Radar Vectors
FAA Order Cancelled Issued Feb 1, 1993 ASO-500H 153 pages Copy saved Nov 18, 2026

Order AT 1100.1 Southern Region Air Traffic Div. Standard Operating Procedures

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION SO AT 1100.1 SOUTHERN REGION

2/19/93

SUBJ: SOUTHERN REGION AIR TRAFFIC DIVISION'S STANDARD OPERATING PROCEDURES

1. PURPOSE. This order establishes standard operating procedures to be used by all branches within the Air Traffic Division (ATD). It is designed to standardize methods used by all ATD personnel in the performance of their duties. This order is in concert with national/regional orders and will be used in performance evaluation and training of all ATD personnel.

SUBJ: SOUTHERN REGION AIR TRAFFIC DIVISION'S STANDARD OPERATING PROCEDURES

2. DISTRIBUTION. This order is distributed to all personnel assigned to the ATD.

3. EFFECTIVE DATE. March 1, 1993.

4. BACKGROUND. This order was implemented to standardize the operating procedures used by the ATD and to provide a single source document that shall be utilized when training personnel new to the ATD.

5. RESPONSIBILITY. It shall be the responsibility of all division personnel to be knowledgeable of the ATD general information and their respective branch Standard Operating Procedures (SOP) contained in this directive. Each branch shall review the SOP annually in January, and forward the required changes to the Division SOP Coordinator, ASO-540. If no changes are required, a negative response shall be forwarded to the coordinator not later than January 30.

6. TRAINING. Branch Managers shall ensure all new personnel are assigned an instructor to train them on their responsibilities. The instructor shall utilize the Division Checklist contained in Appendix 2 and the appropriate portions of this order to accomplish the required training. The completed checklist shall be forwarded to the appropriate supervisor upon completion of the required training.

7. APPENDICES.

Appendix 1 Air Traffic Division (ATD) General Information

Appendix 1 Air Traffic Division (ATD) General Information

Appendix 2 Division Checklist

Appendix 3 System Requirements Branch, ASO-510

Distribution: A-X(AT)-8 Initiated By: AS0-540

SO AT 1100.1

Appendix 4 Appendix 5 Appendix 6

illiamtSood

2/19/93

Resource Management Branch, ASO-520

Appendix 4 Appendix 5 Appendix 6

System Management Branch, ASO-530 Facility Operations Branch, ASO-540

Manager, Air Traffic Division

APPENDIX 1. AIR TRAFFIC DIVISION GENERAL INFORMATION

1. PURPOSE. This appendix contains general information and standard operating procedures to be used by all personnel of the ATD, ASO-500.

APPENDIX 1. AIR TRAFFIC DIVISION GENERAL INFORMATION

2. FUNCTIONAL STATEMENT. The ATD provides for the management of civil and military air traffic operating in the navigable airspace within the geographical boundaries of the region, establishes regional policy and procedures supplementing national procedures, and maintains an air navigation and communications system. The division is under the executive direction of the Associate Administrator for Air Traffic.

3.FUNCTIONS.

a. Exercises line authority over air traffic field facilities and offices within the region.

b. Directs the operation of regional air traffic control, flight assistance, and aeronautical communications systems and facilities.

c. Serves as the lead office for development and coordination of the region's long range program plans to establish/discontinue/relocate air traffic services and air navigation facilities except terminal NAVAIDS.

d. Manages and directs all regional air traffic control operational automation activities and ensures national automation policies are implemented. Develops, as needed, regional policies, procedures, and practices applying to system operation, control, and performance.

Allocates staffing and other resources provided for air traffic services.

f. Assures implementation of national policies, procedures, and practices applying to air traffic services provided to civil and military aircraft. Recommends regional procedures and practices.

g. Provides for efficient allocation and utilization of the navigable airspace.

h. Maintains liaison with military commanders and provides assistance in securing compatibility of civil and military aviation operations.

i. Provides organizational development expertise related to employee involvement groups, survey feedback actions, and team building efforts.

j. Coordinates with the Human Resource Management Division on Labor Management Relation activities and Civil Rights Staff regarding the FAA EEO policy and practices.

k. Implements and maintains the Air Traffic System Effectiveness program within regional boundaries.

4. GOOD OPERATING PRACTICES. It is important to recognize that Regional ATD staff work is different from that of an air traffic facility. Through the proactive support of field facilities the air traffic mission is accomplished. Some examples of good operating practices are:

a. Placing an emphasis on high quality staff work. This activity includes gathering and presenting all the facts, utilizing sound analytical skills in problem solving techniques, fact gathering activities, and the developing and evaluating alternative solutions. This process will result in sound recommendations which form the basis of decisions that impact the Air Traffic Division in a positive manner.

b. Providing guidance on existing documents through interpretations. Developing regional policy and recommending changes to national standards are within the scope of our mission.

c. Maintaining a broader perspective of the overall agency mission and needs. Not only will division personnel be responsible for programs within all three air traffic options, personnel will also be involved with efforts of other divisions and services.

d. Placing a strong emphasis on cost effective decisions. We are responsible for setting priorities to accomplish our goals and objectives, within available resources.

e. Dealing with field facilities and deadlines in a consistent manner.

f. Planning ahead in order to establish realistic priorities and deadlines consistent with ATD goals and objectives.

g. Remaining technically proficient in existing areas of expertise and expanding our knowledge base in the other areas and options.

h. Being open minded and receptive to new ideas, accepting constructive criticism, participating fully, and demonstrating initiative.

i. Communicating openly with individuals at all levels; peers, subordinates, and management alike. This will result in an increased awareness and improved rapport within the group. In the work place there is no room for rumor and innuendo; deal only in facts.

j. Being available to answer telephone calls or ensuring that you return calls promptly. Your responsiveness establishes a good rapport and credibility for the division.

k. Utilizing agendas to improve the effectiveness of meetings, then communicating results to all concerned in a timely manner.

1. Meeting deadlines through the effective use of call-ups, planners, and individual methods.

m. Employing efficient resource management in a productive and prudent manner.

5. STANDARD OPERATING PROCEDURES. The following procedures provide guidance in those areas that are common to the ATD.

a. New Employee Indoctrination and Training. Each branch manager shall ensure every new employee is assigned an instructor, who shall be responsible for their indoctrination and ensuring the required training is accomplished. The specialist will become thoroughly familiar with his/her assigned duties and responsibilities. The training shall be conducted utilizing the Division Checklist and the appropriate portions of this order.

b. Familiarization Flying Program. FAA Order 7210.3 outlines the requirements, procedures, and responsibilities for this program. All eligible personnel not authorized an Air Traffic Evaluation credential are encouraged to use this program in order to obtain a user's viewpoint on how our Air Traffic Control (ATC) System is working. The SF-160 portion of the program requires security, tracking and signatory authority for FAA Form 7000-5 booklets as follows:

(1) The Facility Support Section, ASO-544, is responsible for ordering, dispensing and tracking of FAA Form 7000-5 booklets for all employees who utilize the SF-160 program. This duty is assigned to ASO-544B.

(2) Branch managers shall administer the SF-160 program in accordance with FAA Order 7210.3.

(3) Used FAA Form 7000-5 booklets shall be returned to ASO-544B prior to issuance of additional booklets.

c. ATC Evaluation Credential Program. The Office of Air Traffic System Effectiveness, ATH-1, is responsible for implementing and clarifying the requirements, procedures, and responsibilities for this program. This program requires security, tracking and signature authority for FAA Form 7000-5 booklets as follows:

(1) The System Effectiveness Section, ASO-542, is responsible for ordering, dispensing and tracking of FAA Form 7000-5 booklets for all employees in possession of ATC Evaluator Credentials.

(2) Holders of ATC Evaluation Credentials are delegated signature authority for the issuance of FAA Form 7000-5 and shall ensure the security of all booklets in their possession.

(3) Holders of ATC Evaluation Credentials shall complete inflight monitor reports within five days after completion of each trip and forward them to ASO-542B for review and distribution. The second copy (white) of FAA Form 7000-5 shall be attached to the inflight report for tracking purposes.

(4) Inflight monitor reports shall be generated using the LAP-TOP Field Monitor Report (LFMR) program and each evaluator shall provide ASO-542B with a copy of the diskette containing the inflight evaluation(s) to be included in the branch data base called the Branch Field Monitor Report (BFMR) program by the end of each quarter.

(5) ASO-542B is the division BFMR/LFMR coordinator and maintains the BFMR program and updates the BFMR program as required using information provided by the specialist(s). ASO-542B shall provide training in the use of both programs.

(6) Used FAA Form 7000-5 booklets shall be returned to ASO-544B prior to issuance of additional booklets.

d. Incoming Correspondence. Incoming correspondence is date-stamped when received in the appropriate branch and distributed to the appropriate section/specialist by the clerical staff in that branch.

e. Recurring Reports. Examples of recurring reports include budget quarterly reviews, evaluations of ATC schools, incentive awards reports, facility staffing level letters, etc. An example of each report is retained in the appropriate branch administrative files for the previous year's submissions. Each branch maintains a call-up roster of recurring reports and the appropriate specialist is advised of the requirement for the report approximately 30 days prior to the report due date.

f. Correspondence: Read and Circulating Files.

(1) Branch Read Files are typed on carbon manifold and maintained at the appropriate branch secretary's desk. A copy of every document prepared, including telcon items, position descriptions, etc., is kept in the read file. Occasionally, this document represents the only hard copy of a document needed in the branch. Branch Read Files are retained for 2 years.

(2) Branch Circulating Files are a requirement set forth by the Air Traffic Division office and are compiled within the first 2-3 days of each month. These files are typed on green carbon manifold and filed by the branch secretary after circulation. The material is put in ascending date order and stapled in a file folder labeled for the appropriate branch

"MONTHLY READ FILE: (month)(year)." Branch Circulating Files are retained for 6 months.

A route slip on the front of the circulating file folder denotes the addresses as the Manager of the System Requirements Branch, ASO-510 (1); System Management Branch, ASO-530 (2); Facility Operations Branch, ASO-540 (3); or Resource Management Branch, ASO-520 (4).

g. Electronic Time and Attendance Management System (ETAMS) Processing. The branch secretaries maintain Time and Attendance (T&A) records for all branch personnel and they enter them into the Electronic Time and Attendance Management System (ETAMS) via computer each pay period. The ETAMS manual provides the schedule which must be adhered to and deviations from the standard entry procedures will be noted by ASO-20 and must be resolved.

h. Travel Arrangement Procedures. The following procedures should be used when scheduling travel.

(1) Prepare a worksheet or otherwise list all information needed to prepare travel orders, advances, and vouchers. Furnish a copy of this information to the traveller in advance of the trip.

(2) Once approved, airline and car rental reservations should be made through the Scheduled Airline Traffic Office (SATO). This will ensure that government rate fares and contract carriers are used to the maximum extent. Hotel and/or conference facility reservations should be completed by the traveller.

(3) Travel orders other than Limited Open Authorization (LOA) should be mailed to ASO-20 prior to the start of the trip so that funds will be obligated on time.

i. Filing Travel Vouchers. Upon the completion of the trip, the traveller will complete the following actions:

(1) Prepare the Standard Form 1012 voucher by filling in the trip information and attaching copies of all receipts.

(2) Mail the original voucher and receipts to the ASO-20 for payment. Travel vouchers are required to be filed within 3 working days of the completion of the trip.

(3) Provide one copy of the voucher, receipts and all backup material to the branch administrative staff for filing and record keeping.

(4) In the case of specific programs, such as the Women's Executive Leadership (WEL) and the Senior Executive Service (SES) Candidate Development Program (CDP), copies of vouchers must be sent to the respective program offices in headquarters.

j. Arranging Meetings and Conferences.

(1) Arrange for meetings in the Air Traffic Division conference room through the Air Traffic Division Office, ASO-500A.

(2) Arrange for other conference room(s) by calling the respective division's executive secretary.

(3) Arrange for reserving Rooms 702/704 by calling the Logistics Division, ASO-50.

(4) Arrange for meeting rooms at local hotels, etc., by first contacting the local hotels, then clearing through the Logistics Division (three bidders are required when a fee must be paid).

k. Procuring/Maintaining Supplies. Supplies are requested and obtained from the Supply Room, Logistics Division, ASO-52C3, using the following procedures.

(1) Normal stock supply items, i.e., envelopes, bond paper, pencils, etc., are requested by filling out a Supply Request Form, SO Form 4410-1, and presenting it to the specialist in the supply room. Normally, only the individual authorized to draw supplies should receive stock from the supply room, and Form 4410-1 must be signed by that individual.

(2) Items not normally retained in stock, i.e., Day Planners; items for which distribution is controlled, i.e., computer floppy disks; and items for which an unusually large supply is requested, are requested by filling out a Speed Memo Request, FAA Form 1360.49. The form must be signed by the individual authorized to procure supplies and the request should include the name of a contact person or office to be notified when the material arrives.

(3) Specialists should be aware that large orders may require additional time to fill and the supply specialist will process an order immediately. Additionally, when notified that an order has been filled or a requested item has been received, it should be picked up in a timely manner.

(4) As supplies are frequently restricted in quantity and authorized distribution, specialists should plan ahead to avoid shortages wherever possible.

6. FUNCTIONAL TASK. Human Resource Specialist, ASO-50OH.

a. Serves as division focal point, provides guidance and advice on development of long and short range division goals and objectives. Monitors and tracks approved objectives to assure progress and accomplishments. Recommends and/or initiates action to revise when program priorities are changed. Compiles status reports and statistics for quarterly review. This management information system is used in various ways, i.e., establishment of senior level performance standards and measurements, reports on overall progress and accomplishments to the field and higher level management, etc.

b. Serves as division focal point for various special emphasis human factors educational programs, such as workforce diversity/sexual harassment training, total quality management, situational leadership, executive education programs. WEL program, development of IDPs, etc.

c. Develops, implements and maintains policies, standards and procedures; provides guidance, response to inquiries, and resolution of problems; develops plans and program objectives; tracks, evaluates and reports on all facets of Employee Survey Program (SFA and JSS) as prescribed in 3200.8. Acts as AT regional representative at regional and national workshops and planning conferences.

d. Provides organizational development assistance related to employee involvement programs, employee survey programs, team building and change efforts. Coordinates funding arrangements and provides for both internal and external consultant services for field and RO, through HRMD, headquarters OD consultants, headquarters OD contract. Also arranges for internal management and facilitator expertise to work with field elements.

e. Coordinates, compiles, designs layouts, writes articles and publishes the Air Traffic Division Bulletin to enhance communications and organizational knowledge.

2/19/93 Appendix 2 SO AT 1100.1

APPENDIX 2. DIVISION CHECKLIST

APPENDIX 2. DIVISION CHECKLIST

Division Checklist.

The following is the Division Checklist for new employees.

NAME ARRIVING

INITIAL WHEN COMPLETE

1. PARKING LOT PROCEDURES AND STICKER

2. CAFETERIA

3. CREDIT UNION

4. ADDRESS - (EMERGENCY LOCATOR) FAA 1770.8

5. HEALTH INSURANCE (30 DAYS TO CHANGE SF-2809).

6. ATBA - MUST HAVE LETTER IN GOOD STANDING

6. ATBA - MUST HAVE LETTER IN GOOD STANDING

7. PHOTO FOR I.D.

8. ACCESS TO OFFICE AFTER HOURS

9. WORD PROCESSING CENTER

10. REGIONAL OPERATIONS CENTER VISIT & MEET STAFF

11. BRANCH/REGIONAL/WASHINGTON ORGANIZATIONS

12. REVIEW AND PROVIDE ORGANIZATIONAL CHARTS ON BRANCH/REGIONAL/WASHINGTON ORGANIZATIONS

13. G-CAR PROCEDURES AND SATO OFFICE

13. G-CAR PROCEDURES AND SATO OFFICE

14. BRANCH FUNCTIONS

a. Review Branch SOPs And Functional Statements

b. Review Division SOPs And Functional Statements

15. OFFICE PROCEDURES

a. Branch files

b. Supplies

C. Copy/FAX machines.

d. Travel Call Authority

e. T&A's

f. Computer Orientation and Security.

15. OFFICE PROCEDURES

8. Travel (Imprest Fund).

h. Travel Voucher (complete in 3 Days)

i. Coffee Fund

j. Flower Fund

k. Fan Out List_

1. Correspondence Procedures.

m. Mail

n. E.P.G.'s

0. Social Activities

p. Property Control

q. Telephones and Intercom Use_

r. SF-160/ATC Evaluation Program

16. BRIEFINGS

16. BRIEFINGS

a. Human Resource Management

b. LMR

c. Civil Rights

d. Accounting.

e. ATH-150

2/19/93

f.

8.

h.

SO AT 1100.1 Appendix 2

Public Affairs ASO-300 Offices

ASO-1 Staff

APPENDIX 3. SYSTEM REQUIREMENTS BRANCH STANDARD OPERATING PROCEDURES

1. PURPOSE. This appendix establishes standard operating procedures to be used by the System Requirements Branch, ASO-510.

APPENDIX 3. SYSTEM REQUIREMENTS BRANCH STANDARD OPERATING PROCEDURES

2. FUNCTIONAL STATEMENT. The System Requirements Branch is responsible for providing support relating to air traffic control automation systems, NAS Plan implementation, telecommunications services, and the development of plans to improve, relocate and discontinue air traffic facilities. The branch manages regional air traffic automation functions, and provides guidelines and technical assistance in the implementation of automated programs and procedures and the establishment of new plans. The branch:

a. Prepares information and operational requirements as needed to initiate procurement of leased communications services. Periodically reviews leased services and recommends additions or deletions as appropriate.

b. Develops regional plans for the provision of leased communications services for operation of the air traffic system.

c. Plans for provisions of the necessary equipment to assure satisfaction of the region-wide requirements for air traffic leased communications and compliance with national standards and policies.

d. Within the broad framework of national policies and standards, develops and recommends plans for provisions of air traffic services, facilities and air navigation aids (except terminal NAVAIDS) as follows:

(1) Analyzes system and program requirements for air traffic services, facilities, and air navigation aids.

(2) Develops long-range plans, recommends priorities, and assists in planning for location of air traffic facilities and air navigation aids.

(3) Collects, compiles, analyzes, and develops statistical data, forecasts trends in air traffic which affect planning within the region.

(4) Provides general guidelines for determining planning requirements; recommends discontinuances of services, equipment and/or relocation of air navigation aids based on changing requirements.

(5) Identifies, reviews, and analyzes equipment requirements and deficiencies; develops regional plans, recommends provision of new programs with region-wide requirements; and indicates priorities in terms of overall regional needs.

e. Accomplishes immediate and long-range equipment planning for all air traffic facilities and navigational aids, and programs for their completion within budgetary procedures; and provides air traffic input during

installation and implementation of projects after receipt of project assignments.

f. Provides guidance to air traffic facilities in implementing national and regional policies, programs, and standards pertaining to the provisions of air traffic services.

g. Manages the Air Traffic Division automation functions providing direction as necessary to assure adherence of national and regional policies. Serves as the communications link between the Air Traffic Plans and Requirements Service (ATR) and ATC field facilities.

h. As the focal point for all air traffic control automation activities in the region, coordinates with all interested organizational elements, i.e., Airway Facilities Division automation elements, on matters of concern. Provides ATC automation advice and assistance to other branches and divisions.

i. Monitors system performance of all automated facilities in accordance with national policy and ensures corrective action is taken as necessary to correct problems and correct performance.

j. Develops policy, guidance, and procedures within national policies to ensure configuration control of operational software, compliance with national orders, adequate testing, and maintenance of system operations are maintained at a satisfactory level.

k. Manages regional/facility software activities required for Facilities and Equipment automation projects, including training, test plan development, and system shakedown activities. This requires input into the operational equipment layout, site preparation, and installation planning.

1. Ensures adequate staff work has been completed on all proposed automation software changes originating within the region and validates automation requirements.

m. Provides technical assistance to the Air Traffic Automation Software Policy and Planning Division (ATR-200) and the National Automation Support Facility located at the FAA Technical Center (AOS-440) when required to support NAS ATC operational programs and objectives.

n. Ensures automated facilities are prepared for national system deliveries, facility testing is adequate, and program start-up is timely.

o. Assists facilities in the identification, investigation, and documentation of air traffic control automation problems, ensuring proper priorities are assigned to problems. Develops near-term solutions within national policies and recommends long-term national solutions to these problems.

p. Processes NAS change proposals in accordance with national directives, including approval/denial authority for the development, testing, and implementation of NCPs that are local in scope.

q. Administers and provides support for contract services and assists in fly-ins, air shows, aerial demonstrations and temporary towers.

3. FUNCTIONAL TASK. Planning and Automation Section, ASO-513.

a. Staffing. The section is comprised of a Supervisor, Automation Specialists, Planning Specialists, a Video Production Specialist, and a Secretary. Most positions have primary and collateral assignments.

b. System/Program Implementation. When new systems or programs are implemented, specialists will monitor and/or participate in all planning, installation, testing, acceptance, transition, Initial Operating Capability (IOC) determinations, Operational Readiness Demonstrations (ORD), and closely monitor initial on-line systems performance.

c. System/Program Analysis. Specialists will continuously monitor and analyze all on-line systems performance. This includes establishing or validating requirements for replacement systems, upgrades and/or modifications. Utilizing field facilities' reports is one method to accomplish this.

d. Personnel Locator Board. This board is adjacent to the secretary's area and will be utilized by all personnel to indicate travel, training, leave, and Alternate Work Schedule (AWS) days off. On the last working day of the month, the secretary will clean the board and write in the dates of the new month. All applicable notations from the previous month will be carried forward.

Facility Status Boards. Specialists will maintain facility status boards for their own use, and for reference by the supervisor and other specialists in the primary specialist's absence.

f. Standard Distribution Lists. Specialists will maintain a Standard Distribution List of offices normally requiring information pertaining to their specialty. This list will include a facility contact and routing symbol, facility/office name and current mailing address. Generally, these are composed of all field facilities within a specialty, their Hub Managers (if applicable), and any other interested offices/organizations designated by the specialist or supervisor.

Personal Computers.

(1) Each member of the section, except the Video Production Specialist, is assigned a personal computer. The software included with them occasionally changes, but will generally include:

(a) Word Processor

(b) Database

(c) Spreadsheet

(d)Communication

(e) Travel Voucher

(2) If difficulty with the software or hardware is experienced, specialists should contact the Office Automation Specialists in ASO-520 for assistance.

h. Directives Files/Binders.

(1) The Regional Air Traffic Division (ATD) maintains a Master Directives File located adjacent to the Division Manager's office.

(2) The section maintains directives binders containing those directives that apply to ATC automation plus others as needed. These are maintained in the section supervisor's office.

i. Facsimile (FAX) Transmissions. The ASO-510 branch FAX machine is located in the ASO-513 area. Specialists requesting the secretary to send a FAX message will supply a completed ASO FAX cover sheet containing all necessary information, or provide information as needed to develop a cover sheet. Upon successful transmission, the secretary will return the documents to the specialist with a notation of the time/date transmitted.

j.Employee Suggestions.

(1) Employee suggestions concerning ATC automation systems are forwarded to ASO-513 by ASO-520 for review and evaluation. They cannot be used to change NAS operational software. If the suggestion affects NAS configuration managed items, it must also be submitted concurrently with a NAS Change Proposal. Review procedures shall be conducted in accordance with FAA Order 1800.8. These evaluations shall be completed on Form 3450.17 and returned to ASO-520.

(2) Reference - FAA Order 3450.7 and FAA Order 1800.8.

k. Unsatisfactory Condition Reports (UCR). FAA Order 1800.6 provides . employees with a direct method to advise management of unsatisfactory conditions and are accomplished by filing a Form 1800.1. UCRs shall be evaluated and resolution taken at the lowest level possible. In the event an UCR cannot be resolved at the regional level, it should be evaluated and

forwarded to the director of the headquarters office or service having staff responsibility for the program involved.

1. NAS Change Proposals (NCPs)/Case-Files.

(1) Specialists will process and track NCPs and case-files for systems for which they have responsibility. The section has primary responsibility for configuration management for all ATC automation systems.

ATR-200 is the primary contact for NCPs and case-files. Case-file processing normally requires the specialist to:

(a) Obtain and review the required documentation.

(b) Ensure normal coding conventions.

(c) Validate the need for and methodology used to provide the capability or function.

(d) Ensure adequacy of the documentation, procedures and test plan.

(e) Obtain regional concurrences from ASO-500/400.

(f) ARTS IIIA requires technical approval from support sites.

(g) Establish tracking of the case-file.

(h) Forward case-files for new ARTS IIA functions to ATR-200, upon completion of regional coordination. NOTE: Case-files that have been previously approved by ATR-200 may be approved for implementation at subsequent facilities by the ATD.

(i) Coordinate ARTS IIIA case-files with ATR-200 and ATP-120, as necessary. The ATD has approving authority for ARTS IIIA case-files. Upon operational approval, the case-file is forwarded to ATR-200 for status accounting.

(j) Execute letters of authorization/denial to field facilities.

(2) Case-files affecting hardware are coordinated with ASO-400 and are usually processed through AF channels.

(3) Reference - FAA Order 6120.1 and FAA Order 1800.8.

m. Congressional Inquiries. Congressional inquiries are responses to written inquiries from members of congress or their staffs. These require a

formal written response, normally for the signature of the Regional Administrator and must usually be accomplished with a short deadline.

n. Automation/Radar Outage Reports. When facilities call with an automation/radar outage report (ref.- SO 6040.15), the primary specialist for that system will, if available, take the report, complete the locally developed form, and advise the section supervisor of any significant events. The section secretary will take the report if no specialists are available.

Alternate Work Schedule (AWS). Section personnel may participate in the AWS within the guidelines of current directives and constraints.

p. Section Files/Day-File Binder.

(1) Specialists use the ASO-513 File Index to assign file codes to their memoranda, letters, and related documents. The secretary accomplishes this when no file code is indicated.

(2) The secretary inputs all section documents into the database by date, subject, and file-code for future reference. This data is also stored on diskette by fiscal year. Files for the current fiscal year are kept in the two top drawers of the filing cabinet. The two prior years are kept in the three lower drawers.

(3) The secretary maintains the day-file binder for quick reference by section personnel. This binder is circulated to all specialists monthly in order for them to maintain currency on all section activities/correspondence.

q. Recurring Actions and Reports. The following are recurring actions/reports used internally or sent to other offices or organizations:

(1) ARTS IIA Automation Performance Reviews- Monthly. (See ARTS IIA.)

(2) ARTS IIIA Automation Status Reports- Monthly. (See ARTS IIIA.)

(3) ARTS IIIA Performance Monitor Reports- Monthly. (See ARTS IIIA.)

(4) ARTS IIIA Automation Performance Reviews- Monthly. (See ARTS IIIA.)

(5) Annual Call for Training. (See ATC Automation Training.)

(6) Production of a Quarterly ASO-1 Information Video. (See Video Production Specialist.)

(7) Production of Graphics for the Budget Division. (See Video Production Specialist.)

(8) Quarterly Goals and Objectives. (See Collateral Duties.)

(9) Revalidation of Orders. Every two years specialists will revalidate those orders initiated by ASO-513.

r. Air Traffic Control (ATC) Automation Training.

(1) Specialist Responsibilities. Specialists will establish training requirements and identify personnel requiring ATC automation training for their specialty. They will also provide annual training requirements to the Automation Training Coordinator upon receipt of the annual "Call For Training" (N3000.XX).

Regional specialist's enrollment in ATC Automation Training will be entered into TRIMATE by the Branch Administrative Assistant.

(2) Section ATC Automation Training Coordinator. The specialist assigned this responsibility will maintain records and tracking of ATC Automation Course allotments and make class assignments for the region. The ASO-520 Training Specialist is the primary contact for this function. The Coordinator will, if required, provide completed Form 3000-13 for field personnel attending automation training to the ASO-520 Training Specialist. The ASO-520 specialist will enter the data into TRIMATE. (Normally this function is accomplished at the Terminal, Hub or ARTCC level.)

s. NAS Implementation Manager (NIM). The section supervisor is designated as the NIM and is responsible for implementation, on behalf of the ATD, of all regional programs associated with the Capital Investment Plan (CIP). The NIM acts as the ATD's principal liaison and interface with headquarters Air Traffic/other divisions, all regional divisions, and other regions/facilities in all matters related to the CIP. The NIM is responsible for planning, directing, coordinating and evaluating the safe, efficient, economical and effective implementation of the CIP. The NIM also serves as the Advanced Automation System (AAS) and Voice Switching and Communications System (VSCS) Regional Representative.

t. Primary Automation System Specialist. The primary specialist is the ATD expert in his/her assigned area/system and gives technical advice and assistance to regional branches/sections, facility management, contractors, maintenance, FAA Technical Center and headquarters personnel. The primary specialist represents the ATD Manager and has decision making authority. The specialist is responsible for all aspects of the assigned automation system(s) including:

(1) Defining system requirements.

(2) Planning.

(3) Justification of implementation actions.

(4) Configuration management.

(5) Priorities.

(6) Training requirements.

(7) Facility automation evaluations.

(8) Testing and analysis of proposed changes in equipment, procedures and systems.

(9) Processing NCPs and case-files, including approval or denial authority for the development, testing and implementation of NCPs that are local in scope.

(10) Maintenance of local patch library and documentation, if appropriate.

u. Primary Automation Systems.

(1) ARTS IIA. The primary contact at field facilities will be the Automation Specialists (AUS), Assistant Managers for Automation (AMA) and Assistant Managers for Plans/Programs (AMPP), as appropriate. Operational impacts will be coordinated with the Air Traffic Managers and Hub Managers. Extensive coordination with AOS-410, AVN-250, AAC-932C, ATR-200, ATP-100 and ATP-200 is required to resolve problems and obtain information. The specialist should maintain close coordination with ASO-465 (Radar/Automation Section) concerning equipment problems, deliveries, installation and transition.

(a) Support Memorandum of Agreement (MOA), Nassau, Commonwealth of the Bahamas. The specialist provides expert ARTS IIA assistance and software support services to the Government of the Commonwealth of the Bahamas (GCOB) in accordance with the MOA NAT-I-2065 (GCOB).

To accomplish this, circumstances dictate that some coordination be accomplished directly with the Automation Specialist(s) at Nassau, with the Director of Civil Aviation of the Commonwealth, or with the Southern Region International Staff (ASO-4).

(b) ARTS IIA Telephonic Cascade. The ARTS IIA specialist will initiate the ARTS IIA Cascade when immediate dissemination of information or immediate action is required for all ARTS IIA facilities. Initiation is made by calling the first facilities listed in the ARTS IIA Cascade (Order SO 1770.23) or through the Regional Operations Center (ROC), if necessary.

Use of the ARTS IIA Cascade Message local forms to compose the message is encouraged and will also act as documentation of cascade actions.

(c) ARTS IIA Automation Performance Reviews. These reviews are submitted to ASO-513 and ASO-465 in accordance with Order SO 7800.1, which contains guidance on the content and conduct of the facility automation performance review meetings. When the specialist receives these reports, they will be reviewed for system changes, operational impacts, trends and procedures. The information from these reports is used to assist in maintaining the ARTS IIA facility database.

(d) The specialist will conduct a monthly ARTS IIA Teleconference (TELCON) and distribute a "Recap" to all ARTS IIA facilities and their Hubs. Participants in this TELCON are normally each facility's AUS, ATM or other representative. Newly assigned facility managers should be extended a personal invitation to participate in the next TELCON. All Facility and Hub Managers are invited to participate whenever possible.

(2) ARTS IIIA. The primary contact at field facilities will be the Automation Specialists (AUS), Assistant Managers for Automation (AMA) and Assistant Managers for Plan/Programs (AMPP), as appropriate. Operational impacts will be coordinated with the Air Traffic Managers and Hub Managers. Extensive coordination with AOS-410, AVN-250, AAC-930, ATR-200, ATP-100, and ATP-200 is often required to resolve problems and get information. The specialist shall maintain close coordination with ASO-465 (Radar/Automation) concerning equipment problems, deliveries installations and transition.

(a) FAA and U.S. Army Support MOA, NAT 622. The specialist provides expert ARTS IIIA assistance and software support services to the United States Army at Ft. Rucker, AL, in accordance with this MOA. To accomplish this, coordination must be accomplished directly with the Assistant Manager for Automation and/or Automation Specialist(s) at Ft. Rucker.

(b) ARTS IIIA Telephonic Cascade. The specialist will initiate the ARTS IIIA cascade when immediate dissemination of information or immediate action is required for all ARTS IIIA facilities. Initiation is made by calling the first facilities listed in Order SO 1770.23 or through the RCC, if necessary. Use of the ARTS IIIA cascade message local forms to compose the message is encouraged and will also act as documentation of cascade actions.

(c) ARTS IIIA Automation Performance Reviews. These reviews are submitted to ASO-513 and ASO-465 in accordance with SO 7800.1, which contains guidance on the content and conduct of the facility automation performance reviews. When the specialist receives the reports, they will be . reviewed for system changes, operational impacts, trends and procedures. The information in these reports is used to assist in maintaining the ARTS IIIA facility database.

(d) ARTS IIIA Automation Status Report. These reports are submitted to ASO-513 in accordance with Action Notice 6120.2. (This Action Notice has expired but the policies and practices therein continue to be in effect pending their inclusion in an order.) When the specialist receives the monthly reports, they will be reviewed for system changes, operational impacts, trends and procedures. The information in the reports is used to assist in maintaining the ARTS IIIA facility database.

(e) ARTS IIIA Performance Monitor Reports. These reports are submitted in accordance with Action Notice 6120.1. (This Action Notice 'has expired but the policies and practices therein continue to be in effect pending publication of a new notice or their inclusion in an order.) The specialist will review these reports for accuracy and trends, then forward as appropriate.

(f) ARTS IIIA/FSDPS (Flight Service Data Processing System) TELCON. The specialist conducts the TELCON monthly and composes/distributes minutes. The TELCON includes a representative of each Southern Region ARTS IIIA and FSDPS facility AUS staff.

(3) Enroute. The primary contact at field facilities is the Assistant Manager for Automation (AMA). The primary contact at the headquarters level is the enroute specialist in the Automation Policy Branch, ATR-230, and the Supervisor, Enroute Field Support Section, AOS-423. The specialist is responsible for elevating facility concerns and needs to the headquarters level and coordinating with the Resources and Planning Branch, ASO-420 and the Radar/Automation Section, ASO-465.

(Technically AS0-465 is not responsible for enroute systems, however, they have been willing to provide assistance in the past.)

(a) The specialist acts as the regional representative for the National Enroute Automation and Direct Access Radar Channel (DARC) TELCONs and conducts the monthly Regional Enroute Automation TELCON.

(b) The specialist is responsible for processing enroute case files. Case-files which are national in scope are coordinated with the other regions and held until ATP-100 issues a national call for case-files.

Case-files which are local in scope are reviewed and, if approved, sent to ATR-200 to be considered for inclusion in the Enroute National Local Patch Library (NLPL). Regions may not approve any modifications to the enroute NAS operational or support software.

v. Primary Assignments of Planning Specialists.

(1) General. The specialists are the air traffic experts in the areas of planning, implementation and transition to new automated ATC systems. They are responsible for NAS implementation issues/projects on behalf of the

ATD and maintaining facility contacts. Additionally, they are the regional information expert on these systems. As the information expert, they are responsible for the gathering of available information and the dissemination of that information to Southern Region air traffic controllers. They accomplish information distribution in accordance with SO 7800.2 (Distribution and Tracking of AAS information).

(2) Flight Service. Planning specialists share duties which pertain to advanced systems/planning for the flight service option.

(3) Terminal NAS Implementation Specialist (T-NIS). The T-NIS is responsible for planning duties which pertain to the terminal ATC environment. The primary contact is the Terminal AAS Hub Contact (HUBCON) in each terminal hub (as described in SO 7800.2). The T-NIS is responsible for taking on NAS implementation issues/projects on behalf of the ATD.

(a) The T-NIS acts as a member of the Southern Region Terminal Integration Working Group (TIWG) representing the ATD.

(b) Terminal HUBCON Status Board. The T-NIS maintains the Terminal HUBCON Status Board for their own reference and the reference of other specialists and the supervisor in his/her absence.

(c) Liaison. Maintains regional liaisons between AAS teams, projects and affected Southern Region facilities.

(d) HUBCON TELCON. The specialist conducts this TELCON monthly and is responsible for publishing minutes.

(e) The T-NIS acts as ATD representative for all terminal planning projects in the Southern Region.

(4) Enroute NAS Implementation Specialist (E-NIS). The E-NIS will generate and accomplish the distribution and tracking of Advanced Automation System Enroute information within the Southern Region through the Assistant Managers for NAS Implementation (AMNIs). In addition, the specialist will:

(a) Maintain liaison between the ARTCC AAS implementation teams and supports the AMNI in coordinating major issues and problems with facility management.

(b) Coordinate with staff offices, Airway Facilities Sector, regional and headquarters offices, and contract personnel concerning NAS Plan project requirements and problems.

(c) Review NAS Plan project documentation to maintain familiarity with system functions and contract requirements, and inform affected personnel about NAS Plan project progress, resource requirements, deployment strategies, and schedule changes and status.

(d) Develop technical documents related to site project implementation.

(e) Develop and maintain special project files relating to NAS Plan projects.

(f) Coordinate AAS team member travel with the AMNI and facility management.

W. Video Production Specialist.

(1) The Video Production Specialist is responsible for the production of all video projects, and primarily for the ATD. (As all divisions within the region and headquarters use this specialist for their projects, a basic understanding of each division is useful.) These video projects include all phases of production from preplanning, script, talent, lighting, audio, taping, and post-production (including off-line and on-line editing). Knowledge of computer graphics is required. The specialist produces all other forms of visual communications from posters, slides, overheads, lobby displays, etc.

(2) The specialist deals with abstract thoughts and utilizes creative approaches to solve visual/technical problems. He/she handles the budget for all productions. If overruns are necessary, the specialist will advise management of options and justifies monies spent. The specialist must be able to act independently with little supervision. This position requires some management skills, as most projects require many specialists working together for success.

(3) The specialist performs the following recurring actions:

(a) Creates graphics for the Budget Division's annual conference.

(b) Ensures audio visual equipment/art materials are purchased and maintained within a quarterly budget.

x. Section Secretary. In addition to the duties described in previous paragraphs, the secretary will:

(1) Maintain the FAX machine and its paper supply. He/she will check the receiver four times a day for incoming messages. The secretary checks the cover sheets to match the number of pages FAXed and is responsible for the assembly of each set of messages and distribution to the appropriate personnel.

(2) Maintain section office supplies.

(3) Perform telephone receptionist duties, directing calls to the proper division/branch/section and/or specialists.

(4) Prepare and distribute specialist generated mailings of up to 35 facilities each.

(5) Prepare Time and Attendance (T&A) records for section.

(6) Make travel arrangements for section personnel.

(7) Prepare Permanent Change of Station (PCS) documents.

(8) Schedule meetings and TELCONs, when necessary, for the supervisor and specialists.

(9) Type letters, reports, and other material using the proper format and with minimal error in punctuation and spelling. Documents to be printed on the letter-quality printer by the secretary are normally submitted on floppy disk in a format and version that is compatible with the secretary's computer and software.

(10) Establish and maintain office files.

(11) Maintain a working knowledge of travel vouchers and regulations and assists section specialists in completing travel vouchers.

(12) Receive, review, and distribute incoming mail to supervisor and persons responsible for appropriate action.

(13) Respond to follow-ups on suspense dates of correspondence.

y. Associated Specialty Assignments. The following ATC automation systems do not have a primary specialist dedicated to them and are assigned as collateral duties:

(1) EARTS. The principal contact is the Assistant Manager for Automation (AMA), San Juan CERAP. The specialist represents the region for the EARTS portion of the National Terminal Automation TELCON and on the San Juan CERAP/IFSS Implementation Matrix Team.

(2) FSDPS. The primary contact is the AMA at each FSDPS. An ASO- 513 specialist is responsible for processing case-files.

(3) FDIO. There is no official regional Airway Facilities contact for FDIO, however, ASO-465 has been willing to provide assistance.

The regional AF focal point for FDIO is the Atlanta Air Route Traffic Control Center (ARTCC).

z.Collateral Assignments.

(1) ATD Electronic Bulletin Board (ATD EBB). The ATD Electronic Bulletin Board was established as a communications and distribution tool by the division. ASO-513 has the responsibility to operate and maintain it. Because of limited disk space, maintenance includes running, at least once a month, a program to produce EBB statistics, deleting outdated files and messages. User files should be reviewed to remove duplicate and invalid names. Current virus programs should be obtained and made available in the Virus Detection and Prevention directory.

Uploads should be scanned for viruses before being moved to the download directory. Conferences may be added at the request of other Southern Region Divisions/Branches as well as Headquarters.

(2) Regional Operations Center Call-Back List. This list is maintained for the Regional Operations Center (ROC) and contains names, home telephone numbers and Specialty assignments of section personnel and their alternates. This list is used by the ROC to contact the proper specialist when a field level problem or system impact outage occurs outside of normal business hours.

(3) TELCON Assignments. This is a list maintained for all section personnel with TELCON assignments and lists the titles, dates, times and dialin numbers of TELCONs the section participates in. Its primary purpose is for specialists to know when to cover the TELCONs assigned to another specialist who is out of the office.

(4) Facility Feedback Survey(s). The section conducts an annual survey of regional facilities. This survey asks field facilities to respond to a variety of questions intended to capture:

(a) The quality of service the section is providing.

(b) Methods and areas for improvement.

(c) New areas of services required.

(d) Data from the survey is analyzed by each specialist and recommendations are forwarded to the supervisor. From these, an action plan for the section is formulated. Prior to the next survey, the previous year's action plan is reviewed and assessed.

aa. Section Goals and Objectives. A specialist has been assigned the responsibility of maintaining and updating the section's Goals and Objectives. The specialist collects input from the other specialists and prepares a summary for the section's input to the ATD's Goals and Objectives. Once the ATD Goals and Objectives are determined, the specialist collects quarterly progress reports from the other specialists and prepares the section's

quarterly progress summary for submission to the branch Administrative Assistant.

bb. Daily Summaries.

(1) National Airspace Performance Reporting System (NAPRS) Summary. The specialist will review and summarize the daily NAPRS report for the section supervisor and enter the summaries in a database. Copies of daily NAPRS reports are circulated to all section specialists.

(2) Regional Weather Forecast. The specialist will provide the ATD Manager with a summary of the regional weather observations and forecasts each work day.

(3) National/Regional TELCON Assignments. Section personnel participate in National/Regional TELCONs according to their specialization. The times, dates and specialist assigned are maintained on the TELCON assignment list.

(4) ASO-513 Regional TELCONs. The conduct and content of the following monthly TELCONs with field facilities is the responsibility of the primary/associated specialist. Their purpose is to provide field support and guidance, receive field concerns and problems, and disseminate current information. "Recaps," "Summaries," or "TELCON Notes" are generated by the specialist responsible for the TELCON, and are distributed to all affected facilities, plus other offices of interest. (See Specialist and Collateral assignments.) TELCONs are as follows:

(a) ARTS IIA

(b) ARTS IIIA/FSDPS

(b) ARTS IIIA/FSDPS

(c) Enroute

(d) EARTS

(e) Terminal AAS HUBCONs

(5) ATC Automation Training Coordinator. (See ATC Automation Training.)

cc. NAS Team Assignments.

(1) The section supervisor will select regional specialists for team assignments where such representation is required.

(2) Specialists will solicit and nominate ASO personnel for field team memberships according to the expertise and experience required by the

team. The section supervisor will make selections after coordination with the facility manager(s).

dd. AAS Travel. Regional personnel traveling for AAS and VSCS purposes will use regional AAS funds. Field personnel traveling for these purposes will use funds provided by their NAS Coordination Office (NCO). This travel is accomplished as needed, to review requirements, support or participate in technical interchange meetings, set requirements, etc.

ee. Facility Visits. Facility visits should be made annually, if possible, to all automated ATC facilities, by the appropriate specialist. The purpose of these visits is to see the facility first-hand, meet the facility staff and controllers and verify compliance with existing directives by the automation department. This verification will be presented in the way of assistance to the facility and has the overall objective of standardization. Trip reports will include observations of the effectiveness of the automation system and staff of the facility and any problem areas not in the process of resolution.

ff. Requests for Data from Outside Agencies. Requests for automation data (ARTS Data Extractions/Reductions, DART, National Tracking Automation Program (NTAP), etc.) will be handled in accordance with current directives. All requests for data or information under the Freedom of Information Act (FOIA) will be directed to ASO-540. Requests from news media will be directed to ASO-5.

gg. Requests for Computer Data for Airport Noise Studies. Requests from airport authorities or city/county governments for data to be used in noise studies shall be handled in accordance with FAA Order 1200.22. The section acts as the focal point for all such regional activities, providing necessary guidance to the field facilities.

4. FUNCTIONAL TASK. Facilities and Equipment Planning Section, ASO-514.

a. Staffing. The section is comprised of a section supervisor, six planning specialists (generally, three terminal specialists, two enroute, and one flight service) and a secretary. Most positions have primary and collateral assignments.

b. Section Common Procedures.

(1) Personnel Locator Board. This board is maintained outside the section supervisor's office and will be utilized by all personnel to indicate travel, training, leave, and alternate work schedule (AWS) days off. On the last working day of the month, the secretary will clean the board and write in the dates of the new month.

(2) Personal Computers. Each member of the section is assigned a personal computer. The software included with them occasionally changes, but will generally include:

(a) Word processor.

(b) Database.

(c) Spreadsheet.

(d) Travel voucher.

NOTE: If difficulty with the software or hardware is experienced, specialists should contact the Office Automation Specialists in ASO-520 for assistance.

(3) Directive Files/Binders. The ATD maintains a Master Directives File located adjacent to the Division Manager's office.

(4) Section Files. Section files are located adjacent to the administrative assistant's area. Specialists use the ASO-514 file index to file code their memoranda, letters and related documents. Documents should have file codes entered on the top right hand corner of the document and then placed in the specialist's out box. The secretary will then collect and file them.

(5) Alternate Work Schedule (AWS). Section personnel may participate in the AWS within the guidelines of current directives and constraints. The section supervisor has responsibility for approval or disapproval of any AWS.

c. Unsatisfactory Condition Reports (UCRs). ASO-510 is the focal point for UCRs related to equipment problems. UCRs are logged in by the branch administrative assistant and forwarded to the specialist responsible for the facility involved. The specialist reviews the UCR to determine the appropriate level at which the UCR should be closed.

If unable to close at the facility level, the specialist will coordinate with Airway Facilities to effect closure at the regional level. If closure cannot be accomplished at the facility or regional level, the specialist will forward the UCR to the appropriate headquarters office.

d. Congressional Inquiries. Congressional inquiries are responses to written inquiries from members of congress or their staffs. These require a formal written response, normally for the signature of the Regional Administrator. Depending on the subject of the inquiry, the specialist having responsibility for the item will research the subject and prepare the formal written response.

e. Employee Suggestions. Employee suggestions concerning equipment/facilities are forwarded to ASO-514 by ASO-520 for review and evaluation. If the suggestion affects NAS configuration managed items, it must also be submitted along with a NAS Change Proposal. Review procedures shall be conducted in accordance with FAA Order 1800.8. These evaluations shall be completed on Form 3450.17 and returned to AS0-520.

f. NAS Change Proposals (NCP). Specialists will process and track NCPs and case-files for systems for which they have responsibility. Case-file processing normally requires the specialist to:

(a) Obtain and review the required documentation.

(b) Validate the need for and methodology used to provide the capability or function.

(c) Ensure adequacy of the documentation, procedures and test plan.

(d) Obtain regional concurrences from ASO-500/ASO-400.

g. Facilities and Equipment (F&E) Budget.

(1) ASO-514 is the focal point in the Air Traffic Division for the Facilities and Equipment (F&E) Budget. The basic responsibility of ASO-514 is one of defining the Air Traffic Division's requirements to ensure our field facilities are equipped with the proper facilities and equipment to meet the demands placed upon them by system users. Our primary tool for this activity is the annual F&E budget. The primary source for the data in our budget submissions is the facility manager.

(2) Sequence of events for an (F&E) Budget in the Southern Region:

(a) June 1: Deadline for field facilities to submit items to ASO-514 for the next F&E Budget.

(b) The specialist assigned the duties of F&E Coordinator logs all submissions received in the computer database.

(c) All submissions are passed to the appropriate specialist for a determination of Validate/Nonvalidate. Certain publications such as the Airway Planning Standard (7031.2, 7031.3, 7031.4), and the F&E Call for Estimates contain provisions and conditions relating to the validation of items. Where specific written guidance is not available, the specialist applies his/her knowledge and experience to make the determination. The coordinator logs the determination and nonvalidated items are placed in the appropriate binder. The specialist ensures that each validated submission is in the proper format (FAA Form 2500.70) and is placed in the appropriate word processing file. If the submission needs to be strengthened and/or rewritten to tell the "story" better, he/she rewrites the item.

Submissions for Instrument Landing Systems (ILSs,) Runway Visual Ranges (RVRs), and certain other navigational aids are deferred to Flight Standards (FS) for action. The section still logs them in and provides feedback. Submissions for additional enroute sectors are referred to ASO-530 for evaluation and validation.

(d) The item is typed in final form. It is placed in a computer file and two hard copies are made. The coordinator reviews the write-up and initials one copy to indicate that it meets "Call" requirements and is free of errors. The write-up is then passed to the ASO-514 supervisor for review.

(e) After the supervisor reviews and initials the write-up, the coordinator sends the second hard copy and the computer file to ASO-422. The date the write-up is sent to AF is recorded on the initialed copy of the write-up and is also entered in the computer database. The initialed copies of the write-up are then placed in a binder and retained for record purposes. The deadline for ASO-514 submissions to ASO-422 is August 31.

(f) ASO-422 enters all write-ups into the specialized database which was contractor developed specifically for F&E purposes. This database was developed for use by all regions.

(g) The electronics, plants, and telecommunications engineers make a cost estimate and Project Material List (PML) for each write-up.

(h) ASO-422 compiles all write-ups and places them in the appropriate category as defined in the "Call." Items not falling under a National Program (NP) item in the "Call" must be placed in the regional budget.

(i) On approximately December 10 of each year, AF, AT, and FS meet to establish the priority for every item listed.

(j) Each division establishes the priorities for items in the categories which they sponsor, e.g., Air Traffic will establish the priority for the tower relocate and tower modernize items (most of the items in "Call" Categories 1, 2, and 3 in Appendix 2). Airway Facilities establishes priorities for items such as Replacing TACAN antennas and building repair (most of the items in Categories 4 and 5).

(k) AT, AF, and FS jointly establish priorities for all items which do not qualify for inclusion in an NP item. These items vie for the funds allocated to each region for their regional budget. Normally, all items submitted by FS qualify for an NP item.

Historically, only about half of the regional budget survives; therefore, it is very important that each division's highest priority items are placed near the top of the list because the entire list rarely gets funded.

(1) The next review is accomplished by the division managers. The final review in the regional office is done by the Regional Administrator.

(m) ASO-422 finalizes all write-ups and oversees the printing of the budget. The deadline for submission to headquarters is approximately January 20.

(n) After the budget is mailed, each facility is given written feedback on the disposition of every item considered for the facility. If an item is nonvalidated, a reason is given for why it was nonvalidated.

(3) Field managers should not resubmit a project that is already in a budget. Should it be dropped later, ASO-514 will either resubmit in a subsequent budget, or request the facility to resubmit the item. This policy is reflected in Order SO 2500.5.

(4) The work with a particular budget does not end with its mailing to headquarters. The feedback packages received from each level of review are evaluated to determine the status of items.

If one is cut, it becomes a candidate for inclusion in the following year's budget. However, if timely feedback is not received from the Office of the Secretary of Transportation (OST) and/or the Office of Management and Budget (OMB) reviews, ASO-514's deadline for finalizing budget year submissions to ASO-422 could expire before it is known that an item has been dropped. In this situation, the item is resubmitted for consideration the following year.

(5) Each budget receives at least the following reviews after leaving the regional office:

(a) Headquarter's validate/nonvalidate.

(b) Headquarter's prioritization.

(c) OST review.

(d) OMB review.

(e) Congressional review and appropriation action.

NOTE: After Congress completes its action and the budget becomes an appropriation, it is passed down to the FAA through OMB and OST. After the FAA receives the appropriation, adjustments must be made to accommodate any Congressionally mandated projects. Many times, Congress will add projects to the budget during its review. These are normally large dollar items such as

radars, ILSs, etc. Unfortunately, in most cases, Congress does not provide the additional dollars required. Usually, the funding level of large dollar items will be reduced to provide funds for mandated projects; however, there are times when whole projects will be eliminated. Even though an item survives the review process and receives Congressional approval, no guarantee is given that a Project Authorization (PA) will be issued.

h. Revalidation of F&E Projects.

(1) Normally, there is a considerable time frame from the time a requirement is identified for an F&E project and the Project Authorization (PA) is received. Often requirements change during this period. The scope of the project may need to be revised or the project may no longer be required. Failure to take action on projects of this nature could result in unnecessary expenditures. The following procedure is established to revalidate projects.

(2) ASO-514A will stamp one of the two PAs received from ASO-420 for each project with the Validate/Nonvalidate stamp. The appropriate ASO-514 specialist will review projects pertaining to Air Traffic and coordinate with the facility which initiated the requirement to determine if the requirement still exists (PAs not pertaining to AT should be discarded). If the requirement does still exist, the specialist places his/her initials on the validate line and dates the paper. One copy of the PA should be sent to the facility and the other copy is placed in the facility file. If the requirement no longer exists, the specialist will place his/her initials on the nonvalidate line and write a memo to ASO-422 requesting that a hold be placed on the project pending reprogram action. Correspondence and PAs on these projects will be placed in the appropriate branch file.

(3) Validated projects requiring a change in scope will be handled similar to a new requirement. A revised Form 2500-70 must be forwarded to the Facilities and Equipment Section, ASO-422, detailing revised requirements.

i. Telecommunications.

(1) The duties of the Telecommunications Coordinator for the Southern Region Air Traffic Division (ATD) are assigned to an ASO-514 specialist. The Telecommunications Coordinator is the primary contact and coordination point for all ATD telecommunications requirements, requests, and submissions.

(2) The Telecommunications Coordinator's primary duties are to coordinate with the appropriate office(s) concerning telecommunications for the ATD in the regional office, coordinate operational (non-administrative) telecommunications for field facilities, and maintain appropriate records for tracking of Telecommunications Service Requests (TSRs).

(3) There are three different types of telecommunications submissions sent to the ASO-514 office during the year; TSRs for service

implementation, the Annual Revalidation of Circuit Requirements, and the TSRs for the Leased Services Budget.

(4) TSRs may be submitted throughout the year and should be submitted on SO Form 4441-1, Telecommunications Request. TSRs take a minimum of six weeks to process before a work order is issued. This applies to routine requests, i.e., headsets and related equipment, local circuits, and foot pedals. Major requests for long circuits and large equipment changes could take up to six months to accomplish. F&E specialists shall:

(a) When an SO Form 4441-1 is received from a field facility, check the form for accuracy and validate the requirement. If a letter from a field facility is received, the specialist shall complete an SO Form 4441-1, including a valid justification statement.

(b) Forward all SO Forms 4441-1 to the telecommunications coordinator.

(5) Telecommunications Coordinator shall:

(a) Check each Form 4441-1 for completeness, accuracy, and proper justification.

(b) Assign an "AT" number to the Form 4441-1 and log in the telecommunications binder. "AT" numbers shall be composed of the last two digits of the calendar year, followed by a sequential number, e.g., "XX-121" where XX equals the current year.

(c) Complete the Form 4441-1 by adding the "AT" number, have the submitting specialist sign as the "ASO-514 specialist", and then sign "for" Manager, AS0-510.

(d) Provide a copy of the completed request to ASO-480 for their actions to issue a TSR and place the original in the telecommunications binder.

(e) Act on the copy of the issued TSR received from ASO-480. When received, the specialist shall make a copy for the submitting specialist, and attach the issued TSR to the request in the telecommunications binder.

(f) The Telecommunications Coordinator should perform a tracking action at least monthly to verify that TSRs have been issued on all AT requests submitted to ASO-480. The tracking report shall be forwarded to ASO-480 for justification and verification. ASO-480 will respond to the tracking report with any updated information.

j. Annual Revalidation of Circuit Requirements.

(1) Annual revalidation of circuit requirements shall be accomplished during the first three months of each calendar year. The reports shall be forwarded to AS0-510 not later than April 1 of each year. In memorandum format, the certification reports shall include requests for discontinuances or modifications of circuits, equipment and/or services identified in the revalidation process. If there are no changes, a statement to that effect is required (FAA Order 7031.4, SO AT SUP 1, SUBJ: Airway Planning Standard Number Four - Leased Air Traffic Control Communications Services).

(2) F&E Specialists shall:

(a) Review the circuit revalidation submissions and complete telecommunications requests, if necessary.

(b) Forward all circuit revalidation submissions and associated telecommunications requests to the Telecommunications Coordinator.

(3) The Telecommunications Coordinator shall:

(a) Maintain a log of all submissions and process any associated telecommunications requests.

(b) At the completion of the revalidation process, submit a report from the Manager, Air Traffic Division, ASO-500, to the Manager, System Plans and Programs Division, ATR-100, certifying that circuits have been examined and revalidated. The report shall be narrative form covering the results of the revalidation process. This report shall be forwarded on or before October 15.

k.Telecommunications Budget Submissions.

(1) The Annual Leased Telecommunications Budget submissions are due into AS0-510 by October 15 of each year. The submissions shall include the Budget Year requirements and changes to the Current Year requirements, along with supporting justification. The revised Current Year requirements should only include deletions, not additions. New requirements should be included in the Budget Year.

(2) ASO-480 will advise us by letter or Speed Memo of the deadline for submission of the Leased Telecommunications Budget. A letter shall then be sent to the field facilities from ASO-514 detailing submission procedures and restating their deadline for submissions to ASO-514. During this same time period, the ASO-514 specialists should be briefed on the Leased Telecommunications Budget Procedures.

(3) F&E Specialists shall:

(a) Validate/nonvalidate all field submissions.

(b) Ensure each submission is on the proper form (SO N 2500.126, Appendix 1. Telecommunications Budget Call), and in the proper format, including justification statements.

(c) When the regional F&E Budget submission is being formulated, F&E specialists will assume F&E funding will be approved and shall extract those items (both operational and administrative) that will require telecommunications actions (e.g., an F&E Budget submission for establishment of a new ATCT that will require an Integrated Communication Switching System (ICSS) and administrative telephone system). These items will be entered on a Telecommunications Budget Call form with a projected service date and reflect the Job Number (JON) of the original F&E submission.

(d) Forward completed forms to the Telecommunications Coordinator.

(4) The Telecommunications Coordinator shall:

(a) Maintain a log of all submissions.

(b) Prepare and maintain duplicate binders (one for ASO-514 retention, and one for submission to ASO-480) of field submissions, each subdivided into "validated" and "nonvalidated" sections. The binder shall also include the Revised Current Year requirements.

(c) Obtain printouts of previous two years' Leased Telecommunications Budget from ASO-480. These will show which projects have been approved/not approved.

(d) Have each specialist check the above printouts for "not approved" projects, and have him/her determine whether they are still needed. If still needed, resubmit, with reference to ASO-480's log numbers.

(e) Brief ASO-514 on nonvalidated items.

(f) Submit the copy of the binder prepared for Airway Facilities (in (b) above) to ASO-480 on or before the agreed-upon submission date. (The binder should include a list of submissions from the database in which the submissions were logged.)

(g) Place the Telecommunications Budget Call form in the appropriate year's telecommunications binder when received for F&E Budget items that will require telecommunications actions.

NOTE: When a request is submitted in a Leased Telecommunications Budget, it does not operate like the F&E budget. If an F&E Budget submission is approved and remains in the Budget, the requested work will be performed at a future date. In the Leased Telecommunications Budget, cost estimates are compiled and a total amount of funds is requested for that Budget Year. When that fiscal year arrives, a TSR must be submitted to use the funds and to get the requested work done. For example, the 1993 Budget Year requests were submitted in October 1990.

During September or October 1992, TSRs should have been submitted to ASO-510, from the field facility, for the same work requested in the budget. If a TSR is not submitted, the work will not be performed. All administrative telecommunications requests from field facilities are to be processed through the local Airway Facilities Sector Field Offices (SO Order 4441.10). ASO-514 will process the regional office ATD requests.

1. Facility Shutdowns.

(1) Many modifications must be made to operating systems such as radars, VORs, ILSs, etc., which require the facility to be off the air for an extended period of time. In order to ensure that all appropriate coordination was accomplished with the Air Traffic field facilities, a coordinator was established in the Air Traffic Division. Since ASO-514 is the focal point for equipment issues, it was determined that ASO-514 would perform this function.

(2) Order SO 6020.4 provides policy guidance for the management of an extended shutdown of a commissioned facility or service of the NAS.

(3) The procedure for facility shutdown is as follows:

(a) The shutdown coordinator will attend a monthly meeting on shutdown issues. The meeting is scheduled by Airway Facilities. In addition to the AF & AT coordinators, those in attendance include engineers from the Airway Facilities offices concerned with completing the work.

(b) Review and revise the present published schedule at the monthly meetings, and present new shutdown requirements as needed. In addition to the monthly meetings, unscheduled requirements frequently are received from AF which require action by the ASO-514 coordinator.

(c) Upon receipt of a request from AF for an extended shutdown, contact the appropriate facility to obtain concurrence for the shutdown.

If the schedule presented by AF is not satisfactory due to operational requirements, one or more time frames should be obtained that would be satisfactory to the facility and presented to AF.

(d) Keep notes on all conversations concerning shutdown coordination. Frequently, a breakdown in communications occurs when coordination is made concerning a shutdown that will occur weeks or months hence. It is very important to have a record of the date, time, and person with whom the coordination occurred.

m. Local Projects.

(1) Each region receives a block of F&E funds to accomplish small projects which require F&E funding. The Call For Estimates contains an item depicting the amount of funds that will be handed off for this purpose to each region in the Budget Year covered by the Call.

(2) The following is the typical route of a Local Project from establishment of the requirement to issuing a Project Authorization.

(a) A field facility has a need which requires F&E funding.

(b) The facility completes an SO Form 2500.70 describing the problem, defining the solution, enters appropriate remarks, and forwards it to AS0-514.

(c) The specialist responsible for the facility evaluates the need and validates or nonvalidates the requirement.

(d) If the requirement is validated, the completed form is then forwarded to the ASO-514 Local Projects Coordinator.

(e) The ASO-514 Local Projects Coordinator makes a copy of the correspondence. The copy is forwarded to ASO-422 and the original is kept in the AS0-514 Local Projects binder.

(f) The ASO-514 Local Projects Coordinator establishes priorities, with the input of the ASO-514 specialists, for all Air Traffic submitted items.

(g) The priority list must be continually updated and close coordination with the ASO-422 Local Projects Coordinator should be maintained.

(h) The ASO-422 Local Project Coordinator completes the necessary paperwork to obtain approval to establish the project. Approval for a project is obtained from ASO-200, ASO-400, and ASO-500. ASO-30 must sign the form to signify that funds exist for the project. The ASO-422 Coordinator then completes a Project Authorization, which gives approval to spend the money.

The ASO-514 Local Project Coordinator needs a copy of all correspondence relating to a Local Project for the file.

n. Primary and Collateral Assignments. ASO-514 specialists are assigned specific field facilities. They work with management to ensure their needs are met concerning equipment required to perform air traffic duties. Additionally, specialists are assigned collateral duties. These include various programs currently used in the field. Each specialist has the responsibility to become the regional air traffic expert on programs assigned to him/her. He/she is to attend conferences, meetings, and handle all correspondence relating to the particular subject matter. Examples of these programs include, but are not limited to; ARSR, Airport Surface Radar (ASR), Navaids, D-BRITE, Flight Data Input Output (FDIO), Airport Weather Observation System (AWOS), Airport Weather Information System (AWIS), Controller Chairs, Information Display System (IDS), Pre-Departure Clearance, Airport Surface Detection Equipment (ASDE), Meteorological Weather Processor (MWP), and HIWAS.

o. Call-Up File.

(1) Frequently, a letter requires coordination with other divisions and offices which will require a week or more to coordinate. Specialists should place a 3X5 memo slip on it marked "S" for suspense along with the date to be returned to the originator and placed in the out box. It should contain initials or routing symbol so the secretary knows who should receive it.

(2) The secretary will place the memo in a call-up file which has a slot for each day of the month. This file is kept at the secretary's work station and is checked daily. Work for the current day is returned to the appropriate specialist.

p. Section Secretary. In addition to the duties described in previous paragraphs, the secretary shall:

(1) Maintain section office supplies.

(2) Greet visitors and perform telephone receptionist duties, directing calls to the proper division/branch/section and/or specialists.

(3) Prepare and distribute specialist generated mailings.

(4) Prepare Time and Attendance (T&A) records for section personnel.

(5) Make travel arrangements for section personnel.

(6) Schedule meetings and TELCONs, when necessary, for the section supervisor and specialists.

(7) Type letters, reports and other material for the section supervisor and specialists.

(8) Establish and maintain office files.

(9) Receive, review, and distribute incoming mail to section supervisor and persons responsible for appropriate action.

q. Facility Visits. Planning specialists are encouraged to conduct at least one annual field visit to all their assigned facilities. This helps the specialist to become familiar with the present and future needs of each facility.

APPENDIX 4. RESOURCE MANAGEMENT BRANCH STANDARD OPERATING PROCEDURES

APPENDIX 4. RESOURCE MANAGEMENT BRANCH STANDARD OPERATING PROCEDURES

1. PURPOSE. This appendix establishes standard operating procedures to be used by the Resource Management Branch, ASO-520.

2. FUNCTIONAL STATEMENT. The Resource Management Branch is responsible for reviewing, analyzing, and developing the regional training plan, serving as the divisional contact for all contracts, tracking divisional resources, and managing divisional acquisition programs and the divisional administrative automated data processing program (ADP). The branch:

a. Reviews and analyzes training requirements, consolidates requirements, and develops the regional training plan. Establishes priority of need for a regional program and recommends establishment of new national training programs to meet training requirements. Identifies the need for air traffic technical programs, recommends specific training courses and programs and monitors the effectiveness of the programs. Manages regional Air Traffic training resources, including regional allocations for technical and other training.

b. Provides guidance to the Air Traffic Division in the implementation of national and regional policies, programs and standards pertaining to the provisions of air traffic services, insofar as these items are affected by the budgetary process.

c. Develops and tracks regional Air Traffic operations budget programs.

d. Provides staff support for senior Air Traffic management by identifying, collecting and consolidating management information as required.

e. Serves as the focal point within the division for statistical data reference activity surveys of airports to determine locations which qualify for FAA air traffic services.

f. Identifies trends in air traffic activity which affect operational planning requirements within the region and makes recommendations in the planning process to accommodate the projected changes.

g. Serves as the principal division contact for all contracts, i.e., contract weather, contract training and contract tower activity, etc., and handles the administration of the contract services program.

h. Tracks and monitors division use of resources such as positions, personnel, travel, overtime, permanent change of station (PCS), and procurement requests for equipment and supplies.

i. Manages the ATD administrative acquisition program, utilizing the System Acquisition Management (SAM) Program.

j. Serves as the principal division contact with the following divisions: Accounting, Budget, Logistics, Management Systems, Civil Aviation Security in matters relating to automation security, and Human Resource Management (except Labor Relations Branch).

k. Reviews and analyzes staffing, training, and other resource requirements received from Air Traffic field facilities, and coordinates these with the Facility Operations Branch. Develops and recommends budget requirements for operation of Air Traffic facilities giving consideration to recommendations from other branches in the division, particularly, the Facility Operations Branch.

1. Administers the Modular Applicant Tracking Employment System (MATES) program and special emphasis training programs, i.e., Pre-developmental, Cooperative Education, etc.

m. Serves as the principal division contact for Office of Management and Budget (OMB) Circular A76 and A123 activities.

n. Administers the division Information Resource Management (IRM) program, which includes ADP system development and application, and provides computerized methods for automating information systems.

o. Participates in the inter/intra-divisional review process of the operations budget.

p. Provides personnel management guidance to Air Traffic elements in areas such as position descriptions and implementation of classification guidelines.

q. Serves as the division focal point for statistical data, forecasts trends in air traffic which affect operations, planning, and program requirements within the region.

Administers the Incentive Awards Program and the Employee Suggestion Program.

s. Serves as the division Special Emphasis Program focal point.

3. FUNCTIONAL TASKS BY POSITION. Listed below are the branch positions and the associated functional tasks for each position.

a.AS0-520A:

(1) Career Service Emblems

(2) Mail Control

(3) Incoming Mail

(4) Outgoing Correspondence

(5) Files Maintenance

b. AS0-520.1:

(1) Annual Call For Training Coordinator

(2) Regionally Arranged and Conducted Training (RACT) Budget

(3) Technical Training Administration

(4) Air Traffic TRIMATE Coordinator

(5) On The Job Training Coordinator

(6) En Route Training Contract Coordination

(7) SF-160 Program Coordinator

C. AS0-520.2:

(1) Management and General Training

(2) Facility Reclassification

(3) Incentive Awards Program

(4) Employee Suggestion Program

(5) Processing of Personnel Actions

(6) Maintenance of Facility Staffing Records and Reports

d. ASO-520.3:

(1) Regionally Arranged and Conducted Training (RACT) Budget

(2) AFSS/FSS Training Requirements

(3) Airport Traffic Surveys

(4) Contract Tower Program Management (5) Contract Weather Program Management

(6) Special Emphasis Program Management

e. AS0-520.4:

(1) Operations Budget - Formulation

(2) Operations Budget Execution - Quarterly Field Fiscal Program

(3) Operations Budget Execution - Supplies/Services

(4) Operations Budget Execution - Overtime

(5) Authorized Staffing (1412) Program

f. ASO-520.5:

(1) Facility Reclassification

(2) Incentive Awards Program

(3) Employee Suggestion Program

(4) Processing of Personnel Actions

(5) Maintenance of Facility Staffing Records and Reports

g. ASO-520.6:

(1) Operations Budget - Formulation

(2) Operations Budget Execution - Quarterly Field Fiscal Program

(3) Operations Budget Execution - Travel

(4) Operations Budget Execution - Equipment

(5) Operations Budget Execution - Permanent Change of Station (PCS)

(6) Property Inventory

(7) Stay In School (SIS) Program

h. AS0-520.7:

(1) Regionally Arranged and Conducted Training (RACT) Budget

(2) Quality Through Partnership (QTP) Funding

(3) Monthly Traffic Activity

i. AS0-520.8:

(1) Property Inventory (2) Regionally Arranged and Conducted Training (3) Air Traffic Division Automation Program j. AS0-520.9:

(1) Property Inventory (2) Office Automation Hardware/Software Coordinator (3) Air Traffic Operations Management System (ATOMS) Coordinator NOTE: Each specialist in the branch serves as a primary backup for another specialist's position to ensure that all functional task duties are covered in the event that a specialist position is vacant. Functional task duties may be temporarily reassigned to cover long term position vacancies. 4. FUNCTIONAL TASK. Resource Management Branch, ASO-520. a. Operations Budget - Formulation. (1) Branch focal point: ASO-520.4 for overtime, supplies and services; ASO-520.6 for travel, change of station, and equipment. (2) ARTCCs, Hubs and Branches submit a three year budget on SO Form 2500-20. The requirements are consolidated into a division total. The Annual Call for Estimates prescribes the method and guidance for the formulation and submission of the Operations Appropriation Budget Year requirements. ATZ provides specific guidance, as part of the Call, which applies to Air Traffic specifically. ATZ through ABU determines the level of funding for the CY which is then broken out by option. Except for inflation, increased requirements from the Calendar Year (CY) to the Budget Year (BY) must be as a result of a new initiative tied to a mandated policy. (3) A floppy disk is provided by ATZ-310 for input of regional requirements.

(4) Coordinate with the following offices as required: (a) Internal. All ATD Branches and the AT Budget Analyst in ASO-30, Budget.

(b) External. Air Traffic ARTCC and Hub managers and ATZ-310.

(5) Reference: Annual Call for Estimates (Notice 2500.10) and policy.

b. Operations Budget Execution - Quarterly Field Fiscal Program.

(1) Branch focal points: ASO-520.6 for equipment, travel and change of station; ASO-520.4 for overtime, services and supplies.

(2) Requirements are submitted by ARTCCs, Hubs and Branches in the form of quarterly reviews not later than the 20th of December, March, June, and August of each year. The first submission for a fiscal year is forwarded with the mid-fourth quarter review in August.

(3) All requirements are developed into a Financial Operating Plan (FOP) and a division quarterly review, which is balanced against the fiscal allocation provided by ATZ-310 through ASO-30.

(4) This process is repeated each quarter as part of the quarterly review process. Each ARTCC/Hub/Branch is provided a Quarterly Field Fiscal Program showing their quarterly allocation broken out by sub-object class. Requests for adjustments to the program are submitted via SO Form 2500-43 by each Hub/ARTCC/Branch to ASO-520.4/ASO-520.6.

(5) Copies of each Quarterly Field Fiscal Program and SO Form 2500- 43 are maintained in ASO-520 files.

(6) Coordinate with the following offices as required:

(a) Internal. All ATD Branches and the Air Traffic Budget Analyst in ASO-30.

(b) External. All ARTCC/Hub Air Traffic Managers and ATZ-310.

(7) Reference: Policy.

c. Operations Budget Execution - Supplies/Services.

(1) Branch focal point: ASO-520.4.

(2) Validate and consolidate field supplies/services requirements for quarterly reviews and three-year budget. Write necessary justification to support requirements.

(3) Issue supply program documents to ARTCC/Hub facilities based on requirements and availability of funds.

(4) If supply funds are unavailable for handoff, issue approval to Hubs for essential items, as needed. Maintain a record of dollars approved

for use when preparing quarterly reviews. Approvals can be done by telephone but, in all cases, an So 2500-43 form is submitted for the record as backup. (5) Services funds are not programmed to Hubs but are controlled by ASO-520.4. Approval for funds is issued via SO 2500-43 as needed. (6) Monitor accounting runs on monthly basis to ensure the ATD does not exceed its quarterly allocation. (7) Coordinate with the following offices as required: (a) Internal. ASO-30. (b) External. Air Traffic ARTCC/Hub Managers. (8) Reference: Policy. d. Operations Budget Execution - Overtime. (1) Branch focal point: ASO-520.4. (2) Overtime is tracked by cost center, by pay period. (3) A printout is generated each pay period using data from the payroll system showing actual overtime obligations in dollars and hours for each cost center.

(4) The data is entered into a spreadsheet program and maintained by hub quarterly. (5) Overtime usage is compared to the hub allocation. (6) Total pay period usage is compared to the quarterly allocation. (7) Coordinate with the following offices as required: (a) Internal. None. (b) External. Air Traffic Hub Managers. (8) Reference: Policy. Operations Budget Execution - Travel. (1) Branch focal point: ASO-520.6. (2) Validate and consolidate field/regional travel requirements, quarterly reviews, and three year budget. Write justification to support requirements.

(3) Calculate cost of "must fund" travel for biennial home leave (2114), GOV/rental (2132), Travel Not Otherwise Classified (N.O.C.), i.e., litigation and/or assessment (2191) based on historical data and new initiatives.

(4) Issue travel program documents to field facilities based on requirements and available funds.

(5) If travel funds are unavailable for handoff, coordinate approvals on case-by-case basis with designated approving official and track total amount obligated.

(6) Approve SO Form 2500-43, Adjustment of Quarterly Fiscal Program and issue new program documents, if necessary. Keep a copy and return original to the facility.

(7) Maintain file on approved SO Form 2500-43s and Program Documents by Hub/ARTCC.

(8) Issue travel program documents to each branch.

(9) Coordinate special project travel such as San Juan TDY, Sun N'Fun, Master's Tournament, and other temporary towers.

(10) Serves as division focal point on all travel related questions, i.e., appropriation codes, what sub-object to charge, LOA, per diem rates, voucher processing.

(11) All travel vouchers for TDY and PCS go directly to ASO-22A. Only ASO-520 vouchers for travel are maintained in branch files.

(12) Coordinate with the following offices as required:

(a) Internal. All ATD Branches.

(b) External. All Air Traffic ARTCC/Hub Managers, ASO-30, AS0-22.

(13) Reference: Policy.

Operations Budget Execution - Equipment.

(1) Branch focal point: ASO-520.6.

(2) Validate and consolidate field equipment requirements for quarterly reviews and three-year budget. Write necessary justification to support requirements.

(3) Issue equipment program documents to ARTCC/Hub facilities based on requirements and availability of funds.

(4) If equipment funds are unavailable for handoff, initiate procurement requests (PR) in the System Acquisition Management (SAM) for emergency or "must have" items. The original PR is signed by ASO-520.6 if less than $25,000, or the branch manager if greater than $25,000. AS0-520.4 signs as certifying official. Forward hard copy to ASO-55, log each PR in the automated tracking system, and file a copy in the PR book. When corresponding Procurement Order (PO) is processed by ASO-55, the PO is logged and a copy is filed with the originating PR.

(5) If funds are available for equipment handoff, the Hub/ARTCC administrative assistants generate PRs, remaining within their program allocation. A hard copy is forwarded to ASO-520.6 for review and initialling. If the hub has a co-located Logistics Specialist, the PR is returned to the originating office for processing. If a Logistics Specialist is not colocated, the PR is forwarded to ASO-55 for processing. A copy is maintained in the PR binder.

(6) Coordinate with Logistics Specialist, ASO-55, on PRs in progress and follow up on delinquent delivery, unacceptable or damaged goods.

(7) Monitor accounting runs on monthly basis to ensure the ATD does not exceed its quarterly allocation.

(8) Coordinate with the following offices as required:

(a) Internal. ASO-55.

(b) External. Air Traffic ARTCC/Hub Managers.

(9) Reference: Policy and FAA Order 4400.42.

g. Operations Budget Execution - Permanent Change-of-Station (PCS).

(1) Branch focal point: ASO-520.6.

(2) Complete the following actions for funded moves:

(a) Enter data from selection package by categories in the automated PCS data base.

(b) Initial the selection list and SF-52.

(c) Make back-up index card, numbered to correspond with the name and number on the approved list, and file in the index box. The list is maintained in the blue notebook in the ASO-520.6 credenza.

(d) Forward the selection package to ASO-520.2 or ASO-520.5, as appropriate, for processing.

(3) Complete the following actions for unfunded moves:

(a) Enter data from selection package by categories in the automated PCS data base.

(b) Put the selection package in a file folder and label; file in Master file cabinet to hold for funding.

(4) General information: (a) Reconcile obligated moves with Accounting, ASO-22, on a monthly basis.

(b) Report obligated moves on the Quarterly Review.

(c) Initial corner of all PCS travel orders generated by field facilities and distribute copies, when approved, attaching appropriate back-up material to the original.

(5) Coordinate with the following offices as required: (a) Internal. All ATD Branch Managers, ASO-30, ASO-22, AS0-52CT.

(b) External. Air Traffic ARTCC/Hub Managers and ATZ-310.

(6) Reference: Policy.

h. Authorized Staffing (1412) Program.

(1) Branch focal point: ASO-520.4.

(2) Each field facility submits a staffing budget to ASO-520 no later than August 15 each year. (3) ASO-520 establishes a work group for each option to meet in the regional office and consolidate staffing requirements using the staffing budgets submitted by the facilities. (4) The requirements are placed onto a staffing chart by cost center and by position (budget number). (5) ASO-520 provides adjustments in staffing based on the ATZ-300 authorization.

(6) The staffing chart is updated with the adjustments and coordinated with ASO-540 for review and recommendations.

(7) Final adjustments, if any, are made to the chart.

(8) ASO-520 briefs ASO-500 on the staffing distribution and ASO-500 signs the chart if in agreement.

(9) A computer listing (1412) is updated with new fiscal year changes. The computer listing and staffing chart are forwarded to the Budget Division, ASO-30, with an Authorized Staffing Revision Request (SO Form 2500- 48).

(10) The Fiscal year changes are entered into the Computerized Personnel Information Management System (CPMIS) by ASO-30 and a new 1412 is produced.

(11) The staffing chart is given to ASO-520.2 and ASO-520.5 to prepare staffing letters to each facility manager.

(12) Any adjustments to the 1412 during the year are forwarded to ASO-30 via SO Form 2500-48. When the adjustment has been made by ASO-30, the completed SO Form 2500-48 is returned to ASO-520.4. The adjustment is given to ASO-520.2 or ASO-520.5 for facility notification.

(13) Coordinate with the following offices as required:

(a) Internal. ASO-500, ASO-540 and ASO-520.

(b) External. All Air Traffic Managers, ASO-30, and ATZ-300.

(14) Reference: FAA Orders 1100.123, 1100.126, 1100.146, and policy.

i. Stay-In-School (SIS) Program.

(1) Branch focal point: ASO-520.6.

(2) Submit SIS position requirement to Budget, ASO-30, each August for the upcoming fiscal year.

(3) Assign budget numbers furnished by ASO-30 to the Air Traffic SIS positions.

(4) Request SF-52s from each SIS facility to convert SISs to full time during the summer to be effective approximately May 30 and not extend beyond September 30.

(5) Request SF-52s from each facility to convert SISs to 20 hours a week effective October 1 using new FY budget numbers. Facility must specify tour of duty.

(6) Initial all SF-52 SIS actions and forward to ASO-520.2 or ASO-520.5 for processing.

(7) Coordinate necessary SIS personnel actions with ASO-12.

(8) Maintain all future requests for SIS positions in SIS folder in AS0-520.6 desk.

(9) Coordinate with the following offices as required:

(a) Internal. ASO-12, ASO-30.

(b) External. Facilities with SIS positions.

(10) REFERENCE: SO Order 3300.16.

j. Property Inventory.

(1) Branch focal points: ASO-520.8/ASO-520.9 for computer related inventory; ASO-520.6 for all other inventories.

(2) Perform property inventory for all closed field facilities, prepare associated paperwork, and forward to ASO-52.

(3) Coordinate property transfers, FAA Form 4650-12, with ASO-52.

(4) Coordinate excess property with ASO-52 and instruct field facilities on disposal instructions/guidance.

(5) Field property inventories are furnished by ASO-52 upon request. Reports are maintained in binders. Branch inventory is maintained in the branch files.

(6) Coordinate with the following offices as required:

(a) Internal. ASO-52A and ASO-52A.2.

(b) External. Air Traffic ARTCC/Hub Managers.

(7) Reference: DOT Order 4800.2.

k. Annual Call for Training Coordinator.

(1) Branch focal point: ASO-520.1 for technical training; ASO- 520.2 for management and general training.

(2) Upon distribution of the FAA Academy (AAC) and regional Call for Training notices, a memorandum is generated for ASO-500 signature providing additional guidance to air traffic facilities.

(3) When an ARTCC/AFSS/ATCT hub advises its requirements have been loaded into TRIMATE, the first regional review is done by ASO-520.1 for technical training and Regionally Arranged and Conducted Training (RACT), or by ASO-520.2 for Management and General training. The first review is a cursory one to delete any training requests that are obviously inappropriate for the person or course being requested. Additional requirements can be added by the person conducting the regional review if there is an obvious lack of proper requirements in the field/branch inputs.

(4) The second review consists of reduction of requirements from the unconstrained level to the constrained level as provided by ASO-17. This reduction is done at the regional level. If possible, training requirements associated with personnel in the position (i.e., Category 1, 2, and 3 training) are not deleted.

(5) After the second review, a memo should be sent to each ARTCC/AFSS/ATCT hub requesting its prioritized list of all the training slots remaining in its facility/hub requirements. This is a list of priorities, quota by quota, until all requested training has been listed. The ARTCC/AFSS/ATCT hub should indicate priority number, course number, and facility requesting each slot. These lists are consolidated into one regional list based upon the population within each ARTCC/AFSS/ATCT hub.

(6) If a third review is conducted, ASO-17 will provide the maximum level of requests in each category (Technical, Management and General, RACT) for Air Traffic. The reduction to this level will be done in accordance with the regional priority list obtained in (5) above.

(7) A technical training priority list is generated from the regional list and carried to the Pre-Programming Conference with ATZ-120, AXX- 520 representatives, FAA Technical Center (FAATC) representative, and FAA Academy representative to assist in the determination of the number of classes to be scheduled in each course and the equitable distribution of the quota in those courses.

(8) The distribution of quota for the coming fiscal year, resulting from the call process, is received around August each year. This quota is distributed as early as possible to the field facilities who should ensure proper, and timely, use of that quota.

(9) Coordinate with the following offices as required:

(a) Internal. All ATD Branches, ASO-17.

(b) External. ATZ-100, ATZ-300, AHT-500, FAA Academy Course Managers and CPMIS office, AXX-520 training coordinators, all regional field facilities.

(10) References: Notice 3000.49(X), SO Notice 3000.71, Centralized Training Quota Management Desk Top Aid, and policy.

1. Regionally Arranged and Conducted Training (RACT) Budget.

(1) Branch focal points:

(a) Funding: ASO-520.1.

(b) Out of Agency Approval Authority: ASO-520.8 for Computer Literacy requests; ASO-520.3 for all other requests.

(c) Tracking: ASO-520.7.

(2) The division's RACT funding level for the fiscal year is distributed, by quarter, from ASO-17 as soon as the annual budget has been distributed to the regions.

(3) Each quarter's funding is distributed to the various types of training to be accomplished within that quarter. The on-going types of training that are funded each quarter are regionally conducted On-the-Job Training (OJT), Instructor and examiner training, Out of Agency Training (OAT) which includes computer literacy training and CPR training required by labor contracts, travel and per diem for Center for Management Development (CMD) courses taught at field sites, budget workshops, and training room rentals. Other types of training are funded if money is available.

(4) A projected plan for using each quarter's budget is provided to ASO-17.

(5) As training expenses covered by the RACT budget are approved, costs are tracked via the RACTBUDG automated program by ASO-520.7. Vouchers received from field facilities are used to enter actual costs in the automated program. Totals for each program are provided to ASO-520.1 for review to ensure the obligated level remains within the authorized budget.

(6) Each quarter, ASO-17 provides an accounting run of all the obligated funds from the division's RACT funds. All items in this run must be reconciled with ASO-520's records. Any revisions, deletions, and additions must be coordinated with ASO-17 to ensure an accurate obligation level.

(7) Money from a future quarter cannot be spent in an earlier quarter but unused money can be carried over to the next quarter as long as it does not cross fiscal years.

(8) The quarterly review also involves providing ASO-17 with a spending plan for the upcoming quarter. This plan must identify total amounts to be spent on tuition, travel and per diem, and miscellaneous (rental of rooms, equipment, etc.).

(9) Process Out of Agency TRIMATE requests via the following steps:

(a) The TRIMATE request is reviewed to ensure it meets funding qualification under current guidelines, the request format is correct, and the cost accounting code is correct.

(b) Print a hard copy of the training request for review by the approving authority.

(c) If approved, log the request information in the RACT tracking program and forward the request to the appropriate routing in ASO-17.

(d) If disapproved, return to the requesting facility with explanation of action required.

(10) Coordinate with the following offices as required:

(a) Internal. All ATD Branches, ASO-500H, ASO-17.

(b) External. ARTCC/AFSS/ATCT Hub Training Administrators, ATZ-100.

(11) References: SO Order 3000.8, SO Order 4402.3, Notice 3000.49(X), and Policy.

m. Technical Training Administration.

(1) Branch focal point: ASO-520.1.

(2) Technical training class schedules and quota allocation for the upcoming fiscal year are provided to ASO-520.1 from ASO-17 by August of each year.

(3) Using all information available, quota assignments are made as early as possible to ARTCC/AFSS/ATCT Hub Training Administrators for assignment to individuals within their area of jurisdiction.

(4) It is desirable that all enrollments be completed at least six weeks prior to class starting date, but must be done no less than 21 days prior to start date with the exception of Terminal Basic Radar Training, Course 50034. If enrollment has not been accomplished by three weeks prior to class start date, the quota is removed from this region and redistributed to another region having a request in CPMIS for additional quota.

(5) Any shortfall in the technical courses for the upcoming year is identified as early as possible. A list of additional quota needed is provided to ASO-17 and must include course number, class number(s), quota desired in each class for those courses, and the number of days notice required to be able to use the additional quota, if received. If any class will suffice, no class number is required.

(6) ASO-17 forwards N-SKED reports to ASO-520 at least bi-weekly. These reports show the technical courses, class schedules, quota allocated, and names and facilities of enrollees. These reports should be reviewed regularly to ensure enrollments are completed well before the deadline to prevent losing quota.

(7) Any quota that cannot be used by an Air Traffic employee should be released to pool as early as possible to allow other regions needing additional quota ample time to schedule someone for that class. Releasing quota is accomplished by advising ASO-17.3 of course number, class number, and the quota to be released to pool. ASO-17.3 should also be reminded to transmit the CPMIS message to all regions advising of quota released to pool.

Continue reading ↓ 120 of 301 passages shown