Radar Vectors
FAA Order Cancelled Issued Sep 20, 1996 AFS-420 6 pages Copy saved Nov 22, 2026

Order 8260.43 Prioritization for Development of Wide Area Augmentation System Gps Instrument Approach Procedures

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

US. DEPARTMENT OF TRANSPORTATION

US. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

SUBJ:

9120196

PRIORITIZATION FOR DEVELOPMENT OF WIDE AREA AUGMENTATION

SYSTEM GLOBAL POSITIONING SYSTEM INSTRUMENT APPROACH PROCEDURES

System (GPS) Wide Area Augmentation System (WAAS) instrument approach procedures in the National Airspace System (NAS).

SYSTEM GLOBAL POSITIONING SYSTEM INSTRUMENT APPROACH PROCEDURES

2. DISTRIBUTION. This order is distributed to the branch level in the services of Flight

1. PURPOSE. This order provides guidance and criteria for management of Federal Aviation Administration (FAA) resources in prioritization of precision and nonprecision Global Positioning

Standards, and Airway Facilities; and in the offices of Airport Safety and Standards, Air Traffic Airspace Management Program, Communications, Navigation, and Surveillance Systems, and Aviation System Standards; to the National Flight Procedures Office; to the Regulatory Standards and Compliance Division at the Mike Monroney Aeronautical Center; to the branch level in the regional Flight Standards, Airway Facilities, Airports, and Air Traffic divisions.

3. BACKGROUND. The GPS system will be developed in a manner most effective and efficient in terms of FAA and user resources. Instrument procedures using traditional navigation aids have been provided for all-weather operations to and from runways at &of the nation’s airports serving scheduled air carrier operations. Instrument approach procedures and the supporting equipment have also been provided for many runways at busy general aviation airports. The introduction of GPS navigation brought with it the opportunity to establish instrument operating procedures at locations that could not previously justify the required resources or meet specific siting criteria for the navigation aid (NAVAID) proposed.

4. DEFINITIONS.

a. Aviation Svstem Standards (AVN). The FAA office directly responsible for the development and maintenance of instrument flight procedures throughout the United States and its territories. AVN maintains data required to develop instrument procedures.

b Flight Procedures Office (FPO) An office within the National Flight Procedures Office, Flight Procedures Development Branch, that is responsible for approval or disapproval of requests for Title 34 of the Code of Federal Regulations (14 CFR) part 97 instrument flight procedures. The FPO is generally co-located with the regional Flight Standards Division.

c. Global Positioning System (GPS) A worldwide position, velocity, and time determination system. It includes a constellation of 24’satellites, user receivers, and system integrity monitors.

Standardized routings, maneuvering areas, flight d. iADProach altitudes, and visibility minimums specified for approach operations under instrument flight rules.

e. N i AVN-100. The FAA office responsible for development of all instrument procedures.

Distribution: A-W(FS/AF/AS/TA/ NDNN)-3; AVN-100 (25 CYS); AMA-200 (80 cys); A-X(FS/AF/AS/AT)-3

Initiated by: AFS-420

8260.43 g/20/96 ’

i f National Ocean Service (NOS) The Federal agency responsible for the charting of part 97 civil instrument approach procedures.

g Operational Advantaw An improvement which benefits the users of an instrument procedure. Achievement of lower minimums or authorization for a straight in approach with no derogation of safety are examples of an operational advantage.

thresholds, and centerlines.

j. Phase Ill GPS Survey. Survey of obstructions and obstacle clearance surfaces in the vicinity of an airport.

k. Wavpoints. Predetermined geographical positions, specified in latitude and longitude, used in defining GPSNVAAS instrument approach procedures and, when applicable, elevation data will also be specified.

h. Phase I GPS Survev. Survey and establishment of benchmarks on airports using the World Geodetic System of 1984 as the coordinate system.

i. Phase II GPS Survey. Survey of runway and airport data to include runway ends,

I. Wide Area Augmentation System (WAAS). An augmentation to GPS which provides a signal in space to support en route and precision/nonprecision approach navigation. This information is relayed to users through geostationary satellites to increase the integrity, reliability, and accuracy of the basic GPS signal. .

5. CRITERIA FACTORS. Consider the following items when prioritizing landing areas selected for GPS instrument procedure development. These factors are not all-inclusive, ‘nor are they’. .’ established with any order of precedence.

a. Sites Having Safety Benefits.

(1)

(2) Simplify complex IAP’s.

Improve final approach course alignment with the landing runway.

(3) Address “black hole” IAP’s (i.e., no visual cues to terrain or surface definition) or other problems resulting from conditions in the area surrounding an airport.

(4) Resolve longstanding Notice to Airman issues.

(5) Helicopter approaches supporting Emergency Medical Service (EMS) operations.

b. Sites Having System Enhancements.

(1) Runways at airports that have sufficient demand to justify an instrument landing system (ILS), but have been precluded from installation because of siting limitations.

(2) Runways that were previously approved for an ILS, but remain unfunded.

ILS .

(3) Runways that are forecasted to have sufficient demand within 5 years to justify an

(4) Runways where lower minimums can be achieved with a GPS based IAP or by positive course guidance in the missed approach segment.

c. Airports that provide the best cost benefits per the latest edition of Order 7031.2, Airway Planning Standard Number One Terminal Air Navigation Facilities and ATC Services, or other operational advantages.

d. Runways identified by Air Traffic Service as offering resolution to a capacity problem or providing other operational advantage:

Page 2 Par 4

9120196 8260.43

(1) Reliever airport IAP’s; i.e., reduce demand at primary airports by providing precision approaches at satellite airports.

(2) Minimize taxi time or ground congestion.

e. At least one runway at airports without an IAP where requested by an air carrier/commuter, business, or government agency.

f. Requests from State aviation representatives including necessary justification.

g. Requests from Department of Defense agencies in accordance with existing agreements.

h. At least one runway at other public-use airports that does not have a facility/NAVAID’s available.

6. RESPONSIBILITIES. The following guidance outlines priority establishment for GPS IAP development.

a. Each region will establish a GPS Implementation Working Group (IWG). The appropriate FPO will be the lead with representatives of the appropriate Flight Standards, Airports, Air Traffic, and Airways Facilities branches as participants. Each IWG is responsible for the formation of a regional procedure development priority listing, by State, airport, and runway. These lists will, in turn, provide an effective strategy for implementing a national system of new IAP’s and GPS survey priorities.

b. The Office of Airport Safety and Standards, Design and Operation Criteria Division, - _I AAS-100, will provide each IWG with a listing of airports and runways, by State, that meet the

c. The Air Traffic Airspace Management Program, Aeronautical Information Division, ATA-100, will provide each IWG with a listing of locations forecast to receive an NOS survey under the Obstruction Chart (OC) Program. ATA-IOO will also provide a listing of locations where Phase I and II GPS surveys have been completed. The IWG will review the OC schedule and identify specific airports and runways that require GPS WAAS surveys. The GPS

minimum criteria for an IAP. This listing will include data from the National Flight Data Center (NFDC) data base on based aircraft and estimated annual operations.

survey lists will also be reviewed and a separate survey priority “hot list” will be prepared to

list, as viewed by the FAA, and forward it to the respective State aviation representatives.

e. The State aviation representatives may review the FAA priority list and remaining eligible airports and recommend changes as they deem necessary. In preparing a recommendation for priority for establishment of IAP’s, the State representatives will confirm the desire or willingness of the airport operator to have an IAP established, the runway end for the procedure, and the commitment of the airport operator to meet the minimum approach surface clearances, airport configuration, marking, and lighting standards for the ceiling and visibility minimums sought. (Airport requirements for instrument approaches are described in Advisory

identify those airports and runways that should have a WAAS survey completed within the next calendar year but are not on the aforementioned lists. This will enable the NOS to complete all survey requirements during one onsite visit.

d. Using the data noted in subparagraphs b and c, the IWG will develop the initial priority

Circular 150/5300-l 3, Airport Design, Table A-16, and Order 8260.3B, United States Standard For Terminal Instrument Procedures (TERPS), paragraphs 120 and 122.)

f. For those airports where the need is not sufficient to justify a priority that would result in the establishment of an IAP within 2 years, the proponent for the approach may facilitate development of the IAP by providing the IWG with acceptable survey data required by FAA.

Par 5 Page 3

8260.43 9120196

g. Upon receipt of the recommendations of State aviation representatives, the IWG will finalize the State priority lists for IAP development and forward them to AVN-100. AVN-100 will consolidate the regional priorities into a U.S. master list which will be used by the NFPO to accomplish IAP development.

7. SURVEYS.

a. The IWG will also foward a copy of each IWG procedure development priority list and the survey “hot list” to ATA-100. ATA- will then forward these lists to the National Geodetic Survey for consideration in establishing annual survey schedules.

b. NOS will forward survey data to the NFDC, ATA-I 10, for entry into the National Data Base and to the Automation Technology Branch, AVN-22, for entry into the Aircraft Management Information System. Once all data has been reviewed and entered, AVN-22 will advise the appropriate FPO that surveys are completed and data is available. The FPO will affirm that all necessary data is available for procedure development before initiating procedure requests.

changes may be made to priority lists as circumstances dictate.

9. INFORMATION UPDATE. Any deficiencies found, clarifications needed, or suggested improvements regarding the contents of this order should be noted on FAA Form 13204$I, Directive Feedback Information. For your convenience, this form is included at the end 6f this. -’ order. Your comments should be forwarded to the originating office (Attn: Directives Management Officer) for consideration. If an interpretation is needed immediately, you may call the originating office for guidance. However, you should also use the FAA Form 132049 as a followup to the verbal conversation.

8. SCHEDULE. The IWG’s will convene at least annually with sufficient lead time to ensure regional GPS survey requirements are included in the region’s annual OC request. Interim

William J. White

Deputy Director, Flight Standards Service

Page 4 Par6 ’

U.S. Department of Transportation

Federal Aviation Administration

Directive Feedback Information

Please submit any written comments or recommendations for improving this directive, dr * suggest new items or subjects to be added to it. Also, if you find an error, please tell us about it.

Subject: Order

To: Directive Management Officer,

(Please check all appropriate line items)

0 page An error (procedural or typographical) has been noted in paragraph

be changed as follo&:

on

.

0 Recommend paragraph on page ’ ­ a ’ (attach separate sheet if necessary}

0 Recommend paragraph on page ’ ­ a ’ (attach separate sheet if necessary}

q In a future change to this directive, please include coverage on the folowing subject

(briefly describe what you want added):

0 Other comments:

q I would like to discuss the above. Please contact me.

Submitted by: Date:

Routing Symbol: FTS Telephone Number:

FAA Form 1320-l 9 (8-89)