Order JC 7100.3A Published Procedure Development
This order prescribes procedures for processing published procedure development in the Central Service Area and associated airspace.
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Figure
U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATIO N ADMINISTRATIO N NUMBER ATO Central Service Center JC 7100.3A
Effective Date:
May 21, 2010
UBJ: Published Procedure Development S
1. Purpose of This Order. This order prescribes procedures for processing published procedure development in the Central Service Area and associated airspace.
2. Audience. All Central Service Area Air Traffic Control employees.
3. Where Can I Find This Order. This order is available on the MY FAA employees Web site at https://employees.faagov/tools resources/orders notices/
4. Effective Date. May 21, 2010
5. Cancellation. This order cancels JOC 71 00.3; Published Procedure Development, dated December 11, 2006.
6. Distribution. This order is distributed to group level in the Air Traffic Organization (A TO), to air route traffic control center (ARTCC) and airport traffic control tower (ATCT) facilities in the Central Service Area, and the Central Flight Procedures Office (CFPO).
7. Background. This order revises JOC 7100.3. This order will ensure compliance in the consolidated geographical area and standardize procedures for the Operations Support Group (OSG) in the Central Service Center.
8. Explanation of Changes. The Office of Primary Responsibility (OPR) resides entirely with Operations Support Group (OSG). References to current orders have been updated, appendixes updated, and minor editorial changes incorporated.
9. Related Publications.
a. Federal Aviation Administration (FAA) Order 1050.1, Environmental Impacts: Policies and Procedures.
b. FAA Order 1100.161, Air Traffic Safety Oversight.
c. FAA Order 5050.4, National Environmental Policy Act (NEPA) Implementing Instructions for Airport Projects.
d. FAA Order 7100.9, Standard Terminal Arrival Program and Procedures.
e. FAA Order 7100.10, Air Traffic Satellite Navigation Implementation Plan.
Distribution: Electronic Initiated By: ATO Central Service Center
Operations Support Group
f. FAA Order7110.79, Charted Visual Flight Procedures.
g. FAA Order 721 0.3, Facility Operation and Administration.
h. FAA Order 7400.2, Procedures for Handling Airspace Matters.
1. FAA Order 791 0.4, Airport Diagrams.
J. FAA Order 7910.5, Aeronautical Charting Forum.
k. FAA Order 8260.3, United States Standard for Terminal Instrument Procedures.
1. FAA Order 8260.43, Flight Procedure Management Program.
m. FAA Order 8260.44, Civil Utilization ofArea Navigation (RNAV) Departure Procedures.
n. FAA Order 8260.45, Terminal Arrival Area (TAA) Design Criteria.
o. FAA Order 8260.46, Departure Procedure (DP) Program.
p. FAA Safety Management System (FAA SMS) Manual.
10. Procedures.
a. Departure Procedures (DP) and/or Area Navigation Departure Procedures (RNA V DP). DPs are normally requested by the air traffic control (ATC) facility responsible for departure control at the airport where the procedure is proposed. Requests for DPs and/or RNAV DPs development must be processed in accordance with FAA Order 1050.1, FAA Order 1100.161, FAA Order 5050.4, FAA Order 7400.2, FAA Order 8260.3, FAA Order 8260.44, FAA Order 8260.46, and/or the FAA SMS Manual.
1) The ATC facilities developing and/or processing the DP must:
a) Coordinate with all associated ATC facilities, Planning & Requirements (P&R), OSG, customers, and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary ATC field facility actions and/or coordination on the DP and/or RNA V DP Checklist, Appendix 1.
d) Complete the Air Traffic Initial Environmental Review Checklist, FAA Order 7400.2, Appendix 5.
e) Conduct a noise assessment utilizing the Noise Integrated Routing System (NIRS) Noise Screening Tool (NST).
f) Complete a Safety Risk Management Assessment. Prepare the appropriate documentation in accordance with the FAA SMS Manual.
JC 7100.3A 05/21110
g) Draw the DP and/or RNAV DP on a Sectional Chart (include altitudes).
h) Submit the DP and/or RNAV DP package and a copy ofthe recorded ATC facility actions and/or coordination to the OSG.
i) Retain the original recorded A TC facility actions and/or coordination at least until the procedure is published.
j) Track procedure as necessary until published.
2) OSGmust:
a) Review the DP and/or RNAV DP package to ensure that it is complete, correct and/or accurate.
b) Ensure that coordination has been effected with all associated ATC facilities, P&R, Regional Airspace Procedures Team (RAPT), BSG, Quality Control Group (QCG), other Service Centers (if required), customers and/or interested parties as appropriate.
c) Ensure differences have been resolved.
d) Record all necessary OSG actions, approvals, and/or coordination on the DP and/or RNAV DP Checklist.
e) Submit the DP and/or RNAV DP package to CFPO, Aviation Systems Standards (AVN) and/or Aeronautical Information Management Group (AIM), as appropriate.
f) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
g) Track procedure as necessary until published.
b. Standard Terminal Arrivals (STAR) and/or Area Navigation Standard Terminal Arrivals (RNAV STAR). STARs are normally requested by the responsible ARTCC servicing the terminal area approach control for the arealairport(s) affected or TRACON. Requests for STAR and/or RNA V STAR development must be processed in accordance with FAA Order 1050.1, FAA Order 1100.161, FAA Order 5050.4, FAA Order 7400.2, FAA Order 7100.9, FAA Order 8260.3, and/or FAA SMS Manual.
1) The ATC facility developing and/or processing the STAR must:
a) Coordinate with all associated A TC facilities, P&R, customers and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary ATC field facility actions and/or coordination on the STAR and/or RNAV STAR Checklist, Appendix 2.
d) Conduct a noise assessment utilizing the NIRS Noise Screening Tool (NST).
e) Complete the Air Traffic Initial Environmental and Review Checklist, FAA Order 7400.2, Appendix 5.
f) Complete a Safety Risk Management Assessment and prepare the appropriate documentation as required by the FAA SMS Manual.
g) Draw the STAR and/or RNA V STAR Terminal Area Route Generation Evaluation & Traffic Simulation (TARGETS) package on a Sectional Chart (include altitudes) per FAA Order 7100.9.
h) Submit the STAR and/or RNA V STAR package and a copy ofthe recorded A TC facility actions and/or coordination to OSG.
i) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested.
j) Track procedure as necessary until published as requested.
2) OSGmust:
a) Review the STAR and/or RNAV STAR package to assure that it is complete, correct and/or accurate.
b) Ensure that coordination has been effected with all associated A TC facilities, P &R, RAPT, QCG, other Service Centers (ifneeded), customers and/or interested parties as appropriate.
c) Ensure that differences have been resolved.
d) Record all necessary OSG actions, approvals and/or coordination on the STAR and/or RNA V STAR Checklist, Appendix 2.
e) Submit the STAR and/or RNA V STAR package to CFPO/ A VN and/or AlM, as appropriate.
f) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
g) Track procedure as necessary until published.
c. Standard Instrument Approach Procedures (SlAP), Area Navigation (RNA V) SlAP, Satellite Navigation (SATNA V) SlAP, Charted Visual Flight Procedures (CVFP). Requests for SlAP, RNAV SlAP, SATNAV SlAP and/or CVFP development must be processed in accordance with FAA Order 1050.1, FAA Order 1100.161, FAA Order 5050.4, FAA Order 7110.79, FAA Order 7400.2, FAA Order 7910.4, FAA Order 8260.3, FAA Order 8260.45, FAA Order 8260.47, and/or the FAA SMS Manual.
1) The ATC facility developing and/or processing the above procedure(s) must:
a) Coordinate with all associated ATC facilities, P&R, OSG, airport operators, customers, and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary A TC field facility actions and/or coordination on the SlAP, RNA V SlAP, SATNA V SlAP, and/or CVAP Checklist, Appendix 3.
d) Conduct a noise assessment utilizing the NIRS NST.
e) Complete the Air Traffic Initial Environmental Review Checklist, FAA Order 7400.2, Appendix 5.
f) Complete a Safety Risk Management Assessment and prepare the appropriate documentation as required by the FAA SMS Manual.
g) Submit the SlAP, RNAV SlAP, SATNAV SlAP, and/or CVFP package and a copy of the recorded ATC facility actions and/or coordination to OSG.
h) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published.
i) Track procedure as necessary until published as requested.
2) OSGmust:
a) Review the SlAP, RNAV SlAP, SATNAV SlAP, and/or CVFP package to ensure that it is complete, correct and/or accurate.
b) Ensure that coordination has been effected with all associated ATC facilities, P&R, RAPT, QCG, other Service Centers (if needed), customers, and/or interested parties as appropriate.
c) Ensure differences have been resolved.
d) Record all necessary OSG actions, approvals, and/or coordination on the SlAP, RNAV SlAP, SATNAV SlAP, and/or CVFP Checklist, Appendix 3.
e) Submit the SlAP, RNA V SlAP, SATNAV SlAP, and/or CVFP package to CFPO/ A VN and/or AIM, as appropriate.
f) Retain the original recorded OSG actions and/or coordination at least until the procedure is published.
g) Track procedure as necessary until published.
d. Airport Diagrams (APDG). Must be processed in accordance with FAA Order 7910.4.
1) Revisions/changes to an existing APDG must process as follows:
a) A TC facility must:
(1) Coordinate with all associated A TC facilities, OSG, airport operators, customers and/or interested parties as appropriate.
(2) Resolve differences as appropriate.
(3) Record all necessary A TC field facility actions and/or coordination on the APDG Checklist, Appendix 4.
(4) Submit change request via email (preferred), mail or fax to:
Federal Aviation Administration Aeronautical Information Services FOB 1 OA, Room 626 800 Independence Avenue, S.W. Washington, DC 20591 Fax: 202-493-4266 Email: [email protected]
2) OSG must:
a) Review the APDG package to ensure that it is complete, correct, and/or accurate.
b) Record all necessary OSG actions and/or coordination on the APDG Checklist, Appendix 4.
c) Create an action item in the Service Area Action Tracking System (SAATS).
d) Track information as necessary until published.
3) Developing a new APDG. The ATC facility processing a new ADPG must be processed as follows:
a) Draft a formal letter addressed to the Director ofTerminal Operations and include an electronic Airport Layout Plan (ALP) or similar drawing.
b) Director will forward to OSG.
4) OSG must:
a) Prepare an endorsement memorandum for the signature ofthe Director ofTerminal Operations.
b) Track procedure as necessary until published.
c) Submit request via mail to:
Federal Aviation Administration Aeronautical Information Services FOB 1 OA, Room 626 800 Independence Avenue, S.W. Washington, DC 20591
d) Track information as necessary until published.
e) Close item in SAA TS.
e. Airport/Facility Diagrams (AFD). Requests for AFD information development should be processed as follows:
1) The Airport Manager is responsible for developing, correcting and/or processing AFD information. Coordination is the airport manager's responsibility.
a) Submit new or change request to:
FAA, Aeronautical Information Services, AJR, Rm. 626 800 Independence Avenue, S.W. Washington, DC 20591
b) For charting errors contact:
FAA, National Aeronautical Charting Office, AJV SSMC-4 Sta. #2335 1305 East West Highway Silver Spring, MD 20910-3281
2) ATC facility should refer requests to airport management.
3) OSG should provide support as requested.
f Environmental Actions. Environmental actions must be processed in accordance with FAA Order 1050.1, FAA Order 5050.4, FAA Order 7400.2, and/or current policy and procedures.
1) The A TC facility processing an environmental action must:
a) Coordinate with all associated ATC facilities, P&R, customers, and/or interested parties as appropriate.
b) Resolve differences as appropriate.
c) Record all necessary A TC field facility actions and/or coordination.
d) Submit the associated environmental documents package (Noise Assessment, Air Traffic Initial Environmental Review, other documents as appropriate and graphic depiction) and a copy ofthe recorded ATC facility actions and/or coordination to OSG.
e) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published. Retain all environmental documents (Noise Assessment, Air Traffic Initial
!
Environmental Review, etc) for as long as the procedure is in use.
f) Track information as necessary until environmental actions are completed.
2) OSGmust:
a) Review the environmental documents package to ensure that it is complete, correct and/or accurate.
b) Ensure that coordination has been effected with all associated A TC facilities, P &R, other Service Centers (if needed), customers, and/or interested parties as appropriate.
c) Ensure that differences have been resolved.
d) Record all necessary OSG actions and/or coordination.
e) Ifappropriate, prepare the Categorical Exclusion Declaration (CATEX), FAA Order 7400.2, Appendix 6, and obtain necessary signatures.
f) Retain the original recorded OSG actions and/or coordination at least until the procedure is published. Retain all environmental documents (Noise Assessment, Air Traffic Initial Environmental Review, etc) for as long as the procedure is in use.
g) Track information as necessary until environmental actions are completed.
11. Responsibilities.
a The A TC facility Air Traffic Manager must ensure:
1) That all facility personnel involved in processing procedures are familiar with the provisions ofthis order.
2) That all appropriate coordination has been effected with the district facility and the ATC facility having jurisdiction over the airspace ofthe published procedure.
b. The ATO Central Service Center OSG Manager must ensure that all ATO personnel involved in processing airspace and/or procedures are familiar with the provisions ofthis order.
(::=z~/~ J7"Yl ~1c114/~~ !
Paul J. Sheridan )O(l Nancy B. Kort J Director of En Route and ' Director of Terminal Operations Oceanic Operations Central Service Area Central Service Area
----------------------------------------------
APPENDIX 1: DP and/or RNAV SID CHECKLIST
Name of Procedure:
DATE NAME/INITIAL
1. Terminal ATC Facility
a. Evaluate Request
1) Initiate Guidelines for the Design of Graphic Instrwnent Departure Procedures
2) Utilize FAA Order 8260.46
a) Appendix 2
b) Appendix 3
3) Identify lead air carrier (ifother than proponent)
a) Assist in procedure design
b) Check flyability
4) Coordinate with Traffic Management
5) Request coordination with the RAPT throughOSG
b. Environmental Review/Noise Screening
1) Notify OSG
2) Draw DP and/or RNA V SID on Sectional Chart
3) Complete NIRS NST
APPENDIX 1: DP and/or RNA V SID CHECKLIST
DATE NAME/INITIAL
4) Complete Air Traffic Initial Environmental Review (FAA Order 7400.2,
Appendix 5)
5) Ifa CA TEX is not appropriate, and, if the initial environmental review indicates that extraordinary circwnstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact OSG for further guidance.
c. SMS Review
1) Review change per the provisions of the FAA SMS Manual; include input from the en route facility(s) ifapplicable
2) Prepare the appropriate documentation as required by the FAA SMS Manual or Safety Risk Management Decision Memo (SRMDM).
3) Submit Safety Risk Management Document (SRMD) or SRMDM to OSG for review
d. Check for potential waiver requests (accomplish early in the process)
1) Climb gradients, etc. (CFPO through OSG)
2) Procedural waivers through OSG, if necessary
e. Coordinate, as required, with other facilities that may be affected by the new procedure
APPENDIX 1: DP AND/OR RNAV SID CHECKLIST
DATE NAME/INITIAL
1) Contact controlling ARTCC. ARTCC will initiate their checklist below.
2) Form a joint design team to develop implementation strategy:
a) Management
b) Automation and P&R
c) Affected facilities
f. Develop/change/modify as required
1) Procedures
2) Facility directives
3) Airspace
4) Video maps
5) Automation (ensure P&R is notified early)
g. Coordinate with local OSG Manager and P&R as needed (new equipment, facilities, etc.)
h. Complete the following forms:
1) 8260.46, Appendix 3
2) TARGETS, 8260-ISB and -15C
2. Overlying ARTCC (to be accomplished concurrently with #1 above)
APPENDIX 1: DP and/or RNAV SID CHECKLIST
DATE NAME/INITIAL
a. Assist with environmental issues
b. Assist with SMS review
c. Participate in design team
1) Management
2) Automation (P&R)
3) Traffic Management
d. Develop/change/modify as required
1) Procedures
2) Facility directives
3) Airspace
4) Video maps
5) Automation (accomplish early)
Ensure P &R is notified
e. Coordinate with adjacent Air Route Traffic Control Centers (ARTCC) as needed
3. Re-assemble design team, as needed, to review completed DP package and make modifications and/or corrections, as needed
4. Submit package to OSG, including:
APPENDIX 1: DP and/or RNAV SID CHECKLIST
DATE NAME/INITIAL
a. DP checklist
b. Requested chart date
c. Environmental Docwnentation
d. SRMD
5. OSG
a. Review submitted DP Package
b. Return the DP package to originating A TC facility for modifications, ifnot complete, correct, and/or accurate
c. Ifappropriate, prepare CATEX (FAA Order 7400.2, Appendix 6)
or
Ifa CATEX is not appropriate, coordinate further environmental review (i.e. an Environmental
Assessment (EA) or an Environmental Impact Statement (EIS))
d. Complete review of SRMD or SRMDM and coordinate with QCG, ifrequired
e. Submit DP package to CFPO/ A VN and/or AIM, as appropriate
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
Name ofProcedure: -----------------------
DATE NAME/INITIAL
1. Proponent
a. Complete the responsibilities outlined in FAA Order 7100.9, Paragraph 11
b. Submit the STAR Proposal
1) To the overlying ARTCC Facility and/or ARTCC Airspace/Plans and Procedures Office
2) Other ARTCC and Terminal ATC Facilities, as needed
3) Customers, ifneeded
4) National Airspace Redesign Team, if required
5) Other interested parties
2. ARTCC Facility and/or ARTCC Airspace Office
a. Coordinate with OSG STAR Specialist
b. Coordinate with OSG Environmental Specialist
c. Request coordination with the RAPT through OSG
d. Organize STAR design team based on the scope ofthe project.
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
1) Potential design team members:
a) ARTCC Airspace/Plans and Programs representatives
b) Terminal Airspace/Plans and Programs representatives
c) Operational personnel d) Facility management e) Lead air carriers f) Air Transport Association g) Airport authority h) OSG representative i) CFPO representative j) Others as necessary
2) Develop implementation plan to include, but not limited to:
a) Letters ofAgreement b) Standard Operating Procedures c) Training d) Customer briefings e) Safety Management System f) Automation needs and changes g) Time lines h) Other items as necessary
e. In conjunction with the STAR design team, complete the responsibilities outlined in FAA Order 1100.161, Chapter 3 and FAA Order 7100.9, Paragraph 11
1) Determine operational feasibility
prop
2) onent
Ifrequested, provide feedback to
3) Coordinate with all affected ATC facilities, as needed
APPENDIX 2: STAR and/or RNA V STAR CHECKLIST
DATE NAME/INITIAL
4) Enter into TARGETS
5) Coordinate with P & R
6) Coordinate with customers, as needed
7) Coordinate with National Airspace Redesign Team, ifrequired
8) Coordinate with other interested parties as necessary
9) Serve as focal for problem solving
10) Complete NlRS NST
11) Complete Air Traffic Initial Environmental Review (FAA Order 7400.2, Appendix 5)
or
12) Ifa CATEX is not appropriate, and ifthe initial environmental review indicates that extraordinary circumstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact the OSG for further guidance
13) Safety Management System (SMS) Review
14) Review change per the provisions ofthe FAA SMS Manual; include input from the terminal facility(s), ifapplicable
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
15) Prepare the appropriate documentation as required by the FAA SMS Manual.
16) Submit appropriate documentation as required by the FAA SMS Manual.
17) Complete FAA Form 8260-2, Data Worksheet for new waypoints.
18) Depict STAR on a (VFR) Sectional Chart.
19) Ifapplicable, retain associated environmental documents.
g. Submit STAR package to OSG containing the following:
1) STAR checklist
2) Current FAA Form 7100-4 for conventional STAR and RNA V STAR
3) Current FAA Form 7100-3 for RNAV STAR
4) Current FAA Form 8260-2, Data Worksheet for new fixes/waypoints
5) Current FAA Form 6050-4, Expanded Service Volume (if applicable)
6) SRMD or SRMDM
APPENDIX 2: STAR and/or RNAV STAR CHECKLIST
DATE NAME/INITIAL
7) STAR drawn on Sectional Chart
3. OSG
a. Review submitted STAR package
b. Return the STAR package to the originating ATC facility for modification, ifnot complete, correct, and/or accurate
c. Complete the responsibilities outlined in FAA Order 7100.9, Paragraph 11
d. Ifappropriate, approve prepared CATEX
or
Ifa CA TEX is not appropriate, coordinate further environmental review (i.e. EA or an EIS)
e. Complete review ofSRlviD or SRlviDM and coordinate with QCG, ifrequired.
f. Submit the STAR package to CFPO/ A VN and/or AIM, as appropriate
-----------------------------------------------
APPENDIX 3: SlAP, RNAV SlAP, SATNAV, and/or CVAP CHECKLIST
Name ofProcedure:
DATE NAME/INITIAL
1. ATC Facility
a. Consider requests for SlAP's from proponents, customers, other A TC facilities, FAA Headquarters and Central Service Center, and/or interested parties as appropriate
b. Consider the following items:
1) Need/benefit
2) Customers.
3) Environmental issues
4) Airspace changes
5) Altitude
6) Expanded service volume (ESV)
7) Fix/waypoint names
8) Holding
9) Design types (legs, feeder routes, etc)
10) Communication needs
11) Equipment needs
12) Video maps
13) Waivers
14) Legal ramifications/procedures
15) FAASMS
16) Letters ofAgreement
APPENDIX 3: SlAP, RNAV SlAP, SATNAV and/or CVAP CHECKLIST
DATE NAME/INITIAL
17) Standard operating procedures
18) Training
19) Customer briefings
20) Automation needs and changes
21) Time lines
22) Publication date
23) Other items, as necessary
c. Coordinate with:
1) All affected A TC facilities
2) OSGfor
a) Operational issues, as appropriate
b) Environmental issues, as appropriate
c) SRMD or SRMDM
3) P&R, as appropriate
4) Airport operator for operational and environmental issues, as appropriate
5) Customers and interested parties, as appropriate
6) OSG RNA VI SATNAV specialist
APPENDIX 3: SlAP, RNAV SlAP, SATNAV and/or CVAP CHECKLIST
DATE NAME/INITIAL
7) Request coordination with RAPT throughOSG
d. Submit the SlAP package to OSG, containing the SlAP checklist
2. OSG
a. Review submitted SlAP package
b. Return the SlAP package to the originating ATC facility for modification, ifnot complete, correct, and/or accurate
c. Complete review of SRMD or SRMDM and coordinate with QCG, ifrequired.
d. Submit the SlAP package to CFPO/ A VN and/or AIM, as appropriate
---------------------------------------------
APPENDIX 4: APDG and/or AFD CHECKLIST
Name ofProcedure/Item:
DATE NAME/INITIAL
1. ATC Facility
a Consider APDG/ AFD requests from airport operators, customers, other ATC facilities, and/or interested parties, as appropriate
b. Solicit written concurrence from airport operator for items that are within its jurisdiction (i.e., airport diagrams, runways, taxiways, airport lighting, ramp areas, etc.)
c. Develop a written request that:
1) Is signed by the facility Air Traffic Manager
2) Clearly identifies the item/items that need to be addressed
3) Provides detailed written infonnation on the following, as appropriate
a) Publication name/section b) Procedure name c) City/Airport name d) Location identifiers e) Airport location f) Time conversions g) Geographic positions ofairport, airport reference point (ARP)
h) Charts i) Instnunent approach procedures j) Airport diagrams/airport sketches
k) Elevation 1) Control tower m) Rotating beacon n) Servicing/fuel/oxygen o) Traffic pattern altitude
JC 7100.3A 05/21/10 Appendix4
APPENDIX 4: APDG and/or AFD CHECKLIST
DATE NAME/INITIAL
p) Airport ofentry, landing rights and customs user fee airports
q) Runway data r) Airport remarks s) Weather data sources t) Communication u) NOT AM service v) Airspace w) Radio aids to navigation
4) Provides graphic information on the following, as appropriate:
a) Airport diagrams/charts b) Runways c) Taxiways d) Ramp areas e) Control tower f) Rotating beacon
d. Submit the APDG/AFD package to OSG, containing the written information, graphic information, and the APDG/ AFD Checklist
2. OSG Assist with development ofpackage (facility submits directly to Headquarters (HQ).