Order 6368.1A Facilities and Equipment Maintenance Handbook Apollo Ground-Based Transceiver (GBT) 2000
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Distribution: A-X (AF)-4 Ltd Initiated By: AAL- 470
ORDER AL 6368.1A
FACILITIES AND EQUIPMENT
MAINTENANCE HANDBOOK
APOLLO GROUND-BASED TRANSCEIVER (GBT) 2000
April 21, 2006
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION ALASKAN REGION
FAA Form 1320-5 (Electronic 6/30/2000)
RECORD OF CHANGES DIRECTIVE NO. AL 6368.1A
CHANGE TO
BASIC
SUPPLEMENTS
OPTIONAL USE
CHANGE TO
BASIC
SUPPLEMENTS
OPTIONAL USE
Page i
FOREWORD 1. PURPOSE. This handbook provides guidance and prescribes technical standards, tolerances, and procedures applicable to the maintenance and inspection of the Apollo model GBT2000 Ground-Based Transceiver (GBT), which is the remotely located data link portion of the Automatic Dependent Surveillance-Broadcast (ADS-B) service. It also provides information on special methods and techniques that will enable maintenance personnel to achieve optimum performance from the equipment. This handbook augments information available in instruction books and other handbooks, and compliments the latest edition of FAA Order 6000.15, General Maintenance Handbook for Airway Facilities. 2. DISTRIBUTION. This order is distributed to Airway Facilities branch level in the Alaska Region Headquarters, and according to standard distribution requirements to all Airway Facilities (AF) field stations and facilities. 3. CANCELLATION. AL6368.1, Facilities and Equipment Maintenance Handbook Ground-Based Tranceiver (GBT) dated, September 29, 2003, is canceled. 4. MAINTENANCE AND MODIFICATION POLICY. FAA Order 6000.15 (latest edition), this maintenance handbook, and the applicable equipment instruction handbooks shall be consulted and used together by the maintenance technician in all duties and activities for the maintenance of the Apollo GBT2000 facilities and equipment. These documents shall be considered collectively as the single official source of maintenance policy and direction authorized by the Operational Support organization (AOS). References located in the chapters of this handbook entitled Standards and Tolerances and
Periodic Maintenance shall indicate to the user whether this handbook, and/or the equipment instruction book shall be consulted for a particular standard, key inspection element or performance parameter, performance check, or maintenance procedure. The latest edition of FAA Order 6032.1, National Airspace System Modification Program, contains comprehensive policy and direction concerning the development, authorization, implementation, and recording of the modifications to facilities, systems, and equipment in a commissioned status. It supercedes all instructions published in earlier editions of maintenance technical handbooks and related directives. 5. FORMS. Current forms can be found at feds.faa.gov. 6. RECOMMENDATIONS FOR CHANGES. This handbook is under configuration management control as defined in the latest edition of FAA Order 1800.66, Configuration Management in the National Airspace System, and NAS-MD-001, National Airspace System Master Configuration Index. Any changes to the baseline document or requests for deviation from the established standards shall be processed through the NAS Change Proposal (NCP) process. A copy of the NAS Change Proposal form, FAA Form 1800-2 (appendix 3-2), is provided in the back of this handbook for the convenience of the handbook users. … Craig C. Withee Manager, Satellite Navigation Programs WSA, Eng Svcs Alaskan Region
Page ii
THIS PAGE INTENTIONALY LEFT BLANK
Page iii
Table of Contents
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS 1
100. OBJECTIVE. 1
101. SAFETY. 1
102. CERTIFICATION. 1
103. AIRCRAFT ACCIDENTS. 1
104. COORDINATION. 2
105. FLIGHT INSPECTION. 2
106. TECHNICAL INSPECTION. 2
107. PERIODIC MAINTENANCE. 2
108. ELECTROSTATIC DISCHARGE AND ELECTROMAGNETIC INTERFERENCE PROTECTION. 2
109. TEST EQUIPMENT AND TOOLS FOR PERIODIC MAINTENANCE. 3
110. MODIFICATION POLICY. 3
111. MAINTENANCE AND DIAGNOSTIC DIRECTIVES. 3
112. FAA FORMS. 3
113. FAA ORDERS AND HANDBOOKS. 3
114. SYSTEM SECURITY. 4
Chapter 2 - TECHNICAL CHARACTERISTICS 5
200. PURPOSE. 5
201. SYSTEM INTRODUCTION. 5
202. SYSTEM FUNCTIONAL DESCRIPTION. 6
203. CERTIFICATION REQUIREMENTS. 7
204. GBT BLOCK DIAGRAM. 7
205. CCLI MANTAINENCE SERVICE PORT (RMM). 7
206. GBT COMMUNICATIONS DATA PORTS. 9
Chapter 3 - STANDARDS AND TOLERANCES 13
300. GENERAL. 13
SECTION 1. 13
GBT UNIVERSAL ACCESSS TRANSCEIVER (UAT) 13
SECTION 2. 15
Page iv
GBT GLOBAL POSITIONING SYSTEM (GPS) 15
SECTION 3. 15
GBT DATA FLOW CONFIRMATION 15
Chapter 4 - PERIODIC MAINTENANCE 17
400. GENERAL. 17
SECTION 1. 17
SYSTEM PERFORMANCE CHECKS. 17
SECTION 2. 18
OTHER MAINTENANCE REQUIREMENTS 18
Chapter 5 - MAINTENANCE PROCEDURES 19
500. GENERAL. 19
SECTION 1. 19
HARDWARE MAINTENANCE. 19
501. PERFORMANCE CHECKS. 20
502. GBT POWER SUPPLY, 28 VDC. 21
503. GBT TESTER TRANSMITTER POWER. 22
504. TRANSMITTER CARRIER FREQUENCY. 23
505. GBT FRONT PANEL LED’S. 24
506. GBT TRANSMIT DATA. 24
507. GBT OUTPUT POWER AND UAT ANTENNA VSWR. 25
508. UAT RECEIVER SENSITIVITY 27
509. GLOBAL POSITIONING SYSTEM (GPS) RECEIVER SIGNAL QUALITY. 28
510. GPS and UAT ANTENNA PERFORMANCE CHECKS. 29
511. ADS-B DATA FLOW TO ARTCC CONFIRMATION. 29
512. OTHER MAINTENANCE REQUIREMENTS. 31
SECTION 2. SOFTWARE DIAGNOSTICS. 33
513. DIAGNOSTIC OVERVIEW. 33
514. GBT DIAGNOSTICS SETUP. 33
515. GBT/UAT CONFIGURATION. 33
516. MAINTENANCE LOG DIAGNOSTICS. 34
517. MOTOGPS DIAGNOSTICS. 37
518. CERR DIAGNOSTICS. 38
Page v
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). 41
600. GENERAL. 41
601. INITIAL SETUP. 42
602. CSIO COMMAND TESTING. 43
603. CCLI COMMAND TESTING. 44
604. CERR COMMAND TESTING. 46
605. UAT COMMAND TESTING. 51
606. MAINTENANCE LOG TESTING. 53
607. MOTOGPS TESTING. 56
608. COMMAND IDE (CIDE) TESTING. 56
609. CONFIGURATION CONTROL TESTING. 57
610. GBT SETUP TESTING. 58
611. CLOSING THE ROUTER CONNECTIVITY. 61
Chapter 7 - FLIGHT INSPECTIONS 63
700. GENERAL 63
Appendix 1 CERTIFICATION REQUIREMENTS 65
GBT Equipment Certification Table 66
Appendix 2 ACRONYMS 67
Appendix 3 DOCUMENTS AND FORMS 69
Appendix 3-1 FAA Form 1800-2 Worksheet, Case File / NCP Worksheet 71
Appendix 3-2 FAA Form 1800-2, NCP Change Form 73
Appendix 3-3 FAA Form 6000-8 for GBT 75
Appendix 3-4 FAA Form 6000-8 for GBT/ARTCC Data Flow Confirmation 77
Appendix 4 TEST EQUIPMENT & SPECIAL TOOLS 79
Appendix 4-1 Voltage Standing Wave Ratio Relationships 80
Table of Figures
Page vi
Table of Figures Figure 2-1 CAPSTONE BLOCK DIAGRAM 5
Figure 2-2 INTERNAL PARTS IDENTIFICATION 6
Figure 2-3 GBT FUNCTIONAL BLOCK DIAGRAM 9
Figure 2-4 GBT FRONT PANEL 10
Figure 2-5 GBT BACK PANEL 11
Figure 5-1 SYSTEM TEST SETUP 19
Figure 5-2 MX20 SYSTEM INFO PAGE 21
Figure 5-3 Power Output Test Setup 22
Figure 5-4 Spectrum Measurement 23
Figure 5-5 Transmit Data Test Setup 24
Figure 5-6 Forward Power to UAT Antenna Test Setup 26
Figure 5-7 Expected Waveform 26
Figure 5-8 Reverse Power from UAT Antenna Test Setup 26
Figure 5-9 Receiver Sensitivity Test 27
Figure 6-1 RMM Structure 41
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS › 103. AIRCRAFT ACCIDENTS.
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS 100. OBJECTIVE. The objective of this directive is to provide the necessary guidance for proper maintenance of the Apollo GBT2000 Ground-Based Transceiver (GBT). This directive is to be used in conjunction with information available in the technical instruction books and other directives. 101. SAFETY. Personnel shall observe all safety precautions when performing maintenance on the equipment covered in this manual. Refer to FAA Order 6000.15, General Maintenance Handbook for Airway Facilities, for guidance. 102. CERTIFICATION. Refer to FAA Order 6000.15 for general guidance on the certification of systems, sub-systems, and equipment. Refer to Appendix 1 of this handbook for the specific certification requirements for the Apollo GBT2000. 103. AIRCRAFT ACCIDENTS. The responsibilities of Airway Facilities (AF) personnel following an aircraft accident or incident are defined in FAA Order 8020.11, Aircraft Accident and Incident Notification, Investigation, and Reporting. For each accident or incident for which AF notification is required, the regional Airway Facilities Aircraft Accident Representative (AFAAR) determines which facilities require certification and data archiving, and/or removal from service for more thorough investigative work. Facilities removed from service may be restored via
certification, flight inspection, or both depending upon AFAAR decisions. The AFAAR will communicate these decisions to field personnel through the appropriate Control Center. In general, a certified technician should take the following actions:
a. If the AFAAR or designated representative identifies the Apollo GBT2000 as one of the facilities to be certified, perform the following:
(1) Measure and record the “as found” values of the designated systems key parameters identified in chapter 3, Standards and Tolerances, providing the actions required to measure the parameters do not affect the operational system.
(2) At the earliest time agreeable with Air Traffic operations, complete the remaining checks of key performance parameters. The results of all diagnostic runs must be recorded and turned over to the applicable section supervisor for safekeeping.
(3) If Air Traffic Operations does not release the operational system for Airways Facilities to complete the required checks within 30 minutes, the AFAAR or designated representative shall be notified.
b. All station records such as facility logs, meter readings, forms, etc., are official documents. As such, they will need to be retained in case of an investigation regarding a local aircraft accident. Additionally, these records will be used for investigation of other situations where operation of the facility is in question.
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS › 108. ELECTROSTATIC DISCHARGE AND ELECTROMAGNETIC INTERFERENCE PROTECTION.
104. COORDINATION. Maintenance activities shall be closely coordinated with Air Traffic Operations (ATO) personnel in order to prevent unanticipated interruption of services. Certified electronic technicians assigned to the facility where the equipment is installed shall be responsible for maintaining the equipment. Appropriate ATO personnel shall be advised immediately of equipment failure, restoration to service, or out-oftolerance conditions. ATO personnel shall be advised of any situation that may adversely affect equipment operation. Air Traffic personnel are expected to release the equipment to maintenance in a timely manner when requested to do so. 105. FLIGHT INSPECTION.
a. FAA directives do not address flight inspection for ADS-B or GBT systems. Flight inspection aircraft or ADS-B equipped aircraft flying specified profiles may be required on a case-by-case basis at the discretion of AF or AT management. Flight inspections are further discussed in Chapter 7 of this order that also makes references to the United States Flight Inspection Manual 8200.1 being used as a guide. For Alaska Regional flight inspection protocols see “Capstone Decision Paper #28; Flight Inspection” dated 7/30/02.
b. In lieu of flight inspections, targets of opportunity will be used whenever practical. Analysis prior to commissioning will include the following: determine coverage along expected flight routes, investigate holes in coverage, and review presentation of aircraft in sensor overlap areas. 106. TECHNICAL INSPECTION. Objectively conducted facility inspections are one of the most effective tools for
assuring the reliability of the NAS. See FAA Order 6000.15 and 6040.6, Airways Facilities Technical Inspection Program, for the details on the intervals and requirements for formal inspection. 107. PERIODIC MAINTENANCE.
a. Chapter 4, Periodic Maintenance, of this handbook establishes the tasks and schedules that are required for the periodic maintenance of the Apollo GBT2000. These tasks, as scheduled, are the minimum requirements for each of the systems to meet minimum performance standards.
b. Related information useful to maintenance personnel may be found in the FAA orders, handbooks, maintenance manuals, and diagnostic operating procedures listed in Appendix 3, Documents and Forms. 108. ELECTROSTATIC DISCHARGE AND ELECTROMAGNETIC INTERFERENCE PROTECTION.
a. Refer to FAA-STD-020b, Transient Protection, Grounding, Bonding and Shielding Requirements for Electronic Equipment, which sets forth requirements for Electrostatic Discharge control and protection from electromagnetic interference.
b. Although no maintenance is to be performed which involves opening the GBT unit, care should be taken concerning electrostatic discharge protection, as the equipment is highly susceptible to damage from this hazard. In addition, during scheduled routine maintenance the equipment should be inspected to ensure that grounding, bonding, and shielding requirements are being met.
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS › 113. FAA ORDERS AND HANDBOOKS.
109. TEST EQUIPMENT AND TOOLS FOR PERIODIC MAINTENANCE. Test equipment required for performing routine maintenance of established systems is located in the latest edition of FAA Order 6200.4, Test Equipment Management Handbook. Tools and supplies required for performing routine maintenance of established systems are specified and managed by the latest edition of FAA Order 4630.2, Standard Allowance of Supplies and Working Equipment for National Airspace System Facilities. Until the above directives are updated to include the Apollo GBT2000, test equipment, special tools, and standard allowance supply support items are specified in Appendix 4. 110. MODIFICATION POLICY.
a. No unauthorized modifications to standard equipment, facilities, or procedures are permitted. It is recognized that there will be occasions when certain temporary repairs will be necessary when approved parts are not readily available or a design deficiency is discovered. Under such circumstances, a complete report shall be submitted to the appropriate supervisor, explaining the nature of the problem, describing the changes made, and an estimate of when the equipment will be restored to its original condition. The affected equipment shall be restored to its original condition as soon as possible.
b. Until an Integrated Product Team (IPT) is assigned to the GBT, prior coordination with the following is required before a test modification can be undertaken: Capstone Program Office (CPO), AAL-400, AAL-500, and AOS-363. These organizations may grant approval for a temporary test modification for test
purposes or to determine the feasibility of a proposed improvement. Refer to Order 1800.66, Configuration Management in the National Airspace System, and Order 6032.1, National Airspace System Modification Program for further information.
c. Proposed modifications to improve system performance, increase reliability, minimize safety hazards, or increase maintenance efficiency may and should be suggested by any field technician or engineer. Such proposed modifications must be described in detail and submitted through the proper channels as a NAS Change Proposal (NCP) on FAA Form 1800-2. A Blank NCP worksheet and form (Appendix 3-1 and 3-2) can be found at the back of this handbook. 111. MAINTENANCE AND DIAGNOSTIC DIRECTIVES. A list of maintenance and diagnostic directives applicable to this equipment is included in Appendix 3. These directives shall be readily available for reference in the performance of preventive and corrective maintenance as well as certification of the equipment. 112. FAA FORMS. Current forms can be found at feds.faa.gov. 113. FAA ORDERS AND HANDBOOKS. Appendix 3 lists the latest edition of directives referenced within this document, at time of publication. Personnel should check directive checklists to ensure they reference the current edition.
Chapter 1 - GENERAL INFORMATION AND REQUIREMENTS › 114. SYSTEM SECURITY.
114. SYSTEM SECURITY.
a. Refer to the latest edition of FAA Order 1600.54, FAA Automated Information Systems Security Handbook, for detailed security requirements for FAA automated systems. Personnel are specifically directed to paragraphs 331, 332, and 803.
b. The sites are expected to maintain physical security, user identification (ID), and password protection for the diagnostics performed on the equipment. The Apollo GBT2000 does not currently have user ID and password protection at the unit itself. This protection is only available through the remote interfacing facility. Until upgraded equipment is acquired, caution should be observed in maintaining physical and electronic security at the remote facility. 115 thru 199 RESERVED
201. SYSTEM INTRODUCTION. › Interconnecting cables and transmission lines.
Chapter 2 - TECHNICAL CHARACTERISTICS 200. PURPOSE. This chapter provides a general description of the technical characteristics of the Apollo GBT2000 and its function in the ADS-B system. 201. SYSTEM INTRODUCTION.
a. The GBT is the remote, groundbased component of the overall ADS-B system. The purpose of the GBT is to pass the air-to-ground ADS-B track data (down link path) via data lines to other facilities. Uplink services such as Flight Information Services – Broadcast (FIS-B) and Traffic Information Services - Broadcast (TIS-B) will be furnished when they are available and provided to the GBT. The GBT can be configured to operate as a Fixed ADS-B Beacon (FAB), commonly referred to as a Permanent Echo (PE) or “parrot”. Figure 2-1 shows how the GBT fits into the overall data link system. The complete remote GBT
facility consists of two each of the following components:
Apollo GBT2000 Ground Based Transceiver.
28 Volt DC, 12.5 Amp Power Supply (If required).
GPS Antenna. Universal Access Transceiver (UAT) Antenna.
Interconnecting cables and transmission lines.
b. The internal components of the Apollo GBT2000 are identified in Figure 2- 2. There are no field serviceable items in the GBT and it requires no internal manual adjustments. The Lithium battery has a normal life expectancy of seven to ten years and will normally be replaced at the factory. Future maintenance concepts will likely include field replacement of lithium batteries as required.
Figure 2-1 CAPSTONE BLOCK DIAGRAM
Chapter 2 - TECHNICAL CHARACTERISTICS › 202. SYSTEM FUNCTIONAL DESCRIPTION.
Figure 2-2 INTERNAL PARTS IDENTIFICATION 202. SYSTEM FUNCTIONAL DESCRIPTION.
a. Ground-Based Transceiver. The GBT serves as the data interface providing serial or TCP/IP digital data to other ground equipment. It transmits and receives, providing an air-ground link for ADS-B information. Figure 2-3 is a functional block diagram of the GBT.
b. Universal Access Transceiver (UAT). The UAT operates at 981 MHz (+/- 30 kHz). The transmitter power output is 50 watts typical (+44 dBm to +50 dBm) with a receiver sensitivity of –94 dBm for greater than 90% Message Success Rate (MSR) measured in a 3 MHz bandwidth. The UAT does not generate or consume ADS-B data.
It acts merely as a medium through which data are communicated.
c. GPS Sensor. The Global Positioning System (GPS) sensor has the purpose of supplying timing and position information. The GPS timing signal is critical to proper operation of the system because it is the basis for synchronizing all data transceivers. The GPS position data is applied to the fixed ADS-B beacon, or “parrot,” for transmission in that application. The option is available (but currently not utilized) to use predetermined fixed location coordinates rather than GPS supplied position input.
d. Pentium Processor. The Pentium module, mounted on the motherboard, makes up the GBT Host Computer Assembly and runs the application software.
(Includes LDPU)
Chapter 2 - TECHNICAL CHARACTERISTICS › 205. CCLI MANTAINENCE SERVICE PORT (RMM).
e. System Software. GBT system software is contained on a data card accessible through a door on the front panel. Recording and storing data can be done on the data card if the appropriate software is installed. This capability is not presently enabled. 203. CERTIFICATION REQUIREMENTS. Refer to FAA Order 6000.15, General Maintenance Handbook for Airway Facilities, for general guidance on the certification of systems, subsystems, and equipment. Appendix 1 of this directive gives the specific requirements applicable to the certification of the GBT facility.
a. Certification Rationale. The ADS-B system is one subset of hardware components used in making up the services provided by the ARTCC. Service level and system level certifications are accomplished at the end point (ARTCC). The ADS-B system consists of the GBT, Telecommunications Link to the CCCS at the ARTCC, and the MEARTS. The GBT certification constitutes the sensor portion of the system certification. The Telecommunications certification constitutes the communications portion of the system certification and is performed separately. The CCCS certification constitutes the interface to MEARTS portion of the system and is performed separately. The En Route Surveillance Target Dependent Display (ESTDD) certification for the MEARTS constitutes the service certification.
b. Certification Statement. Upon completion of the required parameter checks, the engineer/technician shall document the action in the facility maintenance log and the maintenance management system. The certification entries should also be made on the FAA Form 6000-8, Technical
Performance Record. The Form 6000-8 can be found in Appendix 3 (Form 3-3 & 3-4), Documents and Forms.
c. Certification Procedures. The GBT facility is an integral portion of the IFR surveillance service provided by the ADS-B system. As a part of system certification, verification that the GBT meets certification criteria as listed in Appendix 1 of this directive is necessary. The certification of the GBT attests only to the fact that the facility is operating within the prescribed tolerances or limits at the time the entry in the appropriate log is made. 204. GBT BLOCK DIAGRAM. Figure 2-3 shows the functional block diagram of the GBT, Figure 2-4 shows a view of the front panel and Figure 2-5 shows a view of the back panel. 205. CCLI MANTAINENCE SERVICE PORT (RMM).
a. The Common Command Line Interface (CCLI) is an interface to the command groups within the GBT. The CCLI (SERVICE) port is a serial port, located on the front panel of the GBT, that allows viewing of selected data on a laptop PC or other computer equipped with terminal emulation software such as the HyperTerminal software set. Commands within the CCLI command set allow control of the various User Interfaces (UIs) to enable or disable their outputs to the SERVICE port for observation. There are two modules used for configuration changes and limited maintenance support utility. These modules can be utilized for initial setup and customizing the GBT operations.
Function Description CONFIG Setup configuration GBT Setup GBT parameters
b. There are six modules for troubleshooting and maintenance support that can be accessed, four command modules and two data log modules.
Function Description CSIO Display hardware and software version numbers CCLI Configure the command line interface CERR Error reporting and filtering UAT Control UAT operations Maintenance Log
Display and reset maintenance logs MotoGPS Log
Display and control GPS data logs
(1) CONFIG - Configuration mode (CONFIG) selects the uplink format to be used by the GBT. The choices are: 1090, UAT, or VDLM4. The only format currently available for the Apollo GBT2000 is UAT.
(2) GBT - GBT mode (GBT) allows configuration of the GBT for the local requirements. This includes positioning, identification, slot assignment for FIS and TIS, and other site-specific items.
(3) CSIO - The Common Standard Input/Output (CSIO) lists the version numbers of the various hardware and software components installed in the GBT.
(4) CCLI – The Common Command Line Interface (CCLI) is an interface to the Link and Display Processing Unit (LDPU) within the GBT. The LDPU can be visualized as a common interface to observe the operation of the functions within the GBT. Commands within the CCLI command set allow control of the various User Interfaces (UIs) to enable or disable their outputs to the SERVICE port for observation. All UIs are factory set to ENABLE by default.
(5) CERR - The Common Error Reporting Routine (CERR) tracks and reports errors that occur within the GBT subsystems. CERR will log to the FLASH card any fatal errors that cause a reset (CRASH) before the reset occurs. Non-fatal errors are reported through the CCLI via the Maintenance Log function.
(6) UAT - The Universal Access Transceiver (UAT) is the radio format for transmitting and receiving data within the GBT. The UAT can transmit over one antenna (as in the ground configuration), or over two antennas (as in the airborne configuration) if a larger volume of coverage is desired due to obstructions of a single antenna.
(7) Maintenance Log - The Maintenance Log records all non-fatal data that is reported from the various functions within the GBT. There are two forms to the Maintenance Log, the Terse and the Complete. The Terse Maintenance Log is an abridged log that only displays the entries that have recorded data (values greater than 0). The Complete Maintenance Log displays all parameter data and their current status, regardless of content. The Maintenance Log also includes the CSIO log entries in both its formats.
(8) MotoGPS Log - The Motorola Global Positioning System receiver (MotoGPS) is an independent module within the GBT. It uses the 24-satellite constellation of the GPS system to identify its location and the correct time, to include the 1 Pulse Per Second (PPS) timing signal. The MotoGPS has its own separate data log that is accessed through the MotoGPS command line of the CCLI. This data log displays the current status of the GPS, the accuracy of its outputs, and the known status of the satellites being tracked.
Chapter 2 - TECHNICAL CHARACTERISTICS › 206. GBT COMMUNICATIONS DATA PORTS.
206. GBT COMMUNICATIONS DATA PORTS.
a. The RS232 SERIAL port (DB-9 connector) in the rear panel (Figure 2-3 & 2- 5) is used for asynchronous serial data flow. The RS232 SERIAL port (DB-9 connector) on the front panel (Figure 2-4) is used for CCLI-RMM and on-site maintenance data access and command inputs. The SYNC SERIAL port (DB-25 connector, Figure 2-5)
is not internally connected therefore rendering it NOT useable.
b. The 10 BASE T (Figure 2-5) data port can be activated through a special software configuration but is NOT operational at this time in the GBT 2000.
207 thru 299 RESERVED
O P T IO N A L
10 90 M H z
C C L I/R M M /S e rvice p o rt
R S 2 3 2 -(D B 9 )
D a ta P o rt
Figure 2-3 GBT FUNCTIONAL BLOCK DIAGRAM
AL 6368.1A 04/21/2006
Figure 2-4 GBT FRONT PANEL
CCLI/RMM
Service port GBT LED
Lights GBT Data
Card Slot
04/21/2006 AL 6368.1A
Page 11
Figure 2-5 GBT BACK PANEL
Data Port
25 Pin Sync Serial port
DO NOT USE
10 Base T Data port
NOT USED
THIS PAGE INTENTIONALY LEFT BLANK
Chapter 3 - STANDARDS AND TOLERANCES › GBT UNIVERSAL ACCESSS TRANSCEIVER (UAT)
Chapter 3 - STANDARDS AND TOLERANCES 300. GENERAL. This chapter prescribes the standards and tolerances for the Ground-Based Transceiver (GBT) facilities, as defined and described in Order 6000.15, General Maintenance Handbook for Airway Facilities. All key performance parameters and/or key inspection elements are clearly identified by
an arrow (→) placed to the left of the applicable item. Entries in the reference paragraph column refer to this handbook, AL 6368.1. 301. Thru 308. RESERVED SECTION 1. GBT UNIVERSAL ACCESSS TRANSCEIVER (UAT) Reference Tolerance/Limit Parameter Paragraph Standard Initial Operating → 309. POWER SUPPLY, 28 Vdc
Para. 502 +28 Vdc +/- 5 Vdc +/- 10 Vdc
310. UAT TRANSMITTER → a) Output Power Para. 507.a +47 dBm +/- 3 dBm
+/- 3 dBm
→ b) Carrier Frequency Para. 504 981 MHz +/- 0.03 MHz
+/- 0.03 MHz
c) LED Indicator: → (1) “GPS” LED Para. 505 Steady Green
Steady Green
Steady Green
→ (2) “FAIL” LED Para. 505 OFF OFF OFF
→ (3) “TX” LED Para. 505 Flashing Red
Flashing Red
Flashing Red
→ (4) “RX” LED Para. 505 Flashing Red
Flashing Red
Flashing Red
→ d) Transmit Data Para. 506 Note 1 Note 1 Note 1
SECTION 1. GBT UNIVERSAL ACCESSS TRANSCEIVER (UAT) Cont.
Reference Tolerance/Limit
Parameter Paragraph Standard Initial Operating → e) UAT Antenna
(1) VSWR (2) Impedance
Para. 507 Para. 510
< 1.5:1 ≤ 10 Ohms
< 1.5:1 ≤ 10 Ohms
≤ 1.7:1 ≤ 10 Ohms
→ 311. UAT RECEIVER SENSITIVITY
Para. 508 & 510
-94 dBm -92 dBm minimum
-92 dBm minimum → 312. GBT CONFIGURATION Para. 515 Note 2 Note 2 Note 2
→ 313. UAT CONFIGURATION Para. 515 Note 3 Note 3 Note 3
NOTE 1 – The MX20 Data Link Status window of the GBT test set displays ADS-B target
numbers. The Traffic page shows proper GBT position data. Nine TIS targets should be displayed. The FIS page should display a FIS text message. NOTE 2 – The GBT configuration settings are set according to site requirements at the time of
installation and are recorded on the Facility Reference Data File (FRDF) for the GBT under test. Default GBT configuration settings are:
Source Identity Code: 0 Source Area Code: 0 TIS-B Timeout: 5 FIS-B Slot Allocation: 2 TIS-B Slot Allocation: 32 FISB Slot Count: 1 TISB Slot Count: 1 TIS-B Service Range: 1 Beacon Mode: ON Position Source: GPS ICAO Address: 3333333 ID: NAME Latitude: 90°0’0.0” N Longitude: 180°0’0.0” W Altitude: 80000 Target Rate: 5 sec
Chapter 3 - STANDARDS AND TOLERANCES › GBT DATA FLOW CONFIRMATION
NOTE 3 – The UAT configuration settings are set at the time of installation. The UAT settings
should not vary from the Default settings unless a specialized application is desired from the GBT. Default UAT configuration settings are:
RX and TX Antenna Diversity=One Antenna Base Station mode Slot Offset=0 SECTION 2. GBT GLOBAL POSITIONING SYSTEM (GPS)
Reference Tolerance/Limit Parameter Paragraph Standard Initial Operating → 314. GPS SIGNAL QUALITY Para. 509 Note 4 Note 4 Note 4
→ 315. GPS ANTENNA Para. 510 Note 5 Note 5 Note 5 → 316. GPS Lock and LEDs Para. 505 Note 6 Note 6 Note 6 NOTE 4 – The GBT Test Set MX20 should display 4 to 8 active satellites. The MX20 “PORT
STATUS” displays Internal and NUC 4 or higher. The displayed Lat/Lon position of the GBT under test from the terminal is within 328 feet (100 meters) (FOM <4) of the surveyed position. The SNR displayed from the terminal is a value greater than 5. NOTE 5 – The GPS Antenna output voltage, on the rear of the GBT panel at the GBT GPS
antenna output connector, should be 5VDC +/- 0.25VDC. Using the diode test mode on a DVM, at the GBT end of the GPS antenna coax cable connector, the reading should be 0.6V – 1.2V. Also see Para. 510. NOTE 6 – This procedure will verify that the LED’s are operating properly and verify the GPS LED is emitting a steady green illumination indicating a GPS satellite lock. SECTION 3. GBT DATA FLOW CONFIRMATION → 317. Data Flow/Transmission to ARTCC
Para. 511 Note 7 Note 7 Note 7
NOTE 7 – Confirm with the ARTCC that proper data flow is occurring and being received, resulting in an alarm free operation. 318 thru 399 RESERVED
THIS PAGE INTENTIONALY BLANK
Chapter 4 - PERIODIC MAINTENANCE › SYSTEM PERFORMANCE CHECKS.
Chapter 4 - PERIODIC MAINTENANCE 400. GENERAL. This chapter establishes the maintenance activities required for the Apollo GBT2000 Ground-Based Transceiver system on a periodic recurring basis, and the schedules for that accomplishment. The chapter is divided into two sections. The first section identifies the performance checks and normal control functions for the GBT that are necessary to determine that the system is operating within established tolerances and limits. The second section identifies other tasks that are necessary to prevent
deterioration and ensure reliability of the system. SECTION 1. SYSTEM PERFORMANCE CHECKS. The System Performance Checks section identifies checks (i.e., tests, measurements, and observations) of normal operating parameters that are necessary to determine whether operation is within established tolerances and limits.
Reference Paragraph Standards and Maintenance
Performance Checks
Tolerances Procedures Semi- Annually
Perform the following semi-annual checks using calibrated external test equipment and complete Form 6000-8, Appendix 3-3 & 3-4.
401. UAT Power Supply 309 502 402. UAT Transmitter & Antenna 310 a. Output Power 310.a 507.a b. Carrier Frequency 310.b 504 c. UAT LED Indicator 310.c (1) “GPS” LED 310.c.1 505 (2) “FAIL” LED 310.c.2 505 (3) “TX” LED 310.c.3 505 (4) “RX” LED 310.c.4 505 d. Transmit Data 310.d 506 e. UAT Antenna VSWR 310.e 1 507.b f. UAT Antenna Impedance 310.e 2 510 403. UAT Receiver Sensitivity 311 508 404. GPS Signal Quality, and Antenna 314, 315 509, 510 405. Data Flow / Transmission to ARTCC 317 511
Chapter 4 - PERIODIC MAINTENANCE › OTHER MAINTENANCE REQUIREMENTS.
Reference Paragraph Standards and Maintenance
Performance Checks
Tolerances Procedures Annually Perform the following annual checks using a laptop computer and complete FAA Form 6000-8, Appendix 3-3& 3-4.
406. GBT Configuration 312 515 407. UAT Configuration 313 515 SECTION 2. OTHER MAINTENANCE REQUIREMENTS. Other Maintenance Requirements section will identify other tasks that are necessary to prevent deterioration and/or ensure reliable operation. These maintenance tasks are
listed by the maximum intervals permitted between performances. The performance interval for the tasks listed as "As Required" means when the opportunity exists in conjunction with other scheduled activities. (For guidance, refer to Order 6000.15C, General Maintenance Handbook for Airway Facilities.)
Reference Paragraph Standards and Maintenance
Performance Checks
Tolerances Procedures Annually 408. Inspect antenna and foundation for damage and corrosion protection. Clean, galvanize, paint and lubricate as required.
See Order 6000.15C for details.
See Order 6000.15C for details.
409. Inspect all cables, connectors and hardware. Clean, repair and replace as required.
See Order 6000.15C for details.
See Order 6000.15C for details. 410. Clean equipment. As required. See Order 6000.15C for details.
See Order 6000.15C for details. 411 thru 499 RESERVED
Chapter 5 - MAINTENANCE PROCEDURES 500. GENERAL. This chapter establishes the maintenance procedures required for the Apollo GBT2000 Ground-Based Transceiver system on a periodic recurring basis. The chapter is divided into two sections. The first section identifies the performance
Chapter 5 - MAINTENANCE PROCEDURES › HARDWARE MAINTENANCE.
checks and normal control functions for the GBT that are necessary to determine that the system is operating within established tolerances and limits. The second section identifies software maintenance diagnostic tasks that are necessary to prevent deterioration and ensure reliability of the system. SECTION 1. HARDWARE MAINTENANCE.
HP 8563A as Per Procedures in This
Handbook
Figure 5-1 SYSTEM TEST SETUP
Chapter 5 - MAINTENANCE PROCEDURES › 501. PERFORMANCE CHECKS.
501. PERFORMANCE CHECKS.
a. The system must be removed from service in order to perform testing. Initial GBT Test Set setup must be performed in preparation for the performance tests. The following setup sequence is a general starting setup. Each test procedure will have specific information to modify this standard setup for the particular test being performed. The system test setup is shown in Figure 5- 1. b. PREPARATION: Coordinate with the appropriate organization(s) to remove the GBT system from service. NOTE: When GBT’s are installed as redundant systems, it will normally be necessary to remove from service only the particular GBT under test.
c. INITIAL SETUP:
(1) Ensure the MX20 power knob (located in the upper right corner) of the GBT test set is off by rotating it fully counter-clockwise. A “click” will be felt.
(2) Connect power to the GBT Test Set. If an AC to DC power supply is used, connect the power supply to an AC power source.
(3) Turn on the MX20 portion of the tester by rotating the MX20 power knob to the right until a “click” is felt.
(4) Connect the laptop computer COM1 serial port to the SERVICE port on the front panel of the GBT under test with the provided serial cable.
(5) Power-up the laptop computer and click the “Start” button. Select “Programs” from the popup menu. Select “Accessories” from the popup sub-menu. Select “HyperTerminal” from the popup sub-menu.
(6) Type “GBT” in the name space in the “HyperTerminal” window and click “OK”.
(7) In the “Connect using” item, choose “Direct to Com1”. Click “OK” to continue.
(8) In the “Port Settings” window, choose the following configuration:
-Bits per Second: 9600 -Data bits: 8 -Parity: None -Stop bits: 1 -Flow control: None Click “OK” to continue.
(9) Turn on the GBT under test. At the laptop computer type command: "cerr glbl f". Press ENTER and observe that data is not scrolling on the computer display.
(10) From the MX20 screen, after the startup routine has finished, select the System Info page by pressing the soft key. Verify that the HB (Heart Beat) data counter is incrementing. Figure 5-2 shows the layout of the System Info page.
Chapter 5 - MAINTENANCE PROCEDURES › 502. GBT POWER SUPPLY, 28 VDC.
Figure 5-2 MX20 SYSTEM INFO PAGE
(11) At the laptop computer, type the command: “gbt beacon off”, then press ENTER. Note that the status will be returned on the computer display indicating that the beacon is OFF and the Tx LED on the GBT front panel does not flash. 502. GBT POWER SUPPLY, 28 VDC.
a. This procedure verifies the power supply is operating within the prescribed standard and tolerance specified in Chapter 3.
b. The GBT will operate from 18 to 40 Vdc. The included rack mount Power Supply, if used, connects to 60 Hz 110 VAC power via a standard three-prong line cord provided. The rack mount power supply provides 28 Vdc to power the GBT. If site battery power is used, this typically provides 24 Vdc. No standby power supply capability (UPS) is provided by GBT components, though it may be provided separately if required.
c. The following test equipment is required:
- Calibrated Digital Voltmeter (DVM)
d. POWER SUPPLY TEST PROCEDURES.
(1) Turn off the external power supply to the GBT under test and remove the power cable connector from the GBT back panel.
(2) Set the DVM to Vdc mode. Place the black (-) lead to one lead of the 28 Vdc cable connector of the power supply and place the red (+) lead to the other lead of the 28 Vdc cable connector.
(3) Turn on the external power supply to the GBT under test. The DVM should read +28Vdc + 5Vdc.
(4) Record the value on FAA Form 6000-8 (Appendix 3-3).
Chapter 5 - MAINTENANCE PROCEDURES › 503. GBT TESTER TRANSMITTER POWER.
(5) Turn off the external power supply to the GBT under test. Connect the power supply cable to the GBT power connector.
(6) Return the GBT to normal operations. 503. GBT TESTER TRANSMITTER POWER.
a. This procedure measures the transmitter power to verify that it is within the standard and tolerance specified in Chapter 3. While performing the following procedures, reference paragraph 505 for LED test to be performed during this phase.
b. The following test equipment is required: - Calibrated Oscilloscope - GBT Test Set - GBT test cables - Laptop Computer The test setup connection is shown in Figure 5-3.
Figure 5-3 Power Output Test Setup
c. TRANSMITTER POWER TEST PROCEDURES.
CAUTION! Static discharge can damage the crystal detector element. Connect cables to the equipment under test and discharge the center conductor prior to connecting to the crystal detector.
(1) Perform the initial setup as described in Paragraph 501.
(2) Ensure the GBT Test Set is powered off.
(3) Connect a TNC patch cable between the UAT Tx OUT connector of the GBT Test Set and the IN port of the Step Attenuator.
(4) Connect a TNC patch cable between the OUT port of the Step Attenuator and the IN port of the Crystal Detector.
(5) Connect a cable from the GBT Test Set Crystal Detector OUT port to Channel 1 of the oscilloscope.
(6) Turn the Step Attenuator to 10 dB.
(7) Turn on power to the GBT Test Set. Turn on the MX20 and wait for the startup routine to finish then type "gbt beacon on" and Press ENTER.
(8) Measure the power output of the GBT Test Set with the oscilloscope. Initial scope settings are: 100 mV/div Vertical, 100 μS/div Time base. Trigger on the rising edge at 20 mV.
(9) Using the RF crystal detector calibration chart supplied with the GBT Test Set, convert the voltage measurement into an RF power level in dBm, and then add 10 dB to the measured value. The final calculated value should read between 18 and 22 dBm. (10) Record the transmitter power value for future use in measuring GBT receiver sensitivity.
(11) Turn off the GBT Test Set and disconnect all the test cables.
(12) Return the GBT system to normal operations.
504. TRANSMITTER CARRIER FREQUENCY.
a. This procedure will verify that the UAT Transmitter carrier frequency is within the standard and tolerance in chapter 3.
b. The following test equipment is required:
504. TRANSMITTER CARRIER FREQUENCY. › - Laptop Computer
- Spectrum Analyzer (HP-8563A or equivalent) - 60 dB In-line Attenuator - Laptop Computer
c. UAT TRANSMITTER TEST PROCEDURES.
(1) Perform the initial setup as described in paragraph 501.
(2) Connect the UAT ANT 1 port of the GBT under test through a 60 dB in-line attenuator to the input of the HP 8563A spectrum analyzer.
(3) At the laptop computer, type in the following command: “cerr glbl f”. Press ENTER.
(4) Type “gbt beacon on”. Press ENTER.
(5) Type, “gbt rate 1”. Press ENTER.
(6) Set the spectrum analyzer to the following settings:
- Sweep Time 24 sec - Center Frequency 981 MHz - Resolution BW 100 kHz - Video BW 1 MHz - Vertical Sensitivity Log Scale 10dB/div - Input Attenuation 10 dB - Reference Level 0 dBm - Span 5 MHz - Trace Max Hold A
(7) Observe the Spectrum analyzer until a full picture of the spectrum is
displayed (approximately 4-6 sweeps in Peak Hold).
(8) Observe the Spectrum Analyzer until a full picture of the spectrum is displayed (approximately 4-6 sweeps in Peak Hold), similar to the presentation in Figure 5-4.
Figure 5-4 Spectrum Measurement
(9) Locate the Main Lobe (highest lobe at the center of the spectrum displayed).
(10) Mark the lowest point at the high frequency side of the Main Lobe. Record this value.
(11) Mark the lowest point at the low frequency side of the Main Lobe. Record this value.
(12) Subtract the low frequency measurement from Step (11) from the high frequency measurement from Step (10). Record this value.
(13) Divide the value from Step (12) by two. Record this value.
506. GBT TRANSMIT DATA. › - Serial Cable
(14) Add the value from Step (13) to the value noted in Step (11). This is the center frequency of the transmitter.
(15) Record the frequency on FAA Form 6000-8, (Appendix 3-3).
(16) Return the GBT system to normal operations. 505. GBT FRONT PANEL LED’S.
a. This procedure will verify that the LED’s are operating properly as specified in Chapter 3.
b. The following test equipment is required:
- GBT Test Set - Laptop Computer
c. LED TEST PROCEDURES.
(1) Press the TEST switch on the GBT front panel and verify all LEDs illuminate.
(2) While performing the Receiver Sensitivity test in paragraph 508, verify that the GBT RX LED flashes.
(3) While performing the GBT Transmitter data test in paragraph 506, verify the GBT TX LED flashes in accordance with the GBT “Rate” setting.
(4) Verify the GPS LED is steady green while the GBT is in an operational mode.
(5) Verify the FAIL LED is off while the GBT is in an operational mode.
(6) Record the results on the FAA Form 6000-8, (Appendix 3-3).
506. GBT TRANSMIT DATA.
a. This procedure verifies proper data transmission from the GBT.
b. The following test equipment is required:
- GBT Test Set - Laptop Computer - Serial Cable The test setup connection is shown in Figure 5-4.
c. TRANSMIT DATA TEST PROCEDURES.
(1) Perform the initial setup as described in paragraph 501.
(2) Turn off power to the GBT Test Set by turning off the power supply. Ensure that the MX20 power knob is off. Power off the GBT under test.
Figure 5-5 Transmit Data Test Setup
(3) Connect a cable between the GBT UAT ANT. 1 connector and the 30 dB Power Attenuator IN port on the GBT Test Set.
(4) Connect a TNC patch cable between the 30 dB Power Attenuator OUT port and the IN port of the Step Attenuator.
(5) Connect a TNC patch cable between the OUT port of the Step Attenuator and the UAT Rx IN connector on the GBT Test Set as in Figure 5-5.
507. GBT OUTPUT POWER AND UAT ANTENNA VSWR. › - Laptop Computer
(6) Set the Step Attenuator to 60 dB.
(7) Turn on power to the GBT under test.
(8) Turn on power to the GBT Test Set. Turn on the MX20 and wait for the startup routine to finish. Press the TRAF soft key to display the Traffic page with Traffic enabled.
(9) At the laptop computer, type the command: “GBT beacon on”. Press ENTER.
(10) View the MX20 for the display of Traffic information.
(11) Press the FN key and then the SYS soft key. View the System Info page on the MX20 and ensure that the DATA LINK STATUS shows the HB and ADS-B counters incrementing.
(12) At the laptop computer, type command: “uat gbssimon”. Press ENTER.
(13) The Status column in the “Data Link Status” window of the System Info page will show that TIS-B and FIS-B targets are detected and will increment the counter.
(14) At the MX-20 screen, press the FN key and then press the TRAF soft key. The Traffic page will show GBT position data. Nine TIS targets should be displayed.
(15) At the MX-20 screen, press the FN key and then press the FIS soft key. The FIS page will display a FIS test message.
(16) Record test result on the FAA Form 6000-8, (appendix 3-3).
(17) At the laptop computer type: “uat gbssimoff”. Return the GBT system to normal operation.
507. GBT OUTPUT POWER AND UAT ANTENNA VSWR.
a. This procedure measures the UAT forward and reverse power. The values are used to calculate the Voltage Standing Wave Ratio (VSWR). The VSWR value should be within the standard and tolerance specified in chapter 3. The transmitter forward power should be within the standard and tolerance as specified in Chapter 3 and is also important for certification.
b. The following test equipment is required:
- GBT Test Set - Calibrated Oscilloscope - GBT test cables - Laptop Computer The test setup connection is shown in Figures 5-5 and 5-6.
c. UAT VSWR TEST PROCEDURES.
CAUTION! Static discharge can damage the crystal detector element. Connect cables to the equipment under test and discharge the center conductor prior to connecting to the crystal detector.
d. Measure UAT Antenna Forward Power (GBT Output Power).
(1) Perform the initial setup procedure from paragraph 501.
(2) Turn off the power to the GBT under test.
Figure 5-6 Forward Power to UAT
Antenna Test Setup (3) Connect a cable between the UAT ANT. 1 connector on the back panel of the GBT under test to the IN port of the Directional Coupler on the GBT Test Set as shown in Figure 5-6.
(4) Connect the UAT antenna cable to the Directional Coupler OUT port on the GBT Test Set.
(5) Connect a TNC patch cable between the center -30 dB OUT port of the Directional Coupler on the GBT Test Set and the IN port of the Step Attenuator.
(6) Connect a TNC patch cable between the OUT port of the Step Attenuator and the IN port of the Crystal Detector.
(7) Connect a cable from the GBT Test Set RF Crystal Detector OUT port to the oscilloscope.
(8) Turn the Step Attenuator to 10 dB.
(9) Turn on power to the GBT under test. Turn on the MX20 and wait for the startup routine to finish.
(10) At the laptop computer, type the command: “gbt beacon on”. Press ENTER.
(11) Measure the power output with the oscilloscope. Initial scope settings are: 100 mV/div Vertical, 100 μS/div Time Base. See Figure 5-7.
Figure 5-7 Expected Waveform
(12) Using the chart supplied with the GBT Test Set, convert the voltage measurement to an RF level in dB, add 40 dB to the measured value and record the value as Pf. This is equal to UAT antenna power forward or (Pf).
(13) At the laptop computer, type the command: “gbt beacon off”. Press ENTER.
e. Measure UAT Antenna Reverse Power.
(1) Turn off power to the GBT under test.
Figure 5-8 Reverse Power from UAT
Antenna Test Setup
508. UAT RECEIVER SENSITIVITY. › - Laptop Computer
(2) Connect the UAT antenna cable to the Directional Coupler IN port on the GBT Test Set as shown in Figure 5-8.
(3) Using a patch cable, connect the UAT ANT. 1 connector at the back of the GBT under test to the OUT port of the Directional Coupler on the GBT Test Set.
(4) Connect a TNC patch cable between the center -30 dB OUT port of the Directional Coupler to the RF Crystal Detector IN port.
(5) Connect a cable from the GBT Test Set RF Crystal Detector OUT port to the oscilloscope.
(6) Turn on power to the GBT under test. Turn on the MX20 and wait for the startup routine to finish.
(7) At the laptop computer, type the command: “gbt beacon on”. Press ENTER.
(8) Measure the power output with the oscilloscope. Initial scope settings are: 100 mV/div Vertical, 100 μS/div Time Base. See Figure 5-6 for test setup.
(9) Using the chart supplied with the GBT Test Set, convert the measured voltage to an RF level in dB, add 30 dB to the measured value and record the value as Pr.
(10) At the laptop computer, type the command: “gbt beacon off”. Press ENTER.
(11) Subtract Pr from Pf (Pf – Pr). The difference is the Return Loss. See Table 4-1 in Appendix 4 to determine the VSWR. Note: GBT output power measured and recorded in 507(a) equals or is the same as UAT antenna power forward or (Pf).
(12) Record the VSWR value on FAA Form 6000-8 (appendix 3-3).
(13) Turn off the GBT under test and disconnect all the test cables.
(14) Return the GBT system to normal operations. 508. UAT RECEIVER SENSITIVITY.
a. This procedure measures the UAT receiver sensitivity to ensure it is within the standard and tolerance in Chapter 3. NOTE: The procedure in paragraph 503 must be completed prior to performing this procedure
b. The Receiver Sensitivity Test checks for proper reception by the GBT under test. ADS-B data is sent by the internal UAT in the GBT Test Set at the rate of one per second.
c. The following test equipment is required:
- GBT Test Set - GBT cables - Laptop Computer The test setup connection is shown in Figure 5-9.
d. RECEIVER SENSITIVITY TEST PROCEDURES.
(1) Perform the initial setup procedure as described in paragraph 501.
Figure 5-9 Receiver Sensitivity Test
(2) Connect a TNC patch cable between the UAT Tx OUT port on the GBT Test Set and the IN port of the Step Attenuator.
(3) Connect a TNC patch cable between the IN port of the 30 dB Power Attenuator on the GBT Test Set and the OUT port of the Step Attenuator.
509. GLOBAL POSITIONING SYSTEM (GPS) RECEIVER SIGNAL QUALITY. › (3) Serial cable
(4) Connect a cable from the OUT port of the 30 dB Power Attenuator to the UAT ANT. 1 connector on the back of the GBT under test.
(5) Turn on power to the GBT Test Set. Turn on the MX20 and wait for the startup routine to finish.
(6) At the laptop computer, type the command: “cerr mdl gbt T T T T” (note spaces btwn Ts). Press ENTER.
(7) View the SERVICE port data stream sent to the laptop computer to ensure that data is being sent and verify the RX LED on the front panel of the GBT is flashing.
(8) Adjust the Step Attenuator slowly until the RX LED on the front panel of the GBT under test is extinguished, or the GBT data sent to the laptop computer stops.
(9) Compute the receiver sensitivity of the GBT under test using the following formula:
GBT Test Set Transmitter power computed from paragraph 503.
+ Fixed Attenuator (-30 dB) + Variable Attenuator setting from the GBT Test Set + Cable loss (-1db) = Receiver Sensitivity
(10) Record the value on FAA Form 6000-8, (appendix 3-3).
(11) Turn off the GBT Test Set and disconnect all the test cables.
(12) Return the GBT system to normal operations. 509. GLOBAL POSITIONING SYSTEM (GPS) RECEIVER SIGNAL QUALITY.
a. This step verifies the signal quality received from the GPS antenna is within the standard and tolerance in Chapter 3.
b. The following test equipment is required:
(1) GBT Test Set (2) Laptop computer (3) Serial cable
(4) GPS SIGNAL QUALITY TEST PROCEDURES.
(1) Turn off the power to the MX20 on the GBT Test Set by turning the rotary knob fully counter-clockwise.
(2) Connect the GBT site GPS antenna cable to the GBT Test Set. Reference the Initial Setup instructions for cable connections in paragraph. 501.
(3) Turn on the MX20 in the GBT Test Set by turning the rotary knob clockwise.
(4) Wait for the startup routine to complete, and then press the “SYS” soft key.
(5) Check the “INTERNAL GPS STATUS” pane on the MX20; the active satellites should display in green.
(6) After no more than 20 minutes, verify the “PORT STATUS” on the MX20 System Info is Internal and NUC 4 or higher.
(7) Reconnect the GBT site’s GPS antenna cable to the GBT being tested.
Chapter 5 - MAINTENANCE PROCEDURES › 511. ADS-B DATA FLOW TO ARTCC CONFIRMATION.
(8) At the laptop computer, type the command: “motogps status on”. Press ENTER.
(9) At the laptop computer, type the command: “motogps status off”. Press ENTER.
(10) The GPS Status Report should be displayed on the terminal screen. Check the SNR values, they should be greater than 5.
(11) At the laptop computer, type the command: “gbt help”. Press ENTER.
(12) Locate the Latitude and Longitude readings and verify that the displayed position is within + 3” (seconds Lat, Lon) of the surveyed position.
(13) Record the results on FAA Form 6000-8, (Appendix 3-3).
(14) Turn off the GBT Test Set and disconnect all the test cables.
(15) Return the GBT system to normal operations. 510. GPS and UAT ANTENNA PERFORMANCE CHECKS.
a. These procedures verify that the connections to the GPS and UAT antennas are made properly. To perform these tests the system must be removed from service.
b. Test Equipment Required: Digital Voltmeter (DVM)
c. CABLE INSPECTION.
(1) Verify that all cables are secured properly.
(2) Look for cables across sharp edges and pinch points.
(3) Check all connections.
(4) Visually inspect the antenna for damage or deterioration.
d. GPS ANTENNA. GPS Antenna: Using the diode test mode of the DVM, check the GPS antenna at the cable end near the GBT.
(1) Place the black (-) lead to the center conductor and the red (+) lead to the coax shield.
(2) The DVM should read between 0.6 V and 1.2 V.
e. UAT ANTENNA. UAT Antenna: Using the ohms mode of the DVM, check the resistance of the UAT antennas at the cable end near the GBT connector.
(1) Apply one test lead to the coax connector center conductor and the other lead to the coax shield.
(2) The impedance should show less than 10 ohms.
(3) Visually inspect the antenna for damage or deterioration.
(4) Record on FAA Form 6000-8 (Appendix 3-3). 511. ADS-B DATA FLOW TO ARTCC CONFIRMATION.
a. This procedure verifies that GBT data is being received at the ARTCC. If En- Route Surveillance Target Dependant Display (ESTDD) certification is not performed with the GBT certification, confirm the ADS-B Data Flow to ARTCC as described in this section. This confirmation is not required if ESTDD certification is performed.
b. The GBT sends packetized data each second to the CCCS and the MEARTS located at the ARTCC. The data flow is
easily confirmed by viewing the MEARTS Communications Gateway (CGW) display. To verify data flow, contact the Automation Specialist at the ARTCC (through the SOC) and perform the following steps:
(1) Request the Automation Specialist to reset the counters on the CGW display.
(2) Wait at least ten minutes and ask the Automation Specialist to provide the CGW display readings listed below to be recorded on the FAA Form 6000-8 (Appendix 3-4) at the GBT facility.
(3) Verify that the counters represent expected GBT operations as per the examples listed in the table below. ADS-B Data Flow to ARTCC Confirmation (cont.)
Reading Definition
Expected Indication (10
minutes since counter reset) Description
UTC date/time
Universal Time Constant
mm/dd/yyyy hh:mm:ss
Current time and date
UTC date/time of last counter reset
mm/dd/yyyy hh:mm:ss
Date/time of last counter reset
SOURCE Source GBT ID xxx Three-letter source ID (GBT identifier set during configuration) RX Receiver 0 For indications other than 0: GBT UAT RF receiver is not valid TX Transmitter 0 For indications other than 0: GBT UAT RF transmitter is not valid SR System Resource 0 For indications other than 0: GBT internal UAT communications are not valid PP Pulse Pair (Pulse Per Second verifier)
0 For indications other than 0: If GPS position is present, the GBT is not receiving valid 1 PPS output from the GBT’s GPS receiver. If GPS position is not present, the GPS position has been absent for more than 10 minutes STAT Status 20
Status message count (once per 30 seconds) SURV Surveillance Varied Surveillance (ADS-B) message count. Varies depending on aircraft UAT traffic CRC Cyclical Redundancy Checksum
0 Cyclical Redundancy Checksum errors encountered
INVMS Invalid message counter
0 An invalid message is a message with a missing field INVSS Invalid SIC/SAC 0 SIC/SAC has not been adapted in MEARTS
512. OTHER MAINTENANCE REQUIREMENTS. › System Grounding.
Reading Definition
Expected Indication (10
minutes since counter reset) Description SERER Serial Error 0 Incorrect serial connection - mismatch of GBT SAC and CCCS UDP port. Normally caused by a swapped cable. FIXPE Fixed Permanent Echo
120 “Parrot” count received by the GBT from other GBTs (once per 5 seconds from colocated GBT; higher if GBT is receiving parrots from other GBTs) 512. OTHER MAINTENANCE REQUIREMENTS.
a. The following activities shall be accomplished on a systematic basis, with appropriate corrective action taken as warranted by the conditions and findings. Activities found in subparagraphs (1) and (2) are to be performed as required, with no activity records required.
b. Antenna cable connector maintenance is to be performed in conjunction with the annual antenna transmission line routine checks, and does require periodic maintenance form records.
(1) Cleaning. Periodic cleaning of equipment and facilities should be scheduled in accordance with local conditions, but at least annually. Schedules for a particular site should be varied as a function of seasonal or environmental conditions. Replacement of air filters that affect the equipment should be performed as needed. Inspect parts for overheating, as evidenced by discoloration, blistering, or bulging of parts or containers, and peculiar odors or excessive heat. Remove any accumulations of dirt, corrosion, rust, mildew, and fungus growth. Inspect for loose mounting bolts, screws, and connections.
Housekeeping. Maintenance personnel shall ensure that equipment in
their charge presents a clean, well-ordered, professional appearance at all times. Equipment storage and work areas shall be kept clean with supplies and working equipment stored in a neat and orderly manner. Safety and professional decorum are directly related to a neat and wellordered workplace.
System Grounding. Section 810 of the National Electric Code provides information on proper grounding of the transceiver, size of required grounding conductor, route, connection to grounding electrode, and requirements for grounding electrode. The code specifies #10, or larger copper conductor. A lug is located on the back panel for grounding purposes. Inspect to ensure that the antenna system is grounded so as to provide some protection against voltage surges and build-up of static charge. Section 810 of the National Electric Code provides information on proper grounding of the mast and support structure, grounding of the lead-in wire to an antenna discharge unit, size of the grounding conductor, location of the antenna discharge unit, connection to grounding electrodes, and requirements for a grounding electrode.
(2) Moisture proofing of Radio- Frequency (RF) Cables. The RF cables, connectors, and terminations shall be inspected at least annually and repaired as required. This should be done in conjunction with any routine that requires disconnection of the cables. Facility outages have been attributed to moisture accumulation in RF coaxial cable connectors. Procedures for moisture proofing cable connections are found in FAA Order 6000.15.
515. GBT/UAT CONFIGURATION. › - Serial Cable
SECTION 2. SOFTWARE DIAGNOSTICS. 513. DIAGNOSTIC OVERVIEW.
a. The diagnostic procedures in this section are primarily for use in verifying a GBT system configuration and to assist in local troubleshooting.
b. The GBT/UAT Configuration procedures allow the existing configuration to be viewed and verified. These configuration parameters can also be changed, as for installing a new or replacement GBT, to meet specific requirements.
c. The Maintenance Log views an internal error history log for the GBT. The entries can be reset to start a new recording period. There are two logs:
(1) Terse – shows only the entries that have a change since the last reset.
(2) Full–shows all 93 possible log entries.
d. The MOTOGPS views a GPS specific log that indicates the health and activity of the GPS subsystem and of the satellites it is tracking.
e. The CERR diagnostics describe how to perform a software reset of the GBT and how to view additional data on the GPS interface to the GBT system. 514. GBT DIAGNOSTICS SETUP.
a. Using a laptop computer, appropriate diagnostic software, and a straight-through serial cable, connect the laptop serial port to the SERVICE port on the front panel of the GBT. The following setup sequence is a general starting setup. Each diagnostic
procedure will have specific information to modify this standard setup for the particular procedure being performed. The test setup is shown in Figure 5-1.
b. PREPARATION: Coordinate with the appropriate organization(s) to remove the GBT system from service.
c. INITIAL SETUP:
(1) Using the serial cable, connect the laptop computer COM1 port to the SERVICE port on the GBT front panel.
(2) Set the computer terminal connection according to Paragraph 501, steps 4 through 8.
(3) If not powered up, apply power to the GBT.
(4) At the laptop computer, type the command: “cerr glbl f”. Press ENTER. This stops all reporting to the service port. 515. GBT/UAT CONFIGURATION.
a. This procedure views the configuration settings for both the GBT and UAT. The following table lists all commands that can be performed under the Universal Access Transceiver (UAT) diagnostics.
b. The following test equipment is required:
- Laptop computer - Serial Cable
c. GBT & UAT CONFIGURATION TEST PROCEDURES.
516. MAINTENANCE LOG DIAGNOSTICS. › (1) NOTE: Perform the initial setup as described in paragraph 514.
(1) Perform the initial setup as described in paragraph 501 for both the GBT and/or the UAT depending on the component to be tested.
(2) At the laptop computer, type the command: “gbt help” for the GBT, or “uat help” for the UAT, depending on the configuration to be tested, then press ENTER.
(3) The configuration settings for the GBT or the UAT, as appropriate, will show on the laptop display. Verify the settings with the recorded data in the FRDF.
(4) If a different configuration is desired, type the appropriate command as listed in the GBT or UAT “help” listing, then press ENTER. Reference paragraphs,
610 for the GBT and 605 for the UAT detailed procedures. 516. MAINTENANCE LOG DIAGNOSTICS.
a. This procedure views the maintenance log options available at the SERVICE port.
b. The following test equipment is required:
- Laptop computer - Serial Cable
c. MAINTENANCE LOG DIAGNOSTICS PROCEDURES.
(1) NOTE: Perform the initial setup as described in paragraph 514.
c. MAINTENANCE LOG, TERSE.
This procedure will list the maintenance log parameters that have a value greater than zero. This indicates the log parameters that have noted a fault condition since the last maintenance log reset. This log will also indicate the Common Standard Input/Output (CSIO) data.
(1) At the laptop computer, type the command: “maint_log print terse”. Press ENTER.
(2) The screen will display information similar to the left-hand column of the following table. Interpretation of the data is provided in the right-hand column.
UAT Command Description
HELP Lists all commands and brief descriptions BASE Places the UAT into Base Station Mode AIR Places the UAT in Airborne Mode RXONLY Places the UAT in Receive Only Mode. RXANDTX Places the UAT in Receive and Transmit Mode. This enables FIS-B and TIS-B if they are otherwise available ONEANT Configures the UAT to use one antenna TWOANT Configures the UAT to use two antennas SLOT Set the slot offset for transmitted data. 0 = random and 1 – 31 = use specified slot
Displayed format Meaning of data 92 : UAT One PPS Failure Monitored parameter title First occurrence: 2001-03-15|06:38:55
Date and time of first occurrence
Last occurrence: 2001-11-27|23:24:56
Date and time of most recent occurrence Count : 139162 How often an occurrence has happened Task ID : 158 Task ID Task Priority : 100 Task priority Module name : GBT Module (system) name Line number : 1353 Line number in software 2002-11-27|22:23:56 Date and time of up to 10 most recent resets 2002-11-27|16:35:35 (Power off /crash resets) 2002-11-26|18:00:32 2001-07-25|22:32:11 2001-07-12|19:45:36 2001-07-06|19:47:09 2001-06-15|17:50:33 2001-05-11|05:46:12 2001-02-23|08:10:00 2001-02-23|07:01:44 138-0452 GBT SOFTWARE 31.20.00 CSIO Data. Software version for GBT 139-0250 1090 SOFTWARE ---- CSIO data. Not used MAGVAR DATABASE: 04 2000 CSIO data. Magnetic Variation database date 139-0244 PARALLEL HS PLD 08 CSIO data. Address of Parallel HS PLD 139-0253 DIGITAL IO PLD 10 CSIO data. Address of Digital I/O PLD 139-0254 SERIAL IO PLD 02 CSIO data. Address of Serial I/O PLD 139-0255 ARINC 429 PLD ---- CSIO data. Not used 139-0256 ARINC 561 PLD ---- CSIO data. Not used 139-0249 UAT FPGA 09 CSIO data. Address of UAT FPGA 139-0247 UAT SOFTWARE 02.20 CSIO data. UAT software version 139-0245 1090 FPGA ---- CSIO data. Not used 139-0246 BUS INTF PAL ---- CSIO data. Not used 428-0043 GPS SOFTWARE 2.3 CSIO data. GPS software version 415-6015 MOTHERBOARD 01 CSIO data. Address of motherboard 415-6014 INTERFACE BOARD 00 CSIO data. Address of interface board LDPU Serial number 0 GBT data. LDPU serial number LDPU ICAO Address 898779 GBT data. ICAO address e. MAINTENANCE LOG, FULL.
This procedure will show all monitored log parameters. The maintenance log monitors 94 parameters and the CSIO data. All parameters are displayed each time the MAINT_LOG PRINT command
is used regardless of the count levels for each monitored item. Many of these 94 logged parameters listed in the table below, are legacy items from the airborne avionics configuration of the hardware being used, and may not be monitored in the Base Station Mode. Item Description Item Description Item Description
0 Arinc traffic data A Invalid
32 DIO Time Mark Select Out
64 Transponder (#2) ownship fail 1 Arinc traffic data B Invalid
33 DIO Internal GPS Avail Out
65 Transponder (#2) ownship corrupt 2 Control Panel Fail 34 DIO UAT Reset Out 66 DIO Altitude Error 3 CDTI Feedback Bus Fail
35 DIO Reserved 2 Out 67 DIO magheading error 4 Control Panel to CDTI Bus Fail
36 DIO APM Clock Out 68 DIO Landing Gear Error 5 CDTI Display Fail 37 DIO APM Out 69 DIO air_ground error 6 GPS position fail 38 DIO APM WEN1 Out 70 DIO Radio Altimeter Error 7 GPS time mark fail 39 DIO APM WEN2 Out 71 DIO performance error 8 Arinc (#1) pressure alt fail
40 DIO APM EN1 Out 72 DIO ADVISEIN1 Error 9 Synchro (#1) pressure alt fail
41 DIO APM EN2 Out 73 DIO ADVISEIN2 error 10 ARINC 429Mag heading fail
42 LDPU to 1090 datalink fail
74 DIO ADVISEIN3 Error 11 Synchro mag heading fail
43 1090 to LDPU datalink fail
75 DIO ADVISEIN4 Error 12 MSP (#1) data link fail
44 UAT ownship fail 76 DIO Climb1 Error
13 Transponder (#1) ownship fail
45 VDLM4 ownship fail 77 DIO Climb2 Error
14 Transponder (#1) ownship corrupt
46 Discrete reference voltage fail
78 DIO Climb3 Error
15 1090 top antenna fail
47 Lithium Battery over voltage
79 DIO Climb4 Error
16 1090 bottom antenna fail
48 Lithium Battery under voltage
80 DIO DL2 Enable Error 17 1090 top antenna sensitivity
49 Air/Ground state mis-match
81 DIO Inc Climb1 Error 18 1090 bottom antenna sensitivity
50 APM’s CRC check on bank1 failed
82 DIO Inc Climb2 Error 19 LDPU over temperature
51 APM’s CRC check on bank 2 failed
83 DIO Inc Climb3 Error 20 UAT transmitter fail
52 APM bank 1&@ match failed
84 DIO Inc Climb4 Error 21 UAT top antenna fail
53 VDLM4 Tx Antenna fail (BITE)
85 DIO Transponder Stby A Error 22 UAT bottom antenna fail
54 VDLM4 Rx Antenna fail (BITE)
86 DIO Transponder Stby B Error 23 UAT receiver sensitivity
55 VDLM4 1PPS fail (BITE)
87 DIO TIS DisableIN Error 24 UAT tx power output threshold fail
56 VDLM4 GPS Input fail (BITE)
88 DIO ADC SelectIN Error 25 UAT rx loopback fail
57 VDLM4 R/T #1 fail (BITE)
89 Arinc 429 From FMC Fail 26 DIO LDPU Status Out 58 VDLM4 R/T #2 fail (BITE)
90 Arinc 561 Input Fail 27 DIO (Corrective) Annunciator Out
59 VDLM4 R/T #3 fail (BITE)
91 UAT Heartbeat Failure
517. MOTOGPS DIAGNOSTICS. › At the laptop computer, type the command: “motogps status on”.
Item Description Item Description Item Description 28 DIO (Preventive) Annunciator Out
60 VDLM4 R/T #4 fail (BITE)
92 UAT One PPS Failure 29 DIO (TA) Annunciator Out
61 Arinc (#2) pressure alt fail
93 Radio Altimeter Failure 30 DIO Advisory 1 Out 62 Synchro (#2) pressure alt fail
31 DIO Advisory 2 Out 63 MSP(#2) data link fail
(1) At the laptop computer, type the command: “maint_log print”. Press ENTER.
(2) The screen will display the same format as for the TERSE maintenance log. The maintenance log will display all 70 logged parameters and CSIO data. The data is interpreted in the same manner as for the TERSE maintenance log. 517. MOTOGPS DIAGNOSTICS.
a. This procedure views the MotoGPS (Motorola GPS) options available at the SERVICE port.
b. The following test equipment is required:
- Laptop computer - Serial Cable
c. MotoGPS DIAGNOSITCS PROCEDURES.
Perform the initial setup procedures described in paragraph 501.
At the laptop computer, type the command: “motogps status on”. Press ENTER.
(3) The screen will step through GPS status reports approximately every second. A typical status report format will look similar to the following:
11/14/2002 23:01:02 Visible Sats:11 Tracked Sats:8 Fix:00100000 ID Mode SNR Status Elev Azimuth 19 SRCH 000 00000000 12 109 27 SRCH 000 00000000 14 098 26 DATA 162 00100000 20 320 13 DATA 171 10100000 50 154 10 TRCK 089 10100000 29 257 08 TRCK 044 10100000 79 041 07 TRCK 079 10100000 12 190 02 TRCK 092 10100000 55 249 Motogps Lat 44 deg 54 min N Motogps Lon 122 deg 59 min W HFOM = 0.090000 HAL = 371
(4) To stop the GPS status report stepping, type “motogps status off” and press ENTER at the laptop computer.
(5) Interpreting the log data.
(a) First line: Date and time from the GPS receiver.
(b) Visible Sats: Number of visible satellites available.
(c) Tracked Sats: Number of satellites actually being tracked.
(d) Fix: See Note 1 below. (e) ID: The ID number for the satellite being tracked.
(f) Mode: SRCH for searching for satellite, DATA for tracked data available for position calculation. TRCK for tracking satellite data, (g) SNR: Signal to Noise Ratio. Higher numbers indicate higher signal quality.
(h) Status: See Note 2 below. (i) Elev: Elevation of satellite above horizon (0 to 90 degrees).
518. CERR DIAGNOSTICS. › - Serial cable
(j) Azimuth: Azimuth of satellite from north (0 to 359 degrees).
(k) Lat: Latitude of the GBT (l) Lon: Longitude of the GBT (m)HFOM: Horizontal Figure of Merit in nautical miles.
(n) HAL: Horizontal Alarm limit in 0.5 meter units, 3704 equals one nautical mile.
NOTE 1: Fix description. These eight bits denote the value of the GPS receiver status message. “1” represents a condition that is present. “0” represents a condition that is not present. The bits in left-to-right order are:
Bit # Description Comments Bit 7 Position propagate Left most (MSB) Bit 6 Poor geometry Bit 5 3D fix Bit 4 Altitude hold (2D fix) Bit 3 Acquiring Satellite/position hold
Bit 2 Not used Bit 1 <3 visible satellites Bit 0 Bad almanac Right most (LSB) NOTE 2: Status description. These eight bits denote the status of the GPS receiver channel for each satellite. “1” represents a condition that is present. “0” represents a condition that is not present. The bits in leftto-right order are:
Bit # Description Comments Bit 7 Used for position Left most (MSB) Bit 6 Sat momentum alert Bit 5 Sat anti-spoof flag Bit 4 Sat unhealthy Bit 3 Sat inaccurate Bit 2 Not used Bit 1 Not used Bit 0 Parity error Right most (LSB)
518. CERR DIAGNOSTICS.
a. This procedure views the Common Error Reporting Routine (CERR) data options available at the SERVICE port. More parameters than are given here are available, but they are not exercised during maintenance activities. Only those parameters that are of use for maintenance procedures are discussed.
b. The following test equipment is required:
- Laptop computer - Serial cable
c. CERR DIAGNOSTICS PROCEDURES. Perform the initial setup procedures described in paragraph 514.
d. SYSTEM RESET (cerr crash).
(1) At the laptop computer, type the command: “cerr crash”. Press ENTER.
(2) The laptop may display a line of random characters. The GBT LED panel will indicate a self-test sequence.
(3) After no more than 5 minutes, the laptop will display a format similar to the following:
Verifying EEPROM Configuration Using EEPROM Shadow APM 0 021212 012929 M 104:2 KLOGT:332 ‘key.log file: write error’ 021212 012929 M 15:200 U_IFOOPN:562 ‘UAT log file open error’ 021212 012929 s 18:200 P_UI_OUT:215 ‘Couldn’t open traffic bus A’
021212 012929 s 18:200 P_UI_OUT:237 ‘Couldn’t open traffic bus B’ 021212 012929 M 11:200 U_CSA:520 ‘CSARM log file open error’ 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43] 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43] 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43] e. CERR MOTOGPS.
(1) At the laptop computer, type in the command: “cerr mdl motogps t t t t”. Press ENTER.
(2) The screen will display a message similar to the following:
changed module: MOTOGPS to F:T S:T M:T I:T
(3) The screen will also step through a format approximately once every second similar to the following:
021127 232237 I 110:20 MOTOGPS:1024 ‘’ Motogps Year/Month/ Day 2002/11/28 021127 232237 I 110:20 MOTOGPS:1029 ‘’ Motogps Hour:Min:Sec 6:04:03 021127 232237 I 110:20 MOTOGPS:1142 ‘’ Motogps Lat 61 deg 15 min N 021127 232237 I 110:20 MOTOGPS:1146 ‘’ Motogps Lon –149 deg –31 min W 021127 232237 I 110:20 MOTOGPS:1235 ‘’ Receive raim stat. Alert = 1 HAL = 3704 021127 232237 I 150:30 MOTOGPS:1508 ‘’ HFOM = 10.010000 HAL = 3704
(4) To stop the stepping, type “cerr mdl motogps f f f f” and press ENTER at the laptop computer.
(5) To interpret the CERR data use the following format:
(year/month/day)(hour/min/sec)(level) (task ID)(task priority)(module):(line #) message
For example, the line entry:
021127 232237 I 113:20 UAT:1377 ‘Recvd Msg” Type = 0 Name = Heart Beat Message Has the meaning: Received on November 27, 2002 at 11:22 and 37 seconds P.M., Informational data, task 113 with priority 20, from the UAT module at line 1377. The received message, type is 0 and name is Heart Beat Message.
519 thru 599 RESERVED
THIS PAGE INTENTIONAL LEFT BLANK
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 600. GENERAL.
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). 600. GENERAL.
a. Figure 6-1 depicts the structure of the Remote Maintenance Monitoring (RMM) connectivity. Through a computer set up for the purpose, it is possible to access each GBT individually and verify or modify configuration and maintenance functions. These functions are resident within software modules as described in Chapter 2, paragraph 205. There are several functions within these modules that are of a specialized nature and not directly associated with routine maintenance functions. These specialized functions will not be discussed. Only those functions related to routine maintenance and troubleshooting will be discussed. It should be noted that all these RMM functions could be accessed directly at the GBT front panel for local maintenance support, as well.
b. There are several functions that may change or inhibit the data to the Status Report, GBT Beacon, or both. To avoid an unnecessary and potentially undesirable situation, RMM operations should be performed on systems that have been released from operational use. If it is necessary to perform RMM operations on a GBT while it is still in operational use, the following functions should be avoided to prevent erroneous data transmissions.
CERR Commands
GBT Commands
UAT Commands Crash Altitude Rx only Date Beacon Rx and Tx Time ICAO ID Latitude Longitude Position Rate SAC
ANICS
GBT (Prim.)
GBT (Aux.)
RMM Router
RMM
ADS-B
Router
MEARTS
CSU
ADS-B
RMM Computer
Capstone Communication
and Control System (CCCS)
RMM
Figure 6-1 RMM Structure
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 601. INITIAL SETUP.
NOTE: Where the word FORMAT is seen, the displayed message will be similar, but not exactly as shown; there may be more or fewer lines, or dates may be different, or some other difference may appear that is standard within the function. Where the word MESSAGE is seen, the displayed message will be exactly as depicted. 601. INITIAL SETUP.
a. PC Connectivity. If a dedicated computer is available, proceed to paragraph 602.
b. In the event a dedicated computer is not available, a computer can be connected using the following procedures.
(1) Connect the CONSOLE port of the RMM router to the COM1 port of the selected RMM computer utilizing the appropriate cable (CISCO type).
(2) Power the computer on and click the “Start” button. Select “Programs” from the popup window. Select “Accessories” from the popup window. Select “HyperTerminal” from the popup window.
(3) Type “GBT” in the name space in the “HyperTerminal” window and click “OK”.
(4) In the “Connect using” item, choose “Direct to Com1”. Click “OK” to continue.
(5) In the “Port Settings” window, choose the following configuration:
• Bits per second: 9600 • Data bits: 8 • Parity: None • Stop bits: 1 • Flow control: None
Click “OK” to continue. (6) The HyperTerminal data window will appear. Click “START” and press <ENTER>.
(7) The screen will display the following message:
PASSWORD
(8) Type in the RMM router password.
(9) Type in the command for connection to the desired site. For example, to connect to the Unalakleet Alternate GBT type the command: “telnet unka” and press <ENTER>.
(10) The screen will display the following similar format:
Trying UNKA (10.0.240.6, 2035) … open (format)
User Access Verification
Password:
(11) Type in the password.
(12) The screen will display the following message:
Password OK
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 602. CSIO COMMAND TESTING.
NOTE: While the GBT is not case sensitive (commands may be typed in upper or lower case), it is sensitive to spaces and underscores. Pay close attention to spaces and underscores since any typographical errors will be ignored and require the operator to re-enter the entire command. 602. CSIO COMMAND TESTING.
a. The following table lists the maintenance commands that can be performed under the Common Standard Input/output (CSIO) command list. A test procedure for each command follows the table.
CSIO Command
Description
HELP Lists all commands and brief descriptions IDCPU Identifies the CPU in use, LDPU or 1090. 1090 isn’t currently available. VERSION Shows versions of all hardware and software in the system. b. CSIO HELP – The CSIO Help command will list all commands available within the CSIO module.
(1) Type in the command: “CSIO HELP”. Press <ENTER>.
(2) The screen will display the following similar message: Command Parameters Description ---------- -------------- ---------------- Help This screen Idcpu Identifies cpu(ldpu or 1090) Version Shows system wide version info Case is not significant. Maximum command length is 200. The default input receive user I/F may be temporarily overridden and
another user I/F may be accessed by entering the target user I/F’s UI name as a prefix (separated by a space) to the desired command. CSIO IDCPU.
(1) Type in the command: “CSIO IDCPU”. Press <ENTER>
(2) The screen will display the following similar message:
LDPU Cpu
c. CSIO VERSION – This command lists the version of all software subsets within the GBT.
(1) Type in the command: ”CSIO VERSION”. Press <ENTER>.
(2) The screen will display the following format. The data may differ from that shown.
ADSB Version Information
138-0452 GBT SOFTWARE 31.20.OO 139-0244 PARALLEL HS PLD 08 139-0253 DIGITAL IO PLD 10 139-0254 SERIAL IO PLD 02 139-0255 ARINC 429 PLD ---- 139-0256 ARINC 561 PLD ---- 139-0247 UAT SOFTWARE 02.20 139-0249 UAT FPGA 09 139-0250 1090 SOFTWARE ---- 139-0245 1090 FPGA ---- 139-0246 BUS INTF PAL ---- MAGVAR DATABASE: 04 2000
428-0043 GPS SOFTWARE 2.3
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 603. CCLI COMMAND TESTING.
603. CCLI COMMAND TESTING. a. The following table lists the maintenance commands that can be performed under the Common Command Line Interface (CCLI) command list. A test procedure for each command follows the table.
CCLI Command
Description
HELP Lists all commands and brief descriptions LIST Lists the available user interfaces (UI) and the UI output status. DSBLOUT Disable the output of a specified UI. ENBLOUT Enable the output of a specified UI. DFLTIN Sets the specified UI to the default UI. CCLI is the usual default UI. LOGSZ Sets the size of the log file in bytes LOG Lists the log setup data LOGALL Turns the log file on and off. This command is not available for 1090
b. CCLI HELP - The CCLI Help command will list all commands available within the CCLI module. Some of these commands do not have a maintenance application and will not be described in the following procedures.
(1) Type in the command: “CCLI HELP”. Press <ENTER>.
(2) The screen will display the following similar message:
Command Parameters Description Help This screen Lis List user interfaces DsblOut UIName Disable a user interface’s output EnblOut UIName Enable a user interface’s output
Command Parameters Description DfltIn UIName Set the default input receive user I/F Log On/Off Turn logging ccli output to a file on or off LogDrv Drive Drive for log files LogSz Size Set the size of the log file (in bytes) LogAll ON/Off Turns master control of file logging on or off. This command is NOT available for the 1090 NOTE: The default input receive user I/F may be temporarily overridden and another user I/F may be accessed by entering the target user I/F’s UI name as a prefix (separated by a space) to the desired command.
c. CCLI LIST – This command lists all the User Interfaces (UI) and whether or not they are enabled. The default setting is for all to be enabled.
(1) Type in the command: “CCLI LIST”. Press <ENTER>.
(2) The screen will display the following format.
Name
Output Title
CIDE Enabled IDE routines
CCLI Enabled ccli Task
CSIO Enabled CSIO
CERR Enabled Error Reporting EEPROM Enabled EEPROM DMA Enabled dma Task LAPM Enabled LAPM MAINT_LOG Enabled Maintenance Log Task CONFIG Enabled LDPU Config PLAYBACK Enabled playback GBT Enabled GBT MOTOGPS Enabled Motogps Task UAT Enabled uat Task
LADIO Enabled LADIO Task d. CCLI DISABLE OUTPUT – This command allows a UI output to be disabled. This will not affect the maintenance log function.
(1) To disable a UI output, type the appropriate command. For example, to disable the CSIO UI, type in the command: “CCLI DSBLOUT CSIO”. Press <ENTER>.
(2) The screen will display the following similar format:
output disabled for user interface CSIO
e. CCLI ENABLE OUTPUT - This command allows a UI output to be enabled.
(1) To enable a UI output, type the appropriate command. For example, to enable the CSIO UI, type in the command: “CCLI ENBLOUT CSIO”. Press <ENTER>.
(2) The screen will display the following similar format:
output enabled for user interface CSIO
f. CCLI DEFAULT INPUT – This command sets a specified UI to be the default UI at the CCLI. If a command is not started with a UI title, the port will output the response for the default UI.
(1) To enable a UI as the default input, type the appropriate command. For example, to enable the CSIO UI, type in the command: “CCLI DFLTIN CSIO”. Press <ENTER>.
(2) The screen will display the following similar message:
the default input receive user interface is now CSIO (CSIO)
g. CCLI LOG SIZE – This command sets the maximum size of the log file within memory.
(1) To set the log size, type in the desired size. For example, to set the log size to 102400 (the default setting), type in the command: “CCLI LOGSZ 102400”. Press <ENTER>.
(2) The screen will display the following similar message:
Log file size has been set to 102400 bytes. h. CCLI LOG - These commands enable or disable a list of the log setup data and the log function itself.
(1) To turn off the CCLI log data list, type in the command: “CCLI LOG OFF”. Press <ENTER>.
(2) The screen will line space, but display no new message.
(3) To view the CCLI log data, type in the command: “CCLI LOG ON”. Press <ENTER>.
(4) The screen will display the following similar format:
Logging Turned On Log file size is set to 102400 bytes. Log file drive is set to: C: (5) To disable all logging functions, type in the command: “LOGALL OFF”. Press <ENTER>.
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 604. CERR COMMAND TESTING.
(6) The screen will display the following similar message:
Master Logging Turned Off. (7) To enable all logging functions, type in the command: “CCLI LOGALL ON”. Press <ENTER>.
(8) The screen will display the following similar message:
Master Logging Turned On. 604. CERR COMMAND TESTING.
a. The following table lists the maintenance commands that can be performed under the Common Error Reporting Routine (CERR) command list. A test procedure for each command follows the table.
CERR Command Description
HELP List all commands and brief descriptions MDLLVL
Change the status of the specified module and level. A state indication is included to determine if an error will be reported. The valid parameters are: Level: F (Fatal), S (Severe), M (Mild), or I (Informational) State: T (True, report it), or F (False, do not report it) MDL
Set the state of the specified module. Used by entering the module name and the desired state for the F, S, M and I levels State: T (True, report it), or F (False, do not report it) LVL
Change the state of a specified level Level: F (Fatal), S (Severe), M (Mild), or I (Informational) GLBL Use to enable all levels to the specified state DFLT Use to set the default enable state of each level
CERR Command Description
TIME Use to set the real-time clock and 24 hour clock DATE Use to set the real-time clock date GETERR HIST
Retrieve the error history from the FLASH disk. Only errors that caused a crash or reset will be displayed. CLEAR ERRHIST
Clear the error history from the FLASH disk CRASH LEVEL
Set the crash (reset) level to S (severe) or F (fatal). An error at the set level or more severe will cause a reset CRASH
Cause the GBT to reset to the debugger program and restart all major functions MotoGPS Display a GPS status summary log
b. CERR HELP - The CERR Help command will list all commands available within the CERR module. Some of these commands do not have a maintenance application and will not be described in the following procedures.
(1) Type the command: “CERR HELP”. Press <ENTER>.
(2) The screen will display the following similar message: Command Parameters Description
Help This screen MdlLvl Mdl Lvl St Change Module/Level enable to State Lvl: F, S, M, or I; St: T or F Mdl Mdl FSt SSt Change
Module enables toMSt Ist States Lvl Lvl St Change level enables to State Glbl St Change all enables to State
Command Parameters Description
Dflt FSt SSt MSt Ist
Change default enables to States Time HH MM SS Set RTC and VRTX times (24 hr clock) Date YY MM DD Set RTC date NvRead Adr Reads NVRAM from location Adr NvWrite Adr Value Writes NVRAM Adr location with Value ERG ReportGroup Enable
report group(s) Command Parameters Description
DRG ReportGroup Disable
report group(s) GRG Get report groups GetErrHist Display Error History Config Memory Clear ErrHist
Clear Error History Config Memory CrashLevel Lvl Reset or Crash to dbgr at this level or more severe (Lvl = ‘F’ or ‘S’) Crash Crashes to debugger or resets Case is not significant. Maximum command length is 200. Error report format: hh:mm:ss.ss Lvl Id:Pri Mdl:Lin ‘msg’ ...
c. CERR MODULE LEVEL – Changes the Level and State settings of a
specific module in one step. Setting a level determines when a State will report its activity. A True State will report every time it has a change. Informational Level will report every second, all other Levels will report when they occur. A False State will not report to the computer. This does not disable the maintenance log reporting.
(1) To set the module Level and State, type in the appropriate command. For example, to set UAT severe modules to True, type in the command: “CERR MDLLVL UAT S T”, then press <ENTER>.
(2) The screen will display the following similar format:
changed module: UAT, level: S to T
NOTE: If informational modules are set to True, the screen will step through a format similar to the following approximately once every second.
021127 232237 I 113:20 UAT:1377 ‘Rcvd Msg:’ Type = 0 Name = Heart Beat Message 021127 232237 I 113:20 UAT:1423 ‘Rcvd HB Msg:’ 09 07
d. CERR MODULE – This command allows the setting of all states in a particular module.
(1) To set all the states in a particular module, type the appropriate command in the following similar format:
CERR MDL UAT F F F F
Press <ENTER>. (2) The screen will display the following similar format:
changed module: UAT to F:F S:F M:F I:F NOTE: “F” disables a module so it does not report. “T” enables a module so it does report.
(3) If the module is commanded in the similar format:
CERR MDL UAT T T T T (4) The screen will display the following similar format:
changed module: UAT to F:T S:T M:T I:T (5) The screen will step through a format similar to the following approximately once every second.
021127 232237 I 113:20 UAT:1377 ‘Rcvd Msg:’ Type = 0
Name = Heart Beat Message 021127 232237 I 113:20 UAT:1423 ‘Rcvd HB Msg:’ 09 07 e. CERR LEVEL – This command will set the Level state of all Levels of the same value.
(1) To set all Level states, type in the appropriate command. For example, to set all Informational levels to True (report) state, type the command: “CERR LVL I T”. Press <ENTER>.
(2) The screen will display the following similar message:
changed Level: I to T Approximately once every second the screen will step through a format similar to the following:
021127 232237 I 12:190 U_INFOAD:535 ‘’ Idle 962 021127 232237 I 110:20 MOTOGPS:1024 ‘’ Motogps Year/Month/Day
2002/11/28 021127 232237 I 110:20 MOTOGPS:1029 ‘’ Motogps Hour:Min:Sec 6:04:03 021127 232237 I 110:20 MOTOGPS:1142 ‘’ Motogps Lat 61 deg 15 min N 021127 232237 I 110:20 MOTOGPS:1146 ‘’ Motogps Lon –149 deg –31 min W 021127 232237 I 110:20 MOTOGPS:1235 ‘’ Receive raim stat. Alert = 1 HAL = 3704 021127 232237 I 150:30 MOTOGPS:1508 ‘’ HFOM = 10.010000 HAL = 3704 021127 232237 I 12:190 P_ONWSHI:1915 ‘Write to 1090 Err’ 021127 232237 I 113:20 UAT:1377 ‘Rcvd Msg:’ Type = 0 Name = Heart Beat Message 021127 232237 I 113:20 UAT:1423 ‘Rcvd HB Msg:’ 09 07
f. CERR GLOBAL – This command will set the Level States of all CERR modules.
(1) To enable reporting of all Levels of all modules, type the command: “CERR GLBL T “. Press <ENTER>.
(2) The screen will display the following similar message:
changed all modules, all levels to T
The screen will step through a format similar to the following approximately once every second.
021127 232237 I 12:190 U_INFOAD:535 ‘’ Idle 962 021127 232237 I 110:20 MOTOGPS:1024 ‘’Motogps Year/Month/Day 2002/11/28 021127 232237 I 110:20 MOTOGPS:1029 ‘’Motogps Hour:Min:Sec 6:04:03 021127 232237 I 110:20 MOTOGPS:1142 ‘’ Motogps Lat 61 deg 15 min N 021127 232237 I 110:20 MOTOGPS:1146 ‘’ Motogps Lon –149 deg –31 min W
021127 232237 I 110:20 MOTOGPS:1235 ‘’ Receive raim stat. Alert = 1 HAL = 3704 021127 232237 I 150:30 MOTOGPS:1508 ‘’ HFOM = 10.010000 HAL = 3704 021127 232237 I 12:190P_ONWSHI: 1915 ‘Write to 1090 Err’ 021127 232237 I 113:20 UAT:1377 ‘Rcvd Msg:’ Type = 0 Name = Heart Beat Message 021127 232237 I 113:20 UAT:1423 ‘Rcvd HB Msg:’ 09 07
(3) If it is desired to disable reporting all Levels of all modules, type the command: “CERR GLBL F”. Press <ENTER>.
(4) The screen will stop stepping and display the following similar message:
changed all modules, all levels to F
g. CERR DEFAULT – This command will set the default State of all Levels within CERR.
(1) To set all Levels to a default report setting, type in the command: “CERR DFLT T T T T”. Press <ENTER>.
(2) The screen will display the following similar message:
changed default to F:T, S:T, M:T, I:T
(3) To set all Levels to a default noreport setting, type the command: “CERR DFLT F F F F”. Press <ENTER>.
(4) The screen will display the following similar message:
changed default to F:F, S:F, M:F, I:F h. CERR TIME – It is not necessary to set the time if the GPS subsystem is operational. However, if during maintenance
it is necessary to disconnect the GPS antenna, the internal clock can be set by the following procedure.
(1) To set the time in the GBT, type in the correct time using the following format (HH MM SS): CERR TIME 23 15 00 Press <ENTER>.
(2) The screen will display the following similar format:
current time 00:00:30 HH:MM:SS) changed time to 23:15:00 (HH:MM:SS) i. CERR DATE – It is not necessary to set the date if the GPS subsystem is operational. However, if during maintenance it is necessary to disconnect the GPS antenna, the internal date can be set by the following procedure.
(1) Type in the correct date using the following format (YY MM DD): CERR DATE 03 02 22 Press <ENTER>.
(2) The screen will display the following similar format:
current date: 02/12/11(YY:MM:DD)
changed date to 03/02/22 (YY:MM:DD)
j. CERR GET ERROR HISTORY – This command allows the display of the error history contained within the FLASH non-volatile memory.
(1) To download the FLASH memory history, type in the command: “CERR GETERRHIST”. Press <ENTER>.
(2) The screen will display a similar format to either of the following:
No error history available.
Last Clear History Performed on: 12/12 at: 01:20 or a format similar to: The Last Error Occurred on: 03/29
ERROR: operator induced crash from ccli
RESETS: 76 LAST CLEAR: 11/00 at 01:40
PREVIOUS ERRORS: DATE MESSAGE 03/29 101031 613748 P_Ownship
k. CERR CLEAR ERROR HISTORY – Clearing the error history will not clear the power failure or Crash command history from the FLASH memory.
(1) To clear the FLASH error history, type in the command: “CERR CLEARERRHIST”. Press <ENTER>.
(2) The screen will display the following similar message:
Error History Cleared
l. CERR CRASH LEVEL – The Crash routine is a software reset that goes back to the debug/boot stage and restarts the GBT. This includes restarting the GPS subsystem and forcing it to reacquire all satellites. The Crash routine can be generated automatically or on demand. To generate an automatic Crash routine, perform the following procedures:
(1) To verify the current Crash level setting without making a change, type in the command:
CERR CRASHLEVEL
Press <ENTER>.
(2) The screen will display the following similar format:
Crash Level = F
Crash Level not changed
(3) To set the level at which the system will automatically initiate a Crash routine (system reset), type in the appropriate command. For example, to initiate a reset after any fatal error (recommended), type the command: “CERR CRASHLEVEL F”. Press <ENTER>.
(4) The screen will display the following similar format:
Crash Level = S
Crash Level changed to F
m. CERR CRASH – CRASH is a software system reset command that forces the system to a debug/boot condition, thereby resetting all the GBT operations, including the GPS functions. May be used to clear fault.
(1) To manually initiate a Crash routine, type in the command: “CERR CRASH”. Press <ENTER>.
(2) The screen may display some random characters.
(3) After no more than 5 minutes, the screen will display the following similar format:
Verifying EEPROM Configuration Using EEPROM Shadow APM 0 021212 012929 M 104:2 KLOGT:324 ‘key.log file: cannot open/ create’
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 605. UAT COMMAND TESTING.
021212 012929 M 104:2 KLOGT:332 ‘key.log file: write error’ 021212 012929 M 15:200 U_IFOOPN:562 ‘UAT log file open error’ 021212 012929 s 18:200 P_UI_OUT:215 ‘Couldn’t open traffic bus A’ 021212 012929 s 18:200 P_UI_OUT:237 ‘Couldn’t open traffic bus B’ 021212 012929 s 19:200 P_UI_INP: 8887 ‘Couldn’t connect to Control Panel’ (5)audioTask 0 021212 012929 M 11:200 U_CSA:520 ‘CSARM log file open error’ 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43] 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43] 021212 012929 s 113:20 UAT:1725 ‘Event Message” [09][43]
n. CERR MOTOGPS – This command will display the GPS output data.
(1) To monitor the current GPS data, type the command: “CERR MDL MOTOGPS T T T T”. Press <ENTER>.
(2) The screen will display the following similar message:
changed module: MOTOGPS to F:T S:T M:T I:T
(3) The screen will immediately approximately once every second start stepping through a similar format to the following:
021127 232237 I 110:20 MOTOGPS:1024 ‘’ Motogps Year/Month/Day 2002/11/28 021127 232237 I 110:20 MOTOGPS:1029 ‘’ Motogps Hour:Min:Sec 6:04:03
021127 232237 I 110:20 MOTOGPS:1142 ‘’ Motogps Lat 61 deg 15 min N 021127 232237 I 110:20 MOTOGPS:1146 ‘’ Motogps Lon –149 deg 31 min W
021127 232237 I 110:20 MOTOGPS:1235 ‘’ Receive raim stat. Alert = 1 HAL = 3704 021127 232237 I 150:30 MOTOGPS:1508 ‘’ HFOM = 10.010000 HAL = 3704
605. UAT COMMAND TESTING.
a. The following table lists the maintenance commands that can be performed under the Universal Access Transceiver (UAT) command list. A test procedure for each command follows the table.
UAT Command Description
HELP List all commands and brief descriptions BASE Place the UAT into the Base Station Mode RXONLY Place the UAT in Receive Only Mode. RXANDTX
Place the UAT in Receive and Transmit Mode. This enables FIS- B and TIS-B if they are otherwise available. ONEANT Configure the UAT to use one antenna TWOANT Configure the UAT to use two antennas SLOT
Set the slot for transmitted data. 0 = random 1 – 31 = use the specified slot
b. UAT HELP - The UAT Help command will list all commands available within the CSIO module. Some of these commands do not have a maintenance application and will not be described in the following procedures.
(1) Type in the command: “UAT HELP”. Press <ENTER>.
(2) The screen will display the following similar format:
Command Description ------- ----------- BASE Put UAT into Base Station Mode. AIR Put UAT into Airborne Mode. RXONLY Put UAT in RX only mode. RXANDTX Put UAT into RX/TX mode. ONEANT Force UAT to use only the TOP antenna. TWOANT Force UAT to use both antennas. SLOT xxx Set the slot offset to a fixed number. 0 -> UAT selects random slot. GBSSIMON Turns on generation of TISB and FISB simulated msgs. GBSSIMOFF Turns off generation of TISB and FISB simulated msgs. CURRENT CONFIGURATION RX and TX Antenna Diversity = One Antenna Base Station mode SlotOffset = 0
c. UAT BASE MODE – This command sets the UAT to base (ground) operations.
(1) To set the UAT operations to Base Mode (recommended), type in the command: “UAT BASE”. Press <ENTER>.
(2) The screen will line step, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT Help (605.b) and check the lower section of the display for CURRENT CONFIGURATION.
d. UAT RECEIVE ONLY MODE – This command enables the UAT receiver while disabling the UAT transmitter.
(1) To set the UAT to Receive Only Mode, type the command: “UAT RXONLY”. Press <ENTER>.
(2) The screen will line space, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT Help (605.b) and check the lower section of the display for CURRENT CONFIGURATION.
e. UAT RECEIVE and TRANSMIT – This command enables both the UAT receiver and UAT transmitter at once.
(1) To set the UAT to Receive and Transmit Mode, type in the command: “UAT RXANDTX”. Press <ENTER>.
(2) The screen will line space, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT Help (605.b) and check the lower section of the display for CURRENT CONFIGURATION.
f. UAT TWO ANTENNA MODE – This command enables two antenna ports for providing additional coverage if one antenna will experience an excessive amount of interference from surrounding obstructions. This mode is normally only used in airborne applications for views above and below the aircraft.
(1) To set the UAT to Two-Antenna Mode (recommended only for special situations), type in the command: “UAT TWOANT”. Press <ENTER>.
(2) The screen will line space, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT
Chapter 6 – REMOTE MAINTENANCE MONITORING (RMM). › 606. MAINTENANCE LOG TESTING.
Help (605.A) and check the lower section of the display for CURRENT CONFIGURATION.
g. UAT ONE ANTENNA MODE – This command enables one antenna port for all receiving and transmitting operations (recommended).
(1) To set the UAT to One-Antenna Mode (recommended), type in the command: “UAT ONEANT”. Press <ENTER>.
(2) The screen will line space, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT Help (605.b) and check the lower section of the display for CURRENT CONFIGURATION.
h. UAT SLOT – This command sets the time slot (1-31) within which the UAT will transmit. Normal operation is to set this command to “0” so that the UAT will transmit within random slots, thus avoiding the possibility of extended interference from, or to, other systems.
(1) To set the time slot the UAT will transmit over, select the appropriate slot command. For example, to set the slot to position 0 (recommended), type in the command: “UAT SLOT 0”. Press <ENTER>.
(2) The screen will line space, but display no new message. If it is desired to verify the operation was successfully completed, repeat the procedure for UAT Help (605.b) and check the lower section of the display for CURRENT CONFIGURATION.
606. MAINTENANCE LOG TESTING.
a. The following table lists the maintenance commands that can be performed under the Maintenance Log list. A test procedure for each command follows in the table.
Maint Log Command Description
HELP List all commands and brief descriptions PRINT Print the entire maintenance log PRINT TERSE
Print maintenance log entries with a count higher than 0 RESET Clear the maintenance log
b. MAINTENANCE LOG HELP - The Maint_Log Help command will list all commands available within the maintenance log module.
(1) Type in the command: “MAINT_LOG HELP”. Press <ENTER>.
(2) The screen will display the following similar message: PRINT - Prints entire maintenance log to CCLI port. PRINT TERSE - Prints maintenance log entries which have a count > 0 RESET - Clears maintenance log. HELP - Displays this command list.
c. MAINTENANCE LOG, TERSE – This command will display only those maintenance log entries that have a value greater than “0”. These are the only entries that have experienced activity since the last maintenance log reset.
(1) To display the terse form of the maintenance log, type in the command: “MAINT_LOG PRINT TERSE”. Press <ENTER>.
(2) The screen will display the following similar format: 92 : UAT One PPS Failure First occurance:2001-03-15|06:38:55 Last occurrence :2001-11- 27|23:24:56 Count : 139162 Task ID : 158 Task Priority : 100 Module name : GBT Line number : 1353 2002-11-27|22:23:56 2002-11-27|16:35:35 2002-11-26|18:00:32 2001-07-25|22:32:11 2001-07-12|19:45:36 2001-07-06|19:47:09 2001-06-15|17:50:33 2001-05-11|05:46:12 2001-02-23|08:10:00 2001-02-23|07:01:44 138-0452 GBT SOFTWARE 31.20.00 139-0250 1090 SOFTWARE ---- MAGVAR DATABASE: 04 2000 139-0244 PARALLEL HS PLD 08 139-0253 DIGITAL IO PLD 10 139-0254 SERIAL IO PLD 02 139-0255 ARINC 429 PLD ---- 139-0256 ARINC 561 PLD ---- 139-0249 UAT FPGA 09 139-0247 UAT SOFTWARE 02.20 139-0245 1090 FPGA ---- 139-0246 BUS INTF PAL ---- 428-0043 GPS SOFTWARE 2.3 415-6015 MOTHERBOARD 01 415-6014 INTERFACE BOARD 00 LDPU Serial number 0 LDPU ICAO Address 898779
d. MAINTENANCE LOG, FULL - The maintenance log monitors 94 parameters and the CSIO data. All parameters are displayed each time the MAINT_LOG PRINT command is used regardless of the count levels for each monitored item. Many of these logged
parameters are legacy items from the airborne avionics configuration of the hardware being used, and may not be monitored in the Base Station Mode. The 94 logged parameters are similar to the following:
Item Description 0 Arinc traffic data A Invalid 1 Arinc traffic data B Invalid 2 Control Panel Fail 3 CDTI Feedback Bus Fail 4 Control Panel to CDTI Bus Fail 5 CDTI Display Fail 6 GPS position fail 7 GPS time mark fail 8 Arinc (#1) pressure alt fail 9 Synchro (#1) pressure alt fail 10 ARINC 429Mag heading fail 11 Synchro mag heading fail 12 MSP (#1) data link fail 13 Transponder (#1) ownship fail 14 Transponder (#1) ownship corrupt 15 1090 top antenna fail 16 1090 bottom antenna fail 17 1090 top antenna sensitivity 18 1090 bottom antenna sensitivity 19 LDPU over temperature 20 UAT transmitter fail 21 UAT top antenna fail 22 UAT bottom antenna fail 23 UAT receiver sensitivity 24 UAT tx power output threshold fail 25 UAT rx loopback fail 26 DIO LDPU Status Out 27 DIO (Corrective) Annunciator Out 28 DIO (Preventive) Annunciator Out 29 DIO (TA) Annunciator Out 30 DIO Advisory 1 Out 31 DIO Advisory 2 Out 32 DIO Time Mark Select Out 33 DIO Internal GPS Avail Out 34 DIO UAT Reset Out 35 DIO Reserved 2 Out 36 DIO APM Clock Out 37 DIO APM Out 38 DIO APM WEN1 Out 39 DIO APM WEN2 Out 40 DIO APM EN1 Out 41 DIO APM EN2 Out 42 LDPU to 1090 datalink fail 43 1090 to LDPU datalink fail 44 UAT ownship fail 45 VDLM4 ownship fail 46 Discrete reference voltage
Item Description fail 47 Lithium Battery over voltage 48 Lithium Battery under voltage 49 Air/Ground state mis-match 50 APM’s CRC check on bank1 failed 51 APM’s CRC check on bank 2 failed 52 APM bank 1&@ match failed 53 VDLM4 Tx Antenna fail (BITE) 54 VDLM4 Rx Antenna fail (BITE) 55 VDLM4 1PPS fail (BITE) 56 VDLM4 GPS Input fail (BITE) 57 VDLM4 R/T #1 fail (BITE) 58 VDLM4 R/T #2 fail (BITE) 59 VDLM4 R/T #3 fail (BITE) 60 VDLM4 R/T #4 fail (BITE) 61 Arinc (#2) pressure alt fail 62 Synchro (#2) pressure alt fail 63 MSP(#2) data link fail 64 Transponder (#2) ownship fail 65 Transponder (#2) ownship corrupt 66 DIO Altitude Error 67 DIO magheading error 68 DIO Landing Gear Error 69 DIO air_ground error 70 DIO Radio Altimeter Error 71 DIO performance error 72 DIO ADVISEIN1 Error 73 DIO ADVISEIN2 error 74 DIO ADVISEIN3 Error 75 DIO ADVISEIN4 Error 76 DIO Climb1 Error 77 DIO Climb2 Error 78 DIO Climb3 Error 79 DIO Climb4 Error 80 DIO DL2 Enable Error 81 DIO Inc Climb1 Error 82 DIO Inc Climb2 Error 83 DIO Inc Climb3 Error 84 DIO Inc Climb4 Error 85 DIO Transponder Stby A Error 86 DIO Transponder Stby B Error 87 DIO TIS DisableIN Error 88 DIO ADC SelectIN Error 89 Arinc 429 From FMC Fail 90 Arinc 561 Input Fail 91 UAT Heartbeat Failure 92 UAT One PPS Failure 93 Radio Altimeter Failure
(1) To display the full maintenance log, type in the command: “MAINT_LOG PRINT”. Press <ENTER>.
(2) The screen will display the following similar format. The Maintenance Log will display all 94 logged functions and CSIO data.
0 : Arinc traffic data A invalid First occurrence : No_Occur Last occurrence: No_Occur Count : 0 Task ID : 0 Task Priority : 0 Module name : 0 Line number : 3145728
• 92 : UAT One PPS Failure First occurrence 93 : Radio Altimeter Failure First occurrence : No_Occur