AC 150/5320-6G Airport Pavement Design and Evaluation

This AC provides guidance to the public on the design and evaluation of pavements used by aircraft at civil airports. For reporting of pavement strength, see AC 150/5335-5, Standardized Method of Reporting Airport Pavement Strength – PCR. See also FAARFIELD 2.0 and AIP Program Guidance Letter 22-01: Guidance on Discount Rate Application for Cost Effectiveness for Airfield Pavement Projects.

Official source ↗ Open PDF

U.S. Department of Transportation Federal Aviation Administration

Advisory Circular

Subject: Airport Pavement Design and Evaluation

Date: 6/7/2021 Initiated By: AAS-100

AC No: 150/5320-6G Change:

1 Purpose. This advisory circular (AC) provides guidance to the public on the design and evaluation of pavements used by aircraft at civil airports. For reporting of pavement strength, see AC 150/5335-5D, Standardized Method of Reporting Airport Pavement Strength – PCR.

2 Cancellation. This AC cancels AC 150/5320-6F, Airport Pavement Design and Evaluation, dated November 10, 2016.

3 Applicability. This AC does not constitute a regulation, and is not legally binding in its own right. It will not be relied upon as a separate basis by the FAA for affirmative enforcement action or other administrative penalty. Conformity with this AC is voluntary, and nonconformity will not affect rights and obligations under existing statutes and regulations, except for the projects described in subparagraphs 2 and 3 below:

1. The standards and processes contained in this AC are specifications the FAA considers essential for the reporting of pavement strength.

2. Use of these standards and guidelines is mandatory for projects funded under Federal grant assistance programs, including the Airport Improvement Program (AIP). See Grant Assurance #34.

3. This AC is mandatory, as required by regulation, for projects funded by the Passenger Facility Charge program. See PFC Assurance #9.

Note: This AC provides one, but not the only, acceptable means of meeting the requirements of 14 CFR Part 139, Certification of Airports.

4 Principal Changes. This AC contains the following principal changes:

1. Reformatted to comply with FAA Order 1320.46, FAA Advisory Circular System.

ii

2. Added clarification on when FAA approval is required and when engineering decisions are documented in the engineer’s report for FAA review.

3. Updated guidance in Chapter 1 on Cost Effectiveness Determination.

4. Expanded Chapter 2 discussion regarding surveying and sampling. Added discussion regarding subgrade stabilization.

5. Expanded Chapter 3 discussion of stabilized base course and drainage layers. Revised text and design examples to incorporate changes in FAARFIELD v2.0 pavement design software. Minimum construction layer thickness adjusted. Rigid pavement joint spacing included option for technical analysis.

6. Included pavement preservation in Chapter 4 as an option for flexible pavements. Updated discussion on maintenance, rehabilitation and reconstruction. Expanded discussion regarding reuse of existing pavement materials.

7. Added discussion on dynamic cone penetrometer in Chapter 5. Updated pavement strength reporting reflecting changes in the International Civil Aviation Organization (ICAO) pavement strength reporting adopting new ICAO Aircraft Classification Rating/Pavement Classification Rating (ACR-PCR) protocol.

8. Expanded discussion in Appendix C of Nondestructive Testing.

9. Added Appendix D on Dynamic Cone Penetrometer.

10. Added Appendix E on Ground Penetrating Radar.

11. Added Appendix G with example of adding User Defined Vehicles to FAARFIELD.

12. Added Appendix H with all FAARFIELD examples.

13. Added Appendix I on Variable Section Runways.

14. Added Appendix K Acronyms and Abbreviations.

15. The format of the document has been updated in this version, and minor editorial changes have been made throughout.

5 Related Reading Material. The publications listed in Appendix J provide further guidance and detailed information on the design and evaluation of airport pavements.

6 Units. Through this AC, customary English units will be used followed by “soft” (rounded) conversion to metric units for tables and figures and hard conversion for the text. The English units govern.

iii

7 Feedback on this AC. If you have suggestions for improving this AC, you may use the Advisory Circular Feedback form at the end of this AC.

John R. Dermody Director of Airport Safety and Standards +

CONTENTS

Paragraph Page

iv

CHAPTER 1. AIRPORT PAVEMENTS—THEIR FUNCTION AND PURPOSES … 1-1

1.1 General … 1-1

1.2 Pavement Design Standards … 1-1

1.3 FAA Pavement Design Program … 1-2

1.4 Evaluation of Existing Pavements … 1-2

1.5 Construction Specifications and Geometric Standards … 1-2

1.6 Airfield Pavements … 1-2

1.7 Skid Resistance … 1-8

1.8 Staged Construction … 1-8

1.9 Design of Structures … 1-8

CHAPTER 2. SOIL INVESTIGATIONS AND EVALUATION … 2-1

2.1 General … 2-1

2.2 Soil Conditions … 2-1

2.3 Surveying and Sampling … 2-2

2.4 Subgrade Stabilization … 2-10

2.5 Seasonal Frost … 2-13

2.6 Frost Design … 2-15

CHAPTER 3. PAVEMENT DESIGN … 3-1

3.1 Design Considerations … 3-1

3.2 FAA Pavement Design … 3-1

3.3 Flexible Pavements … 3-1

3.4 Rigid Pavements … 3-1

3.5 Stabilized Base Course … 3-2

3.6 Base or Subbase Contamination … 3-2

3.7 Drainage Layer … 3-3

3.8 Subgrade Compaction … 3-4

3.9 Swelling / Shrinking Soils … 3-5

3.10 Pavement Life … 3-8

3.11 Pavement Structural Design … 3-8

CONTENTS (CONTINUED)

Paragraph Page

v

3.12 Pavement Design Using FAARFIELD … 3-9

3.13 Typical Pavement Sections … 3-22

3.14 Frost and Permafrost Design … 3-23

3.15 Flexible Pavement Design … 3-26

3.16 Rigid Pavement Design … 3-31

3.17 Pre-stressed, Precast, Reinforced and Continuously Reinforced Concrete Pavement … 3-48

3.18 Aggregate Turf Pavements … 3-49

3.19 Heliport Design … 3-51

3.20 Passenger Loading Bridge … 3-51

3.21 Ground Servicing Equipment … 3-51

CHAPTER 4. PAVEMENT MAINTENANCE, REHABILITATION AND

RECONSTRUCTION … 4-1

4.1 General … 4-1

4.2 Pavement Maintenance … 4-1

4.3 Rehabilitation … 4-2

4.4 Reconstruction … 4-2

4.5 Design Considerations for Rehabilitation and Reconstruction … 4-3

4.6 Construction Considerations … 4-5

4.7 Overlay Structural Design … 4-5

4.8 Nonstructural Flexible Overlays … 4-11

4.9 Alternatives for Reconstruction of Existing Pavement … 4-11

4.10 Preparation of the Existing Pavement Surface for an Overlay … 4-14

CHAPTER 5. PAVEMENT STRUCTURAL EVALUATION … 5-1

5.1 Purposes of Structural Evaluation … 5-1

5.2 Evaluation Process … 5-1

5.3 Flexible Pavements … 5-4

5.4 Overlay Requirement … 5-7

5.5 Rigid Pavements … 5-8

5.6 Use of Results … 5-12

CONTENTS (CONTINUED)

Paragraph Page

vi

5.7 Reporting Pavement Weight Bearing Strength … 5-12

CHAPTER 6. PAVEMENT DESIGN FOR SHOULDERS … 6-1

6.1 Purpose … 6-1

6.2 Shoulder Design … 6-1

6.3 Shoulder Material Requirements … 6-3

6.4 Reporting Paved Shoulder Design … 6-3

APPENDIX A. SOIL CHARACTERISTICS PERTINENT TO PAVEMENT

FOUNDATIONS … A-1

APPENDIX B. DESIGN OF STRUCTURE … B-1

APPENDIX C. NONDESTRUCTIVE TESTING (NDT) USING FALLING-WEIGHT-

TYPE IMPULSE LOAD DEVICES IN THE EVALUATION OF AIRPORT PAVEMENTS … C-1

APPENDIX D. DYNAMIC CONE PENETROMETER (DCP) … D-1

APPENDIX E. GROUND PENETRATING RADAR … E-1

APPENDIX F. REINFORCED ISOLATION JOINT … F-1

APPENDIX G. USER-DEFINED VEHICLE IN FAARFIELD … G-1

APPENDIX H. FAARFIELD EXAMPLES … H-1

APPENDIX I. RUNWAY WITH VARIABLE CROSS SECTION … I-1

APPENDIX J. RELATED READING MATERIAL … J-1

APPENDIX K. ACRONYMS AND ABBREVIATIONS … K-1

vii

FIGURES

Number Page

Figure 1-1. Typical Pavement Structure … 1-6

Figure 1-2. Typical Pavement Structure … 1-6

Figure 3-1. Overview of FAARFIELD Program … 3-11

Figure 3-2. FAARFIELD Effective Tire Width … 3-16

Figure 3-3. Typical Plan and Sections for Pavements … 3-22

Figure 3-4. Rigid Pavement Isolation Joint … 3-40

Figure 3-5. Rigid Pavement Contraction and Construction Joints … 3-41

Figure 1-1: picture of page 7Figure 1-1 · page 7
Picture of the page from the copy saved here

Figure 3-6. Rigid Pavement Joint Sealant Details … 3-42

Figure 3-7. Transition between Rigid and Flexible Pavement Sections … 3-48

Figure 3-8. Aggregate Turf Pavement Structure … 3-50

Figure 5-1. Existing Taxiway Pavement Structure … 5-6

Figure 5-2. Existing Taxiway Structure with User-Defined Surface Layer … 5-7

Figure 5-3. Flexible Pavement Evaluation (with Overlay) … 5-8

Figure 5-4. Rigid Pavement Evaluation - Life Evaluation for Current Traffic … 5-11

Figure 5-5. Rigid Pavement Evaluation - Life Evaluation for Original Traffic (After 10 Years of

Traffic) … 5-12

Figure C-1. Flowchart for Using Deflection Data … C-6

Figure C-2. Deflection Basin and Sensor Location … C-10

Figure C-3. ISM Plot Identifying Pavement Section Limits … C-12

Figure C-4. Normalized Deflection Plot Identifying Pavement Section Limits … C-13

Figure D-1. Schematic of DCP (ASTM D6951-09 … D-2

Figure D-2. DCP in Use (NAPTF) … D-2

Figure E-1. Vehicle based Air-Coupled GPR (NAPTF) … E-1

Figure E-2. Cart based GPR (NAPTF) … E-2

Figure E-3. GPR Results for Asphalt (NAPTF) … E-2

Figure 3-6: picture of page 7Figure 3-6 · page 7
Picture of the page from the copy saved here

Figure E-4. GPR Results for Concrete (NAPTF) … E-3

Figure F-1. Type A-1 Joint Detail … F-2

Figure G-1. Select “Create New User Defined Vehicle” … G-1

Figure G-2. Vehicle Edit Screen … G-3

viii

Figure G-3. Evaluation Point Locus for 2D Gear … G-3

Figure G-4. FAARFIELD Aircraft Library (External Library Group) … G-4

Figure G-5. Select “Edit New User Defined Aircraft” … G-5

Figure G-6. Select UDA for Editing from Drop-Down List … G-5

Figure H-1. CDF Contribution for Aircraft Mix … H-2

Figure H-2. Flexible Design Example Step 1 (Select Pavement Type) … H-4

Figure H-3. Flexible Design Example Step 2 (Structure) … H-4

Figure H-4. Flexible Design Example Step 3 (Traffic) … H-5

Figure H-5. Flexible Design Example Step 4 (Thickness Design) … H-5

Figure H-6. Flexible Design Example Step 5 (Settings for Final Design) … H-6

Figure H-7. Flexible Design Example Step 5 (Final Thickness Design) … H-7

Figure H-8. Flexible Design Example Step 6 (Section Report) … H-8

Figure H-9. Flexible Design Example Step 7 (Compaction/Life Evaluation) … H-9

Figure H-10. Rigid Design Example Step 1 … H-12

Figure H-11. Rigid Design Example Step 2 (Modify Structure Information) … H-12

Figure H-12. Rigid Design Example Step 3 (Aircraft Data) … H-13

Figure H-13. Rigid Design Example Step 4 (Final Design) … H-13

Figure H-14a. Rigid Design Example Step 5 (Section Report) … H-14

Figure H-15b. Rigid Design Example Step 5 (Section Report) … H-15

Figure H-16c. Rigid Design Example Step 5 (Section Report) … H-16

Figure H-17. Rigid Design Example Step 6 (Compaction Requirements) … H-17

Figure H-18. Example of Asphalt on Flexible Overlay Design in FAARFIELD … H-18

Figure H-19. Example of Concrete on Flexible Overlay Design in FAARFIELD … H-19

Figure H-20. Example of Asphalt Overlay on Rigid Pavement in FAARFIELD … H-21

Figure H-21. Example of Unbonded Concrete Overlay on Rigid Pavement in FAARFIELD . H-22

Figure H-22. FAARFIELD Pavement Structure for Compaction Example … H-23

Figure H-23. Subgrade Compaction Requirements for the Example Section … H-25

Figure H-24. Rigid Overlay Percent CDFU … H-27

Figure I-1. Runway Variable Cross-Section … I-2

ix

TABLES

Number Page

Table 1-1. Typical FAA Pavement Specifications for Pavement Layers1 … 1-7

Table 2-1. Typical Subsurface Boring Spacing and Depth for New Construction1,2 … 2-4

Table 2-2. Soil Frost Groups1,2 … 2-14

Table 3-1. Recommended Treatment of Swelling Soils1 … 3-7

Table 3-2. Allowable Modulus Values and Poisson’s Ratios Used in FAARFIELD … 3-19

Table 3-3. Minimum Layer Thickness for Flexible Pavement Structures1 … 3-20

Table 3-4. Minimum Layer Thickness for Rigid Pavement Structures1 … 3-21

Table 3-5. Pavement Joint Types … 3-38

Table 3-6. Dimensions and Spacing of Steel Dowels … 3-44

Table 3-7. Recommended Maximum Joint Spacing - Rigid Pavement1,2 … 3-47

Table 6-1. Minimum Shoulder Pavement Layer Thickness … 6-4

Table C-1. ASTM Standards for Deflection Measuring Equipment … C-2

Table C-2. Recommended Sensor Configuration … C-8

Table D-1. Basic DCP Correlations … D-1

Table H-1. Aircraft Mix … H-22

Table H-2. Depths and Densities … H-23

Table H-3. Computed Compaction Requirements for the Example Section … H-24

x

Page Intentionally Blank

1.2 Pavement Design Standards. › 1.2.3 The failure curves have been calibrated with full-scale pavement…

CHAPTER 1. AIRPORT PAVEMENTS—THEIR FUNCTION AND PURPOSES

1.1 General.

An airport pavement is a complex engineering structure. Pavement analysis and design involves the interaction of four equally important components:

1. The subgrade (naturally occurring soil),

2. The paving materials (surface layer, base, and subbase),

3. The characteristics of applied loads (weight, tire pressure, location and frequency), and

4. Climate (high/low temperatures, rainfall).

Airport pavements are designed and constructed to provide adequate support for the loads imposed by aircraft and to produce a surface that is: firm, stable, smooth, skid resistant, year-round all-weather surface, free of debris or other particles that can be blown or picked up by propeller wash or jet blast.

To fulfill these performance requirements the pavement will need:

1. Structural capacity to support the imposed loads;

2. Sufficient inherent stability to withstand the abrasive action of traffic, adverse environmental conditions, and other deteriorating influences;

3. To be constructed properly using quality materials and workmanship; and

4. To be maintained with regular and routine maintenance.

1.2 Pavement Design Standards.

Flexible Pavement. The flexible pavement design guidance in this AC is based on layered elastic theory.

Rigid Pavement. The rigid pavement design guidance in this AC is based on both layered elastic theory and three-dimensional finite element theory.

The failure curves have been calibrated with full-scale pavement tests at the FAA’s National Airport Pavement Test Facility (NAPTF).

1.6.1 Types of Pavement. › 1.6.1.2 Rigid pavements are those in which the principal load…

1.3 FAA Pavement Design Program.

FAARFIELD. The FAA has developed the computer program FAA Rigid and Flexible Iterative Elastic Layer Design (FAARFIELD) to assist with pavement design. See Chapter 3 for detailed information on FAARFIELD.

1.4 Evaluation of Existing Pavements. This AC presents guidance on airport pavement structural evaluation necessary to assess the ability of an existing pavement to support different types, weights, or volume of aircraft traffic. Current pavement design methods may produce different pavement thicknesses than the methods used to design the original pavement. Use engineering judgment when evaluating results.

1.5 Construction Specifications and Geometric Standards.

Specifications. Construction material specifications referenced by Item Number (e.g. P-401, Asphalt Mix Pavements; P-501, Cement Concrete Pavement, etc.) are contained in AC 150/5370-10, Standard Specifications for Construction of Airports.

Geometric Standards. Airport design standards and recommendations including runway, taxiway, taxilane and apron geometric design, widths, grades, and slopes are contained in AC 150/5300-13, Airport Design. Runway length requirements are discussed in AC 150/5325-4, Runway Length Requirements for Airport Design.

1.6 Airfield Pavements.

Types of Pavement. Pavements discussed in this AC include flexible, rigid, and flexible and rigid overlays. Various combinations of pavement types and layers result in complex pavements classified between flexible and rigid.

1.6.1.1 Flexible pavements are those in which each structural layer is supported by the layer below and ultimately supported by the subgrade. Typically, the surface course for flexible pavements is asphalt mix, Item P-401.

1.6.1.2 Rigid pavements are those in which the principal load resistance is provided by the surface concrete layer. Typically, the surface course for rigid pavements is cement concrete pavement, Item P-501.

1.6.3 Cost Effectiveness Determination. › 1.6.3.2 Routine maintenance costs, such as incidental crack sealing,…

Selection of Pavement Type.

1.6.2.1 With proper design, materials, construction, and maintenance, any pavement type can provide the desired pavement service life. Historically, airport pavements have performed well for 20 years as shown in Operational Life of Airport Pavements, (DOT/FAA/AR-04/46). See section 3.11 for factors to consider when evaluating pavement life. However, no pavement structure will perform for the desired service life without using quality materials installed properly and maintained with timely routine and preventative maintenance.

1.6.2.2 The selection of a pavement section requires the evaluation of multiple factors including cost and funding limitations, operational constraints, construction timeframe, material availability, cost and frequency of anticipated maintenance, environmental constraints, future airport expansion plans, and anticipated changes in traffic. Document the rationale for the selected pavement section, materials and service life in the engineer’s report.

Cost Effectiveness Determination.

1.6.3.1 A cost effectiveness determination includes a life-cycle cost analysis (LCCA). LCCA methodology includes the following steps:

1. Establish alternative design strategies,

2. Determine activity timing (analysis period that includes at least one rehabilitation of each alternative), and

3. Estimate direct costs (estimate future costs in constant dollars and discount to the present using real discount rate).

Note: Analysis period is period of time over which alternative pavement sections are compared and is not necessarily the design life used for the pavement design. Coordinate analysis periods to be evaluated with owner and FAA on federally funded projects. Document LCCA in the engineer’s report on federally funded projects.

1.6.3.2 Routine maintenance costs, such as incidental crack sealing, have a marginal effect on net present value (NPV). Focus on initial construction, planned preventative maintenance, and rehabilitation costs. Base salvage value on the remaining functional life of an alternative at the end of the analysis period.

Note: Include a sensitivity analysis to address the variability of major input assumptions and estimates. Traditionally, sensitivity analysis has evaluated different discount rates or assigned value of time. The ultimate sensitivity analysis is to perform a probabilistic analysis, which allows multiple inputs to vary simultaneously.

1.6.3 Cost Effectiveness Determination. › 1.6.3.5 When considering alternative pavement sections, assume that all…

1.6.3.3 An LCCA in support of a pavement section does not ensure that funds will be available to support the initial construction.

1.6.3.4 For additional information on performing LCCA, refer to Airfield Asphalt Pavement Technology Program (AAPTP) Report 06-06, Life Cycle Cost Analysis for Airport Pavements, and the Federal Highway Administration Life-Cycle Cost Analysis Primer.

1.6.3.5 When considering alternative pavement sections, assume that all alternatives will achieve the desired result of a smooth, foreign object debris (FOD)-free surface with adequate profile and texture to safely operate aircraft. The question is which design alternative results in the lowest total cost over the life of the project and what are the user-cost impacts of alternative strategies. Present worth or present value economic analyses are considered the best methods for evaluating airport pavement design or rehabilitation alternatives. For federally funded projects, use the most recent discount rate published by the Office of Management and Budget (OMB) appropriate for a cost effectiveness analysis. For real discount rates, refer to OMB Circular A-94, Appendix C, Discount Rates for Cost-Effectiveness, Lease Purchase, and Related Analyses. When applicable calculate residual salvage values on the straight-line depreciated value of the alternative at the end of the analysis period. Use engineer experience to establish the initial cost and life expectancy of the various alternatives, with consideration given to local materials, environmental factors, and contractor capability. When considering the effectiveness of various routine and preventative maintenance alternatives, refer to AAPTP Project 05-07, Techniques for Prevention and Remediation of Non-Load Related Distresses on HMA Airport Pavements (Phase I).

The basic equation for determining present worth is:

z n m

i

i r S r M C

i

     

       

   

 1 1 1 1 PW

1 Where:

PW = Present Worth C = Present Cost of initial design or rehabilitation

activity m = Number of maintenance or rehabilitation

activities Mi = Cost of the ith maintenance or rehabilitation

alternative in terms of present costs, i.e., constant dollars r = Discount rate

1.6 Airfield Pavements. › 1.6.4 Pavement Structure.

ni = Number of years from the present of the ith

maintenance or rehabilitation activity S = Salvage value at the end of the analysis period Z = Length of analysis period in years.

n

r 

  

 1 1 is commonly called the single payment present worth factor in most engineering economic textbooks

1.6.3.6 From a practical standpoint, if the difference in the present worth of costs between two design or rehabilitation alternatives is 10 percent or less, it is normally assumed to be insignificant and the present worth of the two alternatives can be assumed to be the same.

Pavement Structure. A pavement structure consists of surface course, base course, subbase course, and subgrade as illustrated Figure 1-1 and Figure 1-2, and described in Table 1-1.

1. Surface. Surface courses typically include cement concrete or asphalt mixture.

2. Base. Base courses generally fall into two classes: unstabilized and stabilized.

a. Unstabilized bases consist of crushed and uncrushed aggregates.

b. Stabilized bases consist of crushed and uncrushed aggregates stabilized with

cement or asphalt.

Figure 1-2: picture of page 16Figure 1-2 · page 16
Picture of the page from the copy saved here

3. Subbase. Subbase courses consist of granular material, which may be unstabilized or stabilized.

4. Subgrade. Subgrade consists of natural or modified soils.

Figure 1-1. Typical Pavement Structure

Figure 1-2. Typical Pavement Structure

ASPHALT SURFACE

STABILIZED BASE

BASE

SUBBASE

DRAINAGE

SUBGRADE

GEOSYNTHETIC SEPARATION

1

2

LOCATION AND NEED FOR DRAINAGE LAYER AS RECOMMENDED BY GEOTECHNICAL AND PAVEMENT ENGINEER.

WHEN RECOMMENDED BY GEOTECHNICAL AND PAVEMENT ENGINEER.

1.

2.

NOTES:

STABILIZED BASE

BASE

SUBBASE

PCC SURFACE

SUBGRADE

DRAINAGE

1

GEOSYNTHETIC SEPARATION

2

LOCATION AND NEED FOR DRAINAGE LAYER AS RECOMMENDED BY GEOTECHNICAL AND PAVEMENT ENGINEER.

WHEN RECOMMENDED BY GEOTECHNICAL AND PAVEMENT ENGINEER.

1.

NOTES:

2.

Table 1-1. Typical FAA Pavement Specifications for Pavement Layers1

Pavement Layer Pavement Specification

Surface Course2 P-501/P-401/P-403/P-404

Stabilized Base Course3 P-401/403

P-304

P-306

P-307

P-407 (EB 102)

Base Course P-2074 P-2085 P-2094

P-210 P-2114

P-212 P-2196

P-2204

Subbase Course P-154

P-213

Subgrade P-152

P-155

P-156

P-157

P-158

Notes:

1. Refer to AC 150/5370-10, Standard Specifications for Construction of Airports, for individual specifications and any additional limitations on use. 2. Use P-404 or P-501 for locations that need a fuel resistant surface, or a fuel resistant seal coat. 3. Use caution with P-304, P-306, or P-307; all are susceptible to leading to reflective cracking. 4. P-209/P-211/P-207/P-220 may be used as a stabilized base when geotechnical laboratory testing indicates that soaked California Bearing Ratio (CBR) material is greater than 100. Note a true stabilized base has a stabilizing agent to mitigate susceptibility to moisture. 5. P-208, Aggregate Base Course, used as base course is limited to pavements designed for gross loads of 60,000 pounds (27,200 kg) or less. 6. P-219, Recycled Concrete Aggregate Base Course, quality of materials and gradation determine how P- 219 will perform. Establish quality with laboratory testing of materials used to produce P-219. 7. P-219, Recycled Concrete Aggregate Base Course, quality of materials and gradation determine how P- 219 will perform.

Chapter 1. AIRPORT PAVEMENTS—THEIR FUNCTION AND PURPOSES › 1.9 Design of Structures.

1.7 Skid Resistance. To provide good traction during all weather conditions provide a skid resistant surface. 49 USC 47101 f (2) recommends grooving or friction treatment of each primary and secondary runways at commercial service airports. Skid resistance is impacted by the combination of many factors including type of surface, aggregate size, texture, shape and gradation, mineralogy of coarse aggregate, and pavement grade, and smoothness. Refer to AC 150/5320-12, Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces, for information on construction and maintenance of skid resistant surfaces.

1.8 Staged Construction.

It may be necessary to construct the airport pavement in stages to accommodate changes in traffic, increases in aircraft weights, frequency of operation or to address funding limitations. The stages may be vertical (i.e. successive layer strengthening) or lateral (i.e. widening, lengthening, etc.).

When designing airport pavements, give consideration for planned runway/taxiway extensions, widening, parallel taxiways, and other changes to ensure that each stage provides an operational surface that can safely accommodate the current traffic.

Consider alignments of future development when selecting the longitudinal grades, cross-slope grade, stub-taxiway grades, etc.

Design each stage to safely accommodate the traffic using the pavement until the next stage is constructed.

Consider the future structural needs for the full-service life of the pavement when evaluating the initial section to be constructed.

Design and construct the underlying layers and drainage facilities to the standards required for the final pavement cross-sections. Refer to AC 150/5320-5, Airport Drainage, for additional guidance on design and construction of airport surface and subsurface drainage systems for airports.

1.9 Design of Structures. Refer to Appendix B for recommended design parameters for airport structures such as culverts and bridges.

2.2 Soil Conditions. › 2.2.1 Site Investigation.

CHAPTER 2. SOIL INVESTIGATIONS AND EVALUATION

2.1 General. The following sections highlight some of the more important aspects of soil mechanics that are important to the geotechnical and pavement engineers. Utilize a qualified geotechnical professional to identify the type and properties of subgrade materials. Document geotechnical investigations and testing in the engineer’s report on federally funded projects. Detailed soil investigations are applicable to construction of new pavements. On rehabilitation projects, extent of soil investigations required is dependent upon reason pavement needs rehabilitation.

Soil.

For engineering purposes, soil includes all-natural deposits that can be moved and manipulated with earth moving equipment, without requiring blasting or ripping. The soil profile is the vertical arrangement of individual soil layers exhibiting distinct physical properties. Subgrade soil is the soil layer that forms the foundation for the pavement structure; it is the soil directly beneath the pavement structure. Subsurface soil conditions include the elevation of the water table, the presence of water bearing strata, and the field properties of the soil. Field properties include the density, moisture content, frost susceptibility, and typical depth of frost penetration.

Classification System. Use ASTM D2487, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System), to classify soils for civil airport pavements for engineering purposes. Appendix A provides a summary of general soil characteristics pertinent to pavements.

Drainage. Soil conditions influence the size, extent, and nature of surface and subsurface drainage structures and facilities. See Chapter 3 for general guidance on basic drainage layers. For detailed guidance on design of subsurface drainage layers, refer to AC 150/5320-5, Airport Drainage Design, Appendix G.

2.2 Soil Conditions.

Site Investigation. Assess soil type and properties for all soils encountered on the project. Collect and identify representative samples of the various soils present to determine:

1. The distribution, profile, physical properties, location, and arrangement of the various soils;

2. The site topography;

3. Location of the water table;

2.3.1 Subsurface Borings and Pavement Cores of Existing Pavement. › 2.3.1.1 The initial step in an investigation of subsurface conditions…

4. Climate data, including frequency of water inundation of pavement areas due to seasonal storm events;

5. Availability and suitability of local aggregate materials for use in construction of the pavement structure; and

6. Locations and soil properties of possible additional borrow areas (if sufficient soils are not available within the boundaries of the airport).

Sampling and Identification Procedures. See ASTM D420, Standard Guide to Site Characterization for Engineering Design and Construction Purposes, for sampling and surveying procedures and techniques. This method is based on the soil profile. Follow ASTM D2488, Standard Practice for Description and Identification of Soils (Visual-Manual Procedures), to identify soils by such characteristics as color, texture, structure, consistency, compactness, cementation, and, to varying degrees, chemical composition.

Soil Maps. Department of Agriculture, Natural Resources Conservation Service soils maps, United States Geological Survey (USGS) geologic maps, and engineering geology maps are valuable aids in the study of soils. The pedagogical classification determined from these maps does not treat soil as an engineering or construction material; however, the data obtained is useful for the engineer conducting preliminary investigations of site selection, development costs, and alignment, as well as for the agronomist in connection with the development of turf areas on airports. Much of this information is available on the respective agency websites.

Aerial Photography. Aerial photography will assist in assessing relief, drainage, and soil patterns. A review of historical aerial site photographs may reveal prior drainage patterns and deposits of different soil types. Many websites now provide access to aerial photographs and maps useful for preliminary site investigations.

2.3 Surveying and Sampling.

Subsurface Borings and Pavement Cores of Existing Pavement.

2.3.1.1 The initial step in an investigation of subsurface conditions is a soil survey to determine the quantity and extent of the different types of soil, the arrangement of soil layers, and the depth of any subsurface water. Profile borings will assist in determining the soil or rock profile and its lateral extent. Due to variations at a site, the spacing of borings cannot always be definitively specified by rule or preconceived plan. Take sufficient borings to identify the extent of soils encountered.

2.3.3 Number of Borings on Rehabilitation Projects. › 2.3.3.4 See Chapter 4 for additional information on pavement…

2.3.1.2 Cores of existing pavement provide information about the existing pavement structure. Take color photographs of pavement cores and include with the geotechnical report.

Number of Borings, Locations, and Depths of New Construction.

2.3.2.1 Take a sufficient number of borings to determine and map existing soil conditions.

2.3.2.2 If past experience indicates that settlement or stability in deep fill areas at the location may be a problem, or if in the opinion of the geotechnical engineer more investigations are warranted, additional and/or deeper borings may be required to determine the proper design, location, and construction procedures.

2.3.2.3 See Table 2-1 for suggested criteria for the location, depth, and number of borings for new construction. These criteria vary depending upon the local conditions, e.g. number and type of subgrade materials or expected depth of embankment. Fewer borings are acceptable if soil conditions are uniform.

Number of Borings on Rehabilitation Projects.

2.3.3.1 Borings are not always required on rehabilitation projects. For example, rehabilitation projects just to correct deficiency in wearing surface or grade generally do not require analysis of subsurface conditions. However, a rehabilitation project to correct a subgrade failure or a structural overlay would require subsurface analysis.

2.3.3.2 As built plans from previous projects and available engineering reports, supplemented with nondestructive testing (NDT) and minimally destructive testing can often be used to establish strength of existing materials. Perform sufficient testing to characterize and verify the type and quality of subgrade material.

2.3.3.3 When pavement rehabilitation or reconstruction is required due to subgrade failure, obtain sufficient borings to characterize the depth and extent of subgrade material that needs to be improved, or removed and replaced. Improvements may include re-compaction, chemical or mechanical stabilization, or replacement with suitable material.

2.3.3.4 See Chapter 4 for additional information on pavement rehabilitation projects.

2.3.4 Soil Exploration Boring Log. › 2.3.4.3 Obtain representative samples of the different soil layers…

Table 2-1. Typical Subsurface Boring Spacing and Depth for New Construction1,2

Area Spacing Depth

Runways, Taxiways and Taxilanes

Random Across Pavement at 200-foot (60 m) Intervals

Cut Areas – 10 ft (3 m) Below Finished Grade Fill Areas – 10 ft (3 m) Below Existing Ground

Other Areas of Pavement

1 Boring per 10,000 Square Feet (930 sq m) of Area

Cut Areas - 10 ft (3 m) Below Finished Grade Fill Areas – 10 ft (3 m) Below Existing Ground

Borrow Areas Sufficient Tests to

Clearly Define the Borrow Material

To Depth of Borrow Excavation

Note 1: Boring depths should be sufficient to determine if consolidation and/or location of slippage planes will impact the pavement structure. Note 2: Follow geotechnical engineer recommendations for depth of borings when fill greater than 10 feet.

Soil Exploration Boring Log.

2.3.4.1 Summarize the results of the soil explorations in boring logs. A typical boring log includes:

1. Location of the boring;

2. Date performed;

3. Type of exploration;

4. Surface elevation;

5. Depth of materials;

6. Sample identification numbers;

7. Classification of the material;

8. Location and elevation of water table; and

9. Soil standard penetration resistance.

2.3.4.2 Refer to ASTM D1586 Standard Test Method for Standard Penetration Test (SPT) and Split Barrel Sampling of Soils.

2.3.4.3 Obtain representative samples of the different soil layers encountered and perform laboratory tests to determine their physical and engineering properties. It is important that each sample tested be representative of a particular soil type and not be a mixture of several materials. Identification of soil properties from composite bag samples can lead to misleading

2.3.7 Nondestructive and Minimally Destructive Testing. › 2.3.7.3 GPR can provide a continuous profile of subsurface conditions.

representation of soil properties. Use caution when using composite samples to ensure that sample is representative of similar materials.

2.3.4.4 In-situ properties, such as in-place moisture, density, shear strength, consolidation characteristics etc., may require obtaining “undisturbed” core samples per ASTM D1587, Standard Practice for Thin-Walled Tube Sampling of Fine-Grained Soils for Geotechnical Purposes.

In-place Bearing Testing. Pits, open cuts, or both may be required for making in-place bearing tests, taking undisturbed samples, charting variable soil strata, etc. This type of soil investigation may be necessary for projects involving in-situ conditions that warrant a high degree of accuracy.

Number of Cores. Cores of existing pavement structure aid in the determination of the extent of rehabilitation and/or reconstruction required to correct the distress. Take sufficient number of cores to identify and evaluate condition of existing pavement structure and to help characterize extent and possible causes of distress.

Nondestructive and Minimally Destructive Testing. Testing to assist in characterization of the subsurface includes falling weight deflectometer (FWD), heavy weight deflectometer (HWD), dynamic cone penetrometer (DCP) tests, or ground penetrating radar (GPR).

2.3.7.1 NDT using FWD or HWD, as described in Appendix C, can be used to evaluate subgrade strength and to assist with establishing locations for soil borings as well as sampling locations for evaluation of existing pavements.

2.3.7.2 DCP tests, per ASTM D6951, Standard Test Method for Use of the Dynamic Cone Penetrometer in Shallow Pavement Applications, can quickly provide useful information regarding relative strength of material. DCP testing is classified as a minimally destructive test. Perform DCP tests on each soil layer during soil borings or after taking pavement cores of existing pavements. DCP results can provide a quick estimate of subgrade strength utilizing correlations between DCP and CBR. In addition, plots of DCP results provide a graphical representation of the relative stiffness of subgrade layers. See Appendix D for additional information on DCP.

2.3.7.3 GPR can provide a continuous profile of subsurface conditions. GPR has the potential to assist with identification of several subsurface conditions such as providing a rough estimate of thickness of subsurface pavement layers, location of subsurface objects, help detecting stripping or layer separation, detection of subsurface moisture, and identifying any

2.3.8 Soil Tests. › 2.3.8.2 Moisture-Density Relations of Soils.

anomalies or changes in subsurface support. See Appendix E for additional information on GPR.

Soil Tests.

2.3.8.1 Soil Characterization Testing Requirements. Identify the tests necessary to characterize the soil properties for the project in the geotechnical report. Perform additional tests beyond those listed below to address local conditions or to support subgrade stabilization, as recommended by the geotechnical engineer. Subsurface evaluations typically include the following standards:

1. ASTM D421, Standard Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants. This procedure outlines how to prepare air dried samples for particle-size and plasticity tests.

2. ASTM D422, Standard Test Method for Particle-Size Analysis of Soils. This analysis covers the quantitative determination of the particle sizes in soils.

3. ASTM D4318, Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils.

a. The plastic and liquid limits of a soil define the lowest moisture

content at which a soil will change from a semisolid to a plastic state and from a plastic to a liquid state, respectively.

b. The plasticity index is the numerical difference between the plastic

limit and the liquid limit and indicates the range in moisture content over which a soil remains in a plastic state prior to changing into a liquid.

c. These plastic limits, liquid limits, and plasticity index properties

are used, either individually or combined with other soil properties, to correlate engineering behavior such as compressibility, permeability, compactibility, shrink-swell potential, and shear strength.

d. The Unified Soil Classification System (ASTM D2487) uses the

plastic limit, liquid limit, and plasticity index of soils to classify soils.

2.3.8.2 Moisture-Density Relations of Soils. For compaction control during construction, use the following ASTM test methods to determine the moisture-density relations of the different soil types:

2.3.9 Subgrade Support for Pavement Design. › 2.3.9.6 Improving weak subgrades may be more cost effective than…

2.3.8.2.1 Pavements Loads of 60,000 Pounds (27,200 kg) or More. For pavements designed to serve aircraft weighing 60,000 pounds (27,200 kg) or more, use ASTM D1557, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ftlbf/ft3 (2,700 kN-m/m3)).

2.3.8.2.2 Pavement Loads Less than 60,000 Pounds (27,200 kg). For pavements designed to serve aircraft weighing less than 60,000 pounds (27,200 kg), use ASTM D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)).

2.3.8.2.3 Expansive Soils Use ASTM D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kNm/m3) regardless of weight of aircraft for soils with expansive characteristics to establish the maximum density for compaction.

Subgrade Support for Pavement Design.

2.3.9.1 Soil classification for engineering purposes provides an indication of the suitability of the soil as a pavement subgrade. However, the soil classification does not provide sufficient information to predict pavement behavior. Performance variations can occur due to a variety of reasons including degree of compaction, degree of saturation (moisture content), height of overburden, etc.

2.3.9.2 The subgrade soil provides the ultimate support for both flexible and rigid pavements and the imposed loads. The pavement structure (surface, base and subbase) distributes the imposed loads to the subgrade over an area greater than the tire contact area.

2.3.9.3 Uniform subgrade support is as important as the amount of subgrade support. Avoid abrupt transitions between different subgrade materials.

2.3.9.4 The FAA recommends selecting a subgrade strength value for design that is one standard deviation (sample) below the mean of laboratory tests. Use a value for design that reflects the expected long-term subgrade support. Document and support the value used in the geotechnical report.

2.3.9.5 Subbase and base layers are difficult to construct without adequate subgrade support. Constructability issues may require improvements to the subgrade to facilitate construction of the subbase and base layers.

2.3.9.6 Improving weak subgrades may be more cost effective than providing thicker layers of aggregate base and subbase.

2.3.9.11 California Bearing Ratio (CBR). › 2.3.9.11.1 Laboratory CBR.

2.3.9.7 Characterize subgrade materials by a suitable strength or stiffness (modulus) parameter for pavement design and evaluation. For pavements to be designed with FAARFIELD, the quality of the subgrade is best characterized by the Elastic Modulus (E). This is the material parameter used by FAARFIELD in calculations. It is a best practice to include a sensitivity analysis of the impact of subgrade strength on FAARFIELD analysis results when a correlation is used to approximate subgrade strength or stiffness.

2.3.9.8 Typically, CBR tests are used to establish the strength of subgrade for flexible pavements. For fine grained non-expansive soils, the elastic modulus E can be estimated from CBR using the following correlation: E (psi) = 1500 × CBR or E (MPa) = 10 × CBR. This correlation is an approximate relationship generally adequate for pavement design and analysis. Other correlations may be used such as, MR=2,555 × CBR0.64 from the American Association of State Highway and Transportation Officials (AASHTO) 2002 Design Guide.

2.3.9.9 For rigid pavements, measure the strength of the subgrade with a plate load test (see paragraph 2.4.3), which gives the modulus of subgrade reaction (k-value). The elastic modulus E can be estimated from k-value using the following correlation: E (psi) = 20.15 × k1.284 (k in pci). This correlation is an approximate relationship that is adequate for pavement design and analysis. If plate-load test data is not available, then estimate the elastic modulus E from CBR using the formula in paragraph 2.3.9.8.

2.3.9.10 In some cases, for example when designing overlays on existing pavements, it is not possible to obtain estimates of E from CBR or plate load data. In these cases, an estimate of E may be obtained by backcalculation from deflectometer (FWD/HWD) data or other NDT using the methods described in Chapter 5 and Appendix C.

2.3.9.11 California Bearing Ratio (CBR). The CBR test is a penetration test conducted at a uniform rate of strain. The force required to produce a given penetration in the material being tested is compared to the force required to produce the same penetration in a standard crushed limestone. The result is expressed as a ratio of the two forces (e.g., a material with a CBR of 15 means the material offers 15 percent of the resistance to penetration that the standard crushed limestone offers).

2.3.9.11.1 Laboratory CBR. Perform laboratory CBR tests in accordance with ASTM D1883, Standard Test Method for California Bearing Ratio (CBR) of Laboratory- Compacted Soils. Conduct laboratory CBR tests on materials obtained from the site and remolded to the moisture and density that will be required during construction. Samples should be soaked prior to testing.

2.3.9.12 Plate Bearing Test. › 2.3.9.12.3 Plate Bearing Test Conditions.

Pavement foundations tend to reach nearly complete saturation after about 3 years. The use of a soaked CBR test simulates the condition of a pavement that has been in service. A soaked CBR also represents the time of year when the weakest subgrade is present, ie. periods of high moisture such as spring thaw or following seasonal storm events.

2.3.9.11.2 CBR for Gravelly Materials. CBR tests are difficult to interpret on gravelly materials. Laboratory CBR tests on gravel often yield CBR results that are too high due to the confining effects of the mold. It is often necessary to use judgement and experience to assign CBR values to gravelly subgrade materials. The FAA pavement design procedure recommends a maximum subgrade E value of 50,000 psi (345 MPa) (CBR=33) for gravel and gravelly soils.

2.3.9.11.3 Number of CBR Tests. The exact number of CBR tests required to establish a design value is dependent upon the number, type, nature and variability of soils encountered at the project site. Variability of the soil conditions encountered at the site combined with the low reliability of CBR tests has a significant influence on the number of tests needed. Generally, three CBR tests on each different major soil type is sufficient. Note that when doing soil borings that sufficient material is obtained to perform all the necessary testing.

2.3.9.11.4 Lime Rock Bearing Ratio. When using the lime rock bearing ratio (LBR) to express soil strength, convert to CBR by multiplying the LBR by 0.8. (CBR 100 = LBR 125)

2.3.9.12 Plate Bearing Test.

2.3.9.12.1 The plate bearing test measures the bearing capacity of the pavement foundation. The result, modulus of subgrade reaction (k value), is a measure of the pressure required to produce a unit deflection of the pavement foundation. The k value has the units pounds per cubic inch (Mega-newton per cubic meter).

2.3.9.12.2 Perform plate bearing tests in accordance with the procedures contained in AASHTO T 222 Standard Method of Test for Non-repetitive Static Plate Load Test of Soils and Flexible Pavement Components for Use in Evaluation and Design of Airport and Highway. This method covers nonrepetitive static plate load tests on subgrade soils and flexible pavement components.

2.3.9.12.3 Plate Bearing Test Conditions. Conduct plate bearing tests in the field on test sections constructed to the design compaction and moisture conditions. Correct the k value, if

2.4 Subgrade Stabilization. › 2.4.4 Stabilize subgrade materials to a minimum depth of 12 in (300…

necessary, to match the moisture conditions expected of the in-service pavement.

2.3.9.12.4 Plate Size. Use a 30-inch (762 mm) diameter plate to determine the k value. Using a smaller plate diameter may result in a higher k value.

2.3.9.12.5 Number of Plate Bearing Tests. Plate bearing tests are expensive to perform resulting in a limited number of tests that can be conducted to establish a design. Due to the limited number of tests, use engineering judgement when selecting the design k value.

2.3.9.12.6 When plate bearing test data is not available the k value may be estimated from available CBR data, see paragraph 3.16.4.

2.3.9.13 Other tests to assist in evaluating subgrade soils include:

1. ASTM D3080, Standard Test Method for Direct Shear Tests of Soils Under Consolidated Drained Conditions,

2. ASTM D2573, Standard Test Method for Field Vane Shear Tests in Cohesive Soil, or

3. ASTM D2166, Standard Test Method for Unconfined Compressive Strength of Cohesive Soil.

2.4 Subgrade Stabilization.

Where the mean subgrade strength is lower than CBR 5 (elastic modulus approximately 7,500 psi) it is recommended to improve the subgrade chemically, mechanically, or by replacement with suitable subgrade material.

When the mean subgrade strength is less than a CBR 3 (elastic modulus approximately 4,500 psi) improve the subgrade through stabilization or replacement with suitable subgrade material.

In addition, consider subgrade stabilization if any of the following conditions exist: poor drainage, adverse surface drainage, frost, periodic water inundation or the need to establish a stable working platform. Use chemical agents, mechanical or geosynthetic methods to stabilize subgrades. When it is not possible to create a stable subgrade with either chemical or mechanical stabilization, remove and replace the unsuitable material with suitable material.

Stabilize subgrade materials to a minimum depth of 12 in (300 mm), or to the depth recommended by the geotechnical engineer. To establish a stable working platform additional thickness may be required or limitations may be required on size and type of construction equipment.

In FAARFIELD, model the stabilized layers as a user-defined layer. (see paragraph 2.5.4).

2.4.6 Chemical Stabilization. › 2.4.6.6 Both cement and lime stabilization will increase the long-term…

Chemical Stabilization.

2.4.6.1 Chemical stabilization of subgrade soils can increase their strength, bearing capacity, improve shrink/swell and freeze/thaw characteristics. Different soil types require different stabilizing agents for best results. Caution: check the soluble sulfate content of the soil and mixing water to avoid potential adverse expansive reaction with either lime or cement treatment. Exercise caution when soluble sulfates content is greater than 3000 ppm, and incorporate measures to control expansion potential when greater than 5,000 ppm. Document the type and amount of stabilizing agent required in the geotechnical report.

2.4.6.2 Cement stabilization works best with coarse grained soils however it can stabilize most any soil. The objective of cement stabilization is to reduce the plasticity index (PI), increase strength and reduce permeability. Cement is typically added at 3-5% by weight for stabilization, additional cement required if layer to be used as a soil cement base. The amount of cement needed is a function of type of soil, reason for stabilization and what strength of material needed. To facilitate even distribution of cement scarify highly plastic clays prior to addition of cement.

2.4.6.3 Lime stabilization is most effective with plastic clayey soils, PI > 12. Lime treatment is generally performed to reduce the PI. This increases the optimum water content, permits compaction under wet conditions, and allows soils to dry out more rapidly. Secondary benefits are increased strength and stability. The lime content required to bring the soil pH to greater than 12 identifies the minimum lime content needed, usually this is between 3-7% by weight.

2.4.6.4 Sandy soils with a pH < 5.3 or with organic content > 2% are classified as ‘poorly reacting soils’ and may not react normally with cement. If the existing soil has a low pH, chemical treatments using lime or cement will neutralize the soil and raise the pH. The cement used to neutralize the soil is in addition to the cement used for stabilization purposes.

2.4.6.5 The following publications are recommended to determine the appropriate type and amount of chemical stabilization for subgrade soils: Unified Facilities Criteria (UFC) Manual Pavement Design for Airfields, UFC 3- 260-02; Soil Cement Laboratory Handbook, Portland Cement Association; The Asphalt Institute Manual Series MS-19, Basic Asphalt Emulsion Manual; and AC 150/5370-10, Items P-155, P-156, P-157, and P-158.

2.4.6.6 Both cement and lime stabilization will increase the long-term strength of soils. How much they will improve strength is dependent upon the type of

2.4.8 Geosynthetics. › 2.4.8.2 Include justification in the engineer’s report from the…

soil, amount of cement or lime added as well as depth of treatment. Long term strength gains of up to 5 times or more of unstabilized strength are possible. Long term strength gain is dependent upon soil type, and type and amount of stabilization. Document and support expected in service long-term strength of stabilized layer in geotechnical report. For additional information on cement stabilization see PCA RD125, Comparative Performance of Portland Cement and Lime Stabilization of Moderate to High Plasticity Clay Soils. For additional information on lime stabilization, see National Lime Association, Bulletin 326, Lime- Treated Soil Construction Manual.

Mechanical Stabilization.

2.4.7.1 Not all subgrades can be stabilized with chemical additives. The underlying soils may be so soft that stabilized materials cannot be mixed and compacted over the underlying soils without failing the soft underlying soils.

2.4.7.2 To facilitate construction of the pavement section, extremely soft soils may require bridging of the weak soils with a layer of rock or coarse sand. Bridging can be accomplished with the use of thick layers, 2-3 feet (600- 900mm), of shot rock, cobbles or coarse sand. If open-graded aggregate layers are used for subgrade replacement, ensure that the layer is fully wrapped in geotextile fabric to minimize migration of fine soil particles into the layer.

2.4.7.3 Geosynthetics may be used as the first layer of mechanical stabilization over soft fine-grained soils. The geosynthetic creates a working platform for the construction of the subsequent pavement layers.

Geosynthetics.

2.4.8.1 The term geosynthetics describes a range of manufactured synthetic products used to address geotechnical problems. Geosynthetics includes four main products: geotextiles, geogrids, geomembranes, and geocomposites. The synthetic nature of the materials in these products makes them suitable for use in the ground where high levels of durability are required. These products have a wide range of applications, including use as a separation between subbase aggregate layers and the underlying subgrade.

2.4.8.2 Include justification in the engineer’s report from the geotechnical engineer to support and justify what the geosynthetic will provide to the pavement structure. The most common use on airports is as a layer to prevent migration of fines, for example to keep fines from migrating into a non-frost susceptible base or subbase. Currently, the FAA does not

2.5 Seasonal Frost. › 2.5.4 Soils with high liquid limits combined with high silt and clay…

consider any reductions in pavement structure for the use of any geosynthetics.

2.4.8.3 Document in geotechnical report the type of geosynthetic and support the expected long-term benefit, if any.

2.5 Seasonal Frost. The design of pavements in areas subject to seasonal frost action requires special consideration. The detrimental effects of frost action may include non-uniform heave and/or a loss of soil strength during warm periods and spring thaw. Other detrimental effects include possible loss of compaction, development of pavement roughness, restriction of drainage, and cracking and deterioration of the pavement surface. Include an evaluation of potential for frost action in the geotechnical report for pavements in areas subject to frost. When all three conditions in paragraph 2.5.1 exist, support method of frost protection or why no frost protection is necessary in geotechnical report.

For detrimental frost action, three conditions are required:

1. Frost susceptible soil,

2. Freezing temperatures must penetrate into the frost susceptible soil, and

3. Free moisture must be available in sufficient quantity to form ice lenses.

Frost Susceptibility. The size and distribution of voids in the soil mass is one element used to estimate the frost susceptibility of soils. Empirical relationships correlate the degree of frost susceptibility with the soil classification and the amount of material finer than 0.02 mm by weight. Use ASTM D7928, Standard Test Method for Particle Size Distribution (Gradation) of Fine Grain Soil Using the Sedimentation (Hydrometer) Analysis.

For frost design purposes soils are categorized into four frost groups, frost group FG-1, FG-2, FG-3, and FG-4,as defined in Table 2-2. The higher the frost group number, the more frost susceptible the soil, i.e., soils in FG-4 are more frost susceptible than soils in frost groups 1, 2, or 3. Selection of the frost design group is a relative estimation of the potential for a soil to be susceptible to frost heave.

Soils with high liquid limits combined with high silt and clay content are more susceptible to frost heave than soils that have coarser gradation such as gravels or sands.

Table 2-2. Soil Frost Groups1,2

Frost Group Kind of Soil

Percentage Finer

than 0.02 mm by

Weight3 Soil Classification

2.5 Seasonal Frost. › 2.5.6 Free Water Necessary for Frost Action.

FG-1 Gravelly Soils 3 to 10 GW, GP, GW-GM, GP-GM

FG-2 Gravelly Soils

Sands

10 to 20 3 to 15 GM, GW-GM, GP-GM SW, SP, SM, SW-SM, SP-SM

FG-3 Gravelly Soils

Sands, except very fine silty sands Clays, PI above 12

Over 20 Over 15

-

GM, GC SM, SC CL, CH

FG-4 Very fine silty sands

All Silts Clays, PI = 12 or less Varved Clays and other finegrained banded sediments

Over 15

- - -

SM ML, MH CL, CL-ML CL, CH, ML, SM

Note 1: Determination of the Frost Group is subjective. Rely on the geotechnical engineer’s

evaluation of impact of frost and permafrost effects. Note 2: This table is from FAA RD 74-30, Design of Civil Airfield Pavements for Seasonal Frost

and Permafrost Conditions. Note 3: ASTM D7928, Standard Test Method for Particle Size Distribution (Gradation) of Fine

Grain Soil Using the Sedimentation (Hydrometer) Analysis.

Depth of Frost Penetration. The depth of frost penetration is a function of the thermal properties of the pavement and soil, the surface temperature, the moisture content of the soil, and the temperature of the pavement and soil at the start of the freezing season. In determining the potential frost penetration depth, give consideration to local engineering and construction experience. The depth of frost penetration is dependent upon the moisture content and type of materials used. In general, the lower the moisture content of base and subbase materials, the deeper the frost penetration will be. The pavement design program Pavement-Transportation Computer Assisted Structural Engineering (PCASE) includes a module to help evaluate the depth of frost penetration. PCASE is available at https://transportation.erdc.dren.mil/pcase/software.aspx.

Free Water Necessary for Frost Action. Free water is needed in the soil mass for frost action (formation of ice lenses) to occur. Water can enter the soil from many different sources, e.g., by infiltration from the surface or sides of the pavement structure, by condensation of atmospheric water vapor, or drawn from considerable depths by capillary action. If the degree of saturation of the soil is 70 percent or greater, frost heave will probably occur. Assume for any soil that

2.6.4 Permafrost. › 2.6.4.4 Consider the depth of seasonal thaw when designing pavements in…

may be susceptible to frost action that sufficient water will be present to cause detrimental frost action.

Edge drain systems may help reduce the amount of available water. However, the effectiveness of the edge drain system will be impacted by the type of subgrade soil present and the depth of frost. Edge drain systems are most effective in removing free water when combined with a subsurface drainage layer. Limiting the amount of material passing the No. 200 sieve to less than 5% in base and subbase aggregate layers will help facilitate drainage of these layers. See paragraph 3.7, Drainage Layer, and AC 150/5320-5, Airport Drainage Design.

2.6 Frost Design.

See Chapter 3 for guidance on how to offset seasonal frost effects when designing pavements. A more rigorous evaluation for frost effects is necessary when designing for pavement service life greater than 20 years.

See Research Report No. FAA-RD-74-030, Design of Civil Airfield Pavement for Seasonal Frost and Permafrost Conditions, for a discussion of frost action and its effects.

It is desirable to have uniform subgrade materials and to have gradual transitions between areas of different materials to minimize the potential for differential frost heave. In areas of significant frost and permafrost it may be necessary to remove and replace materials to a significant depth beneath the pavement.

Permafrost.

2.6.4.1 In arctic regions, it is common to encounter soils that are frozen to considerable depths year-round. Seasonal thawing and refreezing of the upper layer of permafrost can lead to severe loss of bearing capacity and/or differential heave.

2.6.4.2 In areas with continuous permafrost at shallow depths, utilize non-frost susceptible base course materials to prevent degradation (thawing) of the permafrost layer. The frost susceptibility of soils in permafrost areas is classified the same as in Table 2-2.

2.6.4.3 In areas of permafrost, design the pavement structure with an experienced pavement/geotechnical engineer familiar with permafrost protection.

2.6.4.4 Consider the depth of seasonal thaw when designing pavements in areas of permafrost. Base the thawing index for design (design thawing index) on the three warmest summers in the last 30 years of record. If 30-year records are not available, data from the warmest summer in the latest 10year period may be used.

2.6.5 Muskeg. › 2.6.5.3 If the thickness of muskeg is too thick to remove and replace,…

Muskeg.

2.6.5.1 Muskeg is a highly organic soil deposit encountered in arctic areas.

2.6.5.2 If construction in areas of muskeg is unavoidable, and the soil survey shows the thickness of muskeg is less than 5 feet (1.5 m), the muskeg should be removed and replaced with granular fill.

2.6.5.3 If the thickness of muskeg is too thick to remove and replace, place a 5foot (1.5 m) granular fill over the muskeg. This thickness is based on experience, however, differential settlement will occur requiring considerable maintenance to maintain a smooth surface. Use a geosynthetic between the muskeg surface and the bottom of granular fill to prevent migration of the muskeg up into the granular fill.

3.4 Rigid Pavements. › 3.4.1 For rigid pavement design, FAARFIELD uses the horizontal stress…

CHAPTER 3. PAVEMENT DESIGN

3.1 Design Considerations. This chapter provides pavement design guidance for airfield pavements. Use the FAA computer program FAARFIELD for all pavement thickness designs regardless of aircraft gross weight. Consider the aircraft fleet and other vehicles that will utilize the pavement over its intended structural life when performing pavement design. Most pavement designs are controlled by the operations of the most demanding aircraft in the traffic mix; however, it is still good practice to consider all aircraft and other vehicles when designing airfield pavements. At small GA airports often the most demanding load is that of maintenance and refueling vehicles. See Chapter 4 for procedures for overlay design, and Chapter 5 for procedures for evaluating pavements.

3.2 FAA Pavement Design.

The design of airport pavements is a complex engineering problem that involves the interaction of multiple variables. FAARFIELD uses layered elastic and threedimensional finite element-based design procedures for new and overlay designs of flexible and rigid pavements respectively.

On federally funded projects include a copy of the design in the engineer’s report.

3.3 Flexible Pavements.

For flexible pavement design, FAARFIELD uses the maximum vertical strain at the top of the subgrade and the maximum horizontal strain at the bottom of all asphalt layers as the predictors of pavement structural life.

FAARFIELD provides the required thickness for all individual layers of flexible pavement (surface, base, and subbase) required to support a given aircraft traffic mix for the structural design life over a given subgrade.

When all aircraft are less than 60,000 pounds (27,200 kg) full-depth asphalt pavements may be used.

FAARFIELD has the ability to analyze full depth asphalt pavements as a 2-layer structure consisting of only the asphalt surface layer and a subgrade layer. However, the preferred method of analyzing a full-depth asphalt pavement is to use a 3-layer structure consisting of an asphalt surface layer on top of an asphalt base (and a subgrade layer).

3.4 Rigid Pavements.

For rigid pavement design, FAARFIELD uses the horizontal stress at the bottom of the concrete panel as the predictor of the pavement structural life. The maximum

3.6 Base or Subbase Contamination. › 3.6.1 Contamination of subbase or base aggregates may occur during…

horizontal stress for design is determined considering both edge and interior loading conditions.

FAARFIELD provides the required thickness of the rigid pavement panel required to support a given aircraft traffic mix for the structural design life over a given base/subbase/subgrade. FAARFIELD will check for minimum thicknesses of stabilized base, base and subbase, but only analyzes the rigid panel.

3.5 Stabilized Base Course.

When aircraft in the design traffic mix have gross loads of 100,000 pounds (45,359 kg) or more, then use of a stabilized base is required. Full scale performance tests have shown superior performance of both flexible and rigid pavements that include bases stabilized with asphalt or cement.

Exceptions to use of stabilized base may be considered when less than 5% of the traffic is aircraft with gross loads of 100,000 pounds (45,359 kg), or more but all aircraft gross loads are less than 110,000 pounds (49,895 kg), or when the only aircraft over 100,000 pounds (45,359kg) is a C-130 aircraft. Evaluate the potential reduction in long term performance before making substitutions to eliminate stabilized base. Evaluate subsurface moisture conditions before considering substitution of an asphalt or cement base course with an unstabilized aggregate material. Aggregate bases perform best when not saturated.

Superior materials that exhibit a remolded soaked CBR of 100 or greater and have proven performance under similar aircraft loadings and climatic conditions may be substituted for a stabilized base course. Lime rock must exhibit an LBR of 125 or greater. When making substitutions for stabilized base minimum thickness of substituted materials is 6 inches (150 mm).

Bases used under stabilized bases should exhibit a remolded soaked CBR (per ASTM D1883) of at least 35. Suitable bases for use under a stabilized base include P-209, P- 208, or P-211. Other materials, such as P-219, may be acceptable.

Document and support in the engineer’s report, type of material, gradation and strength, for base and subbase as well as for stabilized base when pavement design includes aircraft over 100,000 pounds (45,359 kg).

3.6 Base or Subbase Contamination.

Contamination of subbase or base aggregates may occur during construction and/or once pavement is in service. A loss of structural capacity can result from contamination of base and/or subbase elements with fines from underlying subgrade soils. Contamination reduces the quality of the aggregate material, reducing its structural capacity.

3.7.7 For Flexible Pavements. › 3.7.7.1 Place the drainage layer immediately above the subgrade, except…

Geosynthetic separation materials reduce contamination from subgrade, when placed between subgrade and aggregate layer when constructing a new pavement section. Include a geosynthetic separation material between non-frost susceptible material and frost susceptible material when recommended by the geotechnical engineer.

Document and support need and use of geosynthetic separation material in geotechnical report.

3.7 Drainage Layer.

Drainage layers are recommended for pavements serving aircraft greater than 60,000 pounds, constructed in areas with excessive subsurface moisture and where existing soils have coefficient of permeability less than 20 ft/day (6 m/day). Document and support the need for drainage layers in the geotechnical report. General guidance on basic drainage layers is discussed below.

The use of drainage layers will protect pavements from moisture related subgrade, subbase and base failures. Drainage layers facilitate the quick removal of excess moisture from the pavement structure. Construct drainage layers to be free draining, include outlets to ensure that water is not trapped in the layer. Include a geosynthetic separation material when drainage layer placed directly above subgrade. Regularly perform maintenance of drainage outlets to ensure that they are functioning and that water is not trapped in the drainage layer.

An effective drainage layer will attain 85 percent drainage in 24 hours for runways and taxiways, and 85 percent drainage in 10 days for aprons and other areas with low-speed traffic. Drainage layers that provide a permeability of 500 – 1500 ft/day may be used without calculations.

Consider including a subsurface drainage layer in frost areas constructed on FG2 or higher subgrade soils.

When the drainage layer is located beneath an unbound aggregate base, limit the material passing the No. 200 (0.075 mm) sieve in the aggregate base to less than 5 percent to allow for movement of water through the aggregate base.

For Rigid Pavements. Generally, place a stabilized drainage layer immediately beneath the concrete panel in place of the stabilized base.

For Flexible Pavements.

3.7.7.1 Place the drainage layer immediately above the subgrade, except as noted below or when geotechnical engineer recommends otherwise.

3.8.1 FAARFIELD Compaction Depths for Subgrades Beneath Pavements. › 3.8.1.4 FAARFIELD computes compaction requirements for the specific…

3.7.7.2 When the total thickness of the pavement structure is less than 12 inches (300 mm), place the stabilized drainage layer directly beneath the surface layer using the drainage layer in place of base and subbase.

In the structural design of sections with drainage layers, model these layers in FAARFIELD as user defined layers. The modulus value assigned to the drainage layer depends upon the material used.

Drainage Layer Modulus (psi)

Asphalt-treated permeable base 150,000 psi

Cement-treated permeable base. 250,000 psi

Aggregate drainage layer (unstabilized) 15,000 – 30,000 psi

Note: Higher values may be used when supported with laboratory testing. Use an estimate representative of in service long-term performance properties of material. Document and support value used in the engineer’s report.

See Engineering Brief (EB) 102 Item P-407 Asphalt Treated Permeable Base for sample specification. See AC 150/5370-10, Item P-307, Cement Treated Permeable Base Course, for an example of a stabilized drainage layer. See IPRF-01-G-002-1(G) Stabilized and Drainable Base for Rigid Pavement. For additional guidance on subsurface drainage layers, refer to AC 150/5320-5, Airport Drainage Design, Appendix G, Design of Subsurface Drainage Systems.

3.8 Subgrade Compaction.

FAARFIELD Compaction Depths for Subgrades Beneath Pavements.

3.8.1.1 The compaction requirements in FAARFIELD are based on the Compaction Index (CI) concept. Background information on this concept can be found in U.S. Army Engineer Waterways Experiment Station, Technical Report No. 3-529, Compaction Requirements for Soil Components of Flexible Airfield Pavements (1959).

3.8.1.2 Complete the thickness design analysis in FAARFIELD before computing the subgrade compaction requirements.

3.8.1.3 FAARFIELD determines compaction depths using ASTM D698 or ASTM D1557 based on weight of aircraft. ASTM D698 applies for aircraft less than 60,000 pounds (27,200 kg) and ASTM D1557 applies for aircraft 60,000 pounds (27,200 kg) and greater.

3.8.1.4 FAARFIELD computes compaction requirements for the specific pavement design and traffic mixture and generates tables of required minimum density requirements for the subgrade beneath pavements. The values in these tables denote the minimum compaction requirements, more

3.9 Swelling / Shrinking Soils. › 3.9.1 Soils that shrink or swell are usually clay soils or organic…

restrictive requirements may control on new embankments. Additional compaction only required where in place density is less than the compaction requirements calculated by FAARFIELD. Often only minimal depth of additional compaction required. See Figure H-21.

3.8.1.5 FAARFIELD generates two tables one for non-cohesive soil types and one for cohesive soil types. When determining the compaction requirement, non-cohesive soils have a plasticity index of less than 3.

New Embankments.

3.8.2.1 Compact cohesive fill under pavement, including shoulders, to minimum of 12 inches (300 mm) or to depth calculated by FAARFIELD if greater, to 95 percent of maximum density. For embankments outside of paved areas, compact cohesive soils to at least 90 percent of maximum density.

3.8.2.2 Compact the top 6 inches (150 mm) of non-cohesive fill under pavement, including shoulders, to 100 percent maximum density, and compact the remainder of the fill to 95 percent maximum density.

3.8.2.3 Adjust compaction requirements to address unique local soil conditions, when supported by a geotechnical engineer’s report. When constructing deep fills, soils may require special compaction requirements as directed by the geotechnical engineer.

Cut Sections.

3.8.3.1 Subgrade densities in cut areas under pavement, including shoulders, must be equal or greater than compaction requirements as calculated by FAARFIELD.

3.8.3.2 When densities cannot be achieved by reworking and compaction of existing subgrade, remove and replace with suitable select material.

3.8.3.3 It is a good practice to rework and recompact at least the top 12 inches (300 mm) of subgrade in cut areas under pavements, including shoulders. Depending upon the in-place densities, it may be necessary to rework and recompact additional material.

3.9 Swelling / Shrinking Soils.

Soils that shrink or swell are usually clay soils or organic material that exhibit a significant volume change caused by moisture variations. Pavements constructed on swelling soils are subject to differential movements that may result in surface roughness and cracking. Changes in moisture content of soil are what lead to volume changes in these soils. Soils in arid climates may be more susceptible to swelling than soils in wet

3.9 Swelling / Shrinking Soils. › 3.9.4 For additional information on identifying and handling swelling…

areas which may be more prone to shrinkage. Generally, under pavements swelling is a greater concern than shrinkage.

All clay soils and organic material have potential for volume changes. Sands and Gravel with high clay content and all silts may be moderately expansive. Clean sands and gravels have little to no expansive potential. Clay soils that have liquid limits above 40 and plasticity indexes above 15 may cause swelling.

Treatment is required when soils compacted at 2-3 percent above optimum and that exhibit a swell of greater than 3 percent when tested, per ASTM D1883 Standard Test Method for California Bearing Ration (CBR) of Laboratory-Compacted Soils. When swelling soils are present, incorporate methods to prevent or reduce the effects of soil volume changes. Treatment of swelling soils consists of chemical stabilization, removal and replacement, and compaction efforts in accordance with Table 3-1. Adequate drainage is important when dealing with swelling soils as well as measures to maintain a relatively constant moisture in the soil. When evaluating mitigation measures consider local experience with proposed mitigation techniques and methods.

For additional information on identifying and handling swelling soils, see FAA Reports No. FAA-RD-76-066 Design and Construction of Airport Pavements on Expansive Soils, and DOT/FAA/PM-85115 Validation of Procedures for Pavement Design on Expansive Soils.

Table 3-1. Recommended Treatment of Swelling Soils1

Swell Potential (Based on Experience)

Percent Swell

Measured

(ASTM

D1883)

Potential for

Moisture Fluctuation2 Treatment

Low 3-5 Low Compact soil on wet side of optimum (+2% to +3%) to not greater than 90% of maximum density per ASTM D698.2

High Lime or cement stabilize soil to a depth of at least 6 in (150 mm)

Medium 6-10 Low Lime or cement stabilize soil to a depth of at least 12 in (300 mm)

High Lime stabilize soil to a depth of at least 12 in (300 mm)

High Over 10 Low Lime or cement stabilize soil to a depth of at least 12 in (300 mm)

High For uniform soils, i.e., redeposited clays, stabilize soil to a depth of at least 36 in (900 mm) or raise grade to bury swelling soil at least 36 in (900 mm) below pavement section or remove and replace with non-swelling soil. Increase to 60 in (1,500 mm) when variable soil deposits present

Notes:

1. Soluble sulfate in either soil or mixing water above 3,000 ppm may cause expansion, above 5,000 ppm require special treatment to avoid expansive reactions. Generally, cement stabilization recommended for soils with soluble sulfates greater than 3,000 ppm. 2. Potential for moisture fluctuation is a judgment determination. Consider proximity of water table, likelihood of variations in water table, as well as other sources of moisture, and thickness of the swelling soil layer. 3. Base the design subgrade strength on the moisture content and density used to control swelling. 4. Generally, lime stabilization works best on clay soils and cement on coarser soils with low clay/silt content. However, cement stabilization works on almost all soil types. 5. For lime stabilization, utilize 1-2% more lime than amount needed to increase the soil pH to > 12. Sufficient lime to increase the unconfined compressive strength of the soil at least 50 psi. 6. For cement stabilization, utilize 1-2% more than determined following the PCA method. See PCA Soil Cement Construction Handbook or UFC 3-250-11, Soil Stabilization.

3.11 Pavement Structural Design › 3.11.1 A number of factors influence the required thickness of pavement…

3.10 Pavement Life.

Design Life in FAARFIELD refers to structural life, the total number of load cycles a pavement structure will carry before it fails structurally.

Functional or useful life is the period of time that the pavement is able to provide an acceptable level of service as measured by performance indicators such as FOD, skid resistance, or roughness. Pavements may have significant remaining functional life, even after they have failed structurally.

Structural failure for rigid pavements occurs when concrete panels have extensive structural (load related) cracking. Structural failure for flexible pavements occurs when the subgrade is no longer protected from structural (load related) damage. See Chapter 4 for more details on failure criterion.

The structural design of airport pavements consists of determining both the overall pavement thickness and the thickness of the component parts of the pavement structure.

Properly maintained pavements will have a longer functional life.

3.10.5.1 To maximize a flexible pavement’s life, routine crack sealing and applications of pavement seal coats and small patches will be required.

3.10.5.2 To maximize a rigid pavement’s life, crack sealing, joint sealant repair/replacement, isolated panel replacement and partial depth spall repairs will be required.

3.10.5.3 Due to deterioration from normal use and the environment, both flexible and rigid pavements may require rehabilitation of surface grades and renewal of surface characteristics. A mill and overlay may be required with flexible pavements and surface diamond grinding with rigid pavements.

3.11 Pavement Structural Design

A number of factors influence the required thickness of pavement including:

1. The type, quality, and structural properties of materials used in the pavement structure;

2. The magnitude and character of the aircraft loads to be supported;

3. The volume and distribution of traffic; and

4. The strength of the subgrade soils.

3.12 Pavement Design Using FAARFIELD. › 3.12.1 Application.

Design Life.

It is theoretically possible to perform a pavement design for any service period. To achieve the intended design life requires consideration of many interacting factors including: (1) actual Aircraft mix as compared to traffic considered during design analysis, (2) initial quality of materials and construction, and (3) timely application of routine and preventative pavement maintenance.

3.11.3.1 On federally funded projects coordinate design period as well as any fiscal constraints with FAA and airport owner.

3.11.3.1.1 At large and medium hub airports a longer design life may be appropriate when accurate forecasts of the future aircraft traffic are available and where the size and configuration of the airport is not anticipated to change.

3.11.3.1.2 However, when designing a project at smaller airports, it may be more prudent to design for no more than 20 years since the configuration of the airport and the composition and frequency of future activity is unknown. Many airports have significant changes planned, but whether these plans ultimately become reality depends on local economic conditions (e.g., business upturns or downturns at the fixed base operator (FBO), or the number and composition of based aircraft).

3.11.3.1.3 An LCCA will help to support design periods other than 20 years. However, fiscal constraints (i.e., funds available) may dictate which pavement section(s) and design life are considered. See paragraph 1.6.3 for additional discussion on LCCA.

3.11.3.2 Design new pavements on federally funded FAA projects for a minimum 20-year design life.

3.11.3.3 Design rehabilitation projects for a minimum 10-year design life.

3.11.3.4 Phased projects may only require a temporary pavement for 1-2 years.

3.11.3.5 On federally funded projects, include justification supporting design period used in engineer’s report.

3.12 Pavement Design Using FAARFIELD. The FAA developed FAARFIELD using failure models based on full-scale tests conducted from the 1940s through the present. Design thicknesses in FAARFIELD are calculated using layered elastic and three-dimensional finite element-based structural analysis for flexible and rigid airfield pavements respectively.

Application. The procedures and design software identified in this chapter provide standard pavement thickness designs meeting structural requirements for all airfield pavements.

3.12.3 Current Version FAARFIELD. › 3.12.3.3 FAARFIELD software is available for download at…

3.12.1.1 FAARFIELD currently does not take into account provisions for frost protection and permafrost discussed in paragraph 3.14. It is the responsibility of the user to check these provisions separately from FAARFIELD and to modify the thickness of the pavement structure to provide additional frost and or permafrost resistant materials.

3.12.1.2 Material or construction issues can lead to functional failures in pavements (e.g., excessive roughness, FOD, or surface deformations). These types of issues are not addressed directly by FAARFIELD.

3.12.1.3 FAARFIELD design assumes that all pavement layers meet the applicable requirements of AC 150/5370-10 for materials, construction, and quality control. User-defined layers must be used in FAARFIELD when utilizing materials other than FAA standard materials.

Cumulative Damage Factor (CDF).

3.12.2.1 FAARFIELD is based on the cumulative damage factor (CDF) concept in which the contribution of each aircraft type in a given traffic mix is summed to obtain the total cumulative damage from all aircraft operations in the traffic mix.

3.12.2.2 Thickness designs using FAARFIELD use the entire traffic mix. FAARFIELD does not designate a design aircraft; however, using the CDF method, it identifies those aircraft in the design mix that contribute the greatest amount of damage to the pavement.

3.12.2.3 Note, using departures of a single “design” aircraft to represent all traffic is not equivalent to designing with the full traffic mix in the CDF method and will generally result in excessive thickness.

Current Version FAARFIELD.

3.12.3.1 The current version of FAARFIELD is designated Version 2.0. Failure models used in FAARFIELD were calibrated using the most recent fullscale pavement tests at the FAA’s NAPTF.

3.12.3.2 The internal help file for FAARFIELD contains a user’s manual, which provides detailed information on proper execution of the program. The manual also contains additional technical references for specific details of the FAARFIELD design procedure.

3.12.3.3 FAARFIELD software is available for download at (https://www.faa.gov/airports/engineering/design_software/).

3.12.4 Overview of FAARFIELD Program. › 3.12.4.2 The FAARFIELD program operates either with U.S. customary or…

Overview of FAARFIELD Program.

3.12.4.1 FAARFIELD consists of a main program that calls several subprograms (libraries), as shown schematically in Figure 3-1. The main subprograms are:

1. LEAF (layered elastic analysis),

2. FAAMesh (three-dimensional mesh generation for finite element analysis),

3. FAASR3D (finite element processing), and

4. ICAO-ACR (ACR computation following the ICAO standard method).

3.12.4.2 The FAARFIELD program operates either with U.S. customary or metric dimensions. The FAARFIELD program operates in four functional modes:

1. Thickness Design,

2. Life Computation,

3. Compaction Requirement, and

4. Pavement Classification Ratings (PCR) Computation. See AC 150/5335-5 for discussion on the use of FAARFIELD to compute PCR values.

Figure 3-1. Overview of FAARFIELD Program

Figure 3-1: picture of page 45Figure 3-1 · page 45
Picture of the page from the copy saved here

3.12.6 Aircraft Traffic Considerations. › 3.12.6.3 Tire Pressure.

FAARFIELD Pavement Design Process. Pavement design with FAARFIELD is an iterative process for both flexible and rigid design. (See paragraphs 3.15 and 3.16 for specific information regarding flexible and rigid design, see Appendix H for FAARFIELD examples.) The basic FAARFIELD design steps include:

Step 1 After starting the program, select a pavement type.

Step 2 Modify the pavement structure by adding, deleting or changing layers as needed.

Step 3 Create a traffic mix by selecting a stored mix, or by picking aircraft from the aircraft library.

Step 4 If necessary, change the gross weight or number of departures of aircraft in the traffic mix.

Step 5 Run Thickness Design.

Step 6 Run Compaction/Life to obtain subgrade compaction requirements for new pavement construction.

Step 7 View or print the section design report.

Aircraft Traffic Considerations.

3.12.6.1 Load. Design pavements using the maximum anticipated takeoff weights of the aircraft that will be regularly operating on the pavement. FAARFIELD provides manufacturer-recommended gross operating weights and load distribution, for many civil and military aircraft. For generic aircraft, the load is distributed to the landing gears with 95% to the main and 5% to the nose. Using the maximum anticipated takeoff weight provides a conservative design allowing for changes in operational use and traffic. Where arrivals constitute 85% or greater of that runway’s operations, and for high-speed exit taxiways, the use of aircraft landing weights for design is permitted.

3.12.6.2 Landing Gear Type and Geometry. An aircraft’s gear type and configuration dictates how weight is distributed to a pavement. Refer to FAA Order 5300.7, Standard Naming Convention for Aircraft Landing Gear Configurations, for standard gear designations.

3.12.6.3 Tire Pressure. Tire pressure varies depending on gear configuration, gross weight, and tire size. Tire pressures and gross weight are linked in FAARFIELD.

3.12.6 Aircraft Traffic Considerations. › 3.12.6.6 Total Departures Over Design Life.

FAARFIELD maintains a constant contact area, therefore an increase in gross weight causes a proportional increase in tire pressure. Tire pressure has a more significant influence on strains in the asphalt surface layer than at the subgrade. Flexible pavements constructed in accordance with P-401 will generally accommodate tire pressures up to 254 psi (1.75 MPa). Tire pressure has a negligible impact on rigid pavement design.

3.12.6.4 Aircraft Traffic Volume. For pavement design use forecasts of annual departures by aircraft type including all aircraft that will use the pavement. Seasonal or other nonregular use aircraft may have significant impact on the pavement structure required. On federally funded projects when occasional or seasonal use aircraft are included in the traffic, include sensitivity analysis comparing the structure needed to accommodate all planes in the fleet to the structure needed for all planes that have at least 250 annual departures. Document and support traffic considered for pavement design in the engineer’s report.

3.12.6.5 Departure Traffic. Generally, airfield pavements are designed considering only aircraft departures. The main reason for disregarding arrivals in design is that, typically, the arrival weights are much lighter than the departure weights (due to fuel consumption). If airport operations are such that most aircraft arrive and depart at essentially the same weight (for example, if refueling does not take place), then double the number of departures in FAARFIELD to reflect the number of times the pavement is loaded. See paragraph 3.12.6.1 regarding thickness design of high-speed exit taxiways and other special cases.

3.12.6.6 Total Departures Over Design Life. FAARFIELD evaluates the total number of departures over the design life period. For example, FAARFIELD considers 250 annual departures with a growth rate of 0% and a 20-year design life to be 5,000 total departures. Total departures is calculated using the formula:

𝑁= o1 +

𝑟×𝐿

200 p ×𝑁𝐴×L

Where: N is the total lifetime departures, NA is the annual departures, L is the design life (typically 20 years), and r is the growth rate (percent). For example, FAARFIELD considers 225 annual departures at a 1% annual growth rate to be 4,950 total departures over a 20-year design life. It is not always necessary to include all aircraft that use a facility, but it is necessary to consider all of the most demanding aircraft that use a facility. When a few operations of a heavy aircraft control the design of the pavement structure, perform a sensitivity analysis to determine the impact of the operations of that aircraft.

3.12.7 Non-Aircraft Vehicles. › 3.12.7.1 In some situations, non-aircraft vehicles such as aircraft…

3.12.6.7 Aircraft Traffic Mix. Use the anticipated traffic mix of actual aircraft, for the design computations. Attempting to design for equivalent passes of a “design aircraft” instead of the actual aircraft mix can lead to erroneous results. If a particular aircraft that is part of the anticipated usage does not exist in the FAARFIELD aircraft library, the user can (a) substitute a close aircraft from the “generic” group; or (b) create a user-defined aircraft based on the aircraft gear characteristics. See Appendix G for additional information on building user-defined aircraft.

3.12.6.8 Cumulative Damage Factor (CDF) CDF is the amount of structural fatigue life of a pavement that has been used. It is expressed as the ratio of applied load repetitions to allowable load repetitions to failure. FAARFIELD analyzes the damage to the pavement for each aircraft and determines a final thickness for the total cumulative damage of all aircraft in the evaluation for each 10-inch-wide strip over a total width of 820 inches. The CDF for design is the maximum over all 82 strips. FAARFIELD calculates the damaging effects of each aircraft in the traffic mix based upon its gear spacing, load, and location of gear relative to the pavement centerline. Pass to coverage ratio is calculated for each strip based upon a normally distributed aircraft wander pattern with a standard deviation of 30.5 inches. Then the effects of all aircraft are summed under Miner’s Hypothesis. Since FAARFIELD considers where each aircraft loads the pavement, the pavement damage associated with a particular aircraft may be isolated from one or more of the other aircraft in the traffic mix. When the CDF sums to a value of 1.0, on any of the 82 strips, the structural design conditions have been satisfied. A value of CDF greater than one does not necessarily mean that the pavement will no longer support traffic, but that it will have failed according to the definition of failure used in the design procedures, and within the constraints of material property assumptions. See FAARFIELD help file for additional background on CDF.

Non-Aircraft Vehicles.

3.12.7.1 In some situations, non-aircraft vehicles such as aircraft rescue and firefighting, snow removal, fueling equipment, passenger boarding bridges or ground service equipment may place heavier wheel loads on the pavement than aircraft. FAARFIELD allows these types of vehicles to be included in the traffic mix. The “Non-Aircraft Vehicles” aircraft group includes several common types of truck axles (single, dual, tandem, and dual-tandem). The included truck axles are adequate for most light-duty pavement designs. See paragraph 3.20 for specific recommendations for passenger loading bridges and paragraph 3.20.7 for recommendations for ground service equipment.

3.12.8 Pass-to-Coverage Ratio. › 3.12.8.7 In calculating the P/C ratio, FAARFIELD uses the concept of…

3.12.7.2 For small GA airports, it may be necessary to consider one or more of the following options: (1) limit the size of fuel trucks used for supply and refueling; (2) locate the fuel storage tanks in a location such that the trucks supplying fuel to the airport can access the storage tanks without entering the airfield; (3) strengthen the fuel truck access route; or (4) limit the size of maintenance vehicles (e.g., snow removal equipment).

Pass-to-Coverage Ratio.

3.12.8.1 An aircraft seldom travels along a pavement section in a perfectly straight path or along the same path each time. This lateral movement is known as aircraft wander and is modeled with a normal distribution. As an aircraft moves along a taxiway or runway, it may take several trips or passes along the pavement for a specific point on the pavement to receive a coverage of one full-load application.

3.12.8.2 The ratio of number of passes required to apply one coverage to a unit area of the pavement is expressed by the pass-to-coverage (P/C) ratio. The number of passes an aircraft may make on a given pavement is easy to observe, but the number of coverages is mathematically derived in FAARFIELD.

3.12.8.3 By definition, one coverage occurs when a unit area of the pavement experiences the maximum response (stress for rigid pavement, strain for flexible pavement) induced by a given aircraft.

3.12.8.4 For flexible pavements, coverages are a measure of the number of repetitions of the maximum strain occurring at the top of subgrade.

3.12.8.5 For rigid pavements, coverages are a measure of repetitions of the maximum stress occurring at the bottom of the rigid layer (see Report No. FAA-RD-77-81, Development of a Structural Design Procedure for Rigid Airport Pavements).

3.12.8.6 Coverages resulting from operations of a particular aircraft type are a function of the number of aircraft passes, the number and spacing of wheels on the aircraft main landing gear, the width of the tire-contact area, and the lateral distribution of the wheel-paths relative to the pavement centerline or guideline markings (see Report No. FAA-RD-74-036, Field Survey and Analysis of Aircraft Distribution on Airport Pavements).

3.12.8.7 In calculating the P/C ratio, FAARFIELD uses the concept of effective tire width. For flexible pavements, the effective tire width is defined at the top of the subgrade. FAARFIELD establishes the flexible effective width with “response lines” from the edges of the tire contact surface to the top of the subgrade at a slope of 1:2, see Figure 3-2. FAARFIELD establishes effective width considering both tires in a landing gear when the response lines from the adjacent tires overlap. For rigid pavements, FAARFIELD

Figure 3-2: picture of page 50Figure 3-2 · page 50
Picture of the page from the copy saved here

establishes the effective tire width equal to the nominal tire contact width at the surface of the pavement. FAARFIELD performs all effective tire width and P/C ratio calculations internally.

Figure 3-2. FAARFIELD Effective Tire Width

(b) Flexible Effective Tire Width - Overlap

T

EFFECTIVE TIRE WIDTH

(W + T + H)

W W

W + T

2

1

2 BASE COURSE H

EFFECTIVE TIRE

WIDTH (W + H)

W

W W

T

1

EFFECTIVE TIRE

WIDTH (W + H)

W

(a) Flexible Effective Tire Width - No Overlap

W

T

W

(c) Rigid Effective Tire Width

TIRES (TYPICAL)

SUBGRADE

TIRES (TYPICAL)

HMA SURFACE COURSE

HMA SURFACE COURSE

H

H

EFFECTIVE TIRE WIDTH (W)

SUBGRADE

BASE COURSE

SUBGRADE

TIRES (TYPICAL)

H/2 H/2 H/2 H/2

EFFECTIVE TIRE WIDTH (W)

PCC SURFACE COURSE

H/2 H/2

3.12.9 Cumulative Damage Factor. › 3.12.9.3 In FAARFIELD, the “CDF Graph” function displays plots of CDF…

Cumulative Damage Factor.

3.12.9.1 Fatigue failure in FAARFIELD is expressed by a CDF. The CDF is a form of Miner’s rule, a cumulative damage model for fatigue failure. Using Miner’s rule the total CDF is determined by summing the damage from each individual aircraft. The CDF is a number that represents the amount of structural fatigue life that has been used. Mathematically, CDF is the sum of N terms, where each term is the ratio of applied repetitions to allowable repetitions to failure for one of the N aircraft in the traffic mix. For a pavement design, the pavement structure thickness is adjusted until CDF = 1 for the given traffic mix and structural design life. For a single aircraft (N = 1) and constant annual departures, CDF can be expressed as follows:

CDF = number of applied load repetitions number of allowable repetitions to failure

or

CDF = (annual departures) × (life in years)

(𝑃/𝐶) × (coverages to failure)

or

CDF = applied coverages

coverages to failure

3.12.9.2 FAARFIELD calculates a CDF for each 10-inch (254-mm) wide strip along the pavement over a total width of 820 inches (20.8 m). FAARFIELD calculates a pass-to-coverage ratio for each strip assuming 75 percent of passes occur within a “wander width” of 70 inches (1,778 mm). Statistically, this results in a normally distributed wander pattern with a standard deviation of 30.435 inches (773 mm). The CDF for design is the maximum CDF computed over all 82 strips. Even with the same gear configuration, aircraft with different main gear track widths will have different pass-to-coverage ratios in each of the 10-inch (254 mm) strips and may show little effect on the maximum CDF. Removing the aircraft with the lowest stress or strain may have little effect on the design thickness, depending on how close the gear tracks are to each other and the number of departures.

3.12.9.3 In FAARFIELD, the “CDF Graph” function displays plots of CDF versus lateral offset for each gear in the design mix, and a plot of total CDF for all aircraft in the mix. For a completed design the peak value of total CDF = 1.0. The offset at which the total CDF = 1.0 for a completed design is the critical offset. See Appendix H for example of CDF concept.

3.12.10 FAARFIELD Material Properties. › 3.12.10.3 When designing a new pavement, on federally funded projects,…

FAARFIELD Material Properties.

3.12.10.1 In FAARFIELD, pavement layers are assigned a thickness, elastic modulus, and Poisson’s ratio. Flexible and rigid analysis utilize the same layer properties. FAARFIELD allows layer thicknesses to be varied, subject to minimum thickness requirements. Poisson’s ratio is fixed for all materials however; the elastic moduli are dependent upon material type and are either fixed or variable (within a permissible range). Materials are identified in FAARFIELD by the designations as used in AC 150/5370- 10; for example, crushed aggregate base course is Item P-209. Included in the list of materials is a user-defined layer with properties that can be set by the user. Table 3-2 lists the modulus values and Poisson’s ratios used in FAARFIELD.

3.12.10.2 In a rigid analysis, FAARFIELD requires a minimum of 3 layers (surface, base and subgrade) but allows up to a total of five (5) layers. A flexible design may have an unlimited number of layers or as few as 2 layers (asphalt surface and subgrade).

3.12.10.3 When designing a new pavement, on federally funded projects, use FAA standard materials as specified in AC 150/5370-10 unless the use of other materials has been approved by the FAA as a modification to standards (see FAA Order 5300.1). When analyzing existing sections, user defined layers may be the most accurate way to model performance of existing material. Utilize a modulus that reflects the weakest in service strength of the existing material.

Table 3-2. Allowable Modulus Values and Poisson’s Ratios Used in FAARFIELD

Layer Type FAA Specified Layer Rigid Pavement

psi (MPa)

Flexible Pavement

psi (MPa)

Poisson’s

Ratio

Surface

P-501 Cement Concrete 4,000,000 (30,000) NA 0.15

P-401/P-4031/P-404 Asphalt

Mixture NA 200,000 (1,380)2 0.35

Stabilized

Base and

Subbase

P-401/P-403Asphalt Mixture 400,000 (3,000) 0.35

P-306 Lean Concrete 700,000 (5,000) 0.20

P-304 cement treated

aggregate base

500,000 (3,500)

0.20

P-220 Cement treated soil

base 250,000 (1,700) 0.20

Variable stabilized rigid 250,000 to 700,000 (1,700 to 5,000) NA 0.20

Variable stabilized flexible NA 150,000 to 400,000 (1,000 to 3,000)

0.35

Granular Base and

Subbase

P-209 crushed aggregate Internal calculation by FAARFIELD4 0.35

P-208, aggregate Internal calculation by FAARFIELD4 0.35

P-219, Recycled concrete

aggregate Internal calculation by FAARFIELD4 0.35

P-211, Lime rock Internal calculation by FAARFIELD4 0.35

P-207 Recycled Asphalt

aggregate base3 25,000-500,000 0.35

P-154 uncrushed aggregate Internal calculation by FAARFIELD4 0.35

Subgrade5 Subgrade 1,000 to 50,000 (7 to 350) 0.35

User-defined User-defined layer 1,000 to 4,000,000 (7 to 30,000) 0.35

Notes:

1. P-403 as surface when all aircraft less than 60,000 lbs (27,216 kg) 2. A fixed modulus value for hot mix surfacing is set in the program at 200,000 psi (1380 MPa). This modulus value corresponds to a pavement temperature of approximately 90°F (32°C). 3. The modulus of P-207 is dependent upon the quality and if any additional stabilizing material incorporated, e.g. asphalt, cement, fly ash. Perform geotechnical laboratory testing with field materials to determine appropriate value. 4. See FAARFIELD help file for discussion of calculations. 5. CBR values for chemically modified subgrades lessor of 50% of laboratory strength or CBR 20.

3.12 Pavement Design Using FAARFIELD. › 3.12.11 Minimum Layer Thickness.

Minimum Layer Thickness.

Table 3-3 and Table 3-4 establish minimum layer thicknesses for flexible and rigid pavements respectively, applicable to different aircraft weight classes. The gross weight of the heaviest aircraft in the traffic mix determines minimum thickness requirements, regardless of traffic level. FAARFIELD automatically checks the minimum layer thickness requirements for standard materials based on the traffic mix entered, however the user must still verify that all thickness requirements have been met Use the larger of the values from Table 3-3 and Table 3-4 or the thickness as calculated by FAARFIELD rounded up to the nearest inch. Additional thickness may be required for frost protection.

Table 3-3. Minimum Layer Thickness for Flexible Pavement Structures1

Layer Type FAA Specification Item

Maximum Aircraft Gross Weight Operating

on Pavement, lbs (kg) <60,000 (27,215)

< 100,000

(45,360)

≥100,000

(45,360) Asphalt Surface2 P-401/P-403 3 in (75 mm) 4 in (100 mm) 4 in (100 mm) Stabilized Base3 P-401 or P-403; P-304; P- 3063 Not Required Not Required 5 in (125 mm)

Crushed Aggregate Base5,6 P-209, P-211 Not Required 6 in (150 mm) 6 in (150 mm)

Aggregate Base5,6 P-207, P-208, P-210, P-212,

P-213, P-219

6 in (75 mm) n/a n/a

Drainable Base (When Used)

P-307, P-4077 Not Required 6 in (150 mm)

when used

6 in (150 mm) when used Subbase6,8 P-154 6 in (150 mm) (if required)

6 in (150 mm) (If required)

6 in (150 mm) (if required) Notes:

1. Structural design must be completed to determine layer thicknesses required to support actual traffic. 2. P-403 as surface course when all aircraft less than 60,000 lbs (27215 kg). P-404-Fuel Resistant Hot Mix Asphalt may be used to replace the top 1 1/2 in (75 mm) to 3 in (75mm) of P-401or P-403 where a fuel resistant surface is needed; structurally, P-404 considered same as P-401. 3. See paragraph 3.5, Stabilized Base Course, for requirements and limitations. 4. Use of P-304 or P-306 requires measures to control potential for reflective cracking. 5. P-208, P-210, P-212, P-213, limited to pavements designed for gross loads of 60,000 pounds (27,215 kg) or less or for use as subbase. 6. P-207, P-219 require laboratory testing to establish if it will perform as a base or subbase. If CBR > 100 may be used as a stabilized base, If CBR > 80 may be used in place of P-209, CBR >60 in place of P-208. Both may be used as a subbase under stabilized base. 7. See EB 102, Asphalt Treated Permeable Base. 8. P-154, when structural thickness of subbase required by FAARFIELD is less than 6 in, eliminate subbase in FAARFIELD and calculate thickness of base.

Table 3-4. Minimum Layer Thickness for Rigid Pavement Structures1

Layer Type

FAA Specification

Item

Maximum Aircraft Gross Weight Operating

on Pavement, lbs (kg)

<60,000

(27,215)

< 100,000

(45,360)

≥ 100,000

(45,360)

Rigid Surface2 P-501, Cement Concrete Pavement

6 in (150 mm)2 6 in (150 mm)2 6 in (150 mm)2

Drainable Base (When Used)

P-4075, P-307 6 in (150 mm) when used

6 in (150 mm) When used

Stabilized Base3 P-401 or P-403; P-304; P-306

Not Required Not Required 5 in (125 mm)

Base4 P-209, P-207, P-208, P-210, P-211, P-212, P-213, P-219, P-220

Not Required 6 in (150 mm) 6 in (150 mm)

Subbase5 P-154 6 in (100 mm) As needed for

frost or to create working

platform

As needed for

frost or to create working

platform

Notes:

1. Complete structural design to determine rigid surface layer thickness required to support actual traffic. 2. Use greater of FAARFIELD thickness to the nearest 0.5 inch (10 mm), or minimum layer thickness, if all aircraft < 30,000 lbs (11,520 kg) 5 in (125 mm) minimum thickness. 3. See paragraph 3.5, Stabilized Base Course, for requirements and limitations. P-220 may be used under concrete with minimum thickness of 12” and when concrete thickness is increased by 3” 4. P-207, P-219 require laboratory testing to establish if it will perform as a base or subbase. If CBR > 80 may be used in place of P-209, CBR >60 in place of P-208. Both may be used as a subbase under stabilized base. 5. Any base material may be used as a subbase. 6. See EB 102, Asphalt Treated Permeable Base Course.

Continue reading ↓ 120 of 386 passages shown