Order 6980.19 Replacement of Selenium Rectifiers in the Engine- Generator Transfer Circuitry
Text re-read from the scan: 6 of 6 passages.
- Date
- Nov 24, 2026
- Recorded
- Nov 24, 2026
- Passages
- 6 of 6 changed (was 4)
- Paragraphs
- 32 added or rewritten, 54 removed or rewritten
Read the current text Official source ↗
What changed in the text
Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.
- Changed
[added: ORDER ]DEPARTMENT OF TRANSPORTATION
[removed: ORDER]FEDERAL AVIATION ADMINISTRATION GL 6980.19[removed: GREAT LAKES :REGION] - Added
[added: GREAT LAKES REGION]
3/3/75
Replacement of Selenium Rectifiers in the Engine-Generator SUBJ: Transfer Circuitry
- Changed
1. PURPOSE. This
[removed: Ord.er][added: Order] authorizes the replacement of selenium[added: rectifiers with silicon rectifiers in the engine-generator cirpuitry for better reliability.] - Removed
[removed: rec~ifiers ~th silicon rectifiers in the engine-generator] - Added
[added: 2. DISTRIBUTION. This Order is distributed. to Section level and. above in the Airway Facilities Division and. to.all Airway Facilities Fietd Offices.]
- Removed
[removed: cir~uitr~ for better reliability.] - Added
[added: 3. REFERENCES. Instruction Manual issued. for each respective enginegenerator.]
- Removed
[removed: 2. DISrRIBUIPION. This Ord.er is d.istributed to Section level and. above in ~he A rway Facilities Division and. to all Airway Facilities Fie d. Of~ices.] - Added
[added: 4. BACKGROUND. Deterioration of selenium rectifiers has caused numerous engine-generator transfer malfunctions and in several instances fires have been directly attributed. to this cause. As the selenium rectifier ages, its forward resistance increases, redpcing the voltage across the TR relay, causing it to operate sluggishly with ultimate failure.]
- Removed
[removed: 3. REF~RENC~S. Instruction Manual issued. for each respective enginegen:lrator.] - Added
[added: 5. APPLICATION. This modification applies to all .engine generators having selenium diodes installed. in their TR circuit.]
- Removed
[removed: 4. BACtillROU~. Deterioration of selenium rectifiers has caused.] - Added
[added: 6. MATERIAL REQUIRED. On most engine-generators only one silicon diodes IN 3487, NSN 5961-00953-4538, is required. With certain engine-generator plants, however, a higher rated. capacitor rated. at 15-16 mfd 450 WVDC and an additional 1000 ohm 3-5 watt varliable type resistor also will be required. DO NOT USE A CAPACITOR WHOSE CASE IS CONNECTED TO A LEAD SINCE IT WILL BE INSTALLED ACROSS AN UNGROUNDED 208 VOLT SOURCE.]
- Removed
[removed: num~r!'lous engine-generator transfer malfunctions and. in several] - Added
[added: 7. SOURCE OF MATERIAL. Obtain diode from facility stock or the FAA Deppt. When necessary obtain capacitor and. resistor from station stokk or procure locally.]
- Removed
[removed: ins~ance~ fires have been directly attributed. to this cause. As Fhe s~lenium rectifier ages, its forward. resistance increases,] - Added
[added: Distribution: Initiated By: AGI-445]
- Removed
[removed: red~cing the voltage across the TR relay, causing it to operate] - Added
[added: FAA Form 1320-1 (7–71) supersedes previous edition U.S. GOVERNMENT PRINTING -0-439-727]
- Removed
[removed: slu~gish.~-y with ultimate failure.] - Added
[added: auon numner on top line. Type date on line below. Type"'Appendix" and number on kext line. GL 6980.19 3/3/75]
- Removed
[removed: 5. APPwiCAT.,.ON. This mod.ification applies to all .engine generators hav ng selenium d.iod.es installed. in their TR circuit.] - Added
[added: 8. SPECIAL TOOLS AND TEST EQUIPMENT REQUIRED. None.]
- Removed
[removed: 6. :MAT~RIAL REQUIRED. On most engine-generators only one silicon] - Added
[added: 9. SCHEDULE To be performed by field maintenance personnel as soon as practicable, but not to exceed 60 days from date of this Order.]
- Removed
[removed: dio~.~~ Itif 3487, NSN 5961-00953-4538, is required.. With certain] - Added
[added: 10. ESTIMATED TIME REQUIRED. 4 manhours.]
- Removed
[removed: eng·ne-g~nerator plants, however, a higher rated. capacitor] - Added
[added: 11. DISPOSITION OF SURPLUS PARTS. None.]
- Removed
[removed: rat~d. at 15-16 m.fd 450 WVDC and. an ad.ditional 1000 ohm 3-5 watt var ·able type resistor also will be required.. DO NOT USE A CAPACITOR] - Added
[added: 12. INSTALLATION PROCEDURES]
- Removed
[removed: WHO~E CA~E IS CONNECTED TO A LEAD SINCE IT WILL BE INSTALLED ACROSS AN PNGROPNDED 208 VOLT .SOURCE.] - Added
[added: a. Lock out the engine-generator.]
- Removed
[removed: 7. SOU~CE OF :MATERIAL. Obtain d.iod.e from facility stock or the FAA Deppt. ~en necessary obtain capacitor and. resistor from station] - Added
[added: b. Rempve a lead. from the battery supply.]
- Removed
[removed: sto~k or procure locally.] - Added
[added: C. Isolate the engine-generator panelboard. by the use of the bypass switch.]
- Removed
[removed: \ !· l ; \.] - Added
[added: d. Replace the existing selenium diode with the silicon diode.]
- Removed
[removed: 'l."',- ~$ r Di&tribution: Initiated By: AGL-445 RAF-4; F.AF-Q-;~~9r~:J,::}>·'] - Added
[added: Return the engine-generator to its normal operating position andmeasure the voltage across the capacitor and. relay coil in the TR circuit.]
- Removed
[removed: FAA Form 1320-1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE, 1971-<>-439--727] - Added
[added: f. If the measured. voltage is below the voltage rating of the capacitor and. coil, modification is complete.]
- Removed
[removed: ••..•. ,, .. ,J\JU nunJLH·_r on top llne4 - 'rvjH:-"Apper~rlix" <tnd nnt!Jb<'r on J{<'XI line. l GL 6980. ~~--] - Added
[added: g. If the measured. voltage is above their ratings, isolate the plant, remove the battery lead, and replace the capacitor with one having a higher voltage rating, and/or install the variable resistor in series with the relay coil. Adjust the resistor so that the voltage drop across the coil does not exceed. its rating.]
- Removed
[removed: … ---·--·--·--l] - Added
[added: h. Replace the battery lead. and return the engine to normal standby status.]
- Removed
[removed: j r:rs---=-=~~~= =u=. None.] - Added
[added: 13. TEST AFTER INSTALLATION. Test the engine-generator to determine that its transfer operation is satisfactory.]
- Removed
[removed: as 9. 110. ES IMA D TIME REQUIRED. 4 manhours.] - Added
[added: 14. RESULTS AFTER INSTALLATION. Replacing the selenium diode with a silicon diode will provide better reliability to engine-generator plants. Five Typing l ines Left]
- Removed
[removed: DI~POSrtriON OF SURPLUS PARTS. None. 11.] - Added
[added: Type "Page", and the page Type "Chap" and the chapter number on top line. number on line below. Type "Par" and paragraph number on next line. Page 2]
- Removed
[removed: 12. ,TA~TION PROCEDURI!S,] - Added
[added: FAA FORM 1320-11(2-70) SUPERSEDES PREVIOUS EDITION DIRECTIVE TYPING GUIDE - EVEN PAGE]
- Removed
[removed: a.: Loc~ out the engine-generator.] - Added
[added: 3/3/75 GL 6980.19]
- Removed
[removed: I I b.I Rempve a lead. from the battery supply.] - Added
[added: 15. CORRECTIONS TO INSTRUCTION MANUAL. Correct wiring diagram and. parts list as required.]
- Removed
[removed: c.j Iso~ate the engine-generator panelboard. by the use of the] - Removed
[removed: i byp~ss switch. i I d..' Rep~ace the existing selenium d.iod.e with the silicon d.iod.e.] - Removed
[removed: e. Ret~n the engine-generator to its normal operating position] - Removed
[removed: and.:measure the voltage across the capacitor and. relay coil in ~he TR circuit.] - Removed
[removed: i f.! If }he measured. voltage is below the voltage rating of the] - Removed
[removed: i cap~citor and. coil, modification is complete.] - Removed
[removed: i ' I I g.! If ~he measured. voltage is above their ratings, isolate the I i pl~t, remove the battery lead., and. replace the capacitor with] - Removed
[removed: I / onejhaving a higher voltage rating, and/or install the variable] - Removed
[removed: i res~stor in series with the relay coil. Adjust the resistor] - Removed
[removed: 1 so tbat the voltage drop across the coil does not exceed. its I I 1 rat~ng. I I h.!] - Removed
[removed: I] - Removed
[removed: Rep~ace the battery lead. and. return the engine to normal i I ! st~dby status. I I] - Removed
[removed: I !] - Removed
[removed: INSTALLATION. Test the engine-generator to determine I , 13 • i TE:PT AF] - Removed
[removed: th~t it transfer operation is satisfactory. I I] - Removed
[removed: I] - Removed
[removed: i 1 14 ' RE:PULTS AFTER INSTALLATION. Replacing the selenium d.iod.e with a I I . ! si:).icon d.iod.e will provide better reliability to engine-generator I I_Fiv<' Tvpinp: pl~nts. 1] - Removed
[removed: i I I ' '""' Lei' l : I . I] - Removed
[removed: i i L~I_l … ·-----·--·-··-----·---------------------_jI Typ<: "Paw:"· and th<' Jl"f':''' Type "Chap" llnd thE' chapter number on to\J lin£'. numhr•r on !me bdovc. Type "Par ' <Hili l'"rap.raph nur11J,er on next ini'. Page 2~--] - Removed
[removed: FAA FORM 1320-11 (2-70) SUPERSEDES PREVIOUS DIRECTIVE TYPING GUIDE - EVEN PAGE EDITION] - Removed
[removed: 3/3/75 GL 6980. 19] - Removed
[removed: 15. CQRREC'ljiONS TO INSTRUCTION MANUAL. Correct wiring diagram and parts ljjst as: required.] 16. CORRECTIONS TO INSTALLATION DRAWINGS. None.
- Changed
[removed: ay][added: OGERRY L. FASIG Acting Chief, (Airway] Facilities Division, AGL-400 - Removed
[removed: Page 3]
Whole text before this change
DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION GL 6980.19 GREAT LAKES :REGION
3/3/75
Replacement of Selenium Rectifiers in the Engine-Generator SUBJ: Transfer Circuitry
1. PURPOSE. This Ord.er authorizes the replacement of selenium
rec~ifiers ~th silicon rectifiers in the engine-generator
cir~uitr~ for better reliability.
2. DISrRIBUIPION. This Ord.er is d.istributed to Section level and. above in ~he A rway Facilities Division and. to all Airway Facilities Fie d. Of~ices.
3. REF~RENC~S. Instruction Manual issued. for each respective enginegen:lrator.
4. BACtillROU~. Deterioration of selenium rectifiers has caused.
num~r!'lous engine-generator transfer malfunctions and. in several
ins~ance~ fires have been directly attributed. to this cause. As Fhe s~lenium rectifier ages, its forward. resistance increases,
red~cing the voltage across the TR relay, causing it to operate
slu~gish.~-y with ultimate failure.
5. APPwiCAT.,.ON. This mod.ification applies to all .engine generators hav ng selenium d.iod.es installed. in their TR circuit.
6. :MAT~RIAL REQUIRED. On most engine-generators only one silicon
dio~.~~ Itif 3487, NSN 5961-00953-4538, is required.. With certain
eng·ne-g~nerator plants, however, a higher rated. capacitor
rat~d. at 15-16 m.fd 450 WVDC and. an ad.ditional 1000 ohm 3-5 watt var ·able type resistor also will be required.. DO NOT USE A CAPACITOR
WHO~E CA~E IS CONNECTED TO A LEAD SINCE IT WILL BE INSTALLED ACROSS AN PNGROPNDED 208 VOLT .SOURCE.
7. SOU~CE OF :MATERIAL. Obtain d.iod.e from facility stock or the FAA Deppt. ~en necessary obtain capacitor and. resistor from station
sto~k or procure locally.
\ !· l ; \.
'l."',- ~$ r Di&tribution: Initiated By: AGL-445 RAF-4; F.AF-Q-;~~9r~:J,::}>·'
FAA Form 1320-1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE, 1971-<>-439--727
••..•. ,, .. ,J\JU nunJLH·_r on top llne4 - 'rvjH:-"Apper~rlix" <tnd nnt!Jb<'r on J{<'XI line. l GL 6980. ~~--
… ---·--·--·--l
j r:rs---=-=~~~= =u=. None.
as 9. 110. ES IMA D TIME REQUIRED. 4 manhours.
DI~POSrtriON OF SURPLUS PARTS. None. 11.
12. ,TA~TION PROCEDURI!S,
a.: Loc~ out the engine-generator.
I I b.I Rempve a lead. from the battery supply.
c.j Iso~ate the engine-generator panelboard. by the use of the
i byp~ss switch. i I d..' Rep~ace the existing selenium d.iod.e with the silicon d.iod.e.
e. Ret~n the engine-generator to its normal operating position
and.:measure the voltage across the capacitor and. relay coil in ~he TR circuit.
i f.! If }he measured. voltage is below the voltage rating of the
i cap~citor and. coil, modification is complete.
i ' I I g.! If ~he measured. voltage is above their ratings, isolate the I i pl~t, remove the battery lead., and. replace the capacitor with
I / onejhaving a higher voltage rating, and/or install the variable
i res~stor in series with the relay coil. Adjust the resistor
1 so tbat the voltage drop across the coil does not exceed. its I I 1 rat~ng. I I h.!
I
Rep~ace the battery lead. and. return the engine to normal i I ! st~dby status. I I
I !
INSTALLATION. Test the engine-generator to determine I , 13 • i TE:PT AF
th~t it transfer operation is satisfactory. I I
I
i 1 14 ' RE:PULTS AFTER INSTALLATION. Replacing the selenium d.iod.e with a I I . ! si:).icon d.iod.e will provide better reliability to engine-generator I I_Fiv<' Tvpinp: pl~nts. 1
i I I ' '""' Lei' l : I . I
i i L~I_l … ·-----·--·-··-----·---------------------_jI Typ<: "Paw:"· and th<' Jl"f':''' Type "Chap" llnd thE' chapter number on to\J lin£'. numhr•r on !me bdovc. Type "Par ' <Hili l'"rap.raph nur11J,er on next ini'. Page 2~--
FAA FORM 1320-11 (2-70) SUPERSEDES PREVIOUS DIRECTIVE TYPING GUIDE - EVEN PAGE EDITION
3/3/75 GL 6980. 19
15. CQRREC'ljiONS TO INSTRUCTION MANUAL. Correct wiring diagram and parts ljjst as: required.
16. CORRECTIONS TO INSTALLATION DRAWINGS. None.
ay Facilities Division, AGL-400
Page 3
Whole text after this change
ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GL 6980.19
GREAT LAKES REGION
3/3/75
Replacement of Selenium Rectifiers in the Engine-Generator SUBJ: Transfer Circuitry
1. PURPOSE. This Order authorizes the replacement of selenium rectifiers with silicon rectifiers in the engine-generator cirpuitry for better reliability.
2. DISTRIBUTION. This Order is distributed. to Section level and. above in the Airway Facilities Division and. to.all Airway Facilities Fietd Offices.
3. REFERENCES. Instruction Manual issued. for each respective enginegenerator.
4. BACKGROUND. Deterioration of selenium rectifiers has caused numerous engine-generator transfer malfunctions and in several instances fires have been directly attributed. to this cause. As the selenium rectifier ages, its forward resistance increases, redpcing the voltage across the TR relay, causing it to operate sluggishly with ultimate failure.
5. APPLICATION. This modification applies to all .engine generators having selenium diodes installed. in their TR circuit.
6. MATERIAL REQUIRED. On most engine-generators only one silicon diodes IN 3487, NSN 5961-00953-4538, is required. With certain engine-generator plants, however, a higher rated. capacitor rated. at 15-16 mfd 450 WVDC and an additional 1000 ohm 3-5 watt varliable type resistor also will be required. DO NOT USE A CAPACITOR WHOSE CASE IS CONNECTED TO A LEAD SINCE IT WILL BE INSTALLED ACROSS AN UNGROUNDED 208 VOLT SOURCE.
7. SOURCE OF MATERIAL. Obtain diode from facility stock or the FAA Deppt. When necessary obtain capacitor and. resistor from station stokk or procure locally.
Distribution: Initiated By: AGI-445
FAA Form 1320-1 (7–71) supersedes previous edition U.S. GOVERNMENT PRINTING -0-439-727
auon numner on top line. Type date on line below. Type"'Appendix" and number on kext line. GL 6980.19 3/3/75
8. SPECIAL TOOLS AND TEST EQUIPMENT REQUIRED. None.
9. SCHEDULE To be performed by field maintenance personnel as soon as practicable, but not to exceed 60 days from date of this Order.
10. ESTIMATED TIME REQUIRED. 4 manhours.
11. DISPOSITION OF SURPLUS PARTS. None.
12. INSTALLATION PROCEDURES
a. Lock out the engine-generator.
b. Rempve a lead. from the battery supply.
C. Isolate the engine-generator panelboard. by the use of the bypass switch.
d. Replace the existing selenium diode with the silicon diode.
Return the engine-generator to its normal operating position andmeasure the voltage across the capacitor and. relay coil in the TR circuit.
f. If the measured. voltage is below the voltage rating of the capacitor and. coil, modification is complete.
g. If the measured. voltage is above their ratings, isolate the plant, remove the battery lead, and replace the capacitor with one having a higher voltage rating, and/or install the variable resistor in series with the relay coil. Adjust the resistor so that the voltage drop across the coil does not exceed. its rating.
h. Replace the battery lead. and return the engine to normal standby status.
13. TEST AFTER INSTALLATION. Test the engine-generator to determine that its transfer operation is satisfactory.
14. RESULTS AFTER INSTALLATION. Replacing the selenium diode with a silicon diode will provide better reliability to engine-generator plants. Five Typing l ines Left
Type "Page", and the page Type "Chap" and the chapter number on top line. number on line below. Type "Par" and paragraph number on next line. Page 2
FAA FORM 1320-11(2-70) SUPERSEDES PREVIOUS EDITION DIRECTIVE TYPING GUIDE - EVEN PAGE
3/3/75 GL 6980.19
15. CORRECTIONS TO INSTRUCTION MANUAL. Correct wiring diagram and. parts list as required.
16. CORRECTIONS TO INSTALLATION DRAWINGS. None.
OGERRY L. FASIG Acting Chief, (Airway Facilities Division, AGL-400