Order 8120.22B Production Approval Procedures
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
National Policy
ORDER 8120.22B
09/25/2025
SUBJ: Production Approval Procedures
This order provides procedural guidance for Aircraft Certification Service (AIR) personnel to evaluate and approve production approval activities of manufacturers that produce products or articles in accordance with title 14, Code of Federal Regulations (14 CFR) part 21, Certification Procedures for Products and Articles. The policy contained within this order will support the issuance of the Federal Aviation Administration (FAA) production approvals for:
1. Production certificate (PC).
2. Parts manufacturer approval (PMA).
3. Technical standard order authorization (TSOA).
Additionally, this revision references 14 CFR part 5, Safety Management System (SMS), requirements and establishes prepositioning policy for shipping “prototype” aircraft engines, propellers and articles that are pending FAA-approved design.
DANIEL J.
Digitally signed by DANIEL J. ELGAS ELGAS
Date: 2025.09.25 11:46:41 -04'00' Daniel J. Elgas Aviation Safety Director, Policy and Standards Division, Aircraft Certification Service
Distribution: Electronic Initiated By: AIR-632
Table of Contents
Paragraph Page
Chapter 1. Introduction … 1-1
1-1. Purpose of This Order … 1-1
1-2. Audience … 1-1
1-3. Where to Find This Order … 1-1
1-4. What This Order Cancels … 1-1
1-5. Explanation of Policy Changes … 1-1
1-6. Effective Dates … 1-2
Chapter 2. Production Under a Type Certificate (Part 21, Subpart F) … 2-1
2-1. Applicability … 2-1
2-2. Privileges … 2-1
2-3. Advising the Applicant … 2-1
2-4. Reserved … 2-3
2-5. FAA Conformity Determinations … 2-3
2-6. Assessing the Applicant’s Progress … 2-3
2-7. Extension of Six-Month Period … 2-3
2-8. PC Not Established Within Six-Month Period … 2-3
2-9. Review of Production Quality System Data … 2-3
2-10. Provisional Approval Procedures … 2-4
2-11. Preliminary Certificate Management (PCM) Audit … 2-4
2-12. PCB … 2-5
Chapter 3. Production Certificate (Part 21, Subpart G) … 3-1
3-1. Applicability … 3-1
3-2. Privileges … 3-2
3-3. Advising the Applicant … 3-2
3-4. Reserved … 3-8
3-5. Application … 3-8
3-6. PCM Audit … 3-8
3-7. Reserved … 3-9
3-8. General PCB Information … 3-9
ii
3-9. PCB Member Responsibilities … 3-10
3-10. Conduct of the PCB … 3-11
3-11. PCB Minutes … 3-12
3-12. Distribution of PCB Minutes … 3-12
3-13. PCB Adjournment … 3-13
3-14. Reserved … 3-13
3-15. Preparation and Delivery of PC and PLR … 3-13
3-16. Initial Risk-Based Resource Targeting Assessment … 3-16
Chapter 4. Parts Manufacturer Approval (Part 21, Subpart K) … 4-1
4-1. Applicability … 4-1
4-2. Privileges … 4-2
4-3. Advising the Applicant … 4-2
4-4. Reserved … 4-7
4-5. Applicant Responsibilities … 4-7
4-6. CM Section Responsibility … 4-8
4-7. Reserved … 4-10
4-8. Assignment of the PMA Number … 4-10
4-9. PMA Letter … 4-10
4-10. Initial Risk-Based Resource Targeting Assessment … 4-10
4-11. Reserved … 4-10
4-12. Transferability … 4-11
4-13. Reuse of PMA Design Data … 4-11
4-14. Changes to the Quality System … 4-11
4-15. Revising/Amending the PMA Supplement … 4-12
4-16. Export Considerations … 4-12
Chapter 5. Technical Standard Order Authorization (Part 21, Subpart O) … 5-1
5-1. Applicability … 5-1
5-2. Privileges … 5-1
5-3. Advising the Applicant … 5-1
5-4. Reserved … 5-5
5-5. Application … 5-5
5-6. Design Approval … 5-6
iii
5-7. PCM … 5-6
5-8. Reserved … 5-6
5-9. TSO Letter of Authorization … 5-6
5-10. Letter of TSO Design Approval … 5-6
5-11. Transferability … 5-7
5-12. Processes TSOA/LODA Transfers … 5-7
5-13. Initial Risk-Based Resource Targeting Assessment … 5-7
Chapter 6. Extension of a Production Approval (Domestic Only) … 6-1
6-1. Applicability … 6-1
6-2. Privileges … 6-1
6-3. Advising the Original PAH and the Associate Facility … 6-1
6-4. Reserved … 6-2
6-5. Request for Extension of a Production Approval … 6-2
6-6. Evaluating the Request … 6-2
6-7. Coordination with the Geographic CM Section … 6-3
6-8. Reserved … 6-3
6-9. Approval of the Request … 6-3
6-10. Geographic CM Section Responsibility After Extension Approval … 6-3
6-11. Nontraditional Associate Facilities … 6-3
Chapter 7. Non-U.S. Manufacturing Facilities—Determination of Undue Burden and No Undue Burden … 7-1
7-1. Undue Burden and No Undue Burden … 7-1
7-2. Reserved … 7-1
Chapter 8. Work Performed on New Products or Articles After Leaving a U.S. PAH/Supplier’s Quality System … 8-1
8-1. New Products or Articles Remaining Within Part 21 … 8-1
8-2. New Products or Articles No Longer Within Part 21 … 8-1
Chapter 9. Prepositioning Aircraft Engines, Propellers, or Articles … 9-1
9-1. Applicability … 9-1
9-2. Request to Preposition … 9-1
9-3. Requirements … 9-1
9-4. Conformity Inspection … 9-1
iv
9-5. Who May Issue FAA Form 8130-3 … 9-2
9-6. Completion of FAA Form 8130-3 for Prepositioning Products and Articles … 9-2
9-7. Additional Considerations … 9-3
9-8. Export Considerations … 9-3
Chapter 10. Administrative Information … 10-1
10-1. Distribution … 10-1
10-2. Delegation of Authority … 10-1
10-3. Forms … 10-1
10-4. Deviations … 10-1
10-5. Related Publications … 10-1
10-6. Requests for Information … 10-1
10-7. Electronic Signature … 10-1
10-8. Suggestions for Improvement … 10-1
Appendix A. Evaluation of a PAH’s Quality System … A-1
Appendix B. Adding Interface Components to the PLR … B-1
Appendix C. Acronyms … C-1
Appendix D. Definitions … D-2
Appendix E. Directive Feedback Information … D-1
v
Chapter 1. Introduction
1-1. Purpose of This Order.This order references part 5 and establishes the prepositioning policy for aircraft engines, propellers and articles pending FAA-approved design. In addition, this order describes the policies and procedures for the issuance of production approvals in accordance with part 21, subparts, G, K, and O. The following chapters provide specific guidance for the FAA to process the application and issue a production approval.
1-5. Explanation of Policy Changes. › c. Incorporates memorandums AIR100-16-110-DM12, Deviation to FAA Order…
Note: This order is available to the public for information purposes only. Its content is not legally binding on the public in its own right and will not be relied upon by the Department as a separate basis for affirmative enforcement action or other administrative penalty. Public conformity with the guidance document is voluntary only; nonconformity will not affect rights and obligations under existing statutes and regulations.
1-2. Audience.All FAA employees who provide oversight of the production approval process.
1-3. Where to Find This Order.You can find this order on the MyFAA website at Regulations and Policies and on the Dynamic Regulatory System (DRS) website at DRS.
1-4. What This Order Cancels.This revision cancels the following order, deviation, and policy memorandums.
• FAA Order 8120.22A, CHG 1, Production Approval Procedures, dated October 27, 2023.
• AIR100-16-110-DM10, Deviation to FAA Order 8120.22A Production Approval Procedures, dated May 10, 2016.
• AIR100-16-110-DM12, Deviation to FAA Order 8130.21 Regarding Prepositioned Products and Articles, dated June 28, 2016.
• AIR100-16-110-PM05, Shipment of Prototype Products and Articles with the Authorized Release Certificate, FAA Form 8130-3, Airworthiness Approval Tag, dated June 28, 2016.
1-5. Explanation of Policy Changes.
a. Identifies part 5 requirements for type certificate (TC) and production certificate (PC) holders to submit an implementation plan and provides the PMA and TSOA holders, who desire, the means to participate in the Voluntary SMS Program.
b. Incorporates prepositioning products and articles guidance from FAA Order 8130.21H, CHG 1, Procedures for Completion and Use of the Authorized Release Certificate, FAA Form 8130-3, Airworthiness Approval Tag.
c. Incorporates memorandums AIR100-16-110-DM12, Deviation to FAA Order 8130.21 Regarding Prepositioned Products and Articles, and AIR100-16-110-PM05,
Chapter 1. Introduction › 1-6. Effective Dates.
Shipment of Prototype Products and Articles with the Authorized Release Certificate, FAA Form 8130-3, Airworthiness Approval Tag.
d. Adds chapter 9 to establish policy for prepositioning products and articles pending FAA design approval.
e. Adds a hyperlink to the System Oversight Division (AIR-800) Division-Approved Templates located on AIR-800 Templates for all notification, acknowledgement, hand-off, and PMA letters and supplements referenced throughout this order.
f. Updates FAA Form 1320-19, Directives Feedback Form, in appendix E.
1-6. Effective Dates.The provisions of this revision become effective sixty days from the date of signature.
2-3. Advising the Applicant. › f. The TC holder or licensee who produces a completed product under…
Chapter 2. Production Under a Type Certificate (Part 21, Subpart F)
Section 1. General Information
2-1. Applicability.Part 21, subpart F, applies to a manufacturer of a product or article produced under a TC with no other production approval in place.
2-2. Privileges.A manufacturer of a product or article in accordance with part 21, subpart F, is not granted any privileges. However, a manufacturer of a product or article produced under a TC may be authorized by 14 CFR part 183, Representatives of the Administrator, to apply for and obtain an organization designation authorization (ODA). FAA Order 8000.95, Designee Management Policy and FAA Order 8100.15, Organization Designation Authorization Procedures, contain procedures for the administration of ODAs.
2-3. Advising the Applicant.When production under part 21, subpart F is indicated, a TC applicant should be advised (during the preliminary TC board) of the following:
a. Advisory circular (AC) 21-43, Production Under 14 CFR Part 21, Subparts F, G, K, and O, describes an acceptable means of complying with part 21, subpart F. The FAA may approve alternative methods and procedures when the applicant can show that the proposed methods or procedures will achieve compliance with part 21, subpart F.
b. The applicant should establish and submit a plan to the FAA to schedule inspections and evaluations. The applicant must allow the FAA to inspect or test, including at a supplier facility, to show compliance with § 21.123(d).
c. FAA inspectors or authorized designees will conduct inspections and issue all the necessary airworthiness certificates and approvals for a maximum period of six months, except as otherwise authorized, after the date of issue of the TC. The applicant should also be advised that FAA personnel resources are limited and that delays may occur during the six-month period, depending on the number of inspections and hours that may be necessary.
d. For continued manufacturing of a product or article, the applicant must obtain a PC, in accordance with part 21, subpart G, within six months after the date the TC is issued. Application for a PC is made on FAA Form 8110-12, Application for Type Certificate, Production Certificate, or Supplemental Type Certificate.
e. For any products or articles that are manufactured and made available for use after the deadline date without FAA authorization, enforcement actions may result as defined in FAA Order 2150.3, FAA Compliance and Enforcement Program.
f. The TC holder or licensee who produces a completed product under part 21, subpart F, must flight test or functional test that product in accordance with the requirements of §§ 21.127 and 21.128, or § 21.129, as applicable.
h. The applicant cannot use manufacturing facilities located outside… › (4) Section 21.135 requires a PC applicant producing under a TC to…
(1) Aircraft. Each aircraft, both prior to and after the issuance of a PC, must be flight tested in accordance with an approved production flight test procedure and flight checklist form as required by § 21.127.
(2) Aircraft Engines and Propellers. Each aircraft engine or propeller, both prior to and after the issuance of a PC, must be subjected to an acceptable test run or functional test in accordance with the requirements of § 21.128 or § 21.129, as appropriate.
g. SMS Requirements.
(1) Section 21.135(c) requires PC applicants, except those applying for a PC based on a supplemental type certificate (STC), to meet the applicable requirements in 14 CFR part 5. The part 5 requirements for a PC applicant during the production approval process are defined in § 5.13.
(2) PC applicants should submit their SMS implementation plan for FAA approval following the guidance in AC 21-58, Safety Management Systems for Part 21 Type and Production Certificate Holders.
(3) Part 5 is applicable to PC applicants that desire to manufacture a complete product (aircraft, aircraft engine, or propeller). PC applicants desiring to manufacture less than a complete product, e.g., applicants to manufacture “article(s) or parts only,” are not required to meet part 5. These applicants do not need to submit an SMS implementation plan.
h. The applicant cannot use manufacturing facilities located outside the United States unless the FAA has determined that the location of the facilities places no undue burden on the FAA, as specified in § 21.122(a).
(1) Prior to the issuance of a PC, a TC holder, or licensee who produces a product is responsible for complying with part 21, subpart F, as appropriate for the particular product or article involved.
(2) Aircraft, aircraft engines, and propellers must be marked in accordance with the requirements of 14 CFR 45.11 and 45.13(a) through (c), as applicable.
Note: The holder of a Dealer’s Aircraft Registration Certificate is responsible for complying with the requirements of 14 CFR part 47, Aircraft Registration, regarding the use of temporary registration numbers. Specifically, the temporary registration number must be removed from the aircraft no later than the date on which either title or possession passes to another person as required by § 47.16.
(3) A TC holder or licensee is also responsible for reporting any failures, malfunctions, and defects as required by § 21.3.
(4) Section 21.135 requires a PC applicant producing under a TC to provide to the FAA a document describing how its organization will ensure compliance to part 21, subpart G and describes the requirements for this document. The document must identify a single point of contact who is knowledgeable of, and accountable for, maintaining the organization’s FAA-
Chapter 2. Production Under a Type Certificate (Part 21, Subpart F) › 2-9. Review of Production Quality System Data.
approved operations. In addition, the document must describe the accountable manager’s assigned responsibilities, delegated authorities, and the functional relationship of those responsible for quality.
2-4. Reserved.
Section 2. FAA Actions During the Six-Month Period
2-5. FAA Conformity Determinations.After the TC is issued and prior to the issuance of a PC, the Certificate Management (CM) section is responsible for determining whether the product or articles conform to the type design and are in a condition for safe operation. The CM section is responsible for performing inspections of incoming materials (at the source, if necessary), installations, and the completed products. The CM section is responsible for documenting each inspection on FAA Form 8100-1, Conformity Inspection Record, so that each product or article inspected has a complete inspection record.
2-6. Assessing the Applicant’s Progress.The CM section should periodically assess the applicant’s progress in complying with the regulations for obtaining approval of a PC. If it appears that the applicant is delaying this action or may not be eligible for a PC by the deadline date, the applicant should be advised in writing of all known deficiencies. Also, the applicant should be cautioned that after the deadline date, the FAA will not issue any airworthiness certificates or any other approvals unless the certification branch manager authorizes an extension of time. The CM section should keep the certification branch manager apprised of the applicant’s progress.
2-7. Extension of Six-Month Period.The FAA may grant an extension when there are unusual or extenuating circumstances that preclude the establishment of a PC within the sixmonth limitation. The FAA should not grant an extension of the six-month period without giving due consideration to the impact the extension would have on FAA personnel resources and safety. In all instances, the FAA should consider an extension only when the applicant can substantiate the reasons for requesting such an extension. The authorization for extension must be issued to the applicant in writing.
2-8. PC Not Established Within Six-Month Period.When an applicant fails to establish a PC by the end of the six-month period (except when extended), the FAA will no longer make conformity determinations and will discontinue the issuance of all airworthiness certifications and approvals. However, the FAA should continue to counsel and advise the applicant to the extent necessary to assist in obtaining a PC as soon as practicable.
2-9. Review of Production Quality System Data.When a PC applicant producing under a TC submits quality system data as evidence of compliance with part 21, subpart F, the cognizant CM section will evaluate this data in accordance with the criteria contained in appendix A to this order. Upon completion of its evaluation of the quality system data, the CM section will submit any inadequacies to the applicant for corrective action, using the appropriate template at AIR- 800 Division-Approved Templates. After the data has been reviewed and any applicable corrective actions are taken, the CM section will approve the quality system data submitted by the applicant.
2-11. Preliminary Certificate Management (PCM) Audit. › c. Reporting.
2-10. Provisional Approval Procedures.The CM section should accomplish evaluation of the applicant’s quality system, concurrent with conducting conformity inspections and making those airworthiness determinations required of the FAA prior to the issuance of a PC. It is, therefore, to the advantage of the FAA to evaluate and provisionally approve the quality system on a progressive basis. As portions of the quality system are determined to meet the regulatory requirements, the CM section should do as follows:
a. Maintain a record of those portions of the system considered satisfactory.
b. Reduce conformity inspections to a spot-check basis for articles covered by the provisionally approved portion of the quality system.
c. Place increased emphasis on securing corrective actions on the portions of the quality system where procedural discrepancies have been found or where the quality system has been found to be inadequate.
2-11. Preliminary Certificate Management (PCM) Audit.When the CM section has determined that the PC applicant can comply with § 21.137, the CM section will conduct a PCM audit as follows:
a. PCM Audit.The PCM audit evaluates the applicant’s production facilities in accordance with the pertinent 14 CFR regulation, the FAA-approved design data, and the quality system data referenced in paragraph 2-9 of this order. The cognizant CM section manager will select a team to conduct this audit. The team may consist of the cognizant principal inspector (PI) and at least one other manufacturing inspector or the CM section manager. It is also recommended that an engineer be selected for the team when deemed necessary by the type and complexity of processes and procedures being used at the facility. The standardized evaluation criteria may be used as an aid to evaluate compliance. Team members should be advised that some of the evaluation criteria contained therein may not be related to 14 CFR part 21 and therefore may only be evaluated as a best practice. This audit is not considered a quality system audit (QSA). Noncompliance’s will be documented on FAA Form 8100-6, Noncompliance Record.
b. Notifying the Applicant.Upon completion of the PCM audit, the CM section will formally notify the applicant of any corrective actions necessary to comply with § 21.137 using the appropriate template at AIR-800 Division-Approved Templates. The CM section should advise the applicant that a production certification board (PCB) will be scheduled that could result in a request for additional actions.
c. Reporting.The CM section will prepare FAA Form 8120-14, Production Approval/Certificate Management Activity Report, upon completion of the PCM audit, and provisional approval of the applicant’s quality system, when applicable. The CM section will provide notification to the applicable certification branch manager that the FAA Form 8120-14 may be viewed in the Aircraft Certification Audit Information System (ACAIS). In addition, the CM section will provide information to the applicable division director concerning the applicant’s ability to comply with § 21.137.
Chapter 2. Production Under a Type Certificate (Part 21, Subpart F) › 2-12. PCB.
2-12. PCB.Upon receipt of FAA Form 8120-14 and notification by the CM section that the applicant can comply with § 21.137, the applicable certification branch manager should schedule a PCB in accordance with chapter 3, section 3 of this order.
Chapter 3. Production Certificate (Part 21, Subpart G)
3-1. Applicability. › d. PCs are intended to be issued for the manufacturing of duplicate…
Section 1. General Information
3-1. Applicability.
a. Part 21, subpart G, applies to any of the following persons who desire to manufacture a complete product and article(s) with the benefit of a PC:
(1) The holder/licensee of a § 21.21 TC.
(2) The United States holder/licensee of a § 21.29 TC, if the licensing agreement clearly provides for the TC holder’s and its Civil Aviation Authority’s (CAA) control over any design changes by the licensee. A working arrangement, associated with the respective bilateral agreement, must also be in place between the CAA and the FAA defining their respective responsibilities as State of Design and State of Manufacture.
(3) The holder of a STC, when the STC will be incorporated as follows:
(a) Prior to the issuance of an original airworthiness certificate (OAC) to the aircraft; or
(b) After the issuance of an OAC to the aircraft. In this case, the PC would authorize the manufacturing of associated STC articles in accordance with part 21. However, installation of the STC and return to service of the product is accomplished under the provisions of 14 CFR part 43, Maintenance, Preventive, Maintenance, Rebuilding, and Alteration.
(4) The holder/licensee of a § 21.25 TC, provided the TC was issued based on FAA approval of the type design data. The data must have been submitted by the applicant or the licensor and must meet the requirements of § 21.31.
(5) The holder/licensee of a § 21.27 TC, provided the duplicates produced always originate as an aircraft that was designed and constructed in the United States, accepted for operational use, and declared surplus by the military.
(6) The holder/licensee of a § 21.27 TC must demonstrate their quality system meets the requirements of §§ 21.137 and 21.138 at the product level.
b. A PC may not be issued to the holder of a TC issued under part 21, subpart C, Provisional Type Certificate.
c. A PC may not be issued if the manufacturing facilities are located outside the United States, unless it has been determined, in accordance with § 21.139, that such location(s) would place no undue burden on the FAA.
d. PCs are intended to be issued for the manufacturing of duplicate products (aircraft, aircraft engine, and propeller) only. There may be instances when it is appropriate to issue a PC
c. The PC holder who produces a completed product under part 21,… › (2) Periodic FAA Production Flight Tests.
for something less than a “product.” In those instances, the CM branches must coordinate with the Policy and Standards Division (AIR-600) to determine if a PC is acceptable prior to the issuance of the PC.
3-2. Privileges. A PC holder has the privileges specified in § 21.145. In addition, a PC holder can designate a qualified employee(s) as a designated manufacturing inspection representative (DMIR) in accordance with the provisions of 14 CFR part 183. The PC holder may also be authorized by part 183 to apply for and obtain an ODA. FAA Order 8000.95, Designee Management Policy, and FAA Order 8100.15 contain procedures for the administration of DMIRs and ODAs, respectively.
3-3. Advising the Applicant. The applicant should be advised as follows:
a. AC 21-43 describes an acceptable means of complying with part 21, subpart G. Alternative methods and procedures may be approved when the applicant can show that the proposed methods and procedures will achieve compliance with part 21, subpart G.
b. The applicant must establish a quality system in accordance with § 21.137 and provide a quality manual describing its quality system to the FAA in accordance with § 21.138. The manual must include descriptive material that adequately covers each applicable paragraph of § 21.137. The manual may vary in length depending upon the scale of the quality system, size of the manufacturing facilities, and complexity of the product. For further guidance, refer to AC 21- 43.
c. The PC holder who produces a completed product under part 21, subpart G, must flight test or functional test that product in accordance with the requirements of § 21.137(e).
(1) Aircraft. All aircraft must pass an approved production flight test as part of the inspection procedure required for issuance of an airworthiness certificate. FAA Form 8130-7, Special Airworthiness Certificate, issued for such purposes provides authorization for production flight testing (reference FAA Order 8130.2, Airworthiness Certification of Aircraft). The exception is an aircraft manufactured under a PC and being exported without assembly or flight test under the provisions of § 21.137(e). The intent of this rule is to permit shipment of aircraft without assembly or flight test when the extent of disassembly is the same as an aircraft that has been disassembled for shipment purposes. In these instances, the manufacturer must provide FAA-approved assembly and flight test procedures as a condition of shipment.
(2) Periodic FAA Production Flight Tests. FAA production flight tests will be conducted periodically at the PC holder’s facility to ensure continued compliance with all parameters as specified in pertinent TC data with respect to performance, flight characteristics, operation qualities, equipment operations, etc. The PI, in coordination with the FAA flight test personnel from the appropriate certification branch, may arrange these flight tests. In addition, a determination should be made in coordination with the flight test personnel that the manufacturer’s approved production test pilots are using approved procedures and that the approved procedures remain adequate.
d. PC Holder’s Responsibility. › (5) Issuing Authorized Release Documents for Aircraft Engines,…
(3) Aircraft Engines and Propellers. Aircraft engines and propellers must pass a functional test in accordance with type design requirements as part of the quality system required by § 21.137(e)(2).
d. PC Holder’s Responsibility.
(1) Organization. Section 21.135 requires a PC holder to provide the FAA a document describing how its organization will ensure compliance to § 21.135 and sets out the requirements for this document. The document must identify a single point of contact who is knowledgeable of, and accountable for, maintaining the organization’s FAA-approved operations. In addition, the document must describe the accountable manager’s assigned responsibilities, delegated authorities, and the functional relationship of those responsible for quality. The accountable manager serves as the PAH’s primary contact with the FAA, and is responsible for, and has authority over, a PAH’s production operations.
(2) Reporting Failures, Malfunctions, and Defects. The PC holder must report any failure, malfunction, or defect in any product or article as required by § 21.3. The PC holder should establish a procedure for such reporting as a part of its quality system. This reporting requirement applies to failures, malfunctions, or defects that may result in or have resulted in one of the occurrences listed in § 21.3(c).
(3) Quality System. The PC holder must establish and describe in writing a quality system that complies with § 21.137. The PC holder is responsible for maintaining the quality system in conformity with the data and procedures approved for the PC. The PC holder is also responsible for determining that each completed product and article submitted for airworthiness certification or approval conforms to the TC or STC and is in a condition for safe operation.
(4) Supplier Control. A supplier is a person at any tier in the supply chain who provides a product, article, or service that is used or consumed in the design or manufacture of, or installed on, a product or article. Section 21.137(c) requires procedures for ensuring each supplier-furnished product, article, or service conforms to the PAH’s requirements. This section also requires the PAH to establish a supplier-reporting process for products, articles, or services that have been released from the supplier and subsequently found not to conform to the PAH’s requirements.
(5) Issuing Authorized Release Documents for Aircraft Engines, Propellers, and Articles. Section 21.137(o) requires procedures for issuing authorized release documents, using FAA Form 8130-3, if the PAH intends to issue those documents. These procedures must provide for the selection, appointment, training, management, and removal of individuals authorized by the PAH to issue authorized release documents (refer to AC 21-43).
(7) Changes to Manufacturing Facilities. › (b) The PC is issued to the principal manufacturing facility that…
(a) Procedures established pursuant to § 21.137(o) should ensure that only qualified personnel issue authorized release documents. A PAH’s evaluation of these individuals’ qualifications should include an assessment of their knowledge, background, experience, and training. Qualifications should be commensurate with the complexity and type of product or article for which the PAH issues an authorized release document. These procedures should also include requirements for completing FAA Form 8130-3 that meet the requirements of FAA Order 8130.21, Completion of FAA Form 8130-3 under Part 21.
(b) These documents may be issued for new aircraft engines, propellers, and articles manufactured by the PAH, and for used aircraft engines, propellers, and articles rebuilt or altered pursuant to § 43.3(j). When an authorized release document is used for export, § 21.137(o) requires a PAH to comply with the applicable § 21.335 requirements for the export of new and used aircraft engines, propellers, and articles. Refer to FAA Order 8130.21 to ensure the PAH is in compliance with § 21.335.
(6) Change to the Quality System. Each change to a quality system is subject to review by the FAA pursuant to § 21.150(a). A PC holder must immediately notify the appropriate CM section in writing of any changes that may affect the inspection, conformity, or airworthiness of its product or article pursuant to § 21.150(b). These changes would include, but are not limited to, the following:
(a) Resumption of production after being discontinued for an extended period for other than normal periods of time, such as vacation periods,
(b) Significant curtailment or resumption of production operations,
(c) Significant reduction or reassignment of quality system personnel, and
(d) Changes or revisions to quality system data and related procedures.
(7) Changes to Manufacturing Facilities. The PC holder must immediately notify the CM section in writing of any changes to its manufacturing facilities that may affect the inspection, conformity, or airworthiness of its product or article in accordance with § 21.139(c). The PC holder must obtain FAA approval before making any changes to the location of its manufacturing facilities in accordance with § 21.139(b).
(a) A PC holder’s manufacturing complex would normally consist of a principal facility and all associate facilities using the same quality system approved by the FAA, for the particular type certificated product(s). Associate facilities are discussed in chapter 6 of this order.
(b) The PC is issued to the principal manufacturing facility that controls the design and quality of the product(s) for which the approval was granted. The principal facility address will be listed under the “business address” and all associate facility addresses will be listed under “manufacturing facilities” on FAA Form 8120-4, Production Certificate. A postal address is not acceptable for a facility since the actual location must be identified. Such
d. PC Holder’s Responsibility. › (13) Aircraft, aircraft engines, and propellers, except for a…
addresses, however, may be used as supplemental to the actual address when desired for such uses as corresponding to and from FAA offices.
(c) A PC holder may not transfer a PC, refer to § 21.144. If the PC holder wants a PC for a new location, the PC holder must reapply in accordance with § 21.133.
(d) When the PC holder seeks FAA approval to move an associate facility or add a new production facility, the FAA may, if deemed necessary, conduct a preliminary PCM audit at the new production facility or moved facility. If a PCM audit is deemed necessary, a satisfactory audit result must be obtained before the facility can be approved for production. The PC also must be amended to reflect this change.
(8) A PC holder must ensure that each article and completed product presented for airworthiness certification or approval conforms to its approved design and is in condition for safe operation. This includes primary category aircraft assembled under a PC by another person from a kit provided by the PC holder.
(9) A PC holder must obtain an airworthiness certificate or approval for each aircraft, aircraft engine, and propeller produced under that PC that conforms to its approved design and is in a condition for safe operation. If the PC holder issued the original airworthiness certificate or approval as an export airworthiness approval under part 21, subpart L, that export airworthiness approval would also satisfy the requirement for an airworthiness approval under this subpart.
(10) A PC holder must maintain complete and current design data for each product and article produced under its production approval.
(11) A PC holder must retain its PC and make it available to the FAA upon request.
(12) A PC holder must make available to the FAA information regarding all delegation of authority to suppliers.
(13) Aircraft, aircraft engines, and propellers, except for a fixed-pitch wooden propeller, must be marked using an approved fireproof method pursuant to the requirements of § 45.11 and 45.13(a), as applicable.
Note: The holder of a Dealer’s Aircraft Registration Certificate is responsible for complying with the requirements of part 47 regarding the use of temporary registration numbers. Specifically, the temporary registration number must be removed from the aircraft no later than the date on which either title or possession passes to another person. See § 47.16.
(14) Identification plate requirements for aircraft, aircraft engines,… › (c) The FAA requires that only the information in paragraph…
(14) Identification plate requirements for aircraft, aircraft engines, or propellers produced under a design data licensing agreement program.
(a) Pursuant to § 45.13, an identification plate for an aircraft, aircraft engine, or propeller produced under a design data licensing program must include the following information (as applicable):
1. The builder’s name is the specific name of the licensee as shown on the licensee’s PC.
2. The model designation is that model identified on the associated type certificate data sheet (TCDS).
3. The builder’s serial number is the serial number(s) dedicated for the use of the licensee as assigned by the TC holder on the associated TCDS.
4. The TC number is the number identified on the associated TCDS and upon which conformity to type design requirements is determined.
5. The PC number is the number that is listed on the licensee’s PC.
6. For aircraft engines, the established rating as shown on the TCDS.
7. For aircraft engines manufactured after January 1, 1984, the following information must also be included:
i. The date of manufacture as defined in 14 CFR 34.1.
ii. The status of compliance to applicable exhaust emission provisions, as approved by the FAA (for example, COMPLY, EXEMPT NEW, EXCEPTED SPARE, or NON-U.S., as appropriate).
(b) As prescribed under the provisions of § 45.13(a)(8), the FAA will normally deem it appropriate and necessary to include the following information on the identification plates of products manufactured under a design data licensing agreement between an FAA TC and PC holder: “Manufactured by (insert the PC holder’s name) under a licensing agreement with (insert the TC holder’s name).”
(c) The FAA requires that only the information in paragraph 3-3.d.(14)(a) and (b) of this order be included on the identification plates for all products manufactured under a licensing agreement program. However, the FAA would permit a company/corporate logo or registered trademark to be included (after review and approval by the FAA) on the identification plates, if desired by the manufacturer. Aircraft, aircraft engine, and propeller identification plates should be included as part of the product’s approved design data and are usually defined in an engineering drawing describing material, size, required information entries, mounting location, etc.
e. SMS Requirements. › (1) Section 21.135(c) requires PC applicants, except those applying for…
(15) Marking and Identification of Articles Produced by a PC Holder.
(a) Section 21.146(d) requires that articles produced by a PC holder for which a certificate or approval has been issued must be marked in accordance with part 45. However, part 45 does not address specific marking requirements for articles produced by a PC holder that appear on its production limitation record (PLR). In such cases, those articles must be marked in accordance with the approved design. As a minimum, the article must be identified with the PC holder’s part number and name, trademark, symbol, or other FAA approved PC holder’s identification.
(b) Subassemblies and component parts of products or articles do not have to be identified unless they leave the PC holder’s facility as a separate article. In such cases, in accordance with § 21.146(e), they must be identified with the manufacturer’s part number and name, trademark, symbol, or other FAA-approved PC holder’s identification. The PC holder may choose any method to meet this requirement. Methods include, but are not limited to, the following:
1. Marking the article,
2. Attaching a tag to the article with the required information,
3. Placing the article in a container with the required information, or
4. Providing a document with the article with the required information.
(c) If the article is too small or otherwise impractical to mark with the required information, the PC holder must attach that information to an article, or its container.
(d) Suppliers to PC holders may mark or identify articles, provided that then PC holder adequately controls those suppliers as part of its quality system. Suppliers that mark or identify articles should be treated the same as any other supplier furnishing articles or services, using supplier control procedures as part of the quality system. The CM section may require that specific article marking controls be included in these procedures, along with any additional conditions that may be necessary for suppliers with direct ship authorization.
(e) Each PC holder who manufactures an article for which a replacement time, inspection interval, or related procedure is specified in the airworthiness limitations section of the PC holder’s maintenance manual or instructions for continued airworthiness must permanently and legibly mark that article. Those markings must include a serial number (or equivalent) unique to that article, in addition to other required markings.
e. SMS Requirements.
(1) Section 21.135(c) requires PC applicants, except those applying for a PC based on a STC, to meet the applicable requirements in part 5. The applicable part 5 requirements for a PC applicant during the production approval process are defined in § 5.13. Section 5.13(b)(2) requires a PC applicant to submit an SMS implementation plan to the FAA for approval during the certification process.
3-6. PCM Audit. › b. Evaluate the applicant’s production facilities in accordance with…
(2) PC applicants should submit their SMS implementation plan for FAA approval following the guidance in AC 21-58, Safety Management Systems for Part 21 Type and Production Certificate Holders.
(3) Part 5 is applicable to PC applicants that desire to manufacture a complete product (aircraft, aircraft engine, or propeller). PC applicants desiring to manufacture less than a complete product, e.g., applicants to manufacture “articles or parts only”, are not required to meet part 5. These applicants do not need to submit an SMS implementation plan.
Note: PC holders and applicants not required to comply with part 5 may choose to participate in the FAA’s Voluntary SMS Program and should notify the CM section manager of their intentions. Applicants or holders desiring to participate in the Voluntary SMS Program may contact the FAA through the following email for further information: [email protected]
3-4. Reserved.
Section 2. Processing an Application for a PC
3-5. Application. Application for a PC is made on FAA Form 8110-12. See § 21.133. The applicant must submit the application, accompanied by a document describing the organization in accordance with § 21.135 and one copy of the quality manual showing compliance with § 21.137. These documents must be submitted to the CM branch manager where the applicant’s principal manufacturing facility is located. Upon receipt of a properly executed FAA Form 8110- 12, the CM branch manager will forward a copy to the CM section. The CM section will prepare a letter of acknowledgement advising the applicant that the CM section has been authorized to initiate a PCM audit to determine compliance with applicable regulations. A copy of the letter should be forwarded to the CM branch.
Note: The CM branch may delegate the application for, or amendment to, a PC to the CM section. If this occurs, PC holders will be notified that when submitting FAA Form 8110-12 for an amendment to a PLR, they should send the form directly to the PC holder’s geographic CM section instead of their CM branch.
3-6. PCM Audit. The CM section should plan to conduct an audit within 30 days after acknowledging the PC application. This audit will be conducted as follows:
a. Evaluate the applicant’s quality manual for compliance with § 21.137. Additional guidance is provided in AC 21-43. Any inadequacies in the quality manual submitted must be identified to the applicant for corrective action. After the quality manual has been reviewed, and any applicable corrective actions taken, the CM section will approve the quality manual submitted by the applicant. The approved quality manual may be retained in the CM section files.
b. Evaluate the applicant’s production facilities in accordance with the pertinent 14 CFR, the FAA-approved design data, and the quality manual approved in paragraph 3-6.a. of this order. The CM section manager will select a team to conduct this audit. The team may
3-8. General PCB Information. › b. Applicability. The PCB should be convened only for initial…
consist of the cognizant PI and at least one other manufacturing inspector or the CM section manager. It is also recommended that an engineer be selected for the team when deemed necessary by the type and complexity of processes and procedures being used at the facility. The standardized evaluation criteria may be used as an aid to evaluate compliance. Team members should be advised, however, that some of the evaluation criteria contained therein may not be related to 14 CFR and therefore may only be evaluated as a best practice. This audit is not considered to be a QSA. Noncompliance’s will be documented on FAA Form 8100-6, Noncompliance Record.
c. Confirm that the applicant has submitted an SMS implementation plan to the FAA for approval in compliance with §§ 21.135(c) and 5.13(b)(2).
(1) Confirmation that the applicant has submitted an SMS implementation plan is the only SMS related requirement necessary for the issuance of a PC.
(2) All further SMS related approval activities are provided in Order 8120.24, Implementation Plan Approval, Verification, and Evaluation of Safety Management Systems for Design and Production Approval Holders.
d. Upon completion of the audit, the CM section will formally notify the applicant of any corrective actions needed to comply with § 21.137 using the appropriate template at AIR- 800 Division-Approved Templates. The applicant should be further advised that these items represent only the result of the FAA’s preliminary audit. Additional requests for corrective actions can be anticipated because of subsequent noncompliance’s, which may be noted during the PCB evaluation activity, as detailed in paragraph 3-6. of this chapter.
e. The CM section will provide notification to the CM branch that FAA Form(s) 8100-6 may be viewed in ACAIS. FAA Form(s) 8100-6 should identify any unresolved items requiring corrective action. In addition, letters issued to the applicant requesting corrective action also may be viewed in the ACAIS project folder.
3-7. Reserved.
Section 3. Production Certification Board
3-8. General PCB Information. The PCB is a high-level FAA evaluation function based directly upon the responsibilities established in title 49 of the United States Code (49 U.S.C.) 44701, 44702, 44704, and 44709.
a. Purpose. The purpose of the PCB is to evaluate the eligibility of the applicant for issuance of a PC based upon the preliminary findings and recommendations of the CM section and the PCB’s review of the applicant’s facilities and quality system.
b. Applicability. The PCB should be convened only for initial production approvals, or when entire facilities have been relocated or are added to the PC. The PCB should not be convened for the addition of new models to the PLR or relocation of a portion of the facility. In these instances, the procedures are contained in paragraph 3-15. of this order should be followed.
3-9. PCB Member Responsibilities. › c. Propulsion Section/Branch.
c. PCB Members. PCB members should consist of a group of qualified specialists from airframe, systems and equipment, propulsion, manufacturing, and flight test functions, as appropriate. These members will assist in evaluating the applicant’s production, engineering, flight test procedures, and other related functions. Representatives from AIR-600, and applicable certification branches may also participate in a PCB when deemed desirable or necessary.
d. PCB Chairman. The CM branch manager serving the geographic area where the manufacturing facility is located will act as the chairman of the board. When necessary, the CM branch manager may delegate the chairmanship to the CM section manager or other qualified CM branch personnel.
3-9. PCB Member Responsibilities. Specific PCB member responsibilities are as follows:
a. PCB Chairman. The PCB chairman is responsible for:
(1) Selecting and assigning PCB members, as deemed appropriate for the particular product, and notifying the members of the PCB in sufficient time to permit adequate planning and preparation.
(2) Notifying the applicant of the PCB schedule and identifying members and their assignments.
(3) Selecting a representative number of the applicant’s supplier facilities for evaluation to determine whether the applicant’s quality system provides for satisfactory supplier control.
(4) Conducting pre/post PCB meetings with the PCB or the applicant.
(5) Reviewing and analyzing the PCB findings and ensuring that appropriate corrective actions have or will be taken.
(6) Completing, signing, and distributing the PCB minutes.
b. Principal Inspector. The PI, in coordination with the CM section having certificate management responsibility, and the PCB chairman, is primarily responsible for establishing schedules, making arrangements for meeting rooms, obtaining sufficient copies of the quality manual, and making all other arrangements necessary for convening and conducting the PCB in the most expeditious manner. The PI is further responsible for ensuring that the applicant has taken all agreed upon corrective actions, for preparing the minutes of the PCB, and for initiating and completing any enforcement actions, when applicable.
c. Propulsion Section/Branch. The propulsion section/branch or its equivalent is responsible for the evaluation and approval of the applicant’s production engine/propeller test procedures, as required by § 21.137(e). This effort will be coordinated with the responsible CM section. After determining that the procedures are acceptable, a letter of approval will be prepared and forwarded to the applicant when a PC is issued. A copy of this approval letter will be included in the PCB minutes.
3-10. Conduct of the PCB. › e. Reporting.
d. Flight Test Section/Branch. The flight test section/branch or its equivalent is responsible for the evaluation and approval of the applicant’s flight test procedures and checklists as required by § 21.137(e). This effort will be coordinated with the responsible CM section. Upon determining that the procedures and checklists are acceptable, a letter of approval will be prepared and forwarded to the applicant when a PC is issued. The letter will also include the names of those company pilots designated and authorized by the applicant to conduct production flight tests. A copy of this letter will be included in the PCB minutes.
e. Other PCB Members. Airframe and equipment engineering representatives and all other PCB members are responsible for ensuring that the applicant is in compliance with § 21.137, as appropriate to their particular assignment. Representatives from AIR-600 and the applicable certification branch are responsible for acting in an advisory capacity or for the completion of any PCB activity assigned by the PCB chairman.
3-10. Conduct of the PCB. A PCB is generally conducted in the following basic phases:
a. Initial FAA Personnel Meeting. Prior to arranging a pre-production board meeting, FAA personnel will hold a meeting to review the results of the PCM audit, CM section recommendations, and related correspondence between the FAA and the applicant. This meeting will also serve to plan the PCB audit, schedule subsequent meetings, and establish agenda items for the pre-production board meetings.
b. Pre-Production Board. A pre-production board meeting with the applicant’s representatives should be considered upon receipt of the PC application. This meeting should include the PCB chairman, CM section manager, the PI, and others as necessary. The purpose of this meeting is to advise the applicant as to the purpose of the PCB and of the FAA’s evaluation plans. It should be made clear to the applicant that the PCB is a fact-finding body convened to determine whether the applicant is following §§ 21.135 and 21.137. The applicant should also be advised that the PCB is responsible for making a thorough evaluation of the applicant’s quality system, quality manual, organization, production facilities, and if deemed necessary, supplier facilities. Also, a determination should be made at this time that the location of the applicant’s facilities will pose no undue burden on the FAA as specified in § 21.139.
c. PCB Audit. Following the pre-production board meeting with the applicant, the PCB should evaluate the applicant’s quality manual and perform an on-site evaluation of the applicant’s quality system, organization, production facility, and any suppliers, as deemed appropriate. In addition, the PCB should confirm that the applicant for a PC to produce a complete product has submitted an SMS implementation plan to the FAA for approval. Refer to paragraph 3-6. of this order for audit procedures.
d. Internal FAA PCB Meetings. PCB meetings, attended by all PCB participants, will be conducted as needed to discuss and evaluate each unsatisfactory condition submitted by each member.
e. Reporting. The PCB will prepare FAA Form 8120-14, Production Approval/Certificate Management Activity Report, upon completion of the PCB. All unsatisfactory conditions will be recorded on FAA Form(s) 8100-6 and 8120-14.
3-12. Distribution of PCB Minutes. › b. One copy to the cognizant CM section that participated in the PCB.
f. Final PCB Meeting. A final meeting, attended by all PCB members and representatives of the applicant, will be held to advise the applicant of the PCB findings. Each unsatisfactory condition should be presented and discussed briefly.
(1) Corrective Action. In those instances where a product is being produced under a TC, prior to the issuance of any production approval, the PC applicant must be requested to commence immediate corrective action on those items that directly involve the product and related quality system practices. A reasonable time may be allowed for correcting deficiencies in the quality manual. However, the applicant must be advised that the PCB cannot recommend that a PC be issued unless all applicable regulations are complied with and until the CM section has evaluated all corrective actions and found them to be satisfactory.
(2) Formal Confirmation. The applicant must also be advised that an official letter will be sent confirming the verbal presentation of the list of unsatisfactory conditions. This formal notification letter should be prepared by the PI for the signature of the chairman of the board, within ten working days following the final meeting with the manufacturer. The notification letter template is located at AIR-800 Division-Approved Templates.
(3) Violations. If the PC applicant is manufacturing a product/article under a TC, and any of the unsatisfactory conditions are determined to be violations to part 21, subpart F, appropriate enforcement actions should be initiated by the CM section in accordance with FAA Order 2150.3.
g. Final Phase of PCB. The final phase of a PCB is the evaluation by the CM section of the corrective action taken by the applicant. The results of the re-inspection should be reported to the chairman of the board using FAA Form 8120-14.
h. PCB Conclusion. The CM section will formally advise the applicant in writing, as soon as practical, that a PC will be issued based on a showing of compliance to §§ 21.135 and 21.137, or that a PC will not be issued if there is failure to show compliance with §§ 21.135 and 21.137. The CM section will provide notification to the CM branch that the letter has been issued. It may be viewed in the ACAIS project folder.
3-11. PCB Minutes. The CM section will prepare the PCB minutes for the signature of the chairman. The minutes should encompass a concise record of the entire PCB proceedings, including the names and titles of all participants.
a. All correspondence relating to the PCB, including letters to the applicant, replies, etc., are part of the minutes and should be attached as appendices.
b. All FAA Form(s) 8100-6 and 8120-14, or printed copy of electronic equivalent, should also be attached to the PCB minutes as a separate appendix.
3-12. Distribution of PCB Minutes. The PCB minutes should be distributed as follows:
a. Original to the CM branch involved. Destruction of the original is prohibited.
b. One copy to the cognizant CM section that participated in the PCB.
3-13. PCB Adjournment. The PCB will be adjourned when the PCB minutes are accepted by the chairman and distributed to the PCB members.
(1) Amendment of PCs/PLR. › (a) The applicant for an amendment to a PC to add a TC, model, or both…
3-14. Reserved.
Section 4. Issuance of Production Certificate and Production Limitation Record
3-15. Preparation and Delivery of PC and PLR. Upon a finding by the PCB that the PC applicant’s quality manual, quality system, organization, and facilities comply with §§ 21.135, 21.137, and 21.138, the CM section will prepare FAA Form 8120-4, Production Certificate, and FAA Form 8120-3, Production Limitation Record, for the signature of the CM branch manager or delegate. Signature authority for the PC and PLR may be delegated to the PCB chairman. Electronic signatures are permitted. Delivery of production approvals may be accomplished using email or sent via certified mail. Whichever method of delivery is used, it is essential that the PC holder be advised of its requirement to retain its PC and make it available to the FAA upon request.
a. PC. Each PC will be assigned a unique, consecutive number using a four-digit format beginning with 1000 (e.g., PC No. 1000). The FAA will create and maintain a summary of all issued PCs along with a record of any subsequent changes.
Note: When a PC is issued based on a licensing agreement that is for a specific period of time, it must be indicated on FAA Form 8120-4 under “Duration”.
b. PLR. The FAA issues a PLR as part of a PC. A PLR will include the TC, model number, and production authorization date for each product, and identify each Interface Component (IC) the PC holder is authorized to manufacture and install. After the FAA issues a PLR, a PAH should ensure the PLR accurately reflects each product and IC the PAH intends to manufacture.
Note: When a PC is issued for an STC, the PLR will include the STC number, the model number of each product on which the STC is eligible, and the date that production was authorized.
(1) Amendment of PCs/PLR. Section 21.147 requires a PC holder to apply for an amendment to a PC in a form and manner prescribed by the FAA. A PC holder should apply by submitting to the FAA a properly executed FAA Form 8110-12. It is not normally necessary to establish a PCB. Instead, the CM section should conduct an audit using the guidelines in paragraph 3-6. of this order, as appropriate, to determine whether the quality system is adequate or has been appropriately changed to ensure positive control of the product to be added to the PLR. When changes to the quality system are substantial, the PI may elect to request a nonscheduled QSA to make this determination. The CM section with certificate management responsibility may issue revisions to the PLR to include new products or models, when authorized. The amendment of PCs requires the following:
(a) The applicant for an amendment to a PC to add a TC, model, or both must comply with the applicable §§ 21.137, 21.138, and 21.150 requirements.
(2) IC Amendment to the PLR. › (e) CM section communicates its decision to the PC holder.
(b) The applicant for an amendment to a PC may have its PLR amended to allow the manufacture and installation of an IC, provided:
1. The design and installation data for the IC is owned by, or licensed to, the applicant and made available to the FAA on request,
2. The applicant manufactures the IC,
3. The applicant’s product conforms to its approved type design, and the IC conforms to its approved type design data,
4. The assembled product, with the installed IC, is in a condition for safe operation, and
5. The applicant complies with any other conditions and limitations the FAA considers necessary.
(c) The applicant for an amendment to a PC must comply with §§ 21.147(b), 21.135(c), 5.11(b), and 5.11(d) requirements. These sections require the following:
1. No action is required for the first six months after the part 5 effective date.
2. Have submitted an SMS implementation plan to the FAA for approval within six months of the part 5 effective date.
3. Complete SMS implementation within thirty-six months of the part 5 effective date.
(2) IC Amendment to the PLR. Section 21.147 authorizes a PC holder to apply to amend its PLR to permit the manufacture and installation of ICs. An IC is an article that serves as a functional interface between an aircraft and aircraft engine, an aircraft engine and a propeller, or an aircraft and a propeller. The PLR identifies each IC that the PC holder is authorized to manufacture and install. The following process must be followed before a PC holder may manufacture and install ICs:
(a) PC holder submits a request to the CM section to add ICs (previously identified by the certification branch) to the PLR.
(b) CM section coordinates with the certification branch for applications to add ICs to the PLR when no prior conformation is available to prove the articles meet the requirements to be identified as ICs.
(c) CM section evaluates whether the PAH has the capability to manufacture and install the ICs.
(d) If the CM section determines the PAH is capable, the ICs will be added to the PLR.
(e) CM section communicates its decision to the PC holder.
(5) STC Modifications Incorporated by a TC/PC Holder. › (b) When the PC holder of a TC obtains an STC, or related licensing…
Note: Refer to appendix B to this order for more detailed information on adding ICs to the PLR.
(3) Other Additions to the PLR. If a PC holder desires to add a new TC or new model under an existing TC to the PLR, the PC holder must make application in the same manner as for the original issuance. In this instance, it is not normally necessary to establish a PCB. In place of the PCB, the CM section should conduct an audit using the guidelines in paragraph 3-6. of this order, as appropriate, to determine whether the quality system is adequate or has been appropriately changed to ensure positive control of the product to be added to the PLR. When changes to the quality system are substantial, the PI may elect to request a nonscheduled QSA to make this determination. The CM section having certificate management responsibility may issue revisions to the PLR to include new products or models, when authorized.
(4) Deletions from the PLR. Where production of a type-certificated product has been discontinued, and more than one TC is listed on the PLR, the following applies:
(a) If neither the complete product nor spare articles are being produced, the discontinued product or model should be deleted from the PLR. Upon issuance of the revised PLR, the CM section will request that the PC holder return the superseded PLR, which will be marked “Superseded” and retained in the files. If no other products, models, or spare articles are covered by the PC, the PC holder will be requested to return both the PC and PLR for cancellation. The CM section will retain the canceled PC and PLR.
(b) If production of the complete product has ceased, but spare articles are still being produced, the PLR should be revised to reflect this. The CM section should ensure that the PC holder remains in compliance with part 21, subpart G, and will continue to advise the FAA of any changes in its organization, systems, procedures, or processes.
(5) STC Modifications Incorporated by a TC/PC Holder.
(a) When the holder of the TC seeks and obtains its own STC, or is licensed to use another person’s STC data, the TC holder may amend the TC to incorporate the STC approval by reference. Another party’s STC that is incorporated during production and is referenced in and becomes a part of the TC need not be shown on the PLR. When a TC is amended to incorporate data approved under an STC, only the TC should continue to be shown on the PLR.
(b) When the PC holder of a TC obtains an STC, or related licensing agreement, but does not make the STC an integral part of the TC, the PC holder may incorporate the STC in production products prior to OAC approval, provided that:
1. The PC holder makes application to the FAA to add the STC to its PLR,
2. The quality system data are revised as necessary, and
(5) STC Modifications Incorporated by a TC/PC Holder. › (c) When a PC holder elects to use neither of the foregoing methods,…
3. The engineering data submitted for the STC approval provide all the details necessary for manufacture and for making conformity determinations.
(c) When a PC holder elects to use neither of the foregoing methods, the TC holder may incorporate an STC modification into production products only after OAC, in accordance with the provisions of part 43.
3-16. Initial Risk-Based Resource Targeting Assessment. After the issuance of the PC, the CM section will conduct a risk-based resource targeting (RBRT) assessment of the PC holder. The results will determine the initial basis for conducting ongoing certificate management responsibilities, as summarized in FAA Order 8120.23, Certificate Management of Production Approval Holder.
d. Exceptions. A PMA is required except as described below: › (4) An aircraft owner or operator may produce article(s) for…
Chapter 4. Parts Manufacturer Approval (Part 21, Subpart K)
Section 1. General Information
4-1. Applicability.
a. Part 21, subpart K, is applicable to any person who desires to manufacture an article under a PMA. The PMA is both a design and production approval issued to an applicant who has demonstrated the capability to design and manufacture to specific FAA requirements. The FAA does not separate the State of Design from the State of Manufacture.
b. A PMA may be obtained for replacement articles for technical standard order (TSO) article(s) that are approved as part of a product type design, provided that installation eligibility to that product can be shown. However, approval of an article that would constitute a major design change to the TSO article cannot be done under a PMA and would require a new TSOA. An applicant’s design that could meet the identical provisions of § 21.303 would normally not be considered a major design change.
c. A PMA may not be issued if the manufacturing facilities for the article are located outside the United States, unless it has been determined, in accordance with § 21.309, that such location(s) would place no undue burden on the FAA.
d. Exceptions. A PMA is required except as described below:
(1) Manufacturing inspection procedures, materials, or special processes, such as hardening, plating, or shot-peening are not in and of themselves eligible for PMA. However, if a person participates in controlling the design, manufacture, or quality of an article by performing such procedures or processes and does so with the intent that the article be sold for installation on a type-certificated product, that person must do so as an approved supplier to another’s FAAapproved quality system.
(2) A PMA cannot be issued based on a “one-time-only” STC or FAA Form 337, Major Repair and Alteration, approval. The applicant would have to reapply for a new STC, which constitutes a “multiple approval,” before a PMA could be considered.
(3) Other PAHs (TC, PC, or TSOA) may produce replacement article(s) for their products or article(s) under their existing design and production approvals. A supplier to a PAH may not produce replacement or modification article(s) for sale for installation on a typecertificated product, unless that supplier has a PMA for the replacement or modification article(s). However, a PAH may authorize a major inspection and grant direct-ship authority (with FAA approval) to a supplier.
(4) An aircraft owner or operator may produce article(s) for installation on their own product without a PMA. The installation of those article(s) must comply with part 43 and other applicable airworthiness standards.
4-3. Advising the Applicant. › a. AC 21-43 sets forth an acceptable means of complying with part 21,…
(5) An air carrier, operating under 14 CFR part 121, Operating Requirements: Domestic, Flag, and Supplemental Operations, or 14 CFR part 135, Operating Requirements: Commuter and On Demand Operations and Rules Governing Persons On Board Such Aircraft, may produce article(s) for installation on its own product without a PMA, provided the installation of those article(s) is approved in accordance with part 43 and complies with the air carrier’s accepted maintenance procedures manual and instructions.
(6) An FAA-certificated repair station may produce an article for installation on a type-certificated product for current and anticipated in-house repairs or modifications. Further guidance may be found in AC 43-18, Fabrication of Aircraft Parts by Maintenance Personnel.
(7) The FAA does not require a PMA for production of commercial or standard parts produced for sale for installation on a type-certificated product. A PAH may purchase commercial or standard parts and subject them to more restrictive inspection criteria prior to approval for installation. When a question arises as to whether a part is a commercial or standard part, the certificating CM section should be contacted to determine whether the design of the part meets the criteria for a commercial or standard part.
(8) In accordance with § 21.502, replacement or modification article(s) produced and imported to the United States under the provisions of an agreement with a foreign country do not require a PMA. The scope of the agreement must specifically include acceptance of replacement and modification article(s). Acceptable replacement and modification article(s) may include:
(a) Article(s) produced under the provisions of a bilateral agreement by the foreign holder of an FAA TC issued in accordance with § 21.21 or § 21.29, an STC, or a letter of TSO design approval; or
(b) Articles produced by a foreign manufacturer and approved by their local CAA as specified in a bilateral agreement. Depending on the scope of the bilateral agreement, such articles may include those designed as replacements for United States State of Design products.
Note: In both cases, the article(s) are accepted for import under § 21.502, only when accompanied by a proper export airworthiness approval.
4-2. Privileges. A PMA holder has the privileges specified within the PMA letter and supplement. In addition, a PMA holder is eligible to have a qualified employee(s) designated as a DMIR in accordance with the provisions of part 183. The PMA holder may also be authorized by part 183 to apply for and obtain an ODA. FAA Orders 8000.95 and 8100.15 contain procedures for the administration of DMIRs and ODAs, respectively.
4-3. Advising the Applicant. The applicant should be advised that:
a. AC 21-43 sets forth an acceptable means of complying with part 21, subpart K. Alternative methods and procedures may be approved when the applicant can show that the proposed methods and procedures will achieve compliance with part 21, subpart K.
b. The applicant must establish a quality system in accordance with § 21.307 and provide a quality manual describing its quality system to the FAA in accordance with § 21.308. The manual must include descriptive material that adequately covers each applicable paragraph of § 21.137. The manual may vary in length depending on the scale of the quality system, size of the manufacturing facilities, and complexity of the article. For further guidance, refer to AC 21- 43.
d. PMA Holder’s Responsibility. › (5) Issuing Authorized Release Documents for Articles.
c. Approval of an application for PMA requires an approval of the design by the certification branch and a quality system approval by the CM section.
d. PMA Holder’s Responsibility.
(1) Organization. Section 21.305 requires a PMA holder to provide to the FAA a document describing how its organization will ensure compliance to subpart K and sets out the requirements for this document. The document must identify a single point of contact who is knowledgeable of, and accountable for, maintaining the organization’s FAA-approved operations. In addition, the document must describe the accountable manager’s assigned responsibilities, delegated authorities, and the functional relationship of those responsible for quality. The PMA holder must amend the document as necessary to reflect changes in the organization required by §§ 21.305 and 21.316(a).
(2) Reporting Failures, Malfunctions, and Defects. The PMA holder must report any failure, malfunction, or defect in any article as required by § 21.3. The PMA holder must establish a procedure for such reporting as a part of its quality system. This reporting requirement applies to failures, malfunctions, or defects that may result in or have resulted in one of the occurrences listed in § 21.3(c).
(3) Quality System. The PMA holder must establish and describe in writing a quality system that complies with § 21.307. The PMA holder is responsible for maintaining the quality system in compliance with the data and procedures approved for the PMA, and for determining that each completed article produced conforms to the PMA and any terms or conditions prescribed in the approval.
(4) Supplier Control. A supplier is a person at any tier in the supply chain who provides a product, article, or service that is used or consumed in the design or manufacture of, or installed on, a product or article. Section 21.137(c) requires procedures for ensuring each supplier-furnished product, article, or service conforms to the PAH’s requirements. This section also requires the PAH to establish a supplier-reporting process for products, articles, or services that have been released from the supplier and subsequently found not to conform to the PAH’s requirements.
(5) Issuing Authorized Release Documents for Articles. Section 21.137(o) requires procedures for issuing authorized release documents, using FAA Form 8130-3, if the PAH intends to issue those documents. These procedures must provide for the selection, appointment, training, management, and removal of individuals authorized by the PAH to issue authorized release documents, refer to AC 21-43.
(7) Changes to Manufacturing Facilities. › (c) The PMA is issued to the principal manufacturing facility that…
(a) Procedures established pursuant to § 21.137(o) should ensure that only qualified personnel issue authorized release documents. A PAH’s evaluation of these individuals’ qualifications should include an assessment of their knowledge, background, experience, and training. Qualifications should be commensurate with the complexity and type of product or article for which the PAH issues an authorized release document. These procedures should also include requirements for completing FAA Form 8130-3 that is outlined in FAA Order 8130.21.
(b) These documents may be issued for new aircraft engines, propellers, and articles manufactured by the PAH, and for used aircraft engines, propellers, and articles rebuilt or altered pursuant to § 43.3(j). When an authorized release document used for export, § 21.137(o) requires a PAH to comply with the applicable § 21.335 requirements for the export of new and used aircraft engines, propellers, and articles. Refer to FAA Order 8130.21 to ensure the PAH is in compliance with § 21.335.
(6) Change to the Quality System. Each change to a quality system is subject to review by the FAA in accordance with § 21.320(a). A PMA holder must immediately notify the appropriate CM section in writing of any changes that may affect the inspection, conformity, or airworthiness of its article in accordance with § 21.309(c). These changes would include, but are not limited to, the following:
(a) Resumption of production after being discontinued for an extended period of time for other than normal periods of time, such as vacation periods.
(b) Significant curtailment or resumption of production operations.
(c) Significant reduction or reassignment of quality system personnel; and
(d) Changes or revisions to quality system data and related procedures.
(7) Changes to Manufacturing Facilities. The PMA holder must immediately notify the CM section in writing of any changes to its manufacturing facilities that may affect the inspection, conformity, or airworthiness of its article in accordance with § 21.309(c). The PMA holder must obtain FAA approval prior to making any changes to the location of its facilities in accordance with § 21.309(b).
(a) When a PMA holder moves the principal manufacturing facility to a new location, the PMA is no longer effective since a PMA is not transferable. Refer to § 21.314 for further guidance. If the PMA holder wants a PMA for the new location, then the PMA holder must reapply in accordance with § 21.303.
(b) A PMA holder’s manufacturing complex would normally consist of a principal facility and all associate facilities using the same quality system approved by the FAA, for the particular article(s). Associate facilities are discussed in chapter 6 of this order.
(c) The PMA is issued to the principal manufacturing facility that controls the design and quality of the article(s) for which the approval was granted. A postal address is not acceptable for a facility since the actual location must be identified. Such addresses, however,
may be used as supplemental to the actual address when desired for such uses as corresponding to and from FAA offices.
e. PMA Article Marking Requirements. Section 45.15 specifies the… › (2) Marking Detail Parts of PMA Assemblies.
(d) When the PMA holder seeks FAA approval to move an associate facility or add a new production facility, the FAA may, if deemed necessary, conduct a PCM audit at the new production facility or moved facility. If a PCM audit is deemed necessary, a satisfactory audit result must be obtained before the facility can be approved for production.
(8) Additional Article Approvals. If a PMA holder wishes to produce additional articles under the existing approved quality system, an application must be made, and the holder must show compliance with § 21.307. The CM section will then issue a PMA supplement that adds the new articles to the original approval, using the PMA letter available on AIR-800 Division-Approved Templates. If the new articles’ production constitutes a significant change in the operation or capabilities of the PMA holder, the CM section will conduct a review of the holder’s production and quality systems.
(9) Relationship Changes. The PMA holder may not produce articles if any change in its relationship to the design approval holder (licensor) or otherwise prevents it from meeting its PMA responsibilities.
e. PMA Article Marking Requirements. Section 45.15 specifies the marking requirements for PMA articles produced for installation on TC products, STC products, and TSO articles. In accordance with § 45.15, article(s) produced under a PMA must be permanently and legibly marked with the PMA holders name, trademark, symbol, or FAA-approved identification and part number and the letters “FAA-PMA”. The issuance of the PMA letter authorizes and requires the PMA holder to mark articles as prescribed in § 45.15. The PMA letter is available on AIR-800 Division-Approved Templates.
(1) Marking Critical PMA Articles. In addition to the marking requirements of § 45.15(a), a PMA article with a critical characteristic(s), as described in § 45.15(c), must be permanently and legibly marked with a serial number (or equivalent) unique to that part. The FAA must confirm that the marking location and the associated process will not affect airworthiness.
(2) Marking Detail Parts of PMA Assemblies. PMA article markings required by § 45.15 are applied to the top-level assembly of the approved replacement or modification article. Marking subassemblies or individual detail parts is not required. For example, if the PMA were approved for a hydraulic pump, the PMA marking would be affixed to the completed assembly. It is not required that each individual subassembly or detail part within the assembly be marked with “FAA-PMA,” unless it is being produced under its own PMA. If a PMA is granted for an assembly, individual detail parts of the assembly sold separately, except those produced under their own PMA, must be accompanied by a shipping document containing the information required by § 45.15(a) and must identify the detail part as a subcomponent of a PMA assembly. The article marking requirements for detail parts that are sold by the original PMA holder for installation into its related PMA assemblies may be found within the applicable design data for the assembly. This provides traceability of the individual detail parts to their related PMA assemblies.
e. PMA Article Marking Requirements. Section 45.15 specifies the… › (6) Identification Marking of Replacement and Modification Articles.
Note: There is no need to reissue previously issued PMA letters that require detail parts of an assembly sold separately to be marked in accordance with § 45.15.
(3) Part Numbering. Except as provided in paragraph 4-3.e.(3)(a) and (b) of this order, the applicant’s article should be numbered such that it is distinguishable from the corresponding TC holder’s part number. The TC holder’s part number with a prefix or suffix is sufficient for this purpose, if use of such a prefix or suffix will not cause confusion with the part marking practices of the TC holder. The requirement of § 45.15(a)(1) (to mark with the name, trademark, or symbol of the applicant) may be satisfied using a prefix or suffix if the prefix or suffix is consistent across the applicant’s product line. Each article also must be marked with “FAA-PMA” to meet the requirement of § 45.15(a)(2).
(a) Supplier Part Number. Some applicants are suppliers to PAHs. Often these PAHs use the supplier part numbers in their approved designs. When these suppliers later apply for PMA, they may continue to use their original part numbers, provided they also meet the requirements of § 45.15.
Note: PAHs and suppliers should be advised that when articles are marked only with PAH part numbers, the PAH is responsible for the design and quality of the article and any compliance and enforcement actions. Likewise, when the supplier is manufacturing under its PMA and has marked its article in accordance with § 45.15, they are responsible for the design and quality of the article(s) and any compliance and enforcement actions.
(b) Articles Manufactured Under License. When the PMA is based on the applicant showing evidence of a licensing agreement, the PMA article may have the same number as the type-certificated article, provided the applicant also meets the requirements of § 45.15.
(4) Articles Impractical to Mark. If the FAA finds the article too small or impractical (because of characteristics) to mark all (or any) of the information on the article, the information not marked on the article must be attached to the article or its container in accordance with § 45.15(d).
(5) Supplier Marking of PMA Articles. Suppliers to PMA holders may identify articles with PMA markings provided the PMA approval holder adequately controls those suppliers as part of its quality system. Suppliers that mark articles should be treated the same as any other supplier furnishing articles or services, using supplier control procedures as part of the quality system. The CM section may require that specific article marking controls be included in these procedures, along with any additional conditions that may be necessary for suppliers with direct-ship authorization.
(6) Identification Marking of Replacement and Modification Articles. The PAH must identify any portion of the PMA article (e.g., sub-assemblies, component parts, or replacement articles) that leave the manufacturer's facility as FAA-approved with the manufacturer's part number and name, trademark, symbol, or other FAA-approved manufacturer's identification.
(4) A brief description of the method by which design approval will be… › (a) Identicality by Showing Evidence of a Licensing Agreement.
c. SMS. PMA applicants and holders are not required to comply with part 5 but may choose to participate in the FAA’s Voluntary SMS Program and should notify the CM Section of their intentions. Applicants or holders desiring to participate in the Voluntary SMS Program may contact the FAA through the following email for further information: 9-AVS-AIR- [email protected].
4-4. Reserved.
Section 2. Processing an Application for a PMA.
4-5. Applicant Responsibilities.
a. Application Letter. The applicant must submit a letter of application to a certification branch or CM section, depending on the design approval basis. See 14 CFR 21.303. If the applicant is applying based on an STC or identicality by licensing agreement, the application will be submitted to the CM section having geographical responsibility for the area in which the applicant’s manufacturing facility is located. If the design approval basis is other than an STC or identicality by licensing agreement, the application will be submitted to the certification branch having geographical responsibility for the area in which the applicant’s manufacturing facility is located. The application must include the following information:
(1) The names and addresses of the manufacturing facilities where the articles will be manufactured.
(2) The identity of the article for which PMA application is being made, including:
(a) The type certificated product identified by make, model, series, and if appropriate, serial number, on which the article is to be installed.
(b) The TC holder’s part number and if known, the drawing number and revision level that the PMA article would replace or modify.
(3) A description of the quality system in detail specified in § 21.307.
(4) A brief description of the method by which design approval will be sought:
(a) Identicality by Showing Evidence of a Licensing Agreement. The applicant should submit an appropriate document from the TC, STC, or TSOA holder authorizing use of its FAA-approved data. Evidence of a licensing agreement is not a separate approval method, but merely a way to show identicality. The evidence of a licensing agreement is used by the applicant to show that the data submitted are FAA-approved and are therefore identical. For FAA purposes, the licensing agreement, in whatever form it takes, need only to authorize the applicant to use the type design data specified. The current industry practice of TC holders preparing “assist letters” for applicants to submit to the FAA sufficiently meets the requirements of showing evidence of a licensing agreement under § 21.303(a)(4). The CM section should
4-6. CM Section Responsibility. › c. PCM Audit.
ensure the “PMA assist letter” includes the information specified in paragraph 4-6.f .(1) of this order.
(b) Identicality Without a Licensing Agreement. The applicant should submit a statement certifying that the design is identical in all respects to the design of the article covered under an approved design (for example, TC, STC, or TSOA). In addition, the applicant should summarize the data that support the identicality assertion. Identicality to another PMA is unacceptable.
(c) Test and Computation. The applicant should submit a data package that includes a statement that all design, materials, processes, test specifications, system compatibility, and interchangeability are supported by an appropriate test and substantiation plan for FAA review and approval.
(d) STC. The applicant should stipulate use of the approved data from the STC and reference the STC number.
b. Unnumbered PMA Supplement. The applicant must prepare an unnumbered PMA supplement located on the AIR-800 Division-Approved Templates website. PMA supplements may be emailed to expedite processing.
4-6. CM Section Responsibility. The CM section confirms that the applicant has the capability to produce the proposed article in accordance with the approved design. The CM section will conduct the production approval process upon receipt of the PMA supplement evidencing approval of the design by the certification branch, or upon receipt of an application based on identicality by licensing agreement or STC. The production approval process includes the following:
a. Conformity Inspections. The CM section will perform or delegate conformity inspections at the request of the certification branch or other CM sections.
b. Quality System Description.The CM section will ensure that the applicant has submitted a description of the quality system in the detail specified in § 21.307. Data submitted as evidence of compliance with part 21, subpart K should be evaluated in accordance with the criteria contained in appendix A to this order. The certification branch should be involved in evaluating technical data such as design data control, software control, and material review board (MRB). When the data have been found to be acceptable, an additional statement, like the following, must be included in the initial PMA letter: “(applicant name) must produce all articles in accordance with (applicant name), quality manual, revision (manual’s revision), dated (manual’s date) or a later FAA-approved revision.”
c. PCM Audit.Prior to the original issuance of a PMA, the CM section will conduct the audit of the applicant’s facility, including supplier facilities, as appropriate, to determine whether the applicant is in compliance with part 21, subpart K. The CM section should decide whether to perform a conformity inspection within 30 days of receiving the PMA supplement from the certification branch or prior to issuing a PMA based on an STC or identicality by licensing agreement. This determination should be made based on article criticality, the history of the applicant, article complexity, supplier control issues, etc. When applicable, the CM section
(2) Applicants must provide sufficient data to support discretionary… › (c) Information that establishes the life limits or airworthiness…
will verify the applicant’s manufacturing critical processes required to achieve the approved design characteristics.
d. Principal Inspector. When deemed necessary, the PI should conduct or plan for an article conformity when additional articles are approved by a supplement to the original PMA approval letter, or when the manufacturer expands or relocates its facility.
e. Design Change Issues. The CM section should ensure that the applicant has the proper authority or quality system processes to implement minor design changes and MRB dispositions. The CM section should coordinate with the certification branch to evaluate the quality system controls that detail the design change and MRB disposition processes.
f. PMA Assist Letter.The evidence of a licensing agreement from the TC, STC, or TSOA holder must include written permission for the applicant to use the design data to apply for a PMA. See 14 CFR 21.303 (a)(4). A “PMA assist letter” or similar evidence authorized by the TC, STC, or TSOA holder is sufficient for showing evidence of a licensing agreement. A licensing agreement alone is insufficient to issue a PMA. The applicant must meet all the requirements of § 21.303.
(1) The “PMA assist letter” must include the following information:
(a) Product model, name, and TC/STC/TSO number.
(b) A statement that the PMA applicant is authorized to use the design data as identified by article name and drawing number. If the PMA Assist Letter does not contain the article drawing number, then the PMA application package must provide evidence of Design Holder acceptance of the design data.
(c) Information describing the authority of the PMA applicant to use the TC or STC holder’s part number and other article marking information, if applicable.
(d) Information on the article’s eligibility for installation (product make, series, model, and if appropriate, the serial number per the TCDS).
(2) Applicants must provide sufficient data to support discretionary conformity inspections in their application letters. Holders of the TC, STC, or TSOA may add this information to their assist letters. These data include:
(a) The revision level of the article’s drawing to baseline the design for future approved changes.
(b) A statement as to whether design changes to the article and disposition of nonconforming articles will be controlled through the TC, STC, or TSOA holder’s quality system. The statement also should describe how design change information will flow to the applicant, and consequently, to the FAA.
(c) Information that establishes the life limits or airworthiness limitations of the article.
Chapter 4. Parts Manufacturer Approval (Part 21, Subpart K) › 4-11. Reserved.
g. Identicality Finding.Based on the review of the “PMA assist letter” that contains the information specified in paragraph 4-5.a.(4)(a) of this order, the CM section will make a finding of identicality by showing evidence of a licensing agreement. The CM section also will review the PMA supplement prepared by the applicant.
h. Life-Limited Articles. The CM section will forward PMA applications for life- limited articles to the certification branch to verify completeness of design data. The CM section should ensure that the application includes a continued operational safety plan.
4-7. Reserved.
Section 3. Issuance of a PMA
4-8. Assignment of the PMA Number.The CM section will assign a PMA number to each original PMA letter in accordance with the existing project assignment number procedures. The PMA number should be unique to each PMA holder and be carried forth on subsequent approved supplements to that PMA. The CM section will sign the PMA supplements affirming production approval after completing validation of the quality system.
4-9. PMA Letter.
a. The CM section will prepare the following PMA documents:
(1) A PMA letter for the initial issuance of a PMA.
(2) A transmittal letter for all subsequent issuances of PMA, including all supplements is available on AIR-800 Division-Approved Templates.
b. When an applicant or approval holder asks to use electronic technology to satisfy information requirements for part 21 activities or asks to use an alternative method of storing certification, production, and related information, the applicant or approval holder establishes a procedure to do so and shares the required information with the CM section. The CM section decides whether it will maintain a hard or electronic copy of the required information. For additional information, refer to FAA Order 8000.79, Use of Electronic Technology and Storage of Data, and FAA Order 1350.14, Records Management, which allow for electronic records.
c. The original(s) PMA letter should be presented to the manufacturer, and the CM section will retain one copy for filing. The PMA supplement information will be uploaded into DRS by the CM section.
4-10. Initial Risk-Based Resource Targeting Assessment.After the issuance of the PMA, the CM section will conduct an RBRT assessment of the PMA holder. The results will determine the initial basis for conducting ongoing certificate management responsibilities, as summarized in FAA Order 8120.23.
4-11. Reserved.
Chapter 4. Parts Manufacturer Approval (Part 21, Subpart K) › 4-14. Changes to the Quality System.
Section 4. Post-PMA Activities
4-12. Transferability.
a. A PMA is not transferable to another person, company, or location per § 21.314. The regulations do not preclude revising approval letters to show a change in name only if the holder provides evidence there is no change in the quality system, management, ownership, or location of the principal facility. However, the design portion of a PMA based on an STC may be sold, licensed, or otherwise transferred. If the STC holder or a licensee intends to manufacture articles, it must apply for a new PMA.
b. In the event a PMA holder is acquired by another company, with no resulting change in the legal status of the PMA holder, the acquiring company will not be required to apply for a new PMA. However, the PMA holder must:
(1) Retain possession of the production approval,
(2) Retain the same quality system, and
(3) Continue to operate at the same location with the same core management officials.
c. The PI should conduct an on-site visit to ensure that the PMA holder has complied with the requirements in paragraph 4-12.b. of this order. In addition, the acquiring company should provide a letter to the CM section indicating its status as the new owner of the PMA holder and any future plans affecting the status of the PMA holder. The PI should update the project files to include documentation indicating the acquisition.
d. If the status of the PMA changes (for example, the PMA holder is disbanded or absorbed into the acquiring company) or the PMA holder transfers or relinquishes its production approval, the CM section will ensure that a new application for PMA is submitted for processing by the FAA.
4-13. Reuse of PMA Design Data. Though a PMA itself is not transferable, the design and substantiating data approved under a PMA may be used by another person to apply for a new PMA. The applicant must show compliance with the regulations and may submit previously approved substantiating data to meet (partially or fully) this requirement.
4-14. Changes to the Quality System. Whenever a PMA applicant has submitted data as evidence of compliance with part 21, subpart K, and the CM section has approved the data, any subsequent revisions to these data should be approved by the PI prior to implementation. Revisions that affect the design (for example, MRB, design data control, service difficulty reporting) should be coordinated with the certification branch. The CM section should notify the PMA holder of the approval in writing using the Quality System Changes Acceptance Letter at AIR-800 Division-Approved Templates.
Chapter 4. Parts Manufacturer Approval (Part 21, Subpart K) › 4-16. Export Considerations.
4-15. Revising/Amending the PMA Supplement. When a PMA approval letter is reissued, the first paragraph in the letter should be revised to include the previous supplement numbers. This will eliminate the practice of attaching additional pages of PMA supplements. Often an existing supplement needs correcting for typographical errors or to update contacts. While each certification branch or CM section sets an appropriate method to correct or update the supplement, they must maintain original signatures from each office on all altered supplements in the event of a revision. Some offices issue a revised supplement with corrections. The revised supplement is sent to the PMA holder along with a request to return the original incorrect supplement. An applicant may send an amended supplement request and supporting data to expand installation eligibility. However, while this is an acceptable practice, it is preferred that the applicant generate a new supplement instead. The applicant will submit to the certification branch an updated supplement in Microsoft Word table format with a note stating the specific certification branch or CM section action requested (for example, correction, revision, amendment, superseding, cancellation, or change of address).
4-16. Export Considerations. Many countries have additional requirements regarding their acceptance of PMA articles. In particular, the European Union member states require special statements on FAA Form 8130-3 regarding whether an article is critical or non-critical. Any required statements would be entered in block 12 of FAA Form 8130-3.
5-3. Advising the Applicant. › e. A TSOA does not imply installation eligibility on a…
Chapter 5. Technical Standard Order Authorization (Part 21, Subpart O)
Section 1. General Information
5-1. Applicability. Part 21, subpart O, is applicable to a person who desires to manufacture an article that meets a specific TSO. The TSOA system does not apply to articles produced under a PMA, TC, or PC. The TSOA is both an FAA design and production approval issued to an applicant who has demonstrated the capability to design and manufacture a specific TSO. The FAA does not separate the State of Design from the State of Manufacture.
5-2. Privileges. A TSOA holder has the privileges specified in subpart O and within the letter of TSOA. In addition, a TSOA holder is eligible to have a qualified employee(s) designated as a DMIR in accordance with the provisions of part 183. The TSOA holder may also be authorized by part 183 to apply for and obtain an ODA. FAA Orders 8000.95 and 8100.15 contain procedures for the administration of DMIRs and ODAs, respectively.
5-3. Advising the Applicant. The applicant will be advised that:
a. AC 21-43 sets forth an acceptable means of complying with part 21, subpart O. Alternative methods and procedures may be approved when the applicant can show that the proposed methods and procedures will achieve compliance with part 21, subpart O.
b. The applicant must establish a quality system in accordance with § 21.607 and provide a quality manual describing its quality system to the FAA in accordance with § 21.608. The manual must include descriptive material that adequately covers each applicable paragraph of § 21.137. The manual may vary in length depending upon the scale of the quality system, size of the manufacturing facilities, and complexity of the article. For further guidance, refer to AC 21-43.
c. A TSOA holder is a manufacturer who controls the design and quality of an article produced under the TSO system. The TSOA holder’s control extends to all related articles, processes, or services, including all related articles, processes, or services procured from outside sources.
d. A TSO design approval can be obtained only for the applicable TSO that is in effect on the date of application for that article.
e. A TSOA does not imply installation eligibility on a type-certificated product.
f. TSOA Holder’s Responsibility.
(1) Organization. Section 21.605 requires a TSOA holder to provide the FAA a document describing how its organization will ensure compliance to subpart O and sets out the requirements for this document. The document must identify a single point of contact who is knowledgeable of, and accountable for, maintaining the organization’s FAA-approved operations. In addition, the document must describe the accountable manager’s assigned responsibilities, delegated authorities, and the functional relationship of those responsible for quality. The TSOA holder must amend the document as necessary to reflect changes in the organization required by §§ 21.605 and 21.616(a).
f. TSOA Holder’s Responsibility. › (5) Issuing Authorized Release Documents for Articles.
(2) Reporting Failures, Malfunctions, and Defects. The TSOA holder must report any failure, malfunction, or defect in any article as required by § 21.3. The TSOA holder should be encouraged to establish a procedure for such reporting as a part of its quality system. This reporting requirement applies to failures, malfunctions, or defects that may result in or have resulted in one of the occurrences listed in § 21.3(c).
(3) Quality System. The TSOA holder must establish and describe in writing a quality system that complies with § 21.607. The TSOA holder is responsible for maintaining the quality system in conformity with the data and procedures approved for the TSOA and for determining that each article conforms to the TSO and any terms or conditions prescribed in the TSO letter of authorization. The TSOA holder must provide to the FAA a document describing how its organization will ensure compliance to § 21.607. This document must identify a single point of contact who is knowledgeable of, and accountable for, maintaining the organization’s FAA-approved operations. In addition, the document must describe the accountable manager’s assigned responsibilities, delegated authorities, and the functional relationship of those responsible for quality.
(4) Supplier Control. A supplier is a person at any tier of the supply chain who provides a product, article, or service that is used or consumed in the design or manufacture of, or installed on, a product or article. Section 21.137(c) requires procedures for ensuring each supplier-furnished product, article, or service conforms to the PAH’s requirements. Section 21.137(c) also requires the PAH to establish a supplier-reporting process for products, articles, or services that have been released from the supplier and subsequently found not to conform to the PAH’s requirements.
(5) Issuing Authorized Release Documents for Articles. Section 21.137(o) requires procedures for issuing authorized release documents (using FAA Form 8130-3) if the PAH intends to issue those documents. These procedures must provide for the selection, appointment, training, management, and removal of individuals authorized by the PAH to issue authorized release documents (refer to AC 21-43).
(7) Changes to Manufacturing Facilities. › (b) The TSOA is issued to the principal manufacturing facility that…
(a) Procedures established pursuant to § 21.137(o) should ensure that only qualified personnel issue authorized release documents. A PAH’s evaluation of these individuals’ qualifications should include an assessment of their knowledge, background, experience, and training. Qualifications should be commensurate with the complexity and type of product or article for which the PAH issues an authorized release document. These procedures should also include requirements for completing FAA Form 8130-3 that meets of FAA Order 8130.21.
(b) These documents may be issued for new aircraft engines, propellers, and articles manufactured by the PAH, and for used aircraft engines, propellers, and articles rebuilt or altered pursuant to § 43.3(j). When an authorized release document is used for export, § 21.137(o) requires a PAH to comply with the applicable § 21.335 requirements for the export of new and used aircraft engines, propellers, and articles. Refer to FAA Order 8130.21 to ensure the PAH is in compliance with § 21.335.
Continue reading ↓ 120 of 187 passages shown