81 FR 45872 Safety Management System for Certificated Airports
On October 7, 2010, the FAA published in the Federal Register a notice of proposed rulemaking (NPRM) to require certificate holders to establish a safety management system (SMS) for the entire airfield environment, including movement and non-movement areas, to improve safety at airports hosting air carrier operations. After reviewing the comments received and conducting further internal analysis, the FAA is amending that proposal. The FAA now proposes to require an SMS only for a certificated airport classified as a small, medium, or large hub airport in the National Plan of Integrated Airport Systems; serving international air traffic; or having more than 100,000 total annual operations. The FAA is also proposing changes that would extend the implementation period from 18 to 24 months; require submission of an implementation plan within 12 months instead of 6 months of the effective date of the final rule; modify the training requirements; ensure consistency among various FAA SMS initiatives, and reduce the implementation burden.
This document is proposed. It may have been replaced. Check the official source before relying on it.
Vol. 81
Thursday,
No. 135
July 14, 2016
Part V
Safety Management System for Certificated Airports; Proposed Rules
Federal Register / Vol. 81 , No. 135 / Thursday, July 14, 2016 / Proposed Rules DEPARTMENT OF TRANSPORTATION
Federal Aviation Administration
[Docket No.: FAA-2010-0997; Notice No. 16-04] RIN 2120-AJ38
[Docket No.: FAA-2010-0997; Notice No. 16-04] RIN 2120-AJ38
Safety Management System for Certificated Airports
AGENCY: Federal Aviation Administration (FAA), DOT.
ACTION: Supplemental notice of proposed rulemaking (SNPRM).
SUMMARY: On October 7, 2010, the FAA published in the Federal Register a notice of proposed rulemaking (NPRM) to require certificate holders to establish a safety management system (SMS) for the entire airfield environment, including movement and non-movement areas, to improve safety at airports hosting air carrier operations. After reviewing the comments received and conducting further internal analysis, the FAA is amending that proposal. The FAA now proposes to require an SMS only for a certificated airport classified as a small, medium, or large hub airport in the National Plan of Integrated Airport Systems; serving international air traffic; or having more than 100,000 total annual operations. The FAA is also proposing changes that would extend the implementation period from 18 to 24 months; require submission of an implementation plan within 12 months instead of 6 months of the effective date of the final rule; modify the training requirements; ensure consistency among various FAA SMS initiatives, and reduce the implementation burden.
Dates
DATES: Send your comments on or before September 12, 2016.
ADDRESSES: You may send comments identified by Docket Number FAA-2010-0997 using any of the following methods:
• Federal eRulemaking Portal: Go to http://www.regulations.gov and follow the online instructions for sending your comments electronically.
Addresses
• Mail: Send comments to Docket Operations, M-30; U.S. Department of Transportation, 1200 New Jersey Avenue SE., Room W12-140, West Building Ground Floor, Washington, DC 20590-0001.
• Hand Delivery or Courier: Bring comments to Docket Operations in Room W12-140 of the West Building Ground Floor at 1200 New Jersey Avenue SE., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
• Fax: Fax comments to Docket Operations at 202-493-2251.
For more information on the rulemaking process, see the SUPPLEMENTARY INFORMATION section of this document.
Privacy: In accordance with 5 U.S.C. 553(c), the Department of Transportation (DOT) solicits comments from the public to better inform its rulemaking process. DOT posts these comments, without edit, including any personal information the commenter provides, to www.regulations.gov, as described in the system of records notice (DOT/ ALL-14 FDMS), which can be reviewed at www.dot.gov/privacy.
Docket: To read background documents or comments received, go to http://www.regulations.gov and follow the online instructions for accessing the docket. Or, go to the Docket Management Facility in Room W12-140 of the West Building Ground Floor at 1200 New Jersey Avenue SE., Washington, DC, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
For Further Information Contact
FOR FURTHER INFORMATION CONTACT: For technical questions concerning this proposed rule, contact Keri Lyons, Office of Airports Safety and Standards, Airport Safety and Operations Division, AAS-300, Federal Aviation Administration, 800 Independence Avenue SW., Washington, DC 20591; telephone (202) 267-8972; email [email protected].
Supplementary Information
SUPPLEMENTARY INFORMATION: Later in this preamble under the Additional Information section, we discuss how you can comment on this proposal and how we will handle your comments. This discussion includes related information about the docket, privacy, and the handling of proprietary or confidential business information. We also discuss how you can get a copy of this proposal and related rulemaking documents.
Authority for This Rulemaking
Authority for This Rulemaking
The FAA's authority to issue rules regarding aviation safety is found in Title 49 of the United States Code. Subtitle I, section 106 describes the authority of the FAA Administrator. Subtitle VII, Aviation Programs, describes in more detail the scope of the agency's authority.
The FAA is proposing this rulemaking under the authority described in Subtitle VII, part A, subpart III, section 44706, "Airport operating certificates." Under that section, Congress charges the FAA with issuing airport operating certificates (AOC) that contain terms that the Administrator finds necessary to ensure safety in air transportation. This proposed rule is within the scope of that authority because it requires certain certificated airports to develop and maintain an SMS. The development and implementation of an SMS ensures safety in air transportation by assisting these airports in proactively identifying and mitigating safety hazards.
I. Executive Summary
I. Executive Summary
A. Purpose of This SNPRM
The increasing demands on the U.S. air transportation system, including additional air traffic and surface operations and airport construction, have the potential to heighten risk to operating aircraft. Historically, the approach to aviation safety was based on the reactive analysis of past accidents and the introduction of corrective actions to prevent the recurrence of those events. An SMS, however, helps airport operators to proactively identify potential hazards in the operating environment, analyze the risks of those hazards, and mitigate those risks to prevent an accident or incident. In its most general form, SMS is a set of decision making tools that an airport operator would use to plan, organize, direct, and control its everyday activities in a manner that enhances safety.
A. Purpose of This SNPRM
On October 7, 2010, the FAA published an NPRM entitled "Safety Management System for Certificated Airports" (75 FR 62008). In the NPRM, the FAA proposed to require all 14 Code of Federal Regulations (CFR) part 139 certificate holders to establish an SMS to improve the safety of their aviation-related activities.
The FAA received 65 comments in response to the NPRM from a variety of commenters. Because of the complexity of the issues and concerns raised by the commenters, the FAA began to reevaluate whether deployment of SMS at all certificated airports was the most effective approach. As part of this process, the FAA looked at applicability for various categories of certificate holders to determine which option would maximize safety benefits in the least burdensome manner. While the FAA is proposing a preferred alternative in this SNPRM, the FAA requests comments on the other applicability alternatives discussed in this SNPRM.
The preferred alternative harmonizes with the intent of ICAO SMS standards by including all certificated airports accepting international operations. The FAA supports conformity of U.S. aviation safety regulations with ICAO standards and recommended practices and believes the SNPRM meets the intent of the ICAO standard in a way that complements existing airport safety regulations in part 139.
The FAA continues to believe that an SMS can address potential safety gaps through improved management practices.\1\ SMS's proactive emphasis on hazard identification and mitigation, and on communication of safety issues, would provide certificate holders with robust tools to improve safety. While the comments generated some changes to the proposal in this document, most of the proposed core elements of the SMS program remain in this SNPRM.
\1\ Additional information regarding the purpose of the proposed SMS requirement can be found in the "Background" section of the NPRM (75 FR 62008).
B. Summary of the Major Provisions of the SNPRM
B. Summary of the Major Provisions of the SNPRM
The major change in this SNPRM is to the proposed applicability. Rather than requiring an SMS at all certificated airports, the FAA now proposes to require an SMS be developed, implemented, maintained, and adhered to at any certificated airport:
• Classified as a small, medium, or large hub \2\ airport in the National Plan of Integrated Airport Systems (NPIAS); \3\
\2\ The FAA's use of the term hub airport is different than that of airlines, which use the term to denote an airport with significant connecting traffic by one or more carriers. As defined in 49 U.S.C. 47102, large hubs are those airports that account for 1 percent or more of total U.S. passenger boardings (U.S. passenger enplanements); medium hubs are airports that account for between 0.25 percent and 1 percent of total U.S. passenger boardings; and small hubs are airports that enplane 0.05 percent to 0.25 percent of total U.S. passenger boardings.
\3\ The Secretary of Transportation is required to maintain a plan for developing public-use airports that are important to the national transportation system. The NPIAS identifies the types of projects and estimated costs eligible for federal financial assistance necessary to provide a safe, efficient, and integrated system of airports. The FAA Office of Airports maintains the NPIAS and publishes a Report to Congress every other year. Current and past reports are available at http://www.faa.gov/airports/planning_capacity/npias/.
• Identified by the U.S. Customs and Border Protection (CBP) as a port of entry (under 19 CFR 101.3), designated international airport (under 19 CFR 122.13), landing rights airport (under 19 CFR 122.14), or user fee airport (19 CFR 122.14) (collectively referred to throughout this proposal as "international airports"); or
• Identified as having more than 100,000 total annual operations (according to best available data).
Additionally, the FAA proposes extending the implementation period from 18 to 24 months, requiring submission of an implementation plan within 12 months instead of 6 months of the effective date of the final rule, and changes to the training requirements. Other changes have also been made to ensure consistency among various FAA SMS initiatives and to reduce the implementation burden.
Throughout the document, the FAA requests specific comment on the following issues:
• What other methods may be available to accurately account for and determine applicability based on annual operations or whether the FAA should use a different baseline for determining applicability;
• What other methods may be available to identify international airports;
• What types of data or other information certificated airports could provide under a national reporting database;
• Whether the estimates of the average pool of employees needing comprehensive SMS training is an accurate average across all airports affected by the proposal;
• What types of job roles would require comprehensive SMS training; and
• Whether the implementation of the proposed accountable executive definition is feasible.
C. Summary of the Costs and Benefits
This proposed rule would require certain certificate holders under part 139 to establish an SMS. SMS is a set of tools designed to help airports effectively integrate formal risk control procedures into normal operational practices to improve operational safety. Benefits are estimated at $370.8 million ($225.9 million present value) and total costs are estimated at $238.9 million ($157.5 million present value), with benefits exceeding costs. The following table shows benefits and costs of the alternatives over 10 years.
C. Summary of the Costs and Benefits
Preferred
alternative:
International L, M, S and L, M, S, >100K
Base case All ($) Class I ($) ($) >100K ops ($) ops, and
international
($)
Benefits … $382,987,281 $368,096,671 $360,907,166 $356,128,301 $370,788,457
Costs … 471,104,787 341,021,606 215,010,997 163,760,850 238,865,692
Net Benefits … -88,117,506 27,075,065 145,896,169 192,367,451 131,922,764
PV Benefits (7%) … 233,282,770 224,210,033 219,830,291 216,919,352 225,850,869
PV Costs (7%) … 307,842,595 223,584,687 141,796,001 108,819,973 157,496,312
PV Net Benefits (7%) … -74,559,825 625,346 78,034,290 108,099,379 68,354,557
PV Benefits (3%) … 307,499,272 295,542,114 289,769,378 285,932,407 297,704,052
PV Costs (3%) … 389,440,320 282,304,199 178,432,284 136,340,226 198,211,977
PV Net Benefits (3%) … -74,559,825 625,346 78,034,290 108,099,379 68,354,557
Mitigation Costs: Not quantified, estimates not included. Given the range of mitigation actions possible, it is difficult to quantify potential benefits.
The estimated costs of this rule do not include the costs of mitigations that operators could incur as a result of conducting the risk analysis proposed in this rule. Given the range of mitigation actions possible, it is difficult to provide a quantitative estimate of both the costs and benefits of such mitigations. We anticipate that operators will only implement mitigations where benefits of doing so exceed the costs of mitigations. In order for the estimated benefits to exceed the costs of the rule, the mitigation costs must be below $68.4 million over 10 years (discounted at 7%). The FAA requests comment on this assumption, as well as data regarding costs and benefits associated with any mitigations implemented through voluntary SMS programs.
II. Background
II. Background
A. NPRM
In the NPRM, the FAA proposed to require all part 139 certificate holders to develop and implement an SMS to improve the safety of their aviation-related activities. An SMS is a formalized approach to managing safety by developing an organization-wide safety policy, developing formal methods of identifying hazards, analyzing and mitigating risk, developing methods for ensuring continuous safety improvement, and creating organization-wide safety promotion strategies.
A. NPRM
The original comment period was to close on January 5, 2011, but, in response to several commenters' requests, the FAA extended the comment period to July 5, 2011. Additionally, the FAA permitted commenters to submit clarifying questions to the docket during the comment period. The FAA answered these questions before the comment period closed in a document that was placed in the docket (the "Responses to Clarifying Questions").\4\ The FAA also published a technical report detailing results of the Office of Airports' SMS pilot studies that was also placed in the docket.\5\
\4\ "FAA Responses to Clarifying Questions About Proposed Rulemaking for SMS for Certificated Airports" is available at http://www.regulations.gov/#!documentDetail;D=FAA-2010-0997-0073).
\5\ Safety Management System Pilot Studies (Technical Report) is available at http://www.regulations.gov/#!documentDetail;D=FAA-2010-0997-0074.
In the NPRM, the FAA proposed a new subpart E that would have: (i) Required all holders of an airport operating certificate (AOC) to have an approved airport SMS; (ii) prescribed the components of an SMS; and (iii) prescribed implementation requirements for an airport SMS. Certificate holders would have implemented SMS throughout the airport environment, including the movement and non-movement areas (e.g., runways, taxiways, run-up areas, ramps, apron areas, and on-airport fuel farms).
Under the proposal, the FAA envisioned an SMS as an adaptable and scalable system. For example, the proposal permitted certificate holders to maintain a separate SMS manual in addition to the Airport Certification Manual (ACM), or maintain SMS documentation directly in the ACM. Options such as these would have permitted certificate holders that operate multiple airports maximum flexibility in the development of their SMS. Similarly, the proposal included a requirement for certificate holders to establish a system for identifying safety hazards and a systematic process to analyze hazards and their associated risks. By not prescribing any one means for identifying hazards or analyzing risk, the proposal permitted certificate holders flexibility in developing scalable and adaptable processes under their SMS.
B. Summary of Comments on NPRM
B. Summary of Comments on NPRM
The FAA received 65 comments in response to the NPRM from a variety of commenters including air carriers, airport operators/certificate holders, representatives of airline employees, trade associations, an airport user group, attorneys general, consultants, universities and private citizens. Commenters included:
• Air carriers: Delta Airlines,
• Airport operators/certificate holders: Alaska Department of Transportation and Public Facilities, Austin-Bergstrom International Airport (TX), Bangor International Airport (ME), City of Albuquerque (NM), City of Merced (CA), City of Phoenix (AZ), City of Prescott (AZ), Clark County Department of Aviation (NV), Coastal Carolina Regional Airport (NC), Columbus Regional Airport Authority (OH), Contra Costa County (CA), Dallas/Fort Worth International Airport (TX), Denver International Airport (CO), Floyd Bennett Memorial Airport (NY), Glynn County Airport Commission (GA), Hartsfield-Jackson Atlanta International Airport (GA), Houston Airport System (TX), Huntingburg Airport (IN), Indianapolis Airport Authority (IN), Jacksonville International Airport (FL), Lee County Port Authority (FL), Louisville Regional Airport Authority (KY), Manchester-Boston Regional Airport (MA), March Inland Port Authority (CA), Maryland Aviation Administration (MD), Miami-Dade Aviation Department (FL), Modesto City-County Airport (CA), Myrtle Beach International Airport (SC), Norm Y. Mineta San Jose International Airport (CA), Pitkin County (CO), Pittsburgh International Airport (PA), Port Authority of New York and New Jersey (NY/NJ), Port of Portland (OR), Rapid City Regional Airport (SD), Rochester Airport Company (MN), San Antonio Airport System (TX), Santa Barbara Airport (CA), Tri-Cities Regional Airport (TN), Tucson Airport Authority (AZ), Tulsa Airport Authority (OK), Wayne County Airport Authority (MI),
• Representatives of airline employees: Airline Pilots Association (ALPA),
• Trade associations: Airlines for America (A4A), Aircraft Owners and Pilots Association (AOPA), Airports Council International-North America (ACI-NA), American Association of Airport Executives (AAAE), American Association for Justice (AAJ), Colorado Airport Operators Association (CAOA), Experimental Aircraft Association (EAA), National Air Transportation Association (NATA),
• Airport users groups: Prescott Airport Users Association,
• Attorneys General: Attorney General for the District of Columbia, Attorney General for the State of Oklahoma,
• Consultants and universities: Landry Consultants and Dave Fleet Consulting, Purdue University, the University of Southern California Aviation Safety and Security Program (U.S.C.), and
• Eight individuals and 9 anonymous submissions.
One individual submitted a comment that was out-of-scope, and portions of Clark County, Dallas-Fort Worth International, and AOPA's submissions were out-of-scope.
In addition to the above, the FAA received clarifying questions from the following entities during the comment period: AAAE, ACI-NA, Austin-Bergstrom International Airport, Fairbanks International Airport, Fresno Yosemite International Airport, Landry Consultants and Dave Fleet Consulting, Louisville Regional Airport Authority, Maryland Aviation Administration, Port of Seattle, and U.S.C.. The FAA answered these questions in the Responses to Clarifying Questions.\6\ Those questions are not addressed in this document.
\6\ FAA Responses to Clarifying Questions (May 24, 2011), available at http://www.regulations.gov/#!documentDetail;D=FAA-;2010-0997-0073.
C. Need for SNPRM
C. Need for SNPRM
While reviewing the comments to the NPRM, the FAA began to re-evaluate whether requiring an SMS at all certificated airports was the most effective option. As part of this process, the FAA looked at the applicability for various categories of certificate holders to determine which option would maximize safety benefits in the least burdensome manner. While the FAA is proposing a preferred alternative in this SNPRM, the FAA requests comments on the other applicability alternatives discussed in this SNPRM.
III. Discussion of Proposals in the SNPRM
III. Discussion of Proposals in the SNPRM
A. Differences Between the SNPRM and the NPRM
1. Applicability
In the NPRM, the FAA proposed that all 544 \7\ certificated airports be covered by the SMS requirements.
\7\ The number of certificated airports at the time of SNPRM development.
1. Applicability
Based on comments and other information gathered, it became evident that application of SMS across all certificated airports was not practical. In response, the FAA revised its assumptions used to calculate overall costs associated with this SNPRM's proposal. The FAA also reviewed additional accident and incident databases to obtain more accurate assumptions of benefits derived from an SMS. These additional databases included the FAA Accident and Incident Database (AIDS), NASA's Aviation Safety Reporting System (ASRS), the FAA's Wildlife Strike Database, and the FAA's Runway Incursion Database.
Using these revised cost and benefit estimates, the FAA considered a range of alternatives to determine how to apply an SMS requirement that would reduce risk at the largest group of airports while still producing net benefits. The FAA focused on airports with the highest passenger enplanements and largest total operations so that safety benefits would flow to the overwhelming majority of aircraft operations in the United States. The FAA also focused on incorporating airports with international passenger operations to ensure conformity with international standards and recommended practices. To that end, the FAA developed the following alternatives for additional analysis:
• All part 139 airports (as originally proposed) (544 airports covering 99.8% of U.S. passenger enplanements);
• Airport operators holding a Class I AOC (388 airports covering 99.7% of U.S. passenger enplanements);
• Certificated international airports (240 airports covering 96.1% of U.S. passenger enplanements);
• Large, medium, and small hub airports (as identified in the NPIAS) and certificated airports with more than 100,000 total annual operations (177 airports covering 97.5% of U.S. passenger enplanements); and
• Large, medium, and small hub airports, certificated airports with more than 100,000 total annual operations, and certificated international airports (268 airports covering 98% of U.S. passenger enplanements).
Because the FAA chose to analyze various alternatives based on classifications outside the scope of part 139 (e.g., hubs or international status instead of AOC class), it relied on the best available information to develop the list of affected airports under each alternative. To identify those airports classified as large, medium, or small hubs, the FAA relied on the 2011-2015 NPIAS, current at the time of this analysis. Similarly, the FAA relied on annual operations data reported through FAA Form 5010-1, Airport Master Record (downloaded August 1, 2012). The FAA relied on data obtained from Title 19 of the CFR (see Sec. § 101.3, 122.13, 122.14, 122.15) and the CBP to identify certificated airports authorized to accept international traffic.
After reviewing each of the alternatives and the associated costs and benefits of each, the FAA's preferred proposal would require an SMS be developed, implemented, maintained, and adhered to only at a certificated airport:
• Classified as a small, medium, or large hub airport in the NPIAS; or
• Identified as an international airport; or
• Identified as having more than 100,000 total annual operations.
This preferred alternative covers 268 airports across Classes I, II, III, and IV, thus eliminating the NPRM's SMS requirements for 276 airports that have few passenger enplanements and less complex operations. The airports that comprise this alternative account for over 98% of all passenger enplanements in the U.S.
While simply applying the proposed SMS requirements to large, medium, and small hub-certificated airports would account for most of this traffic, many critical airports would not be included because they do not meet those enplanement thresholds. Simply accounting for airports with higher passenger enplanements fails to acknowledge the many other complex, certificated airports that have significant levels of aircraft operations.\8\ Therefore, to ensure that these busy airports are covered by the proposal, the preferred alternative includes airports with more than 100,000 total annual operations based on their operations data submitted through FAA Form 5010-1, Airport Master Record available on August 1, 2012. The FAA acknowledges that data submitted through FAA Form 5010-1 may be estimates for airports that do not have an air traffic control tower. While more definitive data may be available through the FAA's air traffic control tower counts, this information may not be readily available, may not be accessible to the public, and does not account for certificated airports that do not have an air traffic control tower. The FAA requests comments on what other methods may be available to accurately account for and determine the proposed rule's applicability based on annual operations, or whether the FAA should use a different baseline for determining applicability.
\8\ Section V(B), Applicability contains detailed analysis of these alternatives.
The preferred alternative also harmonizes with the intent of International Civil Aviation Organization (ICAO) SMS standards by including all certificated airports accepting international operations. In December 1996, the FAA published Advisory Circular (AC) 150/5000-5C, Designated U.S. International Airports, which explained the different categories of U.S. airports designated to serve international air traffic and provided a list of those airports. However, the FAA cancelled that AC in September 2010 when it published AC 150/5000-16, Announcement of Availability of the Guide for Private Flyers--U.S. International Airports. The Guide for Private Flyers, published by the CBP, lists all U.S. international airports, designated airports, landing rights airports, and user fee airports. It also defines the term "international airport" and clarifies the use of the word "international" in an airport name. Since the FAA no longer maintains its own list of international airports, the FAA believes the CBP list serves as the best available source of this information because it is developed based on Title 19 (Customs Duties) of the CFR. The FAA believes this approach corresponds with the intent of ICAO Annex 14 standards. The FAA requests comments on this approach, and what other methods may be available to identify international airports.
The FAA acknowledges that an airport's status in any one of these categories may change over time. For example, a small hub airport may become a nonhub airport during the FAA's annual update of passenger enplanement data if its enplanements fall below 0.05% of the total U.S. passenger enplanements. Similarly, an airport not currently considered a hub might see its enplanements increase making it a small hub. The same case could be made for annual operations and international status.
In these cases, the FAA would review each airport's status annually,\9\ consistent with published enplanement data,\10\ to determine which airports are covered by the SMS requirement then in effect. If there is a change to an airport's status that affects its need to comply with those SMS requirements, the FAA would then notify the certificate holder in writing of its changed status. If the change would require the certificate holder to comply with those SMS requirements, the certificate holder would then have two years to comply with the SMS requirements then in effect. Certificate holders whose status changed to be outside the scope of the SMS requirements then in effect would be encouraged to voluntarily maintain and adhere to an SMS. The FAA would maintain a list of those certificate holders meeting the required applicability on its public Web site, updating the list annually.
\9\ The Office of Airports regularly tracks the status of certificated airports. As such, this review would result in an insignificant increase in cost based on current FAA oversight activities.
\10\ This data is available online at http://www.faa.gov/airports/planning_capacity/passenger_allcargo_stats/passenger/. Passenger enplanement data is gathered from the Air Carrier Activity Information System (ACAIS).
The FAA requests comment on this approach. Specifically, if a certificate holder meets the threshold to trigger an SMS requirement, should the certificate holder be required to maintain an SMS even if it no longer meets the threshold? Should a certificate holder meet the applicability threshold for two consecutive years prior to triggering an SMS requirement? 2. Implementation
Under this proposal, certificate holders would be required to develop and implement an SMS within 2 years of the effective date of the final rule. The NPRM originally proposed SMS implementation within 1 year from the effective date of the final rule. This change responds to commenters' requests for additional time to implement SMS.
The FAA recognizes the complexity of implementing SMS in the airport environment and, therefore, increased the timeframes for implementation. The FAA requests comments whether this proposed implementation timeframe is sufficient. Comments should be supported by specific data demonstrating a different implementation timeframe is necessary. 3. Training
The NPRM proposed an SMS training requirement for all employees and tenants with access to the movement and non-movement areas of the airport. To maximize the potential for proactively identifying hazards, the intent was to ensure that individuals authorized access to the movement and non-movement area received training. The FAA's intent was to create a broad training requirement, allowing certificate holders flexibility in how they trained persons with access to these areas. This flexibility included allowing train-the-trainer programs and training specific to the person's role in the SMS. This would allow certificate holders to provide orientation to the majority of persons accessing the non-movement and movement areas of hazard identification and reporting, rather than training on all of the certificate holder's SMS initiatives.
Commenters appear to have interpreted the proposed training requirement to be cumbersome, time consuming, and excessively costly. In light of these comments and lessons learned from the pilot studies, this proposal offers a two-pronged approach to training: (i) Comprehensive SMS training specific to the individual's role and responsibility in implementation and maintenance of the SMS; and (ii) hazard awareness and reporting awareness orientation for all other individuals with access to the movement and non-movement areas.
The FAA expects certificate holders to provide training appropriate to the person's role in the certificate holder's SMS. For example, those persons responsible for analyzing hazard reports to determine action should be properly trained in Safety Risk Management (SRM) and hazard assessment procedures. Individuals, including staff and/or managers, with responsibility for daily oversight of the SMS would be trained in all requirements of the SMS. The certificate holders could use train-the-trainer formats where necessary.
By clarifying this proposed requirement, the FAA anticipates that, on average, 10 employees or managers would need this training at large airports and 3 employees or managers would require it at small airports.\11\ The supplemental initial regulatory evaluation uses these estimates in the cost analysis. The FAA requests comments on whether these estimates are accurate as an average across all airports affected by this proposal. The FAA acknowledges that there may be certificate holders included in the preferred applicability alternative who have smaller staffs than these numbers take into account. The FAA also requests comments on the job roles that would require this type of specific training.
\11\ As discussed in the Supplementary Initial Regulatory Evaluation, the analysis classifies large, medium, and small hub airports as large airports and all others as small airports.
For the remaining persons with access to the movement and non-movement areas, certificate holders could use a variety of means to provide awareness. For example, a certificate holder could develop a brochure or white paper for inclusion in the employee's indoctrination package, or add a reference to hazard identification and reporting to existing training programs such as security or driver training.
The certificate holder would bear the cost of publishing this awareness material and updating it as necessary. For persons employed by tenants, the certificate holder would be responsible for providing the materials to the tenants for distribution. Tenants, such as air carriers, caterers, fueling agents, and FBOs, all would potentially receive this information if their employees access the movement or non-movement areas. However, the certificate holder could choose to provide this material or briefings during badging or security training.
There should be minimal record-keeping costs associated with this type of training/awareness. The FAA anticipates that certificate holders would retain copies of the materials provided and a distribution log detailing when the materials are provided to employees and tenants.
The FAA does not intend for the proposed requirement to apply to persons escorted by a trained individual. As for an air carrier's crewmember training, those individuals authorized to enter the movement and non-movement areas unescorted would receive training appropriate to their role; in this case, awareness of hazard identification and reporting. The air carrier would then distribute the materials provided by the certificate holder.
While the NPRM did not explicitly propose recurrent training, the FAA envisioned the need for certificate holders to provide individuals with updated information, all in support of a positive safety culture. This proposal includes a requirement for recurrent training every other year. It also would require the update of publications for the hazard awareness orientation requirement on the same schedule. 4. Definition of Accountable Executive
Numerous commenters thought the definition of accountable executive proposed in the NPRM was impractical and needed to be revised. After considering these comments, the FAA agrees that the proposed definition will present compliance and operational challenges in the U.S. airport environment. Therefore, in this SNPRM, the new proposed definition (i) eliminates the substantive differences between the part 121 and part 139 definitions, and (ii) clarifies that the accountable executive should not be personally liable to the FAA through certificate action or civil penalty. The FAA requests comment on the feasibility of implementing this proposed definition.
B. Proposals Remaining From NPRM
B. Proposals Remaining From NPRM
As proposed in the NPRM, the certificate holder's SMS would be required to contain the following four components: Safety policy, safety risk management, safety assurance, and safety promotion. To satisfy the safety policy component, the certificate holder would establish a policy which, among other things, defines the certificate holder's safety objectives, establishes a safety policy statement, defines the certificate holder's management responsibilities and accountabilities for safety issues, and identifies and communicates the organization's structure for handling safety issues.
The certificate holder would also be required to designate an accountable executive, within the certificate holder's own organization or governance structure, who would act on its behalf in overseeing the implementation and daily operation of the SMS. For most airports, the FAA anticipates the accountable executive would be an airport manager or airport director rather than a lower level manager or supervisor.
Under safety risk management, the certificate holder would develop processes to identify hazards that may impact the airport's operations. The certificate holder would use these processes to systematically analyze those hazards and their risks, as well as proactively mitigate risk unacceptable to the certificate holder. The certificate holder would retain any documentation developed through these processes to assist in trend and root cause analysis.
Through safety assurance, the certificate holder would develop and implement processes to monitor the safety performance of its SMS. Additionally, the certificate holder would establish and maintain a hazard reporting system that provides reporters confidentiality when communicating safety issues to the system. The certificate holder's staff would regularly update the accountable executive on pertinent safety information such as the certificate holder's compliance with part 139 subpart D requirements, and its performance with regard to its safety objectives, safety critical information, the status of any ongoing mitigations established through safety risk management, and the status of implementing the SMS.
Under safety promotion, the certificate holder would identify managers and staff employees responsible for oversight and implementation of the SMS and would provide training on their SMS responsibilities. These individuals would receive recurrent training every 24 months. For all other individuals with regular access to the movement and non-movement areas of the airfield, the certificate holder would develop and distribute hazard reporting and awareness orientation materials, ensuring those individuals are made aware of hazards and how to report them to the certificate holder's hazard reporting system. The certificate holder would then keep records of training provided and hazard reporting and awareness orientation materials for 24 calendar months.
The certificate holder would also be required to develop processes and procedures to communicate important safety information that ensures all persons authorized access to the movement and non-movement areas are aware of the SMS and their safety roles and responsibilities. Feedback would be provided to individuals using the certificate holder's hazard reporting system. Lessons learned that are relevant to airport employees or stakeholders also would be communicated.
The certificate holder would have the option of either developing and maintaining a separate SMS manual in addition to the Airport Certification Manual (ACM), or incorporating these proposed requirements directly in the ACM. If the certificate holder develops a separate SMS manual, it would cross-reference the SMS requirements in its FAA-approved ACM.
IV. Discussion of Comments Received on NPRM
IV. Discussion of Comments Received on NPRM
A. FAA Rulemaking Authority
The NPRM proposed implementing SMS throughout the airport environment, including the movement and non-movement areas (e.g., runways, taxiways, run-up areas, ramps, apron areas, and on-airport fuel farms). In the NPRM, the FAA acknowledged the proposal extended the scope of part 139 by including the non-movement area but concluded that ensuring air transportation safety required that an SMS apply to any place that affects safety during aircraft operations. An association and a certificate holder noted that the application of SMS to the non-movement area is an unprecedented expansion of the FAA's regulatory scope.
A. FAA Rulemaking Authority
The FAA has authority under 49 U.S.C. 44706 to issue AOCs that contain terms to ensure safety in air transportation. The FAA acknowledges that it has historically focused its regulatory practice on the movement area. However, the statutory authority encompasses the entire airport operating environment, which includes the non-movement area. The proposed requirement to develop and implement an SMS ensures safety in air transportation by assisting certificate holders in proactively identifying and mitigating safety hazards. Furthermore, as discussed later, findings from the SMS pilot studies and the large number of safety incidents occurring in the non-movement area support extending SMS to the non-movement area to ensure safety in air transportation.
Accordingly, as stated in the NPRM, this proposal, to the extent it would apply to both the movement and non-movement areas, is within the FAA's statutory authority.
B. Applicability
B. Applicability
The NPRM proposed requiring all certificate holders, including airport operators holding a Class I, II, III, or IV AOC, to develop and implement an SMS for the movement and non-movement areas of the airport. One Class IV certificate holder recommended that the FAA require SMS only at airports holding a Class I AOC, stating this would target the majority of air carrier passengers in the U.S. and allow small airports to avoid costly burdensome regulations. The certificate holder recommended a voluntary program for Class II, III, and IV certificate holders.
The FAA partially agrees with the commenter. The FAA believes all certificate holders would realize benefits from formalized hazard identification, risk analysis, training and communications processes. However, further review of costs and benefits indicate that, for certificate holders with fewer operations, the costs of SMS implementation may be disproportionate to the benefits realized. The FAA continues to evaluate means to reduce costs for smaller airports, but, in the absence of significant regulatory cost reductions, the FAA's preferred proposal is to require SMS implementation at large, medium, and small hub airports, certificated airports with more than 100,000 total annual operations, and certificated international airports.
Requiring an SMS for only the largest and most complex of operations will enhance safety at airports receiving 98% of all passenger enplanements. The revised proposed rule would apply to 268 airports, thus eliminating the burden on 276 airports that have few passenger enplanements and less complex operations.\12\ This proposed requirement advances the FAA's safety goals and at the same time reduces the burden imposed by the NPRM. Although not proposing to require SMS implementation at all certificated airports, the FAA encourages all certificate holders to voluntarily implement SMS based on this proposed rule and accompanying agency guidance.
\12\ These figures are current as of October 2012.
Besides the alternative proposed in this SNPRM and the proposal in the NPRM, the FAA analyzed a variety of other applicability scenarios including:
• Airport operators holding a Class I AOC;
• Certificated international airports; and,
• Large, medium, and small hub airports and certificated airports with more than 100,000 total annual operations. i. Airport Operators Holding a Class I AOC
Since the last major revision to part 139, the FAA typically has applied technical requirements based on AOC class. Consistent with this past practice, the FAA first analyzed limiting applicability to Class I certificate holders. When reviewed as a whole, the 388 airports identified as holding a Class I AOC (as of October 2012) account for 99.7% of the total U.S. passenger enplanements as of the end of calendar year 2011. All certificated airports account for 99.8% of the total U.S. passenger enplanements, a difference of 0.1%. However, the list fails to account for many busy airports by total annual operations (not passenger enplanements), some of which receive more total annual operations than some Class I airports. Class I certificate holders also appear to include many smaller airports that support only domestic operations. For these reasons, the FAA does not believe that limiting applicability to Class I certificate holders alone is the best way to enhance safety through SMS. ii. Certificated International Airports
The FAA also analyzed certificated international airports. Limiting the scope to these airports meets the intent of the ICAO standard. In the NPRM, the FAA addressed the ICAO standard by proposing all certificate holders implement an SMS. However, many commenters expressed concerns about the expansion of applicability beyond the ICAO standard (i.e., applying the standard to airports serving only domestic traffic). The FAA identified 240 certificated airports with international services (as of August 1, 2012). Relying on data prepared by the CBP, these 240 airports encompass all certificated airports that serve as ports of entry, designated international airports, landing rights airports, and user fee airports.
These international airports account for 96.1% of the total U.S. passenger enplanements (as of the end of calendar year 2011). While these airports account for the vast majority of international operations within the U.S., this scenario fails to capture some of the nation's busiest airports that accept only domestic operations. Based on the limitation of applicable airports under this scenario, the FAA does not believe that limiting applicability to international airports is a viable option to achieve the most safety benefit. iii. Large, Medium, and Small Hub Airports and Certificated Airports With More Than 100,000 Total Annual Operations
The FAA also analyzed airports by their NPIAS category, looking at the airports that receive the vast majority of enplanements, otherwise known as hubs. Including only large, medium, and small hub airports does not capture airports receiving large numbers of total annual operations. Therefore, the FAA included in its analysis of this scenario certificated airports with more than 100,000 total annual operations according to their Airport Master Record, FAA Form 5010-1 (available on August 1, 2012).
This grouping gets much closer to the goal of accounting for the most complex, busiest and highest passenger enplanements throughout the country. Using this grouping for applicability would include 177 certificated airports that account for 97.5% of total U.S. passenger enplanements, and all certificated airports having more than 100,000 total annual operations. The FAA believes this alternative achieves the goal of integrating safety management practices into the most complex, highest operation and passenger enplanement airports. Also, of those alternatives for which FAA has estimated benefits and costs, this alternative has the highest estimated net benefits. However, this alternative does not harmonize with ICAO standards because 91 international airports would not be required to implement an SMS, which could expose small international airports to the risk that international carriers refuse to operate there. Opting out would also require the FAA to file a difference with international standards. iv. Preferred Alternative
The FAA now proposes to require an SMS be developed, implemented, maintained, and adhered to at any certificated airport:
• Classified as a small, medium, or large hub airport;
• Identified as an international airport; or
• Identified as having more than 100,000 total annual operations.
This preferred alternative ensures that safety management practices will be integrated into the busiest airports and harmonizes with international standards. This alternative applies to 268 airports, encompassing 98% of total U.S. passenger enplanements. In addition, this alternative positively responds to the commenters' requests to limit applicability.
On the other hand, including the additional 91 small international airports that would not be captured by the preceding alternative reduces the estimated net benefits of the rule. This is largely due to the small number of reported accidents at these 91 airports. However, FAA's analysis does not consider the possibility that international airports without SMS risk losing international business due to a lack of compliance with ICAO standards. If this were to occur, airlines and other operators would incur costs to re-route to suboptimal locations. The magnitude of this potential effect is uncertain, as it would depend on the decisions of foreign actors to cease operations to domestic airports without a compliant SMS. FAA welcomes comments on this issue. v. Large, Medium, and Small Hub Airports; Certificated Airports With More Than 100,000 Total Annual Operations; and an Optional Certificate of Compliance Program for Airports With Less Than 100,000 Annual Operations
The FAA is also seeking comment on an alternative featuring an optional certificate of compliance program for airports that aren't required to implement an SMS, but is otherwise identical to the alternative discussed in part iii of this section. This option would allow airports with less than 100,000 annual operations to choose to implement a compliant SMS if they believe the benefits to them will outweigh the costs to them.
This alternative mitigates the concern that small international airports would suffer a decline in their international traffic due to a lack of compliance with ICAO's SMS standards, as airports could implement a compliant SMS if they so choose. Providing choice to these airports should also lead to higher net benefits than the preferred alternative, as those airports where the benefits of SMS do not exceed the costs can forego those costs.
As previously stated, this alternative could present business risks to those small airports choosing to not implement a compliant SMS. Civil aviation authorities could prohibit their international air carriers from serving non-compliant airports. Similarly, the FAA could receive unsatisfactory audit findings with additional potential unforeseen consequences for failure to conform to international standards. vi. Inactive Airports
Another Class IV certificate holder and an association requested the FAA not require certificate holders in an "inactive status," or with a Limited AOC, to have an SMS.
Placement in an "inactive" status simply defers the FAA's annual periodic inspections. That way, the agency can focus its efforts on certificate holders with active air carrier service. However, certificate holders in an inactive status must continue to meet all part 139 requirements. As of May 2013, of the fourteen airports in an inactive status, only two would fall under the proposed applicability standards. If a certificated airport was later placed in an "inactive" status, it would still be required to comply with the proposed SMS requirements if it met the applicability requirements of this proposal.
As for the commenters' request about Limited AOCs, the FAA no longer issues Limited AOCs. Therefore, this issue is moot. vii. Adherence to SMS
This SNPRM also proposes changes to § 139.401(a) to specify that the certificate holder must adhere to an airport SMS. While the FAA received no comments regarding this issue, the FAA believes that adding "adhere to" emphasizes the point that an SMS is an ongoing obligation and should not be shelved after implementation. Further, it adds distinction between the phases of SMS from development to implementation to maintenance to adherence. viii. Scalability
The majority of commenters, including certificate holders and associations, commented both directly and indirectly on the need for scalability and flexibility when developing and implementing an SMS.
To address those comments and harmonize with other FAA rules, the FAA proposes a new § 139.401(c) permitting scalability of an SMS based on the size, nature, and complexity of the operations, activities, hazards and risks associated with the certificate holder's operations.
C. Implementation Deadlines and Phasing
C. Implementation Deadlines and Phasing
The NPRM included a two-pronged approach to implementation based on the certificate holder's AOC class. Certificate holders with a Class I AOC would have developed an implementation plan and SMS manual and/or ACM update within 6 months and 18 months of the final rule's effective date. Under the NPRM, all other certificate holders would have 9 months and 24 months, respectively, to develop an implementation plan and SMS manual and/or ACM update. The NPRM did not propose any other implementation approach.
Twenty-six commenters, including five associations, twenty certificate holders, and one consultant offered comments about the FAA's proposed implementation deadlines and the lack of phasing. These commenters generally recommended a phased approach, citing pilot study findings, ICAO's recommended approach, the Airport Cooperative Research Program SMS Guidebook, and the FAA's internal SMS policies. A phased approach usually includes implementing SMS through a series of management steps, such as (1) planning and organization, (2) basic safety management, (3) fully functional SMS, and (4) continuous improvement.
In addition to a phased approach, fourteen commenters, including three associations and eleven certificate holders, believed the deadlines for submitting the implementation plan and implementing SMS were not adequate. Four certificate holders and one association believed the proposed deadlines were aggressive. Two other certificate holders commented that the implementation plan deadline is not adequate based on the complexity and lack of familiarity with SMS concepts. Two certificate holders stated that it would be difficult, if not impossible, to procure consultant assistance within the proposed timeframes associated with the implementation plan.
Two certificate holders stated that if the FAA includes the non-movement area in the final rule, the implementation deadlines should be extended and phased. Furthermore, an association and several certificate holders believed the FAA should require implementation of SMS in the movement area, or those areas already covered under part 139, before requiring SMS in the non-movement area. Doing so would allow certificate holders time to renegotiate lease agreements where necessary, update airport rules and regulations or minimum standards, and use lessons learned for applying SMS to the non-movement area.
One commenter contended that large airports needed as much time as smaller airports to implement SMS, and that two different implementation schedules based on AOC class was not justified. Similarly, an association did not believe the FAA explained why Class I airports need less time to implement SMS than small certificated airports that may have a less complex system to analyze and less cumbersome requirements to adopt.
Nine certificate holders, one association, and one consultant provided implementation schedules which can be summarized into the following three general recommendations:
(1) Longer deadlines after the effective date of the rule for developing implementation plans (ranging from 9 to 18 months for Class I certificate holders, and 12 to 18 months for all other certificate holders), and SMS manuals and/or ACM updates (ranging from 24 to 60 months for Class I certificate holders and 36 months for all other certificate holders);
(2) Phased implementation over the course of 63 months for all certificated airports; and
(3) Airport-centric implementation, which would allow each certificate holder to propose its own phased approach to implementation within reasonable timeframes.
One certificate holder requested the FAA clarify whether SMS programs implemented before the final rule would be automatically recognized as complying with the final requirements.
To facilitate maximum flexibility and scalability, the FAA does not propose to mandate a one-size-fits-all implementation approach. A certificate holder can phase implementation, either by SMS component or by movement versus non-movement area.
The FAA agrees that additional time is needed to facilitate the effective development and implementation of SMS. This proposal would require submission of the implementation plan within 12 months of the effective date of a final rule and submission of the SMS manual and/or ACM update within 24 months of the effective date of a final rule. The FAA believes that 12 months to develop an implementation plan and 24 months to develop and submit the SMS manual and/or ACM update is an acceptable length of time based on lessons learned from the pilot studies. In developing these documents, certificate holders will benefit from the experience of the pilot study airports. Similarly, the FAA plans to incorporate those experiences into advisory circular guidance, including templates for development of an implementation plan.
The FAA encourages voluntary implementation of SMS prior to the establishment of the requirements in a potential final rule. In creating these programs, the FAA encourages each certificate holder to establish flexible programs and processes that would allow it to make changes if its program differs from the requirements in a final rule. Additionally, the proposed implementation deadlines would apply to each certificate holder regardless of whether it has a pre-existing program or not. Therefore, a certificate holder with a voluntary SMS program would have the same 24 months to come into compliance with any differences between its program and the requirements of a final rule. The certificate holder would provide the FAA with an implementation plan identifying the gaps between its existing program and the final requirements and timelines for implementing processes or changes to close those gaps within the 24 months.
The FAA anticipates that a certificate holder's SMS will continually evolve over time based on lessons learned and best practices. Therefore, the certificate holder may find it necessary to amend its implementation plan or SMS manual over time.
D. Implementation Plan Approval and Inspector Authority
D. Implementation Plan Approval and Inspector Authority
The NPRM proposed to require a certificate holder to submit an implementation plan describing how it would meet the SMS requirements and a schedule for implementing SMS components and elements. The proposal called for the FAA to accept the certificate holder's implementation plan.
One association requested inclusion of regulatory provisions for FAA review and feedback on the implementation plan, SMS manual, and ACM update. Also, related to implementation plan review, one certificate holder questioned the role of the FAA inspector in verifying completion of the implementation plan and whether the inspector would have authority to amend or alter the implementation plan after its approval.
The intent of an implementation plan is for the certificate holder to identify its plan for implementing SMS within the applicable areas and map its schedule for implementing the SMS requirements. While the FAA originally proposed accepting the implementation plan, the FAA now proposes to approve submitted implementation plans. This approval is consistent with the FAA's part 121 SMS rule and would provide certificate holders with feedback earlier in the development of SMS programs.
While the FAA originally planned to include examples of implementation plan content in advisory circular guidance, the FAA has chosen to enhance the rule text regarding the implementation plan submission, incorporating minimum details the FAA expects when a certificate holder submits an implementation plan. These details correspond to the key requirements of SMS that a certificate holder should be considering early in the implementation process. Developing a plan for these details would allow a certificate holder to adequately plan for requirements that may present time constraints and allow the certificate holder to meet implementation deadlines.
The FAA does not agree that timelines for feedback should be incorporated into regulatory language. Based on the preferred alternative and new proposed approach for approving implementation plans, the FAA would need to review and approve approximately 268 implementation plans. The Regional Airports Division Offices have experience with reviewing and approving large-scale changes to certificate holder documents, including the ACM, from past rulemaking actions. The FAA would handle these approvals in a timely manner in each Regional Airports Division Office.
The FAA would review implementation plans using a "first-in-first-out" approach. However, the FAA recognizes that some certificate holders may choose to wait until the deadline to submit implementation plans for approval. If the majority of implementation plans were submitted near the deadline, the FAA may then switch to a more risk-based approach for approval, reviewing submissions from certificate holders with the largest number of passenger enplanements or annual operations first. To ensure consistency in these approvals, the FAA intends to provide guidance in its Advisory Circulars and training to Regional Airports Division Offices on the review of the implementation plans.
The FAA would review an implementation plan to verify that the certificate holder identified its timeline for complying with each requirement and defined its methods for compliance. A certificated airport could proceed with development and implementation of its SMS while its implementation plan is under FAA review.
During the periodic inspection, inspectors would verify that the certificate holder continues to comply with the unique deadlines approved by the FAA. As more thoroughly discussed in later sections, an inspector would develop the inspection checklist based on the unique characteristics of the certificate holder's SMS, operations, and past compliance.
The NPRM also proposed that the FAA would approve the certificate holder's SMS manual if it chose to develop a manual separate from the ACM. Similar to the SNPRM's proposal to approve instead of accept the implementation plan, the FAA proposes to accept the SMS manual instead of approve it. Airports that participated in the SMS pilot studies found it necessary to update SMS manuals numerous times as they developed best practices through implementation. Therefore, by the FAA accepting the SMS manual, certificate holders would have greater flexibility adapting to lessons learned without resubmitting the SMS manual for approval. The SNPRM proposes that for a certificate holder choosing to maintain an SMS manual, the certificate holder would be required to submit any changes made to the SMS manual annually, consistent with its inspection schedule. This new proposed requirement would ensure that the FAA's copy of the SMS manual is current and available for the inspector to review before the certificate holder's annual inspection.
The FAA would continue to approve the ACM and its updates. For a certificate holder using an SMS manual, the certificate holder would cross-reference the SMS requirements in its FAA-approved ACM. Any changes to references in the ACM would require submittal to the FAA for approval. However, if the SMS manual changes do not affect the ACM cross-references, there would be no need to resubmit the ACM pages for FAA-approval. If the certificate holder chooses to document the SMS within the ACM instead of a separate SMS manual, it would not have the flexibility afforded by the SMS manual. Changes would need to be submitted to the FAA for approval. Once the FAA accepts the certificate holder's SMS manual and/or approves ACM updates detailing the certificate holder's SMS, that document would be the primary means of complying with the SMS requirements under the proposed rule, not the implementation plan. The implementation plan serves as a tool to help the certificate holder develop and implement the various components and elements of SMS within the prescribed and/or approved deadlines. Once SMS is completely implemented, the implementation plan becomes obsolete. The FAA would not use the implementation plan as a compliance yardstick.
Certificate holders would have the opportunity to submit amendments to implementation plans, with review and approval being the responsibility of the Regional Airports Division Offices.
E. Non-Movement Area
The FAA received numerous comments regarding the non-movement area which can be generally categorized as follows: Definition, applicability, and control.
E. Non-Movement Area
Based on findings from the pilot studies, the FAA proposed extending SMS requirements to the non-movement area of the airport. Since the term non-movement area was not previously defined in part 139, the NPRM included a proposed definition that defined the non-movement area as the area, other than that described as the movement area, used for the loading, unloading, parking, and movement of aircraft on the airside of the airport (including without limitation ramps, apron areas, and on-airport fuel farms).
Five certificate holders questioned the FAA's proposed definition. One certificate holder stated that the proposed definition did not align with existing definitions and could lead to confusion. The certificate holder recommended the FAA align the definition with the current definition for air operations areas. Two certificate holders requested the FAA clarify in the final rule that the non-movement area does not include or apply to landside operations.
Two certificate holders sought clarification on the areas identified in the definition and identified inconsistencies within the NPRM. Two other certificate holders requested the FAA exclude certain areas from the definition, including military and general aviation leaseholds and fuel farms. One of those certificate holders stated that joint-use airports already have safety systems in place to address safety issues and operational concerns, and lease provisions prohibit a certificate holder from imposing SMS within the military leasehold. Two certificate holders stated that fuel farms should not be included in a final rule because they are typically a contracted service and are already subject to regulation by DOT and local authorities.
The FAA has concluded the proposed definition is consistent with existing guidance on distinguishing airport areas based on whether aircraft are subject to air traffic control. The FAA also determined the air operations area definition identified in 14 CFR 153.3 should not replace the proposed non-movement area definition since this term is associated with security-related issues, rather than operational safety issues.
The FAA previously responded to issues regarding applicability to joint-use and general aviation areas, ramps, and bag-makeup areas in its Responses to Clarifying Questions. As many of these same issues were repeated in comments to the NPRM, a summary of those responses and their applicability to the SNPRM follows:
• The proposed rule does not apply to military facilities at joint-use airports, but the certificate holder could invite the military to participate in SMS activities.
• The proposed rule does not require airport tenants to have a separate SMS; it would be applicable to certificate holders of a part 139 AOC only.
• The definition applies to the entire non-movement area regardless of lease arrangements. The proposed rule includes broad requirements intended to increase flexibility to implement an SMS for a certificate holder's unique operating environment.
• A certificate holder's SMS would apply to any safety issues including employee safety, ground safety, vehicle safety, and passenger safety to the extent that they are related to aircraft operations.
• The definition for non-movement area does not include the interior of hangars.
Regarding general aviation areas of the airport, the proposed rule's requirements would give flexibility to each certificate holder to scale the implementation to its unique operating environment. A certificate holder would need to ensure that individuals authorized to access the movement and non-movement areas are aware of, and have the opportunity to report hazards to, the certificate holder's hazard reporting system. Many certificate holders may find it necessary to update airport rules and regulations, revise clauses in lease agreements, and renegotiate lease agreements where appropriate to have airport tenants participate in the airport's SMS. Therefore, while not directly applicable to fixed-base operators (FBOs), a certificate holder may need to work with tenants such as FBOs to ensure the tenants' employees authorized to access these areas are aware of the airport's hazard reporting system.
Similarly, if bag make-up areas are located outside the landside facilities in proximity to air carrier operations, the certificate holder would need to assure implementation of relevant portions of this proposed requirement, like awareness of the hazard reporting system, for individuals working in the external bag make-up area.
As for on-airport fuel farms, § 139.321(b)-(g) currently prescribe requirements applicable to fuel farms for things like inspections and training. Therefore, it would be a natural progression to implement relevant portions of SMS within the fuel farm environment.
Over 25 commenters, including certificate holders and industry associations, disagreed with or questioned applying SMS to the non-movement area. The certificate holders stated that applicability to these areas would be costly and require time to revise standard leases, rules, regulations, and minimum standards. Further, complex geometry, lease agreements, and operational agreements make managing the non-movement area airport-centric. Commenters contended the FAA does not have the time or experience to become familiar with each airport's non-movement areas to judge compliance. One industry association believed that inclusion of the non-movement area without regard to airport-specific considerations undermines the goals of scalability and flexibility. Another industry association and certificate holder believed that more study and guidance is needed before the FAA applies SMS to the non-movement area. These commenters further questioned applicability when a tenant or leaseholder is required to implement SMS under other FAA regulations.
The FAA disagrees with the commenters' issues regarding the applicability of SMS requirements to the non-movement area. The pilot studies found, based on reports from numerous participating airports, that it was difficult to apply SMS concepts to only the movement area because aircraft and airside personnel routinely flow between movement and non-movement areas.
The FAA also identified a large number of safety accidents and incidents occurring in the non-movement area. Analysis of these accidents and incidents indicates that safety in the non-movement area is a significant concern. The proactive approach to hazard identification and analysis of accidents, incidents, or other reported or collected data at each individual airport through an SMS would likely reduce these incidents. The FAA believes there are significant benefits of applying safety management principles to areas not previously regulated under part 139.
While commenters expressed concerns regarding the complexity of operations within the non-movement areas and the FAA's "inexperience" in these areas, the FAA does not propose specific technical requirements in the non-movement area. Instead, the FAA plans to learn from certificate holders as they implement and maintain SMS. Over time, the FAA expects certificate holders and inspectors to share lessons learned or best practices that will then be reported nationally. Similarly, the FAA expects certificate holders to consult with the FAA if they find trends or issues that require a systematic fix.
The FAA is committed to an interoperable approach to SMS and plans to take numerous steps to avoid duplication and enhance cooperation and reporting between the SMS efforts. In addition to providing advisory circular guidance, the FAA has included similar language regarding interoperability and duplication of hazard reporting in the Safety Management Systems for Domestic, Flag, and Supplemental Operations Certificate Holders (Part 121 SMS) final rule [80 FR 1308 (January 8, 2015) \13\].
\13\ Correction made to applicability date, see 80 FR 1584 (January 13, 2015).
The FAA disagrees with the commenters' request for stronger language regarding landside operations. The statutory authority supporting part 139 limits the agency's purview to issuing certificates and minimum safety standards for airports receiving certain passenger carrying operations. The agency's past and current standards apply minimum safety standards for those areas on an airport where passenger-carrying operations are conducted. Accidents or incidents within the terminal environment have minimal impact on the safety of passenger-carrying operations. Moreover, local and state safety codes and regulations would typically cover issues found within the landside environment.
Several commenters, including three associations and nine certificate holders, argued that certificate holders lack sufficient authority and control to impose SMS requirements on airport tenants operating in the non-movement area. These commenters further noted difficulty due to the variety of lease agreements, clauses, and terms. One certificate holder contended that most airports, including itself, do not have personnel or expertise to oversee safety in the non-movement area. Another certificate holder recommended the final rule recognize the uniqueness of the non-movement area and provide latitude based on the activities that occur within the non-movement area, the level of control that the certificate holder has over those activities, and the extent to which access is within the tenant's control. Alternatively, one certificate holder requested the FAA apply or impose the proposed SMS requirements on tenants or exclusive leaseholds and allow the certificate holders to delegate the proposed requirements for shared leaseholds.
One association opined that, in the past, certificate holders have retained some oversight over tenant operations in the non-movement area, but that the NPRM pushed certificate holders to assume a primary role for safety. If that is the expectation, the association strongly disagreed with FAA's vision for SMS in the non-movement area.
Finally, a certificate holder with multiple part 139 airports contended that it would need to renegotiate over 1,500 lease agreements, and that even with renegotiations, it still would not possess the authority needed to fully implement SMS in the non-movement area.
The FAA disagrees with the comments that certificate holders lack control in the non-movement area of their airports. The FAA also disagrees with the request to directly apply these proposed airport SMS requirements on airport tenants. Part 139 applies only to certificated airports. While there may be instances where the certificate holders are not the same entity as the airport owner, airport owners who accept federal financial assistance (the vast majority of part 139 airports) must maintain sufficient rights and powers to operate the airport in accordance with grant assurances, which includes both movement and non-movement areas.
F. Accountable Executive
F. Accountable Executive
The NPRM proposed a requirement for the certificate holder to identify the accountable executive for the airport. Consistent with ICAO's definition of accountable executive, the FAA's proposed definition for accountable executive in the NPRM stated that an accountable executive means a single, identifiable person who, irrespective of other functions, has ultimate responsibility and accountability, on behalf of the certificate holder, for the implementation and maintenance of the certificate holder's SMS. The accountable executive would also have to have full control of the human and financial resources required to implement and maintain the certificate holder's SMS. The accountable executive would also have final authority over operations conducted under the certificate holder's AOC and have final responsibility for all safety issues.
The FAA acknowledged in the NPRM that it may be difficult for publicly-owned and operated airports in the U.S. to identify an accountable executive based on this definition and invited comments.
Twelve commenters, including two associations, nine certificate holders, and one consultant, believed the proposed definition is impractical and needs revision. One association summarized the variety of comments certificate holders had, stating that the definition needs to reflect the realities of U.S. airports where an airport director has managerial responsibilities but does not have final authority over airport operations. The commenter noted that these airports usually have a governing body, such as a Board of Commissioners or City Council, which has ultimate responsibility for operational and financial decisions. Therefore, the highest approving authority may not be one individual, as required by the proposed definition. Further, this association requested any final rule definition reflect that, at the majority of U.S. airports, no single manager has unilateral authority to direct actions by tenants and other non-airport employees.
Other alternative definitions proposed by the commenters included:
• Mirroring the part 121 SMS definition;
• Allowing certificate holders to designate an accountable organization structure instead of one executive;
• Redefining the position to account for airport managers who do not have complete financial control; and
• Allowing for designation of an SMS or Safety Manager because the airport manager may not have the time or ability to fulfill the obligations of the accountable executive position.
One certificate holder requested any final rule include a provision that the FAA does not intend to hold individuals, including the accountable executive, personally liable for safety infractions or violations of the SMS.
The proposed definition eliminates differences between the part 121 and part 139 definitions. The concept of an accountable executive conforms to industry and international safety standards for SMS. The accountable executive's role is to instill safety as a core organizational value and to ensure that SMS is properly implemented and maintained through the allocation of resources and tasks. By designating an accountable executive, responsibility for the certificate holder's overall safety performance is placed at a high level within the organization. The individual should have the authority to ensure that the SMS is implemented and effective. Traditionally, safety programs were housed within one division of the certificate holder's organization. Under a systems approach, the concepts of SMS need to permeate throughout the certificate holder's organization to ensure that all offices, employees, and tenants with responsibilities in the movement and non-movement areas understand their role in SMS.
However, the FAA appreciates the diversity of certificate holder organizations and agrees that the ICAO definition of accountable executive could present compliance and operational challenges for many publicly-owned and operated airports within the U.S. Therefore, the FAA proposes the revised definition in § 139.5 of this proposed rule.
In practice, the FAA anticipates that most certificate holders would designate an airport manager or airport director as the accountable executive. Accountability cannot be delegated; therefore, a lower-level manager or supervisor could not serve as the accountable executive.
The FAA does not intend to require the designation of additional positions to implement the daily operation of the SMS. Such designations should be left to the discretion of the certificate holder based on its unique operating environment and management structure. A certificate holder would have this flexibility in establishing its safety organizational structure as identified in proposed § 139.402(a). The safety organizational structure would identify the positions and offices within the certificate holder's organization that have responsibility for or play a role in the safety of airport operations. This includes the "chain of command" and the means by which airport employees report safety concerns, hazards, and other safety-related information.
G. Data Protection
G. Data Protection
The NPRM included numerous proposed requirements for certificate holders to develop and maintain documentation for hazard reporting, identification, and assessment. While the FAA did not propose a requirement for certificate holders to provide those documents to the agency, the certificate holder would maintain the documents for historical and trend analysis as part of its continuous improvement efforts.
Seventeen commenters, including certificate holders and associations, addressed issues of data protection posed by the proposed rule. Only one association, which represents trial attorneys, agreed with FAA's approach to hazard reporting. This association cautioned the FAA from making any changes, claiming that restrictions on the disclosure of safety data flies in the face of safety and only serves to protect and immunize business entities from responsibility in the event of negligence or wrong doing.
All other commenters believed that, without explicit data protections, persons not employed by the certificate holder would be reluctant to voluntarily share information or report hazards for fear of litigation or public perception if the data is released through state or local sunshine laws. Many commenters believed that, without protecting SMS-related data, certificate holders would not be able to establish effective confidential reporting systems. Commenters made numerous recommendations including:
• Make SMS data confidential.
• Protect data in a similar manner that air carriers are able to protect safety data, such as a data collected under the Flight Operational Quality Assurance Program (FOQA) or the Aviation Safety Action Program (ASAP).
• Protect SMS data using Security Sensitive Information (SSI) provisions.
• Allow redaction of data.
• Establish a national database to accept voluntary safety information from certificate holders and other stakeholders using protections under 49 U.S.C. § 40123 and 14 CFR part 193.
• Make SMS data exempt from disclosure under the Freedom of Information Act (FOIA) pursuant to 49 U.S.C. § 40123 and part 193.
One certificate holder disagreed with the FAA's claim that certificate holders are in the best position to work with state and local legislators to provide additional protection from data disclosure. That certificate holder believed it is an unreasonable burden on airports to seek legislative exceptions to public records laws and will result in a patchwork of legal protection throughout the U.S.
Another certificate holder sought clarification on how the FAA will evaluate the certificate holder's program if there is no requirement to submit data to the FAA and, if the FAA does take or copy the certificate holder's documents, how they will be protected from FOIA.
Section 44735 of title 49 of the United States Code specifically contemplates the protection of SMS data that is voluntarily submitted, such as reports, data, or other information produced or collected for purposes of developing and implementing an SMS, from FOIA disclosure by the FAA. It is important to note, however, such protection could not be afforded to SMS information that is required to be submitted to the FAA, or is kept to satisfy compliance with other regulatory requirements. For these reasons, the FAA is not proposing data reporting requirements for safety-related data created under an SMS (such as hazard reports, safety risk management documentation, or safety assurance documentation). As such, consistent with the authority in section 44735, there should be no implications under FOIA for that safety-related data. The FAA, through its inspectors, could review a certificate holder's documentation to ensure compliance with part 139, but the FAA generally would not take possession of those documents unless the inspector was investigating an issue of non-compliance.
To further clarify the extent of protection that may be afforded under section 44735, the FAA notes that any record or other documentation that is required to show compliance with other regulatory requirements would not be protected. Any information protected under the statute is only protected from release by the FAA. If the information is submitted or released by the certificate holder to another government entity, the protections of the statute are not binding on these other entities. Nor are these documents necessarily protected from discovery in civil litigation, although the certificate holder would be free to ask the court for whatever protections would be appropriate under the rules of the relevant jurisdiction.
The FAA acknowledges that most certificate holders are owned by a state, a subdivision of the state, or a local governmental body. These certificate holders are best situated to understand and comply with their applicable State laws. The FAA is uncertain whether any FOIA exceptions would preclude disclosure requirements under applicable state law. Any redaction of SMS data potentially required to be disclosed would be subject to applicable state law requirements and not established by the FAA.
The FAA also notes that data protection under SSI provisions is inapplicable and may be impermissible because those procedures are for information obtained or developed in the conduct of security activities as described in 49 CFR part 1520.
The FAA cannot speculate on how a third party would report to or share information with a certificate holder's SMS. This proposed rule does not require third parties to turn over SMS data to a certificate holder. However, the proposal would require a certificate holder to establish a confidential hazard reporting system and encourage hazard reporting by all persons accessing the movement and non-movement area. The FAA believes an SMS program could be structured in such a manner to realize safety benefits while limiting the public release of confidential third-party information. Use of third-party servers and de-identification of reporter information prior to receipt by the certificate holder could be solutions that would limit release, subject to applicable state law.
The FAA believes that individual certificate holders are best situated to review and resolve hazard reports related to their unique operating environment. As discussed in the FAA's Responses to Clarifying Questions, the FAA would use existing regulatory oversight processes to ensure that systemic or national compliance issues are reported when appropriate. FAA Order 5280.5C, Airport Certification Program Handbook, requires coordination with and oversight by the Airport Safety and Operations Division for airport certification inspection activities. In accordance with that order, inspection findings are recorded in national databases by inspectors and reviewed by the Airport Safety and Operations Division. Furthermore, enforcement activities by Regional Airports Division Offices are required to be coordinated with the Airport Safety and Operations Division.
The FAA is exploring methods to create a national reporting database for voluntary reporting of SMS data. The agency requests comments from industry on the types of data or other information certificated airports could provide under a national reporting database. This data could be used for system-wide analysis, the development or amendment of standards, and risk-based approach to targeted inspections.
H. Liability
H. Liability
An SMS is a formalized approach to managing safety and includes the establishment of many proactive processes and analyses, and the creation of documentation that can be used for decision-making and trend analysis. The NPRM did not expressly discuss potential liability under this new proactive approach.
Fourteen commenters, including ten certificate holders, two associations and one anonymous commenter, raised issues related to liability, noting that SMS-related processes and documentation will expose certificate holders to additional liability. Eight of those commenters went further to claim that there would be increased liability for airport management, especially for the accountable executive, under the proposed requirements. For example, one certificate holder contended compliance with the proposed SMS requirements could alter the airport's liability under the standard of care laws, which vary from state to state. That certificate holder also feared that decisions, safety risk matrices, and other processes and documentation could become evidence in litigation or the subject of litigation.
Other commenters, including three certificate holders and an association, questioned how a certificate holder's SRM processes could be used against the airport if there is an incident on the airport and it is found that the certificate holder did not act consistent with its own safety risk assessment under its SMS. Furthermore, one association believed there would be increased liability for the certificate holder and the accountable executive if the standards are not high enough or if the standards are not met.
Another association stated that acceptable level of "risk" as is established for SRM safety risk assessments, runs counter to U.S. tort principles and practice. The association further stated that, by identifying a hazard, an airport operator then has a duty to address that hazard promptly through mitigation measures. Furthermore, the commenter noted that although some airports that are owned by a state or municipal entity may be fully or partially protected from negligence claims through sovereign immunity, many, if not most, airports are subject to suit for negligence under applicable state law. Thus, once an airport is aware of a hazard, it is at risk for a negligence claim if injury or damage occurs as a result of that hazard.
Several commenters, including three certificate holders, an air carrier, and an association asserted that certificate holders lack sufficient control in the non-movement area, and that an SMS could result in a certificate holder being held legally responsible for personal injury or property damage resulting from hazards identified through the airport's SMS in areas not under its control. One association argued that airport leases or license agreements transfer a certain degree of control from the airport/landlord to the tenant/ licensee. While an airport may retain a certain degree of control, the tenant typically has a certain degree of autonomy to run its operations within the leased area as it sees fit, subject to legal requirements. There may be times where a certificate holder identifies hazards in the leased area that are not a violation of any enforceable obligation of the tenant. In these cases, the airport will have limited recourse.
Commenters made a number of recommendations including:
• Commit to join industry groups in seeking modifications to federal law;
• Prohibit, by regulation, the testimony of FAA employees in litigation against certificate holders where standards of care is an issue; and
• Provide explicit protection of the certificate holder.
The FAA cannot speculate on potential litigation resulting from a potential accident at some point in the future, which would be fact-specific and subject to applicable law that varies throughout the U.S. However, the FAA does not intend for this proposed rule to create or modify state tort liability law or create a private right of action under federal or state law. The FAA does not agree with the assertion that SMS increases liability for an airport operator or its accountable executive. The availability of additional data and analysis for decision-making should support a certificate holder in potential litigation. Failure to take action on identified safety hazards, regardless of formal analysis under SMS, generally may increase litigation risk. Nevertheless, the FAA intends for SMS to assist certificate holders in uncovering and mitigating unsafe conditions or actions, thus decreasing a certificate holder's litigation risk. A certificate holder could effectively use SMS to reduce liability by promptly investigating identified hazards and risks, conducting a thorough analysis of hazards, and keeping accurate records.
Furthermore, the new proposed definition for accountable executive would clarify that the accountable executive would not be personally liable to the FAA, through either certificate action or civil penalty. Additionally, the FAA does not intend for the accountable executive to have personal liability to any third party; however, issues concerning such liability are controlled by state law, not the SMS regulations.
Finally, the FAA notes that the extent to which SMS data may be discoverable in litigation is subject to the state or federal law governing the litigation. The FAA believes the certificate holder is in the best position to understand and comply with its state's laws.
I. Training
I. Training
In the NPRM, the FAA proposed requiring certificate holders to provide formal training to all employees and tenants with access to the movement and non-movement areas appropriately tailored to the individual's role in the airport's SMS. The FAA invited comment concerning the practical and economic implications of the proposal, or applying the requirement to all individuals with access to those areas.
Ten commenters, including four certificate holders, three associations, one air carrier, one individual and one consultant, identified inconsistencies and various interpretations of the proposal. These commenters noted that terms like employee, tenant, and personnel were used ambiguously throughout the proposal. Three commenters requested the FAA coordinate the terms and definitions in the two rulemaking proposals for part 139.\14\ An association and certificate holder requested that the FAA define these terms.
\14\ During the NPRM comment period, the FAA published the "Safety Enhancements, Certification of Airports" NPRM proposing updates to part 139. After reviewing comments, the FAA issued a final rule (78 FR 3311, January 16, 2013).
Two certificate holders offered the following alternate interpretations of the proposal:
(1) The certificate holder is required to train only its employees;
(2) The certificate holder is required to train those personnel who are employed at the airport (regardless of the identity of the employer); or
(3) The certificate holder is required to train all individuals with access to the movement and non-movement areas of the airfield.
One certificate holder questioned whether the requirement applies to all individuals with access to the movement and non-movement areas or only those that have authority to drive in those areas. The certificate holder requested the FAA reconsider the timing of the training requirement, citing a 2-year cycle instead of annual training as being more consistent with airport security badging processes.