AC 150/5320-5D Airport Drainage Design

This AC provides guidance for engineers, airport managers, and the public about the design and construction of airport surface storm drainage systems; and subsurface drainage systems for paved runways, taxiways, and aprons. It incorporates the DOD Unified Facilities Criteria (UFC) draft document, Surface Drainage Design, dated August 1, 2006. This revision adds guidance that was not included in the original DOD document. See paragraph 5,, "Purpose of this Revision."

Official source ↗ Open PDF

Advisory Circular

U.S. Department of Transportation Federal Aviation Administration

Subject: Airport Drainage Design Date: 8/15/2013 Initiated by: AAS-100

AC No: 150/5320-5D Change:

1. Purpose. This Advisory Circular (AC) provides guidance for engineers, airport managers, and the public about the design and construction of airport surface storm drainage systems; and subsurface drainage systems for paved runways, taxiways, and aprons.

2. Cancellation. This AC cancels AC 150/5320-5C, Surface Drainage Design, dated September 29, 2006.

3. Application. The guidelines and recommendations contained in this AC are recommended by the Federal Aviation Administration (FAA) for the design and construction of airport surface and subsurface drainage systems. This AC offers general guidance for these systems and is neither binding nor regulatory.

4. Department of Defense Unified Facilities Criteria. This AC was developed in collaboration with the Department of Defense (DOD) and incorporates the DOD Unified Facilities Criteria (UFC) draft document, Surface Drainage Design, dated August 1, 2006.

5. Purpose of this Revision. This AC includes additional guidance not included in the DOD document.

a. Wildlife Hazard Attractants and Mitigation: Throughout the planning, design, construction, and maintenance of airport surface storm drainage and subsurface drainage systems the engineer must emphasize and address the elimination and/or mitigation of drainage features in the project(s) that could attract hazardous wildlife on and/or around an airport. The engineer should refer to the following documents and sites for guidance on wildlife hazards at airports for all drainage projects:

(1) AC 150/5200-33, Hazardous Wildlife Attractants on or Near Airports, contains guidance on certain land uses that have the potential to attract hazardous wildlife on or near airports. The AC is available at: http://www.faa.gov/airports/resources/advisory_circulars/.

(2) Wildlife Hazard Management at Airports, A Manual for Airport Personnel, is available at: http://www.faa.gov/airports/airport_safety/wildlife/problem/media/2005_FAA_ Manual_complete.pdf.

(3) Additional information on wildlife issues can be found on the FAA Guidance on Wildlife website at: http://www.faa.gov/airports/airport_safety/wildlife/guidance/.

AC 150/5320-5D 8/15/2013

ii

b. Appendix F, FAA Order 5300.1, Modifications to Agency Airport Design, Construction, and Equipment Standards. FAA Order 5300.1F has been replaced with the following link directing readers to the website for the current FAA Order:

Procedures for requests and processing of modifications to FAA standards are detailed in FAA Order 5300.1, Modifications to Agency Airport Design, Construction, and Equipment Standards. The current FAA Order is available at the following website: http://www.faa.gov/regulations_policies/orders_notices/ index.cfm/go/document.list/parentTopicID/24.

c. The design and location of all drainage structures and/or features must comply with all airport design surface requirements per AC 150/5300-13, Airport Design. AC 150/5300-13 also provides general guidance on drainage considerations. Title 14 Code of Federal Regulations (CFR) Part 139, Certification of Airports, restricts the height of a structure located in a safety area to 3 inches or less above grade.

d. For FAA projects, add the following to paragraph 9-1.1.3:

Plastic pipe used under airfield pavements shall comply with Item D-701, Pipe for Storm Drains and Culverts in AC 150/5370-10, Standards for Specifying Construction of Airports.

e. Web addresses and contact information in Chapter 12 and Appendix A have been updated. The programs and software listed in Chapter 12 are only a few of many available for drainage analysis and are not the only programs or software which may be used for analysis. In addition, new or updated drainage analysis programs, web addresses, and software constantly become available. Before using any software, users should verify the software meets the appropriate design criteria. Use the most current version of all AC, UFC, and other standards cited in this AC.

f. Public Law (PL), United States Code (USC), and other citations have been added for consistency and clarification where required.

Michael J. O’Donnell Director of Airport Safety and Standards

UNIFIED FACILITIES CRITERIA (UFC)

SURFACE DRAINAGE DESIGN

U.S. Department of Transportation

Federal Aviation Administration

APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED

i

UNIFIED FACILITIES CRITERIA (UFC)

SURFACE DRAINAGE DESIGNP1

Any copyrighted material included in this UFC is identified at its point of use. Use of the copyrighted material apart from this UFC must have the permission of the copyright holder. U.S. ARMY CORPS OF ENGINEERS (Preparing Activity) NAVAL FACILITIES ENGINEERING COMMAND AIR FORCE CIVIL ENGINEER SUPPORT AGENCY Record of Changes (changes are indicated by \1\ ... /1/)

Change No. Date Location …

P1

PThis UFC supersedes TM 5-820-1/AFM 88-5, Chap 1, dated August 1987; TM 5-820- 2/AFM 88-5, Chap 2, dated March 1979; TM 5-820-3/AFM 88-5, Chap 3, dated June 1991; TM 5-820-4/AFM 88-5, Chap 4, dated October 1983; TM 5-852-7/AFM 88-19, Chap 7, dated April 1981; NAVFAC DM 21.06, dated April 1986; EI 02C202, dated October 1995. The format of this document does not conform to UFC 1-300-01.

ii

FOREWORD The Unified Facilities Criteria (UFC) system is prescribed by Military Standard (MIL-STD) 3007 and provides planning, design, construction, sustainment, restoration, and modernization criteria, and applies to the Military Departments, the Defense Agencies, and the Department of Defense (DOD) Field Activities in accordance with U SD(AT&L) MemorandumU dated 29 May 2002. UFC will be used for all DOD projects and work for other customers where appropriate. UFC are living documents and will be periodically reviewed, updated, and made available to users as part of the Services’ responsibility for providing technical criteria for military construction. Headquarters, U.S. Army Corps of Engineers (HQUSACE), Naval Facilities Engineering Command (NAVFAC), and Headquarters Air Force Civil Engineer Support Agency (HQ AFCESA) are responsible for administration of the UFC system. Defense agencies should contact the preparing service for document interpretation and improvements. Technical content of UFC is the responsibility of the cognizant DOD working group. Recommended changes with supporting rationale should be sent to the respective service proponent office by the following electronic form: UCriteria Change Request (CCR)U. The form is also accessible from the Internet site listed below. UFC are effective upon issuance and are distributed only in electronic media from the following sources:  Whole Building Design Guide web site DOD page: (Uhttp://dod.wbdg.org/U) Hard copies of UFC printed from electronic media should be checked against the current electronic version prior to use to ensure that they are current. AUTHORIZED BY:

… . Chief, Engineering and Construction U.S. Army Corps of Engineers

… . Chief Engineer Naval Facilities Engineering Command

… The Deputy Civil Engineer DCS/Installations & Logistics Department of the Air Force

… Director, Installations Requirements and Management Office of the Deputy Under Secretary of Defense (Installations and Environment)

iii

UNIFIED FACILITIES CRITERIA (UFC)

NEW DOCUMENT SUMMARY SHEET

Document: UFC draft/AC 150/5320-5D

Description: UFC draft/AC 150/5320-5D provides comprehensive and practical guidance to the Tri-service community and Federal Aviation Administration (FAA) for the design of storm drainage systems associated with transportation facilities. Criteria are provided for the design of storm drainage systems which collect, convey, and discharge stormwater on and around pavements and other transportation facilities.

Reasons for Document:

 Previous criteria associated with this topic were outdated and did not take

advantage of recent developments in the field of hydrologic engineering.  Multiple documents covering various topics on the subject matter were in

circulation and this document provides a consolidated and comprehensive guide for all users.  Many new environmental practices have been developed and were not

addressed in previous criteria.  User feedback indicated that published criteria from multiple documents

was often confusing and contradicting.

Impact: There are negligible cost impacts; however, these benefits should be realized:

 Providing one location for criteria associated with storm drainage will allow

users to be more efficient and effective when applying the procedures and principles contained in this document.  The updated criteria in this document are considered standard practice

and will allow users to take advantage of concepts and methods which are widely understood and accepted throughout the industry today.

CONTENTS

iv

CONTENTS

Page

CHAPTER 1 INTRODUCTION … 1

1-1 PURPOSE … 1 1-2 SCOPE … 1 1-3 REFERENCES … 1 1-4 UNITS OF MEASUREMENT … 1 1-5 APPLICABILITY … 1 1-5.1 Previous Standards … 1 1-5.2 Applicability Within DOD … 1 1-5.3 Design Objectives … 1 1-5.4 Waivers to Criteria … 2 1-6 GENERAL INVESTIGATIONS … 2 1-7 ENVIRONMENTAL CONSIDERATIONS … 2 1-7.1 National Environmental Policy … 2 1-7.2 Federal Guidelines … 3 1-7.3 Regulatory Considerations … 3 1-7.4 Federal Regulations … 3 1-7.5 State Regulations … 5 1-7.6 Local Laws … 7 1-7.7 U.S. Army Environmental Quality Program … 7 1-7.8 U.S. Air Force Environmental Quality Program … 8 1-7.9 U.S. Navy Environmental Quality Program … 8 1-7.10 FAA Environmental Handbook … 8 1-7.11 Environmental Impact Analysis … 8 1-7.12 Environmental Effects of Surface Drainage Systems … 8 1-7.13 Discharge Permits … 9 1-7.14 Effects of Drainage Facilities on Fish … 9

CHAPTER 2 SURFACE HYDROLOGY … 10

2-1 PURPOSE AND SCOPE … 10 2-2 HYDROLOGIC CRITERIA … 10 2-2.1 Design Objectives … 10 2-2.2 Degree of Drainage Required … 10 2-2.3 Surface Runoff from Design Storm … 10 2-2.4 Design Storm Frequency … 10 2-2.5 Surface Runoff from Storms Exceeding Design Storm … 11 2-2.6 Reliability of Operation … 11 2-2.7 Environmental Impact … 12 2-2.8 Maintenance … 12

v

2-2.9 Future Expansion … 12 2-3 HYDROLOGIC METHODS AND PROCEDURES … 12 2-3.1 Rainfall (Precipitation) … 12 2-3.2 Determination of Peak Flow Rates … 15 2-3.3 USGS Regression Equations … 25 2-3.4 SCS TR-55 Peak Flow Method … 28 2-4 DEVELOPMENT OF DESIGN HYDROGRAPHS … 32 2-4.1 SCS Tabular Hydrograph … 33 2-4.2 SCS Synthetic Unit Hydrograph (UH) … 37

CHAPTER 3 PAVEMENT SURFACE DRAINAGE … 41

3-1 OVERVIEW … 41 3-2 DESIGN FREQUENCY AND SPREAD … 41 3-2.1 Selection of Design Frequency and Design Spread … 41 3-2.2 Selection of Check Storm and Spread … 42 3-3 SURFACE DRAINAGE … 42 3-3.1 Longitudinal Slope … 42 3-3.2 Cross (Transverse) Slope … 43 3-3.3 Curbs and Gutters … 44 3-3.4 Roadside and Median Channels … 45 3-4 FLOW IN GUTTERS … 45 3-4.1 Capacity Relationship … 46 3-4.2 Conventional Curb and Gutter Sections … 47 3-4.3 Shallow Swale Sections … 54 3-4.4 Flow in Sag Vertical Curves … 61 3-4.5 Gutter Flow Time … 61 3-5 DRAINAGE INLET DESIGN … 63 3-5.1 Inlet Types … 63 3-5.2 Characteristics and Uses of Inlets … 65 3-5.3 Inlet Capacity … 65 3-5.4 Interception Capacity of Inlets on Grade … 73 3-5.5 Interception Capacity of Inlets in Sag Locations … 87 3-5.6 Inlet Locations … 95 3-5.7 Median, Embankment, and Bridge Inlets … 104 3-6 GRATE TYPE SELECTION CONSIDERATIONS … 113

CHAPTER 4 CULVERT DESIGN … 115

4-1 PURPOSE … 115 4-2 FISH PASSAGE CONSIDERATIONS … 117 4-2.1 General … 117 4-2.2 High Inverts … 117 4-2.3 High Velocities in Culverts … 117 4-2.4 Undersized or Failed Culverts … 117 4-2.5 Erosion Along Drainageways or at Outlets … 118

vi

4-2.6 Channel Filling … 118 4-2.7 Culvert Installation … 118 4-2.8 Control of Icing … 118 4-3 DESIGN STORM … 118 4-4 DESIGN … 118 4-4.1 Hydraulic Design Data for Culverts … 119 4-4.2 Headwalls and Endwalls … 153 4-4.3 Erosion Control at Outlets … 163 4-4.4 Vehicular Safety and Hydraulically Efficient Drainage Practice 176 4-5 OUTLET PROTECTION DESIGN EXAMPLES … 177

CHAPTER 5 CHANNEL DESIGN … 187

5-1 OPEN CHANNEL FLOW … 187 5-1.1 Flow Resistance … 187 5-1.2 Stable Channel Design … 193 5-2 DESIGN PARAMETERS … 198 5-2.1 Discharge Frequency … 198 5-2.2 Channel Geometry … 198 5-2.3 Channel Slope … 198 5-2.4 Freeboard … 198 5-2.5 Shear Stress … 200

CHAPTER 6 STORM DRAIN DESIGN … 203

6-1 PURPOSE AND SCOPE … 203 6-2 DESIGN PROCEDURES FOR THE DRAINAGE SYSTEM … 203 6-2.1 Grading … 203 6-2.2 Classification of Storm Drains … 203 6-2.3 Hydraulics of Storm Drainage Systems … 204 6-2.4 Design Guidelines and Considerations … 213 6-3 PRELIMINARY DESIGN PROCEDURE … 217 6-3.1 Step 1 … 217 6-3.2 Step 2 … 222 6-3.3 Step 3 … 222 6-3.4 Step 4 … 222 6-3.5 Step 5 … 223 6-3.6 Step 6 … 223 6-4 ENERGY GRADE LINE EVALUATION PROCEDURE … 223

CHAPTER 7 DRAINAGE STRUCTURES … 232

7-1 GENERAL … 232 7-2 INLETS … 232 7-2.1 Configuration … 232 7-2.2 Area Inlets … 233

vii

7-3 MANHOLES … 236 7-3.1 Configuration … 236 7-3.2 Chamber and Access Shaft … 237 7-3.3 Frames and Covers … 237 7-3.4 Channels and Benches … 241 7-3.5 Manhole Depth … 241 7-3.6 Location and Spacing … 242 7-3.7 Settlement of Manholes … 242 7-4 JUNCTION CHAMBERS … 243 7-5 MISCELLANEOUS STRUCTURES … 243 7-5.1 Chutes … 243 7-5.2 Security Fencing … 243 7-5.3 Fuel/Water Separators … 246 7-5.4 Outlet Energy Dissipators … 246 7-5.5 Drop Structures and Check Dams … 248 7-5.6 Transitions … 248 7-5.7 Flow Splitters … 248 7-5.8 Siphons … 249 7-5.9 Flap Gates … 250 7-6 DESIGN FEATURES … 251 7-6.1 Grates … 251 7-6.2 Ladders … 252 7-6.3 Steps … 255 7-7 SPECIAL DESIGN CONSIDERATIONS FOR AIRFIELDS … 255 7-7.1 Overview … 255 7-7.2 Recommended Design Parameters … 255

CHAPTER 8 STORM WATER CONTROL FACILITIES … 258

8-1 GENERAL … 258 8-1.1 Storage and Detention/Retention Benefits … 258 8-1.2 Design Objectives … 259 8-2 ISSUES RELATED TO STORM WATER QUANTITY CONTROL FACILITIES … 259 8-2.1 Release Timing … 259 8-2.2 Safety … 260 8-2.3 Maintenance … 261 8-3 STORAGE FACILITY TYPES … 261 8-3.1 Detention Facilities … 262 8-3.2 Retention Facilities … 263 8-3.3 Wet Pond Facilities … 263 8-3.4 Infiltration Facilities … 264

CHAPTER 9 PIPE SELECTON, BEDDING AND BACKFILL … 265

9-1 GENERAL … 265

viii

9-1.1 Pipe Selection … 265 9-1.2 Selection of n Values … 265 9-1.3 Restricted Use of Bituminous-Coated Pipe … 265 9-1.4 Classes of Bedding and Installation … 266 9-1.5 Strength of Pipe … 267 9-1.6 Rigid Pipe … 267 9-1.7 Flexible Pipe … 283 9-1.8 Bedding of Pipe (Culverts and Storm Drains) … 283 9-2 FROST CONDITION CONSIDERATIONS … 283 9-3 INFILTRATION OF FINE SOILS THROUGH DRAINAGE PIPE JOINTS … 285 9-4 MINIMUM AND MAXIMUM COVER FOR AIRFIELDS … 286 9-5 MINIMUM AND MAXIMUM COVER FOR ROADWAYS … 287

CHAPTER 10 GUIDELINES FOR DESIGN IN THE ARCTIC AND SUBARCTIC .... 289

10-1 GENERAL … 289 10-2 ICING … 289 10-2.1 Description … 289 10-2.2 Types … 289 10-2.3 Natural Factors Conducive to Icing Formation … 291 10-2.4 Effects of Human Activities on Icing … 291 10-2.5 Methods of Counteracting Icing … 292 10-3 GUIDELINES FOR DESIGN OF STORM DRAINS IN THE ARCTIC AND SUBARCTIC … 298 10-4 GRADING … 300 10-5 TEMPORARY STORAGE … 300 10-6 MATERIALS … 300 10-7 MAINTENANCE … 300 10-8 JOINTING … 300 10-9 END PROTECTION … 300 10-10 ANCHORAGE AND BUOYANCY … 301 10-11 DEBRIS AND ICING CONTROL … 301 10-12 TIDAL AND FLOOD EFFECTS … 301 10-13 INSTALLATION … 301

CHAPTER 11 WATER QUALITY CONSIDERATIONS … 302

11-1 GENERAL … 302 11-2 GENERAL BMP SELECTION GUIDANCE … 302 11-3 ESTIMATING POLLUTANT LOADS … 305 11-4 EXTENDED DETENTION DRY PONDS … 305 11-5 WET PONDS … 305 11-6 INFILTRATION/EXFILTRATION TRENCHES … 305 11-7 INFILTRATION BASINS … 306 11-8 SAND FILTERS … 306

ix

11-9 WATER QUALITY INLETS … 306 11-10 VEGETATIVE PRACTICES … 306 11-11 ULTRA-URBAN BMPs … 306 11-12 TEMPORARY EROSION AND SEDIMENT CONTROL PRACTICES … 307

CHAPTER 12 DESIGN COMPUTER PROGRAMS … 308

12-1 STORM WATER MANAGEMENT PROGRAMS … 308 12-2 DRIP (Drainage Requirement in Pavements) … 308 12-3 CANDE (Culvert Analysis and Design) … 308 12-4 MODBERG … 308 12-5 PIPECAR … 308 12-6 ADDITIONAL SOFTWARE … 308 12-6.1 HYDRAIN … 310 12-6.2 HYDRA … 310 12-6.3 WSPRO … 311 12-6.4 HYDRO … 311 12-6.5 HY8 … 312 12-6.6 HYCHL … 313 12-6.7 NSS … 313 12-6.8 HYEQT … 313 12-6.9 TR-55 … 313 12-6.10 TR-20 … 314 12-6.11 HMS … 315 12-6.12 HEC-RAS … 316 12-6.13 SWMM … 317 12-7 HYDRAULIC TOOLBOX (HY-TB) … 318 12-7.1 HY12 … 318 12-7.2 HY15 … 318 12-7.3 BASIN … 318 12-7.4 SCOUR … 318 12-8 URBAN DRAINAGE DESIGN PROGRAMS … 318 12-8.1 Manning’s Equation … 319 12-8.2 HEC-22 … 319 12-8.3 Stormwater Management … 319 12-9 DR3M … 319 12-9.1 Rainfall-Excess Components … 319 12-9.2 Impervious Surfaces … 319 12-9.3 Routing … 320 12-9.4 Model Versatility … 320 12-9.5 Urban Basin Planning … 320 12-9.6 Usability … 320 12-10 EVALUATION OF WATER QUALITY … 320 12-11 SOFTWARE AVAILABILITY … 321

x

GLOSSARY … 323

APPENDIX A REFERENCES … 327

APPENDIX B LIST OF CHARTS … 334

APPENDIX C LIST OF SYMBOLS … 385

APPENDIX D BIBLIOGRAPHY … 390

APPENDIX E WAIVER PROCESSING PROCEDURES FOR DOD … 398

APPENDIX F FAA ORDER 5300.1, MODIFICATIONS TO AGENCY AIRPORT

DESIGN, CONSTRUCTION, AND EQUIPMENT STANDARDS … 401

APPENDIX G (FAA ONLY) DESIGN OF SUBSURFACE PAVEMENT DRAINAGE

SYSTEMS … 404

INDEX … 446

FIGURES

UFigureU UTitle Figure 2-1. Example IDF Curve … 13 Figure 2-2. SCS 24-hour Rainfall Distribution … 14 Figure 2-3. Approximate Geographic Areas for SCS Rainfall Distributions … 15 Figure 2-4. Dimensionless Curvilinear SCS Synthetic Unit Hydrograph and Equivalent

Triangular Hydrograph … 38 Figure 2-5. Example: The Triangular Unit Hydrograph … 40 Figure 3-1. Typical Gutter Sections … 45 Figure 3-2. Conveyance–Spread Curves for a Composite Gutter Section … 50 Figure 3-3. Classes of Storm Drain Inlets … 64 Figure 3-4. P-1-7/8 and P-1-7/8 x 4 Grates (Same as P-1-7/8 Grate Without 3/8-in.

Figure 2-2: picture of page 13Figure 2-2 · page 13
Picture of the page from the copy saved here

Transverse Rods) … 68 Figure 3-5. P-1-1/8 Grate … 69 Figure 3-6. Curved Vane Grate … 70 Figure 3-7. 45-Degree 2-1/4 and 45-Degree 3-1/4 Tilt-bar Grates … 71 Figure 3-8. 30-Degree 3-1/4 Tilt-bar Grates … 72 Figure 3-9. Reticuline Grate … 73 Figure 3-10. Depressed Curb-opening Inlet … 81 Figure 3-11. Definition of Depth … 88 Figure 3-12. Curb-opening Inlets … 93 Figure 3-13. Inlet Spacing Computation Sheet … 99 Figure 3-14. Example of Flanking Inlets … 102

xi

Figure 3-15. Median Drop Inlet … 105 Figure 3-16. Embankment Inlet and Downdrain … 113 Figure 4-1. Inlet Control … 120 Figure 4-2. Headwater Depth for Concrete Pipe Culverts with Inlet Control … 121 Figure 4-3. Headwater Depth for Oval Concrete Pipe Culverts Long Axis Vertical with

Inlet Control … 122 Figure 4-5. Headwater Depth for Corrugated Metal Pipe Culverts with Inlet Control .. 124 Figure 4-6. Headwater Depth for Structural Plate and Standard Corrugated Metal Pipe-

Figure 3-5: picture of page 13Figure 3-5 · page 13
Picture of the page from the copy saved here

Arch Culverts with Inlet Control … 125 Figure 4-7. Headwater Depth for Box Culverts with Inlet Control … 126 Figure 4-8. Headwater Depth for Corrugated Metal Pipe Culverts with Tapered Inlet

Control … 127 Figure 4-9. Headwater Depth for Circular Pipe Culverts with Beveled Ring Inlet Control128 Figure 4-10. Outlet Control … 129 Figure 4-11. Head for Circular Pipe Culverts Flowing Full, n = 0.012 … 132 Figure 4-12. Head for Oval Circular Pipe Culverts Long Axis Horizontal or Vertical

Flowing Full, n = 0.012 … 133 Figure 4-13. Head for Circular Pipe Culverts Flowing Full, n = 0.024 … 134 Figure 4-14. Head for Circular Pipe Culverts Flowing Full, n = 0.0328 to 0.0302 … 135 Figure 4-15. Head for Standard Corrugated Metal Pipe-Arch Culverts Flowing Full,

n = 0.024 … 136 Figure 4-16. Head for Field-Bolted Structural Plate Pipe-Arch Culverts 18 inch

Figure 4-7: picture of page 14Figure 4-7 · page 14
Picture of the page from the copy saved here

Corner Radius Flowing Full, n = 0.0327 to 0.0306 … 137 Figure 4-17. Head for Concrete Box Culverts Flowing Full, n = 0.012 … 138 Figure 4-18. Tailwater Elevation at or Above the Top of the Culvert … 139 Figure 4-19. Tailwater Below the Top of the Culvert … 139 Figure 4-20. Circular Pipe Critical Depth … 141 Figure 4-21. Oval Concrete Pipe Long Axis Horizontal Critical Depth … 142 Figure 4-22. Oval Concrete Pipe Long Axis Vertical Critical Depth … 143 Figure 4-23. Standard Corrugated Metal Pipe-Arch Critical Depth … 144 Figure 4-24. Structural Plate Pipe-Arch Critical Depth … 145 Figure 4-25. Critical Depth Rectangular Section … 146 Figure 4-26: Culvert Design Form … 148 Figure 4-27. Culvert Headwalls and Wingwalls … 154 Figure 4-28. Types of Scour at Storm Drain and Culvert Outlets … 156 Figure 4-29. Square Culvert Froude Number … 157 Figure 4-30. Predicted Scour Depth vs. Observed Scour Depth … 158 Figure 4-31. Predicted Scour Width vs. Observed Scour Width … 159 Figure 4-32. Predicted Scour Length vs. Observed Scour Length … 160 Figure 4-33. Predicted Scour Volume vs. Observed Scour Volume … 161 Figure 4-34. Dimensionless Scour Hole Geometry for Minimum Tailwater … 162 Figure 4-35. Dimensionless Scour Hole Geometry for Maximum Tailwater … 162 Figure 4-36. Recommended Size of Protective Stone … 163 Figure 4-37. Length of Stone Protection, Horizontal Blanket … 164 Figure 4-38. Recommended Configuration of Riprap Blanket Subject to Minimum and

Figure 4-17: picture of page 14Figure 4-17 · page 14
Picture of the page from the copy saved here

xii

Maximum Tailwaters … 165 Figure 4-39. Preformed Scour Hole … 166 Figure 4-40. Culvert Outlet Erosion Protection, Lined Channel Expansion … 167 Figure 4-41. Maximum Permissible Discharge for Lined Channel Expansions … 167 Figure 4-42. Flared Outlet Transition … 168 Figure 4-43. Stilling Well … 170 Figure 4-44. U.S. Bureau of Reclamation Impact Basin … 171 Figure 4-45. Saint Anthony Falls Stilling Basin … 172 Figure 4-46. Design Chart for SAF Stilling Basin … 173 Figure 4-47. Recommended Riprap Sizes … 175 Figure 4-48. Scour Hole Riprap Sizes … 176 Figure 5-1. Distribution of Shear Stress … 194 Figure 5-2. Shear Stress Distribution in Channel Bends … 196 Figure 5-3. Channel Geometries … 199 Figure 6-1. Storm Drain Capacity Sensitivity … 207 Figure 6-2. Hydraulic and Energy Grade Lines in Pipe Flow … 211 Figure 6-3. Preliminary Storm Drain Computation Sheet … 221 Figure 6-4. Energy and Hydraulic Grade Line Illustration … 224 Figure 6-5. Energy Grade Line Computation Sheet - Table A … 226 Figure 6-6. Energy Grade Line Computation Sheet - Table B … 227 Figure 7-1.

Figure 4-39: picture of page 15Figure 4-39 · page 15
Picture of the page from the copy saved here

Inlet Structures … 233 Figure 7-2. Typical Inlet Design for Storm Drainage Systems … 234 Figure 7-3. Repair Area Inlets … 235 Figure 7-4. Standard Storm Drain Manhole … 238 Figure 7-5. Standard Precast Manholes … 239 Figure 7-6. Junction Details for Large Pipes … 239 Figure 7-7. Typical Manhole Configurations … 240 Figure 7-8. "Tee" Manhole for Large Storm Drains … 241 Figure 7-9. Efficient Channel and Bench Configurations … 244 Figure 7-10. Details of a Typical Drainage Chute … 245 Figure 7-11. Outlet Security Barrier … 246 Figure 7-12. Transitions to Avoid Obstruction … 249 Figure 7-13. Twin-Barrel Siphon … 250 Figure 7-14. Examples of Typical Inlet Grates … 253 Figure 7-15. Examples of Inlet Design … 254 Figure 7-16. Type A – Bicycle Gear Configuration … 256 Figure 7-17. Type B – Tricycle Gear Configuration … 256 Figure 7-18. Type C – Tricycle Gear Configuration … 257 Figure 8-1. Hydrograph Schematic … 258 Figure 8-2. Example of a Cumulative Hydrograph with and without Detention … 260 Figure 9-1. Three Main Classes of Conduits … 267 Figure 9-2.

Figure 7-2: picture of page 15Figure 7-2 · page 15
Picture of the page from the copy saved here

Free-Body Conduit Diagrams … 268 Figure 9-3. Trench Beddings for Circular Pipe … 269 Figure 9-4. Beddings for Positive Projecting Conduits … 270 Figure 9-5. Installation Conditions that Influence Loads on Underground Conduits .... 270

xiii

Figure 10-1. Typical Cross Section of a Frost Belt Installation … 297 Figure 10-2. Earth Embankments with Impervious Barriers … 298

TABLES

UTableU UTitle Table 2-1. Runoff Coefficients for Rational Formula … 17 Table 2-2. Manning's Roughness Coefficient (n) for Overland Sheet Flow … 19 Table 2-3. Intercept Coefficients for Velocity vs. Slope Relationship of Equation 2-4 ... 21 Table 2-4. Values of Manning's Coefficient (n) for Channels and Pipes … 21 Table 2-5. Nationwide Urban Equations Developed by the USGS … 26 Table 2-6. Runoff Curve Numbers for Urban Areas (Average Watershed Condition, IRaR

= 0.2SRRR) … 30 Table 2-7. Adjustment Factor (Fp) for Pond and Swamp Areas that are Spread

Throughout the Watershed … 31 Table 2-8. Tabular Hydrograph Unit Discharges for Type II Rainfall Distributions

Figure 9-3: picture of page 15Figure 9-3 · page 15
Picture of the page from the copy saved here

(English Units) … 34 Table 2-9. Subarea and Composite Hydrographs … 37 Table 3-1. Manning's n for Street and Pavement Gutters … 47 Table 3-2. Spread at Average Velocity in a Reach of Triangular Gutter … 62 Table 3-3. Average Debris Handling Efficiencies of Grates Tested … 74 Table 3-4. Grate Efficiency and Capacity Summary … 80 Table 3-5. Comparison of Inlet Interception Capacities … 87 Table 3-6. Distance to Flanking Inlets in a Sag Vertical Curve Using Depth at Curb

Criteria … 104 Table 3-7. Grate Ranking with Respect to Bicycle and Pedestrian Safety … 114 Table 4-1. Entrance Loss Coefficients, Outlet Control, Full or Partly Full Entrance Head

Loss, * … 130

Table 5-1. Manning’s n for Natural Stream Channels (Surface Width at Flood Stage

Less than 100 ft) … 188 Table 5-2. Manning's Roughness Coefficients for Lined Channels** … 188 Table 5-3. Classification of Vegetal Covers as to Degree of Retardance* … 189 Table 5-4. Manning's n Relationships for Vegetal Degree of Retardance … 190 Table 5-5. Permissible Shear Stresses for Lining Materials** … 200 Table 6-1. Manning's Coefficients for Storm Drain Conduits … 206 Table 6-2. Increase in Capacity of Alternate Conduit Shapes Based on a Circular Pipe

with the Same Height … 208 Table 6-3. Frequencies for Coincidental Occurrence … 213 Table 6-4. Minimum Pipe Slopes to Ensure 3.0 ft/s Velocity in Storm Drains Flowing Full217 Table 7-1. Manhole Spacing Criteria … 242 Table 7-2. Transition Design Criteria … 249 Table 9-1. Suggested Maximum Cover Requirements for Concrete Pipe, Reinforced

g V K H e e 2

2 

xiv

Concrete, H-20 Highway Loading* … 271 Table 9-2. Suggested Maximum Cover Requirements for Corrugated Aluminum Alloy

Pipe, Riveted, Helical, or Welded Fabrication 2.66-inch Spacing, 0.5-inch-Deep Corrugations, H-20 Highway Loading* … 272 Table 9-3. Suggested Maximum Cover Requirements for Corrugated Steel Pipe,

2.66-inch Spacing, 0.5-inch-Deep Corrugations* … 273 Table 9-4. Suggested Maximum Cover Requirements for Structural Plate Aluminum

Alloy Pipe, 9-inch Spacing, 2.5-inch Corrugations* … 274 Table 9-5. Suggested Maximum Cover Requirements for Corrugated Steel Pipe, 5-inch

Span, 1-inch-Deep Corrugations* … 275 Table 9-6. Suggested Maximum Cover Requirements for Structural Plate Steel Pipe,

6-inch Span, 2-inch-Deep Corrugations* … 276 Table 9-7. Suggested Maximum Cover Requirements for Corrugated Steel Pipe, 3-inch

Span, 1-inch Corrugations* … 278 Table 9-8. Suggested Guidelines for Minimum Cover* … 279 Table 9-9. Minimum Depth of Cover in Feet for Pipe Under Flexible Pavement (Part 1)280 Table 9-9. Minimum Depth of Cover in Feet for Pipe Under Flexible Pavement (Part 2)281 Table 9-9. Minimum Depth of Cover in Feet for Pipe Under Flexible Pavement (Part 3)282 Table 11-1. BMP Selection Criteria* … 303 Table 11-2. Pollutant Removal Comparison for Various Urban BMP Designs* … 304 Table 12-1. Software vs. Capabilities Matrix … 309 Table 12-2. Software Program Contact Information … 321

1-5 APPLICABILITY. › 1-5.3 Design Objectives

CHAPTER 1

INTRODUCTION 1-1 PURPOSE. This document establishes general concepts and procedures for the hydrologic design of surface structures for the U.S. Army, Navy, Air Force, Marine Corps, and Federal Aviation Administration (FAA).

1-2 SCOPE. This manual prescribes the hydrologic design criteria to be used for transportation facilities and other areas.

1-3 REFERENCES. Appendix A contains a list of references used in this UFC. Appendix D is a bibliography that lists publications that are considered relevant to this subject and that offer additional information on various topics.

1-4 UNITS OF MEASUREMENT. The unit of measurement system in this document is the inch-pound (IP). In some cases, International System of Units (SI) measurements may be the governing critical values because of applicable codes, accepted standards, industry practices, or other considerations.

1-5 APPLICABILITY. Criteria in this manual pertain to all Department of Defense (DOD) military facilities in the United States, it territories, trusts, and possessions, and unless otherwise noted, to DOD facilities overseas on which the United States has vested base rights. For DOD facilities overseas, if written agreement exists between host nation and DOD that requires application of either North Atlantic Treaty Organization (NATO), International Civil Aviation Organization (ICAO), or other standards, those standards shall apply as stipulated in the agreement.

1-5.1 Previous Standards. The criteria in this manual are not intended to apply to existing facilities constructed under previous standards; however, when existing facilities are modified or new facilities are constructed, they must conform to the criteria established in this manual unless waived.

1-5.2 Applicability Within DOD. This document covers a wide range of topics in the areas of surface drainage and serves as the standard for several agencies responsible for hydrologic design for transportation facilities and other areas. The intended use of the facility under design may differ between agencies and in some cases dictates the need for separate standards. In special cases in which more than one standard is presented, or the standard does not apply to all agencies, special care has been given to clearly identify the relevant audience. Any user of this manual should pay close attention to the relevance of each topic to the intended agency.

1-5.3 Design Objectives

1-5.3.1 The objective of storm drainage design is to provide for safe passage of vehicles or operation of the facility during the design storm event. The drainage system is designed to collect storm water runoff from the pavement surface and adjacent areas, convey it along and through the adjacent areas, and discharge it to an adequate receiving body without causing adverse on- or off-site impacts.

1-7 ENVIRONMENTAL CONSIDERATIONS. › 1-7.1 National Environmental Policy.

1-5.3.2 Storm water collection systems must be designed to provide adequate surface drainage. Traffic safety is intimately related to surface drainage. Rapid removal of storm water from the pavement minimizes the conditions which can result in the hazards of hydroplaning. Surface drainage is a function of transverse and longitudinal pavement slope, pavement roughness, inlet spacing, and inlet capacity.

1-5.3.3 The objective of storm water conveyance systems (e.g., storm drain piping, ditches and channels, pumps) is to provide an efficient mechanism for conveying design flows from inlet locations to the discharge point without surcharging inlets or otherwise causing surface flooding. Erosion potential must also be considered in the design of open channels or ditches used for storm water conveyance.

1-5.3.4 The design of appropriate discharge facilities for storm water collection and conveyance systems includes consideration of storm water quantity and quality. Local, state, and/or Federal regulations often control the allowable quantity and quality of storm water discharges. To meet these regulatory requirements, storm drainage systems will usually require detention or retention basins, and/or other best management practices (BMPs) for the control of discharge quantity and quality.

1-5.4 Waivers to Criteria. Each DOD service component is responsible for setting administrative procedures necessary to process and grant formal waivers. Waivers to the criteria contained in this manual shall be in accordance with Appendix E.

1-6 GENERAL INVESTIGATIONS. An on-site investigation of the system site and tributary area is a prerequisite for study of drainage requirements. Information regarding capacity, elevations, and condition of existing drains will be obtained. Topography, size and shape of drainage area, and extent and type of development; profiles, cross sections, and roughness data on pertinent existing streams and watercourses; and location of possible ponding areas will be determined. Thorough knowledge of climatic conditions and precipitation characteristics is essential. Adequate information regarding soil conditions, including types, permeability, vegetative cover, depth to and movement of subsurface water, and depth of frost will be secured. Outfall and downstream flow conditions, including high-water occurrences and frequencies, also must be determined. The effect of base drainage construction on local interests’ facilities and local requirements that will affect the design of the drainage works will be evaluated. Where diversion of runoff is proposed, particular effort will be made to avoid resultant downstream conditions leading to unfavorable public relations, costly litigations, or damage claims. Any agreements needed to obtain drainage easements and/or avoid interference with water rights will be determined at the time of design and consummated prior to initiation of construction. Possible adverse effects on water quality due to disposal of drainage in waterways involved in water supply systems will be evaluated.

1-7 ENVIRONMENTAL CONSIDERATIONS.

1-7.1 National Environmental Policy. The National Environmental Policy Act of 1969 (NEPA), approved 1 January 1970, sets forth the policy of the Federal

Government, in cooperation with state and local governments and other concerned public and private organizations, to protect and restore environmental quality. The Act (Public Law [PL] 91-190) states, in part, that Federal agencies have a continuing responsibility to use all practicable means, consistent with other essential considerations of national policy, to create and maintain conditions under which man and nature can exist in productive harmony. Federal plans, functions, and programs are to be improved and coordinated to (1) preserve the environment for future generations, (2) assure safe, healthful, productive, and aesthetically pleasing surroundings for all, (3) attain the widest beneficial uses of the environment without degradation, risk to health or safety or other undesirable consequences, …and (6) enhance the quality of renewable resources and approach the maximum attainable recycling of depletable resources (Refer to Section 101(b) [42 USC § 4321] for complete text.). All Federal agencies, in response to NEPA, must be concerned not just with the impact of their activities on technical and economic considerations but also on the environment.

1-7 ENVIRONMENTAL CONSIDERATIONS. › 1-7.4 Federal Regulations.

1-7.2 Federal Guidelines. Storm drainage design is an integral component in the design of transportation facilities. Drainage design for transportation facilities must strive to maintain compatibility and minimize interference with existing drainage patterns, control flooding of the pavement surface for design flood events, and minimize potential environmental impacts from facility-related storm water runoff. To meet these goals, the planning and coordination of storm drainage systems must begin in the early planning phases of transportation projects. Federal goals for sustainability are outlined in the. Whole Building Design Guide’s (WBDG), Federal Green Construction Guide for Specifiers.

System planning, prior to commencement of design, is essential to the successful development of a final storm drainage design. Successful system planning will result in a final system design that evolves smoothly through the preliminary and final design stages of the transportation project.

1-7.3 Regulatory Considerations. The regulatory environment related to drainage design is ever changing and continues to grow in complexity. Engineers responsible for the planning and design of drainage facilities must be familiar with Federal, state, and local regulations, laws, and ordinances that may impact the design of storm drain systems. A detailed discussion of the legal aspects of highway drainage design, including a thorough review of applicable laws and regulations, is included in the American Association of State Highway and Transportation Officials' (AASHTO) Highway Drainage Guidelines, Volume V, and Model Drainage Manual, Chapter 2. Some of the more significant Federal, state, and local regulations affecting drainage design are summarized in paragraphs 1-7.4 through 1-7.6.

1-7.4 Federal Regulations. The following Federal laws may affect the design of storm drainage systems. The highway drainage engineer should be familiar with these laws and any associated regulatory procedures.

1-7.4.1 The Fish and Wildlife Act of 1956 (Title 16 United States Code [USC] Section 742a, et seq.), the Migratory Game-Fish Act (16 USC § 760c-760g), and the Fish and

Wildlife Coordination Act (16 USC § 661-666c) express the concern of Congress with the quality of the aquatic environment as it affects the conservation, improvement and enjoyment of fish and wildlife resources. The Fish and Wildlife Service's role in the permit review process is to review and comment on the effects of a proposal on fish and wildlife resources. Storm drainage design may impact streams or other channels which fall under the authority of these acts.

1-7.4.2 NEPA (42 USC § 4321-4347) declares the national policy to promote efforts which will prevent or eliminate damage to the environment and biosphere, stimulate the health and welfare of man, and to enrich the understanding of the ecological systems and natural resources important to the nation. NEPA and its implementing guidelines from the Council on Environmental Quality and the Federal Highway Administration (FHWA) affect highway drainage design as it relates to impacts on water quality and ecological systems.

1-7.4.3 Section 401 of the Federal Water Pollution Control Act Amendments of 1972 (FWPCA) (PL 92-500, 86 Stat. 816, 33 USC § 1344) prohibits discharges from point sources unless covered by a National Pollutant Discharge Elimination System (NPDES) permit. These permits are issued under authority of Section 402 of the Act, and must include the more stringent of either technology-based standards or water-quality based standards. The NPDES program regulations are found at Title 40, Code of Federal Regulations, Parts 122-125 (40 CFR 122-125). These regulations govern how the EPA and authorized states write NPDES permits by outlining procedures on how permits shall be issued, what conditions are to be included, and how the permits should be enforced.

1-7.4.4 Section 402p of the FWPCA (PL 92-500, 86 Stat. 816, 33 USC § 1344) requires the EPA to establish final regulations governing storm water discharge permit application requirements under the NPDES program. The permit application requirements include storm water discharges associated with industrial activities. Highway construction and maintenance are classified as industrial activities.

1-7.4.5 The Water Quality Act of 1987 (PL 100-4), an amendment of Section 402p of the FWPCA, provides a comprehensive framework for the EPA to develop a phased approach to regulating storm water discharges under the NPDES program for storm water discharges associated with industrial activity (including construction activities). The Act clarified that permits for discharges of storm water associated with industrial activity must meet all of the applicable provisions of Section 402 and Section 301, including technology and water quality-based standards. The classes of diffuse sources of pollution include urban runoff, construction activities, separate storm drains, waste disposal activities, and resource extraction operations, which all correlate well with categories of discharges covered by the NPDES storm water program.

1-7.4.6 Section 404 of the FWPCA (PL 92-500, 86 Stat. 816, 33 USC § 1344) prohibits the unauthorized discharge of dredged or fill material in navigable waters (waters of the United States (Section 502(7), 33 USC 1362). The instrument of authorization is termed a permit, and the Secretary of the Army, acting through the

Chief of Engineers, U.S. Army Corps of Engineers, has responsibility for the administration of the regulatory program. The definition of navigable waters (waters of the United States, 40 CFR 230.3(s)) includes all coastal waters, navigable waters of the United States to their headwaters, streams tributary to navigable waters of the United States to their headwaters, inland lakes used for recreation or other purposes that may be interstate in nature, and wetlands contiguous or adjacent to the above waters. A water quality certification is also required for these activities.

1-7.4.7 The Coastal Zone Management Act of 1972 (PL 92-583, amended by PL 94-310; 86 Stat. 1280, 16 USC § 1451, et seq.) declares a national policy to preserve, protect, develop, and restore or enhance the resources of the nation's coastal zone, and to assist states in establishing management programs to achieve wise use of land and water resources, giving full consideration to ecological, cultural, historic, and aesthetic values as well as to the needs of economic development. The development of highway storm drainage systems in coastal areas must comply with this act in accordance with state coastal zone management programs.

1-7.4.8 The Coastal Zone Act Reauthorization Amendments of 1990 (CZARA) (PL 101-508) specifically charged state coastal programs (administered under Federal authority by the National Oceanic and Atmospheric Administration [NOAA]), and state nonpoint source programs (administered under Federal authority by the EPA), to address nonpoint source pollution issues affecting coastal water quality. The guidance specifies economically achievable management measures to control the addition of pollutants to coastal waters for sources of nonpoint pollution through the application of the best available nonpoint pollution control practices, technologies, processes, siting criteria, operating methods, or other alternatives.

1-7.4.9 The Safe Drinking Water Act of 1974 (PL 93-523), as amended, includes provisions for requiring protection of surface water discharges in areas designated as sole or principal source aquifers. Mitigation of activities that may contaminate the aquifer (including highway runoff) are typically required to assure Federal funding of the project, which may be withheld if harm to the aquifer occurs.

1-7.5 State Regulations. In addition to complying with the Federal laws cited in paragraphs 1-7.1 through 1-7.4.9, the design of storm drainage systems must also comply with state laws and regulations. State drainage law is derived from both common and statutory law. A summary of applicable state drainage laws originating from common law, or court-made law, and statutory law follow. Note that this is a generalized summary of common state drainage law. Drainage engineers should become familiar with the application of these legal principles in their states.

1-7.5.1 The civil law rule of natural drainage is based upon the perpetuation of natural drainage. A frequently quoted statement of this law is:

. . .every landowner must bear the burden of receiving upon his land the surface water naturally falling upon land above it and naturally flowing to it therefrom, and he has the corresponding right to have the

surface water naturally falling upon his land or naturally coming upon it, flow freely therefrom upon the lower land adjoining, as it would flow under natural conditions. From these rights and burdens, the principle follows that he has a lawful right to complain of others, who, by interfering with natural conditions, cause such surface water to be discharged in greater quantity or in a different manner upon his land, than would occur under natural conditions. . . . (Heier v. Krull. 160 Cal 441 (1911))

This rule is inherently strict, and as a result has been modified to some degree in many states.

1-7.5.2 The reasonable use rule states that the possessor of land incurs liability only when his harmful interference with the flow of surface waters is unreasonable. Under this rule, a possessor of land is legally privileged to make a reasonable use of his land even though the flow of surface waters is altered thereby and causes some harm to others. The possessor of land incurs liability, however, when his harmful interference with the flow of surface waters is unreasonable.

1-7.5.3 Stream water rules are founded on a common law maxim that states that "water runs and ought to run as it is by natural law accustomed to run." Thus, as a general rule, any interference with the flow of a natural watercourse to the damage of another will result in liability. Surface waters from highways are often discharged into the most convenient watercourse. The right is unquestioned if those waters were naturally tributary to the watercourse and unchallenged if the watercourse has adequate capacity; however, if all or part of the surface waters has been diverted from another watershed to a small watercourse, any lower owner may complain and recover for ensuing damage.

1-7.5.4 Eminent domain is a statutory law giving public agencies the right to take private property for public use. This right can be exercised as a means to acquire the right to discharge highway drainage across adjoining lands when this right may otherwise be restricted. Whenever the right of eminent domain is exercised, a requirement of just compensation for property taken or damaged must be met.

1-7.5.5 Agricultural drainage laws have been adopted in some states. These laws provide for the establishment, improvement, and maintenance of ditch systems. Drainage engineers may have to take into consideration agricultural laws that may or may not permit irrigation waste water to drain into the highway right-of-way. If the drainage of irrigated agricultural lands into roadside ditches is permitted, excess irrigation water may have to be provided for in the design of the highway drainage system.

1-7.5.6 Environmental quality acts have been enacted by many states to promote the enhancement and maintenance of the quality of life. Hydraulic engineers should be familiar with these statutes.

1-7 ENVIRONMENTAL CONSIDERATIONS. › 1-7.7 U.S. Army Environmental Quality Program.

1-7.6 Local Laws. Many governmental subdivisions have adopted ordinances and codes that impact drainage design. These include regulations for erosion control, BMPs, and storm water detention.

1-7.6.1 Erosion control regulations set forth practices, procedures, and objectives for controlling erosion from construction sites. Cities, counties, or other government subdivisions commonly have erosion control manuals that provide guidance for meeting local requirements. Erosion control measures are typically installed to control erosion during construction periods, and are often designed to function as a part of the highway drainage system. Additionally, erosion control practices may be required by the regulations governing storm water discharge requirements under the NPDES program. These erosion and sediment control ordinances set forth enforceable practices, procedures, and objectives for developers and contractors to control sedimentation and erosion by setting specific requirements that may include adherence to limits of clearing and grading, time limit or seasonal requirements for construction activities to take place, stabilization of the soil, and structural measures around the perimeter of the construction site.

1-7.6.2 Best managagement practices (BMP) regulations set forth practices, procedures, and objectives for controlling storm water quality in urbanizing areas. Many urban city or county government bodies have implemented BMP design procedures and standards as a part of their land development regulations. The design and implementation of appropriate BMPs for controlling storm water runoff quality in these areas must be a part of the overall design of highway storm drainage systems. Additionally, the NPDES permit program for storm water management addresses construction site runoff by the use of self-designed storm water pollution prevention plans. These plans are based upon three main types of BMPs: those that prevent erosion, others that prevent the mixing of pollutants from the construction site with storm water, and those that trap pollutants before they can be discharged. All three of these BMPs are designed to prevent, or at least control, the pollution of storm water before it has a chance to affect receiving streams.

1-7.6.3 Storm water detention regulations set forth practices, procedures, and objectives for controlling storm water quantity through the use of detention basins or other controlling facilities. The purpose of these facilities is to limit increases in the amount of runoff resulting from land development activities. In some areas, detention facilities may be required as a part of the highway storm drainage system. Detention and retention basins must generally meet design criteria to control the more frequent storms and to safely pass larger storm events. Storm water management may also include other measures to reduce the rate of runoff from a developed site, such as maximizing the amount of runoff that infiltrates back into the ground.

1-7.7 U.S. Army Environmental Quality Program. Army Regulation (AR) 200-1, outlines the Army’s fundamental environmental policies, management of its programs, and its various types of activities, one of which, water resources management, includes minimizing soil erosion and attendant pollution caused by rapid runoff into streams and rivers. The overall goal is to “plan, initiate, and carry out all actions and programs in a

1-7 ENVIRONMENTAL CONSIDERATIONS. › 1-7.12 Environmental Effects of Surface Drainage Systems.

manner that will minimize or avoid adverse effects on the quality of the human environment without impairment of the Army mission.” A primary objective is to eliminate the discharge of pollutants produced by Army activities. Provision of suitable surface drainage facilities is necessary in meeting this objective.

1-7.8 U.S. Air Force Environmental Quality Program. Air Force policy directive (AFPD) 32-70 enunciates Air Force policy in compliance with NEPA executive orders and DOD directives. Procedures outlined in AFPD 32-70 are similar to those described for Army installations. Air Force instruction (AFI) 32-7061 establishes 32 CFR part 989 as the controlling document on environmental assessments and statements for Air Force facilities.

1-7.9 U.S. Navy Environmental Quality Program. The Navy's Environmental Quality Initiative (EQI) is a comprehensive initiative focused on maximizing the use of pollution prevention to achieve and maintain compliance with environmental regulations. The EQI is a fundamental part of the Navy environmental strategy called AIMM to SCORE – Assess, Implement, Manage and Measure to achieve Sustained Compliance and Operational Readiness through Environmental Excellence.

1-7.10 FAA Environmental Handbook. FAA Order 5050.4 provides instructions and guidance for preparing and processing the environmental assessments, findings of no significant impact (FONSI), and environmental impact statements (EIS) for airport development proposals and other airport actions as required by various laws and regulations.

1-7.11 Environmental Impact Analysis. A comprehensive reference, Handbook for Environmental Impact Analysis, was issued in September of 1974. This document, prepared by the U.S. Army Corps of Engineers Construction Engineering Research Laboratory (CERL), presents recommended procedures for use by Army personnel in preparing and processing environmental impact assessments (EIA) and EIS. The procedures list step-by-step actions considered necessary to comply with requirements of NEPA and subsequent guidelines. These require that all Federal agencies use a systematic and disciplinary approach to incorporate environmental considerations into their decision making process.

1-7.12 Environmental Effects of Surface Drainage Systems. Such facilities in the arctic or subarctic could have either beneficial or adverse environmental impacts affecting water, land, ecology, and socioeconomic (human and economic) considerations. Despite low population density and minimal development, the fragile nature of the ecology in the arctic and subarctic has attracted the attention of environmental groups interested in protecting these unique assets. Effects on surrounding land and vegetation may cause changes in various conditions in the existing environment, such as surface water quantity and quality, groundwater levels and quality, drainage areas, animal and aquatic life, and land use. Proposed systems may also have social impacts on the community, requiring relocation of military and public activities, open space, recreational activities, community activities, and quality of life. Environmental attributes related to water could include such items as erosion,

1-7 ENVIRONMENTAL CONSIDERATIONS. › 1-7.14 Effects of Drainage Facilities on Fish.

aquifer yield, flood potential, flow or temperature variations (the latter affecting permafrost levels and ice jams), biochemical oxygen demand, and content of dissolved oxygen, dissolved solids, nutrients, and coliform organisms. These are among many possible attributes to be considered in evaluating environmental impacts, both beneficial and adverse, including effects on surface water and groundwater. Various methods are explained for presenting and summing up the impact of these effects on the environment.

1-7.13 Discharge Permits. The Federal pollution abatement program requires regulatory permits for all discharges of pollutants from point sources (such as pipelines, channels, or ditches) into navigable waters or their tributaries. This requirement does not extend to discharges from separate storm sewers except where the storm sewers receive industrial, municipal, and agricultural wastes or runoff, or where the storm water discharge has been identified as a significant contributor of pollution by the EPA regional administrator, the state water pollution control agency, or an interstate agency. Federal installations, while cooperating with and furnishing information to state agencies, do not apply for or secure state permits for discharges into navigable waters.

1-7.14 Effects of Drainage Facilities on Fish. In many locations, natural drainage channels are environmentally important to preserve fish resources. Culverts, ditches, and other drainage structures constructed along or tributary to these fish streams must be designed to minimize adverse environmental effects. Culvert hazards to fish include high inverts, excessive velocities, undersized culverts, stream degradation, failed or damaged culverts that create obstructions, erosion and siltation at outlets, blockage by icing, and seasonal timing and methods of drainage construction. Consult Federal and state fish and wildlife agencies for guidance on probable effects and possible expedients to mitigate them. Give special concern to anticipated conditions during fish migration season. More information is located in Chapter 4.

2-2 HYDROLOGIC CRITERIA. › 2-2.4 Design Storm Frequency

CHAPTER 2

SURFACE HYDROLOGY 2-1 PURPOSE AND SCOPE. This chapter presents explanations and examples to give a better understanding of problems in the design of drainage facilities, and outlines convenient methods of estimating design capacities for drainage facilities.

2-2 HYDROLOGIC CRITERIA. The Rational Method, developed over 100 years ago, is widely used for estimating design runoff from urban areas. The Rational Formula, popular because of its simplicity in application, is suited mainly to sizing culverts, storm drains, or channels to accommodate drainage from small areas, generally less than 200 acres. Selection of appropriate values of runoff coefficients in the formula depends on the experience of the designers and the designers’ knowledge of local rainfall-runoff relationships. United States Geological Survey (USGS) regression equations and National Resources Conservation Service (NRCS) techniques appropriate for surface drainage design are also included in this chapter.

2-2.1 Design Objectives. The design capacity of surface drainage systems should economically drain the facilities with due consideration of the mission and importance of the particular facility and environmental impacts.

2-2.2 Degree of Drainage Required. The degree of protection to be provided by the drain system depends largely on the importance of the facility as determined by the type and volume of traffic to be accommodated, the necessity for uninterrupted service, and similar factors. Although the degree of protection should increase with the importance of the facility, minimum requirements must be adequate to avoid hazards to operation. One severe accident chargeable to inadequate drainage can offset any difference between the cost of reasonably adequate and inadequate drainage facilities. In some cases, one can justify use of design storm frequencies appreciably higher than minimum criteria in order to protect important facilities. In some designs, portions of the drainage system have been based on as high as a 50-year (yr) design frequency to reduce likelihood of flooding a facility essential to operations and to prevent loss of life.

2-2.3 Surface Runoff from Design Storm. Surface runoff from the selected design storm will be disposed of without damage to facilities, undue saturation of the subsoil, or significant interruption of normal traffic. In addition, certain facilities may have restrictions on surface storage of water due to the potential attraction of waterfowl. For more information on waterfowl hazards, refer to Air Force pamphlet (AFPAM) 91-212 FAA Advisory Circular (AC) 150/5200-33.

2-2.4 Design Storm Frequency

2-2.4.1 DOD Airfields and Heliports. For airfields and heliports, a minimum of a 2-year storm event is required unless a waiver is obtained. This event shall have no encroachment of runoff on taxiway and runway pavements (including paved shoulders). It should be noted that after this design storm frequency is specified, computations must be made to determine the critical duration of rainfall required to produce the maximum

2-2 HYDROLOGIC CRITERIA. › 2-2.6 Reliability of Operation.

rate of runoff for each area. This will depend primarily on the slope and length of overland flow. Another important aspect of the design is minimizing ponding during rain events. Ponding is the accumulation of water around an inlet structure during a rain event. Typically, ponding will be limited around the apron inlets such that it does not exceed 4 inches.

2-2.4.2 Federal Aviation Administration. For airports, it is recommended that the 5-year storm event be used with no encroachment of runoff on taxiway and runway pavements (including paved shoulders). The damage or inconvenience that may be caused by storms greater than the 5-year event may not warrant the increased cost of a drainage system large enough to accommodate that storm. The calculation of and provision for the storage of water or ponding between runways, taxiways, and aprons should usually be considered as a safety factor for temporary accommodation of runoff from storm return periods longer than 5 years. Ponding or storage of water of more than a temporary nature may be acceptable on the airport site other than between runways, taxiways, and aprons. Such temporary storage may indeed be essential because of limitations in offsite outfalls. An additional design consideration is the ponding of water around an inlet structure on an apron during a rain event. Typically, ponding will be limited around an apron inlet such that it does not exceed 4 inches.

2-2.4.3 Areas Other Than Airfields. For such developed portions of military installations as roadways, administrative, industrial, and housing areas, the design storm will normally be based on rainfall of 10-year frequency. Potential damage or operational requirements may warrant a more severe criterion; in certain storage and recreational areas, a lesser criterion may be appropriate. (With concurrence of the using service, a lesser criterion may also be employed in regions where storms of an appreciable magnitude are infrequent and either damages or operational capabilities are such that large expenditures for drainage are not justified.)

An additional design consideration is the spread of water around inlets. Spread is the width of water on the paved surface measured perpendicular to the curb face. More information on limitations of spread can be found in Chapter 3.

2-2.5 Surface Runoff from Storms Exceeding Design Storm. The design storm frequency alone is not a reliable criterion of the adequacy of storm drain facilities. It is advisable to investigate the probable consequences of storms more severe and less frequent than the design storm before making final decisions regarding the adequacy of proposed drain-inlet capacities. Surface runoff from storms greater than the design storm will be disposed of with the minimum damage to the airfield or heliport. The center 50 percent of runways; the center 50 percent of taxiways serving these runways; and helipad surfaces along the centerline should be free from ponding resulting from storms of a 10-yr frequency and intensity determined by the geographic location. For areas other than airfields and heliports, check with the appropriate local regulatory agency for guidance on design storm requirements.

2-2.6 Reliability of Operation. The drainage system will have the maximum reliability of operation practicable under all conditions, with due consideration given to

2-3 HYDROLOGIC METHODS AND PROCEDURES. › 2-3.1 Rainfall (Precipitation).

abnormal requirements such as debris and annual periods of snowmelt and ice jam breakup.

2-2.7 Environmental Impact. Drainage facilities will be constructed with minimal impact on the environment.

2-2.8 Maintenance. The drainage system will require minimum maintenance, and that maintenance will be accomplished quickly and economically. Particular reliance will be placed on maintenance of drainage components serving operational facilities.

2-2.9 Future Expansion. Future expansion of drainage facilities will be feasible with the minimum of expense and interruption to normal traffic.

2-3 HYDROLOGIC METHODS AND PROCEDURES. This section provides an overview of hydrologic methods and procedures commonly used in drainage design. These methods include: the Rational Method, the Soil Conservation Service (SCS) Technical Release 55 (TR-55) method, and the United States Geological Survey (USGS) regression equations. Much of the information contained in this section was condensed from the FHWA Hydraulic Engineering Circular No. 22 (HEC-22). The presentation here is intended to provide the reader with an introduction to the methods and procedures, their data requirements, and their limitations. Most of these procedures can be applied using commonly available computer programs. Chapter 12 of this manual contains information on available computer programs.

2-3.1 Rainfall (Precipitation). Rainfall, along with watershed characteristics, determines the flood flows upon which storm drainage design is based. In this section, we will describe the constant rainfall and the synthetic rainfall techniques.

2-3.1.1 Constant Rainfall Intensity. Although rainfall intensity varies during precipitation events, many of the procedures used to derive peak flow are based on an assumed constant rainfall intensity. Intensity is defined as the rate of rainfall and is typically given in units of inches per hour (in/hr).

Intensity-duration-frequency curves (IDF curves) have been developed for many jurisdictions throughout the United States through frequency analysis of rainfall events for thousands of rainfall gages. The IDF curve provides a summary of a site's rainfall characteristics by relating storm duration and exceedance probability (frequency) to rainfall intensity (assumed constant over the duration). Figure 2-1 illustrates an example IDF curve. To interpret an IDF curve, find the rainfall duration along the X-axis, go vertically up the graph until reaching the proper return period, then go horizontally to the left and read the intensity off of the Y-axis. Regional IDF curves are available in most state or local highway agency drainage manuals. If the IDF curves are not available, the designer needs to develop them on a project-by-project basis.

Figure 2-1. Example IDF Curve

Figure 2-1: picture of page 30Figure 2-1 · page 30
Picture of the page from the copy saved here

2-3.1.2 Synthetic Rainfall Events. Drainage design is usually based on synthetic rather than actual rainfall events. The SCS 24-hour (hr) rainfall distributions are the most widely used synthetic hyetographs. These rainfall distributions were developed by the U.S. Department of Agriculture SCS, which is now known as Natural Resources Conservation Service (NRCS). The SCS 24-hour distributions incorporate the intensityduration relationship for the design return period. This approach is based on the assumption that the maximum rainfall for any duration within the 24-hour duration should have the same return period. For example, a 10-year, 24-hour design storm would contain the 10-year rainfall depths for all durations up to 24 hours as derived from IDF curves. SCS developed four synthetic 24-hour rainfall distributions as shown in Figure 2-2; approximate geographic boundaries for each storm distribution are shown in Figure 2-3.

Figure 2-2. SCS 24-hour Rainfall Distribution

Figure 2-3: picture of page 32Figure 2-3 · page 32
Picture of the page from the copy saved here

2-3 HYDROLOGIC METHODS AND PROCEDURES. › 2-3.2 Determination of Peak Flow Rates.

Figure 2-3. Approximate Geographic Areas for SCS Rainfall Distributions

Although the SCS distributions shown do not agree exactly with IDF curves for all locations in the region for which they are intended, the differences are within the accuracy limits of the rainfall depths from the Weather Bureau's rainfall frequency atlases.

2-3.2 Determination of Peak Flow Rates. Peak flows are generally adequate for design and analysis of conveyance systems such as storm drains or open channels; however, if the design or analysis must include flood routing (e.g., storage basins or complex conveyance networks), a flood hydrograph is required. This section discusses three methods, the Rational Method, the SCS TR-55 method, and the USGS regression equations, that are used to derive peak flows for both gaged and ungaged sites. Each method can be used to develop a peak discharge. The drainage area of the project usually dictates which of these methods should be used. The Rational Method is the most commonly used method, but due to its assumptions, it is limited to drainage areas smaller than 200 acres. For drainage areas up to 2000 acres, the SCS TR-55 method is commonly used. Due to the way in which the regression equations were developed, they are usually not appropriate for very small areas, but each set of equations has its own limitations and those should be understood before the equations are applied. The regression equations are often used to compute the discharges for larger areas such as those necessary for culvert design.

2-3.2.1 Rational Method. One of the most commonly used equations for the calculation of peak flow from small areas is the Rational Formula, given as Equation 2-1:

CIA Q  (2-1)

where:

Q = flow, ftP3

P/s

C = dimensionless runoff coefficient representing the characteristics of the

watershed

I = rainfall intensity, in/hr

A = drainage area, hectares, acres

2-3.2.1.1 Assumptions. Assumptions inherent in the Rational Formula are that:

 Peak flow occurs when the entire watershed is contributing to the flow.

 Rainfall intensity is the same over the entire drainage area.

 Rainfall intensity is uniform over a time duration equal to the time of

concentration (tRc

R). The time of concentration is the time required for water to travel from the hydraulically most remote point of the basin to the point of interest.

 The frequency of the computed peak flow is the same as that of the rainfall

intensity, i.e., the 10-year rainfall intensity is assumed to produce the 10-year peak flow.

 The coefficient of runoff is the same for all storms of all recurrence

probabilities.

2-3.2.1.2 Limitations. Because of the inherent assumptions, the Rational Formula should be applied only to drainage areas smaller than 200 acres.

2-3.2.2 Runoff Coefficient

2-3.2.2.1 The runoff coefficient, C, in Equation 2-1 is a function of the ground cover and a host of other hydrologic abstractions. It relates the estimated peak discharge to a theoretical maximum of 100 percent runoff. Typical values for C are given in Table 2-1. If the basin contains varying amounts of different land cover or other abstractions, a composite coefficient can be calculated through area weighing using Equation 2-2:

weighted C =  

total

x x A

A C  (2-2)

where:

x = subscript designating values for incremental areas with consistent land

cover

Table 2-1. Runoff Coefficients for Rational Formula

Type of Drainage Area Runoff Coefficient, C*

Business: Downtown areas 0.70 - 0.95 Neighborhood areas 0.50 - 0.70 Residential: Single-family areas 0.30 - 0.50 Multi-units, detached 0.40 - 0.60 Multi-units, attached 0.60 - 0.75 Suburban 0.25 - 0.40 Apartment dwelling areas 0.50 - 0.70 Industrial: Light areas 0.50 - 0.80 Heavy areas 0.60 - 0.90 Parks, cemeteries 0.10 - 0.25 Playgrounds 0.20 - 0.40 Railroad yard areas 0.20 - 0.40 Unimproved areas 0.10 - 0.30 Lawns: Sandy soil, flat, 2 percent 0.05 - 0.10 Sandy soil, average, 2 to 7 percent 0.10 - 0.15 Sandy soil, steep, 7 percent 0.15 - 0.20 Heavy soil, flat, 2 percent 0.13 - 0.17 Heavy soil, average, 2 to 7 percent 0.18 - 0.22 Heavy soil, steep, 7 percent 0.25 - 0.35 Streets: Asphaltic 0.70 - 0.95 Concrete 0.80 - 0.95 Brick 0.70 - 0.85 Drives and walks 0.75 - 0.85 Roofs 0.75 - 0.95 *Higher values are usually appropriate for steeply sloped areas and longer return periods because infiltration and other losses have a proportionally smaller effect on runoff in these cases.

2-3.2.2.2 Example 2-1 illustrates the calculation of the runoff coefficient, C, using area weighing.

UExample 2-1

Given: These existing and proposed land uses:

Existing conditions (unimproved):

Land Use Area, acres Runoff Coefficient, C Unimproved Grass 22.1 0.25 Grass 21.2 0.22 Total = 43.3 Proposed conditions (improved):

Land Use Area, acres Runoff Coefficient, C Paved 5.4 0.90 Lawn 1.6 0.15 Unimproved Grass 18.6 0.25 Grass 17.7 0.22 Total = 43.3 Find: Weighted runoff coefficient, C, for the existing and proposed conditions.

Solution:

Step 1. Determine weighted C for existing (unimproved) conditions using

Equation 2-2.

weighted C =  

A

A C x x 

weighted C =          3 43 22 0 2 21 25 0 1 22 .

. . . . 

weighted C = 0.235

Step 2. Determine weighted C for proposed (improved) conditions using

Equation 2-2.

weighted C =              3 43 22 0 7 17 25 0 6 18 15 0 6 1 90 0 4 5 .

…   

weighted C = 0.315

2-3.2.3 Rainfall Intensity. Rainfall intensity, duration, and frequency curves are necessary to use the Rational Method. Regional IDF curves are available in most state

and local highway agency manuals and are also available from NOAA. If the IDF curves are not available, they should be developed.

2-3.2.4 Time of Concentration. A number of methods can be used to estimate time of concentration, tRc

R, some of which are intended to calculate the flow velocity within individual segments of the flow path (e.g., shallow concentrated flow, open channel flow, etc.). The time of concentration can be calculated as the sum of the travel times within the various consecutive flow segments. For additional discussion on establishing the time of concentration for inlets and drainage systems, see Chapters 3 and 6 of this manual.

2-3.2.4.1 Sheet Flow Travel Time. Sheet flow is the shallow mass of runoff on a planar surface with a uniform depth across the sloping surface. This usually occurs at the headwater of streams over relatively short distances, rarely more than about 400 feet (ft), and possibly less than 80 feet. Sheet flow is commonly estimated with a version of the kinematic wave equation, a derivative of Manning's equation, shown as Equation 2-3:

6 0

4 0

.

.

c ti S nL I

K T  

  

  (2-3)

where:

TRti

R = sheet flow travel time, minutes (min)

n = roughness coefficient (see Table 2-2)

L = flow length, ft

I = rainfall intensity, in/hr

S = surface slope, feet per feet (ft/ft)

KRc

R = empirical coefficient equal to 0.933

Table 2-2. Manning's Roughness Coefficient (n) for Overland Sheet Flow

Surface Description n

Smooth asphalt 0.011 Smooth concrete 0.012 Ordinary concrete lining 0.013 Good wood 0.014 Brick with cement mortar 0.014 Vitrified clay 0.015 Cast iron 0.015

Surface Description n

Corrugated metal pipe 0.024 Cement rubble surface 0.024 Fallow (no residue) 0.05 Cultivated soils Residue cover < 20 percent 0.06 Residue cover > 20 percent 0.17 Range (natural) 0.13 Grass Short grass prairie 0.15 Dense grasses 0.24 Bermuda grass 0.41 Woods* Light underbrush 0.40 Dense underbrush 0.80 *When selecting n, consider cover to a height of about 1.2 inches. This is only part of the plant cover that will obstruct sheet flow.

Since the rainfall intensity value, I, depends on tRti

R and tRti

R is not initially known, the computation of tRti

R is an iterative process. An initial estimate of tRti

R is assumed and used to obtain I from the IDF curve for the locality. The tRti

R is then computed from Equation 2-3 and used to check the initial value of tRti

R. If they are not the same, the process is repeated until two successive tRti

R estimates are the same.

2-3.2.4.2 Shallow Concentrated Flow Velocity. After short distances of at most 300 ft, sheet flow tends to concentrate in rills and then gullies of increasing proportions. Such flow is usually referred to as shallow concentrated flow. The velocity of such flow can be estimated using a relationship between velocity and slope as shown in Equation 2-4:

  5 0 28 3 . p kS . V  (2-4)

where:

V = velocity, ft/s

k = intercept coefficient (see Table 2-3)

SRp

R = slope, percent

Table 2-3. Intercept Coefficients for Velocity vs.

Slope Relationship of Equation 2-4

Land Cover/Flow Regime k

Forest with heavy ground litter; hay meadow (overland flow) 0.076 Trash fallow or minimum tillage cultivation; contour or strip cropped; woodland (overland flow) 0.152

Short grass pasture (overland flow) 0.213 Cultivated straight row (overland flow) 0.274 Nearly bare and untilled (overland flow); alluvial fans in western mountain regions 0.305

Grassed waterway (shallow concentrated flow) 0.457 Unpaved (shallow concentrated flow) 0.491 Paved area (shallow concentrated flow); small upland gullies 0.619

2-3.2.4.3 Open Channel and Pipe Flow Velocity. Flow in gullies empties into channels or pipes. Open channels are assumed to begin where either the blue stream line shows on USGS quadrangle sheets or the channel is visible on aerial photographs. Cross-section geometry and roughness should be obtained for all channel reaches in the watershed. Manning's equation can be used to estimate average flow velocities in pipes and open channels as follows:

2 1 3 2 49 1 / / S R n . V  (2-5)

where:

n = roughness coefficient (see Table 2-4)

V = velocity, ft/s

R = hydraulic radius (defined as the flow area divided by the wetted perimeter),

ft

S = slope, ft/ft

Table 2-4. Values of Manning's Coefficient (n) for Channels and Pipes

Conduit Material Manning's n*

Closed Conduits Brick 0.013 - 0.017 Cast iron pipe Cement-lined and seal coated 0.011 - 0.015

Conduit Material Manning's n*

Concrete (monolithic) 0.012 - 0.014 Concrete pipe 0.011 - 0.015 Corrugated-metal pipe – 0.5 inch by 2.5 inch corrugations Plain 0.022 - 0.026 Paved invert 0.018 - 0.022 Spun asphalt lines 0.011 - 0.015 Plastic pipe (smooth) 0.011 - 0.015 Vitrified clay Pipes 0.011 - 0.015 Liner plates 0.013 - 0.017 Open Channels Lined channels Asphalt 0.013 - 0.017 Brick 0.012 - 0.018 Concrete 0.011 - 0.020 Rubble or riprap 0.020 - 0.035 Vegetal 0.030 - 0.400 Excavated or dredged Earth, straight and uniform 0.020 - 0.030

Earth, winding, fairly uniform 0.025 - 0.040

Rock 0.030 - 0.045 Unmaintained 0.050 - 0.140 Natural channels (minor streams, top width at flood stage < 100 feet)

Fairly regular section 0.030 - 0.070 Irregular section with pools 0.040 - 0.100 *Lower values are usually for well-constructed and maintained (smoother) pipes and channels.

For a circular pipe flowing full, the hydraulic radius is one-fourth of the diameter. For a wide rectangular channel (W > 10 d), the hydraulic radius is approximately equal to the depth. The travel time is then calculated as follows:

V L Tti 60  (2-6)

where:

TRti

R = travel time for segment i, min

L = flow length for segment i, ft

V = velocity for segment i, ft/s

UExample 2-2

Given: These flow path characteristics:

UFlow Segment ULength (ft) USlope (ft/ft) USegment Description 1 (sheet flow) 223 0.005 Bermuda grass 2 (shallow conduit) 259 0.006 Grassed waterway 3 (flow in conduit) 479 0.008 15-in concrete pipe

Find: Time of concentration, tRc

R, for the area.

Solution:

Step 1. Calculate time of concentration for each segment.

Segment 1

Obtain Manning's n roughness coefficient from Table 2-2: n = 0.41

Determine the sheet flow travel time using Equation 2-3:

6 0

4 0

.

.

c ti S nL I

K T  

  

 

Since the rainfall intensity value, I, is being sought and is also in the equation, an iterative approach must be used. From experience, estimate a time of concentration and read a rainfall intensity from the appropriate IDF curve. In this example, try a time of concentration of 30 min and read from the IDF curve in Figure 2-1 an intensity of 3.4 in/hr. Now use Equation 2-3 to see how good the 30-min estimate was.

First, solve the equation in terms of I.



    

 

4 0

6 0

5 0 4 0 1 68 68 005 0 223 41 0 933 0

.

.

. . ti I

. . . I . T   

  

  

  

 

Inserting 3.4 in/hr for I, the result is 42.1 min. Since 42.1 is greater than the assumed 30 min, try the intensity for 42 min from Figure 2-1, which is 2.8 in/hr.

Using 2.8 in/hr, the result is 45.4 min. Repeat the process with 2.7 in/hr for 45 min and the result is a time of 46.2. This value is close to the 45.2 min.

Use 46 min for segment 1.

Segment 2

Obtain the intercept coefficient, k, from Table 2-3: k = 0.457 and KRc

R = 3.281

Determine the concentrated flow velocity from Equation 2-4:

ft/s 16 1 5 0 ) 6 0 )( 457 0 )( 28 3 ( 5 0 28 3 … p kS . V   

Determine the travel time from Equation 2-6:

       min 7 3 16 1 60 259 60 2 . . V L Tti   

Segment 3

Obtain Manning's n roughness coefficient from Table 2-4: n = 0.011

Determine the pipe flow velocity from Equation 2-5 (assuming full flow)

V = (1.49/0.011)(1.25/4)0.67 (0.008)0.5 = 5.58 ft/s

Determine the travel time from Equation 2-6:

       min 4 1 58 5 60 479 60 3 . . V L Tti   

Step 2. Determine the total travel time by summing the individual travel times:

tRc

R = TRti1

R + TRti2

R + TRti3

R = 46.0 + 3.7 + 1.4 = 51.1 min Use 51 min

UExample 2-3

Given: Land use conditions from Example 2-1 and the following times of concentration:

Condition Time of concentration

tRc

R (min)

Weighted C (from Example 2-1) Existing condition (unimproved) 88 0.235 Proposed condition (improved) 66 0.315

Area = 43.36 acres

2-3 HYDROLOGIC METHODS AND PROCEDURES. › 2-3.3 USGS Regression Equations.

Find: The 10-year peak flow using the Rational Formula and the IDF curve shown in Figure 2-1.

Solution:

Step 1. Determine the rainfall intensity, I, from the 10-yr IDF curve for each time of

concentration.

Existing condition (unimproved) 1.9 in/hr

Proposed condition (improved) 2.3 in/hr

Step 2. Determine peak flow rate, Q.

Existing condition (unimproved):

Q = CIA

= (0.235)(1.9)(43.3)

= 19.3 ftP3

P/s

Proposed condition (improved):

Q = CIA

= (0.315)(2.3)(43.3)

= 31.4 ftP3

P/s

2-3.3 USGS Regression Equations. Regression equations are commonly used for estimating peak flows at ungaged sites or sites with limited data. The USGS has developed and compiled regional regression equations that are included in a computer program called the National Flood Frequency program (NFF). NFF allows quick and easy estimation of peak flows throughout the United States. All the USGS regression equations were developed using dependent variables in English units. Local equations may be available to provide better correspondence to local hydrology than the regional equations found in NFF. For more information on NFF, refer to paragraph 12-7.7.

2-3.3.1 Rural Equations. The rural equations are based on watershed and climatic characteristics within specific regions of each state that can be obtained from topographic maps, rainfall reports, and atlases. These regression equations are generally of the following form:

d c b T C B aA RQ  (2-7)

where:

RQRT

R = T-year rural peak flow

a = regression constant

b,c,d = regression coefficients

A,B,C = basin characteristics

Through a series of studies conducted by the USGS, state highway, and other agencies, rural equations have been developed for all states. The NFF program described in Chapter 12 is a companion software package to implement these equations. These equations should not be used where dams and other hydrologic modifications have a significant effect on peak flows. Many other limitations are presented in USGS documents.

2-3.3.2 Urban Equations. Rural peak flow can be converted to urban peak flows with the seven-parameter nationwide urban regression equations developed by the USGS. These equations are shown in Table 2-5. A three-parameter equation has also been developed, but the seven-parameter equation is implemented in NFF. The urban equations are based on urban runoff data from 269 basins in 56 cities and 31 states. These equations have been thoroughly tested and proven to give reasonable estimates of peak flows having recurrence intervals between 2 and 500 years. Subsequent testing at 78 additional sites in the southeastern United States verified the adequacy of the equations. While these regression equations have been verified, errors may still be approximately 35 to 50 percent when compared to field measurements. More information can be found in the USGS publication, Flood Characteristics of Urban Watersheds in the United States, Paper 2207 (1983).

Table 2-5. Nationwide Urban Equations Developed by the USGS

Equation

Chapter Equation

Number

47 . 15 . 32 . 65 . 04 .2 17 . 41 . 2 ) 13 ( ) 8 ( ) 3 2 ( 35 .2 2 RQ IA BDF ST RI SL A UQ s s

      (2-8)

54 11 31 59 86 1 16 35 5 13 8 3 2 70 2 5 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-9)

58 09 30 57 75 1 15 32 10 13 8 3 2 99 2 10 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-10)

60 07 29 55 76 1 15 31 25 13 8 3 2 78 2 25 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-11)

62 06 28 53 74 1 15 29 50 13 8 3 2 67 2 50 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-12)

63 06 28 52 76 1 15 29 100 13 8 3 2 50 2 100 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-13)

63 05 27 54 86 1 16 29 500 13 8 3 2 27 2 500 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ       (2-14)

Equation

Chapter Equation

Number where:

UQRT

R = Urban peak discharge for T-year recurrence interval, ftP3

P/s ARs

R = Contributing drainage area, miP2 SL = Main channel slope (measured between points that are 10 and

85 percent of main channel length upstream of site), ft/mi RI2 = Rainfall intensity for 2-hour, 2-year recurrence, in/hr ST = Basin storage (percentage of basin occupied by lakes, reservoirs,

swamps, and wetlands), percent BDF = Basin development factor (provides a measure of the hydraulic

efficiency of the basin (see description in paragraph 2-3.3.2) IA = Percentage of basin occupied by impervious surfaces RQRT

R = T-year rural peak flow

The basin development factor (BDF) is a highly significant parameter in the urban equations and provides a measure of the efficiency of the drainage basin and the extent of urbanization. It can be determined from drainage maps and field inspection of the basin. The basin is first divided into upper, middle, and lower thirds. Within each third of the basin, four characteristics must be evaluated and assigned a code of 0 or 1. The four characteristics are: channel improvements; channel lining (prevalence of impervious surface lining); storm drains or storm sewers; and curb and gutter streets.

With the curb and gutter characteristic, at least 50 percent of the partial basin must be urbanized or improved with respect to an individual characteristic to be assigned a code of 1. With four characteristics being evaluated for each third of the basin, complete development would yield a BDF of 12.

UExample 2-4

Given: The following site characteristics:

 The site is located in Tulsa, Oklahoma.

 The drainage area is 3 square miles (miP2

P)

 The mean annual precipitation is 38 inch

 Urban parameters (see Table 2-5 for parameter definition):

SL = 53 ft/mi

RI2 = 2.2 in/hr (see National Weather Service Technical Paper 40)

2-3 HYDROLOGIC METHODS AND PROCEDURES. › 2-3.4 SCS TR-55 Peak Flow Method.

ST = 5

BDF = 7

IA = 35

Find: The 2-year urban peak flow.

Solution:

Step 1. Calculate the rural peak flow from the appropriate regional equation.

From Water-Resources Investigations Report 94-4002, the rural regression equation for Tulsa, Oklahoma, is:

s / ft ) ( ) ( . P A . RQ . . . . 3 84 1 59 84 1 59 568 38 3 368 0 368 0 2   

Step 2. Calculate the urban peak flow using Equation 2-8.

47 15 32 65 04 2 17 41 2 13 8 3 2 35 2 2 . . s … s RQ IA ) BDF ( ) ST ( ) RI ( SL A . UQ   

s / ft ) ( ) ( ) ( ) ( ) . ( ) ( ) ( . UQ … 3 47 15 32 65 04 2 17 41 747 568 35 7 13 8 5 3 2 2 53 3 35 2 2    

2-3.4 SCS TR-55 Peak Flow Method. The SCS (now known as NRCS) peak flow method calculates peak flow as a function of drainage basin area, potential watershed storage, and the time of concentration. An easy to use graphical approach to this method can be found in the TR-55 publication. While some equations are presented in this UFC, graphs, charts, and figures that easily solve the equations are found in TR-55. This rainfall-runoff relationship separates total rainfall into direct runoff, retention, and initial abstraction to yield the following equation for rainfall runoff:

R

R D S . P

) S . P ( Q 8 0 2 0 2

   (2-15)

where:

QRD

R = depth of direct runoff, inch

P = depth of 24-hour precipitation, inch This information is available in most

highway agency drainage manuals by multiplying the 24-hour rainfall intensity by 24 hour.

SRR

R = retention, inch

2-3.4.1 Empirical studies found that SRR

R is related to soil type, land cover, and the antecedent moisture condition of the basin. These are represented by the runoff curve number, CN, which is used to estimate SRR

R with this equation:

      10 1000 CN SR (2-16)

where:

CN = Curve number, listed in Table 2-6 for different land uses and hydrologic

soil types. This table assumes average antecedent moisture conditions. For multiple land use/soil type combinations within a basin, use area weighing (see Example 2-1). Soil maps are generally available through the local jurisdiction or the NRCS. Soils are grouped into categories A through D based on soil characteristics. Soil Group A includes pervious sandy soils, while Soil Group D includes non-pervious rocks and clays. A complete description is provided in TR-55.

2-3.4.2 Peak flow is then estimated with Equation 2-17:

D k u p Q A q q  (2-17)

where:

qRp

R = peak flow, ftP3

P/s

qRu

R = unit peak flow, ftP3

P/s/miP2

P/in.

ARk

R = basin area, miP2

QRD

R= runoff depth, in.

The unit peak flow, qRu

R, is calculated with the equations or graphical methods presented in TR-55.

2-3.4.3 The concept of initial abstraction is important to the TR-55 method and can be calculated with the following equation:

R a S . I 2 0  (2-18)

IRa

R = initial abstraction, in.

Table 2-6. Runoff Curve Numbers for Urban Areas

(Average Watershed Condition, IRa

R = 0.2SRR

R)

Land Use Description

Curve Numbers

for Hydrologic

Soil Group A B C D Fully developed urban areas (vegetation established)

Lawns, open spaces, parks, golf courses,

cemeteries, etc.

Good condition: grass cover on 75 percent or more of the area 39 61 74 80

Fair condition: grass cover on 50 to 75 percent of the area 49 69 79 84

Poor condition: grass cover on 50 percent or less of the area 68 79 86 89

Paved parking lots, roofs, driveways, etc. (excluding right-of-way) Streets and roads 98 98 98 98 Paved with curbs and storm sewers (excluding right-of-way) 98 98 98 98

Gravel (including right-of-way) 76 85 89 91 Dirt (including right-of-way) 72 82 87 89 Paved with open ditches (including right-of-way) 83 89 92 93 Average % impervious Commercial and business areas 85 89 92 94 95 Industrial districts 72 81 88 91 93 Row houses, town houses, and residential with lot sizes 0.125 acre or less 65 77 85 90 92

Residential: average lot size 0.25 acre 38 61 75 83 87 0.33 acre 30 57 72 81 86 0.50 acre 25 54 70 80 85 1 acre 20 51 68 79 84 2 acres 12 46 65 77 82 Developing urban areas (no vegetation established) Newly graded area 77 86 91 94 Western desert urban areas: Natural desert landscaping (pervious area only) 63 77 85 88 Artificial desert landscaping (impervious weed

barrier, desert shrub with 1 to 2 inch sand or gravel mulch and basin borders)

96 96 96 96

Cultivated agricultural land Fallow Straight row or bare soil 77 86 91 94 Conservation tillage - Poor 76 85 90 93 Conservation tillage - Good 74 83 88 90

2-3.4.4 When ponding or swampy areas occur in a basin, considerable runoff may be retained in temporary storage. The peak flow should be reduced to reflect the storage with Equation 2-19:

p p a F q q  (2-19)

where:

qRa

R = adjusted peak flow, ftP3

P/s

FRp

R = adjustment factor, listed in Table 2-7

Table 2-7. Adjustment Factor (Fp) for Pond and Swamp Areas that are

Spread Throughout the Watershed

Area of Pond or Swamp (percent) FRp

0.0 1.00 0.2 0.97 1.0 0.87 3.0 0.75 5.0 0.72 This method has a number of limitations that can have an impact on the accuracy of estimated peak flows:

 The basin should have fairly homogeneous CN values.

 The CN should be 40 or greater.

 The tRc

R should be between 0.1 and 10 hour.

 IRa

R /P should be between 0.1 and 0.5.

 The basin should have one main channel or branches with nearly equal times

of concentration.

 Neither channel nor reservoir routing can be incorporated.

 FRp

R is applied only for ponds and swamps that are not in the tRc

R flow path.

UExample 2-5

Given: These physical and hydrologic conditions:

 1.27 miP2

P of fair condition open space and 1.08 miP2

P of paved surface (airfield)

CHAPTER 2 SURFACE HYDROLOGY › 2-4 DEVELOPMENT OF DESIGN HYDROGRAPHS.

 Negligible pond and swamp land

 Hydrologic soil type C

 Average antecedent moisture conditions

 Time of concentration is 0.8 hour.

 24-hour, Type II rainfall distribution, 10-year rainfall of 2.8 inch

Find: The 10-year peak flow using the TR-55 peak flow method.

Solution:

Step 1 Calculate the composite CN using Table 2-6 and Equation 2-2.

        88 08 1 27 1 98 08 1 79 27 1      . .

. . A

) A CN ( CN x x

Step 2. Calculate the retention, SRR

R, using Equation 2-16.

. in . CN SR 36 1 10 88 1000 10 1000  

 

                

Step 3. Calculate the depth of direct runoff, QRD

R, using Equation 2-15.

   

        . in . . . .

. . . S . P

S . P Q

R

R D 64 1 36 1 8 0 8 2 36 1 2 0 8 2 8 0 2 0 2 2       

QRD

Ris direct runoff, which means the amount of rainfall available for runoff after losses. Using the direct runoff value and the chart for unit peak discharge found in Chapter 4 of TR-55, the peak discharge can be calculated. Step 4. Determine IRa

R/P from IRa

R = 0.2SRR

R.

  272 0 36 1 2 0 . . . Ia  

10 0 097 0 8 2 272 0 . say . . . P Ia  

Step 5. Calculate peak flow using Equation 2-17.

D k u p Q A q q      s / ft . . 3 1580 64 1 35 2 410  

2-4 DEVELOPMENT OF DESIGN HYDROGRAPHS. This section discusses methods used to develop a design hydrograph. Hydrograph methods can be computationally involved, so computer programs such as HEC-RAS and HMS (Hydrologic Modeling System), TR-20 (based on SCS Technical Release 20), TR-55,

2-4 DEVELOPMENT OF DESIGN HYDROGRAPHS. › 2-4.1 SCS Tabular Hydrograph.

and HYDRAIN are used almost exclusively to generate runoff hydrographs. Hydrographic analysis is performed when flow routing is important, such as in the design of storm water detention, other water quality facilities, and pump stations. Hydrographs can also be used to evaluate flow routing through large storm drainage systems to more precisely reflect flow peaking conditions in each segment of complex systems. See Chapter 12 of this UFC for more information on computer programs for analysis of urban hydrology and hydraulics. HEC-22 contains additional information on hydrographic methods.

2-4.1 SCS Tabular Hydrograph. The SCS developed a tabular method that is used to estimate partial composite flood hydrographs at any point in a watershed. This method is generally applicable to small, nonhomogeneous areas that may be beyond the limitations of the Rational Method. It is applicable for estimating the effects of land use change in a portion of the watershed as well as estimating the effects of proposed structures.

2-4.1.1 The SCS tabular hydrograph method is based on a series of unit discharge hydrographs expressed in cubic feet of discharge per second per square mile of watershed per inch of runoff. A series of these unit discharge hydrographs are provided in TR-55 for a range of subarea times of concentration (TRc

R) from 0.1 to 2 hour, and reach travel times (TRti

R) from 0 to 3 hour. One such tabulation is provided in Table 2-8.

Table 2-8. Tabular Hydrograph Unit Discharges for Type II Rainfall Distributions (English Units)

2-4.1.2 The hydrograph ordinates for a specific time are determined by multiplying the runoff depth, the subarea, and the tabular hydrograph unit discharge value for that time as determined from the tables. See Equation 2-20:

D t AQ q q  (2-20)

where:

q = hydrograph ordinate for a specific time, ftP3

P/s

qRt

R = tabular hydrograph unit discharge from appropriate table, ft P3

P/s/miP2

P/in

A = sub-basin drainage area, miP2

QRD

R = runoff depth, inch

2-4.1.3 The TR-55 publication provides a detailed description of the tabular hydrograph method. In developing the tabular hydrograph, the watershed is divided into homogeneous subareas. Input parameters required for the procedure include: (1) the 24-hour rainfall amount, inch, (2) an appropriate rainfall distribution (I, IA, II, or III), (3) the runoff curve number, CN, (4) the time of concentration, TRc

R, (5) the travel time, TRti

R, and (6) the drainage area, miP2

P, for each subarea. The 24-hour rainfall amount, rainfall distribution, and the runoff curve number are used in Equations 2-15 and 2-16 to determine the runoff depth in each subarea. The product of the runoff depth times drainage is multiplied times each tabular hydrograph value to determine the final hydrograph ordinate for a particular subarea. Subarea hydrographs are then added to determine the final hydrograph at a particular point in the watershed. Example 2-6 provides an illustration of the use of the tabular hydrograph method.

2-4.1.4 These assumptions and limitations are inherent in the tabular method:

 The total area should be less than 2000 acres. Typically, subareas are far

smaller than this because the subareas should have fairly homogeneous land use.

 The travel time, TRti

R, is less than or equal to 3 hour.

 The time of concentration, tRc

R, for any given subarea is less than or equal to 2 hour.

 The drainage areas of individual subareas differ by less than a factor of 5.

UExample 2-6

Given: A watershed with three subareas. Subareas 1 and 2 both drain into Subarea 3.

Consider the basin data for the three subareas:

USubarea UArea (miUP2

P) tRUc

URU(hr) TRUti

URU(hr) UCN

1 0.386 0.5 --- 75 2 0.193 0.5 --- 65 3 0.927 0.5 0.20 70

A time of concentration, tRc

R, of 0.5 hour, an IRa

R/P value of 0.10, and a Type II storm distribution are assumed for convenience in all three subareas. The travel time applies to the reach for the corresponding area; therefore, the travel time, TRti

R, in Subarea 3 will apply to the tabular hydrographs routed from Subareas 1 and 2.

Find: The outlet hydrograph for a 5.9-inch storm.

Solution:

Step 1. Calculate the retention for each of the subareas using Equation 2-16.

        10 1000 CN SR

Subarea 1. in. 33 3 10 75 1000 . SR         

Subarea 2. in. 38 5 10 65 1000 . SR         

Subarea 3. in. 29 4 10 70 1000 . SR         

Step 2. Calculate the depth of runoff for each of the subareas using Equation 2-15.

R

R D S . P

) S . P ( Q 8 0 2 0 2

  

Subarea 1.        

in. 2 3 85 8 0 9 5

85 2 0 9 5 2 . . .

. . QD  

 

Subarea 2.        

in. 28 2 137 8 0 9 5

137 2 0 9 5 2 . . .

. . QD  

 

Subarea 3.        

in. 72 2 109 8 0 9 5

109 2 0 9 5 2 . . .

. . QD  

 

2-4 DEVELOPMENT OF DESIGN HYDROGRAPHS. › 2-4.2 SCS Synthetic Unit Hydrograph (UH).

Step 3. Calculate ordinate values using Equation 2-20: q = qRt

RAQRD

R.

Multiply the appropriate tabular hydrograph values (qRt

R) from Table 2-8 by the subarea areas (A) and runoff depths (Q) and sum the values for each time to give the composite hydrograph at the end of Subarea 3. For example, the hydrograph flow contributed from Subarea 1 (tRc

R = 0.5 hour, TRti

R = 0.20 hour) at 12.0 hour is calculated as the product of the tabular value, the area, and the runoff depth, or 47 (0.386)3.2 = 58 ftP3

P/s.

Table 2-9 lists the subarea and composite hydrographs. Please note that this example does not use every hydrograph time ordinate.

Table 2-9. Subarea and Composite Hydrographs

Flow at Specified Time (ftP3

P/s)

Subarea 11 (hr)

12 (hr)

12.2 (hr)

12.4 (hr)

12.5 (hr)

12.6 (hr)

12.8 (hr)

13 (hr)

14 (hr)

16 (hr)

20 (hr) 1 2 3

17 6 43

58 21 238

143 51 778

410 146 1337

536 191 1281

584 210 1016

466 166 571

294 105 354

65 23 119

33 12 66

17 6 35 Total 66 317 972 1893 2008 1815 1203 753 207 111 58

2-4.2 SCS Synthetic Unit Hydrograph (UH). The SCS developed a synthetic UH procedure that has been widely used in conservation and flood control work. The UH used by this method is based upon an analysis of a large number of natural UHs from a broad cross section of geographic locations and hydrologic regions.

2-4.2.1 This method is easy to apply. The only parameters that need to be determined are the peak discharge and the time to peak (tRp

R). A standard UH is constructed using these two parameters.

2-4.2.2 For the development of the SCS UH, the curvilinear UH is approximated by a triangular UH that has similar characteristics. Figure 2-4 shows a comparison of the two dimensionless UHs. Even though the time base (tRb

R) of the triangular UH is 8/3 of the time to peak, tRp

R, and the tRb

R of the curvilinear UH is five times the tRp

R, the area under the two UH types is the same.

Figure 2-4. Dimensionless Curvilinear SCS Synthetic Unit

Hydrograph and Equivalent Triangular Hydrograph

2-4.2.3 The area under a hydrograph equals the volume of direct runoff, QRD

Figure 2-4: picture of page 55Figure 2-4 · page 55
Picture of the page from the copy saved here

R, which is 1 inch for a UH. The peak flow is calculated using Equation 2-21:

p

D k c p t

Q A K q  (2-21)

where:

qRp

R = peak flow, ftP3

P/s

ARk

R = drainage area, miP2

QRD

R = volume of direct runoff ( = 1 for unit hydrograph), inch

tRp

R = time to peak, hour

KRc

R = 483.5

2-4.2.4 The constant 483.5 reflects a UH that has 3/8 of its area under the rising limb. For mountainous watersheds, the fraction could be expected to be greater than 3/8, and therefore the constant may be near 603.5. For flat, swampy areas, the constant may be on the order of 301.7.

Time to peak, tRp

R, can be expressed in terms of time of concentration, tRc

R, as in Equation 2-22:

c p t t 3 2  (2-22)

Expressing qRp

R in terms of tRc

R rather than tRp

R yields:

c

D k c p t

Q A K q  (2-23)

where KRc

R = 725.25

UExample 2-7

Given: The following watershed conditions:

 The watershed is commercially developed.

 Watershed area = 0.463 miP2

 Time of concentration, tRc

R, = 1.34 hour

 QRD

R = 1.0 inch

Find: The triangular SCS UH.

Solution:

Step 1. Calculate peak flow using Equation 2-23.

qRp

R =

c

D k c

t

Q A K

= 34 1 0 1 463 0 25 725 .

) . ( ) . ( .

= 250.59 ftP3

P/s

Step 2. Calculate the time to peak, tRp

R, using Equation 2-22.

  hr 893 0 34 1 3 2 3 2 . . t t c p   

Step 3. Calculate the time base, tRb

R, of the UH.

Step 4. Draw the resulting triangular UH (see Figure 2-5).

  hr 38 2 893 0 3 8 . . tb  

NOTE: The curvilinear SCS UH is more commonly used and is incorporated into many computer programs.

Figure 2-5. Example: The Triangular Unit Hydrograph

Figure 2-5: picture of page 57Figure 2-5 · page 57
Picture of the page from the copy saved here

3-2 DESIGN FREQUENCY AND SPREAD. › 3-2.1 Selection of Design Frequency and Design Spread

CHAPTER 3

PAVEMENT SURFACE DRAINAGE 3-1 OVERVIEW. Effective drainage of pavements is essential to the maintenance of the service level and to traffic safety. Water on the pavement can interrupt traffic, reduce skid resistance, increase potential for hydroplaning, limit visibility due to splash and spray, and cause difficulty in steering a vehicle when the wheels encounter puddles.

Pavement drainage requires consideration of surface drainage, gutter flow, and inlet capacity. The design of these elements is dependent on storm frequency and the allowable spread of storm water on the pavement surface. This chapter presents design guidance for the design of these elements. Most of the information presented here is taken directly from the FHWA’s HEC-22 and AASHTO's Model Drainage Manual. The charts referenced throughout this chapter can be found in the HEC-22.

3-2 DESIGN FREQUENCY AND SPREAD. Two of the more significant variables considered in the design of pavement drainage are the frequency of the design runoff event and the allowable spread of water on the pavement. A related consideration is the use of an event of lesser frequency to check the drainage design.

Spread and design frequency are not independent. The implications of the use of a criterion for spread of one-half of a traffic lane are considerably different for one design frequency than for a lesser frequency. It also has different implications for a lowtraffic, low-speed roadway than for a higher classification roadway or airport runways. These subjects are central to the issue of pavement drainage and important to highway and runway safety.

3-2.1 Selection of Design Frequency and Design Spread

3-2.1.1 The objective of storm drainage design is to provide for safe passage of vehicles during the design storm event. The design of a drainage system for a curbed pavement section is to collect runoff in the gutter and convey it to pavement inlets in a manner that provides reasonable safety for traffic and pedestrians at a reasonable cost. As spread increases, the risks of traffic accidents and delays, and the nuisance and possible hazard to pedestrian traffic increase.

3-2.1.2 The allowable spread for airfields, runways, taxiways, and aprons was defined in Chapter 2, section 2-2.4, Design Storm Frequency.

3-2.1.3 Spread on traffic lanes can be tolerated to greater widths where traffic volumes and speeds are low. Spreads of one-half of a traffic lane are usually considered a minimum type design for DOD roads.

3-2.1.4 The selection of design criteria for intermediate types of facilities may be the most difficult. For example, some arterials with relatively high traffic volumes and speeds may not have shoulders that will convey the design runoff without encroaching

3-3 SURFACE DRAINAGE. › 3-3.1 Longitudinal Slope.

on the traffic lanes. In these instances, an assessment of the relative risks and costs of various design spreads may be helpful in selecting appropriate design criteria.

3-2.1.5 The recommended design frequency for depressed sections and underpasses where ponded water can be removed only through the storm drainage system is a 50-year frequency event. The use of a lesser frequency event, such as a 100-year storm, to assess hazards at critical locations where water can pond to appreciable depths is commonly referred to as a check storm or check event.

3-2.2 Selection of Check Storm and Spread

3-2.2.1 A check storm should be used any time runoff could cause unacceptable flooding during less frequent events. Also, inlets should always be evaluated for a check storm when a series of inlets terminates at a sag vertical curve where ponding to hazardous depths could occur.

3-2.2.2 The frequency selected for the check storm should be based on the same considerations used to select the design storm, i.e., the consequences of spread exceeding that chosen for design and the potential for ponding. Where no significant ponding can occur, check storms are usually unnecessary.

3-2.2.3 Criteria for spread during the check event are: (1) one lane open to traffic during the check storm event, and (2) one lane free of water during the check storm event. These criteria differ substantively, but each sets a standard by which the design can be evaluated.

3-3 SURFACE DRAINAGE. When rain falls on a sloped pavement surface, it forms a thin film of water that increases in thickness as it flows to the edge of the pavement. Factors that influence the depth of water on the pavement include the length of flow path, surface texture, surface slope, and rainfall intensity. As the depth of water on the pavement increases, the potential for vehicular hydroplaning increases. For the purposes of highway drainage, this section provides information on hydroplaning and design guidance for these drainage elements:

 Longitudinal pavement slope

 Cross or transverse pavement slope

 Curb and gutter design

 Roadside and median ditches

Note that the guidance for transverse and longitudinal slopes for military airfields is in UFC 3-260-01 and for FAA facilities, AC 150/5300-13.

3-3.1 Longitudinal Slope. Experience has shown that the recommended minimum values of roadway longitudinal slope given in the AASHTO Green Book, A Policy on

3-3 SURFACE DRAINAGE. › 3-3.2 Cross (Transverse) Slope.

Geometric Design of Highways and Streets, will provide safe, acceptable pavement drainage. In addition, follow these general guidelines:

 A minimum longitudinal gradient is more important for a curbed pavement

than for an uncurbed pavement since the water is constrained by the curb. However, flat gradients on uncurbed pavements can lead to a spread problem if vegetation is allowed to build up along the pavement edge.

 Desirable gutter grades should not be less than 0.5 percent for curbed

pavements, with an absolute minimum of 0.3 percent. Minimum grades can be maintained in very flat terrain by use of a rolling profile, or by warping the cross slope to achieve rolling gutter profiles.

 To provide adequate drainage in sag vertical curves, a minimum slope of

0.3 percent should occur within 50 feet of the low point of the curve. This is accomplished where the length of the curve in feet divided by the algebraic difference in grades in percent (K) is equal to or less than 167. This is represented as:

1 2 G G

L K   (3-1)

where:

K = vertical curve constant, ft/percent

L = horizontal length of curve, ft

GRi

R = grade of roadway, percent

3-3.2 Cross (Transverse) Slope. An acceptable range of roadway cross slopes is specified in UFC 3-250-01FA. These cross slopes are a compromise between the need for reasonably steep cross slopes for drainage and relatively flat cross slopes for driver comfort and safety. These cross slopes represent standard practice.

3-3.2.1 Cross slopes of 2 percent have little effect on driver effort in steering or on friction demand for vehicle stability. Use of a cross slope steeper than 2 percent on pavements with a central crown line is not desirable. In areas of intense rainfall, a somewhat steeper cross slope (2.5 percent) may be used to facilitate drainage.

3-3.2.2 Additional guidelines related to cross slope are:

 Although not widely encouraged, inside lanes can be sloped toward the

median if conditions warrant.

 Median areas should not be drained across travel lanes.