Radar Vectors
FAA Order Cancelled Issued Mar 6, 2017 AIR-600 124 pages Copy saved Nov 18, 2026

Order 8120.23A Certificate Management of Production Approval Holders with Change 2

This document is cancelled. Cancelled by 8120.23B. Check the official source before relying on it.

Official source ↗ Open PDF

CHANGE

ORDER 8120.23A CHG 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Effective Date: National Policy

SUBJ: Certificate Management of Production Approval Holders

This is a guidance document. Its content is not legally binding in its own right and will not be relied upon by the Department as a separate basis for affirmative enforcement action or other administrative penalty. Conformity with the guidance document is voluntary only. Nonconformity will not affect rights and obligations under existing statutes and regulations.

1. Purpose. This change transmits revised pages to Order 8120.23A, Certificate Management of Production Approval Holders.

2. Who this change affects. The Aircraft Certification Service (AIR).

3. Disposition of Transmittal. Retain this transmittal sheet until this Directive is canceled by a new Directive.

4. Explanation of Policy Changes.

a. This change updates and clarifies the AIR organizational designations and references, as well as other minor editorial changes. This change incorporates directive feedbacks and deviation memos; revises the section on service difficulty investigations; revises the days of notification required before audits; updates or adds definitions in Appendix K to align with FAA Order 8000.72, FAA Integrated Oversight Philosophy; removes references to FAA 8100-7, QSA Customer Feedback Report and to FAA Order 8120.13, International Cooperative Supplier Surveillance Program (ICSSP) Procedures; updates information in and the location of Appendix L, Administrative Information, to Chapter 6, per FAA branding requirements; and makes minor format changes to include updating the table of contents and page numbers.

b. AIR-600 has revised three forms (FAA 8100-3, Quality System Report; FAA 8100-6, Noncompliance Record; and FAA 8120-14, Production Approval/Certificate Management Activity Report) in Aircraft Certification Audit Information System (ACAIS). The sample forms in this Order may not exactly correspond to the forms available in ACAIS, but the instructions to complete the forms in the Order remain in effect, and you should use the latest form available in ACAIS.

Distribution: Electronic Initiated By: AIR-600

06/06/2025

PAGE CHANGE CONTROL CHART Remove Pages Dated Insert Pages Dated ii-v 03/06/2017 ii-vii 1-1 10/27/2023 1-1 1-2 10/27/2023 1-2 2-1 (thru 2-2) 10/27/2023 2-1 (thru 2-2) 3-1 (thru 3-4) 10/27/2023 3-1 (thru 3-4) 3-6 (thru 3-7) 10/27/2023 3-6 (thru 3-7) 3-10 (thru 3-12) 10/27/2023 3-10 (thru 3-12) 3-15 (thru 3-16) 03/06/2017 3-15 (thru 3-16) (thru 3-7) 3-18 03/06/2017 3-18 3-20 (thru 3-21) 10/27/2023 3-20 (thru 3-21) 3-23 (thru 3-26) 10/27/2023 3-23 (thru 3-26) 3-29 10/27/2023 3-29 3-34 10/27/2023 3-34 3-36 (thru 3-39) 10/27/2023 3-36 (thru 3-39) 3-42 10/27/2023 3-42 3-45 (thru 3-46) 10/27/2023 3-45 (thru 3-46) 4-2 10/27/2023 4-2 4-44 (thru 4-9) 10/27/2023 4-4 (thru 4-9) 5-1 10/27/2023 5-1 None 6-1 A-1 (thru A-2) 10/27/2023 A-1 (thru A-2) B-1 (thru B-2) 10/27/2023 B-1 (thru B-2) C-1 (thru C-2) 03/06/2017 C-1 (thru C-2) C-4 03/06/2017 C-4 F-2 10//2023 F-2 G-1 (thru G-2) 03/06/2017 G-1 (thru G-2) G-4 03/06/2017 G-4 H-1 (thru H-2 10/27/2023 H-1 (thru H-2) H-3 (thru H-4) 03/06/2017 H-3 (thru H-4) I-1 10/27/2023 I-1 J-1 (thru J-2) 10/27/2023 J-1 (thru J-2) K-1 (thru K-4) 10/27/2023 K-1 (thru K-4) K-5 10/27/2023 K-5 L-1 10/27/2023 L-1 M-1 10/27/2023 None

Daniel J. Elgas Director, Policy and Standards Division Aircraft Certification Service

06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025 06/06/2025

JAMES DAVID FOLTZ

Digitally signed by JAMES DAVID FOLTZ Date: 2025.06.06 10:35:27 -05'00'

CHANGE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ORDER 8120.23A CHG 1

National Policy Effective Date:

10/27/2023

SUBJ: Certificate Management of Production Approval Holders

1. Purpose. This change transmits revised pages to Order 8120.23A, Certificate Management of Production Approval Holders. It is issued to update the organizational references to reflect the recent organizational changes and address minor formatting issues.

2. Who this change affects. The Aircraft Certification Service (AIR).

3. Where to Find This Order. You can find this order on the FAA website at and on the Dynamic Regulatory System (DRS) website at http://www.faa.gov/regulations_policies/orders_notices

https://drs.faa.gov.

4. Explanation of Changes. This change updates and clarifies the AIR organizational designations and references, as well as other minor editorial changes. When determining responsibility for design approvals, production approval and oversight activities, the following explanations apply:

a. References to “certificate management branch” or “CM branch” include branches responsible for the production approval and oversight aspects of this policy within the Integrated Certificate Management Division (AIR-500) and the System Oversight Division (AIR-800).

b. References to “certificate management section” or “CM section” include sections responsible for the production approval and oversight aspects of this policy within AIR-500 and AIR-800.

c. References to “certification branch” include branches and sections responsible for design approval and oversight aspects of this policy within the Compliance and Airworthiness Division (AIR-700) and AIR-500.

d. Replaced Regulatory and Guidance Library (RGL) references and web-page addresses with Dynamic Regulatory System (DRS) references and web-page addresses.

5. Effective Date. The provisions of this change for this directive become effective on the date of signature.

6. Disposition of Transmittal. Retain this transmittal sheet until this Directive is canceled by a new Directive.

Distribution: Electronic Initiated By: AIR-600

10/27/2023 8120.23A CHG-1

PAGE CHANGE CONTROL CHART

Remove Pages Dated Insert Pages Dated

n/a n/a Change 1 10/27/23 n/a n/a Page Change Control Chart 10/27/23 ii 3/6/17 ii 10/27/23 1-1 3/6/17 1-1 10/27/23

1-2 3/6/17 1-2 10/27/23 3-1 3/6/17 3-1 10/27/23 3-6 3/6/17 3-6 10/27/23 3-10 3/6/17 3-10 10/27/23 3-12 3/6/17 3-12 10/27/23

3-15 3/6/17 3-15 10/27/23 10/27/23 3-19 (thru 3-21) 3/6/17 3-19 (thru 3-21) 10/27/23 3-23 (thru 3-25) 3/6/17 3-23 (thru 3-25) 10/27/23 3-30 3/6/17 3-30 10/27/23 3-35 (thru 3-36) 3/6/17 3-35 (thru 3-36) 10/27/23 3-39 (thru 3-41) 3/6/17 3-39 (thru 3-41) 10/27/23 3-43 3/6/17 3-43 10/27/23 3-45 3/6/17 3-45 10/27/23 4-5 (thru 4-6) 3/6/17 4-5 (thru 4-6) 10/27/23 4-8 (thru 4-10) 3/6/17 4-8 (thru 4-10) 10/27/23 5-1 (thru 5-2) 3/6/17 5-1 (thru 5-2) 10/27/23 Appendix A - 1 (thru A-4) 3/6/17 Appendix A - 1 (thru A-4) 10/27/23 Appendix B - 1 3/6/17 Appendix B - 1 10/27/23 10/27/23 Appendix J - 1 3/6/17 Appendix J - 1

10/27/23 Appendix K - 2 3/6/17 Appendix K - 2

10/27/23 Appendix L - 1 (thru L-2) 3/6/17 Appendix L - 1 (thru L-2)

10/27/23 Appendix M - 1 3/6/17 Appendix M - 1

// signed // Daniel J. Elgas Director, Policy and Standards Division Aircraft Certification Service

ORDER 8120.23A

National Policy

Effective Da te: 03/06/2017

SUBJ: Certificate Management of Production Approval Holders

This order provides guidance and assigns responsibility for the implementation of the Aircraft Certification Service (AIR) certificate management (CM) of production activities of manufacturers and their suppliers producing products and articles in accordance with Title 14 of the Code of Federal Regulations.

This order has been organized into three functional components. The first two chapters describe the CM process. Chapter 3 describes ongoing CM practices and includes Quality System Audits (QSA) and related activities. Chapters 4 and 5 describe additional CM activities, continuous improvement, and the Aircraft Certification Audit Information System’s (ACAIS) role in CM.

//Original Signed by//

Susan J. M. Cabler Acting Manager, Design, Manufacturing, & Airworthiness Division Aircraft Certification Service

Distribution: Electronic Initiated By: AIR-100

Table of Contents

Chapter 1. General … 1-1

 1-1. Purpose of This Order … 1-1  1-3. Where Can I Find This Order … 1-1  1-5. Explanation of Changes … 1-1  1-6. Effective Date … 1-1

Chapter 2. Certificate Management Overview … 2-1

 2-1. Purpose of This Chapter … 2-1  2-2. FAA’s Authority to Perform Certificate Management … 2-1  2-3. Certificate Management Program Overview … 2-1  2-4. Certificate Management Website … 2-4

Chapter 3. Ongoing Certificate Management Responsibilities … 3-1

Section 1. Introduction … 3-1  3-1. Purpose of This Chapter … 3-1  3-2. Assignment of Certificate Management Coordinator … 3-1  3-3. Status of a PAH … 3-1 Section 2. Certificate Management Planning … 3-2 Part 1. Risk Assessment … 3-2  3-4. Overview … 3-2  3-6. Exposure Within the National Airspace System (NAS) … 3-3  3-7. Organizational Risk Assessment … 3-5  3-8. Agreement of Risk Assessment … 3-5  3-9. Modification of Risk Assessment … 3-5  3-10. Facility Selection … 3-6  3-11. Periodic Review of Risk Assessment Tools … 3-6 Part 2. Audit Requirements and Certificate Management Plan … 3-7  3-12. Minimum Audit Requirements … 3-7  3-13. Certificate Management Plan … 3-8 Section 3. Product-Based System Audit Activities … 3-9 Part 1. General … 3-9  3-14. Audit Basics … 3-9  3-15. Selection of a PAH and its Facilities for Audits … 3-9  3-16. Hand-off Procedures … 3-10  3-17. Recording Noncompliances … 3-11 Part 2. Quality System Audit … 3-12 Subpart 1. Overview … 3-12  3-18. What is a QSA? … 3-12 Subpart 2. QSA Auditor Appointment and Training … 3-12  3-19. General … 3-12  3-20. Appointing Officials … 3-12  3-21. Criteria for Candidate Selection … 3-12

ii

Table of Contents (Continued)

 3-22. Criteria for Appointment … 3-15  3-23. Review of Appointment … 3-18  3-24. Reinstatement of Auditors Failing to Meet Appointment Review Criteria. ... 3-19 Subpart 3. Selection and Scheduling of QSAs … 3-19  3-25. QSA Intervals … 3-19  3-26. Selection of Facilities to be Audited … 3-19  3-27. Scheduling of QSAs … 3-19  3-28. Selection of QSA Auditors … 3-21  3-29. Notification of Facilities To Be Audited … 3-24  3-30. Modifications to Scheduled Audits … 3-24 Subpart 4. QSA Procedures … 3-25 Subpart 4-1. QSA Preparation … 3-25  3-31. Lead Audit Office … 3-25  3-32. Assigned Certification Branch and Certificate Management Sections … 3-25  3-33. Audit Team Leader or Principal Auditor … 3-25  3-34. Audit Team Member … 3-27 Subpart 4-2. Conduct of the Audit … 3-28  3-35. Team Leader or Principal Auditor Coordination With Facility Representative … 3-28  3-36. Pre-Audit Team Meeting … 3-28  3-37. Pre-Audit Conference … 3-28  3-38. Audit of Quality System Elements … 3-30  3-39. Recording Noncompliances … 3-31  3-40. Audit Meetings … 3-31  3-41. Post-Audit Conference … 3-33 Subpart 4-3. Post-Audit Activities … 3-35  3-42. Preparing the QSA Report … 3-35  3-43. Quality Review of the QSA Report … 3-35  3-44. Sending the QSA Report … 3-35  3-45. Requesting Corrective Action … 3-35 Part 3. Supplier Control Audit … 3-37 Subpart 1. Overview … 37  3-46. What Is a Supplier Control Audit? … 3-37  3-47. Purpose of a Supplier Control Audit … 3-37  3-48. General PAH Supplier Control Responsibilities … 3-37  3-49. Certificate Management Activity at Suppliers … 3-39  3-50. Coordination of Requests for Supplier Oversight Assistance With Other CAAs … 3-39

Subpart 2. Scheduling of Supplier Control Audits … 3-40  3-51. Division Supplier Control Audit Schedule … 3-40  3-52. Coordination of Supplier Control Audits … 3-41  3-53. Notifying a PAH … 3-42

iii

Table of Contents (Continued)

Subpart 3. Conducting a Supplier Control Audit … 3-44  3-54. Audit Criteria … 3-44  3-55. Recording a Supplier Control Audit … 3-44 Subpart 4. Determining a PAH’s Control of its Suppliers … 3-45  3-56. Determination of Supplier Control … 3-45 Part 4. Principal Inspector Audit … 3-45  3-57. What Is a PI Audit? … 3-45  3-58. Scheduling a PI Audit … 3-45  3-59. Hand-offs of PI Audits … 3-45  3-60. Recording a PI Audit … 3-45 Part 5. Product Audit … 3-46  3-61. What Is a Product Audit? … 3-46  3-62. Selection of Product Audit Characteristics … 3-46  3-63. Product Audit Areas … 3-46  3-64. Product Audit Criteria … 3-47  3-65. Recording Product Audit Results … 3-48  3-66. Recording Completion of a Product Audit … 3-48

Chapter 4. Additional Oversight Responsibilities … 4-1

Section 1. Introduction … 4-1  4-1. Purpose of This Chapter … 4-1 Section 2. Audit of Changes to a PAH’s Quality System … 4-1  4-2. General CM Section Responsibilities … 4-1  4-3. Prioritization of Review … 4-1  4-4. Review of Changes … 4-1  4-5. Post-Review Actions … 4-2 Section 3. Investigation of Service Difficulties … 4-4  4-6. General Service Difficulties Information … 4-4  4-7. Investigation … 4-4  4-8. Corrective Action … 4-5  4-9. Reporting a Service Difficulty Investigation … 4-5  4-10. Foreign Manufacturers … 4-6 Section 4. PAH Noncompliances and Corrective Action … 4-6  4-11. PAH Noncompliances … 4-6  4-12. Documenting Noncompliances … 4-6  4-13. Processing Noncompliances … 4-6  4-14. Obtaining Corrective Action … 4-7 Section 5. Unscheduled Audits or Investigations … 4-7  4-15. General Unscheduled Audit Information … 4-7  4-16. Non-Scheduled Certificate Management Audits … 4-7  4-17. Special Audit Item (SAI) … 4-9

iv

Table of Contents (Continued)

Section 6. Providing Guidance to a PAH … 4-9  4-18. Guidance … 4-9 Section 7. Determining Undue Burden or No Undue Burden … 4-9  4-19. PAH’s Requirements … 4-9  4-20. Undue Burden Determination … 4-10

Chapter 5. ACAIS … 5-1

 5-1. Purpose … 5-1  5-2. Initial Activation of a New PAH in ACAIS … 5-1  5-3. Forms … 5-1  5-4. Database Management … 5-1  5-5. Use of the Database … 5-2

Chapter 6. Administrative Information … 6-1

Appendix A. Category Parts List … A-1

 1. Purpose … A-1  2. Category Parts List … A-1  3. Structure of the CPL … A-1  4. Review of the CPL … A-1  5. CPL Revision Process … A-1

Appendix B. Preparation of the QSA Notification Letter to a PAH … B-1

 1. Purpose … B-1  2. Information to Include in the Notification Letter … B-1

Appendix C. Preparation Instructions for FAA Form 8100-6, Noncompliance Record .. C-1

 1. Purpose … C-1  2. Specific Guidance … C-1

Appendix D. Standardized Noncompliance Codes for PAHs … D-1

Appendix E. Preparation Instructions for FAA Quality System Audit Executive

Summary … E-1

 1. Purpose … E-1  2. Specific Guidance … E-1

Appendix F. Preparation Instructions for Quality System Audit Special Emphasis Items F-

1

 1. Purpose … F-1  2. Specific Guidance … F-1

Appendix G. Preparation Instructions for FAA Form 8100-3, Quality System Audit

Report, Cover Pages … G-1

 1. Purpose … G-1  2. Preparing the Front of the Form … G-1  3. Preparing the Back of the Form … G-3

v

Table of Contents (Continued)

Appendix H. Preparation Instructions for FAA Form 8120-14, Production

Approval/Certificate Management Activity Report … H-1

 1. Purpose … H-1  2. Specific Guidance … H-1

Appendix I. Forms Listing … I-1

Appendix J. Acronyms … J-1

Appendix K. Definitions … K-1

Appendix L. FAA Form 1320-19, Directive Feedback Information … M-1

vi

List of Figures

Figure 2-1. Certificate Management Life Cycle Process … 2-3

Figure 3-1. Three Pillars of Risk Assessment … 3-2

Figure 3-2. Risk Level Determination Process … 3-4

Figure 3-3. Criteria for Candidate Selection and Team Member Appointment … 3-14

Figure 3-4. Criteria for Team Leader Appointment … 3-17

Figure 3-5. Sample Supplier Control Audit Notification Letter … 3-43

Figure 4-1. Sample Letter of Approval for Quality System Changes … 4-3

Figure A-1. Sample Part Categorization Memo for Requesting a Change to the CPL … A-5

Figure B-1. Sample Paragraphs for the Notification Letter … B-2

Figure C-1. Sample FAA Form 8100 6 … C-4

Figure E-1. Sample Executive Summary for Facilities with Noncompliances … E-2

Figure E-2. Sample Executive Summary for Facilities With No Noncompliances … E-3

Figure F-1. Sample Quality System Audit Special Emphasis Items for PAHs … F-2

Figure G-1. Sample FAA Form 8100-3 (Front) … G-2

Figure G-2. Sample FAA Form 8100-3 (Back) … G-4

Figure H-1. Sample FAA Form 8120-14 (Front) … H-3

Figure H-2. Sample FAA Form 8120-14 (Back) … H-4

List of Tables

Table 3-1. Ongoing Certificate Management Audit Minimum Requirements … 3-7

Table 3-2. Selecting a PI or AE as an Auditor … 3-22

Table 3-3. Applicability of Product Audit Criteria to Product Audit Areas (Minimum) … 3-48

Table D-1. Quality System Elements … D-1

Table D-2. Noncompliance Codes … D-2

Table I-1. Forms Available From FAA Logistics Center … I-1

Table I-2. Forms Available Within ACAIS … I-1

vii

Chapter 1. General

1-1. Purpose of This Order. This order explains the Aircraft Certification Service (AIR) certificate management program.

1-2. Audience. All Federal Aviation Administration (FAA) employees who participate in certificate management activities conducted at a production approval holder (PAH) and its suppliers.

1-5. Explanation of Changes. › j. Deletes the random generator method of selecting suppliers for an…

Note: As used in this order, the term PAH encompasses both a PAH and its associate facilities.

1-3. Where Can I Find This Order. You can find this order on the FAA employee website, on the FAA public website, and in the Unless stated otherwise, please refer to the latest version.

FAA Dynamic Regulatory System (DRS).

1-4. Cancellation. FAA Order 8120.23, Certificate Management of Production Approval Holders, dated February 25, 2013, and all associated changes are canceled.

1-5. Explanation of Changes. This revision:

a. Updates the certificate management process and modifies the method by which risk assessments are conducted.

b. Introduces the point of manufacturing methodology for planning and conducting audits.

c. Requires all audits be conducted using the product-based system audit approach.

d. Replaces the Certificate Management Information System (CMIS) with the Aircraft Certification Audit Information System (ACAIS) as the certificate management automation tool.

e. Adds policy pertaining to determining undue burden or no undue burden.

f. Modifies the process for managing the Category Parts List (CPL).

g. Adds noncompliance codes for use in documenting a noncompliance on FAA Form 8100-6, Noncompliance Record.

h. Updates FAA Form 8120-14, Production Approval/Certificate Management Activity Report.

i. Clarifies that a product audit is no longer considered a separate audit, but rather it is conducted as a component of a principal inspector (PI) audit, supplier control audit (SCA), and quality system audit (QSA).

j. Deletes the random generator method of selecting suppliers for an SCA and replaces it with a risk assessment method of selecting suppliers for an SCA.

1-6. Effective Date. › d. Paragraph 3-15; Facility selection and audit planning, via the use…

k. References the newly created certificate management website.

1-6. Effective Date. This order is effective March 20, 2017, with the following exceptions:

a. The use of Table 3-1, Ongoing Certificate Management Audit Minimum Requirements, is effective October 1, 2017.

b. The number and frequencies of all audits conducted prior to October 1, 2017, will be based on the Certificate Management Responsibilities (Ongoing) Minimum Requirements table, formerly located in FAA Order 8120.23, Change 3 (Figure 3-1) and currently located on the certificate management website.

c. Paragraph 3-5; Annual risk assessments (Level Determination and Risk-Based Resource Targeting (RBRT), will be conducted from the period of March 20, 2017 to April 30, 2017.

d. Paragraph 3-15; Facility selection and audit planning, via the use of ACAIS, will not commence until the release of ACAIS version 2.2, which is scheduled to be released May 1, 2017.

2-3. Certificate Management Program Overview. › a. Ongoing Certificate Management.

8120.23A CHG-2

Chapter 2. Certificate Management Overview

2-1. Purpose of This Chapter. This chapter provides an overview of the AIR certificate management program. It describes our statutory responsibilities to perform certificate management and explains how our policies fulfill those responsibilities.

2-2. FAA’s Authority to Perform Certificate Management. Title 49 of the United States Code (49 U.S.C.) subtitle VII provides the statutory authority for the AIR certificate management program and allows the FAA to perform oversight of PAHs at any time and take appropriate actions in the interest of safety. FAA inspectors may enter a PAH’s facility at any time to perform oversight. FAA inspectors must document oversight activities in accordance with paragraph 2-3(a)(3) of this order and notify a PAH of noncompliances in accordance with paragraph 3-17 of this order. Title 14 of the Code of Federal Regulations (14 CFR) part 21 includes specific requirements for PAHs to produce duplicates. Specifically, 14 CFR 21.137 requires a PAH to describe in writing a quality system that ensures each product and article conforms to its approved design and is in a condition for safe operation. Holders of production certificates (PC), parts manufacturer approvals (PMA), and technical standard order (TSO) authorizations must meet the responsibilities of a holder as described in 14 CFR 21.146, 21.316, and 21.616, respectively.

2-3. Certificate Management Program Overview. The certificate management program consists of the policies, procedures, and associated information technologies by which FAA fulfills its statutory responsibilities to ensure a PAH remains in compliance with those regulations that govern the manufacturing of its products or articles. It is a system approach to monitoring a PAH’s compliance with regulations that ensures appropriate corrective actions are taken. The applicable FAA CM section is responsible for all activities associated with the certificate management of PAHs. This program does not impose additional requirements on PAHs.

a. Ongoing Certificate Management. Ongoing certificate management consists of a four-step closed-loop process that is consistent with safety management system best practices. Figure 2-1 below provides a flowchart of this process. The process consists of the following four steps:

(1) Planning Audit Activities. Planning activities include conducting an annual in-- depth risk assessment of each PAH and scheduling the audit activities based on the results of that risk assessment. AIR’s certificate management policy and its planning activities are designed to focus audits on the PAH and its points of manufacture that pose the greatest risk.

(2) Conducting Audits.

(a) Auditing is the key component of the certificate management program. AIR employs a product-based system audit approach when conducting audits. A product-based system audit is a planned and recorded activity that relies on using selected products and articles to the maximum extent practical for determining—

1. Whether that product or article conforms to approved data,

2. Whether a PAH complies with quality system requirements, including procedures and special processes established to meet those requirements, and

2-3. Certificate Management Program Overview. › b. Additional Certificate Management Responsibilities.

8120.23A CHG-2

3. Whether a supplier is furnishing products, articles, or services that conform to the PAH’s requirements.

(b) Two types of audits are conducted:

1. Audits using the point of manufacturing methodology. This is a focused, data-driven audit of an article or process performed in the manufacture of a product or article, conducted at any location where the product or article is manufactured or where the process is being performed (that is, the PAH or supplier location). This methodology uses a combination of a PI audit and a product-based supplier control audit. The PI assigned certificate management responsibility normally performs this activity. These audits focus on areas of high risk within the PAH’s or supplier’s facilities.

2. Quality System Audits (QSA). A QSA is a comprehensive product-based system audit designed to ascertain whether a PAH meets the applicable requirements of 14 CFR and complies with the procedures established to meet those requirements. It applies standardized noncompliance codes that are described in appendix D to this order.

(3) Documenting Audit Activities. All audit activities are documented and maintained in ACAIS. ACAIS contains all audit related forms and templates to be used by the CM section when planning and conducting audits.

(4) Performing Post-Audit Activities. Post-audit activities are performed to:

(a) Validate the PAH’s corrective actions.

(b) Update the PAH’s profile.

b. Additional Certificate Management Responsibilities. The following tasks are accomplished on an as-required basis by the CM section responsible for a specific PAH within its geographical boundaries. Any tasks required to be scheduled and conducted at a PAH or supplier facility located in another geographical area should be handled in accordance with paragraph 3-52 of this order.

(1) Audit/inspect changes to a PAH’s quality system that may affect the inspection, conformity, or airworthiness of the product or article.

(2) Investigate service difficulties that involve quality system problems. The Monitor Safety/Analyze Data (MSAD) process is one source that should be used to identify safety issues or potential safety problems in the in-service aircraft fleet and identifies corrective actions (including changes to quality systems) to mitigate safety risks.

(3) Investigate regulatory violations.

(4) Ensure appropriate corrective actions have been proposed and taken for all noncompliances identified at a PAH.

(5) Determine the need for unscheduled audits and other investigation activity (for example, suspected unapproved part (SUP) investigations) necessary to ensure continued compliance with applicable regulations.

10/27/2023 8120.23A CHG-1

(6) Provide guidance and assistance to the PAH as necessary.

(7) Determining undue burden or no undue burden.

Figure 2-1. Certificate Management Life Cycle Process

2-4. Certificate Management Website. › d. Any other information to support the certificate management process.

10/27/2023 8120.23A CHG-1

2-4. Certificate Management Website. The certificate management website is an informational site on which material can be added, deleted, or changed as required. The certificate management website provides both current and historical information related to all aspects of certificate management and includes the following:

a. Discussions on certificate management responsibilities,

b. Links to certificate management related:

(1) Data collection and analysis sites,

(2) Work tools,

(3) FAA publications, QMS documents, and correspondence,

(4) Briefings, presentations, and articles,

c. Lessons learned, and

d. Any other information to support the certificate management process.

3-3. Status of a PAH. › c. Inactive.

Chapter 3. Ongoing Certificate Management Responsibilities

Section 1. Introduction

3-1. Purpose of This Chapter. Sections 2 through 3 of this chapter provide detailed guidance for accomplishing ongoing certificate management responsibilities.

3-2. Assignment of Certificate Management Coordinator. Many of the tasks identified in this chapter for the CM branch, and the CM sections are primarily administrative. A high degree of operational efficiency may be achieved by assigning many of these tasks to a designated certificate management coordinator. CM branch managers should consider whether such an assignment would be beneficial for their organizations. The types of tasks that a certificate management coordinator could coordinate include:

a. QSA candidate and auditor appointment and training.

b. Audit scheduling and QSA team selection; obtaining additional resources when required.

c. Maintaining a supplier control audit list.

d. Dissemination of general certificate management-related information.

3-3. Status of a PAH. For purposes of certificate management, the status of a PAH and its applicable projects can be identified as one of the following:

a. Pending. The FAA has received the production approval application and is in the approval process but has not yet issued the production approval.

b. Active. The FAA has issued a new production approval, or the PAH has produced and/or shipped products or articles within the past 12 months.

c. Inactive. The FAA has determined that the PAH has not produced or shipped products or articles within the past 12 months. While in an inactive status, the PAH must maintain its FAA-approved quality system required by 14 CFR part 21. A PAH may remain in an inactive status for three risk assessment cycles (3 years).

(1) If the PI makes a determination to keep the PAH inactive in the third year, it must be approved by the PI’s office manager and noted in the PAH’s ACAIS file.

(2) If the PI makes a determination to keep the PAH inactive in the fourth year, it must be approved by the CM branch manager and noted in ACAIS.

(3) An inactive PAH’s production approval will be cancelled in the fifth year unless approved by a deviation to the order signed by the Policy and Standards Division (AIR-600).

d. Canceled. The FAA has completed action to revoke or otherwise terminate the PAH’s production approval.

3-5. Risk Assessment Preparation.

Note: If the determination is to cancel a PAH’s production approval, the PI should contact the PAH and discuss whether it wishes to voluntarily surrender its production approval. If the PAH does not surrender its production approval and has no plans for future production, the PI may seek further guidance from the Office of Chief Counsel.

Section 2. Certificate Management Planning

Part 1. Risk Assessment

3-4. Overview. To ensure resources are being applied to the appropriate areas of risk and the correct level of oversight is being conducted, each active PAH is subject to a risk assessment. Each assessment employs three pillars to provide a consistent and justifiable basis for effective use of FAA resources when performing certificate management:

a. Exposure within the National Airspace System (NAS),

b. Organizational Risk Assessment, and

c. Focusing of Oversight (Facility Selection).

Figure 3-1. Three Pillars of Risk Assessment

Exposure

Within

the National Airspace

Organizational

Risk Assessment

Focusing of

Oversight

(Facility Selection)

3-5. Risk Assessment Preparation. The CM section must conduct a risk assessment of each PAH at a minimum of once every 12 months and not later than March 31 of each year. Delegated facilities, holders of a letter of TSO design approval, and PAHs in an inactive status are not subject to a risk assessment. The risk assessment must be conducted in accordance with the instruction provided in ACAIS and paragraphs 3-6 through 3-10 of this order. The PI must collect and verify all information needed to complete the risk assessment before entering the information into ACAIS. When appropriate, the PI will contact each PAH

3-6. Exposure Within the National Airspace System (NAS). › d. The CM section may change the level determination up to level 1 or…

to obtain current or clarifying information relevant to the risk assessment. The PI must contact each PAH previously designated as inactive to determine whether the PAH’s status has changed.

3-6. Exposure Within the National Airspace System (NAS). The first pillar of the PAH’s overall risk assessment determines the PAH’s risk exposure in the NAS, using the Risk Level Determination Process, located in ACAIS. The Risk Level Determination Process places the PAH in one of three risk levels, based on a series of questions. Refer to Figure 3-2 of this order for the level determination decision flow.

a. PAHs with the highest risk exposure in the NAS are placed in level 1. These PAHs manufacture products, as defined by §21.1, at high production rates, with greater complexity, and significantly outsource production to its suppliers. These products do not include unmanned aircraft (UA) produced as low-risk. Low-risk UAs, as identified within their type certificate data sheets (TCDS), are considered a level 3 PAH.

b. PAHs placed in level 2 manufacture either a product designated as a lesser risk than level 1 or a critical article.

c. PAHs designated Level 3 have the least risk exposure in the NAS. Unlike PAHs designated level 1 or level 2, these PAHs do not manufacture products or articles located on the CPL or designated as critical by the PAH, or manufacture products and/or articles for low-risk UAs.

d. The CM section may change the level determination up to level 1 or down one level to level 2. If this type of change is made by the CM section, the rationale must be documented in ACAIS.

Note: When using the Risk Level Determination Process, the PI may use the PAH’s critical parts list in lieu of the AIR CPL, when approved by the assigned certification branch.

Figure 3-2. Risk Level Determination Process

Risk Level Determination

Level 1 Determination Decision ( Note: The applicant must meet all three of the

question criteria or use the option listed below)

Que stion #1: Doe s PAH produce annually more than 100 Aircraft, 500 Engines (to include rebuilt engines), or 1500 Propellers?

Que stion #2: Does t he PAH have 2 or more models in production?

Que stion #3: (a) Does the PAH have 20 or more external suppliers of crit ical parts/major assemblies

or (b) Outsource 33% or more critical parts/major assemblies

[OR]

Opt ion: The manager of the CM section is empowered to move the status of a PAH to or from a LEVEL 1 or 2 with writte n rationale.

Note: In question #1of the Level 1 Determination Decision, the PI will include rebuilt engines in determining the response.

3-9. Modification of Risk Assessment. › j. Significant changes in the use of suppliers/outsourcing;

10/27/2023 8120.23A CHG-1

3-7. Organizational Risk Assessment. Subsequent to the results of the risk level determination, the second pillar of the PAH’s overall risk assessment uses the RBRT assessment tool to determine the organizational risk. The tool includes several factors that result in the identification of quality systems and complexities according to their potential to produce nonconforming products or articles and the consequential results associated with introducing those products or articles into the system. As a result of the RBRT assessment, a PAH is assigned one of the following organizational risk levels:

a. High. A PAH with the greatest potential to produce nonconforming products or articles.

b. Medium. A PAH with a moderate potential to produce nonconforming products or articles.

c. Low. A PAH with low potential to produce nonconforming products or articles.

Note: The RBRT assessment questions and the guidance for completing the assessment are located in ACAIS.

3-8. Agreement of Risk Assessment. The RBRT assessment tool requires an approving official, usually the CM section manager or their delegate, to review the calculated risk level and the recommended certificate management requirements. To the greatest extent possible, the PI and the CM section manager or their delegate should agree on the final risk level. The CM section manager or their delegate will indicate approval in accordance with the instructions provided in ACAIS.

3-9. Modification of Risk Assessment. When any of the following conditions occur at a PAH subsequent to the final risk assessment, the PI should complete a new risk assessment using the risk assessment tools:

a. Changes in a product or article’s criticality;

b. Significant quality system changes;

c. Significant quality system changes impacting inspection, conformity, or airworthiness;

d. Significant turnover of key staff;

e. Significant increases or reductions in workforce;

f. Deliberate non-responsiveness to corrective action requests;

g. Significant service difficulties attributed to manufacturing or quality system problems;

h. Addition of a complex manufacturing process;

i. Addition of a complex product, article, or part(s);

j. Significant changes in the use of suppliers/outsourcing;

k. Significant increases in the use of international suppliers;

3-11. Periodic Review of Risk Assessment Tools. › b. AIR-800 will coordinate the implementation of any changes to the…

l. Movements or shifts of production locations or volumes; or

m. Expiration of a labor contract or potential labor unrest.

Note: When the audit schedules, as established in the certificate management plan, are impacted by a change in the assigned risk level, the PI should adjust the certificate management plan accordingly.

3-10. Facility Selection. The third pillar of the PAH’s overall risk assessment is the CM section’s determination of which of the PAH’s manufacturing facilities should be audited. The facility selection determination is a risk-based decision that determines how the required number of FAA audits will be distributed among the PAH’s manufacturing facilities. To aid in this decision, a facility selection process has been developed that prioritizes a PAH’s manufacturing facilities based on risk. Refer to paragraph 3-15 of this order. The third pillar also includes low-risk UAs, as identified within their TCDS. These UAs are considered low-risk, level 3 PAHs. CM sections will not select a point of manufacturing audit at the UA’s supplier location. All certificate management of low-risk UAs will be conducted at the PAH’s location and/or flight test area.

3-11. Periodic Review of Risk Assessment Tools.

a. AIR-800 will review and analyze the risk assessment tools periodically to determine if changes are needed. This review is necessary to continually improve the risk assessment process and to keep up with changes in the industry.

b. AIR-800 will coordinate the implementation of any changes to the risk assessment tools, including development and dissemination of revised program guidance, updated ACAIS programming, and associated training materials.

3-12. Minimum Audit Requirements.

Part 2. Audit Requirements and Certificate Management Plan

3-12. Minimum Audit Requirements. The output of the PAH’s risk assessment, specifically the risk level determination and the organizational RBRT designation, is used to define the CM section’s certificate management audit requirements. Table 3-1 provides the minimum of audits and corresponding frequencies associated with the ongoing certificate management of PAHs.

Table 3-1. Ongoing Certificate Management Audit Minimum Requirements

Level 3 Level 3 Level 2 Level 2 Level 2 Level 1 Level 1 Level 1 Low Medium Low Medium High Low Medium High

1+ PI Audit within every 5 FY

1+ PI Audit within every 4 FY

1+ POM Audits within every 3 FY

3+ POM Audits within every 2 FY

4+ POM Audits within every FY

6+ POM Audits within every FY

12+ POM Audits within every FY

18+ POM Audits within every FY

1 QSA NTE 48 months

1 QSA NTE 36 months

1 QSA NTE 24 months

1 QSA NTE 36 months

1 QSA NTE 24 months

1 QSA NTE 24 months

Note 1: All audits in the table above are only “minimum” audit requirements. The plus

symbol (+) indicates that management of the CM section may determine additional audits are required based on risk.

Note 2: Product Audits must be conducted during all audits.

10/27/2023 8120.23A CHG-1

3-13. Certificate Management Plan. A certificate management plan assists the CM section in planning and tracking audits and the performance of PAHs and its applicable suppliers.

3-13. Certificate Management Plan. › c. The scheduling function in ACAIS is intended to provide a starting…

a. After risk assessments have been completed, the CM section will develop a certificate management plan annually for those PAHs that have oversight activities planned for upcoming fiscal year. The CM section will adjust the certificate management plan when changes occur that affect any of the three pillars of risk.

b. As a minimum, the certificate management plan should include the following:

(1) The name of the PAH or applicable supplier subjected to an audit.

(2) Prioritization of the locations to be audited based on risk assessment results. For the number of audits to be conducted at the PAH or supplier locations, refer to table 3-1 of this order. The objective is to conduct oversight at the manufacturing facilities with the greatest risk. Additional audits at a manufacturing facility may be warranted when the FAA’s confidence in the PAH’s quality system has diminished.

(3) Schedules for the audits to be conducted by the CM section. For audits at suppliers, include the names and locations of the suppliers.

(4) A list of hand-offs or CAA requests sent, including, as a minimum, the name of the assigned office that has accepted the hand-off or the CAA that has accepted the oversight request from the CM section. Also include the type of audit requested, the name of the manufacturing facility receiving the audit, and the name of the responsible PAH. Refer to paragraph 3-16 of this order for more information about hand-off procedures.

Note: Hand-off activity duration can be for any given period of time from a oneday event to multiple days/trip in a given fiscal year. Example: The hand-off CM section can request the CAA or other assigned office to perform the audit once a year or once a quarter per year or multiple years until cancelled.

(5) A list of hand-offs or CAA requests received, including, as a minimum, the name of the CM section or CAA that has requested the hand-off, the type of audit or oversight requested, and the name of the applicable manufacturing facility.

c. The scheduling function in ACAIS is intended to provide a starting point in the development of the certificate management plan. Should an inconsistency develop between the ACAIS-generated number, frequencies, or scheduled dates of certificate management activities and the requirements in table 3-1 of this order, table 3-1 will take precedence. Manufacturing locations to be audited should be prioritized based on the risk assessment results. If the number of audits exceeds the certificate management chart minimums, additional certificate management tasks should be considered at the discretion of the CM section. For manufacturing locations not audited in one fiscal year, an audit should be planned for the next fiscal year based on the risk assessment results remaining the same.

3-15. Selection of a PAH and Its Facilities for Audits. › e. Have major inspections been delegated to this facility? (e.g.,…

10/27/2023 8120.23A CHG-1

Section 3. Product-Based System Audit Activities

Part 1. General

3-14. Audit Basics. An audit (PI audit, SCA, or QSA) is a systematic, independent, and focused data-driven, product-based examination of an established PAH’s manufacturing system based on the quality system elements as defined in §21.137 (refer to appendix D to this order). Its purpose is for the CM section to validate that the PAH is effectively complying with regulations and to determine conformity to FAA-approved type design and applicable quality system requirements. An audit is conducted at the location of the PAH or its supplier. The audit should be conducted at the point of manufacturing, on areas with the highest risk.

Note: Although a PI audit, SCA, and QSA are product-based system audits, a product audit must still be conducted during all audits and whenever determined to be necessary by the CM section.

3-15. Selection of a PAH and Its Facilities for Audits. Subsequent to determining the results of a PAH’s risk assessment (i.e., the number and frequency of certificate management audits), the CM section must select the point of manufacturing locations where the required certificate management audits will be conducted. The PI may begin the selection process by determining a PAH/supplier ratio that reflects where the PAH’s manufacturing occurs. For example, a PAH that utilizes suppliers to perform most of its manufacturing, may have a ratio of 20% PAH facilities versus 80% suppliers. In this case, 20% of the required minimum number of audits would be conducted at the PAH’s facilities, and 80% would be conducted at the PAH’s suppliers. The selection of which specific facilities to audit should be based on a prioritization of the risk of the manufacturing activities performed at each facility. When a PAH has multiple facilities listed on the production approval and/or numerous suppliers producing critical articles, the CM section will prioritize their audit locations by validating the following criteria:

a. Will the facility produce any aircraft, aircraft engine, propeller, or article thereof in the next twelve months?

b. Does the facility perform any final testing for an aircraft, aircraft engine, propeller, or critical article?

c. Is the facility solely an assembler/ integrator?

d. Are special processes being performed on a critical article (e.g., heat treat, welding, composite, friction stir welding, chemical etching, etc.)?

e. Have major inspections been delegated to this facility? (e.g., receiving inspection, supplier control, testing, in-process inspection, nondestructive inspection (NDI), final inspection, dock to stock, MRB, etc.)?

3-16. Hand-off Procedures. › a. The requesting CM section will submit in ACAIS a memorandum to the…

8120.23A CHG-2

f. Has the facility been added to the production approval or the supplier listing within the last 12 months?

g. Has the facility been relocated to a new address within the last 12 months?

h. Does evidence indicate that no on-site evaluations have been performed at this facility in the last 12 months?

i. Have any FAA-documented non-compliances at the facility resulted in compliance and enforcement action within the last 2 years?

j. Has the facility had any quality escapes events within the last 24 months?

k. Is the facility located in a non-bilateral country or a bilateral country where the foreign CAA cannot support the FAA?

l. Is there new or novel manufacturing being implemented at the facility?

m. How many quality systems elements are applicable to the facility? (Refer to Appendix D to this order)?

n. Other criteria as applicable.

Note 1: The CM section may use a facility selection process other than the process described in paragraph 3-15, provided the alternate process is equivalent to or better than the facility selection process described in paragraph 3-15. Prior to its use, the CM section will submit its alternative facility-selection process to the CM branch for review and acceptance.

Note 2: The CM section will not select a PAH for an SCA unless there is a special reason or if the supplied articles are not a part of the PAH’s production approval. In cases where the supplied articles are listed on the PAH’s production approval, the CM section will conduct the audit as described in either paragraph 4-16 or paragraph 4-17 of this order.

3-16. Hand-off Procedures. The following hand-off procedures are applicable to PI audits, SCAs, and product audits:

a. The requesting CM section will submit in ACAIS a memorandum to the assigned office no later than May 1 of each year. If a notice of no more than 7 days is required as described in paragraph 3-53(a), the requesting CM section will submit a memorandum in ACAIS and notify the assigned office to provide reduced notice to the PAH. The memorandum will indicate the type of audit that should be conducted and will include all pertinent information regarding the audit including—

(1) The name and address, including county, if applicable, of the PAH or supplier, the actual address where the audit will occur, as well as the PAH’s project number;

3-17. Recording Noncompliances.

8120.23A CHG-2

(2) The name, title, and telephone number of the accountable manager at the PAH’s facility or the person to contact at the supplier who can furnish purchase orders, quality system data, technical data, and other pertinent information;

(3) In the case of an SCA:

(a) A copy of the PAH’s or supplier’s quality system procedures that are required to be implemented at the particular supplier’s facility, unless these documents are available to the FAA at the supplier’s facility;

(b) Any delegation of MRB and/or technical data change control authority;

(c) Any authority permitting direct shipment;

(4) Any other information regarding specific PAH or supplier activities that should be audited, such as a new process or new technology;

(5) Information pertinent to a product or article to be audited, such as part number and description, next level of assembly, or service difficulty or warranty return history; and

(6) The duration of the audit (for example, whether the audit is a single event or will be ongoing for the given fiscal year).

b. When an assigned office receives a request to conduct an audit, it will—

(1) Acknowledge the receipt of the request in ACAIS.

(2) Add the audit to its certificate management plan, if applicable.

(3) In the case of an SCA, notify the responsible PAH in accordance with paragraph 3-53 of this order.

c. At the completion of the audit, the assigned office will submit in ACAIS a memorandum to the requesting CM section. This memorandum should summarize the results of the audit and include all applicable FAA Form(s) 8100-6, 8100-1, and 8120-14. All applicable objective evidence will be mailed to the requesting CM section. The requesting CM section will consider its hand-off request complete upon receipt of this memorandum and any objective evidence.

3-17. Recording Noncompliances. The PI will record all noncompliances, including those reported by a civil aviation authority (CAA) while performing certificate management activities for the FAA, on FAA Form 8100-6, in accordance with the guidelines listed in appendix C to this order. The FAA will notify a PAH of all noncompliances, including at its supplier(s). The FAA will notify a PAH of noncompliances found at its supplier. For all other circumstances, the FAA will not reveal noncompliances to a manufacturer other than the particular manufacturer involved unless a formal request has been processed in accordance with the Freedom of Information Act (refer to FAA Order 1270.1, Freedom of Information Act Program).

3-21. Criteria for Candidate Selection.

Part 2. Quality System Audit

Subpart 1. Overview

3-18. What is a QSA? A QSA is a comprehensive system audit program employing a product-based system audit approach. It is a vital element within the FAA’s mission of continued operational safety. The QSA—

a. Ascertains whether PAHs meet the applicable requirements o f 14 CFR and comply with procedures established to meet those requirements.

b. Populates a database for analyzing audit results and reporting trends.

c. Provides continuous improvement for the FAA by continually monitoring stakeholder feedback and considering proposed improvements by FAA internal and external customers.

d. Evaluates the continued integrity of the design data at PAHs after initial FAA approval. However, the QSA does not reevaluate the approval of previously approved data such as quality manuals or design data.

Subpart 2. QSA Auditor Appointment and Training

3-19. General. The appointing officials designated in paragraph 3-20 of this order will select QSA auditor candidates who have attained a specified level of experience or a combination of experience and education, as engineers, flight test pilots, or aviation safety inspectors (ASI), and who have demonstrated technical knowledge and skills. A candidate will receive QSA training and serve as an auditor-in-training during QSAs under the direct supervision of an appointed QSA team leader before appointment as a QSA team member. Before appointment, a candidate for auditor team leader will have participated in QSAs as an appointed team member and will perform as a team leader-in-training under the direct supervision of an appointed QSA team leader.

3-20. Appointing Officials. The following division managers are authorized to select QSA auditor candidates and to appoint qualified candidates as QSA team members or team leaders within their respective organizations:

a. Assigned certification branch managers;

b. CM branch and CM section managers; and

c. Division managers.

3-21. Criteria for Candidate Selection. The appointing official will select engineering, flight te st or ASI candidates on the basis of the following criteria (refer to figure 3-3 of this order):

03/06/2017 8120.23A

a. Candidates have attained at least one of the following specified levels of experience or a combination of experience and education in their specific disciplines:

3-21. Criteria for Candidate Selection. › b. Candidates have demonstrated—

(1) At least 8 years of technical experience in aerospace manufacturing or design, or in the audit thereof;

(2) A technical or trade school certificate with 6 years of technical experience in aerospace manufacturing or design, or in the audit thereof;

(3) An associate’s degree in engineering or science disciplines, with 5 years of technical experience in aerospace manufacturing or design, or in the audit thereof; or

(4) A bachelor’s degree or higher in engineering or science disciplines, with 3 years of technical experience in aerospace manufacturing or design, or in the audit thereof.

b. Candidates have demonstrated—

(1) Technical knowledge in aerospace manufacturing or design and understanding of FAA goals and objectives, and

(2) Effective oral, written, communication, and interpersonal skills.

03/06/2017 8120.23A

Figure 3-3. Criteria for Candidate Selection and Team Member Appointment

Bachelor’s degree

in Engineering or

Science + 3 years tech experience in

aerospace mfg.

or design, or evaluation?

8 years technical experience in

aerospace manufacturing

or design, or evaluation?

Tech or trade school certificate

+ 6 years tech

experience in aerospace mfg.

or design, or evaluation?

Assoc. degree in

Engineering or Science + 5 years tech experience in

aerospace mfg.

or design, or evaluation?

Satisfactory completion of QSA training

course?

Participation in

at least two QSA audits as an auditor-in-

training?

CANDIDATE ELIGIBLE FOR APPOINTMENT AS

QSA TEAM MEMBER

CANDIDATE NOT

ELIGIBLE FOR APPOINTMENT AS

QSA TEAM MEMBER

No No No

No

Yes Yes Yes Yes No

No

Yes

Yes

3-22. Criteria for Appointment. › a. Team Member.

3-22. Criteria for Appointment. Appointment is the formal process of certifying a QSA candidate as a QSA team member or team leader on the basis of successful completion of all requirements (refer to figures 3-3 and 3-4 of this order).

a. Team Member. Candidates must meet the following minimum requirements before appointment as a team member (refer to figure 3-3 of this order):

(1) Satisfactory completion of the QSA training course and associated written examination. The course will provide training in the policy established in this order, including the techniques for applying the standardized noncompliance codes contained in appendix D to this order and in coordinating team member involvement.

Note: The AIR Enterprise Business Operations Division (AIR-900) will ensure classes are scheduled in accordance with AIR priorities as identified in the annual call for training.

(2) Participation of the candidate, and demonstration of the knowledge and skills acquired during QSA team training, in at least two QSAs as an auditor-in-training.

Note: The candidate’s appointing official must schedule the candidate’s participation as an auditor-in-training to be completed in as short a timeframe as possible to maximize the candidate’s use and retention of acquired knowledge and experience.

(3) The team member candidate’s appointing official is responsible for performing the following in considering the qualifications of the candidate as a team member:

(a) Consider the candidate’s previous experience and education.

(b) Consider the product complexity, facility size, and complexity of quality system elements audited in QSAs in which the candidate participated. (Refer to appendix D to this order for information on quality system elements).

(c) Discuss with team leaders audits in which the candidate participated to determine the candidate’s QSA readiness.

(d) Review QSA reports for audits in which the candidate participated.

(e) Review, when necessary, stakeholder feedback for audits in which the candidate participated.

(f) Interview the candidate.

(g) Discuss with the candidate any weaknesses or deficiencies in their audit readiness identified during the participation phase. Both parties will work to reduce or eliminate these weaknesses or deficiencies through additional training, additional QSAs, Air Transportation Oversight System/Air Carrier Evaluation Program audits, or other similar activities that will increase the candidate’s audit readiness.

3-22. Criteria for Appointment. › b. Team Leader.

(4) On the basis of satisfactory results of the audit of the candidate as listed in paragraph 3-22a(3) of this order, the candidate’s appointing official will appoint the candidate as a team member and add the individual to ACAIS.

b. Team Leader. Candidates must meet the following minimum requirements before appointment as a team leader (refer to figure 3-4 of this order):

(1) Current appointment as a QSA team member.

(2) Ability to mentor and instruct team members.

(3) Participation in at least three audits as an appointed QSA team member. The candidate’s appointing official may request reduction of the requirement by providing documented justification to the appointing official’s manager. The responsibility for requesting any reduction of the requirement rests solely with the candidate’s appointing official.

(4) Participation as a team leader-in-training, and demonstration of knowledge and skills acquired during QSA team training in at least three QSAs under the direct supervision of an appointed QSA team leader. The candidate’s appointing official may request reduction of the requirement by providing documented justification to the appointing official’s supervisor. The responsibility for requesting any reduction of the requirement rests solely with the candidate’s appointing official.

Note: The candidate’s appointing official must schedule the candidate’s participation as a team leader-in-training to be completed in as short a timeframe as possible to maximize the candidate’s use and retention of acquired knowledge and experience.

(5) The candidate’s appointing official is responsible for performing the following activities in considering the qualifications of the candidate as a team leader:

(a) Consider the candidate’s previous experience and education.

(b) Consider the product complexity, facility size, and complexity of quality system elements audited in QSAs in which the candidate participated. (Refer to appendix D to this order for information on quality system elements).

(c) Discuss with team leaders the audits in which the candidate participated to determine the candidate’s team leadership abilities.

(d) Review QSA reports for audits in which the candidate participated.

(e) Review, when necessary, stakeholder feedback for audits in which the candidate participated.

(f) Interview the candidate.

03/06/2017 8120.23A

Figure 3-4. Criteria for Team Leader Appointment

Written justification

from appointing official for reduction

of requirement?

Appointment as QSA team member?

Participated in at least 3 audits as a

team member?

Participated in at

least 3 audits

as a team leader-in-training?

CANDIDATE ELIGIBLE FOR APPOINTMENT AS

QSA TEAM LEADER

Written justification

from appointing official for reduction

of requirement?

Manager approval?

Manager approval?

Yes Yes

Yes

No

No

Yes

No

No

No

No

Yes

Yes Yes

No

CANDIDATE NOT ELIGIBLE

FOR APPOINTMENT AS

QSA TEAM LEADER

(g) Discuss with the candidate any weaknesses or deficiencies in their team leadership abilities identified during the participation phase. Both parties will work to reduce or eliminate these weaknesses or deficiencies through additional training, additional QSAs, Air Transportation Oversight System/Air Carrier Evaluation Program audits, or other similar activities that will increase the candidate’s leadership abilities.

3-23. Review of Appointment. › b. QSA Team Leaders.

(6) On the basis of satisfactory results of the audit of the candidate as listed in paragraph 3-22b(5) of this order, the candidate’s appointing official will appoint the candidate as a t eam leader and update ACAIS.

c. The candidate’s appointing official will document and track the completion of the requirements in paragraphs 3-22a and 3-22b of this order for all QSA candidates. Upon successful completion of the requirements, the appointing official will appoint the candidate as a QSA team leader or team member and will formally notify the candidate of their appointment through issuance of a formal ACAIS-generated acknowledgement letter. The letter will include the individual’s discipline and office identification.

Note: Provide notification of appointment before the auditor’s first scheduled QSA as a team member or team leader.

3-23. Review of Appointment. The cognizant appointing official (1) reviews the participation in QSAs by each auditor under their appointment authority, (2) notifies auditors in writing of decisions not to continue their appointment, and (3) determines the currency and continued validity of appointments as follows:

a. QSA Team Members. Review QSA team members’ participation annually. Ensure team members have accomplished the following requirements, as a minimum:

(1) Participated at an interval of once or more every 2 fiscal years as a QSA team member or QSA team leader, or Q SA Principal Auditor or conducted a Preliminary Certificate Management (PCM) audit, PI audit, or SCA. For PCM audits, refer to FAA Order 8120.22, Production Approval Procedures.

(2) Demonstrated knowledge and skill in QSAs, as determined from sources such as the QSA report, team leaders, cognizant managers, and satisfactory corrective action for any shortcomings in knowledge or skills noted and discussed with the team member during the interim period.

b. QSA Team Leaders. Review QSA team leaders’ participation annually. Ensure team leaders have accomplished the following requirements, as a minimum:

(1) Participated at an interval of once or more every 2 fiscal years a QSA team leader or QSA Principal Auditor or conducted a PCM audit, PI audit, or SCA. For PCM audits, refer to FAA Order 8120.22.

(2) Demonstrated knowledge and skill in QSAs, as determined from sources such as the QSA report, cognizant managers, and satisfactory corrective action for any shortcomings in knowledge or skills noted and discussed with the team leader during the interim period.

3-27. Scheduling of QSAs. › a. Estimate the onsite duration of each QSA according to the following…

10/27/2023 8120.23A CHG-1

3-24. Reinstatement of Auditors Failing to Meet Appointment Review Criteria. Under their appointment authority, appointing officials may reinstate auditors who have not met the appointment review criteria listed in paragraph 3-22 of this order. Use the following criteria to determine eligibility for reinstatement:

a. Team members and leaders who have not met participation requirements may be reinstated after acceptable participation as an auditor-in-training or as a team leader-in-training, as applicable, in two QSAs.

b. Team members who have not demonstrated QSA knowledge or skills may be considered for reinstatement by repeating the formal QSA team member appointment program listed in paragraph 3-22a of this order.

c. Team leaders who have not demonstrated QSA knowledge or skills may be reinstated as a t eam member after acceptable participation as an auditor-in-training in two QSAs. Consideration for reinstatement as a team leader must then follow the formal QSA team leader appointment program listed in paragraph 3-22b of this order.

Subpart 3. Selection and Scheduling of QSAs

3-25. QSA Intervals. Audit intervals for PAHs are identified in table 3-1 of this order.

3-26. Selection of Facilities to be Audited. Procedures for selecting a PAH’s facilities to be audited are identified in 3-15 of this order.

3-27. Scheduling of QSAs. After all facilities have been selected for audit in accordance with Chapter 3 of this order, each division will be responsible for scheduling QSAs at the selected facilities. Use the following procedures:

a. Estimate the onsite duration of each QSA according to the following information. Consider the quality and/or engineering procedures and processes required to be in place; the number of applicable quality system elements, when known (refer to appendix D to this order); the size and physical layout of the facility to be audited (single or multiple locations); and product complexity. Allow enough time to ensure compliance to the applicable 14 CFR and FAA-approved data will be fully audited. Use the following list as a guide for estimating, in terms of facility size only, the onsite duration of the QSA (excluding travel times):

(1) Small facility with fewer than 100 total full-time persons: 1 to 5 working days onsite.

(2) Medium facility with 100 to fewer than 400 total full-time persons: 3 to 5 working days onsite.

(3) Large facility with 400 to fewer than 2,000 total full-time persons: 5 to 10 working days onsite.

(4) Very large facility with 2,000 or more total full-time persons: 7 to 15 working days onsite.

3-27. Scheduling of QSAs. › d. Prepare an audit schedule for the current fiscal year based on the…

Note: When estimating the onsite duration, include only those persons who are used to support the PAH activity.

b. Assign all scheduled audits a distinct QSA number, consisting of the fiscal year, division or CM branch office code, and the audit order sequence.

Note: Do not reassign QSA numbers from canceled audits. Each scheduled audit must be uniquely identified.

c. Identify the lead audit office for each audit. That office is usually the one that performs certificate management responsibility at the facility to be audited. For an associate facility subject to certificate management under the hand-off procedure, the lead audit office is the CM section receiving the hand-off. The lead audit office is responsible for—

(1) Coordinating the notification letter (refer to paragraph 3-29 of this order), and

(2) Notifying the selected team leader and team members (refer to paragraph 3-31 of this order).

d. Prepare an audit schedule for the current fiscal year based on the facility selection criteria in paragraph 3-15 of this order and the duration of each audit.

(1) Prepare the schedule using the following guidelines:

(a) QSA number.

(b) Scheduled start date of each audit.

(c) Duration of each audit.

(d) Facilities and types of approvals to be audited.

(e) Assigned risk level.

(f) Product lines or authorized functions at the facilities to be audited.

(g) Number and disciplines of auditors assigned to each audit.

(h) Additional auditors required beyond the division’s resources.

(i) Number and disciplines of auditors-in-training and team leaders-in-training.

(j) Total number of audits scheduled for the fiscal year.

(k) Applicable project numbers

3-28. Selection of QSA Auditors. › a. Number of Auditors Required.

(2) All division QSA schedules will be entered into ACAIS.

(3) The certification branch and CM section should schedule approval holders with multiple approvals, such as a PC and a PMA, so as to evaluate all approvals during one audit.

(4) When an approval holder has multiple facilities that require significant resources and time to audit, the certification branch and CM section should consider scheduling the facilities individually.

e. Designate an assigned engineer (AE). On the basis of the data collected for paragraphs 3-25 through 3-27d of this order, the CM section will coordinate with the certification branch to determine the need to assign an FAA engineer responsibility relating to a scheduled QSA at a particular design approval facility. The AE must answer questions from the auditors regarding the FAA-approved design or the design approval system in place. The AE also must coordinate any corrective action required regarding the FAA-approved design or the design approval system.

3-28. Selection of QSA Auditors. The assigned certification branch and CM section select appointed QSA auditors to perform each scheduled audit. To broaden expertise, whenever possible, managers are encouraged to permit auditors to participate in QSAs scheduled within the jurisdiction of other divisions. Determine the number and types of auditors required for each audit according to the following criteria:

a. Number of Auditors Required. Determine the total number of auditors required to ensure compliance to the applicable 14 CFR and FAA-approved data.

(1) Estimate the number of auditors required according to the following minimum c riteria:

(a) PAH’s assigned risk level;

(b) Number and complexity of applicable quality, engineering, flight test, and facility procedures and processes in place;

(c) Number of applicable quality system elements, when known (refer to appendix D to this order);

(d) Number of PAH suppliers expected to receive an onsite visit as part of the PAH QSA supplier control system element, when known;

(e) Size and physical layout of the facility to be audited (single or multiple locations); and

(f) Product or design approval system complexity.

10/27/2023 8120.23A CHG-1

(2) Use the following as a guide for estimating the number of QSA auditors required. Increase or decrease the number of estimated auditors shown below depending on your review of the criteria contained in paragraph 3-28a(1) of this order and your confidence that compliance to the applicable 14 CFR and FAA-approved data will be fully audited:

3-28. Selection of QSA Auditors. › b. Types of Auditors Required.

(a) Small facility with fewer than 100 full-time persons: 1 to 3 auditors (including team leader).

(b) Medium facility with 100 to fewer than 400 total full-time persons: 1 to 5 auditors (including team leader).

(c) Large facility with 400 to fewer than 2,000 total full-time persons: team leader plus 5 to 10 auditors.

(d) Very large facility with 2,000 or more total full-time persons: team leader plus up to 10 auditors.

Note 1: When estimating the number of auditors required, include only those full-time persons who are used to support the PAH facility activity.

Note 2: When necessary, the appropriate certification branch and CM section will assign additional auditors as needed.

(3) If it is determined that one auditor is required, select an appointed team leader to perform the audit; this auditor is referred to as the principal auditor. If two or more auditors are selected for an audit, they will constitute a QSA team. Select an appointed team leader and the required number of appointed team members.

b. Types of Auditors Required. Use the criteria identified in paragraph 3-28a(1) of this order and the following criteria to determine the types of auditors required. Select appointed QSA auditors who have appropriate knowledge of the noncompliance codes identified in appendix D to this order applicable to the facility to be audited and, as appropriate, to the products authorized by the approval (for example, select a propulsion engineer when an engine manufacturer is to be audited, and select a flight test pilot when a flight test program is to be audited). When making this determination, consider the following:

(1) It is not necessary to select both engineers and inspectors for a small facility that does not have both engineering and manufacturing capabilities.

(2) Select appointed QSA auditors, as appropriate, to maintain continued appointment in accordance with paragraph 3-23 of this order.

(3) Do not include any appointed auditors who were previously employed by the facility to be audited within 2 years of the scheduled audit.

(4) Determine whether auditors will be made available throughout the duration of the audit. Each auditor is expected to fully participate in each audit. Base any decision to limit

participation on the established AIR priorities. Notify the team leader of any limited participation by auditors.

3-28. Selection of QSA Auditors. › f. Scheduled Changes.

c. Selection of PI and AE as Team Leaders or Auditors. To the greatest extent practicable, the PI and the AE will not be selected as team leaders on QSAs of facilities for which they have certificate management or oversight responsibilities. Use the guidelines in table 3-2 to select the PI and/or AE as auditors:

Table 3-2. Selecting a PI or AE as an Auditor

Number of Persons Performing the Audit PAH Facility Procedure

One to four persons Do not select the responsible certificate management PI as a team member. The AE may be selected as a team member. Five persons or greater The certificate management PI or the AE, or both, may be selected as team members

d. Selection of Auditors-in-Training and Team Leaders-in-Training.

(1) Determine the number of appointed auditors required for the QSA before assigning auditors-in-training. Assign auditors-in-training only to audits for which a team is required. Do not assign auditors-in-training to a principal auditor. Auditors-in-training will supplement appointed auditors. Do not substitute auditors-in-training for appointed QSA auditors, or audit team leaders-in-training for appointed QSA team leaders.

(2) Do not assign more than two auditors-in-training or more than one team leader-in-training to any one audit. Try to assign each auditor-in-training or team leader-in-training to different team leaders during the participation phase of the training.

(3) In cases where auditors-in-training or team leaders-in-training from other divisions are proposed to be used in an audit, coordinate with the appointing managers to establish their eligibility.

e. Additional Resource Requirements. Additional auditors beyond the division’s available resources may be required depending on the size of the facility; type and complexity of product, service, or design approval system; and overall audit objectives. Each division should identify the need for these additional resources before the release of the QSA master schedule for the next fiscal year and coordinate the auditors’ participation with the appropriate division office and ACAIS coordinators. Additional support may also be available from AIR-600, if requested.

f. Scheduled Changes. Each division must update schedule changes electronically in the ACAIS program at least quarterly. Audits added to the master schedule will be assigned a new QSA number in accordance with paragraph 3-27b of this order.

3-30. Modifications to Scheduled Audits. › d. Reduction in the effectiveness of the audit.

3-29. Notification of Facilities To Be Audited. The lead audit office identified in accordance with paragraph 3-27c of this order will notify facilities using the sample formats in appendix B to this order. Coordinate with the responsible PI to ensure the letter does not arrive during scheduled shutdown periods or during any other extended periods when the letter may not be acted upon. For notifications of first-time QSAs, inform the facility that QSA reference material is available on the FAA’s website. If the facility cannot access the website, provide the reference material to the facility. Notify facilities as follows:

a. PAH. The lead audit office will perform these tasks:

(1) Prepare the notification letter and send it to the facility to be audited no more than 30 calendar days before the audit.

(2) Provide a copy of the notification letter to the designated audit team leader or principal auditors, the PI, and the AE.

b. Changes After Notification Letter Is Sent. As appropriate, notify the facility, responsible PAH, requesting CM section, AIR-600, and team leader or principal auditor of any changes to the audit schedule or team composition after the notification letter has been sent.

3-30. Modifications to Scheduled Audits. Every effort will be made to maintain established audit schedules. However, modifications to the audit schedule should be considered under special circumstances. The assigned certification branch and CM section will jointly reschedule any affected audit in coordination with the PI, AE, and team leader or principal auditor, and update the schedule in the ACAIS program. Special circumstances that may warrant modifications to the audit schedule include—

a. Risk to auditors’ safety,

b. Change in a facility’s production or delegation status from active to inactive,

c. Involvement of the FAA in a labor-management dispute at a facility, and

d. Reduction in the effectiveness of the audit.

3-33. Audit Team Leader or Principal Auditor. › a. Upon receipt of a copy of the notification letter, contact the lead…

10/27/2023 8120.23A CHG-1

Subpart 4. QSA Procedures

Subpart 4-1. QSA Preparation

3-31. Lead Audit Office. Perform, as a minimum, the following QSA preparations:

a. Notify, through ACAIS, the selected audit team leader and team members, or the principal auditor, at least 60 calendar days before each division QSA. A record of the notification does not need to be retained.

b. Ensure logistical support for an audit within the geographical area.

3-32. Assigned Certification Branch and Certificate Management Sections. At least 60 calendar days before each audit, notify through ACAIS all auditors within the division selected for AIR-600-led QSAs and QSAs in support of other divisions. A record of the notification does not need to be retained.

3-33. Audit Team Leader or Principal Auditor. Coordinate QSA preparation to enable the audit team to make the most of limited time in the facility. The team leader provides orientation and assigns quality system elements to team members. These actions, as appropriate, require coordination with the PI, the AE, and the facility to be audited. The team leader or principal auditor will perform the following, as appropriate:

a. Upon receipt of a copy of the notification letter, contact the lead audit office to identify the responsible PI and AE and obtain from the PI and AE items such as the following:

(1) Applicable FAA-approved procedures, including engineering and quality manuals, procedures manuals, and handbooks, when practical. Obtain documentation in electronic format, if available, to simplify copying and distribution to team members. If applicable data are not available electronically, work with the PI or AE to identify relevant documents and to obtain printed copies of only those pages necessary to support the QSA.

(2) Current facility data available in ACAIS.

(3) Known or suspected problem areas, including any areas the PI and AE would like special emphasis on during the QSA, such as requests to conduct a product audit. The team leader should also confer with the PI to identify and become familiar with the following quality system attributes as applicable:

(a) Critical processes (including special processes) and critical suppliers;

(b) Recent design changes;

(c) Significant changes in manufacturing personnel, procedures, or inspections;

(d) Rework and scrap data;

3-33. Audit Team Leader or Principal Auditor. › b. Prepare a written audit plan, using the form found in the ACAIS…

10/27/2023 8120.23A CHG-1

(e) Material Review Board (MRB) history;

(f) Quality escapes;

(g) Any additional relevant correspondence or data pertaining to issues discovered in the course of new product deliveries or acceptance;

(h) Service difficulties;

(i) Airworthiness Directives (AD); and

(j) Relevant issues identified in the MSAD database.

Note: The team leader should contact the appropriate facility representative before the audit to arrange to have any information referenced in (a) through (j) above or other relevant quality data, procedures, or records available for the team at the in-briefing as referenced in the facility notification letter and deemed necessary by the team leader.

(4) Recent self-disclosure items reported under FAA Order 2150.3, FAA Compliance and Enforcement Program.

(5) Agreements made between the assigned certification branch or CM section and the facility to be audited.

(6) Facility access information, including badges and security clearances.

(7) Lodging information.

(8) Any other items necessary to prepare for the audit.

b. Prepare a written audit plan, using the form found in the ACAIS program, for conducting the audit. The audit plan includes the following items:

(1) Name and address of the facility to be audited.

(2) Dates of the audit.

(3) Names of the team leader and members (when more than one auditor is selected).

(4) Audit objectives. List the reason for the QSA and what information is expected to be obtained during the audit. For example: “Establish facility compliance with the procedures established to meet the applicable requirements of 14 CFR or establish cause of repetitive Service Difficulty Reports (SDR).”

(5) Types of approval.

(6) Type certificate (TC) or supplemental type certificate (STC) number, as applicable.

3-34. Audit Team Member. › a. Upon notification by the team leader, confirm availability for the…

03/06/2017 8120.23A

(7) Current product line.

(8) Number of employees associated directly with the production approval activity.

(9) List of top-level FAA-approved procedures (for example, quality manual index of procedures, procedures manual, PMA approval letter, and TC data sheets).

(10) FAA/facility agreements in effect; for example, agreement on frequency of submittal of minor design changes.

(11) Plant layout.

(12) Organizational chart.

(13) Major processes.

(14) Unusual features of the product, manufacturing and inspection methods, or design approval system.

(15) Self-disclosure items under FAA Order 2150.3.

(16) Special emphasis items recommended by the PI and AE.

(17) Quality system element, to include product audit, assignments (when more than one auditor is selected).

(18) Access information, including facility point of contact.

(19) Lodging information.

(20) Equipment required (for example, notebook computer, safety shoes, and coveralls).

c. Coordinate assignments, requirements, and arrangements with team members as far in advance of the audit as possible, but no later than 30 calendar days before the audit. The audit plan may be amended as necessary. Notify team members immediately of changes in schedule, assignments, requirements, and arrangements. Provide copies of all relevant facility documents to team members, when feasible.

d. Notify the lead audit office immediately of changes in team numbers or composition.

e. Coordinate with the applicable PI or AE, or geographic PI, as necessary.

3-34. Audit Team Member. Perform these tasks:

a. Upon notification by the team leader, confirm availability for the QSA, quality system elements assigned, and travel arrangements.

Note: Notify the team leader immediately if you become unavailable for the QSA.

3-37. Pre-Audit Conference. › d. Review details of the audit agenda, including the nonconformance…

10/27/2023 8120.23A CHG-1

b. Before the audit, review all material provided by the team leader, PI, or AE appropriate to the assigned quality system elements. When possible, make a preliminary selection of the procedures you plan to audit.

Subpart 4-2. Conduct of the Audit

3-35. Team Leader or Principal Auditor Coordination With Facility Representative. The team leader or principal auditor will coordinate with the designated representative of the facility to be audited to ensure administrative arrangements for items such as team access, escorts, meeting rooms, and safety and security requirements are complete. The team leader should take this opportunity to review the special emphasis areas described in paragraph 3-33a(3) with the facility representative and arrange with the representative to have applicable information available to the FAA at the pre-audit team meeting.

3-36. Pre-Audit Team Meeting. The team leader and all team members meet before starting the audit, usually at the facility to be audited. They review the following audit elements, as appropriate, for proper coordination and understanding:

a. Current quality system or design approval system, and corrective action history of the facility to be audited in the selected areas;

b. Team functional assignments;

c. Audit plan;

d. Audit objectives;

e. Working relationship of the facility to be audited with the FAA;

f. Organizational structure of the facility to be audited;

g. Approved quality system documents, including quality manuals and/or quality data submitted by PAHs to describe their quality systems;

h. Approved design approval system documents, including any procedures manual or handbook; and

i. Agreements made between the certification branch or managing CM section and the facility to be audited.

3-37. Pre-Audit Conference. Soon after arrival at the facility to be audited, the audit team leader or principal auditor conducts a pre-audit conference with appropriate senior management, cognizant supervisory personnel, and other appropriate personnel of the facility who will be associated with the audit, including escorts. The team leader or principal auditor must perform the following tasks, as appropriate:

a. Introduce team members.

b. Give a brief overview of QSA, highlighting the cooperative intention of the audit.

c. Provide the audit’s scope and objectives.

d. Review details of the audit agenda, including the nonconformance codes and procedures to be used.

3-38. Audit of Quality System Elements. › d. Review PAH supplier records by selecting a random sample of PAH…

10/27/2023 8120.23A CHG-1

e. Review administrative arrangements for the post-audit conference.

f. Encourage senior management to send feedback and send it to the address on the form within 30 calendar days of the post-audit conference. Explain that this feedback is designed to obtain senior management assessment of the conduct of the QSA and is used by the FAA for continuous quality improvement of the certificate management program.

g. Allow time for a question-and-answer session.

3-38. Audit of Quality System Elements. The QSA team audits all of the applicable quality system elements and conducts at least one product audit at the PAH. Each quality system element addresses a specific activity or function that may affect the maintenance of FAA-approved design or quality data. Each quality system element is listed in appendix D to this order. The QSA team will perform the following tasks, as appropriate:

a. Review FAA-approved quality systems manuals or procedures manuals/handbooks to determine if current data ensure that regulatory requirements are met, if conforming products, articles, and parts are manufactured, and if design approval systems are maintained and controlled.

b. Review design system, design approval system, and quality system data to determine if current data are FAA-approved.

c. Review other facility procedures (related to the production approval facility) that are not part of the facility’s FAA-approved data to determine if the current procedures impact any of the quality system elements.

d. Review PAH supplier records by selecting a random sample of PAH supplier audit reports.

(1) The reports may consist of onsite audits, mail-in surveys, third-party audits, or a combination of all three. The reports must be reviewed for compliance with the PAHs’ quality system requirements. This may include, but is not limited to, the following conditions:

(a) Adherence to scheduled frequency of supplier control audits.

(b) Appropriate documentation of audits. This includes a signature by an appropriate authority, and attachment of required certifications and test documents.

10/27/2023 8120.23A CHG-1

(c) Determination of whether noncompliances provide evidence of root cause, corrective action, follow up, and closure.

3-38. Audit of Quality System Elements. › e. Audit Compliance to Facility Procedures and Quality Requirements.…

(d) If a history of similar noncompliances is evident, determination of whether the PAH is appropriately conducting root cause analysis and applying corrective action.

(2) FAA Form 8100-1, Conformity Inspection Record, will be used to record the following information. The completed record will be entered in ACAIS as part of the QSA report.

(a) Total number of audit reports reviewed.

(b) Identification of suppliers reviewed.

(c) Total number of noncompliances documented for all supplier reports reviewed.

(3) The component page of the QSA report titled Special Emphasis Items may be used to record any additional or supplemental information pertaining to the supplier audit record review that the auditor considers important. Include this information as a note under the heading, “Note to CM branch manager and Cognizant Principal Inspector”.

Note: The results will be used for two purposes: (1) to identify areas that may require more focused attention during audit of the supplier control system element and (2) as input into the following year’s risk assessment of the PAH.

(4) Any noncompliance noted during the review of PAH supplier audit reports will be recorded under the supplier control quality system element. Noncompliance will also be documented in accordance with paragraph 3-39 of this order.

Note: Paragraph 3-38d and appendix D, of this order apply only to PAH facilities that use suppliers in the process of manufacturing FAA-approved products. Review of supplier records should be started early in the audit process to allow for additional time in case issues are noted.

e. Audit Compliance to Facility Procedures and Quality Requirements. Prioritize audits according to any special concerns raised by the PI or AE. Use the quality system elements in appendix D to this order to determine the depth of the audit in the subject area. Perform, as necessary, a combination of document and product reviews to determine if the quality system element meets applicable requirements.

Note: Standardized Noncompliance Codes. Auditors should use the noncompliance codes in appendix D to document the results of the audit of each quality system element in a standardized manner. The non-compliance codes are designed to cross all the functional areas within a facility’s organization that have the greatest potential to impact the integrity of the FAA-approved design and product quality. All responses to the questions are direct inputs to the database from which trend analysis is accomplished. Each auditor should be knowledgeable of all the noncompliance codes applicable to the quality system element assigned to be audited and should strive to

3-40. Audit Meetings. › a. Daily Meeting.

03/06/2017 8120.23A

audit as many of the procedures, requirements, and products related to the condition as time allows.

f. Select at least one team member to conduct at least one product audit at a PAH of a manufactured product (for example, characteristic dimensioning, processing attributes, and physical examination) to determine compliance with current system procedures and quality requirements.

g. g. On the basis of facility procedures or quality requirements, identify, and document other quality system elements and statement-of-condition practices and principles not contained in appendix D to this order that were required to document what was audited. Write or type additional criteria and statement-of-condition practices and principles and include the appropriate reference to the facility procedures or quality requirements and the auditor’s recommendation of the quality system element to which the criteria and statement of condition apply. Team members must present new criteria and statement-of-condition practices and principles to the team leader as soon as they are completed.

h. h. Detect and report noncompliances and areas that may require additional audit by the PI or AE.

i. i. If an QSA discloses a noncompliance that may involve other PAHs, the team leader and PI must consider the gravity and potential systemic impact of the noncompliance, and accordingly identify those additional PAHs also affected. The PI will follow up to verify the affected PAHs and notify and apprise the appropriate PIs of the encountered concern.

3-39. Recording Noncompliances. Auditors will record all noncompliances on FAA Form 8100-6, or electronic equivalent, according to the guidelines in appendix C to this order.

Note: Record as a certification-related noncompliance any condition that questions the certification basis. Address the noncompliance on the QSA Executive Summary (refer to paragraphs 3-40b(2)(c) and 3-42b, and appendix E, to this order) and as a special emphasis item in the audit report (refer to paragraphs 3-40b(2)(d) and 3-41c, and appendix F to this order).

3-40. Audit Meetings.

a. Daily Meeting. The team leader or principal auditor holds the following daily meetings, as appropriate:

(1) Meeting With Audit Team Members. The team leader will review and discuss the following with team members:

(a) Status of the audit,

(b) Problems encountered,

(c) Plan of the next day’s audit, and

3-40. Audit Meetings. › b. Final Critique Meeting/Audit Wrap-Up.

10/27/2023 8120.23A CHG-1

(d) All FAA Form(s) 8100-6, or electronic equivalent, prepared during the day to ensure correctness, adequacy, and completeness.

(2) Meeting/Communication With PI and AE. The team leader or principal auditor ensures the certificate management PI and AE, and the geographic PI, as applicable, are informed of all discussions concerning the status of the audit. This meeting should occur daily when the PI and AE are part of the audit team. Otherwise, coordinate with the PI and AE to establish the method and frequency at which these discussions should occur.

(3) Meeting With the Audited Facility’s Designated Representative. The team leader or principal auditor holds a brief meeting daily with the audited facility’s designated representative to discuss the progress of the audit, including problems encountered, the status of actions requested by the team, schedule changes, and the coordination of further audit activities.

b. Final Critique Meeting/Audit Wrap-Up. At the conclusion of the audit, the team leader holds a final critique meeting. The principal auditor allows time to finalize the details of the audit. The team leader and members or the principal auditor do the following, as appropriate:

(1) Team Members or Principal Auditor.

(a) Complete all required FAA Form(s) 8100-6, or electronic equivalent. When using an electronic equivalent, print to paper when all information has been entered. Team members discuss FAA Form(s) 8100-6 with the team leader to determine if there are any possible violations of the applicable requirements of 14 CFR. The team leader must resolve any disagreement regarding noncompliances. The lead audit office, or requesting CM section, as applicable, must determine the level of corrective action required (refer to paragraph 3-45 of this order).

(b) Ensure all true copies of objective evidence are included to support the appropriate FAA Form(s) 8100-6, or electronic equivalent, appropriately referenced, and clearly identified in accordance with FAA Order 2150.3.

(2) Team Leader or Principal Auditor.

(a) Resolve team disagreements on specific noncompliances.

(b) Discuss all noncompliances with the certificate management PI or AE, delegated facility AE, and geographic PI, as applicable.

(c) Prepare the QSA Executive Summary (refer to appendix E to this order). Prepare original forms within ACAIS as follows:

1. PAH. Prepare one original summary.

2. Facility With Multiple Production Approvals. Prepare one original summary. For example, if a facility has a PMA and a TSO authorization, prepare one original summary

3-41. Post-Audit Conference. › a. Introduce FAA personnel not previously introduced at the pre-audit…

10/27/2023 8120.23A CHG-1

(d) Identify and record specific problems or concerns that the QSA team believes require further action and that should be brought to the attention of the assigned certification branch or CM section, the geographic PI, the AE, and the Flight Standards principal maintenance inspector (as appropriate). Use the instructions in appendix F to this order to record these special emphasis items. Prepare original documents or electronic equivalents as follows:

1. PAH. Prepare one original or electronic document.

2. Facility With Multiple Production Approvals. Prepare only one original or electronic document. For example, if a facility has a PMA and a TSO authorization, prepare one original document.

(e) Verify that signed original FAA Form(s) 8100-6 or electronic equivalents have been prepared for inclusion, as applicable, in each QSA report to be sent to the responsible CM section or assigned certification branch having delegation oversight (refer to paragraph 3-42d of this order). Each report to be sent must include all applicable FAA Form(s) 8100-6. When a signed original FAA Form 8100-6 is applicable to two or more reports, do the following:

1. Reproduce the signed original FAA Form(s) 8100-6 as required for inclusion in the applicable QSA reports to be sent to the responsible CM section with oversight.

2. Identify all true copies of the signed form in accordance with FAA Order 2150.3.

(f) Provide a copy of the completed final draft FAA Form(s) 8100-6 to the certificate management PI or AE, and the geographic PI, as applicable, when they are present.

(g) Verify that the required number of true copies of objective evidence has been prepared for inclusion, as applicable, in each QSA report to be sent to the responsible CM section having oversight responsibilities.

(h) Provide all true copies of objective evidence to the certificate management PI or AE, when present. When the PI or AE is not present, forward the copies in accordance with the applicable instructions in paragraph 3-44a of this order. If the objective evidence will be necessary as a reference during preparation of the audit report, make a separate copy and identify each page as “For Reference Only.”

(3) Certificate Management PI or AE, or Geographic PI (When Present). As appropriate, consider providing a copy of the completed final draft FAA Form(s) 8100-6 to the facility’s management. Clearly mark each copy as “DRAFT” before release.

3-41. Post-Audit Conference. The team leader or principal auditor must conduct a post-audit conference with appropriate senior management and cognizant supervisory personnel of the audited facility. The team leader or principal auditor must, as appropriate, do the following:

a. Introduce FAA personnel not previously introduced at the pre-audit conference.

3-41. Post-Audit Conference. › g. Adjourn the QSA.

b. Give a brief presentation of the overall results of the audit, using each completed QSA Executive Summary as a reference:

(1) Provide a completed and signed QSA Executive Summary to the audited facility’s designated representative.

(2) Summarize all noncompliances. Mention only noncompliances previously discussed with the certificate management PI and AE, the geographic PI, as applicable, and facility personnel.

c. Explain the purpose and use of ACAIS as it relates to QSA data.

d. Explain corrective action and follow-up procedures.

Note: Emphasize that the PI or AE may conduct additional investigations into noncompliances reported in the QSA report. The results of these investigations may be included with the letter requesting corrective action for the QSA noncompliances.

e. Remind senior management of and encourage them to send feedback within 30 calendar days of the post-audit conference.

f. Request final comments. Clarify any misunderstandings or disagreements before departure.

g. Adjourn the QSA.

3-43. Quality Review of the Report.

10/27/2023 8120.23A CHG-1

Subpart 4-3. Post-Audit Activities

3-42. Preparing the QSA Report. The team leader or principal auditor must prepare the QSA report. When a facility has one or more production approvals, prepare one audit report. Format and compile each audit report in the ACAIS program. The report will consist of the following:

a. FAA Form 8100-3, Quality System Audit Report, or printed copy of electronic equivalent (appendix G to this order). Each completed electronic form, or printed copy must be electronically or physically signed. Prepare an original electronic form or printed copy for each PAH affected.

b. QSA Executive Summary or printed copy of electronic equivalent (appendix E to this order). Each electronic copy of the summary must be electronically signed. The printed copy presented to the PAH representative must be physically signed. All other information on electronic copies must be identical to the signed copy as presented to the PAH. Prepare an original summary or printed copy for each PAH affected.

c. QSA Special Emphasis Items or printed copy of electronic equivalent (appendix F to this order). Prepare an electronic listing of special emphasis items or printed copy for each PAH affected.

d. FAA Form 8100-6 or printed copy of electronic equivalent (appendix C to this order). Each report must include all applicable FAA Form(s) 8100-6.

e. FAA Form 8100-1 or printed copy of electronic equivalent. Each report must include documentation of product audits (including onsite QSA supplier audits if applicable), and supplier audit record reviews as applicable.

f. FAA Form 8120-14, Production Approval/Certificate Management Activity Report, or printed copy of electronic equivalent. FAA Form 8120-14 is only used when onsite supplier audits take place.

Note 1: Ensure the QSA report identifies only noncompliances presented at the post-audit conference.

Note 2: Do not include reproductions of true copies of objective evidence in an original audit report. Objective evidence must be a true copy signed and dated in accordance with FAA Order 2150.3.

3-43. Quality Review of the Report. The QSA report contains the data that forms the basis of corrective action requests (refer to paragraph 3-45 of this order) and the QSA national database. To this end, the audit report must be accurate and complete. Division managers (or delegated individuals) must establish a review process within their divisions that ensures accuracy and completion of the QSA report before distribution.

3-45. Requesting Corrective Action.

3-44. Sending the QSA Report. Using ACAIS, the team leader or principal auditor and the responsible assigned certification branch and CM section managers (or delegated individuals) will process the QSA report as follows:

a. Team Leader or Principal Auditor.

(1) Make the audit report available to the responsible C M section manager or delegate within 15 working days of the post-audit conference. The manager or delegate must return the report to the team leader or principal auditor for correction and/or continued processing within 5 working days of receipt.

(2) Make the audit report available to the responsible CM branch manager within 5 working days of receipt of the CM section manager’s or delegate’s comments. Do not send copies of objective evidence to the CM branch manager. Send or deliver all true copies of any objective evidence to the attention of the certificate management PI.

(3) Make the audit report available to the assigned certification branch manager. The copy for the assigned certification branch manager may be tailored according to the needs of that manager. Include copies of any objective evidence that the assigned certification branch manager may require to investigate identified special emphasis items. These copies must be sent or delivered to the attention of the assigned certification branch manager.

(4) Make the audit report available to the immediate manager of any auditors-in-training assigned to the team.

b. CM Branch Manager.

(1) Make the audit report available to the certificate management PI within 3 working days of receipt of the report from the QSA team leader.

(2) Include any additional audit documents that the team leader provides.

c. Responsible Assigned Certification Branch Manager.

(1) Make the QSA report available to the AE within 3 working days of receipt of the report from the QSA team leader.

(2) Send or deliver all copies of any objective evidence to the attention of the AE, as applicable; send the true copies of the objective evidence under separate cover.

Note: Assigned certification branch investigations of special emphasis items identified during the conduct of a QSA should be coordinated with the responsible CM section.

3-45. Requesting Corrective Action. The PI must request corrective action in accordance with paragraph 4-14 of this order.

3-48. General PAH Supplier Control Responsibilities. › a. This responsibility is applicable regardless of:

10/27/2023 8120.23A CHG-1

Part 3. Supplier Control Audit

Subpart 1. Overview

3-46. What Is a Supplier Control Audit? A supplier control audit is a systematic and independent examination, employing a product-based system audit approach, to determine compliance of an established supplier system or inspected products, articles, or parts with the PAH’s requirements, technical data, or specifications. A supplier control audit is conducted to evaluate the PAH’s established system to control the articles, materials, supplies, and services provided by outside sources. This audit is conducted by the CM section assigned certificate management responsibility for the PAH. A supplier control audit is applicable to suppliers of a PAH as determined by the selection process identified in paragraph 3-15 of this order.

Continue reading ↓ 120 of 268 passages shown