ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GREAT LAKES REGION GL 6910 .6
21 Dec 72
SUBJ: DEMOUNTABLE FRAME HOIST SUPPORT FOR ALS MOVING COIL REGULATORS
1 PURPOSE. This order furnishes fabrication details for a demountable frame hoist support to simplify removal of moving coil type regulator cores at ALS substations, and authorizes sector procurement where considered justified.
SUBJ: DEMOUNTABLE FRAME HOIST SUPPORT FOR ALS MOVING COIL REGULATORS
2. DISTRIBUTION. This order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities Field Offices.
3. CANCELLATION. Order CE SM 6910.8 is cancelled.
BACKGROUND
Lead breakage problems have been experienced with the G.E. and Westinghouse ALS constant current refulators using the moving coil principle. Most of the trouble experienced in this Region has been with the G.E. equipment. Repairs necessitate removal of the coil from the regulator tank. Removal of the core requires a lifting device, usually a rented mobile crane.
b. The demountable frame shown on the attached drawing was developed by the Southern Region. It fastens directly to the regulator housing and transformer base and provides a readily useable and economical lift frame from which a hoist may be suspended.
5. FIELD ACTION.
ao Individual Sector Offices shall submit. their requirements to the Regional Office with complete justification. Factors to be considered in justifying the installation should include:
(1) Availability of local equipment for removing the regulator coil.
(2) The. cost of this service as compared to the cost of the hoist.
(3) Present and future needs.
Distribution: RAF-3; FAF-0 (Normal) Initiated By: AGL-445
FAA Form 1320-1 (7-71) SLpersedes previous edition U.S. GOVERNMENT PRINTING -C-439-727
GL 6910.6 21 Dec 72
b. The Regional Office will make the final determination for installing the hoist.
C. Local fabrication with installation by the local GFET is recommended.
d. A minimum 1 ton capacity ratchet lever hoist with a 9: lift is recommended, Sears and Roebuck Catalog No. F99.G 78885 with 8' of additional chain, or equal.
alan H. Sloss
ALAN H.GLASS Chief, Airway Facilities Division
S"GALV. PIPE,WELDED CONST. 123/4 CLEAN E PRIME WELDS.PAINT 834 WELDS W/ ALUM.PAINT
S"GALV. PIPE,WELDED CONST. 123/4 CLEAN E PRIME WELDS.PAINT 834 WELDS W/ ALUM.PAINT
SLOT 2 PLACES S/0 WIDEA2LONG 3/1G FLATE
WELD GALU PIPE 3" LONG
DETAIL 'A'. UPPER GUICE ONE REOD
9" GALV PIPE x3" LONG 0/6 DIA. HOLES
WELD ys."x3"FLAT BAR
DETAILB' LOWER GUIDE (SEE DETAIL'A' ONE REQ'D 3
DETAILB' LOWER GUIDE (SEE DETAIL'A' ONE REQ'D 3
VOTES:
CLEAN WELDS & PRIME. PAINT ICOAT ALUM. POSITION LOWER GUIDE ON BASE. DRILLE TAF BASE FOR I/2 CAP SCREWS,FASTEN TO BASE WY2XI/Z CAP SCREWS
SEE DETAIL'B
ELEVATION LIFP- FRAME DETERMINE DIMENSION ONCACOD DRILL 9IG" HOLES IN FIELD LIFT -FRAME DETAILS