AC 150/5200-30D Airport Field Condition Assessments and Winter Operations Safety

This AC provides guidance to assist airport operators in developing a snow and ice control plan, assessing and reporting airport conditions through the utilization of the Runway Condition Assessment Matrix (RCAM), and establishing snow removal and control procedures. Consolidated version includes Changes 1 and 2. For implementation purposes, all certificated airports must submit revised Snow and Ice Control Plans to the FAA no later than September 1, 2016, for approval. The Federal NOTAM System is the primary means of conveying airport condition information by certificated and federally obligated airports. Effective October 1, 2016, the Federal NOTAM System will incorporate the new reporting criteria and methodology contained in this AC.

Official source ↗ Open PDF

U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

Subject: Airport Field Condition Assessments and Winter Operations Safety

Date: 10/29/2020 Initiated By: AAS-300

AC No: 150/5200-30D Change: 2

1 Purpose. This advisory circular (AC) change provides additional language on when to issue new runway condition reports. The change also provides additional language that addresses the impact of snow accumulation around NAVAIDs. The AC will now have language that is similar to what FAA Order 6750.49, Maintenance of Instrument Landing System (ILS) Facilities, denotes. The language will further address accumulations, clearing, and the removal of snow around NAVAID equipment.

2 Application. The Federal Aviation Administration (FAA) recommends the guidance in this advisory circular for when to issue runway condition reports. This AC does not constitute a regulation, is not mandatory, and is not legally binding in its own right. It will not be relied upon as a separate basis by the FAA for affirmative enforcement action or other administrative penalty. Conformity with this AC is voluntary, and nonconformity will not affect rights and obligations under existing statutes and regulations, except as follows:

1. Use of the standards and guidance in this AC is mandatory for airports that receive funding under Federal grant assistance programs, including the Airport Improvement Program. See Grant Assurance #34.

2. Use of the standards and guidance in this AC is mandatory for projects funded by the Passenger Facility Charge program. See PFC Assurance #9.

3. This AC provides one, but not the only, acceptable means of meeting the requirements of 14 CFR part 139, Certification of Airports.

3 Principal Changes. This AC change includes the following principal changes:

ii

1. For paragraph 1.12.15, adds the contaminant description term “Patchy” and the definition, for when 25 percent or less of the reported surface of a taxiway, apron, or heliports is contaminated.

2. For paragraph 1.12.18, adds new language citing RwyCC reported based on direction of assessment and RwyCC may be read in reverse for opposite direction operations. Also, a new note added on RwyCC reporting.

3. For paragraph 4.2.2.1, adds new note related to challenges of managing and monitoring more than one runway during winter operations.

4. For paragraph 4.2.2.4.1, adds additional language on the effect of snow accumulation around the Localizer and Glide Slope antenna.

5. For paragraph 4.2.3.1, adds language about the need for coordination to assess snow accumulations for EMAS within the Localizer critical area.

6. For paragraph 5.6.1, adds new language on assessment collection and dissemination of airport condition information based on agreements, procedures, and planned and unplanned scenarios according to certain weather events.

7. For paragraph 5.7.2.1, adds additional language on how to report runway conditions.

8. For paragraph 5.7.2.1.3, adds new paragraph on condition reports that remain unchanged for an extended period, and a new note on communicating updated condition report information.

9. For paragraph 5.11, adds new language on airports record and log control of snow and ice control activity which includes documenting times and results of completed assessment, regardless of whether they triggered a change in reported conditions.

John R. Dermody Director of Airport Safety and Standards

U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

Subject: Airport Field Condition Assessments and Winter Operations Safety

Date: 3/8/2017 Initiated By: AAS-300

AC No: 150/5200-30D Change: 1

1 PURPOSE. This advisory circular (AC) change is based on feedback received from airport operators seeking additional guidance on issues to help improve the implementation of the TakeOff and Landing Performance Assessment initiative. These improvements relate to reporting wet runway, slippery when wet reporting procedures, unacceptable aspects of reporting Mu values to aircraft operators, using current runway in use for generating runway surface condition reports, airport operators abilities to use mitigations to improve runway conditions, and clarifications on using Conditions Not Monitored and Surface Conditions Not Reported NOTAMs.

2 APPLICATION. The information contained in this AC provides guidance for the airport operators in the development of plans, methods, and procedures for identifying, reporting, and removal of airport contaminants. The use of this guidance is an acceptable means of compliance, for airports certificated under Title 14 Code of Federal Regulations (CFR) part 139, Certification of Airports. The use of this AC is also a method of compliance for federally obligated airports. Furthermore, use of the specifications in this AC is mandatory for projects funded under the Airport Improvement Program (AIP) or with revenue from the Passenger Facility Charge (PFC) program.

3 PRINCIPAL CHANGES. This AC change includes the following principal changes:

1. For paragraph 1.12.17, incorporates additional guidance on RwyCC use by pilots and their ability to read RwyCCs in reverse for opposite direction operations.

2. For paragraph 1.12.19.1, incorporates guidance to not report a “Wet” runway when a “Slippery When Wet” NOTAM is in effect.

3. For paragraph 5.1.4.1, corrects the metric equivalency for 1/8 inch from (3.2 mm) to (3 mm) in item four of the list and other places where this error occurs.

iv

4. For paragraph 5.2, additional information is added to the note to emphasize the unacceptable aspects of reporting or disseminating friction (Mu) values to aircraft operators.

5. For paragraph 5.6, additional information is added to the note describing when airport operators must report “Wet” conditions when associated with other winter contaminants.

6. For paragraph 5.7.2.1, additional information is added that provides the airport operator with instructions for how to generate a runway surface condition report.

7. Paragraph 5.7.2.2 is now appended with a sub-paragraph 5.7.2.2.2 related to mitigations which the airport operator can use to improve runway conditions that differ from the process of upgrading a Runway Condition Code.

8. Clarifies the use of Conditions Not Monitored NOTAMs in paragraph 5.12 and adds an example and translation language.

9. Clarifies the use of Surface Conditions Not Reported NOTAMs in paragraph 5.13 and adds an example with translation language.

SIGNED BY JOHN R. DERMODY

John R. Dermody Director of Airport Safety and Standards

U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

Consolidated to Include Changes 1-2

Subject: Airport Field Condition Assessments and Winter Operations Safety

Date: 7/29/2016 Initiated By: AAS-300

AC No: 150/5200-30D Change:

1 PURPOSE. This advisory circular (AC) provides guidance to assist airport operators in developing a snow and ice control plan, assessing and reporting airport conditions through the utilization of the Runway Condition Assessment Matrix (RCAM), and establishing snow removal and control procedures.

2 CANCELLATION. This AC cancels AC 150/5200-30C, Airport Winter Safety and Operations, dated December 9, 2008.

3 APPLICATION.

1. The information contained in this AC provides guidance for the airport operators in the development of plans, methods, and procedures for identifying, reporting, and removal of airport contaminants. The use of this guidance is an acceptable means of compliance, for airports certificated under Title 14 Code of Federal Regulations (CFR) part 139, Certification of Airports. The use of this AC is also a method of compliance for federally obligated airports. Furthermore, use of the specifications in this AC is mandatory for projects funded under the Airport Improvement Program (AIP) or with revenue from the Passenger Facility Charge (PFC) program.

2. For implementation purposes, all certificated airports must submit revised Snow and Ice Control Plans to the FAA no later than September 1, 2016, for approval. The Federal NOTAM System is the primary means of conveying airport condition information by certificated and federally obligated airports. Effective October 1, 2016, the Federal NOTAM System will incorporate the new reporting criteria and methodology contained in this AC.

ii

4 PRINCIPAL CHANGES. The AC incorporates the following principal changes:

1. Updates the title of the AC to communicate the inclusion of guidance on field condition assessments beyond winter conditions.

2. Introduces the Runway Condition Assessment Matrix (RCAM) and procedures for its use and application.

3. Expands on using current NOTAM system technology for airport condition reporting.

4. Adds new information to the Airfield Clearing Priorities for the Snow and Ice Control Plan.

5. Adds definitions of contaminants in Paragraph 1.12.

6. Defines vehicle and pilot reported braking action and updates terminology: Good, Good-to-Medium, Medium (previously known as Fair), Medium-to-Poor, Poor, and Nil.

7. Adds “conditions not monitored” information for airport operators to use when the airport is not monitored due to operations hours or staffing.

8. Adds the new acronym “RwyCC” for Runway Condition Code.

9. Removes the capability to report friction (Mu) values (replaced by RwyCCs).

10. Adds information on snow removal from Engineered Material Arresting Systems.

11. Adds new Appendix A, Sample Airport Condition Assessment Worksheet.

12. Adds new Appendix F, Runway Condition Assessment Matrix (RCAM) (For Airport Operators’ Use Only).

13. Provides origin and background on the Takeoff and Landing Performance Assessment Aviation Rulemaking Committee.

14. Identifies the approved list of layered contaminants.

15. Introduces percentage based contaminant reporting by runway third.

16. Limits use of Vehicle Braking Action Reports to non-runway environment (e.g., taxiways, aprons, holding bays, etc.).

17. Provides examples of how multiple contaminants are to be illustrated.

18. Revises and supplements the list of questions for Snow and Ice Control Plans (SICPs).

19. Provides a decision tree for an overview of the basic RCAM process.

5 Related Code of Federal Regulations (CFRs) and Reference Materials. The following are FAA regulations and publications (see current versions) from which material has been extracted for the preparation of this AC. They will continue to be the authoritative source of revisions to this AC. These references also contain additional

iii

resource material that may be useful in special situations, but their immediate availability to airport operators is not considered necessary to accomplish the basic operational purpose of this AC. Electronic versions of these documents are available online.

1. Electronic CFRs are available at www.ecfr.gov:

a. 14 CFR Part 139, Certification of Airports.

b. 14 CFR Part 25, Airworthiness Standards: Transport Category Airplanes.

c. 14 CFR Part 91, General Operating and Flight Rules.

d. 14 CFR Part 121, Air Carrier Certification.

e. 14 CFR Part 135, Operating Requirements: Commuter and On Demand Operations and Rules Governing Persons On Board Such Aircraft.

f. 49 CFR Part 1542, Airport Security.

g. 49 CFR Part 1544, Aircraft Operator Security: Air Carriers and Commercial Operators.

2. Air Traffic publications are available at www.faa.gov/air_traffic/publications/:

a. FAA Order JO 7110.10, Flight Services.

b. FAA Order JO 7110.65, Air Traffic Control.

c. FAA Order JO 7210.3, Facility Operation and Administration.

d. FAA Order JO 7930.2, Notices to Airmen (NOTAMs).

e. Aeronautical Information Manual (AIM).

f. Pilot/Controller Glossary (P/CG).

3. Airport ACs (150 series) are available at www.faa.gov/airports/resources/advisory_circulars/:

a. AC 150/5300-13, Airport Design.

b. AC 150/5200-28, Notices to Airmen (NOTAMs) for Airport Operators.

c. AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces.

4. Other FAA ACs are available at www.faa.gov/regulations_policies/advisory_circulars/:

a. AC 25-31, Takeoff Performance Data for Operations on Contaminated Runways.

b. AC 25-32, Landing Performance Data for Time-of-Arrival Landing Performance Assessments.

c. AC 91-79, Mitigating the Risks of a Runway Overrun Upon Landing.

d. AC 121.195-1, Operational Landing Distances for Wet Runways; Transport Category Airplanes.

iv

5. Other FAA Orders and Notices are available at http://www.faa.gov/regulations_policies/orders_notices/:

a. FAA Order 8900.1, Flight Standards Information Management System.

b. FAA Order 5190.6, Airport Compliance Manual.

SIGNED BY MICHAEL J. O’DONNELL

Michael J. O’Donnell Director of Airport Safety and Standards

CONTENTS

Paragraph Page

v

CHAPTER 1. INTRODUCTION … 1-1

1.1 Overview … 1-1

1.2 Background … 1-1

1.3 Snow and Ice Control Committee … 1-2

1.4 Airport Snow and Ice Control Committee (SICC) … 1-2

1.5 Snow Control Center (SCC) … 1-2

1.6 Airfield Clearing Priorities for the Snow and Ice Control Plan (SICP) … 1-2

1.7 Terminal and Landside – Ground Side Priority … 1-2

1.8 Airfield Target Clearance Times … 1-2

1.9 Staffing for Operation of Snow and Ice Control Equipment … 1-2

1.10 Sizing and Storage of Snow and Ice Control Equipment … 1-2

1.11 FAA-Approved Runway Friction Measuring Equipment … 1-1

1.12 Definitions … 1-2

CHAPTER 2. THE SNOW AND ICE CONTROL PLAN … 2-1

2.1 Safety Requirements … 2-1

2.2 Airport Operators … 2-1

2.3 Snow and Ice Control Plans … 2-1

2.4 Topics for Pre- and Post-Season SICC Meetings … 2-3

2.5 Outlining a Snow and Ice Control Plan (SICP) … 2-1

2.6 Topics for Writing Instructions and Procedures for Winter Operations and Notification … 2-1

2.7 Runway Incursion Mitigation and Operations During Non-Towered Air Traffic Control Periods … 2-2

2.8 Staff Training and Recordkeeping … 2-3

2.9 Other Related Items … 2-3

CHAPTER 3. FORECAST TECHNOLOGY FOR AIRPORT OPERATORS … 3-1

3.1 Weather Forecasting … 3-1

3.2 FAA Forecasting Research and Development for Airport Operators … 3-1

3.3 Forecasting Runway Surface Conditions … 3-4

CHAPTER 4. SNOW CLEARING OPERATIONS AND ICE PREVENTION … 4-1

vi

4.1 Introduction … 4-1

4.2 Snow Clearing Principles … 4-1

4.3 Controlling Snow Drifts … 4-12

4.4 Snow Disposal … 4-13

4.5 Methods for Ice Control and Removal … 4-14

4.6 Approved Chemicals … 4-15

4.7 Runway Friction Improvements … 4-17

4.8 Sand … 4-19

CHAPTER 5. SURFACE ASSESSMENT AND REPORTING … 5-1

5.1 Airport Operator Responsibility … 5-1

5.2 Runway Friction Surveys … 5-2

5.3 Runway Condition Assessments … 5-5

5.4 Applying the RCAM to a Runway Assessment … 5-14

5.5 Reportable Contaminants without Performance Data … 5-17

5.6 Condition Reporting … 5-17

5.7 Information Exchanged Between the Airport and Pilots … 5-18

5.8 Requirements for Runway, Taxiway, and Apron and Holding Bay Closures … 5-21

5.9 Continuous Monitoring … 5-22

5.10 Letter of Agreement (LOA) Between Airport Operator and Air Traffic Control Tower … 5-23

5.11 Airport Records and Log Controls … 5-23

5.12 Using “Conditions Not Monitored” NOTAMs … 5-24

5.13 “Surface Conditions Not Reported” NOTAMs … 5-25

5.14 Winter NOTAM Abbreviations … 5-25

APPENDIX A. SAMPLE AIRPORT CONDITIONS ASSESSMENT WORKSHEET ... A-1

APPENDIX B. DEVELOPMENT OF RECOMMENDED SNOW BANK HEIGHT

PROFILES … B-1

APPENDIX C. SNOW AND ICE CONTROL AS A MATERIALS-HANDLING

PROBLEM … C-1

APPENDIX D. DECELEROMETERS THAT MEET FAA TECHNICAL

SPECIFICATIONS … D-1

APPENDIX E. PERFORMANCE SPECIFICATION FOR DECELEROMETERS … E-1

vii

APPENDIX F. RUNWAY CONDITION ASSESSMENT MATRIX (RCAM) (FOR

AIRPORT OPERATORS’ USE ONLY) … F-1

FIGURES

Figure 1-1. Example of Prioritized Paved Areas for the Snow and Ice Control Plan … 1-2

Figure 3-1. ETI Precipitation Gauge in a Single Alter Wind Shield 2 Type … 3-2

Figure 3-2. Schematic of Unidirectional Storm WSDDM Configuration … 3-3

Figure 4-1. Snow Bank Profile Limits Along Edges of Runways and Taxiways with the Airplane

Wheels on Full Strength Pavement (see Figure 4-2 guidance) … 4-8

Figure 4-2. ILS CAT I and CAT II/III Snow Clearance Area Depth Limitations … 4-9

Figure 4-3. Possible Team Configuration with Perpendicular Wind … 4-10

Figure 4-4. Possible Team Configuration During Light Snowfall with Parallel or Calm Wind 4-10

Figure 4-5. Possible Team Configuration During Medium to Heavy Snowfall with Parallel or

Calm Wind (Dependent upon Rotary Plow performance) … 4-11

Figure 4-6. Typical Snow Trench Dimensions … 4-13

Figure 5-1. Runway Condition Description Column of the RCAM … 5-9

Figure 5-2. Runway Condition Code (RwyCC) Column of the RCAM … 5-10

Figure 5-3. Friction Assessment Column of the RCAM … 5-12

Figure 1-1: picture of page 11Figure 1-1 · page 11
Picture of the page from the copy saved here

Figure 5-4. Vehicle Deceleration or Directional Control Observation Column of the RCAM . 5-13

Figure 5-5. Pilot Reported Breaking Action Column of the RCAM … 5-14

Figure B-1. Individual Height Profiles of Airplane Wingtips and Outer and Inner Engine

Nacelles’ Lower Edges for Airplane Design Groups III and IV … B-2

Figure B-2. Individual Height Profiles of Airplane Wingtips and Outer and Inner Engine

Nacelles’ Lower Edges for Airplane Design Groups V and VI (* indicates preliminary data) … B-3

TABLES

Table 1-1. Clearance Times for Commercial Service Airports … 1-2

Table 1-2. Clearance Times for Non-Commercial Service Airports … 1-2

Table 4-1. Guidance for Airside Urea Application Rates … 4-16

Table 4-2. Standard Gradation for Sand … 4-20

Table 4-3. Expanded Sand Gradation Standard … 4-20

Table 5-1. Friction Survey Example … 5-5

Table 5-2. Runway Condition Assessment Matrix (RCAM) (for Airport Operator Use Only) .. 5-7

viii

This page intentionally left blank.

Figure 5-4: picture of page 11Figure 5-4 · page 11
Picture of the page from the copy saved here

1.2 Background. › 1.2.2 At the core of this recommendation is the concept of using the…

CHAPTER 1. INTRODUCTION

1.1 Overview. The presence of contaminants such as snow, ice, or slush on airfield pavements causes hazardous conditions that may contribute to airplane incidents and accidents. Further, winter storm conditions usually reduce airport traffic volumes through flight delays and/or cancellations and, in severe storm conditions, airport closures. The extent to which these undesirable effects are minimized will depend on the approach taken by the airport operator to closely monitor and assess conditions and have mitigating practices ready to combat potential and any existing contaminant conditions on the airport. This revised AC introduces new concepts and practices and a different approach for airport operators to use, which is a less subjective way of assessing airport conditions. The information in this AC harmonizes activities across FAA Lines of Business in addressing airport surface contaminants. This harmonization recognizes that aircraft manufacturers have determined that variances in contaminant type, depth, and air temperature cause specific changes in aircraft braking performance. As a result, it is possible to take the aircraft manufacturers’ data for specific contaminants and produce the Runway Condition Assessment Matrix for use by airport operators. This harmonization effort associated with identified contaminants extends beyond our domestic airports to our ICAO partners, who are implementing similar standards and procedures to make the process of identifying airport contaminants less subjective. In complying with part 139 for certificated airports, the NOTAM system will become more important for distributing airport conditions reports.

1.2 Background.

1.2.1 Following the overrun accident of a Boeing-737 in December of 2005, the FAA found that the current state of the industry practices did not have adequate guidance and regulation addressing operation on non-dry, non-wet runways, i.e., contaminated runways. As such, the FAA chartered an Aviation Rulemaking Committee (ARC) to address Takeoff and Landing Performance Assessment (TALPA) requirements for the appropriate parts 23, 25, 91 subpart K, 121, 125, 135, and 139. In formulating recommendations, it became clear to the ARC that the ability to communicate actual runway conditions to the pilots in real time and in terms that directly relate to expected aircraft performance was critical to the success of the project. While researching current NOTAM processes numerous significant short comings were discovered that hampered this communication effort. This document provides NOTAM reporting procedures intended for a digital communication process that would support this major safety initiative and resolve the identified shortcomings. Without accurate real time information pilots cannot safely assess takeoff or landing performance.

1.2.2 At the core of this recommendation is the concept of using the included Runway Condition Assessment Matrix (RCAM) (shown in Table 5-2) as the basis for performing runway condition assessments by airport operators and for interpreting the reported runway conditions by pilots in a standardized format based on airplane

CHAPTER 1. Introduction › 1.4 Airport Snow and Ice Control Committee (SICC).

performance data supplied by airplane manufacturers for each of the stated contaminant types and depths. The concept attempts, to the maximum extent feasible, to replace subjective judgments of runway conditions with objective assessments which are tied directly to contaminant type and depth categories, which have been determined by airplane manufacturers to cause specific changes in the airplane braking performance.

1.3 Snow and Ice Control Committee. Winter storm conditions usually reduce airport traffic volumes through flight delays and/or cancellations and, in severe storm conditions, airport closures. The extent to which these undesirable effects are minimized will depend on the approach taken by the airport operator to combat winter conditions. The airport operators that are most successful at combating winter storms are those that establish an airport snow and ice control committee that conducts pre- and post-seasonal planning meetings, operates a Snow Control Center (SCC), and, most importantly, implements a written plan. This advisory circular provides recommendations and guidance for writing plans plus identifies topics that should receive special focus to improve operational safety. For airports certificated under part 139, the written plan is referred to as the Snow and Ice Control Plan (see §139.313, Snow and Ice Control.)

1.4 Airport Snow and Ice Control Committee (SICC). All airports subject to icing conditions or annual snowfall of several inches (6 inches (15 cm) or more) should have a SICC. Such committees have been effective in (1) preseason planning, (2) focusing the operational plan to improve runway safety and communications between various offices/departments involved or impacted by a storm event, (3) addressing the needs of airport users, and (4) critiquing clearing activities of the airfield and apron areas after the winter season and after each storm event. It is recommended that the airport operator schedule ongoing evaluation meetings, preferably after each storm event, to allow evaluation of procedures, identify safety concerns, and, when necessary, implement revised clearing procedures. The SICC size and functions will vary based on the airport size, airport users, and the type of winter weather experienced within its geographical location. The airport manager or his/her representative should chair the SICC. The committee should include representatives from the following:

1. Airport operations staff.

2. Airline flight operations departments (pilot representative), airline station personnel (deicing representatives), and fixed-base operators.

3. FAA air traffic control, flight service station, and technical operations.

4. Other concerned parties deemed necessary, such as the U.S. military (at joint-use airports), service providers, and contractors who may be actively conducting construction activities.

1.6.1 Establishing Priority Areas. › 1.6.1.1 Priority 1.

1.5 Snow Control Center (SCC). The airport operator should set up a Snow Control Center (SCC) for snow and ice control activities. Depending on the size of the airport and its operations, the SCC may be in a special room or facility, or it might be a “snow desk” in a maintenance building, or it could be the command vehicle of the operations officer. The SCC performs the following main functions: (1) managing snow clearing operations; (2) serving as a prime source of field condition reporting, e.g., timely runway braking conditions, snow accumulations, etc.; (3) informing the airport traffic control tower (ATCT), air carriers, air taxis, and other parties of expected runway closures and openings; and (4) issuing timely NOTAMs (see AC 150/5200-28, Notices to Airmen (NOTAMs) for Airport Operators, and FAA Orders 7930.2, Notices to Airmen (NOTAMS), and 7340.1, Contractions.)

1.6 Airfield Clearing Priorities for the Snow and Ice Control Plan (SICP). It is impractical and infeasible for airport operators to simultaneously clear all airside pavement and support facilities of all snow, slush, and ice. The airport operator can establish a minimum level of service by establishing a priority classification system much like how municipalities clear their roadway system during snow events. This targeted approach places focus on critical areas of the airfield that will allow aircraft operations in a safe and efficient manner at an acceptable level of service given environmental conditions. Efforts to clear areas of lower importance can be delayed until the higher priority areas are fully functional or to low aircraft activity hours.

1.6.1 Establishing Priority Areas. The SICP, as a minimum, should identify two priority areas based on the airport’s safety requirements, aircraft operations, and navigational aid facilities. The sizing of the priority areas should take into account the airport resource capabilities and the actual aircraft operational needs. Correct sizing of the highest priority area will optimize clearing activities. Oversizing the highest priority area can be counterproductive as it may exceed the airport’s resource capabilities, and it can deflect limited resources to clear areas not immediately needed for aircraft operations. Figure 1-1 illustrates an airport with typically prioritized areas.

1.6.1.1 Priority 1. Areas appropriate for this category are those that directly contribute to safety and the re-establishment of aircraft operations at a minimum acceptable level of service. Priority 1 will generally consist of the primary runway(s) with taxiway turnoffs and associated taxiways leading to the terminal , portions of the terminal ramp, portions of the cargo ramp, airport rescue and fire fighting (ARFF) station ramps and access roads, mutual aid access points (including gates), emergency service roads, access to essential NAVAID, and centralized deicing facilities. It is not necessary to clear an entire terminal or cargo apron. Priority 1 should only include those portion(s) of apron areas immediately necessary to allow movement of aircraft at a minimum acceptable level of service. Those portions of the

CHAPTER 1. Introduction › 1.7 Terminal and Landside – Ground Side Priority.

apron area that are not essential to re-establishing a minimum level of acceptable airfield service may be used as temporary snow pile staging area for subsequent removal during low activity periods.

1.6.1.2 Priority 2. Areas appropriate for Priority 2 are those not essential to re-establishing a minimum acceptable level of service for aircraft operations. Items in this category normally include crosswind/secondary runways and their supportive taxiways, terminal and cargo apron area not cleared under Priority 1, commercial ramp areas, overnight parking, access roads to secondary facilities, and airfield facilities not essential to flight operations or not used on a daily basis.

1.6.1.3 Priority 3. Priority 3 includes all other areas not addressed under Priority 1 or Priority 2. This typically includes the perimeter security road and service roads within the AOA.

Figure 1-1. Example of Prioritized Paved Areas for the Snow and Ice Control Plan

1.7 Terminal and Landside – Ground Side Priority. The clearing of snow from the terminal and landside infrastructure to and from the terminal is a separate category generally not contained in the SICP because the objective of this clearing operation is public access, not aircraft operation safety. Moreover, different chemicals, clearing equipment, and techniques, and possibly the use

1.8 Airfield Target Clearance Times. › 1.8.1 First, use the general information note and footnote in Table 1-1…

of municipal or service contractors, might be standard for such operations. Landside pavement deicers should not be tracked onto the airfield areas because of their corrosive properties to aircraft. See Paragraph 4.6.2 for prohibition of landside chemicals on aircraft operational areas.

1.8 Airfield Target Clearance Times. Airports should consider having sufficient equipment to clear within a reasonable time 1 inch (2.54 cm) of snow weighing up to 25 lb/ft3 (400 kg/m3) for the priorities outlined in Paragraph 1.6 that accommodate clearing the anticipated airplane operations during the Priority 1 clearance time. This means that generally only some portions of the terminal or cargo apron should be included in the Priority 1 area. If supportive runways (such as a parallel runway) typically have simultaneous operations during the winter months, then the areas for both runways and associated principal taxiways should be included in the total area. The term “reasonable time,” as used in this AC, is based on the airport type and number of annual operations. The guidance in Paragraphs 1.8.1, 1.8.2, and 1.9 is provided to assist the airport operator in determining necessary equipment.

1.8.1 First, use the general information note and footnote in Table 1-1 and Table 1-2 to classify the airport as a Commercial Service Airport or a Non-Commercial Service Airport.

Table 1-1. Clearance Times for Commercial Service Airports

Annual Airplane Operations

(includes cargo operations)

Clearance Time1

(hour)

40,000 or more 1/2

10,000 – but less than 40,000 1

6,000 – but less than 10,000 11/2

Less than 6,000 2

General: Commercial Service Airport means a public-use airport that the U.S. Secretary of Transportation determines has at least 2,500 passenger boardings each year and that receives scheduled passenger airplane service [see 49 U.S.C. 47102(7)].

Footnote 1: These airports should have sufficient equipment to clear 1 inch (2.54 cm) of falling snow weighing up to 25 lb/ft3 (400 kg/m3) from Priority 1 areas within the targeted clearance times.

CHAPTER 1. Introduction › 1.9 Staffing for Operation of Snow and Ice Control Equipment.

Table 1-2. Clearance Times for Non-Commercial Service Airports

Annual Airplane Operations

(includes cargo operations)

Clearance Time1

(hour)

40,000 or more 2

10,000 – but less than 40,000 3

6,000 – but less than 10,000 4

Less than 6,000 6

General: Although not specifically defined, Non-Commercial Service Airports are airports that are not classified as Commercial Service Airports [see Table 1-1, general note].

Footnote 1: These airports may wish to have sufficient equipment to clear 1 inch (2.54 cm) of falling snow weighing up to 25 lb/ft3 (400 kg/m3) from Priority 1 areas within the recommended clearance times.

1.8.2 Second, using the appropriate table, find the number of annual airplane operations handled by the airport and the targeted clearance time. As shown in the tables, this action-initiating condition, compared with an action-initiating event based on weather forecasts or runway surface condition sensors, calls for clearing operations for 1-inch (2.54-cm) snowfall with an assumed weight (snow density) of up to 25 lb/ft3 (400 kg/m3). For airports located in regions where snow densities over 25 lb/ft3 (400 kg/m3) are the norm, the airport operator should keep in mind that heavier snow densities can increase the size and type of equipment comprising the fleet used to clear Priority 1 paved areas within the targeted clearance times (for details, see AC 15330/5220-20, Airport Snow and Ice Control Equipment).

1.9 Staffing for Operation of Snow and Ice Control Equipment. Sizing the snow and ice control equipment fleet should be based on the total Priority 1 paved area that is cleared of snow, slush, or ice within a targeted clearance time. AC 150/5220-20 offers guidance on how to select the number and types of equipment necessary to meet targeted clearance times. As for staffing, § 139.303(a)-(b) relate equipment fleet size with sufficient, qualified staff. Section 139.303(b) requires certificate holders “to equip personnel with sufficient resources needed to comply with the requirements of this part.” Section 139.303(a) requires certificate holders “to provide sufficient and qualified personnel to comply with the airport’s Airport Certification Manual and the requirements of this part.” While snow removal and surface treatment may be adequate for runways, the adequacy should extend to maintaining all open taxiways, aprons, centralized deicing facilities, and holding bays in a safe operating condition.

1.11 FAA-Approved Runway Friction Measuring Equipment. › 1.11.2 Decelerometers.

1.10 Sizing and Storage of Snow and Ice Control Equipment. Sizing the snow and ice control equipment fleet should be based on the total Priority 1 paved area that is cleared of snow, slush, or ice within a targeted clearance time. The equipment necessary for Priority 1 may be used to clear lower priority areas once Priority 1 areas are clear. AC 150/5220-20 offers guidance on how to select the number and types of equipment necessary to meet targeted clearance times. Snow and ice control equipment should be housed in a building capable of maintaining 50 degrees Fahrenheit to prolong the useful life of the equipment and to enable more rapid response to operational needs. Operationally, equipment should be inspected after each use to determine whether additional maintenance or repair is necessary. Guidance on storing snow and ice control equipment is provided in AC 150/5220-18, Buildings for Storage and Maintenance of Airport Snow and Ice Control Equipment and Materials.

1.11 FAA-Approved Runway Friction Measuring Equipment. There are two basic types of friction measuring equipment that can be used for conducting friction surveys on runways during winter operations: Continuous Friction Measuring Equipment (CFME) and Decelerometers (DEC). See Paragraph 5.2.

1.11.1 Continuous Friction Measuring Equipment (CFME). CFME devices are recommended (over Decelerometers) for measuring friction characteristics of pavement surfaces covered with contaminants, as they provide a continuous graphic record of the pavement surface friction characteristics with friction averages for each one-third zone of the runway length. They may be either selfcontained or towed. AC 150/5320-12, Measurement, Construction, and Maintenance of Skid-Resistant Airport Pavement Surfaces, contains performance specifications for CFME in Appendix 3 and a list of FAA-approved equipment in Appendix 4.

1.11.2 Decelerometers. Decelerometers are recommended (over CFMEs) for airports where the longer runway downtime required to complete a friction survey is unacceptable and for busy airports where it is difficult to gain access to the full length of a runway crossed by another runway. Decelerometers should be of the electronic type due to the advantages noted below. Mechanical decelerometers may be used, but should be reserved as a backup. Airports having only mechanical devices should plan to upgrade as soon as possible. Neither type of decelerometer will provide a continuous graphic record of friction for the pavement surface condition. They provide only a spot check of the pavement surface. On pavements with frozen contaminant coverage of less than 25 percent, decelerometers are used only on the contaminated areas. For this reason, a survey taken under such conditions will result in a conservative representation of runway braking conditions. This should be considered when using friction values as an input into decisions about runway treatments. In addition, any time a pilot may experience widely varying braking along the runway, it is essential that the percentage of contaminant coverage be noted in any report. FAA-approved decelerometers are listed in Appendix D of this AC, and performance specifications are provided in Appendix E.

1.12.4 Contaminated Runway. › 1.12.4.2 When runway contaminants exist, but overall coverage within…

1.11.2.1 Electronic Decelerometers. Electronic decelerometers eliminate potential human error by automatically computing and recording friction averages for each one-third zone of the runway. They also provide a printed record of the friction survey data.

1.11.2.2 Mechanical Decelerometers. Mechanical decelerometers may be used as a backup to an electronic decelerometer. The runway downtime required to complete a friction survey will be longer than with an electronic decelerometer. Mechanical decelerometers do not provide automatic friction averages or a printed copy of data.

1.12 Definitions.

1.12.1 Ash. Ash is a grayish-white to black solid residue of combustion normally originating from pulverized particulate matter ejected by volcanic eruption.

1.12.2 Compacted Snow. Compacted snow is snow that has been compressed and consolidated into a solid form that resists further compression such that an airplane will remain on its surface without displacing any of it. If a chunk of compressed snow can be picked up by hand, it will hold together or can be broken into smaller chunks rather that falling away as individual snow particles.

Note: A layer of compacted snow over ice must be reported as compacted snow only.

Example: When operating on the surface, significant rutting or compaction will not occur. Compacted snow may include a mixture of snow and embedded ice; if it is more ice than compacted snow, then it should be reported as either ice or wet ice, as applicable.

1.12.3 Contaminant. A contaminant is a deposit such as frost, any snow, slush, ice, or water on an airport pavement where the effects could be detrimental to the friction characteristics of the pavement surface.

1.12.4 Contaminated Runway.

1.12.4.1 For purposes of generating a runway condition code and airplane performance, a runway is considered contaminated when more than 25 percent of the overall runway length and width coverage or cleared width is covered by frost, ice, or any depth of snow, slush, or water.

1.12.4.2 When runway contaminants exist, but overall coverage within the area of the runway that is being maintained is 25 percent or less, the contaminants

1.12 Definitions. › 1.12.9 Frost.

will still be reported. However, a runway condition code will not be generated.

Note: While mud, ash, sand, and oil are reportable contaminants, there is no associated airplane performance data available for these contaminants and no Runway Condition Code (RwyCC) will be reported. Mud is the only contaminant in this reference where a measured depth is reportable.

Exception: Rubber is not subject to the 25 percent rule, and will be reported as Slippery When Wet when the pavement evaluation/friction deterioration indicates the averaged Mu value on the wet pavement surface is below the Minimum Friction Level classification specified in Table 3-2, Friction Level Classification for Runway Pavement Surfaces, of AC 150/5320-12, Measurement, Construction, and Maintenance of Skid- Resistant Airport Pavement Surfaces.

1.12.5 Dry Runway/Pavement. Use the term “DRY” to describe runway/pavement surfaces that are neither wet nor contaminated. A FICON NOTAM must not be originated for the sole purpose of reporting a dry runway. A dry runway surface should be reported only when there is need to report conditions on the remainder of the surface.

1.12.6 Dry Snow. Dry snow is snow that has insufficient free water to cause it to stick together. This generally occurs at temperatures well below 32° F (0° C). If when making a snowball, it falls apart, the snow is considered dry.

1.12.7 Eutectic Temperature/Composition. A deicing chemical melts ice by lowering the freezing point. The extent of this freezing point depression depends on the chemical and water in the system. The limit of freezing point depression, equivalent to the lowest temperature that the chemical will melt ice, occurs with a specific amount of chemical. This temperature is called the eutectic temperature, and the amount of chemical is the eutectic composition. Collectively, they are referred to as the eutectic point.

1.12.8 FICON (Field Condition Report). A FICON is a Notice to Airmen (NOTAM) generated to reflect pavement surface conditions on runways, taxiways, and aprons and Runway Condition Codes (RwyCCs) if greater than 25 percent of the overall runway length and width coverage or cleared width of the runway is contaminated.

1.12.9 Frost. Frost consists of ice crystals formed from airborne moisture that condenses on a surface whose temperature is below freezing. Frost differs from ice in that the frost crystals grow independently and therefore have a more granular texture.

Note: Heavy frost that has noticeable depth may have friction qualities similar to ice and downgrading the runway condition code accordingly should be considered. If

1.12 Definitions. › 1.12.13 Multiple Contaminants.

driving a vehicle over the frost does not result in tire tracks down to bare pavement, the frost should be considered to have sufficient depth to consider a downgrade of the runway condition code.

1.12.10 Ice. Ice is the solid form of frozen water including ice that is textured (i.e., rough or scarified ice).

Note: A layer of ice over compacted snow must be reported as ice only.

1.12.11 Layered Contaminant. A layered contaminant is a contaminant consisting of two overlapping contaminants. The RCAM identifies the approved list of layered contaminants, including:

1. Dry Snow over Compacted Snow

2. Wet Snow over Compacted Snow

3. Slush over Ice

4. Water over Compacted Snow

5. Dry Snow over Ice

6. Wet Snow over Ice

1.12.12 Mud. Mud is wet, sticky, soft earth material.

1.12.13 Multiple Contaminants. Multiple contaminants are a combination of contaminants (as identified in the RCAM) observed on paved surfaces. When reporting multiple contaminants, only the two most prevalent contaminants are reported. When reporting on runways, up to two contaminant types may be reported for each runway third. The Runway Condition Code (when applicable) will be based on the most hazardous contaminant, when both contaminants are not from the same category in the RCAM. The reported contaminants may consist of a single and layered contaminant, two single contaminants, or two layered contaminants. The reporting of “multiple contaminants” represent contaminants which are located adjacent to each other, not to be confused with a “layered contaminant” which is overlapping. For example:

 Single contaminant and Layered contaminant.

‘Wet’ and ‘Wet Snow over Compacted Snow’

 Single contaminant and Single contaminant.

‘Wet Snow’ and ‘Slush’

 Layered contaminant and Layered contaminant.

‘Dry Snow over Compacted Snow’ and ‘Dry Snow over Ice’

1.12.20 Slippery When Wet Runway. › 1.12.20.1 For runways where a friction survey (conducted for pavement…

1.12.14 Oil. Oil is a viscous liquid, derived from petroleum or synthetic material, especially for use as a fuel or lubricant.

1.12.15 Patchy. A description that can be associated with a contaminant covering 25 percent or less of the reported portions of a taxiway, apron, or heliport. Patchy cannot be used to describe contaminants on any runway.

1.12.16 Runways (Primary and Secondary).

1.12.16.1 Primary. Primary Runways are runways being actively used or expected to be used during existing or anticipated adverse meteorological conditions, where the majority of the takeoff and landing operations will take place.

1.12.16.2 Secondary. Secondary runways are runways that support a primary runway and is less operationally critical. Takeoff and landing operations on such a runway are generally less frequent than on a primary runway. Snow removal operations on these secondary runways should not occur until Priority 1 surfaces are satisfactorily cleared and serviceable.

1.12.17 Runway Condition Assessment Matrix (RCAM). The RCAM is the tool (Table 5-2) by which an airport operator will assess a runway surface when contaminants are present.

1.12.18 Runway Condition Code (RwyCC). Runway Condition Codes describe runway conditions based on defined contaminants for each runway third. Use of RwyCCs harmonizes with ICAO Annex 14, providing a standardized “shorthand” format (e.g., 4/3/2) for reporting. Pilots use RwyCCs to conduct takeoff and landing performance assessments. Airports report RwyCCs based on the direction of the assessment which can apply in reverse for aircraft operating from the opposite direction.

Note: Report only one set of RwyCCs per runway. For example, do not report two runway condition reports (one from each end) for a runway as this may cause confusion for pilots and unnecessarily saturates the NOTAM system.

1.12.19 Sand. Sand is a sedimentary material, finer than a granule and coarser than silt.

1.12.20 Slippery When Wet Runway.

1.12.20.1 For runways where a friction survey (conducted for pavement maintenance) indicates the averaged Mu value at 40 mph on the wet pavement surface

failed to meet the minimum friction level classification specified in AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, the airport operator must reports via the NOTAM system a RwyCC of ‘3’ for the entire runway (by thirds: 3/3/3) when the runway is wet. The runway condition description “Slippery When Wet” is used for this condition. Do not report a “Wet” runway when a “SLIPPERY WHEN WET” NOTAM is in effect. When a “SLIPPERY WHEN WET" NOTAM is in effect, report the runway condition “Slippery When Wet” instead of “Wet” for the relevant thirds. If airport operator judgment deems a downgrade is necessary, the downgrade must be made such that all three runway thirds match (i.e. 3/3/3, 2/2/2, 1/1/1). An airport may discontinue the use of this NOTAM when the runway minimum friction level classification has been met or exceeded.

1.12 Definitions. › 1.12.25 Wet Snow.

1.12.20.2 Slippery When Wet is only reported when a pavement maintenance evaluation indicates the averaged Mu value on the wet pavement surface is below the Minimum Friction Level classification specified in Table 3-2 of AC 150/5320-12. Some contributing factors that can create this condition include rubber buildup, groove failures/wear, and pavement macro/micro textures.

1.12.21 Slush. Slush is snow that has water content exceeding a freely drained condition such that it takes on fluid properties (e.g., flowing and splashing). Water will drain from slush when a handful is picked up. This type of water-saturated snow will be displaced with a splatter by a heel and toe slap-down motion against the ground.

1.12.22 Water. Water is the liquid state of water. For purposes of condition reporting and airplane performance, water is greater than 1/8-inch (3mm) in depth.

1.12.23 Wet Ice. Wet ice is ice that is melting, or ice with a layer of water (any depth) on top.

1.12.24 Wet Runway. A runway is wet when it is neither dry nor contaminated. For purposes of condition reporting and airplane performance, a runway can be considered wet when more than 25 percent of the overall runway length and width coverage or cleared width being used is covered by any visible dampness or water that is 1/8-inch (3 mm) or less in depth.

1.12.25 Wet Snow. Wet snow is snow that has grains coated with liquid water, which bonds the mass together, but that has no excess water in the pore spaces. A well-compacted, solid snowball can be made, but water will not squeeze out.

CHAPTER 2. The Snow and Ice Control Plan › 2.3 Snow and Ice Control Plans.

CHAPTER 2. THE SNOW AND ICE CONTROL PLAN

2.1 Safety Requirements. Snow, ice, and slush should be removed as expeditiously as practicable. The goal is to maintain runways, high-speed turnoffs, and taxiways in a “no worse than wet” (i.e., no contaminant accumulation) condition. Surface friction can be improved by application of sand when unusual conditions prevent prompt and complete removal of slush, snow, or ice. Operations of snow removal equipment and support vehicles must be conducted to prevent runway incursions and interference or conflict with airplane operations. This safety responsibility is shared by airport personnel, airplane operators, and any contract service providers. The reduced hours of daylight during the winter and frequent lowvisibility conditions resulting from fog, blowing snow, or precipitation require extra care during field operations and greater attention to enhancing visibility of equipment performing winter maintenance (i.e., snow removal, friction enhancement, etc.). Postclearing operations must be conducted to ensure airfield signage and markings between the runway(s) and apron are visible to the maximum extent possible to pilots to reduce the potential for runway incursions.

2.2 Airport Operators. Airport operators ensure safety of operations at their facilities in accordance with 14 CFR part 139 regulatory guidance. Airport operators should ensure the snow and ice control plan is current, complete, and customized to the local conditions. All airport leases and agreements should be clear and specific and cover the duties and responsibilities of lessees to carry out their assigned snow and ice control duties. Airport operators, however, should notify the users of the airport of any change in published procedure or change in the physical facility. As an example, an airport operator should give, as soon as practicable, notice of pavement or visual aids that may have been damaged by a snow plowing operation. Complete documentation of compliance with the snow and ice control plan (SICP) should be kept. This documentation includes when and where SAIC activities have taken place. This advisory circular will use the term “Snow and Ice Control Plan” to represent the airport’s snow and ice control plans.

2.3 Snow and Ice Control Plans. The Snow and Ice Control Plan (SICP) is a basic document encompassing at least two separate phases. Phase #1 addresses pre- and post-winter season subjects that prepare the airport operator for the new winter season. This phase may include revising the existing SICP after the winter season ends. Phase #2 addresses the sequential actions, via instruction and procedures, taken by the airport operator for dealing with winter storms and notifying airport users in a timely manner when less than satisfactory conditions exist at the airport including the closure of runways. Chapters 1, 3, 4, and 5 of this AC offer guidance, recommendations, and standards for writing instructions and procedures for Phase #2. Additionally, Paragraphs 2.4 and 2.5 should be used to

maintain a safer airfield. At minimum, the following questions should be addressed when outlining new plans or revising existing plans:

1. Are we meeting all applicable part 139 requirements?

2. Are we materially prepared and adequately budgeted for the new winter season?

3. Did the SICP incorporate identified post-season improvements?

4. Are we staffed adequately with qualified personnel?

5. Is our training program effective and adequately tracking test records and development of qualified personnel?

6. Are procedures for disposal of deicers and equipment maintenance materials and supplies in compliance with storm water regulations?

7. Were the pre- and post-season meetings held this year appropriate to address all facets and needs of operations and meet the requirements of the SICP?

8. Did our weather forecasting method monitor last year’s storm events accurately and in a timely manner?

9. Do we need to change our prescribed storm conditions to start clearing operations or preventive measures?

10. Do we need to change our runway, taxiway, apron and holding bay closure procedures as defined in Paragraph 5.8 for closing a runway and other paved areas used by airplanes?

11. In reference to our closure procedures, do we need to revise the steps prescribed in the SICP for continuously monitoring?

12. Are there any changes to our chain-of-command and phone numbers?

13. Do we need to update or issue a Letter of Agreement (LOA) with the air traffic control tower (ATCT) or other parties for implementing runway, taxiway, apron and holding bay closure procedures?

14. Were there any changes to the airfield areas to be cleared and maintained, the timing of operations, and how clearing will be done?

15. Are we informing our users frequently and in a timely manner when we must close the airport or report less than satisfactory surface conditions? Did we get complaints?

16. How do we ensure markings, signs, and lighting systems are legible/visible after clearing operations? Are touchdown markings addressed in our procedures?

17. What are our procedures in case of airfield accidents involving snow clearing crews, airplanes, or other airport vehicles?

18. Did we address all unique airport site conditions?

19. Have all storm crews received driver’s training on the SICP and trained on new equipment?

2.4 Topics for Pre- and Post-Season SICC Meetings. › 2.4.1 Topics Relative to Airport Snow Removal Operations Discussions.

2.4 Topics for Pre- and Post-Season SICC Meetings. As with all plans, the SICP should be reviewed at least annually to collectively assess the previous year’s program. Three general topics are recommended for discussion, namely to incorporate (1) changes to airport staff, equipment, runway chemicals, and airport clearing procedures; (2) changes to air carrier ground deicing/anti-icing programs; and (3) “lessons learned” from actual events encountered. The SICC should consider holding a series of meetings to prepare for and adequately budget for the upcoming winter season. Two distinct meetings should be held; one focused on airport clearing operations, and the other focused on air carrier ground deicing/anti-icing programs. Each meeting should discuss any new topics not dealt with in past years, such as any new FAA aircraft ground deicing/anti-icing polices or any new Federal, state, or local storm water runoff regulations.

2.4.1 Topics Relative to Airport Snow Removal Operations Discussions. The following are topics normally covered:

1. Areas designated as Priority 1 areas, to include any new airfield infrastructure.

2. Clearing operations, follow-up airfield assessments and reporting actions to further mitigate the potential for pilot and vehicular surface incidents or runway incursions.

3. Staffing requirements and qualifications (training) for snow crews and Snow Control Center staff.

4. Updates to the training program to close any ambiguity.

5. Streamline the decision-making process, the “chain-of-command” authority.

6. Response times to keep runways, taxiways, and apron areas operational, e.g., to rectify problems encountered during previous storm events that hampered airport operations.

7. Communications, terminology, frequencies, and procedures with the airport traffic control tower (ATCT), snow crews, and the Snow Control Center.

8. Monitoring and updating of surface conditions after a clearing operation and deicing or sanding applications.

9. Issuance of NOTAMs and dissemination to air carrier and other airport tenants to meet timely notification requirements.

10. Equipment inventory, including assessing the condition of snow control equipment, scheduling repairs, and stocking spare parts.

11. Status of procurement contracts and specifications for new vehicles or equipment.

12. Preventive maintenance program for snow control equipment and maintenance and calibration for friction testing equipment.

13. Status of procurement contracts and specifications for deicer-/anti-icer materials and sand supply, including their storage before the first snowfall.

14. Validation of deicer certification letters from vendors.

2.4 Topics for Pre- and Post-Season SICC Meetings. › 2.4.2 Topics Relative to Air Carrier Ground Deicing/Anti-icing Programs.

15. Procedures for storm water runoff mitigation.

16. Snow hauling and/or disposal plan, including sites for dumping snow or positioning of portable melter equipment for melting snow in place.

17. New runoff requirements for the containment and/or collection of deicing chemicals and vehicle maintenance fluids and materials.

18. Changes to or the addition of new contract service for clearing aprons.

2.4.2 Topics Relative to Air Carrier Ground Deicing/Anti-icing Programs. The airport operator should act as a facilitator and arrange a meeting for the parties that may be affected by airplane ground deicing plans, including those plans required of air carriers operating under 14 CFR part 121. These parties include airport management and consultants, air carriers, other airport users, corporate tenants, pilot representatives, and FAA Air Traffic Control. The meeting should assess the impact of any airplane ground deicing activities on airport operations and identify actions that can be taken by the various parties to maximize the efficiency of operations during icing conditions. For example, the committee may be able to identify the most effective locations for secondary deicing and establish procedures for its implementation. At most airports, one meeting to discuss these subjects before the start of the winter season should suffice. However, at other airports, subsequent meetings may be necessary to assess the effectiveness of plans and to modify them if necessary. These meetings typically address the following topics:

1. Assessment of all air carriers’ deicing programs from the previous year, including—

a. Reviewing airplane surface flow strategies.

b. Reviewing ground time and takeoff clearances after deicing.

c. Analyzing and adjusting to airplane deicing plans.

2. Actions needed by various parties (e.g., airport operator, aircraft operators, air traffic) to maximize efficiency of operations, including—

a. Identifying locations for airplane deicing that use chemicals or infrared

deicing technology.

b. Planning taxi routes to minimize ground time.

c. Developing rates that control deiced departures.

d. Allocating departure slot capacities.

e. Determining airport deicing crew needs.

f. Verifying communication procedures between air traffic control and airplanes

to be deiced.

3. Any requirements for containment/collection of deicing/anti-icings.

CHAPTER 2. The Snow and Ice Control Plan › 2.6 Topics for Writing Instructions and Procedures for Winter…

2.5 Outlining a Snow and Ice Control Plan (SICP).

2.5.1 A logical first step in writing the SICP is to identify and prioritize the timely clearing of snow and/or ice from aircraft movement areas. Paragraphs 1.6 and 0 of this advisory circular discuss airfield clearing priorities and clearance times. These parameters, in turn, guide the airport operator in selecting the conditions that initiate activities, such as, clearing operations, chemical applications, runway friction surveys, and other operations. Chapter 3 provides information on weather forecasting and weather system technology as one important tool useful as a head start for an appropriate response for winter storm forecasts.

2.5.2 Next, the SICP includes instructions and procedures for handling the various types of winter storms encountered by the airport and how to notify airport users in a timely manner of other than normal runway conditions, including, but not limited to: runway closures, and when any portion of the movement area normally available to them is covered by snow, slush, ice, or standing water.

2.5.3 When winter contaminants are present on airfield pavements, the airport operator should assess the conditions and take mitigating steps for the contaminant type.

2.5.4 Finally, the SICP addresses special safety topics to minimize runway incursions during initial and follow-up clearing operations. Paragraph 2.7 of this chapter offers guidance and recommendations for runway incursion mitigation.

2.6 Topics for Writing Instructions and Procedures for Winter Operations and Notification. Part 139 airports are required to address the following topics in their SICP (see § 139.313(b)), and it is recommended that all other airport operators address the same topics in their SICP. Each topic provides a cross-reference for further clarification.

1. Prompt removal or control, as completely as practicable, of snow, ice, and slush on airfield pavements (see Chapter 4).

2. Positioning snow off airfield pavement surfaces so all airplane propellers, engine pods, rotors, and wing tips will clear any snowdrift and snow bank as the airplane’s landing gear traverses any portion of the movement area (see Figure 4-1, Chapter 4).

3. Selection and application of authorized materials for snow and ice control to ensure they adhere to snow and ice sufficiently to minimize engine ingestion (see Chapter 4).

4. Timely commencement of snow and ice control operations.

5. Prompt notification in accordance with § 139.339, to all air carriers using the airport when any portion of the movement area normally available to them is less than satisfactorily cleared for safe operation by their aircraft (see Chapter 5,

2.7 Runway Incursion Mitigation and Operations During Non-Towered Air… › 2.7.5 Include special snow crew communication procedures for “whiteout”…

Paragraphs 5.8, Requirements for Runway, Taxiway, and Apron and Holding Bay Closures, and 0, Condition Reporting). In addition, all airplane operators should be informed any time pavements are contaminated with ice, snow, slush, or standing water.

2.7 Runway Incursion Mitigation and Operations During Non-Towered Air Traffic Control Periods.

2.7.1 The SICP should contain specific procedures for those periods when the ATCT is closed and for airports that do not have an ATCT (non-towered airport). Additionally the SICP should contain specific procedures for unexpected situations, such as when “whiteout” conditions occur while snow clearing crews occupy the runways. The following items should be considered:

2.7.2 Surface clearing procedures must ensure snow removal operations will not create the possibility for a runway incursion after the runway reopens, for example, signage, markings and lighting are clearly visible.

2.7.3 Although it is not required, airport operators should consider closing runways during snow clearing operations. For airport operators that choose to keep runways open during such operations, the SICP should include procedures requiring continuous coordination among the clearing crew and the SCC to ensure the equipment operators on runways are aware of their surroundings. Snow removal equipment operators should monitor appropriate air traffic control (ATC) or other frequencies for information on approaching or departing airplanes.

2.7.4 The overlying air traffic control frequency should be monitored along with the local frequency by the airport’s Snow Control Center at all non-towered airports and at airports where the ATCT has less than 24-hour operations. This should apply even if a NOTAM has been issued closing the runway for snow clearing operations. Such monitoring is especially important during marginal visual meteorological condition (VMC) and instrument meteorological condition (IMC).

Note: The overlying air traffic facility may be enroute, terminal, or flight service. Monitoring is recommended for snow crews to hear an airplane approaching and therefore be able to clear the runway of personnel and equipment, if necessary. At times air traffic control and /or the pilots may not be aware of a runway closure at the nontowered airport. That is, sometimes a NOTAM is issued after an airplane becomes airborne and the pilot did not receive the latest update, especially at an uncontrolled airfield. The FAA recommends that NOTAMs for runway closures, snow removal operations, and any other lengthy maintenance activities at uncontrolled airports be directly coordinated with the overlying air traffic control facility (TRACON or ARTCC) when the operation will begin in less than 60 minutes.

2.7.5 Include special snow crew communication procedures for “whiteout” conditions at both towered and non-towered airports.

2.9 Other Related Items. › 2.9.1 Other Airport Plans and Programs.

2.7.6 Include special snow crew communication procedures for occasions when a single equipment operator needs to return to the runway after a major clearing event.

2.8 Staff Training and Recordkeeping. The SICP should describe qualification criteria and training for individuals directly involved in snow and ice control operations. The SICP should also outline recordkeeping procedures for tracking employee progress in achieving training goals and objectives. The SICP may specify that an implemented training program contain specific course material for equipment drivers, staff working in the Snow Control Center, etc. Although airport operators should develop their own training programs to address conditions at their particular airports, the FAA recommends the programs contain the following minimum components:

1. Formal classroom lectures, training films if available, and discussion periods to teach the contents of the SICP to individuals who need to understand procedures in detail.

2. Tabletop exercises that use miniature equipment on airfield layouts to simulate operations.

3. Hands-on training for equipment operators on how their equipment works as well as practice runs under typical operational scenarios.

4. Instruction on airfield familiarization that includes both day and night tours of the airfield and ensures an understanding of all surface markings, signs, and lighting.

5. Instruction for all personnel on proper communication procedures and terminology. This includes the special procedures to be followed during “whiteout” conditions and when radio signal is lost between drivers and/or the ATCT. See FAA AC 150/5210-20, Ground Vehicle Operations on Airports, for guidance on communication procedures for airport personnel.

6. Instruction for drivers on the proper procedures and communications to follow when the ATCT is not operating or the airport has no ATCT.

7. Training in following runway closure criteria for personnel responsible for closing and opening runways during snow events. This training is especially important for non-towered airports or part-time towered airports.

8. Examples of common runway incursions during snow removal operations.

2.9 Other Related Items. The implemented SICP should integrate with other airport plans, programs, and lease agreements.

2.9.1 Other Airport Plans and Programs. Although the SICP is a stand-alone plan, it should integrate with other airport plans and programs to avoid conflicts and duplication of procedures and responsibilities. A few examples of closely related plans/programs are the Airport Certification Manual,

2.9 Other Related Items. › 2.9.4 Storm Water Runoff Regulations.

Airport Emergency Plan, and the Storm Water Pollution Prevention Plan (for deicer runoff mitigation). The FAA recommends the airport fire-fighting and rescue service receive a copy of the SICP, especially so responders will know which service roads will be closed.

2.9.2 Post Accident/Incident Recommendations.

2.9.2.1 To address accidents or incidents that might occur during adverse weather conditions, the SICP should contain procedures that ensure surface conditions occurring during the event are properly inspected and documented. Additionally, the airport operator must not disturb evidence on the runway until the appropriate Federal authority (FAA/National Transportation Safety Board (NTSB)) provides a release. To help the NTSB, the airport operator should document the type and depth of contamination on the runway at the time of the accident/incident, which should include conducting a runway friction assessment and taking still and/or video photography.

Note: Refer to Paragraph 5.1.3 to address conditions that are acceptable to use decelerometers or continuous friction measuring equipment to conduct runway friction surveys on frozen contaminated surfaces.

2.9.2.2 If wreckage is observed on the pavement, the airport operator must not attempt to conduct testing in those areas that would disturb evidence on the runway (see AC 150/5200-12, Fire Department Responsibility in Protecting Evidence at the Scene of an Aircraft Accident).

2.9.3 Snow and Ice Control Contractors/Lease Agreements. The principle of ensuring safety of operations applies equally to lease holders and service contractors hired to perform snow and ice control services. In particular, contractual agreements should be clear and specific in terms of duties, procedures for snow and ice control, responsibilities for communications and ground control, and other contingencies. Service contractors and leaseholders should receive a copy of the latest airport SICP, not necessarily the complete Airport Certification Manual. Contracted service providers are recommended to have the same training as described in Paragraph 2.8.

2.9.4 Storm Water Runoff Regulations. Greater emphasis has been placed on mitigating the negative impacts associated with snow clearing operations and equipment maintenance on bodies of water off the airport. The SICP should be reviewed and modified, if necessary, to ensure it complements the airport’s storm water discharging permit. That is, the SICP should help the airport operator achieve compliance with Federal, State, and local environmental storm water runoff regulations.

3.2.1 Weather Support to Deicing Decision Making (WSDDM) System. › 3.2.1.2 WSDDM systems must comply with the equipment performance and…

CHAPTER 3. FORECAST TECHNOLOGY FOR AIRPORT OPERATORS

3.1 Weather Forecasting. Appropriate responses to a winter storm event begin with accurate and timely weather information. A reliable weather forecast not only enhances the effectiveness and efficiency of any SICP, but it offers airport operators operational cost savings associated with snow clearing tasks, chemical usage, and staffing. Airport operators should base their snow clearing operations or preventive measures on weather forecasting that offers continuous, up-to-date, and airport weather-related information. The FAA recommends that airport operators select a weather forecasting approach that offers usable information to airport users as well as to the airport operator. One such approach, the Weather Support to Deicing Decision Making (WSDDM) System, is described below.

3.2 FAA Forecasting Research and Development for Airport Operators. The FAA Aviation Weather Research Program began research in the 1990s to fully understand the safety problems faced during winter storm events and to improve decision making by airport operators and air carrier ground operations during these events. The research resulted in the Weather Support to Deicing Decision Making (WSDDM) System, an integrated display system that depicts accurate, real-time determinations of snowfall rate, accumulations and their liquid equivalents, temperature, humidity, wind speed, and direction of storm events.

3.2.1 Weather Support to Deicing Decision Making (WSDDM) System. The WSDDM System is an automated system that analyzes and forecasts short-term winter weather conditions within the airport vicinity. The data inputs to the system are provided by snow gauges; weather radars, such as Doppler; surface weather stations; and National Weather Service Aviation Routine Weather Report (METAR) data from Automated Surface Observing Systems (ASOS). All data are processed by software algorithms to produce a graphical and text depiction of current weather conditions and a 1-hour forecast of expected snowfall rate and accumulation at the airport. The displayed analyses and forecasts can be easily understood by most users. The graphical data can be generated and displayed on a local computer or viewed online. The system has been effective at major U.S. airports.

3.2.1.1 The basic version of the WSDDM system, known as Basic WSDDM, is for unidirectional storm fronts. The system has a single snow gauge with a computer display of the current and historical liquid equivalent snowfall rates and accumulation. Airports that routinely encounter multiple storm fronts should use two or more snow gauges. Figure 3-1 shows one type of snow gauge used by WSDDM. Figure 3-2 illustrates the Basic WSDDM schematic for a unidirectional storm configuration.

3.2.1.2 WSDDM systems must comply with the equipment performance and installation requirements described in Society of Automotive Engineers

Figure 3-1: picture of page 34Figure 3-1 · page 34
Picture of the page from the copy saved here

3.2 FAA Forecasting Research and Development for Airport Operators. › 3.2.2 Safety and Operational Benefits.

(SAE) Aerospace Standard (AS) 5537, Weather Support to Deicing Decision Making (WSDDM), Winter Weather Nowcasting System. The SAE specification is available for purchase at http://www.sae.org.

3.2.2 Safety and Operational Benefits. The WSDDM system provides current and 1-hour NOWCAST forecasts (current conditions) of snow bands and surface weather conditions on the airport and the surrounding 125-mile (200-km) vicinity. The display is optimized to allow airport operators and air carriers to understand (typically within 1 minute) the current weather conditions at the airport and in the surrounding region. This capability allows for more rapid and appropriate decision making during winter storms with minimal impact on airport resources and staff workload.

Figure 3-1. ETI Precipitation Gauge in a Single Alter Wind Shield 2 Type

3.2.2 Safety and Operational Benefits. › 3.2.2.2 Real-Time Liquid Content Forecast.

Figure 3-2. Schematic of Unidirectional Storm WSDDM Configuration

3.2.2.1 Benefits to Airport Operators. Users of WSDDM have reported various operational and cost-saving benefits. WSDDM optimizes runway clearing operations by providing airport operators more accurate information about when a snow band will affect the airport. Accurate timing saves on anti-icers because it allows crews to apply them according to the manufacturer’s recommended lead times. In terms of managing crew workloads, WSDDM determines gaps in storm events, which can be used to change crew shifts, take rests, and refill chemical trucks, sand spreaders, and other equipment. Airport operators are also able to more accurately determine when the airport can resume normal operations by examining the radar loops and storm tracks and watching storm trends. By examining the storm tracks, users can make fairly accurate 3- to 4-hour forecasts of snow onset, which, in turn, allow airport operators to prepare more appropriately for winter storms.

Figure 3-2: picture of page 35Figure 3-2 · page 35
Picture of the page from the copy saved here

3.2.2.2 Real-Time Liquid Content Forecast. A key safety element of the WSDDM system is the use of one or more precision snow gauges. These snow gauges provide real-time estimates of the liquid equivalent snowfall rate for every minute. The improved accuracy

of the WSDDM system reporting is key to air carrier deicing operations because the deicing community has shown the improper liquid equivalent snowfall rate reporting is the key factor leading to the failure of deicing/anti-icing fluids. The current National Weather Surface METAR stations do not provide this data. Instead, METAR provides hourly snow intensity estimates based on visibility. Snow intensity estimates based on visibility have been shown to be misleading when wet snow, heavily rimed snow (snow that has accreted significant amounts of cloud droplets), and snow containing single crystals of compact shape (nearly spherical) occur. Researchers define the hazard as high-visibility/high-snowfall rate conditions. Recent examination of five of the major airplane ground deicing accidents showed that high visibility-high snowfall rate conditions were present during a number of these accidents. All of the accidents had nearly the same liquid equivalent rate of 0.1 inch/hour (2.5 mm/hour), but widely varying visibilities. The WSDDM System was designed to address this safety concern by including snow gauges to measure liquid equivalent snowfall rate every minute.

3.3 Forecasting Runway Surface Conditions. › 3.3.1 Stationary Runway Weather Information Systems.

3.3 Forecasting Runway Surface Conditions. One proven method of forecasting the surface conditions of runways is to use runway surface condition sensors (RSCS). Two basic types of RSCS are in use today, namely in-pavement stationary sensors and vehicle-mounted infrared sensors. The safety benefit of RSCS is their predictive capability for proactive anti-icing decision making. Since the temperature of pavements lag behind air temperature, the use of air temperature to infer surface conditions is imprecise. Therefore, the use of air temperature is not preferred over pavement temperature when available because it frequently leads to misinformation about the true behavior of pavement surfaces. The RCAM’s use of outside air temperature (OAT) is due in part to the unavailability of surface temperature at most airports. This inaccuracy can result in inappropriate airfield clearing operations or poorly timed preventive measures. At its worst, this misinformation might result in delays that allow ice to bond to paved surfaces, the hardest condition to rectify.

With the exception of freezing rain, ice will not form on pavements unless the pavement temperature itself reaches the freezing point. Therefore, knowledge of the direction and rate of temperature change within a pavement structure provides the predictive capability as to when to expect the formation of ice. The predictive nature of RSCS is particularly valuable as it ensures the timely application of anti-icing (or deicers) chemicals, which provides a cost savings in chemicals, and helps crews make appropriate chemical selections to prevent, weaken, or disbond ice or compacted snow from paved surfaces. Airport operators have at their disposal in-pavement RSCS at predetermined sites and mobile RSCS that are hand-held or vehicle-mounted to evaluate any pavement.

3.3.1 Stationary Runway Weather Information Systems. These stationary sensors provide only site-specific pavement and air temperature trends, dew point temperature, chemical strength, and other atmospheric weather conditions at

3.3 Forecasting Runway Surface Conditions. › 3.3.2 Mobile Infrared Surface and Ambient Temperature Sensor Systems.

the installation sites. Sensor information is generally disseminated via a central computer to airport users. An added bonus of in-pavement RSCS is their ability to predict when previously applied chemicals have been diluted sufficiently to require reapplication of chemicals. The FAA recommends that in-pavement RSCS comply with the performance and installation requirements of SAE Aerospace Recommended Practice (ARP) 5533, Stationary Runway Weather Information System (In-pavement). The SAE specification is available for purchase at http://www.sae.org.

3.3.2 Mobile Infrared Surface and Ambient Temperature Sensor Systems. These vehicle-mounted sensors provide pavement and air temperatures at any desired airfield pavement location. Information is disseminated directly to the viewer or driver of the vehicle-mounted units. The FAA recommends that mobile RSCS comply with the performance requirements of SAE ARP 5623, Mobile Digital Infrared Pavement Surface, Ambient Air and Dew Point Temperature Sensor System. The SAE specification is available for purchase at http://www.sae.org.

This page intentionally left blank.

CHAPTER 4. SNOW CLEARING OPERATIONS AND ICE PREVENTION

4.1 Introduction. Contaminants on a runway impede airplane acceleration by absorbing energy in compaction and displacement, and by impinging on parts of the airplane after being kicked up by the tires. For airplanes decelerating, slush, snow, and standing watercovered pavements and, especially iced surfaces, hamper deceleration rates due to a reduction in the friction coefficient of the runway and the potential for hydroplaning. Large chunks of ice, from refreezing snow or slush, or deposits from aircraft gear created during landings, can cause severe damage to tires, engines, and airframes. Wet snow, slush, and standing water can cause structural damage from spray impingement or by engine ingestion, which can affect acceleration capability. The recommended maximum depth for takeoff operations for slush and water is ½ inch (13mm) unless the airplane’s AFM shows greater depths to be safe (see AC 25-31, Takeoff Performance Data for Operations on Contaminated Runways).

CHAPTER 4. Snow Clearing Operations and Ice Prevention › 4.2 Snow Clearing Principles.

Consequently, these runway surface contaminants should be minimized to maintain safe landing, takeoff, and turnoff operations. For these reasons, snow clearing operations for Priority 1 runway(s), taxiway connectors, and taxiways to the terminal(s) should start as soon as practicable after snowfall or icing begins. One prime goal is to take the appropriate measures so snow in its various forms, such as slush or frozen water, does not bond to the pavement. Dry snow falling on cold dry pavements will generally not adhere and may be blown off by wind or airplane operations or removed by brooming operations. In such conditions, only brooming may be needed to prevent the formation of compacted snow tracks. Snow fences may be of use to airports that primarily experience dry snowfalls. Wet snow, however, cannot be blown off the pavement and will readily compact and bond to it when run over by airplane wheels. Consequently, the airport operator needs to implement different clearing and/or preventive measures for wet snow than those used for dry snow conditions.

When measures are taken, the airport operator’s Snow Control Center (SCC) should (1) maintain close coordination with the ATCT and the Flight Service Station (FSS) or UNICOM to ensure prompt and safe responses to winter storm events and (2) inform the users of the airport when less than satisfactory conditions exist.

4.2 Snow Clearing Principles. Winter conditions and rates of accumulations of precipitation vary widely from airport to airport. However, there are some basic guidelines that apply to all airports that should be followed as closely as possible. The airport operator should notify airport users promptly and issue a NOTAM advising users of unusual airport conditions. Wind speed and direction, available equipment, and local conditions that may require special equipment and techniques, collectively determine the snow clearing procedures for the airport’s SICP. The following guidance offers a generic outline for writing the SICP that covers terminal apron environment-related items, runway/taxiway-related items, and areas with special surface material such as Engineered Material Arresting Systems.

4.2 Snow Clearing Principles. › 4.2.1 Terminal Apron Suggested Clearing Objectives.

4.2.1 Terminal Apron Suggested Clearing Objectives. Accumulations of snow and slush, snow tracks, and thin layers of ice on aprons and airplane parking areas, including holding bays, can make for safety hazards. The SICP should contain measures to mitigate at least the following five common situations:

1. Slick Apron Surfaces. Apron equipment and apron personnel operating on slick or icy apron surfaces lack sufficient traction to start, stop, or even remain in place when encountering jet exhaust from surrounding airplanes. Maintaining good traction is critical to the safety of personnel, equipment, and airplanes.

2. Increased Airplane Engine Thrust. Pilots of parked or holding airplanes apply increased engine thrust to break away, maneuver, and taxi under adverse apron surface irregularities, such as frozen ruts formed by tire tracks. The resultant excessive engine blast necessary to overcome such obstacles may damage other airplanes, apron equipment, or apron personnel.

3. Obscured Taxiway Signage. The clearing of snow from apron areas should not be performed in a way that partially or completely covers taxiway signs with plowed snow. Observing this precaution will reduce the risk of runway incursions.

4. Obscured Terminal Visual Aids. The obscuration of normally visible surface markings or obliterated sign messages could make maneuvering on aprons difficult and slow. Pilots, unable to see these visual aids, are hard pressed to judge direction and taxiing clearances.

5. Snow Stockpiles Adjacent to Airplane Operating Areas. Airport operators should exercise care when moving snow from the aprons and terminal toward taxiways and runways. Locate snow and ice stockpiles at a sufficient setback such that aircraft wingtip hazards are eliminated. Depending on the amount of snow cleared and the size of the apron, apron signage directing pilots toward the runway could become obscured (covered with snow), and the resulting height of snow stockpiles could cause a clearance issue between taxiing airplanes and the snow stockpile. Airports that experience heavy snowfalls and have large aprons with limited space for stockpiling snow should consider operating snow melters or hauling snow away.

a. The strategy for snow and ice removal will be unique to the airport configuration and amount of precipitate to be cleared. A phased removal process will allow the operator to focus effort on aprons areas necessary to reestablish minimum aircraft operations.

b. Areas of the apron not immediately needed for aircraft operations may be used as temporary storage of snow from Priority 1 areas. Removal of these snow piles can occur during low activity hours to limit interaction with taxiing aircraft.

c. Airports with constrained terminal apron area space may not have adequate space to stockpile snow even on a temporary basis. Such locations may need to haul snow from the terminal apron to another location on the airport. Hauling requires additional safety and environmental considerations. Escort of haul trucks should be optimized to limit interaction with parked and taxiing

4.2.2 Runway and Taxiway Suggested Clearing Objectives. › 4.2.2.1 Focus runway snow clearing operations on keeping the entire…

aircraft. Snow melt from the stockpiles location should consider water quality requirements.

d. Some locations may find the use of snow melters for removing snow from Priority 1 terminal areas to be advantageous. These locations will typically have constrained terminal apron space and experience frequent heavy snowfalls on a recurring annual basis. Considerations for using snow melters include cost, safety, environment, frequency of heavy snow, and airport operations.

e. Some locations may find a combination of hauling and melting to be optimum in removing snow in an efficient manner.

4.2.2 Runway and Taxiway Suggested Clearing Objectives. The following guidance is intended to show efficient use of various equipment to optimize snow clearing operations. Some types of equipment may not be appropriate for some airports. Equipment and procedures used should be determined based on many factors, including but not limited to climate, number and types of operations, and amount of annual snowfall.

4.2.2.1 Focus runway snow clearing operations on keeping the entire primary runway(s), as near as practicable, bare from snow accumulations or ice buildup. Depending on the precipitation rate, the time required to clear the full width of the runway may result in additional accumulation, and thus less braking capability, on the critical center portion. In such a case, concentrating on the center portion of the runway, during the initial clearing operations can result in greater safety. The minimum width required will vary by airplane type, but is generally 100’ for transport category airplanes. The airport operator should check with airport users regarding their minimum runway width requirements. Additionally, the airport operator should keep in mind that the entire width of runway is still usable and should be safely maintained. This means that while contaminant depths may vary from the center cleared portion to the remaining portions of the runway, the condition of the outlying portions must not present a hazard. Use sweepers or brooms initially to keep the primary runway or its center portion, as near as practicable, bare of accumulations. Also, when snow has melted or ice begins to separate from the pavement due to the action of chemicals, sweepers or brooms should be used to remove the residue. As soon as snow has accumulated to a depth that cannot efficiently be handled by the sweepers or brooms, displacement plows and rotary plows (snow blowers) should be used as follows.

1. Use displacement plows, in tandem if more than one, to windrow snow into a single windrow that can be cast over the edge of runway lights by a rotary plow.

2. For runways or other paved areas with in-pavement surface condition sensors, remove any snow or ice that affects the performance of the remote sensors.

4.2.2.4 A covering of snow and ice or drifts may affect visual and… › 4.2.2.4.1 Glide slope (GS) critical ground areas along the runway…

10/29/2020 AC 150/5200-30D Change 2

3. Regarding the use of displacement plows, ice and snow will always melt around runway centerline and touchdown zone light assemblies. However, under cold temperature and with LED fixtures, ice rings, termed “igloos,” tend to form around them. In order to prevent damage to lights, use appropriate polyurethane cutting edges or shoes and casters on plow moldboards and on the front of rotary plows.

4. Rotary plows should throw snow a sufficient distance from runways/taxiways edges so adequate clearance is available between airplane wings and engine nacelles and the cast snow banks. Figure 4-1 shows desired maximum snow height profiles, which are based on airplane design groups.

4.2.2.2 All drivers should maintain a safe distance between equipment operating in echelon (i.e., Vformation, close wing formation) in order to avoid accidental contact or accidents (see Figure 4-3, Figure 4-4, and Figure 4-5).

Figure 4-1: picture of page 46Figure 4-1 · page 46
Picture of the page from the copy saved here

4.2.2.3 Obscured visual aids—in particular, in-pavement and edge lights, taxiway markings, runway markings (such as touchdown marking), airport guidance signs, and runway end identification lights (REIL), precision approach path indicator (PAPI) or visual approach slope indicator (VASI)—should be maintained free of snow and ice.

4.2.2.4 A covering of snow and ice or drifts may affect visual and electronic NAVAIDs. Any snow or ice that affects the signal of electronic NAVAIDs should be removed. When clearing with rotary plows and displacement plows, special procedures need to take into account the location of all NAVAIDs, especially to protect the guidance signal of instrument landing systems (ILS). The SICP needs to address the following situations:

4.2.2.4.1 Glide slope (GS) critical ground areas along the runway require that snow depths be limited in height to prevent signal loss or scattering. Figure 4-2 provides graphic representations of the GS ground snow clearance areas with prescribed snow depth limitations according to type of facility and aircraft approach category. When snow depths exceed the specified depth limitations, minima are raised to the “localizer only” function until the

Note: When conditions make it challenging to effectively manage and monitor more than one runway, airports with multiple runways should focus their efforts on the primary runway and taxi routes and initiate closures on any surface that cannot be safely maintained or monitored. As a best practice, many airports pre-emptively initiate closures at the onset of a known problematic weather event, allowing for the effective management of those areas that will remain available for air carrier use. At high traffic airports, this is accomplished in coordination with air traffic and local stakeholders to minimize impacts.

Figure 4-2: picture of page 47Figure 4-2 · page 47
Picture of the page from the copy saved here

4.2.2.4 A covering of snow and ice or drifts may affect visual and… › 4.2.2.4.4 The snow depth height limitations noted in Figure 4-1 do not…

10/29/2020 AC 150/5200-30D Change 2

conditions revert or are corrected. As for the localizer (LOC) critical ground area, a snow accumulation level of two (2) feet is the limit at which point the system specialist begins observing the condition of the LOC signal. For both the GS and LOC, the accumulation of large amounts of snow can change the surface area, and consequently may affect its radiated signal. The depth of any snowbanks along the edges of the cleared dimensions of the LOC and GS snow clearance areas may require mitigations to less than two (2) feet where clearance requirements for some aircraft or movement areas may dictate lower heights.

Note: There is no substitute for the specialist’s skill in observation and analysis of the LOC critical area for snow/ice depths, drifts, piling, or obstruction to signals, and exercising prudent judgements regarding requisite action. When a specialist determines snow or ice accumulations jeopardize the signal strength or accuracy from the LOC or GS antenna, the individual with NOTAM authority and/or NAVAIDS owner issues a NOTAM.

4.2.2.4.2 Two consecutive pilot reports of GS signal malfunctions generally result in raised minima (a NOTAM must be issued by the individual with NOTAM authority and/or owner of the NAVAID). A few additional points should be considered:

 The 200-foot width dimension adjacent to the threshold might be wider

for an antenna mast placed further out (see FAA Order 6750.49, Maintenance of Instrument Landing System (ILS) Facilities).

 The snow clearance areas illustrated in the figures are minimal in size.

 Snow clearing activities should not allow snow banks, mounds, or ridges

exceeding 2 feet to be placed along the edges of the prescribed snow clearance areas.

 Snow banks should not be placed off the approach ends of runways,

especially for CAT II/III operations.

Note: Snow banking operations need to take into account the guidance in Figure 4-1.

4.2.2.4.3 Visibility of signs (legibility) and lights should be maintained by certain prescribed clearing techniques or by performing post-clearing maintenance. Maintaining visibility can be better achieved by taking into account wind directions. For example, in crosswind conditions, cast in the downwind direction. Figure 4-3 through Figure 4-5 provide general guidance.

4.2.2.4.4 The snow depth height limitations noted in Figure 4-1 do not take into consideration airplane characteristics. That is, at some airports, airplane characteristics, such as engine clearances, may dictate lower snow banks than shown in Figure 4-2. The objective here is prevention by avoiding the introduction of hazardous snow banks, drifts, windrows, and ice ridges that

4.2.2 Runway and Taxiway Suggested Clearing Objectives. › 4.2.2.10 Joint-use airports with military operations may have arresting…

could come into contact with any portion of the airplane wing or nacelle surface.

4.2.2.5 If the airport’s operation involves the use of snow banks, their height profiles should be compatible with NAVAID ground requirements and offer sufficient clearance between airplane wings and engine nacelles to avoid structural damage to jet and propeller airplanes. Figure 4-1 shows maximum allowable snow height profiles, which are based on airplane design groups (see AC 150/5300-13, Airport Design, for airplane design group categories.) Snow banking along terminal or cargo aprons likewise should comply with Figure 4-1 to prevent operational problems caused by ingestion of ice into turbine engines or by propellers striking the snow banks. Appendix B, which used numerous airplane models, was used to develop criteria for Figure 4-1.

4.2.2.6 Airport operators’ actions associated with periodic assessments based on changing conditions, completion of snow clearing operations, or any other contaminant clearing requirements provided for in the SICP, runway assessments and friction measurements should be accomplished to determine the effectiveness of the clearing operation. See Chapter 5 for additional guidance.

4.2.2.7 If the runway pavement temperature is warm enough for snow to compact and bond, or if freezing rain is forecasted, approved anti-icing chemicals and/or heated sand should be applied prior to the start of precipitation or as soon as precipitation starts. Some airport operators prefer to apply deicing chemicals rather than anti-icing chemicals for different weather conditions. Paragraph 4.6 provides a listing of approved fluid and solid material specifications.

4.2.2.8 All snow removal units operating in aircraft movement areas must maintain radio communication with the ATCT, if one exists, or be under the direct control of a designated supervisor who in turn is in direct communication with the ATCT.

4.2.2.9 High-speed runway turnoffs require the same attention for ice and snow control and removal as runways. These turnoffs should offer sufficient directional control and braking action for airplanes under all conditions. Accident data clearly illustrate that poor attention to high-speed runway turnoffs contributes to veer offs.

4.2.2.10 Joint-use airports with military operations may have arresting barriers located near the end of the runway or at the beginning of the overrun areas. Great care should be taken in clearing snow from the barriers. Barriers located on the runway should be deactivated and pendants removed prior to snow removal operations. Snow should be removed to the distance required for effective run-out of the arresting system.

4.2.3 Engineered Material Arresting System (EMAS) Suggested Clearing… › 4.2.3.2 Identify compatible deicing agents and the equipment, tools, or…

10/29/2020 AC 150/5200-30D Change 2

4.2.3 Engineered Material Arresting System (EMAS) Suggested Clearing Objectives.

4.2.3.1 EMAS installed at airports require special attention as relates to removal of contaminants. Most are designed to be mechanically or manually cleared of contaminants. The manufacture specifications should be followed in order to determine what types of equipment are compatible with the EMAS bed and recommended clearing procedures and/or limitations. Coordinate with NAVAID system operators to help assess the snow accumulation on any EMAS that may exist within the LOC critical areas to ensure no adverse effect on the radiated signal. See AC 150/5220-22, Engineered Materials Arresting Systems (EMAS) for Aircraft Overruns, for additional guidance.

4.2.3.2 Identify compatible deicing agents and the equipment, tools, or process for application.

Figure 4-1. Snow Bank Profile Limits Along Edges of Runways and Taxiways with the

Airplane Wheels on Full Strength Pavement (see Figure 4-2 guidance)

Figure 4-2. ILS CAT I and CAT II/III Snow Clearance Area Depth Limitations

Figure 4-3. Possible Team Configuration with Perpendicular Wind

Figure 4-4. Possible Team Configuration During Light Snowfall with Parallel or Calm

Wind

Figure 4-5. Possible Team Configuration During Medium to Heavy Snowfall with Parallel

or Calm Wind (Dependent upon Rotary Plow performance)

Figure 4-3: picture of page 48Figure 4-3 · page 48
Picture of the page from the copy saved here

4.2.4 Surface Incident/Runway Incursion Mitigation Procedures. › 4.2.4.1 Radio Communications.

4.2.4 Surface Incident/Runway Incursion Mitigation Procedures. The FAA recommends the SICP contain specific safety procedures or a separate written section to mitigate the possibility for surface incidents/runway incursions. These specific safety procedures should provide answers to, at a minimum, the following two questions: (1) How can pilots of the various types of airplanes or vehicle drivers traversing the airfield cause a runway incursion because of our snow clearing operations? and (2) How do snow operation personnel at either non-towered airports or airports with less than 24-hour ATCTs monitor information released by the ATC enroute center? The procedure addressing the latter questions should apply even if a NOTAM has been issued closing the runway for snow clearing operations. This precaution is especially important during marginal visual meteorological condition (VMC). The SICP should address the following topics:

4.2.4.1 Radio Communications. Equipment operations should be timed carefully and coordinated properly with team members to ensure an orderly turnaround for safe return and start of a new pass. The SICP should designate a lead operator for each shift who maintains contact with his team members and the ATCT. At airports lacking an ATCT or when the tower is closed, proper radio communications must be maintained at all times and in accordance with SICP procedures. Consideration should be given to providing vehicle operators with headphones to minimize ambient noise disruption from vehicular noise.

4.3.1 Snow Fences. › 4.3.1.1 Prior to any installations, the airport operator should contact…

4.2.4.2 Failed Radio Signals. The SICP should outline specific procedures when radio signal is lost between crews and when a single driver loses radio signal. All drivers must be trained in the specific procedures to follow.

4.2.4.3 Airfield Signage and Lights. Airfield signs must be kept clean of contaminants to maintain the legibility of signage. Priority should be given to lights and signs associated with holdlines, direction and location signs, and ILS critical areas. Common methods to remove snow from signs include using a truck mounted with an air-blast unit, spraying the faces of signs with an approved liquid deicer, or hand shoveling.

4.2.4.4 Low Visibility and Whiteouts. It is of utmost importance to maintain visual contact with your surroundings during snow clearing operations, especially for operations in an echelon formation. The SICP should specify procedures to follow if visibility suddenly drops to near zero or whiteout conditions exist while clearing operations are in progress. For example, the airport operator may require that all equipment stop immediately with all drivers radioing in their positions to the designated supervisor or to ATCT for runway evacuation instructions.

4.2.4.5 Driver Fatigue. Consideration should be given to monitoring the “windshield time” of drivers (length of shift) operating snow removal equipment because operator fatigue could become a contributing factor for runway incursions. In response, some airport operators have implemented limits on driver operating hours.

4.3 Controlling Snow Drifts. Preventing snow from drifting onto operational areas at airports receiving severe winter storms reduces the duration and frequency of snow clearing operations. Two methods for controlling drifts are described below.

4.3.1 Snow Fences. Snow fences that are properly designed and located can reduce windblown snow across airfields. Experience at a particular airport is the most helpful in determining optimum locations for snow fences. The following precautions and guidance are provided:

4.3.1.1 Prior to any installations, the airport operator should contact the local technical operations for any planned installations in the vicinity of a NAVAID system. Failure to remove snow or the introduction of snow in areas adjacent to NAVAID systems could result in erroneous signal guidance or facility shutdown.

4.4 Snow Disposal. › 4.4.1 Melting Pits or Portable Melters.

4.3.1.2 Snow fences should be located upwind of the area to be protected.

4.3.1.3 A study conducted by the U.S. Department of Agriculture showed 12-foot (3.7-m) high fences were generally most effective. Shorter heights can be and usually are necessary on airport property, since snow fences must not be located near critical surfaces, in Runway or Taxiway Safety Areas, or Object Free Areas, as defined in AC 150/5300-13.

4.3.2 Snow Trenches. Snow trenches that catch and store drifting snow have been used at times by airports with heavy snowfalls. This approach is considered an expedient way to control snow from drifting after it has been cleared to the edge of the runway. Multiple trenches spaced longitudinally about 10 feet (3 m) apart running parallel to the runway can store more snow. A trench should be excavated no closer than 50 feet (15 m) from the runway. Figure 4-6 illustrates typical snow trench formation relative to wind direction.

Figure 4-6. Typical Snow Trench Dimensions

Figure 4-6: picture of page 51Figure 4-6 · page 51
Picture of the page from the copy saved here

4.4 Snow Disposal. The SICP should also specify how and where large quantities of snow are to be disposed. Two common approaches are as follows:

4.4.1 Melting Pits or Portable Melters. Various airports have been using snow and ice melters to deal with frequent large snow events and the environmental mitigation of deicer chemicals. The use of snow melters in lieu of hauling may be advantageous for certain airports given the frequency of heavy snowfalls and terminal area space constraints. Use of snow melters is mostly appropriate in the terminal area. It is not necessary to melt Priority 1 area snow located on taxiways and runways. Because the objective is to remove the snow from the

4.5 Methods for Ice Control and Removal. › 4.5.2 Once the ice has bonded to the pavement surface, the airport…

Priority 1 apron area, it is prudent that sponsors considering the use of snow melters conduct an equivalency comparison between hauling snow to other locations on the airport and melting the snow in place. Appropriate considerations for the comparison include:

1. Economy – cost of operating and maintaining snow melter equipment vs hauling operations

2. Safety – impact of snow melter operations working in AOA vs truck hauling operations through the AOA

3. Environment – comparison of water quality factors for onsite melting vs disposal remote from apron.

4. Airport operations – impact of personnel and equipment working in close proximity to parked and taxiing aircraft.

4.4.2 Identifying Disposal Sites. If there is insufficient space for storing snow near areas to be cleared and no melting or flushing means are available, hauling to a disposal site may be necessary. If deemed necessary, the disposal site should be selected before winter sets in and identified in the SICP. The selection process should at least consider the following:

1. disposal sites do not compromise airplane operations, airport NAVAIDs, airport traffic, and ATCT operations such as ATCT line-of-sight requirements;

2. sites have adequate drainage capability; and

3. sites offer, if required, environmental mitigation of captured chemicals.

4.5 Methods for Ice Control and Removal.

4.5.1 Preventing a bond from occurring between ice and the pavement surface is always preferred over the mechanical removal or melting of the bonded ice. Appendix C provides the characteristics of ice and other forms of snow and other details as it relates to handling their removal. Paragraph 4.6 provides the FAA-recommended chemical specifications for approved airside pavement anti-icer and deicer products. Prevention is achieved by applying approved anti-icing chemicals to pavements with temperatures expected to go below 32° F (0° C). Fluid anti-icing products instead of solid anti-icing products are recommended since the liquid form is more effective in achieving uniform distributions and improved chemical-adhesion to the pavement surface. The primary drawback of solid chemicals on cold pavements is their inability to adhere properly to the surface, which can lead to their being windblown or scattered about.

4.5.2 Once the ice has bonded to the pavement surface, the airport operators may use approved deicers to melt through the ice pack to break up or weaken the ice bond; increase the frictional characteristics of the surface, for example, by applying heated sand; or use mechanical means, such as plowing with under-body scrapers or scarifying the ice surface to break the ice packs. The type of brooms used to remove a layer of ice is important since in some cases the broom may actually “polish” the ice, thus reducing