One of the benefits of having a state act as a sponsor for more than one airport (like for various location grants) is that it may reduce ADO, state, or sponsor workload by combining multiple grants into one. It may also provide economies of scale through state sponsorship. For instance, equipment can be acquired in quantity at potentially lower unit cost, several small and similar construction projects can be accomplished or related airport master plans or airport layout plans can be prepared. Co-sponsorship of projects between the airport and the state remains an alternative to this procedure if the airport, the state and ADO believe this to be more efficient.
2-8. Sponsorship Determination Process.
The FAA Office of Airports is responsible for making sponsor determinations for AIP. The process differs by entity type as outlined below. For Federal agency sponsors of an FAA designated safety critical airport eligible under 49 USC § 47118(h), this determination will be made by APP-1.
a. Public Agencies. Per the current version of FAA Order 1100.145, Delegations of Authority, Appendix 4, the regional division manager is delegated to take actions with respect to their function and assigned responsibilities, which are detailed in the current version of FAA Order 1100.5, FAA Organization – Field. These responsibilities include making sponsorship determinations for public agencies. The regional division manager may document their determination in one of two ways. First, the regional division manager may make a written designation of sponsorship prior to issuing a grant. Second, if there is no controversy or complexity, the regional division manager may make an implicit determination by allowing the ADO to issue a grant to the proposed sponsor. The FAA has determined that it is preferable to have a written determination of sponsorship prior to the regional division manager issuing the first grant to a new sponsor. Therefore, for determinations made by the regional division manager after the publication of this Handbook, the regional division manager must make a written determination prior to issuing the first grant to the new sponsor. The regional division manager and ADO may contact APP-500, ACO-100, or regional legal counsel for assistance with these sponsorship determinations.
b. Private Entities. APP-1 makes the sponsorship determination for a private entity. APP-1 must have made a written designation of sponsorship prior to the ADO issuing the first grant (an implicit determination is not an option).
c. Public Private Entities. In addition, a sponsor may also fall in the rare public-private sponsorship category. This is where an airport privatizes some, but not all, of the management of the airport. In this case, the regional division manager and ADO must consult ACO-100 and APP-500 for direction on how to proceed. APP-1 must have made a written designation of sponsorship prior to the ADO issuing the first grant (an implicit determination is not an option).
2-9. Transfer of Sponsorship.
In order for an existing sponsor to transfer the sponsorship of an obligated airport to another entity, the sponsor must obtain pre-approval from the FAA. Per the current version of FAA Order 5190.6, FAA Airport Compliance Manual, the existing sponsor must first obtain
Chapter 2. Who can get a grant? › 2-10. Conflicting Grant Requests from More than One Entity.
ARP-1 pre-approval to release the entire airport. Then the FAA must make a sponsorship determination for the new entity as discussed in Paragraph 2-8. The existing sponsor cannot transfer sponsorship unless ARP-1 approves the release of the airport and the FAA makes a positive sponsorship determination for the new sponsor. The ADO must refer to the current version of FAA Order 5190.6, FAA Airport Compliance Manual for specific sponsor transfer requirements, including the willingness of the sponsor to take on the applicable grant assurances and obligations.
The ADO and regional office must contact APP-500 and ACO-100 to determine the current process prior to initiating the review of a sponsorship transfer request.
2-10. Conflicting Grant Requests from More than One Entity.
Where more than one entity applies for a grant for the same or similar project, and where identification of the appropriate agency empowered to do the project is not clear, the regional division manager will designate the eligible applicant based on which one is best equipped to do the project. This is a rare situation and is generally related to a planning project. APP-400 can provide assistance to the regional division manager and the ADO in these cases.
This page has been intentionally left blank.
Section 1. List of 16 Requirements for Project Funding. › 3-1. List of 16 Requirements for Project Funding.
Chapter 3. What projects can be funded?
Section 1. List of 16 Requirements for Project Funding.
3-1. List of 16 Requirements for Project Funding.
A project must meet the 16 general requirements listed in Table 3-1 in order for the ADO to consider it for AIP funding. The ADO must not approve projects that do not meet these requirements. The remaining sections of this chapter discuss each of these 16 general requirements in greater detail.
Table 3-1 The 16 General Requirements for Project Funding
The general requirements are… As found in…
a. Is the project eligible? Section 2
b. Is the project justified? Section 3
c. Is the project on airport property (with good title)? Section 4
d. Is the project on the FAA approved airport layout plan? Section 5
e. Has the sponsor satisfied the intergovernmental review and airport user
consultation requirements?
Section 6
f. Has the FAA completed an environmental finding for the project? Section 7
g. Will the project result in a usable unit of work? Section 8
h. Will the project be planned, designed, and/or constructed to FAA standards? Section 9
i. Has the project been procured correctly? Section 10
j. Are the project costs allowable? Section 11
k. Are the project costs necessary to accomplish the project (Allowable Rule #1)? Section 12
l. Were the project costs incurred after the grant was executed (Allowable Rule #2)?
Section 13
m. Are the project costs reasonable (Allowable Rule #3)? Section 14
n. Is this the only Federal grant containing these project costs (Allowable Rule #4)? Section 15
o. Are the project costs within the allowable Federal share (Allowable Rule #5)? Section 16
p. Can the project be completed without unreasonable delay? Section 17
Section 2. Project Eligible. › 3-6.
Section 2. Project Eligible.
3-2. The Act Establishes the General Types of Eligible Projects.
The Act identifies the general types of projects that may be funded with AIP, which are airport planning, airport development, noise compatibility planning, and noise compatibility projects (see 49 USC § 48103).
Only these types of projects are eligible and can be funded. The Federal Appropriations Law prohibits the ADO from funding ineligible projects (as discussed in Paragraph 1-10). If this Handbook does not list a project as eligible, the ADO must receive an eligibility determination from APP-500 in order to proceed with the project. This effort will maintain consistency on a national basis.
However, just because a project is eligible under the Act, it does not mean that the ADO can fund the project. The project must meet the other requirements further outlined in this chapter.
3-3. Project Requirement Tables (in the Appendices by Project Type).
The tables in the appendices contain project specific requirements for projects that are eligible under the Act. These tables have been broken out into the appendices for ease of use. ADOs must not use these appendices independently. They must also apply the 16 general project requirements outlined in this chapter to determine if a project can be funded with AIP.
3-4. Prohibited Project and Unallowable Cost Tables.
Appendix C contains tables that the ADO can use to help determine if the FAA has previously identified a project or cost to be ineligible or unallowable.
3-5. Only Specific Equipment is Eligible under the Act.
49 USC § 47102(3) lists the specific pieces of equipment eligible under AIP. No other pieces of equipment (including associated computer hardware or software for the equipment) are eligible unless AAS-1 has made a written determination that the equipment will contribute significantly to airport safety or security.
3-6. Eligibility of Maintenance, Rehabilitation, Reconstruction, and Replacement Projects.
These concepts cause much confusion. The goal for all of the actions above is to obtain a functioning unit as the final outcome. What differentiates these concepts is the level of effort and the resulting change in useful life. As the work effort for a category increases, the question of whether the work belongs in the category surfaces (for example, determining when timely maintenance is actually rehabilitation.) As a result, the conclusion of which category the project falls into rests with the specific circumstances. Table 3-2 explains the differences between these concepts and Table 3-3 provides eligibility examples.
Table 3-2 Differences between Maintenance, Rehabilitation, Reconstruction, and
Replacement Projects
Item Explanation Eligibility
a. Maintenance
(including minor repair)
Maintenance includes any regular or recurring work necessary to preserve existing airport facilities in good condition, any work involved in the care or cleaning of existing airport facilities, and any incidental or minor repair work on existing airport facilities.
Continue reading ↓ 120 of 1316 passages shown