Order JC 7100.3C Published Procedure Development
This order prescribes procedures for processing published procedure development in the Central Service Area and associated airspace, not connected with National Airspace/Metroplex initiatives.
This document is no longer current. Cancelled by JC 7100.3C. Check the official source before relying on it.
U.S. DEPARTMENT OF TRANSPORTATION
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATO Central Service Center
SUBJ: PUBLISHED PROCEDURE DEVELOPMENT
ORDER NUMBER JC 7100.3C
Effective Date:
Apri I 1, 2015
1. PURPOSE. This order prescribes procedures for processing published procedure development in the Central Service Area and associated airspace, not connected with National Airspace/Metroplex initiatives.
ORDER NUMBER JC 7100.3C
2. DISTRIBUTION. This order is distributed to group level in the Air Traffic Organization (ATO), to air route traffic control centers (ARTCC), and airp01i traffic control tower (ATCT) facilities in the Central Service Area.
3. WHERE CAN I FIND THIS ORDER This order is available on the MY FAA employees Web site at https://employees.faa.gov/tools resources/orders notices/.
4. EFFECTIVE DATE. Ap1il 1, 2015
5. CANCELLATION. This order cancels JC 7100.3B: Published Procedure Development, dated September 27, 2012
6. BACKGROUND. This order revises JC 7100.38. This order will ensure compliance in the consolidated geographical area and standardize procedures for the Operations Support Group (OSG) in the Central Service Center.
7. EXPLANATION OF CHANGES. Removed cancelled orders, added new orders and updated references to current orders. Deleted and added references for environmental processes. Appendixes have been updated, and minor administrative changes incorporated where required. Added coordination with Military Representative. Changed organization name AeroNav Products, to Aeronautical Information Services. Updated signature authority for realigned ATS management.
8. RELATED PUBLICATIONS.
a. Federal Aviation Administration (FAA) Order 1050.1, Environmental Impacts: Policies
and Procedures.
b. FAA Order 1100.161, Air Traffic Safety Oversight.
c. FAA Order 5050.4, National Environn1ental Policy Act (NEPA) Implementing
Instructions for Airport Projects.
d. FAA Order 7100.9, Standard Terminal An-ival Program and Procedures.
Distribution: Electronic £nitiated By: ATO Central Service Center
Operations Suppo11 Group
e. FAA Order 7100.10, Air Traffic Satellite Navigation Implementation Plan.
f. FAA Order 7100.41, Performance Based Navigation Implementation Process. NOTE: When it is determined that a procedure.falls into the category ofPerformance Based Navigation (PBN) and a PBN Work group must be established per A.JV-I./. then use FAA Order 7100. 41 as the primary guidance.
g. FAA Order 7110.79, Charted Visual Flight Procedures.
h. FAA Order 7210.3, Facility Operation and Administration.
1. FAA Order 7400.2, Procedures for Handling Airspace Matters.
J. FAA Order 7910.4, Airport Diagrams.
k. FAA Order 7910.5, Aeronautical Charting Forum.
I. FAA Order 8260.3, United States Standard for Terminal Instrument Procedures.
m. FAA Order 8260.19, Flight Procedures and Airspace.
n. FAA Order 8260.43, Flight Procedure Management Program.
o. FAA Order 8260.46, Departure Procedure (DP) Program.
p. FAA Order 8260.58, United States Standard for Performance Based Navigation (PBN)
Instrument Procedure Design.
q. FAA Safety Management System (FAA SMS) Manual.
9. PROCEDURES.
a. Departure Procedures (DP) and/or Area Navigation Departure Procedures (RNA V DP). DPs are normally requested by the air traffic control (ATC) facility responsible for departure control at the airport where the procedure is proposed. Requests for DPs and/or
RNA V DPs development must be processed in accordance with FAA Order I050.1 , FAA Order
1100.161, FAA Order 5050.4, FAA Order 7400.2, FAA Order 8260.3, FAA Order 8260.58, FAA Order 8260.46, and/or the FAA SMS Manual.
1) The ATC facilities developing and/or processing the DP must:
a) Coordinate with all associated A TC facilities, Planning & Requirements (P&R), OSG, customers, and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary ATC field facility actions and/or coordination on the DP and/or RNA V DP Checklist, Appendix 1.
d) Request from the Service Center Environmental Specialist and complete the Instrument Flight Procedures (IFPs) Re-engineered Environmental Review Process, prescreening filter.
e) Complete a Safety Risk Management Assessment. Prepare the appropriate documentation in accordance with the FAA SMS Manual.
f) Draw the DP and/or RNAV DP on a Sectional Chart (include altitudes).
g) Submit the DP and/or RNAV DP package and a copy of the recorded ATC facility actions and/or coordination to the OSG.
h) Retain the original recorded A TC facility actions and/or coordination at least until the procedure is published.
i) Track procedure as necessary until published.
2) OSG must:
a) Review the DP and/or RNA V DP package to ensure that it is complete, correct and/or accurate.
b) Create an action item in the Service Area Action Tracking System (SAA TS)
c) Ensure that coordination has been effected with all associated ATC facilities, customers and/or interested parties as appropriate and if required, P&R, Regional Airspace Procedures Team (RAPT), BSG, Quality Control Group (QCG). other Service Centers and Regional Office
Military Representatives.
d) Ensure differences have been resolved.
c) Record all necessary OSG actions, approvals, and/or coordination on the DP and/or RNA V DP Checklist.
f) Submit the DP and/or RNAV DP package to Aeronautical Information Services, as appropriate.
g) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
h) Track procedure as necessary until published.
b. Standard Termina] Arrivals (ST AR) and/or Area Navigation Standard Terminal Arrivals (RNAV STAR). STARs are normally requested by the responsible ARTCC servicing
the terminal area approach control for the area/airport(s) affected or TRACON. Requests for STAR and/or RNA V STAR development must be processed in accordance with FAA Order
1050.1, FAA Order 1100.161, FAA Order 5050.4, FAA Order 7400.2, FAA Order 7100.9, FAA Order 8260.3, and/or FAA SMS Manual.
1) The ATC facility developing and/or processing the STAR must:
a) Coordinate with all associated A TC facilities, P&R, customers and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary A TC field facility actions and/or coordination on the STAR and/or RNAV STAR Checklist, Appendix 2.
d) Request from the Service Center Environmental Specialist and complete the Instrument Flight Procedures (lFPs) Re-engineered Environmental Review Process, prescreening filter.
e) Complete a Safety Risk Management Assessment and prepare the appropriate documentation as required by the FAA SMS Manual.
f) Draw the STAR and/or RNAV STAR Terminal Area Route Generation Evaluation & Traffic Simulation (TAR GETS) package on a Sectional Chart (include altitudes) per FAA Order 7100.9.
g) Submit the STAR and/or RNA V STAR package and a copy of the recorded ATC facility actions and/or coordination to OSG.
h) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested.
i) Track procedure as necessary until published as requested.
2) OSG must:
a) Review the STAR and/or RNAV STAR package to assure that it is complete, correct and/or accurate.
b) Create an action item in the Service Area Action Tracking System (SAA TS)
c) Ensure that coordination has been effected with all associated A TC facilities, customers and/or interested parties as appropriate and if required, P&R, Regional Airspace
Procedures Team (RAPT), BSG, Quality Control Group (QCG), other Service Centers and Regional Office Military Representatives.
d) Ensure that differences have been resolved.
e) Record all necessary OSG actions, approvals and/or coordination on the STAR and/or RNAV STAR Checklist, Appendix 2.
f) Submit the STAR and/or RNAV STAR package to Aeronautical Information Services.
g) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
h) Track procedure as necessary until published.
c. Standard Instrument Approach Procedures (SIAP), Area Navigation (RNAV) SIAP, Satellite Navigation (SATNAV) SIAP, Charted Visual Flight Procedures (CVFP). Requests for SIAP, RNAV SIAP, SATNAV SIAP and/or CVFP development must be processed in accordance with FAA Order 1050.1 , F J\J\ Order 1100.161 , FAA Order 5050.4, FAA Order 7110. 79, FAA Order 7400.2, F J\A Order 7910.4, FAA Order 8260.3, FAA Order 8260.58, and/or the FAA SMS Manual.
1) The ATC facility developing and/or processing the above proccdure(s) must:
a) Coordinate with all associated ATC facilities, P&R, OSG, airport operators, customers, and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary ATC field facility actions and/or coordination on the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVAP Checklist, Appendix 3.
d) Request from the Service Center Environmental Specialist and complete the Instrument Flight Procedures (IFPs) Re-engineered Environmental Review Process, pre-screening filter.
e) Complete a Safety Risk Management Assessment and prepare the appropriate documentation as required by the FAA SMS Manual.
f) Submit the SIAP, RNAV SIAP, SATNAV SlAP, and/or CYFP package and a copy of the recorded ATC facility actions and/or coordination to OSG.
g) Retain the original recorded A TC facility actions and/or coordination at least until the procedure is published.
h) Track procedure as necessary until published as requested.
2) OSG must:
a) Review the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVFP package to ensure that it is complete, correct and/or accurate.
b) Create an action item in the Service Area Action Tracking System (SAATS)
c) Ensure that coordination has been effected with all associated A TC facilities, customers and/or interested parties as appropriate and if required, P&R, Regional Airspace Procedures Team (RAPT), BSG, Quality Control Group (QCG), other Service Centers and Regional Office Military Representatives.
d) Ensure differences have been resolved.
e) Record all necessary OSG actions, approvals, and/or coordination on the SIAP,
RNAV SIAP, SATNAV SIAP, and/or CVFP Checklist, Appendix 3.
t) Submit the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVFP package to Aeronautical Information Services.
g) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
h) Track procedure as necessary until published.
d. Airport Diagrams (APDG). Must be processed in accordance with FAA Order 7910.4.
1) Revisions/changes to an existing APDG must process as follows:
a) ATC facility must:
(1) Coordinate with all associated ATC facilities, OSG, airport operators, customers and/or interested parties as appropriate.
(2) Resolve differences as appropriate.
(3) Record all necessary ATC field facility actions and/or coordination on the APDG Checklist, Appendix 4.
(4) Submit change request via email, mail, web site (preferred) or fax to:
Federal Aviation Administration Aeronautical Information Services FOB IOA, Room 626 800 Independence Avenue, S.W. Washington, DC 20591 Fax: 202-493-4266
Email: 9-awa-ats-d iagramsr wfaa.go\' https://nfdc.faa.gov/po11aJ/airportDiagrams.do.
b) OSG must:
(I) Review the APDG package to ensure that it is complete, correct, and/or accurate.
(2) Record all necessary OSG actions and/or coordination on the APDG Checklist, Appendix 4.
(3) Create an action item in the Service Area Action Tracking System (SAATS).
(4) Track information as necessary until published.
2) Developing a new APDG. The ATC facility processing a new APDG must be processed as follows:
a) ATC Facility must:
(1) Draft a formal Jetter addressed to the Director of Air Traffic Services
North/South and include an electronic Airport Layout Plan (ALP) or similar drawing.
(2) Director will forward to OSG.
b) OSG must:
(1) Prepare an endorsement memorandum for the signature of the Director of
Air Traffic Services North/South.
(2) Create an Action Item in the Service Area Action Tracking System (SAATS).
(3) Submit request via email (preferred), mail or fax to:
Federal Aviation Administration Aeronautical Information Services FOB l OA, Room 626 800 Independence Avenue, S. W. Washington, DC 20591 FAX: 202-493-4266 Email: [email protected]
(4) Track information as necessary until published.
(5) Close item in SAA TS.
e. Airport/Facility Directory (AFD). Requests for J\FD information development should be processed as follows:
l) The Airport Manager is responsible for developing, correcting and/or processing AFD information. Coordination is the airport manager·s responsibility.
a) Submit new or change request to:
FAA, Aeronautical Information Management NFDC Group AJV-21
800 Independence Avenue, S.W. Washington, DC 20591 Web Site: http://nfdc.faa.gov
b) For charting en-ors contact:
FAA, Aeronautical Information Services SSMC-4 Sta. #4445
1305 East West Highway Silver Spring, MD 20910-3281
2) ATC facility should refer requests to airport management.
3) OSG should provide support as requested.
f. Environmental Actions. Environmental actions must be processed in accordance with FAA Order 1050.1, FAA Order 5050.4, FAA Order 7400.2. FAA Order 8260.19 and/or cunent policy and procedures.
1) The ATC facility processing an environmental action must:
a) Coordinate with all associated ATC facilities, P&R, customers, and/or interested pai1ies as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary A TC field facility actions and/or coordination.
d) Submit the associated environmental documents package ( pre-screening filter and other documents as appropriate and graphic depiction) and a copy of the recorded A TC facility actions and/or coordination to OSG.
e) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published. Retain aJI environmental documents for as long as the procedure is in use.
f) Track information as necessary until envirornnental actions are completed.
2) OSG must:
a) Review the environmental documents package to ensure that it is complete, coITect and/or accurate.
b) Create an Action rtem in the Service Area Action Tracking System (SAA TS).
c) Ensure that coordination has been effected with all associated ATC facilities, P&R, other Service Centers (if needed), customers, and/or interested parties as appropriate.
d) Ensure that differences have been resolved.
e) Record all necessary OSG actions and/or coordination.
f) If appropriate, prepare the Categorical Exclusion Declaration (CATEX), FAA Order 7400.2, Appendix 6, and obtain necessary signatures.
g) Retain the original recorded OSG actions and/or coordination at least until the procedure is published. Retain all environmental documents for as long as the procedure is in use.
h) Track information as necessary until environmental actions are completed.
10. RESPONSIBILITIES.
a. The ATC facility Air Traffic Manager must ensure:
l) That all facility personnel involved in processing procedures are familiar with the provisions of this order.
2) That all appropriate coordination has been effected with the district facility and the ATC facility having jurisdiction over the airspace ofthe published procedure.
b. The A TO Central Service Center OSG Manager must ensure that all A TO personnel involved in processing airspace and/or procedures are familiar with the provisions of this order.
ello Tony Kim Stover Director, A Traffic Services North. Acting Director, Air Traffic Services South, Central Ser ice Area, AJTCN Central Service Area, AJTCS
IO
APPENDIX 1: DP and/or RNAV SID CHECKLIST
Name of Procedure: -------- ---- -- ------
DATE NAME/INITIAL
1. Terminal ATC Facility
1. Terminal ATC Facility
a. Evaluate Request
1) Initiate Guidelines for the Design of Graphic Instmment Departure Procedures
2) Utilize FAA Order 8260.46
a) Appendix 2
b) Appendix 3
3) Identify lead air canier (if other than proponent)
a) Assist in procedure design
b) Check fly ability
4) Coordinate with Traffic Management
5) Request coordination with the RAPT through OSG
b. Environmental Review/Noise Screening
1) Notify OSG
2) Draw DP and/or RNAV SID on Sectional Chart
APPENDIX 1: DP and/or RNAV SID CHECKLIST
APPENDIX 1: DP and/or RNAV SID CHECKLIST
DATE NAME/INITIAL
3) Ifa CATEX is not appropriate, and, if the initial environmental review indicates that extraordinary circumstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact OSG for further guidance.
DATE NAME/INITIAL
c. SMS Review
1) Review change per the provisions of the FAA SMS Manual; include input from the en route facility(s) if applicable
2) Prepare the appropriate documentation as required by the FAA SMS Manual or Safety Risk Management Decision Memo (SRMDM).
3) Submit Safety Risk Management Document (SRMD) or SRMDM to OSG for review
d. Check for potential waiver requests (accomplish early in the process) and coordinate with OSG
e. Coordinate, as required, with other facilities that may be affected by the new procedure
APPENDIX 1: DP AND/OR RNAV SID CHECKLIST
APPENDIX 1: DP AND/OR RNAV SID CHECKLIST
DATE NAME/INITIAL 1) Contact controlling ARTCC. ARTCC will injtiate their checklist below.
2) Form a joint design team to develop implementation strategy:
a) Management
b) Automation and P&R
c) Affected facilities
f Develop/change/modify as required
1) Procedures
2) Facility directives
3) Airspace
4) Video maps
5) Automation (ensure P&R is notified early)
g. Coordinate with OSG Manager and P&R as needed (new equipment, facilities, etc.)
h. Complete the following forms:
1) 8260.46, Appendix 3
2) TARGETS, 8260-lSB and -15C
2. Overlying ARTCC (to be accomplished concurrently with #1 above)
2. Overlying ARTCC (to be accomplished concurrently with #1 above)
APPENDIX 1: DP and/or RNA V SID CHECKLIST
DATE NAME/INITIAL
a. Assist with environmental issues
b. Assist with SMS review
c. Participate in design team
1) Management
2) Automation (P&R)
3) Traffic Management
d. Develop/change/modify as required
DATE NAME/INITIAL
I) Procedures
2) Facility directives
3) Airspace
4) Video maps
5) Automation (accomplish early)
Ensure P&R is notified
e. Coordinate with adjacent Air Route Traffic Control Centers (ARTCC) as needed
3. Re-assemble design team, as needed, to review completed DP package and make modifications and/or corrections, as needed
4. Submit package to OSG, including:
APPENDIX 1: DP and/or RNAV SID CHECKLIST
APPENDIX 1: DP and/or RNAV SID CHECKLIST
DATE NAME/INITIAL
a. DP checklist
b. Requested chart date
c. Environmental Documentation
d. SRMD
5. OSG
a. Review submitted DP Package
b. Return the DP package to originating A TC facility for modifications, if not complete, correct, and/or accurate
DATE NAME/INITIAL
c. If appropriate, prepare CATEX (FAA Order 7400.2, Appendix 6)
or
Ifa CATEX is not approp1iate, coordinate finiher environmental review (i.e. an Environmental Assessment (EA) or an Environmental Impact Statement (EIS))
d. Complete review ofSRMD or SRMDM and coordinate with QCG, if required
e. Submit DP package to Aeronautical Information Services.
------------------------
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
Name ofProcedure:
DATE NAME/INITIAL
1. Proponent
a Complete the responsibilities outlined in FAA Order 7100.9, Paragraph 11
b. Submit the ST AR Proposal
1) To the overlying ARTCC Facility and/or ARTCC Airspace/Plans and ProcedW"es Office
1. Proponent
2) Other ARTCC and Tenninal A TC Facilities, as needed
3) Customers, if needed
4) National Airspace Redesign Team, if required
5) Other interested parties
2. ARTCC Facility and/or ARTCC Airspace Office
a. Coordinate with OSG STAR Specialist
b. Coordinate with OSG Environmental Specialist
2. ARTCC Facility and/or ARTCC Airspace Office
c. Request coordination with the RAPT through OSG
d. Organize STAR design tean1 based on the scope ofthe project.
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
1) Potential design team members:
a) ARTCC Airspace/Plans and Programs representatives
b) Terminal Airspace/Plans and Programs representatives
DATE NAME/INITIAL
c) Operational personnel d) Facility management e) Lead air caniers f) Air Transport Association g) Airport authority h) OSG representative
i) Others as necessary
2) Develop implementation plan to include, but not limited to:
a) Letters ofAgreement b) Standard Operating Procedw-es c) Training d) Customer briefings e) Safety Management System f) Automation needs and changes g) Time Iines h) Other items as necessary
e. In conjunction with the STAR design team, complete the responsibilities outlined in FAA Order
1100.161 , Chapter 3 and FAA Order 7100. 9, Paragraph 11
1) Determine operational feasibility
2) Ifrequested, provide feedback to proponent
3) Coordinate with all affected A TC facilities, as needed
APPENDIX 2: STAR and/or RNAV ST AR CHECKLIST
APPENDIX 2: STAR and/or RNAV ST AR CHECKLIST
DATE NAME/INITIAL
4) Enter into TARGETS
5) Coordinate with P & R
6) Coordinate with customers, as needed
7) Coordinate with National Airspace Redesign Team, if required
8) Coordinate with other interested parties as necessary
9) Serve as focal for problem solving
DATE NAME/INITIAL
10) Ifa CATEX is not appropriate, and ifthe initial environmental review indicates that extraordinary circumstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact the OSG for fmther guidance
11) Safety Management System (SMS) Review
12) Review change per the provisions ofthe FAA SMS Manual; include input from the terminal facility(s), if applicable
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
15) Prepare the appropriate documentation as required by the FAA SMS Manual.
16) Submit appropriate documentation as required by the FAA SMS Manual.
17) Complete FAA Form 8260-2, Data Worksheet for new waypoints.
18) Depict STAR on a (VFR) Sectional Chait
DATE NAME/INITIAL
19) Ifapplicable, retain associated environmental documents.
g. Submit ST AR package to OSG containing the following:
1) ST AR checklist
2) Current FAA Form 7100-4 for conventional STAR and RNA V ST AR
3) Current FAA Form 7100-3 for RNAV STAR
4) Current FAA Fo1m 8260-2, Data Worksheet for new fixes/waypoints
5) Current FAA Fom1 6050-4, Expanded Service Volume (ifapplicable)
6) SRMD or SRMDM
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
7) ST AR drawn on Sectional Chait
3. OSG
a Review submitted ST AR package
b. Return the STAR package to the originating ATC facility for modification, if not complete, correct, and/or accurate
c. Complete the responsibilities outlined in FAA Order 7100.9, Paragraph 11
DATE NAME/INITIAL
d. Ifappropriate, approve prepared CATEX
or
Ifa CATEX is not appropriate, coordinate further environmental review (i.e. EA or an EIS)
e. Complete review of SRMD or SRMDM and coordinate with QCG, if required.
f. Submit the ST AR package to Aeronautical Infonnation Services.
------------------------
APPENDIX 3: SIAP, RNAV SlAP, SATNAV, and/or CVAP CHECKLIST
APPENDIX 3: SIAP, RNAV SlAP, SATNAV, and/or CVAP CHECKLIST
Name of Procedure:
DATE NAME/INITIAL
1. ATC Facility
a. Consider requests for SIAP's from proponents, customers, other ATC facilities, FAA Headquarters and Central Service Center, and/or interested parties as appropriate
1. ATC Facility
b. Consider the following items:
1) Need/benefit
2) Customers.
3) Environmental issues
4) Airspace changes
5) Altitude
6) Expanded service volume (ESV)
7) Fix/waypoint names
8) Holding
9) Design types (legs, feeder routes, etc)
10) Communication needs
11) Equipment needs
12) Video maps
13) Waivers
14) Legal ramifications/procedures
15) FAASMS
15) FAASMS
16) Letters of Agreement
APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST
DATE NAME/INITIAL
17) Standard operating procedures
18) Training
19) Customer briefings
20) Automation needs and changes
21) Time lines
22) Publication date
23) Other items, as necessary
DATE NAME/INITIAL
c. Coordinate with:
1) All affected ATC facilities
2) OSG for
a) Operational issues, as appropriate
b) Environmental issues, as appropriate
c) SRMD or SRMDM
3) P&R, as appropriate
4) Airport operator for operational and environmental issues, as appropriate
5) Customers and interested parties, as appropriate
6) OSG RNAV/ SATNAY specialist
APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST
APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST
DATE NAME/INITIAL
7) Request coordination with RAPT through OSG
d. Submit the SIAP package to OSG, containing the SIAP checklist
-----------------------
APPENDIX 4: APDG and/or AFD CHECKLIST
Name ofProcedure/Item:
DATE NAME/INITIAL
1. ATC Facility
1. ATC Facility
a. Consider APDG/ AFD requests from airpo11 operators, customers, other ATC facilities, and/or interested parties, as appropriate
b. Solicit written concurrence from airpo11 operator for items that are within its jurisdiction (i.e., airport diagrams, runways, taxiways, airpoti lighting, ramp areas, etc.)
c. Develop a written request that:
1) Is signed by the facility Air Traffic Manager
2) Clearly identifies the item/items that need to be addressed
3) Provides detailed written information on the following, as appropriate
a) Publication name/section b) Procedure name c) City/ Airpo1t name d) Location identifiers e) Airpo1t location f) Time conversions g) Geographic positions ofairport, airport reference point (ARP)
h) Charts i) Instrument approach procedures j) Airport diagrams/airport sketches
k) Elevation
1) Control tower m) Rotating beacon n) Servicing/fuel/oxygen o) Traffic pattern altitude
APPENDIX 4: APDG and/or AFD CHECKLIST
APPENDIX 4: APDG and/or AFD CHECKLIST
DATE NAME/INITIAL
p) Airport ofentry, landing rights and customs user fee airports
q) Runway data r) Airport remarks s) Weather data sources t) Communication u) NOTAM service v) Airspace w) Radio aids to navigation
4) Provides graphic information on the following, as appropriate:
DATE NAME/INITIAL
a) Airport diagrams/charts b) Runways c) Taxiways d) Ramp areas e) Control tower f) Rotating beacon
d. Submit the APDG/ AFD package to OSG, containing the written information, graphic inf01mation, and the APDG/AFD Check! ist
2. OSG Assist with development ofpackage (facility submits directly to Headquru1ers (HQ).