1

ORDER 6580.3A

REMOTE COMMUNICATIONS FACILITIES INSTALLATION STANDARDS HANDBOOK

NOVEMBER 1, 1993

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Distribution: A-W(NC/SE/TR/NS/SM/OS)-2; A-X(AF)-3; A-ZY-1; Initiated By: ANC-700 A-FAF-7(LTD)

RECORD OF CHANGES

DIRECTIVE NO.

2

SUPPLEMENTS

CHANGE SUPPLEMENTS

CHANGE TO

OPTIONAL USE

OPTIONAL USE

TO BASIC

FAA FORM 1320–5

BASIC

Recycled Recyclable

11/1/93 6580.3A

FOREWORD

This order provides guidance and reference material to be used in the installation of remote communications facilities, i.e., air-toground radio communications facilities, in support of the Capital Investment Plan.

3

This order also outlines the orderly approach leading to the establishment, reconsolidation, relocation, and upgrade of remote communications facilities. Every effort was made to consider those activities required with tasks to be completed first, followed with tasks to be completed in a finished operational remote communications facility.

The expected results of establishing a complete standards guide to be followed by all regions includes cost avoidance through: (1) improved grounding and bonding requirements; (2) reduced maintenance travel and staff time; and (3) reduced retrofitting for implementation of modern equipment.

An earnest attempt was made to include all related information needed to establish or improve remote communications facilities. Ideas to enhance or expand the handbook to be a more useful and beneficial tool are greatly appreciated. Additional information which only those persons with direct hands-on experience can provide should be conveyed to ANC-300 by calling(202) 287-7181 or writing to Program Manager for Air/Ground Communications and Control Program, ANC-300, 800 Independence Avenue SW, Washington DC 20591.

ichet K. / ee

Lockett K.Yee Program Manager for Air/Ground Communications and Control

Page i (and ii)

5

TABLE OF CONTENTS

CHAPTER 1. GENERAL

1. Purpose 2.1 Distribution 3. Cancellation 4. Background 5. Philosophy 6. Site Criteria 7.-12.Reserved

Page No.

1

1 1 1 1 2 3 3 4

Existing A/G Radio Communications

Figure 1-1. System

CHAPTER 2. REMOTE COMMUNICATIONS FACILITIES

SECTION 1. GENERAL

13. Remote Communications Facilities Operation

5

5

5 6

Proposed A/G Radio Communications

Figure 2-1. System Figure 2-2. ATCT and Ancillary Facilities Figure 2-3. En Route National RCAG System Major Facilities 14. Automated Terminal Information System 15. En Route Flight Advisory System Figure 2-4. ARTCC and Ancillary Facilities 16. Interfacility Communications Facilities 17.-21. Reserved

SECTION 2. FUNCTIONAL EQUIPMENT DESCRIPTION

22. Genelal 23. Transmitter System 24. Receiver System Figure 2-5. RCF and Control Facilities 25. Antenna System 26. Remote Maintenance Monitoring 27. Emergency Communications

7 10

11 11 12 13 13

13

13 13 14 15 16 16 17

Figure 2-6. Block Diagram Remote Maintenance

Monitoring 28. Sustaining BUEC System 29.-32. Reserved Figure 2-7. ARTCC A/G Communications System Redundancy

18 19 19 20

Page iii

6

6580.3A 11/1/93

Page No.

SECTION 3. EQUIPMENT DESCRIPTION 21

33. General 21 34. VHF Transmitters 21 Table 2-1. Radio Equipment 22 35. UHF Transmitters 23 36. VHF Receivers 23 37. UHF Receivers 23 38. New Transmitters and Receivers 23 39. Remote Control System 23 40. Antennas 24 41. Multicouplers 24 42. Coaxial RF Line Sections 25 43. Combiners 25 44. Isolators 25 45. Filters 25 46. Transmission Line 25 47. Equipment Racks 25 48.-51. Reserved 25

SECTION 4. SITE CHARACTERISTICS 26

52. General 26 53. Stand-Alone RCF 26 54. Collocated RCF 26 55. Building Floor Plans 26 Figure 2-8. Stand-Alone RCF Site Layout 27 Figure 2-9. Typical Antenna Pole Mounting 28 Figure 2-10. Typical Integral RCF/VORTAC Antenna Mounting 29 Figure 2-11. Typical Floor Pian With Racks 30 (No Engine Generator) Figure 2-12. Typicai RCF/RCAG Floor Plan W/Racks 31 Figure 2-13. Typical RCF/RTR Floor Plan W/Racks 32 Figure 2-14. RCF/VORTAC Collocated in a 21' 34 Diameter Building Figure 2-15. RCF/VORTAC Collocated in a 35 20'x 36' Building Figure 2-16. RCF/VORTAC Collocated in a 36 25'x 31' Building Figure 2-17. RCF/VORTAC Collocated in a 32' 37 Diameter Building Figure 2-18. RCF/VORTAC Collocated in a 38 36'x 36' Building Figure 2-19. Future RCF/VORTAC Facility 39 Figure 2-20. RCF/RCL Collocated in a 40 14'x 26' Building 56.-60. Reserved 41

Page iv

7

Figure 2-21. Small 10' x 14' RCL Building

CHAPTER 3. MANAGEMENT OF RCF

SECTION 1. ADMINISTRATIVE

61. General 62. Notices to Airmen 63. Planning 64. Tasks 65.-69. Reserved

SECTION 2. TECHNICAL

70. General 71. Design Considerations Table 3-1. Typical Electrical Parameters For Earth and Water

Page No.

42

43

43

43 43 43 44 45

46

46 46 48

49

Figure 3-1. Typical Average Ambient Noise Level

72. Installation 73. Testing and Evaluation 74.-78. Reserved

CHAPTER 4. GROUNDING & LIGHTNING PROTECTION

SECTION 1. GENERAL REQUIREMENTS

79. Grounding System 80. Grounding System Terminology 81. Grounding System Description

50 52 52

53

53

53 53 54 55

Figure 4-1." Typical Facility Ground System

82. EMI 83. Transient Protection 84.-87. Reserved

SECTION 2. EARTH ELECTRODE SYSTEM

88. General 89. Environmental Conditions Evaluation 90. Earth Resistance 91. Design Parameters

56 56 56

57

57 57 57 57 60

Figure 4-2. Change in Resistance vs Number

and Spacing of Rods 92. Installation Figure 4-3. Effect of Chemical Treatment

61 62

On Resistance Of Ground Rod System

64

Figure 4-4a. Typical RCF Earth Electrode System

65

Figure 4-4b. Typical RCF Earth Electrode System

Page v

8

6580.3A 11/1/93

Page No.

Figure 4-5. Exothermic Welding Process 66 Figure 4-6. Ground Rod Welds 67 Figure 4-7. Details of Ground Rod/Inter- 68 Connecting Cable Installation Figure 4-8. Grounding Access Well Construction 69 Figure 4-9. Connection to Earth Electrode 71 System Figure 4-10. Tower And Structure Surface Ground 73 Plane System In Poor Conducting Soil 93. Main Ground Plate 75 94. Main Ground Plate Installation 75 Figure 4-11. Trench Method of Soil Treatment 76 Figure 4-12. Alternate Method of Soil Treatment 77 Table 4-1. RCF Earth Electrode System 78 Installation Materials Figure 4-13. Main Ground Plate Installation 79 Table 4-2. New Installation Junction Box, 80 Main Ground Plate 95.-98.Reserved 81

SECTION 3. LIGHTNING PROTECTION SYSTEM 81

99. Requirements 81 Figure 4-14. Lightning Protection for Antenna 82 Platforms Figure 4-15. Determining Air Terminals for 83 Buildings Under 50 Feet Tall Figure 4-16. Determining Air Terminals for Towers 84 Figure 4-17. Air Terminal Protection of Flat 85 Surfaces 100. Installation 86 Figure 4-18a. Antenna Tower Grounding and 87 Lightning Protection Figure 4-18b. Antenna Tower Grounding and 88 Lightning Protection Figure 4-19. Guyed Tower Grounding and Lightning 89 Protection 101.-105. Reserved 90 Figure 4-20a. Typical Antenna Tower Coaxial 91 Cable and Junction Box Grounding Figure 4-20b. Typical Antenna Tower Coaxial 92 Cable and Junction Box Grounding Figure 4-21. Typical Coaxial Cable Bulkhead 93 Plate Figure 4-22. Typical Cable Grounding in Antenna 94 Patch Panel Figure 4-23. Lightning Protection for Under- 95

Page vi

9

Page No.

ground cables

SECTION 4. MULTIPOINT GROUND SYSTEM

106. Requirements 107. Installation Figure 4-24. Multipoint Ground Plate Figure 4-25. Multipoint Ground Installation 108.-112. Reserved Figure 4-26. Split Bolt Ground Connection Table 4-3. Sizes of Grounding Cable

SECTION 5. SINGLE POINT GROUND SYSTEM

113. Requirements 114. Installation Figure 4-27. Single Point Ground Plate Figure 4-28. Single Point Ground Installation 115.-119. Reserved

SECTION 6. TRANSIENT AND SURGE PROTECTION SYSTEM

120. Requirements 121. AC Power Protection Figure 4-29. Single Phase AC Power Surge Arrester Installation Figure 4-30. Three Phase AC Power Surge Arrester Installation Table 4-4. Materials for AC Power Surge Arrester Installation 122. Transmitter/Receiver Protection 123. Landline Protection Figure 4-31a. Coaxial Transient Suppressor Mounting Figure 4-31b. Coaxial Transient Suppressor Mounting Figure 4-32. Landline Protector Circuit Assembly Installation Table 4-5. Existing Installation Lightning Protection Circuits Material Table 4-6. New Installation Lightning Protection Circuits Material Figure 4-33. Landline Lightning Protection Installation Figure 4-34. Landline Junction Box Installation 124.-125. Reserved

96

96 96 97 98 99 100 101

102

102 102 103 104 105

105

105 105 107

108

109

110 110 111

112

113

114

116

117

118 119

Page vii

10

SECTION 7. TESTING

126. Criteria 127. Earth Electrode System Figure 4-35. Earth Resistance Tester 128. Lightning Protection System 129. Muitipoint Ground System 130. Single Point Ground System 131.-135. Reserved

CHAPTER 5. POWER DISTRIBUTION SYSTEM

SECTION 1. GENERAL

136. General Power Systems Table 5-1. General AC Load Center Power/ System Characteristics

SECTION 2. AC POWER

137. General 138. AC Power Distribution 139. Grounding Requirements

Page No.

120

120 120 121 122 125 126 126

127

127

127 127

128

128 128 128

Figure 5-1. Simplified AC Power Distribution

System 140. AC Panelboard Figure 5-2. Main AC Service Ground Split Bolt Connection Figure 5-3. Typical Reconfigured RCF Single Phase AC Power Panelboard Figure 5-4. Typical Reconfigured RCF Three Phase AC Power Panelboard 141. Wiring 142.-145. Reserved

SECTION 3. DC POWER SYSTEM

146. General 147. DC Power Distribution Figure 5-5. Typical RCF Power Distribution Diagram Figure 5-6. Typical DC Power Rack Figure 5-7. Typical DC Load Distribution Figure 5-8. Battery Alarm and Monitor Panel 148. Grounding Requirements 149. DC Wiring

Page viii

129

131 132

133

134

135 135

135

135 135 136

137 138 139 140 140

11

11/1/93 6580.3A

Page No.

150. DC Power-Up Procedures 140 151.-155.Reserved 141

CHAPTER 6. EQUIPMENT INSTALLATION 143

SECTION 1. SYSTEM DESCRIPTION 143

156. General 143 Figure 6-1. RCF Electronic Equipment Block 144 Diagram 157. Equipment Rack Configuration 146 Figure 6-2. Typical Single Channel Equipment 147 Racks Figure 6-3. Typical Two Channel Equipment Racks 148 Figure 6-4. Typical Transmitter Combiner 149 Equipment Racks 158. Wireways 150 Figure 6-5. Receiver Multicoupler Equipment 151 Rack Figure 6-6. Voice Frequency Control Equipment 152 Rack Figure 6-7. Typical RCF Cable Tray Installation, 153 Top View Figure 6-8. Typical RCF Metallic Duct, Cable 154 Tray and Conduit Installation 159.-162. Reserved 155

SECTION 2. INSTALLATION OF EQUIPMENT 156

163. Equipment Installation 156 164.-165.Reserved 157

SECTION 3. EQUIPMENT RACK WIRING AND CABLE 158 INSTALLATION

166. Rack Terminal Block 158 167. Audio and Control Cables 158 Figure 6-9. Typical Equipment Rack Wiring 159 Figure 6-10a. Typical Landiine Cable Termination 160 Figure 6-10b. Typical Landline Cable Termination 161 Figure 6-11. Typical Rack Equipment Grounding 162 Figure 6-12. Typical Audio/Control Cable 163 Configuration 168. Coaxial Cable 164 169. RF Coaxial Cable Installation 165

Page ix

12

Page No.

Figure 6-13a. Typical Transmitter RF Cabling System (With Combiner) Figure 6-13b. Typical Transmitter RF Cabling System (Without Combiner) Figure 6-14a. Typical Receiver RF Cabling System (With Multicoupler) Figure 6-14b. Typical Receiver RF Cabling System (Without Multicoupler) Table 6-1. Antenna System Materials List Figure 6-15. VHF Transmitter Combiner Cavity Cable Harness Figure 6-16. UHF Transmitter Combiner Cavity Cable Harness Figure 6-17. RF Cabling Transfer Relay Configuration 1 Figure 6-18. RF Cabling Transfer Relay Configuration 2 Figure 6-19. RF Cabling Transfer Relay Configuration 3 Figure 6-20. RF Cabling Transfer Relay Configuration 4 Figure 6-21. LPA Transfer Relay Cabling Configuration (Proposed) 170.-172. Reserved Figure 6-22. Typical Coaxial Transfer Relay Panel Type A Figure 6-23. Typical"Coaxial Transfer Relay Panel Type B

SECTION 4. ANTENNA RF CABLE PATCH PANEL, AND BULKHEAD PLATE INSTALLATION

173. Building Antenna RF Cable Patch Panel Figure 6-24. Typical Wall Mounted Antenna Cable Patch Panel 174. Antenna RF Cable Bulkhead Plate 175.-177. Reserved Figure 6-25. Antenna Coaxial Bulkhead Plate

166

167

168

169

170 172

173

175

176

177

178

179

180 181

182

183

183 184

186 186 187 188

Figure 6-26. Alternate Wall Bulkhead Feedthrough

SECTION 5. ANTENNA SYSTEM INSTALLATION

178. Design Guidelines and Requirements 179. Maintenance Considerations 180. Interference Reduction 181. Interference Resolution

Page x

189

189 190 190 191

13

182. Frequency Intermodulation Analysis 183. Stand-Alone RCF Antenna Configuration Figure 6-27. Typical Interference Reduction Devices Figure 6-28. Twelve Frequency Antenna Configuration Figure 6-29. Antenna Configuration for RCF Collocated at AFSS 184. Collocated RCF at AFSS Facility 185. RCF Collocated at VORTAC 186. RCF Collocated at An Air Route Surveillance Radar 187. RCF for an Airport Traffic Control Tower

Page No.

192 192 193

194

194

195 195 195

195

Figure 6-30. Typical RCF Collocated With VORTAC

188. Material and Equipment 189. Antenna System Installation Summary 190. Underground Installation of Coaxiai Cable 191. Overhead Installation of Coaxial Cable 192. Reserved Figure 6-31. Cable Protective Conduit Installation Figure 6-32. Antenna Mast Messenger Cable Installation Figure 6-33.

196 197 198 198 199 199 200

201

202

Messenger Cable 1.5 Percent Sag at

70 Degrees Fahrenheit

SECTION 6. ANTENNA TOWERS AND POLES

193. Metal Antenna Tower 194. Antenna Pole and Platform

203

203 203

Figure 6-34. Typical VHF and/or UHF Antennas

on Steel Tower 195. Antenna Tower Coaxial Cable and Junction Box Installation

204

205 206

Figure 6-35. Typical RCF Antenna Pole Platform Typical VORTAC With RCF Antenna

Figure 6-36. Pole Platforms Figure 6-37a. Typical Antenna Tower Coaxial Cable and Junction Box Figure 6-37b. Typical Antenna Tower Coaxial Cable and Junction Box 196. Let-Down Mast Antenna Poles

207

208

209

210

Page xi

14

Page No.

197. RCF Antenna Mounting and Grounding 198.-199. Reserved Figure 6-38. Typical Region Supplied Let-Down Antenna Pole Figure 6-39. Antenna/Mast Mounting Details

SECTION 7. BACKUP EMERGENCY COMMUNICATIONS (BUEC) EQUIPMENT

200. Installation of Site BUEC Equipment 201.-206. Reserved Figure 6-40. BUEC Transceiver Slide Adapter Installation Figure 6-41. BUEC Antenna Location on Long Range Radar (LRR) Tower Figure 6-42. BUEC Transceiver Stand-Alone Installation

CHAPTER 7. SYSTEM TEST AND ACCEPTANCE

SECTION 1. EQUIPMENT ACTIVATION, TEST AND CHECKOUT

207. General 208. Communications Equipment Activation 209. Backup Emergency Communications Equipment Checkout 210.-215.Reserved

SECTION 2. SYSTEM TEST

216. General 217.-220. Reserved

SECTION 3. SYSTEM ACCEPTANCE

221. General 222. Contractor Acceptance Inspection 223. Joint Acceptance Inspection 224. Technical Reference Data 225. Technical Performance Record 226. Flight Inspections 227. Site Cleanup 228.-230.Reserved

Page xii

210 210 211

212

213

213 213 214

215

216

217

217

217 217

217 219

220

220 222

222

222 223 223 223 223 223 224 224

15

APPENDIX 1. ACRONYMS

APPENDIX 2. REFERENCES

APPENDIX 3. EQUIPMENT SPECIFICATIONS

Table 1. Equipment Categories Table 2.

Page No.

1

1

1

2

VHF Receivers (Typical Characteristics)

Table 3.

4

UHF Receivers (Typical Characteristics)

Table 4. VHF Transmitters (Typical Characteristics) Table 5. UHF Transmitters (Typical Characteristics) Table 6.

7 11

14

New VHF Receivers (Typical Characteristics)17

Table 7.

New UHF Receivers (Typical Characteristics)19

Table 8. New VHF Transmitters (Typical Characteristics) Table 9. New UHF Transmitters (Typical Characteristics) Table 10. TACO Antenna (Electrical Characteristics)

21

23

25

Table 11. TACO Antenna (Physical Characteristics)

Table 12. Antenna Products Co. Antenna (Physical Characteristics) Table 13. Typical Receiver Multicoupler Signal Sensitivities Table 14. Typical Transmitter Combiner Cavity Power Loss and VSWR

APPENDIX 4. NOMOGRAPHS

Figure 1. Nomograph for Electromagnetic Propagation in Free Space (100-100,000 MHz) Figure 2. Radio Field Strength/Power Density Conversion Chart Figure 3. Radio Ground-to-Air and Air-to-Air dB Loss/Nautical Miles Chart Figure 4.

27 29

31

32

1

2

3

4

Antenna Lobing for Phasing Separations

of 45 to 720 Degrees Figure 5. Audio dB-VU-dBm Chart Table 15. Audio Volts/dBm Chart for 600 Ohms Figure 6. Transmitter Modulation Analysis

5

6 7 8

Page xiii

16

6580.3A 11/1/93

Page No.

APPENDIX 5. RCF AIR-TO-GROUND ANTENNA LOCATIONS 1

Figure 7. Antenna Pattern Distortion in the 2 Horizontal Plan Figure 8. Typical Transmitter Intermodulation 5 Situation Figure 9. VHF Receiver Desensitization 10 Figure 10. UHF Receiver Desensitization 11 Figure 11. Antenna Spacing to Avoid Inter- 13 modulation Interference (VHF TX - Untuned Final) Figure 12. Antenna Spacing to Avoid Inter- 14 modulation Interference (VHF TX - Tuned Final) Figure 13. Antenna Spacing to Avoid Inter- 15 modulation Interference (UHF TX - Untuned Final) Figure 14. Antenna Spacing to Avoid Inter- 16 modulation Interference (UHF TX - Tuned Final) Figure 15. Antenna Spacing to Avoid Inter- 17 modulation Interference (VHF TX - LPA With Tuned Cavity) Figure 16. Antenna Spacing to Avoid Inter- 18 modulation Interference (UHF TX LPA With Tuned Cavity) Figure 17. Intermodulation Product Free Space 21 Attenuation Interpolation Graph Figure 18. Computed Receiver Front-End Profile 23 Compared to Specification Figure 19. Typical Pattern Distortion Caused 24 By Another Antenna Figure 20. slant Distance & Effective Aperture 25 for Staggered Antennas Figure 21. Typical Pattern Distortion Caused 26 by a Vertical Conducting Object

APPENDIX 6. VERTICAL LOBING 1

Figure 22. Geometry of Direct and Reflected 2 Propagation Paths Figure 23. Example of Vertical Pattern With 3 Vertical Lobing Distortions (Shown for Flat Earth) Figure 24. Nominal Values for Communications 5 Link Figure 25. Graphical Aid for Determining 7 Service Volumes

Page xiv

17

11/1/93 6580.3A

Page No.

Figure 26. Comparison Graph for Matching Lobe/ 8 Nuli Structure to Service Volume Requirements Figure 27. Low-Angle Antenna Coverage Limits 9 Figure 28. Position Of Nulls vs Grazing Angle 10 for Various Antenna Heights (Dry Dessert) Figure 29. Position Of Nulls vs Grazing Angle 11 for Various Antenna Heights (Average Ground) Figure 30. Position of Nulis vs Grazing Angle 12 for Various Antenna Heights (Good Ground) Figure 31. Position of Nulls vs Grazing Angle 13 for Various Antenna Heights (Marshland) Figure 32. Position of Nulls vs Grazing Angle 15 for Various Antenna Heights (Freshwater) Figure 33. Position of Nulls vs Grazing Angle 16 for Various Antenna Heights (Sea Water) Figure 34. Distance to Nulls of 12 uV Contour 17 for Various Grazing Angles (Dry Desert) Figure 35. Distance to Nulls of 12 uV Contour 18 for Various Grazing Angles (Average Ground) Figure 36. Distance to Nulis Of 12 uV Contour 19 for Various Grazing Angles (Good Ground) Figure 37. Distance to Nulls of 12 uV Contour 20 for Various Grazing Angles (Marshland) Figure 38. Distance to Nulls of 12 uV Contour 21 for Various Grazing Angles (Freshwater) Figure 39. Distance to Nulls of 12 uV Contour 22 for Various Grazing Angles (Seawater) Figure 40. Comparison Graph for Example No. 1 26 Figure 41. Comparison Graph for Example No. 2 27 Figure 42. Reflection Zone for Vertical Lobing 29

APPENDIX 7. PATTERN DISTORTION 1

Figure 43. General Configuration for Omni- 2 directional Pattern Distortion

Page xv

18

6580.3A 11/1/93

Page No.

Table 16. Gain of Antennas and Objects 4 Causing Pattern Distortion Table 17. Total Pattern Distortion for 6 Four VHF Antennas Arranged in a Square Figure 44. Four Standard Antennas Arranged 8 in a Square Table 18. Computer Generated Analysis of 9 Horizontal Distortion

APPENDIX 8. DETERMINATION OF RECEIVER DESENSITIZATION AND 1 TRANSMITTER INTERMODULATION PRODUCT INTERFERENCE

Table 19. Receiver Desensitization Worksheet 2 Table 20. Receiver Desensitization Worksheet 6 (Sample) Table 21. Transmitter Intermodulation 8 Product Interference Parameters Figure 45. Single VHF Transmitter Combiner 10 8-Inch Aluminum Cavity Insertion Loss Figure 46. Single UHF Transmitter Combiner 11 8-Inch Aluminum Cavity Insertion Loss Table 22. Transmitter Intermodulation 13 Product Attenuation Table 23. Filter Device Attenuation 14 Table 24. Transmitter Intermodulation Product 17 Interference Worksheet Table 25. Transmitter Intermodulation Product 18 Interference Worksheet (Sample) Figure 47. Typical Stand-Alone RCF Inter- 21 modulation Product Interference Calculation

Page xvi

19

11/1/93 6580.3A CHAPTER 1. GENERAL

1. puRposE. This order provides procedures, guidance, and reference material which shall be used in the installation of Remote Communications Facilities (RCF), i.e, air-to-ground (A/G) radio communications facilities, in support of the Capital Investment Plan (CIP) Project 24-02, Communications Facilities Consolidation/Network.

2. DIsTRIBUTION. This order is distributed to division level in the Office of the Program Director for Communications and Aircraft Acquisition, NAS System Engineering, Air Traffic Plans and Requirements, NAs Transition and Implementation, Systems Maintenance and Operational Support Services; branch level to Regional Airway Facilities divisions; director level at the FAA Technical Center and the Mike Monroney Aeronautical Center; limited distribution to Airway Facilities sector field offices, sector field units, and sector field office units.

3. CANCELLATIONS. The following orders are canceled:

a. Order 6580.2, Remote Communication Facility Siting Criteria Handbook, dated November 12, 1985.

b. Order 658o.3, Remote Communication Facility Installation Standards Handbook, dated April 30, 1986.

4. BACKGROUND.

a. Existing System. The existing system of remote A/G communications facilities was established according to regional requirements for terminal and en route traffic control and flight services. Specific facilities are used to support Radio Frequency (RF) communications between the pilots and control personnel providing these services. Figure 1-1, Existing A/G Radio Communications System, illustrates the existing A/G radio communications system.

b. Proposed system. The improvement of A/G communications facilities through establishment, consolidation, relocation, upgrading, and networking of A/G radio communications facilities will provide improved performance of facilities which serve the combined needs of air traffic control (ATC) and flight services. This activity is a major element in the CIP Plan family of A/G radio communications projects. One major objective of projects in this category is to provide a modern, solid-state, remotely monitored radio communications network with improved performance for the FAA.

Chap 1 Page 1 Par 1

20

6580.3A 11/1/93

5. PHILOSoPHY. RCF's provide the A/G radio link between pilots and air traffic controllers, Flight Service Stations (FSS), and terminals. These facilities employ transmitters, receivers, antenna systems, remote control units, and associated equipment necessary for the transmission and reception of RF communications. When controlled by an Air Route Traffic Control Center (ARTCC), an RCF is designated as a Remote Center Air to Ground (RCAG); a Remote Transmitter Receiver (RTR) when controlled by an Airport Traffic Control Tower (ATCT) or Terminal Radar Approach Control (TRACoN); and a Remote Communications Outlet (RCo) when controlled by an FSs or Automated Flight Service Station (AFSS). Since the three types of remote communications facilities use common technology and have common design requirements, a single installation standards handbook is applicable to all three types. The CIP Project 24-02, Communications Facilities Consolidation/Network, will reduce costs and improve performance through the consolidation of the various types of communications facilities and upgraded installation standards.

a. Cost. Consolidation of individual facilities will reduce costs since the use of additional sites results in more land ownership and/or leasing costs and increased time and costs for travel to and from the sites when providing scheduled and unscheduled maintenance. This is in addition to the cost for building maintenance, heating, ventilation and air conditioning (HVAC), and leased landiines.

b. Performance. The existing facilities do not provide the desired level of performance with regard to RF coverage, reliability, and Radio Frequency Interference (RFI) standards. Performance will be enhanced when the new installation standards are put into practice. These standards will define proper installation of equipment and grounding systems, Electromagnetic Compatibility (EMC) objectives, and Electromagnetic Interference (EMI) and RFI reduction measures.

c. Results. This project will reduce costs and improve performance through the following:

(1) Reduced land and facilities costs.

(2) Reduced maintenance costs.

(3) Reduced HVAC requirements.

(4) Improved installation procedures.

(5) Improved site management.

The consolidated facilities may appear to be a single large facility; however, their individual identities, for the purpose of certain documentation and other non-technicai considerations, will be

Page 2 Chap 1 Par5

21

11/1/93 6580.3A

retained. This order contains standard design and installation criteria for communications facilities at consolidated as well as individual stand-alone sites.

6. SITE CRITERIA. RCF site relocation, and/or reconfiguration planned by the regions must meet all of the air traffic specified service volume, EMC/EMI/RFI standards, and frequency protection criteria. This will require FAA headquarters and regional spectrum management offices to perform an EMC study, an RFI analysis, and an RF coverage analysis for the frequencies associated with all of the specified service volumes at these sites. It is imperative that the spectrum management offices be involved early in the design process to ensure frequency analysis and frequency assignment process proceeds in a timely manner. Any condition in the RF environment that may affect facility operation must be brought to the attention of the RCF manager and project coordinator. These conditions shall be addressed in the preliminary stages of facility design or relocation.

7.-12. RESERVED.

Chap 1 Page 3 Par 5

22

EXISTING A/G RADIO COMMUNICATIONS SYSTEM

FIGURE 1-1.

RTR

ATCTRTR

RTR

RO

AFSRRCO

DFRCO

VOOC

TRACON

AATC ROL

RCAG

RTR

ASR

RCAG

ARSRUEC

Chap 1 Par 7

11/1/93 6580.3A

CHAPTER 2. REMOTE COMMUNICATIONS FACILITIES

SECTION 1. GENERAL

13. REMOTE COMMUNICATIONS FACILITIES OPERATION. The RCF prOVide RF communications for various services within the ATC system. The present ATC system is required to provide coverage of the entire airspace over the contiguous United States, Hawaii, Alaska, and the Atlantic and Pacific control zones. This coverage extends from ground surface at terminal areas to an altitude of 70,000 feet at en route areas.

23

a. ATC Communications System. The ATC communications system encompasses a network of ATCT, ARTCC, TRACON, AFSS, FSS, and their associated RCF's. The RCF may be stand-alone or be coliocated with other Federal Aviation Administration (FAA)-owned facilities to extend the service range of the ATC facility. The number of stand-alone RCF sites is held to the minimum required to maintain the air traffic coverage. An illustration of a typical ATC A/G radio communications system after consolidation is shown in Figure 2-1, Proposed A/G Radio Communications System.

b. Terminal A/G Radio Communications Frequencies. The number of A/G radio communications frequencies for non-approach and non-radar approach control facilities is specific, whereas those for radar approach control facilities vary according to functional requirements.

c. Terminal Control Facilities. The terminal control facilities include ATCT, TRACON, AFSS/FSS, and their associated RCF's. A TRACON can be collocated with an ATCT or in a stand-alone facility at the airport. The Air Force RADAR APPROACH CONTROL, and Navy RÀDAR AIR TRAFFIC CONTROL CENTER are military facilities similar to the FAA TRAcoN, except that they often have ground-controlled approach capabilities.

(1) Air Traffic Control Tower. The upper portion of the tower, calied the TowER CAB, has windows which provide a panoramic view of the airport grounds and airspace in the vicinity." Radar displays which show aircraft location are used by tower personnel for collision avoidance and to position aircraft for landing and takeoff. Control panels for radio communications equipment are located in the tower to provide RF communications between the pilot and ground personnel in the performance of their duties. Figure 2-2, ATCT and Ancillary Facilities, illustrates its principal facilities.

(a) ATCT Buildings. The ATCT buildings are frequently leased by the FAA from the local municipality. Current policy permits

Chap 2 Page 5 Par 13

24

PROPOSED A/G RADIO COMMUNICATIONS SYSTEM

FIGURE 2-1.

VOCF

RCORAG) ATCTRCF

TRAORCF

AFSRCF

BUEC VOCF

REMMOTE BUEC DFRRCF

ASRRCF

ARSRCF

Chap 2 Par 13

FIGURE 2-2. ATCT AND ANCILLARY FACILITIES

RF

Chap 2 Par 13

RF

AFS

VORTRCF

TRAOORCL

ARTC

6580.3A 11/1/93

the FAA to construct its own structures, within limitations. The ATCT usually has two or more controller positions, each with its own control and audio equipment. The ATCT building is comprised of a tower cab and in some cases a collocated TRAcoN, associated equipment room, and administrative offices.

26

(b) Tower Cab. The typical tower cab is located so that a panoramic view of the airport is possible with little or no obstruction. Air traffic controllers work in this space and utilize A/G radio communications, radar, and information from TRACON facilities in the performance of duty. Operations are performed using communications consoles, radar displays, and various indicators and navigational aids.

(c) Air Traffic Controller. Air traffic controllers accept aircraft entering their geographic area of responsibility, TRACON/ATCT terminal area or ARTCC sector. They establish A/G radio communications with the aircraft, identify it, and control flight progress until the aircraft is handed over to an adjacent sector or terminal or is released from the control system.

(2) Terminal Radar Approach Control. In busy air traffic areas, TRACoN is used to monitor aircraft position via radar. Radar systems provide vital information used in collision avoidance systems and allow proper control and positioning of approaching aircraft.

(a) TRACON Facility. A typical TRACON facility is located in the base of the tower cab. It could, however, be located in a separate building near the airport. The TRACON facility is connected to the tower cab by means of an interphone/intercom system, or an interfacility switching system. Besides having the normai transmit and receive equipment access similar to the tower cab, the TRACON facility is provided with the Automated Radar Terminal System (ARTS) equipment access.

(b) TRACON Equipment Room. The TRACON equipment rooms normally contain the audio jack panel, patch panel (resectoring panel), power supplies, Navigational Aids (NAvAIDs) monitor and visual aids monitor equipment, Bright Radar Indicator Terminal Equipment (BRITE) and Digital BRITE (DBRITE), collocated Remote Transmitter/Receiver (RTR) equipment and other equipment systems (Air Surveillance Radar, Integrated Communications Switching System associated equipment).

(3) Flight Service Stations. Flight service information is provided by FSs and AFss facilities. These stations provide flight plan and weather service information and information on terminal activity, arrivals and departures, connecting flights, fueling,

Page 8 Chap 2 Par 13

27

11/1/93 6580.3A

maintenance requests, and other data the pilot may require regarding aircraft servicing and passenger needs. These facilities provide flight service information to pilots via radio and/or commercial telephone communications. AFSS/FSS facilities can provide limited airport information service where there is no control tower. Depending on the size of the AFSS/FSS and its location, the AFSS/FSS radio equipment may be at a collocated Remote Communications Outlet (RCO) or a stand-alone RCO.

d. En Route Control Facility. All aircraft operating under Instrument Flight Rules must maintain contact with an ARTCC and/or the tower en route system on the proper A/G radio communications frequency while en route. This radio contact is made through a RCAG communications facility. The ARTCC is the hub of ATC and the focal point for coordination and A/G radio communications. An ARTCC is interconnected via the interfacility communications network with other elements of other NAs facilities. The en route centers control the operation of an RCAG and Air Route Surveillance Radars (ARSR). The connections between the ARTCC and the national RCAG system are illustrated in Figure 2-3, En Route National RCAG System, Major Facilities. Since the RCAG may be collocated at a Very High Frequency (VHF) Omni-Range/VHF Omni-Range Tactical Air Navigation (VORTAC) facility, or another FAA facility several hundred miles from its ARTCC, it is generally connected to the ARTCC by leased landlines or an FAÀ owned Remote Communications Link (RCL)(i.e., microwave).

(1) ARTCC Controlled U.S. Airspace. U.S. airspace controlled by the ARTCC is divided into individual boundary areas. The boundary area of an ARTCC is divided horizontally and vertically into sectors. Each sector is assigned to an air traffic controller who is responsible for control of air traffic within that sector. The air space described by this boundary is defined as the radio coverage area that exhibits no less than -87dBm (10uV) signal strength. This area must also meet the 14dB protection criteria at the aircraft receiver input. A network of long-range radar and beacon equipment provides each controller with data for locating and tracking commercial, general aviation, and military aircraft. An A/G radio communications system enables the controller to communicate with the aircraft.

(2) ARTCC A/G Radio Communications System. The ARTCC A/G radio communications system includes equipment which provides the air traffic controller with a means of controlling the equipment at RCAG facilities. Up to five ATC positions are provided in each sector, with A/G radio communications and telephone communications to perform individual functions. Each controller has access to the communications channel at the RCAG providing A/G radio communications

Chap 2 Page 9 Par 13

28

6580.3A 11/1/93

FIGURE 2-3. EN ROUTE NATIONAL RCAG SYSTEM, MAJOR FACILITIES

B06110n

SYMMMOLS RCceliy

Page 10 Chap 2 Par 13

11/1/93 6580.3A

coverage in the controller's sector of responsibility. Factors such as changes in service to airports, changes in procedures, changes in system usage, etc., can require resectorization. This procedure is accomplished by a resectoring patch panel that allows A/G radio communications frequencies to be assigned to different controller positions.

29

(3) Air Route Traffic Control Center. The ARTCC contains equipment used to monitor position and communicate with aircraft en route. As aircraft approach the service area of a TRACoN, communications is passed to TRACON and/or ATCT facilities. Figure 2-4, ARTCC and Ancillary Facilities, illustrates these facilities.

(4) ARTCC Equipment Room. The ARTCC equipment room is normally located on the lower floor of the ARTCC building and contains the resectoring patch panel, recording equipment, transmit and receive controls, and remote audio equipment. A Backup Emergency Communications (BUEC) processor and patch panel, as well as the BUEC transceivers may be located in the ARTCC equipment room. An RCAG may be collocated with the ARTCC facility.

14. AUTOMATED TERMINAL INFORMATION SYSTEM. The Automated Terminal Information System (ATIS) is typically used at high activity airports and is a broadcast only service to pilots. The ATIs supplies information relative to conditions at an airport and is available on a continuous basis, with updates as required, during the operating hours of the airport. The information provided consists of barometric pressure, windspeed and direction, runway in use, airport advisories, etc., and is broadcast either over a VHF Omnidirectional Range (VOR) channel or a dedicated VHF channel. ATIs is available to aircraft at higher activity control towers.

15. EN ROUTE FLIGHT ADVISORY SYSTEM. The En Route Flight Advisory System (EFAs) is located at selected FSS's and provides pilots with real-time weather advisories. The weather data provided is obtained from real-time weather observations and pilot reports. When a pilot requests EFAS service, the EFAS specialist monitoring the transmission selects the appropriate ground transmitter and provides the information the pilot requests. When the EFAs station is not manned, an automatic voting system determines the ground receiver location with the best reception from the aircraft and selects the appropriate ground transmitter to relay prerecorded information to the pilot.

Chap 2 Page 11 Par 13

30

FIGURE 2-4. ARTCC AND ANCILLARY FACILITIES

RF

RL

RL

BUEC RL ARTC

ARSRRRUEC

ATCT AFS

TRACON

VOCF

Chap 2 Par15

11/1/93 6580.3A

The EFAS will soon be supported by the Automated Surface Observing System (ASOS), the Automated Weather Observing System (AwOS), and in the future by the AWOS Data Acquisition System (ADAS).A high frequency capability is planned to expand the EFAs service to international and trans-oceanic flights.

31

16. INTERFACILITY COMMUNICATIONS SYSTEMS. In the vast majority of cases, cost considerations dictate that FAA owned facilities be used when both FAA owned and leased interfacility communications facilities are available. In exceptional circumstances, the FAA owned facilities may already be fully utilized and additional interfacility communications facilities shall then be obtained on a lease basis.

17-21. RESERVED.

SECTION 2. FUNCTIONAL EQUIPMENT DESCRIPTION

22. GENERAL. The RCF equipment and its associated antenna system, provide control facilities (ATCT, TRACON, ARTCC, and AFSS/FSS) with radio transmitter and receiver system capabilities. An RCF may be collocated with the control facility or geographically separate from the control facility. The ability to remotely locate an RCF makes it possible to locate antennas to meet air traffic requirements of radio coverage and system protection. A single RCF may serve a number of controi facilities. Figure 2-5, RCF and Control Facilities, illustrates the interrelationship between these control facilities.

23. TRANSMITTER SYSTEM. The VHF and Ultra High Frequency (UHF) transmitter system associated with A/G radio communications includes RF, antenna, audio, and control equipment. All new RCF transmitter equipment will be solid-state. Vacuum-tube designed tone signaling and control equipment is also being replaced on an emergency case-bycase basis with solid-state control equipment until such time as the equipment from the proposed CIP is deployed.

a. RF Equipment. The RF equipment is comprised of main and standby transmitters, and the associated transmission system. The antenna system consists of the antennas and transmission lines which connect the antennas to the transmitters, combiners, coaxial line, coaxial RF line sections, circulators, filters, and coaxial relays. The relays transfer main and standby transmitter outputs to the antenna system. The main and standby equipment provide required redundancy and are used interchangeably. The standby equipment is not considered a backup system. There may be tunable BUEC transceivers and their associated antenna systems at alternate locations.

Chap 2 Page 13 Par 15

32

6580.3A 11/1/93

b. Control and Audio Circuits. The control and audio circuits between the control facility and the RCF are FAA owned landlines, RCL's or leased unconditioned voice grade landlines. Transmit audio from the control facility and receive audio from the RCF pass over these circuits. Some sites have SS-1/Ss-4 alternate leased line switching. A leased line is capable of being switched when the primary line fails.

c. Antennas. The transmit antennas may be omnidirectional or directional depending on the coverage requirements. The antenna could have a gain of odB or more. However, the license for the frequency must state the antenna type, directivity, and gain.

d. Operation. The VHF and UHF bands are presently used by the FAA for two-way communications in the ATC service. The existing crystal-controlled, fixed-frequency, vHF exciters have a power output of 10 watts in the 118 MegaHertz (MHz) to 137 MHz band. The UHF exciters have a power output of 10 watts in the 255 MHz to 400 MHz band. These exciters, when required, use a Linear Power Amplifier (LPA) to increase output power to 50 watts to provide increased service volume coverage. Additionally, BUEC transceivers are functional in either the VHF or UHF bands and when required (ARTCC only) have ar RF power output of 20 watts.

24. RECEIVER SYSTEM. The VHF and UHF receiver systems associated with A/G radio communications include: RF, antenna, audio, and control equipment. Vacuum-tube designed tone signaling and control equipment is being replaced on an emergency case-by-case basis with solid-state control equipment until such time that newer equipment is deployed.

a. RF Equipment. The RF equipment is comprised of main and standby receivers and the associated antenna system. The antenna system consists of the antennas, transmission lines that connect the antenna to the receivers, multicouplers, filters, and coaxial relays. The coaxial relays are used to transfer main and standby receiver RF inputs to the antenna systems. There may be tunable backup transceivers and associated antenna systems at alternate locations.

b. Control and Audio Circuits. The control and audio circuits between the control facility and the RCF are FAA owned landlines, remote communications links, or leased unconditioned voice grade landlines. Transmit audio from the control facility and receive audio from the RCF pass over these circuits.

Page 14 Chap 2 Par 23

33

FIGURE 2-5. RCF AND CONTROL FACILITIES

AFS

Chap 2 Par24

RF

TRACON

ARTC

6580.3A 11/1/93

c. Antennas. The receive antennas may be omnidirectional or directional depending on the coverage requirements. The antenna could have a gain of odB or more. However, the license for the frequency must state the antenna type, directivity, and gain.

34

25. ANTENNA SYSTEM. Half-wave, vertically polarized, omnidirectional dipole antennas enclosed in fiberglass radomes are used. The dipoles have an area of non-coverage directly over the antenna. This noncoverage area leads to the requirement, in high and super high sectors, for the RCAG site be located outside the sector boundaries and not along an air route. Cross-channel interference, transmitter power reductions, an increase in A/G radio communications, and requirements for additional frequency channels demand better antennas. The configurations are single VHF and UHF, and stacked collinear VHF and UHF arrays. Directional VHF and UHF antennas are also used to satisfy special coverage applications.

26. REMOTE MAINTENANCE MONITORING. The Remote Maintenance Monitoring (RMM) system will improve the day-to-day operations and reduce maintenance costs. The equipment goal is to provide an efficient system approach to integrate the requirements of the Environmental Remote Monitoring Subsystem (ERMS) sensoring and maintenance monitoring, and emergency backup battery power control. A single maintenance monitoring equipment set is used to allow the monitor equipment to integrate the monitoring facility with all of its associated remote facilities. The remote site and facility maintenance panels have the ability to interface with the Maintenance Data Terminal (MDT). Maintenance monitoring parameters and Site Adaptation Data (SAD) tables will be reviewed and/or edited locally with a MDT, or the Maintenance Terminal (MT). The monitoring equipment is to provide ATC facilities with a standardized remote monitoring system that incorporates expansion and reconfiguration capabilities. The modular construction of monitoring equipment accommodates the FAA size requirements for ARTCC's, ATCT's, TRACON's and ATC facilities and their associated remote radio facilities.

a. Monitor Equipment Functions. Automatic detection and alarm sensors provide fault information for failures occurring within the indicator, display, and control subsystems and for failures occurring within main, standby, or backup equipment. An alarm is sensed by the closure of a normally open dry relay contact. This alarm information is then converted to a serial digital format and transmitted over the four-wire voice grade landline. Digital will be according to manufacturer's specifications. The alarm system shall be capable of displaying a momentary as well as a constant alarm condition.

Page 16 Chap 2 Par 24

35

11/1/93 6580.3A

b. Remote Maintenance Monitoring. Facility RMM will be provided through the monitoring equipment. The equipment will provide each RCF with performance monitoring, and status certification capability which can be accomplished from centralized control and work centers. The RCF systems have a standardized subsystem for remote monitoring of the operational status and key performance parameters of A/G radio communications equipment, selected environmental building parameters (ERMS), standby power source status, and site security over the same voice grade line as the analog voice communications. ARTCc's are considered the primary monitoring sites; however, other sites such as ATCT and FSS/AFSS facilities equipped with RMM consoles and interface components may also monitor communications equipment status. A diagram of RMM is shown in Figure 2-6, Remote Maintenance Monitoring System.

27. EMERGENCY COMMUNICATIONS. Some FAA facilities maintain emergency communications A/G radio equipment to satisfy their particular requirements.

a. Terminal Facility Emergency Transceiver. Portable selfcontained multi-frequency transceivers are located at ATCT and TRACON facilities to provide emergency A/G radio communications in the event of an airport emergency or primary power failure. These transceivers ensure that a source of A/G radio communications is always available and used only in the event of catastrophic failures of the main and standby transmitter/receiver systems. Use is restricted to emergencies because of the limited number of frequencies, low power output, and potential for producing RF interference. Order 65i0.4A, Radio Communications Requirements for Air Traffic Control Facilities, addresses current applications for emergency transceivers.

b. En Route Facility Backup Emergency Communications. Fixed remote tunable vHF and UHF transceivers are used to provide backup emergency A/G radio communications for ARTCC's located throughout the United States. In the past, BUEC equipment was installed at various alternate sites, i.e., ARSR, VOR, and RCL sites. The CIP made provisions for locating BUEC installations for optimum coverage of the required airspace. However, BUEC equipment shali not be located at the RCF site due to the tuning capability of the transceiver and the potential for causing cross-channel, intermodulation, and harmonic interference. BUEC tunable transceivers are controlled at the ARTCC through the BUEC processor, control group equipment, and BUEC selector units at the controller's position. The BUEC processor provides automatic allocation of transceivers with a predetermined priority for up to 120 controller positions. The system capability has been or will be expanded from up to 60 VHF and 60 UHF frequencies to up to 120 VHF and 120 UHF frequencies.

Chap 2 Page 17 Par 26

36

FIGURE 2-6. REMOTE MAINTENANCE MONITORING SYSTEM

MDT

TRACON ATCT ARTCC

REMOTE FACILITY

SENSOR

POWER ENVIRONMENTAL

MAIN/

MPS

MPS MODEM

SS

MODEM

UF

STANDBY

LANDLINE

ALARMS SECURITY

Chap 2 Par 27

11/1/93 6580.3A

The BUEC priority module can select up to 10 remote locations with the original system, and up to 8 remote locations with the new modules. Normally, only four remote sites are required to cover the actual airspace of a particular frequency: Figure 2-7, ARTCC A/G Communications System Redundancy, illustrates the system redundancy.

37

28. SUSTAINING BUEC SYSTEM. The present BUEC system is provided by controllable multichannel equipment located within ARTCC facilities and some remote collocated facilities, i.e., ARSR and TRACON sites. The sustaining BUEC system has the principal function per Order 6510.4A to provide primary frequency backup to individual sector communications when an RCF frequency is out-of-service. Sustaining BUEC will use single frequency equipment installed at remote sites within weather proof enclosures. Refer to chapter 6 paragraph 200, for more information.

29.-32. RESERVED.

Chap 2 Page 19 Par 27

38

FIGURE 2-7.

ARTCC A/G COMMUNICATIONS SYSTEM REDUNDANCY

ARTCC

LOCAL BUEC

(NORMAL)

-SS

LEASED LINES

RCL

-OR-

-SS

EQUIP. REQD.PER FREQUENCY

MAIN RCF 1-XMTR (VHF OR UHF) 1-RCVR (VHF OR UHF) STANDBY 1-XMTR (VHF OR UHF) 1-RCVR (VHF OR UHF)

REMOTE BUEC TRANSCEIVERS

RF PATH

—SS— LANDLINE

Chap 2 Par 33

39

11/1/93 6580.3A

SECTION 3. EQUIPMENT DESCRIPTION

33. GENERAL. The following equipment is typically located at A/G radio communications facilities.

a. Antennas.

b. Standard 83-inch high racks (EIA 19" W).

c. RF line section panel/RF relay patch panel.

d. VHF transmitters.

e. VHF receivers.

f. UHF transmitters.

g. UHF receivers. h. VHF transceivers.

i. UHF transceivers.

j. Remote control and monitoring equipment.

k. Lightning and surge protection. n Battery supply with charger. DC/AC TELCO Invertor. n Mini-Demarc. n Equipment may not be in place. The RCF may include additional equipment such as filters, combiners, and multicouplers as required to meet the objectives of CIP Project 24-02, Communications Facility Consolidation Network. The quantity and types of radio equipment required by the various control facility categories are given in Table 2-1, Radio Equipment. For updated radio equipment requirements, refer to Order 6510.4À and recommendations made by CIP Project 44-03, Radio Frequency Interference (RFI) Elimination Project.

34. VHF Transmitters. The VHF A/G transmitter consists of an exciter and optional LPA. The exciter is normally used independently and is capable of providing a carrier output power of 10 watts. The exciter supports 25 KiloHertz (kHz) channel spacing between 117.975 MHz and 136.975 MHz.

Chap 2 Page 21 Par 33

40

TABLE 2-1. RADIO EQUIPMENT

TYPICAL QUANTITIES OF EQUIPMENT PER CONTROL FACILITY

CATEGORY OF RADIO VHF UHF CONTROL FACILITY OPERATING FREQUENCIES FREQUENCIES POSITIONS

Non-approach Control 2 3 Transmit If Military Tower (Low Activity, 2 3 Receive 2 Transmit Visual Flight Rules: 2 Receive Operates only 16 Hrs daily)

Non-radar Approach 3 4 Transmit If Military Control Tower 4 Receive 3 to 4 (Medium activity)

Radar Approach (Tracon) 7 to 24 4 to 10 Control Tower 4 to 20 as Transmit Transmit (High activity) required 7 to 24 4 to 10 Receive Receive

MAIN AND STANDBY EMERGENCY EQUIPMENT TRANSCEIVER

VHF = 1 VHF, 1 UHF 6 Transmitter (If required) 6 Receivers

UHF (If assigned) 4 Transmitters 4 Receivers

VHF= 2 VHF, 1 UHF 8 Transmitters (If assigned) 8 Receivers

UHF (If assigned) 6 to 8 Transmitters 6 to 8 Receivers

VHF = 14 to 48 2 VHF, 1 UHF Transmitters 14 to 48 14 to 48 Receivers (TRACON)

UHF = 8 to 20 1 VHF, 1 UHF Transmitters (Tower Cab) 8 to 20 Receivers

Cha 2

Par 34

41

11/1/93 6580.3A

The LPA is capable of providing a power output of 50 watts when driven by the exciter. The use of the 50 watt LPA is justified when the power output of 10 watts from the exciter is not sufficient to provide a -87 decibel relative to 1 microvolt (dBm) signal level at the input of the aircraft receiver located at the edge of the associated service volume. The VHF A/G transmitter has a faiisafe mode which, after sensing power amplifier failure, switches the output of the exciter directiy to the antenna system.

35. UHF TRANSMITTERS. The UHF A/G transmitter is similar to the VHF exciter and optional LPA except for operating frequencies. UHF transmission is between 225.000 MHz and 399.975 MHz with 25 kHz channel spacing.

36. VHF RECEIVERS. The VHF A/G receiver associated with ATC service is capable of reception on any one of 760 frequencies spaced 25 kHz apart between 117.975 MHz and 136.975 MHz.

37. UHF RECEIVERS. The UHF receiver associated with ATC service A/G radio communications is similar to the VHF receiver in overall design, except for its operating frequency and number of frequencies available. The UHF receiver is capable of reception on any one of 7,000 channels spaced 25 kHz apart between 225.000 MHz and 399.975 MHz.

38. NEW TRANSMITTERS AND RECEIVERS. During the revision of this order new activity has started to purchase new VHF and UHF transmitters and new VHF and UHF receivers. This equipment could be used in new or collocation projects. The new equipment as described in the procurement specification will fit electrically and physically into current RCF equipment racks and facilities without alteration. One characteristic although is different in the VHF and UHF transmitters. These units are not to be used with LPA's that require control (i.e., PTT or activate) leads between the transmitter .and the LPA. No leads are provided in the new equipment. Refer to appendix 3 for equipment specifications.

39. REMOTE CONTROL SYSTEM. The remote control system at the RCF sites includes equipment to interface incoming audio landlines with equipment to be controlled from a remote facility.

a. Components. New installations shall use solid-state radio control equipment at control facilities for selection of A/G transmit or receive radio channels and transmitter keying. Remote operation includes paired transmitter/receiver control systems. The basic components of each system include an active jack unit, an audio unit, one or more selector units, a power supply assembly, and a patch panel.

Chap 2 Page 23 Par 34

42

6580.3A 11/1/93

b. Control Equipment. Various types of radio control or Voice Frequency Control System (VFCS) interface equipments are utilized for remote control of NAs transmitters and receivers. One of the more popular systems in use today is the LCT-CNTR-IA and RCT-RCAG-IA (VoDATA) system. Speech is contained in the 300 to 3000 Hertz (Hz) range. Control functions are transmitted using the Frequency Shift Keying (FSK) method at 2880 Hz ±60 Hz. A notch filter is used to remove the 2880 Hz signaling tone. This equipment is completely solid-state and contains ali of the equipment needed for processing audio and control signals for transmit and receive, keying, muting, and main/standby selection functions. Control of an RCF frequency requires a four-wire voice grade, unconditioned landline or RCL.

c. Functions. Keying, muting, and transmitter/receiver frequency selection functions are represented as a 12-bit synchronous data word transmitted at 150 bits per second. The data word is superimposed on the voice signal at the origination site interface, and the combined signal is transmitted to the RCF. The voice and data are received at the RCF site, where it is separated by a similar interface and delivered to the radio equipment.

40. ANTENNAS. A number of antenna configuration and antenna arrays are in use at RCF facilities.

a. Configurations. The antenna configurations are in single and dual stacked collinear arrays. All are designed to match a 50 ohm characteristic impedance transmission line. Each dipole within a stacked array is independently operated with a high degree of isolation. The electrical, mechanical, and instailation characteristics are compatible with existing and future FAA facility applications.

b. Antenna Arrays. Highly directional antennas are also utilized for resolving coverage difficulties. A directional collinear antenna is available that has approximately four dBi gain (directivity). Another directional Yagi-type antenna is also available which provides approximately 10 dBi gain.

41. MULTICoUPLERS. Active receiver multicouplers which provide 0 dB through-loss shall be used when an RCF uses multiple receivers and site analysis dictates that more than one receiver would be connected to a single antenna. The unit may have an output capacity of 16 ports; however, current policy stipulates that only four are used. This criteria is predicated on single point failure potential of a system architecture based on more than four receivers connected through one multicoupler and one antenna. Unused ports shall be terminated with 50 ohm loads. The multicoupler operates in the 118 MHz to 138 MHz range for VHF and 225 MHz to 400 MHz range for UHF.

Page 24 Chap 2 Par 39

43

11/1/93 6580.3A

42. COAXIAL RF LINE SECTIONS. The coaxial RF line sections are selfcontained, passive devices configured for permanent mounting in a 50 ohm RF line. They are used to monitor the Voltage Standing Wave Ratio (VSWR) of transmission systems. Coaxial·RF line sections, the correct technical term, are sometimes referred to as an RF body.

43. COMBINERS. Transmitter combiners shall be used when site analysis dictates the need to use a single antenna for more than one transmitter. Through-loss is less than 3.0 dB for up to four transmitter/antenna combinations. Consideration shall be made as to the coverage area impact of the combiner through-loss.

44. IsoLAToRs. Isolators are non-reciprocal devices with three ports and are used for Intermodulation (IM) control. This is accomplished by terminating reflected or other incoming signals into a 50 ohm load on the third port.

45. FILTERS. Both transmitters and receivers shall use filters when necessary to prevent transmitter noise and receiver desensitization. All transmitters shall employ harmonic and intermodulation suppression filters to reduce third order harmonics which may be magnified by the use of combining systems.

46. TRANSMISSION LINE. Internal RF coaxial cable transmission paths (i.e., to/from an internal RF cable patch panel) or external short jumper cables shall utilize double shielded RG-214 or lower loss RG-331. For long transmission paths (i.e., from facility to antenna tower) the RF coaxial transmission cable shall be the lower loss RG-333. Where RG-214 cable is not suitable (i.e., multicoupler applications) double shielded RG-223 shall be used keeping lengths as short as possible. The RF transmission cable in all applications shall have a nominal 50 ohms impedance. Older cable types that might exist (RG-8, RG-213 and RG-17) shall be replaced with the recommended, lower loss RF cable types.

47. EOUIPMENT RACKS. The basic equipment rack frequently used to house electronic equipment has a modular solid-sided steel sheet metal cabinet with rear access door(s). A detailed description and drawings of the 19 inch Electronic Industry Association (EIA) racks are contained in FAA-E-2672A, Rack, Cabinets, Solid-Sided and Open- Sided Types. The following types of equipment cabinet racks are presently available from the FAA Logistics Center:

NSN 5975 01 094 1436-1, Rack, Single Door, 83 inches High

NSN 8200 00 130 4280-1, Rack, DSRCE configured, 83 inches High

48.-51. RESERVED.

Chap 2 Page 25 Par 42

44

6580.3A 11/1/93

SECTION 4. SITE CHARACTERISTICS

52. GENERAL. A majority of RCF site structures are over 40 years old. Heating, ventilation, and air conditioning are insufficient, in many cases, for the equipment housed in the structures. Much of the RCF equipment located at some sites was designed in the mid 1950's and uses vacuum-tube and electromechanical relay technology. Many remote sites have already changed over to solid-state remote control equipment.

53. STAND-ALONE RCF. An FAA study completed in April 1984 concluded that 12 VHF and 12 UHF channels can be consolidated at a single RCF through the use of external isolation devices such as combiners and multicouplèrs. RCF antenna site configurations and RFI suppression devices should be considered. As a result, the present configurations may be changed. RCF antennas are typically mounted on steel towers with hexagonal or rectangular platforms with sidearms for antenna separation. A site layout for an RCF is shown in Figure 2-8, Stand- Alone RCF site Layout.

54. COLLOCATED RCF. The FAA, in a project called "Cosite", investigated the effects of antennas on RCF coverage when collocated with a VORTAC site. The EMC and antenna configuration guidelines for use in the RCF should also be considered. These sites require pole mounting of RCF antennas. Typical antenna mounting details are shown in Figure 2-9, Typical Antenna Pole Mounting. An integral RCF collocated with a vORTAC is shown in Figure 2-10, Typical Integral RCF/vORTAC Antenna Mounting. The antenna poles selected for use at collocated RCF NAVAIDS are fiberglass or wood. Another configuration is illustrated in chapter 6, Figure 6-38, Typical Region Suppiied Let- Down Pole Antenna. These poles exhibit a high dielectric constant as compared with metal poles. The RCF antennas are typically mounted on the cross-arm in let-down pole applications. The antenna pole platform and the antenna pole cross-arm shall be oriented on the long axis with respect to the voRTAC facility. RCF transmission lines may be run underground (the recommended method) or suspended between the building and antenna pole via messenger cable.

55. BUILDING FLOOR PLANS. The impact of the building floor plan space for the added equipment shali be determined since sufficient space may not exist to meet standard space requirements for access to the front, side and rear of the equipment. The actual RCF building dimensions should be based on the quantity of equipment reguired to support the number of frequencies to be installed at the collocated RCL/RCF facility.

Page 26 Chap 2 Par 52

45

FIGURE 2-8. STAND-ALONE RCF SITE LAYOUT

TOWER NO.4

GATE

-140 t-

120 ft

+10n

TOWER NO. 1 10ft

STAND-ALONE TYPICAL RCF BLDG.

140 ft.

BATTERY ROOM

60 ft

TOWER NO. 2

PERIMETER FENCE

Chap 2

Par 55

BURIED ANTENNA COAXIAL CABLES RG-331 or RG-333 (4 PLACES)

TOWER NO.3

FIGURE 2-9. TYPICAL ANTENNA POLE MOUNTING

46

DOWN CONDUCTOR

TOEARTH ELECTRODE SYSTEM

GROUND ROD

30ft

AIR TERMINAL

8 ft. min.

-34 ft.

3 INCH CONDUIT

CONDUIT TO RCF

VN ANTENNAS

ft.

3 ft.

COAXIAL CABLE JUNCTION BOX

GROUND ROD

Chap 2

Par55

FIGURE 2-10.

TYPICAL INTEGRAL RCF/VORTAC ANTENNA MOUNTING

COMBINATION TACAN MONITOR AND RCF ANTENNA POLE, LOCATE 60 t FROM CENTER OF COUNTERPOISE

47

MAGNETIC NORTH

COAXIAL CABLE

ANTENNA SHELTER

COUNTERPOISE

ACFNORTAC BUILDING

AIR TERMINAL TACAN MONITOR AND ACF XMIT LINE VIA UNDERGROUND (RECOMMENDED) OR MESSENGER CABLE

RCF COUNTERPOISE TRANSMITTER ANTENNA

120FT.

A-AVIEW

Chap 2

Par 55

FIELD DETECTOR

90° AZIMUTH

ACF RECEIVER ANTENNA POLE (NON METALLIC RECOMMENDED) AT 135° FROM MAGNETIC NORTH

AIR TERMINAL

RCF RECEIVER ANTENNA

48

6580.3A 11/1/93

FIGURE 2-11. TYPICAL RCF FLOOR PLAN WITH RACKS

(NO ENGINE GENERATOR)

24 FT.-0° (NOMINAL OUTSIDE DMENSION)

COMMUNICATION RACKS

16 FT. LEAD LINE TERMINAL

(CLEAR INSIDE DIMENSION) TERMINAL BOX CABINET A EQUIPMENT ROOM

TERMINAL CABINET B

COMMUNICATION RACKS

FLOOR PLAN

NC NO.2 12 ROOF OVERHANG OR CANOPY

EXTERIOR 10 FT.-0 FINISHED LIGHTS NOMINAL FLOOR BUILDING HEIGHT 7FT.-0

1 1 NOMINAL 3 FT. X 7 FT. DOOR (TYPE)

RIGHT ELEVATION FRONT ELEVATION CANOPY OR ROOF OVERHANG OVER EACH DOOR

7FF.0

LEFT ELEVATION REAR ELEVATION

Page 30 Chap 2

Par 55

49

11/1/93 6580.3A

FIGURE 2-12. TYPICAL RCF/RCAG FLOOR PLAN WITH RACKS

-40 FT.-0° NOMINAL AIR CONDITIONER 5FT.10 FT.0- NO.1 45FT.0 HEATER TOILET NO.1 EXHAUST FAN 2-0°x6-g FLUSHPANEL BATTERY

(CLEAR INSIDE 16 FT.4° MIN. DIMENSION) EQUIPMENT ROOM METAL STUD PARTN DRY WALL FINISH BOTHSIDES FUEL7 i TANKI

ENGINE ROOM INTAKE LOUVER

CONTROL LINE HEATER NO.2 TERMINAL AREA ENGINE GENERATOR COMMUNICATION RACKS TELCO

AIR CONDITIONER EXTERIOR LIGHT NO.2 FLOOR PLAN

ROOF OVERHANG OR CANOPY TO BE-PROVIDED EXHAUST HOOD SEE DETAIL

AC ÑO.2

FINISHED FLOOR

FRONT ELEVATION RIGHT ELEVATION EXHAUST FAN ENG.GEN. EXHAUSTPIPE

AC NO.1 ACNO.2 AC NO. 1

EXHAUST HOO0

REAR ELEVATION LEFT ELEVATION

Chap 2 Page 31

Par 55

50

6580.3A 11/1/93

FIGURE 2-13. TYPICAL RCF/RTR FLOOR PLAN WITH RACKS

32 FT.-0° (NOMINAL OUTSIDE DIMENSION) EXHAUST COMMUNICATION 1oGYPSUM WALLBOARD ON EACH SIDE OF STEEL STUDS T1T.9 FAN RACKS

TERMINAL CABINET BATTERY RACK

TOILET IF 16 FT. REQUIRED (CLEAR INSIDE EQUIPMENT INTAKE LOUVER DIMENSION) ROOM

TERMINAL CABINET B

COMMUNICATION TELCO VINYL TILE RACKS

OUTDOOR METER CONV. OUTLET

FLOOR PLAN

EXTERIOR LIGHTS 12

ROOF OVERHANG 10 FT.-0 OR CANOPY INTAKE NOMINAL LOUVER BUILDING HEIGHT NOMINAL 3 FT.X7 FT. DOOR (TYPE)

RIGHT ELEVATION FRONT ELEVATION PRE-ENGINEERED METAL BUILDING CANOPY OR ROOF OVERHANG OVER EACH DOOR

EXHAUST FAN

EXHAUST HOOD

REAR ELEVATION LEFT ELEVATION

Page 32 Chap 2 Par 55

51

11/1/93 6580.3A

a. Racks and Equipment. Typical rack and equipment floor plans for stand-alone RCF/RCAG/RTR are shown in Figure 2-1i, Typical RCF Floor Plan with Racks (No Engine Generator), Figure 2-12, Typical RCF/RCAG Floor Plan with Racks, and Figure 2-13, Typical RCF/RTR Floor Plan with Racks.

b. Collocated Equipment. Typical RCF/VORTAC collocated equipment floor plans are shown in figures 2-14 through 2-18 listed in subparagraphs (1)-(6). These figures illustrate the equipment floor plan layout showing equipment, RCF/vORTAC building conduit, and junction boxes. The communications equipment backup power battery racks are mounted no closer than three feet from the NAVAIDS battery rack. Telephone Company (TELCO) termination equipment installation shall be enclosed in a chainlink barrier isolated from FAA equipment where possible. This would allow TELCo access to their equipment yet maintain security of the FAA equipment.

(1) Figure 2-14, RCF/VORTAC Collocated in a 21' Diameter Building, shows the floor plan and six communications equipment racks and five future equipment racks collocated in the 21-foot size RCF/voRTAC builäing that is not equipped with an engine generator.

(2) Figure 2-15, RCF/VORTAC Collocated in a 20'x 36' Building, shows four communications equipment racks collocated in the RCF/VORTAC facility.

(3) Figure 2-16, RCF/VORTAC Collocated in a 25'x 31' Building, shows four communications equipment racks collocated in the RCF/VORTAC facility. Although only four racks are shown for EFAS or ATIs equipment, there is sufficient room for several more communications equipment racks.

(4) Figure 2-17, RCF/VORTAC Collocated in a 32' Diameter Building, shows four communications equipment racks collocated in the building floor plan.

(5) Figure 2-18, RCF/VORTAC Collocated in a 36'x 36' Building, shows five communications equipment racks collocated in the building floor plan.

(6) An FAA-sponsored study has been conducted to analyze concepts for a future standard shelter for RCF/VORTAC equipment." One of these concepts is a 32-foot diameter signal counterpoise erected over a 21-foot square facility shelter. The floor plan for this building is shown in Figure 2-19, Future RCF/VORTAC Facility.

c. RCF Collocated at RCL. The following are illustrations of RCF/RCL collocated equipment building floor plans.

Chap 2 Page 33 Par 55

52

6580.3A 11/1/93

FIGURE 2-14. RCF/VORTAC COLLOCATED IN A 21' DIAMETER BUILDING

LANDLINE ACF JUNCTION BOX BATTERY RACK / MINI DEMARC

LANDLINE LIGHTNING SURGE PROTECTION EXISTING INTERFACE BATTERY BOX

COMMUNICATION 2 1° EMT PH1 RACKS EMT (TELECABLEPH2)

3/4° EMT (ANT.

ANTENNA CONTROL SPEED ANTENNA SWTCH. DET ANT COAXJ (BCPS AC POWER CABLES) rEMT SW. CONT. CABLE)

BOX BOX

1°EMT VOR 1.0.T.

EXCLUSION RJ45S SENSOR & RCO COMM ENVIRONMENTAL POWER PANEL DIST. DME ANTENNA FEED CABLE ANTENNA CABLES TACAN DME OR BCPS SQ DUCT NEW4X4 CABLES LO.T.

2EMT (BATTERY AC POWER CABLES) SURGE PROTECTION

BATTERY RACK VORTAC (PH 1)) ENTRANCE BREAKER

BATTERY INTERFACE BOX

Page 34 Chap 2 Par 55

53

FIGURE 2-15. RCF/VORTAC COLLOCATED IN A 20'x 36' BUILDING

20t

RCF BATTERY RACK

COMMUNICATION RACKS

36 t

TACAN OR DME

VOR

IOT

Chap 2

Par 55

VORTAC BATTERY RACK

ANTENNA SPEED CONTROL

FIGURE 2-16. RCF/VORTAC COLLOCATED IN A 25'x 31' BUILDING

-31 ft.

DCPS VOR

EXISTING RCO RACK

COMMUNICATION 25 ft. RACKS

54

RCF BATTERY RACK

ANTENNA SPEED CONTROL

VORTAC BATTERY RACK

Chap 2 Par 55

FIGURE 2-17. RCF/VORTAC COLLOCATED IN A 32' DIAMETER BUILDING

VORTAC BATTERY RACK

Chap 2

Par 55

ANTENNA SPEED TACAN CONTROL OR DME BCPS VOR

ENVIRONMENTAL SENSOR

COMMUNICATION RACKS

RCF BATTERY RACK

FIGURE 2-18. RCF/VORTAC COLLOCATED IN A 36'X 36' BUILDING

56

-36 ft

STORAGE

ANTENNA TACAN SPEED CONTROL DME

36 ft.

TERM.

BCPS VOR

COMMUNICATION RACKS

VORTAC ACF BATTERY BATTERY RACK RACK

AC PANEL

Chap 2

Par 55

FUTURE RCF/VORTAC FACILITY

FIGURE 2-19.

—10 ft. 6"-

POWER PANEL

21 ft. 0"

EDGE OF STEEL SIGNAL COUNTERPOISE ABOVE

Chap_2 Par 55

21 ft. 0"

57

——10 ft. 6°

FUTURE BATTERY RACKS

BATTERY RACKS (VENTED TO EXTERIOR)

BLDG, JOINT

VORTAC BUILDING OF TWO-21X10'-6° PRECAST HALVES

VOR EQUIPMENT RACKS

FUTURE AG COMMUNICATION RACKS

FIGURE 2-20. RCF/RCL COLLOCATED IN A 14'x 26' BUILDING

-26 ft.

COMMUNICATION RACKS

14 ft. RCL RACKS

RCF BATTERY RACK

58

Chap 2 Par 55

11/1/93 6580.3A

(1) Figure 2-20, RCF/RCL Collocated in a 14'x 26'Building, shows communications equipment racks collocated in an RCF building.

(2) Figure 2-21, Smal1 10'x 14' RCL Building, shows the layout of a small building.

56.-60. RESERVED.

Chap 2 Page 41 Par 55

60

SMALL 10'x 14' RCL BUILDING

FIGURE 2-21.

COMMUNICATION RACKS

14 ft.

RCL RACKS

10 ft.

Chap_2 Par 55

11/1/93 6580.3A

CHAPTER 3. MANAGEMENT OF RCF

SECTION 1. ADMINISTRATIVE

61. GENERAL. Several administrative tasks need to be accomplished before the actual installation takes place at any of the RCF. These tasks include the acquisition of land, appropriation of funding, filing environmental impact statements, and securing permits to construct new sites or to modify existing sites. The following sections will address these tasks.

61

62. NOTICES TO AIRMEN. Notices To Airmen (NOTAM) may be used for various actions or pending actions.

a. Shutdown NoTAM. The extended shutdown of commissioned facilities undergoing extensive equipment changes, additions, or modernization necessitates the issuance of an advance SHUTDOWN NOTAM. Advance NOTAM's, whenever possible, are normally issued by the regional office where more effective coordination with other groups is possible. This authority may be delegated by the regional office to field installation personnel when the actual shutdown date is contingent upon work progress.

b. Return to Service NOTAM. A return to service NOTAM is issued by the regional office after work done to an existing site is completed. A Joint Acceptance Inspection (JAI) may be necessary before a "return to service" NOTAM can be issued.

c. Commissioning NOTAM. A commissioning NOTAM is issued by the regional office when a new facility is completed or an existing facility undergoes significant changes. This requires the successful completion of a JAI prior to issuing the NOTAM.

63. PLANNING.

a. Land Acquisition. Many RCF facilities will be collocated at existing host facilities. When this is not feasible, however, it will be necessary to construct a new facility. Proposed RCF facilities require siting and possible land acquisition. This process includes submitting a legal description and a plot of the site including access roads and utility easements. Proof of conformance to zoning restrictions is also required. This document must be presented prior to requesting the acquisition of property rights. All transactions for acquiring property rights, whether for purchase, lease, or use restrictions, are governed by Order 4660.1, Real Property Handbook. These transactions are handled by FAA real estate office personnel.

Chap 3 Page 43 Par 61

62

6580.3A 11/1/93

b. Funding. When land is to be purchased for a new facility site, funds for the purchase shall be included in the region or center Facilities and Equipment (F&E) budget in the same fiscal year as the funds for the facility equipment, installation, and building. This amount is an estimate of the value of the land rights to be acquired, plus acquisition costs and a 15 to 20 percent contingency. Instructions for including land acquisition funds in the annual F&E budget submission are found in Order 2500.55, Call for Estimates - Facilities and Equipment, which is updated annually.

c. Determination of Need to Acquire. All possible sites which are found acceptable for the efficient operation of the facility must be considered. Before any action has begun to acquire new land, a determination must be made that the requirements cannot be satisfied by use of property already held by the FAA, property which is accessible to other Government agencies, public land, exchange of Government-owned property for privately-owned property, or the use of existing rights-of-way and easements when available at nominal cost or less.

64.TASKS.

a. Site Investigation. Prior to conducting investigations and tests, the legal right to enter and use the land must be obtained in writing from the landlord and, if appropriate, the right to clear or otherwise change the character of the land must also be obtained. If verbal authorization is granted, confirmation must be made in the form of a letter with a return receipt. When a landowner will not grant a right of entry, a right of entry must be obtained through the United States (U.S.) courts. Local U.S. attorneys should be consulted through regional counsel in these instances. Contacts with landowners should generally be made by FAA real estate personnel, and when contacts are made by others they must be under the direction of the FAA real estate office.

b. Environmental Impact Statements. Environmental Impact Statements (EIS), or a Finding of No Significant Impact (FONSI) shall be approved before negotiations for the acquisition of any land interest begin. Real estate files should contain a copy of the EIs, FONSI, or a reference to the office of record.

c. Land Office Survey. It is of prime importance to identify the owners of the land for all candidate sites and obtain the addresses through which they may be contacted. The legal description of land can usually be obtained locally from the city, township, or county clerk's office. Whenever possible, a copy of the deed(s) or other appropriate documentation showing land ownership should be attached to the site survey report. Land adjacent to the proposed sites may be affected by the site zoning restrictions. These restric-

Page 44 Chap 3 Par 63

63

11/1/93 6580.3A

tions may be determined during the office survey, so that the ownership information of this type of land, may also be included in the site survey report.

d. Temporary Agreement. Once the site surveys are completed and it has been decided to field test a specific candidate site, a temporary agreement must be entered into with the property owner(s). This agreement (Permit to Test, Testing License, etc.) will secure entry and access to the property for setting up a portable RCF and testing the site. Contact the regional reai estate office of the Logistics Division for specific details concerning these agreements.

e. Zoning Restrictions. When the temporary agreement is secured, the landowner(s) should be made aware that zoning restrictions will be required if the site is actually selected. This will reduce the possibility of complications during lease negotiations.

f. Temporary Permits. Temporary permits to utilize access roads of adjacent property owners shall also be obtained prior to site testing. An easement is often all that is required to install a permanent access road to a facility, making the actual purchase of land for this purpose unnecessary. Leases or other agreements, as required, should be entered into with appropriate governing agencies or property owner(s) for the use of existing roads. The regional real estate office of the Logistics Division should be contacted for appropriate procedures for entering into such agreements.

65.-69.RESERVED.

Par 64 Chap 3 Page 45

64

6580.3A 11/1/93

SECTION 2. TECHNICAL

70. GENERAL. The RCF may be a stand-alone facility or it may be collocated with an FAA-owned host facility, i.e., a control facility, NAVAIDS facility, radar facility, or a RCL. Important attributes to consider when selecting an RCF site include the surrounding topography, ground conductivity, and the amount of ambient electrical noise. An RCF site must be capable of transmitting and receiving a usable signal within its service volume area. Since site conditions may have an adverse impact on the performance of NAvAIDS, radar, or other host facility equipment, coordination is required between the respective program managers of the collocated facility types.

71. DESIGN CONSIDERATIONS. The primary concern of those responsible for siting an RCF is the awareness of potential interference generated in the environment of the proposed site. If the interference encountered during the selection process exceeds the maximum allowable levels, the site shall be removed from the list of candidates.

a. Electromagnetic Interference. EMI is the unintentional radiation from equipment such as microwave ovens, industrial heaters, welding equipment, electronic door openers, etc. Equipment installed in the vicinity of the antenna site is addressed under Federal Communications Commission (FCC) regulations. The regional spectrum engineering office reviews all requests by commercial interests to install RF emitting equipment in the proximity of FAA facilities.

b. Electromagnetic Compatibility (EMC)/RFI. Licensed radio equipment shall be engineered and installed so that no radio interference is experienced at the input to the RCF receivers. The maximum allowable undesired signal level at the input of the RCF receivers from any licensed station is -104 dBm for signals within VHF and UHF bands, and -45 dBm for signals outside the A/G communications RF bands.

(1) RF Interference. Interference pertaining to RF transmitter and receiver sites can be classified into two categories: transmitter noise and receiver desensitization.

(a) Transmitter Noise. This noise is the sideband energy produced by a transmitter. When a transmitter is collocated with a receiver, transmitter noise may cause reduced receiver performance when the noise is greater than the receiver's sensitivity.

(b) Receiver Desensitization. This condition occurs when the transmitter carrier's sideband energy from an on site transmitter spills into the receiver's selectivity band.

Page 46 Chap3 Par70

65

11/1/93 6580.3A

(2) Transmitter Generated Noise. The four basic transmitter generated interference sources that can affect communications receivers are shown in the following list.

(a) Transmitter sideband energy.

(b) Spurious transmitter modulation.

(c) Overmodulation of the carrier.

(d) Intermodulation.

(3) Thermal Noise. Receiver sensitivity is theoretically limited to thermal noise which is present in all dissipative materials. Shot noise is also present and is a byproduct of current flow. In some instances pre-selectors used in front of a receiver may introduce noise into the receive system. Bandpass filters having very steep skirts are used at congested sites to accommodate multiple receivers and transmitters. Use of these devices can increase the noise level at the front end of the associated receivers. Proper engineering and judicious use of these devices will prevent surpassing the noise sensitivity of the receivers in use.

c. Siting Criteria. .The primary purpose of selecting a site is to provide effective service volume coverage for ATC communications. There are three site characteristics that must be evaluated when selecting a site for A/G communications: surrounding terrain, ground conductivity, and ambient RF noise.

(1) Surrounding Terrain. The topography near the site should not limit radio line of sight. Perfect optical line of sight, although desirable, is not necessary since some refraction takes place at VHF and UHF frequencies. Flat terrain requires evaluation of the effect of ground reflections on the verticaliy polarized A/G communications signals. Ground reflections predominantly affect A/G communications with high flying aircraft. A concern in evaluating refractions is the effect of terrain at low angles which affects communications with aircraft flying at low altitudes and at maximum range. The lowest altitude wili generally be 2,000 feet. The direct ray angle for high altitude approach control characterized by the beam elevation and the beam width is 0.14 degrees. The direct ray angle for extreme range and lowest altitude is 0.72 degrees. These angles are close to horizontal.

(2) Ground Conductivity. Good ground conductivity will improve the low altitude RF coverage at great distances from the site. Conductivity of the soil at a distance of three to five wavelengths around the site is considered good if it is between 0.01 to 0.02 mho per meter. Typical ground conductivity for various types of soil and

Chap 3 Page 47 Par 71

66

TYPICAL ELECTRICAL PARAMETERS FOR EARTH AND WATER

TABLE 3-1.

Permit-

Conductivity (ó)

Earth Type

Poor Moderate Fair Average Good

tivity (ë)

0.001 4.0 to 5.0 0.003 4.0 0.01 15 0.005 to 0.03 10 to 15 0.01 to 0.02 4.0 to 30 2.0 to 5.0

0.00001 to 0.001

Dry Land Desert Dry,Sandy, Flat-Typical Coastal Flat,Wet Coastal Region Dry Sandy Soils Pastoral Land Pastoral Hills, Rich Soil Pastoral Medium Hills & Forest Fertile Soil Rich Agri. Land (Low Hills) Rocky Land (Steep Hills) Highiy Moist Soii Wet Soil Marshy Soil Marshy, Flat(Dense Woods) Marshy, Forested, Flat Low Hiils w/Unforested Rich Soil Mountainous, Hilly("1000 Meters) Urban Industrial (Avg. Atten.) Urban Industrial (Max. Atten.) Urban Industrial Fresh Water Fresh Water(10°C at 100.0 MHz) Fresh Water(20°C at 100.0 MHz) Sea Water Sea Water(10°C at Up to 1.0 GHz) Sea Water(20°C at Up to 1.0 GHz) Sea Ice Polar Ice Polar Ice Cap Arctic Land

0.002 15 0.01 3.0 0.002 10 0.01 to 0.02 4.0 to 30 0.001 10 0.005 15 0.003 to 0.01 14 to 20 0.004 to 0.006 13 0.002 10 0.01 15 0.002 10 to 15 0.005 to 0.02 30 0.001 to 0.1 5.0 to 30 0.1 30 0.0075 12 0.008 12 0.01 to 0.02 4.0 to 30 0.001 5.0 0.001 5.0 0.0004 3.0 0.0001 3.0 0.001 to 0.01 80 to 81 0.001 to 0.01 84 0.001 to 0.01 80 3.0 to 5.0 80 to 81 4.0 to 5.0 80 4.0 to 5.0 73 0.001 4.0 0.000025 3.0 0.0001 1.0 0.0005 3.0 to 5.0

Chap 3 Par 71

67

11/1/93 6580.3A

water is shown in Table 3-1, Typical Electrical Parameters for Earth and Water. Refer to paragraph 127, chapter 4, for measurement method guidance. A system of ground conductors can be installed to improve the ground plane near the site if the ground conductivity is less than desirable. The conductors that form the counterpoise/ground plane must not be spaced more than 0.1 wavelength from each other at the lowest operating frequency. This means separation can be no more than 10 inches if the lowest operating frequency is 118 MegaHertz (MHz). Adding moisture-retaining plants and shrubs near the site will improve ground conductivity by increasing the moisture content of the soil. This strategy can be used if ground conductivity is only marginally low. Refer to paragraph 91, Chapter 4, for conductance enhancement guidance.

(3) Ambient RF Noise. Both the VHF and UHF A/G communications bands used by the FAA are in a heavily used portion of the radio spectrum. This, coupled with atmospheric noise and manmade noise, contributes to the ambient noise level at A/G communications sites. Typical ambient RF noise levels between 100 KiloHertz (kHz) and 10 GigaHertz (GHz) are shown in Figure 3-1, Typical Average Ambient Noise Level. A noisy RF environment can reduce the effective receiver range at a site.

FIGURE 3-1. TYPICAL AVERAGE AMBIENT NOISE LEVEL

40

30 LARGE CITY TYPICAL SET IGNITION NOISE NOISE 20 ATMOSPHERIC STATIC 10 NIGHT

-116dBm TYVPL L VM -40 -10 -20 -30 0 2 5 NOON 2 5 2 COSMIC NOISE 5 2 (166 DB BELOW 1 WATT) 5 THERMAL NOISE 2 5

10-1 1 10 102 103 10 FREQUENCY IN MEGAHERTZ

Chap 3 Page 49 Par 71

68

6580.3A 11/1/93

This effect is because the RF noise can mask the desired signals. Also, a receiver's squelch circuit must be set higher than the ambient RF noise level to be effective. The higher the RF noise level, the higher the squelch setting and the stronger the desired signal has to be in order to be received. An evaluation of the RF noise level at a prospective site should be done prior to site selection.

72. INSTALLATION. Installation of equipment at an RCF is the responsibility of regional FAA personnel or their contractor installation team. Management of and responsibility for installation may differ depending on whether FAA personnel or contractor personnel are used. Onsite responsibilities for the pre-installation, installation, checkout, verification, and acceptance of the RCF are divided among the various categories of management. Installation responsibilities are divided among the regional office RCF project coordinator, sector office management, the installation team leader, and the installation team in accordance with the regional work order. The onsite assignment of responsibilities of each is general in scope.

a. Washington Office RCF Project Manager. The Washington Office RCF Project Manager is primarily responsible for the facilities and equipment. This includes the planning and funding of the program, the development of the program plan, site requirements, instaliation standards, coordination of regional planning into the national program, and initiation of procurement requests any national equipment procurements.

b. Regional Office RCF Project Coordinator. The Regional Office RCF Project Coordinator is primarily responsible for the management of the region's RCF program. This includes initiation of regional actions to implement the RCF program, coordinating material, and site planning. The following are also regional office coordinator responsibilities.

(1) Site preparation prior to the arrival of the installation crew.

(2) Pre-installation testing and verification of the existing equipment.

(3) Completion of all pre-installation tasks.

(4) Assistance to the Technical Onsite Representative (TOR) and contractor or FAA installation team.

(5) JAI.

(6) Local procurements.

Page 50 Chap 3 Par 72

69

11/1/93 6580.3A

c. Sector Office Management. Sector office management provides personnel and equipment under the guidance of the TOR's FAA installation team leader. Following are tasks supported by the sector office:

(1) Facility shutdown.

(2) Facility return to service or commissioning.

d. TOR's Responsibility. The TOR is the coordinator for the entire onsite contractor installation process and is responsible for ensuring completion of the tasks. Duties include, but are not limited to, verifying the proper pre-installation, installation, checkout, and acceptance of the RCF equipment installation. The TOR will maintain a site log of the installation history. This log includes daily entries for arrival and departure time of contractor personnel, and logging of problems concerning installation, configuration, administration, and management during the project. This log can be used for crosschecking and verifying the contractor's log. Specific duties of the TOR are to ensure that the contractor's tasks listed in subparagraphs (1)-(4) are performed.

(1) Establish and maintain a contractor site log.

(2) Verify and update equipment configuration data.

(3) Install, adjust, and align equipment in accordance with FAA approved technical instruction manuals.

(4) Conduct acceptance tests, Contractor Acceptance Inspections (CAI) and JAI in accordance with FAA instructions.

(5) Complete all necessary forms and records required for facility return to service or commissioning.

The TOR is responsible for ensuring that:

(1) Access to the site is available to the contractor.

(2) Necessary equipment is available to the contractor.

e. Installation Team Leader. The installation team leader is the FAA installation team coordinator for the onsite installation process. It is the responsibility of the team leaders to verify the proper pre-installation, installation, checkout, and preparation for acceptance of the RCF equipment installation. The team leader's duties are similar to those of the TOR. Supervision by the team leader, however, is limited to the FAA installation team.

Chap 3 Page 51 Par 72

70

6580.3A 11/1/93

f. Installation Team. The installation team is responsible for installation of new equipment in accordance with the instructions of the work order. The installation team is also responsible for the removal and proper packaging for shipment of any old equipment removed during the installation process. Additional duties include the following:

(1) Establish and maintain regional documentation.

(2) Verify equipment configuration and individual serial numbers.

(3) Assist in conducting acceptance tests and logs results in accordance with FAA approved methods.

73. TESTING AND EVALUATION. Final testing, evaluation, and acceptance shall be accomplished in accordance with Order 6030.45, Facility Reference Data File, which describes the CAI and JAI. FAA Form 6030-17, Technical Reference Data Record, shall be used to record test data. The contractor is obligated to correct all discrepancies found during the CAI. The contractor is under no further obligation after the JAI is accepted by the FAA. A list shall be kept of all exceptions from the JAI checklist along with its status. The regional office is responsible for the planning and monitoring of this effort. Further details on testing and evaluation of installations is found in Chapter 7, System Test and Acceptance.

74.-78.RESERVED.

Page 52 Chap 3 Par 72