ORDER 8120.2DPRODUCTION APPROVAL AND CERTIFICATE MANAGEMENT PROCEDURES

ORDER 8120.2D

PRODUCTION APPROVAL AND CERTIFICATE

MANAGEMENT PROCEDURES

August 17, 2004

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Distribution: A-W (IR/FS/VN) -3; A-X (CD/FS) -3; A-FFS-0 (LTD) Initiated by: AIR-200 A-FAC-0 (ALL); AMA-220 (10 copies); AMA-250 (10 copies) AFS-600 (10 copies); AVR-20 (ALL); AEU-100

RECORD OF CHANGES DIRECTIVE NO. 8120.2D

CHANGE

TO

BASIC

SUPPLEMENTS

OPTIONAL

CHANGE

TO

BASIC

SUPPLEMENTS

OPTIONAL

CHG 1 9/23/2005

FAA Form 1320-5 (6-80) USE PREVIOUS EDITION

8120.2D CHG 1

SUBJ:

9/23/2005

PRODUCTION APPROVAL AND CERTIFICATE MANAGEMENT PROCEDURES

A-W (IR/FS/VN)-3; A-X (CD/FS)-3; A-FFS-0 (LTD); A-FAC-0 (ALL);

AMA-220 (10 copies); AMA-250 (10 copies); AFS-600 (10 copies); AVS-20 (ALL); AEU-100

AIR-200

1. PURPOSE. This change is issued to revise information to harmonize with the Certificate Management Information System.

2. DISTRIBUTION. This order is distributed to Washington Headquarters division levels of the Flight Standards Service, to the branch levels of the Aircraft Certification Service, to the branch levels in the regional Flight Standards Divisions and Aircraft Certification Directorates, to all Flight Standards District Offices, to all Aircraft Certification Offices, to all Aircraft Certification field offices, to all Manufacturing Inspection District and Satellite Offices, to the Aircraft Certification and Airworthiness Branches at the Federal Aviation Administration Academy, to the Suspected Unapproved Parts Program Office, to the International Policy Office, and to the Flight Standards Service Regulatory Support Division.

3. DISPOSITION OF TRANSMITTAL. After filing the attached pages, retain this transmittal.

4. PAGE CONTROL CHART. See the attached page control chart.

8120.2D CHG 1 9/23/2005

PAGE CONTROL CHART

Remove Pages Dated Insert Pages Dated

vii-x 8/17/2004 vii-x 9/23/2005 1 thru 6 8/17/2004 1 thru 6 9/23/2005 17 8/17/2004 17 9/23/2005 18 8/17/2004 18 8/17/2004 25 8/17/2004 25 9/23/2005 26 8/17/2004 26 8/17/2004 29 and 30 8/17/2004 29 and 30 9/23/2005 39 8/17/2004 39 9/23/2005 40 8/17/2004 40 8/17/2004 49 8/17/2004 49 9/23/2005 50 and 51 8/17/2004 50 and 51 8/17/2004 52 thru 83 (and 84) 8/17/2004 52 thru 84 9/23/2005 APPENDIX 2 APPENDIX 2 1 thru 6 8/17/2004 1 (thru 6) 9/23/2005 APPENDIX 3 APPENDIX 3 1 8/17/2004 1 9/23/2005 2 8/17/2004 2 8/17/2004 APPENDIX 5 APPENDIX 5 1 (and 2) 8/17/2004 1 (and 2) 9/23/2005 APPENDIX 6 APPENDIX 6 1 and 2 8/17/2004 1 and 2 9/23/2005 APPENDIX 7 APPENDIX 7 1 8/17/2004 1 9/23/2005 2 8/17/2004 2 8/17/2004 3 8/17/2004 3 9/23/2005 4 8/17/2004 4 8/17/2004 APPENDIX 8 APPENDIX 8 1 8/17/2004 1 9/23/2005 2 8/17/2004 2 8/17/2004

9/23/2005 8120.2D CHG 1

Page 3 (and 4)

Remove Pages Dated Insert Pages Dated APPENDIX 9 APPENDIX 9 1 (and 2) 8/17/2004 1 (and 2) 9/23/2005 /S/ Frank P. Paskiewicz Manager, Production and

Airworthiness Division, AIR-200

8/17/2004 8120.2D

i (and ii)

FOREWORD

This order was prepared to provide guidance for Aircraft Certification Service personnel in the accomplishment of certain agency responsibilities. These include the evaluation, approval, and certificate management of the production activities of manufacturers and their suppliers producing products or parts thereof in accordance with Title 14, Code of Federal Regulations.

The guidance in this order relates to the following four types of production approvals issued by the Federal Aviation Administration:

1. Production Certificate.

2. Approved Production Inspection System.

3. Parts Manufacturer Approval.

4. Technical Standard Order authorization.

This order has been organized into two functional areas: procedures for the evaluation and issuance of a production approval, and procedures for certificate management of a production approval.

/S/

Frank P. Paskiewicz Manager, Production and Airworthiness Division, AIR-200

ORDER 8120.2DPRODUCTION APPROVAL AND CERTIFICATE MANAGEMENT PROCEDURES › TABLE OF CONTENTS

8/17/2004 8120.2D

iii

TABLE OF CONTENTS

CHAPTER 1. INTRODUCTION

Paragraph Page 1. Purpose. … 1 2. Distribution. … 1 3. Cancellation. … 1 4. Explanation of Major Changes. … 1 5. Acronyms. … 2 6. Definitions. … 3 7. Forms. … 6 8. Relation to Other Directives. … 6 9. Requests for Information. … 6 10. Authority To Change This Order. … 6 11. Deviations. … 6 12. Electronic Signature. … 6 13. Continuous Improvement Program. … 7 14. Records Management. … 7 15.-19. Reserved. … 7

CHAPTER 2. PROCEDURES FOR ISSUING A PRODUCTION APPROVAL

SECTION 1. INTRODUCTION

20. General. … 9

SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY (PART 21, SUBPART F)

PART 1. GENERAL

21. Applicability. … 9 22. Privileges. … 9 23. Advising the Applicant. … 9

PART 2. FAA ACTIONS DURING THE SIX-MONTH PERIOD

24. FAA Conformity Determinations. … 12 25. Assessing the Applicant’s Progress. … 12 26. Extension of Six-Month Period. … 12 27. APIS or PC Not Established Within Six-Month Period. … 12 Figure 1. Sample FAA Form 8100-1, Conformity Inspection Record. … 13 Figure 2. Sample Letter of Authorization for Extension of § 21.123(c) Six-Month Limitation. … 15

8120.2D 8/17/2004

iv

PART 3. PROCESSING AN APPLICATION FOR AN APIS

Paragraph Page 28. Application. … 12 Figure 3. Sample FAA Form 8110-12, Application for Type Certificate, Production Certificate, or Supplemental Type Certificate. … 16 29. Review of Production Inspection System Data. … 17 30. Provisional Approval Procedures. … 17 31. Preliminary DO Audit. … 17 32. APIS Board. … 18

PART 4. ISSUANCE OF AN APIS

33. APIS Approval Letter. … 18 34.-40. Reserved. … 18 Figure 4. Sample Letter for Approving a Manufacturer’s Production Inspection System. … 19

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G)

PART 1. GENERAL

41. Applicability. … 22 42. Privileges. … 22 43. Advising the Applicant. … 22

PART 2. PROCESSING AN APPLICATION FOR A PC

44. Application. … 25 45. Preliminary DO Audit. … 25 Figure 5. Sample PC Application Acknowledgement Letter. … 26

PART 3. PRODUCTION CERTIFICATION BOARD

46. General. … 27 47. PCB Member Responsibilities. … 27 48. Conduct of the Board. … 28 49. PCB Minutes. … 29 50. PCB Adjournment. … 30

PART 4. ISSUANCE OF PRODUCTION CERTIFICATE AND PRODUCTION LIMITATION RECORD

51. Preparation and Delivery of PC and PLR. … 30 Figure 6. Sample FAA Form 8120-4, Production Certificate. … 31 Figure 7. Sample FAA Form 8120-3, Production Limitation Record. … 32 Figure 8. Sample PC Transmittal Letter. … 33 52.-55. Reserved. … 34

8/17/2004 8120.2D

v

SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION (PART 21, SUBPART O)

PART 1. GENERAL

Paragraph Page 56. Applicability. … 35 57. Privileges. … 35 58. Advising the Applicant. … 35

PART 2. PROCESSING AN APPLICATION FOR A TSO AUTHORIZATION

59. Application. … 38 60. Design Approval. … 38 61. Preliminary DO Audit. … 38

PART 3. ISSUANCE OF A TSO AUTHORIZATION OR LETTER OF TSO DESIGN APPROVAL

62. TSO Letter of Authorization. … 39 63. Letter of TSO Design Approval. … 39 64.-67. Reserved. … 39

SECTION 5. PARTS MANUFACTURER APPROVAL (SPECIAL GUIDANCE)

68. General. … 40 69. Marking Detail Parts of PMA Assemblies. … 40 70. Identification Marking of Replacement and Modification Parts Produced Pursuant to the Enhanced Enforcement Program (EEP) as Published in Federal Register Notice, February 27, 1995. … 40 71. Supplier Marking of PMA Parts. … 40 72.-84. Reserved. … 40

SECTION 6. EXTENSION OF A PRODUCTION APPROVAL WITHIN THE UNITED STATES

PART 1. GENERAL

85. Applicability. … 41 86. Privileges. … 41 87. Advising the Original PAH and the Associate Facility. … 41

8120.2D 8/17/2004

vi

PART 2. PROCESSING A REQUEST FOR EXTENSION OF A PRODUCTION APPROVAL

Paragraph Page 88. Request for Extension of a Production Approval. … 42 89. Evaluating the Request. … 42 90. Coordination With the Geographic District Office. … 43

PART 3. APPROVAL OF THE REQUEST FOR EXTENSION OF A PRODUCTION APPROVAL

91. Approval of the Request. … 43 92. Geographic MIDO Responsibility After Approval of the Request for Extension. .. 43

SECTION 7. NON-U.S. MANUFACTURING FACILITIES—DETERMINATION OF UNDUE BURDEN AND NO UNDUE BURDEN

93. Undue Burden and No Undue Burden. … 44 94.-95. Reserved. … 44

CHAPTER 3. CERTIFICATE MANAGEMENT PROCEDURES

SECTION 1. INTRODUCTION

96. General. … 45 Figure 9. Certificate Management Life Cycle Process. … 46 97. Domestic Hand-Off Procedures. … 47 98. Assignment of CM Coordinator. … 48 99. Status of a PAH. … 49 100.-102. Reserved. … 49

SECTION 2. ONGOING CM RESPONSIBILITIES

PART 1. INTRODUCTION

103. General. … 50 Figure 10. Certificate Management Responsibilities (Ongoing) – Minimum Requirements. … 50 104. Certificate Management Plan. … 51 105. Coordination of Audit Activities With Other CAA’s. … 51 106. Recording Noncompliances. … 52 107. Reserved. … 52

9/23/2005 8120.2D CHG 1

vii

PART 2. RESOURCE TARGETING

Paragraph Page 108. Resource Targeting Model. … 52 109. Scope. … 52 110. Resource Targeting Groups. … 52 111. Resource Targeting Categories. … 53 112. Resource Targeting Assessment of Facilities. … 53 Figure 11. Sample AIR Form 8120-9. … 54 113. Identification of Resource Targeting Groups. … 56 114. Modification of Resource Targeting Groups. … 56 115. Resource Targeting Model Validation Plan. … 56 116. Modification of the Resource Targeting Model. … 57 117.-122. Reserved. … 57

*

PART 3. DETERMINING SUPPLIER CONTROL BY A PAH OR ASSOCIATE FACILITY

123. General. … 57 124. Certificate Management Activity. … 59 125. Determination of Supplier Control. … 59 126.-128. Reserved. … 59

PART 4. PRINCIPAL INSPECTOR EVALUATION

129. General. … 59 130. Recording a PI Evaluation. … 61 131.-134. Reserved. … 61

PART 5. AIRCRAFT CERTIFICATION SYSTEMS EVALUATION PROGRAM EVALUATION

135. General. … 61 136.-138. Reserved. … 62

PART 6. SUPPLIER CONTROL AUDIT

139. General. … 62 140. Supplier Selection. … 63 141. Directorate Supplier Control Audit List. … 64 142. Coordination of Supplier Control Audits Between Directorates. … 65 143. Notifying a PAH or Associate Facility. … 65 144. Recording a Supplier Control Audit. … 65 145.-147. Reserved. … 65 Figure 12. Sample Supplier Control Audit Notification Letter. … 66 *

8120.2D CHG 1 9/23/2005

viii

PART 7. PRODUCT AUDIT

Paragraph Page 148. General. … 67 149. Selection of Product Audit Characteristics. … 68 150. Product Audit Areas. … 68 151. Product Audit Criteria. … 68 Figure 13. Applicability of Product Audit Criteria to Product Audit Areas (Minimum). … 69 152. Recording Product Audit Results. … 69 153. Recording Completion of a Product Audit. … 70 154.-156. Reserved. … 70

*

SECTION 3. RANDOM CM RESPONSIBILITIES

PART 1. INTRODUCTION

157. General. … 71 158.-159. Reserved. … 71

PART 2. EVALUATION OF CHANGES TO A PAH’S OR ASSOCIATE FACILITY’S QC OR INSPECTION SYSTEM

160. General. … 71 161. Prioritization of Review. … 71 162. Review of Changes. … 71 163. Post-Review Actions. … 72 164.-167. Reserved. … 72 Figure 14. Sample Letter of Approval for Quality Control System Changes by a PC or TSO Authorization Holder. … 73 Figure 15. Sample Letter of Acknowledgement for Inspection System Changes by an APIS or PMA Holder. … 74

PART 3. INVESTIGATION OF SERVICE DIFFICULTIES

168. General. … 72 169. Investigation. … 75 170. Corrective Action. … 75 171. Reporting a Service Difficulty Investigation. … 75 172. Foreign Manufacturers. … 76 173.-175. Reserved. … 76 *

9/23/2005 8120.2D CHG 1

ix

PART 4. INVESTIGATION OF REGULATORY VIOLATIONS

Paragraph Page 176. Enforcement Actions on Safety-Related or Systemic Noncompliances. … 76 177. Enforcement Procedures. … 77 178. Multiple Enforcement Actions. … 77 179. Timeliness. … 77 180. Invalid Alleged Violations. … 77 181. Voluntary Disclosure Procedures. … 77 182.-184. Reserved. … 78

*

PART 5. CORRECTIVE ACTION

185. General. … 78 186. Corrective Action Procedures. … 78 Figure 16. Corrective Action Flowchart. … 79 187. Corrective Action Response. … 81 188. Corrective Action Validation. … 82 189.-191. Reserved. … 82

PART 6. UNSCHEDULED AUDITS, EVALUATIONS, OR INVESTIGATIONS

192. General. … 82 193. Non-Scheduled CM Audits/Evaluations. … 82 194. Other Random Investigations. … 83 195.-197. Reserved. … 83

PART 7. PROVIDING GUIDANCE TO A PAH OR ASSOCIATE FACILITY

198. General. … 84 *

APPENDIX 1. EVALUATION OF A PAH’S QUALITY CONTROL OR INSPECTION SYSTEM

1. Purpose. … 1 2. Data Review. … 1 3. Data Approval/Acceptance Standards. … 3

APPENDIX 2. RESERVED * *

8120.2D CHG 1 9/23/2005

x

APPENDIX 3. RESOURCE TARGETING INDICATOR ASSESSMENT CRITERIA

Paragraph Page 1. Purpose. … 1 2. Specific Guidance. … 1 Figure 1. Resource Targeting Indicators … 1

APPENDIX 4. CATEGORY PARTS LIST

1. Purpose. … 1 2. Category Parts List. … 1 3. Structure of the CPL. … 1 4. CPL Revision Process. … 1 Figure 1. Sample Category Parts List. … 2 Figure 2. CPL Revision Process Flowchart. … 4 Figure 3. Sample Part Categorization Memo for Requesting an Addition to the CPL. 5 Figure 4. Sample Part Categorization Memo for Requesting a Change to the CPL. 6 Figure 5. Sample Part Categorization Memo for Requesting Removal of an Assembly/Part From the CPL. … 7

APPENDIX 5. RESOURCE TARGETING REPORTS

1. Purpose. … 1 2. Types of Reports. … 1

APPENDIX 6. RESOURCE TARGETING MODEL VALIDATION PLAN

1. Purpose. … 1 2. Resource Targeting Validations. … 1

APPENDIX 7. PREPARATION INSTRUCTIONS FOR FAA FORM 8100-6, NONCOMPLIANCE RECORD

1. Purpose. … 1 2. Specific Guidance. … 1 Figure 1. Sample FAA Form 8100-6. … 4

APPENDIX 8. PREPARATION INSTRUCTIONS FOR FAA FORM 8120-14, PRODUCTION APPROVAL/CERTIFICATE MANAGEMENT ACTIVITY REPORT

1. Purpose. … 1 2. Specific Guidance. … 1 Figure 1. Sample FAA Form 8120-14. … 3

APPENDIX 9. FORMS LISTING

1. Purpose. … 1 Figure 1. Forms Available From FAA Logistics Center. … 1 Figure 2. Forms Available Within CMIS. … 1 * *

9/23/2005 8120.2D CHG 1

CHAPTER 1. INTRODUCTION

1. PURPOSE. This order contains guidance related to— *

a. Production approvals and certificate management (CM) of manufacturers of type-certificated products, technical standard order articles, and replacement and modification parts, to ensure fair and uniform administration of Title 14, Code of Federal Regulations (14 CFR).

ORDER 8120.2DPRODUCTION APPROVAL AND CERTIFICATE MANAGEMENT PROCEDURES › CHAPTER 1. INTRODUCTION

b. The Certificate Management Information System (CMIS). In those cases in which activities and work processes are automated by CMIS, aviation safety inspectors, aviation safety engineers, and flight test pilots must use CMIS to perform that work. In the event a manual activity or work process described in this order becomes automated in CMIS, the use of CMIS to perform that activity or work process will take precedence. *

2. DISTRIBUTION. This order is distributed to Washington Headquarters division levels of the Flight Standards Service, to the branch levels of the Aircraft Certification Service, to the branch levels in the regional Flight Standards Divisions and Aircraft Certification Directorates, to all Flight Standards District Offices, to all Aircraft Certification Offices, to all Aircraft Certification field offices, to all Manufacturing Inspection District and Satellite Offices, to the Aircraft Certification and Airworthiness Branches at the Federal Aviation Administration Academy, to the Suspected Unapproved Parts Program Office, to the Brussels Aircraft Certification Staff, and to the Flight Standards Service Regulatory Support Division.

3. CANCELLATION. Federal Aviation Administration (FAA) Order 8120.2C, Production Approval and Certificate Management Procedures, dated April 5, 2002, is canceled.

4. EXPLANATION OF MAJOR CHANGES. This revision—

a. Removes all references to the Manufacturer’s Maintenance Facility.

b. Modifies the requirement for the FAA to conduct a preliminary district office (DO) audit when a production approval holder (PAH) moves an associate facility or adds a new plant.

c. Adds language regarding the use of temporary registration numbers.

d. Allows an Approved Production Inspection System (APIS) holder to extend its production approval to an associate facility.

e. Adds language regarding the requirement for the FAA to make a determination of undue burden or no undue burden after reviewing the initial production approval application involving non-U.S. manufacturing facilities.

f. Clarifies direct ship authorization requirements.

g. Reduces the notification period for supplier control audits.

h. Clarifies that suppliers to a Technical Standard Order (TSO) authorization holder and/or a Parts Manufacturer Approval (PMA) holder may identify parts.

8120.2D CHG 1 9/23/2005

i. Explains the criteria by which new unused products and parts may be reintroduced into a PAH’s quality control or inspection system.

j. Renumbers the Resource Targeting Facility Assessment Sheet.

k. Revises the preparation instructions for FAA Form 8100-6, Noncompliance Record.

l. Incorporates a sample of the current FAA Form 8120-14, Production Approval/Certificate Management Activity Report.

5. ACRONYMS. Acronyms used in this order are as follows:

14 CFR Title 14, Code of Federal Regulations

AC Advisory Circular

ACO Aircraft Certification Office

ACSEP Aircraft Certification Systems Evaluation Program

APIS Approved Production Inspection System

ASI Aviation Safety Inspector

CAA Civil Aviation Authority

CM Certificate Management *

CMIS Certificate Management Information System

CMO Certificate Management Office *

CPL Category Parts List

DMIR Designated Manufacturing Inspection Representative

DO District Office

DOA Delegation Option Authorization

EEP Enhanced Enforcement Program

FAA Federal Aviation Administration

FIS Fabrication Inspection System

ICSSP International Cooperative Supplier Surveillance Program

MIDO Manufacturing Inspection District Office

MIO Manufacturing Inspection Office

9/23/2005 8120.2D CHG 1

MRB Material Review Board

NDT Nondestructive Testing

OAC Original Airworthiness Certificate

ODAR Organizational Designated Airworthiness Representative

PAH Production Approval Holder

PC Production Certificate

PCB Production Certification Board

PI Principal Inspector

PLR Production Limitation Record

PMA Parts Manufacturer Approval

* QC Quality Control

SDR Service Difficulty Report *

STC Supplemental Type Certificate

TC Type Certificate

TSO Technical Standard Order

6. DEFINITIONS. For the purpose of this order, the following definitions apply:

a. Article. Materials, parts, and/or appliances produced under the provision of a TSO authorization. All references in this order to “parts thereof” include TSO articles, as applicable. An article as specified in 14 CFR § 21.143(a) (which includes any material, part, subassembly, assembly, system, or appliance that is used in the type-certificated product) is referred to herein as a “part thereof.”

b. Associate Facility. This is a facility that has been approved as an extension to an original PAH. This facility is owned and operated by the same corporate management as the original PAH that controls the design and quality of the product or part(s) thereof, except for companies participating in joint-production and/or co-production business agreements. The associate facility must be listed as a manufacturing facility on the production certificate (PC) or the letter of authorization for other production approvals, e.g., APIS, PMA, or TSO authorization (reference chapter 2, section 6 of this order).

c. Audit. A systematic and independent examination to determine compliance of an established supplier system, inspected product or part(s) thereof, or processes with purchase order requirements, technical data, or specifications.

8120.2D CHG 1 9/23/2005

d. Category 1 Product or Part(s) Thereof. A product or part(s) thereof whose failure could prevent continued safe flight and landing; resulting consequences could reduce safety margins, degrade performance, or cause loss of capability to conduct certain flight operations.

e. Category 2 Product or Part(s) Thereof. A product or part(s) thereof whose failure would not prevent continued safe flight and landing; resulting consequences may reduce the capability of the aircraft or the ability of the crew to cope with adverse operating conditions or subsequent failures.

f. Category 3 Product or Part(s) Thereof. A product or part(s) thereof whose failure would have no effect on continued safe flight and landing of the aircraft.

g. Certificate. A document (i.e., a certificate or approval) issued by the FAA that recognizes an applicant’s or PAH’s established quality control or inspection system and allows for the production of products or parts thereof in accordance with an FAA-approved design.

h. Certificate Management. The method by which the FAA ensures that a PAH remains in compliance with those pertinent regulations that govern the manufacturing of its particular products or parts thereof.

i. Corrective Action. The measures taken to resolve unsatisfactory conditions and to prevent reoccurrence.

j. Days. A reference to calendar days, unless otherwise specified.

k. Distributor. A broker, dealer, reseller, or other person or agency engaged in the sale of parts for installation in type certificated aircraft, aircraft engines, propellers, and in appliances.

l. District Office. The Manufacturing Inspection District Office (MIDO), and where applicable, Certificate Management Office (CMO), having CM responsibility for a defined geographical area.

m. Evaluation. A systematic and independent examination of an established PAH or associated facility system based on the system elements defined in Order 8100.7.

n. Foreign Manufacturer. A person other than an FAA production approval holder who causes a product or part(s) thereof to be produced outside the United States.

o. Group I Facility. A PAH or associate facility identified by resource targeting as having the greatest potential to produce nonconforming products or parts thereof.

p. Group II Facility. A PAH or associate facility identified by resource targeting as having a moderate potential to produce nonconforming products or parts thereof.

q. Group III Facility. A PAH or associate facility identified by resource targeting as having a low potential to produce nonconforming products or parts thereof.

r. Group IV Facility. A PAH or associate facility identified by resource targeting as having little or no potential to produce nonconforming products or parts thereof.

s. Inspection System. The total network of administrative and technical data at an APIS or PMA holder required to control the product or part(s) thereof to 14 CFR.

9/23/2005 8120.2D CHG 1

t. Internal Procedure. A PAH’s or associate facility’s procedures that are not included as part of the FAA-approved data.

u. Manufacturer. A person as defined by 14 CFR part 1, Definitions and Abbreviations (part 1), who causes a product or part(s) thereof to be produced. A manufacturer may be a PAH or a supplier to a PAH.

v. Noncompliance. A PAH’s or associate facility’s operating practice that is found to be inconsistent with 14 CFR, FAA-approved data, or internal procedures. A supplier’s operating practice found to be inconsistent with a PAH’s or associate facility’s purchase order requirements is considered to be a noncompliance by the PAH or associate facility.

w. On-going Certificate Management. The performance of CM requirements based on resource targeting that may be accomplished on a continuing basis.

x. Part(s) Thereof. Any part, material, appliance, system, subassembly, assembly, or software used in a product.

y. Production Approval. An authorization, approval, or certificate issued by the FAA that allows a manufacturer to produce products or parts thereof in accordance with FAA-approved design and an FAA-approved quality control or inspection system.

z. Production Approval Holder. This is a holder of a PC, APIS, PMA, or TSO authorization who controls the design and quality of a product or part(s) thereof. [A person who has been issued a production approval by the FAA.]

aa. Principal Inspector. A manufacturing inspector who has been assigned CM responsibility of a particular PAH or associate facility.

bb. Produce. To manufacture, or cause to be manufactured, a product or part(s) thereof.

cc. Product. Aircraft, aircraft engine, or propeller.

dd. Production Certification Board. An FAA evaluation function consisting of a selected group of FAA specialists acting under the direction of the Production Certification Board (PCB) chairperson for the purpose of determining eligibility of the holder of a type certificate (TC) or supplemental type certificate (STC), or a licensee, for the issuance of a PC.

ee. Quality Control Data. Data that provides a description of the quality control system required by part 21 for a PC or TSO authorization holder. These data would encompass the methods, procedures, processes, inspections, tests, specifications, charts, lists, forms, etc., which the PAH employs to produce products or parts thereof.

ff. Quality Control System. The total network of administrative and technical data and detailed procedures at a PC or TSO authorization holder required to control the product or part(s) thereof to 14 CFR.

gg. Random Certificate Management. The performance of CM tasks that may be accomplished on an as-needed basis.

8120.2D CHG 1 9/23/2005

hh. Random Sampling. A sampling procedure that ensures that each element in a population has an equal chance of being selected.

ii. Resource Targeting. A method of categorizing PAH’s and associate facilities that provides for effective FAA CM resource deployment.

jj. Root Cause. The underlying cause of a systemic or recurring noncompliance, usually identified through structured analysis.

kk. Specialist. As related to the facility audit function of PC or APIS Boards, FAA manufacturing inspectors/supervisors or flight test, structures, systems, and/or equipment engineering personnel.

ll. Supplier. Any person, including a distributor, who furnishes parts or related services (at any tier) to an applicant, PAH, or another supplier.

7. FORMS. This order identifies several forms used for the evaluation, approval, and CM of production activities. Some of the forms are provided by AIR-200 in electronic format. Appendix 9, Forms Listing, provides a listing of the forms and their sources.

8. RELATION TO OTHER DIRECTIVES. Orders referenced in this directive list only the basic order number. It is the responsibility of the user to establish that the latest revision/amendments are being utilized.

9. REQUESTS FOR INFORMATION. All public requests for information regarding production approval or CM activities will be processed in accordance with the Freedom of Information Act. Refer to FAA Order 1270.1, Freedom of Information Act Program. Any deficiencies found, clarifications needed, or improvements regarding the content of this order should be forwarded to the Planning and Financial Resources Management Branch, AIR-530, Attention: Directives Management Officer, for consideration. FAA Form 1320-19, Directive Feedback Information, is located on the last page of this order for your convenience or you may obtain it electronically from the FAA Web site. A copy may be forwarded to the Production and Airworthiness Division, AIR-200, Attention: Comments to Order 8120.2. If an interpretation is urgently needed, you may contact AIR-200 for guidance, but you should also use the Form 1320-19 as a follow up to each verbal conversation.

10. AUTHORITY TO CHANGE THIS ORDER. The issuance, revision, or cancellation of the material in this order is the responsibility of the Aircraft Certification Service, Production and Airworthiness Division, AIR-200. This division will accomplish all changes, as required, to carry out the agency’s responsibility to provide for production approval and CM.

11. DEVIATIONS. Adherence to the procedures in this order is necessary for uniform administration of this directive material. Any deviations from this guidance material must be coordinated and approved by AIR-200. If a deviation becomes necessary, the FAA employee involved should ensure the deviations are substantiated, documented, and concurred with by the appropriate supervisor. The deviation must be submitted to AIR-200 for review and approval. The limits of federal protection for FAA employees are defined by Title 28 U.S.C. § 2679.

12. ELECTRONIC SIGNATURE. The use of an electronic signature for the issuance of a production certificate and a production limitation record, or a production approval letter (i.e., APIS, PMA, or TSO authorization) is not permitted.

8/17/2004 8120.2D

7 (and 8)

13. CONTINUOUS IMPROVEMENT PROGRAM. The CM Continuous Improvement Program (CMCIP) is established to evaluate current CM policies and practices, identify difficulties and inconsistencies in implementation, and recommend improvements. A Certificate Management Improvement Team (CMIT) has been chartered by AIR-200. The CMIT includes representatives from each directorate and AIR-200. All AIR personnel are strongly encouraged to provide recommendations for improvement of the CM program to their respective CMIT representative.

14. RECORDS MANAGEMENT. Refer to Orders 0000.1, FAA Standard Subject Classification System, 1350.14, Records Management, and 1350.15, Records Organization, Transfer, and Distribution Standards, or your office Records Management Officer (RMO)/Directives Management Officer (DMO) for guidance regarding retention or disposition of records.

15.-19. RESERVED.

SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY(PART 21, SUBPART F) › PART 1. GENERAL

8/17/2004 8120.2D

CHAPTER 2. PROCEDURES FOR ISSUING A PRODUCTION APPROVAL

SECTION 1. INTRODUCTION

20. GENERAL. This chapter provides guidance relative to the issuance of a production approval. The following sections provide specific guidance for each of the production approval types, including extension of a production approval within the United States. In general, each section describes the applicability of the production approval, the privileges of the approval, the advice that the FAA should be providing to the applicant, processing the application, and issuing the production approval.

SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY

(PART 21, SUBPART F)

PART 1. GENERAL

21. APPLICABILITY. Part 21, subpart F, is applicable to a manufacturer of a product or part(s) thereof without benefit of a PC.

22. PRIVILEGES. A manufacturer of a product or part(s) thereof in accordance with part 21, subpart F, is not granted any privileges. However, upon establishment of an APIS, the APIS holder is eligible to have a qualified employee(s) designated as a Designated Manufacturing Inspection Representative (DMIR) in accordance with the provisions of 14 CFR part 183, Representatives of the Administrator (part 183). The APIS holder may also be authorized by part 183 to represent the Administrator as an Organizational Designated Airworthiness Representative (ODAR). FAA Order 8100.8, Designee Management Handbook, contains procedures for the administration of DMIRs and ODARs.

23. ADVISING THE APPLICANT. When production under the provisions of part 21, subpart F, is indicated, a TC applicant should be advised (during the preliminary TC Board) of the following:

a. Advisory Circular (AC) 21-6, Production Under Type Certificate Only, sets forth an acceptable means of complying with part 21, subpart F. The FAA may approve alternative methods and procedures when the applicant can show the proposed methods or procedures will achieve compliance with part 21, subpart F.

b. The applicant’s intentions should be documented with respect to production and submitted to the MIDO/CMO. This will allow the FAA to schedule inspections and evaluations at the earliest stages of establishment of the APIS.

c. The applicant should be encouraged to strive for a PC instead of an APIS. The following advantages of the PC should be emphasized:

(1) No requirement to submit FAA Form 8130-9, Statement of Conformity, for each completed product.

(2) Reduced FAA involvement, relative to conformity inspections and airworthiness certification.

8120.2D 8/17/2004

(3) Issuance of airworthiness certificates and approvals for completed products without further showing.

(4) Issuance of export approvals for small aircraft without assembly or flight test.

d. FAA inspectors or authorized designees will conduct inspections and issue all of the necessary airworthiness certificates and approvals for a maximum period of six months, except as otherwise authorized after the date of issue of the TC. The applicant should also be advised that FAA personnel resources are limited and that delays may occur during the six-month period depending on the number of inspections and hours that may be necessary.

e. Subsequent to the six-month period (except as otherwise authorized), an APIS or PC must be obtained in order to continue production of the type-certificated product. Additionally, any products or part(s) thereof manufactured after the deadline date without FAA authorization may result in actions as defined in Order 2150.3, Compliance and Enforcement Program.

f. An APIS is based on compliance with those inspection standards specified in § 21.125. Furthermore, these standards along with any inspection system data submitted form the basis for all FAA CM activity.

g. The APIS holder is required to have process specifications, materials review board records, test procedures, and flight check forms that are acceptable to the FAA. It would be advantageous to the TC applicant to develop these data concurrently with the manufacture, inspection, and testing of prototypes of the product.

h. The TC holder or licensee who produces a completed product under part 21, subpart F, must flight test and/or functional test that product in accordance with the requirements of §§ 21.127, 21.128, or 21.129, as applicable.

(1) Aircraft. Each aircraft, both prior to and subsequent to the issuance of an APIS, must be flight tested in accordance with an approved production flight test procedure and flight checklist form as required by § 21.127.

(2) Engines and Propellers. Each engine or propeller, both prior to and subsequent to the issuance of an APIS, must be subjected to an acceptable test run or functional test in accordance with the requirements of § 21.128 or 21.129, as appropriate.

i. The manufacturer should be encouraged to submit (at the appropriate time) a description of the inspection system as evidence of compliance with § 21.125.

j. The applicant cannot utilize manufacturing facilities located outside the United States unless the FAA has determined that the location of the facilities places no undue burden on the FAA, as specified in § 21.43.

k. TC Holder’s Responsibility.

(1) Prior to the issuance of an APIS, a TC holder or licensee who produces a product is responsible for complying with §§ 21.123, 21.127, 21.128, 21.129, and 21.130, as appropriate for the particular product involved.

8/17/2004 8120.2D

(2) All products and parts thereof manufactured under the provisions of part 21, subpart F, must be marked in accordance with the requirements of 14 CFR part 45, Identification and Registration Marking (part 45).

NOTE: The holder of a Dealer’s Aircraft Registration Certificate is responsible for complying with the requirements of 14 CFR part 47, Aircraft Registration (part 47), regarding the use of temporary registration numbers. Specifically, the temporary registration number must be removed from the aircraft no later than the date on which either title or possession passes to another person.

(3) A TC holder or licensee is also responsible for reporting any failures, malfunctions, and defects as required by § 21.3.

l. APIS Holder’s Responsibility. Upon the establishment of the APIS, the APIS holder is responsible for the actions listed in paragraph 23k above and the following actions:

(1) The APIS holder must submit a manual to the MIDO that describes the APIS and the means for making the determinations required by § 21.125(b).

(2) The APIS holder is responsible for maintaining the APIS in accordance with § 21.125 to ensure that each product conforms to the type design and is in a condition for safe operation. The APIS holder must also comply with any terms or conditions as prescribed in its APIS approval letter.

(3) The APIS holder is responsible for notifying the FAA of changes in the location of the manufacturing complex approved by the FAA for the particular type certificated product(s).

(a) The APIS is issued to the principal manufacturing facility that controls the design and quality of the product(s) for which the approval was granted. A mailbox address is not acceptable for a facility since the actual location must be identified. Such addresses, however, may be used as supplemental to the actual address when desired for such uses as corresponding to and from FAA offices.

(b) When the APIS holder moves the principal manufacturing facility to a new location, the APIS is no longer effective since an APIS is not transferable. If the APIS holder wants an APIS for the new location, the APIS holder must establish the APIS in accordance with § 21.123.

(c) When the APIS holder adds a new plant, the FAA must be notified of such changes. The FAA may, if deemed necessary, conduct a DO audit at the new plant. If a DO audit is deemed necessary, a satisfactory audit result must be obtained before the plant can be approved for production.

SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY(PART 21, SUBPART F) › PART 3. PROCESSING AN APPLICATION FOR AN APIS

8120.2D 8/17/2004

PART 2. FAA ACTIONS DURING THE SIX-MONTH PERIOD

24. FAA CONFORMITY DETERMINATIONS. Subsequent to the date of issuance of the TC and prior to the issuance of an APIS or PC, the MIDO/CMO has full responsibility for determining whether the product or part(s) thereof conform to the type design and are in a condition for safe operation. The MIDO/CMO has the responsibility for performing inspections of incoming materials (at the source, if necessary), installations, and the completed products. The MIDO/CMO has the responsibility for documenting each inspection on FAA Form 8100-1, Conformity Inspection Record, so that each product or part(s) thereof inspected has a complete inspection record. Refer to figure 1 for a sample form.

25. ASSESSING THE APPLICANT’S PROGRESS. The MIDO/CMO should periodically assess the applicant’s progress in complying with the regulations for obtaining approval of an APIS or PC. If it appears that the applicant is delaying this action or may not be eligible for an APIS or PC by the deadline date, the applicant should be advised in writing of all known deficiencies. Also, the applicant should be cautioned that after the deadline date, the FAA will not issue any airworthiness certificates or any other approvals unless an extension of the time period is authorized by the directorate manager. The MIDO/CMO should keep the directorate office apprised as to the applicant’s progress.

26. EXTENSION OF SIX-MONTH PERIOD. The FAA may grant an extension when there are unusual or extenuating circumstances that preclude the establishment of an APIS or PC within the six-month limitation. The FAA should not grant an extension of the six-month period without giving due consideration to the impact the extension would have on FAA personnel resources and safety. In all instances, the FAA should consider an extension only when the applicant can substantiate the reasons for requesting such an extension. For example, extensions may be justified in those instances where products are in limited or infrequent production and for license and transfer of TC’s that were issued more than six months prior to the licensing agreement or transfer. Refer to figure 2 for a sample extension letter.

27. APIS OR PC NOT ESTABLISHED WITHIN SIX-MONTH PERIOD. When an applicant fails to establish an APIS or PC by the end of the six-month period (except as otherwise extended), the FAA will no longer make conformity determinations and will discontinue the issuance of all airworthiness certifications and approvals. However, the FAA should continue to counsel and advise the applicant to the extent necessary to assist in obtaining an APIS or PC as soon as practicable.

PART 3. PROCESSING AN APPLICATION FOR AN APIS

28. APPLICATION. When an applicant expresses a desire to apply for an APIS instead of a PC, the applicant should be advised that a formal application is not required by the regulations. However, the applicant may use FAA Form 8110-12, Application for Type Certificate, Production Certificate, or Supplemental Type Certificate, to apply for the APIS since it contains appropriate spaces to indicate whether or not production privileges are desired or whether or not parts will be manufactured for sale. Refer to figure 3 for a sample form.

PART 3. PROCESSING AN APPLICATION FOR AN APIS › FIGURE 1. SAMPLE FAA FORM 8100-1, CONFORMITY INSPECTION RECORD

8/17/2004 8120.2D

FIGURE 1. SAMPLE FAA FORM 8100-1, CONFORMITY INSPECTION RECORD (FRONT)

8120.2D 8/17/2004

FIGURE 1. SAMPLE FAA FORM 8100-1, CONFORMITY INSPECTION RECORD (BACK)

8/17/2004 8120.2D

FIGURE 2. SAMPLE LETTER OF AUTHORIZATION FOR

EXTENSION OF § 21.123(c) SIX-MONTH LIMITATION

PART 3. PROCESSING AN APPLICATION FOR AN APIS › FIGURE 2.

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

SOUTHWEST REGION ROTORCRAFT DIRECTORATE MANUFACTURING INSPECTION OFFICE

2601 MEACHAM BOULEVARD FORT WORTH, TEXAS 76137-4298

May 10, 1999 Johnson Aircraft Corporation 119 Standards Street Benbrook, Texas 12345 Attention: Mr. Nelson P. Norman, Vice President Authorization for Extension of Production Under Type Certificate Only, Title 14, Code of Federal Regulations (14 CFR), Part 21, Certification Procedures for Products and Parts (part 21), Section 21.123(c). Your request, dated April 28, 1999, regarding the subject matter has been reviewed and authorization is hereby granted to extend the period of time products may be manufactured under a Type Certificate Only without an approved production inspection system from June 1, 1999, to October 1, 1999. This extension of time is based on the fact that you were unable to establish an approved production inspection system within the six-month period as required by Section 21.123(c) due to the four-month labor strike at your facility which ended April 15, 1999. Aircraft produced under the provisions of this authorization will continue to require inspection by FAA personnel at various stages of fabrication, processing, and assembly where detailed inspections can be conducted. Johnson Aircraft Corporation must also continue to comply with part 21, subpart F, as applicable, including the requirements for a FAA Form 8130-9, Statement of Conformity, with each application for an airworthiness certificate. Jason P. Hope Manager, Manufacturing Inspection Office, ASW-180

PART 3. PROCESSING AN APPLICATION FOR AN APIS › FIGURE 3.

8120.2D 8/17/2004

FIGURE 3. SAMPLE FAA FORM 8110-12, APPLICATION FOR TYPE CERTIFICATE,

PRODUCTION CERTIFICATE, OR SUPPLEMENTAL TYPE CERTIFICATE

No certificate may be issued unless a completed application form has been received (14 C.F.R.-21)

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION APPLICATION FOR TYPE CERTIFICATE, PRODUCTION CERTIFICATE,

OR SUPPLEMENTAL TYPE CERTIFICATE

FORM APPROVED

O.M.B. No. 04-R0078

1. Name and address of applicant ABC Aircraft Company 4954 Airport Drive Detroit, Michigan

2. Application made for - … Type Certificate X Production Certificate … Supplemental Type Certificate

3. Product Involved X Aircraft … Engine … Propeller

4. TYPE CERTIFICATE (Complete item 4a below)

a. Model designation(s) (All models listed are to be completely described in the required technical data, including drawings representing the design, material, specifications, construction, and performance of the aircraft, aircraft engine, propeller which is the subject of this application.)

5. PRODUCTION CERTIFICATE (Complete items 5a-c below. Submit with this form, in manual form, one copy of quality control data or changes thereto covering new products, as required by applicable FAR.)

a. Factory address (if different from above) b. Application is for -

X New production certificate … Additions to production Certificate (Give P.C. No.)

P.C. No.

c. Applicant is holder of or a licensee under a Type Certificate or a Supplemental Type Certificate

(Attach evidence of licensing agreement and give certificate number) … >

T.C./S.T.C. No. 1A26

6. SUPPLEMENTAL TYPE CERTIFICATE (Complete items 6a-d below)

a. Make and model designation of product to be modified

b. Description of modification

c. Will data be available for sale or release to other persons? … Yes … No

d. Will parts be manufactured for sale? (Ref. FAR 21.303) … Yes … No

7. CERTIFICATION - I certify that the above statements are true.

Signature of certifying official

John J. Smith John J. Smith

Title Director, Quality Assurance

Date May 10, 1999

FAA Form 8110-12 (3-80) SUPERSEDES PREVIOUS EDITION (REPRESENTATION)

9/23/2005 8120.2D CHG 1

29. REVIEW OF PRODUCTION INSPECTION SYSTEM DATA. When an APIS applicant submits production inspection system data as evidence of compliance with part 21, subpart F, the cognizant MIDO will evaluate these data in accordance with the criteria contained in appendix 1 of this order. Any inadequacies in the data submitted must be identified to the applicant for corrective action. After the data has been reviewed, and any applicable corrective actions taken, the MIDO will accept the production inspection system data submitted by the applicant. The FAA does not approve this data since there is no part 21 requirement for submittal of this data for approval.

30. PROVISIONAL APPROVAL PROCEDURES. Evaluation of the applicant’s inspection system should be accomplished by the MIDO, concurrent with conducting conformity inspections and making those airworthiness determinations required of the FAA prior to the issuance of an APIS. It is, therefore, to the advantage of the FAA to evaluate and provisionally approve the inspection system on a progressive basis. As portions of the system are determined to meet the regulatory requirements, the MIDO should:

a. Maintain a record of those portions of the system considered satisfactory.

b. Reduce conformity inspections to a spot-check basis for articles covered by the provisionally approved portion of the system.

c. Place increased emphasis on securing corrective actions on the portions of the system where procedural discrepancies have been found or where the system has been found to be inadequate.

31. PRELIMINARY DO AUDIT. When the MIDO has determined that the applicant has the capability to comply with § 21.125, the MIDO will conduct a DO audit as follows:

a. The DO audit evaluates the applicant’s production facilities in accordance with 14 CFR, the FAA-approved design data, and the production inspection system data accepted in paragraph 29 above. The cognizant MIDO manager will select a team to conduct this audit. The team may consist of the cognizant principal inspector (PI) and at least one other manufacturing inspector or the MIDO manager. It is also recommended that an engineer be selected for the team when deemed necessary by the type and complexity of processes and procedures being utilized at the facility. The standardized evaluation criteria contained in Order 8100.7, Aircraft Certification Systems Evaluation Program, may be used as an aid to evaluate compliance. Team members should be advised, however, that some of the evaluation criteria contained therein may not be related to 14 CFR, and therefore may only be evaluated as a best practice. This audit is not considered an Aircraft Certification Systems Evaluation Program (ACSEP) evaluation. Document noncompliances on FAA Form 8100-6, Noncompliance Record. Refer to appendix 7. * *

b. Notifying the Applicant. Upon completion of the DO audit, the MIDO will formally notify the applicant as to any corrective actions necessary to comply with § 21.125. The MIDO should advise the applicant that an APIS Board will be scheduled that could result in a request for additional actions.

c. Reporting. The MIDO will prepare FAA Form 8120-14, Production Approval/Certificate Management Activity Report upon completion of the DO audit, and provisional approval of the applicant’s inspection system when applicable. The MIDO will provide notification to the directorate office that the Form 8120-14 may be viewed in CMIS. In addition, the MIDO will provide information to the directorate office concerning the applicant’s ability to comply with § 21.125. Refer to appendix 8 for a sample Form 8120-14.

*

*

SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY(PART 21, SUBPART F) › PART 4. ISSUANCE OF AN APIS

8120.2D 8/17/2004

32. APIS BOARD. Upon receipt of Form 8120-14 and notification by the MIDO that the applicant is in a position to comply with § 21.125, the directorate office should schedule an APIS Board. The primary objective of this board is to make a final determination as to whether or not the applicant has established a production inspection system that complies with § 21.125 and that is capable of producing products and parts thereof in conformity with the type design and in a condition for safe operation.

a. Conduct of the APIS Board. The directorate office will conduct the APIS board in a manner similar to a PCB, including the use of a Chairman. Use the PCB procedures contained in chapter 2, section 3, part 3 of this order, as appropriate.

b. APIS Board Minutes. Document the APIS Board minutes in the same manner as a PCB, as applicable to the particular situation. Refer to paragraph 49 of this order.

PART 4. ISSUANCE OF AN APIS

33. APIS APPROVAL LETTER.

a. Preparation and Delivery. When the APIS Board has determined and documented that the applicant’s complete production inspection system complies with the requirements of part 21, subpart F, the directorate office will prepare a letter approving the production inspection system. Refer to figure 4 for a sample letter. Electronic signature is not permitted. The approval letter should be delivered to the manufacturer by the MIDO or may be forwarded by certified mail when deemed most expeditious.

b. Additions to the APIS. If the APIS holder desires to add another type-certificated product or a new model to the APIS, the MIDO should evaluate any changes to the APIS that may be involved in the manufacture of the new product. Upon receipt of a completed Form 8120-14 and a satisfactory recommendation from the MIDO, the directorate office may then issue a superseding approval letter. The letter should be issued listing the original and the new product(s) and/or model(s). The APIS holder will be requested to return the original letter. The directorate office will annotate the word “Superseded” on the original letter and retain it in the directorate files.

34.-40. RESERVED.

PART 4. ISSUANCE OF AN APIS › FIGURE 4.

8/17/2004 8120.2D

FIGURE 4. SAMPLE LETTER FOR APPROVING A MANUFACTURER’S PRODUCTION INSPECTION SYSTEM

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

SOUTHWEST REGION ROTORCRAFT DIRECTORATE MANUFACTURING INSPECTION OFFICE

2601 MEACHAM BOULEVARD FORT WORTH, TEXAS 76137-4298 November 4, 1999 GEM Aircraft Company 711 Suburban Lane Oklahoma City, Oklahoma 73064 Production Inspection System Approval Your production inspection system has been evaluated and found to be in compliance with applicable parts of Title 14, Code of Federal Regulations (14 CFR). Therefore, you are authorized to produce the following products and parts thereof in compliance with the standards contained in 14 CFR part 21, Certification Procedures for Products and Parts, Subpart F, and in conformity with the type design data forming the basis for the following type certificate(s): Type Certificate/Make/Model 1A25GEM1010 GEM 1020 1A78 The following terms and conditions are applicable to this approval: 1. GEM Aircraft Company’s production approval inspection system, methods, procedures, and manufacturing facilities, including your suppliers, are subject to FAA surveillance or investigations. Accordingly, GEM Aircraft Company must advise its suppliers that its facilities are also subject to FAA surveillance and investigation. 2. GEM Aircraft Company must make available to the FAA, upon request, any pertinent information concerning its suppliers who furnish parts/services, including: a. A description of the part or service. b. Where, and by whom, the part or service will undergo inspection; c. Any delegation of inspection duties.

8120.2D 8/17/2004

FIGURE 4. SAMPLE LETTER FOR APPROVING A MANUFACTURER’S PRODUCTION INSPECTION SYSTEM (CONT’D)

d. Any delegation of materials-review authority. e. Name and title of FAA contact at the supplier facility. f. The inspection procedures required to be implemented. g. Any direct shipment authority. h. Results of GEM Aircraft Company evaluation, audit, and/or surveillance of its suppliers. i. The purchase/work order number (or equivalent). j. Any feedback relative to service difficulties originating at GEM Aircraft Company suppliers. 3. Parts or services furnished by suppliers located in a foreign country or jurisdiction may not be used in the production of the products listed in this approval unless: a. That part or service can and will be completely inspected for conformity at GEM Aircraft Company’s facility; or b. The FAA has determined that the location of the foreign supplier facility places no undue burden on the FAA in administering applicable airworthiness requirements. When the use of such foreign suppliers is contemplated, GEM Aircraft Company must advise the FAA at least 10 days in advance to allow the FAA to make this determination; or c.

The parts/services furnished by the foreign supplier are produced under the “components” provision of U.S. airworthiness bilateral agreements, and approved for import to the U.S. in accordance with Section 21.502. 4. This approval is not transferable to another person or location. In addition, it may be withdrawn for any reason that would preclude its issuance or at anytime the FAA finds that the approved production system is not being maintained. Also, the approval can be withdrawn if unsafe or nonconforming parts are accepted under the approved production inspection system; or if the Statement(s) of Conformity, FAA Form 8130-9, required by Section 21.130, is found to be invalid. 5. Our district office (address of cognizant office) must be notified within 10 days from the date that the address shown in this approval has been changed. 6.

GEM Aircraft Company must maintain its approved production inspection system in continuous compliance with the requirements of Section 21.125, and ensure that each product or part(s) thereof conforms with the type design data and is in a condition for safe operation.

8/17/2004 8120.2D

FIGURE 4. SAMPLE LETTER FOR APPROVING A MANUFACTURER’S PRODUCTION INSPECTION SYSTEM (CONT’D)

7. GEM Aircraft Company is eligible for the appointment of qualified individuals in its employ to represent the FAA as Designated Manufacturing Inspector Representatives for the purpose of issuing Airworthiness Approvals for Class I, II, and III products. 8. GEM Aircraft Company will report to our district office, in a timely manner, information concerning service difficulties on any product(s) or part(s) thereof produced under this approval, in addition to any failures, malfunctions, and defects required to be reported in accordance with Section 21.3. 9. All pertinent technical data for the product(s) or part(s) thereof to be produced under this approval must be readily available to the FAA at the facility in which the parts are being produced. 10. GEM Aircraft will notify our district office immediately in writing of any changes to the APIS that may affect the inspection, conformity, or airworthiness of the product(s) approved in this letter. 11. GEM Aircraft Company will produce all parts in accordance with GEM Aircraft Company Quality Control Manual, Revision G, dated July 17, 1996, which has been presented as evidence of compliance with Section 21.125. Accordingly, any revisions to these data must be submitted and approved by our district office prior to implementation. Jack M. Safeway Manager, Manufacturing Inspection Office, ASW-180

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G) › PART 1. GENERAL

8120.2D 8/17/2004

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G)

PART 1. GENERAL

41. APPLICABILITY.

a. Part 21, subpart G, is applicable to any of the following persons who desire to manufacture a complete product and part(s) thereof with benefit of a PC:

(1) The holder/licensee of a § 21.21 TC.

(2) The U.S. holder/licensee of a § 21.29 TC, so long as the licensing agreement clearly provides for the TC holder’s and its Civil Aviation Authority’s control over any design changes by the licensee. A working arrangement must also be in place between the Civil Aviation Authority (CAA) and the FAA defining their respective responsibilities as State of Design and State of Manufacture.

(3) The holder of an STC when the PC is used to incorporate the particular STC on completed aircraft prior to the issuance of an original airworthiness certificate (OAC). STC’s incorporated after OAC are accomplished under the provisions of 14 CFR part 43, Maintenance, Preventive Maintenance, Rebuilding, and Alteration (part 43). Also, STC holders who only desire to produce the modification parts/kit should be encouraged to apply for PMA.

(4) The holder/licensee of a § 21.25 TC, provided the TC was issued based on FAA approval of the type design data. The data must have been submitted by the applicant or the licensor and must meet the requirements of § 21.31.

b. A PC may not be issued to the holder of a TC issued under § 21.27, or part 21, subpart C (provisional).

c. A PC may not be issued if the manufacturing facilities are located outside the United States, unless it has been determined, in accordance with § 21.137, that such location(s) would place no undue burden on the FAA.

42. PRIVILEGES. A PC holder has the privileges specified in § 21.163. In addition, a PC holder is eligible to have a qualified employee(s) designated as a DMIR in accordance with the provisions of part 183. The PC holder may also be authorized by part 183 to represent the Administrator as an ODAR. Order 8100.8 contains procedures for the administration of DMIRs and ODARs.

43. ADVISING THE APPLICANT. The applicant should be advised that:

a. AC 21-1, Production Certificates, sets forth an acceptable means of complying with part 21, subpart G. Alternative methods and procedures may be approved when the applicant can show that the proposed methods and procedures will achieve compliance with part 21, subpart G.

8/17/2004 8120.2D

b. The data required to be submitted under § 21.143 should be arranged in the format suggested in AC 21-1. In those instances where an applicant has already established quality control (QC) procedures, e.g., for military contracts, the applicant must identify those portions that comprise the QC data that will be used to show compliance with § 21.143. The data may or may not comprise a lengthy document, depending upon the size of the manufacturing facilities and product complexity. The data must include descriptive material that adequately covers each applicable paragraph of § 21.143. A title should be provided for positive identification and a revision page or similar control is required to ensure that the original approval date and the date of each revision is recorded. A number or letter should identify each revision.

c. The PC holder who produces a completed product under part 21, subpart G, must flight test and/or production test that product in accordance with the requirements of § 21.143(a)(3).

(1) Aircraft. All aircraft must pass an approved production flight test as part of the inspection procedure required for issuance of an airworthiness certificate. A Special Airworthiness Certificate, FAA Form 8130-7, issued for such purposes provides authorization for production flight testing (reference FAA Order 8130.2, Airworthiness Certification of Aircraft and Related Approvals). The exceptions would be small airplanes and gliders manufactured under a PC and being exported without assembly or flight test under the provisions of § 21.325(b). The intent of this rule is to permit shipment of aircraft without assembly or flight test when the extent of disassembly is the same as an aircraft that has been disassembled for shipment purposes. In these instances, the manufacturer must provide FAA-approved assembly and flight test procedures as a condition of shipment.

(2) Periodic FAA Production Flight Tests. FAA production flight tests will be conducted periodically at the PC holder’s facility to ensure continued compliance with all parameters as specified in pertinent type certificate data with respect to performance, flight characteristics, operation qualities, equipment operations, etc. The PI, in coordination with the FAA flight test personnel from the appropriate Aircraft Certification Office (ACO), may arrange these flight tests. In addition, a determination should be made in coordination with FAA flight test personnel that the manufacturer’s approved production test pilots are continuing to use approved procedures and that the approved procedures remain adequate.

(3) Engines and Propellers. Engines and propellers must pass a production test approved as part of the QC data required by § 21.143(a)(3).

d. PC Holder’s Responsibility.

(1) The PC holder is responsible for maintaining the QC system in conformity with the data and procedures approved for the PC, and for determining that each completed product submitted for airworthiness certification or approval conforms to the TC or STC and is in a condition for safe operation.

(2) Section 21.147 requires the holder of a PC to immediately notify the MIDO/CMO in writing of any changes that may affect the inspection, conformity, or airworthiness of the product. These changes would include, but are not limited to:

(a) Relocation of a portion of its facility or addition to existing facilities.

8120.2D 8/17/2004

1 A PC holder’s manufacturing complex would normally consist of a principal facility and all associate facilities using the same quality control system approved by the FAA, for the particular type certificated product(s). Associate facilities are discussed in section 6 of this chapter.

2 The PC is issued to the principal manufacturing facility that controls the design and quality of the product(s) for which the approval was granted. The principal facility address will be listed under the “business address” and all associate facility addresses will be listed under “manufacturing facilities” on FAA Form 8120-4, Production Certificate. A mailbox address is not acceptable for a facility since the actual location must be identified. Such addresses, however, may be used as supplemental to the actual address when desired for such uses as corresponding to and from FAA offices.

3 When a PC holder moves the principal manufacturing facility to a new location, the PC is no longer effective since a PC is not transferable. Refer to § 21.155. If the PC holder wants a PC for the new location, the PC holder must reapply in accordance with § 21.133.

4 When the PC holder moves an associate facility or adds a new plant, the FAA must be notified of such changes in accordance with § 21.147. The FAA may, if deemed necessary, conduct a preliminary DO audit at the new plant or moved facility. If a DO audit is deemed necessary, a satisfactory audit result must be obtained before the facility can be approved for production. The PC also must be amended to reflect this change.

(b) Resumption of production after being discontinued for an extended period of time for other than normal periods of time, such as vacation periods.

(c) Significant curtailment/resumption of production operations.

(d) Significant reduction/reassignment of QC personnel.

(e) Changes or revisions to QC data and related procedures.

(3) All products and parts thereof produced under the provisions of part 21, subpart G, must be marked in accordance with the requirements of part 45, and in accordance with any related FAA-approved QC procedures, as applicable.

NOTE: The holder of a Dealer’s Aircraft Registration Certificate is responsible for complying with the requirements of part 47, regarding the use of temporary registration numbers. Specifically, the temporary registration number must be removed from the aircraft no later than the date on which either title or possession passes to another person.

(4) The PC holder must report all failures, malfunctions, and defects as required by § 21.3. The PC holder should be encouraged to establish a procedure for such reporting.

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G) › PART 2. PROCESSING AN APPLICATION FOR A PC

9/23/2005 8120.2D CHG 1

PART 2. PROCESSING AN APPLICATION FOR A PC

44. APPLICATION. Application for a PC is made on Form 8110-12. Refer to figure 3 for a sample form. The applicant must submit the application, accompanied by one copy of the QC procedures showing compliance with § 21.143, to the Manager, Manufacturing Inspection Office (MIO), in the directorate in which the applicant’s principal manufacturing facility is located. Refer to paragraph 43d(2)(a)1 and 2 above. Upon receipt of a properly executed Form 8110-12, the MIO manager will forward a copy to the MIDO/CMO. The MIDO/CMO will prepare a letter of acknowledgement, advising the applicant that it has been authorized to initiate a DO audit to determine compliance with applicable regulations. A copy of the letter should be forwarded to the MIO. Refer to figure 5 for a sample letter. * *

45. PRELIMINARY DO AUDIT. The MIDO/CMO should make arrangements to conduct a DO audit within 30 days after acknowledging the PC application. This audit will be conducted as follows:

a. Evaluate the applicant’s QC data for compliance with § 21.143. Additional guidance is provided in appendix 1 of this order. Any inadequacies in the data submitted must be identified to the applicant for corrective action. After the data have been reviewed, and any applicable corrective actions taken, the MIDO/CMO will approve the QC data submitted by the applicant. The approved QC data may be retained in the MIDO/CMO files.

b. Evaluate the applicant’s production facilities in accordance with 14 CFR, the FAA-approved design data, and the QC data approved in paragraph 45a above. The cognizant MIDO/CMO manager will select a team to conduct this audit. The team may consist of the cognizant PI and at least one other manufacturing inspector or the MIDO/CMO manager. It is also recommended that an engineer be selected for the team when deemed necessary by the type and complexity of processes and procedures being utilized at the facility. The standardized evaluation criteria contained in Order 8100.7 may be used as an aid to evaluate compliance. Team members should be advised, however, that some of the evaluation criteria contained therein may not be related to 14 CFR, and therefore may only be evaluated as a best practice. This audit is not considered to be an ACSEP evaluation. Noncompliances will be documented on Form 8100-6. Refer to appendix 7. * *

c. Notifying the Applicant. Upon completion of the DO audit, the MIDO/CMO will formally notify the applicant as to any corrective actions needed to comply with § 21.135. The applicant should be further advised that these items represent only the result of the FAA’s preliminary DO audit. Additional requests for corrective actions can be anticipated as a result of subsequent noncompliances, which may be noted during the PCB evaluation activity, as detailed in part 3 below.

* d. Reporting. The MIDO/CMO will provide notification to the MIO that the “Preliminary” Form(s) 8100-6 may be viewed in CMIS. The “Preliminary” Form(s) 8100-6 should identify any unresolved items requiring corrective action. In addition, letters issued to the applicant requesting corrective action also may be viewed in the CMIS project folder. *

PART 2. PROCESSING AN APPLICATION FOR A PC › FIGURE 5. SAMPLE PC APPLICATION ACKNOWLEDGEMENT LETTER

8120.2D 8/17/2004

FIGURE 5. SAMPLE PC APPLICATION ACKNOWLEDGEMENT LETTER

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

TRANSPORT AIRPLANE DIRECTORATE SEATTLE MANUFACTURING INSPECTION DISTRICT OFFICE

2500 EAST VALLEY ROAD, SUITE C-2 RENTON, WASHINGTON 98055-4056

June 10, 1999 ABC Aircraft Company 4954 Airport Drive Renton, Washington 12345 Production Certification Application Acknowledgement This will acknowledge receipt of your application dated May 30, 1999, for a Production Certificate. This office has been authorized to initiate a preliminary evaluation of your manufacturing operations, quality control system, and testing procedures. The quality control data, required by Title 14, Code of Federal Regulations (14 CFR), part 21, Certification Procedures for Products and Parts (part 21), section 21.143, and submitted with your application, were forwarded to this office for our utilization in determining compliance with applicable regulations. Accordingly, your quality control system and manufacturing facilities (including any supplier facilities, as appropriate) will be evaluated by this office to determine compliance with part 21, subpart G. To preclude any misunderstandings, please notify your suppliers as soon as possible that they are subject to FAA evaluations. We will contact you in the near future to advise you of our evaluation schedule.

Subsequent to our preliminary evaluation, a Production Certification Board will be established to make a final determination as to eligibility for issuance of a Production Certificate. This will be accomplished as soon as practicable following our recommendations to the Manager, Manufacturing Inspection Office, Transport Airplane Directorate. You will be given adequate notice so that a date for convening the Production Certification Board at your principal facility can be mutually agreed upon. Roger C. Moore Manager, ANM-108S

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G) › PART 3. PRODUCTION CERTIFICATION BOARD

8/17/2004 8120.2D

PART 3. PRODUCTION CERTIFICATION BOARD

46. GENERAL. The PCB is a high-level FAA evaluation function based directly upon the responsibilities established in Title 49 United States Code (49 USC), §§ 44701, 44702, 44704, and 44709.

a. Purpose. The purpose of the PCB is to evaluate the eligibility of the applicant for issuance of a PC based upon the preliminary findings and recommendations of the MIDO/CMO and the PCB’s review of the applicant’s facilities and QC data.

b. Applicability. The PCB should be convened only for initial production approvals, or when entire facilities have been relocated or are added to the PC. The PCB should not be convened for the addition of new models to the production limitation record (PLR) or relocation of a portion of the facility. In these instances, the procedures contained in paragraph 51b(1) of this order should be followed.

c. PCB Members. PCB members should consist of a group of qualified specialists from Airframe, Systems & Equipment, Propulsion, Manufacturing, and Flight Test functions, as appropriate. These members will assist in evaluating the applicant’s production, engineering, flight test procedures, and other related functions. Representatives from Washington, DC, the Aeronautical Center, and/or other directorates may also participate in a PCB, when deemed desirable or necessary.

d. PCB Chairman. The MIO or CMO manager of the directorate where the manufacturing facility to be evaluated is located will act as the Chairman of the Board. When necessary, the MIO or CMO manager may delegate the chairmanship to the MIDO manager or other qualified directorate office personnel.

47. PCB MEMBER RESPONSIBILITIES. Specific PCB member responsibilities are as follows:

a. PCB Chairman. The PCB chairman is responsible for:

(1) Selecting and assigning board members, as deemed appropriate for the particular product, and notifying the members of the PCB in sufficient time to permit adequate planning and preparation.

(2) Notifying the applicant of the PCB schedule and identifying members and their assignments.

(3) Selecting a representative number of the applicant’s supplier facilities for evaluation to determine whether or not the applicant’s QC system provides for satisfactory supplier control.

(4) Conducting pre/post PCB meetings with the PCB and/or the applicant.

(5) Reviewing and analyzing the PCB findings and ensuring that appropriate corrective actions have or will be taken.

(6) Completing, signing, and distributing the PCB minutes.

8120.2D 8/17/2004

b. Principal Inspector. The PI, in coordination with the responsible MIDO/CMO having CM responsibility, and the PCB chairman, is primarily responsible for establishing schedules, making arrangements for meeting rooms, obtaining sufficient copies of QC data, and making all other arrangements necessary for convening and conducting the PCB in the most expeditious manner. The PI is further responsible for ensuring that the applicant has taken all agreed upon corrective actions, for preparing the minutes of the PCB, and for initiating and completing any enforcement actions, when applicable.

c. Propulsion Section/Branch. The propulsion section/branch or its equivalent is responsible for the evaluation and approval of the applicant’s production engine/propeller test procedures, as required by § 21.143(a)(3). This effort will be coordinated with the responsible MIDO/CMO. Upon determining that the procedures are acceptable, a letter of approval will be prepared and forwarded to the applicant when a PC is issued. A copy of this approval letter will be included in the PCB minutes.

d. Flight Test Section/Branch. The flight test section/branch or its equivalent is responsible for the evaluation and approval of the applicant’s flight test procedures and checklists as required by § 21.143(a)(3). This effort will be coordinated with the responsible MIDO/CMO. Upon determining that the procedures and checklists are acceptable, a letter of approval will be prepared and forwarded to the applicant when a PC is issued. The letter will also include the names of those company pilots designated and authorized by the applicant to conduct production flight tests. A copy of this letter will be included in the PCB minutes.

e. Other PCB Members. Airframe and equipment engineering representatives and all other PCB members are responsible for ensuring that the applicant is in compliance with § 21.139, as appropriate to their particular assignment. Representatives from Washington, DC, the Aeronautical Center, and/or other directorates are responsible for acting in an advisory capacity and/or for the completion of any PCB activity assigned by the PCB chairman.

48. CONDUCT OF THE BOARD. A PCB is generally conducted in the following basic phases:

a. Initial FAA Personnel Meeting. Prior to arranging a Pre-Production Board meeting, a meeting of FAA personnel will be held to review the results of the DO audit, MIDO/CMO recommendations, and related correspondence between the FAA and the applicant. This meeting will also serve to plan the PCB audit, schedule subsequent meetings, and establish agenda items for the Pre-Production Board meetings.

b. Pre-Production Board. A Pre-Production Board meeting with the applicant’s representatives should be considered upon receipt of the PC application. This meeting should include the PCB chairman, MIDO/CMO manager, the PI, and others as necessary. The purpose of this meeting is to advise the applicant as to the purpose of the Board and of the FAA’s evaluation plans. It should be made clear to the applicant that the board is a fact-finding body convened to determine whether or not the applicant is in compliance with § 21.135. The applicant should also be advised that the PCB is responsible for making a thorough evaluation of the applicant’s QC system/data, organization, production facilities, and if deemed necessary, supplier facilities. Also, a determination should be made at this time that the location of the applicant’s facilities will pose no undue burden on the FAA as specified in § 21.137.

9/23/2005 8120.2D CHG 1

c. PCB Audit. Following the Pre-Production Board meeting with the applicant, the PCB should evaluate the applicant’s QC data and perform an on-site evaluation of the applicant’s QC system, organization, production facility, and any suppliers, as deemed appropriate. Refer to paragraph 45 above for audit procedures.

d. Internal FAA PCB Meetings. Board meetings, attended by all board participants, will be conducted as needed to discuss and evaluate each unsatisfactory condition submitted by each member.

e. Recording Unsatisfactory Conditions. All unsatisfactory conditions will be recorded on Form(s) 8100-6 and 8120-14. Refer to appendixes 7 and 8 of this order. * *

f. Final PCB Meeting. A final meeting, attended by all PCB members and representatives of the applicant, will be held to advise the applicant of the PCB findings. Each unsatisfactory condition should be presented and discussed briefly.

(1) Corrective Action. In those instances where a product is being produced under a TC only, the PC applicant must be requested to commence immediate corrective action on those items that directly involve the product and related QC practices. A reasonable time may be allowed for correcting deficiencies in the QC data. However, the applicant must be advised that the PCB cannot recommend that a PC be issued unless all applicable regulations are complied with and until the MIDO/CMO has evaluated all corrective actions and found them to be satisfactory.

(2) Formal Confirmation. The applicant must also be advised that an official letter will be sent confirming the verbal presentation of the list of unsatisfactory conditions. This formal notification should be prepared by the PI for the signature of the Chairman of the Board, within ten working days following the final meeting with the manufacturer.

(3) Violations. If the PC applicant is manufacturing a product under a TC only, and any of the unsatisfactory conditions are determined to be violations to part 21, subpart F, appropriate enforcement actions should be initiated by the MIDO/CMO in accordance with FAA Order 2150.3.

g. Final Phase of PCB. The final phase of a PCB is the evaluation by the MIDO/CMO of the corrective action taken by the applicant. The results of the reinspection should be reported to the Chairman of the Board using Form 8120-14. Refer to appendix 8 of this order. * *

h. PCB Conclusion. The MIDO/CMO will formally advise the applicant in writing, as soon as practicable, that a PC will be issued based on a showing of compliance to § 21.135, or that a PC will not be issued if there is failure to show compliance with § 21.135. The MIDO/CMO will provide notification to the MIO that the letter has been issued and may be viewed in the CMIS project folder. * *

49. PCB MINUTES. The MIDO/CMO will prepare the PCB minutes for the signature of the Chairman. The minutes should encompass a concise record of the entire PCB proceedings, including the names and titles of all participants.

a. All correspondence relating to the PCB, including letters to the applicant, replies, etc., are considered to be part of the minutes and should be attached as appendixes.

b. All Form(s) 8100-6 and 8120-14, or printed copy of electronic equivalent, should also be attached to the PCB minutes as a separate appendix.

SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G) › PART 4.

8120.2D CHG 1 9/23/2005

c. Distribution of PCB Minutes. The PCB minutes should be distributed as follows:

(1) Original to the directorate office involved. In accordance with Manual FAA-IR-04-01, Aircraft Certification Service Records Management Requirements Manual, destruction of the original is not authorized.

(2) One copy to the cognizant MIDO/CMO that participated in the PCB.

50. PCB ADJOURNMENT. The PCB will be adjourned when the PCB minutes are accepted by the Chairman and distributed to the board members.

PART 4. ISSUANCE OF PRODUCTION CERTIFICATE

AND PRODUCTION LIMITATION RECORD

51. PREPARATION AND DELIVERY OF PC AND PLR. Upon a finding by the PCB that the PC applicant’s QC data/system, organization, and facilities comply with § 21.135, the MIDO/CMO will prepare Form 8120-4 and FAA Form 8120-3, Production Limitation Record, for the signature of the MIO Manager. Refer to figures 6 and 7 for sample forms. Signature authority for the PC and PLR may be delegated to the PCB Chairman. Electronic signature is not permitted. Delivery of the PC and PLR should be in person by the PI; however, if this procedure will result in an undue delay, the PC and PLR may be sent to the PC holder by certified mail. Whichever method of delivery is used, it is essential that the PC holder be advised of the PC display requirements and of the PC responsibilities by a letter. Refer to figure 8 for a sample letter. *

a. PC. The PC will be consecutively numbered within each directorate; e.g., PC-6CE would indicate that the PC was the sixth one issued by the Small Airplane Directorate. However, numbers issued prior to the date of this order need not be changed. Each directorate should establish and maintain a summary of PC’s issued and a listing of changes made thereto.

*

NOTE: When a PC is issued based on a licensing agreement that is for a specific period of time, it must be indicated on Form 8120-4 under “Duration.”

b. PLR. The PLR will include the TC and model number of each product authorized for production, and the date that production was authorized.

(1) Additions to the PLR. If a PC holder desires to add a new TC or new model under an existing TC to the PLR, the PC holder must make application in the same manner as for the original issuance. In this instance, it is not normally necessary to establish a PCB. In place of the PCB, the MIDO/CMO should conduct an audit using the guidelines in paragraph 45, as appropriate, to determine whether the QC system is adequate or has been appropriately changed to ensure positive control of the product to be added to the PLR. When changes to the QC system are substantial, the PI may elect to request a nonscheduled ACSEP evaluation to make this determination. Refer to Order 8100.7. The MIDO/CMO having CM responsibility may issue revisions to the PLR to include new products or models, when authorized.

PART 4. › FIGURE 6. SAMPLE FAA FORM 8120-4, PRODUCTION CERTIFICATE

8/17/2004 8120.2D

FIGURE 6. SAMPLE FAA FORM 8120-4, PRODUCTION CERTIFICATE

This form is a representation of the original form and not to be construed as the original certificate.

NOT FOR OFFICIAL USE

The United States of America

Department of Transportation Federal Aviation Administration

Production Certificate

Number 6CE

This certificate, issued to

ABC AIRCRAFT COMPANY whose business address is

4954 AIRPORT DRIVE KANSAS CITY, MISSOURI and whose manufacturing facilities are located at

752 PRIMROSE LANE St. LOUIS, MISSOURI authorizes the production, at the facilities listed above, of reasonable duplicates of airplanes which are manufactured in conformity with authenticated data, including, drawings, for which Type Certificates specified in the pertinent and currently effective Production Limitation Record were issued. The facilities, methods, and procedures of this manufacturer were demonstrated as being adequate for the production of such duplicates on date of 5 May, 1999. Duration: This certificate shall continue in effect indefinitely, provided, the manufacturer continuously complies with the requirements for original issuance of certificate, or until the certificate is canceled, suspended, or revoked. By direction of the Administrator Date issued: August 10, 1999 J.J. Jones . J. J. Jones Manager, Manufacturing Inspection Office

This Certificate is not Transferable, AND ANY MAJOR CHANGE IN THE BASIC FACILITIES, OR IN THE LOCATION THEREOF, SHALL BE IMMEDIATELY REPORTED TO THE APPROPRIATE REGIONAL OFFICE OF THE FEDERAL AVIATION ADMINISTRATION ------------------------------------------------------------------------------------------------------------------ Any alteration of this certificate is punishable by a fine of not exceeding $1,000, or imprisonment not exceeding 3 years or both FAA FORM 8120-4 (12-69) SUPERSEDES FAA FORM 333

PART 4. › FIGURE 7. SAMPLE FAA FORM 8120-3, PRODUCTION LIMITATION RECORD

8120.2D 8/17/2004

FIGURE 7. SAMPLE FAA FORM 8120-3, PRODUCTION LIMITATION RECORD

This form is a representation of the original form and not to be construed as the original certificate.

NOT FOR OFFICIAL USE

The United States of America

Department of Transportation Federal Aviation Administration

Production Limitation Record

The holder of Production Certificate No. 6CE may receive the benefits incidental to the possession of such certificate with respect to

AIRCRAFT (OR AIRCRAFT PROPELLERS, AIRCRAFT ENGINES, AS APPLICABLE)

manufactured in accordance with the data forming the

basis for the following Type Certificate(s) No.

Type Certificate Model Date Production Authorized 5A25 ABC 258D August 10, 1999

(Note: Any number of columns may be be used provided the material is neat and legible. Additional PLRs may be used when necessary. Additional PLRs shall be numbered “1 of 2,” “2 of 2,” as appropriate to the number of pages involved.)

LIMITATIONS: (if any)

By Direction of the Administrator August 10, 1999 J. J. Jones Date of issuance J. J. Jones Manager, Manufacturing Inspection

FAA FORM 8120-3 (7-67)

8/17/2004 8120.2D

FIGURE 8. SAMPLE PC TRANSMITTAL LETTER

DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

SMALL AIRPLANE DIRECTORATE MANUFACTURING INSPECTION OFFICE

901 LOCUST STREET, ROOM 301 KANSAS CITY, MISSOURI 64106-2641

August 12, 1999 ABC Aircraft Company 4954 Airport Drive Kansas City, Missouri 12345 Production Certificate Transmittal We are pleased to forward Production Certificate No. 6CE, dated August 10, 1999, together with its Production Limitation Record listing Type Certificate No. 5A25. These documents must be prominently displayed in the main office of your factory, as required by Title 14, Code of Federal Regulations (14 CFR), part 21, Certification Procedures for Products and Parts (part 21), Section 21.161. A Production Certificate authorizes the production of duplicates of specific type-certificated products and entitles the holder to certain privileges, including the option to obtain the appointment of a Designated Manufacturing Inspection Representative to issue airworthiness certificates and other related approvals. It should be noted that the issuance of a Production Certificate also places basic responsibilities upon the holder, as prescribed by 49 United States Code, Sections 44702(a) and 44704(b). The related rules are contained in part 21 and 14 CFR part 45, Identification and Registration Marking. We suggest that copies of the aforementioned be made available to the appropriate personnel in your organization. If at any time you have questions concerning your privileges or responsibilities relative to your Production Certificate, please contact either this office or our Manufacturing Inspection District Office (number and address). James C. Grace Manager, Manufacturing Inspection Office, ACE-180 (NOTE: When the PC and PLR are delivered in person, this letter should be suitably revised to reflect such delivery.)

PART 4. › FIGURE 8. SAMPLE PC TRANSMITTAL LETTER

8120.2D 8/17/2004

(2) Deletions from the PLR. Where production of a type-certificated product has been discontinued, and more than one TC is listed on the PLR, the following applies:

(a) If neither the complete product nor spare parts are being produced, the discontinued product or model should be deleted from the PLR. Upon issuance of the revised PLR, the MIDO/CMO will request that the PC holder return the superseded PLR, which will be marked “Superseded” and retained in the files. If no other products, models, or spare parts are covered by the PC, the PC holder will be requested to return both the PC and PLR for cancellation. The MIDO/CMO will retain the canceled PC and PLR.

(b) If production of the complete product has ceased, but spare parts are still being produced, the PLR should be revised to reflect this. The MIDO/CMO should ensure that the PC holder remains in compliance with § 21.147 and will continue to advise the FAA of any changes in its organization, systems, procedures, or processes.

(3) STC Modifications Incorporated by PC Holder.

(a) When the holder of the TC obtains an STC, or is licensed to use another person’s STC, the TC holder may amend the TC to incorporate the STC approval. An STC that is referenced in and becomes a part of the TC need not be shown on the PLR.

(b) When the PC holder of a TC obtains an STC, or related licensing agreement, but does not make the STC an integral part of the TC, the PC holder may incorporate the STC in production products prior to OAC approval, provided that:

1 The PC holder makes application to the FAA to add the STC to its PLR.

2 The QC data is revised as necessary.

3 The engineering data submitted for the STC approval provides all the details necessary for manufacture and for making conformity determinations.

(c) When a PC holder elects not to use either of the foregoing methods, the TC holder may incorporate an STC modification into production products only after OAC, in accordance with the provisions of part 43.

52.-55. RESERVED.

SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION (PART 21, SUBPART O) › PART 1. GENERAL

8/17/2004 8120.2D

SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION (PART 21, SUBPART O)

PART 1. GENERAL

56. APPLICABILITY. Part 21, subpart O, is applicable to a person who desires to manufacture an article that meets a specific TSO. The TSO authorization system does not apply to parts produced under a PMA, TC only, or a PC.

57. PRIVILEGES. A TSO authorization holder has the privileges specified in § 21.603. In addition, a TSO authorization holder is eligible to have a qualified employee(s) designated as a DMIR in accordance with the provisions of part 183. The TSO authorization holder may also be authorized by part 183 to represent the Administrator as an ODAR. Order 8100.8 contains procedures for the administration of DMIRs and ODARs.

58. ADVISING THE APPLICANT. The applicant will be advised that:

a. Section 21.605(a)(3) establishes the need for a QC system. AC 21-1 sets forth an acceptable means of complying with § 21.605(a)(3). The FAA may approve alternative methods and procedures when the applicant can show that the proposed methods and procedures will achieve compliance with § 21.605(a)(3).

b. The applicant should arrange the data required for submittal to the FAA under § 21.605(a)(3) in the format suggested by AC 21-1. In those instances where an applicant has already established QC procedures, e.g., for military contracts, the applicant must identify those portions that comprise the QC data that the applicant will use to show compliance with § 21.605. The data may or may not comprise a lengthy document, depending upon the size of the manufacturing facilities and product complexity. The data must include descriptive material that adequately covers each applicable paragraph of § 21.605. A title should be provided for positive identification and a revision page or similar control is recommended to ensure that the original approval date and the date of each revision is recorded. A number or letter should identify each revision.

c. A TSO authorization holder is a manufacturer who controls the design and quality of an article produced under the TSO system. The TSO authorization holder’s control extends to all related parts, processes, or services, including all related parts, processes, or services procured from outside sources.

d. A TSO design approval can be obtained only for the applicable TSO that is in effect on the date of application for that article.

e. A TSO authorization does not imply installation eligibility on a type-certificated product.

f. TSO Authorization Holder’s Responsibility.

(1) The TSO authorization holder is responsible for maintaining the QC system in conformity with the data and procedures approved for the TSO authorization, and for determining that each completed article and parts thereof produced conforms to the TSO and any terms or conditions prescribed in the TSO letter of authorization.

8120.2D 8/17/2004

(2) The holder of a TSO authorization should notify the MIDO in writing prior to any changes that may affect the inspection, conformity, or airworthiness of the product. These changes would include:

(a) Relocation of a portion of its facility or addition to existing facilities.

1 A TSO authorization holder’s manufacturing complex would normally consist of a principal facility and all associate facilities using the same quality control system approved by the FAA, for the particular TSO article(s). Associate facilities are discussed in section 6 of this chapter.

2 The TSO authorization is issued to the principal manufacturing facility that controls the design and quality of the article(s) for which the approval was granted. A mailbox address is not acceptable for a facility since the actual location must be identified. Such addresses, however, may be used as supplemental to the actual address when desired for such uses as corresponding to and from FAA offices.

3 When a TSO authorization holder moves the principal manufacturing facility to a new location, the TSO authorization is no longer effective. In accordance with FAA Order 8150.1, Technical Standard Order Procedures, the responsible MIDO will evaluate the TSO holder’s QC system to determine the TSO holder’s ability to comply with § 21.143. If the MIDO finds no change to the TSO holder’s ability to comply with § 21.143, the TSO holder may be eligible for the reissuance of its TSO authorization(s). The ACO must notify the TSO holder that no new articles may be shipped from its new facility until the TSO authorization has been reissued.

4 When the TSO authorization holder moves an associate facility or adds a new plant, the FAA should be notified of such changes. The FAA may, if deemed necessary, conduct a preliminary DO audit at the new plant or moved facility. If a DO audit is deemed necessary, a satisfactory audit result must be obtained before the facility can be approved for production.

(b) Resumption of production after being discontinued for an extended period of time for other than normal periods of time, such as vacation periods.

(c) Significant curtailment/resumption of production operations.

(d) Significant reduction/reassignment of QC personnel.

(e) Changes or revisions to QC data and related procedures.

(3) The TSO authorization holder must report all failures, malfunctions, and defects as required by § 21.3. The TSO authorization holder should be encouraged to establish a procedure for such reporting.

8/17/2004 8120.2D

(4) Identification Marking. A TSO authorization holder is responsible for ensuring that only those articles that meet the applicable TSO performance standards are identified as required by § 21.603. Section 21.603(a) states in part that “...no person may identify an article with a TSO marking unless that person holds a TSO authorization and the article meets applicable TSO performance standards.” The intent of § 21.603 is to address the identification of an article with its original TSO identification marking as required by § 21.607(d) at the time of manufacture.

(a) Supplier Marking. Suppliers to TSO authorization holders can identify parts with TSO markings provided the TSO approval holder adequately controls those suppliers as part of its quality system. Suppliers that mark parts should be treated the same as any other supplier furnishing parts or services, using supplier control procedures as part of the quality system. MIDOs may require that specific part marking controls be included in these procedures, along with any additional conditions that may be necessary for suppliers with direct-ship authorization.

(b) Detail Parts and Invoice Identification. When detail parts are produced for installation in a TSO article, individual detail parts of the TSO article sold separately must be accompanied by a shipping document containing the information required by § 21.607(d) and must identify the TSO assembly for which they are eligible.

(c) Detail Parts and Design Data Identification. TSO article markings required by §§ 21.603 and 21.607(d) are applied to the top-level assembly for which the original TSO authorization was granted, not subassemblies or individual detail parts. It is not required that each individual subassembly or detail part within the TSO article be marked. The TSO marking requirements for detail parts, which are sold by the original TSO authorization holder for installation into its related TSO articles, may be found within the applicable design data for the TSO article. This provides traceability of the individual detail parts to their related TSO articles.

(5) Reidentifying Marking. Section 21.603 does not prohibit a certificated person, authorized under § 43.3, from modifying or replacing the original TSO identification marking in accordance with the TSO authorization holder’s instructions (e.g., service letters, service bulletins, airworthiness directives, etc.) resulting from an FAA-approved design change. The following guidance applies to the incorporation of design changes to TSO articles that have left the manufacturer’s quality control system that require reidentifying of the TSO articles.

(a) There are instances when the holder of a TSO authorization, or a letter of TSO design approval, changes a design and provides data so that these changes may be incorporated into articles in service, through alteration. Service bulletins, service letters, and airworthiness directives are common nomenclature for these types of data, but the data may be transmitted in any appropriate form. Regardless of whether the change is major or minor, as defined in § 21.611, it may be necessary and/or appropriate to reidentify the article.

(b) The reidentification procedure indicated in paragraph 58f(5)(a) above must be part of the FAA-approved data for the entire alteration. The identification markings must comply with the requirements of § 21.607 and the applicable TSO. Some of the reidentification methods expected include the following: making additional marks; making new marks and obliterating the old; installing a new data plate or label provided by the TSO authorization holder; or a combination thereof. Consideration should be given to minimizing confusion as to the status of the article and maximizing traceability to the maintenance and alteration records.

SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION (PART 21, SUBPART O) › PART 2. PROCESSING AN APPLICATION FOR A TSO AUTHORIZATION

8120.2D 8/17/2004

(c) Design changes introduced by persons other than the TSO authorization holder are permissible under § 21.611(c). Order 8150.1 addresses the identification/marking requirements of TSO articles that are modified by persons other than the TSO manufacturer.

(6) Identification Marking of Replacement and Modification Parts Produced Pursuant to the Enhanced Enforcement Program (EEP) as Published in Federal Register Notice of February 27, 1995. Parts produced under the EEP that subsequently were issued TSO authorizations were not eligible at the time of production and are ineligible for marking in accordance with § 21.607(d). Although parts produced under the authority of the EEP are not eligible for part marking, these parts were considered acceptable for sale/installation under the provisions of § 21.305(d). Section 21.305(d) allows parts to be approved in any manner approved by the FAA Administrator. Parts produced under the authority of the EEP continue to be acceptable subsequent to the expiration of the EEP.

PART 2. PROCESSING AN APPLICATION FOR A TSO AUTHORIZATION

59. APPLICATION.

a. An applicant (or an applicant’s authorized agent) must submit an application for a TSO authorization by letter to the Manager, Aircraft Certification Office (ACO), in the region in which the applicant’s principal manufacturing facility is located. The applicant must submit, along with the application, those documents required by § 21.605, which includes:

(1) A statement of conformance.

(2) A copy of the technical data.

(3) A description of the QC system in the detail specified in § 21.143.

b. A foreign manufacturer who desires to obtain a TSO letter of design approval (as provided for in § 21.617) must submit an application through its CAA to the ACO (or equivalent) that has cognizance over the geographical area in which the foreign manufacturer is located. A foreign manufacturer located in a member state of the European Union who desires to obtain a TSO letter of design approval must submit an application through the European Aviation Safety Agency to the Boston ACO.

60. DESIGN APPROVAL. The regulations and requirements concerning TSO design approval methods are contained in part 21, subpart O, and the applicable TSO. Policy covering TSO design approval methods is contained in Order 8150.1.

61. PRELIMINARY DO AUDIT. At the request of the ACO, the MIDO should make arrangements to conduct a DO audit, within the deadline established by the ACO. This audit will be conducted as follows:

a. Evaluate the applicant’s QC data for compliance with § 21.143 using the criteria contained in appendix 1 of this order. The data must include an acceptable test procedure to which each production article will be tested. Any inadequacies in the data submitted must be identified to the applicant for corrective action. After the data has been reviewed, and any applicable corrective actions taken, the MIDO will approve the quality control data submitted by the applicant. The approved QC data may be retained in the MIDO files.

SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION (PART 21, SUBPART O) › PART 3. ISSUANCE OF A TSO AUTHORIZATIONOR LETTER OF TSO DESIGN APPROVAL

9/23/2005 8120.2D CHG 1

b. Evaluate the applicant’s production facilities in accordance with 14 CFR, the FAA-approved design data, and the QC data approved in paragraph 61a above. The cognizant MIDO manager will select a team to conduct this audit. The team may consist of the cognizant PI and at least one other manufacturing inspector or the MIDO manager. It is also recommended that an engineer be selected for the team when deemed necessary by the type and complexity of processes and procedures being utilized at the facility. The standardized evaluation criteria contained in Order 8100.7 may be used as an aid to evaluate compliance. Team members should be advised, however, that some of the evaluation criteria contained therein may not be related to 14 CFR, and therefore may only be evaluated as a best practice. This audit is not considered to be an ACSEP evaluation. Record all noncompliances on Form(s) 8100-6 and 8120-14. Refer to appendixes 7 and 8 of this order. * *

c. Reporting. The MIDO will advise the ACO concerning the results of the DO audit. Any unresolved items requiring corrective action should be identified and copies of letters to the applicant requesting corrective action will be provided.

PART 3. ISSUANCE OF A TSO AUTHORIZATION

OR LETTER OF TSO DESIGN APPROVAL

62. TSO LETTER OF AUTHORIZATION. Upon a showing of compliance with part 21, subpart O, the cognizant ACO will issue a letter in accordance with established procedures. Electronic signature is not permitted. This letter should be amended, as appropriate, to reflect subsequent additions to a manufacturer’s original TSO authorization, after appropriate coordination between the ACO and MIDO in determining the need for a DO audit.

63. LETTER OF TSO DESIGN APPROVAL. The cognizant ACO may issue a letter of TSO design approval for an import appliance to a foreign manufacturer located in a country with which the United States has an agreement that provides for the reciprocal acceptance of appliances, provided the following criteria are met: * *

a. The CAA of the country in which the appliance will be manufactured certifies to the FAA that the design of the particular appliance meets the pertinent design requirements of the specific TSO.

b. The CAA is advised that each appliance produced under the provisions of the TSO design approval and exported to the United States must be accompanied by a certificate of airworthiness for export as specified in § 21.502.

64.-67. RESERVED.

CHAPTER 2. PROCEDURES FOR ISSUING A PRODUCTION APPROVAL › SECTION 5. PARTS MANUFACTURER APPROVAL (SPECIAL GUIDANCE)

8120.2D 8/17/2004

SECTION 5. PARTS MANUFACTURER APPROVAL (SPECIAL GUIDANCE)

68. GENERAL. The guidance relative to the issuance of a PMA is located in FAA Order 8110.42, Parts Manufacturer Approval Procedures. The subjects and procedures in this section provide supplemental guidance to that order.

69. MARKING DETAIL PARTS OF PMA ASSEMBLIES. PMA part markings required by § 45.15 are applied to the top-level assembly of the approved replacement or modification part. Marking subassemblies or individual detail parts is not required. For example, if the PMA were approved for a hydraulic pump, the PMA marking would be affixed to the completed assembly. It is not required that each individual subassembly or detail part within the assembly be marked with FAA-PMA, unless it is being produced under its own PMA. If a PMA is granted for an assembly, individual detail parts of the assembly sold separately must be accompanied by a shipping document containing the information required by § 45.15 and will identify the PMA assembly for which they are eligible. The part marking requirements for detail parts that are sold by the original PMA holder for installation into its related PMA assemblies, may be found within the applicable design data for the assembly. This provides traceability of the individual detail parts to their related PMA assemblies.

70. IDENTIFICATION MARKING OF REPLACEMENT AND MODIFICATION PARTS PRODUCED PURSUANT TO THE ENHANCED ENFORCEMENT PROGRAM (EEP) AS PUBLISHED IN FEDERAL REGISTER NOTICE, FEBRUARY 27, 1995. Section 45.15 states that each person who produces a replacement or modification part under a PMA issued under § 21.303 will permanently and legibly mark the part. Parts produced without a PMA, such as parts produced under the EEP, were not produced under § 21.303 and therefore are not eligible for marking in accordance with § 45.15. Although parts produced under the authority of the EEP are not eligible for part marking, these parts were considered acceptable for sale/installation under the provisions of § 21.305(d). Section 21.305(d) allows parts to be approved in any manner approved by the FAA Administrator. Parts produced under the authority of the EEP continue to be acceptable subsequent to the expiration of the EEP.