ORDER 6190.12C

ORDER 6190.12C

MAINTENANCE OF THE AUTOMATED RADAR TERMINAL

SYSTEM EXPANSION (ARTS IIIE)

OCTOBER 2005

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Distribution: Selected Airway Facilities Field Offices Initiated By: ATO Terminal

RECORD OF CHANGES Directive No. 6190.12C

SUPPLEMENTS SUPPLEMENTS CHANGE

SUPPLEMENTS SUPPLEMENTS CHANGE

TO BASIC

OPTIONAL CHANGE

TO BASIC

OPTIONAL

FAA FORM 1320-5 (6-80) USE PREVIOUS EDITION

FORWARD

1. PURPOSE.

This handbook provides guidance and prescribes technical standards, tolerances, and procedures applicable to the maintenance and inspection of the Automated Radar Terminal System Expansion (ARTS IIIE), Surveillance Display Subsystem (SDS) Terminal Radar Approach Control (TRACON), SDS Tower and Radar Gateway (RGW) System. It also provides information on special methods and techniques that will enable maintenance personnel to achieve optimum performance from the equipment. This information augments information available in instruction books and other handbooks, and complements the latest edition of Order 6000.15, General Maintenance Handbook for Airway Facilities. 2. DISTRIBUTION.

FAA FORM 1320-5 (6-80) USE PREVIOUS EDITION

This directive is distributed to selected offices and services within Washington headquarters, regional Airway Facilities (AF) divisions, William J. Hughes Technical Center, Mike Monroney Aeronautical Center, and Airway Facilities Field Offices having the following facilities/equipment: ARTS IIIE. 3. CANCELLATION.

This Order cancels Order 6190.12B, Maintenance of the ARTS IIIE, dated 4/15/98. 4. EXPLANATION OF CHANGES.

This revision incorporates changes resulting from the addition of PowerPC (PPC) chassis, ARTS Color Displays (ACD), Remote ARTS Color Displays (RACD), Local ARTS Color Display (LACD), Traffic Management Unit (TMU), RGW and Mosaic mode. 5. MAINTENANCE AND MODIFICATION PROCEDURES.

a. Order 6000.15, this handbook, and the applicable equipment instruction books shall be consulted and used together by the maintenance technician in all duties and activities for the maintenance of the ARTS IIIE system. These documents shall be considered collectively as the single official source of maintenance policy and direction

authorized by Air Traffic Organization - Terminal (ATO-T). References located in the chapters of this handbook entitled Chapter 3, Standards and Tolerances, Chapter 4, Periodic Maintenance, and Chapter 5, Maintenance Procedures shall indicate to the user whether this handbook and/or the equipment instruction book shall be consulted for a particular standard, key inspection element or performance parameter, performance check, maintenance task, or maintenance procedure.

b. The latest edition of Order 6032.1, Modifications to Ground Facilities, Systems, and Equipment in the National Airspace System (NAS), contains comprehensive policy and direction concerning the development, authorization, implementation, and recording of modifications to facilities, systems, and equipment in commissioned status. It supersedes all instructions published in earlier editions of maintenance technical handbooks and related directives. 6. FORMS LISTING

Modifications to equipment that are listed in NAS-MD-001, NAS Configuration Management Document, as baselined under configuration management, shall be in accordance with the latest edition of Order 1800.8, National Airspace System Configuration Management. 7. RECOMMENDATIONS FOR IMPROVEMENT.

This handbook is under configuration management control as defined in Order 1800.8 and NAS-MD-001. Any changes to the baseline documents or requests for deviation from national standards shall be processed through the NAS Change Proposal (NCP) process. Copies of FAA Form 1800-2, NAS Change Proposal, are provided in the back of this handbook for the convenience of handbook users.

Teri L. Bristol Director, Terminal Program Operations

Page i (and ii)

TABLE OF CONTENTS

TABLE OF CONTENTS

Paragraph Page

CHAPTER 1. GENERAL INFORMATION AND REQUIREMENTS 1 100. OBJECTIVE … 1 101. SAFETY … 1 102. COORDINATION … 1 103. CERTIFICATION … 1 104. RECORD KEEPING … 3 105. AIRCRAFT ACCIDENTS … 3 106. FLIGHT INSPECTION … 3 107. TECHNICAL INSPECTION … 4 108. PERIODIC MAINTENANCE … 4 109. TEST EQUIPMENT AND TOOLS FOR PERIODIC MAINTENANCE … 4 110. INSTRUCTION BOOKS … 4 111. FAA FORMS … 4 112. FAA ORDERS AND HANDBOOKS … 4 113-119. RESERVED … 4

CHAPTER 2. TECHNICAL CHARACTERISTICS 9 200. PURPOSE … 9 201. AUTOMATED RADAR TERMINAL SYSTEM (ARTS) DESCRIPTION … 9 202. ARTS HARDWARE … 9 203. ARTS SOFTWARE … 10 204. MOSAIC PROCESSING AND DISPLAY CAPABILITY … 10 205. RADAR GATEWAY (RGW) SYSTEM … 10 206. DIRECT RADAR FEED (DRF) CAPABILITY … 10 207-209. RESERVED … 10

CHAPTER 3. STANDARDS AND TOLERANCES 13 300. GENERAL … 13 301. OVERALL SYSTEM … 14 302. PERMANENT RETURN RANGE AND AZIMUTH … 14 303. CQARS DATA ANALYSIS … 15 304-309. RESERVED … 16 310. TPS … 16 311. TRACK PROCESSING … 16 312-319. RESERVED … 18 320. CPS … 18 321. COMMON PROCESSING … 18 322. MSAW/CA ALARM … 20 323–329. RESERVED … 20 330. SMC … 20 331. SYSTEM MONITOR … 20 332–339. RESERVED … 21 340. DPS … 21 341. DISPLAY PROCESSORS … 21 342. DISPLAY PRESENTATION … 26 343-349. RESERVED … 30 350. SSI … 30 351. ARTS GATEWAY … 30 352. ROUTERS AND SWITCHES … 31 353. LANS … 31

Page iii

354–359. RESERVED … 31 360. RGW … 31 361. RADAR GATEWAY … 31 362–369. RESERVED … 32 370. RESERVED … 32 371–379. RESERVED … 32 380. RADAR/ARTS INTERFACE SUBSYSTEM … 33 381. TERMINAL RADAR VIDEO SWITCHING SYSTEM (TRVSS)/ RADAR SYSTEM SELECTOR SWITCH (RSSS) … 33 382-389. RESERVED … 34

CHAPTER 4. PERIODIC MAINTENANCE 35 400. GENERAL … 35

CHAPTER 4. PERIODIC MAINTENANCE 35 400. GENERAL … 35

SECTION 1. PERFORMANCE CHECKS 36

Subsection 1. ARTS IIIE PERFORMANCE CHECKS 36

410. DAILY … 36 411. WEEKLY … 37 412. MONTHLY … 37 413. QUARTERLY … 38 414. SEMI-ANNUALLY … 38 415-419. RESERVED … 39

Subsection 2. SDS PERFORMANCE CHECKS 40

SECTION 1. PERFORMANCE CHECKS 36

420. DAILY … 40 421. WEEKLY … 40 422. MONTHLY … 40 423. QUARTERLY … 41 424. SEMI ANNUALLY … 42 425. RESERVED … 42 426. AS REQUIRED … 42 427–429. RESERVED … 42

Subsection 3. SDS TOWER PERFORMANCE CHECKS 43

430. DAILY … 43 431. WEEKLY … 43 432. MONTHLY … 44 433. QUARTERLY … 44 434. SEMI ANNUALLY … 44 435. RESERVED … 45 436. AS REQUIRED … 45 437–439. RESERVED … 45

Subsection 4. RGW PERFORMANCE CHECKS 46

440. DAILY … 46 441. WEEKLY … 46 442. MONTHLY … 46 443. QUARTERLY … 46 444. SEMI ANNUALLY … 47 445–449. RESERVED … 47

Subsection 5. SSI PERFORMANCE CHECKS 48

450–452. RESERVED … 48 453. QUARTERLY … 48 454–459. RESERVED … 48

450–452. RESERVED … 48 453. QUARTERLY … 48 454–459. RESERVED … 48

Subsection 6. MISCELLANEOUS PERFORMANCE CHECKS 49

Page iv

460. RESERVED … 49 461. WEEKLY … 49 462. MONTHLY … 49 463. QUARTERLY … 49 464. SEMI ANNUALLY … 49 465. RESERVED … 49 466. AS REQUIRED … 49 467-499. RESERVED … 50

CHAPTER 5. MAINTENANCE PROCEDURES 51 500. GENERAL … 51 501. TECHNICAL PERFORMANCE RECORDS ENTRIES … 51 502. MSAW/CA AURAL ALARM CHECK … 60 503. MSAW/CA ALARM CHECK UNDER PROGRAM CONTROL … 60 504. ENABLE SENSOR TOLERANCE ALARM … 62 505. REGISTRATION ANALYSIS … 62 506. CQARS DATA ANALYSIS … 62 507. SENSOR COVERAGE ANALYSIS PROGRAM (SCAP) … 65 508. PERMANENT RETURN RELIABILITY … 65 509. PERMANENT RETURN ACCURACY CDR DATA ANALYSIS … 66 510. BACKUP AND RESTORE PREF SETS … 66 511. DISK FIX UTILITY … 70 512. ARSR BACKUP MODE TARGET REGISTRATION CHECK … 70 513. SINGLE SENSOR MODE DISPLAY REGISTRATION CHECKS FOR NON-MOSAIC DISPLAYS … 71 514. SINGLE SENSOR MODE DISPLAY REGISTRATION CHECKS FOR MOSAIC CAPABLE SITES … 72 515. MOSAIC MODE REGISTRATION CHECKS … 73 516. DERIVING LAT/LON TOLERANCES FOR PERMANENT RETURNS IN MOSAIC MODE … 76 517. LDDT … 80 518-519. RESERVED … 80 520. MAP VERIFICATION CHECK … 80 521. DATA ENTRY AND DISPLAY … 80 522. RDM TO REMOTE DISPLAY CONNECTIVITY CHECK … 81 523. DRF MODE DISPLAY REGISTRATION CHECK … 81 524. UPS LOAD TEST … 81 525-599. RESERVED … 82

CHAPTER 6. FLIGHT INSPECTION 83 600-609. RESERVED … 83

CHAPTER 6. FLIGHT INSPECTION 83 600-609. RESERVED … 83

CHAPTER 7. GLOSSARY 85 700. GLOSSARY … 85

APPENDIX 1. CERTIFICATION REQUIREMENTS AT TRACONS AND LOCAL AIR TRAFFIC

CONTROL TOWERS 89

APPENDIX 2. CERTIFICATION REQUIREMENTS AT REMOTE AIR TRAFFIC CONTROL TOWERS 95

Page v

LIST OF ILLUSTRATIONS

LIST OF ILLUSTRATIONS

Figure Page

Figure 2-1. Typical ARTS IIIE Hardware Configuration … 11 Figure 2-2. Tower DP Subsystem Reference Diagram … 12 Figure 5-1. RACD Daily Maintenance … 52 Figure 5-2. RACD Weekly Maintenance … 53 Figure 5-3. RACD Semi-Annual (SA-1) Maintenance … 54 Figure 5-4. RACD Semi-Annual (SA-2) Maintenance … 55 Figure 5-5. ACD Semi-Annual Maintenance … 56 Figure 5-6. ARTS Daily Maintenance … 57 Figure 5-7. AGW Semi-Annual Maintenance … 58 Figure 5-8. TMU ISIS Monitor Semi-Annual Maintenance … 59

Page vi

Figure 2-1: picture of page 8Figure 2-1 · page 8
Picture of the page from the copy saved here

LIST OF TABLES

LIST OF TABLES

Table Page

Table 1-1. Maintenance and Diagnostic Manuals … 5 Table 1-2. FAA Forms … 6 Table 1-3. FAA Orders and Handbooks … 7 Table 3-1. Paragraph Numbering System … 13 Table 4-1. ARTS IIIE Performance Checks … 36 Table 4-2. SDS TRACON Performance Checks … 40 Table 4-3. SDS Tower Performance Checks … 43 Table 4-4. RGW Performance Checks … 46 Table 4-5. SSI Performance Checks … 48 Table 4-6. Miscellaneous Performance Checks … 49 Table 5-1. Sensor Performance Parameters … 64 Table 5-2. Mosaic Mode Permanent Return Tolerance Worksheet … 78 Table A.1-1. Terminal Surveillance Airborne Target Display (TSATD) Service … 89 Table A.1-2. Automated Radar Terminal System (ARTS) … 90 Table A.1-3. Radar Gateway (RGW) System … 92 Table A.1-4. Surveillance Display Sub-System (SDS) … 93 Table A.2-1. Terminal Surveillance Airborne Target Display (TSATD) Service … 95 Table A.2-2. Surveillance Display Sub-System (SDS) … 96

Page vii (and viii)

CHAPTER 1. GENERAL INFORMATION AND REQUIREMENTS

CHAPTER 1. GENERAL INFORMATION AND REQUIREMENTS

100. OBJECTIVE.

This handbook provides guidance and prescribes technical standards, tolerances, and procedures applicable to the maintenance and inspection of the Automated Radar Terminal System Expansion (ARTS IIIE), Surveillance Display Subsystem (SDS) Terminal Radar Approach Control (TRACON), SDS Tower and Radar Gateway (RGW) System. It does not cover plant, communications, or alternating current (ac) power equipment maintenance.

101. SAFETY.

Personnel shall observe all pertinent safety precautions when performing duties on the equipment. Refer to Order 6000.15, General Maintenance Handbook for Airway Facilities, for guidance.

102. COORDINATION.

Maintenance activities at each facility shall be closely coordinated at all times through the appropriate Control Center with Air Traffic (AT) operations personnel in accordance with Order 6000.15.

103. CERTIFICATION.

Refer to Order 6000.15 for general guidance on the certification of services, systems and subsystems. Refer to Appendix 1 of this handbook for TRACON Certification Requirements or Appendix 2 of this handbook for Tower Certification Requirements.

a. Certification Rationale.

The certification rationale is based on the criteria published in Order 6000.15, which specifies that systems and services providing moment-by-moment positional information will require certification.

(1) Certification of the automation systems and services shall be accomplished using one or any combination of methods as described in Order 6000.15. The nationally approved

procedures in this order are intended to provide guidance in support of making certification determinations.

(2) Additional actions for certification may be taken at the discretion of the certifier and should consider potential impacts on Air Traffic Control (ATC) operations.

(3) In the vast complex NAS, the physical separation of the major systems impose a responsibility on the certifier to make determinations about the capability of multiple systems working together to provide an advertised service.

b. Terminal Air Traffic Control Environment

(1) The terminal automation environment consists of primary radar sensors, secondary beacon sensors, transmission mediums, automated processing capabilities, and display systems. Together, they support the large number of flight plan processing and radar data processing required to accomplish the ATC function at the TRACON and Tower.

(2) The major service is Terminal Surveillance Airborne Target Display (TSATD).

(3) The major systems include ARTS as the primary automation system and the RGW as the backup automation system.

(4) The major subsystem is SDS.

(5) The NAS must be viewed as more than a large hardware/software system. It also includes numerous controllers at their sector displays and operating positions, the live air traffic being controlled, and the personnel that monitor system operations and restore systems or equipment that fail.

c. Levels of Certification. There are three levels of periodic certification in the automated terminal environment. The service level is the highest level, a system level in the middle, and a subsystem level as the lowest.

(1) Service Level.

(a) Surveillance services provide a means for air traffic control personnel to determine aircraft position, course, and identification used to facilitate the safe and efficient movement of aircraft within the service volume area. This service is certified as TSATD in accordance with tables published in this handbook.

(b) Order 6000.15 established new naming conventions for NAS Infrastructure Services. The Terminal Radar Data Processing (TRDP) service and Remote Tower Alphanumeric Display (RTADS) service have been combined to create TSATD for both the Tower and TRACON.

(c) Service level certification is the highest level in the certification hierarchy and is based on the system level of certification being current.

(2) System Level. System level certification provides the basis for the service level certification. System certification is based on the provision of advertised services. Advertised services are the functional capabilities of a system such as processing capability or interface capability. They are the primary focus of subjective certification judgments. Measurement of the certification parameters is one method used to determine the quality and scope of the advertised services. The following require system level certification:

(a) ARTS.

(b) RGW.

(c) External Systems. Surveillance radar and beacon systems are certified in accordance with provisions of the applicable maintenance handbook.

(3) Subsystem Level. Subsystem level certification is similar to system level certification and includes the SDS.

d. Certification Responsibility. The certification entry to be made in the facility maintenance log is published in Appendices in this order.

(1) General. Certification responsibility will be assigned to appropriate technical personnel in accordance with requirements in

the latest edition of Order 3400.3, Airway Facilities Maintenance Personnel Certification Program.

(2) Certification Responsibilities. Certification responsibility designations included in the certification requirement tables are for general guidance only. It is recognized that circumstances will arise that will necessitate special designations by the manager for other personnel having sufficient and appropriate expertise to perform technical certification of service and system performance. Special designees must comply with the requirements in the latest edition or Order 3400.3.

e. Certification Accomplishments.

(1) Certification Requirements. Certification shall be accomplished as follows:

(a) Periodic. Periodic certification shall be accomplished within the intervals specified in appendixes 1 and 2, and in accordance with Order 6000.15.

(b) Part of the Restoration Process. In the event of a failure, certification may be required prior to restoring a single item of equipment back into operation.

(2) Certification Following Corrective Maintenance on ARTS IIIE Equipment. After corrective maintenance on an element of the ARTS IIIE system affecting a certification parameter, the ARTS IIIE must be recertified. No attempt is made to provide related guidance for all possible restoration situations or the required certification actions involved: therefore, the cognizant certifying Airway Transportation Systems Specialist (ATSS) must determine the extent of the recertification actions to be taken since they will relate directly to the corrective maintenance that was performed.

(3) Certification Following Software Maintenance. Certification may be required in accordance with Appendix 1 or 2 following software changes pertaining to the ARTS IIIE as determined by the ARTS IIIE certifying official.

(4) Peripheral Device Failure Following Certification. Loss of a Redundant Chassis, Continuous Data Recording (CDR), Digital Altimeter Setting Indicator (DASI), Flight Data Entry PC (FDEPC) or interfacility functions, shall not result in decertification of the ARTS. A log entry will be made noting the loss and the cognizant AT operations personnel shall be advised.

(5) Certification Status Following a System Recovery.

(a) Following a system reconfiguration, the ARTS remains certified unless the system fails to recover properly or, in the opinion of the ARTS IIIE certifying official, there is reason to believe that a hardware failure occurred and was not properly isolated from the operational system.

(b) Any element that fails to recover properly should be physically isolated from the system, so that it cannot be activated during a future reconfiguration. Decertification may be required if the system or subsystem is judged to not meet the published certification requirements.

f. Certification Procedures.

(1) TSATD Service. Certification of the TSATD service can be accomplished using any combination of methods described in Order 6000.15 to determine the quality and scope of the provided service. If direct measurement of certification parameters is the chosen method, refer to Table 1 of Appendices 1 and 2 in this order.

(2) System. Certification of the automation system can be accomplished using any combination of methods described in Order 6000.15 to determine the quality and scope of the advertised services. If direct measurement of certification parameters is the chosen method, refer to Appendix 1, Table 2 or 3 in this order. Generally, completion of periodic maintenance at the appropriate interval may be used as a basis for certification determinations.

(3) Subsystem. Certification of the surveillance display subsystem can be accomplished using any combination of

methods described in Order 6000.15 to determine the quality and scope of the advertised services. If direct measurement of certification parameters is the chosen method, refer to Appendix 1, Table 4 or Appendix 2, Table 2 in this order. Generally, completion of periodic maintenance at the appropriate interval may be used as a basis for certification determinations.

104. RECORD KEEPING.

Station records, such as facility logs, meter reading forms, initial standards and tolerances, etc., must be maintained to satisfy all legal, maintenance and quality assurance requirements.

105. AIRCRAFT ACCIDENTS.

When aircraft accidents or incidents occur, maintenance personnel are responsible to evaluate and document the technical performance of the facilities which may have been involved, when requested by the Airway Facilities Aircraft Accident Representative (AFAAR) through the appropriate control center. For some facilities, it may also be necessary to remove them from service, and to conduct flight inspections. This requires that facility operational data be obtained and recorded in the maintenance log and on technical performance records. These records are official documents, and may be used by an aircraft accident investigation board in the determination of facility operational status at the time of the accident. See the latest edition of Order 8020.11, Aircraft Accident and Incident Notification, Investigation, and Reporting, for detailed guidance on requirements and activities following an aircraft accident/incident.

106. FLIGHT INSPECTION.

Normal instruction and guidance concerning flight inspection of the basic radar system and associated equipment are contained in the latest edition of Order A 8200.1, United States Standard Flight Inspection Manual.

107. TECHNICAL INSPECTION.

Formal inspections, objectively conducted, are an important part of the overall maintenance evaluation system. They are one of the more effective management tools for assuring the required quality level of maintenance work and of equipment and system performance. See Order 6000.15 and the latest edition of Order 6040.6, Airway Facilities NAS Technical Evaluation Program for further detail.

108. PERIODIC MAINTENANCE.

Maintenance personnel shall follow the tasks and schedules provided in chapter 4, which include the minimum essential periodic maintenance activities and the frequency with which they shall be performed to meet the minimum performance standards.

109. TEST EQUIPMENT AND TOOLS FOR PERIODIC MAINTENANCE.

Test equipment and tools required for performing routine maintenance and

troubleshooting of the ARTS IIIE system is shown in the latest edition of Order 6200.4, Test Equipment Management Handbook.

110. INSTRUCTION BOOKS.

A list of maintenance and diagnostic manuals is referenced in Table 1-1 in this directive. These manuals shall be readily available for reference in the performance of periodic and corrective maintenance and certification of the system.

111. FAA FORMS.

Table 1-2 represents the applicable FAA forms required within the document.

112. FAA ORDERS AND HANDBOOKS.

The latest edition of the applicable directives represented in Table 1-3 shall be used within this document.

113-119. RESERVED.

Table 1-1. Maintenance and Diagnostic Manuals

Title Publication Number

Time Code Generator/Synchronized-Generator TrueTime, Inc (Model 814-149)

Antenna Down/Up Converter TrueTime, Inc (Model 142-6150)

XL-AK Time and Frequency Receiver TrueTime, Inc (Model 600-101)

WWVB RTC Slave KINEMETRICS (Model SF-DC)

Dynair Video Distribution Amp Models DA-1060C and DA 3060C Dynair

Azimuth Distribution Unit ATC 21047 (Metric System Corp)

Unit/Subsystem Procedures for ATC Systems ATC 21055 Rev K Change 11

Instruction Book for ISP Full Digital ARTS Display (FDAD) ATC 40146, Vol. 1-3

Computer System Operators Manual/Software User’s Manual

Common Arts IIIE Instruction Book for ARTS Gateway (AGW) TI 6190.50

Common Arts IIIE Instruction Book for ARTS Radar Gateway

(RGW)

TI 6190.52

Common Arts IIIE Instruction Book for Remote-Arts Color

Display (R-ACD)

TI 6190.53

Common Arts IIIE Instruction Book for Remote Display

Multiplexer (RDM)

TI 6190.54

Common Arts IIIE Instruction Book for PowerPC Chassis TI 6190.55

Common Arts IIIE Instruction Book for ARTS Color Display

(ACD)

TI 6190.56

Common Arts IIIE Instruction Book for System Configuration

and Interface

TI 6190.57

Common Arts IIIE Instruction Book for System Monitor Console

Subsystem

TI 6190.58

Common Arts IIIE Instruction Book for Display Processing (DP)

Subsystem

TI 6190.59

Common Arts IIIE Instruction Book for Common Processing (CP)

Subsystem

TI 6190.60

Common Arts IIIE Instruction Book for Track Processing (TP)

Subsystem

TI 6190.61

Common Arts IIIE Computer System Diagnostic Manual (CSDM) TI 6190.62

Common Arts IIIE Interface Control Document (ICD) TI 6190.63

Common Arts IIIE Interface Design Document (IDD) P1, P2 &P3 TI 6190.64

Title Publication Number

Technical Manual for Operation and Maintenance Instructions

DBRITE System

TI 6410.18

Table 1-2. FAA Forms

Form Number Description

FAA Form 1800-2 NAS Change Proposal

FAA Form 6008-8 Technical Performance Record

FAA Form 6030-1 Facility Maintenance Log

FAA Form 6030-3 Hardware Discrepancy Report

FAA Form 6030-16 Technical Reference Data Records Cover/Transmittal Sheet

FAA Form 6030-17 Technical Reference Data Records Cover

FAA Form 6032-2 Airway Facilities Modification Record

FAA Form 6040-3 Facility and Service Outage Report

FAA Form 6100-1 Program Technical Report

FAA Form 6310-8 Technical Performance Record - ASR/ASDE/PAR IFR Room

Table 1-3. FAA Orders and Handbooks

Order Number Description 1100.134 Maintenance of National Airspace System Automation Subsystem 1320.58 Equipment and Facility Directives - Modification and Maintenance Technical Handbooks 1800.8 National Airspace System Configuration Management 3400.3 Airway Facilities Maintenance Personnel Certification Program 4630.2 Standard Allowance of Supplies and Working Equipment for National Airspace System Facilities 6000.15 General Maintenance Handbook for Airway Facilities 6000.22 Maintenance of Analog Lines 6032.1 Modifications to Ground Facilities, Systems, and Equipment in the National Airspace System (NAS) 6040.6 Airway Facilities NAS Technical Evaluation Program 6170.10 Maintenance of Data Multiplexing Network Equipment 6190.9 Electronic Equipment Modification Handbook Automated Radar Terminal System Expansion (ARTS IIIE) 6200.4 Test Equipment Management Handbook 6310.2 Maintenance of Airport Surveillance Radar (ASR) Facilities 6310.9 Maintenance of Airport Surveillance Radar (ASR-7, ASR-7E, ASR-7F, ASR-8) 6310.10 Maintenance of Airport Surveillance Radar (ASR-4, -4B, -5, -5D, -6,

-6D) Transmitter Site Equipment 6310.19 Maintenance of Airport Surveillance Radar-9 (ASR-9) 6310.30 Maintenance of Airport Surveillance Radar-11 (ASR-11) 6350.13 Maintenance of Radar Microwave Link Equipment (RML-1A, 2, 3, and 4) 6350.15 Maintenance of Radar Microwave Link Equipment (RML-6) 6360.1 Maintenance of Air Traffic Control Beacon Interrogator (ATCBI-4) Equipment 6360.14 Maintenance of Air Traffic Control Beacon Interrogator (ATCBI-5) Equipment 6365.3 Maintenance of the Mode Select (Mode-S) Beacon System 6410.18 Maintenance of the Digital Brite Radar Indicator Tower Equipment (DBRITE) 7210.3 Facility Operation and Administration 8020.11 Aircraft Accident and Incident Notification, Investigation, and Reporting 8260.25 Implementing Epoch Year Magnetic Variation Values A 8200.1 United States Standard Flight Inspection Manual 6540.38 LDRCL

Chap 1 Par 119 Page 7 (and 8)

CHAPTER 2. TECHNICAL CHARACTERISTICS

CHAPTER 2. TECHNICAL CHARACTERISTICS

200. PURPOSE.

This chapter provides a general description of the automated air traffic control capabilities and the technical characteristics of the hardware and software that comprise the system.

201. AUTOMATED RADAR TERMINAL SYSTEM (ARTS) DESCRIPTION.

The ARTS IIIE system provides automated alphanumerics, beacon tracking level, and radar tracking level, with ARTCC/Terminal Radar Approach Control (TRACON) ARTS IIIE interfacility data transfer capability. The ARTS IIIE system function provides the following capabilities:

a. Radar target detection and processing.

b. Beacon–radar correlation and tracking.

c. Mosaic processing and display.

d. Improved aircraft tracking program.

e. MSAW/CA.

f. Hardware and software expansion capability.

g. Online continuous data recording, i.e., CDR.

h. Failure recovery and reconfiguration.

i. Automatic overload sensing and protection.

j. Common processing.

k. Track processing.

l. Radar/ARTS interface.

202. ARTS HARDWARE.

ARTS hardware is composed of Commercial-off-the-Shelf (COTS) components connected to a Versa Module Eurocard (VME) bus. The ARTS IIIE chassis contain the various subsystems that provide the ARTS IIIE functionality. Refer to Figure 2-1, Typical ARTS IIIE Hardware Configuration, for a diagram of the ARTS IIIE configuration.

The hardware comprising the ARTS IIIE system can be broken down into the following major subsystems:

a. Track Processing Subsystem (TPS). The TPS subsystem performs tracking and surveillance functions. The TPS consists of (3) Track Processors (TP). The TP tracks and processes targets and provides a serial interface for all digital sensors.

b. Common Processing Subsystem (CPS). The CPS subsystem performs correlation between flight plans and target tracking information. CPS performs Minimum Safe Altitude Warning (MSAW), Conflict Alert (CA), interfacility message processing, and system wide keyboard processing.

c. System Monitor Console (SMC). The SMC Subsystem performs system monitoring and control functions and consists of microprocessor nodes residing on the network with a set of peripherals. The SMC also performs Continuous Data Recording (CDR).

d. Display Processing Subsystem (DPS). The DPS contains display subsystems and subsystems that drive the displays.

(1) The SDS consists of FDAD, ACD, TMU, LACD, RACD and Digital Bright Radar Indicator Tower Equipment (DBRITE). The primary purpose of the SDS is to provide the human–computer interface (HCI) between the ATC sensors and processors, and the air traffic controller.

(2) RDM provides an interface to drive the displays and process controller inputs.

(3) Remote Display Buffer Memory (RDBM) and Local BANS Processor (LBP) provide an interface to drive the DBRITE displays. Refer to Figure 2-2, DBRITE DPS Reference Diagram, for a diagram of the DBRITE/DPS configuration.

e. Subsystem Interface (SSI). The SSI subsystem provides a common communication

medium used between operational subsystems of the ARTS IIIE and external users.

Figure 2-2: picture of page 22Figure 2-2 · page 22
Picture of the page from the copy saved here

(1) The SSI subsystem is the means by which the TPS, CPS, DPS, and SMC communicate. The SSI is characterized by efficient, reliable Local Area Network (LAN) technology and is configured with fail–safe, dual trunk redundancy.

(2) The ARTS Gateway (AGW) provides an interface for external users of ARTS data.

f. RADAR ARTS Interface Subsystem. The Radar/ARTS Interface consists of a Terminal Radar Video Switching System (TRVSS).

(1) The TRVSS controls analog video display selection for FDADs and DBRITEs.

203. ARTS SOFTWARE.

The software comprising the ARTS IIIE system consists of two distinct types. They are operational and offline. A brief description of the two types follows:

a. Operational Software. The operational software consists of executive, tasks, and database elements and is distributed across multiple processors. The operational software is responsible for meeting the real–time requirements for displaying and tracking aircraft in the terminal environment.

b. Offline Software. Offline software is a collection of support, utility, and diagnostic software, which operates independently of the operational program.

204. MOSAIC PROCESSING AND DISPLAY CAPABILITY.

Mosaic capability uses track data from all adapted sensors to provide a display presentation of the entire ARTS IIIE system plane to the controller. Mosaic capability processes and display targets and tracks from multiple sensors based on a sensor hierarchy within a Radar Sort Box (RSB) grid. Individual RSBs are two miles by two miles. Mosaic capability provides improved coverage in the service volume area to overcome the limitations of a single sensor.

205. RADAR GATEWAY (RGW) SYSTEM.

The primary purpose of the RGW is to provide radar, beacon, and weather radar information to the Display Processing Subsystem (DPS) in the event that the ARTS IIIE operational network is unavailable. The RGW has all the capabilities of the ARTS with the exception of interfacility and DASI interfaces. Additionally, RGW has Mosaic and display capabilities.

a. RGW Hardware. The RGW combines the TPS, CPS, and SMC major subsystems of the ARTS IIIE into a single redundant chassis. Refer to Figure 2-1, Typical ARTS IIIE Hardware Configuration, for a diagram of the RGW configuration.

b. RGW Software. The software comprising the RGW system includes the software functionality of the TPS, CPS, and SMC.

206. DIRECT RADAR FEED (DRF) CAPABILITY.

The primary purpose of DRF is to provide radar, beacon and weather information to the RACD in the event the interface is interrupted between the Tower and TRACON. DRF capability provides digital extents, trails, weather and limited data blocks.

207-209. RESERVED.

Echo Printer

PD-PC LAN Media Storage Unit

IEEE 802.3 Networks 10Base5 Thicknet or 100BaseTX Fast Ethernet

TRACK PROCESSING

TRACK PROCESSING

SUBSYSTEM

COMMON PROCESSING

SUBSYSTEM

SUBSYSTEM INTERFACE

SUBSYSTEM

SYSTEM MONITOR CONSOLE

SUBSYSTEM

(3) (3)

(6) (3)

(3) (1)

(3)

(6)

(1)

100BaseT LAN Auxiliary LAN

(3 LANs, 1/SMC Processor)

GFE PCs

Digiitized ASR-8/ASR-9/Mode S/

ARSR Sensors ARTCC TMS DASI

WWVB or GPS

SYSTEM MONITOR CONSOLE

Note: V denotes variable quantity

(2)

(2)

ARTS Clients

RADAR GATEW AY SUBSYSTEM (2)

IEEE 802.3 Networks 100BaseTx Fast Ethernet

ARTS Gateway

Common Processor Track Processor

SMC Processor

SMC Personal Computer

External Real-Time

Clock (Master)

External Real-Time

Clock (Slave)

High- Speed Printer

RADAR GATEW AY SUBSYSTEM (2)

Performance

Data PC

(V)

ASR-8 Sensors

Sensor Gateway

(V) (V) (V) (V)

DISPLAY PROCESSING

SUBSYSTEM

RACD or

RDBM/ DBRITE

MSAW

Alarm

Local BANS/ DBRITE

RSSS Radar/ Beacon

Remote

Display Multiplexer

Full Digital

ARTS Display

ARTS

Color Display

Local BANS Processor

(2)

Media Storage

Unit

RDBM/ DBRITE

RGW Personal Computer

RGW

(2) (4)

100BaseT Auxiliary LAN

Digitized

ASR-8/ ASR-9/ Mode S/

ARSR Sensors

External Real-Time

Clock (Slave)

TMU/ LACD

Figure 2-1. Typical ARTS IIIE Hardware Configuration

LBP

RDM M

RDM

RDM

M M

M RDBM DBRITE

M M RACD

DBRITE = DIGITAL BRIGHT INDICTOR TOWER EQUIPMENT RACD = REMOTE ARTS COLOR DISPLAY RDBM = REMOTE DISPLAY BUFFER MEMORY RDM= REMOTE DISPLAY MULTIPLEXER M=MODEM

M M RACD

Interface between DBRITE and DISPLAY maybe microwave link,

hardwire connection, or fiber link LOCAL TOWER

EXISTING EQUIPMENT ARTS IIIE EQUIPMENT SUBSYSTEM

INTERFACE

DISPLAY

DISPLAY

DISPLAY

DBRITE

Figure 2-2. Tower DP Subsystem Reference Diagram

CHAPTER 3. STANDARDS AND TOLERANCES

CHAPTER 3. STANDARDS AND TOLERANCES

300. GENERAL.

This chapter prescribes the standards and tolerances for the ARTS IIIE and RGW Systems as defined and described in Order 6000.15. All key performance parameters and/or key inspection elements are clearly identified by an arrow placed to the left of the applicable item. The paragraphs in this

chapter are numbered so as to enhance the organization and make it easier to use. Table 3-1 summarizes the paragraph numbering system.

NOTE: All reference paragraphs apply to this handbook unless otherwise indicated.

Table 3-1. Paragraph Numbering System

Paragraph Numbers Standards and Tolerances Apply to the Following

301-309 Overall System (ARTS)

310-319 TPS

320-329 CPS

330-339 SMC

340-349 DPS

350-359 SSI

360-369 RGW

370-379 Reserved

380-389 Radar/ ARTS/ Interface Subsystem

NOTE: Reference FAA Forms 6030-16/6030-17 values are equivalent to commissioning criteria.

STANDARDS AND TOLERANCES

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

301. OVERALL SYSTEM.

→ 302. PERMANENT

RETURN RANGE AND AZIMUTH.

Accuracy

a. Single Sensor Permanent Return Accuracy

Para 509 FAA Form 6030- 17

(1) ASR Beacon

(a) Azimuth FAA Form 6030- 17 Value +/- 2 ACPs +/- 5 ACPs

→ 302. PERMANENT

(b) Range FAA Form 6030- 17 Value +/- 0.0625nmi Same as Initial

(2) ASR Search

(a) Azimuth FAA Form 6030- 17 Value +/- 2 ACPs +/- 5 ACPs

(b) Range FAA Form 6030- 17 Value +/- 0.0625nmi Same as Initial

(3) Air Route Surveillance Radar (ARSR) Beacon

(a) Azimuth FAA Form 6030- 17 Value +/- 2 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.125nmi Same as Initial

(4) ARSR Search

(a) Azimuth FAA Form 6030- 17 Value +/- 4 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.125nmi Same as Initial

b. Mosaic Permanent Return Accuracy /Common Arts Quick Radar Sensors (CQARS)

Para 506 FAA Form 6030- 17

(1) ASR Beacon

(a) Azimuth FAA Form 6030- 17 Value +/- 2 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.0625nmi Same as Initial

STANDARDS AND TOLERANCES

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(2) ASR Search

(a) Azimuth FAA Form 6030- 17 Value +/- 4 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.0625 nmi

Same as Initial

(3) ARSR Beacon

(a) Azimuth FAA Form 6030- 17 Value +/- 2 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.125 nmi

Same as Initial

(4) ARSR Search

(a) Azimuth FAA Form 6030- 17 Value +/- 4 ACPs Same as Initial

(b) Range FAA Form 6030- 17 Value +/- 0.125 nmi

Same as Initial

→ 303. CQARS DATA

→ 303. CQARS DATA

ANALYSIS.

Para 506

a. PR Reliability

(1) Beacon Verify reliability for each adapted Beacon Permanent Return is greater than or equal to 90%

Same as standard

Same as standard

(2) Search Verify reliability for each adapted Search Permanent Return is greater than or equal to 80%

Same as standard

Same as standard

b. Inter-Sensor Linking

(1) Inter-Sensor Linking valid for sensor center to sensor center distance less than or equal to 80nmi

(a) ASR-ASR 0nmi +/- 0.2nmi +/- 0.2nmi

(b) ASR-ARSR 0nmi +/- 0.4nmi +/- 0.4nmi

(c) ARSR-ARSR 0nmi +/- 0.4nmi +/- 0.4nmi

STANDARDS AND TOLERANCES

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(2) Inter-Sensor Linking valid for sensor center to sensor center distance greater than 80nmi

(a) ASR-ASR 0nmi +/- 0.4nmi +/- 0.4nmi

(b) ASR-ARSR 0nmi +/- 0.6nmi +/- 0.6nmi

(c) ARSR-ARSR 0nmi +/- 0.6nmi +/- 0.6nmi

c. Radar Reinforcement Rate1

Para 506

(1) ARSR 1/2/3 Greater than or equal to 60%

Same as standard

Same as operating

(2) All Others Greater than or equal to 80%

Same as standard

Same as operating

304-309. RESERVED.

310. TPS.

311. TRACK PROCESSING.

a. TP

→ (1) Power Supplies TI 6190.61 Para 6.5.1.3

(a) +5.0 V dc + 5.0 Volts direct current (V dc)

+.25, -.125 Same as standard

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as standard

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as standard

(d) Ripple for 5.0 V dc, +12 V dc, -12 V dc

200 Mv peak-topeak maximum

(2) Floppy Confidence Test TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(3) Hard Disk Internal Diagnostic Test

TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard 1 For ASR-11 Sensors where Search coverage may not equal Beacon coverage, the following applies: Upon review and assurance in writing (from the Air Traffic Manager) that Air Traffic defined Beacon and Search sensor volumes are adequate for the Air Traffic service required, the following alternate procedure is allowed for the calculation of radar reinforcement rate. For a sensor where the Beacon volume is greater than the Search volume, the radar reinforcement rate shall be calculated using only those Beacon-only targets within the volume of the search. This procedure requires the use of radar data analysis tool RBAT or the analysis of CDR data.

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

→ (4) VCOM-54 Channel To

Different Channel Synchronous Loop-Back Test

TI 6190.62 Para 5.2

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as standard

→ (5) Diagnostic Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as standard

(6) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.1.2

Successful no fault execution

Same as standard

Same as initial

b. PPC TP

→ (1) Power Supply TI 6190.55 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c). -12.0 V dc -12 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as standard

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as standard

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC card reader 1 Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

→ (3) VCOM-54 Channel To

Different Channel Synchronous Loop-Back Test

TI 6190.62 Para 5.2

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

→ (4) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

(5) Extended Diagnostics Test (Non Operator Intervention)

TI 6190. 62 Para 4.15.2

Successful no fault execution (except Flash 2)

Same as standard

Same as initial

312-319. RESERVED.

320. CPS.

321. COMMON PROCESSING.

a. CP

→ (1) Power Supplies TI 6190.60 Para 6.5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc+12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as standard

(2) CP Floppy Confidence Test

TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(3) CP Hard Disk Internal Diagnostic Test

TI 6190.62 Para 5.6

→ (4) VCOM-54 Test TI 6190.62 Para 5.2

(a) Channel To Different Channel Synchronous Loop-Back Test

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as initial

(b) Channel To Same Channel Asynchronous Loop-Back Test

Successful no fault execution

Same as standard

Same as standard

(c) Remote Display Connectivity

Para 522 Successful no fault execution

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

→ (5) Diagnostic Test TI 6190.62 Para 5.3

Successful no fault execution

Same as standard

Same as standard

(6) Extended Diagnostic Test (Non Operator Intervention)

TI 6190.62 Para 4.3.2

Successful no fault execution

Same as standard

Same as initial

b. PPC CP

→ (1) Power Supplies TI 6190.55 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC card reader 1 SCSI Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

→ (3) VCOM-54 Test TI 6190.62 Para 5.2

(a) Channel To Different Channel Synchronous Loop-Back Test

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as initial

(b) Channel To Same Channel Asynchronous Loop-Back Test

Successful no fault execution

Same as standard

Same as initial

→ (4) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(5) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.14.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

→ 322. MSAW/CA ALARM.

Test MSAW Alarm under Program Control using referenced paragraph or with targets of opportunity

Para 503 Successful no fault execution

Same as standard

Same as standard

323–329. RESERVED.

330. SMC.

331. SYSTEM MONITOR.

a. SMC

→ (1) Power Supplies TI 6190.58 Para 6.5.1.3

Successful no fault execution

Same as standard

Same as standard

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as standard

(2) Floppy Confidence Test TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(3) Hard Disk Internal Diagnostic Test

TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(4) CDR Internal Disk Diagnostic Test

TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

→ (5) Diagnostic Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as standard

(6) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.8.2

b. PPC SMC

→ (1) Power Supplies TI 6190.55 Para 5.1.3

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Test TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

→ (3) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

(4) CDR Internal Disk Diagnostic Test

(5) Extended Diagnostic Test (Non Operator Intervention)

TI 6190.62 Para 4.13.2

332–339. RESERVED.

340. DPS.

341. DISPLAY PROCESSORS.

a. RDM

→ (1) Power Supplies TI 6190.54 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as standard

(2) Floppy Confidence Test TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(3) Hard Disk Internal Diagnostic Test

TI 6190.62 Para 5.6

Successful no fault execution

Same as standard

Same as standard

(4) VCOM-54 Interface Card Test

TI 6190.62 Para 5.2

Successful no fault execution

Same as standard

Same as standard

→ (5) Diagnostic Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as standard

(6) Extended Diagnostic Test (Non Operator Intervention)

TI 6190.62 Para 4.7.2

Successful no fault execution

Same as standard

Same as standard

b. PPC RDM

→ (1) Power Supplies TI 6190.54 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 SCSI Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(3) VCOM-54 Test TI 6190.62 Para 5.2

(a) Channel To Different Channel Synchronous Loop-Back Test

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as initial

(b) Channel To Same Channel Asynchronous Loop-Back Test

Successful no fault execution

Same as standard

Same as initial

→ (4) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

(5) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.14.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

(6) Remote Display Connectivity Check

Para 522 Successful no fault execution

Same as standard

Same as standard

c. ACD/TMU

→ (1) Power Supplies TI 6190.56 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(e) Kybd/Trkball +5 V dc

+5.0 V dc +/- .25 Same as initial

(f) Kybd/Trkball + 12 V dc

+12.0 V dc +/- .6 Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 SCSI Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

→ (3) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

(4) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.14.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

d. RACD

→ (1) Power Supplies TI 6190.53 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(e) Kybd/Trkball +5 V dc

+5.0 V dc +/- .25 Same as initial

(f) Kybd/Trkball + 12 V dc

+12.0 V dc +/- .6 Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 SCSI Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

→ (3) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than the HDD)

Same as standard

Same as initial

4) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.14.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

e. FDAD

→ (1) FDAD Display Monitor

(FDP) Diagnostics

TI 6190.62 Para 4.5

Successful no fault execution

Same as standard

Same as standard

→ (2) Power Supply ATC 40146 Meter voltage reading for switch positions A through T shall be within range listed per instruction book

Same as standard

Same as standard

(3) Range Marks ATC 40146 Proper alignment as per ATC 40146

+/-2% of range

Same as initial

(4) System alignment ATC 40146 Proper alignment as per ATC 40146

Same as standard

Same as standard

f. LBP

→ (1) Power Supply LBP TI 6190.59 Para 6.5.2.3

(a) +5.0 V dc + 5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc + 12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc - 12.0 V dc -.6, +.30 Same as initial

→ (2) Internal Diagnostics

SLD/CLD

TI 6190.62 Para 4.6

Successful no fault execution

Same as standard

Same as standard

g. RDBM

→ (1) RDBM Power Supply PX 12102 Para 5.5.c.1

(a) + 5.0 V dc (PS-1 +5V)

+ 5.0 V dc +/- 0.25 V dc

Same as initial

(b) + 5 V Ripple 100mv pk – pk maximum

Same as standard

Same as standard

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(c) + 12.0 V dc (PS1- +12V)

+ 12.0 V dc +/- 0.8 V dc Same as initial

(d) + 12 V Ripple 200mv pk – pk maximum

Same as standard

Same as standard

(e) -12.0 V dc (PS1- - 12V) - 12.0 V dc +/- 0.6 V dc Same as initial

(f) -12 V Ripple 200mv pk – pk maximum

Same as standard

Same as standard

(2) RDBM RTDT TI 6190.62 Para 5.8

Successful no fault execution

Same as standard

Same as standard

→ (3) RDBM Firmware

Diagnostic and BITE Test

PX 12102 Para 5

Successful no fault execution

Same as standard

Same as standard

(4) Maintenance Panel Test

Successful no fault execution

Same as standard

Same as standard

→ (5) Test Clock PX 12102 Para 5.5.c.3

19.2 kHz +/- 0.10 kHz

Same as initial

342. DISPLAY PRESENTATION.

→ a. Single Sensor Display

Registration

Para 513, Para 514 or Para 523

(1) Radar/Beacon Permanent Returns

(a) Azimuth FAA form 6030- 17 value Same as standard

+/- 1 deg.

(b) Range ASR/BCN FAA form 6030- 17 value Same as standard

+/- 0.07 nmi

(c) Range ARSR search FAA form 6030- 17 value Same as standard

+/- 0.13 nmi

(2) Target/Alphanumeric Registration

Alphanumeric symbology coincident with target extent

Same as standard

Same as standard

→ b. Mosaic Display

Registration

Para 515

(1) ASR Beacon

(a) Azimuth NOTE: Box drawn at +/- 4 ACPs

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(b) Range NOTE: Box drawn at +/- 0.125 nmi

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(2) ASR Search

(a) Azimuth NOTE: Box drawn at +/-6 ACPs

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(b) Range NOTE: Box drawn at +/- 0.250 nmi

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(3) ARSR Beacon

(a) Azimuth NOTE: Box drawn at +/- 3 ACPs

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(b) Range NOTE: Box drawn at +/- 0.125 nmi

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(4) ARSR Search

(a) Azimuth NOTE: Box drawn at +/- 4 ACPs

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

(b) Range NOTE: Box drawn at +/- 0.250 nmi

Center of Extent/Track symbol in Box or 6030-17 value

Same as standard

Same as standard

→ c. ARSR Back-up

Registration

Para 512 Less than or equal to 2 nmi separation

Same as standard

Same as standard

→ d. MSAW/CA Aural Alarm Para 502 Successful no fault execution

Same as standard

Same as standard

→ e. Map Magnetic North

Mark

0 degrees +/- 1 degree Same as initial

f. LDDT Para 517

(1) ACD/TMU TI 6190.56 Para. 5.1.4

Successful no fault execution

Same as standard

Same as standard

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(2) RACD TI 6190.53 Para 5.1.4

Successful no fault execution

Same as standard

Same as standard

(3) FDAD/DBRITE TI 6190.62 Para 5.7

Successful no fault execution

Same as standard

Same as standard

g. RTDT TI 6190.62 Para 5.8

Successful no fault execution

Same as standard

Same as standard

h. Lamp Checks All Lamps properly lit

Same as standard

Same as standard

i. SONY Monitor TI 6190.56

(1) Video Adjustment

→ (a) Color and brightness. Contrast Minimum

Manufacturer Setting

0.241≤x≤0.301 0.256≤y≤0.316 43.01≤Y≤47.0

Same as initial

(b) Picture size with unit in Millimeter (mm). Width x Height

Manufacturer Setting

498 x 498 +/- 5 Same as initial

(c) Convergence

(1) Zone A: The area within the circle whose radius from the center of the CRT to the edge of the picture size

≤0.333 mm Same as standard

Same as standard

(2) Zone B: The area outside of zones A and C

≤0.508 mm Same as standard

Same as standard

(3) Zone C: The areas within the four right isosceles triangles at the corners of the picture size whose sides are 1 inch

≤0.700 mm Same as standard

Same as standard

(d) Geometric Distortion of all areas of the picture

Manufacturer Setting

Within 1% of Picture height at areas of the picture 1% of 498 +/-

Same as standard

→ (e) Focus Minimum recognizable character font

Manufacturer Setting

Character size 1

Same as standard

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

→

Y = 150cd/m*m 135< <165 Same as initial

x = 0.304 0.274< <0.334

Same as initial

j. BARCO ISIS Monitor

(1) 100% White

TI 6190.53 Para 6.10

y = 0.330 0.300< <0.360

Same as initial

→ (2) Check For Bad Pixels No pixel currently On or Off in the critical display area

Same as standard

Same as standard

k. BARCO 251B Monitor

→ (1) 100% White Y = 600cd/m*m 500< Y2 300< Y

x = .309 0.299< <0.319

0.294< <0.324

TI 6190.53 Para 6.10

y = 0.336 0.324< <0.346

0.319< <0.351

→ (a) Check For Bad Pixels.

No pixel currently On or Off in the critical display area

Same as standard

Same as standard

l. FDAD/ISP Interim Support Plan (ISP) FDAD ATC 40146

(1) Internal Test Patterns Proper alignment as per instruction book

Same as standard

Same as standard

(2) Range Marks Proper alignment as per instruction book

2% of range Same as initial

(3) Lamp Checks All lamps properly lit.

Same as standard

Same as standard

→ (4) System Alignment Proper alignment as per instruction book

Same as standard

Same as standard

→ (5) Signal

(a) MTI Video Level Rear Panel Connector

FAA Forms 6030- 17 value but not less than +2 V dc

Same as standard

Same as standard

2 Initial applies only for new monitors with <50 hrs usage.

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(b) Normal Video Level Rear Panel Connector

FAA Forms 6030- 17 value but not less than +2 V dc

Same as standard

Same as standard

(c) Beacon Video Level Rear Panel Connector

FAA Forms 6030- 17 value but not less than +2 V dc

Same as standard

Same as standard

(d) Map Video Level Rear Panel Connector

FAA Forms 6030- 17 value but not less than +2 V dc

Same as standard

Same as standard

343-349. RESERVED.

350. SSI.

351. ARTS GATEWAY.

a. AGW

→ (1) Power Supplies TI 6190.50 Para 5.1.3

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12.0 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc+12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Test TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as initial

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(c) CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

→ (3) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than HDD)

Same as standard

Same as initial

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(4) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.13.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

352. ROUTERS AND SWITCHES.

353. LANS.

a. ARTS LANs TI 6190.62 Para 5.4

(1) LAN1 (Operational)

(a) LAN Test Successful no fault execution

Same as standard

Same as initial

(2) LAN2 (Maintenance)

(a) LAN Test Successful no fault execution

Same as standard

Same as initial

b. RGW LANs TI 6190.62 Para 5.4

(1) LAN1 (Operational)

(a) LAN Test Successful no fault execution

Same as standard

Same as initial

(2) LAN2 (Maintenance)

(a) LAN Test Successful no fault execution

Same as standard

Same as initial

c. Tower LANs TI 6190.62 Para 5.9

(1) LAN1 (Operational)

(a) Tower LAN Test Successful no fault execution

Same as standard

Same as initial

(2) LAN2 (Maintenance)

(a) Tower LAN Test Successful no fault execution

Same as standard

Same as initial

354–359. RESERVED.

360. RGW.

361. RADAR GATEWAY.

a. RGW

→ (1) Power Supply TI 6190.55 Para 6.5.3

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(a) +5.0 V dc +5.0 V dc +.25, -.125 Same as initial

(b) +12.0 V dc +12.0 V dc +.6, -.30 Same as initial

(c) -12.0 V dc -12 V dc -.6, +.30 Same as initial

(d) Ripple for +5.0 V dc, +12.0 V dc, -12.0 V dc

200 mv peak-topeak maximum

Same as standard

Same as initial

(2) Disk Tests TI 6190.62 Para 5.6

(a) Floppy Confidence Test

Successful no fault execution

Same as standard

Same as standard

(b) Hard Disk Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as standard

(c). CDROM Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(d) PC Card Reader 1 SCSI Internal Diagnostic Test

Successful no fault execution

Same as standard

Same as initial

(e) CDR Internal Disk Diagnostic Test

Successful no fault execution

Same as standard

Same as standard

→ (3) VCOM-54 Test TI 6190.62 Para 5.2

(a) Channel To Different Channel Synchronous Loop-Back Test

Successful no fault execution of 50 cycles, Channel 7 to any other Channel

Same as standard

Same as initial

→ (4) Diagnostics Test TI 6190.62 Para 5.3

Successful no fault execution (except for SCSI devices other than HDD)

Same as standard

Same as initial

(5) Extended Diagnostics Test (Non Operator Intervention)

TI 6190.62 Para 4.12.2

Successful no fault execution (except Flash 2)

Same as standard

Same as standard

362–369. RESERVED.

370. RESERVED.

371–379. RESERVED.

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

380. RADAR/ARTS INTERFACE SUBSYSTEM.

381. TERMINAL RADAR VIDEO SWITCHING SYSTEM (TRVSS)/ RADAR SYSTEM SELECTOR SWITCH (RSSS).

Manufacturer Handbook

a. TRVSS/RSSS

→ (1) Power Supply (Main)

(a) +12 Vdc +12 Vdc +/-.2 Vdc Same as standard

(b) +5 Vdc +5 Vdc +/-.2 Vdc Same as standard

(c) –5 Vdc -5 Vdc +/-.2 Vdc Same as standard

(d) Load Sharing 50% +/-5%

→ (2) Power Supply

(Auxiliary)

(a) +24 Vdc +24 Vdc +/-.2 Vdc Same as standard

(b) Load Sharing 50% +/-5% Same as standard

→ (3) DC-DC Converter

(a) 60 Vdc 60 Vdc +/-10 Vdc Same as standard

→ (4) Video Selection/Drivers Manufacturer Handbook

(a) Weather (Wx) Amplitude

FAA Forms 6030-17 value Same as standard

(b) MTI/Moving Target Detected (MTD) Amplitude

FAA Forms 6030-17 value Same as standard

(c) Beacon (BCN) Amplitude

FAA Forms 6030-17 value Same as standard

(d) BCN/Analog (ANA) Amplitude

FAA Forms 6030-17 value Same as standard

→ (5) Digital Selection/

Drivers

Manufacturer Handbook

(a) ACP Amplitude FAA Forms 6030-17 value Same as standard

STANDARDS AND TOLERANCES

Parameter Reference Standard Tolerance/Limit

Paragraph Initial Operating

(b) Azimuth Reference Pulse (ARP) Amplitude

FAA Forms 6030-17 value Same as standard

(6) Trigger Selection/ Drivers

Manufacturer Handbook

(a) Pretrigger Amplitude

FAA Forms 6030-17 value Same as standard

(b) Pretrigger Delay FAA Forms 6030-17 value Same as standard

→ (7) Trigger Delay

Generator

(a) Trigger Delay FAA Forms 6030-17 value Same as standard

382-389. RESERVED.

CHAPTER 4. PERIODIC MAINTENANCE

CHAPTER 4. PERIODIC MAINTENANCE

400. GENERAL.

a. This chapter establishes all the maintenance activities that are required for the ARTS IIIE and RGW equipment systems on a periodic, recurring basis, and the schedules for their accomplishment. The chapter is divided into two sections. The first section identifies the performance checks (i.e., tests, measurements, and observations) of normal operating controls and functions that are necessary to determine whether operation is within established tolerances/limits. The second section identifies other tasks that are necessary to prevent deterioration and/or ensure reliable operation. Refer to Order 6000.15 for additional general guidance.

b. In addition to the periodic, recurring activities specified in this chapter, Order 6000.15 establishes requirements for routine maintenance and other specific maintenance activities that are to be performed for all AF equipment.

c. The following tables of performance checks and maintenance tasks are not to be

taken as the minimum work required for proper maintenance, rather as the maximum interval permitted between tasks. Refer to Order 6000.15 for guidance.

d. It is understood that the frequency of accomplishment for the tasks listed are to be performed at a given period. For instance, on an anniversary, the annual, semiannual, quarterly, monthly, weekly, and daily tasks shall all be performed.

e. The content of the following two sections follows the latest edition of Order 1320.58, Equipment and Facility Directives - Modification and Maintenance Technical Handbooks, paragraph 216f(b) and (c). The activities listed include some, but not all, activities listed in instruction books, as well as some activities not listed in instruction books.

NOTE: All reference paragraphs apply to this handbook unless otherwise indicated.

SECTION 1. PERFORMANCE CHECKS

SECTION 1. PERFORMANCE CHECKS

Subsection 1. ARTS IIIE PERFORMANCE CHECKS

Table 4-1. ARTS IIIE Performance Checks

ARTS IIIE Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

410. DAILY.

a. CPS

(1) Force Reconfiguration To An Alternate CP By Resetting Active CP. Verify That Critical Data Is Retained, and Reconfiguration Alarm Sounds

CSOM/SUM

Para 4.3.1

(2) Indication That Operational Program Is Cycling Properly

b. TPS

(1) Force Reconfiguration To An Alternate TP By Resetting The Active TP. Verify That Critical Data Is Retained and Reconfiguration Alarm Sounds

CSOM/SUM

Para 4.3.1

(2) Indication That Operational Program Is Cycling Properly

c. SMC

(1) Screen/Review System Monitor (SMON) Messages For Any Anomalies (I.E., Aural Alarm Failure, No Response From Disk, No Keyboard Function Response, Unexplained RDM Switching Of Remote Network Ids (NIDS, Etc)

CSOM/SUM

Para 4.3.1

(2) Review System/Subsystem Status Reports

(3) Call and Review Suicide Notes

(4) Verify Proper Timing and Operation of Real Time Clock

(5) Review SW Revision Level

(6) Verify CDR Recording is Active

(7) Run Beacon Radar Online Performance Monitor (BROPM /CQARS)

d. Mosaic

(1) CQARS Data Analysis

(a) PR Reliability Check Para 302.a Para 506

(b) Inter-Sensor Link Check Para 302.b Para 506

(c) PR Accuracy Check Para 301.b Para 506

(2) Generate Registration Analysis Summary Report Para 505

ARTS IIIE Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

(3) Activate System Tolerance Alarm Para 504

e. Remote Tower Connectivity

(1) Verify Remote Tower Connectivity On Both Communication Channels

Para 341.b.3 Para 522

411. WEEKLY.

a. System Checks

(1) System Cold Start – Reset All Chassis CSOM/SUM

Para 4.2.1

(2) Run CDR Permanent Return Data Analysis Para 301.a Para 509

b. Mosaic

(1) Review Registration Analysis Summary Reports Para 505

c. SMC/RGW/PD PC

c. SMC/RGW/PD PC

(1) Power up reset TRACON SMC, RGW and Performance Data Personal Computers (PD-PC)

(2) Review TRACON PC Event Viewer Logs

412. MONTHLY.

a. CPS

(1) Run CP Diagnostic Para 321.a.5

or

Para 321.b.4

TI 6190.62

Sec 5

(2) Verify MSAW/CA Functionality Under Program Control Para 322 Para 503

b. TPS

(1) Run TP Diagnostic Para 311.a.5

or

Para 311.b.4

TI 6190.62

Sec 5

c. AGW

(1) Run AGW Diagnostic Para 351.a.3 TI 6190.62

Sec 5

d. SMC

(1) Run SMC Diagnostic Para 331.a.5

or

Para 331.b.3

TI 6190.62

Sec 5

e. System Check

ARTS IIIE Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

(1) Run CDR Permanent Return Data Analysis For ASR-9/Mode-S Sensors in Air Traffic Control Beacon Interrogator (ATC-BI) Mode

Para 301.a Para 509

413. QUARTERLY.

NOTE: When performing extended diagnostics, populate removable media devices with media (except for lower flash)

a. CPS

(1) Run CP Extended Diagnostic Para 321.a.6

or

Para 321.b.5

TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

b. TPS

(1) Run TP Extended Diagnostic Para 311.a.6

or

Para 311.b.5

TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

c. AGW

(1) Run AGW Extended Diagnostic Para 351.a.4 TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

d. SMC

(1) Run SMC Extended Diagnostic Para 331.a.6

or

Para 331.b.5

TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

414. SEMI-ANNUALLY.

a. CPS

(1) Check Power Supply Voltages and Ripple and Adjust As Required

Para 321.a.1

or

Para 321.b.1

TI 6190.60

Sec 6

TI 6190.55

Sec.5

b. TPS

ARTS IIIE Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

(1) Check Power Supply Voltages and Ripple and Adjust As Required

Para 311.a.1

or

Para 311.b.1

TI 6190.61

Sec 6

TI 6190.55

Sec 5

c. AGW

(1) Check Power Supply Voltages and Ripple and Adjust As Required

Para 351.a.1 TI 6190.50

Sec 5

d. SMC

(1) Check Power Supply Voltages and Ripple and Adjust As Required

Para 331.a.1

or

Para 331.b.1

TI 6190.58

Sec 6

TI 6190.55

Sec 5

e. Mosaic

(1) Run Sensor Coverage Analysis Program (SCAP) Para 507

415-419. RESERVED.

SECTION 1. PERFORMANCE CHECKS CON’T

SECTION 1. PERFORMANCE CHECKS CON’T

Subsection 2. SDS PERFORMANCE CHECKS

Table 4-2. SDS TRACON Performance Checks

SDS TRACON Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

420. DAILY.

a. Display Registration Checks

(1) Non Mosaic Displays (FDADs)

(a) Single Sensor Mode Display Registration Check Para 342.a Para 513

or 514

(b) ARSR Target Registration Check Para 342.c Para 512

(c) PR Reliability Para302.a Para508 or CDR edit of 20 scans minimum

(2) Mosaic Displays (ACD/TMU/LACD)

(a) Single Sensor Mode Display Registration Check In Both ARTS and RGW Mode

Para 342.a Para 514

(b) Mosaic Mode Display Registration Check In Both ARTS and RGW Mode

Para 342.b Para 515

(c) Verify RGW Mode Operation and Ability To Switch Between ARTS/RGW

b. Reserved

c. Activate MSAW/CA Aural Alarm Para 342.d Para 502

421. WEEKLY.

a. Data Entry and Display Para 521

422. MONTHLY.

a. RDM

(1) Run RDM Diagnostic Para 341.a.5

or

Para 341.b.4

TI 6190.62

Sec 5

b. LBP

(1) Run LBP Diagnostic Para 341.f.2 TI 6190.62

Sec 4

SDS TRACON Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

c. FDAD Display

(1) Run FDP Diagnostic Para 341.e.1 TI 6190.62

Sec 4.5

(2) Range Marks Para 341.e.3 ATC 41046

Vol. 1

(3) Check System Alignment Para 341.e.4 ATC 41046

Vol. 1

(4) Video Levels (Measured at Rear Jack Panel) Para 342.l.5 FAA Form

6030-17

values

d. ARTS Displays3

(1) Run Diagnostic Para 341.c.3 TI 6190.62

Para 5.3

423. QUARTERLY.

NOTE: When performing extended diagnostics, populate removable media devices with media (except for lower flash)

a. RDM

(1) Run RDM Extended Diagnostic Para 341.a.6

or

Para 341.b.5

TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

b. ARTS Displays3

(1) Run Extended Diagnostic Para 341.c.4 TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

(3) Run LDDT Para 342.f.1 TI 6190.56

Sec 5

c. FDAD Displays

(1) Calibrate Internal Digital Voltmeter ATC 41046

Vol. 1

(2) Check Power Supply Voltages/Ripple and Adjust As Required Para 341.e.2 ATC 41046

Vol. 1

(3) Run LDDT Para 342.f.3 Para 517

3 NOTE: ARTS displays are defined as ACD, LACD, RACD and TMU.

SDS TRACON Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

424. SEMI ANNUALLY.

a. RDM

(1) Check Power Supply Voltages/Ripple and Adjust As Required Para 341.a.1 TI 6190.54

Sec 5

b. LBP

(1). Check Power Supply Voltages/Ripple and Adjust As Required Para 341.f.1 TI 6190.59

Sec 5

c. ARTS Displays 4

(1) Check Power Supply Voltages/Ripple and Adjust As Required Para 341.c.1 TI 6190.56

Sec 5

(2) Check TMU/LACD Keyboard Power Supply Voltages Para 341.c.1 TI 6190.53

Sec 5

(3) Back Up Pref Sets Para 510

d. Monitors/Displays4

(1) Check Sony Monitor Alignment Para 342.i TI 6190.56

(2) Check ISIS Monitor Alignment Para 342.j TI 6190.53

Para 6.10,

6.10.3

(3) Check BARCO 251B Monitor Alignment Para 342.k TI 6190.53

Para 6.10,

6.10.2

(4) Check FDAD Monitor Para 342.l ATC 40146

Vol. 1

425. RESERVED.

426. AS REQUIRED.

a. Map Verification Check Para 342.e Para 520

427–429. RESERVED.

4 NOTE: ARTS displays are defined as ACD, LACD, RACD and TMU.

SECTION 1. PERFORMANCE CHECKS CON’T

Subsection 3. SDS TOWER PERFORMANCE CHECKS

Table 4-3. SDS Tower Performance Checks

SDS Tower Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

430. DAILY.

a. DRF Capable RACDs Only

(1) DRF Mode Display Registration Check Para 342.a Para 523

(2) PR Reliability Para 302.a Para 508

431. WEEKLY.

a. RACD Chassis

(1) Check Front Panel 2x20, LEDs, FSS, Circuit Card Assemblies (CCA) for Normal Indications

(2) Check Interfacing Equipment (Direct Digital Connect (DDC) pnl., Verilink, Newbridge, etc.) for Normal Front Panel Indications

(3) Check Uninterruptible Power Supply (UPS) Front Panel Indicators for Normal Operation

b. RACD/LACD Display

(1) Data Entry and Display Para 521

(2) Activate MSAW/CA Aural Alarm Para 342.d Para 502

(3) Check BARCO 251B Monitor for Proper Focus, Brightness, Color, Pixels5

(4) Check BARCO 251B Display Cooling Fans

(5) Single Sensor Mode Display Registration Check Para 342.a Para 513

(6) ARSR Target Registration Check Para 342.c Para 512

(7) PR Reliability Para 302.a Para 508

(8) Verify Display Data From All Sensors Adapted For Tower

(9) Verify RGW Mode Operation and Ability To Switch Between ARTS/RGW

c. RDBM

(1) Run Firmware Test Para 341.g.3 PX 12102

5 RACDs/LACDs only

5 RACDs/LACDs only

SDS Tower Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

432. MONTHLY.

a. ARTS Tower Displays (RACD/ACD/LACD)

(1) Run Diagnostic Para 341.d.3 TI 6190.62

Para 4.10.1

433. QUARTERLY.

NOTE: When performing extended diagnostics, populate removable media devices with media (except for lower flash)

a. RACD/LACD

(1) Run Extended Diagnostic Para 341.d.4 TI 6190.62

Sec 4

(2) Run Disk Fix Utility Para 511

(3) Run LDDT Para 342.f.2 TI 6190.53

Sec 5

b. RDBM/DBRITE

b. RDBM/DBRITE

(1) Run RTDT Para 341.g

434. SEMI ANNUALLY.

a. RACD/LACD

(1) Check Power Supply Voltages/Ripple and adjust as required Para 341.d.1 TI 6190.53

Sec 5

(2) Check RACD Keyboard Power Supply Voltages Para 341.d.1 TI 6190.53

Sec 5

(3) Back Up Pref Sets Para 510

(4) Load Test UPS (If Installed) Para 524

b. RACD/LACD Monitors/Displays (Tower)

(1) Check Sony Monitor Alignment Para 342.i TI 6190.56

(2) Check BARCO 251B Monitor Alignment Para 342.k TI 6190.53

Para 6.10

c. RDBM

(1) Check Power Supply Voltages/Ripple and Adjust As Required Para 341.g.1 PX 12102

(2) Check RDBM Internal and Modem Clock and Adjust As Required

Para 341.g.5 PX 12102

SDS Tower Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

435. RESERVED.

436. AS REQUIRED.

a. Map Verification Check Para 342.e Para 520

437–439. RESERVED.

SECTION 1. PERFORMANCE CHECKS CON’T

SECTION 1. PERFORMANCE CHECKS CON’T

Subsection 4. RGW PERFORMANCE CHECKS

Table 4-4. RGW Performance Checks

RGW Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

440. DAILY.

a. Successfully Force Reconfiguration To Alternate RGW By Resetting The Active RGW

CSOM/SUM

Para 4.3.1

b. Indication That The Operational Program Is Cycling Properly

c. Review SMON Messages or Printouts

d. Review System/Subsystem Status Reports

e. Call and Review Suicide Notes

f. Review SW Revision Level

g. Verify Proper Timing and Operation of Real Time Clock6

h. Run BROPM/CQARS 6

i. Verify CDR Recording is Available

441. WEEKLY.

a. Run Permanent Return CDR Data Analysis Para 301 Para 509

b. Cold Start RGW System CSOM/SUM

Para 4.5.1

442. MONTHLY.

a. Run RGW Diagnostic Para 361.a.4 TI 6190.62

Sec 5

443. QUARTERLY.

NOTE: When performing extended diagnostics, populate removable media devices with media (except for lower flash)

a. Run RGW Extended Diagnostic Para 361.a.5 TI 6190.62

Sec 4

b. Run Disk Fix Utility Para 511

6 This only applies to Revision 32 and later.

RGW Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

444. SEMI ANNUALLY.

a. Check Power Supply Voltages/Ripple and Adjust As Required Para 361.A.1 TI 6190.52

Para 6.5.3

445–449. RESERVED.

SECTION 1. PERFORMANCE CHECKS CON’T

Subsection 5. SSI PERFORMANCE CHECKS

Table 4-5. SSI Performance Checks

SSI Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

450–452. RESERVED

450–452. RESERVED

453. QUARTERLY.

a. LAN Tests TI 6190.62

Sec 5

(1) ARTS LAN Test

(a) Test All Nodes Using LAN 1 (Operational) Para 353.a

(b) Test All Nodes Using LAN 2 (Maintenance) Para 353.a

(2) RGW LAN Test

(a) Test All Nodes Using LAN 1 (Operational) Para 353.b

(b) Test All Nodes Using LAN 2 (Maintenance) Para 353.b

(3) Tower LAN Test

(a) Test All Nodes Using LAN 1 (operational) Para 353.c

(b) Test All Nodes Using LAN2 (Maintenance) Para 353.c

b. Routers and Switches Manufacturer

Handbook

(1) Verify Front Panel Indicators For Proper Operation

c. Clean and Inspect Routers and Switches.

454–459. RESERVED.

SECTION 1. PERFORMANCE CHECKS CON’T

SECTION 1. PERFORMANCE CHECKS CON’T

Subsection 6. MISCELLANEOUS PERFORMANCE CHECKS

Table 4-6. Miscellaneous Performance Checks

Miscellaneous Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

460. RESERVED.

461. WEEKLY.

a. Check Lamps On All Units and Adjust/Replace As Required

462. MONTHLY.

a. Check and Clean or Replace Filters On All Units

b. Check Ventilation Louvers/Ports for Obstructions On All Units

c. Clean Display Surface

463. QUARTERLY.

a. Check Blowers and Fans for Proper Operation

b. Clean PCs

464. SEMI ANNUALLY.

a. Clean Surfaces Of All Cabinets

b. Clean Interior Of All Cabinets

c. Inspect Cables and Connectors

465. RESERVED.

466. AS REQUIRED.

a. High Speed Printers (HSP) Manufacturer Handbook

(1) Clean HSP Units.

(a) Clean Top Cover Viewing Window

(b) Vacuum Band Mechanism Area

(c) Clean Paper Motion Sensors and Band Brushes

(d) Clear Ribbon Shorting Bars

(e) Clean Print Bands an Pulleys

(f) Clean Ribbon Shafts

Miscellaneous Performance Checks Reference

Standards &

Tolerances

Maintenance

Procedures

(2) Inspect for Inoperative/Damaged Items and Loose Hardware

(3) Check Operator Controls and Status Display

b. Echo Printers Manufacturer Handbook

(1) Clean and Vacuum Printers

(2) Clean Platten and Paper Bail Rollers

(3) Check Operator Controls and Status Display

c. PD-PC, SMC-PC and RGW-PC Manufacturer Handbook

(1) Virus Protect

467-499. RESERVED.

NOTE: Virus protection software shall be FAA approved and distributed.

CHAPTER 5. MAINTENANCE PROCEDURES

CHAPTER 5. MAINTENANCE PROCEDURES

500. GENERAL.

This chapter establishes the procedures for accomplishing the various essential maintenance activities required for the ARTS IIIE and RGW Systems, either on a periodic or incidental basis. The procedures contained herein are those that cannot be found in the equipment handbooks.

NOTE: In this chapter, the character “^” signifies a space. With the exception of Table 5-2, in which the character “^” signifies the mathematical exponential factor, otherwise known as “to the power of”.

501. TECHNICAL PERFORMANCE RECORDS ENTRIES.

Order 6000.15 contains maintenance concept guidance and detailed instructions for field utilization of Technical Performance

Record forms as applicable to the ARTS IIIE and RGW. Entries shall be made in accordance with the instructions published in Order 6000.15 (except as otherwise instructed in the subparagraphs to follow). Figures 5-1 through 5-8 are samples of FAA Form 6000-8.

a. The ARTS IIIE and RGW system performance shall be recorded daily on FAA Form 6000-8.

b. Items currently required to verify normal broadband terminal radar system performance shall be recorded as specified in the appropriate maintenance directives.

c. Records of certifications shall be made in the Facility Maintenance Log, FAA Form 6030-1, or by electronic means.

TECHNICAL PERFORMANCE RECORD RACD DAILY MAINTENANCE

TECHNICAL PERFORMANCE RECORD RACD DAILY MAINTENANCE

FACILITY DATES

FROM

TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT RACD EQUIP S/N 123 PERIODICITY DAILY

Daily SDS Tower Performance Checks

DRF Mode Display Registration Check DRF Mode PR Reliability

West Sensor

RSM #7 West Sensor

LOCATION EQUIPMENT RACD EQUIP S/N 123 PERIODICITY DAILY

RSM #8 West Sensor

MTI #1 West Sensor

MTI #2

DATE

TIME

AZ RNG AZ RNG AZ RNG AZ RNG

West

Sensor

RSM #7

West

Sensor

RSM #8

West

Sensor

MTI #1

West

Sensor

MTI #2

COMMENTS

INITIALS

NOMINALS 112 49.06 133 49.93 97 1.37 111 2.43 > OR=

90% > OR=

90% > OR=

80% > OR=

80%

UPPER LIMIT 113 49.13 134 50.00 98 1.44 112 2.5 100% 100% 100% 100%

LOWER LIMIT 111 48.99 132 49.86 96 1.3 110 2.36 > OR=

LOWER LIMIT 111 48.99 132 49.86 96 1.3 110 2.36 > OR=

90% > OR=

90% > OR=

80% > OR=

80%

Figure 5-1. RACD Daily Maintenance

TECHNICAL PERFORMANCE RECORD RACD WEEKLY MAINTENANCE

FACILITY DATES

FROM

TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT RACD EQUIP S/N PERIODICITY WEEKLY

SINGLE SENSOR MODE

Figure 5-1: picture of page 62Figure 5-1 · page 62
Picture of the page from the copy saved here

DISPLAY REGISTRATION PR RELIABILITY

DISPLAY REGISTRATION PR RELIABILITY

PR #1

PR #2

DATE

TIME

AZ RNG AZ RNG

NUQ MTI 1 Reliability

NUQ MTI 2 Reliability

NUQ CPME 1 Reliability

NUQ CPME 2 Reliability

OAK MTI Reliability

OAK CPME 1 Reliability

OAK CPME 2 Reliability

COMMENTS

INITIALS

NOMINALS 112 49.06 133 49.93 ≤80% ≤80% ≤90% ≤90% ≤80% ≤90% ≤90% Monitor MTI and CPME for 20

AZ RNG AZ RNG

sweeps or ≅ 92 secs

UPPER LIMIT 113 49.13 134 50.00

LOWER LIMIT 111 48.99 132 49.86

Figure 5-2. RACD Weekly Maintenance

TECHNICAL PERFORMANCE RECORD RACD SEMI-ANNUAL (SA-1) MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT RACD EQUIP S/N PERIODICITY S/A

Figure 5-2: picture of page 63Figure 5-2 · page 63
Picture of the page from the copy saved here

LOCATION EQUIPMENT RACD EQUIP S/N PERIODICITY S/A

Power Supply Voltage and Ripple

DATE

TIME

Back-Up Pref Sets

Clean Surfaces of all Cabinets

Clean Interiors of all Cabinets

Inspect Cables and Connectors

Chassis Pwr Sup. + 5 Vdc

Ripple for Chassis + 5 Vdc

Chassis Pwr Sup. + 12 Vdc

Ripple for Chassis + 12 Vdc

Chassis Pwr Sup. - 12 Vdc

Ripple for Chassis - 12 Vdc

COMMENTS

INITIALS

NOMINALS 3 3 3 3 4.875< <5025 200mv p-p max 11.64< <12.60 200mv p-p max -12.6<

<-11.64 200mv p-p max

Figure 5-3. RACD Semi-Annual (SA-1) Maintenance

Figure 5-3: picture of page 64Figure 5-3 · page 64
Picture of the page from the copy saved here

TECHNICAL PERFORMANCE RECORD RACD SEMI-ANNUAL (SA-2) MAINTENANCE

TECHNICAL PERFORMANCE RECORD RACD SEMI-ANNUAL (SA-2) MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT EQUIP S/N PERIODICITY S/A

251b DISPLAY KYBD PWR SUP

100% WHITE

DATE

TIME

Y x y 5 Vdc Ripple

5 Vdc 12 Vdc Ripple

12 Vdc

COMMENTS

INITIALS

NOMINALS >300 .294 <X<

NOMINALS >300 .294 <X<

.324 .319 <y<

.351 4.75 to 5.25 200mv P-P Max 11.40 to 12.60 200mv P-P Max

Figure 5-4. RACD Semi-Annual (SA-2) Maintenance

TECHNICAL PERFORMANCE RECORD ACD SEMI-ANNUAL MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT ACD EQUIP S/N 123 PERIODICITY S/A

Sony Monitor Video

Figure 5-4: picture of page 65Figure 5-4 · page 65
Picture of the page from the copy saved here

LOCATION EQUIPMENT ACD EQUIP S/N 123 PERIODICITY S/A

Adjustment Power Supply Voltage and Ripple

Color and Brightness,

Contrast Minimum

DATE

TIME

x y Y

+5Vdc PS

+12Vdc PS

-12Vdc PS

+5 Ripple

+12 Ripple

-12 Ripple

COMMENTS

INITIALS

NOMINALS 0.271 0.286 45.0 5 12 -12 200mv P-P Max 200mv P-P Max 200mv P-P Max

UPPER LIMIT 0.301 0.316 47.0 5.25 12.6 -11.7

LOWER LIMIT 0.241 0.256 43.01 4.875 11.7 -12.6

LOWER LIMIT 0.241 0.256 43.01 4.875 11.7 -12.6

Figure 5-5. ACD Semi-Annual Maintenance

TECHNICAL PERFORMANCE RECORD ARTS DAILY MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT ARTS EQUIP S/N PERIODICITY DAILY

Intersensor Linking Center to Center < OR = 80NMI ASR-ASR

Figure 5-5: picture of page 66Figure 5-5 · page 66
Picture of the page from the copy saved here

LOCATION EQUIPMENT ARTS EQUIP S/N PERIODICITY DAILY

Intersensor Linking Center to Center

< OR = 80NMI ASR-ARSR

Intersensor Linking Center to Center

< OR = 80NMI ARSR-ARSR

DATE

TIME

Verify MSAW/CA

East Sensor PR Reliability Chk Beacon

East Sensor PR Reliability Chk Search

DFE TO SAC

DFE TO AZL

DFE TO DFW

DFE TO KLR

LLR TO KLR

Mosaic DFW ASR PR Accuracy Chk Beacon Az

LLR TO KLR

Mosaic DFW ASR PR Accuracy Chk Beacon Ring

Mosaic DFW ASR PR Accuracy Chk Search Az

Mosaic DFW ASR PR Accuracy Chk Search Ring

Mosaic KLR ARSR PR Accuracy Chk Beacon AZ

Mosaic KLR ARSR PR Accuracy Chk Beacon Ring

Mosaic KLR ARSR PR Accuracy Chk Search AZ

Mosaic KLR ARSR PR Accuracy Chk Search Ring

COMMENTS

INITIALS

NOMINALS >OR=

NOMINALS >OR=

90% >OR=

80% 0 0 0 0 0 2797.9 15.7 191.4 1.67 2085.5 7.7 1131.4 14.6

UPPER LIMIT 100% 100% 0.2 0.2 0.2 0.4 0.4 2799.9 15.7625 195.4 1.7325 2087.5 7.825 1135.4 14.725

LOWER LIMIT >OR=

90% >OR=

80% -0.2 -0.2 -0.2 -0.4 -0.4 2795.9 15.6375 187.4 1.6075 2083.5 7.575 1127.4 14.475

LOWER LIMIT >OR=

Figure 5-6. ARTS Daily Maintenance

TECHNICAL PERFORMANCE RECORD AGW SEMI-ANNUAL MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT AGW EQUIP S/N 123 PERIODICITY S/A

DATE

TIME

+5Vdc PS

+12Vdc PS

-12Vdc PS

+5 Ripple

+12 Ripple

-12 Ripple

COMMENTS

INITIALS

Figure 5-6: picture of page 67Figure 5-6 · page 67
Picture of the page from the copy saved here

LOCATION EQUIPMENT AGW EQUIP S/N 123 PERIODICITY S/A

NOMINALS 5 12 -12 200mv P-P Max 200mv P-P Max 200mv P-P Max

UPPER LIMIT 5.25 12.6 -11.7

LOWER LIMIT 4.875 11.7 -12.6

Figure 5-7. AGW Semi-Annual Maintenance

TECHNICAL PERFORMANCE RECORD TMU ISIS MONITOR SEMI-ANNUAL MAINTENANCE

FACILITY DATES

FROM TO SUPERVISOR’S

SIGNATURE

LOCATION EQUIPMENT TMU ISIS MONITOR EQUIP S/N PERIODICITY S/A

Figure 5-7: picture of page 68Figure 5-7 · page 68
Picture of the page from the copy saved here

BARCO ISIS MONITOR

BARCO ISIS MONITOR

100% White Bad Pixels

DATE

TIME

x y Y None in

Critical Areas

COMMENTS

INITIALS

NOMINALS 0.304 0.330 150CD/ M*M

0.334 0.360 165.0

0.274 0.300 139.00

Figure 5-8. TMU ISIS Monitor Semi-Annual Maintenance

502. MSAW/CA AURAL ALARM CHECK.

a. Objective. Verify proper operation of MSAW/CA Aural Alarm.

Figure 5-8: picture of page 69Figure 5-8 · page 69
Picture of the page from the copy saved here

NOMINALS 0.304 0.330 150CD/ M*M

b. Discussion. This check verifies the display hardware is capable of properly providing both an aural and visual indication of the MSAW/CA alarm.

Several methods are provided below to perform this check. The keyboard entry method is preferred, as this method exercises DPS MSAW/CA software subroutines. Performance of one of the available methods is required for each operational display.

c. Test Equipment Required. None.

d. Conditions. Checks must be made on operational displays while the operational program is being executed. Coordination with the appropriate control center is necessary.

e. Detailed Procedures.

(1) Keyboard Entry Method (ACD/TMU/RACD).

(a) Use the trackball to minimize the alarm indicator view, at the keyboard enter: F7,2,ALARM^M<Enter> where ^ = space. Verify the alarm indicator view maximizes, the LA alarm area is flashing green, and the aural alarm sounds.

(b) Use the trackball to minimize the alarm indicator view, at the keyboard enter: F7,2,ALARM^C<Enter> where ^ = space. Verify the alarm indicator view maximizes, the CA alarm area is flashing red, and the aural alarm sounds.

(2) Trackball Selection Method (ACD/TMU/RACD).

(a) Use the trackball to select the LA button in the alarm indicator view area. Verify the LA alarm area is flashing green and the aural alarm sounds. Reselect the LA button to terminate the alarm test.

(b) Use the trackball to select the CA button in the alarm indicator view area. Verify the CA alarm area is flashing red and the aural

alarm sounds. Reselect the CA button to terminate the alarm test.

(3) Keyboard Entry Method (FDAD)

(a) At the keyboard enter: F7,2,ALARM^M<Enter> Verify the LA alarm lamp flashes green and the aural alarm sounds.

(b) At the keyboard enter: F7,2,ALARM^C<Enter> Verify the CA alarm lamp flashes red and the aural alarm sounds.

(4) Button Selection Method (FDAD)

(a) At the display, depress the LA alarm lamp pushbutton. Verify the LA lamp flashes green and the aural alarm sounds.

(b) At the display, depress the CA alarm lamp pushbutton. Verify the CA lamp flashes red and the aural alarm sounds.

(5) Keyboard Entry Method (DBRITE).

(a) At the keyboard enter: F7,2,ALARM^M<Enter> Verify the LA aural alarm sounds.

(b) At the keyboard enter: F7,2,ALARM^C<Enter> Verify the CA aural alarm sounds.

503. MSAW/CA ALARM CHECK UNDER PROGRAM CONTROL.

a. Objective. Verify the capability of the operational program to detect MSAW/CA conditions and to visually/aurally alert controllers regarding these conditions.

b. Discussion. This test will verify that the operational program can detect an MSAW condition in the following areas: arrival monitor at a primary and a satellite airport, departure monitor at a primary and a satellite airport, and general terrain monitor. Conflict alert conditions in the following areas: Type 1 runway, Type 2 arrival/departure corridor, and Type 3 general airspace. Mode-C Intruder (MCI) is also tested.

c. Test Equipment Required. None.

d. Conditions. This test is conducted from a display in training mode. This test will activate the MSAW/CA aural alarms at the display the scenario is running on. Full coordination with the appropriate control center is required.

e. Detailed Procedures.

(1) Select a keyboard to execute the scenario.

(2) Verify a scenario for the selected keyboard is available in the SCEN directory of the active CP hard drive or on a floppy disk.

NOTE: Each scenario is written for execution from a specific keyboard and will normally have the following naming convention:

XXXYZ.## XXX = Facility identifier

Y = Keyboard subset number

Z = Keyboard position symbol

## = Version number of the file or blank for initial release

(3) Configure display to run scenario.

(a) Unpair paired keyboard(s). F7,C,(paired kybd),*,C<enter>

(b) Consolidate keyboards(s) to another display. F7,C,(kybd to),(kybd from),+<enter>

(c) Place display in training status. F15,X,M<enter>

(d) Enable Aural Alarm. F15,X,A<enter>

(e) Enable ETG. F15,X,T<enter>

(4) Activate the appropriate scenario. F15,X,I,$,xxxyz.## <enter>

NOTE: $=C if scenario is on hard drive. $=F if scenario is on a floppy disk.

(5) Observe that the scenario starts and that flight plan information begins to appear in

the tabular list. The scenario normally takes approximately 10 minutes to run. Verify that the test targets produce the following alerts:

(a) APM1MSW should display and sound LA (arrival at primary airport).

(b) APM2MSW should display and sound LA (arrival at satellite airport).

(c) DEP1MSW should display and sound LA (departure at primary airport).

(d) DEP2MSW should display and sound LA (departure at satellite airport).

(e) GTM1MSW should display and sound LA (general terrain monitor).

(f) GTM2MSW should display and sound LA (general terrain monitor).

(g) CA1TYP1 and CA2TYP1 should display and sound CA (Type 1 area).

(h) CA3TYP2 and CA4TYP2 should display and sound CA (Type 2 area).

(i) CA5TYP3 and CA6TYP3 should display and sound CA (Type 3 area).

(j) MCICA1 should display and sound MCI CA.

(k) SCENARIO OFF should display when the scenario is completed.

(6) Disable ETG. F15,Z,T<enter>

(7) Return the display to live mode. F15,Z,M<enter>

(8) Deconsolidate the keyboards. F7,C<enter>

(9) Return keyboards to paired status. F7,C,(paired kybd),*,P,(kybd paired to) <enter>

(10) Verify all alarms were processed by reviewing the SMR file.

504. ENABLE SENSOR TOLERANCE ALARM.

a. Objective. Ensure the sensor tolerance alarm is active.

b. Discussion. The sensor tolerance alarm is an aural alarm indicating a serious sensor alignment or registration problem. Currently no utility or indicator exists to alert the systems specialist that the sensor tolerance alarm has been inhibited since the last cold start. The only way to ensure the alarm is active is to enter the sensor tolerance alarm enable command and review SMON printouts.

c. Test Equipment Required. None.

d. Conditions. This procedure must be performed from either the SMS SMC-PC or a display keyboard with supervisory privileges.

e. Detailed Procedures.

(1) Make a note of the approximate time for use in searching the SMON printouts.

(2) At the display keyboard enter: :F7,2^SENT^E<enter> or in the SMON window of the SMS SMC-PC enter: F,2^SENT^E<enter>

(3) Review the SMON printouts at the time noted in step (1) above and verify the command entered in step (2) above was processed by the system.

505. REGISTRATION ANALYSIS.

a. Objective. Generate and review daily registration summary printouts and perform weekly sensor registration trend analysis.

b. Discussion. This analysis uses dailygenerated registration printouts output to the SMR file. This procedure can be performed in either ARTS or Radar Gateway mode. ARTS mode is preferable.

c. Test Equipment Required. None.

d. Condition. Normal operating conditions.

e. Detailed Procedures.

(1) At the SMS SMC-PC, type CA^R<enter> in the SMON keyboard entry

area, or at an ACD keyboard, type: F11,R<enter>. The registration summary report is output in the SMR file. Review the summary report or the “RTQC Config” window for abnormal values.

(2) Review SMR files for instances of registration RTQC Bound printouts and Sample Complete printouts. If an RTQC Bound printout or Sample Complete printout is encountered, assess sensor performance and correct sensors as appropriate.

(3) Review the week’s registration summary reports for abnormal values and trends. If abnormal values or trends are encountered analyze alignment and correct sensors as appropriate.

(4) Review SMR files for high instances of RTQC TIMEOUT printouts. Consider modifying sensor pairing in adaptation if the condition persists.

NOTE: RTQC TIMEOUT printouts on some sensors are not unusual during low traffic periods.

506. CQARS DATA ANALYSIS.

a. Objective. Verify PR Performance, Inter-sensor linking, and overall sensor performance using CQARS.

b. Discussion. The Common Arts Quick Analysis of Radar Sites (CQARS) status reporting function provides for the monitoring and confirmation of the radar subsystem interfaces. It provides sensor performance data for evaluating operational suitability of sensors for Mosaic operation.

c. Test Equipment Required. None.

d. Condition. No impact to AT operations will result from CQARS. CQARS is an online performance monitor program that runs continuously in the background. The minimum collection time interval is selectable. The default collection time interval should be adapted to 10 minutes. For Inter-sensor linking verification, the minimum time interval should be 60

minutes. This check should be performed on both the ARTS and RGW systems.

e. Detailed Procedures.

(1) Permanent Return Verification and Sensor Performance Verification.

(a) On the SMC-PC or RGW-PC, select Sensor Config status report.

(b) Select a Sensor.

(c) Verify collection time interval is 10 minutes minimum, as shown on top bar of CQARS status report.

(d) Verify PR reliabilities are within standards and tolerances.

(e) Verify mean range and azimuth for each adapted PR is within the standards and tolerances of the expected range and azimuth.

(f) If a sensor has no search PR available with known accurately surveyed position, or if search PR reliability does not meet or exceed the standards and tolerances in step (d) above, verify the sensor has a Beacon PR that is within standards and tolerance for reliability and accuracy and the radar reinforcement rate is within the standard and tolerances.

(g) Verify remaining Radar/Beacon performance parameters meet threshold limits as evidenced by green indication in “Current” column.

(h) Perform steps (b) through (g) for each adapted sensor.

(2) Inter-Sensor Linking Verification.

NOTE: This check must be done during normal to heavy traffic periods.

(a) On the SMC-PC or RGW-PC, select Start, Programs, function config, performance monitor config.

(b) Select CQARS online performance monitor.

(c) Click on the “>”. Observe “CQARS on-line performance monitor” appears in the right hand box.

(d) Enter “60” (default) in the collection time interval box.

(e) Click the Apply or OK button.

(f) Note time. Wait 60 minutes, then select Sensor Config status report.

(g) Select a Sensor.

(h) Verify collection time interval is 60 minute minimum.

(i) Verify Inter-Sensor Link standards and tolerances are not exceeded as evidenced by the values in the “AVG-Dist” column.

(j) Repeat steps (g) through (i) for each adapted sensor.

(k) Return CQARS collection time interval to site adapted default value.

(3) Alternate Method For Verifying Location Of PRs Using CDR Data Analysis.

The following detailed procedure provides an alternate method to verify the accuracy of the reported range and azimuth of PRs.

(a) A minimum of 10 minutes of CDR target data is required for this procedure.

(b) Reduce the stored radar or beacon target data by running the CDR editor. Select RT for Radar Target Reports or BT for Beacon Target Reports in the Classes tab. Select applicable filters (e.g. Sensor, Beacon Code, Range, Azimuth) in the Filter tab to extract the desired data.

(c) Review the CDR printout to ensure the average reported range and azimuth position values are within standards and tolerances.

(d) Repeat steps (b) and (c) above as necessary for the remaining permanent returns.

(e) Repeat steps (b) through (d) above as necessary for the remaining sensors.

Table 5-1. Sensor Performance Parameters

SENSOR PERFORMANCE

SENSOR PERFORMANCE

PARAMETERS

ASR-7/8/

TDX-2000

BCN

ONLY

ASR-

9/11

ARSR-

4

ARSR-

1/2/3

a. BEACON

(1) Radar Reinforcement 80% N/A 80% 80% 60%

(2) Mode 3/A Validity 97% 97% 97% 97% 97%

(3) Mode C Validity 96% 96% 96% 96% 96%

(4) SRTQC Reliability 98% 98% 98% 98% 98%

(5) BRTQC Reliability 98% 98% 98% 98% 98%

(6) Permanent Return Reliability. 90% 90% 90% 90% 90%

(7) Zero Code 1% 1% 1% 1% 1%

(8) Blip/Scan 90% 90% 90% 96% 96%

(9) Splits 1% 1% 1% 1% 1%

b. SEARCH

(1) Splits 5% N/A 3% 2% 2%

(2) Permanent Return Reliability. 80% N/A 80% 80% 80%

NOTE 1: At least one adapted Beacon PE is required to be in tolerance for each sensor.

NOTE 2: Search PEs may not be applicable to some sensors.

NOTE 3: The search range and azimuth accuracy may be verified without search PEs or MTI reflectors, provided the system has at least one beacon permanent return that is within range and azimuth accuracy standard and tolerance, the limits stated herein, and the radar reinforced rate for that sensor is greater than or equal to 80%.

NOTE 4. Valid data can be expected when >10 minutes of data is collected.

NOTE 5 Valid data can be expected when >1000 beacon reports/hours are recorded.

NOTE 6. Reliability parameters may exceed 100%. CQARS begins collecting data as soon as the start entry is made rather than waiting for the start of the next scan. Therefore a partial scan of data may be included in the calculation. The number of extra hits should never be greater than the number of scans in the calculation plus one. The shorter the calculation period the more the percentage may exceed 100%. The error can be kept to less than 1% if the collection period is 100 scans or more. The maximum error can be calculated from 100 – ((SCANS * 100)/(SCANS + 1)).

507. SENSOR COVERAGE ANALYSIS PROGRAM (SCAP).

a. Objective. To check sensor coverage and investigate why sensor coverage has degraded or recommend Mosaic adaptation changes based on changes in sensor coverage.

b. Discussion. Mosaic adaptation that contains the Radar Sort Boxes (RSBs) ranking by sensor, needs to be optimized initially, and reviewed periodically thereafter and/or when sensor coverage improves or degrades. Changes may occur that will result in reduced or increased sensor coverage due to any number of factors. Some examples are: shift in sensor alignment; change in power output of the transmitter; construction of a building or Tower or other obstruction that may cause a gap in coverage or reflections; or interference from other transmitters, etc. SCAP is a program used to evaluate sensor coverage. SCAP uses CDR data as input and produces a text file that is then imported into the Site Adaptation Editor (SA Editor) for viewing. The SA Editor provides comparison by RSB of Site Adaptation derived RSB ranking versus SCAP analysis RSB ranking. SCAP analysis RSB ranking is based on the sensor seeing the largest number of targets having the highest ranking, the sensor with the next highest number ranked 2nd, and so on.

The SCAP program should be run using CDR data to check whether there is a problem with the sensor, or to check whether the Mosaic adaptation should be changed to shift sensor ranking for RSBs where the preferred sensor or a high ranking sensor has coverage problems. SCAP can be re-run and results appended to a previous analysis. This facilitates using CDR data from multiple time periods to get a more realistic analysis using data from a longer time period than may be contained in a single CDR data file. If it looks like there may be a problem with the sensor operation itself, further investigation may be required to determine the cause of the problem and whether there is a possible remedy.

c. Test Equipment Required. None.

d. Condition. SCAP analysis requires a standby or off-line SMC to run.

e. Detailed Procedures.