Order 6810.2 Very High Frequency (VHF) Omnirange Test (VOT) Siting Criteria
Text read by OCR from a scanned file. Check the original, as some words may be misread.
Change 1.pdf › 2
DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION 6810.2
SUBJ: VERY HIGH FREOUENCY (VHF) OMNIRANGE TEST (VOT) SITING CRITERIA
1. PURPOSE. This order provides guidance and reference material for siting of the very high frequency omnirange test (VOT) facilities in the National Airspace System (NAS).
TABLE OF CONTENTS
Par No. Title Page No.
2. Distribution 1 3. Background 1 4. References 2 5. System Description 2 6. Site Evaluation 3 7. Criteria to be Considered 5 8. Site Survey, Analysis and Testing 8 9. vOT Siting Responsibilities 8
DISTRIBUTION. This order is distributed to division level in the Program Engineering Service, the Offices of Airport Standards and Flight Standards, and the Aviation Standards National Field Office'in Washington headquarters; to branch level in the regional Airway Facilities divisions and to the Airway Facilities sectors, sector field offices, sector field office units, and sector field units.
3. BACKGROUND.
a. VOT Function and Types. The vOT emits a test signal to check very high frequency omnidirectional range (vor) receiver (avionics) integrity and accuracy of indicated bearing (azimuth). The vOr modernization will replace the tube-type facilities currently in use with solid-state equipment. In addition, the new equipment will be installed at sites that have no vOT facility at this time. There are two types of existing VOT equipment: Standard and Area. Standard vOr's are exclusively for ground use; Area vOT's are used both on the ground and in the air. The difference is primarily one of transmitter output power.
b. Power Output Limit. Facilities to be established under the VOT modernization program are Standard vOT's (including replacement equipment for Area VOT's) and will be located at airports to be for GROUND USE ONLY. New VOT equipment power output is limited to 2 watts. In the case of Area vOT service must be mainteained and higher power output is required, the regional Airway Facilities offices should perform engineering tests and submit a NAS Change Proposal (NCP).
Distribution: A-W(PS|AS|FS|VN)-2; A-X(AF)-3; A-FAF-2|3|7(STD) Initiated By: APS-420
6810.2 4/17/89
c. Extensive Siting Guidance. Order 6630.3, Antenna Configuration Handbook for Terminal and En Route Facilities, provides extensive guidance in siting VHF/UHF antennas in the terminal environment. Order 6630.3 contains excelient technical information and should be used to resolve technical vor antenna siting issues that are found to be beyond the scope of this document.
2
d. Intent. The intent of this order is to present an overview of siting and installation considerations specific to the vOT program. Detailed technical guidance can be found in order 6630.3.
4. REFERENCES.
a. Order 6630.3 Antenna Configuration Handbook for Terminal and En Route Facilities
b. Order 6820.10 VOR, VOR/DME, and VORTAC Siting Criteria
c. Order 6030.45 Facility Reference Data File
d. Order OA P 8200.1 United States Standard Flight Inspection Manual
5. SYSTEM DESCRIPTION.
a. Concept. To provide a calibration signal for airborne vOR receivers, the vOr must essentially transmit a simulated vOR signal having the ·same components as the true signal. The vOr transmits a signal with both the reference and variable signals in phase, independent of direction from vOT. This results is a specified indication on the aircraft vOR receiver of ZERO DEGREES FROM regardless of aircraft position with respect to the VOT. The VOT and vOR systems are briefly described below.
b. yOR System. Both the conventional vOR and Doppler VOR operate in the 108 to 118 Miz frequency band. Both vOR's provide separate 30 Hz reference and variable signals to the airborne avionics for phase comparison to determine the azimuth of the aircraft from the vOR size. The phase difference between the two 30 Hz amplitude and frequency modulated (AM/FM) components is equal to the azimuth (in degrees clockwise from magnetic north) with respect to the VOR site.
(1) Conventional. The conventional vOR provides the reference signal via a 9960 Hz subcarrier that is frequency modulated (FM) at a 30 Hz rate. In addition, a 30 Hz variable signal amplitude modulates the carrier frequency with its phase lagging the 30 Hz reference component proportional to the azimuth of the avionics from the VOR.
(2) Doppler. The doppler vOR provides fixed 30 Hz AM reference signal and a 30 Hz variable signal advancing counterclockwise, which also produces a phase difference proportional to the azimuth of the avoinics from the VOR.
Page 2 Par 5
3
C. vOT System.
(1) General. Like VOR, the VOT transmits an omnidirectional, horizontally polarized field pattern in the l08 to ll8 MHz band. This pattern is simultaneously modulated by two in-phase 30 Hz signals that duplicate the frequency of the vOR reference and variable signals. Because the modulation components of this test signal are always in phase, the two signals will produce the same reading on an aircraft course deviation indicator (CDI) as though the aircraft receiver were located at magnetic north (zero-degrees from) with respect to the vOT regardless of its actual position. If required, the CDI is adjusted to read zero-degrees as a part of preflight checks.
(2) Equipment Configuration. Figure 2-1 shows typical vOT equipment and appendix 1 contains preliminary VOr antenna drawings. Detailed technical information on the vOr can be obtained from the equipment specification (FAA-G-2768).
6. SITE EVALUATION.
a. General. The vOT modernization program includes both the replacement of obsolete equipment at existing facilities and the installation of equipment at new locations. Siting requirements at specific airports vary, so installation locations are determined on a site-by-site basis. The VOT will be installed in an existing facility (e.g., airport tower, ATCT, RTR, FSS, radar facility) which complies with the system requirements (installation instructions will be provided in the vOr equipment instruction manuals). In general, vor's which will replace existing Standard vor's can be located at the same sites and use existing hardware (including racks, antenna mounts, etc.). Standard vor's which replace. Area vOr's are subject to the establishment criteria below since they may require different installation locations.
b. Operational Characteristics. The operational characteristics of the vOr make them inherently simple to site and install. For this reason, FAA personnel familiar with VHF equipment and antennas should have sufficient expertise to site and install the vor's. This order will not address technical antenna issues in depth (see Order 6630.3), but will discuss practical considerations for the vOr. The information contained in this order will be sufficient for siting at most locations.
c. General Siting Procedures. In general, vor siting will proceed as follows:
(1) A location for the equipment and antenna will be chosen based on the general guidance provided in this order. Burn-in and shakedown tests will follow installation and site survey.
(2) The facility will be flight checked (by taxiing aircraft on the ground) as described in Order OA P 8200.1.
Par 5 Page 3
4
0 0 CTCNOEA ASSEMBLY
Q
22"deer × 19"wride
MONIIOR
HE NOTE A
0
A REMOTE STATUS CONTROL UNIT (RSCU)
FIGURE 2-1. TYPICAL VOT EQUIPMENT Page 4
SUCTION A-A
x 10'"high
Par 6
(3) If the system passes, it will undergo commissioning/acceptance tests; otherwise it will be necessary to refer to the documents referenced in this order to resolve the technical problems.
5
d. Commissioning and Acceptance. Commissioning and acceptance procedures are in accordance with Order 6030.45, and with site shakedown procedures.
7. CRITERIA TO BE CONSIDERED.
a. Coverage. The most important consideration in evaluating a site for installation of the vor is ensuring that adequate coverage is provided. While signal coverage in all areas within the airport boundaries accessible to aircraft is desirable, locations of primary concern are taxiways, run-up areas, parking ramps, etc. Because the in-phase signals from a voT provide a zero-degree reading independent of receiver bearing, longitudinal multipath effects are not likely to be a source of bearing accuracy problems. Signal coverage problems due to vertical lobing are not relevant since airborne use is not authorized.
b. Interference. The immediate area must be free from sources of signal interference at the low elevation angles typical of vor user areas. To minimize this problem, the antenna should be:
(1) Mounted on the roof of the facility in which the vOr is installed.
(2) Placed at least several wavelengths (approximately 30 feet) away from any nearby object (particularly other transmitting antennas); minimum separation distance is 6 feet.
(3) Sited to avoid large metallic objects close to or in line-of-sight of the coverage area. Such objects ay affect the coverage by reradiating, reflecting, or blocking the signal.
c. Line-of-Sight/Obstructions. To the extent possible, the vOr antenna should have a direct line-of-sight to the areas of interest listed in paragraph 7a above. The antenna should be placed so that the minimum required signal coverage (15 microvolts receiving antenna input strength from the 2.0 W transmitter output) is achieved throughout these areas. Additional guidance is available in the VOT section of order OA P 8200.1. The VOT transmitted has a integral attenuator which provides a 15 dB power output reduction in l dB increments. In cases where l00 percent line-of-sight coverage is not possible, antenna placement should minimize the areas shadowed by buildings, towers, antennas, and other obstructions.
d. Interference with Other Antennas. Order 6630.3, chapter 3, contains siting principles which address such issues as antenna pattern distortion, receiver desensitization, transmitter intermodulation product interference, receiver and intermodulation spurious response, antenna spacing and frequency separation. In general, these issues wili not present any problems, but
Par 6 Page 5
6
6810.2 4/17/89
specific sites may require consideration of one or more of these factors to determine optimal voT antenna placement. In addition, the effect which the newly.installed vOr antenna has on existing antennas and signal patterns must be considered. Since the vOT is small and transmits low power, no problems are anticipated. However, there is one configuration to be avoided; the vOT antenna should not be located within l00 feet of an airport vOR or localizer since their similar signals/frequencies and high power output could interfere with operation of the vor.
e. Antenna Cable Length. The vOr equipment specification states that the transmitter-to-antenna and monitor loop-to-monitor cable shall not exceed 100 feet (max) of RG 214 coax, which corresponds to 2.4 dB of transmission loss at l18 MHz. At installations where the separation between the VOT and its antenna requires a cable length greater than 100 feet (thereby causing greater line loss), a lower loss cable type (such as RG 331 or RG 333) should be used. Refer to Order 6630.3, chapter 2, section 1, for a detailed discussion of transmission lines and formulas for calculating signal loss rates for verious cable types. Double shielded cables should be used.
Cable Type Line loss (dB) at 118 MHz for 100 ft cable
RG 214/U 2.4 dB RG 331/U 0.88 dB RG 333/U 0.57 dB
f. Antenna Height. The required installed vOT antenna height will be determined by a tradeoff of a least two factors. The first is that the antenna must be placed sufficiently high to achieve the. line-of-signt requirements of paragraph 7b. The second factor is that the antenna should be placed as low as possible so that it is below the level of other antennas to minimize any interference as described in paragraph 7c. The antenna shall not penetrate any Part 77 surface. The antenna will be supported on a 2.5-inch galvanized pipe with threaded connections. A #6 bare copper wire connected to the antenna/pipe assembly will provide grounding and lightning protection.
g. vOT Equipment Placement. The VOT transmitter/monitor consists of two equipment drawers (each 10 1/2 inches high) which mount in a standard 19-inch equipment rack. The equipment is designed to operate from standard 120 VAC power and in FAA-G-2l00d, environment II conditions (-10 to 50 degrees C or 14 to 122 degrees F, 5 to 90 degrees RH). More detailed requirements can be found in the vOT equipment instruction book, but facilities which meet these environmental and power criteria can be considered for equipment placement. Installation effort will be greatly reduced if the vOr equipment is located in the tower equipment room. This will reduce or eliminate trenching/cable routing for the RSCU cable described below.
Page 6 Par 7
7
h. Remote Status and Control Unit (RSCU) Placement. The RSCU is a small panel which provides five VOT control/monitoring functions. The RSCU interface to the vOT equipment cabinet will be via one dedicated cable consisting of twisted-pair wires for the five functions.
(1) vOT normal indicator.
(2) vOT alarm indicator.
(3) Aural alarm (speaker).
(4) Alarm silence button.
(5) vor monitor reset button.
i. RSCU Interface. The RSCU interface to the VOT equipment cabinet will be via one dedicated cable consisting of twisted-pair wires for the five functions.
(1) Cable. The FAA Depot stocks cable which meets the requirement for the RSCU interface to the VOT equipment cabinet. Either six-pair, 19 AWG exterior or Armored/direct-burial cable is available (NSN's: 6145-01-066-49491 and 6145-01-066-49481). Final cable selections will be determined at the first system shakedown testing with installation instructions to be provided to each site. Five of the six pairs will be used.
(2) Placement. The placement of the RSCU should be in a room where controllers or maintenance technicians normally monitor air traffic control equipment status. The recommended location is the tower cab, with the alternative being the facility maintenance room.
(3) Push-to-Talk Function. Regional and local plans to utilize the VOT push-to-talk function will also be a consideration. The vOT has a microphone jack on the monitor front panel. Use of a remote microphone requires a 4 conductor interface to a terminal block connection provided at the rear of the monitor. The remote push-to-talk can be implemented with the RSCU cable recommended above. The 12 available conductors can be reallocated to provide all necessary functionality.
j. Obstruction Lights. (Refer to FAA Advisory Circular 150/5345-2). If required, an obstruction light may be mounted on top of the threaded pipe. In this case, AC power wires (3 conductors, 12 AWG) must be fished through the pipe for connection to the light fixture. A terminal block is provided at the base of the pipe to provide wire connections.
Par 7 Page 7
6810.2 4/17/89
8. SITE SURVEY, ANALYSIS, AND TESTING.
a. Purpose. The primary purpose of the site survey is to select a site which will provide the required coverage (see paragraph 7a). The information obtained during the site survey is sufficient to prepare site drawings. The survey will document and ensure that the antenna does not penetrate any Part 77 surfaces. The site drawings must include a vicinity sketch, site plan, and horizon profile. The survey will establish (and document in the various drawings) a dimensional description of the site, including the locations and heights of prominent adjacent buildings and obstructions. A set of accurately registered panoramic photographs may be substituted for the horizon profile.
8
b. Testing. Equipment testing can occur only after installation is complete. The equipment instruction book supplied with the vOT will contain test procedures. Procedures for verifying signal integrity and coverage are contained in Order OA P 8200.1.
c. Siting Information. Extensive siting information for equipment utilizing the vor frequencies can be found in Order 6820.10. Should any technical siting problems arise, refer to this order. Airport topography does not normally present significant siting problems, so the information in these documents is not normally required.
d. Required Equipment. A calibrated vOR receiver is required for VOT site surveys. Siting and coverage requirements are discussed in paragraph 7.
9. VOT SITING RESPONSIBILITIES.
a. Program Officer (APS-420). The program office is responsible for overall vor program management including technical monitoring, acquisition and implementation planning, and fiscal and physical status accounting.
b. National Airway Engineering Field Support Sector (ASM-150). ASM-150 shall perform shakedown testing on the test and evaluation system (first unit), finalize the information contained in this order, and provide common JAI data sheets and generic site shakedown test procedures to be used for regional vOr installations. In addition, ASM-150 shall provide configuration management for vOT technical documentation and second-level engineering support.
c. Regional and sector Airway Facilities offices shall be responsible for all tasks associated with field implementation of the vot as specified by Order 6030.45. Specific responsibilities include: site survey, site preparation, equipment installation and removal (if required), shakedown and burn-in testing, flight check, JAI/Operational Readiness Demonstration, commissioning and decommissioning (if required), certification, repair, and maintenance.
Page8 Par 8
9
d. Other Responsibilities. All other responsibilities are assigned in the latest edition of Order 6790.13, VHF Omnirange Test (VOT) Facility System Implementation Plan/System Program Plan.
Robert E. Brown Director, Program Engineering Service
Par 9 Page. 9
6810.2 Appendix 1
APPENDIX 1. ANTENNA DRAWINGS
11
3°
12 3/16
10°
STRIPLINE DEVICE
OBSTRUCTION LIGHT WIRING
THREADED PIPE CAP
3/4° PIPE
RADOME
NEATHERPROOF COVER PLATE 0 SET SCREM
2 1/2°DIA SUPPOAT PIPE
24 5/16° SO
RADOME
FEED CABLE
CABLE CLAMP
VOT ANTENNA ASSEMBLY Page 1
6810.2 Appendix 1
INDICATES FIXED CAPACITOR SOLOER POINT
VARIABLE CAPACITOR -RESISTOR
12
HONITOA LOOP
—FIXED CAPACITOR
TRANSHIT LOOP
STRIPLINE ASSEMBLY TOP VIEW
TYPE "N" FEMALE CONNECTOR
TEAMINAL BLOCK
GFE
Page 2
TRANSFORHER -VARIABLE CAPACITOR
STRIPLINE ASSEMBLY BOTTOH VIEW
STRIPLINE ASSEMBLY
-OBSTRUCTION LIGHT WIAING
-ACCESS COVER REMOVED
-CABLE CLAMP
GFE
SET SCREWS
Li
VOT ANTENNA BASE
12 › 3
12/21/92 6810.2 CHG 1 Appendix 2
APPENDIX 2. REFERENCE POINT POWER
This appendix can be used to determine theoretically whether a given VOT site can meet the requirements of Order OA P 8200.1, paragraph 202, for 15 - 20 uV signal level at the reference point. If the VOT cannot be sited to meet this requirement, the antenna monitor loop must be bypassed as described in Appendix 3, Monitor Loop Bypass.
1. GRAPH 1. TRANSMIT POWER, can be used to determine the amount of attenuation required to theoretically achieve an 18 uV signal level at the VOT reference point for a given antenna height above ground and distance in miles to the reference point. The following procedure provides guidance on how to use the graph to determine whether a site will support the 15 to 20 uV requirement.
a. Using an airport map, determine the line-of-site distance from the antenna site to the reference point. Typically, the reference point is the furthest point on the taxiway from the VOT antenna.
b. Determine the height, from ground level, of the transmit antenna in feet.
C. If the Transmit Antenna Height (h) falls between plotted heights, extrapolate the antenna height and draw a line parallel to the h, lines.
d. Follow the point from the distance in miles across to the transmit antenna height line.
e. At their intersection, read the required VOT transmit power at the antenna.
The scale in the middle of the graph labeled "Transmit Antenna Plus Cable Loss" starts at 2.0 W (2000 mW) and adds the maximum attenuation (18 dB) allowable by the system design (3 dB line loss plus 15 dB attenuator loss). If the required VOT transmit power at the antenna is within the scale, theoretically, the site will support the 15 to 20 uV requirement. The actual site may vary as much as 3 dB. If the antenna siting cannot be located to provide the required coverage, siting characteristics, and power level at the reference point, then bypass the antenna monitor loop as shown in Appendix 3 to obtain the required attenuation. For calculations beyond the graph limits or to understand the theory behind the graph, refer to figures 1 and 2.
12 › 4
Appendix 2 6810.2CHG 1 12/21/92
FIGURE 1. GRAPH 1. TRANSMIT POWER
vOT Transmit Power (P.) Required for a given Antenna Height (h ) to produce 18 uv from a Receive Halfwave Dipole at a Height of 12 Ft. and a Distanoe (m) Miles.
hr = 120 Ft.
Transsit Antenna Height, hr - 10 Ft
Transmit Attenuator Plus Cable Loss
8186420
WOT TRANSMIT POWER AT ANTENNA ( P.
1.02.85 10 25 0 0 260 60 10. 3000 me00 P(m)
Page 2 0 +10 +20 50 Pr(d6m)
12 › 5
6810.2 CHG 1 12/21/92 Appendix 2 FIGURE 2. TRANSMIT POWER
The power required to be transmitted into the antenna to achieve a desired signal can be determined as follows:
3.677hh(PT)1/2 d4 .VR d2 Pr = 3.6772 h2h2 VR: Received Voltage h: Transmitter Height PT: Transmitter Power h: Receiver Height d: Distance Converting transmitter power to decibel milliwatts (dBm) P(dBm) = 10 10g (1000P) = 10 log 1000 + 20 log VR + 40 log d - 20 10g 3.677 - 20 10g h - 20~l0g h P(dBm) = 20 log VR + 40 log d - 20 log hr - 20 log hR + 18.69 The desired signal is 18 uV (15 - 20 uV), and the receiver antenna height is 12 feet in the tail of the Beechcraft KingAir. Pr(dBm) = -93.89 + 40 1og d - 20 10g h - 21.58 + 18.69
P(dBm) = 40 1og m - 20 log h + 52 dB
Pτ(dBm) = Transmitter Power (dBm) at Antenna m = Distance in Statute Miles Transmitter Antenna Height in Feet
Page 3
12 › 6
6810.2 CHG 1 12/21/92 Appendix 2
TABLE 1. TRANSMIT POWER REOUIRED (dBm)
2 5 8 10 18 20 30 40 60 80 100 m
.2 18 10 6 4.0 -1.0 -2 -5.5 -8 -11.5 -14 -16 .4 30 22 18 16.0 11 10 6.5 4.0 0.5 -2 -3.9 .6 37.1 29.1 25 23.1 18 17.1 13.6 11 7.5 5 3.1
1.0 .8 34.1 30 34 28.1 32 26.9 23 22.1 26 18.6 22.4 16 20 12.5 16.4 10 14 12 8.1
1.6 1.8 1.2 1.4 35 30 32.7 34.1 29.1 31.8 30.6 25.6 32.7 28.3 30.17 23.1 25.8 28.1 22.2 24.6 19.6 26.6 17.1 19.8 22.1 24.1 17.8 15.2 20.2 22.2
2.0 32 28.5 26 24
PT(dBm) = 40 l0g m - 20 l0g hT + 52 dB
Power required at the transmit antenna to produce 18 μV of signal from a receive 1/2 wave dipole antenna, at a distance m miles and at a height of 12 feet. The transmit antenna is at a height of hp feet. See plot, Figure 1, Graph 1, Transmit Power.
NOTE:
P T (mw) = 10g -1 [Pr (dbm)] 10
Use the above to convert power in dbm to power in mw.
Page 4
12 › 7
12/21/92 6810.2 CHG 1 Appendix 3
APPENDIX 3. MONITOR LOOP BYPASS
This appendix provides instructions on how to bypass the antenna monitor loop to obtain more than the total of 18 dB attenuation allowed by the FA-10235 VOT system design. Bypass the antenna monitor loop when a site cannot be located to provide the required coverage, siting characteristics, and power level at the reference point.
Figure 3, Monitor Loop Bypass, provides instructions on how to bypass the antenna monitor loop by using a splitter and additional attenuation to feed the transmitter output directly into the monitor. To avoid damage to the monitor, at least 4 dB attenuation must be applied to the signal in addition to the 3 dB of the splitter. The actual attenuation levels required vary according to the location, but appendix 1 can be used to estimate the total amount of attenuation required.
Page 1
12 › 8
6810.2 CHG 1 12/21/92 Appendix 3
FIGURE 3. MONTTOR LOOP BYPASS
loop usims a splitter. The vOT may be operated at lower levels by bypassing the antenna
15 dB VOT TRANSMITTER ATTn 3 dB SPLITTER
OUTPUT
VOE MONITOR +15 dBm ATTn ANTENNA TO +15 dBm
1. Set the vOT attenuator to 15 dB and connect the splitter as shown.
2. The signal available to the antenna is +15 dBm. 3. Set the output attenuator to reduce the signal as desired. If more than +15 dBm is required then reduce the VOT attenuatOr, but DO NOT SET TO LESS THAN 4 dB AS DAMAGE TO THE MONITOR MAY RESULT. (+26 dBm at monitor) 5. Adjust R2 of the FLM board as necessary.
Page 2
U.S. DEPARTMENT OF TRANSPORTATION CHANGE FEDERAL AVIATION ADMINISTRATION 6810.2 CHG 1
12/21/92
SUBJ: VERY HIGH FREQUENCY (VHF) OMNIRANGE TEST (VOT) SITING CRITERIA
1. PURposE. This change provides additional siting guidance and reference material to site the vOT to meet the signal level requirements of Order OA P 8200.1, United Btates 8tandard Flight Inspection Manual.
2. DISTRIBUTION. This change is distributed to branch level in the office of the Program Director for Navigation and Landing and the 8ystems Maintenance 8ervice; to branch level in the regional Airway Facilities divisions; to branch level in the Communications/Navigation/surveillance Division at the FAA Technical Center; and to branch level in the FAA Logistics Center, and the FAA Academy at the Mike Monroney Aeronautical Center.
3. EXPLANATION OF CHANGES. This change adds Appendix 2, Reference Point Power, and Appendix 3, Monitor Loop Bypass. Use appendix 2 to estimate the reference point power level as a function of the voT antenna height above ground and the distance to the reference point. If the signal level at the voT reference point cannot be attenuated to 15 - 2o uv as required by Order OA P 8200.1, paragraph 202, then appendix 3 provides guidance on how to bypass the antenna monitor loop and attenuate the power output to obtain the required signal level.
4. DISPOSITION OF TRANSMITTAL. After filing the revised page, this transmittal should be retained.
PAGE CONTROL CHART
Remove Pages Dated Insert Pages Dated
Appendix 2, 1-4 12/21/92 Appendix 3, 1-2 12/21/92
CharleB. Ochoa Progpám Manager for Navigation
Distribution: Initiated By: A-W(NN/SM)-3; A-X(AF)-3; A-Z(CN)-3; ANN-130 A-Y(DE/AY)-3