Orders
Internal FAA directives, including 8900.1 and the air traffic orders.
All CurrentHistoricalCancelledProposed 12,207 documents
- Order 6830.5Criteria for Siting Microwave Landing SystemsCancelledJul 22, 1993
- Order 6850.1Letter of Agreement for Mals/rail OperationCancelledJan 1, 1971
- Order 6850.1AUse of Flasher Test Unit With 3-Intensity FlasherCancelledJun 1, 1975
- Order 6850.2Implementation of Air to Ground and Ground-To Ground Remote Control for Mals/railCancelledNov 1, 1975
- Order 6850.2Access to Visual Aid FacilitiesCancelledMay 1, 1975
- Order 6850.2Modifications to Ge Alsaf Regulator Substation Procured Under Contract Cca-33958CancelledJan 1, 1973
- Order 6850.2AVisual Guidance Lighting SystemsCancelledDec 17, 1981
- Order JO 6850.2BVisual Guidance Lighting SystemsCancelledAug 20, 2010
- Order JO 6850.2CVisual Guidance Lighting SystemsAug 30, 2022
- Order 6850.3Warning Sign - Low-Impact Resistance StructuresCancelledFeb 1, 1977
- Order 6850.3Maintenance of Departure LightsCancelledFeb 1, 1976
- Order 6850.4Implementation of Air-To-Ground/ground-To-Air Remote Control for Mals/rail & Other Vis AidsCancelledFeb 1, 1976
- Order 6850.5AMaintenance of Lighted Navigational AidsCancelledApr 1, 1988
- Order 6850.5ANeutral Connection to GroundCancelledJul 1, 1985
- Order 6850.5AMaintenance of Lighted Navigational AidsCancelledMay 1, 1981
- Order 6850.5BMaintenance of Lighted Navigational AidsCancelledAug 1, 1991
- Order JO 6850.5CMaintenance of Lighted Navigational AidsCancelledMar 27, 1995
- Order JO 6850.5DMaintenance of Lighted Navigational AidsFeb 5, 2021
- Order 6850.7Visual Guidance Lighting Systems Standard DrawingsCancelledOct 21, 1974
- Order 6850.8AMedium-Intensity Approach Lighting System With/runway Alignment Indicator Lights (MALSR)CancelledAug 29, 1975
- Order 6850.9Revised Approach Light CriteriaCancelledApr 1, 1975
- Order 6850.10ARunway End Identifier Lighting (REIL) System Standard DrawingsCancelledMar 18, 1977
- Order 6850.11Medium-Intensity Approach Lighting System With Runway Alignment Indicator Lights (MALSR)Aug 27, 1975
- Order 6850.12Visual Guidance Lighting Systems Standard Drawings Fy-75CancelledMay 17, 1976
- Order 6850.13AMedium Intensity Approach Light System, 40 Feet to 128 Feet Mounting HeightCancelledOct 24, 1981
- Order 6850.14AWarning Sign - Low-Impact Resistance StructuresCancelledMay 11, 1977
- Order 6850.15CVisual Guidance Lighting Systems Standard Drawings (fy 76/77/78/79) (REVISED)CancelledNov 24, 1980
- Order 6850.16Lamp, Par64 Bulb, Mogul End ProngCancelledOct 17, 1977
- Order 6850.17Medium-Intensity Lighting System With Runway Alignment Indicator LightsCancelledOct 27, 1977
- Order 6850.18Obstruction Marking for FAA Facilities Revised Drawing D-5480CancelledFeb 1, 1978
- Order 6850.19Frangible CouplingCancelledMar 23, 1978
- Order 6850.20Medium Intensity Approach Lighting System Threshold Lighting BackfitCancelledDec 16, 1980
- Order 6850.21Omnidirectional Approach Lighting System (ODALS)CancelledJan 9, 1981
- Order 6850.22Fiberglass Low-Impact Resistant (LIR) Structures for Approach Lighting SystemsNov 14, 1981
- Order 6850.23Medium Intensity Approach Lighting With Rail Runway Alignment Indicator Lights and Runway EndCancelledSep 17, 1981
- Order 6850.24Runway End Identifier Lighting SystemCancelledSep 9, 1982
- Order 6850.25High Intensity Approach Lighting System With Sequenced Flashing LightsCancelledSep 9, 1982
- Order 6850.26AVisual Glideslope IndicatorsCancelledFeb 1, 1985
- Order 6850.27Remote Radio Control System (RRCS) Project Implementation PlanCancelledMar 25, 1988
- Order 6850.28Precision Approach Path Indicator (PAPI) Project Implementation PlanCancelledMar 30, 1988
- Order 6850.29Pip for Malsr With RMSCancelledDec 5, 1989
- Order 6850.30Runway Identified LightingRunway Identified Lighting Subsystem With Remote Monitoring Subsystem Project Implementation PlanCancelledMar 12, 1990
- Order 6850.31Remote Radio Control System Fa-10266 Project Implementation PlanCancelledApr 30, 1990
- Order 6850.32Precision Approach Path Indicator With RMS Fa-10265 Project Implementation PlanCancelledJun 27, 1990
- Order 6850.34Std. Drawings for Runway End Identifier Lighting System Type Fa-10264 W/remote Monitoring SubsystemCancelledJul 21, 1993
- Order 6850.35High Intensity Approach Lighting System With Sequenced Flashing Lights (ALSF-2) Project PlanCancelledMar 30, 1993
- Order 6850.36Precision Approach Path Indicator With Remote Monitor SubsystemCancelledJan 10, 1994
- Order 6850.37Visual Guidance Lighting Equipment Approval ProgramMar 7, 2006
- Order JO 6850.38Maintenance of the Runway Status Lights (RWSL) System, Type FA-29900Jun 27, 2014
- Order 6860.1System Program Plan & System Implementation Plan for Loran Aviation MonitorCancelledDec 12, 1988
- Order JO 6860.2Maintenance of Loran-C Monitor EquipmentCancelledMar 21, 1990
- Order 6860.3Electronic Equipment Modification Handbook - Long-Range Navigation (LORAN) EquipmentCancelledSep 11, 1982
- Order 6880.1U.S. National Aviation Standard for the Global Positioning System Standard Positioning ServiceCancelledAug 16, 1993
- Order 6882.1Wide Area Augmentation System Operation and Maintenance ProgramCancelledAug 7, 2002
- Order JO 6882.2Maintenance of the Wide Area Augmentation SystemCancelledSep 24, 2007
- Order JO 6882.2AMaintenance of the Wide Area Augmentation SystemCancelledAug 3, 2010
- Order JO 6882.2BMaintenance of Wide Area Augmentation SystemJun 6, 2016
- Order JO 6882.28Interim Maintenance Task Guidance on Addition of AMR GEO (PRN 133)CancelledDec 30, 2014
- Order 6884.1Siting Criteria for Ground Based Augmentation System (GBAS)Dec 15, 2010
- Order 6900.1Petroleum Spill Prevention Control and Countermeasure Plan InspectionsCancelledMar 1, 1976
- Order 6900.1Plant & Structures Inspection GuidelinesCancelledMay 1, 1968
- Order 6900.1Engine Generator & Equipment Room Vent Hood ModificationCancelledOct 1, 1973
- Order AC 6900.1DWork Requests to Facility Support DivisionCancelledOct 1, 1990
- Order 6900.2Sector Plant & Structures (P&S) Work Concepts, Working Equipment and Workshop Storage SpaceCancelledApr 1, 1977
- Order 6900.2DRequest for Field Maintenance Party ServiceCancelledFeb 1, 1980
- Order 6900.2ERequests for Field Maintenance Party ServiceCancelledJun 1, 1988
- Order 6900.3Plant and Structures (P&S)/ENVIRONMENTAL ModiPlant and Structures (P&S)/ENVIRONMENTAL Modification IndexCancelledOct 1, 1981
- Order 6900.3Plant and Structures ModificationsCancelledSep 1, 1977
- Order 6900.3DIndex of Plants and Structures ModificationsCancelledApr 1, 1992
- Order 6900.5Environmental Engineering HandbookCancelledJul 1, 1980
- Order 6900.5CPlant and Structures Maintenance Work Orders and Oper Procedures for Ce Fmps (ris Ce AF 6900-2)CancelledApr 1, 1980
- Order 6900.5DPlant and Structures Maintenance Work Orders and Operating Procedures for Ce FmpCancelledApr 1, 1986
- Order 6900.8Installation of Sliding on Existing FacilitiesCancelledFeb 1, 1975
- Order AF 6900.13Caretaker Schedule of Servicing Duties at Intermed Iate Landing FieldsCancelledJan 1, 1951
- Order 6900.24Power Conditioning Systems (PCS) Performance TestCancelledDec 1, 1974
- Order JO 6900.25Lightning and Surge Protection, Grounding, Bonding and Shielding (LPGBS) PolicyNov 13, 2018
- Order JO 6900.26Electrical Work Premises Wiring PolicyHistoricalMar 22, 2023
- Order 6910.1Approach Lighting Systems (ALS) Metering and Overload CircuitsCancelledMar 1, 1982
- Order 6910.1APower Factor Correction Capacitors, Als SubstationsCancelledMay 1, 1982
- Order 6910.2Regional Supplement to AF P 6910.3, Ch 13, Chapter 14CancelledFeb 1, 1966
- Order 6910.2APainting, Marking, and Lighting of Faa-Owned Towers and StructuresCancelledMar 1, 1982
- Order 6910.2BPainting, Marking, and Lighting of Faa-Owned Towers and StructuresCancelledOct 1, 1992
- Order 6910.2CPainting, Marking, and Lighting of FAA-Owned Towers and StructuresCancelledSep 21, 2001
- Order 6910.3Airport Beacons on FAA Standard Control TowersCancelledNov 1, 1964
- Order AF P 6910.3Plant Equipment Modifications - Visual NavaidsOct 21, 1968
- Order 6910.4Regional Supplement No. 1 to AF P 6910.3, Chg 19, Chap. 21CancelledSep 1, 1966
- Order 6910.5Approach Lighting Systems (ALS) Metering and Overload CircuitCancelledDec 1, 1967
- Order 6910.5Method of Keeping the General Electric and Westinghouse Electric Als System in OperationCancelledOct 1, 1967
- Order 6910.6Demountable Frame Hoist Support for Als Movinf Coil RegulatorsCancelledDec 1, 1972
- Order 6910.6Approach Lighting Systems (ALS) Removal & Replace. of Flush Fixtures - ToolCancelledDec 1, 1967
- Order 6910.7Relocation of Resistors in Sequence Flasher Power UnitsCancelledMar 1, 1973
- Order 6910.8Elimination of Outer Doors on HEVI-DUTY, Three Phase, ALSAF Regulator SubstationsCancelledMar 1, 1973
- Order 6910.8Retrofit Replacement of Semi-Flush Approach Lighting FixturesCancelledJun 1, 1968
- Order 6910.15Method of Keeping the Ge/hollingsworth and Westinghouse Als. Sys. in Oper.w RegCancelledAug 1, 1976
- Order 6920.2ABacteriological Analysis of Domestic Water Supplies (RIS: Al 6920-1)CancelledSep 1, 1978
- Order JO 6920.2AMaintenance of Water and Sanitation SystemsDec 17, 1980
- Order 6920.2BDrinking Water and Waste Water AnalysisCancelledJan 1, 1986
- Order 6930.1Standard for Painting And/or Lighting Steel TowersCancelledMar 1, 1967
- Order 6930.1Maintenance of Structural Towers and GuysCancelledOct 1, 1965
- Order 6930.1AFIRE Prevention and Maintenance of Fire Protection EquipmentCancelledSep 1, 1975