Radar Vectors
FAA Order Current Issued Nov 23, 2026 AJV-P 465 pages Copy saved Nov 24, 2026

Order JO 7400.2S Procedures for Handling Airspace Matters

This order prescribes policy, criteria, guidelines, and procedures applicable to the System Operations Services; Mission Readiness Services; Aeronautical Information Services; Technical Operations Services; Technical Operations Spectrum Engineering Services Group/Spectrum Assignment and Engineering Team; Technical Operations Technical Services; the Office of Airport Planning and Programming, (APP); the Office of Airport Safety and Standards, (AAS); Airports District Office (ADO); and the Flight Standards Service. While this order provides procedures for handling airspace matters, additional procedures and criteria to supplement those contained herein may be set forth in other directives and should be consulted.

Official source ↗ Open PDF

FAA Order JO 7400.2S, Procedures for Handling Airspace Matters,…

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ORDER JO 7400.2S

Air Traffic Organization Policy Effective Date: December 24, 2026

SUBJ: Procedures for Handling Airspace Matters

This order specifies procedures for use by all personnel in the joint administration of the airspace program. The guidance and procedures herein incorporate into one publication as many orders, notices, and directives of the affected services as possible. Although every effort has been made to prescribe complete procedures for the management of the different airspace programs, it is impossible to cover every circumstance. Therefore, when a situation arises for which there is no specific procedure covered in this order, personnel must exercise their best judgment.

The order consists of six parts:

a. Part 1 addresses general procedures applicable to airspace management.

b. Part 2 addresses policy and procedures unique to Objects Affecting Navigable Airspace.

c. Part 3 addresses policy and procedures unique to Airport Airspace Analysis.

d. Part 4 addresses policy and procedures unique to Terminal and En Route Airspace.

e. Part 5 addresses policy and procedures unique to Special Use Airspace.

f. Part 6 addresses policy and procedures regarding the integration of Outdoor Laser Operations, High Intensity Light Operations, and integration of Rocket and Launch-Vehicle Operations into the National Airspace System.

Crystal L. Ball Director (A), Operational Policy, AJV-P Mission Readiness Services Air Traffic Organization (ATO)

Distribution: Electronic Initiated By: AJV-P Vice President, Mission Readiness Services

FAA Order JO 7400.2S, Procedures for Handling Airspace Matters,… › Explanation of Changes - Basic

Explanation of Changes

Basic

Direct questions through appropriate facility/service center office staff to the Office of Primary Responsibility (OPR).

a. 2–3–2. RESPONSIBILITY

2–3–3. DOCKETS 2–3–4. COMMENT PERIODS 2–3–6. SUBMISSION OF RULEMAKING AIRSPACE CASES TO HEADQUARTERS 2–3–7. EFFECTIVE DATE OF FINAL RULES 2–3–8. PUBLICATION IN FEDERAL REGISTER 2–4–3. CIRCULARIZATION 2–4–5. SUBMISSION OF NONRULEMAKING SUA CASES TO RULES AND REGULATIONS GROUP 2–4–6. EFFECTIVE DATE OF NONRULEMAKING ACTIONS 2–4–7. PUBLICATION ON NONRULEMAKING ACTIONS This change amends Chapter 2, Section 3, Processing Rulemaking Airspace Actions, and Section 4, Processing Nonrulemaking Airspace Actions, to include the requirement to submit the final National Environmental Policy Act of 1969 (NEPA) environmental review documents when submitting rulemaking and nonrulemaking action to Headquarters. Additionally, updates are made to remove outdated requirements, correct references to DOT Order 2100.6, and correct the organization code of the Air Traffic and Airspace Law Branch. b. 11–3–3. ONSITE EVALUATIONS

This change enables Flight Standards Service (AFS), Office of Safety Standards (OSS), Flight Procedures and Airspace Group (AFS-420), to become the primary reviewers for seaplane evaluations. AFS will determine when to conduct an onsite evaluation for seaplane bases and heliports using risk-based analysis. In addition, AFS will conduct a review when the Flight Standards District Office (FSDO) does not have the resources available. The FSDO will normally conduct the seaplane base and heliport onsite evaluation if deemed necessary by the risk-based analysis. c. Editorial Changes

Editorial change include updating any reference akin to the old terminology "NOTAM system," "Federal NOTAM System (FNS)," or "United States NOTAM System (USNS)" within this order to either “NOTAM Service” or “NOTAM Management Service (NMS).” d. Entire Publication

Additional editorial/format changes were made where necessary. Revision bars were not used because of the insignificant nature of these changes.

Explanation of Changes E of C-1

Table of Contents

Table of Contents

Part 1. General Procedures for Airspace Management

Chapter 1. General

Section 1. Introduction

Paragraph Page 1−1−1. PURPOSE OF THIS ORDER … 1−1−1 1−1−2. AUDIENCE … 1−1−1 1−1−3. WHERE TO FIND THIS ORDER … 1−1−1 1−1−4. WHAT THIS ORDER CANCELS … 1−1−1 1−1−5. CHANGE AUTHORITY … 1−1−1 1−1−6. EXPLANATION OF CHANGES … 1−1−2 1−1−7. SUBMISSION CUTOFF AND EFFECTIVE DATES … 1−1−2 1−1−8. DELIVERY DATES … 1−1−2 1−1−9. RECOMMENDATIONS FOR PROCEDURAL CHANGES … 1−1−2 1−1−10. REQUESTS FOR INTERPRETATIONS OR CLARIFICATIONS TO THIS ORDER … 1−1−3 1−1−11. DISTRIBUTION … 1−1−3 1−1−12. SAFETY MANAGEMENT SYSTEM … 1−1−3

Section 2. Authority and Order Use

1−2−1. POLICY … 1−2−1 1−2−2. AUTHORITY AND APPLICABILITY … 1−2−1 1−2−3. FUNCTIONAL RESPONSIBILITIES … 1−2−1 1−2−4. TITLE 14 CODE OF FEDERAL REGULATIONS (CFR) REFERENCES … 1−2−1 1−2−5. WORD MEANING … 1−2−2 1−2−6. ABBREVIATIONS … 1−2−2

Section 3. Airspace Planning and Analysis

1−3−1. BACKGROUND … 1−3−1 1−3−2. POLICY … 1−3−1 1−3−3. RESPONSIBILITIES … 1−3−1

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases

Section 1. Ex Parte Communications

2−1−1. DEFINITION … 2−1−1 2−1−2. SCOPE … 2−1−1 2−1−3. POLICY … 2−1−1 2−1−4. DISCLOSURE … 2−1−1 2−1−5. PERMITTED CONTACT … 2−1−2 2−1−6. RECORDING CONTACTS … 2−1−3 2−1−7. ADVICE FROM COUNSEL … 2−1−3 2−1−8. RELEASE OF RULEMAKING AND/OR NONRULEMAKING TEXTS … 2−1−3 2−1−9. ADDITIONAL REFERENCES … 2−1−3

Table of Contents i

Paragraph Page

Section 2. Executive Order 10854

2−2−1. SCOPE … 2−2−1 2−2−2. POLICY … 2−2−1

Section 3. Processing Rulemaking Airspace Actions

2−3−1. PURPOSE … 2−3−1 2−3−2. RESPONSIBILITY … 2−3−1 2−3−3. DOCKETS … 2−3−1 2−3−4. COMMENT PERIODS … 2−3−2 2−3−5. FLIGHT PROCEDURAL DATA … 2−3−2 2−3−6. SUBMISSION OF RULEMAKING AIRSPACE CASES TO HEADQUARTERS … 2−3−2 2−3−7. EFFECTIVE DATE OF FINAL RULES … 2−3−3 2−3−8. PUBLICATION IN FEDERAL REGISTER … 2−3−3

Section 4. Processing Nonrulemaking Airspace Actions

2−4−1. PURPOSE … 2−4−1 2−4−2. IDENTIFICATION … 2−4−1 2−4−3. CIRCULARIZATION … 2−4−1 2−4−4. CIRCULARIZATION DOCUMENTATION … 2−4−2 2−4−5. SUBMISSION OF NONRULEMAKING SUA CASES TO HEADQUARTERS … 2−4−2 2−4−6. EFFECTIVE DATE OF NONRULEMAKING ACTIONS … 2−4−2 2−4−7. PUBLICATION OF NONRULEMAKING ACTIONS … 2−4−3

Section 5. Informal Airspace Meeting

2−5−1. PURPOSE … 2−5−1 2−5−2. POLICY … 2−5−1 2−5−3. CLASS B AND C INFORMAL AIRSPACE MEETING NOTIFICATION PROCEDURES … 2−5−1 2−5−4. INFORMAL AIRSPACE MEETING NOTIFICATION PROCEDURES FOR AIRSPACE ACTIONS OTHER THAN CLASS B AND CLASS C … 2−5−2 2−5−5. LOCATION … 2−5−2 2−5−6. AGENDA ITEMS … 2−5−2 2−5−7. RECORD OF MEETINGS … 2−5−2

Chapter 3. Aeronautical Information

Section 1. General

3−1−1. POLICY … 3−1−1 3−1−2. RESPONSIBILITY … 3−1−1 3−1−3. TRUE/MAGNETIC DIRECTIONS … 3−1−1 3−1−4. NAVIGATIONAL AID COORDINATES … 3−1−1 3−1−5. DIRECTIONS … 3−1−1

Section 2. Charted Reporting Points

3−2−1. POLICY … 3−2−1 3−2−2. CHART SERIES SELECTION … 3−2−1 3−2−3. FAA FORM 8260-2, RADIO FIX AND HOLDING DATA RECORD … 3−2−1

ii Table of Contents

Paragraph Page 3−2−4. PREPARATION OF FORM 8260-2 … 3−2−1

Section 3. Naming of NAVAIDs, Aeronautical Facilities, and Fixes

3−3−1. GENERAL … 3−3−1 3−3−2. RESPONSIBILITY … 3−3−1 3−3−3. NAMING OF NAVAIDs … 3−3−1 3−3−4. NAMING OF WAYPOINTS, INTERSECTIONS, AND DME FIXES … 3−3−2

Chapter 4. NAVAIDs

Section 1. General

4−1−1. PURPOSE … 4−1−1 4−1−2. POLICY … 4−1−1 4−1−3. RESPONSIBILITY FOR FREQUENCY SELECTION … 4−1−1 4−1−4. GOVERNING CRITERIA … 4−1−1 4−1−5. LONG-RANGE PLANNING … 4−1−1 4−1−6. PROPOSED CHANGES … 4−1−1

Section 2. FAA NAVAIDs

4−2−1. POLICY … 4−2−1 4−2−2. COORDINATION … 4−2−1 4−2−3. INFORMAL AIRSPACE MEETINGS … 4−2−1 4−2−4. APPROVAL AUTHORITY … 4−2−1 4−2−5. DISTRIBUTION … 4−2−2 4−2−6. COMMISSIONING DATE … 4−2−2 4−2−7. PROCESSING REGULATORY ACTIONS … 4−2−2

Section 3. Military NAVAIDs

4−3−1. POLICY … 4−3−1 4−3−2. COORDINATION WITH MILITARY … 4−3−1 4−3−3. EVALUATION BY TECHNICAL OPERATIONS SERVICES OFFICE … 4−3−1 4−3−4. CIRCULARIZATION … 4−3−1 4−3−5. DETERMINATION RESPONSIBILITY … 4−3−1 4−3−6. NOTIFICATION AND DISTRIBUTION … 4−3−1

Section 4. Non-Federal NAVAIDs

4−4−1. POLICY … 4−4−1 4−4−2. REQUEST FOR ESTABLISHMENT … 4−4−1 4−4−3. RESPONSIBILITY … 4−4−1 4−4−4. EXTERNAL COORDINATION … 4−4−3 4−4−5. COMPLETION AND NOTIFICATION PROCESS … 4−4−3 4−4−6. AERONAUTICAL STUDY RETENTION AND ARCHIVING … 4−4−3

Section 5. Discontinuance of FAA NAVAIDs

4−5−1. POLICY … 4−5−1 4−5−2. RESPONSIBILITIES … 4−5−1 4−5−3. COORDINATION OF PROPOSALS … 4−5−1

Table of Contents iii

Paragraph Page 4−5−4. OBTAINING APPROVAL … 4−5−1 4−5−5. DISCONTINUANCE ACTION … 4−5−2 4−5−6. CANCELLATION OF CONTROLLED AIRSPACE AND INSTRUMENT PROCEDURES . . . . 4−5−2 4−5−7. DECOMMISSIONING DATE … 4−5−2 4−5−8. DISCONTINUANCE OF NAVAIDs INCLUDED IN ICAO PLANS … 4−5−2 4−5−9. INTERNATIONAL STAFF NOTIFICATION … 4−5−2

Section 6. Discontinuance of Military and Non-Federal NAVAIDs

4−6−1. POLICY … 4−6−1 4−6−2. RESPONSIBILITY … 4−6−1 4−6−3. ACTION PRIOR TO DISCONTINUANCE … 4−6−1 4−6−4. DISCONTINUANCE OF NAVAIDs INCLUDED IN ICAO PLANS … 4−6−1

Part 2. Objects Affecting Navigable Airspace

Chapter 5. Basic

Section 1. General

5−1−1. PURPOSE … 5−1−1 5−1−2. AUTHORITY … 5−1−1 5−1−3. POLICY … 5−1−1 5−1−4. SCOPE … 5−1−1 5−1−5. RESPONSIBILITY … 5−1−1 5−1−6. SENSITIVE CASES … 5−1−2 5−1−7. AUTOMATION … 5−1−2 5−1−8. OE/AAA AUTOMATED SYSTEM AIRPORT/RUNWAY DATABASE … 5−1−2 5−1−9. TRAINING … 5−1−2 5−1−10. RELEASE OF INFORMATION … 5−1−2

Section 2. Notices

5−2−1. REQUIREMENTS … 5−2−1 5−2−2. PROCESSING … 5−2−1 5−2−3. FAA FORMS … 5−2−1

Chapter 6. Aeronautical Studies

Section 1. General

6−1−1. POLICY … 6−1−1 6−1−2. AERONAUTICAL STUDY NUMBERS … 6−1−1 6−1−3. STUDY OF EXISTING STRUCTURES … 6−1−2 6−1−4. PROPOSALS UNDER CONSTRUCTION … 6−1−3 6−1−5. STRUCTURES EXCEEDING 2,000 FEET … 6−1−3 6−1−6. FEASIBILITY STUDIES … 6−1−3 6−1−7. TOWER OWNERSHIP … 6−1−3

iv Table of Contents

Paragraph Page

Section 2. Initial Processing/Verification

6−2−1. VERIFICATION/E-FILING … 6−2−1 6−2−2. VERIFICATION/PAPER-FILING … 6−2−1 6−2−3. DIVISION COORDINATION … 6−2−2 6−2−4. ADDITIONAL COORDINATION … 6−2−3

Section 3. Identifying/Evaluating Aeronautical Effect

6−3−1. POLICY … 6−3−1 6−3−2. SCOPE … 6−3−1 6−3−3. DETERMINING ADVERSE EFFECT … 6−3−1 6−3−4. DETERMINING SIGNIFICANT VOLUME OF ACTIVITY … 6−3−2 6−3−5. SUBSTANTIAL ADVERSE EFFECT … 6−3−2 6−3−6. RESPONSIBILITY … 6−3−2 6−3−7. AIRPORT SURFACES AND CLEARANCE AREAS … 6−3−12 6−3−8. EVALUATING EFFECT ON VFR OPERATIONS … 6−3−12 6−3−9. EVALUATING EFFECT ON IFR OPERATIONS … 6−3−20 6−3−10. EVALUATING EFFECT ON AIR NAVIGATION AND COMMUNICATION FACILITIES . . . . 6−3−23 6−3−11. EVALUATING PLANNED OR FUTURE AIRPORT DEVELOPMENT PROGRAMS … 6−3−26 6−3−12. EVALUATING TEMPORARY CONSTRUCTION … 6−3−26 6−3−13. CONSIDERING SHIELDING … 6−3−27 6−3−14. CONSIDERING SHADOW PLANE … 6−3−28 6−3−15. RECOMMENDING MARKING AND LIGHTING OF STRUCTURES … 6−3−28 6−3−16. NEGOTIATIONS … 6−3−30 6−3−17. CIRCULARIZATION … 6−3−30

Chapter 7. Determinations

Section 1. Issuing Determinations

7−1−1. POLICY … 7−1−1 7−1−2. RESPONSIBILITY … 7−1−1 7−1−3. DETERMINATIONS … 7−1−1 7−1−4. DETERMINATION CONTENT AND OPTIONS … 7−1−2 7−1−5. DETERMINATION DATES … 7−1−8 7−1−6. EXISTING STRUCTURES … 7−1−8 7−1−7. DISTRIBUTION OF DETERMINATIONS … 7−1−8

Section 2. Extension of Determinations

7−2−1. AUTHORITY … 7−2−1 7−2−2. CONDITIONS … 7−2−1 7−2−3. EXTENSION PERIOD … 7−2−1 7−2−4. REVIEW PROVISIONS FOR PETITION … 7−2−1 7−2−5. DISTRIBUTION … 7−2−1

Section 3. Revision, Correction, and Termination of Determination

7−3−1. REVISIONS AND TERMINATIONS BASED ON NEW FACTS … 7−3−1 7−3−2. CORRECTION … 7−3−1

Table of Contents v

Paragraph Page 7−3−3. STANDARD FORMAT … 7−3−1 7−3−4. DISTRIBUTION … 7−3−2

Chapter 8. Post Determination Action

Section 1. Action

8−1−1. FOLLOW-UP ACTION … 8−1−1 8−1−2. RECEIPT OF COMPLETED PSR … 8−1−1 8−1−3. RECEIPT OF COMPLETED FAA FORM 7460-2 … 8−1−1 8−1−4. PROCESSING PROJECT ABANDONED NOTIFICATION … 8−1−2 8−1−5. PROCESSING DISMANTLEMENT NOTIFICATION … 8−1−2

Chapter 9. Discretionary Review Process

Section 1. General

9−1−1. AUTHORITY … 9−1−1 9−1−2. OEG RESPONSIBILITY … 9−1−1 9−1−3. JURISDICTION … 9−1−1

Section 2. Petition Processing

9−2−1. ADMINISTRATIVE PROCESSING … 9−2−1 9−2−2. RECOMMENDATIONS … 9−2−1 9−2−3. DISTRIBUTION OF NOTICES TO GRANT DISCRETIONARY REVIEW … 9−2−2 9−2−4. OEG PARTICIPATION … 9−2−2 9−2−5. DISCRETIONARY REVIEW … 9−2−2 9−2−6. FINAL DECISION … 9−2−2 9−2−7. DISTRIBUTION OF DECISION … 9−2−2

Part 3. Airport Airspace Analysis

Chapter 10. Basic

Section 1. Policy

10−1−1. PURPOSE … 10−1−1 10−1−2. AUTHORITY … 10−1−1 10−1−3. AIRPORT PROGRAMS … 10−1−1 10−1−4. FUNDING RESPONSIBILITY … 10−1−2 10−1−5. RESPONSIBILITY … 10−1−2

Section 2. Airport Study

10−2−1. PURPOSE … 10−2−1 10−2−2. STUDY NUMBER ASSIGNMENT … 10−2−1 10−2−3. PROPOSALS SUBJECT TO AERONAUTICAL STUDY … 10−2−1

vi Table of Contents

Paragraph Page

Section 3. Airport Standards

10−3−1. DESIGN STANDARDS … 10−3−1 10−3−2. AIRPORT SPACING GUIDELINES AND TRAFFIC PATTERN AIRSPACE AREAS … 10−3−1 10−3−3. DESIGNATION OF INSTRUMENT RUNWAYS, CHANGES OF AIRPORT STATUS VFR TO IFR AND LOWERING MINIMUMS … 10−3−3 10−3−4. AIRSPACE FEASIBILITY STUDY … 10−3−4 10−3−5. ONSITE EVALUATION … 10−3−4 10−3−6. FORMULATION OF FAA DETERMINATION … 10−3−4

Section 4. Airport Charting and Publication of Airport Data

10−4−1. POLICY … 10−4−1 10−4−2. RESPONSIBILITY … 10−4−1 10−4−3. AIRPORT CHARTING … 10−4−1

Chapter 11. Evaluating Aeronautical Effect

Section 1. General

11−1−1. EXISTING AND PROPOSED OBJECTS … 11−1−1 11−1−2. AIRPORT TRAFFIC PATTERNS … 11−1−1 11−1−3. INSTRUMENT FLIGHT PROCEDURES … 11−1−1 11−1−4. AIR TRAFFIC CONTROL PROCEDURES … 11−1−1 11−1−5. SAFETY OF PERSONS AND PROPERTY ON THE GROUND … 11−1−2 11−1−6. NOISE CONSIDERATION … 11−1−2 11−1−7. AERONAUTICAL ACTIVITY … 11−1−2 11−1−8. WIND ROSE DATA … 11−1−2 11−1−9. HELICOPTER INGRESS-EGRESS ROUTES … 11−1−3 11−1−10. DISPLACED THRESHOLDS AND CHANGING THE RUNWAY END … 11−1−3 11−1−11. EXISTING AIRPORTS … 11−1−3

Section 2. Processing of Airport Proposals By Regional Airports Offices

11−2−1. PROPOSALS … 11−2−1 11−2−2. AIRPORT LAYOUT PLANS (ALP) … 11−2−2 11−2−3. NON-PART 157 PROPOSED CONSTRUCTION OR ALTERATION ON NON- OBLIGATED PUBLIC-USE AIRPORTS … 11−2−3 11−2−4. FAA COORDINATION … 11−2−3 11−2−5. NEGOTIATION WITH SPONSOR … 11−2−4 11−2−6. CIRCULARIZATION … 11−2−4 11−2−7. EVALUATE COMMENTS AND AERONAUTICAL EFFECT … 11−2−4 11−2−8. INFORMAL AIRSPACE MEETINGS … 11−2−5 11−2−9. ISSUE DETERMINATION … 11−2−5

Section 3. Processing of Airport Proposals By Regional Flight Standards Offices

11−3−1. EFFECT ON SAFETY OF FLIGHT … 11−3−1 11−3−2. EFFECT ON SAFETY OF PERSONS AND PROPERTY ON THE GROUND … 11−3−1 11−3−3. ONSITE EVALUATIONS … 11−3−1

Table of Contents vii

Paragraph Page

Section 4. Processing of Airport Proposals By Operations Support Group Flight Procedures Teams

11−4−1. EFFECT ON INSTRUMENT PROCEDURES … 11−4−1 11−4−2. EVALUATION OF PART 77 AERONAUTICAL STUDIES … 11−4−1 11−4−3. EVALUATION OF PART 157 AERONAUTICAL STUDIES … 11−4−1 11−4−4. EVALUATION OF CONSTRUCTION SAFETY AND PHASING PLANS … 11−4−2 11−4−5. EVALUATION OF AIRPORT LAYOUT PLANS (ALP) … 11−4−2

Section 5. Processing of Airport Proposals By Technical Operations Services Area Offices

11−5−1. ELECTROMAGNETIC OR LINE-OF-SIGHT INTERFERENCE … 11−5−1 11−5−2. EVALUATION OF INSTRUMENT RUNWAY DESIGNATION … 11−5−1 11−5−3. CHANGE IN AIRPORT STATUS FROM VFR TO IFR … 11−5−1 11−5−4. AIRPORT PROPOSALS … 11−5−1

Section 6. Processing of Airport Proposals By Service Area Offices

11−6−1. EFFECT ON AIR TRAFFIC CONTROL OPERATIONS … 11−6−1 11−6−2. COORDINATION … 11−6−1 11−6−3. AIRPORT TRAFFIC PATTERNS … 11−6−2 11−6−4. PART 77 REVIEW … 11−6−2 11−6−5. DESIGNATION OF INSTRUMENT RUNWAY/CHANGE IN AIRPORT STATUS VFR TO IFR … 11−6−2 11−6−6. ONSITE EVALUATION … 11−6−3

Chapter 12. Airport Determinations

Section 1. General

12−1−1. RESPONSIBILITY … 12−1−1 12−1−2. TERMINOLOGY … 12−1−1 12−1−3. CONDITIONAL DETERMINATIONS … 12−1−2 12−1−4. EXPIRATION DATES … 12−1−2 12−1−5. STATEMENT IN DETERMINATIONS … 12−1−3 12−1−6. AIRPORT MASTER RECORD … 12−1−3 12−1−7. ADVISE FEDERAL AGREEMENT AIRPORT SPONSORS … 12−1−3 12−1−8. DISSEMINATION OF STUDY RESULTS … 12−1−4 12−1−9. REVIEW OF SENSITIVE OR CONTROVERSIAL CASES AND PART 157 DETERMINATIONS … 12−1−4 12−1−10. DISPOSAL OF FEDERAL SURPLUS REAL PROPERTY FOR PUBLIC AIRPORT PURPOSES … 12−1−5

Chapter 13. Military, NASA, and Other Agency Airport Proposals

Section 1. General

13−1−1. PRIOR NOTICE TO FAA … 13−1−1 13−1−2. FORM OF NOTICE … 13−1−1 13−1−3. FAA HEADQUARTERS REVIEWS … 13−1−1

viii Table of Contents

Paragraph Page 13−1−4. REGIONAL/SERVICE AREA OFFICE REVIEW … 13−1−1 13−1−5. MILITARY PROPOSALS OTHER THAN MCP … 13−1−1

Part 4. Terminal and En Route Airspace

Chapter 14. Designation of Airspace Classes

Section 1. General

14−1−1. PURPOSE … 14−1−1 14−1−2. CONTROLLED AIRSPACE … 14−1−1 14−1−3. UNCONTROLLED AIRSPACE … 14−1−2 14−1−4. FRACTIONAL MILES … 14−1−2 14−1−5. AIRSPACE LEGAL DESCRIPTION … 14−1−3 14−1−6. EXAMPLES OF TERMINAL AIRSPACE LEGAL DESCRIPTIONS … 14−1−3

Section 2. Ad Hoc Committee Procedures for Class B and Class C Airspace Actions

14−2−1. BACKGROUND … 14−2−1 14−2−2. POLICY AND PURPOSE … 14−2−1 14−2−3. COMMITTEE FORMATION … 14−2−1 14−2−4. FAA PARTICIPATION … 14−2−1 14−2−5. COMMITTEE PROCESS … 14−2−2 14−2−6. FAA ACTION ON COMMITTEE RECOMMENDATIONS … 14−2−2

Chapter 15. Class B Airspace

Section 1. General

15−1−1. PURPOSE … 15−1−1 15−1−2. NONRULEMAKING ALTERNATIVES … 15−1−1 15−1−3. RESPONSIBILITIES … 15−1−1 15−1−4. SERVICE CENTER EVALUATION … 15−1−1

Section 2. Class B Airspace Planning

15−2−1. CRITERIA … 15−2−1 15−2−2. DESIGNATION … 15−2−1 15−2−3. CONFIGURATION … 15−2−1 15−2−4. IFR TRANSITION ROUTES … 15−2−3 15−2−5. VFR CONSIDERATIONS … 15−2−3 15−2−6. CHART ENHANCEMENTS … 15−2−3

Section 3. Class B Airspace Processing

15−3−1. OVERVIEW … 15−3−1 15−3−2. STAFF STUDY … 15−3−1 15−3−3. PRE-NPRM AIRSPACE USER COORDINATION … 15−3−3 15−3−4. NPRM PHASE … 15−3−3 15−3−5. POST-NPRM PROCESSING … 15−3−4 15−3−6. REVOKING CLASS B AIRSPACE … 15−3−4

Table of Contents ix

Paragraph Page

Chapter 16. Class C Airspace

Section 1. General

16−1−1. PURPOSE … 16−1−1 16−1−2. NONRULEMAKING ALTERNATIVES … 16−1−1 16−1−3. RESPONSIBILITIES … 16−1−1 16−1−4. SERVICE CENTER EVALUATION … 16−1−1

Section 2. Class C Airspace Planning

16−2−1. CRITERIA … 16−2−1 16−2−2. DESIGNATION … 16−2−1 16−2−3. CONFIGURATION … 16−2−1 16−2−4. TIME OF DESIGNATION … 16−2−2

Section 3. Class C Airspace Processing

16−3−1. STAFF STUDY … 16−3−1 16−3−2. PRE-NPRM AIRSPACE USER COORDINATION … 16−3−2 16−3−3. NPRM PHASE … 16−3−2 16−3−4. POST-NPRM PROCESSING … 16−3−3 16−3−5. PUBLICITY … 16−3−3 16−3−6. REVOKING CLASS C AIRSPACE … 16−3−3

Chapter 17. Class D Airspace

Section 1. General

17−1−1. PURPOSE … 17−1−1 17−1−2. REGIONAL/SERVICE AREA OFFICE EVALUATION … 17−1−1 17−1−3. DESIGNATION … 17−1−1 17−1−4. TIME OF DESIGNATION … 17−1−2 17−1−5. PART TIME SURFACE AREAS … 17−1−2

Section 2. Class D Airspace Standards

17−2−1. CONFIGURATION … 17−2−1 17−2−2. AIRPORT REFERENCE POINT/GEOGRAPHIC POSITION … 17−2−1 17−2−3. SATELLITE AIRPORTS … 17−2−1 17−2−4. ADJOINING CLASS D AIRSPACE AREAS … 17−2−1 17−2−5. DETERMINING CLASS D AREA SIZE … 17−2−1 17−2−6. DEPARTURES … 17−2−2 17−2−7. ARRIVAL EXTENSION … 17−2−2 17−2−8. VERTICAL LIMITS … 17−2−2 17−2−9. COMMUNICATIONS … 17−2−2 17−2−10. WEATHER OBSERVATIONS AND REPORTING … 17−2−2 17−2−11. LOSS OF COMMUNICATION OR WEATHER REPORTING CAPABILITY … 17−2−3

x Table of Contents

Paragraph Page

Chapter 18. Class E Airspace

Section 1. General

18−1−1. INTRODUCTION … 18−1−1 18−1−2. CLASS E SURFACE AREAS … 18−1−1 18−1−3. DESIGNATION … 18−1−1

Section 2. Transitional Airspace

18−2−1. PURPOSE … 18−2−1 18−2−2. 700/1,200-FOOT CLASS E AIRSPACE … 18−2−1 18−2−3. 700-FOOT CLASS E AIRSPACE … 18−2−1 18−2−4. 1,200-FOOT CLASS E AIRSPACE … 18−2−1 18−2−5. CLASS E AIRSPACE FLOORS ABOVE 1,200 FEET … 18−2−1 18−2−6. COORDINATION OF MISSED APPROACH ALTITUDES … 18−2−1

Section 3. Transitional Airspace Area Criteria

18−3−1. DEPARTURE AREA … 18−3−1 18−3−2. LENGTHY DEPARTURE CLASS E AIRSPACE EXTENSIONS … 18−3−1 18−3−3. ARRIVAL AREA … 18−3−1 18−3−4. ARRIVAL EXTENSION … 18−3−1 18−3−5. PROCEDURE TURN PROTECTION … 18−3−2 18−3−6. DETERMINING BASE ALTITUDES … 18−3−2

Chapter 19. Other Airspace Areas

Section 1. General

19−1−1. EN ROUTE DOMESTIC AIRSPACE AREAS … 19−1−1 19−1−2. OFFSHORE/CONTROL AIRSPACE AREAS … 19−1−1 19−1−3. DESIGNATION … 19−1−2 19−1−4. PROCESSING … 19−1−2

Chapter 20. Air Traffic Service Routes

Section 1. General

20−1−1. PURPOSE … 20−1−1 20−1−2. CONTROLLED AIRSPACE … 20−1−1 20−1−3. DESIGNATION OF ATS ROUTES … 20−1−1 20−1−4. RESPONSIBILITIES … 20−1−1 20−1−5. ROUTE IDENTIFICATION … 20−1−2 20−1−6. BASE ALTITUDES … 20−1−3 20−1−7. MINIMUM EN ROUTE ALTITUDES … 20−1−3 20−1−8. PROCEDURAL REQUIREMENTS … 20−1−3 20−1−9. ACTION TO RAISE BASE OF TRANSITION AREAS … 20−1−3

Table of Contents xi

Paragraph Page

Section 2. Flight Inspection Requirements

20−2−1. FLIGHT INSPECTION REQUESTS … 20−2−1 20−2−2. REQUEST FOR FLIGHT INSPECTION DATA … 20−2−1 20−2−3. FLIGHT INSPECTION REPORT … 20−2−1 20−2−4. FLIGHT INSPECTION DATA DISTRIBUTION … 20−2−1

Section 3. Federal Airways

20−3−1. DEFINITION … 20−3−1 20−3−2. NAVAID SPACING … 20−3−1 20−3−3. VERTICAL AND LATERAL EXTENT … 20−3−1 20−3−4. WIDTH REDUCTIONS … 20−3−2

Section 4. Jet Routes

20−4−1. DEFINITION … 20−4−1 20−4−2. NAVAID SPACING … 20−4−1 20−4−3. JET ROUTE WIDTH … 20−4−1

Section 5. Area Navigation (RNAV) Routes

20−5−1. PURPOSE … 20−5−1 20−5−2. RNAV ROUTE CRITERIA … 20−5−1 20−5−3. WAYPOINTS … 20−5−1 20−5−4. LATERAL PROTECTED AIRSPACE CRITERIA FOR RNAV EN ROUTE SEGMENTS … 20−5−1 20−5−5. RNAV ROUTE DESCRIPTIONS … 20−5−2

Part 5. Special Use Airspace

Chapter 21. General

Section 1. Policy

21−1−1. PURPOSE … 21−1−1 21−1−2. SCOPE … 21−1−1 21−1−3. DEFINITION AND TYPES … 21−1−1 21−1−4. CATEGORIES … 21−1−1 21−1−5. SUA APPROVAL AUTHORITY … 21−1−2 21−1−6. MINIMUM VOLUME AND TIMES … 21−1−2 21−1−7. OPTIMUM USE OF AIRSPACE … 21−1−2 21−1−8. JOINT-USE POLICY … 21−1−2 21−1−9. ENVIRONMENTAL ANALYSIS … 21−1−3 21−1−10. CONTROLLING AGENCY … 21−1−3 21−1−11. USING AGENCY … 21−1−3 21−1−12. WAIVERS … 21−1−4 21−1−13. PUBLIC NOTICE PROCEDURES … 21−1−4 21−1−14. SUA NONRULEMAKING CIRCULARS … 21−1−4 21−1−15. CHARTING AND PUBLICATION REQUIREMENTS … 21−1−6 21−1−16. CERTIFICATION OF SUA GEOGRAPHIC POSITIONAL DATA … 21−1−7

xii Table of Contents

Paragraph Page 21−1−17. LEAD SERVICE CENTER … 21−1−7

Section 2. SUA Legal Descriptions

21−2−1. GENERAL … 21−2−1 21−2−2. BOUNDARIES … 21−2−1 21−2−3. ALTITUDES … 21−2−1 21−2−4. TIME OF DESIGNATION (RULEMAKING SUA) / TIMES OF USE (NON- RULEMAKING SUA) … 21−2−2 21−2−5. CONTROLLING AGENCY … 21−2−4 21−2−6. USING AGENCY … 21−2−4 21−2−7. SUA LEGAL DESCRIPTION AMENDMENTS … 21−2−4

Section 3. SUA Proposals

21−3−1. GENERAL … 21−3−1 21−3−2. CLASSIFIED INFORMATION … 21−3−1 21−3−3. PROPOSAL CONTENT … 21−3−1 21−3−4. ABBREVIATED PROPOSALS … 21−3−4

Section 4. Coordination of Proposals

21−4−1. POLICY … 21−4−1 21−4−2. PRE-PROPOSAL COORDINATION … 21−4−1 21−4−3. ATC FACILITY COORDINATION … 21−4−1 21−4−4. SUBMISSION OF PROPOSALS … 21−4−2

Section 5. Service Center OSG Actions

21−5−1. GENERAL … 21−5−1 21−5−2. SERVICE CENTER OSG PROCESSING REQUIREMENTS … 21−5−1 21−5−3. AERONAUTICAL IMPACT CONSIDERATION … 21−5−2 21−5−4. ENVIRONMENTAL DOCUMENT REVIEW … 21−5−2 21−5−5. SERVICE CENTER DETERMINATION … 21−5−3 21−5−6. DISAPPROVAL OF PROPOSALS … 21−5−3 21−5−7. SUBMISSION OF APPROVAL RECOMMENDATIONS TO FAA HEADQUARTERS … 21−5−3 21−5−8. HANDLING OF PROPOSALS TO REDUCE OR REVOKE SUA … 21−5−4 21−5−9. FAA INITIATED SUA PROPOSALS … 21−5−4

Section 6. Aeronautical Study

21−6−1. PURPOSE … 21−6−1 21−6−2. POLICY … 21−6−1 21−6−3. CONTENT OF STUDY … 21−6−1

Section 7. Restricted Area and MOA Annual Utilization Reports

21−7−1. PURPOSE … 21−7−1 21−7−2. REPORTING REQUIREMENTS … 21−7−1 21−7−3. SUPPLEMENTARY REPORTS … 21−7−1 21−7−4. UTILIZATION REPORT TERMS … 21−7−1 21−7−5. REVIEW REQUIREMENT … 21−7−2 21−7−6. REVIEW SUMMARY … 21−7−3

Table of Contents xiii

Paragraph Page

Section 8. SUA Review and Analysis

21−8−1. GENERAL … 21−8−1 21−8−2. POLICY … 21−8−1 21−8−3. SOURCES OF INFORMATION … 21−8−1 21−8−4. UTILIZATION STANDARDS … 21−8−2 21−8−5. SUA REVIEW GUIDE … 21−8−2 21−8−6. SUA REVIEW FOLLOW UP ACTION … 21−8−4

Chapter 22. Prohibited Areas

Section 1. General

22−1−1. DEFINITION … 22−1−1 22−1−2. PURPOSE … 22−1−1 22−1−3. IDENTIFICATION … 22−1−1 22−1−4. DESCRIPTION … 22−1−1 22−1−5. WAIVERS/AUTHORIZATION … 22−1−1 22−1−6. USING AGENCY … 22−1−2

Section 2. Processing

22−2−1. SUBMISSION OF PROPOSALS … 22−2−1

Chapter 23. Restricted Areas

Section 1. General

23−1−1. DEFINITION … 23−1−1 23−1−2. PURPOSE … 23−1−1 23−1−3. IDENTIFICATION … 23−1−1 23−1−4. RESTRICTED AREA FLOOR … 23−1−1 23−1−5. JOINT-USE … 23−1−2 23−1−6. TEMPORARY RESTRICTED AREAS … 23−1−2

Section 2. Processing

23−2−1. SUBMISSION OF PROPOSALS … 23−2−1 23−2−2. TEMPORARY RESTRICTED AREA PROPOSALS … 23−2−2

Chapter 24. Warning Areas

Section 1. General

24−1−1. BACKGROUND … 24−1−1 24−1−2. DEFINITION AND PURPOSE … 24−1−2 24−1−3. POLICY … 24−1−2 24−1−4. IDENTIFICATION … 24−1−3 24−1−5. JOINT-USE … 24−1−3

xiv Table of Contents

Paragraph Page

Section 2. Processing

24−2−1. SUBMISSION OF PROPOSALS … 24−2−1 24−2−2. EXECUTIVE ORDER 10854 COORDINATION … 24−2−1 24−2−3. ENVIRONMENTAL REVIEW … 24−2−2

Chapter 25. Military Operations Areas

Section 1. General

25−1−1. DEFINITION … 25−1−1 25−1−2. PURPOSE … 25−1−1 25−1−3. IDENTIFICATION … 25−1−1 25−1−4. MOA FLOOR … 25−1−1 25−1−5. LOCATION … 25−1−1 25−1−6. JOINT USE … 25−1−2 25−1−7. TEMPORARY MOAs … 25−1−2 25−1−8. MOAs IN CLASS G AIRSPACE … 25−1−2

Section 2. Processing

25−2−1. SUBMISSION OF PROPOSALS … 25−2−1 25−2−2. TEMPORARY MOA PROPOSALS … 25−2−1

Chapter 26. Alert Areas

Section 1. General

26−1−1. DEFINITION … 26−1−1 26−1−2. PURPOSE … 26−1−1 26−1−3. IDENTIFICATION … 26−1−1 26−1−4. LOCATION … 26−1−1 26−1−5. ACTIVITIES … 26−1−1

Section 2. Criteria

26−2−1. ESTABLISHMENT … 26−2−1 26−2−2. TYPES OF OPERATIONS … 26−2−1

Section 3. Processing

26−3−1. ALERT AREA PROPOSALS … 26−3−1 26−3−2. SUBMISSION OF PROPOSALS … 26−3−1

Chapter 27. Controlled Firing Areas

Section 1. General

27−1−1. DEFINITION … 27−1−1 27−1−2. PURPOSE … 27−1−1 27−1−3. CRITERIA … 27−1−1

Table of Contents xv

Paragraph Page 27−1−4. CHARTING … 27−1−1 27−1−5. DIMENSIONS … 27−1−1 27−1−6. ACTIVITIES … 27−1−1 27−1−7. APPROVAL … 27−1−2 27−1−8. SUSPENSION OR REVOCATION … 27−1−2

Section 2. Processing

27−2−1. SUBMISSION REQUIREMENTS … 27−2−1 27−2−2. CFA PROPOSALS … 27−2−1 27−2−3. SERVICE CENTER OSG ACTION … 27−2−1 27−2−4. APPROVAL LETTER … 27−2−1

Section 3. Safety Precautions

27−3−1. USER RESPONSIBILITIES … 27−3−1 27−3−2. PRECAUTIONARY MEASURES … 27−3−1 27−3−3. AREA SURVEILLANCE … 27−3−1

Chapter 28. National Security Areas

Section 1. General

28−1−1. DEFINITION … 28−1−1 28−1−2. PURPOSE … 28−1−1 28−1−3. CRITERIA … 28−1−1 28−1−4. DIMENSIONS … 28−1−1 28−1−5. CHARTING … 28−1−1 28−1−6. REVOCATION … 28−1−1

Section 2. Processing

28−2−1. SUBMISSION OF PROPOSALS … 28−2−1

Part 6. Miscellaneous Procedures

Chapter 29. Outdoor Laser Operations

Section 1. General

29−1−1. PURPOSE … 29−1−1 29−1−2. AUTHORITY … 29−1−1 29−1−3. POLICY … 29−1−1 29−1−4. RESPONSIBILITIES … 29−1−1 29−1−5. DEFINITIONS … 29−1−2

Section 2. Evaluating Aeronautical Effect

29−2−1. SERVICE CENTER COORDINATION … 29−2−1 29−2−2. AERONAUTICAL REVIEW … 29−2−1 29−2−3. LOCAL LASER WORKING GROUP (LLWG) … 29−2−2

xvi Table of Contents

Paragraph Page 29−2−4. PROTECTION DISTANCE CALCULATIONS … 29−2−2 29−2−5. CONTROL MEASURES … 29−2−3

Section 3. Aeronautical Determinations

29−3−1. FINDINGS … 29−3−1 29−3−2. CONTENT OF DETERMINATIONS … 29−3−1 29−3−3. PUBLICATION OF LASER OPERATIONS IN THE NAS … 29−3−1

Section 4. Notices to Airmen

29−4−1. ISSUANCE OF NOTICES TO AIRMEN (NOTAM) … 29−4−1

Section 5. Aircraft Illumination Actions

29−5−1. PROCEDURES … 29−5−1

Chapter 30. High Intensity Light Operations

Section 1. General

30−1−1. PURPOSE … 30−1−1 30−1−2. POLICY … 30−1−1 30−1−3. AUTHORITY … 30−1−1 30−1−4. DEFINITIONS … 30−1−1

Section 2. Aeronautical Review/Determinations

30−2−1. EVALUATION OF AFFECTED AIRSPACE AREAS … 30−2−1 30−2−2. AERONAUTICAL STUDY … 30−2−1 30−2−3. CONTENT OF DETERMINATION … 30−2−1

Chapter 31. Amateur Rocket and Commercial Space Operations

Section 1. General

31−1−1. PURPOSE … 31−1−1 31−1−2. AUTHORITY … 31−1−1 31−1−3. POLICY … 31−1−1 31−1−4. CONTROLLING FACILITY … 31−1−1 31−1−5. DEFINITIONS … 31−1−1 31−1−6. RESOURCES … 31−1−2

Section 2. Amateur Rockets

31−2−1. RESPONSIBILITIES … 31−2−1 31−2−2. GENERAL OPERATING LIMITATIONS … 31−2−1 31−2−3. AMATEUR ROCKET PROCESS … 31−2−2 31−2−4. AERONAUTICAL ANALYSIS … 31−2−3 31−2−5. AIRSPACE MANAGEMENT … 31−2−3 31−2−6. WAIVER/AUTHORIZATION FORMAT AND CONTENT … 31−2−4 31−2−7. NOTIFICATION TO AIR TRAFFIC FACILITIES … 31−2−5 31−2−8. NOTAMS … 31−2−5

Table of Contents xvii

Paragraph Page

Section 3. Launch and Reentry Vehicle Operations

31−3−1. RESPONSIBILITIES … 31−3−1 31−3−2. NOTICE TO AIRMEN (NOTAM) … 31−3−2 31−3−3. LAUNCH AND REENTRY PROCESS … 31−3−2

Chapter 32. Environmental Matters

Section 1. General Information

32−1−1. PURPOSE … 32−1−1 32−1−2. POLICY … 32−1−1 32−1−3. BACKGROUND … 32−1−1 32−1−4. DELEGATION OF AUTHORITY … 32−1−2 32−1−5. RESPONSIBILITIES … 32−1−3

Section 2. Environmental Processing

32−2−1. THE PROCESS … 32−2−1 32−2−2. ENVIRONMENTAL REVIEW OF FLIGHT PROCEDURES AND OTHER AIR TRAFFIC ACTIONS … 32−2−8 32−2−3. ENVIRONMENTAL REVIEW OF SPECIAL USE AIRSPACE (SUA) ACTIONS … 32−2−11 32−2−4. CFR PART 150 STUDIES … 32−2−11 32−2−5. ENVIRONMENTAL REVIEW OF LETTERS OF AGREEMENT AND OTHER AIRSPACE AND AERONAUTICAL DOCUMENTS … 32−2−12

Section 3. Environmental Impact Categories and Other Topics

32−3−1. ENVIRONMENTAL IMPACT CATEGORIES TO BE INCLUDED IN ANALYSIS … 32−3−1 32−3−2. ENVIRONMENTAL IMPACT CATEGORIES EXCLUDED FROM ANALYSIS … 32−3−2 32−3−3. ENVIRONMENTAL SCREENING AND MODELING TOOLS … 32−3−4 32−3−4. RECORDS RETENTION … 32−3−6

Section 4. Air Traffic-Specific Environmental Guidance and Requirements

32−4−1. DEPARTMENT OF TRANSPORTATION (DOT) ACT SECTION 4(f) (RECODIFIED AS 49 USC SECTION 303(c)) … 32−4−1 32−4−2. NATIONAL HISTORIC PRESERVATION ACT (NHPA) § 106: ACTIONS NOT REQUIRING CONSULTATION … 32−4−1 32−4−3. COMMUNITY INVOLVEMENT … 32−4−1 32−4−4. SEGMENTATION AND INDEPENDENT UTILITY … 32−4−2 32−4−5. DIVERSE VECTOR AREAS (DVA) … 32−4−2 32−4−6. NATIONAL SECURITY AREAS (NSAs) … 32−4−3 32−4−7. PROHIBITED AREA AND ALERT AREA DESIGNATIONS … 32−4−3 32−4−8. RECORDS RETENTION … 32−4−3 32−4−9. APPENDICES … 32−4−4 32−4−10. MEMORANDUMS AND EMAILS SUPERSEDED BY THIS ORDER … 32−4−4

xviii Table of Contents

Paragraph Page

Chapter 33. Parasail Operations

Section 1. General

33−1−1. PURPOSE … 33−1−1 33−1−2. AUTHORITY … 33−1−1 33−1−3. POLICY … 33−1−1 33−1−4. CONTROLLING FACILITY … 33−1−1 33−1−5. RESOURCES … 33−1−1

Section 2. Waivers

33−2−1. RESPONSIBILITIES … 33−2−1 33−2−2. GENERAL OPERATING LIMITATIONS … 33−2−1 33−2−3. WAIVERS … 33−2−1 33−2−4. WAIVER PROCESS … 33−2−2 33−2−5. AERONAUTICAL ANALYSIS … 33−2−2 33−2−6. FACILITY COORDINATION … 33−2−2 33−2−7. WAIVER/AUTHORIZATION FORMAT AND CONTENT … 33−2−2

Appendices

Appendix 1. Environmental Study Process Flow Chart … Appendix 1−1 Appendix 2. FAA Procedures for Processing SUA Actions … Appendix 2−1 Appendix 3. Procedures for Processing SUA Actions Aeronautical Process Flow Chart … Appendix 3−1 Appendix 4. FAA Procedures for Processing SUA Actions: Aeronautical and Environmental Summary Table … Appendix 4−1 Appendix 5. Air Traffic Initial Environmental Review (IER) … Appendix 5−1 Appendix 6. Sample FAA Categorical Exclusion Document Template … Appendix 6−1 Appendix 7. FAA/DOD Memorandum of Understanding … Appendix 7−1 Appendix 8. FAA Special Use Airspace Environmental Processing Procedures … Appendix 8−1 Appendix 9. Noise Policy for Management of Airspace Over Federally Managed Lands … Appendix 9−1 Appendix 10. Community Involvement Policy … Appendix 10−1 Appendix 11. Federal Aviation Administration (FAA) Notification of Proposed Project(s) Template … Appendix 11−1 Appendix 12. Evaluating Air Traffic Impacts for Wind Turbine Farm Proposals … Appendix 12−1 Appendix 13. Template for Memorandum of Assessment of Potential Impact on the NAS … Appendix 13−1

Table of Contents xix

Chapter 1. General › Section 1. Introduction

Part 1. General Procedures for Airspace Management

Chapter 1. General

Section 1. Introduction

1−1−1. PURPOSE OF THIS ORDER

a. This order prescribes policy, criteria, guidelines, and procedures applicable to the System

Operations Services; Mission Readiness Services; Aeronautical Information Services; Technical Operations Services; Technical Operations Spectrum Engineering Services Group/ Spectrum Assignment and Engineering Team; Technical Operations Technical Services; the Office of Airport Planning and Programming, (APP); the Office of Airport Safety and Standards, (AAS); Airports District Office (ADO); and the Flight Standards Service. b. While this order provides procedures for handling airspace matters, additional procedures and

criteria to supplement those contained herein may be set forth in other directives and should be consulted.

1−1−2. AUDIENCE

a. This order applies to all ATO personnel and anyone using ATO directives. b. This order also applies to all regional, Service Centers, Instrument Flight Procedure

(IFP) Service Providers, and field organizational elements involved in rulemaking and nonrulemaking actions associated with airspace allocation and utilization, obstruction evaluation, obstruction marking and lighting, airport airspace analysis, and the management of air navigation aids. States that participate in the State Block Grant Program (SBGP) assist the Office of Airport Safety and Standards in these actions, but the overall responsibility remains with the Office of Airports. Participating states include Georgia, Illinois, Michigan, Missouri, New Hampshire, North Carolina, Pennsylvania, Tennessee, Texas, and Wisconsin.

1−1−3. WHERE TO FIND THIS ORDER

This order is available on the FAA's Air Traffic Plans and Publications website at http://faa.gov/ air_traffic/publications and Orders & Notices website at https://www.faa.gov/regulations_policies/ orders_notices/.

1−1−4. WHAT THIS ORDER CANCELS

FAA Order JO 7400.2R, Procedures for Handling Airspace Matters, dated August 7, 2025, and all changes to it are canceled.

1−1−5. CHANGE AUTHORITY

The Director of Operational Policy (AJV-P) will issue changes to this directive after obtaining concurrence from the affected Headquarters offices/services/service units on the cover of this order.

Introduction 1−1−1

1−1−6. EXPLANATION OF CHANGES

a. The significant changes to this order are identified in the Explanation of Changes page(s). It is

advisable to retain the page(s) throughout the duration of the basic order. b. If further information is desired, please direct questions through the appropriate facility/service

area/regional office to the headquarters office of primary responsibility.

1−1−7. SUBMISSION CUTOFF AND EFFECTIVE DATES

This order and its changes are scheduled to be published to coincide with AIRAC dates. However, due to the infrequent nature of changes submitted for this order, publishing may be postponed.

TBL 1−1−1 Publication Schedule

Basic or Change Cutoff Date for Submission Effective Date of Publication

JO 7400.2S 7/9/26 12/24/26

Change 1 12/24/26 6/10/27

Change 2 6/10/27 11/25/27

Change 3 11/25/27 5/11/28

JO 7400.2T 5/11/28 10/26/28

Change 1 10/26/28 4/12/29

Change 2 4/12/29 9/27/29

Change 3 9/27/29 3/14/30

1−1−8. DELIVERY DATES

This order will be available on the FAA website 30 days prior to its effective date.

1−1−9. RECOMMENDATIONS FOR PROCEDURAL CHANGES

a. The responsibility for processing and coordinating revisions to this order is delegated to the

Airspace Regulation Group Manager. b. Proposed changes or recommended revisions must be submitted, in writing, to the Airspace

Regulation Group. The proposal should include a description of the change or revision, the language to be inserted in the order, and the rationale for the change or revision. c. The Airspace Regulation Group will review and revise proposed changes as necessary and

submit supported proposals to Operational Policy (AJV-P). When appropriate, the Airspace Regulation Group may convene a workgroup for this purpose. Composition of the workgroup will be determined by the subject matter and the expertise required. The Airspace Regulation Group is responsible for the selection of the members of the workgroup, and for appointing the chairperson of the group.

1−1−2 Introduction

d. The Operational Policy directorate is responsible for ensuring all approved revisions are

published. e. When revised, reprinted, or additional pages are issued, they will be marked as follows:

1. Each revised or added page will show the change number and effective date of the change. 2. Bold vertical lines in the margin of the text will mark the location of substantive procedural, operational, or policy changes (for example, when material that affects the performance of duty is added, revised, or deleted).

1−1−10. REQUESTS FOR INTERPRETATIONS OR CLARIFICATIONS TO THIS ORDER

a. Interpretation and clarification requests from field air traffic personnel or Service Center

personnel must be submitted as follows: 1. The request must be submitted, in writing, by an Air Traffic Facility ATM/general manager, or Service Center Group Manager to their Service Area Director or Service Center Director. All requests must include: (a) A point of contact to direct any follow-up questions to; (b) The complete title and number of the paragraph in question, a clear and concise

statement of the issue creating the interpretation or clarification request, and any relevant background information. 2. The Service Area Director/Service Center Director must review the request and determine if more than one interpretation of the meaning and/or intent of the language can be inferred. 3. If the Service Area Director/Service Center Director determines that an interpretation is required, submit the request, in writing, to the Operational Policy Directorate at 9-AJV-P- [email protected], for a response. b. Interpretation and clarification requests from other ATO or FAA offices or entities/agencies

outside the FAA must be submitted, in writing, to the Operational Policy Directorate at 9-AJV- [email protected]. The request must include: 1. Requester's contact information including name, entity/agency, phone number, and e-mail address; 2. The complete title and number of the paragraph in question, a clear and concise statement of the issue creating the interpretation or clarification request, and any relevant background information.

1−1−11. DISTRIBUTION

This order is distributed electronically to all who subscribe to receive email notifications through FAA's website. All organizations are responsible for viewing, downloading, and subscribing to receive email notifications when changes occur to this order. Subscriptions to air traffic directives can be made through the Air Traffic Plans and Publications website at https://www.faa.gov/air_traffic/ publications/ or directly via the following link: https://public.govdelivery.com/accounts/USAFAA/ subscriber/new?topic_id=USAFAA_39.

1−1−12. SAFETY MANAGEMENT SYSTEM

Every employee is responsible for ensuring the safety of equipment and procedures used in the provision of services within the National Airspace System (NAS).

Introduction 1−1−3

a. Risk assessment techniques and mitigations, as appropriate, are intended for implementation

of any planned safety significant changes within the NAS, as directed by FAA Order 1100.161, Air Traffic Safety Oversight. b. Direction regarding the Safety Management System and its application can be found in the

Air Traffic Organization Safety Management System Manual; FAA Order JO 1000.37, Air Traffic Organization Safety Management System; and FAA Order 1100.161, Air Traffic Safety Oversight.

1−1−4 Introduction

Chapter 1. General › Section 2. Authority and Order Use

Section 2. Authority and Order Use

1−2−1. POLICY

The navigable airspace is a limited national resource that Congress has charged the Federal Aviation Administration (FAA) to administer in the public interest as necessary to ensure the safety of aircraft and its efficient use. Although the FAA must protect the public's right of freedom of transit through the airspace, full consideration must be given to all airspace users, to include national defense; commercial and general aviation; and space operations. Accordingly, while a sincere effort must be made to negotiate equitable solutions to conflicts over the use of the airspace for non-aviation purposes, preservation of the navigable airspace for aviation must be the primary emphasis.

1−2−2. AUTHORITY AND APPLICABILITY

The authority for the procedures and associated rules and regulations addressed in this order are provided in 49 U.S.C. Subtitle VII, Aviation Programs, Part A - Air Commerce and Safety, and Part B - Airport Development and Noise:

a. Section 40101, Policy. b. Section 40102, Definitions. c. Section 40103, Sovereignty and Use of Airspace, and the Public Right of Transit. d. Section 40106(a), Deviations From Regulations. e. Section 40109, Authority to Exempt. f. Section 106(f), Authority of the Secretary and the Administrator. g. Section 106(g), Duties and Powers of Authority. h. Section 40113, Administrative. i. Section 44501(a), Long Range Plans and Policy Requirements. j. Section 44502, General Facilities and Personnel Authority. k. Section 44502(c), Military Construction, Rockets, and Missiles. l. Section 44718, Structures Interfering with Air Commerce. m. Section 44719, Standards for Navigational Aids. n. Section 44720, Meteorological Services. o. Section 44721, Aeronautical Maps and Charts. p. Section 46104(e), Designating Employees to Conduct Hearings. q. Section 46301, Civil Penalties. r. Section 46308, Interference with Air Navigation. s. Chapter 471, Airport Development - All of Subchapters I and II. t. Chapter 475, Noise - All of Subchapters I and II.

1−2−3. FUNCTIONAL RESPONSIBILITIES

Functional responsibilities of headquarters and regional/service area organizations referred to in this order are detailed in Order 1100.1, FAA Organization -Policies and Standards.

1−2−4. TITLE 14 CODE OF FEDERAL REGULATIONS (CFR) REFERENCES

a. Part 11, General Rulemaking Procedures.

Authority and Order Use 1−2−1

b. Part 71, Designation of Class A, B, C, D, and E Airspace Areas; Air Traffic Service Routes;

and Reporting Points. c. Part 73, Special Use Airspace. d. Part 77, Objects Affecting Navigable Airspace. e. Part 91, General Operating and Flight Rules. f. Part 93, Special Air Traffic Rules. g. Part 95, IFR Altitudes. h. Part 97, Standard Instrument Approach Procedures. i. Part 101, Moored Balloons, Kites, Amateur Rockets, Unmanned Free Balloons, and Certain Model Aircraft. j. Part 152, Airport Aid Program. k. Part 157, Notice of Construction, Alteration, Activation, and Deactivation of Airports. l. Chapter III, Commercial Space Transportation. m. Chapter V, National Aeronautics and Space Administration.

1−2−5. WORD MEANING

As used in this Order:

a. “Must" means an action/procedure is mandatory. b. “Must not" means an action/procedure is prohibited. c. “Should" is used when application is recommended. d. “May" and “need not" are used when application is optional. e. “Will" is used only to indicate futurity, never to indicate any degree of requirement for

application of a procedure. f. “Navigable airspace" means airspace at or above the minimum flight altitudes prescribed by the Code of Federal Regulations, including airspace needed for safe takeoff and landing. g. “Controlled airspace" is a generic term used to describe Class A, Class B, Class C, Class D,

and Class E airspace. h. “Uncontrolled Airspace” (Class G) is airspace that has not been designated by rule as Class

A, B, C, D, or E.

1−2−6. ABBREVIATIONS

See TBL 1−2−1 for a list of abbreviations used in this Order.

TBL 1−2−1 FAA Order JO 7400.2 Abbreviations

Abbreviation Meaning

AAS Office of Airport Safety and Standards

ADO Airport District Office

AE Airport Elevation

AFS Flight Standards Service

1−2−2 Authority and Order Use

Abbreviation Meaning

AGC Office of the Chief Counsel

AGL Above Ground Level

AIM Aeronautical Information Manual

AIS Aeronautical Information Services

ALP Airport Layout Plan

APO Office of Aviation Policy and Plans

APP Office of Airport Planning and Programming

ARP Airport Reference Point

ARSR Air Route Surveillance Radar

ARTCC Air Route Traffic Control Center

ARU Airborne Radar Unit

ASR Airport Surveillance Radar

AST Office of Commercial Space Transportation

ATC Air Traffic Control

ATCAA Air Traffic Control Assigned Airspace

ATCRBS Air Traffic Control Radar Beacon System

ATCSCC David J. Hurley Air Traffic Control System Command Center

ATCT Airport Traffic Control Tower

ATO Air Traffic Organization

ATREP Air Traffic Representative

CARF Central Altitude Reservation Function

CDRH Center for Devices and Radiological Health

CFA Controlled Firing Area

CFZ Critical Flight Zone

CFR Code of Federal Regulations

Authority and Order Use 1−2−3

Abbreviation Meaning

CP Construction Permit

DF Direction Finder

DME Distance Measuring Equipment

DMS Docket Management System

DNE Does Not Exceed

DNH Determination of No Hazard

DOD Department of Defense

DOH Determination of Hazard

EBO Exceeds But Okay

EMI Electromagnetic Interference

ERP Effective Radiated Power

FAAO Federal Aviation Administration Order

FACSFAC Fleet Area Control and Surveillance Facility

FCC Federal Communications Commission

FDA Food and Drug Administration

FL Flight Level

FPT Flight Procedures Team

FSDO Flight Standards District Office

FSS Flight Service Station

GAO Government Accountability Office

HIL High Intensity Light

IAP Instrument Approach Procedure

ICAO International Civil Aviation Organization

IFR Instrument Flight Rules

ILS Instrument Landing System

1−2−4 Authority and Order Use

Abbreviation Meaning

IR IFR Military Training Route

IRAC Interdepartmental Radio Advisory Committee

J Joule

L/MF Low/Medium Frequency

LFZ Laser Free Zone

LLWG Local Laser Working Group

LMM Middle Compass Locator

LOA Letter of Agreement

LOD Letter of Determination

LOM Outer Compass Locator

LSO Laser Safety Officer

MAJCOM Military Major Command

MCA Minimum Crossing Altitude

MCP Minimum Crossing Point

MEA Minimum En Route Altitude

MHA Minimum Holding Altitude

MIA Minimum IFR Altitude

MOA Military Operations Area

MOCA Minimum Obstruction Clearance Altitude

MPE Maximum Permissible Exposure

MRAD Milliradian

MRU Military Radar Unit

MSA Minimum Safe Altitude

MSL Mean Sea Level

MSWLF Municipal Solid Waste Landfill

Authority and Order Use 1−2−5

Abbreviation Meaning

MTR Military Training Route

MVA Minimum Vectoring Altitude

NAD North American Datum

NAS National Airspace System

NASA National Aeronautics and Space Administration

NAVAID Navigational Aid

NDB Nondirectional Radio Beacon

NEPA National Environmental Policy Act

NFDD National Flight Data Digest

NFZ Normal Flight Zone

NM Nautical Mile

NPH Notice of Presumed Hazard

NOHD Nominal Ocular Hazard Distance

NOTAM Notice to Airmen

NPIAS National Plan of Integrated Airport Systems

NPRM Notice of Proposed Rulemaking

NR Nonrulemaking

NRA Nonrulemaking Airport

NSA National Security Area

NWS National Weather Service

OE Obstruction Evaluation

OE/AAA Obstruction Evaluation/Airport Airspace Analysis

OFZ Obstacle Free Zone

PAPI Precision Approach Path Indicator

PFC Passenger Facility Charge

1−2−6 Authority and Order Use

Abbreviation Meaning

PL Public Law

PSR Project Status Request

RBS Radar Bomb Scoring

REIL Runway End Identifier Lights

RNAV Area Navigation

ROFA Runway Object Free Area

RPZ Runway Protection Zone

RVR Runway Visual Range

RVV Runway Visibility Value

SFZ Sensitive Flight Zone

SID Standard Instrument Departure

SMO System Maintenance and Operations

SMO System Maintenance and Operations

SR Scientific/Research Lasers

STAR Standard Terminal Arrival Route

SUA Special Use Airspace

TERABA Termination/Abandoned Letter

TEREXP Termination/Expired Letter

TERPS United States Standard for Terminal Instrument Procedures

TERPSR Termination Project Status Letter

TOFA Taxiway Object Free Area

USC United States Code

UTC Coordinated Universal Time

VASI Visual Approach Slope Indicator

VFR Visual Flight Rules

Authority and Order Use 1−2−7

Abbreviation Meaning

VGSI Visual Glide Scope Indicator

VOR Very High Frequency Omnidirectional Range

VORTAC Very High Frequency Omni-Directional Range/Tactical Air Navigation Aid

VR VFR Military Training Route

1−2−8 Authority and Order Use

Chapter 1. General › Section 3. Airspace Planning and Analysis

Section 3. Airspace Planning and Analysis

1−3−1. BACKGROUND

a. Airspace management functions historically have been widely dispersed. Responsibility for

airspace management has resided with the regional/service area offices, while airspace changes for operational considerations have been handled by field facilities. The focus on airspace change and redesign has been local in scope and centered, for the most part, on single areas. It is apparent that changes in airspace configuration, architecture, and/or structure have national implications for air traffic control, traffic flow management, and the user community. Therefore, changes in the use or allocation of the airspace need to be coordinated at the national level. b. The details involved in airspace design must be centrally located. It is essential that efforts

expended on airspace studies and proposed airspace changes be coordinated at the national level. This coordination will ensure that resources are effectively prioritized and optimized for the efficient use of the nation's airspace.

1−3−2. POLICY

The air traffic planning and analysis policy uses an interdisciplinary approach to ensure the effective management of national airspace changes. This policy requires national implementation strategies; especially for changes designed to enhance user operations, maintain the highest standards of safety, generate new efficiencies, and effectively use our resources. Mission Readiness Services, Strategy Directorate, Airspace Modernization Group (AJV-S3) is designated as the air traffic office that will provide national oversight.

1−3−3. RESPONSIBILITIES

a. The Mission Readiness Services Executive Director of Service Centers (AJV-01) and

Headquarters, Air Traffic Services (AJT) must develop Standard Operating Procedures (SOP)s that must be followed to ensure compliance with Instrument Flight Procedure (IFP) policy and criteria contained in regulations, advisory circulars, and orders (e.g., the FAA Order 8260 series, JO 7110.65, and this order). 1. Review the SOPs at least annually, assessing for practices and/or procedures no longer required or relevant content to ensure operational efficiency and flexibility to support customers. 2. Update SOPs as needed when new or revised IFP criteria and/or policy is published to ensure changes are implemented as required. b. Mission Readiness Services, Strategy Directorate, Airspace Modernization Group (AJV-S3)

must: 1. Formulate airspace efficiency policy in collaboration with Mission Readiness Services, Operational Policy Directorate, Airspace Regulation Group (AJV-P2) that overseas 14 CFR part 71 and part 73, and non-rulemaking Special Use Airspaces (SUA) rules and regulations policy. 2. Establish guidelines for airspace architecture and structural changes. 3. Provide a high-level analysis of current and proposed operations for efficiency from a NASwide perspective.

Airspace Planning and Analysis 1−3−1

c. Mission Readiness Services Service Center Operations Support Groups must:

1. Follow the rulemaking and non-rulemaking processes in this order for processing 14 CFR part 71 and part 73, and non-rulemaking SUA actions. 2. Develop and coordinate the IFP SOPs for developing and processing IFP actions in accordance with FAA Order 8260 series. d. Headquarters, Air Traffic Services must develop SOPs specifying air traffic facility

responsibilities, timelines, and processes for post-implementation monitoring of IFP actions.

1−3−2 Airspace Planning and Analysis

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases › Section 1. Ex Parte Communications

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases

Section 1. Ex Parte Communications

2−1−1. DEFINITION

Ex parte communication is any contact between the FAA and a party outside the government related to a specific rulemaking proceeding, before that particular proceeding is finalized. A rulemaking proceeding does not close until all received comments have been addressed, and a final rule is published. “Ex parte" is a Latin term that is interpreted to mean “one sided," and indicates that not all parties to an issue were present when it was discussed. Because some interested persons, including the general public, are excluded from an ex parte communication, such a contact may give, or appear to give, an unfair advantage to one party.

NOTE− Written comments submitted to the docket are not considered ex parte contacts because they are available for inspection by all members of the public.

2−1−2. SCOPE

Whether ex parte contacts are initiated by the FAA or by a member of the public (including affected industry), they are improper if they affect the basic openness and fairness of the decision making process. Because of this possibility and because of the possible appearance of impropriety, the FAA's policy on ex parte contacts is very strict. This policy, however, does not significantly restrict the gathering of information needed to make an intelligent decision.

2−1−3. POLICY

The FAA encourages full public participation in rulemaking and nonrulemaking actions. This policy allows for appropriate ex parte contacts when necessary to ensure adequate public comment. Persons directly responsible for the rulemaking/nonrulemaking action should, in addition to providing the public the opportunity to respond in writing to proposed actions and/or to appear and be heard at a hearing, undertake such contacts with the public as will be helpful in resolving questions of substance and justification. Responsible persons should be receptive to proper contacts from members of the public who are affected by, or interested in, the proposed action. Contact with the public to obtain current information needed for rulemaking/nonrulemaking actions or to clarify written comments is permissible.

2−1−4. DISCLOSURE

While this policy recognizes the importance of ex parte contacts, it also contains a strict mandate to disclose these contacts. Specifically, the FAA has an obligation to conduct its rulemaking activities in a public manner, whereby interested members of the public are afforded adequate knowledge of such contacts. This is necessary to ensure all interested members of the public are afforded the opportunity to make their views known to the FAA. Without such disclosure, other interested members of the public and the FAA may be deprived of informed and valuable comments.

Ex Parte Communications 2−1−1

2−1−5. PERMITTED CONTACT

The kind of ex parte contacts permitted and the procedures to be followed depend on when the contact occurs. Under some circumstances, an ex parte contact could affect the basic openness and fairness of the rulemaking process. Even the appearance of impropriety can affect public confidence in the process. Any questions regarding the following authorized contacts should be addressed by the Office of the Chief Counsel.

a. Before the issuance of any rulemaking and/or nonrulemaking action, ex parte contacts are

authorized when needed to obtain technical and economic information. Each contact that influenced the specific effort must be included in a report discussing each contact or group of related contacts. This report must be placed in the project's docket/case file. b. During the comment period, ex parte contacts are strongly discouraged, since requests for

information can be submitted in writing or at a public meeting. The only information that should be released is that contained in the proposed rule and any other information made generally available during a public meeting. Information, such as facts not presented in the rulemaking/ nonrulemaking notification or at a public meeting, or the agency's preliminary thinking on the final rule, should not be discussed. Persons who contact the agency by telephone or in person seeking to discuss the proposal should be advised that the proper avenue of communication during the comment period is by written comment submitted to the docket. When the agency determines that it would be helpful to meet with a person or group during the comment period, the meeting must be announced in the Federal Register and all interested persons must be invited. c. In a formal public hearing, the testimony is usually recorded and the transcript added to the

docket. Summaries of all substantive oral communications and copies of materials provided that could affect the agency position must be placed in the docket. Individuals who have made oral comments at meetings should be encouraged to also submit those comments to the docket in writing. d. Persons who contact the agency simply to obtain information regarding the proposal may be

provided with information that has already been made available to the general public. No record of such a contact is required. e. Once the comment period has closed, subsequently received written communications should

also be placed in the docket. Inform those who wish to submit such “late filed" comments (in accordance with Part 11), their comments will be given consideration to the extent that they cause no undue expense or delay. f. If the agency determines that it would be helpful to meet with a person or group after the close of the comment period, the meeting must be announced in the Federal Register. Moreover, consideration should be given to reopening the comment period. Substantive oral communications other than formal meetings are discouraged. If it is discovered that such a contact has occurred, a summary of the contact must be placed in the docket if it could be perceived as influencing the rulemaking process. Such a summary must be accompanied by copies of any material distributed during meetings between the FAA and interested parties. g. Contacts after the close of the comment period should be avoided. However, if an ex parte

communication occurs that could substantially influence the rulemaking after the comment period has closed, it is the FAA's policy to consider reopening the comment period. Important information should not be disregarded simply because it was late. However, because contacts after the close of the comment period may result in reopening the comment period, they should

2−1−2 Ex Parte Communications

be avoided. Written comments received after the closing date do not require reopening the comment period unless the agency is substantially and specifically influenced by the comment.

2−1−6. RECORDING CONTACTS

A record of a contact or series of contacts need only be made when it is determined that the contact influenced the agency's action. The record of a contact or series of contacts may be made at any time after the contact, but must be made before issuance of the final action. The record of ex parte contacts need not be a verbatim transcript of the communication. However, a mere recitation that on a stated day a meeting or telephone conversation was held with listed persons to discuss a named general subject is inadequate. The report of the meeting or contact should contain at a minimum:

a. The date and time of the meeting or conversation. b. A list of the participants. c. A summary of the discussion (more than a simple list of the subjects discussed). d. A specific statement of any commitments made by any FAA personnel. A copy of any

documents discussed should be attached to the record. Any questions on the preparation of the record should be directed to the Office of the Chief Counsel.

2−1−7. ADVICE FROM COUNSEL

Questions concerning the propriety of ex parte contacts, or the actions to be taken after such contacts, should be directed to the Office of the Chief Counsel. Ex parte contacts must be handled correctly to prevent unwarranted delay and legal challenge.

2−1−8. RELEASE OF RULEMAKING AND/OR NONRULEMAKING TEXTS

The agency policy is to not provide outside parties the texts of rulemaking/nonrulemaking documents before official release. Such disclosures may give the appearance that the agency is seeking outside party approval and may give an advantage to some parties over other members of the public. There is one exception to this policy. It may be necessary to discuss possible specific regulatory provisions under consideration to obtain information on technical, operational, and economic impacts needed for agency deliberations. Avoid discussion of specific language unless needed information cannot be obtained without discussion of the precise technical language to be used. When necessary, limit discussion and disclosure to the minimum amount of rule text necessary to accomplish the task. Preamble text is not to be distributed before publication.

2−1−9. ADDITIONAL REFERENCES

For additional information on ex parte communications, see the following:

a. DOT Order 2100.2, Policies for Public Contacts in Rulemaking. b. Appendix 1 to Title 14 CFR part 11, Oral Communications with the Public During Rulemaking.

Ex Parte Communications 2−1−3

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases › Section 2. Executive Order 10854

Section 2. Executive Order 10854

2−2−1. SCOPE

a. Executive Order 10854 extends the application of 49 U.S.C. § 40103 to the overlying airspace

of those areas of land or water outside the United States beyond the 12-mile offshore limit in which the United States, under international treaty agreement or other lawful arrangements, has appropriate jurisdiction or control. b. Under the provisions of Executive Order 10854, airspace actions must be consistent with the

requirements of national defense, international treaties or agreements made by the United States, or the successful conduct of the foreign relations of the United States.

NOTE− See FIG 2−2−1 for the text of Executive Order 10854.

2−2−2. POLICY

Any rulemaking or nonrulemaking actions that encompass airspace outside of the United States sovereign airspace (i.e., beyond 12 NM from the United States coast line) must be coordinated with the Departments of Defense and State. All Executive Order 10854 coordination will be conducted by the Airspace Regulation Group.

FIG 2−2−1 Executive Order 10854

EXECUTIVE ORDER 10854 EXTENSION OF THE APPLICATION OF THE FEDERAL AVIATION ACT OF 1958 By virtue of the authority vested in me by section 1110 of the Federal Aviation Act of 1958 (72 Stat. 800: 49 U.S.C. 1510), and as President of the United States, and having determined that such action would be in the national interest, I hereby order as follows: The application of the Federal Aviation Act of 1958 (72 Stat. 731; 49 U.S.C. 1301 et seq.), to the extent necessary to permit the Secretary of Transportation to accomplish the purposes and objectives of Titles III and XII thereof (49 U.S.C. 1341-1355 and 1521-1523), is hereby extended to those areas of land or water outside the United States and the overlying airspace thereof over or in which the Federal Government of the United States, under international treaty, agreement or other lawful arrangement, has appropriate jurisdiction or control: Provided, that the Secretary of Transportation, prior to taking any action under the authority hereby conferred, shall first consult with the Secretary of State on matters affecting foreign relations, and with the Secretary of Defense on matters affecting national-defense interests, and shall not take any action which the Secretary of State determines to be in conflict with any international treaty or agreement to which the United States is a party, or to be inconsistent with the successful conduct of the foreign relations of the United States, or which the Secretary of Defense determines to be inconsistent with the requirements of national defense. Dwight D. Eisenhower The White House, November 27, 1959

Executive Order 10854 2−2−1

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases › Section 3. Processing Rulemaking Airspace Actions

Section 3. Processing Rulemaking Airspace Actions

2−3−1. PURPOSE

This section prescribes procedures to be followed when taking rulemaking actions to establish, modify, or revoke regulatory airspace.

2−3−2. RESPONSIBILITY

a. The Airspace Regulation Group is responsible for processing the following actions: Class

A, Class B, and Class C airspace areas; special use airspace (except controlled firing areas); offshore airspace areas; Air Traffic Service (ATS) routes; and those Class D and Class E airspace areas that overlie U.S. territories and possessions. b. Service Centers are responsible for processing all Class D and Class E airspace areas (except

those overlying U.S. territories and possessions). c. The Air Traffic and Airspace Law Branch (AGC-250) is responsible for ensuring that the

airspace cases in paragraphs a and b, above, meet the requirements of the Administrative Procedure Act (5 U.S.C. Chapter 5, Section 553) and DOT Order 2100.6, Policies and Procedures for Rulemakings.

2−3−3. DOCKETS

a. Docket Location.

1. The official docket for both Headquarters and Service Center rulemaking cases must be maintained by DOT Docket Operations, U.S. Department of Transportation, 1200 New Jersey Avenue, SE, Room W12-140, West Building Ground Floor, Washington, DC 20590. 2. The Federal Docket Management System (FDMS) is the government-wide online database that includes DOT’s public dockets. The public may review documents placed in the docket, and submit comments on proposed rules, by accessing the Federal eRulemaking Portal at www.regulations.gov. b. Docket Identification.

1. Rulemaking cases are identified by two docket numbers. The first, an FAA docket number, consists of the acronym FAA; the current year; and a consecutively assigned number (for example, FAA-2003-14010). The second, an Airspace docket number, includes the last two digits of the calendar year; the appropriate FAA regional abbreviation for the geographic area the airspace action falls within (for example, AEA, ASO, etc.); and a consecutively assigned number within the calendar year (for example, 16-ASW-46). The FAA docket number is assigned by DOT Docket Operations. The Airspace docket number is assigned by the Service Center responsible for the geographic area the airspace action falls within, except for those airspace actions that are required to be originated by Headquarters. 2. Numbers must run consecutively within each calendar year. c. Docket Content. The official docket must include all petitions, notices, rules, comments,

correspondence, available graphics, and related material concerning the case (other than working files).

Processing Rulemaking Airspace Actions 2−3−1

2−3−4. COMMENT PERIODS

Notice of Proposed Rulemaking (NPRM) actions should provide the following public comment periods:

a. Proposed nonsignificant rules (for example, most airspace actions): 45 days. b. Proposed significant rules (for example, Class B and Class C actions): 60 days.

REFERENCE− DOT Order 2100.6, Rulemaking and Guidance Procedures.

2−3−5. FLIGHT PROCEDURAL DATA

a. If an airspace docket requires an instrument procedure change and/or flight inspection, the

appropriate Operations Support Group (OSG) must coordinate the proposed effective date with Aeronautical Information Services (AIS). The proposed effective date must consider the time needed to process procedural changes, complete part 71 rulemaking, and allow ample time for flight inspection, if required. Any problems that could affect the proposed effective date must be coordinated with AIS and the Airspace Regulation Group. See Order 8260.26, Establishing and Scheduling Standard Instrument Procedure Effective Dates, for scheduled charting deadlines and publication dates. b. If a rule without a prior NPRM is to be issued, and flight check data is required, the OSG must

provide details of the change to AIS to request flight inspection and coordinate the planned effective date.

2−3−6. SUBMISSION OF RULEMAKING AIRSPACE CASES TO HEADQUARTERS

a. To initiate part 71 and part 73 rulemaking for airspace actions that are processed by

Headquarters, the OSG Manager must submit a request memorandum to the Airspace Regulation Group Manager. b. The request must include the following:

1. A regional docket number (except for Class B and C actions). 2. Background information to include the purpose and need for the proposed action. If an informal airspace meeting is held, provide the meeting summary, public comments, and proposed mitigations. (a) Provide specific details of the proposed action for inclusion in the NPRM to present the

public with enough information to develop effective comments. (b) For airspace actions, the proposed description of the airspace and aeronautical chart

depiction.

NOTE− A chart depiction is not required for ATS routes.

(c) For ATS route actions, the proposed descriptions of the ATS route and TARGETS track

plot. (d) If radials, courses, or bearings are included as part of an airspace or ATS route description,

both True and Magnetic values must be included for the NPRM.

2−3−2 Processing Rulemaking Airspace Actions

c. If an airspace action needs to be completed by a specific date, the OSG must coordinate

with any other FAA offices as necessary to ensure that sufficient lead time exists for meeting airspace rulemaking, processing and charting requirements, instrument approach procedure development, and flight inspection deadlines (if required). d. The OSG must review all public comments posted to the Federal eRulemaking Portal

(www.regulations.gov) or submitted directly to the FAA in response to an NPRM. The public comments must be analyzed to identify aeronautical impacts and whether mitigations are appropriate or cannot be adopted for specific reasons. e. Within 90 days after the NPRM comment period closing, the OSG Manager will submit a

memorandum to the Airspace Regulation Group Manager with either a recommendation for further action (for example, proceed to final rule, changes required, withdraw the proposal, etc.), or a status update on the proposal. Include the following information in the memorandum: 1. An analysis of issues raised in the NPRM comments received and how they are being addressed or mitigated. Provide a detailed explanation for issues that cannot be mitigated. 2. Confirmation that the airspace description remains the same as proposed in the NPRM or details of the changes that are required.

NOTE− If substantial changes are made to the proposed action, a supplemental NPRM, with a new comment period, could be required.

3. Copies of public comments received and any additional information that should be considered by the Airspace Regulation Group. 4. National Environmental Policy Act of 1969 (NEPA) environmental review document. 5. The requested airspace effective date.

2−3−7. EFFECTIVE DATE OF FINAL RULES

a. Amendments to 14 CFR parts 71 and 73 must be made effective at 0901 Coordinated

Universal Time (UTC) and must coincide with 56-day en route charting dates published in FAA Order 8260.26, Establishing Submission Cutoff Dates for Civil Instrument Flight Procedures, Appendix A, Data Submission Cutoff Dates. Exceptions are as follows: 1. Safety or national interest actions that require an earlier effective time or date. 2. Editorial changes. 3. Actions that lessen the burden on the public (for example, revocation of restricted areas). b. Cutoff dates are established to allow sufficient time for chart production and distribution. To

meet this requirement, final rules must be published in the Federal Register on or before the applicable deadline for en route airspace date for the planned effective date.

REFERENCE− FAA Order 8260.26, Appendix A.

2−3−8. PUBLICATION IN FEDERAL REGISTER

a. The Federal Register accepts both paper and electronic submissions.

Processing Rulemaking Airspace Actions 2−3−3

b. Paper submissions must have an original NPRM or an original final rule and a CD with two

duplicate certified electronic files that are forwarded to AGC-200 for publication in the Federal Register. The Office of the Federal Register requires that all original documents be signed with blue ink. c. Electronic submissions are submitted though the Federal Register web portal at

webportal.fedreg.gov. For more information on how to get a digital signature and the submission process, see the Office of the Federal Register's Document Drafting Handbook, Chapter 6. d. All documents must meet the criteria and format established by the Office of the Federal

Register as outlined in the Document Drafting Handbook; www.archives.gov/federal-register/ write/handbook.

2−3−4 Processing Rulemaking Airspace Actions

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases › Section 4. Processing Nonrulemaking Airspace Actions

Section 4. Processing Nonrulemaking Airspace Actions

2−4−1. PURPOSE

This section prescribes the procedures to be followed when establishing, modifying, or revoking nonrulemaking airspace.

2−4−2. IDENTIFICATION

Nonrulemaking cases are identified by a study number. The study number includes the last two digits of the calendar year, the appropriate FAA regional or airports office abbreviation that the action falls within, a consecutively assigned number within each calendar year, and either an “NR” (nonrulemaking), “NRA” (nonrulemaking airport), or “OE” (obstruction evaluation) suffix as appropriate.

EXAMPLE−

1. 21-AWP-1-NR for studies involving navigational aids and nonrulemaking Special Use Airspace (SUA) cases (i.e., Alert Areas, Controlled Firing Areas, MOAs, and Warning Areas).

2. 21-ASO-1-NRA for studies involving airports.

3. 21-AGL-1-OE for studies involving surface structures not located on public-use airports

4. 21-ORL-1-NRA for studies processed by an airports district office.

2−4−3. CIRCULARIZATION

a. Except for NRA airspace proposals, nonrulemaking airspace proposals must be circularized by

the regional/service area office unless procedures for processing those types of proposals allow exemptions to circularization. Each notice must contain a complete, detailed description of the proposal including charts, if appropriate, to assist interested persons in preparing comments. Circularization lists must include, but not be limited to, all known aviation interested persons and groups such as the state aviation agencies; Service Center military representatives; national and local offices of aviation organizations; local flight schools, local airport owners, managers, and fixed base operators; and local air taxi and charter flight offices. To ensure the widest public participation, Service Centers should consider all available communication alternatives for distributing circulars and receiving comments (for example, email, fax, etc.). Normally, a 45day comment period should be provided. Other parts in this order contain additional guidance regarding circularization. b. Discuss in the nonrulemaking circular any regulatory changes (for example, part 71, part

73) that might be affected if the nonrulemaking proposal is adopted. Describe the regulatory changes in as much detail as is known at the time. c. Regional/service area offices must coordinate with their respective state aviation

representatives to ascertain which nonrulemaking circulars each state is interested in receiving. If various agencies within a state government request copies of particular circulars, the regional/ service area office may request that one agency be designated to receive and distribute the requested copies. d. Send one copy of each SUA nonrulemaking circular to the Airspace Regulation Group.

Processing Nonrulemaking Airspace Actions 2−4−1

e. Except for Class B and Class C airspace actions, when a nonrulemaking action is associated

with a rulemaking action, the nonrulemaking proposal may be included in the NPRM, and a separate nonrulemaking circular is not required. The NPRM will satisfy the circularization requirement and present the full scope of both the rulemaking and nonrulemaking proposal.

2−4−4. CIRCULARIZATION DOCUMENTATION

All notices of aeronautical studies, informal airspace meetings, and determinations issued for obstruction evaluation and airport airspace analysis studies require certificates of mailing. The certificate must be recorded in each case file as follows: AERONAUTICAL STUDY [NUMBER] CERTIFICATE OF MAILING I HEREBY CERTIFY THAT A COPY OF THE ATTACHED [notice/determination] WAS MAILED TO EACH OF THE ADDRESSEES LISTED ON THE ATTACHED [mailing list/distribution list number] THIS [date] DAY OF [month/year]. SIGNED: [specialist/mail clerk/etc.]

2−4−5. SUBMISSION OF NONRULEMAKING SUA CASES TO HEADQUARTERS

a. After the circular public comment period ends, the OSG must analyze all comments received

and coordinate with the concerned ATC facility to develop a response to the issues raised by the comments, and determine if the proposal should be modified as a result of the comments. Coordinate with the appropriate Service Center military representative for nonrulemaking SUA actions to discuss possible mitigations or changes based on the comments. If significant changes are made to what was circularized, it may be necessary to re-circularize the proposal for additional public comment b. After considering all pertinent information, the OSG and the ATC facility will determine

whether the proposal should be forwarded for approval or disapproved. If the action is to be disapproved, the OSG will comply with the guidance in paragraph 21−5−6, Disapproval of Proposals, of this order. c. Within 90 days after the circular comment period closing, the OSG Manager will submit

a memorandum to the Airspace Regulation Group Manager with either a recommendation to approve, or a status update on the proposal. Include the following information in the memorandum: 1. A discussion of each issue raised by the comments and how it was resolved or addressed. 2. The final version of the airspace description (including a revised chart, if applicable). 3. Copies of public comments received and any additional information that should be considered by the Airspace Regulation Group. 4. NEPA environmental review document. 5. The requested airspace effective date.

2−4−6. EFFECTIVE DATE OF NONRULEMAKING ACTIONS

Nonrulemaking actions must be made effective at 0901 UTC and must coincide with the 56-day en route charting dates published in FAA Order 8260.26, Appendix A. Exceptions are as follows:

a. Safety or national interest actions that require an earlier effective time or date. b. Editorial changes. c. Actions that lessen the burden on the public (for example, revocation of special use airspace).

2−4−2 Processing Nonrulemaking Airspace Actions

2−4−7. PUBLICATION OF NONRULEMAKING ACTIONS

Cutoff dates are established to allow sufficient time for chart production and distribution. To meet this requirement, nonrulemaking actions must be published in the National Flight Data Digest (NFDD) no later than 58 days prior to the chart publication date.

REFERENCE− FAA Order 8260.26, Appendix A.

Processing Nonrulemaking Airspace Actions 2−4−3

Chapter 2. Rulemaking/Nonrulemaking Airspace Cases › Section 5. Informal Airspace Meeting

Section 5. Informal Airspace Meeting

2−5−1. PURPOSE

This section prescribes the procedures to be followed for informal airspace meetings held before the issuance of a rulemaking or nonrulemaking airspace proposal.

2−5−2. POLICY

a. Informal airspace meetings may be held when the FAA determines there is a need to obtain

additional technical information or facts to assist in the development of a proposal prior to the issuance of an NPRM or a nonrulemaking circular. The number of meetings required will be determined by the Service Center office based on the scope of the proposal. b. Informal airspace meetings are mandatory for any planned Class B and/or Class C airspace

proposals prior to issuing an NPRM.

NOTE− Meetings are not required for minor Class B or Class C airspace changes (for example, editorial corrections, ARP updates, etc.). Contact the Airspace Regulation Group if in doubt whether a proposed change requires a meeting.

c. Informal airspace meetings are not a decision-making forum. The purpose is to gather additional

information to be considered in developing the proposal. These meetings provide interested parties an opportunity to present views, recommendations, and comments on a proposal. All comments received during these meetings will be considered prior to any revision or issuance of a notice of proposed rulemaking. d. At FAA's discretion, an electronic meeting format (such as webinars, podcasts, etc.) may be

used to supplement the traditional meeting format. Electronic meetings must provide a method of posting questions and answers that can be viewed by all participants after the meeting. In addition, instructions for participants to submit written comments after the meeting must be included.

2−5−3. CLASS B AND C INFORMAL AIRSPACE MEETING NOTIFICATION PROCEDURES

a. The OSG must submit informal airspace meeting details to the Airspace Regulation Group for

preparation of the notice and submission to the Federal Register at least 90 days in advance of the first meeting date. The following meeting information is required: 1. A general explanation of the proposed action to enable interested persons to prepare comments prior to the meeting. 2. The name, address, and telephone number of the person from whom additional information may be obtained. 3. Dates and times of the meeting(s). 4. Address(es) of meeting location(s). 5. Address for submitting written comments following the meeting(s). b. The Federal Register notice must be published a maximum of 60 days and a minimum of 30

days in advance. The comment closing date will be 30 days after the last meeting date.

Informal Airspace Meeting 2−5−1

c. In addition to the Federal Register publication, informal airspace meeting notices must be

sent to all known aviation interested persons and groups including, but not limited to, state aviation agencies, Service Center military representatives, national and local offices of aviation organizations, local flight schools, local airport owners, managers and fixed base operators, and local air taxi and charter operators within a 100-mile radius of the primary airport for Class B airspace actions and within a 50-mile radius of the primary airport for Class C airspace actions.

2−5−4. INFORMAL AIRSPACE MEETING NOTIFICATION PROCEDURES FOR AIRSPACE ACTIONS OTHER THAN CLASS B AND CLASS C

a. When additional information is needed, or known/anticipated controversy warrants, the above

procedures may also be used for informal airspace meetings concerning airport airspace analysis, SUA, or commissioning/decommissioning of navigation aids. Every effort must be made to notify all interested aviation organizations and/or persons and groups that may be affected by the proposed action. b. Service centers are responsible for the preparation and distribution of informal airspace meeting

notices for airspace actions other than Class B and C. Meeting notices are not required to be published in the Federal Register. The notice of the meeting should be distributed at least 30 days prior to the meeting date. c. The meeting notice must:

1. Explain that the purpose of the meeting is to solicit aeronautical comments regarding the proposal's effect on the use of the navigable airspace. 2. Provide a general explanation of the proposed action to enable interested persons to prepare comments prior to the meeting. d. Service centers are encouraged to also make use of electronic media, local newspapers, radio,

and television to supplement the dissemination of meeting notices.

2−5−5. LOCATION

Informal airspace meetings should be held at locations and times that provide an opportunity for the public to submit aeronautical comments relative to the proposed action. For larger airspace area proposals, multiple meeting locations and times may be necessary to obtain input from the public over a wider geographic area.

2−5−6. AGENDA ITEMS

Agenda items will be included in the informal airspace meeting notice. Suggested items include, but are not limited to, meeting procedures, FAA presentation on the proposed airspace action, and an opportunity for public presentations/comments. Only presentations or comments from attendees that concern the proposed action will be accepted.

2−5−7. RECORD OF MEETINGS

a. Official transcripts or minutes of informal airspace meetings must not be taken or prepared.

However, the chairperson must ensure that a memorandum summarizing the discussions and issues raised at the meeting(s) is prepared. A copy of the list of attendees and any written comments submitted at the meeting(s) or during the associated comment period must be attached to the memorandum. b. For airspace actions, a copy of the memorandum and attachments must be included in the OSG

recommendation package submitted to the Airspace Regulation Group.

2−5−2 Informal Airspace Meeting

Chapter 3. Aeronautical Information › Section 1. General

Chapter 3. Aeronautical Information

Section 1. General

3−1−1. POLICY

All geographic (latitude and longitude) and vertical data submitted or used in airspace matters must be based on current North American Datum (NAD) criteria.

3−1−2. RESPONSIBILITY

a. Aeronautical Information Services (AIS)is responsible for coordination with charting agencies

and chart producers. b. AIS will furnish appropriate aeronautical chart cutoff and publication dates. Cutoff dates are 9

weeks (10 weeks for action involving flight check) in advance of the publication date to allow sufficient time for charting and chart distribution purposes. c. Any information pertinent to the development of aeronautical information (for example,

validation of geographical coordinates, airport geographic positions, true radials, etc.) must be obtained from AIS.

3−1−3. TRUE/MAGNETIC DIRECTIONS

All radials, courses, and bearings specified in an NPRM must be stated both as true and magnetic, except magnetic need not be stated in terminal airspace notices.

3−1−4. NAVIGATIONAL AID COORDINATES

When a navigational aid (NAVAID) is used as a reference point in a controlled airspace description, its geographic coordinates must be included in degrees, minutes, and seconds.

3−1−5. DIRECTIONS

Directions must be described as follows:

General 3−1−1

TBL 3−1−1

338° True - 022° True = North

023° True - 067° True = Northeast

068° True - 112° True = East

113° True - 157° True = Southeast

158° True - 202° True = South

203° True - 247° True = Southwest

248° True - 292° True = West

293° True - 337° True = Northwest

3−1−2 General

Chapter 3. Aeronautical Information › Section 2. Charted Reporting Points

Section 2. Charted Reporting Points

3−2−1. POLICY

a. Charted reporting points should be established only when necessary to provide minimum en

route altitude (MEA) changes or to assist in the separation of aircraft. b. Reporting points should not be established solely for the purpose of communication handoffs

(transfer of aircraft control from one sector/facility to another to define an approach control area of jurisdiction).

3−2−2. CHART SERIES SELECTION

The request to have a reporting point charted should be limited to the chart series necessary for its intended use. For example, a reporting point established for the high altitude structure should not appear on the low altitude charts.

3−2−3. FAA FORM 8260-2, RADIO FIX AND HOLDING DATA RECORD

a. Visual Flight Rules Fix. The appropriate air traffic field facility must forward the completed

FAA Form 8260-2 through the service area office to AIS. b. Instrument Flight Rules Fix. FAA Form 8260-2 will serve as a request form, a checklist for

flight inspection in response to a request for charted reporting points, and a record of action taken to publish the data. The appropriate air traffic field facility must request flight inspection action by completing the FAA Form 8260-2 and submitting it to the FPT through the service area office. It should be forwarded through the respective service area office when necessary to establish, modify, or cancel an intersection that is used as a reporting point, or to establish, modify, or cancel a holding pattern.

3−2−4. PREPARATION OF FORM 8260-2

Instructions for preparation of FAA Form 8260-2 are contained in Order 8260.19, Flight Procedures and Airspace.

Charted Reporting Points 3−2−1

Chapter 3. Aeronautical Information › Section 3. Naming of NAVAIDs, Aeronautical Facilities, and Fixes

Section 3. Naming of NAVAIDs, Aeronautical Facilities, and Fixes

3−3−1. GENERAL

a. All fixes located at a common point must have the same name/code regardless of type, altitude,

or route structure. b. If one of the collocated fixes is a NAVAID, the other fixes must be assigned the same name

and three-letter identifier.

3−3−2. RESPONSIBILITY

a. Service area office are responsible for assigning and changing names of NAVAID and

aeronautical facilities, and must follow the instructions contained herein and in FAA Order JO 7350.9, Location Identifiers, Chapter 1. b. AIS is responsible for issuing five-letter names for radio fixes, waypoints, marker beacons,

and compass locators. Five-letter names must be issued by AIS to the Terminal Procedures and Charting Group, Major Military Commands (MAJCOM) and Air Route Traffic Control Centers (ARTCC) for future assignments. c. AIS in conjunction with the respective service area office, must ensure that no duplication in

location name exists.

3−3−3. NAMING OF NAVAIDS

a. The NAVAID name selected should represent a city, town, or prominent geographic landmark

that is depicted on a sectional aeronautical chart at or near the site. If one is neither available nor suitable, a local memorial name may be used. A common, easily understood word should be selected for the NAVAID name. b. The name must not sound similar to an existing NAVAID/fix location name within the

originating ARTCC's area, the adjacent ARTCC's area, or within a 300 NM radius from the NAVAID involved. c. Unduly long names should not be used. d. A navigational aid with the same name as the associated airport should be located on that airport.

However, in existing situations, a NAVAID off the airport with the same name as the airport may retain the airport name provided there is no other NAVAID with the same name. If retention of the airport name at an off-airport NAVAID could lead to a potentially confusing situation, the name should be changed. Only one NAVAID located on the airport may be assigned the airport name.

NOTE− For the purpose of this paragraph only, a compass locator must be considered as a separate NAVAID.

e. Instrument Landing Systems (ILS).

1. Inner/middle fan markers (without collocated nondirectional radio beacons (NDB) or compass locators) and localizer equipment are not normally assigned names. Localizers

Naming of NAVAIDs, Aeronautical Facilities, and Fixes 3−3−1

are identified with the associated airport name and applicable runway number in official writings. 2. All outer markers must be assigned names/codes. If the outer marker is to be situated at the same geographic location as a fix, it must adopt the fix names/code. 3. All outer compass locators (LOM) and middle compass locators (LMM) must be assigned names/codes. If co-located with a fix, they must also adopt the fix name/code. f. Names/codes assigned must be the “chart names" that will appear on aeronautical charts, in airspace dockets, and other official publications and records.

3−3−4. NAMING OF WAYPOINTS, INTERSECTIONS, AND DME FIXES

a. To decide whether a fix needs to be named, see Order 8260.19, Flight Procedures and Airspace. b. Names assigned for waypoints, intersections, Air Traffic Control (ATC) coordination, and

Distance Measuring Equipment (DME) fixes not co-located with a navigational aid must consist of a single five-letter pronounceable name. These five letters must serve as the name, identifier, and computer code. c. Regional/service area office requests for specific five-letter names for radio fixes and waypoints

should be avoided, but may be granted by AIS if feasible. d. Five-letter names that are assigned by the Mission Readiness, Terminal Procedures and

Charting Group and major commands will be coordinated with the associated ARTCC to preclude similar sounding fix names. e. AIS must not duplicate any radio fix, waypoint, marker beacons or compass locators names. f. A fix or waypoint name change is required if the fix/waypoint is moved 1 nautical mile (NM) or more unless operational requirements dictate otherwise.

3−3−2 Naming of NAVAIDs, Aeronautical Facilities, and Fixes

Chapter 4. NAVAIDs › Section 1. General

Chapter 4. NAVAIDs

Section 1. General

4−1−1. PURPOSE

This chapter provides guidelines and procedures for nonrulemaking actions related to requests for the establishment, relocation, modification, and discontinuance of NAVAIDs.

4−1−2. POLICY

a. Various types of NAVAIDs are in use today, each serving a specific purpose in the National

Airspace System (NAS). These aids have varied owners and operators, but the FAA has statutory authority to prescribe standards for the operation of any of these aids that are used as part of the NAS. b. Dates for commissioning, discontinuance, or conversion of NAVAIDs that are part of the NAS

must coincide with associated aeronautical charting dates.

4−1−3. RESPONSIBILITY FOR FREQUENCY SELECTION

The Interdepartmental Radio Advisory Committee (IRAC), which is composed of representatives of various Federal agencies, has delegated to the FAA the responsibility to manage frequency selections/ assignments for all NAVAIDs. The frequency is selected by the regional Frequency Management Office as set forth in the FAA's 6050 series of Orders. Military and other government proponents apply for frequency authorization to the FAA through their respective headquarters. Non-Federal proponents must file with the Federal Communications Commission (FCC) and must only be notified of the frequency selected after the FCC/IRAC action is completed.

4−1−4. GOVERNING CRITERIA

Order 7031.2, Airway Planning Standard Number One - Terminal Air Navigation Facilities and Air Traffic Control Services; Order 7031.3, Airway Planning Standard Number 2 -Air Route Traffic Control; and other pertinent agency orders contain criteria governing the establishment of NAVAIDs.

4−1−5. LONG-RANGE PLANNING

Service area offices, Technical Operations service area offices, the Technical Operations ATC Facilities, Implementation Services, and the FPT, must work in concert to maintain a long-range plan for the provision of NAVAIDs and associated air traffic control services.

4−1−6. PROPOSED CHANGES

The service area office and/or FPT must submit to Technical Operations ATC Facilities, Implementation Services proposed changes to NAVAIDs that are of a magnitude to require advance budgetary planning and/or user coordination at the national level.

General 4−1−1

Chapter 4. NAVAIDs › Section 2. FAA NAVAIDs

Section 2. FAA NAVAIDs

4−2−1. POLICY

a. Site locations for the establishment or relocation of NAVAIDs require approval by the

appropriate Technical Operations service area offices, FPT, service area offices, Airports, and Flight Standards Divisions. b. The Technical Operations service area offices' airspace focal point must request the appropriate

service area office to initiate a nonrulemaking study of the selected site. c. The Technical Operations service area office must concur with the site location before the

request for study is made.

4−2−2. COORDINATION

The service area office must coordinate the proposed site with AIS, FPT, Flight Standards and Airports Divisions, as well as affected air traffic control facilities. The NAVAIDs purpose must be considered and, as appropriate, a preliminary decision made regarding:

a. The establishment of instrument procedures; b. Airways/routes; c. Designation of controlled airspace; d. The ability to provide essential air traffic services; e. The effect of the site on facility performance; and f. The effect on the location or configuration of an airport. If all offices agree with the selected site, then the service area office should circularize the proposal, as determined necessary, for comment from the aviation community.

4−2−3. INFORMAL AIRSPACE MEETINGS

Convene an informal airspace meeting in accordance with the procedures detailed in chapter 2, section 6, of this Order. Informal airspace meetings may not be practical for time critical changes or in those cases where delay will adversely affect aviation safety. At such meetings, agency representatives should explain the planned use of the NAVAIDs, including instrument approaches or other terminal procedures or airspace planning, and any action will be subsequently handled by airspace rulemaking procedures. However, care should be taken that the agency's ex parte policy is not violated during these informal proceedings.

4−2−4. APPROVAL AUTHORITY

The service area office is responsible for coordination and final approval or disapproval of sites selected for installation of en route NAVAIDs. The regional FPT is responsible for coordination and final approval or disapproval of sites selected for installation of terminal NAVAIDs. The approval or disapproval determination must be issued by memorandum to the appropriate Technical Operations service area office. Any disapproval issued must include the reasons why a site is not acceptable. Agency personnel are reminded that en route site approval does not constitute approval of instrument approach procedures or controlled airspace planning to be processed under rulemaking action.

FAA NAVAIDs 4−2−1

4−2−5. DISTRIBUTION

The service area office must distribute a copy of the approval or disapproval determination to all FAA offices that participated in the site study and to ARN-1.

4−2−6. COMMISSIONING DATE

The responsible Technical Operations service area office is authorized to proceed with installation of the NAVAID upon receipt of the site approval. As soon as possible thereafter, an estimated date of commissioning must be agreed upon by the service area office, FPT, Technical Operations service area office, and any other concerned FAA offices. To the extent possible, the date of commissioning must coincide with the associated aeronautical charting dates.

4−2−7. PROCESSING REGULATORY ACTIONS

The FPT must process the necessary instrument procedures and the service area office must process airspace rulemaking actions to be effective with the associated aeronautical charting date.

4−2−2 FAA NAVAIDs

Chapter 4. NAVAIDs › Section 3. Military NAVAIDs

Section 3. Military NAVAIDs

4−3−1. POLICY

Military NAVAID proposals may affect airspace or airport utilization and the availability of interference protected frequencies. Consequently, military proposals involving the establishment or relocation of military NAVAIDs are forwarded to the service area office for nonrulemaking studies. Such proposals should contain the following information:

a. Site of the NAVAIDs using geographical coordinates to the nearest hundredth of a second. b. Equipment type. c. Power output. d. Frequency range. e. Any other pertinent information.

4−3−2. COORDINATION WITH MILITARY

The service area office is authorized to coordinate with the originating military organization to obtain any additional information needed for the nonrulemaking study.

4−3−3. EVALUATION BY TECHNICAL OPERATIONS SERVICES OFFICE

The regional Frequency Management Office must evaluate the military proposal to determine frequency availability and frequency protection. This evaluation must be provided to the responsible service area office.

4−3−4. CIRCULARIZATION

If the frequency evaluation report is favorable, the service area office must complete coordination with the appropriate Airports, Flight Standards, and other Technical Operations service area offices, and the FPT. If appropriate, circularize the proposal to user groups and other interested persons for comment. If the public comments indicate further discussion is warranted, then consideration should be given to holding an informal airspace meeting to discuss the proposal.

4−3−5. DETERMINATION RESPONSIBILITY

The responsibility to determine the acceptability of the military proposal is delegated to the service area office after coordination with the FPT, Technical Operations service area office, Flight Standards, and Airports Divisions. Any problems with, or objections to, the proposal must be resolved at the regional/service area office level prior to issuance of the decision. The determination must be issued in memorandum form stating that the FAA has “no objections" or “objects" to the installation of the NAVAID. Airports Divisions are cautioned to ensure that site locations for the establishment or relocation of NAVAIDs on obligated airports are in accordance with FAA approved Airport Layout Plans. Any restrictions or reasons why the proposal is objectionable must be clearly set forth in the memorandum.

4−3−6. NOTIFICATION AND DISTRIBUTION

The appropriate service area office must normally address the determination to the military organization that originated the proposal. When the request for the study originated from FAA

Military NAVAIDs 4−3−1

headquarters, then the determination should be directed to the office requesting the study or relayed to the Military Command through FAA/Department of Defense (DoD) coordination procedures. Forward copies of the memorandum to ARN-1, the Technical Operations Spectrum Assignment and Engineering Services, and those regional/service area offices that participated in the study.

4−3−2 Military NAVAIDs

Chapter 4. NAVAIDs › Section 4. Non-Federal NAVAIDs

Section 4. Non-Federal NAVAIDs

4−4−1. POLICY

For the purpose of this section, the term NAVAID is synonymous with Air Navigation Facility as defined in Title 49 of the United States Code (49 USC), Subtitle VII, Part A, Subpart I, Chapter 401, Section 40102, (a), (4). The FAA's role regarding non-federal systemsis to assist sponsors proposing to establish, replace, or relocate such NAVAIDs by providing technical planning, minimum equipment and operational standards, and processing requirements for such proposals. This applies to system types identified in the Non-Federal Program, FAA Order 6700.20. The operation of nonfederal facilities associated with the approval of Instrument Flight Rules (IFR) and air traffic control procedures must be in accordance with the minimum requirements set forth in Title 14 Code of Federal Regulations (CFR) Chapter I, Subchapter J, part 171, titled “Non-Federal Navigation Facilities” and in FAA Order 6700.20. Title 14 CFR part 171, outlines the minimum requirements non-federal facilities must meet in accordance with the authorities cited from Title 49 of the United States Code in part 171.

4−4−2. REQUEST FOR ESTABLISHMENT

The sponsor requesting the establishment, replacement, or relocation of a non-federal system, as defined in part 171 and FAA Order 6700.20, must submit a separate FAA Form 7460-1, Notice of Proposed Construction or Alteration, for each component of the system to ensure sufficient description. The following information should be provided:

a. The site of the system using geographical coordinates to the nearest hundredth second, to

include all components of the system, such as shelters, antennas, and other sensors. b. The facility ground elevation and height of the tallest part of the structure, to include obstruction

lights or lightning rods. c. Facility information:

1. Facility identification. 2. Facility name. 3. Facility type. 4. Facility subtype. 5. Equipment manufacturer, make and model. d. Facility design drawings that show the proposed location. For systems located on an airfield, the

sponsor must include: elevations of the entire airport property, annotations of support facilities (e.g., shelters, concrete pads, and structures), distances from the proposed system to the nearest point of the runway(s), and equipment profile. e. Pictures of the proposed location. f. Provide critical aircraft per AC 150/5000-17 that operates or will operate at the airport or runway end, as applicable. g. Identify any known siting criteria deviations. h. Any other pertinent information.

4−4−3. RESPONSIBILITY

Sponsors must submit requests for the establishment, replacement, or relocation of a non-federal system to the Non-Federal Program Implementation Manager (PIM) in the Service Center's Planning

Non-Federal NAVAIDs 4−4−1

and Requirements Group for initial processing. The Non-Federal PIM will review the proposal to ensure it includes all necessary information and is accurate, then disseminate it to the appropriate offices for review via the OE/AAA system. In order to determine the outcome of the proposal within the required notice period, each office should forward the results of its evaluation within 45 days to the Non-Federal PIM for further processing. Areas of responsibility are delegated as follows:

a. Service Center's Non-Federal PIM. The Service Center's Non-Federal PIM is responsible for

the overall service area office coordination on behalf of the sponsor. The Non-Federal PIM will direct sponsors to the appropriate Advisory Circulars and Orders that provide information on the minimum equipment and operational performance standards, siting requirements, and the conditions prerequisite to use of the facility. Additionally, the Non-Federal PIM will: 1. Direct the sponsor to submit a frequency request, if applicable, to the Spectrum Engineering Services Group via FAA Frequency Coordination Request (FCR) Internet Portal at https://webfcr.faa.gov/. 2. Submit required aeronautical data to Aeronautical Information Services (AIS) using the appropriate AIS System Data Form (e.g., 7900-2 Navigational Aids, 7900-5 Weather, 7900-6 Instrument Landing Systems, etc.) via the Aeronautical Information Portal at https://nfdc.faa.gov/nfdcApps/. 3. Assist the sponsor on the process for submitting an aeronautical study request. 4. Coordinate with the sponsor to submit any additional information needed for the aeronautical study. 5. If applicable, direct the sponsor when to submit their request for an instrument flight procedure (IFP) via the Instrument Flight Procedures Information Gateway website at https://www.faa.gov/air_traffic/flight_info/aeronav/procedures/ifp_form/. 6. If applicable, advise the sponsor of the process for scheduling a commissioning flight and ground inspection. 7. Provide the appropriate air traffic and technical operations offices the results of the aeronautical study. b. Air Traffic. The appropriate air traffic control facility will examine the proposal and provide

comments regarding utilization of the airspace, aeronautical operations, and air traffic control procedures. c. Airports Division. The appropriate Airport District Office (ADO)/Regional Office will evaluate

the proposal for impacts to airports. The ADO/Regional Office will: 1. Evaluate the proposal in reference to existing and planned airport development on file with the agency. 2. Evaluate the proposal for compliance with applicable airport design surfaces and standards. d. Flight Standards. The Flight Technologies and Procedures Division (FTPD) is the focal point

for studying the effect of the proposed non-federal system with respect to the safe and efficient use of navigable airspace by aircraft and with respect to the safety of persons and property on the ground. e. Flight Procedures Team (FPT). The appropriate service area is the focal point for studying the

effect of the proposed non-federal system on existing or proposed IFR flight procedures. In developing IFR procedures, FPT personnel will: 1. Determine whether their respective requirements outlined in part 171 and Order 8260.3, United States Standard for Terminal Instrument Procedures (TERPS), have been satisfied. 2. Initiating development of required IFR procedures.

4−4−2 Non-Federal NAVAIDs

3. Identify new IFP development requirements and impacts to existing/proposed FAA instrument flight procedures in accordance with FAA Order 8260.43, Flight Procedures Management Program. Non-FAA service providers are responsible for their procedures. f. Technical Operations Spectrum Engineering Group, Spectrum Assignment and Engineering Team. Evaluates the proposal to determine frequency availability, potential frequency interference effects on existing/planned navigational aids, radar/surveillance, and possible electromagnetic interference to radio communications frequencies. These tasks include: 1. Validate frequency assignments with the Federal Communications Commission (FCC). 2. Provide the sponsor with the Non-Government Tracking Number (NGT#) for their FCC application to affirm coordination with the FAA. 3. Provide the frequency assigned to the Non-Federal PIM. g. Technical Operations/Operations Engineering Support Group. Evaluates the proposal to

determine if the project meets the FAA's required siting criteria for the specific system type. These tasks include: 1. Provide comments pertaining to the proposal to ensure the project meets proper siting criteria. See the most recent version of FAA Order 6700.20 for systems without FAA equivalency. 2. Coordinate sponsor identified siting criteria deviations with the applicable Second-Level Engineering Office as appropriate. 3. Review proposal for impacts to other NAS facilities and provide comments. h. Other applicable FAA offices or services may be requested to provide an evaluation of the

proposal on a case-by-case basis.

4−4−4. EXTERNAL COORDINATION

The appropriate service area office will circularize the proposal in accordance with FAA Order JO 7400.2, Chapter 11, Evaluating Aeronautical Effect, Section 2, Processing of Airport Proposal By Regional Airports Offices or Section 4, Processing of Airport Proposals by Operations Support Group (whichever applies) of this order.

4−4−5. COMPLETION AND NOTIFICATION PROCESS

The Non-Federal PIM will prepare a determination letter based upon the results of the study, which will include any comments received from the appropriate offices. The determination letter will identify if there are any objections; it does not give approval for the project to proceed. The Non-Federal PIM must then forward the determination letter to the sponsor. Upon completing other processes outlined in FAA Order 6700.20, the Non-Federal PIM will communicate to the sponsor whether the FAA will approve or disapprove the project.

4−4−6. AERONAUTICAL STUDY RETENTION AND ARCHIVING

The Non-Federal PIM will store copies of the determination issued to the sponsor for future retrieval and make them available upon request.

Non-Federal NAVAIDs 4−4−3

Chapter 4. NAVAIDs › Section 5. Discontinuance of FAA NAVAIDs

Section 5. Discontinuance of FAA NAVAIDs

4−5−1. POLICY

Operational requirements, air traffic demand, and budgetary limitations are normally the basis for the retention or decommissioning of FAA NAVAIDs. Since economics are a necessary consideration, a NAVAID becomes a candidate for decommissioning when the activity level, or factors other than activity level on which it may have been justified, are eliminated or changed significantly. Discontinuance criteria are contained in the appropriate Airway Planning Standards (Orders 7031.2, Terminal, and 7031.3, En Route). Any discontinuance should be in accordance with the Federal Radio Navigation Plan.

4−5−2. RESPONSIBILITIES

a. En Route and Oceanic Services and Terminal Services must ensure that FAA-funded NAVAIDs

Continue reading ↓ 120 of 957 passages shown