ORDER

AIRPORT TRAFFIC CONTROL TOWER AND

TERMINAL RADAR APPROACH CONTROL

FACILITY DESIGN GUIDELINES

August 11, 2004

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

6480.7D

RECORD OF CHANGES

OPTIONAL OPTIONAL SUPPLEM ENT CHANGE

OPTIONAL OPTIONAL SUPPLEM ENT CHANGE

TO BASIC

CHANGE

TO BASIC

SUPPLEM ENT

FAA Form 1320-5 (6-80) use previous edition

i

FOREWORD

This order sets forth guidelines and fundamental requirements for design of airport traffic control towers (ATCTs) and terminal radar approach control (TRACONs) facilities to be used by engineers, designers, planners, and procurement personnel engaged in the establishment, replacement, or modernization of these facilities. This issue incorporates changes to Order 6480.7C, Airport Traffic Control Tower and Terminal Radar Approach Control Facility Design Guidelines, dated 28 April 1995, necessary to bring it up to date. Nancy G. Chapman

SUPPLEM ENT

Page ii

TABLE OF CONTENTS

FOREWORD … i

CHAPTER 1. GENERAL

SECTION l. INTRODUCTION

1. Purpose … 1-1 2. Distribution … 1-1 3. Cancellation … 1-1 4. Explanation of Changes … 1-1 5. Applicability … 1-2 6. Requests for Information … 1-2 7. Objective … 1-2 8. Scope … 1-2 9. Organization … 1-3 10. References … 1-3

SECTION 2. ATCT/TRACON DEVELOPMENT PROCESS

SECTION 2. ATCT/TRACON DEVELOPMENT PROCESS

11. Preliminary Considerations … 1-3 12. Basic Policy Directives … 1-4 13. Overview of the Development Process … 1-4 Figure 1-1. ATCT Planning and Establishment Process Flow Chart … 1-5

SECTION 3. PROJECT PLANNING

14. Data Collection … 1-6 15. Formulate Design Criteria … 1-6 16. Preliminary Design Concept … 1-6 17. Design Guideline Waivers … 1-6

SECTION 4. IMPORTANT CONSIDERATIONS AND REQUIREMENTS

SECTION 4. IMPORTANT CONSIDERATIONS AND REQUIREMENTS

18. Environmental Impact … 1-7 19. Intergovernmental Review of Federal Programs … 1-7 20. Energy Conservation … 1-7 21. Codes … 1-8 22. Deviations from Standards … 1-8 23. Project Documents … 1-8 24. Security … 1-9

Page iii

CHAPTER 2. BASIC DESIGN CRITERIA

SECTION 1. GENERAL

SECTION 1. GENERAL

25. Introduction … 2-1

SECTION 2. AIR TRAFFIC CONTROL RESPONSIBILITIES

26. ATCT/TRACON Classifications … 2-1 27. Jurisdiction of Airspace Control … 2-3 28. Establishment Criteria … 2-3

SECTION 3. AIRWAY FACILITY RESPONSIBILITIES

29. Equipment Maintenance … 2-4 30. Facility Maintenance … 2-4 31. Possible Additional Accommodations … 2-5 32-33. Reserved … 2-5 34. Staffing and Space Relationship … 2-5 35. Variations in Equipment and Installation … 2-5 36. Specialized Environmental Factors … 2-17 37. Other Space Requirements … 2-17 38. Special ATCT/TRACON Classifications … 2-18 38-1. FAA Contract Tower Equipment … 2-18

CHAPTER 3. REPRESENTATIVE AIRPORT TRAFFIC CONTROL TOWERS AND

CHAPTER 3. REPRESENTATIVE AIRPORT TRAFFIC CONTROL TOWERS AND

TERMINAL RADAR APPROACH CONTROL FACILITIES

SECTION 1. BASIC COMPONENTS

39. Introduction … 3-1 40. Control Cab … 3-1 41. Tower Shaft … 3-1 42. Base Building … 3-1

SECTION 2. BASIC CONFIGURATION

43. Introduction … 3-1 44. Base Building and Non-Functional Shaft … 3-1 45. Flexibility of the Basic Configuration … 3-2 46. Variations of the Basic Configuration … 3-2 47.-49. Reserved … 3-2 Figure 3-1 Representative Airport Traffic Control Facilities … 3-3 Figure 3-2 Representative Airport Traffic Control Facilities … 3-4 Figure 3-3 Representative Airport Traffic Control Facilities … 3-5

SECTION 2. BASIC CONFIGURATION

Page iv

Figure 3-4 Representative Airport Traffic Control Facilities … 3-6

SECTION 3. REPRESENTATIVE SITE LAYOUTS

50. Introduction … 3-6 51. Comparative Examples … 3-7 52.-53. Reserved … 3-7

SECTION 4. REPRESENTATIVE TECHNICAL AND OPERATIONAL SPACE

LAYOUTS

54. Description … 3-7 55.-58. Reserved … 3-7

CHAPTER 4.SITE SELECTION AND DESIGN

CHAPTER 4.SITE SELECTION AND DESIGN

SECTION 1. INTRODUCTION

59. General … 4-1 60. Guidelines … 4-1

SECTION 2. SITE SELECTION

61. Preliminary Considerations … 4-1 62. Siting Criteria … 4-4 63. Approval … 4-4

SECTION 3. SITE INVESTIGATION

64. General … 4-4 65. Boundary Survey … 4-4 66. Topographic Survey … 4-5 67. Soil and Foundation Analysis … 4-5 68. Utilities … 4-7 69. Hazardous Material Site Survey … 4-7 70. Hazardous Materials … 4-7 71.-72. Reserved … 4-7

SECTION 4. SITE DESIGN

SECTION 4. SITE DESIGN

73. Earthwork and Site Preparation … 4-7 74. Storm Drainage … 4-7 75. Access Roads … 4-8 76. Parking Accommodations … 4-9 Figure 4-1 Typical Parking Lot Configuration … 4-11 77. Sidewalks … 4-12 78. Landscaping … 4-12

Page v

79. Security … 4-13 80. Traffic Signs … 4-13 81. Facility Sign … 4-13 82. Utility Site Work … 4-13 83. Accessibility … 4-13 84. Trash Storage and Disposal Area … 4-13 85. Geological Survey … 4-13 86.-88. Reserved … 4-13

CHAPTER 5.ARCHITECTURAL DESIGN

CHAPTER 5.ARCHITECTURAL DESIGN

SECTION 1. INTRODUCTION

89. General … 5-1 90. Design Criteria … 5-1 91. Quality Standards … 5-4

SECTION 2. LIFE SAFETY REQUIREMENTS

92. General … 5-5 93. Occupancy Loads … 5-5 94. Exit Requirements … 5-6 95. Doors … 5-6 96. Corridors … 5-7 97. Stairways … 5-7 98. Smoke Proof Enclosures … 5-8 99. Fire Protection … 5-9 100. Fire-Rated Partitions … 5-9 101. Fire and Smoke Detection … 5-9 102. Fire Extinguishing Systems … 5-11 103. Fire Extinguishers … 5-11 104. Safety … 5-11 105. Physically Disabled Provisions … 5-12 106. Standby Power Generation System … 5-12 107.-110. Reserved … 5-12

SECTION 3. GENERAL REQUIREMENTS

SECTION 3. GENERAL REQUIREMENTS

111. Elevators and Platform Lifts … 5-12 112. Materials … 5-14 113. Energy Conservation … 5-22 114. Raised Computer Floors … 5-23

Page vi

SECTION 4. SPACE REQUIREMENTS

115. Space Allocation Requirements … 5-23 116. Administrative Space … 5-24 118. Training and Conference Rooms … 5-28 119. Break Rooms … 5-29 120. Locker Rooms … 5-31 121. Toilet Rooms … 5-32 122. TRACON Operation Room and Simulator Room … 5-33 123. Communications Equipment Room … 5-34 124. RADAR Equipment Room … 5-35 125. Storage … 5-36 126. Recorder Playback Room … 5-36 127. Telco room … 5-37 128. Engine Generator Space … 5-38 129. UPS Equipment Room … 5-41 130. Mechanical Equipment Rooms … 5-42 130. Receiving Area … 5-43 132. Mechanical/Electrical Maintenance Space … 5-43 133. Janitor Closet … 5-43 134. Corridor Link … 5-44 135. Smoking Area … 5-45

SECTION 5. TOWER SHAFT REQUIREMENTS

SECTION 5. TOWER SHAFT REQUIREMENTS

136. General … 5-45 137. Description … 5-45 138. Base Level … 5-45 139. Tower Shaft … 5-45 140. Cable/Utility Chase … 5-45 141. Reserved … 5-46 142. Junction and Subjunction Level … 5-46 143. Intermediate Levels … 5-46 144. Reserved … 5-46

SECTION 6. CONTROL CAB REQUIREMENTS

SECTION 6. CONTROL CAB REQUIREMENTS

145. General … 5-46 146. Description … 5-46 147. Sizes and Shape … 5-47 148. Floor … 5-47

Page vii

149. Walls … 5-47 150. Sill … 5-47 151. Window Glass … 5-47 152. Window Mullions … 5-48 153. Ceiling … 5-49 154. Roof … 5-50 Figure 5-1 ASDE III Antenna Bolt Hole Location … 5-52 155. Walkway … 5-52 156. Columns … 5-53 157. Column Raceway … 5-53 158. Cab Stair … 5-54 159. Cab Consoles … 5-54 160. Floor Hatch And Hoist … 5-54

SECTION 7. SPACE RELATIONSHIPS

SECTION 7. SPACE RELATIONSHIPS

161. Floor Plans … 5-54 162.-164. Reserved … 5-56 Figure 5-2 Block Diagram – Non Functional Shaft … 5-57 Figure 5-3. Block Diagram - Administrative Base Building … 5-58 Figure 5-4. Block Diagram - One Story TRACON Base Building … 5-59 Figure 5-5. Block Diagram - Two Story TRACON Base Building (First

Floor) … 5-60 Figure 5-6. Block Diagram - Two Story TRACON Base Building

(Second Floor) … 5-61

CHAPTER 6. STRUCTURAL DESIGN

CHAPTER 6. STRUCTURAL DESIGN

SECTION 1. INTRODUCTION

165. General … 6-1 166. Basic Requirements … 6-1 167. Reserved … 6-1

SECTION 2. DESIGN LOADINGS

168. Standard Loadings … 6-2 169. Special Loadings … 6-5 170. Loading Combinations … 6-6 171. Reserved … 6-6

SECTION 3. MATERIALS

172. Strength of Materials … 6-6

SECTION 3. MATERIALS

Page viii

173. Reserved … 6-7

SECTION 4. MATERIAL SELECTION FACTORS

174. General … 6-7 175-180. Reserved … 6-7 181. Environmental Protection … 6-7 182. Durability … 6-7 183. Reserved … 6-7 184. Tropical Environments … 6-7 185.-186. Reserved … 6-7

SECTION 5. SHAFT AND BASE BUILDING FRAMING SYSTEMS

SECTION 5. SHAFT AND BASE BUILDING FRAMING SYSTEMS

187. Steel … 6-7 188. Concrete … 6-8 189. Reserved … 6-8

SECTION 6. CONTROL CAB FRAMING SYSTEM

190. General … 6-8 191. Special Considerations … 6-8 192. Reserved … 6-8 193. Steel … 6-9 194. Concrete … 6-9 195. Reserved … 6-10

SECTION 8. WALLS AND PARTITIONS

196. General … 6-10 197. Exterior Walls … 6-10 198. Interior Walls … 6-10 199. Walls Below Grade … 6-10 200. Reserved … 6-10

SECTION 9. CONSTRUCTION AT OR BELOW GRADE

SECTION 9. CONSTRUCTION AT OR BELOW GRADE

201. Slab-On-Grade … 6-10 202. Foundations and Walls … 6-11 203.-205. Reserved … 6-11

SECTION 10. FOUNDATION REQUIREMENTS

206. Subsurface Investigation … 6-11 207.-208. Reserved … 6-12

SECTION 11. SUPPLEMENTAL CONSIDERATIONS

Page ix

209. Construction … 6-12 210. Structural Design Calculations … 6-12 211. Structural Drawings … 6-13 212. Professional Registration … 6-13

CHAPTER 7. MECHANICAL DESIGN

CHAPTER 7. MECHANICAL DESIGN

SECTION 1. INTRODUCTION

213. General … 7-1 214. References … 7-1

SECTION 2. PRELIMINARY DESIGN CRITERIA

215. Use of Existing HVAC Sources … 7-1 216. Exterior Design Temperatures … 7-1 217. Interior Design Temperatures … 7-2 218. Design Analysis … 7-2 219.-220. Reserved … 7-2

SECTION 3. FUNCTIONAL REQUIREMENTS

SECTION 3. FUNCTIONAL REQUIREMENTS

221. General … 7-3 222. Critical Spaces … 7-3 223. Loads … 7-3 224. Reliability … 7-3 225.-228. Reserved … 7-3

SECTION 4. SPACE REQUIREMENTS

229. General … 7-4 230. Basic Requirements … 7-4

SECTION 5. SPECIAL REQUIREMENTS

231. General … 7-9 232. Air Distribution … 7-9 233. Air Filtration … 7-9 234. Ventilation … 7-10 235. Humidity Control … 7-10 236. Seismic Restraint … 7-11 237. Thermostats … 7-11 238. Cab Windows … 7-11 239. Expansion … 7-11 240. Vacuum Cleaning System … 7-11

SECTION 5. SPECIAL REQUIREMENTS

Page x

241. HVAC Systems and Equipment … 7-11 242. Energy Conservation … 7-15

CHAPTER 8. PLUMBING DESIGN

SECTION 1. INTRODUCTION

243. General … 8-1 244. References … 8-1 245. Reserved … 8-1

SECTION 2. PIPING REQUIREMENTS

246. Cast Iron Pipe … 8-1 247. Copper Pipe … 8-1 248. Plastic Pipe … 8-1 249. Noise Isolation … 8-1 250. Control Cab Downspouts … 8-1 251. Insulation … 8-1 252. Seismic Restraint … 8-2 253-254. Reserved … 8-2

SECTION 3. FIXTURES

SECTION 3. FIXTURES

255. Control Cab … 8-2 256. Break Room … 8-2 257. Toilet Rooms … 8-2 258. Service Sinks … 8-2 259. Hose Bibbs … 8-2 260. Automatic Lawn Sprinkler System … 8-3 261.-265. Reserved … 8-3

SECTION 4. SPECIAL REQUIREMENTS

266. Control Cab … 8-3 267. Water Pressure … 8-3 268. Fuel Storage Tanks … 8-3 269. Sanitary Treatment … 8-3 270. Supplementary Water Heating … 8-4 271. Storm Drainage … 8-4 272. Foundation Drainage … 8-4

SECTION 5. FIRE PROTECTION

SECTION 5. FIRE PROTECTION

273. Extinguishing Systems … 8-4

Page xi

274. Fire Hydrants … 8-4 275. Reserved … 8-4

CHAPTER 9. ELECTRICAL DESIGN

SECTION 1. INTRODUCTION

276. General … 9-1 277. Codes and Standards … 9-1 278. Distribution Systems … 9-1 279. Reserved … 9-2

SECTION 2. EXTERIOR DESIGN

SECTION 2. EXTERIOR DESIGN

280. Site Lighting … 9-2 281. Building Service Facilities … 9-2 282. Commercial Supply … 9-3 283. Electrical Conduits … 9-3

SECTION 3. BUILDING DISTRIBUTION

284. Service Disconnect Means … 9-3 285. Main Distribution Panel … 9-4 286. Panelboards/Switchboards … 9-6 287. Standby Power Systems … 9-7 288. Motors and Motor Controls … 9-9 289. Transformers … 9-9 290. Wiring Methods … 9-9 291. Cab DC Power System … 9-9 292. Reserved … 9-10

SECTION 4. LIGHTING AND CONVENIENCE OUTLETS

SECTION 4. LIGHTING AND CONVENIENCE OUTLETS

293. General … 9-10 294. TRACON Operations Room … 9-11 295. Control Cab … 9-15 296. RADAR/ARTS Equipment Room … 9-15 297. Airfield Lighting Control Panel … 9-15 298. Exterior Heater Outlets … 9-15

SECTION 5. SPECIAL REQUIREMENTS

299. Grounding, Lightning, And Surge Protection … 9-15 300. Emergency Lighting … 9-21 301. Security Systems … 9-21

SECTION 5. SPECIAL REQUIREMENTS

Page xii

302. Fire alarm system … 9-22 303. Local Area Network And Fiber Optic Circuitry … 9-22 304. Cable Trays … 9-22 305. Labeling … 9-22 306. Metering … 9-22 307. Telecommunications and Networks … 9-22 308. Power and Communications Outlets … 9-23 309. Communication Equipment Rooms … 9-23 310.-315 Reserved … 9-23

APPENDIX 1 REFERENCED PUBLICATIONS … 1

APPENDIX 1 REFERENCED PUBLICATIONS … 1

FAA ORDERS … 1

FAA STANDARDS … 2

FEDERAL STANDARDS … 3

FEDERAL SPECIFICATIONS … 3

FAA REPORTS … 3

CODE OF FEDERAL REGULATIONS … 3

FAA ADVISORY CIRCULARS … 4

FEDERAL AVIATION REGULATIONS (FAR) … 4

OTHER PUBLICATIONS … 4

APPENDIX 2 DEFINITIONS … 1

APPENDIX 3 REPRESENTATIVE SPACE LAYOUTS AND CONSOLE DRAWINGS ... 1

APPENDIX 3 REPRESENTATIVE SPACE LAYOUTS AND CONSOLE DRAWINGS ... 1

Figure 1. Representative Low Activity ATCT Site Layout … 1 Figure 2. Representative Intermediate Activity ATCT Site Layout … 2 Figure 3. Representative Major Activity ATCT Site Layout … 3 Figure 4. 234 SQ. FT. Standard. Representative Low Activity Control

Cab Layout … 4 Figure 5. 350 SQ. FT. Standard Intermediate Activity Control Cab

Layout … 5 Figure 6. 625 SQ. FT. Standard Major Activity Cab Layout … 6 Figure 7. 850 SQ. FT. Standard Major Activity Cab Layout … 7 Figure 8. ASDE-3 Equipment in Major Activity Cab Layout … 8

Page xiii

Figure 9. Technical Space Layouts … 9 Figure 10. Technical Space Layouts … 10 Figure 11. ARTS IIIA Equipment Room Layout … 11 Figure 12. ARTS II TRACON Equipment Room Layout … 12 Figure 13. Minimum ARTS II TRACON Operations Room Layout … 13 Figure 14. Representative Communications Equipment Room Layout … 14 Figure 15. Major Activity TRACON Operations Room Layouts … 15 Figure 16. Radar XE "Radar" Display Console … 16 Figure 17. Representative Sill and Wall Section … 17 Figure 18. Typical Cab Console … 18 Figure 19. Island Console … 19 Figure 20. Corner Console with Horizontal Equipment Panel … 20 Figure 21. Corner Console with Sloping Equipment Panel … 21 Figure 22. BRITE ASRConsole … 22 Figure 23. BRITE ASDE Console … 23 Figure 24. Flight Data Entry Processor Console (FDEP) … 24 Figure 25. Convenience Unit … 25

APPENDIX 4 ABBREVIATIONS … 1

APPENDIX 4 ABBREVIATIONS … 1

CHAPTER 1. GENERAL

SECTION 1. INTRODUCTION

1. PURPOSE . This order establishes guidelines and fundamental design requirements for airport traffic control tower (ATCT) and terminal radar approach control (TRACON) facilities.

2. DISTRIBUTION. This order is distributed to division levels in Airway Facilities, Air Traffic, Office of System Architecture and Investment Analysis, and the Terminal Business Service in Washington headquarters; to division level at the Mike Monroney Aeronautical Center and the William J. Hughes Technical Center; to the branch level in the regional Airway Facilities (AF) and Air Traffic (AT) divisions; and a standard distribution to all Airway Facilities field offices.

SECTION 1. INTRODUCTION

3. CANCELLATION. Order 6480.7C, Airport Traffic Control Tower and Terminal Radar Approach Control Facility Design, dated 28 April 1995, is canceled.

4. EXPLANATION OF CHANGES. This revision extensively updates Order 6480.7C. The update resolves inconsistencies between this order and other reference documents; e.g., the International Building Code (IBC), FAA Acquisition Management System (AMS) and applicable Federal Aviation Administration (FAA) orders; and incorporates clarifications and elaborates on other items suggested by reviewers since the issuance of 6480.7C on 28 April 1995; and to provide a consistent format. “Shall” remains the operative word and is defined in paragraphs 5 and 22. Major and minor changes include the following subjects:

a. Site security requirements.

b. Electrical, mechanical, and structural design requirements.

c. Environmental requirements.

d. Disabled access requirements.

e. Seismic- and weather-related requirements.

f. Remove reference material direct quote requirements.

g. Corrected numerous editorial oversights.

h. Updated reference materials and refer directly to reference documents by paragraph number and general requirements.

i. Added the IBC document as reference.

j. Added the FAA AMS and the Integrated Product Development System (IPDS).

5. APPLICABILITY. This order shall be used to establish new ATCTs, TRACONs, and ATCT/TRACONs and existing facility relocation or upgrade projects. All projects, ATCT/TRACON standard design site adaptations, and custom designs, are subject to these standards.

a. The figures in this order addressing facility layouts are intended as representative examples and should not be construed as design requirements.

b. The use of "shall" in this document indicates a condition, situation or technical parameter that the procuring organization shall address and define in the appropriate procurement documents, i.e., Screening Information Request (SIR), Statement of Work (SOW), Specifications, etc.

c. In selected cases, it may not be prudent or practical to implement certain requirements set forth in this document. When necessary, these deviations shall be documented and approved by the designated approval authority.

6. REQUESTS FOR INFORMATION

a. Requests for further information concerning this directive should be forwarded to:

6. REQUESTS FOR INFORMATION

Terminal Business Service, ATB-300 800 Independence Avenue, SW Washington, DC 2059l

b. Changes will be made to this document whenever there are sufficient new items or modifications.

c. Employee suggestions and unsatisfactory condition reports (UCRs) will be used as information sources for changes.

d. Letters covering new or modified items may also be sent through normal channels to:

Airway Facilities Comments: Air Traffic Comments: Terminal Business Service Air Traffic System Development Facilities Division, ATB-320 Directorate, ARU-1 800 Independence Avenue, SW 400 Seventh Street, SW Washington, DC 20591 Washington, DC 20590

7. OBJECTIVE. The objectives of this order are as follows:

a. Combine into one source, either directly or by reference, all current data pertaining to ATCT/TRACON designs.

b. Establish the minimum ATCT/TRACON project design criteria.

c. Provide guidance that will promote facility design consistency and uniformity.

8. SCOPE. This order provides general guidance and includes specific requirements on planning, materials, aesthetics, economics, functional requirements, future expansion

capabilities, and other information necessary to provide the designer with complete guidelines for ATCT/TRACON design.

9. ORGANIZATION. This order is divided into nine chapters that address ATCT/TRACON facilities design criteria/requirements. Definitions, acronyms, and generic tower drawings are included in the appendices.

10. REFERENCES. A complete list of documents referenced in this order is provided as Appendix 1 Referenced Publications. The design and procurement process shall use the latest version of each referenced document. Procurement and construction contracts shall specifically list and use the version in effect as of the date of contract signing.

a. Specific web site addresses were not used in this document to avoid frequent conflicting address changes. Contact the subject organization or use the available search engines to find the specific web site for the subject discussed.

SECTION 2. ATCT/TRACON DEVELOPMENT

SECTION 2. ATCT/TRACON DEVELOPMENT

PROCESS

11. PRELIMINARY CONSIDERATIONS. Prior to the initiation of formal ATCT/TRACON design activities including runway and airport building ten-year expansion, extensive planning shall be completed to include:

a. Preliminary requirements analysis.

b. Budget development process and cost requirements.

c. Project establishment and life-cycle cost data analysis. Facility life-cycle costs shall be minimized and best value solutions implemented.

d. Determine facility design criteria.

e. Develop site selection and real estate acquisition process.

f. Outline employee involvement with site personnel and labor representatives.

g. Applicable publications and documents.

h. Facility staffing and equipment requirements.

i. Control cab height.

j. Review “lessons learned” from recent tower designs and construction.

k. Utilize the Airport Traffic Control Tower Cab simulator, William J. Hughes Technical Center Airway Facilities Tower Integration Laboratory (AFTIL) to model cab and out-the-

window views of runways, taxiways, lights, buildings, terrain, and various skylines in addition to moving aircraft and ground vehicles.

l. Human factors. Operations, maintenance, FAA Human Factors Design Guide, and working environment.

12. BASIC POLICY DIRECTIVES. Specific ATCT/TRACON development and design direction is also provided by basic policy directives. These directives shall automatically become part of an ATCT/TRACON design. Directives in effect at the publication of this order are listed in Appendix 1 Referenced Publications.

13. OVERVIEW OF THE DEVELOPMENT PROCESS. The design process is one of several steps in the overall planning and establishment process for an ATCT/TRACON. Figure 1-1. ATCT PLANNING AND ESTABLISHMENT PROCESS illustrates the major components, planning, and establishment design process steps.

Par 13 Page 1-5 FIGURE 1 1. ATCT PLANNING AND ESTABLISHMENT PROCESS

FIGURE 1-1. ATCT PLANNING AND ESTABLISHMENT PROCESS

FIGURE 1-1. ATCT PLANNING AND ESTABLISHMENT PROCESS

SECTION 3. PROJECT PLANNING

14. DATA COLLECTION. The early design planning involves past data accumulation to determine the present facility requirements, as well as future plans and requirements, generally projecting at least ten years past facility commissioning.

SECTION 3. PROJECT PLANNING

a. The designer may obtain preliminary information from the designated approval authority (see the ANI [National Airspace System Implementation Program] SOP web site on the FAA intranet).

b. Refer to CHAPTER 2 for background information and guidance on the principal factors that influence the ATCT/TRACON designs.

15. FORMULATE DESIGN CRITERIA. Following the project's approval for funding, data collection is begun and the process of formulating the basic design criteria is initiated.

a. The information provided in Chapters 2 and 3 will aid the designer in formulating design criteria.

b. The formulation of the design criteria process runs concurrent with the site selection process.

16. PRELIMINARY DESIGN CONCEPT. After determining the facility needs and identifying environmental conditions affecting the project, the designer can develop a preliminary design concept that encompasses building configuration and site layout when applicable. The preliminary design concept will be subject to approval by the designated approval authority before detailed design can proceed.

17. DESIGN GUIDELINE WAIVERS. Waivers to specific facility design guidelines will be considered with sufficient justification and alternate design detail. A waiver request, in writing, to ATB-300 must be completed for any deviation to these facility design guidelines. The waiver request must include enough information to enable a management decision on the request. At a minimum, the request must include the subjects listed below. Before beginning the waiver request, direct communications with ATB-320 are suggested to define detail and facilitate the submission and approval process. Additional submission details may be negotiated between ATB-300 and the requesting organization.

a. Specific design guideline requirement affected.

b. Alternate design description.

c. How does the alternate design meet the original requirement intent?

d. Cost/benefit analysis for the change.

e. Schedule impact to complete the new design.

f. Impact to project if waiver is approved/disapproved.

g. Additional factors determined by ATB-320 and the requesting organization.

SECTION 4. IMPORTANT CONSIDERATIONS

SECTION 4. IMPORTANT CONSIDERATIONS

AND REQUIREMENTS

18. ENVIRONMENTAL IMPACT. Compliance with the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190, is an integral component of the FAA comprehensive environmental responsibility.

a. An Environmental Assessment in accordance with Order 1050.1, Policy and Procedures for Considering Environmental Impacts of Proposed FAA actions, shall be prepared in conjunction with site selection.

AND REQUIREMENTS

b. Further consideration shall be given during the site design process to ensure that the specific project imposes the minimum adverse impact on the natural and human environment.

19. INTERGOVERNMENTAL REVIEW OF FEDERAL PROGRAMS. The design shall comply with Executive Order 12372 requirements. This Executive Order, based on the Intergovernmental Cooperation Act of 1968 and the United States Code, Title 3, Section 301, fosters an intergovernmental partnership. Further, it strengthens the FAA establishment program by relying on State and local processes for the State and local government coordination and review of proposed Federal financial assistance and development. Order 1200.21, Intergovernmental Review of FAA Programs and Activities Guidance provides requirements.

20. ENERGY CONSERVATION.

a. The designer shall:

1) Consider minimizing ATCT/TRACON life-cycle cost by utilizing energy efficiency, water conservation, and solar or other renewable energy technologies. Refer to FAA-STD-033, Design Standards for Energy Management in National Airspace System (NAS) Physical Facilities, for energy management guidance.

2) Comply with 10 CFR 436 life cycle costing procedures.

3) Ensure the design and construction is in compliance with Executive Order 13123, Greening the Government Through Efficient Energy Management, Order 1053.1, Energy and Water Management Program for FAA Buildings and Facilities, and the 1992 Energy Policy Act.

4) Meet or exceed the 10 CFR 435 and other national or local energy performance standards applicable to Federal residential or commercial buildings that may be more cost effective over the life of the facility.

5) Utilize passive solar design, such as day lighting and adopt active solar technologies,

where cost effective.

b. Additionally, the designated approval authority should provide the designer with other documentation, as appropriate, which describes energy efficiency and water conservation products and services that might be available from other Federal Agencies; i.e., Department of Energy (DoE), General Services Administration (GSA), or the Department of Defense (DoD).

c. Refer to paragraph 20 for additional guidance on energy conservation. The energy conservation requirements do not override equipment reliability, health, and safety requirements.

21. CODES. Code requirements set forth in this order are to be considered the standard for ATCT/TRACON designs. References to codes in this order are intended to provide guidance where specific requirements are not otherwise expressly addressed herein.

a. FAA national standards shall meet applicable Order 3900.19, National Electrical Code (NEC) requirements, Occupational Safety and Health Administration (OSHA), National Fire Protection Association (NFPA), FED-STD-795, 29 CFR 1960.20, and IBC code requirements. Site-specific designs shall follow these recognized national codes and applicable local codes.

b. The latest version of all orders, standards, specifications, and codes shall be used to design facilities. Executive Order mandated design requirements shall be followed.

c. The more stringent reference document requirement shall be used when multiple documents are referenced.

d. The Spectrum Assignment and Engineering Division, ASR-100, and the Environmental Energy and Safety Division, AFZ-800, shall be consulted on radiation hazard issues at new facilities, from proposed or existing sources of electromagnetic radiation (i.e., near-by radar systems).

22. DEVIATIONS FROM STANDARDS. The use of the word "shall" in this document represents a requirement and indicates a condition, situation, or technical parameter that will be adhered to.

a. Deviations from the standards set forth in this order may be approved only if they exceed the minimum requirements.

b. All deviations shall be approved and recorded by the designated approval authority.

23. PROJECT DOCUMENTS. All project documents; i.e., plans, calculations, reports, specifications, and design notes, shall be prepared in accordance with standards FAA-STD-002, Federal Aviation Agency Standard for Engineering Drawings; FAA-STD-005, Preparation of Specification Documents, and ANI-Standard Operating Procedures (SOPs).

a. The project documents shall be prepared in FAA-approved electronic format and shall be compatible with existing FAA electronic resources.

b. Final plans, specifications, design notes, and record drawings will become a permanent part of the project file.

c. It is the designated approval authority’s responsibility to assure that the required documents are included in the project file.

d. The latest version of any reference document quoted herein is to be used unless specifically directed otherwise by this order.

24. SECURITY. ATCT/TRACON security requirements shall be prescribed and implemented to a degree that is consistent with vulnerability, imminent threat, and facility criticality. Paragraph 302 describes FAA security system requirements.

a. A security risk analysis/threat assessment shall be conducted to determine the criticality, vulnerability, and threat associated with the assets and grounds under FAA control to be protected.

b. A security risk assessment report shall be prepared and used as part of the design process to ensure individual site security requirements have been met. The elements of this risk assessment shall include but not be limited to automated information management, operation, physical, personnel, and information security.

c. The risk analysis shall be used as the basis for determining the methods of access control and the remote monitoring techniques to be employed at each site. Access requirements shall be determined for all telco and vendor controlled spaces.

d. As a minimum, all ATCTs/TRACONs shall be designed to feature access control using, for example, keys, electronic card entry systems, or cipher locks.

e. Capability to remotely monitor facility grounds from a cab or TRACON position using direct visual monitoring or the use of motion sensors or the use of closed circuit television (CCTV) monitors shall be provided.

f. Facility access and delivery drop-off requirements shall be determined for all delivery vehicles and personnel.

g. Security considerations should be addressed during planning, site selection, and design to ensure that all security requirements are met. Order 1600.6, Physical Security Management Program, provides general physical security policy. Order 1600.69 provides specific guidance on physical security requirements by security level for each facility type. The Orders also establish procedures to ensure compliance with public laws, national security directives and policies, and Department of Transportation (DoT) orders. For additional information concerning security requirements, refer to paragraphs 79 and 302.

CHAPTER 2. BASIC DESIGN CRITERIA

CHAPTER 2. BASIC DESIGN CRITERIA

SECTION 1. GENERAL

25. INTRODUCTION. This chapter outlines the basic criteria that shall be evaluated and analyzed prior to starting the design effort. Some criteria have fixed parameters, but in many instances the parameters are variable and will need to be determined and approved by the designated approval authority for a specific ATCT/TRACON facility.

SECTION 1. GENERAL

a. Human Factors. The ATCT/TRACON facility must consider the implications of operational requirements and task performance on design, and the impact of the design on human performance of operations and maintenance tasks.

b. Human factors considerations should include, but not be limited to, varied staffing levels (high and low); anthropometrics; alternative equipment designs and configurations; training and training equipment requirements; accessibility for those with disabilities; operator work space and access requirements for ease of maintenance; general and task lighting; storage space and use of special tools, manuals, and job aids; safety and health considerations; the environment for necessary visual and audio alerts; and individual and team procedures along with necessary communications (visual and aural). These human factors considerations should be addressed during the early stages of the design and development of the facility, assessed during structures evaluations and tests, and conform to architectural and human factors best practices including those specified in FAA Human Factors Design Guide (DoT/FAA/ACT-96-1) and the FAA Human Factors Job Aid.

SECTION 2. AIR TRAFFIC CONTROL

SECTION 2. AIR TRAFFIC CONTROL

RESPONSIBILITIES

26. ATCT/TRACON CLASSIFICATIONS. Airport traffic control towers are classified into categories designated by the Position Classification Standard for Air Traffic Control, Series ATC-2152. Actual classification level is determined on a facility basis by air traffic management.

a. These categories are based upon the ATC-2152 Position Classification Standard, Part I, Terminal Positions. The ATC categories are listed in Table 2-1. The distinction levels are used to establish personnel requirements and are useful data for other design purposes. It is important for the designer to review the current and projected air traffic activity and complexity levels in order to formulate project scope. Coordination with local and regional Air Traffic organizations is essential.

b. Other major factors establishing project scope are equipment type, agency space standards and policies, airport configuration, automation equipment, personnel requirements, facility complement, and growth rate.

c. These factors may combine to create distinctive design requirements. However, some can be grouped and used to establish design classifications.

d. Currently, there are three nominal ATCT/TRACON design classifications: (1) Low Activity, (2) Intermediate Activity, and (3) Major Activity. Elements affecting design classification are listed in Table 2-2.

e. Provide 25 percent unassigned equipment growth space in ATCT equipment rooms and TRACONS unless the allocation conflicts with local requirements. Growth space shall be fully supported by electrical power system, HVAC system, etc. This shall be included in the spare 25 percent capacity of these systems.

f. The Terminal Area Forecast data at the FAA-APO web site (http://www.apo.data.faa.gov) has past, present, and projected air traffic activity data.

TABLE 2-1. AIRPORT TRAFFIC CONTROL TOWER ACTIVITY LEVELS

TABLE 2-1. AIRPORT TRAFFIC CONTROL TOWER ACTIVITY LEVELS

Terminal Types Terminal Level Non-Radar Approach VFR

Tower

Non-Radar

Approach

Limited

Radar Approach

Radar Approach New Levels Old Levels

* I 0 - 34.9 0 - 24.9 --- --- * II 35 - 89.9 25 - 79.9 0 - 24.9 0 - 19.9 * III 90 or more 80 or more 25 - 59.9 20 - 59.9 * IV --- --- 60 or more 60 - 99.9 * V --- --- --- 100 or more Traffic Data Used Airport Operations Airport Operations and

Instrument Operations

Instrument Operations

Instrument Operations

CRITERIA: Hourly Traffic Density Factor (sum of daily traffic for the busiest 183 days of the last 365 days, divided by 183 days, divided by 16 hours or actual hours of operation if a facility is open less than 16 hours). Traffic data to be used is determined by facility type.

*See Position Standard ATC-2152, Appendix A for specific facility level.

TABLE 2-2. ATCT/TRACON DESIGN CLASSIFICATIONS

TABLE 2-2. ATCT/TRACON DESIGN CLASSIFICATIONS

DESIGN ELEMENTS

DESIGN CLASSIFICATIONS LOW ACTIVITY

LOW ACTIVITY

RADAR

INTERMEDI

ATE ACTIVITY

MAJOR ACTIVITY

Control Cab Size Over 220 SF Over 350

SF

Over 350 SF Over 500 SF

Tower Height (to Cab Floor)

Up to 97 ft. 75 – 99 ft. Up to 141 ft. Generally 120

MAJOR ACTIVITY

ft. and over

Radar/Automation Equipment for TRACON

None ARTS II/IIA or III/ IIIA,

STARS

ARTS II/IIA

or III/ IIIA,

STARS

ARTS III/IIIA, STARS

Number of Radar Systems

None 1 1 or more 1 or more

Planned Radar Positions

None Up to 6 Up to 10 10 or more

27. AIRSPACE CONTROL JURISDICTION. The designer shall consider relative equipment and space size requirements for ATCT/TRACON jurisdictional responsibilities over other satellite airports. The following functions where the ATCT/TRACON jurisdictional requirements shall be considered early in the design process are:

ARTS III/IIIA, STARS

a. VFR traffic separation.

b. IFR approach control.

c. Radar advisory service.

d. Tower service, vectoring and sequencing.

e. Tower en route control.

f. Air traffic system safety.

g. Air traffic system flexibility and delays.

h. System user access and productivity.

28. ESTABLISHMENT CRITERIA. See Order 7031.2, Airway Planning Standard Number One - Terminal Air Navigation Facilities and Air Traffic Control Services for the detailed criteria involved in establishing ATCT facilities with or without TRACON facilities.

SECTION 3. AIRWAY FACILITY BUILDING

SECTION 3. AIRWAY FACILITY BUILDING

REQUIREMENTS

29. EQUIPMENT MAINTENANCE. Special emphasis shall be placed on providing safe, adequate access to tower equipment for routine and emergency maintenance. Proper working areas around equipment and testing requirements for:

a. Heating, ventilating, and air conditioning (HVAC).

b. Electronic equipment.

c. Engine generators.

d. Power conditioning systems (PCS).

e. Uninterruptible power systems (UPS).

f. Elevators.

g. Electrical cab hoist.

h. Environmental control and monitoring system (ECMS).

i. Direct Digital Control (DDC) system.

j. Prepackaged engine generator location.

k. Other special mechanical systems.

l. Lighting.

m. Equipment hoists.

n. Electrical cabinets.

o. Compressed air supplies.

p. DC power supplies.

30. FACILITY MAINTENANCE. Special consideration shall be given to the maintenance aspects of materials, finishes, space layout, etc.

a. Primary consideration shall be given to the use of low or no maintenance materials. Maintenance equipment storage space shall be provided in convenient locations.

b. Some facility areas (i.e., tower cab) require special design attention. These areas include loading docks and other project operational material transfer devices.

c. Building landscaping shall consider low maintenance designs.

31. POSSIBLE ADDITIONAL ACCOMMODATIONS. Airway Facilities field personnel responsible for remote field facilities on the airport are frequently assigned to, and located at, an ATCT/TRACON facility. In some special cases, an entire field maintenance organization may be located in the facility, which may require additional office, electronics, and environmental workshop storage space and may also include special requirements, such as remote maintenance and monitoring (RMM) and computer-based instruction (CBI) equipment. These requirements shall be determined by the designated approval authority in accordance with AMS Policy (with Order 4420.4, Space Acquisition, treated as a historical document) and shall be evaluated early in the design planning process to assess the facility special use impact. See the Administrative Space Standard in the Federal Aviation Acquisition Management System Toolset (FAST) for additional space guidance.

32. - 33. RESERVED .

SECTION 4. SPECIAL REQUIREMENTS

34. STAFFING AND SPACE RELATIONSHIP. The personnel and space arrangement required for safe and efficient facility operation is a major factor influencing the ATCT/TRACON design.

a. The relationship of some spaces affected by special equipment is critical, while other space relationships are desirable for convenience only.

SECTION 4. SPECIAL REQUIREMENTS

b. In all cases, administrative office space shall be designed to provide maximum use and accommodate common space sharing by all FAA organizations.

c. See the Administrative Space Standard in FAST for additional space guidance.

35. VARIATIONS IN EQUIPMENT AND INSTALLATION.

a. Individual ATCT equipment inventories are very flexible. In addition, the equipment state-of-the-art design is constantly changing. Several major replacements or additions to electronic equipment should be anticipated during the facility life.

1) The equipment actually installed may not include all of the items originally intended.

2) Some flexibility and future equipment space allowance shall be incorporated into the building design. Use 25 percent growth margin unless specific known growth establishes a different percentage.

3) Future airport plans and current and future equipment space requirements should be based on an FAA-approved facility equipment forecasting database; e.g., facility requirements database (FRDB).

4) In general, replacement systems should not occupy more space than the systems they are replacing.

5) Due to age, activity, and growth rate, wide variations exist in the type and quantity of equipment currently installed in ATCTs and TRACONs.

6) In general, the complexity and quantity is proportional to the facility's activity level. As the activity level designation increases, the complexity of equipment increases.

b. Equipment installed in any ATCT/TRACON is dependent upon the specific needs at that location. For this reason, a typical equipment list cannot be assumed for any activity level. However, a representative equipment list illustrating the generic equipment package normally associated with each design classification can be utilized as preliminary guidance as shown in Table 2-3. The designated approval authority shall approve the final equipment detailed planning list. Table 2-4, Table 2-5, and Table 2-6 provide the designer with a general idea of the basic special equipment requirements at ATCTs and TRACONs in each design classification.

TABLE 2-3. REPRESENTATIVE EQUIPMENT LISTING

TABLE 2-3. REPRESENTATIVE EQUIPMENT LISTING

EQUIPMENT QUANTITY MAJOR ACTIVITY

INTERMEDIATE

ACTIVITY

LOW ACTIVITY A. Communication Equipment

1. Air/ground receivers 7-12 3 2

2. Recorders 3 2 1

3. Power supply/distribution panel 2 1

4. Resectoring panel As required 1

5. Main/standby relay panel As required 1

6. Miscellaneous equipment As required 1

6. Miscellaneous equipment As required 1

7. Weather equipment As required 1

8. NAVAIDS /visaids monitor racks 8 2

9. Audio jack panels 3

10. Position power supply 1

11. Terminal racks 4

12. Tone equipment racks 2

13. Mixing amplifiers 1

14. Voice switch 1 1 1

15. Voice switch maintenance position 1 1 1

15. Voice switch maintenance position 1 1 1

B. Radar Equipment

1. Radar

a) ARTS II/IIE 1 b) Numeric Generator Units 3 c) Rack Line Compensator Trigger Dist. Unit

1

d) ASDE Console 1 e) ASDE PPI 1 f) ASR-8/9 Com. 1

EQUIPMENT QUANTITY MAJOR ACTIVITY

INTERMEDIATE

ACTIVITY

LOW ACTIVITY

2. ARTS II/IIE

a) APC cabinet 1 b) RADS display, maintenance (TRACON only)

2. ARTS II/IIE

1

c) Dacom modem rack 1 d) ASR-37 1 e) Video mapper 1

3. ARTS IIIA/IIIE

a) PEC cabinet (magnetic tape unit) 1 b) IOP cabinet(s) As required c) Dacom modem rack 1 d) BRITE A/N 1 e) BRITE 1 f) Buffer 2 g) ATCBI-3 Nom. Com. 3 h) ATCBI-3 Com. 2 i) Video Mapper 1 j) Maintenance display (portable) 1 k) FA-8762 Common equipment 1 l) ASR-37/42 1 m) Medium speed printer 1 n) Disc drive 1 o) RTCCS (FA-9485) 1 C. Cab Equipment

1. DBRITE

1. DBRITE

a) Control panel As required As required As required b) Display As required As required As required

2. Wind indicators As required As required As required

3. DASI As required As required As required

4. Digital time readout As required As required As required

5. Field lighting panel 1-2 1-2 1

6. AWIS /electro-writer 1 1 1

6. AWIS /electro-writer 1 1 1

7. FDIO

EQUIPMENT QUANTITY MAJOR ACTIVITY

INTERMEDIATE

ACTIVITY

LOW ACTIVITY a) Keyboard/monitor 1 1 1 b) Printer 2 2 2

8. ATIS 1-2 1-2 1

9. ARTS keyboard As required As required As required

10. Approach light system (ALS) control As required As required As required

11. Voice switch common equipment

11. Voice switch common equipment

a) Direct access As required As required As required b) Telephone jack As required As required As required c) Speaker module As required As required As required d) Radio select module As required As required As required e) TED keypad As required As required As required

12. Convenience Unit 1 1 1

12. Convenience Unit 1 1 1

a) Compact refrigerator b) Sink unit c) Microwave oven * d) Coffee maker * e) Chilled water dispenser

13. HVAC control 1 1 1

14. Light guns 2 2 2

15. NAVAID monitor As required As required As required

16. Door release

a) Control 1 1 1 b) Speaker 1 1 1

17. Fire alarm 1 1 1

18. LLWAS display As required As required As required

18. LLWAS display As required As required As required

19. ASDE

a) Cab unit 1 - - b) Display As required - -

20. ILS/MLS monitor As required As required As required

EQUIPMENT QUANTITY MAJOR ACTIVITY

INTERMEDIATE

ACTIVITY

LOW ACTIVITY

21. Podium As required As required As required

22. Strip bay As required As required As required

22. Strip bay As required As required As required

23. Light dimmer switch As required As required As required

24. Portable transceiver As required As required As required

25. CONRAC monitors administration phone system FDEP

1 1 1

26. Telephone 1 1 1

27. PDC

a) Monitor 1 - - b) Keyboard 1 - -

28. Radar control 1 1 -

28. Radar control 1 1 -

29. RVR/RVV control As required As required As required

30. TMU workstation As required - -

31. Engine generator (E/G) monitoring 1 1 1 (TRACAB) D. TRACON Equipment

1. ARTS display As required As required -

2. FDIO

a) Keyboard/monitor As required As required -

3. ASR-37/TTY emulator As required As required -

3. ASR-37/TTY emulator As required As required -

4. Wind indicator As required As required -

5. DASI As required As required -

6. Overhead control (1 for every 5 positions)

2-3 1-2 -

7. Beacon decoder 1 1 -

8. Digital Time Readout As required As required -

EQUIPMENT QUANTITY MAJOR ACTIVITY

EQUIPMENT QUANTITY MAJOR ACTIVITY

INTERMEDIATE

ACTIVITY

LOW ACTIVITY

9. TMU workstation As required - -

10. Voice switch common equipment

a) Direct access As required As required - b) Telephone jack As required As required - c) Speaker module As required As required - d) Radio select module As required As required - e) TED keypad As required As required -

11. Telephone As required As required -

11. Telephone As required As required -

12. E/G and UPS monitoring 1 1 1 (TRACAB)

13. Door release

a) Control 1 1 - b) Speaker 1 1 -

14. ARTS panel - - 1 (TRACAB)

* Items C.12c and C.12d are not required to be physically attached to the convenience unit.

TABLE 2-4. TYPICAL POWER AND COOLING REQUIREMENTS FOR ARTS IIIA

TABLE 2-4. TYPICAL POWER AND COOLING REQUIREMENTS FOR ARTS IIIA

EQUIPMENT

EQUIPMENT WATTS BTU/HR PCAB (populated) 3,847 15,390

1. IOPB 955 4,000

2. Memory 16K 850 3,400

3. CMA 240 960

4. RFDU 476 1,904

5. MDBM 600 2,400

6. BCAB 440 1,760

PEC (populated) 3,000 12,000 SRAP (dual) 2,000 8,000 DCU 337 1,200 DDU 1,520 7,000 IBAG 1,100 3,600 CMC 337 1,200

TABLE 2-5. TYPICAL SITE POWER AND COOLING REQUIREMENTS

TABLE 2-5. TYPICAL SITE POWER AND COOLING REQUIREMENTS

EQUIPMENT WATTS BTU/HR Single Beacon

1. ARTS IIIA 25,000 97,200

Dual Beacon

1. ARTS 6,800 27,390

2. STARS See Table

2-6 See Table

2-6

3. EARTS 34,000 131,000

RCL/LDRCL

1. RF rack 528 VA 1660

2. MUX (@2 channel banks) 432 VA 1358

RDVS IIA

RDVS IIA

1. Equipment rack 1 2.1 KW 6600

2. Equipment rack 2 0.97 KW 3049

3. QCT 500 W 1572

FDIO

1. PC-RCU rack 1.0 KW 3143

MDS (test outlet) 500 W 1572 BWM

1. Rack 1 8.2 KW 25773

2. Workstation 1.8 KW 5657

DVRS2

1. Recorder 400 W 1257

2. Reproducer 400 W 1257

VSBP (per UPS) 450 W 1414 PREMNET 5000

1. Standard unit 540 W 1697

1. Standard unit 540 W 1697

RCE

EQUIPMENT WATTS BTU/HR

1. Control – RCE 25 W 79

CM-200 receivers 8 W 25 Multicouplers

1. VHF (decibel prod) 15 W 47

2. UHF (decibel prod) 15 W 47

Coded time source

1. Receiver 151 W 475

2. Distribution amplifier 65 W 204

DMN

1. 3600 codex modem 80 W 251

2. Distribution amplifier 65 W 204

2. EIA patch panel (CPP AR-4) 0.013 kVA 41

3. 2185 digital bridge 10 W 31

4. Hadax digital bridge 10 W 31

Fiber optic DBRITE hub TBD ETMS

1. Data router 100 W 314

2. Workstation 500 W 1572

ACE-IDS

1. ACC cabinet 1.8 kVA 5657

2. Workstation 720 VA 2263

3. Monitors (20”) 85 W 267

TDWR

1. MDT (remote) 500 W 1572

1. MDT (remote) 500 W 1572

ITWS

1. ITWS processor 6.24 kVA 19612

2. Communications rack 1.84 kVA 5783

DASI

1. Sensor translator 60 W 189

EQUIPMENT WATTS BTU/HR

2. Display unit 10 W 31

3. Decoder unit 10 W 31

Remote monitor and control

1. ASR-8 workstation 500 W 1572

2. ARSR-4 workstation 500 W 1572

3. Mode S workstation 500 W 1572

3. Mode S workstation 500 W 1572

Remote monitor and control

1. CMS workstation 500 W 1572

ARMS (Airport RMS)

1. Link control unit (LCU) (Unit 1)

2. Power supply (Unit 4) 224 W 704

VOT

1. Monitor/transmitter 500 W 1572

SSRBDS

1. Decoder power supply N/A

2. Radar beacon monitor N/A

3. SS beacon decoder 300 W 943

3. SS beacon decoder 300 W 943

Dantel (IWA ASR-8) 300 W 943 Dual remote SCIP

1. Unit 24) 7000 W 22001

Remote data communications

1. Unit 21/23 1000 W 3143

ASR-9 SCIP

1. Unit 24 7000 W 22001

Remote data communication equipment

1. Unit 21/23 1000 W 3143

ARMS (Airport RMS) 500 W 1572 Administration LAN system TBD Network system

EQUIPMENT WATTS BTU/HR

EQUIPMENT WATTS BTU/HR

1. CBI workstation 500 W 1572

TDLS D-ATIS

1. TDLS power usage 502W 1578

LLWAS/CFW

1. Processor/monitor unit 500W 1572

RRCS 500W 1572 ILS

1. Power supply unit 4 224W 704

RVR

1. DPU 460W 1446

ASDE-X

1. SMR pedestal (ATCT roof) 4000 W 12572

2. Display monitor (ATCT cab) 200W 629

3. Display/monitor processor 712 W 2238

3. Display/monitor processor 712 W 2238

4. SMR motor controller 3200W 10058

5. SMR dehydrator/compressor 170 W 534

6. SMR transceiver cabinet 3100W 9743

7. SMR power and monitor cabinet 6400W 20115

8. SMR data processor 2500W 7858

9. Processor cabinet 3500W 11001

10. Communication cabinet 500W 1572

11. RMS cabinet 280W 800

11. RMS cabinet 280W 800

TABLE 2-6. STARS POWER AND COOLING REQUIREMENTS

EQUIPMENT WATTS BTU/HR Terminal controller workstation (TCW) 1095 3442 Monitor controller workstation (MCW) (w/printer)

1829 5749

EQUIPMENT WATTS BTU/HR GPW pseudo pilot 338 1062 Full service rack (FSR) (1-3R) 1899 5969 Emergency service rack (ESR) (1-3R) 1907 5994 TCW hub rack (12-35 TCW) 897 2819 Supplemental display 81 255 Communications rack 672 2112 Simulator 338 1062 Site support server 338 1062 CSU/DSU (nominal) 15 47

TABLE 2-6. STARS POWER AND COOLING REQUIREMENTS

36. SPECIALIZED ENVIRONMENTAL FACTORS.

a. Much of the equipment installed in ATCTs has special environmental requirements that will affect the facility design. These environmental requirements are a function of space relationships and equipment operating parameters. For example, certain ATCT complex areacritical functions will necessitate special consideration that includes redundant heating, ventilation, and air conditioning (HVAC) systems.

b. Environmental control and monitoring systems (ECMS/DDCS) used for building management monitoring and control shall be installed at all intermediate and major activity facilities.

1) These systems shall be automated and shall provide performance monitoring, status, control, alarms, and energy management.

2) Refer to FAA-STD-033), Energy Management in NAS Physical Facilities, paragraph 242.k for all major building mechanical/electrical systems/subsystems.

3) These systems shall be an open system design that does not rely on a specific manufacturer's proprietary hardware or software.

37. OTHER SPACE REQUIREMENTS.

a. Several military and civilian agencies have agreements with the FAA for the operation of equipment and lease of space at certain ATCT/TRACON facilities.

b. Several telephone companies (telcos) also provide and maintain equipment located at FAA facilities, and a provision should be made for separate telco room access.

c. Telco equipment will be installed in an area to which telco employees have access in accordance with facility security requirements but that does not allow them access to the remainder of the facility. This allows the telco to maintain their equipment without an FAA escort or having access to the operating facility. These agreements may increase space requirements and should be reviewed in the initial stages of the design process.

d. The designer shall plan hazardous or flammable material storage required for daily and ongoing operations.

e. Security requirements are addressed in paragraphs 24, 79, and 302.

38. SPECIAL ATCT/TRACON CLASSIFICATIONS. The designer should remain flexible and address any special requirements, as defined by the designated approval authority, peculiar to the airport activity classification for a specific location. The design classifications listed in Table 2-2 are intended to be nominal only. However, the general design elements do not always determine a particular design classification.

38-1. FAA CONTRACT TOWER (FCT) EQUIPMENT. Table 2-7 lists the FCT minimum operational equipment. This list is applicable to locations where the Airport Sponsor provides and maintains air traffic control (ATC) operational equipment. The equipment shall be furnished and maintained in accordance with applicable FAA standards and regulations. These standards and regulations include, but are not limited to, the FAA Orders identified in Appendix 1.

TABLE 2-7. FAA CONTRACT TOWER EQUIPMENT

TABLE 2-7. FAA CONTRACT TOWER EQUIPMENT

FCT Equipment

1. Voice switch communication equipment capable of radio and telephone ATC communication, as appropriate. This shall include the capability of headset use and instructor/student override capabilities.

2. One headset per controller and one handset per position, with appropriate spares.

3. Very High Frequency radios for ground/air communication, as required, to support level of traffic; i.e., Local Control, Ground Control, Automated Terminal Information Service, Clearance Delivery, and Emergency. One transmitter and one receiver for each frequency. Handheld radios are not authorized as primary units.

4. Ultra High Frequency radios for ground/air communication, as required, to support military operations. Handheld radios are not authorized as primary units.

5. Landline communication system with direct access line to controlling instrument flight rules facility.

6. Tunable emergency back-up transceiver with battery back-up supply.

7. Dual deck, multi-channel, voice recorder system for continuous unattended recording of each position used for receiving/transmitting ATC clearances, coordination, and instructions. Capabilities must include: synchronized recording of time, playback without recording interruption, re-recording to suitable portable storage media and/or a portable recorder with re-recording capability, any internal storage media must be configurable to preclude retention of data older than 15 days, and remote alarm. Appropriate storage media must be provided (one for each of 15 days, plus spares).

8. Back-up power source for essential equipment, (i.e. radios, voice switch), cab

FCT Equipment HVAC, etc.

9. Two altimeter setting indicators. A certifiable digital altimeter setting indicator (DASI) is preferred and required if ASOS/AWOS or a “traceable pressure standard” is not available within ten miles for precision approaches and 25 miles for non-precision approaches (FAA Order 7210.3, Section 8 and FAA Notice 7210.477). Aircraft altimeters are not acceptable.

10. Two direct reading wind indicators.

11. If ASOS/AWOS is available on the airport, locate ASOS/AWOS Operator Input Device (OID) in the tower cab. If tower is ATIS equipped, provide an ASOS/ATIS interface device.

12. Two pair of operable binoculars, 7x50 or greater.

13. Signal lightgun with a back-up power source.

14. At least one 24-hour clock with seconds display; i.e., digital LED.

15. Alert system to notify airport emergency equipment operator.

16. Airport lighting controls.

17. Window shades as prescribed in FAA regulations for all tower cab windows (adjustable). (FAA specification E 2470.)

18. Mechanical or electronic traffic counting device.

19. Position lighting (to support established operating positions with rheostat control).

20. Electrostatic Discharge (ESD) resistant controller chairs of appropriate height for the conduct of tower operational duties.

21. Floor covering shall be ESD resistant.

22. Note for 20 and 21: other floor grounding apparatus may be necessary dependant upon specifications of the electronic equipment installed.

23. Administrative telephone with handsets in the operating and administrative quarters.

24. Appropriate non-operational space and equipment will also be provided. This must include:

 Lockable Air Traffic Manager’s office  Restroom one floor below the tower cab

FCT Equipment  Training/break room  Appropriate desk, chairs, table, locking file cabinet

CHAPTER 3. REPRESENTATIVE AIRPORT TRAFFIC

CHAPTER 3. REPRESENTATIVE AIRPORT TRAFFIC

CONTROL TOWERS AND TERMINAL RADAR

APPROACH CONTROL FACILITIES

SECTION 1. BASIC COMPONENTS

39. INTRODUCTION. ATCT/TRACON facilities have three basic components: control cab or cab, tower shaft or shaft, and base building. Each basic component is defined in Appendix 2, and the following three paragraphs discuss the function of each.

SECTION 1. BASIC COMPONENTS

40. CONTROL CAB. The cab is the primary control tower operating space. The cab shall be situated at the desired elevation above ground level (AGL) and physically oriented relative to the primary runways to provide the best unobstructed view of the airport aircraft primary movement areas (taxiways and runways).

41. TOWER SHAFT. The primary tower shaft function is to support the raised cab at the desired elevation. Tower cab access can be provided with a stairway and/or elevator. Tower shafts can be structurally independent (freestanding) or an integral part of another related structure such as a terminal building or base building.

42. BASE BUILDING. The base building is a single or multiple-story building adjacent to the tower shaft. Its primary function is to provide facility functional space. When the base building is structurally independent, it is usually attached to the tower shaft with an access corridor or link. The base building is normally used to house the equipment necessary to support the operational needs of the ATCT and TRACON, including space for administrative and training functions.

SECTION 2. BASIC CONFIGURATION

SECTION 2. BASIC CONFIGURATION

43. INTRODUCTION. The three basic components of an ATCT/TRACON can be combined in a limited number of ways to design a facility. The preferred design is a non-functional tower shaft supporting the control cab and a base building.

44. BASE BUILDING AND NON-FUNCTIONAL SHAFT. The basic configuration is a cab on a shaft with a base building.

a. The shaft is not utilized for functional space except for minimal mechanical and electronic equipment located directly below the cab. The shaft provides cable routing to the tower cab. Support personnel shall not be housed in the shaft. The base building and nonfunctional tower shaft offers the following attributes:

1) Flexibility in space arrangement.

2) Potential for future expansion.

3) HVAC units may be located on the base building roof, thereby alleviating potentially crowded conditions of interior mechanical spaces.

4) A base building lends itself to more convenient, safe, and efficient circulation of people.

5) ATCTs and TRACONs may be independently constructed and remotely located for economy and land acquisition ease.

6) Standardization of a non-functional tower shaft with support spaces in a base building can significantly reduce design and construction costs; because functional floor space in elevated, shaft levels are very expensive.

45. FLEXIBILITY OF THE BASIC CONFIGURATION. The basic configuration flexibility is limited because of certain specific requirements, such as accessibility and space relationships imposed by equipment and personnel. The personnel and functional space arrangement required for efficient facility operation places restrictions on the designer. Furthermore, established policy directives regarding ATCT/TRACON facilities will set prescribed design limitations.

46. VARIATIONS OF THE BASIC CONFIGURATION.

a. Although the basic configuration described above may seem to restrict the ATCT/TRACON facilities design, configuration variations are allowed.

b. Figure 3-1 through 3-4 illustrate ATCT/TRACON designs currently in use that represent the basic configuration.

c. The designer should be aware of the flexibility of the basic configuration and not limit conceptual planning to these or any other examples unless specifically directed.

47. - 49. RESERVED.

Tower Picture

NON-FUNCTIONAL SHAFT WITH 6,200 SF TRACON BASE BUILDING –

INTERMEDIATE ACTIVITY FIGURE 3 1 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

NON-FUNCTIONAL SHAFT WITH 8,400 SF TRACON BASE BUILDING –

NON-FUNCTIONAL SHAFT WITH 8,400 SF TRACON BASE BUILDING –

INTERMEDIATE ACTIVITY

FIGURE 3-1 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

FIGURE 3 2 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

ADMINISTRATIVE BASE BUILDING AND NON-FUNCTIONAL SHAFT

INTERMEDIATE ACTIVITY

ADMINISTRATIVE BASE BUILDING AND NON-FUNCTIONAL SHAFT MAJOR

ADMINISTRATIVE BASE BUILDING AND NON-FUNCTIONAL SHAFT MAJOR

ACTIVITY

FIGURE 3-2 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

FIGURE 3 3 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

24,000 SF TRACON BASE BUILDING AND NON-FUNCTIONAL SHAFT MAJOR

ACTIVITY FIGURE 3 3 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

14,500 SF TRACON BASE BUILDING AND NON-FUNCTIONAL SHAFT MAJOR ACTIVITY

FIGURE 3-3 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

FIGURE 3-3 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

FIGURE 3-4 REPRESENTATIVE AIRPORT TRAFFIC CONTROL FACILITIES

SECTION 3. REPRESENTATIVE SITE LAYOUTS

50. INTRODUCTION. Several factors influence the site layout and design for ATCT/TRACON facilities. Although many of these factors cannot be established prior to site selection, certain basic parameters such as activity level, ATCT design classification, security, budget limitations, staffing, utility requirements, parking requirements, etc., can be predetermined. An overview of

SECTION 3. REPRESENTATIVE SITE LAYOUTS

the differences normally associated with design classification is provided in this chapter as an aid in achieving better initial specific project scope understanding. See paragraphs 24, 79, and 302 for security requirements.

51. COMPARATIVE EXAMPLES. The tremendous site layout diversity at existing ATCT/TRACON facilities with the same activity level is an indication that many variables control site design. Still, some basic standards can be identified in almost every site developed. It is important for a designer to recognize the relationship of general site requirements to the different activity levels. For this reason, Appendix 3 Representative Space Layouts and Console Drawings Figures 1 through 3 illustrate existing sites for each level of activity. These drawings are included as representative examples only and are not intended to establish any specific design criteria.

52. - 53. RESERVED.

SECTION 4. REPRESENTATIVE TECHNICAL

SECTION 4. REPRESENTATIVE TECHNICAL

AND OPERATIONAL SPACE LAYOUTS

54. DESCRIPTION. Appendix 3 Representative Space Layouts and Console Drawings, Figures 4 through 15, contain layout drawings that exhibit representative technical and operational space variations that include cab, TRACON, communication, and radar areas. These drawings are included as representative examples only and are not intended to establish any specific design criteria. The dimensions on these drawings are recommended; however, actual dimensions shall be based on the consideration of pullback/pullout clearances for equipment maintenance/ replacement, peak personnel traffic (shift change), and minimizing noise (voice) interference from other positions.

55. - 58. RESERVED

55. - 58. RESERVED

CHAPTER 4. SITE SELECTION AND DESIGN

SECTION 1. INTRODUCTION

59. GENERAL.

a. This chapter provides objectives, influencing factors, and requirements affecting ATCT/TRACON facility site design. The major consideration in ATCT cab design, orientation, construction, and location within the airport facility is air traffic controller visibility. The ATCT may be located on a site near the terminal, across the airfield opposite the terminal, or integrated into the terminal. An ideal location is one that allows total unrestricted visual contact with all types of traffic on and around the airport. Due to other structures on the airport, the controller's line-of-sight will normally be obstructed unless the controller is near the runway and high above the ground.

SECTION 1. INTRODUCTION

b. Safety criteria in FAR Part 77 limit the tower height and require that it be located well away from the runway centerline. It also shall not interfere with terminal procedures such as missed approach paths.

c. Sites in or near the terminal area are not always the most desirable, as they add complexities to site considerations. These sites will have several restrictions of one type or another. As a rule, these sites are relatively small, odd shaped, obstructed, and congested or any combination of these factors.

d. Site design criteria required in this chapter, where applicable, shall apply to each ATCT and TRACON site regardless of location, configuration, or category. TRACON sites are less restrained by airport configuration but are usually co-located with the ATCT. Locating the ATCT or TRACON near the airport surveillance radar (ASR) is not necessary with digital format radars.

60. GUIDELINES. The minimum ATCT and TRACON site standards and requirements are chronologically presented in three major categories: (1) site selection, (2) site investigation, and (3) site design. Each of these sections involves criteria that shall be met before work can proceed on subsequent design phases.

SECTION 2. SITE SELECTION

SECTION 2. SITE SELECTION

61. PRELIMINARY CONSIDERATIONS. Site selection activities are initiated after it has been determined that an airport qualifies for a control tower or that an existing control tower facility is inadequate and requires relocation or replacement. Site selection may be predetermined by the airport master plan or airport layout plan. In any event, the site selection process requires analysis of factors that include the following:

a. Economics.

1) Utilities shall be evaluated for availability, future expansion capability, and accessibility to assure that excessive cost will not be incurred because of the site condition and/or location.

2) Site preparatory work cost assessment should be made for the same reason. Preparatory work includes all work required on topography, ground water condition, environmental clean-up, soil stability and geology, and drainage to adapt the site for construction and/or use.

3) In addition, the site-required tower height must be calculated because project costs increase significantly and proportionally with tower height.

b. Visibility.

1) Refer to Order 6480.4, Airport Traffic Control Tower Siting Criteria, to review visibility requirements.

2) Complete airport surface area visibility shall be assured at all times of day. This includes movement in controlled air traffic related surfaces.

3) Tower cab orientation shall minimize major airport activity point obstruction. Maximum airborne traffic pattern visibility, unobstructed direct runway approach path, and landing area viewing are essential.

4) Visibility shall not be impaired by direct or indirect external light sources. Such sources may be ramp lights, parking area lights, a rising or setting sun, and reflective surfaces.

5) Local weather phenomena shall be given consideration to preclude visibility restriction caused by fog or ground haze.

c. Land Area Requirements.

1) A guide to lot size is shown in Table 4-1.

2) Site land requirements shall be coordinated in accordance with FAA Order 1600.69, paragraph 304, Appendix 9.

3) Site size includes that land required for structures, sidewalks, docks, areas between tower and other structures, and base building future expansion requirements.

4) Adjacent airport development and lot shape will also affect lot size.

5) See paragraphs 24 and 79 for additional security requirements.

d. Parking Requirements. While it is desirable to have FAA employee parking adjacent to the ATCT complex, employee parking may be provided by the airport and may be located away from the tower. Areas in addition to that recommended in Table 4-1, may be required where odd shaped parcels are involved.

e. Environmental Due Diligence Audit (EDDA). The EDDA shall be completed in accordance with FAA Order 1050.19), Environmental Due Diligence Audits in the Conduct of FAA Real Property Transactions.

f. Security. A security assessment shall be completed to determine building setback requirements.

g. Compatibility. Other airport facilities, existing or proposed, shall be examined to determine their compatibility with the ATCT. Conditions that adversely affect operations, such as structures restricting view or conditions that adversely impact the use of equipment; i.e., potential sources of radio frequency interference (RFI) or electromagnetic interference (EMI) and microwave and equipment telemetry link line-of-sight, should be avoided.

h. Maintainability and Accessibility. Consideration should be given to maintainability and accessibility requirements. The site shall be able to accommodate equipment that may be required to support site maintenance efforts.

TABLE 4-1. AREA REQUIREMENTS

TABLE 4-1. AREA REQUIREMENTS

Facility Type Site Area Parking Perimeter & Future

Site Expansion

Total

Spaces Area Low Activity ATCT

4,800 SF 10-40 2,700 SF to 10,800 SF

Up to 10,000 SF 10,200 SF to 25,000 SF Intermediate Activity TRACON

14,400 SF 30-80 8,100 SF to 21,600 SF

Up to 20,000 SF 25,000 SF to 56,000 SF Intermediate to High Activity ATCT

18,000 SF to 22,500 SF

40-60 10,800 SF to 16,200 SF

Up to 20,000 SF 25,000 SF to 58,000 SF Intermediate Activity ATCT/TRACON

(ARTS II) 22,500 SF 60-100 16,200 SF to 27,000 SF

Up to 20,000 SF 40,000 SF to 70,000 SF Major Activity TRACON

30,000 SF 60-130 16,200 SF to 35,100 SF

Up to 30,000 SF 48,000 SF to 95,000 SF Major Activity ATCT/TRACON

40,000 SF to 52,000 SF

80-200 21,600 SF to 53,000 SF

Up to 30,000 SF 62,000 SF to 135,500 SF

62. SITING CRITERIA. The required ATCT siting criteria and minimum eye level determinations are outlined in FAA Order 6480.4.

63. APPROVAL. A layout plan indicating the approximate site size, tower location and other structures, access roads, and parking accommodations should be submitted to the designated approval authority for approval. The designated design approval authority is defined as the first level supervisor for the specific tower project design engineer. Deviations are approved in accordance with paragraph 22.

SECTION 3. SITE INVESTIGATION

SECTION 3. SITE INVESTIGATION

64. GENERAL. Site investigation will require proposed project site visitation to become familiar with the site and surrounding environments prior to starting the design and document preparation. Information on utility services available in the site vicinity should be collected early and verified during a site visitation.

65. BOUNDARY SURVEY. A boundary survey shall be made to establish the site limits. These limits shall be marked at corners or directional changes on the perimeter with permanent monuments. The survey shall include a drawing prepared at a scale suitable for clarity,

graphically representing the survey. The boundary survey should be performed concurrent with and by the same registered surveyor performing the topographical survey.

66. TOPOGRAPHIC SURVEY. A topographic survey shall be conducted and shall graphically represent the site, including location of existing structures, utilities, cables, etc., and the extent of trees and vegetation on the site.

1) The survey shall also provide one (1) foot contours at a clear suitable scale.

2) It shall include an area outside the limits of the site boundary sufficient to provide the designer with enough information to blend the site grading into the surrounding terrain.

3) A temporary benchmark, produced from a permanent benchmark on the airport, shall be established at a close proximity to the proposed building site.

4) All elevations shall be expressed from mean sea level (MSL).

5) The survey shall be prepared in electronic media/format and shall be compatible with existing FAA electronic resources as defined by the designated approval authority.

6) Registered surveyor seals shall be prepared in accordance with local and state requirements.

7) A brief report shall be prepared to document the utility availability, as well as rough order of magnitude connection costs or extending the utilities to the proposed site.

67. SOIL AND FOUNDATION ANALYSIS. Soil and foundation conditions shall be investigated to assure that the proposed structure and foundation suitability does not require extraordinary soil preparation effort.

a. A soil investigation to determine type and condition of soil is required. An analysis and engineering report is required in accordance with paragraph 207.

b. General report requirements include foundations, structures, pavement, excavated soil reuse as backfill, and site development recommendations.

c. Investigation Information. The required investigation information that is not limited to, but shall include preliminary data for:

1) Structures.

2) Location, size, and construction type.

3) Perimeter grade beam loading.

4) Interior and exterior column loading.

5) Structural slab loading.

a) Wind shear.

b) Wind overturning moment.

c) Weather.

6) Pavement.

a) Location.

b) Loading.

c) Traffic requirements.

d) Accessibility.

e) Water runoff impact.

7) Site Development.

a) Proposed area of construction.

b) Location of proposed utilities.

c) Drainage considerations.

d) Erosion control measures.

d. Report Requirements. The general requirements of the engineering report shall not be limited to, but shall include recommendations for:

1) Structures.

a) Foundation Element. This shall include detailed design criteria for the foundation(s) type or types recommended.

b) Soil settlement characteristics.

c) Detailed specification preparation criteria, including information on excavation, dewatering, or special specific problem area consideration types.

2) Pavements.

a) Soil suitability, removing and replacing necessity, and acceptable material availability.

b) Compaction properties.

c) Proposed site-suitable pavement type, rigid or flexible, recommendation.

3) Site Development.

a) Type of materials to be encountered in excavation on the site.

b) Unusual drainage. Conditions on or adjacent to the site.

c) Soil problems that involve significant properties that could affect design.

d) Equipment access to and mobility on the site.

68. UTILITIES. Determining which utilities are to be utilized requires consideration of several factors: availability, nearest source, service quality, energy conservation incentive program, and local restrictions or requirements. Consultation with each utility and the airport sponsor to determine the responsibility for extending the service to the site, connections, demand requirements, and procedures will be required.

69. HAZARDOUS MATERIAL SITE SURVEY. A site survey shall be conducted that includes soil and foundation analyses to determine if any pre-existing contamination from hazardous materials waste is present that could affect the facility design or personnel safety or health. Refer to paragraph 61.e concerning EDDA.

70. HAZARDOUS MATERIALS. Hazardous material shall be identified, monitored, and managed in accordance with national, state, and local environmental regulations.

71. - 72. RESERVED.