Radar Vectors
FAA Order Cancelled Issued Mar 1, 1973 AGL-464 2 pages Copy saved Nov 22, 2026

Order 6910.7 Relocation of Resistors in Sequence Flasher Power Units

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GL 6910.7 GREAT LAKES REGION

ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GL 6910.7 GREAT LAKES REGION

19 Mar 73

RELOCATION OF RESISTOR R-121 (SPEC. FAA-125O) OR RESISTOR R-105 SUBJ: (SPEC. FAA-125OA) IN FLUSH/FRANGIBLE SEQUENCE FLASHER POWER UNITS.

PURPOSE. This Order authorizes the relocation of monitor resistor R-121 or R-105 in the sequence flasher flush/frangible condenser discharge power units to prevent arcing due to the presence of moisture. 2. DISTRIBUTION. This. Order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities field offices.

19 Mar 73

CANCELLATION.Order CE SM 6910.9 is cancelled.

4. BACKGROUND

a. Because of the close proximity of components, as well as the presence of moisture on the phenolic board, arcing has occurred between various resistor components and the monitor resistor, R-12l, thereby burning it out. b. Since the R-12l resistor is tied to a common monitor line, this allowed the arc to backfeed into the other flasher units, causing a: burnout of R-121 in each unit.

4. BACKGROUND

5. MODIFICATION.To prevent possible recurrence of this condition, relocation of the monitor resistor in the flush/frangible power supplies is authorized. a. Remove resistor R-12l from the phenolic board and install it at terminal 4 of terminal board TB-101.(Specification FAA-1250). Remove resistor R-l05 from the phenolic board and install it at terminal #4 of terminal board TB-101. (Specification FAA-1250A). 6. PROCEDURES

a. Where required, relocation of the resistor shall be accomplished as outlined in Figure 1, Page 2.

b. Correct instruction book drawings after completion of the modification.

afor H. Mlass ALAN H. GLASS Chief,Airway Facilities Division

Distribution: RAF-3; FAF-O (Normal) Initiated By: AGL-445

FxA

GL 6910.7 19 Mar 73

FIGURE 1 PARTIAL SCHEMATIC OF SYLVANIA FLUSH/FRANGIBLE POWER SUPPLY

FIGURE 1 PARTIAL SCHEMATIC OF SYLVANIA FLUSH/FRANGIBLE POWER SUPPLY

TIO4 8

5 4 2.5 VAC 220K R115 DIOI 30 9

6 RI16

240 VAC 000000000 eeeeee KIOI 5 (R105) R121 22K 270K 270K≤ 27

12OVAC (PULSED)

F1O2 2A S.B. SIOI Remove R121

TBIOI 1234 Wew Location Resistor of R121 (R105) & tape wires after removal (R105). Soldep TB102 99990 5678M 0005

BLACK 24O VAC WHITE,GROUND WHITE,NEUTRAL BLACK,MONITOR GREEN , TIMING

BLACK 24O VAC WHITE,GROUND WHITE,NEUTRAL BLACK,MONITOR GREEN , TIMING

Page 2 U.S. GOVERNMENT PRINTING OFFICE: 1972-754-261