84 FR 15296 Streamlined Launch and Reentry Licensing Requirements
This rulemaking would streamline and increase flexibility in the FAA's commercial space launch and reentry regulations, and remove obsolete requirements. This action would consolidate and revise multiple regulatory parts and apply a single set of licensing and safety regulations across several types of operations and vehicles. The proposed rule would describe the requirements to obtain a vehicle operator license, the safety requirements, and the terms and conditions of a vehicle operator license.
This document is proposed. It may have been replaced. Check the official source before relying on it.
vii. ARC Recommendations
In discussing the scalability of FSS requirements, the ARC proposed that the FAA delineate categories of operators and vehicles. The suggested categories included a new vehicle by a new operator, a proven vehicle by an experienced operator, a derived vehicle by an experienced operator, and considerations for vehicle hazard class and population density in operating areas. The FAA considered operator and vehicle categories as a means of scaling FSS reliability requirements as an alternative to consequence analysis, but determined that the relevant measure of public protection indicating the need for an FSS is not experience, but risk and possible consequence. While less experienced operators will likely pose a higher risk, as accounted for in the probability of failure, experience does not account for the potential consequences of a vehicle failure. Experienced operators with experienced vehicle designs can propose operations that still pose a high risk to the public, or an operation with low risk but high potential consequences in the event of a failure. The FAA seeks comment on the proposal to use consequence, not operator experience, as a factor in level-of-rigor.
K. Other Prescribed Hazard Controls
K. Other Prescribed Hazard Controls
1. Agreements
The FAA proposes to streamline the existing agreement requirements by removing specific requirements for a variety of agreements and procedures and allowing an operator to determine what agreements would be needed for its particular operation. In § 450.147 (Agreements), a vehicle operator would be required to have written agreements with any entity that provides a service or use of property to meet a requirement in part 450.
1. Agreements
Current § 417.13 requires a launch operator to enter into an agreement with a Federal launch range to have access to and the use of U.S. Government property and services required to support a licensed launch from the facility and for public-safety related operations and support before conducting a licensed launch from a Federal launch range. The Federal launch range arranges for the issuances of notifications to mariners and airmen.
Currently, for launches from a non-Federal launch site in the United States, a launch operator must ensure that launch processing at the launch site satisfies the requirements of part 417. For a launch from a launch site licensed under part 420, a launch operator must conduct its operations in accordance with any agreements that the launch site operator has entered into with any Federal and local authorities. These include agreements with the local U.S. Coast Guard district to establish procedures for the issuance of a Notice to Mariners (NTM) prior to a launch and with the FAA air traffic control (ATC) facility having jurisdiction over the airspace through which the launch will take place to establish procedures for the issuance of a Notice to Airmen (NOTAM) prior to the launch and for the closing of air routes during the launch window. For a launch from an exclusive-use site, where there is no licensed launch site operator, a launch operator must satisfy the requirements of part 420.
In addition, a launch operator must: (1) Describe its procedures for informing local authorities of each designated hazard area near the launch site associated with a launch vehicle's planned trajectory and any planned impacts of launch vehicle components and debris; (2) provide any hazard area information to the local U. S. Coast Guard, or equivalent local authority, for the issuance of NTMs and to the FAA ATC office, or equivalent local authority, that have jurisdiction over the airspace through which the launch will take place for the issuance of NOTAMs; and (3) coordinate with any other local agency that supports the launch, such as local law enforcement agencies, emergency response agencies, fire departments, the National Park Service, and the Mineral Management Service.
For launches of RLVs under part 431 and reentries under part 435, an operator must enter into launch and reentry site use agreements with a Federal launch range or a licensed launch or reentry site operator that provide for access to and the use of property and services required to support a licensed RLV mission or reentry and public safety-related operations and support. Additionally, an operator must enter into agreements with the U.S. Coast Guard and the FAA regional office that has jurisdiction over the airspace through which a launch and reentry will take place to establish procedures for the issuance of NTMs and NOTAMs.
As discussed earlier, there are currently similar requirements under parts 417 and 431 and, by reference, part 435, for agreements to ensure that NTMs and NOTAMs are implemented. Part 417 references part 420, which also contains requirements for these notices and requires operators to describe procedures to ensure that these and other notifications are accomplished. Part 417 requires an operator to execute agreements with multiple entities. None of the current requirements adequately addresses NTMs and NOTAMs when the U.S. Coast Guard or the FAA does not have jurisdiction, such as with launches or reentries from or to foreign or international territories. Currently, these agreements must be in place before a license is issued. However, in practice, the FAA sometimes accepts draft agreements or makes the submission of the executed agreements a condition of the license.
Under proposed § 450.147, a vehicle operator would be required to enter into a written agreement with any entity that provides a service or property that meets a requirement in part 450. Such entities would include a Federal launch range operator, a licensed launch or reentry site operator, any party that provides access to or use of property and services required to support a safe launch or reentry under part 450, the U.S. Coast Guard, and the FAA. Other entities that provide a service or property could also include local, state, or federal agencies, or private parties. For instance, a local fire department might provide a standby service to control a possible fire, a state agency could provide any number of services such as road closures, and NASA might provide telemetry capability. Although agreements with local agencies, for example, may be necessary to ensure public safety, the FAA believes that it is overly prescriptive to list in regulation the specific entities with which each operator must enter into an agreement.
This proposal would require an operator to enter into only those agreements necessary for its particular operation. If an operator works with multiple entities to satisfy requirements in proposed part 450, it would need multiple agreements. However, if agreements required under this proposed section are already addressed in agreements executed by the site operator, an operator would only need to enter into agreements with either the Federal launch range or other site operator and any entity with which the site operator does not perform the necessary coordination. In particular, Federal launch ranges almost always arrange for the issuance of NTMs and NOTAMs for launches.\94\
\94\ Typically, Federal ranges do not arrange for the issuance of NTMs and NOTAMs for the disposal of a launch vehicle from orbit or the reentry of a reusable launch or reentry vehicle.
The proposal also contemplates agreements between a maritime or aviation authority other than the U.S. Coast Guard or the FAA. Unless otherwise addressed in agreements with the site operator, the proposed rule would require an operator to enter into such agreements for a launch or reentry that crosses airspace or impacts water not under the jurisdiction or authority of the U.S. Coast Guard or the FAA.
Section 450.147(b) would require all agreements to clearly delineate the roles and responsibilities of each party in order to avoid confusion concerning responsibility for executing safety-related activities. Section 450.147(c) would require all agreements to be in effect before a license can be issued. However, as noted earlier, the FAA recognizes that agreements might not be finalized by the time the FAA is prepared to make a licensing determination. Therefore, the regulation would allow an operator to request a later effective date, contingent upon the Administrator's approval. An operator could do this by providing the FAA the status of the negotiations involving the agreement including any significant issues that require resolution and the expected date for its execution.
Under proposed § 450.147(d), an applicant would be required to describe each agreement in its vehicle operator license application. An applicant should clearly delineate the roles and responsibilities of each party to the agreement to support a safe launch or reentry. The applicant would also need to provide a copy of any agreement, or portion thereof, to the FAA upon request. The FAA recognizes that some portions of agreements may contain business-related provisions that do not pertain to FAA requirements. Those portions would not be required. The FAA seeks comment on its proposed approach to agreements. 2. Safety-Critical Personnel Qualifications
The FAA proposes to remove the certification requirements found in Sec. § 417.105, 417.311, and 415.113 and replace them with performance-based requirements in § 450.149 (Safety-Critical Personnel Qualifications). Section 450.149 would require qualified personnel to perform safety-critical tasks for launch and reentry operations. The FAA also proposes to expand personnel qualification requirements to ensure that safety-critical personnel are qualified to perform their assigned safety tasks.
An operator must qualify and train its safety-critical personnel in performing their safety-critical tasks for all vehicle and license types because training mitigates the potential for human error during safety-critical operations. Currently, the FAA requires a personnel certification program in part 417 for personnel that perform safety-related tasks. Specifically, § 417.105 requires that a launch operator employ a personnel certification program that documents the qualifications, including education, experience and training, for each member of the launch crew. The launch operator's certification program must include annual reviews and revocation of certifications for negligence or failure to satisfy certification requirements. Section 415.113 requires an operator to submit a safety review document that describes how the applicant will satisfy the personnel certification program requirements of § 417.105 and identify by position individuals who implement the program. The document must also demonstrate how the launch operator implements the program, contain a table listing each hazardous operation or safety critical task certified personnel must perform, and include the position of the individual who reviews personnel qualifications and certifies the personnel performing the task. In § 417.105(b), an operator is required to review personnel qualifications and issue individual certifications. The intent behind this requirement was to ensure that qualified people perform the required safety tasks.
Neither part 431 nor part 435 have a personnel certification program requirement or any personnel training requirement; however, the need for personnel qualifications is a natural outcome of the system safety process.
The FAA recognizes that the current regulations in part 417 are inflexible and that using a certification program is not the only method to ensure qualified personnel perform safety-critical tasks. Operators may use other methods to verify all training and experience required for personnel to perform a task is current. For example, an operator may maintain training records to document internal training and currency requirements or completion standards for its safety critical personnel. An operator's issuance of individual certifications does not itself enhance public safety. If the personnel are qualified through training and experience for each safety task performed, additional certification is unnecessary because no additional training is required for an individual to be issued a certification. Removing the certification requirement would also reduce cost to the industry by removing the two-step process to allow qualified personnel to perform safety-related tasks.
Additionally, the flight safety crew roles and qualifications requirements in § 417.311, are prescriptive. Section 417.311(a) requires a flight safety crew to document each position description and maintain documentation of individual crew qualifications, including education, experience, and training, as part of the personnel certification program of § 417.105. Section 417.311(b) describes the roles of the flight safety crew and explicitly states subjects and tasks that the crew must be trained in and references the certification program. Finally, § 417.311(c) requires the flight safety crew members to complete a training and certification program to ensure familiarization with launch site, launch vehicle, and FSS functions, equipment, and procedures related to a launch prior to being called on to support a launch. It also requires a preflight readiness training and certification program be completed and prescribes the content that must be included in such training. The current regulations are a burden to operators because they focus on FSSs and do not account for evolving technologies, including autonomous FSSs. Removing the prescriptive requirements in § 417.311 and replacing them with performance-based requirements would alleviate this burden.
The ARC recommends that the proposed regulation ensure that the applicant has a structure in place to protect public safety, and that the FAA use current requirements as guidelines for evaluation and approval when necessary. The FAA agrees that the regulations should ensure that personnel performing tasks that impact public safety are qualified to perform those tasks. As the industry grows and operations become more frequent and varied, operators need greater flexibility in operational practices. Employing a qualification program to ensure personnel performing safety-critical tasks are trained is one factor in protecting safety of public and public property.
Therefore, the FAA proposes to remove the requirements for a certification program described in Sec. § 415.113 and 417.105 and replace the prescriptive requirements of § 417.311 with performance-based requirements that capture the intent of the current regulations--to ensure that an operator's safety-critical personnel are trained, qualified, and capable of performing their safety critical tasks, and that their training is current. Under proposed § 450.149, an applicant would be required to identify in its application the safety-critical tasks that require qualified personnel and provide its internal training and currency requirements, completion standards, or any other means of demonstrating compliance with proposed § 450.149(a).
The proposed performance-based requirements would allow each operator to identify the safety-critical operations and personnel needed for the operation. It would also allow an operator to determine what training, experience, and qualification should be required for each safety-critical task. The FAA would consider any task that may have an effect on public safety and meets the definition of safety-critical found in § 401.5 subject to the requirements of § 450.149. These tasks would include, but are not limited to, operating and installing flight safety system hardware, operating safety support systems, monitoring vehicle performance, performing flight safety analysis, conducting launch operations, controlling public access, surveillance, and emergency response. With the many different kinds of operations currently underway, an operator is in the best position to identify the operations, personnel, and training needed for its operation.
The FAA would also require that an operator ensure personnel are qualified, and that those qualifications are current, without requiring certification. The regulation would require proper training of personnel and verification that each person performing safety critical tasks is qualified. Under § 450.149, an applicant would be required to document all safety-critical tasks and internal requirements or standards for personnel to meet prior to performing the identified tasks during the application phase. The applicant would be required to provide internal training and currency requirements, completion standards, or any other means of demonstrating compliance with the requirements of § 450.149 in its application. The applicant would also be required to describe the process for tracking training currency. In the event that a person's qualification was not current, either because their qualification does not meet the training currency requirements detailed in the application or because a new process or procedure has been instituted that has made the training inaccurate or incomplete, the individual would not be qualified to perform safety-related tasks specific to the expired qualification.
Lastly, part 460 contains training and qualification requirements for flight crew. Compliance with these requirements would meet the training and qualification requirements in proposed § 450.149 for flight crew. 3. Work Shift and Rest Requirements
The FAA proposes to combine the rest requirements of Sec. § 417.113(f) and 431.43(c)(4)(i) through (iv) into proposed § 450.151 (Work Shift and Rest Requirements) which would require an applicant to document and implement rest requirements that ensure personnel are physically and mentally capable of performing tasks assigned. An applicant would be required to submit its rest rules during the application phase.
Personnel involved in the launch or reentry of expendable and reusable vehicles need to be physically and mentally capable of performing their duties, especially those people making decisions or performing operations that affect public safety. Fatigue can degrade a person's ability to function and make the necessary decisions to conduct a safe launch or reentry operation. Since the FAA started requiring rest rules, there have been no incidents resulting from fatigue during a licensed launch or reentry. To maintain this level of safety, the FAA proposes to continue requiring rest rules in order to prevent fatigue and ensure operator personnel can perform their duties safely.
A 1993 NTSB investigation of an anomaly that occurred during a commercial launch from a Federal launch range found a high probability that fatigue and lack of rest prior to launch operations contributed to mistakes that resulted in the vehicle initiating flight while the range was in a no-go condition.\95\ Launching in a no-go condition increases risk to the public because the vehicle operates outside of established boundaries and analysis. The NTSB found that the person who decided to proceed with the launch was not given enough time to rest after working extra hours the previous day. In addition, the launch was scheduled for early in the morning so the on-console time was around 2:00 a.m. The NTSB report recommended instituting rest rules that allow for sufficient rest before the launch operation.
\95\ Special Investigation Report: Commercial Space Launch Incident, Launch Procedure Anomaly Orbital Sciences Corporation, Pegasus/SCD-1, 80 Nautical Miles East of Cape Canaveral, Florida, February 9, 1993. Report PB 93-917003/NTSB/SIR93-02, July 23, 1993; (https://www.ntsb.gov/safety/safety-studies/Documents/SIR9302.pdf).
As a result of the 1993 NTSB report, the FAA issued rest rules in its 1999 final rule. The 1999 final rule required an applicant to ensure that its flight safety personnel adhere to Federal launch range rest rules. In its 2000 final rule for RLVs, the FAA required rest rules, in § 431.43(c)(4), similar to the Air Force work and rest standards for launches and the FAA's ELV requirements.\96\ The specific and detailed requirements set forth in § 431.43(c)(4) fail to account for the various factors that can affect crew rest such as the time of day of an operation, length of preflight operations, and travel to and from the launch or reentry site.
\96\ Section 431.43(c)(4) contains requirements that are detailed and prescriptive. It requires vehicle safety operations personnel to adhere to specific work and rest standards. These requirements prescribe the maximum length of workshift and the minimum rest period after such work shift preceding initiation of an RLV reentry mission or during the conduct of the mission. It also prescribes the maximum hours permitted to be worked in the 7 days preceding initiation of an RLV mission, the maximum number of consecutive work days, and the minimum rest period after 5 consecutive days of 12-hour shifts.
The 2006 final rule adopted the current § 417.113(f), which is more performance-based than § 431.43(c)(4). Section 417.113(f) requires that for any operation that has the potential to have an adverse effect on public safety, the launch rules must ensure that the launch crew is physically and mentally capable of performing all assigned tasks. It also requires those rules to govern the length, number, and frequency of work shifts, and the rest afforded to launch crew between shifts.
The ARC recommended the FAA use the § 417.113(f) approach as a basis for the proposed rest rules. The ARC recommended that the regulations should require each license applicant and operator to establish crew rest requirements applicable to their individual operation and suggested that the FAA consider each operator's rules through the application review and approval process. The FAA agrees with this approach. Additionally, the ARC suggested that the rest rules apply to specific personnel with direct control of the vehicle or launch or reentry decision making. While the FAA agrees with the intent of requiring all safety critical personnel to adhere to rest rules, it does not want to limit safety critical personnel to the roles the ARC identified because it is prescriptive and does not allow for operational flexibility.
The FAA also agrees with the ARC that it is up to the company to monitor compliance with its rest rules. The FAA does not have an explicit requirement for an operator to monitor its employees, only that it documents and implements rest requirements. The FAA seeks comment on whether a specific requirement for operator monitoring would be necessary. Regardless, the FAA would monitor compliance on occasion with its inspection program, as it does today with current crew rest rules.
The FAA recognizes that launch and reentry operations are varied. The FAA considered using prescriptive requirements like those in § 431.43(c)(4) to address rest rules. However, there are many factors that can affect crew rest that make a prescriptive regulation impracticably complex and inflexible for allowing alternate methods of compliance that take into account mitigations and unique circumstances.
Section 450.151 would retain the current performance-based requirements of § 417.113(f) with modifications to include launch and reentry operations. The proposed requirements would cover operations of expendable, reusable, and reentry vehicles and allow an operator flexibility to employ rest rules that fit the particular operations. Current § 417.113(f) requires that crew rest rules govern the length, number, and frequency of work shifts, including the rest afforded the launch crew between shifts. Similarly, proposed § 450.151(a) would require an operator to document and implement rest requirements that ensure safety-critical personnel are physically and mentally capable of performing all assigned tasks. Proposed § 450.151(b) would provide additional requirements regarding the aspects of work shifts and rest periods critical to public safety, and would add a process for extending work shifts.
Proposed § 450.151(b)(1) would require an operator's rest rules to include the duration of each work shift and the process for extending this shift; including the maximum allowable length of any extension. This requirement would provide each operator with the flexibility to identify the duration of each work shift most suited to the operation such that safety-critical personnel are physically and mentally capable of performing all assigned tasks. It would also require a process for extending a work shift. Work shift length is important because performance decreases and fatigue increases as the length of the work shift increases. An operator should determine the optimum length for a work shift that ensures personnel are capable of performing their assigned tasks. Unforeseen circumstances can require personnel to work beyond the established work shift length. In such cases, under this proposal, the operator would be required to have a process for extending the work shift length up to a limit where personnel are no longer considered capable of performing their duties.
Proposed § 450.151(b)(2) would require an operator's rest rules to include the number of consecutive work shift days allowed before rest is required. This requirement would provide each operator with the flexibility to identify the number of consecutive work shift days safety-critical personnel may work such that they remain physically and mentally capable of performing all assigned tasks. Proposed § 450.151(b)(3) would require an operator's rest rules to include the minimum rest period required between each work shift, including the period of rest required immediately before the flight countdown work shift. An operator would also be required to identify the minimum rest period required after the maximum number of work shift days allowed. Having enough rest between work shifts is important to ensure personnel are able to perform critical tasks. The rest period before a countdown is particularly important because it can be affected by time of launch, reviews, and work needed to get a vehicle ready for operation.
The FAA also proposes to remove the term "crew" from the rest requirements. The use of "crew" can be misleading and limiting. Operators could interpret crew to be flight crew only, whereas the rest rules are intended to apply to any position affecting public safety. Under this proposal, an applicant would be required to submit rest rules to the FAA that demonstrate compliance with proposed § 450.151. The FAA would evaluate an operator's rest rules in the same way as it currently does under § 417.113(f) to ensure that personnel affecting public safety are mentally and physically capable of performing their duties during launch or reentry operations, and that the rest rules satisfy the requirements of proposed § 450.151.
While an operator would be able to create its own rest rules under proposed § 450.151, an applicant would also be able to use current rest rules. That is, § 431.43(c)(4) would be an acceptable means of compliance to proposed § 450.151. The FAA would evaluate other rest rules against this benchmark and relevant standards. 4. Radio Frequency Management
The FAA proposes to maintain the current substantive requirements of § 417.111(f) for radio frequency management and to expand the applicability of these requirements to RLVs and reentry vehicles in proposed § 450.153 (Radio Frequency Management). The FAA also would remove the current requirements to implement a frequency management plan and to identify agreements for coordination of use of radio frequencies with any launch site operator and local and federal authorities.
Under § 415.119 and appendix B of part 415, an applicant for a launch license is required to include a frequency management plan \97\ in its application, and that plan must satisfy the requirements of § 417.111(f). Specifically, current § 417.111(f) requires an operator to implement a frequency management plan that identifies each frequency, all allowable frequency tolerances, and each frequency's intended use, operating power, and source. The plan must also provide for the monitoring of frequency usage and enforcement of frequency allocations and identify agreements and procedures for coordinating use of radio frequencies with any launch site operator and any local and Federal authorities, including the FCC.
\97\ A radio frequency management plan describes how an operator manages radio frequencies to meet termination or tracking requirements.
While parts 431 and 435 do not contain explicit frequency management requirements, an operator is required to identify and mitigate hazards, including hazards associated with frequency management as part of the system safety process in § 431.35(c) and (d). Section 431.35(c) requires operators to perform a hazard analysis and identify, implement, and verify mitigations are in place.\98\
\98\ One such hazard is radio interference that could disable a commanded FSS. An operator might mitigate such a hazard by ensuring that the power level of the command transmitter is sufficient to ensure termination with high reliability (i.e., 0.999 at 95 percent). For reentry vehicles, radio frequencies for tracking are coordinated to ensure there is coverage where needed as well as communication with the vehicle.
Section 450.153 would replace the current requirement in § 417.111(f) to implement a frequency management plan. In proposed § 450.153(a), the FAA proposes to make these radio frequency management requirements applicable to any radio frequency used. This proposed requirement would include radio frequencies used not only in launch vehicles, but also in RLVs and reentry vehicles. Because radio frequency requirements are a mitigation for hazards associated with frequency management, the proposed requirements would not necessarily be new requirements for RLVs or reentry vehicles but would codify the need for radio frequency management for RLVs and reentry vehicles.
The FAA also proposes to maintain the substantive radio frequency requirements of current § 417.111(f) in proposed § 450.153(a). Although the increased use of autonomous termination systems makes frequency management less critical for flight termination, there are still many operators that use command termination systems. Moreover, these requirements remain applicable to autonomous termination systems because operators still need to allocate radio frequencies to telemetry and tracking. There are also other hazards, such as electromagnetic interference and induced currents, that can result from radio frequency interference and that require mitigation. Therefore, an operator would continue to be required to: (1) Identify each frequency, all allowable frequency tolerances and each frequency's intended use, operating power and source; (2) provide for monitoring of frequency usage and enforcement of frequency allocations; and (3) coordinate the use of radio frequencies with any site operator and any local and Federal authorities.
While no substantive changes are proposed to the radio frequency requirements, this proposal would remove the current requirement that an operator's frequency management plan identify agreements and procedures for coordinating the use of radio frequencies with any launch site operator and any local or federal authorities. Many of the agreements necessary for radio frequency management would be covered in proposed § 450.147.
In proposed § 450.153(b), an applicant would be required to submit procedures or other means to demonstrate compliance with the requirements of § 450.153(a) as part of its application. This requirement would provide an applicant flexibility in the manner of demonstrating compliance, such as using checklists or continuing to use a frequency management plan. 5. Readiness: Reviews and Rehearsals
The FAA proposes to revise and consolidate the readiness requirements of parts 417 and 431 into a performance-based regulation that would require an operator to document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. The FAA currently requires an operator to be ready to perform launch or reentry operations. Readiness, which is currently addressed through readiness reviews and rehearsals, has three components--readiness of the vehicle, of the personnel, and of the equipment. In consolidating these parts, the FAA proposes to remove the current requirements to conduct rehearsals, to poll the FAA at the launch readiness review, and to provide a signed written decision to proceed. The FAA also proposes to eliminate the specific review requirements of Sec. § 417.117 and 431.37.
Launch rates have increased substantially since the adoption of parts 417 and 431. In 2007, an operator might only launch one to three times a year. Currently, there are operators that have launch rates exceeding 20 launches per year. Readiness requirements have become overly burdensome as operators spend time on rehearsals and reviews that were meant to ensure readiness. Timing requirements have resulted in additional reviews or non-compliances. Operators in a high launch rate environment may not benefit much from rehearsals and added reviews.
Currently, § 417.117 requires that a launch operator (1) review the status of operations, systems, equipment and personnel required by part 417, (2) maintain and implement documented criteria for successful completion of each review, (3) track and document corrective actions or issues identified during the review, and (4) ensure that launch operator personnel overseeing the review attest to successful completion of the reviews criteria in writing. Section 417.117(b)(3) requires an operator to conduct a launch readiness review for flight within 48 hours of flight. The decision to proceed with launch must be in writing and signed by the launch director and any launch site operator or Federal launch range. The launch operator must also poll the FAA to verify that the FAA has not identified any issues related to the launch operator's license.
For RLV operations, § 431.37 requires an applicant to submit procedures that ensure readiness of the vehicle, personnel, and equipment as part of the application process. These procedures must involve the vehicle safety operations personnel and the launch site and reentry site personnel involved in the mission. The procedures must include a mission readiness review and specify that the individual responsible for the conduct of the licensed activities is provided specific information upon which he or she can make a judgement as to mission readiness.
Additionally, as part of the readiness requirements, § 417.119 requires an operator to rehearse its launch crew and systems to identify corrective actions necessary to ensure public safety that cover the countdown, communications, and emergency procedures, and it specifically directs the launch operator in how to conduct its rehearsals. Section 431.33(c)(1) similarly requires an applicant to monitor and evaluate operational dress rehearsals to ensure they are conducted in accordance with procedures required by § 431.37 to ensure the readiness of vehicle safety operations personnel.
The requirements of both parts 417 and 431 are prescriptive and do not provide an operator with much flexibility as to compliance. The lack of flexibility is evidenced by the issuance of waivers and documentation of non-compliances. This requirement has created a burden on operators because they must spend extra resources requesting waivers and responding to enforcement actions. Processing waivers and conducting additional reviews costs time and money for the FAA, as well. For example, § 417.117(b)(3) requires a flight operator to hold a launch readiness review no earlier than 48 hours before flight. Since 2007, the FAA has processed over 20 waivers to the 48-hour requirement. In situations where ELV operators have not requested a waiver to the timing requirement, they have held additional reviews just to meet the timing requirement of the flight readiness review. Additionally, the FAA has issued at least three enforcement letters because operators did not meet the timing requirement.
The ARC recommended that the FAA distill reviews down to intent, list the minimum items the FAA reviews, and let the operator inform the FAA in the license application where those items are and how they would be reported. The FAA agrees that specific reviews are not required and proposes a list of items required to address readiness. The FAA also agrees that specific rehearsals are not required because there are a variety of methods by which an operator could meet readiness requirements. As discussed later, the FAA proposes to remove the specific requirement for rehearsals.
The FAA proposes to revise and consolidate the readiness requirements of parts 417 and part 431 into proposed § 450.155, which would require an operator to document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. The FAA anticipates that under this proposal an operator would be able to achieve readiness by various methods including, but not limited to, readiness meetings, tests, rehearsals, static fire tests, wet dress rehearsals,\99\ training, and experience.
\99\ A wet dress rehearsal includes at least a partial fueling of a vehicle with a liquid propellant.
While current regulations require specific readiness reviews, proposed § 450.155 (Readiness) would remove the requirement for flight readiness reviews, including the requirements for a launch readiness review no earlier than 15 days before flight and the flight readiness review no earlier than 48 hours before flight. The FAA proposes to remove these requirements because it has found that multiple readiness reviews may not be necessary to demonstrate readiness. For instance, readiness can be determined by a single meeting close enough in time to the launch or reenty to ensure there have been no material changes to readiness, such as failure of a radar or telemetry system. Under the proposed rule, it would be up to the operator to propose how it would ensure readiness, and whether such procedures would include one or more readiness reviews, testing, or some other means.
By eliminating the timing requirements, operators with high launch rates could propose how they will ensure they are ready for launch and whether that involves one or more readiness reviews held close enough in time to the launch to ensure no significant changes occur between the review and the launch. Removing the specific requirements for reviews and tests would not relieve the operator from having to perform a test or hold a review that is necessary for determining readiness, rather it would provide the operator with flexibility to develop and propose those tests and reviews most suitable for the operation in order to ensure readiness. The FAA would evaluate and make a determination on the adequacy of the proposed procedures during the licensing process. The FAA plans to publish a draft means-of-compliance guide with the publication of the proposed rule, which should include acceptable approaches. In the long term, the FAA plans to refer to an AC or standard for every performance-based requirement.
Instead of requiring specific readiness reviews, proposed § 450.155 would require that an operator document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. As part of the application requirements, the operator would be required to demonstrate compliance with the requirements of proposed § 450.155 through procedures that may include a readiness meeting close in time to flight. Unlike Sec. § 417.117 and 431.37, proposed § 450.155 would not specify particulars of what the procedures must contain. However, the operator would be required to document and implement procedures that at a minimum address: (1) Readiness of vehicle and launch, reentry, or landing site, including any contingency abort location; (2) readiness of safety-critical personnel, systems, software, procedures, equipment, property and services; and (3) readiness to implement a mishap plan. The FAA proposes to require that the procedures address these particular areas because the FAA has determined that a safe launch or reentry, at a minimum, requires the vehicle, site, and safety personnel to be ready and all safety systems and safety support equipment to be working properly. Additionally, being prepared to implement a mishap plan would ensure that public safety is maintained during a mishap because personnel would be familiar with their roles and ready to perform their duties in order to return the vehicle and site to a safe condition after the mishap.
The FAA also proposes to remove the requirement that an operator poll the FAA at the launch readiness review and provide a signed certificate of the decision to proceed contained in § 417.117. This polling is unnecessary because the FAA will always inform the operator of any licensing issues as soon as the FAA becomes aware of them. The FAA also proposes to remove the requirement that an operator provide a signed certificate of the decision to proceed with launch or reentry operations because the FAA has not used any signed certificate required under § 417.117 for any launch or reentry. All the certificates have been filed and have not served any purpose other than to comply with the requirement under § 417.117. The FAA believes that removing the requirements to poll the FAA and to have a signed certificate to proceed would not affect public safety and would relieve burdens to comply with those requirements from the operator and the FAA.
The FAA proposes to remove the requirements in § 417.119 because rehearsals are not always needed to achieve readiness. It is important that the launch team be familiar with operations. Rehearsals are a good way to ensure proficiency with procedures, exercise communications and critical safety positions as a team, and identify areas where the operator needs to improve. However, the FAA acknowledges that rehearsals are not the only way to ensure the readiness performance requirement is met. This proposal would allow an operator to determine what methods would be best suited to ensure readiness for its operation. Operators that have high launch rates may not need to rehearse personnel that were involved in a similar launch days or weeks earlier. However, licensees that have not launched for a long time or that are launching for the first time may need rehearsals to meet some of the readiness requirements. Operators with high launch rates could demonstrate readiness with a readiness review and would not have to hold rehearsals, and training could fill gaps where actual operations do not provide familiarity with certain aspects of operations. For example, if no anomalies are experienced during actual operations, the operator could hold a rehearsal or provide additional training to exercise the anomaly resolution process.
Current § 417.117(b)(3)(xi) requires an operator to review launch failure initial response actions and investigation roles and responsibilities and § 417.119(c) requires an operator to have a mishap plan rehearsal; current § 431.45 contains the requirements for a mishap plan for RLVs. Section 450.155(a)(3) would require an operator to document and implement procedures to ensure readiness to implement a mishap plan in the event of a mishap. The proposal would allow flexibility to meet the readiness requirement for implementing a mishap plan by allowing an operator to propose a procedure acceptable to the FAA. Thus, an operator would have the ability to develop procedures to ensure readiness through training, rehearsals, or other means that might be more applicable to its vehicle and mission. The FAA would still expect an operator to review any lesson learned, corrective action, or changes to procedures resulting from any mishap plan rehearsals or mishap investigations.
Under § 450.155(b), an applicant would need to demonstrate compliance with the requirements through procedures that may include a readiness meeting close in time to flight and describe the criteria for establishing readiness to proceed with the flight of a launch or reentry vehicle. 6. Communications
Currently, the FAA requires operators to implement communications plans to ensure that clear lines of authority and situational awareness are maintained during countdown operations. The communications plan was the result of a 1993 NTSB investigation discussed earlier. One of the contributing factors identified in the investigation was the lack of clear communications between different ranges and the operator. The FAA requirements for communications plans are currently found in Sec. § 417.111(k) and 431.41 and are nearly identical. Currently, Sec. § 417.111(k) and 431.41 require an operator to implement a communications plan. Part 435 requires a reentry vehicle operator to comply with the safety requirements of part 431, including § 431.41. Both Sec. § 417.111(k) and 431.41 require an operator's communications plan to define the authority of personnel, by individual or position title, to issue "hold/resume," "go/no-go," and abort commands; assign communication networks so that personnel have direct access to real-time safety-critical information required to issue "hold/ resume," "go/no-go," and any abort decisions and commands; ensure personnel monitor common intercom channels during countdown and flight; and implement a protocol for using defined radio telephone communications terminology.
Additionally, § 431.41(b) requires that the applicant submit procedures to ensure that the licensee and reentry site personnel receive copies of the communications plan, and that the reentry site operator concurs with the plan. For launches from a Federal launch range, § 417.111(k) also requires the Federal launch range to concur with the communications plan.
Operators launching from Federal launch ranges comply with § 417.111(k). Operators submit a communications plan during the application process and coordinate with the Air Force. The communications plan includes lines of authority, identification of who has access to which channels, protocols for communication and procedures for decision processes. Often, the communication plan is not fully developed at the time the operator applies for a license, so operators often submit a representative plan during the application process and then provide a final plan prior to the first launch under a license.
The FAA proposes to retain the substantive communications requirements in Sec. § 417.111(k) and 431.41 in § 450.157 (Communications), in paragraph (a), and remove the specific requirement to implement a communications plan. Section 450.157(b) would also require an operator to ensure currency of the communication procedures, similar to the current requirement in § 417.111(e). The FAA would preserve these requirements because all key participants must work from the same communications procedures in order to avoid miscommunication that could lead to a mishap.\100\
\100\ NTSB Special Investigation Report: Commercial Space Launch Incident, Launch Procedure Anomaly Orbital Science Corporation, Pegasus/SCD-1, 80 Nautical Miles East of Cape Canaveral, Florida (February 9, 1993); at p. 53.
Section 450.157(c) would require an operator during each countdown to record all safety-critical communications network channels that are used for voice, video, or data transmissions to support safety-critical systems. This is substantially the same requirement as in Sec. § 417.111(l)(5)(vii) and 431.41. The FAA would retain this requirement because communications recording is often critical to mishap investigations.
Lastly, the FAA would not require operators to submit communication procedures during the application process because generally such procedures are not mature at the time of application, and hence are unlikely to be the ones used during the actual countdown. Under the proposal, the FAA would not approve the communications procedures prior to licensing and would rely instead on an inspection process that ensures the operator is following the requirements for communications procedures. These inspections would be consistent with current practice, where FAA inspectors often review the operator's final communications procedures. Given that the FAA would no longer require demonstrations of compliance at the application stage for communications and preflight procedures, operators may be required to make revisions to those procedures to resolve issues identified during compliance monitoring. 7. Preflight Procedures
Under § 417.111(l), an operator is required to develop and implement a countdown plan that verifies each launch safety rule and launch commit criterion is satisfied, personnel can communicate during the countdown, the communication is available after the flight, and a launch operator will be able to recover from a launch abort or delay. This countdown plan must cover the period of time when any launch support personnel are required to be at their designated stations through initiation of flight. It also must include procedures for handling anomalies that occur during countdown and any constraints to initiation of flight, for delaying or holding a launch when necessary, and for resolving issues. It must identify each person by position who approves the corrective actions, and each person by position who performs each operation or specific action. It also must include a written countdown checklist that must include, among other items, verification that all launch safety rules and launch commit criteria have been satisfied.
In case of a launch abort or delay, the countdown plan must identify each condition that must exist in order attempt another launch, including a schedule depicting the flow of tasks and events in relation to when the abort or delay occurred and the new planned launch time, and identify each interface and entity needed to support recovery operations. Currently § 415.37(a)(2) requires that the applicant file procedures that ensure mission constraints, rules and abort procedures are listed and consolidated in a safety directive or notebook. Similarly, the mission readiness requirements of § 431.37(a)(2) require that procedures that ensure mission constraints, rules, and abort plans are listed and consolidated in a safety directive notebook.
Currently some operators have paper notebooks containing all the checklists and countdown plans. These notebooks are updated frequently, even up to the day before a launch with change pages by every member of the launch team. This process can sometimes lead to confusion and configuration issues. Other operators have electronic systems that contain all the checklists and countdown procedures. There are many advantages to electronic records, such as ease of dissemination and configuration control. As electronic file use becomes more common, the need for a physical notebook becomes unnecessary. What is critical for safety is that all launch personnel have the same set of procedures. Due to the dynamic nature of countdown procedures, operators provide checklists and procedures used in prior launches to meet the application requirements. The FAA evaluates these checklists and procedures during the license evaluation. However, because the checklists and procedures being evaluated are not final, operators must submit all updates to these documents as part of the continuing accuracy of the license requirements. FAA inspectors ensure the checklists and procedures are the most current, and that configuration control is maintained.
The FAA proposes to streamline the current countdown procedures and requirements in Sec. § 415.37(a)(2), 417.111(l), and 431.39(a)(2) and replace them in § 450.159 (Preflight Procedures). In doing so, the FAA proposes to remove the requirements for safety directives or safety notebooks and for a countdown plan, and the requirement to file such plans because there are many methods of documenting the preflight procedures that do not involve a plan or notebook. Although the proposed preflight procedures would not be required to be submitted as part of the license application process, FAA inspectors would still ensure that such preflight procedures are implemented.
Unlike the current regulations, the FAA proposes a performance-based requirement where an operator would need to implement preflight procedures would verify that all flight commit criteria are satisfied before flight and that ensure the operator is capable of returning the vehicle to a safe state after a countdown abort or delay.\101\ This aligns with the intent of current regulations while permitting flexibility on how the safety goal is achieved. As a result, there would be no impact on safety resulting from the removal of the current prescriptive requirements.
\101\ A countdown abort includes launch scrubs, recycle operations, hang-fires, or any instance in which the launch vehicle does not lift-off after a command to initiate flight has been sent.
Additionally, proposed § 450.159(b) would require an operator to ensure the currency of the preflight procedures, and that all personnel are working with the approved version of the preflight procedures, similar to the current requirement in Sec. § 415.37(a)(3) and 431.39(c). The FAA would preserve these requirements because all key participants must work from the same preflight procedures in order to avoid a mishap.
The FAA anticipates that the current requirements of § 417.111(l)(1) through (6) would be a means of compliance under the proposal, but not the only means of compliance. By allowing alternative means of compliance, the proposed regulations would provide greater operational flexibility and procedure streamlining across all operation types. 8. Surveillance and Publication of Hazard Areas
The FAA proposes to adopt surveillance of a flight hazard area regulations based on recent granted waivers and to better align with current practices at the Federal launch ranges, where most commercial launches take place, and to codify current practice that eliminates unnecessary launch delays while maintaining public safety. This proposal would only alter the substantive requirements applicable to the surveillance of ship (waterborne vessel) hazard areas not the surveillance of land or aircraft hazard areas. Therefore, this discussion will focus primarily on the proposal's effect on the surveillance of waterborne vessel hazard areas. The specific requirements for conducting a flight hazard area analysis are discussed later in the preamble.
Current regulations on establishing and surveilling hazard areas, including ship hazard areas, for ELVs are found in Sec. § 417.205 \102\ and 417.223 \103\ and part 417, appendix B.\104\ Part 431 does not set explicit requirements for the surveillance of waterborne vessel hazard areas, and the FAA has not yet issued a license under part 431 over water. However, both Sec. § 417.107(b)(2) and 431.35(b)(1)(ii) require that an operator ensure all members of the public are cleared of all regions, whether land, sea, or air, where any individual would be exposed to more than 1 x 10-6 PC. Although not explicit, the current regulations for ELV and RLV operations effectively require surveillance and evacuation of all regions where the individual risk criterion would be violated by the presence of any member of the public.
\102\ Section 417.205 requires the flight safety analysis to employ risk assessment, hazard isolation, or a combination of risk assessment and partial isolation of the hazards to demonstrate control of risk to the public.
\103\ Section 417.223 requires, in part, that an FSA include a flight hazard area analysis that identifies any regions of land, sea, or air that must be surveyed, publicized, controlled, or evacuated in order to control the risk to the public from debris impact hazards.
\104\ Section B417.5(a) of appendix B to part 417 states that a launch operator must perform a launch site hazard area analysis that protects the public, aircraft, and ships from the hazardous activities in the vicinity of the launch site.
The net effects of the current ELV regulations are: (1) An operator must establish a ship hazard area sufficient to ensure the PI for any ship does not exceed 1 x 10-5 for any debris that could cause a casualty, (2) an operator must monitor the ship hazard area prior to initiating the flight operation, and (3) if a large enough ship enters the waterborne vessel hazard area to exceed the 1 x 10-5 PI criterion, then the launch must be scrubbed or delayed until the ship exits the hazard area. Appendix B to part 417 directs a launch operator to evacuate and monitor each launch site hazard area to ensure compliance with the risk criteria in § 417.107(b)(2) and (3) and provide an adequate methodology to achieve this end. The FAA designed this methodology to be consistent with Air Force range safety requirements in 2006 and to ensure that the cumulative PI to any ships would not exceed 1 x 10-5 for any debris expected to exceed the kinetic energy or overpressure thresholds established by § 417.107(c).
Current § 417.223(b) requires public notices for flight hazard areas. A flight hazard area analysis must establish the ship hazard areas for notices to mariners that encompass the three-sigma impact dispersion area for each planned debris impact.\105\ Section 417.121(e) contains procedural requirements for issuing notices to mariners (and airmen). Furthermore, § 417.111(j) requires a launch operator to implement a plan that defines the process for ensuring that any unauthorized persons, ships, trains, aircraft or other vehicles are not within any hazard areas identified by the FSA or the ground safety analysis. In the plan, the launch operator must list each hazard area that requires surveillance to meet Sec. § 417.107 and 417.223, as well as describe how the launch operator will provide for day-of-flight surveillance of the flight hazard area to ensure that the presence of any member of the public in or near a flight hazard area is consistent with flight commit criteria developed for each launch. In practice, these regulations have been comprehensive enough to ensure public safety, but at times overly prescriptive and unduly conservative.
\105\ In addition, a flight hazard area analysis must establish the aircraft hazard areas for notices to airmen that encompass the 3-sigma impact dispersion volume for each planned debris impact.
The FAA has waived several waterborne vessel protection requirements \106\ in light of advanced ship monitoring technology and risk calculation models. The FAA's first waiver of the § 417.107(b)(3) requirement illustrates the need for this proposed change.\107\ In approving the first waiver and numerous subsequent waivers to enable the proposed option, the FAA assessed the technological advances previously discussed. In this assessment, the FAA reviewed the Federal launch range input data and probabilistic casualty models that the Air Force at the 45th Space Wing uses to quantify individual and collective risks to people on waterborne vessels during the launch countdown for space launch missions. The FAA found that the 45th Space Wing's public risk analyses use accurate data and scientific methods that are mathematically valid, with reasonably conservative assumptions applied in areas where significant uncertainty exists. In that instance, the FAA performed independent analyses using alternative methods to estimate the casualty risks for multiple foreseeable scenarios involving debris impacts on various types of waterborne vessels and found that large passenger vessels anywhere between the launch point and the first stage disposal zone can contribute significantly to the estimated EC from a launch. The FAA also found that small boats (too small to have Automatic Identification System (AIS) required \108\) located close to the launch point should not produce significant individual risks. However, no past waivers involved changes in the areas where surveillance was mandatory in current practice, only where ships were allowed to be present in order for the launch to proceed.
\106\ For example, see Waivers of Ship Protection Probability of Impact Requirement, 81 FR 28930 (May 10, 2016).
\107\ 81 FR 28930 (May 10, 2016).
\108\ AIS is required on commercial vessels 65 feet in length or more, towing vessels 26 feet in length or more, and other self-propelled vessels certified to carry more than 150 passengers or carrying dangerous cargo.
Section 450.161 (Surveillance and Publication of Hazard Areas) would require an operator to publicize, survey, and evacuate each flight hazard area before initiating flight or reentry, to the extent necessary to ensure compliance with proposed § 450.101. Proposed § 450.161(a) does not change the need for surveillance relative to the current requirements in parts 417 or 431 for people on land or aircraft because the proposal would continue to require that an operator ensure all regions where any individual member of the public would be exposed to more than 1 x 10-6 PC are evacuated. However, the proposal would remove the requirement to evacuate and monitor areas where a waterborne vessel would be exposed to greater than 1 x 10-5 PI currently required by Appendix B to part 417, paragraph 417.5(a).
The FAA proposal to include people on ships in the collective risk computation (see proposed § 450.101(a)(1) and (b)(1)) would explicitly allow the application of risk management principles to protect people on waterborne vessels. For example, an applicant could apply conservative estimates of the ship traffic and vulnerability to demonstrate acceptable public risks. In proposed § 450.161(a), surveillance would only be required to the extent necessary to ensure compliance with the public safety criteria, including individual and collective risks as well as notification of planned impacts from normal flight events capable of causing a casualty. For instance, an operator would not need to perform surveillance of areas where the risk to any individual would be no more than 1 x 10-6 PC, unless surveillance was necessary to ensure acceptable collective risks.
The proposal would generally allow operators the option to use the current approach in part 417, where surveillance is required to ensure no ship is exposed to more than 1 x 10-5 PI, because that would generally be sufficient to ensure compliance with proposed § 450.101. In addition, the proposal would also provide the option for launch and reentry operators to use the new technology, including modern surveillance techniques, and include people in waterborne vessels as part of the collective risk calculation as approved by previous waivers.\109\ Current practice is to issue waivers to operators as an alternative to scrubbing or delaying a launch or reentry due to waterborne vessels in an area where the PI exceeds 1 x 10-5. Thus, the proposal would curtail the need for waivers.
\109\ 81 FR 28930 (May 10, 2016).
While the proposal would relax the current part 417 requirement to ensure that no ship is exposed to more the 1 x 10-5 PI, the FAA notes that the requirement to ensure no ships are present in areas where the individual risk exceeds 1 x 10-6 PC is consistent with international guidelines. The International Maritime Organization (IMO) is the United Nations organization for safety and environmental protection regulations for maritime activities. The IMO has developed a risk-based approach to safety and environmental protection regulations, which identifies a key threshold of one in a million (1 x 10-6) probability of fatality per year for individual crewmembers, passengers, and members of the public ashore (considered third parties by the IMO). The IMO guidelines equate individual risks at the 1 x 10-6 probability of fatality per year as broadly acceptable for maritime activities, and specifically state that individual risks below this level are negligible and no risk reduction required. The proposed § 450.101(a)(2) and (b)(2) requirements would ensure that no person will be present on ships where the individual risk exceeds 1 x 10-6 PC . This requirement is consistent, and reasonably conservative, with respect to the IMO guidelines as explained in the RCC 321-07 Supplement.\110\ Thus, the FAA proposes to codify requirements for the development and surveillance of ship hazard area that are reasonably consistent with IMO guidelines for formal safety assessments.
\110\ Range Commanders Council Risk Committee of the Range Safety Group, Common Risk Criteria for National Test Ranges: Supplement. RCC 321-07 Supplement, White Sands Missile Range, New Mexico, 2007, p. 5-50.
As previously discussed, there were important advances in ship surveillance techniques in recent years. In the past, observation techniques posed significant risks to launch operators. For example, the only known deaths related to launch operations at Cape Canaveral were five occupants of a helicopter that crashed at sea shortly after 2 a.m. on April 7, 1984, while flying surface surveillance for the scheduled launch of a Trident 1 missile from the USS Georgia.\111\ In many cases, the proposal would relieve the requirement for the type of surveillance that posed significant risks to launch operators in the past.
\111\ Air Force News Print Today (Apr. 8, 2011).
Section 450.161(b) would require surveillance sufficient to verify or update the assumptions, input data, and results of the flight safety analyses. Given there are numerous assumptions and input data that are critical to the validity of the flight safety analyses, this requirement could have a variety of surveillance implications beyond the surveillance necessary to ensure the public exposure at the time of the operation is consistent with the assumptions and input data for the flight safety analyses. For example, an FSA could assume that a jettisoned stage remains intact to impact or breaks up into numerous pieces that are all capable of causing casualties to people in a class of aircraft (e.g., business jets). An operator would be required to employ some type of surveillance (e.g., telemetry data, or remote sensors such as a camera or radar) to verify that the jettisoned stage behaves as assumed by the FSA if that behavior is germane to the size of the aircraft hazard area.
Additionally, § 450.161(c) would require an applicant to publicize warnings for each flight hazard area, except for regions of land, sea, or air under the control of the vehicle or site operator or other entity by agreement. If the operator relies on another entity to publicize these warnings, the proposal requires the operator to verify that the warnings have been issued. The FAA notes that some operators already follow this practice. The proposed requirements would allow warnings that are consistent with current practice but would also allow more flexibility for warnings to mariners in accordance with proposed § 450.133(b). Notably, § 450.133(b)(1) would be consistent with current practice at the Federal launch ranges based on input from the CSWG, and § 450.133(b)(2) and (3) are based on current U.S. Government consensus standards).\112\ Proposed § 450.161(d) would also require an applicant to describe how it will provide for day-of-flight surveillance of flight hazard areas, if necessary, to ensure that the presence of any member of the public in or near a flight hazard area is consistent with flight commit criteria developed for each launch or reentry.
\112\ RCC 321-17 Standard.
This proposal is consistent with the executive branch policy to replace prescriptive requirements with performance-based criteria.\113\ Specifically, the FAA proposes to replace the "one-size-fits-all" approach to ship protection that effectively prevents launch or reentry operations to proceed if ships are in identified hazard areas irrespective of the estimated risks posed to people on those vessels. For example, during the launch of the Falcon 9 from CCAFS to deliver the SES-9 payload to orbit, SpaceX was delayed by the presence of a tug boat towing a large barge inside the ship hazard area in compliance with the FAA's requirement in § 417.107(b) to limit the PI for waterborne vessels to 1 x 10-5.\114\ Under the proposal, delays such as this would be avoided without the need for waivers. The FAA proposes to replace the "one-size-fits-all" approach with the performance-based criteria of the collective and individual risk limits in proposed § 450.101, and in doing so would require an operational delay only when necessary to ensure acceptable individual and collective risks. This approach was safely and successfully used, by waiver, for all Falcon 9 launches from the CCAFS and KSC starting in 2016. The FAA seeks comment on the proposed approach.
\113\ SPD-2 (May 24, 2018), at Section 2b.
\114\ 81 FR 28930 (May 10, 2016).
Application of public risk management for the protection of people in waterborne vessels has the potential for reducing launch costs by reducing the number of operational delays and scrubs due to ships in areas where the individual and collective risks are nevertheless acceptable. Because it is a major procurer of launch services, reduced launch costs would be of direct benefit to the U.S. Government. It would also help to make the U.S. launch industry more competitive internationally by reducing launch delays and scrubs. 9. Lightning Hazard Mitigation
The FAA proposes to remove appendix G to part 417 and replace it with the performance-based requirements of § 450.163 (Lightning Hazard Mitigation). The current requirements in appendix G to part 417 are outdated, inflexible, overly conservative, and not explicitly applicable to many RLVs and reentry vehicles.
Lightning is an atmospheric discharge of electricity, and can either occur naturally or be "triggered." Triggered lightning can be initiated as a result of a launch vehicle and its electrically-conductive exhaust plume passing through a strong pre-existing electric field.\115\ However, the triggering phenomenon is unpredictable because there are many conditions that must occur in order for the breakdown of the electric field resulting in a lightning strike to occur. One condition is the enhancement factor of the launch or reentry vehicle that acts as a conductor. The extremities of the vehicle, such as the nose radius of curvature coupled with the effective length of the vehicle (taking into account the plume length) will establish the viability of a lightning strike. Furthermore, a launch vehicle's propellants will have different conductivity characteristics, leading to varying lengths; \116\ as a result, not every vehicle will trigger a lightning strike under the same environmental conditions. This unpredictability is exacerbated further by the fact that a triggered lightning strike can occur even when the vehicle is penetrating a benign cloud, or is outside a cloud that is not producing lightning.
\115\ Roeder, William P. and Todd M. McNamara, A Survey Of The Lightning Launch Commit Criteria, American Meteorological Society, Aviation Range and Meteorology Conference.
\116\ E. P. Krider, M. C. Noogle, M. A. Uman, and R. E. Orville. "Lightning and the Apollo 17/Saturn V Exhaust Plume," Journal of Spacecraft and Rockets, Vol. 11, No. 2 (1974), p. 72-75.
Lightning can and has caused or necessitated the destruction of launch and reentry vehicles in flight. This destruction may occur both by physical damage (direct effect) to structural or electronic components from lightning attachment to the vehicle and by damage or upset to electronic systems from a nearby discharge (indirect effect). The direct and indirect effects of a lightning discharge pose hazards to the safety critical systems of launch and reentry vehicles, such as the FSS. If damage to the vehicle's safety critical components renders it inoperable or causes safety-critical systems to malfunction, there may be no way to stop the vehicle from reaching the public. For example, the damage may cause the command signal that instructs the vehicle to stop thrusting, or to abort the mission, to not be received.
Two such triggered lightning events occurred in 1969 and 1987, during ascent. In 1969, when a manned Apollo XII \117\ vehicle lost power to its Command Module, the launch was seconds away from beginning initiation of its abort command. In 1987, an unmanned ELV lost its guidance, navigation and control \118\ and began careening towards the range safety impact limit lines. The range safety officer had to terminate its flight.
\117\ Merceret et al., ed., A History of the Lightning Launch Commit Criteria and the Lightning Advisory Panel for America's Space Program. NASA/TP-2010-216283, 10, Section 2.3 (August 2010).
\118\ Merceret et al., ed., A History of the Lightning Launch Commit Criteria and the Lightning Advisory Panel for America's Space Program. NASA/TP-2010-216283, 31, Section 4.3.2 (August 2010).
These two incidents led to the establishment of the present-day lightning launch commit criteria (LLCC), which the Air Force and NASA adhere to for all launches from a Federal launch range. The Lightning Advisory Panel (LAP),\119\ an advisory body to the Air Force and NASA, is responsible for reviewing and proposing modifications to the LLCC. Adherence to the LLCC has resulted in zero lightning-caused launch incidents for over thirty years.
\119\ The LAP's expertise range from in-depth knowledge of the physics of lightning, electric fields, and clouds, to lightning impacts on launch vehicles and statistics of electric field strength in specific environmental conditions. Its membership is primarily academia, although the Air Force and NASA fund this organization.
The FAA codified the LLCC into Appendix G to part 417 to address concerns that the direct and indirect effects of a natural or triggered lightning strike may disable a vehicle's FSS such that the launch operator could not stop the vehicle if it veered outside the impact limit lines (i.e., due to degraded signal). The FAA renamed these requirements to "Lightning Flight Commit Criteria" (LFCC).
The LFCC in appendix G to part 417 consist of 10 natural and triggered lightning avoidance rules that provide criteria to minimize the risk of a launch vehicle being struck by lightning or triggering lightning. One rule contains criteria for avoiding natural lightning, the remaining nine contain avoidance criteria for triggering or initiating lightning when flying through, or near, specific cloud types or phenomena known to produce natural or triggered lightning. Taking into account the electrification process and the properties of electric fields within clouds, the triggered lightning rules establish time and distance requirements for distinct cloud types (e.g., cumulus cloud, attached or detached anvil cloud, thick clouds) believed to contain the necessary environmental conditions to produce elevated electric fields. These time and distance criteria help mitigate the threat of triggering lightning by increasing the probability that the electric field, at a given distance or after a length of time, will be below the threshold needed to produce lightning. Other rules contain prescriptive requirements and thresholds for not launching if there are high-surface electric fields as measured by a ground-based field mill, or if there is a threat of a vehicle becoming charged if it penetrates a cloud that contains frozen precipitation.\120\
\120\ Triboelectrification is a phenomenon that can occur when a launch vehicle flies through a region in a cloud that contains frozen precipitation. Under the right conditions, frozen precipitation can deposit a charge on the vehicle. If the launch vehicle is not treated, an electrostatic discharge could result.
Unfortunately, codifying the LLCC into appendix G of part 417 has led to two major challenges. First, because the science behind triggering lightning is not fully known, the criteria were developed with a margin of safety for large ELVs, such as the Titan IV. As a consequence, the criteria may be overly conservative for certain types of vehicles. While the LAP has updated the LLCC to keep pace with the advances in science and technology, the FAA rulemaking process is lengthy, and does not permit appendix G to be updated with the frequency necessary to keep up with the changes to the LLCCs. Revisions to appendix G are likely to be out-of-date by the time they are finalized and published. As a result, appendix G preserves much of the original LLCCs outdated standards, which leaves a discrepancy between the LLCC and appendix G.
In an effort to address this issue, the FAA made four ELOS determinations. The first ELOS determination permitted the use of a new maximum radar reflectivity method \121\ to determine whether the radar reflectivity values were below the risk threshold for triggering lightning in the cloud. Because this new measurement technique was not in appendix G, the launch operator could not benefit from this improvement unless it requested and received approval to use this technique rather than follow the criteria currently in appendix G. The ELOS determination relieved the burden on the operator to seek approval to use a different radar reflectivity measurement process; therefore, allowing more opportunity for the launch operator to take advantage of the improvement rather than wait until a final rulemaking incorporated the change.
\121\ This radar reflectivity method allowed measurement of a hydrometeor by a radar with a wavelength of less than 5 centimeters but greater than 3 centimeters if: (1) The surface of the radome of the radar was hydrophobic and the precipitation rate at the radar site was less than 15 mm/hr (0.59 in/hr) rainfall equivalent, and (2) For each point that was measured, the horizontal extent of composite radar reflectivity greater than lOdBZ along the line of sight between the radar and the point did not exceed the reflectivity extent in kilometers for a 3 cm radar due to radar beam attenuation.
When the LAP updated the LLCCs again, the FAA issued a second ELOS determination reducing the distance requirement for the flight path of the launch vehicle in relation to a thick cloud, if the radar reflectivity thresholds were satisfied.\122\ The issuance of this ELOS determination was necessary to enable operators to use the most recent thick cloud rule without needing to seek individual ELOS determinations from the FAA or waiting for the FAA to update appendix G through a rulemaking.
\122\ The Launch operator can launch within 5nm of a thick cloud layer if the radar reflectivity is below 0 dBZ.
The third ELOS determination also resulted from an update to the LLCCs and allowed for use of a shorter radar wavelength to measure radar reflectivity if the criteria for attenuation due to rainfall and beam spreading were met. This modification allowed a launch operator to make use of weather radars that have wavelengths between 3 and 5 cm, in addition to radars with wavelengths of 5 cm or greater. Similar to the other ELOS determinations, this relieved the burden from the operator to seek approval from the FAA, and allowed the operator to immediately use different radar wavelengths or wait until the FAA updated appendix G.
The fourth ELOS determination informed the launch operator that satisfying NASA-STD-4010 would meet the requirements of appendix G to part 417.\123\ This ELOS determination enabled an operator to use the more up-to-date LLCC in place of the outdated LFCC in appendix G. It also recognized that the NASA-STD-4010 contained the most current LLCCs and removed the burden from the FAA to issue an ELOS determination for every new update to the LLCC.
\123\ The NASA-STD-4010 has been adopted by both NASA and the Air Force. When NASA published the LLCCs in a NASA Standard document it provided uniform engineering and technical requirements in one location lessening confusion to which version of the LLCCs were currently being applied.
The FAA only codified the LFCCs into part 417, and not parts 431 and 435. While the LFCCs are not explicitly included in part 431 or 435, § 431.35(c) requires an applicant to employ a system safety process to identify and mitigate hazards, including lightning. Additionally, while not all launch and reentry vehicles have the same threshold to trigger lightning, they do have the potential to incur direct or indirect effects that may impact their safety critical systems. Therefore, in order to protect public health and safety, the LFCCs are an appropriate mitigation strategy for suborbital RLVs and reentry vehicles that can induce lightning that could affect public safety. In 2006, the FAA sponsored a study to conduct a triggered lightning risk assessment for five different concept suborbital RLVs, from two different launch sites, to gain an understanding of the potential risk of triggering lightning for these new categories of vehicles.\124\ The study took into account the vehicle design, mission profile, and propellants, as well as the lightning climatology of a given launch site.
In 2010,\125\ a follow-on study was performed for four concept vehicles at a total of four different launch sites.\126\ The study showed that all concept vehicles had a much higher triggering threshold (i.e., it was harder to initiate lightning) than that of a Titan IV ELV and that they each had different triggering thresholds within each concept vehicle and phase of mission. For instance, the glide phase was shown to have a higher triggering threshold than a powered phase. On the other hand, the study noted that many uncertainties remain with understanding the triggering conditions. Therefore, the results of the study recommended that until more accurate triggering thresholds for the differing vehicle concepts can be quantified, the avoidance criteria should be followed. The FAA requests comments on this proposal.
\124\ Krider, Phil, E. et al., Triggered Lightning Risk Assessment for Reusable Launch Vehicles at the Southwest Regional and Oklahoma Spaceports, Report No: ATR-2006(5195)-1, Jan 30, 2006 (https://www.faa.gov/about/office_org/headquarters_offices/ast/reports_studies/media/ATR-2006(5195)-1.pdf).
\125\ Krider, Phil, E., et al., Triggered Lightning Risk Assessment for Reusable Launch Vehicles at Four Regional Spaceports, Report No: ATR-2010(4387)-1, Apr 30, 2010. (https://www.faa.gov/about/office_org/headquarters_offices/ast/reports_studies/media/ATR-2010%20(5387)-1.pdf).
The ARC recommended the intent or performance goal of the current LFCC be captured into performance-based requirements that allow for the consideration of each launcher's mission profile, general vehicle and flight safety system components, and other factors that may reduce the currently-required 30-minute wait.\127\ The ARC also recommended that the prescriptive requirements in Appendix G be placed in a guidance document that provides acceptable means of meeting the performance-based requirements. Finally, the ARC estimated that launch and site operators could save hundreds of thousands of dollars, or more, for each avoidance of launch scrubs and no-go calls due to unnecessarily conservative weather restrictions.
\127\ The ARC stated, "intent or performance goal, of the stated requirements." The FAA has interpreted the phrase "of the stated requirements" to mean of the current LFCC found in appendix G to part 417.
The FAA generally agrees with the ARC's recommendation and proposes to replace the detailed prescriptive LFCC in appendix G with performance-based requirements in proposed § 450.163. It would also provide an AC that contains an accepted means of compliance with the proposed § 450.163(a)(1), including reference to NASA-STD-4010 \128\ and would also include other relevant standards for the design of a vehicle to withstand the direct and indirect effects of a lightning discharge. The FAA seeks comment on this approach.
\128\ NASA-STD-4010 is the current lighting launch commit criteria employed by NASA and the Air Force. The FAA uses this standard as its basis for the requirements in Appendix G and has issued a broad-based ELOS determination allowing an operator to comply with the current NASA-STD-4010 instead of the existing Appendix G which is outdated.
The FAA anticipates that a performance-based regulation, accompanied by an associated AC and government standards, would resolve many of the issues with the current Appendix G. While a thorough understanding of whether a given launch vehicle and its mission profile will trigger lightning is far from being understood, a performance-based requirement for mitigating natural and triggered lightning strikes or encountering a nearby lightning discharge would allow an operator to use up-to-date lightning avoidance criteria without having to wait for the regulation to be updated, or for the FAA to issue an ELOS determination or a waiver.
The intent of the current requirements found in Appendix G to part 417 is to avoid and mitigate natural and triggered lightning. Under the proposed regulations, the FAA would require operators to avoid and mitigate the potential for intercepting or initiating lightning strike or encountering discharge through implementation of flight commit criteria. Alternatively, an operator would be able to use a vehicle designed to continue safe flight if struck by lightning or encountering a nearby discharge. Finally, an operator would be able to comply with the proposed regulation by ensuring that compliance with public safety criteria would be met in the event of a lightning strike on the vehicle.
Proposed § 450.163(a)(1), would require an operator to mitigate the potential for a vehicle to intercept or initiate a lightning strike or encounter a nearby discharge through flight commit criteria using a means of compliance accepted by the Administrator. Currently, the FAA is only aware of one standard, NASA-STD-4010, that is currently acceptable and would satisfy the requirements of proposed § 450.163(a)(1). While FAA anticipates that industry might develop new standards as technology advances, such standards would be required to be submitted as alternative means of compliance under § 450.35 (Accepted Means of Compliance) paragraph (c) and accepted by the Administrator prior to use. If an operator were to submit an alternative means of compliance to NASA-STD-4010, the proposed lightning standard would need to be evaluated and accepted by the FAA, including any consultation with outside expert, prior to being used in any license application using the new standard.
The FAA anticipates that this revision would provide more flexibility to an operator than the current appendix G, which prescribes the specific lightning flight commit criteria that an operator must use. While the only method currently accepted by the Administrator is NASA-STD-4010, operators would have the flexibility to propose lightning flight commit criteria based on a certain vehicle's mission profile (e.g., whether it is a piloted RLV launching a payload to low Earth orbit, or a piloted suborbital reusable launch vehicle with spaceflight participants on board).\129\ However, as previously discussed, such a proposed means of compliance would need to be accepted prior to being used in a license application to satisfy proposed § 450.165(a)(1).
\129\ The piloted vehicles can control and maneuver the vehicle leading up the release point or area thus limiting the exposure of the vehicle to elevated electric fields upon its launch.
An operator may choose instead to mitigate lightning strikes and the initiation of lighting by using a vehicle designed to continue safe flight in the event of a lightning strike, in accordance with proposed § 450.163(a)(2). To accomplish this, an operator would need to demonstrate that the vehicle design adheres to design standards for lightning protection of the vehicle and its safety critical systems. The FAA is currently evaluating current aircraft lightning protection standards, such as AC 20-136B and AC20-107B, to determine whether a launch or reentry vehicle designed to those standards would allow for the continued safe flight of the vehicle.\130\ The FAA anticipates that it would accept other industry standards for lightning protection or certification standards during vehicle design, such as SAE Aerospace Recommended Practices, or European Organization for Civil Aviation Equipment, as an acceptable means of compliance to proposed § 450.163(a)(2).
\130\ AC 20-136B, Aircraft Electrical and Electronic Lightning System Lightning Protection, provides information and guidance on the protection of aircraft electrical and electronic systems from the effects of lightning. AC 20-107B, provides information and guidance on composite aircraft structure.
Finally, an operator would be able to choose to comply with proposed § 450.163(c) by ensuring that it would be in compliance with the public safety criteria of proposed § 450.101 should it encounter discharge or take a direct lightning strike. The use of physical containment as a hazard control strategy would be a prime example, but other scenarios may also apply.
Section 450.163 would apply to all launch and reentry vehicles, including ELVs, RLVs, hybrids, and reentry vehicles. Because the proposed requirement is performance based, each operator would be able to provide lightning mitigation methods designed for a specific vehicle's mission profile. Under § 450.163, the FAA anticipates that an operator would be able to apply new research findings or methodologies in a more timely manner than under appendix G. Further, the FAA would be able to update guidance materials in a timely manner to include those means of compliance that result from advances in science, information, or technology. Additionally, the FAA believes that, by providing an operator with the flexibility to mitigate natural and triggered lightning strikes through standards and best practices, the operators could avoid costly delays resulting from compliance with the requirements in the current appendix G.
Section 450.163(b) would establish application requirements. To comply with proposed § 450.163(a)(1), an applicant would be required to submit lightning flight commit criteria that mitigate the potential for a launch or reentry vehicle intercepting or initiating a lightning strike, or encountering a nearby discharge using a means of compliance accepted by the Administrator. As previously discussed, the only current method to comply with § 450.165(a)(1) would be to use NASA-STD-4010. If an applicant chooses instead to comply with § 450.163(a)(2), it would be required to provide documentation demonstrating that the vehicle is designed to protect safety critical systems, such as electrical and electronic systems, or FSSs. The FAA anticipates that this documentation would include proof and validation that the vehicle has followed lightning protections standards that would protect the vehicle's safety critical systems from a direct or indirect lightning discharge. If an applicant chooses to comply with § 450.163(a)(3), it would be required to provide documentation demonstrating compliance with § 450.101 in the event of a lightning discharge. As previously discussed, the FAA expects that this would be demonstrated through any number of analyses that validate that the vehicle is able to control individual and collective risk to the public,
The FAA considered using direct measurement of the electric field within a cloud as an option for a launch operator to comply with proposed § 450.163. However, it is the FAA's understanding that there is currently no consensus among the scientific community on the electric field value threshold to initiate lightning. Without a definite threshold value, the FAA would not be able to make a safety determination if an operator were to take direct measurements of the electric field. In addition, further research and data is required to establish procedures for measuring within the cloud, for how many measurements to make within a period of time or distance from the cloud, and such other considerations. Nevertheless, given the performance-based nature of § 450.163, it is possible that in the future, an accepted means for obtaining real time electric field readings along the flight profile could lead to less restrictive criteria. 10. Flight Safety Rules
In proposed § 450.165, an operator would be required to establish and observe flight safety rules that govern the conduct of each launch or reentry. These would include flight commit criteria and flight abort rules. i. Flight Commit Criteria
The FAA proposes to consolidate the flight-commit criteria requirements currently contained in parts 417, 431, and 435. Flight-commit criteria are conditions necessary prior to the flight of a launch vehicle or the reentry of a reentry vehicle to ensure that the launch or reentry does not exceed the public safety criteria in proposed § 450.101. Although this proposal restates flight-commit requirements differently than the current regulations, the changes would not alter substantive requirements, and are intended solely for clarification purposes.
The ELV launch requirements for flight readiness are contained in Sec. § 415.37 and 417.113. Section 415.37 requires an applicant to file procedures for verifying readiness for safe flight, which result in flight-commit criteria. Section 417.113(c) requires that the launch safety rules include flight-commit criteria that identify each condition that must be met in order to initiate flight. The flight-commit criteria must implement the FSA; for a launch that uses an FSS, must ensure that the FSS is ready for flight; and for each launch, must document the actual conditions used for the flight-commit criteria at the time of lift-off and verify whether the flight-commit criteria are satisfied.
Flight-commit criteria for launch and reentry of a reusable launch vehicle are contained in Sec. § 431.37 and 431.39, and by extension in § 435.33 for the reentry of a reentry vehicle other than a RLV. Unlike part 417, the parts 431 and 435 requirements are performance-based and required as part of the system safety analysis requirements.
Flight-commit criteria-related requirements appear throughout proposed part 450. The main requirements would be found in Sec. § 450.155, 450.159, and 450.165. Section 450.155 would require an operator to document and implement procedures to assess readiness to proceed with the flight of a launch or reentry vehicle. Proposed § 450.159 would require an operator to implement preflight procedures to verify that each flight-commit criterion has been met before initiating flight.
Proposed § 450.165 would mandate that an operator's flight safety rules include flight-commit criteria identifying each condition necessary prior to initiating flight to satisfy proposed § 450.101. These commit criteria would include surveillance, monitoring of meteorological conditions, implementing window closures for the purpose of collision avoidance, monitoring the status of any flight safety system, and any other hazard controls derived from system safety, software safety, or flight safety analyses. Also, for any reentry vehicle, the commit criteria would include monitoring the status of safety-critical systems before enabling reentry flight.
Part 450 also includes requirements to develop flight-commit criteria based on the results of various analysis. For instance, § 450.135 (Debris Risk Analysis) would require operators to demonstrate compliance with public safety criteria in proposed § 450.101. In § 450.137, the far-field overpressure blast effect analysis would have to demonstrate compliance with public safety criteria in proposed § 450.101. Sections 450.139 (Toxic Hazards for Flight) and 450.187 (Toxic Hazards Mitigation for Ground Operations) would require an operator to derive flight-commit criteria based on the results of its toxic release hazard analysis, containment analysis, or toxic risk assessment to ensure any necessary evacuation of the public from any toxic hazard area prior to flight. Proposed § 450.141 (Wind Weighting for the Flight of an Unguided Suborbital Launch Vehicle) would require an operator to establish flight-commit criteria that control the risk to the public from potential adverse effects from normal and malfunctioning flight.
Proposed § 450.161 would require an applicant to describe how it will provide for day-of-flight surveillance of flight hazard areas, if necessary, to ensure that the presence of any member of the public in or near a flight hazard area is consistent with flight-commit criteria. Section 450.163 would require an operator to derive flight-commit criteria that mitigate the potential for a launch or reentry vehicle intercepting or initiating a lightning strike, or encountering a nearby discharge. Finally, § 450.169 (Launch and Reentry Collision Avoidance Analysis) would require an operator use the results of the collision avoidance analysis to develop flight-commit criteria for collision avoidance. ii. Flight Abort Rules
The FAA proposes to include flight abort rules as part of proposed flight safety rules in § 450.165. Flight abort rules apply to a vehicle that uses an FSS and are the conditions under which an FSS must abort the flight to ensure compliance with flight safety criteria. Current regulations in parts 417 and 431 address flight abort rules.
Section 417.113(d) sets flight termination rules for ELVs. It requires operators to identify the conditions under which the FSS, including the functions of the flight safety system crew, must terminate flight to ensure public safety. The flight termination rules must implement the FSA, and specifically requires operators to terminate flight in the following six scenarios:
1. When real-time data indicate a flight safety limit has been reached.
2. At the straight-up time if the vehicle flies straight up.
3. If the vehicle becomes erratic and may endanger protected areas, while potentially losing control of the flight safety system.
4. No later than at the expiration of the data loss flight time if tracking data is lost.
5. If a vehicle is performing erratically prior to entering an overflight gate, or if the vehicle is not flying parallel to or converging to the nominal trajectory prior to entering a gate.
6. If a vehicle is performing erratically prior to entering a hold gate, or if the vehicle is not flying parallel to or converging to the nominal trajectory prior to entering a hold gate.
Some of these current requirements may be overly prescriptive. For example, flight abort at the straight-up time is only one method of mitigating risk to the launch area in the event of a vehicle that fails to program and flies straight up. Although other methods may mitigate risk to an acceptable level, under the current requirements, an operator would be forced to abort flight at the straight up time. Also, the rules for allowing vehicles to enter gates are too subjective and not easily tied to specific hazards.
Part 431, applicable to RLVs, does not impose specific flight abort rules. However, § 431.39(a) requires an applicant to submit mission rules and contingency abort plans that ensure safe conduct of mission operations during nominal and non-nominal vehicle flight. These would encompass flight abort rules because § 401.5 defines contingency abort as the cessation of vehicle flight during ascent or descent in a manner that does not jeopardize public health and safety and the safety of property, in accordance with mission rules and procedures. Part 431 requires flight abort when needed to mitigate risk and a set of rules to that end, yet does so without following part 417's more detailed and prescriptive approach. In practice, orbital rockets licensed under part 431 have used an AFSS with flight abort rules that are conservatively consistent with the six scenarios identified in 417.113(d), when applicable (e.g., no straight-up time for a horizontal launch).
Section 450.165(c) lays out the proposed consolidation and clarification of flight abort rules. Although the FAA would maintain much of § 417.113(d)'s structure and requirements, the FAA looked for opportunities to replace prescriptive requirements with outcome objectives. The FAA would require operators to develop flight abort rules to comply with the public safety criteria of § 450.101, as well as to prevent debris capable of causing a casualty from impacting in uncontrolled areas if the vehicle is outside the limits of a useful mission. Operators would also need to identify the functions of any flight abort crew, as specifically required in part 417. This is also consistent with the FAA's practice in implementing part 431. Although not specifically stated in § 431.39(a), the FAA has required operators to identify crew functions. The FAA proposes to eliminate the straight-up rule, as it is not reasonable to include the rule at the exclusion of other existing mitigation options. Also, the FAA proposes to simplify the current requirements for gate passage to allow a vehicle to pass through a gate if it can achieve a useful mission. This would allow the operator to specify which vehicle parameters are the most useful for determining whether a vehicle should be allowed to enter a gate. For orbital launches, vehicles unable to achieve orbit cannot achieve a useful mission and should be terminated. The FAA would delete separate requirements for hold-and-resume gates, as analysis should show which types of gates are most effective for the proposed flight, and those should be implemented.
These proposed rules, which would be similar to those from part 417, were chosen over the generic requirement for mission rules from part 431 because they correspond to other sections in the proposed rule describing flight safety limits, gates, and other requirements. This is consistent with the ARC's recommendation to change part 431 to better capture the intent of the flight abort rules. An operator should balance potentially competing objectives as necessary to minimize risk when writing specific flight abort rules. For example, if there is a rule to destruct a vehicle to prevent an intact impact in order to reduce distant focused overpressure risk, the operator should also consider the resulting risk to aircraft when establishing the timing of the destruct action.
Proposed § 450.165(d) lays out the application requirements for flight safety rules. For flight commit criteria, the FAA would require an applicant to provide a list of all flight commit criteria. These would include any criteria related to surveillance, monitoring of meteorological conditions, implementation of launch or reentry windows closures for the purpose of collision avoidance, confirmation that any safety-critical system is ready for flight, monitoring of safety-critical systems prior to enabling re-entry flight, and any other hazard controls. For flight abort rules, the FAA would require an applicant to provide a description of each rule, and the parameters that will be used to evaluate each rule, as well as a list that identifies the rules necessary for compliance with each requirement in § 450.101. All conditions in which flight abort action would be taken must be described, as well as rules and conditions allowing flight to continue past a gate. Lastly, the FAA would require an applicant to provide a description of the vehicle data that will be available to evaluate flight abort rules across the range of normal and malfunctioning flight. This information is necessary to ensure that compliance with the flight abort rules is achievable. 11. Tracking
The FAA proposes to adopt vehicle tracking requirements. Specifically, proposed § 450.167 (Tracking) would require an operator to measure and record in real time the position and velocity of the vehicle. The system used to track the vehicle would be required to provide data to determine the actual impact locations of all stages and components, and to obtain vehicle performance data for comparison with the preflight performance predictions. The proposed requirements would be consistent with current practice for a wide variety of vehicles, including the widespread use of telemetry data, and various requirements of parts 417, 431, and 437.
Current regulations for ELVs require a vehicle tracking system as part of the FSS. For example, in § 417.113(c), as part of the flight commit criteria for a launch that uses an FSS, readiness for flight includes that the launch vehicle tracking system has no less than two tracking sources prior to lift-off. Also, the launch vehicle tracking system must have no less than one verified tracking source at all times from lift-off to orbit insertion for an orbital launch, to the end of powered flight for a suborbital launch. Of course, the need for tracking is implicit in other requirements for launch of a vehicle with an FSS, including the requirements regarding data loss flight times in § 417.219.
Continue reading ↓ 420 of 1213 passages shown