VN 3900.1 04/30/04 ORDER

VN 3900.1 04/30/04 ORDER

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION VN 3900.1

04/30/04

SUBJ: AVN OCCUPATIONAL SAFETY AND HEALTH PROGRAM

1. PURPOSE. This order establishes the policy framework and assigns responsibility for an effective A VN wide Occupational Safety and Health (OSH) program.

SUBJ: AVN OCCUPATIONAL SAFETY AND HEALTH PROGRAM

2. DISTRIBUTION. This order is distributed to A VN Branch level and above; Safety and Facility Services Management, AMP-1 00; and Environmental Branch, ACT -640.

3. DEFINITIONS: See Appendix 1.

4. POLICY STATEMENT. A VN's mission is to ensure standard development, evaluation, and certification of airspace systems, procedures, and equipment for customers worldwide. The A VN OSH program does not exist separate from this mission--it is tied directly to it, and enhances it. The primary instruments in completing the A VN mission are its employees. All workspace, aircraft, and equipment are merely tools to enable A VN employees to succeed. The goal of the OSH program is to ensure that A VN employees are provided these tools free from recognized hazards that cause or are likely to cause them death or serious physical harm. The program also protects these valuable tools to improve mission accomplishment. The safety management system described in this order is intended to meet or exceed all federal, state and agency OSH requirements and is based on the Occupational Health and Safety Assessment Series 18001 specification (OHSAS 18001 ). This order establishes a system safety approach relying on operational risk management to identify and manage risks within A VN.

5. RESPONSIBILITIES. Management will be fully committed to developing, implementing and improving the A VN OSH program to include identifying, requesting and providing the required resources. Management will establish accountability systems at all employee levels, throughout the organization, to ensure success. See Appendix 2 for accountability system guideline.

a. Manager, Safety and Quality Assurance Staff, AVN-6, is responsible for the overall A VN OSH program to include development, maintenance, and oversight and is the focal point for all OSH related issues within A VN. Additionally, A VN-6 will provide the necessary assistance and technical expertise in the development and operation of division level OSH programs. A VN-6 will monitor new occupational safety and health legislation and agency orders to assure that the development and implementation of controls are planned and executed. A VN-6 will establish an Occupational Safety and Health Program Manager to meet this requirement.

b. AVN Division Managers. AVN Division Managers will be responsible for developing, implementing and improving an effective OSH program within their division. One or more Division Occupational Safety and Health Representatives will be assigned in writing by Division Management. These representatives may be full time safety specialists or collateral duty safety personnel depending on the scope and nature of operations within the division. AVN Division OSH Representatives will have direct line reporting and accountability to the Division. The A VN Occupational Safety and Health Program Manager will participate in the indirect management of Division Occupational Safety and Health

Distribution A-W(VN)-3; A-Y(MP-100) I copy; A-Z(CX-42) I copy; A-W(EE-200/FZ-800) I copy; OPR: AVN-6 PASS (Local)/LIUNA (Local)/NAGE (Local)/AFGE (Local)/NATCA (Local) (I copy)-Z

VN 3900.1 04/30/04

Representatives with regard to the development and implementation of division safety program performance goals and objectives.

c. AVN Division OSH Representatives. AVN Division OSH Representatives will be responsible for leading and coordinating the development, implementation and improvement of the division occupational safety and health program. Division OSH representatives will be the points of contact for A VN -6, and other internal and external OSH contacts.

d. All A VN employees are responsible. All A VN employees are responsible to support the occupational safety and health program. They must comply with federal, state, and A VN safety program requirements and will be encouraged to notify supervisors and/or safety representatives of hazards they find in the work place.

6. PROGRAM GOALS AND OBJECTIVES: The overall goal of the A VN Occupational Safety and Health program is to prevent injury and illness to A VN personnel. This is achieved through the identification, evaluation and control of risk. Operational Risk Management (ORM) is a tool that enhances this process and assists with the prioritization of safety program efforts. See Appendix 3, ll 3.2 and D for ORM guidelines.

a. Fiscal Year. Each fiscal year, specific safety program objectives will be determined for each A VN division. These objectives may be determined collectively through the Division Safety Committee but must be supported with a documented risk assessment and approved by Division Management. See Appendices 4, 4.1 , 4.2, 4.3 and 4.4 for implementation guidance. Objectives must be submitted to the A VN Occupational Safety and Health Program Manager along with a request for resources. The A VN Occupational Safety and Health Program Manager will review all division safety program objectives. Divisions will be held accountable for demonstrating good faith effort to meet agreedto expectations.

b. Safety Program Objectives. Documented Division Safety Program objectives will include the following information.

(1) Identification of individuals delivering the program objectives.

(2) Identification of tasks, which need to be implemented in order to achieve objectives.

(3) Allocation of appropriate responsibility and authority for each task.

(4) Allocation of time lines to each individual task, in order to meet the overall time line of the related objective.

(5) Allocation of suitable resources (e.g. financial, human, equipment, logistics) to each task.

(6) Identification and delivery of training to affected employees related to objectives.

(7) Procedures for managing change (e.g. new or altered practices, processes, equipment or material).

04/30/04 VN 3900.1

7. SAFETY AND HEALTH ORGANIZATION. The A VN occupational safety and health program will be organized to optimize effective communication and delivery of resources. This will be established through the following means:

a. Organizational Structure: Appendix 6 illustrates the A VN OSH organizational structure. A VN-6 represents A VN as the Program Manager for Occupational Safety and Health. Division management designates division Occupational Safety and Health Representatives. Each branch establishes collateral duty safety functions as required to support development and implementation of safety procedures at the branch level. Branch management designates personnel with this responsibility.

b. Executive Occupational Safety and Health Committee. The A VN Executive Occupational Safety and Health Committee will be established. The A VN OSH Program Manager will serve as the Secretary who is responsible for initiating the development and implementation of the Executive Occupational Safety and Health Committee. The principal function of the director level committee is to consult and provide policy advice on and monitor the performance of, the A VN-wide safety and health program.

c. Division Occupational Safety and Health Committees. A VN Division Occupational Safety and Health Committees will be established. The Division OSH Representative will serve as the chairperson who is responsible for initiating the development and implementation ofthe safety committee. Division Occupational Safety and Health Committees will provide a method by which employees can utilize their knowledge of workplace operations to assist division management in the improvement of safety policies, conditions, and practices.

d. Facility Safety and Health Committees: Occupational Safety and Health Committees will be formed at the facility level where practicable, when the facility is detached from an A~ Division office. Facility Occupational Safety and Health Committees will provide a method by which local employees can utilize their knowledge of workplace operations to assist facility and division management in the improvement of safety policies, conditions, and practices.

e. Committee Development and Implementation. Committee development and implementation will be provided according to the following:

(1) Committee chairperson. The committee chairperson will be nominated from among the committee's members and will be elected by the committee members. Management and nonmanagement members should alternate in this position. Maximum service time as chairperson should be two consecutive years.

(2) Employee Representation. Committee will have equal representation of management and non-management employees, who will be members of record. Non-management members of division level committees will represent all employees ofthe division and will be determined according to the following rules:

(a) Collective bargaining arrangements. Where employees are represented under collective bargaining arrangements, members will be appointed from among those recommended by the exclusive bargaining representative.

VN 3900.1 04/30/04

(b) Employees not represented by bargaining arrangements. Where employees are not represented under collective bargaining arrangements, members will be determined through procedures devised by the A VN Executive Safety Committee that provide for effective representation of all employees.

(c) Others. Where some employees are covered under collective bargaining arrangements and others are not, members will be representative of both groups.

(3) Management Representation. Division Managers will appoint management representatives in writing. These individuals are designated as Division OSH Representatives.

(4) Terms. Committee members should serve overlapping terms. Such terms should be of at least two years duration, except when the committee is initially organized.

(5) Meetings. Committees will establish a regular schedule of meetings and special meetings will be held as necessary; division level committees will meet at least quarterly and the director level committee will meet at least annually.

(a) Notice of meetings. Adequate advance notice of committee meetings will be furnished to employees and each meeting will be conducted pursuant to a prepared agenda.

(b) Meeting minutes. Written minutes of each committee meeting will be maintained and distributed to each committee member, and upon request, will be made available to employees and to outside officials.

8. HAZARD IDENTIFICATION, EVALUATION & CONTROL: Occupational hazards will be identified, evaluated and controlled by implementing the following:

a. Design Review. Design reviews will be conducted of all proposed facility construction and maintenance projects to identify, evaluate and mitigate potential hazards associated with completed operations/processes and potential hazards to A VN personnel generated by these operations.

(1) Facilities. Local jurisdictional codes, best management practices, American National Standards Institute (ANSI), Occupational Safety and Health Administration (OSHA), and National Fire Protection Association (NFPA) standards will be applied to all new, altered or modified occupant facilities and workstations. Facility construction, alteration and/or renovation projects will not be initiated without design review and A VN concurrence of plans. Affected Division OSH Representatives and the A VN OSH Program Manager will be authorized to conduct said reviews and will document findings, change requests and concurrence status.

(a) Operational Risk Management. Operational Risk Management_will be utilized as the primary design review method. See Appendix 3, ll,3.2 and 3.3 for ORM guidelines.

(b) Design Review Implementation. The Design Review Checklist may be used to assure that applicable items are considered. See Appendix 5.

04/30/04 VN 3900.1

(c) Work instruction and training. Division OSH Representatives and Division Management will assure that any safety procedures developed as a result of a design review are incorporated into employee work instruction and training.

(2) Contractor Safety. To assure the safety of A VN employee exposed to construction, alteration and/or renovation projects, Division OSH Representatives will participate in preconstruction meetings and periodic contractor meetings.

(a) Safety Plans. The contracting officer's technical representative, facilities manager and A VN management representatives will gain agreement to a site-specific contractor safety plan prior to the initial performance and major phases of work. FAA Order 3900.57 and Form 3900-8 will be used to evaluate and document the project safety plan.

(b) Work Instruction and Training. Division OSH Representatives and Division Management will assure that any safety procedures developed as a result of a contract review are incorporated into employee work instruction and training.

b. Job Hazard Analysis. Job Hazard Analysis (JHA) will be completed on routine tasks and jobs as required. Due to the magnitude of tasks, the prioritization for completing JHAs will be based on

risk. JHAs will be completed by trained, competent OSH personnel and will involve the participation of affected employees, lead supervisors, and branch managers.

(1) JHA Worksheet. The JHA Worksheet or equivalent will be used to document the identification, evaluation and mitigation of occupational injury and illness exposures. Findings and conclusions will be reviewed and approved by A VN Division OSH Representatives and forwarded to Division Management as required for authorization to mitigate. See Appendix 7, JHA Worksheet.

(2) Work instruction and training. Division OSH Representatives and Division Management will assure that any safety procedures developed as a result ofjob hazard analyses are incorporated into employee work instruction and training.

(3) Implementation Guideline. The JHA Implementation Guideline may be used to aid in the completion ofjob hazard analyses. See Appendix 7.1.

c. Self-Inspection.

(1) Coordination. All inspection activity will be coordinated with employee bargaining units in accordance with contract requirements.

(2) Workplaces and Facilities. A VN workplaces and facilities will be categorized as a general workplace or increased risk workplace based upon an evaluation of the operations by the A VN OSH Program Manager. The A VN OSH Program Manager will maintain a list of increased risk workplaces. For each of the increased risk workplaces, a list of associated facilities will be identified; e.g., facility (MMAC), workplace (Battery Room), location or room number (H-9 Lean-to). The list will be updated at least annually with the revision date documented. However, workplaces will be added to the increased risk list as soon as it is indicated that conditions change and the risk increased; i.e., accident reports, medical monitoring results, construction projects, etc.

VN 3900.1 04/30/04

(3) Frequency. Increased risk workplaces will be inspected at least twice a year by an OSH Professional.=. All others will be inspected annually.

(4) Documentation. Documentation will be prepared by the inspector for each workplace inspection and made available upon request by region/center, headquarters, or authorized employee representatives. Documentation will include the date of the inspection, identification of facility, location of finding, description of finding, regulatory citation, risk assessment code and recommended corrective action. The A VN OSH Program Manager is responsible for maintaining a master copy of all inspection reports and abatement plans.

(5) Risk Assessment. Risk values (risk assessment codes) will be assigned to each finding and will be determined in accordance with Appendix 8, Risk Assessment Code Matrix!. Where available, quantitative risk assessment methods will be preferred, otherwise qualitative assessment methods may be used.

(6) Posting. Form 3900-1 , Occupational Safety & Health Inspection Report, will be prepared, issued, and posted when a finding generates a risk value of one to ten (1-1 0). Division OSH Representatives will post the form as soon as possible, but no later than 15 days ofthe finding. The posting will be placed at or near each place an unsafe or unhealthful working condition referred to in the notice exists or existed. In addition, a notice will be posted if any special procedures are in effect. Where, because of the nature of the workplace operations, it is not practicable to post the notice at or near each such place, such notice will be posted, unedited, except for reason of national security, in a prominent place where it will be readily observable by all affected employees. A copy of the notice will be sent to employee representatives and to the A VN OSH Program Manager.

(7) Findings. The A VN OSH Program Manager and Division Management must be contacted immediately when imminently dangerous conditions are found or when a finding is equivalent to a 1-5 risk value. Otherwise, the A VN OSH Program Manager must receive safety inspection reports within 14 days of the completed inspection.

(8) Abatement. With the support of the A VN OSH Program Manager, Division OSH Representatives will gain agreement with Division Management to each abatement plan. Each finding must be supported by an abatement plan to assure that safety violations are corrected and hazards are mitigated. Appendix 9, Abatement Implementation Guideline, will be utilized to determine abatement plan completion schedules. A copy of each abatement plan will be sent to affected employee representatives.

(a) Root Cause Analysis. Division OSH Representatives and Division Management will apply root cause analysis to determine corrective action that may be required to prevent a recurrence of a finding.

(b) Work Instruction. Division OSH Representatives and Division Management will assure that any safety procedures developed as a result of an inspection and root cause analysis are incorporated into employee work instruction and training. See Appendix 10, Root Cause Analysis Implementation Guideline.

(9) Verification. Division OSH Representatives will conduct follow-up inspections on all abatement plans and report any failure to complete corrective actions to the A VN OSH Program Manager and employee representatives.

04/30/04 VN 3900.1

d. Inspections by other organizations. ·All safety inspections conducted by organizations outside of A VN (i.e., OSHA, Regions, Centers) will be coordinated through the A VN OSH Program Manager and Division OSH Representatives. A VN Safety Representatives will be responsible for ensuring that all applicable aspects of paragraph 8.c. of this order are completed.

e. Employee Reports of Unsafe Conditions. Employees are considered the best source of hazard information. All A VN employees are responsible and encouraged to recognize and report and/or correct hazardous working conditions without fear of reprisal.

(1) Communication. Employees may report hazardous conditions verbally or in writing. Employees may communicate their concern to their team lead, supervisor or manager, but in all cases the Division OSH Representative must be notified as soon as possible for imminently dangerous conditions. The employee's report must include the nature and location of the hazard and the time and date it was discovered. Employees will be encouraged to recommend corrective action.

(2) Notification. The employee or employee's representative may use the FAA Hazard Report or equivalent to document the notification.

(3) Risk Assessment. Management will use Appendix 11 , Management Follow-Up Report of Unsafe Condition,. or equivalent to document the receipt, investigation and corrective action of the employee's report. A preliminary risk assessment_will be completed. Conditions producing a risk value of 1..:5 (imminent danger) will be investigated and corrected immediately. Conditions generating a risk value of 6-10 will be investigated and corrected as required within three working days. Conditions generating a risk value of 11-20 will be investigated and corrected as required within 20 working days. Management will forward a copy of the completed Management Follow-Up Report ofUnsafe Condition to affected employees within 15 calendar days.

(4) Documentation. Division OSH Representatives will maintain a Log of Employee Reports. The log will include a file or reference number, date/time report was received, location of reported unsafe condition, a description of the reported unsafe condition, a risk assessment value and the date and description of corrective action. The log will be forwarded to the A VN OSH Program Manager every year on December 31. Division OSH Representatives will forward copies of all completed employee and management reports to the A VN OSH Program Manager.

(5) Reporting. The A VN OSH Program Manager will assist division management as required in the investigation, evaluation and correction of hazardous conditions. The A VN OSH Program Manager will submit a consolidated report containing all logged entries to AFZ-800 and AEE -200 by January 15 of each year.

(6) Work Instruction and Training: Division OSH Representatives and Division Management will assure that any safety procedures developed as a result of the investigation and corrective action of employee reports are incorporated into employee work instruction and training.

f. Industrial Hygiene Surveys. The Division OSH Representative and/or the A VN OSH Program Manager will justify the need for industrial hygiene (IH) and other specialized surveys as required. These surveys may consist ofpersonal, environmental, or biological monitoring depending on the potential hazard and exposure. The A VN OSH Program Manager will assist with the coordination of resources and the performance of these surveys as required.

VN 3900.1 04/30/04

(1) Risk Assessment. To assure the effective use of limited resources, to eliminate the tendency to respond to problems that seem to be hot at the moment, and to assure that regulatory requirements are met, the Division OSH Representative and the A VN OSH Program Manager will prioritize the implementation of industrial hygiene monitoring based on risk.

(2) Reporting. All specialized surveys will be coordinated with bargaining units, thoroughly documented, reviewed and approved by the Division OSH Representative and/or A VN OSH Program Manager, and findings disseminated to affected employees and managers within 30 days of receiving the final report.

(3) Surveys by other organizations. Any industrial hygiene surveys of A VN operations by external parties must be coordinated through the A VN OSH Program Manager and the Division OSH Representative.

(4) Work Instruction and Training. Division OSH Representatives and Division Management will assure that any safety procedures, facility or equipment needs identified as a result of these surveys are implemented and incorporated into employee work instruction and training.

g. Medical Surveillance. The goal of the A VN Medical Surveillance Program is to safeguard employees' health by anticipating and identifying physiological changes in employees related to workplace exposures so that preventive measures can be taken, as well as identifying occupationally induced diseases prior to incapacitating illness.

(1) Hazard Identification and Evaluation. The Division OSH Representatives and the A VN OSH Program Manager will investigate health hazards affecting A VN employees and determine which employees will be included in or removed from the A VN medical surveillance program. Division OSH Representatives will ensure that job hazard analyses and/or industrial hygiene surveillance procedures are used to identify A VN employees whose job tasks expose them to occupational health hazards. Division Management, Division OSH Representatives and the A VN OSH Program Manager will ensure that employees have an avenue for requesting a job hazard analysis of their workplace and/or work tasks. Division Management and Division OSH Representatives will ensure the annual reviews of employees' work tasks and/or work environments to identify new operations or modifications to the workspace environment; and ensure these reviews are documented. All personnel will be responsible for informing Division Management, Division OSH Representatives or the A VN OSH Program Manager of any new occupations, job tasks or environmental hazards that should be covered in the medical surveillance program.

(2) Exams. Division Management, Division OSH Representatives and the A VN OSH Program Manager will ensure that medical evaluations are tailored to specific groups of employees and their exposures, that a qualified physician supervises the medical testing, and that the results are furnished to appropriate recipients in a coordinated, timely manner. Division OSH Representatives and the A VN OSH Program Manager will ensure that funding for industrial hygiene surveillance/exposure monitoring and job hazard analyses of workplaces is requested in the budgetary review process. Division Management will ensure that the required medical examinations are provided without cost to the employee, without loss ofpay, and at a reasonable time and place.

04/30/04 VN 3900.1

(3) Record Confidentiality and Accessibility. Division Management, Division OSH Representatives and the A VN OSH Program Manager will ensure that a confidential repository of all employee medical records is maintained and secured, and that employees have access to their records as needed for personal medical care in accordance with 29 CFR 1910.1020.

(4) Program Management. Division Management, Division OSH Representatives and the A VN OSH Program Manager will review the medical surveillance program and update it based upon changes in regulations, consultation with site management and employees, exposure data, and medical monitoring test results.

(5) Enrollment. Division OSH Representatives and the A VN OSH Program Manager will ensure coordination with qualified medical service providers when results ofjob hazard analyses and/or industrial hygiene monitoring indicate the need to include an employee in or remove an employee from the medical surveillance program; and that the designated medical review officer is provided copies of all documentation supporting this determination for inclusion in, or removal from, the medical surveillance program. Division OSH Representatives and the A VN OSH Program Manager will ensure that a current listing of all employees who are included in the medical surveillance program is maintained and is provided to the qualified medical service provider.

(6) Training. Division Management and Division OSH Representatives will ensure that all affected individuals are informed and trained in the hazards of their job and the relevance of industrial hygiene surveillance and medical monitoring; and that this training is documented. The A VN OSH Program Manager will ensure that Division OSH Representatives and any other appropriate personnel receive training needed to evaluate workplace hazards properly, and ensure that all training is documented.

h. Mishap Investigation. The purpose of a mishap investigation is to determine the causes so that corrective action can be taken to prevent a recurrence and for documenting workers compensation claims. Causes are hazards and those factors that, individually or in combination, directly cause mishaps. Mishap investigations should be performed as soon as possible after the rendering of emergency medical services. Mishaps are occupational injuries and/or illnesses sustained by A VN employees. Contractor mishaps, visitor mishaps and mishaps involving bodily injury to all other non-A VN personnel working onsite for A VN are included in this reporting requirement; however, non-AVN personnel injuries and illnesses are reported for information only. Employees will notify supervisors of mishaps as soon as possible. All mishaps will be investigated.

(1) Reporting. Within 30 days of employee notification of mishap, the supervisor directly responsible for the operation, material, or persons(s) involved in the mishap will investigate and provide a written report of the results using FAA Form 3900-6, FAA Mishap Report (use AC3900-11 for Aeronautical Center mishaps). The Division OSH Representative or A VN OSH Program Manager will provide guidance and consultation as required or requested by the supervisor. Form 3900-6 (or succeeding form) will be forwarded to the Division OSH Representative who will ensure complete data to facilitate hazard identification and trend analysis. Division OSH Representatives will forward copies of all mishap reports to the A VN OSH Program Manager within 15 days of completion. The A VN OSH Program Manager will establish and maintain a mishap database to facilitate periodic analysis and required annual summary reporting.

(2) Fatalities. Supervisors will immediately notify the Division OSH Representative and A VN OSH Program Manager of any death or the in-patient hospitalization of three or more

VN 3900.1 04/30/04

employees involved in one incident within 8 hours after the incident. The Division OSH Representative or A VN OSH Program Manager will notify the OSHA area office within 8 hours after the incident. The Division OSH Representative or A VN OSH Program Manager will make a verbal report to the region/center OSH Program Manager, AFZ-800 and AEE-200 within 24 hours. AEE will formally report to OSHA. The Director of Aviation System Standards, A VN -1, will appoint an investigation team when an on-duty death or the hospitalization of three or more employees occurs as the result of a single accident.

(a) Written Report. The team will prepare a written report and forward it to the region/center OSH Program Manager, AFZ-800 and AEE-200 within 15 days after completing the investigation.

(b) Procedures. Procedures to be used by the investigation team will be developed by the A VN Manager of Safety and Quality Assurance/ A VN -6, depending on the type of accident.

(c) Investigation Reports. Investigation reports will include appropriate documentation, photographs, employee interviews, witness reports, measurements, and other pertinent information. A checklist of items to be covered in the narrative report is addressed in Appendix 12.

(d) Report copies. Copies of reports will be provided to the facility supervisor or manager, the appropriate OSH committee, A VN-1, A VN OSH Program Manager, center director, and national headquarters. If requested, the report will be available to the Secretary of Labor or his/her representative.

(e) Form CA-6. Supervisors will complete a CA-6 form for all deaths and forward through the appropriate AHR office to OWCP.

(3) Workers Compensation. Forms CA-l and/or CA-2 will be forwarded to the Aeronautical Center Workers Compensation Specialist/AMH-200 ifthe injury or illness results in lost time or medical expenses (actual or anticipated). Mishap and Workers' Compensation forms will be forwarded by Division Management or the Division OSH Representative when all information has been obtained, but in no case later than 30 days after the date of employee notification.

(4) Work Instruction and Training. Division OSH Representatives and Division Management will assure that any safety procedures developed as a result of a mishap investigation are incorporated into employee work instruction and training.

i. Accident Analysis: Periodic analysis of A VN workplace accidents provides an indication of an organization's safety performance, but more importantly the identification of trends, problem areas and opportunities for improvement. The A VN OSH Program Manager will ensure that periodic summary reports are provided to the A VN Director, A VN Division Managers and A VN Facility Managers. Summary Reports will be retained for a period of 5 years. Statistics should indicate mishap dates, nature of the mishap, the affected division and branch, incidence rates, the amount of lost time and the estimated costs. Refer to the USDOL Occupational Injury and Illness Classification Manual for assistance.

9. TRAINING: This section describes procedures for the identification of competency and training requirements to implement the A VN Occupational Safety and Health System described in this order.

04/30/04 VN 3900.1

a. Full time safety representatives. Full time safety representatives will seek and/or maintain competency as a Certified Safety Professional or equivalent.

b. Part-time and/or collateral duty safety representatives. Part-time and/or collateral duty safety representatives will establish and maintain a fundamental knowledge of the OSHA standards by completing the OSHA No. 600 Course, or equivalent, triennially. See Appendix 13 for a course description.

c. Management. The A VN Occupational Safety and Health Program Manager will be responsible for ensuring that safety representatives and managers are adequately indoctrinated with the A VN safety system.

d. New Employees. Division OSH Representative and Division Management is responsible for providing new employees an overview presentation of the A VN safety system, including general safety precautions and emergency procedures.

e. All Employees. Supervisors will assure that any safety procedures developed as a result of hazard identification, evaluation and control efforts are incorporated into employee work instruction and training plans. Supervisors will assure that individual safety training plans are integrated with mission related training requirements. General safety training will be performance based unless otherwise imposed by regulation. All training will be coordinated in accordance with the A VN Management Handbook. Division OSH Representatives will assist supervisors with the identification of recurrent training requirements established by OSHA. Documented quarterly safety training will be conducted at all employee levels to maintain a heightened awareness of workplace hazards and precautions. Division Safety Representatives and the A VN OSH Program Manager will provide assistance to supervisors in the accessibility, selection, presentation and maintenance of training resources. Division Safety Representatives will be responsible for ensuring that appropriate briefings are provided as required for abnormal or unique employee exposures and for visitor orientation.

10. INITIA TIVES.

Safety Awards Program. The A VN Occupational Safety and Health Manager will be responsible for directing and implementing an organization-wide safety awards program. The intent of the awards program is to encourage employee involvement in the occupational safety and health program, recognize outstanding employee safety performance and superior contributions and to improve safety in the workplace. Division Managers and Safety Representatives will be responsible for implementing the safety awards program at the division and branch level.

11. DOCUMENTATION: A substantial amount of safety documentation will be maintained to assure the occupational safety and health program is understood and effectively and efficiently operated.

a. A VN Occupational Safety and Health Order. This Occupational Safety and Health Order (VN 3900.1) will serve as A VN' s top level of the safety documentation system and may be widely distributed to stakeholders, regulatory officials and other interested parties. It defines the approach and responsibility for A VN ' s safety management system and provides the methods for containing and indexing all occupational safety and health documentation including procedures and job instructions. A VN-6 is the office of primary responsibility and will review the order annually. The A VN OSH Order will include the following:

VN 3900.1 04/30/04

(1) Safety Policy.

(2) Organizational Chart.

(3) Safety Organization.

(4) Statement of Authority and Responsibility.

(5) Distribution List of Controlled Copies.

(6) Safety System Specification/Standard Procedures Index.

(7) Forms Index.

b. Division Occupational Safety and Health Manuals. Occupational safety and health manuals will be prepared for each A VN division. Division OSH Manuals will define the responsibility (who, what, when) for each division's safety management system and will be written by division management. Division OSH Manuals will describe safety management activities, methods and processes at the division level. Divisions will be the office of primary responsibility and will review the OSH Manuals annually. Division OSH Manuals will include the following:

(1) Purpose and objective.

(2) Scope.

(3) Responsibilities.

(4) References to all documents covered under the program.

(5) Definitions ofkey terms.

(6) Procedures providing a description of the actions or tasks to be carried out by whom, and in what sequence.

(7) Documentation requirements.

c. Work/Job Instruction. Safety-related work instructions will be prepared for use at all applicable employee levels as required based on the nature of the hazard and magnitude of the risk. The purpose of work instructions is to define how hazardous work will be safely completed (e.g. task cards). A VN divisions and branches will be the offices of primary responsibility and will continuously review work instructions. Safety-related work instruction will include the following:

(1) A sequence of actions necessary to complete a job or task.

(2) Scope.

(3) Responsibilities.

04/30/04 VN 3900.1

(4) References to all documents covered under the instruction.

(5) Documentation requirements.

d. Other Safety Related Documentation. This documentation may ·consist of forms or controlled documents that may become a safety record like air quality logs and employee reports of unsafe conditions. The purpose of this documentation is to prompt the recording of forms (hard copy and/or electronic), tags, and labels that may become a safety record. A VN divisions and branches will be the offices of primary responsibility to ensure the development and integrity of these documents. Examples of other safety related records are as follows:

(1) Safety Policy.

(2) Safety objectives and commitment.

(3) Organization charts.

(4) Mishap reports.

(5) Certificate of training.

(6) New employee orientation.

(7) Internal evaluation reports.

(8) Annual inspection reports.

e. Document Control. All documents and data containing information critical to the operation of this program and the performance of A VN's safety and health activities will be identified and controlled. A VN divisions will be responsible for identifying and controlling safety documentation within the division safety program. The A VN OSH Program Manager is responsible for maintaining a master index of all A VN OSH programs, procedures and forms. Each division will establish the following document controls:

(1) Procedures for controlling documents, including assigned responsibilities and authorities.

(2) Procedures for documentation of registers, master lists or indexes.

(3) Procedures for the archiving of records as required.

12. EMERGENCY PREPAREDNESS & RESPONSE. Plans, equipment and exercises will be established at the lowest operating level to ensure the safe and efficient delivery of emergency response for the protection of A VN employees, assets, and liabilities. Each division, via the local safety committee, will be responsible for establishing and maintaining the following:

a. Emergency Plans. Emergency plans will outline the actions to be taken when specified emergency situations rise and should include the following:

VN 3900.1 04/30/04

(1) Identification of potential accidents and emergencies.

(2) Identification of the person to take charge during an emergency.

(3) Details of actions to be taken by personnel during an emergency, including those actions to be taken by external personnel who are on site of the emergency, such as contractors or visitors.

(4) Responsibility, authority and duties of personnel with specific roles during the emergency.

(5) Evacuation procedures.

(6) Identification and location of hazardous materials and emergency action required.

(7) Interface with external emergency services.

(8) Communication with neighbors and the public.

(9) Protection of vital records and equipment.

(10) Availability of necessary information like a master list of hazardous materials during the emergency.

b. Emergency Equipment. Emergency equipment needs will be identified and equipment will be provided in adequate quantity. Equipment will be tested, inspected and maintained at regular intervals for continuing operability. Examples include the following items:

(1) Alarm systems.

(2) Emergency lighting and power.

(3) Means of escape.

(4) Safe refuges.

(5) Critical isolation valves, switches and shut-offs.

(6) Fire-fighting equipment.

(7) First aid equipment (including emergency showers, eye wash stations, etc.).

(8) Communication facilities.

c. Practice Drills. Practice drills will be carried out according to a pre-determined schedule. Where appropriate and practical, the participation of external emergency services in practice drills should be encouraged.

VN 3900.1 04/30/04

13. SAFETY INFORMATION SYSTEM. The A VN Occupational Safety and Health Program Manager will be responsible for ensuring that safety information is readily available, accessible and appropriately disseminated to division safety representatives and affected employees.

14. PROGRAM EVALUATION: The A VN Occupational Safety and Health Program Manager will be responsible for developing, initiating and implementing a performance evaluation program for the overall A VN occupational safety and health system. This program will include procedures for the A VN Director's review of the operation of the occupational safety and health management system to assess whether it is being fully implemented and remains suitable for achieving the organization' s stated policy and objectives. The objectives of this program will be to identify and evaluate key performance parameters including, but not limited to the following:

a. Development and completion of safety program objectives.

b. Development and implementation of effective safety controls.

c. Utilization of "lessons learned" from mishap analysis, inspection findings and system failures.

d. Integration of operational risk management.

e. Effective training and communication systems.

f. Internal evaluation programming.

g. Safety program quality assurance.

Thomas C. Accardi Director of Aviation System Standards, A VN-1

15 and (16)

04/30/04 VN 3900.1 Appendix 1 APPENDIX 1 DEFINITIONS

Division Occupational Safety and Health Representative: Personnel assigned by division management having sufficient training and experience to perform general workplace safety duties (i.e., JHAs, workplace inspections, mishap investigations, etc.). As a minimum, these personnel will meet the Agency's definition of Collateral Duty Safety and Health Personnel, but may also be full-time Occupational Safety and Health Professionals.

Design Review: A tool and process involving the review and evaluation ofproposed facility specifications, drawings, plans and/or blueprints in accordance with OSHA, EPA, NFP A, ANSI, FAA Orders and other applicable safety standards.

Exposure: The state of being exposed to accident, injury or illness potential.

Facility Manager: The Facility Manager is generally, the highest-ranking resident manager of the primary occupant line of business in an FAA owned or leased facility, or designee, selected by mutual agreement of the occupant line of business officials.

Hazard: A limit of exposure likely to cause bodily harm. Unsafe acts and conditions.

Industrial Hygiene: The identification, evaluation and control of environmental health hazards (i.e., disease and illness) in the workplace

Job Hazard Analysis (JHA): Hazard analysis tool that utilizes observations to review job methods and uncover hazards.

Medical Surveillance: A method to support hazard identification, evaluation and control involving the examination of workers by medical personnel to determine physiological and psychological responses to potentially hazardous agents like toxic substances, radiation and noise.

Mishap: An occurrence in a sequence of events that produces unintended injury, death or property damage. Also referred to as an accident or incident.

Occupational Safety and Health Professional: Safety Specialists, safety managers, safety engineers, or industrial hygienist; or equally qualified agency, military, or non-Government personnel who meet the basic qualifications of the above classifications as defined by AHR standards and recommended by the A VN OSH Manager.

Operational Risk Management: A management tool that deals with the identification, assessment, and mitigation of risk.

Resources: Elements of time, personnel, facilities and equipment necessary to complete a project or process.

Risk: Probability and magnitude of bodily harm.

VN 3900.1 04/30/04 Appendix 1

Root Cause Analysis: A management tool used to identify underlying factors that contributed to the cause of an accident.

Safety Controls: Designs, devices, procedures and warnings that may be of administrative or engineering nature and that serve to reduce the risk of accident.

Self-Inspection: Internal inspections of workplaces in accordance with OSHA, EPA, NFPA, ANSI, FAA Orders and other applicable safety standards.

04/30/04 VN 3900.1 Appendix 2

APPENDIX2 ACCOUNTABILITY SYSTEM GUIDELINE

APPENDIX2 ACCOUNTABILITY SYSTEM GUIDELINE

1. Purpose: The purpose of this guideline is to assist A VN management in the development of an Occupational Safety and Health Accountability System. The principle content contains the essential elements necessary to meet safety performance expectations.

2. Principle of Operation: A safety accountability system "makes" a safety program work by establishing employee and management performance expectations. Meeting or exceeding expectations should result in rewards, recognition or promotion, which provide employees with incentives to implement various elements of the safety program. It also credits employees for proactive, prudent safe behavior and actions.

A safety accountability system should be designed to easily integrate with an existing employee performance appraisal system. As with most appraisal systems, safety performance elements should be weighed in accordance with the organization's values just as the weight of other performance factors (i.e. quality of work, timeliness, etc.) are determined.

Objectives should be established at the beginning of the evaluation period, agreed to between management and labor, and measured at the end of the period.

The determination of objectives begins with the organization's needs. For the occupational safety and health program, this will involve the identification, evaluation and control of risk of injury or illness. These risks are identified as a result of the operational risk management program.

Performance evaluations may be performed qualitatively and/or quantitatively. A qualitative evaluation would consider the completion and general observation of safety program objectives or routine procedures. A quantitative evaluation would consider the grading of safety program outcomes based on the amount of completion and effectiveness.

3. Management Performance Factors: Division management should be held accountable for meeting safety performance objectives established by the Program Director. These may be passed onto branch management. One to three specific objectives should be established per year. Annual objectives may be considered large scale, thus requiring at least a year to complete. An example of a long scale safety objective is the development and implementation of a fall protection program, an ergonomics program or a hearing conservation program throughout a Division.

In addition, division management should be held accountable for implementing existing safety program elements like risk assessment, self-inspections, safety training, and accident investigation.

4. Employee Performance Factors: Recommended employee safety performance factors include the following:

• Observation of standard practices and safety procedures .

• Reporting ofhazards and injuries .

VN 3900.1 04/30/04 Appendix 2

• Participation in safety projects, training and education.

• Cooperation/assistance with safety activities.

04/30/04 VN 3900.1

Appendix 3 APPENDIX3 OPERATIONAL RISK MANAGEMENT

1. PURPOSE. The management of risk, all dimensions of risk, is key to maximizing mission effectiveness and sustainment of readiness. Operational Risk Management (ORM) principles, techniques, and tools will be used to increase mission success, strengthen job performance, and identify opportunities to expand mission capabilities in all areas and at all levels, thereby strengthening A VN's mission posture.

Appendix 3 APPENDIX3 OPERATIONAL RISK MANAGEMENT

2. DISTRIBUTION. This is a mandatory appendix to VN 3900.

3. DEFINITIONS. See Appendix 3.1 .

4. GOALS. The fundamental goals of ORM are to:

a. Enhance mission effectiveness at all levels, while preserving assets and safeguarding health and welfare.

b. Integrate ORM into mission processes; ensuring decisions are based upon assessments of risk integral to the activity and mission.

c. Create an organization in which every leader, airman, and employee is trained and motivated to manage risk in all their on- and off-duty activities.

d. Identify opportunities to increase A VN's mission effectiveness in the National Airspace System.

5. PRINCIPLES. The four guiding principles ofORM are:

a. Accept no unnecessary risk.

b. Make risk decisions at the appropriate level.

c. Accept risk when benefits outweigh the costs.

d. Integrate ORM into operations and planning at all levels.

6. SCOPE. This mandatory appendix requires the application of a flexible but formalized risk management process for all business decisions. The objective of this policy is to formalize a common sense approach to risk management and risk analysis/assessment in A VN decision-making.

This mandatory appendix is not intended to interfere with regulatory processes and activities. Each division office will interpret, establish, and execute the policy contained herein consistent with its role and responsibility.

7. RISK MANAGEMENT POLICY. Aviation System Standards will use a formal, disciplined, and documented decision-making process. The critical information resulting from a risk management process can thereby be effectively communicated in an objective and unbiased manner to decision makers, and from decision makers to stakeholders.

VN 3900.1 04/30/03 Appendix 3

All decision making authorities within A VN will maintain risk management expertise appropriate to their operations, and will perform and document the safety risk management process prior to issuing decisions. The choice of methodologies to support risk management efforts remains the responsibility of each A VN Division office. The decision-making authority will determine the documentation format. The approach to safety risk management is composed of the following steps:

a. Plan. A case-specific plan for risk analysis and risk assessment will be predetermined in adequate detail for appropriate review and agreement by the decision making authority prior to commitment of resources. The plan will additionally describe criteria for acceptable risk.

b. Hazard Identification. The specific hazard or list of hazards to be addressed by the risk management plan will be explicitly identified to prevent ambiguity in subsequent analysis and assessment.

c. Analysis. Both elements of risk (hazard severity and likelihood of occurrence) will be quantitatively characterized. The inability to quantify and/or lack of historical data on a particular hazard does not exclude the hazard from this requirement. If the seriousness of a hazard can be expected to increase over the effective life of the decision, this should be noted. Additionally, both elements should be estimated for each hazard being analyzed, even if historical and/or quantitative data is not available.

d. Assessment. The combined impact ofthe risk elements will be compared to acceptability criteria and the results provided for decision-making.

e. Decision. The risk management decision will consider the risk assessment results. Risk assessment results may be used to compare and contrast alternative options.

See Appendix 3.2 and 3.3 for implementation guidelines and additional resources, respectively.

8. PRINCIPLES FOR RISK ASSESSMENT AND RISK CHARACTERIZATION. In characterizing risk, one must comply with each of the following:

a. General. Risk assessments, to the maximum extent feasible:

(1) Are scientifically objective.

(2) Are unbiased.

(3) Include all relevant data available.

(4) Employ default or conservative assumptions only if situation-specific information is not reasonably available. The basis of these assumptions must be clearly identified.

(5) Distinguish clearly as to what risks would be affected by the decision and what risks would not.

(6) Are reasonably detailed and accurate. Page 2

04/30/04 VN 3900.1 Appendix 3

(7) Relate to current risk or the risk resulting from not adopting the proposal being considered.

(8) Allow for unknown and/or unquantifiable risks.

b. Principles. The principles to be applied when preparing risk assessments are:

(1) Each risk assessment should first analyze the two elements of risk: severity of the hazard and likelihood of occurrence. Risk assessment is then performed by comparing the combined effect of their characteristics to acceptable criteria as determined in the plan.

(2) A risk assessment may be qualitative and/or quantitative. To the maximum extent practicable, these risk assessments should be quantitative.

(3) The selection of a risk assessment methodology should be flexible.

(4) Basic assumptions should be documented or, if only bounds can be estimated reliably, the range encompassed should be described.

c. Significant risk assessment assumptions, inferences, or models should:

(1) Describe any model used in the risk assessment and make explicit the assumptions incorporated in the model.

(2) Identify any policy or value judgments.

(3) Explain the basis for choices.

(4) Indicate the extent that the model and the assumptions incorporated have been validated by or conflict with empirical data.

(5) All risk assessments should include or summarize the information of paragraphs 8.1.3 and 8.1.4 as well as 8.2.4 and 8.2.5. This record should be maintained by the organization performing the assessment in accordance with FAA Order 1350, Records Organization, Transfer, and Destruction Standards.

d. Analysis of risk reduction benefits and costs.

(1) Compare the results of a risk assessment for each risk-reduction alternative considered, including no action, in mandatory appendix to rank each risk assessment for decisionmaking purposes. The assessment should consider future conditions, e.g., increased traffic volume.

(2) Assess the costs and the risk reduction or other benefits associated with implementation of, and compliance with, an alternative under final consideration.

10. SUBSTITUTION RISKS. Risk assessments will include a statement of substitution risks. Substitution risks will be included in the risk assessment documentation.

VN 3900.1 04/30/03 Appendix 3

11. RESPONIBILITIES. The following responsibilities and authorities are to be derived from this policy:

a. A VN Division Managers.

(1) Serve as principal advocates for the ORM program.

(2) Develop and maintain ORM implementation and sustainment plans for their functional areas that direct the integration of ORM into all operational decision-making processes.

(3) Develop and provide policy, plans, and programs that support and ensure ORM integration within their functional areas.

b. A VN Branch Managers.

(1) Tailor ORM application and techniques to accommodate the unique mission needs of their organization.

(2) Develop and maintain ORM implementation and sustainment plans for their branch that direct the integration of ORM into all operational decision-making processes.

c. A VN Program Managers. Integrate the ORM process, principles, and techniques into curricula for all education and training programs to the extent that it is possible and mission supportive to do so. ORM integration into curriculum will be tailored to meet the unique mission of the program in consideration of the goals outlined in this Policy Directive.

d. Safety & Quality Staff, A VN-6.

(1) Lead the overall cross-functional integration effort ofORM into A VN.

(2) Designate an A VN ORM Program Manager.

(3) Monitor advancements and innovations in risk management for application to the A VN ORM program.

(4) Provide guidance and oversight of all matters pertaining to the formulation, review, and execution of policies, plans, and programs relative to the A VN ORM program.

(5) Maintain statistical databases, tools and other resources as required to assist A VN Divisions.

e. All A VN Personnel. Apply ORM principles, concepts, and techniques to assess the risks associated with the daily mission and duty-related activities.

04/30/04 VN 3900.1 Appendix 3 .1

APPENDIX 3.1 OPERATIONAL RISK MANAGEMENT DEFINITIONS

APPENDIX 3.1 OPERATIONAL RISK MANAGEMENT DEFINITIONS

Costs. Direct and indirect costs to the United States Government, State, local, and tribal governments, international trade impacts, and the private sector.

Emergency. A circumstance that requires immediate action to be taken.

Hazard. Condition, event, or circumstance that could lead to or contribute to an unplanned or undesired event.

Mishap. Unplanned event, or series of events, that results in death, injury, occupational illness, or damage to or loss of equipment or property.

Operational Risk Management (ORM). The systematic process of identifying hazards, assessing risk, analyzing risk control options and measures, making control decisions, implementing control decisions, accepting residual risks, and supervising/reviewing the activity for effectiveness.

Product Life Cycle. The entire sequence from precertification activities through those associated with removal from service.

Risk. The probability and severity of loss or adverse impact from exposure to various hazards.

Risk Assessment. The process of detecting hazards and their causes, and systematically assessing the associated risks.

Risk Characterization. Identification or evaluation of the two components of risk, i.e., undesired event severity and likelihood of occurrence.

Risk Management. Management activity ensuring that risk is identified and eliminated or controlled within established program risk parameters.

System. A composite, at any level of complexity, of personnel, procedures, materials, tools, equipment, facilities, and software. The elements of this composite entity are used together in the intended operational or support environment to perform a given task or achieve a specific mission requirement.

Substitution Risk. Additional risk to human health or safety, to include property risk, from an action designed to reduce some other risk(s).

Page 1 (and 2)

04/30/04 VN 3900.1 Appendix 3.2

APPENDIX 3.2 ORM IMPLEMENTATION GUIDELINE

APPENDIX 3.2 ORM IMPLEMENTATION GUIDELINE

Operational Risk Management (ORM) is a continuous process designed to detect, assess, and control risk while enhancing performance and maximizing organizational capabilities. ORM provides the basic structure for the detection, assessment, and ultimate sustained control of risk while enhancing performance and maximizing organizational capabilities. Individuals at all levels identify and control hazards through the ORM process. Figure 1 shows the ORM process chart with its six steps.

Figure 1

Step 1. Identify the Hazard. A hazard can be defined as any real or potential condition that can cause mission degradation, injury, illness, death to personnel or damage to or loss of equipment or property. Experience, common sense, and specific risk management tools help identify real or potential hazards.

Step 2. Assess the Risk. Risk is the probability and severity of loss from exposure to the hazard. The assessment step is the application of quantitative and/or qualitative measures to determine the level of risk associated with a specific hazard. This process defines the probability and severity of a mishap that could result from the hazard based upon the exposure of personnel or assets to that hazard. Apply the risk assessment code matrix to quantify the level of risk.

Step 3. Analyze Risk Control Measures. Investigate specific strategies and tools that reduce, mitigate, or eliminate the risk. Effective control measures reduce or eliminate one of the three components (probability, severity, or exposure) of risk.

Step 4. Make Control Decisions. Decision makers at the appropriate level choose the best control or combination of controls based on the analysis of overall costs and benefits.

VN 3900.1 04/3 0/04 Appendix 3 .2

Step 5. Implement Risk Controls. Once control strategies have been selected, an implementation strategy needs to be developed and then applied by management and the work force. Implementation requires commitment of time and resources.

Step 6. Supervise and Review. Risk management is a process that continues throughout the life cycle of the system, mission, or activity. Leaders at every level must fulfill their respective roles in assuring controls are sustained over time. Once controls are in place, the process must be periodically reevaluated to ensure their effectiveness.

Example 1: A VN Occupational Safety & Health Program Risk Assessment

The following example illustrates application of the first four steps in the six-step process. The "Operational Analysis" methodology was used to identify hazards. Figure 2 was used to qualify the level of risk.

Figure 2

Problem ID: What are risks associated with taking "ownership" of the A VN OSH Program?

a. Transfer the Program Manager back to A VN-6. An agreement was reached with AMP-10 and the paperwork has been started to complete the transfer. This should be effective by the next pay period. If not done correctly, could cause a political problem with the MMAC (L).

b. Survey A VN operations/ID Exposure

(1) Not asking the right questions or applying the right regulations (L)

(2) People attempt to use the survey and program for personnel gain(M)

(3) Could put some people on the defensive (L)

04/30/04 VN 3900.1 Appendix 3 .2

c. Revise MOA we have with MMAC. This has been completed and is ready to be staffed in MMAC andAVN

(1) Alienate MMAC (M)

(2) Failure to define and include all program elements resulting in gaps of coverage (M)

(3) Since the MOA covers many areas other than Safety the coordination with the other areas will slow down the process and delay funding of the safety program requirements (H)

d. Write Draft A VN Order.

(1) Alienation of unions (L)

(2) Alienation of Managers (L)

(3) To restrictive (L)

(4) To lenient and does not fulfill legal, regulatory requirements (L)

(5) Does not improve safety (L)

(6) Does not integrate with ISO (L)

(7) Does not enhance the mission (M)

e. Publish Order

f. Establish Funding Requirements with AFZ-800

(1) AFZ-800 doesn't come through with the money as promised (M)

(2) We miscalculate the amount of funds needed (H)

g. Train Safety Representatives

(1) Training is inadequate or inappropriate (L)

(2) Training is to expensive or no money will be available due to budget cuts (L)

(3) Training takes too long and managers don't want to release the people (L)

h. Program Evaluation.

Summary & Conclusions: Two high risks were identified:

VN 3900.1 04/30/04 Appendix 3.2

a. Revising the MOA. It was decided to mitigate the risk here by insuring we maintained open channels with MMAC, leaving the funding process as is until all coordination was done, continue to apply steady pressure to move the coordination along on both sides, A VN and MMAC

b. Funding. It was decided the best way to mitigate this was to estimate dollars for the first year only rather than try and project a 5 year requirement.

Example 2: Aircraft Storage in Hangar 8

The following example illustrates application of the USAF Comparative Risk Assessment Model.

1. Scope: This risk assessment considers the occupational safety/health, equipment damage and mission impact associated with the proposed change. It is intended to provide non-biased, objective based decision making information for the Director of the Aeronautical Center. The process used in completing this assessment is based on the FAA System Safety Handbook, FAA Order 8040.4 and Air Force Pamphlet 90-902.

2. Proposed Change: AMP has requested the discontinued occupancy of Hangar 10 by FAA Academy personnel due to, reportedly, unsafe facility conditions; however, contract aircraft maintenance operations shall remain.

3. General Requirements: The FAA Academy utilizes light aircraft in support of their mission to train and educate aviation safety inspectors (OPS) assigned to Flight Safety District Offices. The Academy operates ten aircraft consisting of two King Air A200s, five Beechcraft Barons, and three Cessna 1 72s.

Aviation System Standards operates and maintains 33 aircraft in support of their flight inspection mission. The fleet consists of six British Aerospace Hawkers, three Challengers, six Learjets, and eighteen 300 series Beechcraft King Airs distributed among six flight inspection offices.

Both organizations need hangar and ramp facilities for storing, launching, parking, servicing, maintenance and testing aircraft as well as pilot and crew briefing and debriefing.

4. Options: Operational options are the various conditions and configurations associated with the operation, maintenance and storage of the Academy's aircraft.

Option A (Leave as is in current configuration)

• Maintenance - "Louisiana Aircraft of Oklahoma" provides contract maintenance on all aircraft except the A200s. The A200s were recently transferred to A VN-300. The contractor is housed in the south end of Hangar 1 0. Ground based operational maintenance test are conducted on Hangar 9 and 10 ramps.

04/30/04 VN 3900.1 Appendix 3.2

• Storage - All airworthy aircraft are stored in the north end of Hangar 8.

• Operations - Briefings are conducted in the office trailer adjacent to Hangar 9. Aircraft depart and arrive using the Hangar 9 ramp directly east of the Academy briefing office.

Option B

• Maintenance - Same as Option A.

• Storage - All airworthy aircraft are stored in the north end of Hangar

• Operations - Same as Option A. In addition, space in Hangar 8 would be available, within reason, for pre-flight inspections and/or temporary emergency facilities as required.

Option C

• Maintenance - Same as Option A.

• Storage- All airworthy aircraft are stored in the north end of Hangar 8.

• Operations - Briefings are conducted from a room in the northeast end of Hangar 8. Aircraft are parked and launched along the northern-most row ofthe Hangar 8 ramp.

5. Hazard Identification: A hazard is defined as a condition, event, or circumstance that could lead to or contribute to an unplanned or undesired event. The potential hazards listed below are common to all aircraft ramp operations. The following list was determined qualitatively and is inclusive of significant exposures:

(1) Aircraft Damage - contact with ground vehicles, stationary objects or other aircraft

(2) Foreign object damage (aircraft engine damage)

(3) Noise- hearing loss

(4) Slips/trips/falls - strains, sprains, contusions and fractures

(5) Temperature extremes - frostbite, hypothermia, heat exhaustion, heat stroke

(6) Airborne dust/debris/smoke/vapor- eye injuries, acute respiratory failure

(7) Struck-by ground vehicles- strains, sprains, contusions and fractures

VN 3900.1 04/30/04 Appendix 3.2

(8) Jet blast- strains, sprains, contusions and fractures

(9) Struck-by operating aircraft- strains, sprains, contusions and fractures

(10)Struck by aircraft in tow- strains, sprains, contusions and fractures

(11 )Struck by projectiles - fire/explosion

All potential hazards except no. a & bare associated with casualty risk.

6. Risk Assessment: Risk assessment is a process of identifying hazards and quantifying or qualifying the degree of risk they pose for exposed individuals, populations, or resources. Risk is identified as an expression of the impact of an undesired event in terms of event severity and event likelihood.

This project uses the "Modified Comparative Risk Assessment" method depicted in Air Force Pamphlet 90-902. This method is considered the most appropriate when comparing options associated with change. This method also provides for numerical assignments of risk assessment codes (RAC), which can then be quantified.

In this assessment, both qualitative and quantitative risk analysis methods were used. Quantitative risk assessment is preferred since it removes bias and is based on factual data. Qualitative methods are used when statistical data is not available, as in this case with hazard number two through eleven (see paragraph 5).

The Modified Comparative Risk Assessment Matrix Model

Figure 3. llustrates the modified risk assessment matrix model (adopted from Air Force Pamphlet 90­ 902, 12/14/00) used to assign risk levels. Modified means the traditional risk assessment codes (i.e., 3C) are replaced with numerical values (i.e., 1 0). The lower the numerical value, the higher the risk. For example, one ( 1) is the greatest possible risk and twenty (20) is the least possible risk.

Severity

Severity Categories

CATASTROPHIC- Complete mission failure, death, or loss of system

04/30/04 VN 3900.1 Appendix 3.2

CRITICAL- Major mission degradation, severe injury, occupational illness or major system damage MODERATE- Minor mission degradation, injury, minor occupational illness, or minor system damage NEGLIGIBLE- Less than minor mission degradation, injury, occupational illness, or minor system damage

Probability Categories

FREQUENT Individual item- Occurs often in the life ofthe system Fleet or inventory- Continuously experienced individual Airman- Occurs often in career Airmen exposed- continuously experienced

Figure 3: picture of page 30Figure 3 · page 30
Picture of the page from the copy saved here

LIKELY individual item- Occurs several times in the life of the system Fleet or inventory- Occurs regularly individual Airman- Occurs several times in a career All Airmen exposed- Occurs regularly

OCCASIONAL individual item- Will occur in the life of the system Fleet or inventory- Occurs several times in the life of the system individual Airman- Will occur in a career All Airmen exposed- Occurs sporadically

SELDOM Individual item- May occur in the life of the system Fleet or inventory- Can be expected to occur in the life of the system Individual Airman- May occur in a career All Airmen exposed- Occurs seldom

UNLIKELY Individual item- So unlikely you can assume it will not occur in the life of the system Fleet or inventory- Unlikely but could occur in the life of the system Individual Airman- So unlikely you can assume it will not occur in a career All Airmen exposed- Occurs very rarely

Figure 3

VN 3900.1 04/30/04 Appendix 3.2

The Comparative Risk Assessment

Figure 4 illustrates the numerical values assigned to each potential hazard. All assigned values except hazard no. 1 are based on qualitative analysis. Risk values assigned to hazard no. 1 are based on quantitative analysis (See Aircraft Damage for more information).

Values assigned to hazard no. 2, foreign object damage (FOD), are based on a proportional increase in the amount of FOD generation from AMA operations. This takes into consideration the additional equipment and material associated with AMA ramp operations.

Values assigned to hazard no. 3, noise, assume propeller aircraft produces less noise than jet aircraft.

Values assigned to hazard no. 11 , fire/explosion, assume a higher fire/explosion risk associated with the handling of aviation gas. Aviation gas has a lower flash point (is more volatile) than jet fuel.

FIGURE 4. Comparative Risk Assessment

No. Potential Hazard Risk Values Option A Option 8 Option C

1 Aircraft Damage ­ contact with ground vehicles, stationary objects or aircraft 11 15 7

1 Aircraft Damage ­ contact with ground vehicles, stationary objects or aircraft 11 15 7

2 Foreign object damage (aircraft engine damage) 11 11 7

3 Noise ­ hearing loss 7 7 7

4 Slips/trips/falls - strains, sprains, contusions and fractures 14 14 14

5 Temperature extremes - frostbite, hypothermia, heat exhaustion, heat stroke 14 14 14

6 Airborne dust/debris/smoke/vapor ­ eye injuries, acute respiratory failure 14 14 10

6 Airborne dust/debris/smoke/vapor ­ eye injuries, acute respiratory failure 14 14 10

7 Struck-by ground vehicles - strains, sprains, contusions and fractures 11 15 7

8 Jet blast- strains, sprains, contusions and fractures 14 14 10

9 Struck-by operating aircraft - strains, sprains, contusions and fractures 15 15 II

10 Struck by aircraft in tow - strains, sprains, contusions and fractures 16 16 14

10 Struck by aircraft in tow - strains, sprains, contusions and fractures 16 16 14

11 Struck by projectiles - fire/explosion 12 12 8

Aircraft Damage: Quantitative methods were used to determine the risk of Aircraft damage - contact with ground vehicles, stationary objects or other aircraft. A review of accident statistics associated with

11 Struck by projectiles - fire/explosion 12 12 8

04/30/04 VN 3900.1 Appendix 3.2

this hazard revealed several occurrences when A VN aircraft were damaged and decommissioned while at fixed based operator's facilities (FBO). No such occurrences at A VN Flight Inspection Offices (FlO) have been experienced. The FBO occurrences are summarized in Figure 4.

The FBO occurrence frequency is 1.4 incidents per year. This frequency was used in Option C (Figure 3) based on the amount of ramp congestion equivalent to a typical FBO. Ramp congestion at FBOs is considerably greater than at FIOs because FBOs seek to maximize ramp and aircraft service capacity.

Date Aircraft

Type

Tail Number Occurrence Description Mission Interruption

Est. Cost of

Repairs

12/20/96 BE300 N67

Right aileron damaged by vehicle while aircraft parked 30+ days $20,000 +

01122/97 BE300 N81

LH wingtip damaged during tow 3+ days $5,000 +

02/11198 BE300 N83

R T wingtip damaged by ground vehicle 2+ days $1,000 +

04/20/01 BE300 N79

Tow tug impacted aircraftminor damage to landing gear nose strut

None $500 +

10/11101 BE300 N77

NLG tire and wheel damaged while being towed 2 +days $3,000 +

1999 BAel25

Radom damage by tug

2 +days $30,000 +

1999 BAe125

Wingtip damage by vehicle

2 +days $10,000 +

10/01 BAE 125

Radom damaged while parked 2 +days $30,000 +

FIGURE 5. FBO Occurrences

Change in Risk: The change in risk, from the baseline Option A, is illustrated in Figure 5. Change in Risk was determined using the following equation:

% Change In Risk = (RA - Rx)IRA * 100%

Where;

RA = Risk value assigned to Option A.

Rx = Risk value assigned to Option B or C.

VN 3900.1 04/3 0/04 Appendix 3 .2

No. Potential Hazard

Change in Risk

Option A Option B Option C

1 Aircraft Damage - contact with ground vehicles, stationary objects or aircraft 0% -36% +53%

1 Aircraft Damage - contact with ground vehicles, stationary objects or aircraft 0% -36% +53%

2 Foreign object damage (aircraft engine damage) 0% 0% +36%

3 Noise - hearing loss 0% 0% 0%

4 Slips/trips/falls - strains, sprains, contusions and fractures 0% 0% 0%

5 Temperature extremes - frostbite, hypothermia, heat exhaustion, heat stroke 0% 0% 0%

6 Airborne dust/debris/smoke/vapor - eye injuries, acute respiratory failure 0% 0% +29%

6 Airborne dust/debris/smoke/vapor - eye injuries, acute respiratory failure 0% 0% +29%

7 Struck-by ground vehicles - strains, sprains, contusions and fractures 0% -36% +53%

8 Jet blast- strains, sprains, contusions and fractures 0% 0% +29%

9 Struck-by operating aircraft- strains, sprains, contusions and fractures 0% 0% +27%

10 Struck by aircraft in tow- strains, sprains, contusions and fractures 0% 0% +13%

10 Struck by aircraft in tow- strains, sprains, contusions and fractures 0% 0% +13%

11 Struck by projectiles - fire/explosion 0% 0% +33%

FIGURE 6. Change in Risk

Conclusions: Option B offers the least amount of risk based on the reduction in ramp congestion and associated reduction in risk to aircraft damage and personnel injury. Option Coffers the greatest amount of risk primarily based on the increased congestion of the ramp operating area.

11 Struck by projectiles - fire/explosion 0% 0% +33%

04/30/04 VN 3900.1 Appendix 3.3

APPENDIX 3.3 ADDITIONAL RESOURCES

The following resources (hyperlinks to the WWW) are offered for enhancing knowledge, understanding and application of the A VN ORM Program:

• U.S. Army (http://safety.army.mil/home.html) • U.S. Air Force ORM Guidelines and Tools (http://www.e-publishing.af.miVpubfiles/af/90/afpam90­ 902/afpam90-902. pdf) • Naval Safety Center (http://www.safetycenter.navy.mil/orm/default.htm) • U.S. Marine Corp (http://www.hqmc.usmc.mil/safety.nsf/) • FAA Office of System Safety (ASY) (http://www.asy.faa.gov/)

APPENDIX 3.3 ADDITIONAL RESOURCES

Page 1 (and 2)

04/30/04 VN 3900.1 Appendix 4

APPENDIX4 SAFETY PROGRAM OBJECTIVES GUIDELINES

INTRODUCTION:

The purpose of this guideline is to aid A VN division managers, occupational safety/health representatives and safety committees in the development of annual safety program objectives.

APPENDIX4 SAFETY PROGRAM OBJECTIVES GUIDELINES

Objectives are established to meet goals. Goals should be realistic, measurable and reachable. Goals should also be prioritized based on the relative level of risk when compared to other safety goals.

PROGRAM RISK ASSESSMENT:

Program risk assessment is the starting point for the identification and prioritization of hazard evaluations.

A Job Hazard Analysis (JHA) is a micro evaluation tool that assesses the risk factors associated with a specific job cycle. On the other hand, a Program Risk Assessment is a macro evaluation tool that provides for the prioritization of resources by qualifying and quantifying the risk associated with each environmental, safety and health program listed in Appendix 4.1 . Likewise, Each program is designed to manage specific risks associated with injury, illness, property damage or environmental impairment. Each safety program element is normally made up of program elements like written policy, implementation procedures and training.

There are two fundamental risk factors associated with ESH Programs. The first one deals with the level of regulatory compliance and the other deals with the inherent liability risk the safety program is designed to control. The level of risk must be determined for each factor and then combined to establish the overall risk associated with the program.

REGULATORY COMPLIANCE:

The overall compliance rating is determined by the average ratings assigned to the following program elements:

(1) Written Policy

(2) Implementation

(3) Training

The specific criteria and rating for each of these elements is illustrated in Appendix 4.2. For example, the composite compliance rating of a fall protection program was determined to be 1.33 based on the following;

Written Policy= None 1 point

VN 3900.1 04/30/04 Appendix 4

Implementation= None 1 point Training = Competent Persons identified and trained 2 points

Composite Compliance Rating= 1 + 1 +2=4/3=1.33

Inherent Liability Risk

Inherent liability risk is the estimated monetary loss potential the safety program seeks to mitigate. Liabilities are categorized as follows:

(1) Fines and penalties: Currently, federal agencies are not subject to OSHA fines and penalties so this is a moot point for federal occupational safety and health programs; however, the FAA is subject to fines and penalties promulgated by the EPA.

(2) Compensation for personal injury, property damage and economic loss: This is the direct cost incurred as a result of a paid claim to an individual or organization. For occupational injuries and illnesses, this would be the workers compensation benefit.

(3) Indirect cost of accident: The indirect cost of accidents includes non-compensible items and activities like lost production time, damaged products, damaged equipment, overtime expenses, training and replacement, time spent rendering medical aid, time spent on hospital calls and extra management time completing reports and forms. Experts estimate the indirect cost of accidents is four times the amount of the direct cost.

(4) Corrective action cost: This is the cost borne from the corrective action an organization takes to reduce the risk of a recurrent safety violation or similar accident. An example would be the cost of disposing hazardous waste from an accidental spill of hazardous material.

Each category is assigned an estimated range of liability severity (i.e., Fines & Penalties is $0 to $25,000). Likewise, each category is assigned an estimated range of liability probability (i.e ..04 to 1.0). The estimated liability for the category is the product of severity and probability. The total estimated liability for the program is the sum of each category's estimated liability. See Appendix 4.3 for an illustration of the application of an inherent liability risk assessment for a Fall Protection Program.

Overall Program Risk

Appendix 4.4 illustrates an example of the overall risk associated with an ESH Program. The compliance rating is the composite value determined from Appendix 4.2. The estimated liability is the total for the program derived from Appendix 4.3. The overall risk value is the product of the estimated liability divided by the compliance rating. The programs are then sorted by risk for prioritization as illustrated in Appendix 4.4.

Risk Controls

04/30/04 VN 3900.1 Appendix 4

Following the identification, assessment, and prioritization of risk, safety controls are then developed and implemented to eliminate or reduce risk. To maximize effectiveness, a hierarchy of safety controls should be applied when determining what controls to implement first. The hierarchy of controls is as follows:

a. Engineering controls are the most reliable and effective type of controls. These are design changes that directly eliminate (ideally) or limit the severity and/or likelihood of the hazard, e.g. reduction in pressure/amount of hazardous material, substitution ofless hazardous material, reduction of noise produced, fail-safe design, leak before burst, fault tolerance/redundancy, ergonomics, etc. Although not as reliable as true engineering controls, this category also includes protective safety devices such as guards, barriers, interlocks, grounding and bonding systems, pressure relief valves to keep pressure within a safe limit, etc. These items typically seek to reduce indirectly the likelihood of the hazard. These controls are often linked with caution and warning devices like detectors and alarms that are either automatic (do not require a human response) or manual (require a human response).

b. Administrative controls that significantly limit daily exposure to hazard by control or manipulation of the work schedule or manner in which work is performed, e.g., job rotation;

c. Work Practice controls, a type of administrative control that includes workplace rules, safe and healthful work practices, and procedures for specific operations. Work Practice controls modify the manner in which an employee performs assigned work. This modification may result in a reduction of exposure through such methods as changing work habits, improving sanitation and hygiene practices, or making other changes in the way the employee performs the job.

d. Personal protective equipment.

04/30/04 VN 3900.1 APPENDIX 4.1 Environmental, Safety and Health Programs

ESH Program

Number ESH Program Name ESH Program Description

1.01 On-Site Cleanup, Non- Petroleum

1.01 On-Site Cleanup, Non- Petroleum

This program involves the cleanup of contaminated sites on Aeronautical Center leased property including soil and groundwater under the Comprehensive Environmental, Response, Compensation and Liability Act (CERCLA).

1.02 On-Site Cleanup, Petroleum Product

1.02 On-Site Cleanup, Petroleum Product

This program involves the cleanup of contaminated sites on Aeronautical Center leased property including soil and groundwater under the Resource Conservation and Recovery Act (RCRA).

1.03 Off-Site Cleanup

This program involves the cleanup of contaminated sites at non-Aeronautical Center property including soil and groundwater under the Comprehensive Environmental, Response, Compensation and Liability Act (CERCLA) .

2.01 Air Emissions Management

2.01 Air Emissions Management

This program involves ensuring compliance of Aeronautical Center air emissions with the Clean Air Act. Emissions include volatile organic compounds of various types including refrigerants .

2.02 Asbestos Management

This program involves management of the asbestoscontaining materials present in MMAC buildings in accordance with OSHA and NESHAPS regulations and FAA policy.

2.02 Asbestos Management

2.03 Drinking Water This program involves ensuring compliance of Aeronautical Center drinking water with the Safe Drinking Water Act.

2.04 Water Pollution & Spill

Prevention

This program covers compliance activities at the Aeronautical Center under the Clean Water Act, including discharges to sanitary and storm sewers, storm water pollution prevention program and the spill prevention, control and countermeasures (SPCC) planning .

2.05 Solid Waste Management

2.05 Solid Waste Management

This program involves management of solid waste generated at MMAC in accordance with applicable regulatory requirements.

2.06 Hazardous Waste Management

This program involves management of hazardous wastes generated at MMAC in accordance with Resource Conservation and Recovery Act (RCRA) requirements.

2.07 Fuel Storage Tanks

2.07 Fuel Storage Tanks

This program involves management of fuel storage tanks associated with vehicle refueling and emergency generators (for both building backup and training purposes) at the MMAC in accordance with federal , state, and FAA regulations.

VN 3900.1 04/30/04 Appendix 4.1

ESH Program

Number ESH Program Name ESH Program Description

2.08 Emergency Planning & Community Right-To-Know

2.08 Emergency Planning & Community Right-To-Know

This program covers compliance activities at the MMAC under the Emergency Planning and Community Right-to- Know Act (EPCRA). This involves filing an annual inventory report regarding certain hazardous materials to the Local Emergency Planning Commission (LEPC).

2.09 Toxic Substances (PCB)

2.09 Toxic Substances (PCB)

This program involves management of equipment at the MMAC which has been identified as containing or which could possibly contain PCBs in accordance with Toxic Substance Control Act (TSCA) requirements. Radon testing and mitigation is also included.

2.10 Pesticide Management

2.10 Pesticide Management

This program involves management of pesticides at the MMAC in accordance with the Federal Insecticide, Fungicide and Rodenticide Act.

2.11 Radioactive Materials

This program covers compliance activities at the MMAC under Atomic Energy Act (AEA) and Low-Level Waste Policy Act (LLWPA).

2.12 Natural Resources Management

2.12 Natural Resources Management

This program covers compliance activities at the MMAC under sixteen federal laws including the Endangered Species Act and the North American Wetland Conservation Act.

2.13 Cultural & Historical

This program covers compliance activities at the MMAC under ten federal laws including the National Historic Preservation Act.

2.21 Hazardous Waste Operations

2.21 Hazardous Waste Operations

This program covers the safety of MMAC personnel involved in operations of hazardous waste as well as emergency response operations for releases of, or substantial threats of releases of, hazardous substances without regard to the location of the hazard.

2.22 Ventilation

2.22 Ventilation

"Ventilation" specifically refers to Industrial Ventilation. Building comfort heating and cooling systems are not included in the scope of this program. This program involves ensuring that all systems engineered and installed to mechanically remove harmful air contaminants operate sufficiently and provide a level of protection to reduce/eliminate concentrations of gases, fumes, vapors, or particles that might otherwise exceed worker exposure limits.

04/30/04 VN 3900.1 Appendix 4.1

ESH Program

Number ESH Program Name ESH Program Description

2.23 Noise

2.23 Noise

This program seeks to identify work areas where hazardous noise exists. Once identified , these areas are evaluated first to determine if engineering controls can be used to eliminate or reduce the hazard, and secondly if administrative controls can eliminate or reduce the hazard . If neither of these methods work, personal protective equipment is used , and personnel are placed in the hearing conservation program.

2.24 Radiation This program seeks to identify and control both ionizing and non-ionizing radiation .

2.25 Hazard Communication

2.25 Hazard Communication

The purpose of this program is to ensure that the hazards of all chemicals produced or imported are evaluated , and that information concerning their hazards is transmitted to employers and employees. This transmittal of information is accomplished by means of a comprehensive hazard communication program, which are to include container labeling and other forms of warning , material safety data sheets and employee training . Exposure monitoring is not included in the scope of this program.

2.26 Explosives This program seeks to insure the safe handling and storage of explosive-type materials.

2.27 Respiratory Protection

2.27 Respiratory Protection

This program is established to ensure all workers are provided with protection from respiratory exposures when respiratory protection is the final option. A Respiratory Protection Program will be established for work locations where it has been determined a potential for an exposure exists above established respiratory exposure limits.

2.28 Permit-Required Confined Space Entry

2.28 Permit-Required Confined Space Entry

This program involves the development and implementation of a confined space entry program in accordance with OSHA 1910.146 and FAA Order 3900 .198.

2.29 Toxic and Hazardous

Substances

Workers who handle toxic and hazardous substances must

2.29 Toxic and Hazardous

be provided with protection and the knowledge of how to protect themselves from these materials. Caring for the health of workers exposed to hazardous substances requires evaluating the potential for exposures through routes of entry including Inhalation, Ingestion , Absorption , and Injection.

VN 3900.1 04/30/04 Appendix 4.1

ESH Program

Number ESH Program Name ESH Program Description

2.30 Lockout/Tagout

2.30 Lockout/Tagout

This program is intended to prevent personal injuries from the unexpected energizing or start up of machines or equipment during installation, servicing or repairs.

2.31 Welding, Cutting and Brazing

The purpose of this program is to comply with regulations for welding, cutting and brazing, 29 CFR 1910, subpart Q .

2.32 Fire Protection

2.32 Fire Protection

This program works to see that the correct type of extinguishers are available in work sites, that these extinguishers are inspected on a monthly basis, and that personnel are trained in their operation. Installation, operation, testing , inspection and maintenance of sprinkler and alarm systems also fall under this program. This program includes emergency evacuation programming and requirements under the Life Safety Code, NFPA 101 .

2.33 Bloodborne Pathogens

2.33 Bloodborne Pathogens

This program protects employees whose jobs potentially expose them to occupational hazards from blood or other potentially infectious body fluids. CAMI has assumed responsibility for training required by this program.

2.35 Powered Industrial Trucks

This program deals with the control of forklifts and compliance with regulations for powered industrial trucks in accordance with OSHA 1910.178.

2.36 Hearing Conservation

2.36 Hearing Conservation

This program involves protecting workers from noiseinduced hearing loss resulting from hazardous noise (29 CFR 191 0.95). It includes gathering information regarding noise levels that are hazardous, how monitoring is performed , information and training , medical surveillance, and record keeping .

2.37 Hoist/Sling

2.37 Hoist/Sling

This program deals with the visual inspection and testing of material hoists. Deficiencies are identified and corrected to reduce the risk of hoist failure and resulting employee injury. Comply with regulations for inspection of hoists and cranes, 29 CFR 1910.179.

2.38 Emergency Operations

2.38 Emergency Operations

This program deals with the planning and management of national security emergencies and major disasters in accordance with AC 1900.128 and FAA Order 1900.1 E.

04/30/04 VN 3900.1 Appendix 4.1

ESH Program

Number ESH Program Name ESH Program Description

2.39 Self Inspection Program

2.39 Self Inspection Program

This program was set up to comply with Washington directive that specified that limited/moderate risk workplaces be inspected annually by designated

inspectors. Increased risk workplaces are to be inspected twice a year.

2.40 Ergonomics

The goal of this program is to reduce the risk of musculoskeletal disorders (e.g., back injuries) from factors such as overexertion, prolonged repetition , and awkward posture. Both office (computer workstations) and industrial workstations are included under this program .

Continue reading ↓ 120 of 221 passages shown