The purpose of these procedures is to integrate the National Environmental Policy Act (NEPA) into FAA’s decision-making processes. Specifically, the procedures: describe the process by which FAA determines, based on its statutory authorities and Congressional statements of purpose and policy, e.g. safety, efficiency, and minimizing effects of aviation activity on people and the environment, what actions are subject to NEPA’s procedural requirements and the applicable level of NEPA review.

Official source ↗ Open PDF

The Executive Director of the FAA Office of Environment and Energy, Julie Ann Marks, signed the following notice on June 30, 2025, and FAA submitted it for publication in the Federal Register. While we have taken steps to ensure the accuracy of this pre-publication version, it is not the official version. Please refer to the official version in a forthcoming Federal Register publication, which will appear on the Federal Register website, https://www.federalregister.gov/, Government Printing Office’s website, https://www.govinfo.gov/app/collection/fr, and on https://regulations.gov in Docket No. FAA-2025-1571. Once the official version of this document is published in the Federal Register, this version will be removed and replaced with a link to the official version.

Effective Date: 6/30/25

SUBJ: FAA National Environmental Policy Act Implementing Procedures

This Order serves as the Federal Aviation Administration’s (FAA) policy and procedures for compliance with the National Environmental Policy Act (NEPA), as amended, and reflects the February 25, 2025, Interim Final Rule issued by the Council on Environmental Quality rescinding its regulations implementing NEPA. The provisions of this Order apply to actions directly undertaken by the FAA and to actions undertaken by a non-Federal entity where the FAA has authority to condition a permit, license, or other approval. The requirements in this Order apply to, but are not limited to, the following actions: grants, loans, contracts, leases, construction and installation actions, procedural actions, research activities, rulemaking and regulatory actions, certifications, licensing, permits, plans submitted to the FAA by state and local agencies for approval, and legislation proposed by the FAA. The Order was last revised in 2015.

This Order updates FAA Order 1050.1F, Environmental Impacts: Policies and Procedures to: 1) provide streamlined procedures that maintain environmental amenities and protection; 2) reduce regulatory delays that may impede aviation safety improvements and infrastructure development as well as integration of new entrant technologies; and 3) provide a clear, concise, and up-to-date statement of the FAA’s requirements for implementing NEPA.

Christopher J. Rocheleau Acting Administrator

ORDER

1050.1G

Distribution: Electronically Initiated by: AEE-400

i

Table of Contents

PURPOSE, POLICY, AND APPLICABILITY 1

PART 1—NEPA AND AGENCY PLANNING 2

PART 2—ENVIRONMENTAL IMPACT STATEMENTS 18

PART 3—EFFICIENT ENVIRONMENTAL REVIEW 23

PART 4—AGENCY DECISION MAKING 28

PART 5—PROCEDURES FOR APPLICANT-PREPARED NEPA DOCUMENTS 30

PART 6—DEFINITIONS 31

PART 7—SEVERABILITY 35

APPENDIX A—SIGNIFICANCE DETERMINATION FOR FAA ACTION A-1

APPENDIX B—EXTRAORDINARY CIRCUMSTANCES AND CATEGORICAL EXCLUSIONS B-1

APPENDIX C—FEDERAL AVIATION ADMINISTRATION REQUIREMENTS FOR ASSESSING IMPACTS RELATED TO NOISE AND NOISE-COMPATIBLE LAND USE C-1

Page 1 of 32

FAA National Environmental Policy Act Implementing Procedures

PURPOSE, POLICY, and APPLICABILITY

Purpose and policy.

(a) The purpose of these procedures is to integrate the National Environmental Policy Act (NEPA) into FAA’s decision-making processes. Specifically, the procedures: describe the process by which FAA determines, based on its statutory authorities and Congressional statements of purpose and policy, e.g. safety, efficiency, and minimizing effects of aviation activity on people and the environment, what actions are subject to NEPA’s procedural requirements and the applicable level of NEPA review. These procedures also ensure that relevant environmental information is identified and considered early in the process in order to ensure informed decision making; enable FAA to conduct coordinated, consistent, predictable and timely environmental reviews; reduce unnecessary burdens and delays; and implement NEPA’s mandates regarding lead and cooperating agency roles, page and time limits, and sponsor preparation of environmental documents.

PURPOSE, POLICY, and APPLICABILITY › Applicability.

(b) Procedural and Interpretive Guidance. This Order sets forth FAA’s procedures and practices for implementing NEPA. It further explains FAA’s interpretation of certain key terms in NEPA. It does not, nor does it intend to, govern the rights and obligations of any party outside the Federal government. It does, however, establish the procedures under which FAA will typically fulfill its requirements under NEPA.

(c) Consultation with the Council on Environmental Quality (“CEQ”). In addition to the process for establishing or revising categorical exclusions (CATEXs) set forth in § 1.4(b) and (d), FAA will consult with CEQ while developing or revising their proposed NEPA implementing procedures, in accord with NEPA § 102(2)(B), 42 U.S.C. § 4332(B).

Applicability.

(a) Applicability. This Order is applicable to all FAA employees who approve, manage, or otherwise participate in actions requiring FAA compliance with 42 U.S.C. §§ 4321 et seq., DOT Order 5610.1, and all FAA contractors, and state aviation agencies participating in FAA’s State Block Grant Program (SBGP), involved in such actions under the FAA’s purview. This Order provides guidance to applicants on how to provide information to the FAA to comply with NEPA or to draft NEPA-related documents as part of their applications. The Order does not in fact, nor does it intend to, govern the rights and obligations of any party outside the FAA. The FAA will independently review and assess whether applicant furnished information, data, and draft NEPA-related documents comply with the FAA’s interpretations of existing law, agency procedure, practice, and guidelines with respect to NEPA compliance.

(b) Authority. NEPA imposes certain procedural requirements on the exercise of FAA’s existing legal authority in relevant circumstances. Nothing contained in these procedures is intended or should be construed to limit FAA’s other authorities or legal responsibilities.

(c) Line of Business NEPA Procedures. This Order supersedes Lines of Business (LOB)-specific orders, as well as any LOB-specific guidance, manuals, or other NEPA-related instructions to the extent that they conflict with this Order. LOB-specific NEPA Orders, guidance manuals, or instructions may be used as a reference or guide to NEPA practices in those instances where there are no substantive conflicts with this Order.

PART 1—NEPA AND AGENCY PLANNING › § 1.1 Determining when NEPA applies.

Page 2 of 32

Cancellation and Effective Date.

This Order cancels FAA Order 1050.1F, “Environmental Impacts: Policies and Procedures,” issued July 16, 2015. This Order is effective immediately, but FAA is soliciting public comment on this Order and may update it based on comments received. This Order does not apply to or alter any decisions made and final environmental documents issued prior to the effective date of this Order. FAA will apply the procedures in this Order to actions initiated on or after the effective date of this Order.

PART 1—NEPA AND AGENCY PLANNING

§ 1.1 Determining when NEPA applies.

(a) FAA will determine that NEPA does not apply to a proposed agency action when:

(1) The activities or decision do not result in final agency action under the Administrative Procedure

Act, see 5 U.S.C. § 704, or other relevant statute that also includes a finality requirement;

(2) The proposed activity or decision is exempted from NEPA by law;

(3) Compliance with NEPA would clearly and fundamentally conflict with the requirements of

another provision of law;

(4) In circumstances where Congress by statute has prescribed decisional criteria with sufficient

completeness and precision such that FAA retains no residual discretion to alter its action based on the consideration of environmental factors, then that function of FAA is nondiscretionary within the meaning of NEPA § 106(a)(4) and/or § 111(10)(B)(vii) (42 U.S.C. § 4336(a)(4) and § 4336e(10)(B)(vii), respectively), and NEPA does not apply to the action in question;

(5) The proposed action is an action for which another statute’s requirements serve the function of

agency compliance with the Act; or

(6) The proposed action is not a “major Federal action.” The terms “major” and “federal action,”

each have independent force. NEPA applies only when both of these two criteria are met. While such a determination is inherently bound up in the facts and circumstances of each individual situation, and is thus reserved to the judgment of FAA in each instance, FAA provides its officials and the public at large with the following interpretive guidance:

(i) FAA will presume, on the basis of its experience, that the following list of actions, though not

exhaustive, generally qualify as “major”:

(A) Unconditional or mixed ALP approval of airport development for which the FAA has ALP approval authority under 49 U.S.C. § 47107(a)(16) and § 47107(x);

(B) Federal financial participation in airport development via any of the following funding sources: Passenger Facility Charges; grants authorized under Subtitle VII, Part B of Title 49 of the U.S. Code; under Title VII or Division J of Public Law No. 117-58; or similarly situated future programs for Federal assistance.

(C) Issuance, modification or renewal of commercial space launch site operator licenses, vehicle operator licenses, and experimental permits.

(ii) NEPA does not apply to “non-Federal actions.” Therefore, under the terms of the statue, NEPA does not apply to actions with no or minimal Federal funding, or with no or minimal Federal involvement where a Federal agency cannot control the outcome of the project or ministerial actions. NEPA § 111(10)(B)(i), 42 U.S.C. § 4336e(10)(B)(i). A but-for causal

Page 3 of 32

relationship is insufficient to make an agency responsible for a particular action under NEPA. By the same token, minimal Federal funding or involvement, which may in a causal sense be a butfor cause of an action, does not by itself convert that action into a Federal action within the meaning of the language of the statute. In addition to the illustrative general categories set forth in NEPA § 111(10), 42 U.S.C. § 4336e(10), FAA has determined that the following non-exhaustive list of FAA’s activities are not subject to NEPA because they presumptively do not meet the definition of a “major Federal action”:

(A) The FAA presumes that the definition of a major federal action is not applicable to

projects or proposals for which FAA funding comprises 14% or less of the total project funding and where the FAA has no other Major Federal Action or maintains minimal ongoing federal control and responsibility relating to the use of the funds or the resulting project. This presumption does not apply to airport development projects funded in whole or in part via Passenger Facility Charges under Subtitle VII, Part A of Title 49 of the U.S. Code or federal grants authorized under Subtitle VII, Part B of Title 49 of the U.S. Code; Title VII of Division J of Public Law No. 117-58; or similarly situated future programs for Federal assistance.

(B) Advisory Actions: Some FAA actions are of an advisory nature, such that the FAA does

not have substantial control or responsibility over their outcome. Actions of this type are not subject to NEPA review. If it is known or anticipated that some subsequent Federal action is subject to NEPA, the FAA must indicate so in the advisory action. Examples of advisory actions include:

a. Determinations under 14 CFR part 77, Safe, Efficient Use, and Preservation of the

Navigable Airspace;

b. Determinations under 14 CFR part 157, Notice of Construction, Alteration,

Activation, and Deactivation of Airports, which applies to civil or joint-use airports, helipads, and heliports;

c. Designation of alert areas and warning areas under FAA Order 7400.2, Procedures

for Handling Airspace Matters;

(b) Administrative Actions. NEPA review is not required for the promulgation of this Order or similar orders issued by the FAA Administrator or organizational elements as authorized by the FAA Administrator that provide supplemental instructions for agency compliance with this Order. NEPA review is also not required for administrative actions (e.g., contractor selection associated with a NEPA review) or for making editorial changes or corrections to publications that do not change the action being taken.

(1) Clarifying or administrative procedural changes that do not have the potential to result in or direct changes in the environment, including but not limited to: (i) amending or removing notes to procedures that will not change where or how aircraft fly; (ii) changing the naming conventions, including the names of airports, waypoints, fixes, or

procedures, and documenting such change in aviation charts; (iii) issuing memoranda, directives, notices, and similar documents that would not result in

physical or operational changes; (A) Exemptions granted under 49 U.S.C § 41718 of the FAA Reauthorization Act of 2024

(the Act) from the application of sections 49104(a)(5), 49109, 49111(e), and 41714 to air carriers on select routes between Ronald Reagan Washington National Airport and domestic hub airports and exemptions from the requirements of subparts K and S of part 93, Code of Federal Regulations of the Act shall not be considered a major Federal action.

PART 1—NEPA AND AGENCY PLANNING › § 1.2 Determine the appropriate level of NEPA review.

Page 4 of 32

a. FAA may make determinations under this section or on an individual basis, as

appropriate.

b. FAA may seek the Council’s assistance in making an individual determination under

this section.

c. FAA shall consult with other Federal agencies concerning their concurrence in

statutory determinations made under this section where more than one Federal agency administers the statute.

(c) The issuance or update of the FAA’s NEPA procedures is not subject to NEPA review.

(d) In determining whether NEPA applies to a proposed agency action, FAA will consider only the action or project at hand.

§ 1.2 Determine the appropriate level of NEPA review.

(a) If FAA determines under § 1.1 that NEPA applies to a proposed activity or decision, FAA will then determine the appropriate level of NEPA review in the following sequence and manner. At all steps in the following process, FAA will consider the proposed action or project at hand and its effects.

(1) If FAA has established, or adopted pursuant to NEPA § 109, 42 U.S.C. § 4336c, a CATEX that covers the proposed action (see appendix B of these procedures), FAA will analyze whether to apply the CATEX to the proposed action if appropriate, pursuant to § 1.4(e). Where a proposed action consists of multiple activities, and all of the activities that comprise the proposed action fall within more than one CATEX, the FAA may rely on multiple categories for a single proposed action, provided that the aggregate extraordinary circumstances are not present that cannot be mitigated below the level of significance.

(2) If another agency has already established a CATEX that covers the proposed action, FAA will consider whether to adopt that exclusion pursuant to § 1.4(c) so that it can be applied to the proposed action at issue, and to future activities or decisions of that type.

(3) If the proposed action warrants the establishment of a new CATEX or the revision of an existing CATEX, pursuant to § 1.4(b), FAA will consider whether to establish or revise and then apply the CATEX to the proposed action pursuant to § 1.4(e).

(4) If FAA cannot apply a CATEX to the proposed action consistent with paragraphs (a)(1)-(a)(3), FAA will consider the proposed action’s reasonably foreseeable effects consistent with paragraph (b), and then will:

(i) if the proposed action is not likely to have reasonably foreseeable significant effects or the

significance of the effects is unknown, develop an environmental assessment (EA), as described in § 1.5 of this Order; or

(ii) if the proposed action is likely to have reasonably foreseeable significant effects and

significant effects cannot be reduced to less than significant levels, develop an EIS, as described in Part 2 of this Order.

(b) When considering whether the reasonably foreseeable effects of the proposed action are significant, FAA will analyze the potentially affected environment and degree of the effects of the action. FAA may use any reliable data source and will not undertake new research unless it is essential to evaluating alternatives and the cost and time of obtaining it are not unreasonable.

(1) In considering the potentially affected environment, FAA may consider, as appropriate to the specific action, the affected area (national, regional, or local) and its resources. The FAA will consider the following resources when preparing the NEPA document:

PART 1—NEPA AND AGENCY PLANNING › § 1.3 NEPA and agency decisionmaking.

Page 5 of 32

(i) Aviation Emissions and Air Quality

(ii) Biological resources (including fish, wildlife, and plants)

(iii) Coastal Resources

(iv) Department of Transportation Act Section 303 (referred to as "Section 4(f)") and Land and

Water Conservation Fund (referred to as “Section 6(f)”)

(v) Farmlands

(vi) Hazardous materials, solid waste, and pollution prevention

(vii) Historical, architectural, archeological, and cultural resources

(viii) Land use

(ix) Natural resources and energy supply

(x) Noise and noise-compatible land use

(xi) Socioeconomics and children’s health and safety risks

(xii) Visual effects (including light emissions)

(xiii) Water resources (including wetlands, floodplains, surface waters, groundwater, and wild

and scenic rivers).

(2) In considering the type and degree of the effects, FAA may consider the following, as appropriate to the specific action:

(i) Both short- and long-term effects.

(ii) Both beneficial and adverse effects.

(iii) Effects on public health and safety.

(iv) Economic effects.

(v) Effects on the quality of life of the American people.

(3) Special Purpose Laws and Requirements. In addition to NEPA compliance, the FAA must comply with all other applicable special purpose laws and requirements. Consultations must be accomplished prior to completing the environmental review. To ensure efficiency in completing environmental and other legal requirements, the FAA must involve other agencies during the NEPA process and meet the public engagement requirements, where applicable, in all applicable special purpose laws. The FAA must report on the status of any special consultation required (e.g., under Section 7 of the Endangered Species Act, 16 U.S.C. § 1536; Section 106 of the National Historic Preservation Act, 54 U.S.C. § 306108; Section 4(f) of the Department of Transportation Act, 49 U.S.C.§ 303; or the Coastal Zone Management Act, 16 U.S.C. §§ 1451-1466). Agency consultation(s) should occur concurrently with the NEPA process to the greatest extent possible to avoid duplication and delay.

(4) Reducing Paperwork. The reduction of excessive paperwork distributing and publishing of the EA, FONSI or joint FONSI/ROD, EIS, and ROD may be made through electronic media, cloudbased, or interactive digital platforms (e.g., a project or agency website, dashboard, email list, or social media). The FAA will apply these concepts to all NEPA reviews (analyses and documents).

§ 1.3 NEPA and agency decisionmaking.

(a) Planning and timing. Each of FAA’s LOB engages in unique planning procedures based on the nature of their activities and the entity undertaking the activity (FAA vs. applicant/sponsor). As a

Page 6 of 32

result, each LOB will rely on its own statutory and regulatory authorities to determine the appropriate integration of planning and NEPA. Environmental issues should be identified and considered early in a proposed action’s planning process to ensure efficient, timely, and effective environmental review. Adequate planning is the foundation for any proposed project and is essential for completing the NEPA process efficiently and effectively. Initiating the appropriate level of environmental review at the earliest reasonable time facilitates the NEPA process. Regardless of whether the FAA or an applicant or contractor is preparing the environmental document, the FAA should ensure that proper planning is completed, and the project is sufficiently developed to permit meaningful review before beginning the NEPA process. FAA coordination with other Federal, State, Tribal, or local agencies may also be required to determine the necessary design level to proceed with the environmental analysis

(b) Limitations on actions during the NEPA process. While a NEPA review is ongoing, FAA will take no action concerning a proposal that would:

(1) have an adverse environmental effect; or

(2) limit the choice of reasonable alternatives.

(c) Actions developed by non-Federal entities. For proposed actions that are initially developed by applicants [e.g., entities that submit applications for Federal financial assistance, permits, or licenses] or other non-Federal entities, FAA will:

(1) Coordinate with the non-Federal entity at the earliest reasonable time in the planning process to inform the entity what information FAA might need to comply with NEPA and establish a schedule for completing steps in the NEPA review process, consistent with NEPA’s statutory deadlines and any internal agency NEPA schedule requirements; and

(2) begin the NEPA process by determining whether NEPA applies, as described in § 1.1 of this Order, and if it does, determine the appropriate level of NEPA review, as described in § 1.2 of this Order, as soon as practicable after receiving the complete application or the information necessary to undertake environmental review.

An applicant or a contractor hired by the applicant may prepare an EA or EIS under FAA’s supervision. FAA’s procedures for applicant-prepared EAs and EIS are included in part 5 of this Order.

(d) If FAA is considering an application from a non-Federal entity and becomes aware that the applicant is about to take an action within FAA’s jurisdiction that would meet either of the criteria in paragraph (b), FAA will promptly notify the applicant that FAA will take appropriate action to ensure that the objectives and procedures of NEPA are achieved. This section does not preclude development by applicants of plans or designs or performance of other activities necessary to support an application for Federal, State, Tribal, or local permits or assistance. When considering a proposed action for Federal funding, only when not in conflict with 49 U.S.C. § 47106(c)(1)(B), the FAA may authorize such activities, including, but not limited to, purchase of long lead-time equipment, and purchase options made by applicants.

(e) Rulemaking. For informal rulemaking conducted pursuant to the Administrative Procedure Act, 5 U.S.C. § 553, the environmental document will normally accompany the proposed rule. When the FAA prepares an EIS for a rulemaking activity that could cause significant environmental impacts, the responsible FAA official should consult with the Office of Rulemaking (ARM-1) and the Office of the Chief Counsel, Airports and Environmental Law Division (AGC-600) to coordinate public engagement.

(f) Streamlining. The Office of Airports is required to complete NEPA reviews for certain statutorily identified projects consistent with the streamlining provisions of 49 U.S.C. §47171. Refer to the statute and the FAA’s Desk Reference for more detail.

PART 1—NEPA AND AGENCY PLANNING › § 1.4 Categorical exclusions.

Page 7 of 32

§ 1.4 Categorical exclusions.

(a) Generally. This section describes the process FAA uses for establishing and revising CATEXs, for adopting other agencies’ CATEXs, and for applying CATEXs to a proposed agency action. FAA’s CATEXs, including CATEXs FAA established and substantiated consistent with its NEPA procedures, legislative CATEXs, and CATEXs adopted from other agencies, are listed in Appendix B. Extraordinary circumstances are discussed in Appendix B.

(b) Establishing and revising CATEXs. To establish or revise a CATEX, the FAA will determine that the category of actions normally does not significantly affect the quality of the human environment. In making this determination, the FAA will:

(1) Develop a written record containing information to substantiate its determination. The written record may also be established through a decision document supported by a programmatic environmental document that substantiates the FAA’s conclusion that the category of actions analyzed in the programmatic environmental document does not have significant effects, individually or in the aggregate. The decision document associated with this programmatic environmental document may contain limitations on the application of the CATEX, including within specific geographic areas or habitat types, in the presence or absence of other environmental conditions, duration, associated mitigation measures, and circumstances under which the categorical exclusion would expire or cease to be available;

(2) Consult with CEQ on its proposed CATEX, including the written record, for a period not to exceed 30 days prior to providing public notice as described in subparagraph (3); and

(3) Provide public notice in the Federal Register of FAA’s establishment or revisions of the CATEX and the location (e.g., website) of availability of the written record if the FAA determines notice in the Federal Register is warranted.

(4) Update this Order, as appropriate, to reflect the establishment of CATEXs through a programmatic environmental document and associated decision document. Where the programmatic document proposing a CATEX as described in subsection (b)(1) has been made available for notice and comment, this Order may be made available to the public through a public notice in the Federal Register without a public comment period.

(c) Adopting CATEXs from other Department of Transportation Operating Administrations

(1) Cross-Modal Use of CATEXs. The FAA may use a CATEX established by another operating administration (OA) or OST office and included in its NEPA procedures.3 In coordination with AGC-600, the LOB/SO should consult with the applicable OA or OST office to confirm that the CATEX was designed to apply to the same kind of action as the proposed action. When determining if extraordinary circumstances exist, the LOB/SO should generally follow the extraordinary circumstances process set forth in the NEPA procedures containing the CATEX but may determine that it is appropriate to also consider the extraordinary circumstances process as described in this Order (refer to Appendix B-1).

(d) Adopting CATEXs from other Federal agencies. Consistent with NEPA § 109, 42 U.S.C. § 4336c, FAA may adopt a CATEX listed in another agency’s NEPA procedures. When adopting a CATEX, FAA will:

(1) Identify the CATEX listed in another agency’s NEPA procedures that covers its category of proposed or related actions;

(2) Notify AEE-400 and AGC-600 of the desire to use another Federal agency’s CATEX. In making this notification, the requesting LOB should describe the FAA actions for which this CATEX would

Page 8 of 32

be used and include the rationale describing why the other agency’s categorically excluded action and the category of proposed FAA actions are substantially similar.

(3) Once there is a consensus among the requesting LOB, AEE-400 and AGC-600 that the other Federal agency’s CATEX could appropriately be applied to the FAA action, AEE-400, in collaboration with AGC-600 and the requesting LOB, will consult with the Federal agency that established the CATEX to ensure it would be properly applied;

(4) AEE-400 will coordinate with AGC-600 and the requesting LOB to publish, if the FAA determines public notice is warranted, a notice in the Federal Register notifying the public of the intent to adopt the CATEX and to incorporate it into these procedures, describe the FAA actions to which the adopted CATEX will apply, describe extraordinary circumstances review that will be undertaken when the CATEX is applied to a specific proposal, and will describe briefly the interagency consultation the FAA took with the originating agency; and

(5) Following consideration of public comments if the FAA provides public notice consistent with section 1.4(d), AEE-400, in consultation with AGC-600 and the requesting LOB, will determine whether to adopt the CATEX and incorporate it into Appendix B of this Order.

(e) Removal of CATEXs. To remove a CATEX from Appendix B of these procedures, FAA will:

(1) Develop a written justification for the removal;

(2) Consult with CEQ on its proposed removal of the CATEX, including the written justification, for a period not to exceed 30 days prior to providing public notice as described in subparagraph (3); and

(3) Provide public notice of FAA’s removal of the CATEX and the written justification in the Federal Register.

(f) Applying CATEXs. If FAA determines that a CATEX covers a proposed agency action, FAA will evaluate the action for extraordinary circumstances that indicate a normally excluded agency action is likely to have reasonably foreseeable significant adverse impact(s).

(1) If an extraordinary circumstance is not present, FAA will determine that the CATEX applies to the proposed agency action and conclude review.

(2) FAA will determine that the CATEX applies to the proposed agency action and conclude review if FAA either:

(i) Determines that, notwithstanding the extraordinary circumstance, the proposed agency action

is not likely to result in reasonably foreseeable adverse significant effects; or (ii) Modifies the proposed agency action to avoid those effects.

If FAA determines that it cannot apply the CATEX to the proposed action, FAA will prepare

an EA or EIS, as appropriate.

(3) Documentation of CATEX determinations. How FAA will document its evaluation of the applicability of a CATEX:

(i) Some of the CATEXs listed in Appendix B cover actions for which there are no reasonable

expectations of any changes in use or other changes that could cause an environmental impact. These are designated with an asterisk (*). Many of the other CATEXs cover actions that have little or no potential for extraordinary circumstances. When using a CATEX for these actions, a LOB/SO may prepare a simple written record (which may already be included in documentation prepared during the course of normal project development) that a specific CATEX was determined to apply to a proposed action.

Page 9 of 32

(ii) Some actions involve greater potential for one or more extraordinary circumstances or

otherwise warrant additional CATEX documentation, as described in Paragraph iii, below. Factors that may warrant the preparation of additional documentation include actions:

(A) Likely to affect sensitive resources sufficiently to heighten concerns regarding the

potential for extraordinary circumstances;

(B) That would result in changes to the routine routing of aircraft that have the potential to

result in significant increases in noise over noise sensitive areas;

(C) Involving situations in which the applicability of a CATEX is not intuitively clear;

(D) Involving known controversy on environmental grounds or significant public opposition

relating to the nature of the project’s effects; or

(E) For which litigation is anticipated.

(iii) FAA LOB/SOs are responsible for identifying proposed actions within their purview that

warrant CATEX documentation. LOB/SOs may additionally exercise professional judgment to document a project-specific CATEX that is not included in the list of CATEXs denoted with an asterisk (*). A determination that a proposed action qualifies for a CATEX is not considered deficient due to lack of documentation provided that extraordinary circumstances have been considered.

(4) The documentation prepared for a CATEX determination should be concise. The extent of documentation should be tailored to the type of action involved and the potential for extraordinary circumstances. There is no prescribed format; however, the documentation should cite the CATEX(s) used, describe how the proposed action fits within the category of actions described in the CATEX, and explain that there are no extraordinary circumstances that would preclude the proposed action from being categorically excluded.

(i) The documentation of compliance with special purpose laws and requirements may either be

included in a documented CATEX or may be documented separately in a Record of Decision (ROD) (see Desk Reference). In preparing documentation to support the use of a CATEX from an Airport action, applicants should refer to the ARP’s Standard Operating Procedure (SOP) for CATEX Determinations.

(ii) Project-specific mitigation can be applied to a CATEX to “avoid significance.” When a

CATEX is being considered, any potentially significant effects must be examined in greater detail to conclude that the effects are not, in fact, significant or eliminated by revising the project. When project-specific mitigation cannot avoid significance or results in uncertainty about whether effects are significant, then an EA is the appropriate level of environmental review. When project-specific mitigation cannot avoid known significant effects, then an EIS is the appropriate level of environmental review.

(iii) Where the potential for extraordinary circumstances is identified, FAA will determine that the

CATEX nevertheless applies to the proposed agency action and conclude review if:

(A) It was determined that, notwithstanding the extraordinary circumstance, the proposed

agency action is not likely to result in reasonably foreseeable adverse significant effects; or

(B) The proposed agency action was modified to avoid those effects.

(g) Applying legislative categorical exclusions. If FAA determines that a categorical exclusion established through legislation, or a categorical exclusion that Congress through legislation has directed FAA to establish, covers a proposed agency action, FAA will conclude review consistent with

PART 1—NEPA AND AGENCY PLANNING › § 1.5 Environmental assessments.

Page 10 of 32

applicable law. If appropriate, FAA may examine extraordinary circumstances, modify the proposed agency action, or document the determination that the legislative categorical exclusion applies, consistent with this section and the legal authority for the establishment of the legislative categorical exclusion.

(h) Reliance on CATEX determinations of other agencies. FAA may also rely on another agency’s determination that a CATEX applies to a particular proposed agency action if the agency action covered by that determination and the FAA’s proposed action are substantially the same, or if FAA’s proposed action is a subset of the agency action covered by that determination. FAA will document its reliance on another agency’s CATEX determination.

(1) LOBs/SOs should consult with AGC-600 if they are uncertain whether the CATEX determination covers the proposed action;

(2) Obtain the necessary documentation from the agency that made the CATEX determination the FAA intends to rely on (referred to below as the “determination agency”), including documentation showing that its CATEX determination meets the standards in subsections (b) and (c) above and any additional information the LOB/SO may need;

(3) Verify that the FAA’s proposed action and the determination agency’s proposed action covered by the CATEX determination are “substantially the same.” For example, the agencies’ actions are related as components of the same project, such that they would have the same effects;

(4) Verify that extraordinary circumstances do not exist under which the FAA’s proposed action may have a significant environmental effect (refer to Appendix B);

(5) Document the reliance. The record documenting FAA’s reliance on the CATEX determination should include a summary of the CATEX determination and other documentation obtained from the determination agency, the information and analysis supporting the LOB/SO’s verifications in Section 1.4(g)(3) and (4) above, the LOB/SO’s finding that the relevant requirements in 42 U.S.C. § 4336c have been met, and the LOB/SO’s decision to rely upon the determination agency’s CATEX determination which should be signed by the responsible FAA official;

(6) Publish the reliance determination on the FAA website or otherwise make it publicly available.

(i) List of CATEXs. FAA established CATEXs are listed in Appendix B.

§ 1.5 Environmental assessments.

(a) Generally. If an action is subject to NEPA, as determined following the procedures in § 1.1, and unless FAA finds that the proposed action is excluded from having to prepare an EA or EIS pursuant to a CATEX as determined following the procedures in § 1.4, or by another provision of law, FAA will prepare an EA with respect to a proposed agency action that does not have a reasonably foreseeable significant effect on the quality of the human environment, or if the significance of such effect is unknown. FAA is mindful of Congress’ direction that EAs are to be “concise.” NEPA § 106(b)(2); 42 U.S.C. § 4336(b)(2).

(b) Elements. For the purpose of providing evidence and analysis for determining whether to prepare an EIS or a finding of no significant impact, EAs will briefly discuss:

(i) The purpose and need for the proposed agency action based on the FAA’s statutory authority.

When the proposed agency action concerns FAA’s duty to act on an application for authorization or other approval of non-federal activity, the purpose and need for the proposed agency action will also be informed by the goals of the applicant;

(ii) The proposed action and alternatives to the extent required by NEPA § 102(2)(H), 42 U.S.C.

§ 4332(2)(H);

Page 11 of 32

(iii) The reasonably foreseeable effects of the proposed agency action and the alternatives

considered; and

(iv) Any other information that is necessary to allow the responsible FAA official to determine

whether a FONSI is appropriate, a mitigated FONSI is appropriate to avoid significance, or an EIS may be required.

(c) Agency actions normally requiring an EA. The following classes of actions normally require EAs, but likely do not require an EIS:

(1) Acquisition of land greater than three acres for, and the construction of, new office buildings and essentially similar FAA facilities;

(2) Issuance of certificates for new, amended, or supplemental aircraft types for which (a) environmental regulations have not been issued; or (b) new, amended, or supplemental engine types for which emission regulations have not been issued; or (c) where a NEPA analysis has not been prepared in connection with a regulatory action;

(3) Establishment of aircraft/avionics maintenance bases to be operated by the FAA;

(4) Authorization to exceed Mach 1 flight under 14 CFR § 91.817, Civil Aircraft Sonic Boom;

(5) Establishment of FAA housing, sanitation systems, fuel storage and distribution systems, and power source and distribution systems;

(6) Establishment or relocation of facilities such as Air Route Traffic Control Centers (ARTCC), Airport Traffic Control Towers (ATCT), and off-airport Air Route Surveillance Radars (ARSR), Air Traffic Control Beacons (ATCB), and Next Generation Radar (NEXRAD);

(7) Establishment, relocation, or construction of facilities used for communications (except as provided under Appendix B Paragraph B-2.3.a. of this Order) and navigation that are not on airport property;

(8) Establishment or relocation of instrument landing systems (ILS);

(9) Establishment or relocation of approach lighting systems (ALS) that are not on airport property;

(10) Unconditional Airport Layout Plan (ALP) approval of, or Federal financial participation in, the following categories of airport actions:

(i) Location of a new airport that would serve only general aviation;

(ii) Location of a new commercial service airport that would not be located in a Metropolitan

Statistical Area (MSA);

(iii) A new runway at an existing airport that is not located in an MSA;

(iv) Runway strengthening having the potential to significantly increase off-airport noise impacts;

(v) Construction or relocation of entrance or service road connections to public roads that

substantially reduce the level of service rating of such public roads below the acceptable level determined by the appropriate transportation agency (i.e., a highway agency); and

(vi) Land acquisition associated with any of the items in (10)(i)-(v);

(11) Approval of operations specifications or amendments that may significantly change the character of the operational environment of an airport, including, but not limited to:

(i) Approval of operations specifications authorizing an operator to use aircraft to provide

scheduled passenger or cargo service at an airport that may cause significant impacts to noise, air quality, or other environmental impact categories; or

Page 12 of 32

(ii) Amendment of operations specifications authorizing an operator to serve an airport with

different aircraft that may cause significant impacts to noise, air quality, or other environmental impact categories;

(12) New air traffic control procedures (e.g., instrument approach procedures, departure procedures, en route procedures) and modifications to currently approved procedures that routinely route aircraft over noise sensitive areas at less than 3,000 feet above ground level (AGL) (unless otherwise categorically excluded under Paragraphs (procedures category) B-2.5.q. and B-2.5.r of this Order);

(13) Establishment or modification of an Instrument Flight Rules Military Training Route (IR MTR);

(14) Special Use Airspace (SUA) (unless otherwise explicitly listed as an advisory action (see § 1.1((a)(6)(ii)(B) of this Order, Advisory Actions) or categorically excluded (see Paragraph B-2 of this Order, The Federal Aviation Administration’s CATEXs));

(15) Issuance of any of the following:

(i) A commercial space launch site operator license for operation of a launch site at an existing

facility on developed (e.g., co-located with a Federal range or municipal airport); or

(ii) A commercial space vehicle operator license or experimental permit to operate a vehicle

to/from an existing launch or reentry site

(16) Formal and informal runway use programs that may significantly increase noise over noise sensitive areas;

(17) Issuance of new or amended Operations Specifications to an operator for UAS operations conducted under 14 CFR Part 135;

(18) Proposed agency actions that do not fall under a CATEX, but with respect to which there is no clear indication that significant effects will result; and

(19) Proposed agency actions typically covered by a CATEX but that involve an extraordinary circumstance, where the presence of the extraordinary circumstance prevents FAA from applying the CATEX under § 1.4(e) above.

(d) Scope of analysis.

(1) In preparing the environmental assessment, FAA will focus its analysis on whether the environmental effects of the action or project at hand are significant.

(2) Similarly, FAA will document in the EA where and how it drew a reasonable and manageable line relating to its consideration of any environmental effects from the action or project at hand that extend outside the geographical territory of the project or might materialize later in time.

(3) To the extent it assists in reasoned decision-making, FAA may, but is not required to by NEPA, analyze environmental effects from other projects separate in time, or separate in place, or that fall outside of FAA’s regulatory authority, or that would have to be initiated by a third party. If FAA determines that such analysis would assist it in reasoned decisionmaking, it will document this determination in the environmental assessment and explain where it drew a reasonable and manageable line relating to the consideration of such effects from such separate projects.

(e) Page limits.

(1) The text of an EA is strictly prohibited from exceeding 75 pages, not including citations or appendices.

(2) Appendices are to be used for voluminous materials, such as scientific tables, collections of data, statistical calculations, and the like, which substantiate the analysis provided in the environmental

Page 13 of 32

assessment. Appendices are not to be used to provide additional substantive analysis, because that would circumvent the congressionally mandated page limits.

(3) EAs will be formatted for an 8.5”x11” page with one-inch margins using a word processor with 12-point proportionally spaced font, single spaced. Footnotes may be in 10-point font. Such size restrictions do not apply to explanatory maps, diagrams, graphs, tables, and other means of graphically displaying quantitative or geospatial information, although pages containing such material do count towards the page limit. When an item of graphical material is larger than 8.5”x11”, each such item will count as one page.

(4) Declaration Related to Page Limits. The breadth and depth of analysis in an EA will be tailored to ensure that the environmental analysis does not exceed this page limit. In this regard, as part of the finalization of the EA, a responsible official will attest (and the declaration will be incorporated into the EA) that FAA has considered the factors mandated by NEPA; that the EA represents FAA’s good-faith effort to prioritize documentation of the most important considerations required by the statute within the congressionally mandated page limits; that this prioritization reflects FAA’s expert judgment; and that any considerations addressed briefly or left unaddressed were, in FAA’s judgment, comparatively not of a substantive nature that meaningfully informed the consideration of environmental effects and the resulting decision on how to proceed.

(f) Deadlines. As the Supreme Court has repeatedly held, NEPA is governed by a “rule of reason.” Congress supplied the measure of that reason in the 2023 revision of NEPA by setting the deadlines in NEPA § 107(g) of NEPA, 42 U.S.C. § 4336a(g). These deadlines indicate Congress’s determination that an agency, working within Congress’s allocation of resources, has presumptively spent a reasonable amount of time on analysis and the document should issue, absent very unusual circumstances. In such circumstances, an extension will be given only for such time as is necessary to complete the analysis. Thus:

(1) Determining the EA Start Date. The FAA will complete the EA in one year. The start date of the one-year period is to be the soonest of three triggering events established at 42 U.S.C. § 4336a(g)(1)(B). To identify the date on which the triggering event occurs, the responsible FAA official must determine that:

(i) Project planning is sufficiently mature to allow meaningful evaluation of the proposed

action’s environmental effects;

(ii) There is sufficient information and analysis to support a decision that an EA is the

appropriate level of NEPA review; and

(iii) For actions proposed by an applicant, the applicant has provided the FAA with a sufficient

scope of work to demonstrate adequate environmental review will be undertaken and the applicant has furnished sufficient information on its consultants’ and subconsultants’ credentials to ensure the requisite expertise will be available to support the NEPA evaluation.1

(2) Determining the end date for the EA. The EA will publish (unless the deadline is extended pursuant to the provision below), at the latest, on the day the deadline elapses, in as substantially complete form as is possible.

1 For ARP actions involving grant funding, the applicant must also be able to demonstrate that there is sufficient project funding to pay the portion of the project costs that will not be paid by the United States Government, including project costs to complete the environmental review and construct/permit/mitigate/implement the project. See 49 U.S.C. § 47106(a)(3).

PART 1—NEPA AND AGENCY PLANNING › § 1.6 Findings of no significant impact.

Page 14 of 32

(3) Deadline extensions. If FAA determines it is not able to meet the deadline prescribed by NEPA § 107(g)(1)(B), 42 U.S.C. § 4336a(g)(1)(B), it must consult with the applicant, if any, pursuant to NEPA § 107(g)(2), 42 U.S.C. § 4336a(g)(2). After such consultation, if needed, and for cause stated, it may establish a new deadline. Cause for establishing a new deadline is only established if the EA is so incomplete, at the time at which FAA determines it is not able to meet the statutory deadline, that issuance pursuant to subsection (2) above would result in inadequate analysis. Such new deadline must provide only so much additional time as is necessary to complete such EA. The announcement of the new deadline will specify the reason why the EA was not able to be completed under the statutory deadline and whether the applicant consented to the new deadline.

(4) Declaration Related to Deadline. When the EA is published, a responsible official will attest (and the declaration will be incorporated into the EA) that the resulting EA represents FAA’s goodfaith effort to fulfill NEPA’s requirements within the Congressional timeline; that such effort is substantially complete; that, in FAA’s expert opinion, it has thoroughly considered the factors mandated by NEPA; and that, in FAA’s judgment, the analysis contained therein is adequate to inform and reasonably explain FAA’s final decision regarding the proposed federal action.

§ 1.6 Findings of no significant impact.

(a) FAA will prepare a finding of no significant impact if FAA determines, based on the EA, not to prepare an EIS because the proposed action will not have significant effects. The finding of no significant impact will:

(1) Include the EA or incorporate it by reference;

(2) Document the reasons why FAA has determined that the selected alternative will not have a significant effect on the quality of the human environment;

(3) State the authority for any mitigation that FAA has adopted and any applicable monitoring or enforcement provisions. If FAA finds no significant effects based on mitigation, the mitigated finding of no significant impact will state any mitigation requirements enforceable by the agency or voluntary mitigation commitments that will be undertaken to avoid significant effects;

(4) Identify any other environmental documents related to the finding of no significant impact; and

(5) State that an EIS will not be prepared, concluding the NEPA process for that action;

(6) The FONSI documents the basis for the FAA’s determination that the proposed action would not have significant environmental impacts. It does not represent the FAA’s decision to implement the proposed action.

(b) Methods of providing the notice of availability (NOA) of a FONSI and its associated EA include:

(1) For actions with effects of national concern, notification may occur through publication in the Federal Register;

(2) For actions with effects primarily of local concern, notification may occur through one of the following methods:

(i) Publication in the Federal Register;

(ii) Compliance with the affected State, Tribal, and/or local government’s public notification

procedures for comparable actions;

(iii) Publication in local newspapers;

(iv) Publication through other local media;

PART 1—NEPA AND AGENCY PLANNING › § 1.7 Lead and cooperating agencies.

Page 15 of 32

(v) Direct notification to potentially interested community organizations, including small business

associations;

(vi) Direct mailing to owners and occupants of nearby or affected properties; or

(vii) Publication through electronic media (e.g., a project or agency website, Permitting

Dashboard, email list, or social media).

(3) The notice will indicate locations where the FONSI and its associated EA are available for public inspection. The responsible FAA official will provide FONSIs and associated EAs on request, free of charge or at a fee commensurate with the cost of reproduction.

§ 1.7 Lead and cooperating agencies.

In many instances, a proposed activity or decision is undertaken in the context that entails activities or decisions undertaken by other federal agencies (e.g., where multiple federal authorizations are required with respect to a project sponsor’s overall purpose and goal). These activities and decisions are “related actions,” in that they are each the responsibility of a particular agency, but they are all related in a matter relevant to NEPA, e.g., by their relationship with one overarching project. In such instances, Congress has provided that the multiple agencies involved shall determine which of them will be the lead agency pursuant to the criteria identified in NEPA § 107(a)(1)(A), 42 U.S.C. § 4336a(a)(1)(A). When serving as the lead agency, FAA is ultimately responsible for completing the NEPA process and determining and documenting the scope of the project at hand. When a joint lead relationship is established pursuant to NEPA § 107(a)(1)(B), 42 U.S.C. § 4336a(a)(1)(B), FAA and the other joint lead agency or agencies are collectively responsible for completing the NEPA process.

(a) Lead Agency. When the FAA acts as the lead agency, and there is a cooperating agency with jurisdiction by law, or special expertise, the FAA has the primary responsibility for the preparation of environmental documents.

(1) When the FAA acts as the lead agency, the FAA shall invite the participation of each cooperating agency in the NEPA process at the earliest practicable time. The FAA shall determine the purpose and need, and alternatives in consultation with any cooperating agency. However, where projects are aviation projects subject to a streamlined environmental review process of the FAA Reauthorization Act of 2024, the Secretary shall be solely responsible for establishing the purpose and need of the proposed project. (See 49 U.S.C. § 47171(j)).

(2) In addition, the FAA NEPA lead shall develop a schedule, setting milestones for all environmental reviews, permits, and authorizations required for the implementation of the action, in consultation with any applicant and all joint lead, cooperating, and participating Federal agencies, as soon as practicable. After coordination with all parties, the project schedule and milestones for all environmental reviews, permits, and authorizations required for the implementation of the action should be posted to the Permitting Dashboard within 14 days of environmental document initiation (refer to the Desk Reference for further instructions). If the FAA NEPA lead anticipates that a milestone will be missed, the FAA NEPA lead shall notify appropriate officials at the FAA and, if applicable, other cooperating and participating Federal agencies. As soon as practicable, the FAA shall elevate the issue to the appropriate officials of the FAA for timely resolution.

(b) Role as a Cooperating Agency. Upon request by the lead agency, if the FAA has jurisdiction by law, it shall be a cooperating agency. If the FAA is acting as a cooperating agency, the responsible FAA official must determine based on an independent evaluation, that the document, or portion(s) thereof (1) adequately addresses the relevant FAA action(s); and (2) meets the applicable standards of the NEPA statute, this Order and the Desk Reference.

PART 1—NEPA AND AGENCY PLANNING › § 1.8 Notices of intent and scoping.

Page 16 of 32

§ 1.8 Notices of intent and scoping.

As a preliminary step to determining whether, in connection with a proposal that is not excluded pursuant to a categorical exclusion, FAA will prepare an EA or an EIS, FAA will determine and document the scope of the project at hand.

(a) Notice of intent. As soon as practicable after determining that a proposal is sufficiently developed to allow for meaningful public comment and requires an EIS, FAA will publish a notice of intent to prepare an EIS in the Federal Register. If FAA determines that it will prepare an EA for a proposed action, FAA may publish a notice of intent to prepare an EA in the Federal Register.

(1) The notice of intent for an EIS will include a request for public comment on alternatives or effects and on relevant information, studies, or analyses with respect to the proposed agency action. NEPA § 107(c); 42 U.S.C. § 4336a(c).

(2) In addition to a request for comment required for notices of intent for EISs, notices of intent may include:

(i) The purpose and need for the proposed action;

(ii) A preliminary description of the proposed action and alternatives the EIS will consider;

(iii) A brief summary of expected effects;

(iv) Anticipated permits and other authorizations (i.e., anticipated related actions);

(v) A schedule for the decision-making process;

(vi) A description of the public scoping process, including any scoping meeting(s);

(vii) Contact information for a person within FAA who can answer questions about the proposed

action and the EIS; and

(viii) Identification of any cooperating and participating Federal agencies, and any information

that such agencies require in the notice to facilitate their decisions or authorizations.

(b) Scoping. FAA may use an early and open process to determine the scope of issues for analysis in an environmental document, including identifying substantive issues that meaningfully inform the consideration of environmental effects and the resulting decision on how to proceed, eliminating from further study non-substantive issues, and determining whether there are connected actions that should be addressed in the same environmental document. Scoping may begin as soon as practicable after the proposal for action is sufficiently developed for consideration. Scoping may include appropriate preapplication procedures or work conducted prior to publication of the notice of intent. The responsible FAA official must take the lead in the scoping process (unless it is not the lead agency for the environmental document), inviting, to the extent the responsible FAA official deems it helpful, the participation of affected Federal, state, and local agencies, any potentially affected Tribes, applicants, and other interested persons (including those who might oppose the proposed action).

PART 2—ENVIRONMENTAL IMPACT STATEMENTS › § 2.1 Preparation of environmental impact statements.

Page 17 of 32

PART 2—ENVIRONMENTAL IMPACT STATEMENTS

§ 2.1 Preparation of environmental impact statements.

(a) FAA will prepare an EIS only with respect to proposed agency actions that are not excluded pursuant to a CATEX and that otherwise require preparation of an environmental document and that have a reasonably foreseeable significant effect on the quality of the human environment. NEPA § 106(b)(1); 42 U.S.C. § 4336(b)(1). Whether an impact rises to the level of “significant” is a matter of FAA’s expert judgment. FAA will presume, on the basis of its experience, that the following types of action generally “significantly affect the quality of the human environment,” consistent with section NEPA § 102(2)(C), 42 U.S.C. § 4332(2)(C):

(1) Unconditional ALP approval of, or Federal financial participation in, the following categories of airport actions:

(i) Location of a new commercial service airport in an MSA;

(ii) A new runway to accommodate air carrier aircraft at a commercial service airport in an MSA;

or

(iii) Major runway extension (as defined in § 1.6(q) of this Order).

(2) Issuance of a commercial space launch or reentry site operator license that requires the construction of a new commercial space launch or reentry site on undeveloped land.

(b) During the process of preparing an EIS, FAA:

(1) Will obtain the comments of:

(i) any Federal agency that has jurisdiction by law or special expertise with respect to any

environmental impact involved or is authorized to develop and enforce environmental standards.

(ii) Appropriate State, Tribal, and local agencies that are authorized to develop and enforce

environmental standards.

(2) May request the comments of:

(i) State, Tribal, or local governments that may be affected by the proposed action;

(ii) Any agency that has requested it receive statements on actions of the kind proposed;

(iii) The applicant, if any; and

(iv) The public, including by affirmatively soliciting comments in a manner designed to inform

those persons or organizations who may be interested in or affected by the proposed action.

(c) This process of obtaining and requesting comments pursuant to (b) above may be undertaken at any time that is reasonable in the process of preparing the EIS. FAA will ensure that the process of obtaining and request comments pursuant to (b) above, and FAA’s analysis of and response to those comments, does not cause FAA to violate the congressionally mandated deadline for completion of an EIS.

(d) Addressing comments contained in EISs. FAA will address any significant comments received consistent with paragraph (b) of this section in the EIS. FAA may address or respond to individual comments or groups of comments that are substantially the same by:

(1) Modifying alternatives, including the proposed action;

(2) Developing and evaluating alternatives not previously given serious consideration;

PART 2—ENVIRONMENTAL IMPACT STATEMENTS › § 2.3 Analysis within the environmental impact statement.

Page 18 of 32

(3) Supplementing, improving, or modifying analyses, to include consideration of science or literature not previously considered;

(4) Making factual corrections;

(5) No action needed. The agency may provide a brief rationale for taking no action, such as:

(i) The comment is outside the scope of what is being proposed;

(ii) There is no cause-effect relationship between the actions the agency is proposing and the

issue raised and/or recommendation made;

(iii) The commenter misinterpreted the information provided; or

(iv) The recommendation made does not comply with applicable laws or regulations and/or are

not feasible to implement (technically or economically), etc.

(e) When soliciting public comments, the FAA will describe in the notice of availability of the EIS the methods by which members of the public may submit comments. Methods for receiving comments will be selected based on the nature of the action and the NEPA professional’s judgment as to the method(s) most likely to produce meaningful and substantive comments from the public.

§ 2.2 Purpose and need.

The statement will include the purpose and need for the proposed agency action based on the FAA’s statutory authority. When the proposed agency action concerns FAA’s duty to act on an application for authorization, the purpose and need for the proposed agency action will also be informed by the goals of the applicant.

§ 2.3 Analysis within the environmental impact statement.

(a) The EIS will include a detailed statement on:

(1) reasonably foreseeable environmental effects of the proposed agency action;

(2) any reasonably foreseeable adverse environmental effects which cannot be avoided should the proposal be implemented;

(3) a reasonable range of alternatives to the proposed agency action, including an analysis of any adverse environmental impacts of not implementing the proposed agency action in the case of a no action alternative, that are technically and economically feasible, and meet the purpose and need of the proposal;

(4) the relationship between local short-term uses of man’s environment and the maintenance and enhancement of long-term productivity;

(5) any irreversible and irretrievable commitments of Federal resources which would be involved in the proposed agency action should it be implemented; and

(6) Any means identified to mitigate adverse environmental effects of the proposed action. FAA is mindful in this respect that NEPA itself does not require or authorize FAA to impose any mitigation measures.

PART 2—ENVIRONMENTAL IMPACT STATEMENTS › § 2.4 Page limits.

Page 19 of 32

(b) Scope of analysis.

(1) In preparing the environmental impact statement, FAA will focus its analysis on whether the environmental effects of the action or project at hand are significant.

(2) Similarly, FAA will document in the EIS where and how it drew a reasonable and manageable line relating to its consideration of any environmental effects from the action or project at hand that extend outside the geographical territory of the project or might materialize later in time.

(3) To the extent it assists in reasoned decision-making, FAA is not required to by NEPA, but may analyze environmental effects from other projects separate in time, or separate in place, or that fall outside of FAA’s regulatory authority, or that would have to be initiated by a third party. If FAA determines that such analysis would assist it in reasoned decisionmaking, it will document this determination in the EIS and explain where it drew a reasonable and manageable line relating to the consideration of such effects from such separate projects.

(c) EISs will discuss effects in proportion to their significance. With respect to issues that are not of a substantive nature and do not meaningfully inform the consideration of environmental effects and the resulting decision on how to proceed, there will be no more than the briefest possible discussion to explain why those issues are not substantive and therefore not worthy of any further analysis. EISs will be analytic, concise, and no longer than necessary to comply with NEPA in light of the congressionally mandated page limits and deadlines.

(d) If the responsible FAA official determines that the action would have a significant effect abroad, he or she should determine what type of document must be prepared and considered in accordance with Section 2-4 of Executive Order 12114, Environmental Effects Abroad of Major Federal Actions, 44 Federal Register 1957 (Jan. 9, 1979). Further guidance on compliance with this Executive Order can be found in the Desk Reference.

§ 2.4 Page limits.

(a) Page limits. Except as provided in paragraph (b), the text of an EIS will not exceed 150 pages, not including citations or appendices.

(b) An EIS for a proposed agency action of extraordinary complexity is strictly prohibited from exceeding 300 pages, not including any citations or appendices. FAA will determine at the earliest possible stage of preparation of an EIS whether the conditions for exceeding the page limit in paragraph (a) are present.

(c) Appendices are to be used for voluminous materials, such as scientific tables, collections of data, statistical calculations, and the like, which substantiate the analysis provided in the environmental assessment. Appendices are not to be used to provide additional substantive analysis, because that would circumvent the congressionally mandated page limits.

(d) EISs shall be prepared on 8.5”x11” paper with one-inch margins using a word processor with 12point proportionally spaced font, single spaced. Footnotes may be in 10-point font. Such size restrictions do not apply to explanatory maps, diagrams, graphs, tables, and other means of graphically displaying quantitative or geospatial information, although pages containing such material do count towards the page limit. When an item of graphical material is larger than 8.5”x11”, each such item shall count as one page.

(e) Declaration Related to Page Limits. The breadth and depth of analysis in an EIS will be tailored to ensure that the EIS does not exceed these page limits. In this regard, as part of the finalization of the EIS, a responsible official will attest that FAA has considered the factors mandated by NEPA; that the EIS represents FAA’s good-faith effort to prioritize documentation of the most important considerations required by the statute within the congressionally mandated page limits; that this

PART 2—ENVIRONMENTAL IMPACT STATEMENTS › § 2.6 Publication of the environmental impact statement.

Page 20 of 32

prioritization reflects FAA’s expert judgment; and that any considerations addressed briefly or left unaddressed were, in FAA’s judgment, comparatively unimportant or frivolous.

§ 2.5 Deadlines.

As the Supreme Court has repeatedly held, NEPA is governed by a “rule of reason.” In establishing deadlines for the EIS process in the 2023 revision of NEPA, Congress supplied the measure of that reason in the 2023 revision of NEPA by setting the deadlines in NEPA § 107(g), 42 U.S.C. § 4336a(g). These deadlines indicate Congress’s determination that an agency, working within Congress’s allocation of resources, has presumptively spent a reasonable amount of time on analysis and the document should issue, absent very unusual circumstances. In such circumstances, an extension will be given only for such time as is necessary to complete the analysis. Thus:

FAA will complete the EIS not later than the date that is 2 years after the sooner of:

(a) Two years is measured from the date the FAA published the Notice of Intent (NOI) in the Federal Register to the date on which the FAA publishes the notice of availability of the Final EIS in the Federal Register.

(b) The EIS will publish (unless the deadline is extended pursuant to the provision below) on the day the deadline elapses, in as substantially complete form as is possible.

(c) If FAA determines it is not able to meet the deadline prescribed by NEPA § 107(g)(1)(A), 42 U.S.C. § 4336a(g)(1)(A), it must consult with the applicant, if any, pursuant to NEPA § 107(g)(2), 42 U.S.C. § 4336a(g)(2). After such consultation, if needed, and for cause stated, it may establish a new deadline. Cause for establishing a new deadline is only established if the EIS is so incomplete, at the time at which FAA determines it is not able to meet the statutory deadline, that issuance pursuant to subsection (c) above would result in an inadequate analysis. Such new deadline must provide only so much additional time as is necessary to complete such EIS. The announcement of the new deadline will specify the reason why the EIS was not able to be completed under the statutory deadline and whether the applicant consented to the new deadline. For direct FAA actions not involving applicants, the approving official may make the decision to exceed the deadline only, when needed and only for the additional period of time needed.

(d) Declaration Related to Deadlines. When the EIS is published, a responsible official will attest (and the declaration will be incorporated into the EIS) that the resulting EIS represents FAA’s good-faith effort to fulfill NEPA’s requirements within the Congressional timeline; that such effort is substantially complete; and that, in the FAA’s expert opinion, it has thoroughly considered the factors mandated by NEPA; and that, in the FAA’s judgment, the analysis contained therein is adequate to inform and reasonably explain FAA’s final decision regarding the proposed federal action.

§ 2.6 Publication of the environmental impact statement.

FAA will publish the entire EIS. The FAA may publish the EIS by any methods deemed suitable to provide notice to interested parties. Such methods may include, but are not limited to, those previously identified in these procedures for providing notice of the availability of a FONSI and its associated EA (see § 1.6(b)).

PART 3—EFFICIENT ENVIRONMENTAL REVIEWS › § 3.2 Reliance on existing environmental documents.

Page 21 of 32

PART 3—EFFICIENT ENVIRONMENTAL REVIEWS

§ 3.1 Programmatic environmental documents and tiering.

(a) FAA may prepare environmental documents for programmatic Federal actions, such as the adoption of new agency programs. FAA may evaluate the proposal(s) in one of the following ways:

(1) Geographically, including actions occurring in the same general location, such as body of water, region, or metropolitan area.

(2) Generically, including actions that have relevant similarities, such as common timing, effects, alternatives, methods of implementation, media, or subject matter.

(3) By stage of technological development.

(b) Consistent with NEPA § 108, 42 U.S.C. § 4336b, and § 3.2 of this Order, after completing a programmatic environmental assessment or environmental impact statement, FAA may rely on that document for 5 years if there are not substantial new circumstances or information about the significance of adverse effects that bear on the analysis. After 5 years, as long as FAA reevaluates the analysis in the programmatic environmental document and any underlying assumption to ensure reliance on the analysis remains valid and briefly documents its reevaluation and explains why the analysis remains valid considering any new and substantial information or circumstances, FAA may continue to rely on the document.

(c) When a programmatic EIS or EA has been prepared, any subsequent EIS or EA for proposed projects within the scope of the programmatic document only needs to incorporate by reference by summarizing the issues discussed in the programmatic document, discuss the relationship between the new document and the previous review, providing access to the programmatic EIS or EA, and concentrating the subsequent project specific EIS or EA on site-specific impacts not covered by the programmatic document§ 3.2 Adoption (Reliance on existing environmental documents).

§ 3.2 Reliance on existing environmental documents.

(a) Generally. FAA may rely on any pre-existing EIS, EA, or determination that a CATEX applies to a given project, or portion thereof, provided that the statement, assessment, determination, or portion thereof meets the standards for an adequate statement, assessment, or determination under these procedures. When relying on an EIS, EA, or portion thereof, FAA will cite, briefly describe the content and relevance to the environmental document and may make modifications that are necessary to render the relied-upon document, or portion thereof, fit for fulfilling NEPA’s analytic requirements for the action at hand.

PART 3—EFFICIENT ENVIRONMENTAL REVIEWS › § 3.6 Supplements to environmental documents.

Page 22 of 32

(b) Substantial Similarity.

(1) If the actions covered by the original EIS or EA and the proposed action are substantially the same, the FAA will republish the relied-upon statement or assessment. Any conclusion that the proposed actions are substantially the same must be based upon FAA’s independent review.

(2) If the actions are not substantially the same, FAA may modify the statement or assessment as necessary to render the statement fit for fulfilling NEPA’s analytic requirements for the action at hand, and publish the relied-upon statement or assessment, as modified. Where appropriate, FAA may solicit comment to the extent that solicitation of comment will assist FAA in expeditiously adapting the relied-upon statement or assessment so that it is fit for FAA’s purposes.

§ 3.3 Publishing pre-decisional environmental documents.

During the process of preparing any environmental document provided for by these procedures, FAA may publish such draft, pre-decisional materials as in its judgment may assist in fulfilling its responsibilities under NEPA and this Order.

§ 3.4 Combining documents.

FAA will combine, to the fullest extent practicable, any environmental document with any other agency document to reduce duplication and paperwork.

§ 3.5 Incorporation.

(a) Incorporation. FAA may incorporate material, such as planning studies, analyses, or other relevant information, into environmental documents by reference when the effect will be to cut down on bulk without impeding FAA and public review of the action. When incorporating material by reference, FAA will cite, briefly describe the content and relevance to the environmental document and make the materials reasonably available for review by potentially interested parties within the time allowed for comment. Material based on proprietary data that is not available for review and comment must not be incorporated by reference. FAA will not use incorporation as a means to evade the statutory page limits.

(b) Although NEPA itself does not require cost-benefit analysis, FAA conducts cost-benefit analysis, as appropriate, including in the context of major rules, as required by OMB Circular A-4, when issuing a Letter of Intent (see 49 USC 47110(e)), and in certain Airport Improvement Program (AIP) funded airport development projects (see chapter 3 of the Airport Improvement Program Handbook, FAA Order 5100.38D). To the extent that this cost-benefit analysis is relevant to any alternatives analysis FAA is conducting pursuant to NEPA, FAA will incorporate the cost-benefit analysis or append it to the statement to avoid duplication in evaluating the environmental effects. In such cases, the environmental document will discuss the relationship between that analysis and any analyses of unquantified environmental effects, values, and amenities.

§ 3.6 Supplements to environmental documents.

FAA will prepare supplements to environmental documents only if a major Federal action remains to occur, and:

(a) FAA makes substantial changes to the proposed action that are relevant to environmental concerns; or

(b) FAA decides, in its discretion, that there are substantial new circumstances or information about the significance of the adverse effects bearing on the proposed action or its effects.

PART 3—EFFICIENT ENVIRONMENTAL REVIEWS › § 3.11 Unique identification numbers.

Page 23 of 32

§ 3.7 Integrity and completeness of information.

(a) FAA will not undertake new scientific and technical research to inform its analyses unless it is essential to a reasoned choice among alternatives and the overall costs and time frame of such undertaking are not unreasonable. Rather, FAA will make use of reliable existing data and resources.

(b) When FAA is evaluating an action’s reasonably foreseeable effects on the human environment, and there is incomplete or unavailable information that cannot be obtained at a reasonable cost or the means to obtain it are unknown, FAA will make clear in the relevant environmental document that such information is lacking.

§ 3.8 Integrating NEPA with other environmental requirements.

(a) To the fullest extent possible, FAA will prepare environmental documents concurrently with and integrated with analyses and related surveys and studies required by other Federal statutes.

(b) FAA will combine an environmental document prepared in compliance with NEPA with any other agency document to reduce duplication and paperwork. Thus, FAA may combine an environmental document with related plans, rules, or amendments as a single consolidated document.

(c) If comments on a notice of intent or other aspects of a scoping process identify consultations, permits, or licenses necessary under other environmental laws, the environmental document may contain a section briefly listing the applicable requirements and how FAA has or will meet them (e.g., permits applied for or received, consultations initiated or concluded).

§ 3.9 Elimination of duplication with State, Tribal, and local procedures.

(a) FAA will cooperate with State, Tribal, and local agencies that are responsible for preparing environmental documents.

(b) To the fullest extent practicable unless specifically prohibited by law, FAA will cooperate with State, Tribal, and local agencies to reduce duplication between NEPA and State, Tribal, and local requirements, including through use of studies, analysis, and decisions developed by State, Tribal, or local agencies. Such cooperation may include:

(1) Joint planning processes;

(2) Joint environmental research and studies;

(3) Joint public hearings (except where otherwise provided by statute); or

(4) Joint environmental documents.

§ 3.10 Proposals for regulations.

Where the proposed action is the promulgation of a rule or regulation, procedures and documentation pursuant to other statutory or Executive order requirements may satisfy one or more requirements of this subchapter. When a procedure or document satisfies one or more requirements of this subchapter, FAA may substitute it for the corresponding requirements in this subchapter and need not carry out duplicative procedures or documentation. Agencies will identify which corresponding requirements in this subchapter are satisfied and consult with CEQ to confirm such determinations.

§ 3.11 Unique identification numbers.

For all environmental documents, FAA will provide a unique identification number for tracking purposes, which FAA will reference on all associated environmental review documents prepared for the proposed agency action and in any database or tracking system for such documents. FAA will

PART 3—EFFICIENT ENVIRONMENTAL REVIEWS › § 3.12 Emergencies.

Page 24 of 32

coordinate with the CEQ and other federal agencies to ensure uniformity of such identification numbers across federal agencies

§ 3.12 Emergencies.

Where emergency circumstances make it necessary to take an action with reasonably foreseeable significant environmental effects without observing the provisions of these procedures, FAA will consult with the CEQ about alternative arrangements for compliance with NEPA § 102(2)(C), 42 U.S.C. § 4332(2)(C). In addition, the LOB/SO should coordinate with AEE-400 and AGC as soon as practicable. When time permits, environmental documentation should be prepared in accordance with this Order. Immediate emergency actions necessary to protect the lives and safety of the public or prevent adverse impacts to ecological resources and functions should never be delayed in order to comply with NEPA. These actions should be taken as soon as is necessary to ensure the protection and safety of the public and the protection of ecological resources and functions. Alternative arrangements for NEPA compliance are permitted for emergency actions pursuant to the following:

(a) CATEXs. Where emergency circumstances make it necessary to determine whether an extraordinary circumstance would preclude the use of a CATEX, the responsible FAA official must make the determination as soon as practicable. If an extraordinary circumstance exists, FAA will consider whether the application of the CATEX is still appropriate notwithstanding the presence of extraordinary circumstances. Use of the CATEX may remain appropriate, even with the extraordinary circumstance, if the FAA finds with further analysis that the proposed action does not have the potential to result in significant impacts. In these instances, the mere presence of an extraordinary circumstance does not prevent the application of the categorical exclusion. The responsible FAA official must comply with (b) or (c) below, as applicable.

(b) EAs. Where emergency circumstances make it necessary to take an action that requires an EA before the normal EA process can be completed in accordance with this Regulation, the responsible FAA official must consult with AEE-400 and AGC to develop alternative arrangements. Alternative arrangements for such actions should focus on minimizing adverse environmental impacts of the FAA action and the emergency. To the maximum extent practicable, the alternative arrangements should include the interagency coordination and public notification and involvement that would normally be undertaken for an EA for the action at issue. The Director of AEE may grant alternative arrangements. Any alternative arrangements must be documented. AEE may consult with CEQ on the alternative arrangements.

(c) EIS. CEQ may grant alternative arrangements for NEPA compliance where emergency circumstances make it necessary to take actions with significant environmental impacts without observing other provisions of this Regulation. In these situations, the processing times may be reduced or, if the emergency situation warrants, preparations and processing of EISs may be abbreviated. A request for alternative arrangements must be submitted to CEQ and notice of a potential request should be provided to CEQ at the earliest opportunity. Before making the request, the responsible FAA official must consult with AEE-400 and AGC for evaluation to ensure national consistency. For projects undertaken by an applicant, the responsible FAA official must inform AEE-400 and AGC about the emergency. AEE will notify the Office of the Assistant Secretary for Transportation Policy (P-1) of any situations when alternative arrangements will be requested and will consult CEQ requesting the alternative arrangements for complying with NEPA.

PART 4—AGENCY DECISION MAKING › § 4.2 Review and Approval of NEPA Documents

Page 25 of 32

PART 4—AGENCY DECISION MAKING

§ 4.1 Decision documents.

At the time of its decision on the proposed action, FAA may prepare and timely publish a concise public decision document or joint decision document notifying the public that the decisionmaker has certified that FAA has considered all relevant information raised in the NEPA process and that the NEPA process has closed.

§ 4.2 Review and Approval of NEPA Documents

(a) General. The FAA’s internal review process is a means of coordinating the review of NEPA documents among appropriate management levels and across LOB/SOs. Internal review is to ensure that (1) NEPA documents are technically and legally sufficient; (2) the concerns of other FAA offices and any related foreseeable agency actions by other FAA offices are properly discussed in the NEPA documents; and (3) any commitments that are the responsibility of other FAA offices are coordinated with the appropriate action office so that these commitments will be implemented; (4) the NEPA documents incorporate all agency actions under the purview of individual FAA offices to streamline project reviews and reduce the potential of supplemental NEPA reviews. LOB/SOs should have in place processes to provide evidence of appropriate coordination and legal sufficiency review. The responsible FAA official must contact affected LOB/SOs for guidance on program-specific coordination procedures.

(b) Review and Approval of EAs, Finding of No Significant Impact (FONSI) and FONSI/RODs.

(1) EAs and FONSIs Originating and Approved in FAA regions, District Offices, Centers, and Service Areas. The NEPA lead in the Region, District Office, Center, or Service Area must coordinate review of the EA and FONSI with affected LOB/SOs. The NEPA lead must also coordinate legal sufficiency review of the EA and FONSI with AGC. Following coordination with the interested LOB/SO and any required legal sufficiency review, the approving official may approve and sign the FONSI.

(2) EAs and FONSIs Originating or Approved in Washington, D.C. Headquarters. The NEPA lead LOB/SO must coordinate review of the EA and FONSI with affected LOB/SO. The NEPA lead must also coordinate legal sufficiency review of the EA and FONSI with AGC. Following coordination and any required legal sufficiency review by AGC, the approving official may approve and sign the FONSI.

(3) FONSI/RODs. The NEPA lead must coordinate review of the FONSI/ROD with affected LOB/SO and AGC. Following coordination and any required legal sufficiency review by AGC, the responsible FAA official may approve and sign the FONSI/ROD.

(c) Review and Approval of Records of Decisions.

(1) Where authority to approve the ROD is in the Region, Center, or Service Area. The NEPA lead Region, Center, or Service Area must coordinate review with affected LOB/SOs and applicable AGC for legal sufficiency review. Following coordination and review for legal sufficiency, the decisionmaker may approve and sign the ROD. If Headquarters concurrence is required by an LOB/SO, the NEPA lead must obtain that concurrence prior to approval of the ROD. For proposed actions that cross regional boundaries or involve more than one LOB, the Regional Administrator is responsible for signing the ROD. Following applicable AGC legal sufficiency review, the approving official may approve and sign the final EIS, and the responsible FAA official may file the final EIS with the EPA.

PART 4—AGENCY DECISION MAKING › § 4.3 Filing requirements.

Page 26 of 32

(2) Where authority to approve the ROD is retained in Washington, DC Headquarters. The NEPA lead must coordinate review with affected LOB/SOs and applicable AGC for legal sufficiency review. Unless specifically requested, coordination with AEE-400 is not required; however, the responsible FAA official must provide AEE-400 with a copy of the ROD for information purposes. Following review for legal sufficiency, the decisionmaker may approve and sign the ROD and file the final EIS with the EPA.

(d) Combined Final EIS and ROD. If the final EIS and ROD will be combined in accordance with 49 U.S.C. § 304a(b) [or 23 U.S.C. § 139(n)(2)], the following statement must also be included in the Draft EIS: The FAA will issue a single document that consists of the Final EIS and ROD pursuant to 49 U.S.C. 304a(b) [and 23 U.S.C. 139(n)(2)] unless FAA determines that statutory criteria or practicability considerations preclude issuance of such a combined document.

§ 4.3 Filing requirements.

FAA will file EIS documents together with comments and responses with the Environmental Protection Agency (EPA), Office of Federal Activities for publication in the Federal Register.

Page 27 of 32

PART 5—PROCEDURES FOR APPLICANT-PREPARED NEPA DOCUMENTS

§ 5.1 Procedures for applicant-prepared environmental documents.

PART 5—PROCEDURES FOR APPLICANT-PREPARED NEPA DOCUMENTS › § 5.1 Procedures for applicant-prepared environmental documents.

In accordance with NEPA § 107(f), 42 U.S.C. § 4336a(f), FAA has established procedures allowing applicants, or contractors hired by applicants, to prepare NEPA documents under FAA’s supervision.

(a) FAA will independently evaluate the environmental document and will take responsibility for its contents.

(b) FAA will assist applicants and applicant-hired contractors by providing guidance and outlining the types of information required for the preparation of the environmental document. FAA may also provide appropriate guidance and assist in environmental document preparation, to the extent that FAA’s resources and policy priorities permit. FAA will work with the applicant to define the purpose and need, and, when appropriate, to develop a reasonable range of alternatives to meet that purpose and need.

(c) FAA will work with the applicant to develop a schedule for preparation of the environmental document. Major changes to the schedule or related matters will be documented through written correspondence.

(d) FAA may request from an applicant environmental information for use by FAA in evaluating an environmental document. Except as otherwise set forth in applicable law or regulation, it is the applicant’s decision whether to provide this information if requested. Without information from the applicant, FAA will use the best information available at the time. This may include a decision file consisting of any factual, scientific, or technical information used, developed, or considered by the applicant or applicant-hired contractor in the course of preparing the environmental document, including any correspondence with FAA or with third parties.

(e) FAA must supervise the preparation of environmental documents by applicants and contractors, including participating in, concurring with, or leading contractor selection and establishing the scope of work for the analysis, to ensure that the environmental impacts are appropriately identified and disclosed, identify appropriate mitigation; and ensure that the environmental document complies with the requirements of NEPA, this Order, other FAA requirements applicable to contractors, and all other applicable Federal, State, Tribal, and local laws.

PART 6—DEFINITIONS › § 6.1 Definitions.

Page 28 of 32

PART 6—DEFINITIONS

§ 6.1 Definitions.

As used in this Order, terms have the meanings provided in NEPA § 111, 42 U.S.C. § 4336e. In addition:

(a) NEPA means the National Environmental Policy Act, as amended (42 U.S.C. § 4321, et seq.).

(b) Airport Sponsor means a public agency that submits an application to the Secretary of Transportation for financial assistance under 49 U.S.C. Subpart B, Chapter 471, Subchapter I, Airport Development; or a private owner of a public-use airport who submits an application for financial aid for the airport to the Secretary of Transportation under 49 U.S.C. Subpart B, Chapter 471, Subchapter I (as defined in 49 U.S.C. 47102 (1)).

(c) Applicant means a non-federal entity, including a project sponsor, that seeks an action by the FAA, such as granting a permit, license, or other approval, or financial assistance. A contractor performing environmental work in contractual privity with an applicant, but not in direct contractual privity with the FAA, is encompassed in the term “applicant” within this Order. Examples include, but are not limited to, airport sponsors, grant applicants, airlines, and commercial space license and permit applicants.

(d) Approving official means any FAA official with the authority to approve and sign FONSIs, EISs, and RODs. The official also has the authority to rescind RODs. LOB/SOs should designate approving officials consistent with FAA Order 1100.154, Delegations of Authority, and any other applicable FAA directives.

(e) Authorization means any license, permit, approval, finding, determination, or other administrative decision issued by an agency that is required or authorized under Federal law in order to implement a proposed action.

(f) Connected action means a separate Federal action within the authority of FAA that is closely related to the proposed agency action and should be addressed in a single environmental document because the proposed agency action.

(1) Automatically triggers the separate Federal action, which independently would require the preparation of additional environmental documents;

(2) Cannot proceed unless the separate Federal action is taken previously or simultaneously; or

(3) Is an interdependent part of a larger Federal action that includes a separate Federal action, which mutually depend on the larger Federal action for their justification.

(g) Contractor means an individual or company, in contractual privity with the FAA, contracted to provide environmental services (e.g. conduct research and environmental analysis of all environmental resources to determine potential impacts, identify and recommend potential mitigation, and complete the legally sufficient CATEX, EA, or EIS), and is responsible for the contract’s requirements. This can include subcontractors or consultants who participate in a contract or subcontract at any level. “Contractor” means an entity selected by the FAA, unless otherwise specified.

(h) Decisionmaker means the FAA official with authority to approve and sign a ROD or other document that represents the completion of the FAA’s decisionmaking. Examples include, but are not limited to, a grant, ALP approval, or other document demonstrating the completion of decisionmaking. LOB/SOs should designate decisionmakers consistent with Chapter 10 of this Order, FAA Order 1100.154, Delegations of Authority, and any other applicable FAA directives.

Page 29 of 32

(i) Effects or impacts means changes to the human environment from the proposed action or alternatives that are reasonably foreseeable and have a reasonably close causal relationship to the proposed action or alternatives.

(1) Effects include ecological (such as the effects on natural resources and on the components, structures, and functioning of affected ecosystems), aesthetic, historic, cultural, economic (such as the effects on employment), social, or health effects. Effects appropriate for analysis under NEPA may be either beneficial or adverse, or both, with respect to these values.

(2) A “but for” causal relationship is insufficient to make an agency responsible for a particular effect under NEPA. Effects should generally not be considered if they are remote in time, geographically remote, or the product of a lengthy causal chain. Effects do not include those effects that the agency has no ability to prevent due to the limits of its regulatory authority or, that would occur regardless of the proposed action.

(j) Federally recognized Tribe, Tribe, Indian Tribe, or Tribal Nation means any Indian Tribe, band, nation, pueblo, village, community, or other organized group or community of Indians, including any Alaska Native village or regional or village corporation as defined in or established pursuant to the Alaska Native Claims Settlement Act (43 U.S.C. § 1601, et seq.), that the Secretary of the Interior recognizes as an Indian Tribe pursuant to the Federally Recognized Indian Tribe List Act of 1994, (25 U.S.C. § 479a). The descriptive term “Tribal” relates to this definition.

(k) Human environment means comprehensively the natural and physical environment and the relationship of Americans with that environment. (See also the definition of “effects” in paragraph (e) of this section.)

(l) Jurisdiction by law means agency authority to approve, veto, or finance all or part of the proposal.

(m) Major Runway Extension means a runway extension that: (1) allows a commercial service airport to serve a more demanding critical aircraft or aircraft requiring a higher Runway Design Code (RDC); and/or (2) accommodates an increased haul length for the existing aircraft fleet; and (3) is located in an MSA.

(n) Mitigation means measures that avoid, minimize, or compensate for effects caused by a proposed action or alternatives as described in an environmental document or ROD and that have a nexus to those effects. While NEPA requires consideration of mitigation, it does not mandate the form or adoption of any mitigation; however, special purpose laws may also require mitigation. Mitigation includes:

(1) Avoiding the impact altogether by not taking a certain action or parts of an action.

(2) Minimizing effects by limiting the degree or magnitude of the action and its implementation.

(3) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment.

(4) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action.

(5) Compensating for the impact by replacing or providing substitute resources or environments.

(o) NEPA Lead means an FAA LOB/SO, Regional Operating Division, Center, or Service Area that has primary responsibility for complying with NEPA, including preparation and approval of NEPA documents.

(p) NEPA process means all measures necessary for compliance with the requirements of section 2 and title I of NEPA § 102(2), 42 U.S.C. § 4332(2).

Page 30 of 32

(q) Notice of intent means a public notice that an agency will prepare and consider an environmental document.

(r) Participating Federal agency means a Federal agency participating in an environmental review or authorization of an action.

(s) Publish and publication mean methods found by the agency to efficiently and effectively make environmental documents and information available for review by interested persons, including electronic publication.

(t) Related action means an action undertaken by an agency, e.g., a permitting action, some other type of authorization action, an analysis required by statute, or the like, that bears a relationship to other actions undertaken by other agencies relevant to NEPA, e.g., that a set of related actions are all related to one overarching project.

(u) Reasonable alternatives mean a reasonable range of alternatives that are technically and economically feasible, meet the purpose and need for the proposed action, and, where applicable, meet the goals of the applicant.

(v) Reasonably foreseeable means sufficiently likely to occur such that a person of ordinary prudence would take it into account in reaching a decision.

(w) Responsible FAA Official means an FAA employee within the LOB/SO with overall responsibility to: (1) advise an applicant on how to integrate environmental considerations into the planning process early in the planning stage of a proposed project; (2) determine the level of NEPA required for a proposed project; (3) supervise the preparation of the NEPA documents; (4) independently evaluate the environmental issues; (5) furnish guidance and participate in the preparation of NEPA documents; (6) evaluate and take responsibility for the scope and content of the documents; and (7) has the authority to approve a CATEX determination.

(x) Scope consists of the range of actions, alternatives, and effects to be considered in an environmental document. The scope of an individual statement may depend on its relationships to other statements.

(y) State means a State of the United States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, Guam, American Samoa, the Virgin Islands, or an instrumentality thereof.

(z) State Block Grant Program (SBGP) means funds (block grants) provided by the FAA directly to Block Grant States (BGS) to prioritize, select, and fund AIP projects at participating non-primary airports within the state that receives the funding under the SBGP (49 U.S.C. § 47128). The FAA and the respective BGS execute a Memorandum of Agreement (MOA) detailing the SBGP administration and compliance responsibilities. Such responsibilities include, but are not limited to, compliance with NEPA and other special purpose laws under certain conditions. SBGP participants must comply with this Order (see the Desk Reference) when undertaking NEPA reviews.

(aa) Substantial information means information that paints a dramatically different picture of impacts compared to the description of impacts in the EA or EIS.

(bb) Tiering refers to the coverage of general matters in broader EISs or EAs (such as national program or policy statements) with subsequent narrower statements or environmental analyses (such as regional or basin-wide program statements or ultimately site-specific statements) incorporating by reference the general discussions and concentrating solely on the issues specific to the statement subsequently prepared.

PART 7—Severability. › § 7.1 Severability.

Page 31 of 32

PART 7—Severability.

§ 7.1 Severability.

The sections of this Order are separate and severable from one another. If any section or portion therein is stayed or determined to be invalid, or the applicability of any section to any person or entity is held invalid, it is FAA’s intention that the validity of the remainder of those parts will not be affected. The remaining sections or portions therein shall continue in effect.

Appendices

6/30/ 25 Order 1050.1G

Appendices

Appendix A Significance Determination for FAA Actions

Appendix B Extraordinary Circumstances and FAA Categorical Exclusions

Appendix C FAA Requirements for Assessing Impacts Related to Noise and Noise –

Compatible Land Use

Page A-1

Appendix A Significance Determination for FAA Actions

Exhibit A-1. Significance Determination for FAA Actions.

Environmental Impact Category Significance Threshold Factors to Consider

Aviation Emissions and Air Quality

The action would cause pollutant concentrations to exceed one or more of the National Ambient Air Quality Standards (NAAQS), as established by the Environmental Protection Agency under the Clean Air Act, for any of the time periods analyzed, or to increase the frequency or severity of any such existing violations.

Biological Resources (including fish, wildlife, and plants)

The U.S. Fish and Wildlife Service or the National Marine Fisheries Service determines that the action would be likely to jeopardize the continued existence of a federally listed threatened or endangered species or would result in the destruction or adverse modification of federally designated critical habitat.

The FAA has not established a significance threshold for nonlisted species.

The action would have the potential for:

• A long-term or permanent loss of unlisted plant or wildlife species, i.e., extirpation of the species from a large project area (e.g., a new commercial service airport); • Adverse impacts to special status species (e.g., state species of concern, species proposed for listing, migratory birds, bald and golden eagles) or their habitats; • Substantial loss, reduction, degradation, disturbance, or fragmentation of native species’ habitats or their populations; or • Adverse impacts on a species’ reproductive success rates, natural mortality rates, non-natural mortality (e.g., road kills and hunting), or ability to sustain the minimum population levels required for population maintenance.

Department of Transportation Act, Section 4(f), and )") and Land and Water Conservation Fund (referred

The action involves more than a minimal physical use of a Section 4(f) resource or constitutes a “constructive use” based on an FAA determination that the aviation project would

Page A-2

Environmental Impact Category Significance Threshold Factors to Consider

Continue reading ↓ 120 of 211 passages shown