U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION NUMBER ATO Central Service Center JOC 7100.3

Effective Date: December 11, 2006

SUBJ: PUBLISHED PROCEDURE DEVELOPMENT

1. PURPOSE. This order prescribes procedures for processing published procedure development in the Central Service Area and associated airspace.

SUBJ: PUBLISHED PROCEDURE DEVELOPMENT

2. DISTRIBUTION. This order is distributed to group level in the Air Traffic Organization (ATO). to air route traffic control center (ARTCC) and airport traffic control tower (ATCT) facilities in the Central Service Area and the Fort Worth Flight Procedures Office (FTW FPO).

3. CANCELLATION. This order cancels Order SW 7100.3; Published Procedure Development dated January 15, 2003.

4. EFFECTIVE DATE. December 11, 2006

5. BACKGROUND. This order incorporates and expands Order SW 7100.3 to comply with the ATO reorganization and Safety Management System requirements. This order will ensure compliance in the consolidated geographical area and standardize procedures for System Support Group in the Central Service Area.

6. EXPLANATION OF CHANGES. This order has been revised and updated to reflect the air traffic reorganization and office title changes. References to an Office of Primary Responsibility (OPR) have been deleted. The OPR resides entirely with System Support Group. References to current orders have been updated, Safety Management System requirements added, appendixes updated and minor editorial changes incorporated.

7. RELATED PUBLICATIONS.

a. Order 1050.1, Environmental Impacts: Policies and Procedures

b. Order 1100.161, Air Traffic Safety Oversight

c. Order 5050.4, National Environmental Policy Act (NEPA) Implementing Instructions for Airport Actions

d. Order 7100.9, Standard Terminal Arrival (STAR)

e. Order 7100.10, Air Traffic Satellite Navigation Implementation Plan ( SATNAV)

f. Order 7110.79, Charted Visual Flight Procedures (CVFP)

Distribution: Electronic Initiated By: ATO Central Service Area System Support Group

g. Order 7210.3, Facility Operation and Administration

h. Order 7400.2, Procedures for Handling Airspace Matters

i. Order 7910.4, Airport Diagrams (APDG)

j. Order 7910.5, Aeronautical Charting Forum

k. Order 8260.3, Terminal Instrument Procedures, (TERPS)

1. Order 8260.43, Flight Procedure Management Program

m. Order 8260.44, Civil Use of Area Navigation (RNAV) Departure Procedures (DP)

n. Order 8260.45, Terminal Arrival Area (TAA) Design Criteria

o. Order 8260.46, Departure Procedure (DP) Program

p. Order 8260.47, Barometric Vertical Navigation (VNAV) Instrument Procedure Development

q. FAA Safety Management System Manual

8. PROCEDURES.

a. Departure Procedures (DP) and/or Area Navigation Departure Procedures (RNAV DP). – DP's are normally requested by the air traffic control (ATC) facility responsible for departure control at the airport where the procedure is proposed. Requests for DP's and/or RNAV DP's development must be processed in accordance with Order 1050.1, Order 1100.161, Order 5050.4, Order 7400.2, Order 8260.3, Order 8260.44, Order 8260.46, and/or FAA Safety Management System Manual.

(1) The ATC facilities developing and/or processing the DP must:

(a) Coordinate with all associated ATC facilities, Planning and Requirements Group, Business Services Group, customers, and/or interested parties as appropriate.

(b) Resolve differences as appropriate.

(c) Record all necessary ATC field facility actions and/or coordination on the DP and/or RNAV DP Checklist, Appendix 1.

(d) Conduct a noise assessment utilizing the Noise Integrated Routing System (NIRS) Screening Tool (NST).

(e) Complete the Air Traffic Initial Environmental Review Checklist, Order 7400.2, Appendix 5.

(f) Complete a Safety Risk Management Assessment and prepare a Safety Risk Management Document (SRMD), FAA Safety Management System Manual.

(g) Draw the DP and/or RNAV DP on a Sectional Chart (include altitudes).

(h) Submit the DP and/or RNAV DP package and a copy of the recorded ATC facility actions and/or coordination to the System Support Group.

(i) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested.

(j) Track procedure as necessary until published as requested.

(2) System Support Group must:

(a) Review the DP and/or RNAV DP package to assure that it is complete, correct and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, Planning and Requirements Group, Regional Airspace Procedures Team (RAPT), Business Services Group, Safety Assurance Group, other Service Centers (if required), customers and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions, approvals and/or coordination on the DP and/or RNAV DP Checklist.

(e) Submit the DP and/or RNAV DP package to FTW FPO/Aviation Systems Standards (AVN) and/or Aeronautical Information Management Group, as appropriate.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the procedure is published as requested.

(g) Track procedure as necessary until published as requested.

b. Standard Terminal Arrivals (STAR) and/or Area Navigation Standard Terminal Arrivals (RNAV STAR). – STAR's are normally requested by the responsible ARTCC servicing the terminal area approach control for the area/airport(s) affected or terminal radar approach control facility. Requests for STAR and/or RNAV STAR development must be processed in accordance with Order 1050.1, Order 1100.161, Order 5050.4, Order 7400.2, Order 7100.9, Order 8260.3 and/or FAA Safety Management System Manual.

(1) The ATC facility developing and/or processing the STAR must:

(a) Coordinate with all associated ATC facilities, Planning and Requirements Group, Business Services Group, customers and/or interested parties as appropriate.

(b) Resolve differences as appropriate.

(c) Record all necessary ATC field facility actions and/or coordination on the STAR and/or RNAV STAR Checklist, Appendix 2.

(d) Conduct a noise assessment utilizing the NIRS Screening Tool (NST).

(e) Complete the Air Traffic Initial Environmental and Review Checklist, Order 7400.2, Appendix 5.

(f) Complete a Safety Risk Management Assessment and prepare a Safety Risk Management Document (SRMD), FAA Safety Management System Manual.

(g) Draw the STAR and/or RNAV STAR on a Sectional Chart (include altitudes).

(h) Submit the STAR and or RNAV STAR package and a copy of the recorded ATC facility actions and/or coordination to System Support Group.

(i) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested.

(j) Track procedure as necessary until published as requested.

(2) System Support Group must:

(a) Review the STAR and/or RNAV STAR package to assure that it is complete, correct and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, Planning and Requirements Group, Regional Airspace Procedures Team (RAPT), Business Services Group, Safety Assurance Group, other Service Centers (if needed), customers and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions, approvals and/or coordination on the STAR and/or RNAV STAR Checklist, Appendix 2.

(e) Submit the STAR and/or RNAV STAR package to FTW FPO/AVN and/or Aeronautical Information Management Group, as appropriate.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the procedure is published as requested.

(g) Track procedure as necessary until published as requested.

c. Standard Instrument Approach Procedures (SIAP), Area Navigation (RNAV) Standard Instrument Approach Procedures (SIAP), Satellite Navigation (SATNAV) Standard Instrument Approach Procedures (SIAP), Charted Visual Flight Procedures (CVFP). - Requests for SIAP, RNAV SIAP, SATNAV SIAP and/or CVFP development must be processed in accordance with Order 1050.1, Order 1100.161, Order 5050.4, Order 7110.79, Order 7400.2, Order 7910.4, Order 8260.3, Order 8260.45, Order 8260.47, and/or FAA Safety Management System Manual.

(1) The ATC facility developing and/or processing the above procedure(s) must:

(a) Coordinate with all associated ATC facilities, Planning and Requirements Group, Business Services Group, airport operators, customers, and/or interested parties as appropriate.

(b) Resolve differences as appropriate.

(c) Record all necessary ATC field facility actions and/or coordination on the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVAP Checklist, Appendix 3.

(d) Complete a Safety Risk Management Assessment and prepare a Safety Risk Management Document (SRMD), FAA Safety Management System Manual.

(e) Submit the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVFP package and a copy of the recorded ATC facility actions and/or coordination to System Support Group.

(f) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested.

(g) Track procedure as necessary until published as requested.

(2) System Support Group must:

(a) Review the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVAP package to assure that it is complete, correct and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, Planning and Requirements Group, Regional Airspace Procedures Team (RAPT), Business Services Group, Safety Assurance Group, other Service Centers (if needed), customers, and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions, approvals, and/or coordination on the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVAP Checklist, Appendix 3.

(e) Submit the SIAP, RNAV SIAP, SATNAV SIAP, and/or CVFP package to FTW FPO/AVN and/or Aeronautical Information Management Group, as appropriate.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the procedure is published as requested.

(g) Track procedure as necessary until published as requested.

d. Airport Diagrams (APDG). - Requests for APDG development must be processed in accordance with Order 7910.4.

(1) The ATC facility developing and/or processing an APDG must:

(a) Coordinate with all associated ATC facilities, airport operators. customers and/or interested parties as appropriate.

(b) Resolve differences as appropriate.

(c) Record all necessary ATC field facility actions and/or coordination on the APDG and/or AFD Checklist, Appendix 4.

(d) Submit the APDG package and a copy of the recorded ATC facility actions and/or coordination to System Support Group.

(e) Retain the original recorded ATC facility actions and/or coordination at least until the APDG is published as requested.

(f) Track information as necessary until published as requested.

(2) System Support Group must:

(a) Review the APDG package to assure that it is complete, correct, and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, airport operators, customers, and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions and/or coordination on the APDG and/or AFD Cheeklist, Appendix 4.

(e) Submit the APDG package to Aeronautical Information Management Group.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the APDG is published as requested.

(g) Track information as necessary until published as requested.

e. Airport/Facility Directory (AFD). Requests for AFD information development must be processed as follows:

(1) The ATC facility developing and/or processing AFD information must:

(a) Coordinate with all associated ATC facilities, airport operators, customers and/or interested parties as appropriate.

(b) Resolve differences as appropriate

(c) Record all necessary ATC field facility actions and/or coordination on the APDG and/or AFD Checklist, Appendix 4.

(d) Submit the AFD package and a copy of the recorded ATC facility actions and/or coordination to System Support Group.

(e) Retain the original recorded ATC facility actions and/or coordination at least until the AFD information is published as requested.

(f) Track information as necessary until published as requested.

(2) System Support Group must:

(a) Review the AFD package to assure that it is complete, correct and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, airport operators, customers, and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions and/or coordination on the APDG and/or AFD Checklist, Appendix 4.

(e) Submit the AFD package to Aeronautical Information Management Group.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the AFD information is published as requested.

(g) Track information as necessary until published as requested.

f. Environmental Actions. - Environmental actions must be processed in accordance with Order 1050.1, Order 5050.4, Order 7400.2, and/or current policy and procedures.

(1) The ATC facility processing an environmental action must:

(a) Coordinate with all associated ATC facilities, Planning and Requirements Group, Business Services Group, customers, and/or interested parties as appropriate.

(b) Resolve differences as appropriate.

(e) Record all necessary ATC field facility actions and/or coordination.

(d) Submit the associated environmental documents package (Noise Assessment, Air Traffic Initial Environmental Review, other documents as appropriate and graphic depiction) and a copy of the recorded ATC facility actions and/or coordination to System Support Group.

(e) Retain the original recorded ATC facility actions and/or coordination at least until the procedure is published as requested. Retain all environmental documents (Noise Assessment, Air Traffic Initial Environmental Review, etc) for as long as the procedure is in use.

(f) Track information as necessary until environmental actions are completed.

(2) System Support Group must:

(a) Review the environmental documents package to assure that it is complete, correct and/or accurate.

(b) Assure that coordination has been effected with all associated ATC facilities, Planning and Requirements Group, Business Services Group, other Service Centers (if needed), customers, and/or interested parties as appropriate.

(c) Assure that differences have been resolved.

(d) Record all necessary System Support Group actions and/or coordination.

(e) Review and, if appropriate, concur with the Categorical Exclusion Declaration (CATEX), Order 7400.2, Appendix 6.

(f) Retain the original recorded System Support Group actions and/or coordination at least until the procedure is published as requested. Retain all environmental documents (Noise Assessment, Air Traffic Initial Environmental Review, etc) for as long as the procedure is in use.

(g) Track information as necessary until environmental actions are completed.

9. RESPONSIBILITIES.

a. The ATC facility Air Traffic Manager must assure:

(1) That all facility personnel involved in processing procedures are familiar with the provisions of this order.

(2) That all appropriate coordination has been affected with the HUB facility and the ATC facility having jurisdiction over the airspace of the published procedure.

b. The ATO Central Service Area System Support Group Manager must ensure that all ATO personnel involved in processing airspace and/or procedures are familiar with the provisions of this order.

(Original signed by) (Original signed by)

Paul Sheridan Nancy Kort Area Director, Area Director, En Route and Oceanic Operations Terminal Operations ATO Central Service Area ATO Central Service Area

APPENDIX 1: DP and/or RNAV DP CHECKLIST

APPENDIX 1: DP and/or RNAV DP CHECKLIST

Name of Procedure:

DATE NAME/INITIAL

1. Terminal ATC Facility

a. Evaluate Request

(1) Initiate Guidelines for the Design of Graphic Instrument Departure Procedures

(2) If RNAV DP, request reservation slot with System Support Group RNAV Coordinator (OEP Prioritization List)

1. Terminal ATC Facility

(3) Utilize Order 8260.46

(a) Appendix 2

(b) Appendix 3

(4) Identify lead air carrier (if other than proponent)

(a) Assist in procedure design

(b) Check fly ability

(5) Coordinate with AJR (Traffic Management)

(6) Request coordination with the Regional Airspace Procedures Team (RAPT) through System Support Group

b. Environmental Review/Noise Screening

(1) Notify System Support Group

(2) Draw DP and/or RNAV DP on Sectional Chart

(3) Complete Noise Integrated Routing System (NIRS) Screening Tool (NST)

APPENDIX 1: DP and/or RNAV DP CHECKLIST

APPENDIX 1: DP and/or RNAV DP CHECKLIST

DATE NAME/INITIAL

(4) Complete Air Traffic Initial Environmental Review (Order 7400.2, Appendix 5)

(5) If appropriate, complete Categorical Exclusion Declaration (CATEX)(Order 7400.2, Appendix 6)

or

If a CATEX is not appropriate, and, if the initial environmental review indicates that extraordinary circumstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact the System Support Group for further guidance

DATE NAME/INITIAL

c. Safety Management System (SMS) Review

(1) Review change per the provisions of the FAA SMS Manual; include input from the en route facility(s) if applicable

(2) Prepare Safety Risk Management Document (SRMD)

(3) Submit SRMD to System Support Group for review

d. Check for potential waiver requests (accomplish early in the process)

(1) Climb gradients, etc. (FPO through System Support Group)

(2) Procedural waivers through System Support Group, if necessary

e. Coordinate, as required, with other facilities that may be affected by the new procedure

APPENDIX 1: DP AND/OR RNAV DP CHECKLIST

APPENDIX 1: DP AND/OR RNAV DP CHECKLIST

DATE NAME/INITIAL (1) Contact controlling en route center ATC facility. En route center ATC Facility will initiate their checklist below.

(2) Form a joint design team to develop implementation strategy:

(a) Management

(b) Automation, Planning and Requirements Group, Business Services Group

(c) Affected facilities

f. Develop/change/modify as required

(1) Procedures

(2) Facility directives

(3) Airspace

(4) Video maps

(5) Automation (ensure Planning and Requirements Group and Business Services Group are both notified, accomplish early)

g. Coordinate with local System Support Center Manager and Planning and Requirements Group as needed (new equipment, facilities, etc.)

h. Complete the following forms:

(1) 8260.46, Appendix 3

TARGETS, 8260-15B and -15C

2. Overlying En Route Center ATC Facility (to be accomplished concurrently with 1 above)

2. Overlying En Route Center ATC Facility (to be accomplished concurrently with 1 above)

APPENDIX 1: DP and/or RNAV DP CHECKLIST

DATE NAME/INITIAL

a. Assist with environmental issues

b. Assist with SMS review

c. Participate in design team

(1) Management

(2) Automation (Planning and Requirements Group and Business Services Group)

DATE NAME/INITIAL

(3) AJR (Traffic Management)

d. Develop/change/modify as required

(1) Procedures

(2) Facility directives

(3) Airspace

(4) Video maps

(5) Automation (accomplish early)

(a) Ensure Planning and Requirements Group is notified

(b) Ensure Business Services Group is notified

e. Coordinate with adjacent ARTCC's as needed

3. Re-assemble design team, as needed, to review completed DP package and make modifications and/or corrections, as needed

4. Submit package to System Support Group, including

4. Submit package to System Support Group, including

APPENDIX 1: DP and/or RNAV DP CHECKLIST

DATE NAME/INITIAL

a. DP checklist

b. Requested chart date

c. Environmental Documentation

d. Safety Risk Management Document

5. System Support Group

a. Review submitted DP Package

b. Return the DP package to originating ATC facility for modifications, if not complete, correct, and/or accurate

5. System Support Group

c. If appropriate, approve Categorical Exclusion Declaration (CATEX)(Order 7400.2, Appendix 6)

or

If a CATEX is not appropriate, coordinate further environmental review (i.e. an environmental assessment or an environmental impact statement)

d. Complete review of SRMD and coordinate with Safety Assurance Group, if required

e. Submit DP package to FTW-FPO/AVN and/or Aeronautical Information Management Group, as appropriate

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

Name of Procedure:

DATE NAME/INITIAL

1. Proponent

a. Complete the responsibilities outlined in Order 7100.9, Paragraph 11

b. Submit the STAR Proposal

(1) To the overlying ARTCC Facility and/or En Route Center Airspace/Plans and Procedures Office

1. Proponent

(2) Other En Route and Terminal ATC Facilities, as needed

(3) Customers, if needed

(4) National Airspace Redesign Teams, if required

(5) Other interested parties

2. En Route Center ATC Facility and/or En Route Center Airspace Office

a. Coordinate with System Support Group STAR Specialist

2. En Route Center ATC Facility and/or En Route Center Airspace Office

b. Coordinate with System Support Group Environmental Specialist

c. If RNAV STAR, request reservation slot with System Support Group RNAV Coordinator (OEP Prioritization List/RAPT Team)

d. Request coordination with the Regional Airspace Procedures Team (RAPT) through System Support Group

e. Organize STAR design team based on the scope of the project.

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

DATE NAME/INITIAL

(1) Potential design team members:

(a) Center Airspace/Plans and Programs representatives (b) Terminal Airspace/Plans and Programs representatives (c) Operational personnel (d) Facility management (e) Lead air carriers (f) Air Transport Association (g) Airport authority (h) System Support Group representative (i) FTW FPO representative (i) Others as necessary

DATE NAME/INITIAL

(2) Develop implementation plan to include, but not limited to:

(a) Letters of Agreement (b) Standard Operating Procedures (c) Video maps (d) Sector airspace changes (e) Training (f) Customer briefings (g) Safety Management System (h) Automation needs and changes (i) Time lines 1) Other items as necessary

f. In conjunetion with the STAR design team, complete the responsibilities outlined in Order 1100.161, Chapter 3 and Order 7100.9, Paragraph 11

(1) Determine operational feasibility

(2) If requested, provide feedback to proponent

(3) Coordinate with all affected ATC facilities, as needed

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

DATE NAME/INITIAL

(4) TARGETS the proposal when available

(5) Coordinate with Planning and Requirements Group and Business Services Group

(6) Coordinate with customers, as needed

(7) Coordinate with National Airspace Redesign Teams, if required

DATE NAME/INITIAL

(8) Coordinate with other interested parties as necessary

(9) Serve as focal for problem solving

(10) Complete Noise Integrated Routing System (NIRS) Screening Tool (NST)

(11) Complete Air Traffic Initial Environmental Review (Order 7400.2, Appendix 5)

(12) If appropriate, complete Categorical Exclusion Declaration (CATEX)(Order 7400.2, Appendix 6)

or

If a CATEX is not appropriate, and if the initial environmental review indicates that extraordinary circumstances or other reasons exist that have the potential for causing significant environmental impact, the facility will contact the System Support Group for further guidance

(13) Safety Management System (SMS) Review

(a) Review change per the provisions of the FAA SMS Manual; include input from the terminal facility(s), if applicable

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

DATE NAME/INITIAL

(b) Prepare Safety Risk Management Document (SRMD)

(c) Submit SRMD to System Support Group for review

(14) Complete FAA Form 8260-2, Data Worksheet for new waypoints

(15) Depict STAR on a (VFR) Sectional Chart

(16) If applicable, retain associated environmental documents

DATE NAME/INITIAL

g. Submit STAR package to System Support Group containing the following:

(1) STAR checklist

(2) Current FAA Form 7100-4 for conventional STAR and RNAV STAR

(3) Current FAA Form 7100-3 for RNAV STAR

(4) Current FAA Form 8260-2, Data Worksheet for new fixes/waypoints

(5) Current FAA Form 6050-4, Expanded Service Volume (if applicable)

(6) Environmental documents including

(a) Air Traffic Initial Environmental Review (Order 7400.2, Appendix 5)

(b) If appropriate, Categorical Exclusion Declaration (CATEX)

(c) NIRS Screening Tool (NST)

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

APPENDIX 2: STAR and/or RNAV STAR CHECKLIST

DATE NAME/INITIAL

(d) Other environmental documents as appropriate

(7) Safety Risk Management Document

(8) STAR drawn on Sectional Chart

3. System Support Group

a. Review submitted STAR package

b. Return the STAR package to the originating ATC facility for modification, if not complete, correct, and/or accurate

3. System Support Group

c. Complete the responsibilities outlined in FAA Order 7100.9, Paragraph 11

d. If appropriate, approve Categorical Exelusion Declaration (CATEX)

or

If a CATEX is not appropriate, coordinate further environmental review (i.e. an environmental assessment or an environmental impact statement)

e. Complete review of SRMD and coordinate with Safety Assurance Group, if required

f. Submit the STAR package to FTW-FPO/ AVN and/or Aeronautical Information Management Group, as appropriate

APPENDIX 3: SIAP, RNAV SIAP, SATNAV, and/or CVAP CHECKLIST

APPENDIX 3: SIAP, RNAV SIAP, SATNAV, and/or CVAP CHECKLIST

Name of Procedure:

DATE NAME/INITIAL

1. ATC Facility

a. Consider requests for SIAP's from proponents, customers, other ATC facilities, FAA Headquarters and Central Service Center, and/or interested parties as appropriate

1. ATC Facility

b. Consider the following items:

(1) Need/benefit

(2) Customers.

(3) Environmental issues

(4) Airspace changes

(5) Altitude

(6) Expanded service volume (ESV)

(7) Fix/waypoint names

(8) Holding

(9) Design types (legs, feeder routes, etc)

(10) Communication needs

(11) Equipment needs

(12) Video maps

(13) Waivers

(14) Legal ramifications/procedures

(15) FAA Safety Management System

(16) Letters of Agreement

APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST

APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST

DATE NAME/INITIAL

(17) Standard operating procedures

(18) Training

(19 Customer briefings

(20) Automation needs and changes

(21) Time lines

(22) Publication date

(23) Other items, as necessary

c. Coordinate with

(1) All affected ATC facilities

DATE NAME/INITIAL

(2) System Support Group for

(a) Operational issues, as appropriate

(b) Environmental issues, as appropriate

(c) Safety Risk Management Document

(3) Planning and Requirements Group, as appropriate

(4) Business Services Group, as appropriate

(5) Airport operator for operational and environmental issues, as appropriate

(6) Customers and interested parties, as appropriate

(7) System Support Group RNAV/ SATNAV specialist

APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST

APPENDIX 3: SIAP, RNAV SIAP, SATNAV and/or CVAP CHECKLIST

DATE NAME/INITIAL

(8) Request coordination with Regional Airspace Procedures Team (RAPT) through System Support Group

d. Submit the SLAP package to System Support Group, containing the SIAP checklist

2. System Support Group

2. System Support Group

a. Review submitted SLAP package

b. Return the SLAP package to the originating ATC facility for modification, if not complete, correct, and/or accurate

c. Complete review of SRMD and coordinate with Safety Assurance Group, if required

d. Submit the SIAP package to FTW FPO/ AVN and/or Aeronautical Information Management Group. as appropriate

APPENDIX 4: APDG and/or AFD CHECKLIST

APPENDIX 4: APDG and/or AFD CHECKLIST

Name of Procedure/Item:

DATE NAME/INITIAL

1. ATC Facility

a. Consider APDG/AFD requests from airport operators, customers, other ATC facilities, and/or interested parties, as appropriate

b. Solicit written concurrence from airport operator for items that are within its jurisdiction (i.e., airport diagrams, runways, taxiways, airport lighting, ramp areas, etc.)

1. ATC Facility

c. Develop a written request that:

(1) Is signed by the facility Air Traffic Manager

(2) Clearly identifies the item/items that need to be addressed

(3) Provides detailed written information on the following, as appropriate

(a) Publication name/section (b) Procedure name (c) City/Airport name (d) Location identifiers (e) Airport location (f) Time conversions (g) Geographic positions of airport, airport reference point (ARP) (h) Charts (i) Instrument approach procedures Airport diagrams/airport sketches (k) Elevation (1) Control tower (m) Rotating beacon (n) Servicing/fuel/oxygen (0) Traffic pattern altitude

APPENDIX 4: APDG and/or AFD CHECKLIST

APPENDIX 4: APDG and/or AFD CHECKLIST

DATE NAME/INITIAL

(p) Airport of entry, landing rights and customs user fee airports (q) Runway data (t) Airport remarks (s) Weather data sources (t) Communication (u) NOTAM service (v) Airspace (w) Radio aids to navigation

(4) Provides graphic information on the following, as appropriate:

DATE NAME/INITIAL

(a) Airport diagrams/charts (b) Runways (c) Taxiways (d) Ramp areas (e) Control tower (f) Rotating beacon

d. Submit the APDG/AFD package to System Support Group, containing the written information, graphic information, and the APDG/AFD Checklist

2. System Support Group

a. Review the submitted APDG/AFD package

2. System Support Group

b. Return the procedure package to the originating ATC facility for modification if not complete, correct, and/or accurate

c. Submit the procedure package to FTW FPO/AVN. and/or Aeronautical Information Management Group, as appropriate