CHANGE DEPARTMENTOFTRANSPORTATION FEDERAL AVIATION ADMINISTRATION 6740.4 CHG 1
7/24/81
Cancellation Date:Retain
SUBJ: NONDIRECTIONALBEACON (NDB) INSTALLATION STANDARDS HANDBOOK
1. PURPOSE. This change provides information for commissioning of facilities after the installation of NDB equipment.
2. CHANGE. Paragraph 8 of chapter 1 has been changed to correct the procedure for commissioning a facility after the installation ofNDBequipment.
PAGECONTROL CHART Remove Pages Dated Insert Pages Dated
3 and 4 2/23/81 3 2/23/81 4 7/24/81
XInlinon
Director, Airway Facilities Service
Distribution: Selected Airway Facilities Field Offices; Initiated By: AAF-410 A-X(AF)-3;ZAF-602
6740.4-1
2/23/81 6740.4
FOREWORD
Civil NDB facilities are operated and maintained by the FAA to provide aircraft bearing information. This service is to be expanded and upgraded by the installation of solid-state nondirectional beacon (NDB) units at terminal navigation aids. This order provides installation guidance, installation drawings, and appropriate electrical wiring diagrams, for this multiyear effort of installing the 400 watt and 50 watt NDB transmitters and associated antenna tuning unit (atu) at air navigation facilities. The Installation Procedure (Chapter 4) and Installation Standards (Chapter 5) are also generally applicable to higher wattage NDB and atu units. Site Engineering (chapter 6) provides information needed for selecting sites and suitable antennas.
The Chief, Navaids/Communications Engineering Division, AAF-400, is authorized to issue changes to this order except that authority to approve changes in policy is reserved for the Director Airway Factlities Service, AAF-1.
GERALD L. THOMPSON Director, Airway Facilities Service
Page i (and ii)
For sale by the Superintendent of Documents, U.S. Government Printing Office Washington, D.C. 20402
TABLE OF CONTENTS
CHAPTER 1. GENERAL INFORMATION
1. Purpose 2. Distribution 3. Background 4. Scope 5. Safety 6. Directive Verbs 7. FAA Drawings 8. Commissioning Data 9. Abbreviations 10. Waivers 11. Reserved
CHAPTER 2. NDB EQUIPMENT DESCRIPTION
12. Introduction 13. NDB Function 14. NDB Physical Description 15. 50 Watt ATU Function 16. 50 Watt ATU Physical Description 17. Reserved
CHAPTER 3. NDB INSTALLATION DRAWING PACKAGE
18. Introduction 19. Drawing Synopsis 20. Reserved
CHAPTER 4. NDB And ATU Installation Guidance
21. Introduction 22. Installation Summary 23. Installation Procedure 24. Reserved
CHAPTER 5. INSTALLATION STANDARDS
SECTION 1. EQUIPMENT INSTALLATION
25. General, NDB Units and 50 Watt ATU 26. 400 Watt NDB Rack Installation 27. 50 Watt NDB Cabinet Installation Details 28. 50 Watt ATU Cabinet Installation Details
Page No.
1 1 1 1 2 2 2 4 4 4 5
7 7 7 8 17 17
21 21 21
53
53 53 57 57
59 64 65 65
Page iii
Page No.
Antenna Feed Through and Spark Gap Installation
29. 30. 31.
SECTION 2.
32. 33. 34.
SECTION 3.
35. 36. 37.
38.
CHAPTER 6.
39. 40. 41. 42. 43.
44. 45. 46. 47. 48. 49. 50. 51. 52.
APPENDIX 1.
Figure
1-1 2-1 2-2 2-3 2-4
Page iv
Emergency Power Supply Installation External Cabling Interconnection
Wiring and Cabling
Electrical Wiring System Wiring Inside Cable Ducts
Grounding, Shielding, and Bonding
General Requirements for Existing Facilities Requirements for Grounding, Bonding, and Protection Reserved
SITE ENGINEERING
Introduction Propagation Site Selection Determination of Earth Ground Factors Determining the Effective Ground Conductivity Measuring Ground Conductivity Field Strength Antenna Selection Antenna Efficiency Antenna Bandwidth Antenna Input Impedance Calculation of Antenna Parameters Sample Calculations Information References
Form FAA-198 (NDB) (7 pages) Record of Meter Readings and Adjustments
LIST OF FIGURES
NDB Installation Drawings Interrelationship of Transmitter Transmitter Front View Mounting Dimensions Transmitter FA9782 - Access Door Open
66 67
83 85 87
88 89
90 91
93 93 94 94
95 96 96 122 122 125 127 128 133 136
1
3 8 9 10 11
2-5 2-6 2-7 2-8 2-9 3-1 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9
6-1
6-2 6-3 6-4
Cabinet Dimensions Transmitter Rear View Internal Terminals Cabinet Mounting Dimensions Antenna Tuning Unit - Cover Removed NDB Installation Drawings Supply Chassis Top and Bottom External Connectors Cabinet with Electronic Chassis Removed Electronic Chassis Mounting of Tuning Slugs External Connectors Power Supply Assembly - Top View Power Amplifier Assembly, Drawer Extended Procedure for Attaching Type N Connectors M39012/1-0005, to Cable Ground Conductivity for North America at 30 KHz Range of 50 Watt NDB Using PA35D Antenna Range of 100 Watt NDB Using PA35D Antenna
Page No.
12 13 16 19 20 23 68 69 73 74 75 77 79 82
84
98 99 100
Range of 50 Watt NDB with AATU and PA35E Antenna
6-5
(AATU-NX200TUB, FAA Type-FA9782/1)
101
Range 50 Watt NDB (ND200) Using PA40A Antenna
6-6 6-7
Range of 25 Watt NDB Using PA60A Antenna
102 103
Range of 50 Watt NDB Using PA60A Antenna and
6-8 6-9 6-10 6-11 6-12 6-13 6-14 6-15
6-16
6-17
6-18
6-19
6-20
6-21
100 Watt NDB Using PA40A Antenna Range of 100 Watt NDB Using PA60A Antenna Range of 250 Watt NDB Using PA60B Antenna Range of 400 Watt NDB Using PA60B Antenna Range of 250 Watt NDB Using PA90B Antenna Range of 400 Watt NDB Using PA90B Antenna Range of 250 Watt NDB Using PA120B Antenna Range of 500 Watt NDB Using PA120B Antenna Ground-Wave Propagation Curves; Sea σ = 4 S/m, e = 80 Ground-Wave Propagation Curves; Earth σ = 3 x 10-2 S/m, e = 4 Ground-Wave Propagation Curves; Earth σ = 10-2 S/m, e = 4 Ground-Wave Propagation Curves; Earth σ = 3 x 10−3 S/m, e = 4 Ground-Waye Propagation Curves; Earth 0= 10=3 S/m, e = 4 Ground-Wave Propagation Curves; Earth σ = 3 x 10-4 S/m, e = 4 Ground-Waye Propagation Curves; Earth σ= 10=4 S/m, e = 4
104 105 106 107 108 109 110 111
112
113
114
115
116
117
118
Page v
6-23
6-24 6-25 6-26 6-27 6-28
Table
Ground-Wave Propagation Curves; Earth σ= 3 x 10-5 S/m, e = 4 Ground-Wave Propagation Curves; Earth σ= 10-5 S/m, e = 4 Equivalent Antenna Circuit Equivalent Antenna and Tuning Coil Circuit Effective Antenna Height Antenna Capacitance NDB RF Currents
LIST OF TABLES
Page No.
120 124 124 129 130 132
15
Correction Factor for Fa-9782/1 Antenna Current
2-1 4-1 5-1 5-2 5-3
5-4 5-5 5-6 5-7 6-1 6-2 6-3
Page vi
NDB Installation Procedures Equipment Supplied in 400 Watt NDB Crates Equipment Supplied in 50 Watt Packing Crate Equipment Supplied in 50 Watt ATU Packing Crate Equipment Required But Not Supplied NDB Input/Output Connections Power Amplifier Transformer Settings Input and Output Summary Radio Wave Ground Penetration Typical Nautel Antenna Specifications Antenna Radial Resistance
54 60 61
62 63 71 78 81 96 123 132
2/23/81 6740.4
CHAPTER 1. GENERAL INFORMATION
1. PURPOSE. This order is a guide for planning and installing the nondirectional beacon (NDB) transmitter type FA-9781 (400 watt) NDB, the FA-9782 (50 watt) NDB, and the FA-9782/1 (50 watt) atu at air navigation facilities.
2. DISTRIBUTION. This order is distributed to selected offices and services in Washington headquarters, FAA Technical Center, and the Aeronautical Center; to branch level within regional Airway Facilities division.
3. BACKGROUND. The NDB provides aircraft bearing information during transition from en route to airport precision approach facilities and as a nonprecision approach at many smaller airports. The FA- 9781 and FA-9782 NDBs are completely solid-state units which will be used to replace the obsolete vacuum tube NDB units currently installed at air navigation facilities. Cost studies have shown that replacing obsolete vacuum tube equipment with solidstate equipment will pay for itself in savings on operating costs and maintenance costs. The FAA has planned an NDB replacement program starting in fiscal year 1980 and extending for about five years. This order will provide NDB installation directions to cognizant FAA and assigned contractor personnel.
4. SCoPE. This order provides direction for installing the FA- 9781 and FA-9782 NDBs and the FA-9782/1 atu at existing air navigation facilities. The text provides a brief description of the equipment's functional and physical characteristics, presents floor plan arrangement drawings for locating the NDB units and the atu in the facility enclosures, defines a step-by-step procedure for installing the equipment, provides installation standards, and presents applicable interface and interconnection wiring diagrams.
a. A 400 watt atu is available from the NDB equipment manufacturer (Nautel Maine, Inc.) and is listed on the Federal Supply Schedule (Contract No. GS-00S-92095, SIC No. 225-217, Modei No. NX2000TUB). The 400 watt NDB can be adjusted to suit a 50 or 72 ohm terminal impedance. If unique site conditions require a 400 watt atu, the unit is a regional procurement option, which does not require a request for a waiver.
b. The order describes the NDB equipment (chapter 2), presents applicable installation drawings and wiring diagrams (chapter 3), delineates a step-by-step installation procedure (chapter 4) and provides installation standards (chapter 5).
Chap 1 Par 1 Page 1
6740.4 2/23/81
c. The order provides only NDB and associated equipment installation guidance and direction for existing or future air navigation facilities. Once the NDB equipment is installed, the applicable manufacturer-furnished instruction books, referenced in text or appropriate references, shall be referred to for any equipment operation, calibration, or initial checkout procedures.
5. SAFETY. Personnel shall, at all times, exercise care while working on equipment where dangerously high voltages are employed. This is especially true when inspection plates and dust covers are removed or access doors are opened, exposing internal wiring. Contact with ac, dc, or rf potentials can result in severe shock, burns, or loss of life. Maintenance personnel should familiarize themselves with the technique for resuscitation found in the manual of first aid instructions. All individuals should be thoroughly familiar with general safety practices prior to working on equipment so as not to endanger themselves or others. Operating and maintenance personnel should refer to FAA Orders 6000.15A, General Maintenance Handbook for Airway Facilities, for safety precautions to be observed and 3900.6A, Occupational Safety Program for Airway Facilities Personnel. Ignorance and carelessness are predominant factors in most accidents. Particular attention shall be given to proper use of the grounding cable prior to working on high voltage circuits with power controls in the "off" position due to charges retained in capacitors. To avoid casualties, always remove power, then discharge and ground by use of a grounding rod, prior to touching any parts.
6. DIRECTIVE VERBS. This order contains policy statements and/or other guidance material wherein directive verbs such as SHALL, WILL, and MAY are used. The following rules of usage apply:
a. Shall is used to denote compulsory or mandatory action which the person directed is obliged to take. Example: The equipment SHALL be adjusted to operate in accordance with Handbook tolerances.
b. Should is used to denote an action which is strongly recommended, but left to the discretion of the person being directed. Example: The equipment SHOULD be shut down if, in the opinion of the technician, catastrophic failure is imminent.
c. Will is used to denote action in the future tense. Example: Obsolete equipment WILL be replaced as soon as funds can be made available.
d. May is used to denote permission. Example: At navigation aid facilities, certain maintenance activities MAY be performed without recourse to flight inspection.
7. FAA DRAWINGS. The drawings included in this order as standard references are listed in figure 1-1.
Chap 1 Page 2 Par 4
2/23/81 Drawing Number
D-6186-002
D-6186-003
D-6186-004
D-6186-005
D-6186-006
D-6186-007
D-6186-008
D-6186-009
D-6186-010
D-6186-011
D-6186-012
D-6186-013
D-6186-014
Chap 1 Par 7
Description
FA 9782 NDB Installation Marker/Comlo Bldg Layout 50 watt NDB
FA 9781 NDB Installation Marker/Comlo Bldg Layout 400 watt NDB
FA 9782 NDB Installation Power and Signal Wiring Diagram with Tube Marker 50 watt NDB and atu
FA 9781 NDB Installation Power and Signal Wiring Diagram 400 watt NDB
FA 9781 and FA 9782 NDB Installation Antenna Details ILS Marker and Compass Locator
FA 9781 and FA 9782 NDB Installation Antenna Details, Type "T" ILS Marker and Compass Locator :
FA 9781 and FA 9782 NDB Installation Antenna Details, MH Facility
FA 9781 and FA 9782 NDB Installation Antenna Details, Hexagonal Top Hat 500 Ft. Radials
FA 9781 and FA 9782 NDB Installation Antenna Details, Hexagonal Top Hat 165 Ft. Radials
FA 9781 and FA 9782 NDB Installation Spark Gap and Antenna down Wire
FA 9781 and FA 9782 NDB Installation Ground Plane, Middle and Outer Compass Locator Markers
FA 9781 and FA 9782 NDB Installation Ground Plane, FM-MH Facility or H or MH Facility
9782/1 NDB Installation External Mounting of ATU
FA-9782 NDB Installation "T" Antenna 2-wire
FIGURE 1-1. NDB INSTALLATION DRAWINGS
6740.4 Page
27
29
31
33
35
37
39
41
43
45
47
49
51
6740.4 CHG 1 7/24/81
* 8. COMMISSIONING DATA. The facility shall be commissioned only after satisfactory completion of a joint acceptance inspection (JAI) by the installation personnel and the Field Office Chief or his repre-
sentative. This shall include preparation of FAA Form 198 for the NDB. A sample of this form is presented in appendix 1 herein. *
9- ABBREVIATIONS. The following abbreviations are used in this order.
ATU - antenna tuning unit ICAO - International Civil Aviation Organization If - low frequency raf - medium frequency ATC - Federal Aviation Administration Technical Center NDB - nondirectional beacon NEC - National Electrical Code rf - radio frequency vswr - voltage standing wave ratio
10- WAIVERS. Facility configuration must be standardized to allow for future standard enhancements to the facility. The instructions, descriptions, standards, drawings, and procedures contained in this directive represent the FAAs baseline and standard criteria concerning NDB equipment. Some facilities under the purview of this directive have been commissioned prior to the effective date of this order using equipment which has been procured without the benefit of FAA approved specification. Existing NDB facilities on the effective date of this order which are not in compliance with this order shall be considered nonstandard facilities.
a. Regional procurement of equipment and devices to be used for air traffic control or navigation for which specifications have not received prior FAA approval is prohibited by the latest edition of Order 1100.5, FAA Organization Field, paragraph 222.j(2). The inclusion of such nonstandard equipments in this directive is for installation purposes only and, as such, will not be used as justification for procurement, installation, or commissioning of additional or similar equipment. Those facilities having a need to use nonstandard procedures for NDB installation will request waivers to applicable paragraphs of this directive in order to continue to operate with
justifiable variances. For explicit instructions pertaining to commissioning, operating, and maintaining nonstandard facilities see
the latest edition of Order 6000.20 Waiver of Criteria for Establishment and Maintenance of Airway Facilities. Requests for waivers submitted by facilities management personnel will be accompanied by all pertinent technical data necessary to define the problem and to justify the nonstandard equipment or operation requested. They will also include recommended solutions to the problem. Waivers already approved are still valid and do not require resubmission.
Chap 1 Page 4 Par 8
2/23/81 6740.4
b. At existing facilities that are operationally acceptable, no wiring changes are to be made solely as a result of receiving this handbook. Existing waivers shall remain in effect as long as these facilities are considered operationally acceptable; however, whenever a facility undergoes modification such as modernization, conversion, relocation, or equipment addition and removal, the standards set forth herein shall be followed.
c. Action to be taken to budget for facility improvements which eliminate the need for waivers. Nonstandard facilities shall be upgraded to standard facilities within 3 years of the effective date of this order. The 3-year time frame allows for the normal budget process. The regions have the responsibility to submit budget estimates to effect the upgrading of nonstandard facilities.
11. RESERVED.
Chap 1 Par 10 Page 5 (and 6)
O
0
2/23/81 6740.4
CHAPTER 2. NDB EQUIPMENT DESCRIPTION
12. INTRODUCTION. The following paragraphs provide a general functional and physical description of the 50 and 400 watt NDB units and the 50 watt atu. Figure 2-1 presents the interrelationship of the 50 watt NDB and its associated atu. Figure 2-2 shows the 400 watt NDB.
13. NDB FUNCTION. The NDB is a completely solid-state system that provides all the requirements of a NDB ground station transmitter for electronic aeronautical navigation.
a. The NDB is designed to operate in the low frequency (1f) and medium frequency (mf) bands to provide ground wave signals to a receiver. A radio direction finder is used to measure the relative bearing of the transmitter with respect to the heading of the airplane. The NDB is used primarily for transition of aircraft from en route to airport approach facilities.
14. NDB PHYSICAL DESCRIPTION.
a. The 50 watt NDB cabinet dimensions are presented in figure 2-3. Figure 2-4 depicts the 50 watt NDB with the cover opened to show the control panel and internal electrical components. The unit is wall- mounted at the mounting brackets and will extend out from the wall approximately 10 inches. The electrical component installations were performed at the factory prior to shipment. The regulator/charger (A1A1) must be removed to expose the terminal boards TB1 and TB2 as part of performing external wiring connections.
(1) External Connections. The 50 watt NDB transmitter is provided with external inputs for voice (600 ohm balanced) and a dc battery emergency supply (48 V dc). Remote status indication is available from a set of "C" contacts, closed to indicate normal operation, and a choice of ac or dc supply (0.5 to 5.0 V ac into 600 ohms or 24 V dc). The external connections are accomplished through the use of terminal boards TB1 and TB2 mounted in back of the regulator/charger A1A1. The cabling is installed using the conduit feed through located at the base of the cabinet. The NDB power requirement is a single phase nominal 115 V ac (102- 138 V), 60 Hz at 160 volt-ampere maximum.
(2) Internal Wiring Connections. All internal wiring connections were performed at the factory prior to shipment.
b. The 400 watt NDB cabinet dimensions are presented in figure 2-5. A rear view of the unit is shown in figure 2-6. Vents at the top of the cabinet must be unobstructed to permit forced air from the fan to escape and provide cooling. The cabinet must be secured to the floor by
Chap 2 Par 12 Page 7
ANTENNA FEED
50 WATT ANTENNA TUNING UNIT FA-9782/1
50 WATT NDB TRANSMITTER FA-9782
COAX. RF F.EED
115 V SUPPLY AC LNO
CABINET 48 V DC GROUND BATTERY CABLE
DANGER HGHVOLTAGE 20,000 VOLTS
ANTENNA GROUND PLANE
24 V DC SUPPLY
REMOTEISTATUSI MONITOR CONTROL 0.5- 5 V AC or 24 VDC CLOSED CONTACTS NORMAL STATUS
FIGURE 2-1. INTERRELATIONSHIP OF TRANSMITTER
Chap 2 Par 14
%, MOD,DC VOLTS, TONE LEVEL,
FWD/REFL
DC AMPS, RF DRIVE LEVEL
EXCITERI MONITOR 1A2
POWER AMPLIFIER 1A3
POWER SUPPLY 1A1
POWER
INTERLOCK BYPASS
-FAN
INTERLOCK BYPASS
FIGURE 2-2. TRANSMITTER FRONT VIEW
Chap 2 Par 14
7/16 HOLE FOR 3/8 BOLT (one of four)
—7.875
COVER PROTRUDES 0.875"
12
-9.5" C to C
SPACING PILLAR (one of four)
625"
25.25°ç to.C
24
LOWER SLOTTED BRACKET
FIGURE 2-3. MOUNTING DIMENSIONS
Chap 2 Par 14
HINGED MONITOR CONTROL PCB A1A7 PANEL SW. REG. DRIVER A1A3
EXCITER PCB A1A2
POWER HARMONIC RF PROBE AMPLIFIER FILTER PCBA1A6 A1A4 A1A5
REGULATOR/CHARGER SUPPLY A1A1 CHASSIS EXTERNAL TERMINALS UNDER
FIGURE 2-4. TRANSMITTER FA9782 - ACCESS DOOR OPEN
Chap 2 Par 14
FRONT
T 1.5
48.875
23.563
HOLE FOR EXTERNAL CONNECTIONS
13.562-
BASE 14 22
REAR
9/16 ONE OF FOUR SPACED SYMMETRICALLY ABOUT CENTRE LINE
SIDE
-22
TYPE N CONNECTOR
TOP
FRONT
CABINET DIMENSIONS
FIGURE 2-5.
Chap 2 Par 14
EXCITERI MONITOR 1A2
POWER AMPLIFIER 1A3
POWER SUPPLY 1A1
72Ω TYPE N RF OUTPUT CONNECTOR
TB1.TB2 EXTERNAL INTERFACE
EXTERNAL. WIRING ENTRY CONDUIT
WHEN INSTALLED AT SITE, AC LINE IS LED THROUGH CONDUIT AT TOP OR BASE
FIGURE 2-6. TRANSMITTER REAR VIEW
Chap 2 Par 14
6740.4 2/23/81
half-inch bolts located as shown in figure 2-5. All internal components of the cabinet are accessible from the front. Therefore, the cabinet back may be installed close to a wall. A clearance space of 2 inches between the cabinet and the wall should be allowed to permit entry of cooling air through the perforated panels.
(1) External Connnections. The externalterminal connections at the transmitter are completed at terminal boards 1TB1 and 1TB2 mounted behind the power supply drawer 1A1. The terminal boards, as presented in figure 2-7, are easily accessible when the drawer is removed. Connections are most readily made before the drawer is mounted. Cabling may enter the cabinet through the top cover beside the rf output type N connector or through the aperture in the base of the cabinet.
15. 50 WATT atu FUNCTION. The FA-9782/1 50 watt atu matches the impedance of the antenna, within the range from 2 to 24 ohms resistance and from 166 to 1500 picofarads capacity, to the 50 ohm impedance of the transmitter output. It automatically compensates for the variations in antenna reactance caused by environmental changes while the system is operating. The maximum vswr of the rf feed into the antenna is 1.25 : 1, when TONE is off. Metering of forward and reflected power and rf current is provided.
a. The resistive and inductive components of the antenna impedance are matched by adjustable tappings on the transformer and loading coil assembly, respectively. The coil assembly is finedtuned by a servo system which, through a motorized drive, positions ferrite tuning slugs in two coils. The electronics are totally solid-state. Three sets of coils, NAUTEL 133-9023, have been produced to cover the frequency range from 190 kHz to 535 kHz. All three match to the total specified range of antenna capacities over the following ranges.
(1) 133 - 9023 - 1 and 2 from 190 - 285 kHz ) 1, 3, 5 - right-hand (2) 133 - 9023 - 3 and 4 from 286 - 405 kHz ) 2, 4, 6 - left-hand (3) 133 - 9023 - 5 and 6 from 406 - 535 kHz )
b. 50 WATT antenna tuning measurement of output power and antenna current on the panel meter is required. Because of the impedance matching transformer the current metering circuit sees 50 ohms resistive. To determine the current flowing in the antenna the reading of the meter must be multiplied by a factor which depends upon the tapping. These are presented in Table 2-1.
c. A method of reestablishing output power, so that a confirming flight inspection is not required, regions may use ammeter method
Chap 2 Page 14 Par 14
TABLE 2-1. Correction. Factor for FA-9782/1 Antenna Current
Tap
Output Load
Input 3 2
3 2 1 3 2
3 2
Tap 4 4 4 5 5 5 6 6 6 7 7 7
Resistance Ohms 34.7 28.1 23.2 18.7 15.1 12.5 9.9 8.0 6.6 5.6 4.5 3.7
Multiplying Factor 1.2 1.33 1.47 1.64 1.82 2 2.25 2.5 2.75 3 3.33 3.67
The actual antenna current is obtained by multiplying the meter reading by the multiplying
Chap 2 Par 15
factor.
Page 15
RF FEEDROUGH TYPE N.CONDUIT FOR OTHER EXTERNAL CABLING ADJACENT.
1A3 INTERLOCK
1A3TB3(FS)
1A1 INTERLOCK
RF COAX CONNECTOR FOR 1A3 J1 (TYPE N)
1TB2 AC LINE CONNECTIONS
GND 'LUG CONNECTION FROM 1A1
1A1TB1 (FS)
GND LUG CONNECTION FROM 1A3
1A2 TB2(FS)
-1A2TB1(FS)
GND LUG CONNECTION FROM 1A2
1A3TB1(FS)
-1 A3 TB2(FS)
1TB1 EXTERNAL CONNECTIONS
GND LUG CONNECTION FOR PA SUPPLY (2 WIRES)
GND LUG CONNECTION FROM CABINET
Chap 2 Par 15
FIGURE 2-7. INTERNAL TERMINALS
2/23/81 6740.4
to verify same power during replacement. The FA9782 has Ia current antenna meter built into the unit. Regions may also use a signal strength meter which is available from the Frequency Management staff in the region.
16. 50 WATT ATU PHYSICAL DESCRIPTION.
a. The 50 watt atu cabinet dimensions are presented in figure 2-8 and the atu with the cover removed in figure 2-9. The atu unit is housed in a single, all-weather cabinet fitted with rear brackets for mounting on a vertical surface adjacent to the antenna feed through opening. The top-hinged front cover is secured at the bottom when closed, and is supported in the open position by a bar and lug arrangement. The top cover is flanged to provide weather protection for the top ventilating ports on three sides of the cabinet. A ventillation air intake, which must not be obstructed when the unit is installed, is located in the atu base plate. In areas of severe weather, such as blowing snow, an additional length of pipe and baffle should be added to the air intake pipe.
b. The two loading coils and a drive motor are mounted on a bracket bolted to the rear panel. The vertical threaded motor drive shaft controls the positioning of the ferrite tuning slugs in the coils via a threaded horizontal traveller attached to the two spindles. Limit switches interrupt the electrical drive mounted forms supported by pillars on the bracket. to the motor at both ends of travel. The coils are wound on vertically
c. The electronic chassis mounts on the front of the same bracket by captive fixing screws and contains all the component electronic subassemblies in the unit.
connections, for the signal and power supply cables, are made at the base of the unit. A heavy ground lug for connections to the (1) External Connections. The two external electrical
antenna ground plane is fitted at the lower left corner of the rear panel. A window in the front cover allows observation of the test meter without raising the cover. An externally mounted switch shorts the meter when not in use.
connections were made at the factory prior to shipment. (2) Internal Wiring Connections. All internal wiring
17. RESERVED.
Chap 2 Par 15 Page 17 (and 18)
0
DANGER HIGREVOLTAGE 20000VOETS
27.37"
13/16"HOLE (1 of 4)
Chap 2 Par 16
MAXIMUM DEPTH OF CABINET 13.5"
23.25
DANGER HIGHIVOLTAGE 20000 VOLTS
17.75" 22C to.C
FIGURE 2-8 CABINET MOUNTING DIMENSIONS
19 C to
SPARK
L2 LOADING COILS L3
DANGER
HIGHIVOLTAGE
2000O:VOLTS
E1 FEEDTHROUGH INSULATOR
ASSEMBLY FIXING SCREW (one of four)
A1A1 RF PROBE
METER CAL
GAP
OVERRIDE J1 CONTROL RF INPUT
TEST METER AND CONTROL
-A1 A2 SERVO PROBE
A1A3 MATCHING TRANSFORMER
FIGURE 2-9. ANTENNA TUNING UNIT - COVER REMOVED
Chap 2 Par 16
2/23/81 6740.4
CHAPTER 3. NDB INSTALLATION DRAWING PACKAGE
18. INTRODUCTION. The installation drawings, tabulated in figure 3-1 and presented herein, shall be adhered to when locating the 50 and 400 watt NDB units, the 50 watt atu, completing applicable interface wiring connections, routing cable or conduit, and completing the antenna feed through and spark gap installations. The drawings also present typical NDB facility antenna installation drawings for routing antenna cables from the antenna feed through to the antenna mast.
19. DRAWING SYNOPSIS:
a. Drawing D-6186-001 presents the floor plan arrangement for a 50 watt NDB and atu in a marker compass locator building. The 50 watt NDB and its associated atu are wall mounted to unistrut channels. Overhead thin wall conduit and ducting will be employed for routing the appropriate 50 watt NDB and atu cabling.
b. Drawing D-6186-002 presents the floor plan arrangement for the 400 watt NDB in a marker compass locator building. The NDB rack is floor mounted. Appropriate envelope space is also shown routing. for a 400 watt atu. Thin wall conduit will be installed for cable
c. Drawing D-6186-003 presents the applicable 50 watt NDB and its associated atu wiring and interconnection diagram.
d. Drawing D-6186-004 presents the applicable 400 watt NDB wiring and interconnection diagram.
e. Drawings D-6186-005 through D-6186-009 present various NDB facility type antenna installation details. The rf cable is routed from the 50 watt atu or the 400 watt NDB to the antenna via the antenna feed through the spark gap, and antenna down wire.
down wire installation details. f. Drawing D-6186-010 presents the spark gap and antenna
g. Drawings D-6186-011 and D-6186-012 present ground plane installations at various facility types.
20. RESERVED.
Chap 3 Par 18 Page 21 (and 22)
Drawing Number
D-6186-001
D-6186-002
D6186-003
D-6186-004
D-6186-005
D-6186-006
D-6186-007
D-6186-008
D-6186-009
D-6186-010
D-6186-011
D-6186-012
D-6186-013
Chap 3 Par 20
Description Page
FA 9782 NDB Installation 25 Marker/Comlo Bldg Layout 50 watt NDB
FA 9781 NDB Installation 27 Marker/Comlo Bldg Layout 400 watt NDB
FA 9782 NDB Installation 29 Power and Signal Wiring Diagram with Tube Marker 50 watt NDB and atu
FA 9781 NDB Installation 31 Power and Signal Wiring Diagram 400 watt NDB
FA 9781 and FA 9782 NDB Installation 33 Antenna Details ILS Marker and Compass Locator
FA 9781 and FA 9782 NDB Installation 35 Antenna Details, Type "T" ILS Marker and Compass Locator
FA 9781 and FA 9782 NDB Installation 37 Antenna Details, MH Facility
FA 9781 and FA 9782 NDB Installation 39 Antenna Details, Hexagonal Top Hat 500 Ft. Radials
FA 9781 and FA 9782 NDB Installation 41 Antenna Details, Hexagonal Top Hat 165 Ft. Radials
FA 9781 and FA 9782 NDB Installation 43 Spark Gap and Antenna down Wire
FA 9781 and FA 9782 NDB Installation 45 Ground Plane, Middle and Outer Compass Locator Markers
FA 9781 and FA 9782 NDB Installation 47 Ground Plane, FM-MH Facility or H or MH Facility
9782/1 NDB Installation External 59 Mounting of ATU
FA-9782 NDB Installation 51 "T" Antenna 2-wire
FIGURE 3-1. NDB INSTALLATION DRAWINGS
Page 23 (and 24)
0
pg25
ANTENNA FEED THRU
COAX TO MARKER VENT FAN ANTENNA
FA9782
BATTERY TRAY SEE NUTE 4
MARKER
UNDER FLOOR CONDUIT (UNUSEO)
UNDER FLOOR POWER CONDUIT SIGNAL
3 NO. 14 1 NO. 6 POWER
POWER A PANEL
TELCO
FLOOR PLAN
B
FA-9782/1 NDB ATU
NOTES
I MAXIMUM DISTANCE IS 8 FOR RG33I OH HG214 (FA-9782 INSTRUCTION BOOK)
2- THE ATU CAN BE INSTALLED AI THE ANTENNA BASE IF DESIRED
3 -THE USE OF THIN WALLED CONDUIT IS OPTIONAL 4-INSIALLLIION OF THE BATTEKY ANU BATTEHY THAI AHE OTTIUNAL
TO ANTENNA
ANTENNA
-1'-5"APPROX.
FEED THRU
OVERHEAD CONDUIT POWER
SIGNAL
11 UNISTRUT-
11
MARKER XMTR 11 VENT
1'-6* APROX.
FA9782 /1 NOB ATU
70 APPROX. FA9782 NOB XMTR BATTERY DISCONNECT
FA9782/1 -UNISTRUT NDB ATU
WALL PNL JOINT SQ DUCT 4 INCH TRIM SEE NOTE 3 FA9782 NDB XMTR
APPRO.
FAN
I1 1
CONDUIT
4 INCH SQ. DUCT
CONDUIT BATTERY
APPROX.
MARKER PEDESTAL
SECTION A-A
SEE NOTE 3
BAT TERY TRAY SEE NOTE 4
TRAY
BATTERIES SEE NOTE
DATE DRBCRIPTION DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINTON. OC ROSAI
FA-9782 NDB INSTALLATION
-BATTERIES
Chap 3 Par 19
SECTION B-B
MARKER/COMLO BLDG LAYOUT
50 WATT NDB
RIS GY.HAVATOI OR AAF-910 SH, MAYAIDSAONM RNG DIY MF 100 AIRWAY FACILITIES D-2.23-81 AMAF IND INC SEAVICE D-6186-001
Page 25 (and 26)
VENT FAN
PUWER CAO
SKNAL CNO
PUWER A PANEL
TELCO.
FLOOR PLAN
VENT FAN
ANTENNA FEED THRU
TO ANTENNA
70 APPROX.
ANTENNA FEEDTHRU.
NOB ATU IF USED
FA-9781 NDO XMTR
pg27
HPPROX
MUUNT ON WALL OR PEDESTAL
3:6-
DATE
REV.LTR
SECTION A.A
Chap 3
Par 19
1'- 10 APPROX. 2°MIN.
26 APPROX
111% 111 APPROX. APPROX
SECTION B-B
HPPROX
AMAF INO. INC.
DESCAIPTION CHECKED APFROVED DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINETOM, O.C 2OSSI
FA-9781 NDB INSTALLATION
COMLO BLOG. LAYOUT
400WATT NOB W/OPT. ATU
howx C.H.NAVAIDS BR AAF-410 CH HAYNDS KOMM ENG P.Y ANE 9=0 AIRWAY FACILITIES DATE-2-23-81 REV
SERVICE D-6186-002
Page 27 .(and 28)
pg29
TO
NON- DIRECTIONAL BEACON TRANSMITTER
ANTENNA
TYPE FA 9762
MARKER TRANSMITTER
TELCO DEMARC
A
ALARM CONTACL WHERN NMAL REOTE 8 SUPMY RMOTE y VOIE IPUT TO OATU 03SN LON
Rf J3 Stt NOTE 2 OUT
FEED THRU
ANTENNA TUNING UNIT FA-9782/1
J1 RF IN 24V DC INPUT ANTENNA
GND
NEUT
GND
J2 A B
TB1
MONITOR OUT
VOICE IN (IF USED)
CB1 15 AMP
01 CB2 15 AMP
CB3 240V AC 60 HZ 15 AMP I-PHASE
φ2 50 AMP CB9 15 AMP CB4
NEUT CB5 15 AMP
CB6 30 AMP
CB7 15 AMP
NEUT
2
-MARKER XMTR
14 AWG
CONV OUTLETS
-NOT USED
SHELTER LIGHTS
220V AC OUTLETS
VENT FAN
14 AWG
TB2
22 AWG
22 AWG
22 AWG
w
2
RESET SWITCH
3 AMP OFF-ON FUSE SWITCH
LOW VOLTAGE DROP RELAY SHOWN (ENERGIZED)
(SEE NOTE 1)
BATTERY DISCONNECT CIRCUIT PER SKETCH GL-SK459A-79-070
18 AWG
18 AWG
(SEE NOTE 1)
12V 12Y 12V 12V
12 AWG
BAT TERIES
12 AWG
NOTES
I- THE INSTALLATION OF BATTERIES IS OPTIONAL
2 - TRANSMITTER J3 70 OHM TYPE N USE RGII/U COAX
TO ANTENNA GND RADIAL SYSTEM
MARKER TRANSMITTER PEDESTAL
DATE DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
FA-9782 NDB INSTALLATION
50 OHM TYPE BNC USE RG214/U COAX
SAFETY GND
AC POWER DISTRIBUTION PANEL
Chap 3
14 AWG
AMAF IND INC
POWER AND SIGNAL WIRING DIAGRAM
5OW NDB AND ATU WITH TUBE MARKER
CH. NSYAIDS BRAAF-110 MAYAIDS/COMT ENS PIYANE -2-23-81 AIRWAY FACILITIES SERVICE D-6186-003
Page 29 (and 30)
TO
TO
NON-DIRECTIONAL BEACON TRANSMITTER
ANTENNA FEED THRU.
ANTENNA FEED THRU.
pg31
TYPE FA-9781
MniRnER
THANSMITTER
TELCO
DEMAKC
AAM CCTS CLOON NE NNL
SEE NOTE 1 √3 RF OU7
O7HS VOIP VNPUT OuT RF J3 SEE NIE
4
ANTENNA IUNINI UNIT
IF USED
115 V. AC
NEUT
NONITOR OUT
VOICE IN (iF USED)
CB1 15AMP
1 C82 15AMP
CB3 240V AC GOHZ 15 AMP I- PHASE
$2 50 AMO CB9 15AMP CB4
NEUT C85 15 AMP
CB6 30 AMP
C87 15 AMP
NEUT
SAFETY GND
AC POWER OISTRIBUTION PANEL
Chap 3
NOT USED
14 AWG
CONY OUTLETS
NOT USED
SHELTER LKGHTS
220V AC OUTLETS
VENT FAN
14 ANG
11 OWG
ON5
TB2 TB1
22AMG
22AM
1BANG
ANG
NOTES
1- TRANSMITTER J3 7O OMM TYPE N USE R4/U COAX 50 ONM TYPE BNC USE RG214/U CONX
AMAF IND, INC.
ANTENNH GND J2 9
6 om
TO ANTENNA GND. RADIAL SYSTEM
4
REV.LTR DATE DESCRIPTION CHECKED APPROVED
DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINGTON, OC ROBDI
FA. 9781 NDB INSTALLATION
POWER AND SKNAL WIRING DIAGRAM
400WATT NDB
RES2 CH HAVAIOS BR BATE-2-23-81 LTR AIRWAY FACILITIES SERVICE D-6186-004
Page 31 (and 32)
pg33
15°
3 1:0~
(20)
PROTECTOR GUY WIRE 30 REQ.D WNEN TYP ANCHORED OUTSIDE 3’.0 FENKED AREA TYP
NOTES: 1. THE FIVE BOTIOM POLE STEPS(ITEM ES) ON ENCH POLE SHHLL BE THE DETACHABLE TYPE. ALL OTHERS SHALL BE THE FIXED TYPE (ITEM 11). 2. AFTER TENSION ADJUSTMENT. ALL TURNBUCKLES SHALL BE LACED 3 TIMES WITH NO. H AWG COPPER WIRE ANO TIED. 3. SIMILAR AND EQUAL PARTS MANUFACTUREO BY OTHERS MAY BE SUBSTITUTED FOR THOSES CALLED FOR IN THE MATERIAL LIST.
BOFT. POLE A
FOR DETAILS OF
ITEM MATERIAL LIST 1 SULATOR, ANTENNA LAPP NO. 43BOBPI2 2 3 4 CONNECTOR, COPPER, KEARNEY NO.BO-ZR 4 5 6 2 BOLT, CLEVIS, 516*x14*GALV. HUBBARD NO. G814 7
8 200 WIRE, COPPER, HARD DRAWN NO. 4. STRANDED, SILICON BRONZE OR EQUAL
9 2 ACCORDANCE WITH SPECIFICATION CAA- 746 POLE. WOOD, CLASS-S, 3OFY. TYPE I OR II
10 11 16 STEP, POLE 518"A9" HOOK HEAD, GALV HUBBARD NO 7124 12 8 CLAMP GUY, 3- BOLT, GALV. FOR 18" GUY WIRE HUBBARD NO. 7449
13 2 HUBBARD NO. 110O ANGLE THIMBLEYE, FOR SIB BOLT, GALY. 1 4 WASHER, CURVED 2'h"=2R"GALV. HUBBARD NO. 7822 15 THIMBLE, FOR 'IS WIRE, GALV. HUBBARD NO. 7593
16 2 TURNBUCKLE '12×I2EYE-CLEVIS,GALV. HUBBARO NO.8644
17 2 ANCHOR, GUY STEELWING, OVAL EYE. 3/4", 5'z FT. LONG GALV. HUBBARD NO. 7526.A
18 100' WIRE. GUY, 3IB SIMENS MARTIN GRADE COATING OR BETTER CLASS -A
19 SHACKLES, OROP FORGED, STEEL 1-1" WITH 20 4 "I"DIA. PIN, GALY. THOMAS LRUGNLIN CO F14. NO. G-213 21 22 2 GUY WIRE PROTECTOR WITN 2 U-BOUTS NUBBARD N.7S5B
23 10 STEPS, POLE. DETACHABLE. LAG AND PLATE HUBBORD NO 7235 ANO STEP NO. 723G GALV.
24 2 INSULATOR. GUY. PORCELAN 'S"HOLES. HUBBARD NO. 506
-POLE"8
DOWNLEAD AND SPARK
PPOX
GAP 5EE OM 06186.010
SEE NOTE 5:0
5.6
10-0
5-0 5-0
DETHILS OF POLE A' iB"
25FT.
23 NOTE 1 SEE
3'.0"
40FT.
9
23 FINISHED GRADE
MEVLTR DATE DESCRIPTION DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINSTON, SC. 2OSDI
FA. 9781 AND 9782 NDB INSTALLATION ANTENWA DETAILS, TRIANGULAR ILS MARKER AND COMPASS LOCATOR
ilse howx
116 2M SH NAVAIPA BRAAF-1I0 CH MAVAIDSK ER RIX AN 12 -2-23-81 AIRWAY FACILITIES SERVICE D6186-005
AMAF INO.WC,
Chap 3
Page 33 (and 34)
pg35
A
5-0" 9
2 POLE -STEPS B 10 AT TOP
t-6" A AFPROX TYP 9'-0"
A
POLE·A
E
A
SEE NOTE 18 1
C
POLE -B
E D
TEN NO QTY REQ MATERIAL LIST
2 POLE PAIN 30 FT LONG,CLASS 3, FULL LENGTH, PRESSURE THEATED,
2 10 STEP (LAČ AI PLATE) AND NO.7236 STEP GALV. TACHABLE, GALV. HUBBARD NO 7235
3 16 S TEP, POLE, HOOKHEAD 5/8 IN.X 9 IN. GALY. HUBBARD NO. 7124 4 2 ANGLE THIMBLEYE, HUBBARD NO. JIOO FOR 5/B IN BOLT GALY 5 6 2 ANCHORS, GUY, STEEL WING,OVAL EYE 3/4 IN.* 5-1/2 FT. GALV. HUBBARD NO 7526-A
7 2 TURNBUCKLE EYE & CLEVIS V 2 IN.× 12 IN. HUBBARDO NO. 8713 GALV. 8 110 FT. STRANDED, STEEL, 5/I6IN. GUY, SIEMENS-MARTIN GALV. CLASS "A" COATING OR BETTER
9 24 CLIPS FOR 5/16 IN. WIRE ROPE, HUBBARD NO, 74BI GALY. 10 4 INSUL ATORS. GUY, PORCELAIN, 13/I6 IN. HOLES, HUBBARD NO. 506 11 X 2 CROSSARMS WOOD 8FT.-0 IN, STANOARD 3-1/4 IN× 4-1/4 IN. CREOSOTED 4 BRACES, CROSSARM, FLAT, 7/32 IN. 2I-7/32 IN. 2 32 IN. GALV. HUBBARD NO.8032 14 BOLTS SLEYIS 5/B IN, * 14 IN. HUBBARD NO 6BI4 CALY WITH NUI WASHFRS. CURVED 2 1/2 IN, × 2 -1/2 IN. HRIBBARD NO.7822 GALV WASHERS. SQUARE 2 IN. × 2 IN. HUBBARD NO.7BI2 GALY 17 3 TURNBUCKLE, EYE & CLEVIS V/2 IN. X 9 IN. HUBBARD NO. B645 GALY 18 6 INSLATOR ANTENNA LAPP INSUL ATOR CO. NO 43BOBHI2- I2 IN, LONG 19 6 SHACKLE, DROP FORGED, STEEL 2 IN. X H/I6 IN. WITH 5/8 IN. DIA. PIN GALV. HUBBARD NO.6793
20 8 THIMBLE FOR 3/ B IN. WIRE ROPE GALV HLBBARD NO 7593 21 16 CONNECTOR, COPPER KEARNEY NO.84O-2 300 FT WIPE. ANTENNA NO,4 STRANDED SILKON BRONZE OR EQUAL. 23
24 2 LAG SCREW 1/2IN.<5IN. LONG GALV. 3 NUT, HEX 5/B IN. GALV.
4 CARRIAGE BCLT, 3/B IN, × 4 IN. GALY 31 SERVISLEEVS HUBBARD NO. 7453 GALY. 32 SERVISLEEVS HUBBARD NO.7452 GALV. X 33 2 GUYWIRE PROTECTOR WITH 2- "U" BOLTS, HUBEARD NO.7558
TO CENTER ANTENNA WIRE
25
31
SECTION A - A
OUTER ANTENNA WIRE TO POLE-A
15
NOTES AFTER TENSION ADJUSTMENT ALL TURNBUCKLES SHALL BE SAFETIED WITH 3-TURNS OF NO.9 WIRE WHKCH SHALL BE COPPER AND SIMLAR TO METAL USED IN GUY WIRES AND TURNBUCKLES TO PREVENT ELECTROLYSIS TO OUTER 2 SIMILAR AND EQUAL PARTS MANUFACTURED BY OTHERS MAY BE SUBSTITUTED FOR THOSE CALLED FOR IN MATERIAL LIST
ANTENNA MRE
THE FIVE BOTTOM POLE STEPS, ON EACH POLE, ARE DE TACHABLE 26
GUY WIRE PROTECTOR REQUIRED WHEN ANCHOR IS OUTSIDE FENCED AREA
APPROX 9'-0"
SEE 14 NOTE
SECTION B -B
CENTER ANTENNA WIRE TO POLE -A
21
32
3 ITEM NOT FURNISHED BY THE GOVERNMENT
-POLE -A POLE-B- 7
BULDING
COUNTERPOISE
16
1'-6" TYP
SEE
TO CENTER
FOR DETAILS OF DOWNLEAD, POST & SPARK GAP SEE DWG. D6186-010
3'- 0" 40'-0"
ANTENNA WIRE
NOTE 6"MAX
SECTION C - C
80'-0" 20'-0"
OUTER ANTENNA WIRE TO POLE-B
3'-6"
FINISHED GRADE
21
14
32
OATE DESCAIPTION meCHED
26
5-0" -20-0"
5'-0"
DETAILS OF POLE A& B
Chap 3
Par 19
22 ANTENNA WIRE TO OUTER
SECTION D-D
CENTER ANTENNA WIRE TO POLE-B
DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION BASHINOTOR, SC ROSOI
DOWNLEAD FA-9781 AND 9782 NDB INSTALLATION
SECTION E-E ILS MARKER ANDCOMPASS LOCATOR ANTENNA DETAILS, TYPE "T"
DOWNLEAD FROM CENTER ANTENNA WIRE
FEC NISNCH NAVAIDS BR AAF 410 AIRWAY FACILITIE'S DATE-2-23-81 n
AMAF INO.INC. SERVICE D-6186-006
Page 35 (and 36)
15• 2
8 4:6′′ 16 2
6:6 ANTENNA DOWN LEAD
pg37
32:0“
27
12
9
APPROX 20' POLE A
1-6′′ TYP
16
POLE 'B POLE '8* 1S THE SAME AS POLE"A" EXCEPT AS SHOWN
17EM QTY MATERIAL LIST
1 2 INSUL ANTENNA. LAPP INSULATOR cO. NO.5993 12 2 310' WIRE. ANTENNA NO. 4AMG STRANDED, SILKON BRONZE OR EQUAL 3 8 THIMBLE, GALV. FOR WIRE ROPE HUBBARD NO. 7593 4 SHACKLE. ANCHOR, GALY. 518 PIN HUBBARD NO. 6793 5 1 EYEBOLT GALV. 518 WITH NUTS WASHERS HUB8ARD NO.9068 6 2 BOLT, CLEVIS, 5/8 GALV. HUBBARD NO. 6814 7 2 POLE, ASA CLASS III TREATED FULL LENSTH 8 1 PULLEY. GALV. 6 SINGLE BLOCK, SWIVEL EYE S/B" CABLE 9 150 CABLE, GUY, 7STRANOS, GALV. 6500 L8 MIN. 10 12 CLAMP, GUY, GALV. 3- BOLT 38"CABLE HUBBARD NO. 7449 11 2 BOLT, THIMIBLE EYE ANGLE SIS XIE" GALV, WITH NNT HUBEARD NO. 9ISE 12 TURNBUCKLE GALV. S1B" ×12", EYE AND CLEVIS 13 2 INSULATOR, GUY. PORCELAIN. S HOLES, HUBBARD NO. SEI 14 2 ANCHOR,GUY, STEELWING, EZ EYE I'4'xB' CALY. HUBBARO NO. 755O 15 50 STEP, POLE. HOOK HERD, GALV, N-:9- HUBBARD NO. 7I24 16 4 WASHER. CURVEO. GALV. 2-1E"× 2'I" HUBBPRD NO. 7822 17 6 CONNELTOR, COPPER, KEARNEY NO.B4O-L 18 19 20 STEP, POLE, DETACHABLE, GALV. HUBBAR'D, NO. 7235 21 10 LAG AND PLATE MUB8ARD NO 7236
23 24 25 2 GUY WIRE PROTELTOR WITH 2-U" BOUTS HUBBNRD NO. 75SB 26 GUY, PLATE, CURVED, GALK. HUB8ARD NO. 8887 27 4 LAG SCREW. 12*×2" 28 16 GUY WIRE SLEEVING HUBBARD NO. 7454
POLE"B
DOWN LEAD TO POST SEE OWG.D6186-010 FOR DETAILS
3:0 TYP
(21
10 3:0 TrP 0 SEE NOTE1
5.0" 20' 6~. 36 POLE SETTING FINISHED GRADE POLE SET SET
OF BLDG.
250MNN
NOTES:-
-125' 20'
AMAF INO.INC. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
1- GUY WIRE PROTECTOR REQUIRED WHEN
HEIGHT IN IN
ANCHOREO OUTSIDE FENCED AREA
ABOVE EARTH ROCK GROUND x SEE TABLE 50'.0 7.0 5-0" 7:0′′ 20:0" 55-0 5'-0" 60'.0 8..6~ 5′-0
POLE "A"
ATE PERCAIPTION
WASINOTON,&C BOODI
FA-9781 AND 9782 NOB INSTAXLATION ANTENNA DETAILS MH FACILITY
-2-23-81 AIRWAY FACILITIES SERVICE D-6186-007 CHECKED
Paoe 37 (and 38)
pg39
23/81
FINISHED GHADE
W 34OA-9-0"LONG ANCHOK ROO CIW 4×4.'4 WASHER AND SQUARE NUT
8 NO. ↓ AT NO,4 TIES CENTEROF CORNER'S AND
2-0"
NO.4 R00 AT O~CIC
GUY ANCHOR BLOCK
GROUND KADIAL 500FT LONG 18-REQ.
2*CLEAR
AT 12 CC EACH FACE
5.0
2.0"
3"CLEAR
4
GUY ANCHOR BLOCK
3′APKOX
COAX DOWN LEAD
VIEW AT "A"
2-0
FINISHEO GRADE
1/4×8" ANCHOR BOLT
NO.4 TIES AT II" CIC
3°CLEAR
CLEAR 2-1⁄2z
6
4-0"
A-NO.6 ROOS
1.0"
0
GROUND RADIAL (SEE NOTE 243)
NO.BAWG TINNED COPPER
NO. 12 AWG BARE COPPER
SILVER SOLDER
NO.8 ANG 3- REQ @120•
ANTENNA SUPPORT BLOCK
SEE NOTE 4
FINISHED GRADE SEE NOTE 1
ANTENNA HEKTH A 8
60 4 36° 60 90. 6 32° 90' 120' 30° /20'
NOTES:- 1 COAX WILL RUN 6ABOVE GROUND RADIAL'S (SEE NOTE 2) AND A DISTANCE NO GRENTER THEN EOO' FROM THE TOWER TO EQUIPMENT BUKDING 2 GROUND RADIAL'S TO BE BURIED BDEEPMIN. INSIDE FENCED ARSA AND 30"DEEP MIN. OUTSIDE FENCED AREA. 3. THE NUMBER OF GROUND RACIALS FOR PERMA- FROST LOCATIONS SHOULD BE 3O AND
ENLARGED VIEWOF GROUNDMAT CENTER
DATE DESCSIPTIuN DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
WASIMOTON. OC BOSOI
FA- 9781 ANO 9782 NDB INSTALLATION
ANTENNA DETAILS, HEXAGONAL
TOP HAT, 500 FT. RADIALS
SAF -ATO SHHAUNOS/COHM ENIR DY ANE-S0
MOY EH. NAVAIRS BR
500 FT. LONG. THE CONNECTOR BOX OR ATU IS LOCATED AT THE BASE OF THE ANTENNA
AMAE INO INC
-2-23-81 AIRWAY FACHLITIES SEAVICE D-6186-008
Page 39 (and 40)
NO.4 R005 AT 8° CIC GROUND RADIAL 165 FT. LONG 18- REQ.
pg41
2:0"
2'0
9
COAX DOWN LEAD
FINISHED GRADE
SEE NOTE NOG ROD 4-REQ.
FINISHED GRADE SEE NOTE 1
GROUND RADIAL
(SEE NOTE 24 3) 20
NO. 12AWG TINNED COPPER
4"DNA. NOM. 56~ TO 6-O" PRODECTION. POST SILVER SOLDER MUST BE INSTALLED PERFECTLY PLUMB. ANY DEVIATION WILL BE AMPLIFIED BY ANTENNA.
NO.8 AWG 3- REQ @120°
NO.8 AWG TINNED COPPER
ENLARGED VIEW OF
GROUNDMAT CENTER 10
AT 8′′ CK NO. 4 TIES NOTES:-
1 - COAX WILL RUN 6" ABOVE GROUND RADIRL'S (SEE NOTE 2) AND A DISTANCE NO GREATER THEN 200' FROM THE TOWER TO EQUIPMENT MEVLTR DATE DESLSIPTION
GROUND RADIAL'S TO BE BURIED B" DEEP MIN. INSIDE FENCED BULOING. DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
ARER AND 3O"DEEP MN OUTSIDE FENCED ARER. 3- THE NUMBER OF GROUND RADIALS FA-9781 ANO 9782 NDB INSTALLATION FOR PERMA-FROST LOCATIONS SHOULD BE 30 AND 500 FT. LONG ANTENNA DETAILS, HEXAGONAL TOP THE CONNECTOR BOX OR ATU IS LOCATED AT THE BASE OF THE HAT 165 FT. RADIALS ANTENNA ANTENNA
CONCRETE ANTENNA BASE
Chap 3
Dor 10
HEIGHT
35FT. AAF-419
40FT. AIRWAY FACILITIES DA7-2-23-81
AMAF IND.INC SERVICE D6186-009
Page 41 (and 42)
Pg43
FLATTEN TIPI CLOSE ENDS OF TUBES WITH SOLDER
ITEM QTY MATERIAL LIST
1 2 NSULATOR STUO BOLT LOCKE NO 24107, W1TH 14 D1A ×8 %
2 24 0.D. COPPER TUBING
FLATTEN ONE END+BEND
3 BRACKET *10GA. × 1/z STEEL, FLAT, GALY (AS SHOWN)
OTHER END AS SHOWN
2-R 2R
2 TERMINAL LUG (DOWN WIRE TYPE) 4 3 TERMINAL LU (TRIANKGULAR TYPE)
5 1 PLAIN WASHERS, ALL BRASS 8OLT '4A"DIA. * 1'"LONG WITH NUT, LOCKWUSHER. 2-
6 2 CONNECTOR, COPPER, KEARNEY NO. 84O-2 (TRIANGULAR TYPE) CONNECTOR, COPPER, KEARNEY NO. 84O-2 (DOWN WIRE TYPE)
NO.6 BARE COPPER
4
GROUND WIRE
SPARK GAP
10. REF
2R ANTENNA WIRE AND TERMINAL USEO NITH TRIANGULAR ANTENNA VIEW AT "C" SPARK GAP
1 THIMBLES, FOR HUBBARD NO. 7593 $8" WIRE ROPE, GALY (DOWN WIRE TYPE)
7 2 HUBBARD NO. 7593 THIMBLES FOR /O"WIRE ROPE, GALY (TRIANGULAR TYPE)
1 SHACKLES, DROP FORGED STEEL 2"/N WITH S/B OIA. PIN. GALV. HUBBARD NO.6793 (DOWN WIRE TYPE)
2 SHACKLES, DROP FORGED STEEL 2", "/N WITH SIB DIA. AN, GALV. HUBBARD NO.6793 (TRIANGULAR TYPE)
9 2 1 INSULATOR, ANTENNA, LAPP INSULATOR CO. (DOWN WIRE TYPE) INSULATOR, ANTENNA, LAPP NSULATOR CA (TRIANGULAR TYPE)
1 BOLT, CLEVIS 5/",5 HUBBARD NO. 6805 GALK WITH NUT (DOWN WIRE TYPE) 10 1 SHOULDER HUBBARD NO. EYEBOLT 4956 GOLV. (TRIANGULAR TYPE)
11 2 WASHER SQUARE 2°×2" GALY. HUBBARD NO. 7BIL 12 1 NUT. HEX 5/ GALV. DOWN WIRE TYPE ONLY
ANTENNA WIRE
TO SPARK GAP
-TO SPARK GHP
H ANTENNA WIRE
RUBBER GASKET CUT 2° DIA HOLE
13 1 POST, MOOOEN4".4", 12' DOUGLAS FIR OR EQUAL PRESSURE TREATED
14 1 EYE NUT $18 GALV. HUBBARD NO. 75OZ (TRIANGULAR TYDE ONLY) SHACKLE, DROP FORGED. STEEL 14="/ 15 WITH'OIA PIN GALV. THOMAS (TRIANGULAR TYPE ONEY) LAUGHLIN CO. F14. NO. G.213
IN BOTH INSIDE
ANTENNA WIRE
OUTSIDE SHEETS
150 7
15°
FASTEN GND. WIRE TO BLOG. WITH CLIPS AND nO. 9 m000 SCR.
OF MASONITE
NO.10× 3/4" R.H. WOOD SCR 12.REQ
-WOOD SPACER BLOCK
3
8'.0′′
13 80
FINISHED GRADE
4:0"
2.0"MIN.
-FINISHED GRADE
314" x10' SECTION GROUND WIRE COPPER CLAD STEEL GROUND ROD
-NO.10 mO0D SCR.
2
REVLTR DATE DESCRIPTION DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
2′′× 6°× 12* CLEAT
2'x 6"s 12CLEAT
TREATED
TREATED
FA- 9781 ANO 9782 NDB INSTALLATIN
VIEW AT "B"
SPARK GAP ANO ANTENNA DOMN WIRE SUPPORT
DETAILS FOR
DETAILS FOR
DOWN WIRE TYPE ANTENNA
TRIANGULAR ANTENNA
SH.NAYAIDO =310 OATE-Q-23-BI AIRWAY FACKITIES SEAVICE D-6186-010
AMAF IND. INC.
Chap 3
Page 43 (and 44)
65'-0"
BOTH ANTENNA POLES TO BE EITHER GUYED EXTERNALLY OR BRACED INTEHNALLY
X
30 TREATED POLE 25ABOVE GROUND
FLAT TOP TYPE "T" ANTENNA (COMPASS LOCATOR)
pg45
-X-
80'-0"
GROUND ROD
ALTERNATE LAYOUT
X
401-0"
30° QUADRANT
PLOT & BLDG
15°
80'-0"
3'-0" FROM E TO LEAD-IN
ROOF TOP COUNTERPOISE
QUADRANT I
QUADRANT
20'-0".
12' GATE
LOCATE L.L.S.-MARKER COMPASS LOCATOR BUILDING & COUNTERPOIS -ON SIDE OF PLOT FARTHEST AWAY FROM EXISTING UTILITY OVERHEAD LINES.
20'-0"
30 QUADRANT II
15°
CONTROL LINE (BURIED)
POWER LINE (BURIED)
15'-10"
-RADIALS
GND ROD 3-WIRES 120° APART
SILVER SOLDER
I60 FT, RADIALS NOMINAL ON ALL NEW INSTALLATIONS RADIALS TO BE 2" DEEP MIN. INSIDE OF FENCED AREA AND 24" DEEP OUTSIDE FENCED AREA
AEVLTR BATE BLSLAIPTION CHe.MED
DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION
-X- -x
X -x- X
-FENCE
-NOTE
TREAT ENTIRE FENCED AREA WITH SOIL STERILIZER AND COYER WITH A MINIMUM OF 3 INCHES OF GRAVEL, CRUSHED STONE OR SIMILAR LOCAL ACCEPTABLE MATERIAL
30'TREATED POLE 25ABOVE GROUND
FA-9781 ANO 9782 NDB INSTALLATION
GROUND PLANE, MIODLE ANO OUTER
COMPASS LOCATER MARKERS
uu!
OATE- 2-23-.1 AIRWAY FACKLITIES SERVICE D-6186-011
AMAF INO. INC.
Chap 3
Page 45 (and 46)
pg47
30 QUADRANT II
NO.6 GND ANIENNA WIRE 30 FT. GUY MIN. WIRE
ANTENNA POLE
4:0 LEASED
PROPERTY LINE QUADRANT 150°
0-0"
50:0°
125-FT. O-IN.
TEEMINAL POLE
UNDER GEOUND POWER LINE
4FT. DRIVEWAY
-12FT. GOTE
12′×12' TYPE 'S" BLDG.
80'-0".
-STUB POST COUNTERPOISE
1500 QUAORANT III
GRAVEL AREA AROUND AND UNDER COUNTERPOUSE
CLASS "C" FENCE (MOOD POST)
30 QUADRANT I
250.FT. O-1N
GROUND ROD
ANTENNA POLE
GUY WIRE
SET NOOD POST AT CORNERS AND AS INDICATED
NOTES:-
1 USE THIS GROUND CONFIGURATION ONLY WHERE AVAILABLE LAND ARER DOES NOT PERMIT THE USE OF RADIAL'S. FOR STANDARD GROINO RAOML LAYOUT SEE DRAWMKG 06186.011 2- GROUND WIRES TO BE BURIED 2"DEEP MN. INSIDE OF
AREA
FM-MH PLOT PLAN
125.FT. O-IN.
TERMINAL POLE
CLASS C' FENCE (WOOD POST)
-NO.6 GND. WIRE
ANTENNA
250FT. MIN
OVERHEAD POWER LIME
9F7. DRIVEWOY
12 FL. GATE
12'×B' OR LARGER TYPE'S" BLDG.
50 FT. MN. POLE
-ANTENNA POLE
ANTENNA
DOWN LEAD GUY
TRANSMITTER BULDING
AMAF WO. IMC.
DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION BASHINGTON, DC BOSOS
FA-9781 AND 9782 NDB INSTALLATION
AREA
GUY 30 FT. GRAVEL
WIRE MIN
1-0* ANTENNA POLE LEASED
80'-0
GROUND ROD
STUB POST
GUY WIRE
SET WOOD POST AT CORNERS AND AS INDICATED
GROUNO PLANE, FNA-MH FACILITY
OR H OR MH FACLITY
DA16-2-23-81 AIRWAY FACILITIES SERVICE D-6186-012
H OR MH PLOT PLAN
PROPERTY LINE
REV LIR Date
APPROVED
PSOCOIPTION
Chap 3
Page 47 (and 48)
pg49
NUT, BOLT,WASHER & L'WASHER
UNISTRUT
ATO
22"
POLE (ROUND OR SQUARE)
-"A"
19′′
TRIANGULAR MAST MTG
VIEW AT "A"
ATO
DRILL DESIRED SIZE HOLE IN UNISTRUT FOR BOLTS
REV.LTR DATE DESCRIPTION CHECKED APPROVED DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINSTON, D.C. ROBSI
FA-9782/1NDB INSTALLATION EXTERNAL MOUNTING OF ATU
CH.MROAIDS BR AIRWAY FACILITIES BATE-2-23-81 LTA. REV SERVICE D-6186-013
AMAF IND IN
Chap 3
Page 49 (and 50)
pg51
2/23/
NOTES: I. ANTENNA,POLE OR TOWER, AND EACES EHIES ARE A LOCAL REGINAL PROCUREMENT OPTION DEPENDING PON SITE CONDITIONS. 2. RECOMMENDED TOWER HEIGHTS U FT.(18M) 10 100FI.1 30M)
150
HIGH VOLTAGE INSULATOR-2/END I AT BOTTOM OF DOWNLEAD
2 WIRE TOP
DOWNLEAD
ATU
3-0
TOWER (SEE IIOTES)
4 1-è
2-4
HALYARD -2 NO 4 ANCHOR
-ATU
COUNTERWEIGHT
Chap 3
DOWNLEAD ANCHOR
6-0°
-7 NO 4
4 NO 4
ATU BASE
8-2
COUNTERWEIGHT
REV.LTR DATE SESCAIPTION CHECKED APPROVED DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION WASHINSTON, D.C. ROSOI
FA-9782 NDB INSTALLATION
TANTENNA 2 WIRE
AIRWAY FACILITIES DATE-2-23281 REV LTA SERVICE D-6186-014
Page 51 (and 52)
2/23/81 6740.4
CHAPTER 4. NDB AND ATU INSTALLATION GUIDANCE
21. INTRODUCTION. This chapter documents a step-by-step procedure for installing the 400 and 50 watt NDB units and the 50 watt atu. The installation steps are tabulated in table 4-1 with references to detailed text presented in chapter 5 (Installation Standards) and chapter3 (NDB Installation Drawings Package).
a. Prior to implementing the table 4-1 installation steps, the cognizant FAA field activity or installation contractor should thoroughly review chapters 2 and 3 of this order to understand the installation equipment's physical characteristics, where it will be located, cable routing paths, and necessary wiring connections.
22. INSTALLATION SUMMARY. Briefly, the assigned NDB installation personnel shall perform the following:
a Unpack and inspect the NDB units and the atu.
b Install the 400 watt NDB equipment rack frame, locate it as shown in the applicable chapter 3 drawing, D-6186-002, and anchor it to the facility floor.
c. At 50 watt NDB and atu installation, install unistrut, for wall mounting the equipment, as shown in chapter 3 drawing, D-6186-001. Mount the NDB and atu cabinets to the unistruts.
d. Install conduit or ducting and route power and signal cables in accordance with drawings D-6186-001 and D-6186-002.
e. At 50 watt NDB and atu installation,installbattery box, four 12 volt batteries, battery disconnect switch, and associated conduit cabling. (Optional item, regional decision and funding.)
f. Complete external wiring connections in accordance with drawingsD-6186-003 and D-6186-004.
g Install 400 watt NDB rack components.
h. Route antenna cable from the 50 watt atu or 400 watt NDB to the antenna feed through opening to the spark gap.
i. Install spark gap and antenna down wire support in accordance with drawing D-6186-010 and check antenna and antenna ground plane installation drawings. This spark gap is optional.
j. Antenna installation details are presentedin drawings D-6186-005 through D-6186-009.
Chap 4 Par 21 Page53
NDB INSTALLATTON PROCEDURE
TABLE 4-1
Page Task Definition
Chapter 5, Installation Standards Para. 25, General
Comments/Notes 6740.4
Unpack and inspect the NDB units and
1 the 50 watt atu Unpacking and repacking Check equipment supplied and required Visualinspection Damaged equipment
2 At 400 watt NDB installations Locate NDB rack Anchor rack
3 At 50 watt NDB installations Install unistruts e Wall mount NDB and associated atu
4 Install ducting and thin wall conduit Route power cable, signal cable, and AC protective ground wire.
D-- Chap
Para. 26, 400 watt NDB rack installation
Para. 27, 50 watt NDB cabinetinstallation details Para. 28, 50 watt atu cabinet installation details
Section2, Wiring and Cabling Section3, Grounding, Shielding, and Bonding
Equipment supplied/required - Table5-1 400 watt NDB - Table 5-2 50 watt NDB - Table 5-3 50 watt atu - Table 5-4 equipment required but not supplied.
Refer drawing D-6186-002 A two inch minimum air space gap required between rack and facility wall
Refer drawing D-6186-001 Two inch ventilation air gap required on both units. Allow one foot clearance from equipment
Refer drawingD-6186-001 thru, D-6186-004 for ducting or conduit and cable routing Power cables shall be routed in 3/4 inch thin wall conduit. Signal cables shall be routed in lk inch thin wall conduit Route the ac protective ground wire in the power cable conduit. Once the power cables have been wired to the ac power distribution panel, appropriate safety precautions shall be taken to prevent energizing the NDB 2/23/81
6740.4-2
Par 22 Chap 4 Task Definition Installation Standards Chapter 5, Comments/Notes
5 Locate antenna feed through Install antenna feed through equipment opening point spark gap installation Para. 29, Antenna feed through and antenna materials list Referdrawing D-6186-010 for installa- tion direction and applicable 2/23/81
Install spark gap equipment
611 At 50 watt NDB installations, installPara. 30, Emergency Battery Box Four 12 volt batteries power supply Refer drawings D-6186-001 and D-6186-003
Battery Switch The box must be vented to Battery Cables atmosphere outside facility. Conduit 7 Route antenna cable from antenna 400 watt NDB feed through to the 50 watt atu or Refer drawings D-6186-001 and D-6186-002 • Provide sufficient length for drip loop at antenna feed through
8 Perform external cabling interconnections Para. 31, External cabling interconnections
Section 2, Wiring and Cabling Section 3, Grounding, Shielding, and Bonding
Page 55 1/ Optional item, regional decision and· funding 6740.4
Task Page
55 9
Par 22 Chap 4
Definition
NDB grounding summary • AC protective ground AC safety ground Equipment external ground
Chapter 5, Installation Standards
Section 3 Grounding, Shielding, and Bonding Para. 34, Inside cable ducts
Coments/Notes Ground Connections 6740.4
• Power cable-green wire, power panel to NDB terminal board No. 6 insulated wire- transmitter external ground to power panel. Ducting bare No. 6 copper wire. No. 6 insulating wire atu External ground-to marker transmitter pedestal-to antenna ground
2/23/81
2/23/81 6740.4
k. Antenna ground plane installation details are presented in drawings D-6186-011 and D-6186-012.
1. Prior to energizing any NDB equipment, review applicable manufacturer furnished equipment manuals.
23. INSTALLATION PROCEDURE. Table 4-1 is the step-by-step procedure for installing the NDB units and the 50 watt atu. The procedure is applicable to all NDB system installations. Table 4-1 identifies each task, provides references to the applicable chapter 3 drawings or detailed text in the Installation Standards (chapter 5), and provides appropriate comments. The installation standards of chapter 5 are an integral part of the procedure and shall be adhered to during the installation.
a. Prior to implementing the procedure, the assigned NDB installation personnel shall review table 4-1, the referenced text, and drawings. Depending upon the facility and the size of the installation staff, some of the tasks can be performed in parallel to expedite the installation.
b. Installation Test Equipment Required:
(1) See Appendix 1, page 4. Frequency counter and oscilloscope.
Tester. (2) See Appendix 1, page 5, paragraph (2)d, Insulation
Measuring Unit CZ 546 or equal. (3) See Appendix 1, page 5, paragraphs e and f, Impedance
(4) See Order 6740.2A, page 43, paragraph 162.a. Field Intensity Meter.
24. RESERVED.
Chap 4 Par 22 Page 57 (and 58)
0
2/23/81 6740.4
CHAPTER 5. INSTALLATION STANDARDS
SECTION 1. EQUIPMENT INSTALLATION
25. GENERAL, NDB UNITS AND 50 WATT ATU.
a. Unpacking. The 400 watt NDB unit is shipped in three packing crates. The 50 watt NDB and its associated atu are each shipped in single crates. The contents of the respective packing crates are listed on the packing slips. The construction of the crate clearly indicates which side should be opened. After opening the packing crates, the installation crew should conduct a thorough examination for shipment damage. Remove all packing material.
b. Check Equipment Supplied. Check contents of each shipping container (tables 5-1 through 5-3) to ensure that the NDB units and the 50 watt atu are complete.
c. Damaged Equipment. Examine the contents of the containers for signs of shipping damage. Particularly check to see if the containers show signs of mishandling. If any equipment is found to be damaged, no attempt should be made to remove, install or operate it. Inform the carrier as to the nature of the damage before repacking and returning the equipment to the factory.
d. Visual Inspection. After opening all the containers, removing all packing materials or interior restraints, and checking that no shipping damage has occurred; the NDB and atu are ready to be moved into a flat, clear surface for a thorough inspection.
(1) Remove the NDB and the atu with associated hardware from the containers, and place on clean, flat surface or work bench.
(2) Inspect electrical components for shipping damage.
e. Check Equipment Not Supplied. Table 5-4 lists those items required to complete the NDB unit or atu installation which are not furnished.
f. Repacking. If it is necessary to repack either NDB unit or the 50 watt atu, it is recommended that packing for reshipment be accomplished by using the same containers and cushioning fillers with which the equipment was originally packed. If these materials are not available, care should be taken to provide adequate cushioning and sturdy shipping containers, as required by specification MIL-E-17555. The following precautions should be taken when packing either the NDB unit or the 50 watt atu:
(1) Internal Studs. Overlay internal studs with shock absorbing material for equipment support. Ensure that protruding connectors do not bear on any part of the crate.
Chap 5 Par 25 Page 59
6740.4 2/23/81
TABLE 5-1. EQUIPMENT SUPPLIED IN 400 WATT NDB CRATES
Packing Crate Size Weight Contents Number
1. 25.5 cu. ft 276 1bs cabinet with power supply and power amplifier modules unshipped.
2. 4.22 cu. ft 132 1bs power supply
3. 6.12 cu. ft 72 1bs 8xpower amplifier modules, spare parts listed in 1, 2
1. Spare sub-assemblies and relay
Item Part Desig
Power amplifier module 133-1022 1A3A2-A9
exciter 133-1018 1A2A1
monitor 133-1026 1A2A2
rf probe 133-9046 1A3A11
24 V dc power supply 133-2022 1A2A3
contactor relay 2160B23AA-66 1A2K1
2. Harmonic filter spare components 1A3A10
Item Value Part Desig
Inductors 17 uH 133-3048 L1/L3/L4 27.4 uH 133-3048/1 L2/L5/L6 24.1 uH 133-3048/2 L7 15 uH 133-3048/3 L8 24.5 uH 133-3048/4 L9 39.7 uH 133-3048/5 L10
Capacitors 390 pF DM20FF391G04CR C1 9100 pF 27115B912G00 C2/C4 5600 pF 27120B562G00 c3/C5 1200 pF DM20FF122G04CR C6 750 pF DM20FF751G04CR C7 8600 pF 27120B682G00 C8 4300 pF 27120B432G00 C9 Resistors 50 ohm 70 W NHL-70 flat R1/R2
Page 60 Chap 5 Par 25
TABLE 5 - 2
EQUIPMENT SUPPLIED IN 5O WATT NDB PACKING CRATE
ITEM
QTY
DESCRIPTION
REMAKKS
50 WATT NDB (30x17x16 INCHES)
2 3 4
2 2 4
TRANSMITTER BATTERY CABLE, AWG 14 CONDUIT CONNECTORS, 2H42 CABINET SPACERS FOR REAR MOUNTING BRACKETS
WT - 98 lbs
LENGTH - 12 FT
The exciter pcb AlA2, monitor pcb AlA7 and all transmitter spares are
1/
crated with the atu.
Chap 5 Par 25
EQUIPMENT SUPPLIED IN 5O WATT ATU PACKING CRATE
TABLE 5-3.1
Nomenclature Dimensions
50 Watt Antenna 31.5 x 38 x 18 inches
Weight
88 1bs
80 x 96.5 x 45.7 centimeters
Tuning Unit
1. System spares.
Name Circuit Description
Servo probe FA-9782/1-A1A2 Matching transformer FA-9782/1-A1A3 RF probe FA-9782-A1A6. FA9782/1-A1AI Regulator charger FA-9782-A1A1 Exciter FA-9782-A1A2 PA module FA-9782-A1A4 Monitor FA-9782-A1A7 RF transformer FA-9782-A1A5T1 Inductor 27.4 uH FA-9782-A1A5 L1,L3,L4,L7 Inductor 17 uH FA-9782-A1A5 L2, L5,L6,L8 Inductor 39.7 uH FA-9782-A1A5 L9 Inductor 24.5 uH FA-9782-A1A5 110 Capacitor 390 pF FA-9782-A1A5 CI Capacitor 9100 pF FA-9782-A1A5 C2,C4 Capacitor 5600 pF FA-9782-A1A5 C3,C5 Capacitor 6800 pF FA-9782-A1A5 C6 Capacitor 4300 pF FA-9782-A1A5 C7 Resistor 100 ohm 2 W FA-9782-A1A5 R1,R2,R3,R4
41.4 kg.
133-9041 133-9055 133-9046 133-1052 133-1018 133-1022 133-1026 133-1072 133-1043 133-1043/1 133-1043/2 133-1043/3 CMR05F291GODM CMRO7F912GODM CMR07F562GODM CMR07F432GODM CMRO6F432GODM RL425101G
Mating connector for 24 V dc supp!y at J2 MS3106E14575.
2.
Loading coil assembly (right and left hand coils) with rf jumper
3.
cables for the specified frequency. Packed separately.
Tuning ferrite slug assembly (right and left hand slugs). Packed
4. separately.
5. Two lock nut and washer sets for tuning slugs (plastic bag).
Chap 5 Par 25
2/23/81 6740.4 TABLE 5-4. EQUIPMENT REQUIRED BUT NOT SUPPLIED
50 WATT NDB
1. Cabinet securing bolts. (4) 3/8 inch bolts or similar arrangements long enough to take 2 inch spacers. 2. Solid sheath coaxial cable type RG33i or similar, not longer than λ /8 at the operating carrier frequency, fitted with weatherproof Type N connectors at each end. RG-214 would be acceptable as a similar type cable.
3. ATU dc supply wiring. 2 wire total resistance less than 5 ohms. (See Table 5-4 for mating connector).
4. Battery on/off switch, 2 amp fuse and battery enclosure. (optional) 5. Four 12 Volt lead acid batteries rated at 40 AH min. (optional)
6. External ground cabling and rod.
7. Remote monitor status control lines: 2 wires. See paragraph 29 and table 5-5.
50 WATT ATU
1. Antenna ground cabling to the ground plane. AWG6 or larger.
2. Antenna feeder from the feedthrough insulator El.
400 WATT NDB
1. Four, one-half inch cabinet securing bolts or threaded studs to brace the transmitter to the floor.
2. Antenna feeder cable suitable for outdoor use at the 400 watt power level, with a characteristic impedance of 72 or 50 ohms, dependent upon the matching terminal impedance level at the antenna.
3. If the transmitter is to feed into 50 ohms, the connector, J1, fitted in the cover must be exchanged for the appropriate component.
4. The cable must be fitted with suitable outdoor mating connectors.
5. External ground cabling and rod.
6. Remote monitor status control lines; 2 wires.
50 AND 400 WATT NDBs
Antenna feed through hardware, drawing D-6186-010.
2. Spark gap hardware, drawing D-6186-010.
Chap 5 Par 25 Page 63
6740.4 2/23/81
(2) Loose Ancillary Equipment. Insure that any loose ancillary equipment packed with the shipment is supported by packing material and the chassis components are tightly secured.
(3) Short Out Meter Terminals. On the 50 watt NDB, short out the test meter terminals. On the 400 watt NDB, short out the two meters on the exciter/monitor control panel.
(4) Power Supply Drawer/Power Amplifier Modules. When packing the 400 watt NDB shipping crates, make certain the power supply and power amplifier modules are not mounted in the cabinet.
26. 400 WATT NDB RACK INSTALLATION.
a. 400 Watt NDB Rack Dimensions. The 400 watt NDB rack dimensions, as presented in figure 2-5, are nominally 48 inches high, 24 inches deep, and 22 inches wide.
b. 400 Watt NDB Rack Installation Details. The 400 watt NDB rack shall be installed in existing air navigation facilities as a free standing unit (drawing D-6186-002). The following general guidelines should be followed when installing the 400 watt NDB rack:
(1) The rack should be installed plumb, level, and square. Metalwashers may be used as shims to compensate for floor irregularities.
(2) After proper leveling and alignment, the rack should be anchored to the floor, as described in subparagraph c.
(3) Grounding the rack to floor reinforcing steel should be avoided.
c. Anchoring of 400 Watt NDB Rack.
(1) The 400 watt NDB rack shall be anchored to the floor at all four corners at the 9/16-inch diameter holes located on the inside of the cabinet.
(2) Several methods of anchoring the racks to the floor are available.The preferred method is to use lead caulking anchors set in concrete floors. When using lead anchors, it is necessary to drill an appropriate size hole of sufficient depth to accept the anchor. The anchor is then firmly seated in the holes, and a screw or bolt is used to attach the rack to the anchor. Different floor constructions, of course, necessitate different anchoring techniques. In the case of wood floors, it would only be necessary to use lag bolts. Toggle or molley bolts can sometimes be used on certain type floors. The method of anchoring shall not present protrusions or sharp surfaces which may be hazardous to personnel.
Chap 5 Page 64 Par 25
2/23/81 6740.4
27. 50 WATT NDB CABINET INSTALLATION DETAILS.
a. 50 Watt NDB Cabinet Dimensions. The 50 watt NDB cabinet dimensions, as presented in figure 2-3 are nominally 25 inches high, 9 inches deep, and 11 inches wide.
b. 50 Watt NDB Cabinet Location. The 50 watt NDB shall be located in existing air navigation facilities as presented in drawing D-6186-001. Brackets are fitted to the rear panel for wall mounting. The distance of the site from the antenna tuning unit (adjacent to the antenna) is significant. The length of the feeder cable should be no longer than /8. (70 meters at 535 kHz is the shortest critical length, increasing to 197 meters at 190 kHz). The mounting location shall be free from obstruction with a one foot clearance from other equipment.
c. Mounting. The 50 watt NDB shall be mounted to unistrut channels (or equivalent). The unistrut channels are bolted to enclosure wall studs as shown in drawing D-6186-001.
(1) The cabinet shall be installed plumb, level, and square.
(2) Vents in the base and at the top of the cabinet must not be obstructed to permit convection cooling. The exit vents are on the rear panel. Four spacer pillars are supplied to provide an appropriate air space.
(3) The cabinet shall be bolted to the unistruts at each corner mounting bracket with 3/8 inch bolts and lock washers. The spacing pillars shall be installed between the mounting brackets and the wall to insure adequate ventillation.
(4) The method of mounting shall not present protrusions or sharp surfaces which may be hazardous to personnel.
28. 50 WATT ATU CABINET INSTALLATION DETAILS.
a. 50 Watt atu Cabinet Dimensions. The 50 watt atu cabinet dimensions, as presented in figure 2-8, are nominally 27 inches high, 14 inches deep, and 18 inches wide.
b. 50 Watt atu Cabinet Location. The 50 watt atu shall be located in the air navigation facility as presented in drawing D-6186--001.. The atu is located within a specified distance from the 50 watt NDB (refer paragraph 27.b., FA-9782 Instruction book.).
c. Mounting. The 50 watt atu shall be mounted to unistrut channels (or equivalent). The unistrut channels are bolted to enclosure wall studs as shown in drawing D-6186-001.
Chap 5 Par 27 Page 65
6740.4 2/23/81
(1) The vents in the base and sides of the atu must be unobstructed to permit convection cooling.
(2) The cabinet shall be installed plumb, level, and square.
(3) The cabinet shall be bolted to the unistruts at each corner.
29. ANTENNA FEED THROUGH AND SPARK GAP INSTALLATION. DraWing D-6186-010 presents the NDB facility antenna feed through and spark gap installation and delineates required hardware. This spark gap is optional depending upon the type unit.
a. Installation Procedure.
(1) At the antenna feed through location point, drill a 2 inch diameter hole.
(2) Wall mount insulator bowls to each side of masonite wall.
(3) Wall mount spark gap galvanized steel bracket.
(4) Fabricate and install copper gap spark tubes as specified in drawing D-6186-010.
(5) Install terminal lugs at antenna feed through and spark gap galvanized steel bracket.
(6) Route No. 6 bare copper wire from spark gap to ground as shown in drawing D-6186-010.
(7) Connect outside antenna cables to antenna feed through ground lug.
(8) Attach ring terminal to inside antenna rf cable for antenna feed through attachment.
30. EMERGENCY POWER SUPPLY INSTALLATION. The emergency 48 volt power supply system is an optional installation at 50 watt NDB facilities. It is a regional facility decision and will be procured with regional funds.
a. Installation Procedure.
(1) Install associated conduit as shown in drawing D-6186- 001.
(2) Install battery switch and route battery cables. (Refer to drawing D-6186-003 for wiring and interconnection diagrams).
Chap 5 Page 66 Par 28
2/23/81 6740.4
(3) Locate and install battery box as shown on drawing D-6186-001.
(4) If the facility does or does not have a vent fan, vent the battery box to atmosphere, outside the building, to exhaust hydrogen gas.
31. EXTERNAL CABLING INTERCONNECTION. Drawing D-6186-003 and D-6186-004 present wiring diagrams and cable interconnections for the 50 and 400 watt NDB units respectively. Paragraphs a through c provide interconnection guidance, and paragraph d provides specific direction on connector attachment.
a. 50 Watt NDB Installation.
(1) Figure 2-1 shows the general layout of the external cabling at the 50 watt NDB and atu. The terminal connections at the transmitter are shown in figures 5-1 and 5-2. The regulator charger assembly (A1A1) shown in figure 2-4, must be removed from its socket XA1, supported by two pillars, to expose TB1 and TB2. The rf antenna feed is taken from the type N connector J3, and all other cabling is brought up through the conduit feedthrough, located in the base of the cabinet.
(a) The feeder cable to the atu should not be longer than /8 using half-inch solid sheath coaxial cable or similar (50 ohm characteristic impedance). The mating connectors required are type N, suitable for outdoor conditions at the atu. Careful dressing is required and bends of less than 10 inches in diameter are to be avoided.
(2) A two-wire (line and neutral), with separate ground connection is required at TB1 as shown in figure 5-2. The power requirement is a single phase nominal 115 V ac (102-138 V), 60 Hz at 160 volt-ampere maximum. It is highly recommended that an external breaker be wired into the supply to expedite removal of ac from the cabinet for power-off maintenance procedures.
(3) The NDB cabinet shall be grounded from its external ground lug (figure 5-1) back to the power panel NDB circuit breaker with bare No. 6 copper wire routed in the 3/4 inch thin wall conduit with the power cable.
WARNING: Do not apply power at this time.
Chap 5 Par 30 Page 67
REGULATOR / CHARGER A1A1 MOUNTS
LUG POSITION FOR EXTERNAL GROUND
AC SUPPLY INTERFACE 102-138V AC 57-63Hz 160VA MAX.
CONTACTS
A1T1 A1L1
SUPPLY COMPONENTS
SUPPLY CABLEFORM
CABLEFORM INTERFACE (By fanning strip)
REG./CHARGER A1 A1 INTERFACE
EXTERNAL INTERFACE
AC NEUTRAL
PRIMARY TAPS 2,3 and 4 ALTERNATE TERMINAL FOR AC LINE WIRE GRA/WHT
FIGURE 5-1 SUPPLY .CHASSIS TOP AND BOTTOM
Chap 5 Par 31
2/23/81 6740.4
AC MONITOR/ DC MONITOR/ STATUS/CONTROL STATUS/CONTROL
REMOTE -REMOTE TB2 TB2
0110 24 V 0.5-5 DC + V AC ADJUST
OTHER EXTERNAL CONNECTIONS
EXTERNAL VOICE 60O BALANCED PAIR
48 V DC BATTERY 48 V DC
24 V DC atu SUPPLY 24 V DC
TB2
TB1
030 020 N G 102-138 V AC 57- 63 Hz AC LINE SUPPLY
160 VA MAX. PF 0.8
Chap 5 FIGURE 5-2. EXTERNAL CONNECTORS Page 69 Par 31
6740.4 2/23/81
(4) The atu interface and remote connections at TB2 are shown in figure 5-2. The external voice input should be a stranded shielded telephone pair having the shield well grounded as shown. The emergency battery (if installed) should be located as shown in drawing D-6186-001 and should be connected at A1TB2-4 via an external on/off switch and 3 amp fuse installed as closely as possible to the battery. These battery circuit items are not supplied. Leave switch off at this time.
(a) The remote monitor status control is provided for alternative ac/dc supplies, and a closed set of contacts from the transmitter to indicate normal status (open indicates alarm). The ac supply provides an adjustable voltage into 600 ohms from 0.5 to 5.0 V ac. The 24 V supply will not provide a current in excess of 133 mA.
(5) Table 5-5 summarizes 50 watt NDB input/output connections. Additional items to be checked include the following:
(a) No loose or detached wiring at XA1, XA2, XA3, XA4, XA6, and TB1, TB2, TB3, A3TB1, and A6TB1. A11 terminal boards mated with fanning strips on the wraparound cableform.
(b) Ground jumpers connected as follows:
1 Across control panel upper hinges (one wire). At exciter XP2 lower lug (three wires). At pa module lower bracket lug (three wires). 1213415161 At harmonic filter fixing screw (one wire). At monitor XA7 lower lug (three wires). At rf probe XA6 left-hand (one wire).
(c) Rf jumpers connected at rf filter A1A5 at J1 and J2 from A3 and A6 (BNC's P1 and P2).
(d) M1 shortening strap removed from across positive/- negative terminals.
b. 50 Watt atu Installation
(1) The two-wire, 24 V dc power supply from the transmitter is connected at J2 using mating connector provided; +term A - term B. The tuning motor draws less than 0.15 amps under full load. The mating type N connector for the rf feed (not provided) is connected at J1 (UGi095A/U). The antenna connection at the feed through insulator should be arranged without sharp bends and should contain a drip loop at the insulator end. The wire should be of sufficient diameter to prevent corona discharge. The antenna ground connection is taken from the external lug on the rear panel to the antenna ground plane. Heavy cable or braid AWG 6 or larger should be used.
Page 70 Par 31 Chap 5
2/23/81 6740.4
TABLE 5-5 NDB INPUT/OUTPUT CONNECTIONS
INPUT SUMMARY
FUNCTION CABLING TERMINAL
External Voice Stranded shielded pair, AWG-22 TB2-5 and 6 600 ohm balanced
Battery (+) AWG 12/x 12 foot cables are TB2-4 supplied. If longer cabling is required, the total loop resistance should not be greater than 0.1 ohm
Battery (-) 0.1 ohm TB2-3
External Ground No. 6 bare copper wire External Ground lug
OUTPUT SUMMARY
FUNCTION CABLING TERMINAL
atu supply (24 v dc) Two-wire - total resistance TB2-2 (+) less than 5 ohms (AWG-18) TB2-3 ground
Remote monitor Alternative connections are TB2 status control shown in figure 5-2 ac and dc supplies
Chap 5 Par 31 Page 71
6740.4 2/23/81
(2) All wiring to the electronic assembly is connected at the terminal strips A1TB1, A1A1TB1, A1A2TB1, and A1A3TB1. The external side at A1TB1, A1A1TB1 and A1A3TB1 must be disconnected to remove the assembly when access is required to the tuning motor drives in the rear of the cabinet. The connections at the two pcb's A1 and A2 are via fixed chassis sockets. The rf jumpers are connected at terminal strips.
(3) The loading coils and ferrite tuning slugs (figure 5-3) are disassembled prior to shipment and packed separately in the atu crate. To assemble the coils in the atu, proceed as follows.
(a) Having made all interconnections between the transmitter and the atu, remove exciter pcb from transmitter to ensure that its rf output is zero, then switch on the transmitter. The 24 volt supply will then be fed to the atu. Switch on the atu power at S1.
(b) Operate the decrease switch to drive the tuning slug to its lower limit switch.
(c) Switch off the atu and the transmitter, then remove the electronic assembly from the atu by disconnecting the external interconnections at A1TB1, A1A1TB1 and A1A3TB1 and backing off on the four captive fixing screws shown in figure 5-4.
(4) At the top of each tuning spindle, place a nut and lockwasher (shipped in plastic bag), then screw on the ferrite slug assembly, bearing on the lower female standoff only, until the thread bottoms. Tighten nut to lock in place. See figure 5- 5. Do not bear on the ferrite or ceramic pillar.
(5) Install loading coils on coil support ceramic pillars using the screw and lockwashers provided. Part numbers for the operating frequency range for right- and left-hand coils (viewed from front) are listed below.
(a) 190-285 kHz 133-9023-1 (right-hand) 133-9023-2 (1eft-hand) (b) 286-405 kHz 133-9023-3 (right-hand) 133-9023-4 (1eft-hand) (c) 406-535 kHz 133-9023-5 (right-hand) 133-9023-6 (1eft-hand)
(6) The slugs are now positioned such that when driven to the upper limit switch, the ferrite sections are centered vertically in the loading coils. This produces the maximum available inductance value for the loading coil in use which is reduced as the slugs are withdrawn by the tuning motor. It may subsequently be determined that a lesser value of maximum inductance is required. Where this
Chap 5 Page 72 Par 31
DANGER
HIGHEVOLTAGE
20000-VOLTS
COIL SUPPORT PILLAR
TUNING SPINDLES
THREADED DRIVE SHAFT
TRAVELLER SPINDLE ADJUST• AT A AND B
ANTENNA GROUND LUG
SCREENED VENT
FIGURE 5-3.
TB2
MOTOR
LOWER LIMIT S5
SLUG ASSY PILLAR
S6 UPPER LIMIT
CR1 CR2
METER SWITCH S3
CABINET WITH ELECTRONIC CHASSIS REMOVED
Chap 5 Par 31
A1A3TB1-CONNECTIONS
CAPTIVE SCREW
TB1-8 FOR ANTENNA GND. TB1-1 TO 7 FOR ALTERNATE INPUT, OUTPUT CONNECTIONS.
INPUT
(one of four)
A1R1
A1S4
JUMPER (Fig.1-1)
0
A1CT A1L1
A1S1
A1M1 A1S 2 A1DS1
TB1- CONNECTIONS TB1-1 TO J2-A RED TB1-2 TO TB2-3WHT TB1-3 TO TB2-2 WHT/VIO TB1-5 TO J2-B BLK TB1-5 TO S3-2 BLK TB1-6 TO S3-1 WHT
FIGURE 5-4 ELECTRONIC CHASSIS
Chap 5 Par 31
2/23/81 6740.5
-FERRITE SLUG
STUD (Lock-tite in slug epoxy-glued in pillar)
CERAMIC PILLAR
-FEMALE STANDOFF
THREADED STUD
-LOCK NUT AND WASHER
TOP OF SPINDLE
FIGURE 5-5 MOUNTING OF TUNING SLUGS
Chap 5 Par 31 Page 75
2/23/81 6740.4
is the case, the position of the tuning spindles may require later readjustment.
First ensure that the motor drive is in its lower limit of travel as in paragraph 31.b.(3)(b), above. Loosen the spindle adjusting screws A and B (figure 5-3) and the two locking collars immediately above them. Lower the spindles until just clear of the cabinet base. Then tighten motor fixing screws.
(7) Replace the electronic assembly and reconnect all interconnecting wires (figure 5-4).
c. 400 Watt NDB Installation.
(1) The external terminal connections at the transmitter terminal boards are shown in figure 5-6 and in drawing D-6186- 004. The 1TB1 and 1TB2 are mounted behind the power supply drawer 1A1, and therefore are easily accessible only when the drawer is removed. Connections are most readily made before the drawer is mounted. Cabling may enter the cabinet through the top cover beside the rf output type N connector or through the aperture in the base of the cabinet.
(2) The transmitter is fitted with 72 ohm type N receptacle on the top cover. The cable (not supplied) must be suitable for outdoor conditions with weatherproof connectors and have the appropriate power rating and attenuation characteristics for the 400 watt power level. Careful dressing is requried, and bends of less than 10 inches in diameter should be avoided. If a 50 ohm terminal impedance is required, the type N receptacle must be exchanged (not supplied). Because of its short electrical length, the coaxial cabling from the power amplifier (1A3J1) to the receptacle serves for either terminal impedance, but the matching transformer at the amplifier output (1A3T2) must be adjusted by connecting the output lead at 1A3TB3 as shown in Table 5-6. A second transformer must be set up to the intended operating power level at 1A3TB4 as shown.
(3) Ground the transmitter cabinet back to the power panel, from the external ground lug (figure 5-7), with bare No. 6 copper wire.
(4) A two-wire connection with separate ground is required at TB2 as shown in figure 5-6. The power requirement is a single phase, either nominal 114 V ac (102-138 V) or 230 V ac (204-276 V) as shown in figure 5-6, 60 Hz at 1.2 kilovolt ampere max. An external breaker shall be wired into the supply to expedite removal of ac from the cabinet during maintenance.
WARNING: Do not apply power at this time.
Chap 5 Page 76 Par 31
TB2
TB1.
G 102-138 or 204-276 V L-L AC SUPPLY. -L 57-63 Hz 1.2.KVA MAX. N P.F. = O.9
-L TERMINAL 3 IS USED FOR 23O NOMINAL.L-L SUPPLY ONLY.
REMOTE ON/OFF (SWITCHED ON WHEN CLOSED)
EXTERNAL VOICE 6OOΩ BALANCED STANDARD TELEPHONE PAIR
REMOTE ALARM CONTACTS (CLOSED CONTACTS INDICATE SHUTDOWN)
EXTERNAL CONNECTIONS
FIGURE 5-6
Chap 5 Par 31
TABLE 5-6
POWER AMPLIFIER TRANSFORMER SETTINGS
Terminal
TB5-1 TB5-2 TB4-3 TB4-4 TB4-5
Setting
50 ohms 72 ohms 50 - 100 watts 100 - 200 watts 200 - 400 watts
Chap 5 Par 31
FAN
SUPPLY
RECT. DIODES
CR1/CR2
FILTER CHOKE. L1
AC LINE CONTACTOR K1
XFMR CURRENT T1 SHUNT
GND LUG 115 V/230 V ANDVOLTAGE LEVEL ADJUST CABLEFORM TB2 CONNECTIONS TB1
FIGURE 5-7. POWER SUPPLY ASSEMBLY - TOP VIEW
Chap 5 Par 31
6740.4 2/23/81
(5) The remote connections at TB1 are shown in figure 5-6. The external voice input should be a stranded shielded pair having the shield grounded as shown. The remote alarm contacts are closed for normal operation and open for alarm. The remote on/off switching terminals TB1-6 and 7 must be externally connected to switch transmitter on. Table 5-7 presents an input and output summary.
(6) After making the external connections at 1TB1 and 1TB2, the power supply assembly is to be inserted into the bottom drawer by depressing the spring-loaded catches on the slides. The fanning strip on the cableform is to be connected to 1A1TB1. The ground cabling, consisting of three wires - AWG 12 - two black and one black and white, is to be connected at the ground lug (figure 5-7). The eight power amplifier modules are then to be inserted into the power amplifier rack and the captive retaining screws secured (figure 5-8).
(7) Complete the following wiring checklist:
(a) External wiring is complete at 1TB1 and 1TB2.
(b) External ground wire connected from ground lug to power panel.
(c) Cableform fanning strips are securely connected at assembly terminal blocks.
(d) Rf jumper is connected from 1J1 (rf output receptacle) to 1A3J1 (power amplifier output).
(e) Meter shorting straps are removed from across positive/negative terminals at the exciter/monitor control panel.
d. Assemble Power and Signal Connectors.
(1) Assemble spade lugs (to fit No. 6 screws) for attaching power and signal cables to the 400 and 50 watt NDB transmitters, the marker transmitter, and the Telco demarc box.
(2) Assemble type N connectors to both ends of the rf feed cable between the 50 watt NDB and its associated 50 watt atu at J1 and J3.
(3) Assemble multipin connector for 50 watt atu 24 V dc power supply at J2.
(4) Assemble type N connctors for attaching the 400 watt NDB rf output and the antenna cable at J3 and at J1.
Chap 5 Page 80 Par 31
FUNCTION
External Voice
Remote Alarm
Remote ON/OFF
External Ground
Chap 5 Par 31
TABLE 5-7 INPUT AND OUTPUT SUMMARY
CABLING TERMINAL
Stranded shielded pair, AWG-22 1TB1-4 and 5 600 ohm balanced shield at 3
Two-wire - closed contacts TB1-2 for normal status TB1-1
Two-wire 115 V ac 1TB1-6 and 7
Bare No. 6 copper wire Ground lug AWG power panel
SWITCHED REG. DRIVER A1 (BEHIND)
RF PROBE A11
J1 RF OUTPUT
FIGURE 5-8
HYBRID COMBINER U1
HARMONIC FILTER A10
TOP PA MODULES A2 TO A9
POWER AMPLIFIER ASSEMBLY, DRAWER EXTENDED
Chap 5 Par 31
2/23/81 6740.4
(5) Procedures for attaching Type N connectors are presented in figure 5-9.
SECTION 2. WIRING AND CABLING
32. ELECTRICAL WIRING. Power wiring in the NDB facility shall conform to the National Electrical code (NEC). All receptacles and equipment conductors shall be a 3-wire grounding type. Other general requirements are:
a. Ducts and Conduits. All electrical wires from circuit breaker panel to equipment cabinets shall be protected in approved ducts or conduits. At junction points of conduit-to-duct or conduit-to-elecrical outlet boxes, bushings shall be installed to protect wires from physical damage. On cable tray systems, dividers shall be provided if power and radio signaling conductors share the cable tray. Outside electrical installations shall use moistureproof conduits and fittings.
b. Electrical Conductors.
(1) Single conductor wiring protected in ducts or conduits shall be thermoplastic covered wire, type THW or THWN. The wire size is determined by the current flow of the circuit. Most branch circuits are protected with 20 amp breakers which, in accordance with NEC, requires use of No. 12 wire or larger diameter.
(2) Any wire splices shall be made with approved splicing connectors and be in accessible areas such as junction boxes and square ducts with covers.
c. Color of Wires.
(1) AC electrical wires, either single conductor or 3-wire cord types, shall be color coded as follows:
(a) White - Neutral.
(b) Green - Ground.
(c) Black - 115 volt ac.
(d) Every other voltage will use separate color wire.
(2) Wires may be wrapped with colored tape at the exposed areas to conform to the color code above.
Chap 5 Par 31 Page 83
6740.4 2/23/81
SIP WASHEN TWHEN SUPMIID CONIACI
4. lype angle conneclors. omit this siep and proceed to Solder conlacl lo canlor conduclos. For access
slep 5. For caplive contacis. (a) assemble bushing and insula.
(when supplied). and gaskel over jacket. Remove jacket to dimension "A." 1. Cul cable and squaro. placo ciamp-nut, slip washer lor, allach contact, or (b) assemble washer and larger (cable end) insulalor. Allach contact Assemble smaller (mating end) insulator. WASHER
CADEI INF DUSHING INSUN AIUO IOR WASHERO DRAID CLAMP INSINLATOR MAlING (ND
2. Comb oul braid and taper forward. Piace braid (b) ciamp over brsid gsinat jackol cut.
3. Fold braid buck over brald clamp and trim as shown bovs. Aamovs dieloctrle to dimension "B." Cut
conter conductor to dimsnsion "C." cods dimensions as shown below. and assomble as in- When cable positioning insulators are used adjust trim 5. curely. Ve paakel must bo split by brsid clamp. Thraad assembly inlo connactor, and lock s
dicatod. SINI.SOLID DILECTRIC
TRIM CODE
A B C
3/8 .046 7/32 1000)
FIGURE 5-9. PROCEDURE FOR ATTACHING TYPE N CONNECTORS M39012/1-0005, TO CABLE
Chap 5 Page 84 Par 32
2/23/81 6740.4
33. SYSTEM WIRING.
a. Wiring and cabling between the ac power distribution panel in the facility building or shelter and the NDB equipment shall be installed to meet the present circuit demands.
b. Cable Installation. In the ducting, between the 50 watt NDB and its associated atu, cables shall be installed in the duct in a systematic order, with as few crossovers as possible. Where the number of cables requires stacking, the cables traveling the furthest shall be on the bottom of the stack. The first run of cables shall be secured to the tray at regular intervals using plastic tiewraps (such as PAN-TY cable ties)." Second, third, and succeeding stacks of cables are tied to those below. If signal/control cable runs share a common duct with power cables, signal/control cables shall be isolated from power cables by a metal barrier or separate duct. At NDB installations, 3/4 inch thin wall conduit shall be installed for routing the power cable with external ground cable and 1 1/2 inch thin wall conduct shall be installed for routing the signal cables.
c. Dressing of Cables. Dressing of cables includes arranging them in a systematic order, removing the outer covering and inner insulation on individual pairs, and otherwise preparing them for termination to blocks or equipment connectors. It is very important that the cable dressing be carried out in a uniform manner throughout the installation, and that the general appearance is pleasing to the eye. Cables extending into racks shall be arranged in the order of their use, with those terminating into the lowest part of the rack installed first and secured to the side wall of the rack. Other cables will lie on top and be tied to those below. The cover of the cables and their inner insulation are to be removed at the point which allows ample room for splitting the wires before they enter the terminal block or connector. The foil around shielded pairs is removed at the cable opening point and the drain wires either removed or continued to the connector point.
d. Terminating Wires. Cable connections should be made only at terminal strips or in junction boxes. Cable lengths up to 1,000 feet should be continuous in length (no splices). After dressing of the cables: is completed to the intended terminating point, the individual cable pairs are separated. Actual terminating techniques depend upon the type of connector or block being wired. However, on all installations some slack shall be left in the terminal wire. It is apparent that termination of the facility wiring is probably the most important operation of the installation and should be carried out professionally. The care and attention exercised on this phase will pay off when the equipment is placed in operation and when the facility is inspected periodically.
Chap 5 Par 33 Page 85
6740.4 2/23/81
e. Insulation. When removing insulation from wires, insulation stripping devices which nick, mar, or damage the conductor in any way should not be used. Good quality cable strippers should be used. The correct setting (size) of the stripping tool should be based on the size of the wire. Proper use of the cable strippers will ensure that the wire is not nicked, a condition which could later cause breaks. Strip only the insulation necessary to make the connection.
f. Solderless Lugs. When using solderless lugs, the size and type of wire must be considered so that the proper lug can be used. Lugs are color coded for wire size. Red lugs are No. 22 through No. 16 size wire, blue lugs are for No. 16 through No. 14 size wire, and yellow lugs are for No. 12 through No. 10 size wire. Also, lugs must be selected based on the size of the screw. The lugs used most often are spade lugs that accept No. 22 through No. 16 wire and fit a No. 6 screw, and the ones that accept No. 16 through No. 14 wire and fit a No. 6 screw. All lugs used are insulated; therefore, no insulation needs to be installed. Special crimping tools are provided for installation of lugs. Proper use of these tools is imperative for a good electrical connection. All stranded wire requires the use of lugs. Stranded wire shall not be installed under a binding post without the use of a lug.
g. Plastic Tubing. When soldering wires to cable plugs, lengths of spaghetti (plastic tubing) shall be used over each wire and connection point. This will ensure to the maximum extent possible that shorts are prevented. A cable clamp is to be used on all plugs to avoid strain on the cable connections and to avoid twisting.
h. Equipment-to-Equipment Connections. In a number of cases, direct equipment-to-equipment connections have to be made. They are generally of two types. In one type, a fixed length of cable with suitable connectors at either end are factory made and supplied complete with grounding connections. It is desirable to use them as supplied unless the length is insufficient. In the other type, only the equipment connectors are provided and the cable must be provided and the cable must be fabricated at site using the required length of appropriate type of cable with proper shielding and grounding drain connections where necessary.
i. Handling of Shields. Cables having shielded pairs shall have their shield grounded at the equipment end only. Shielded pairs normally have an aluminum foil wrapping with a bare wire (drain wire) under the foil. In such cases, only the drain wire is terminated to the ground.The best installation is achieved by removing the foil from all the cable pairs at the same point and then twisting their drain wires together to form a braid. All the drain wires can then be lugged together and attached to the insulated grounding bus.
Chap 5 Page 86 Par 33
2/23/81 6740.4
j. Marking Cables. All cables should be tagged at each end for easy identification. Positioning of markers or labels should permit easy access without disturbing adjacent wiring and cabling. The markers used for this purpose should be of a type that is both durable and easy to install (such as PAN-TY markers). In all cases, markers should be installed in accordance with manufacturer's recommendations.
k. Clamping Cables. Cables should be supported adjacent to connectors by a cable clamp of appropriate size to prevent pulling on the connector. The distance between the cable clamp and connector should be such that the connector can be easily removed and reattached to its mating unit while minimizing loading on the connector.
1. Wiring Check-Out. Every connection made during an installation shall be verified both for unintended grounding and circuit continuity before energizing the system. Unintended grounding shall be tested with a low voltage megger or a multimeter set to a high resistance scale. The resistance between ground and the wire shall be nominally infinite. Continuity testing shall be accomplished by setting the multimeter on a low resistance scale. One end of the wire is connected to a common wire (ground wire). The resistance between the other end of test wire and common wire is measured. Continuity is established when this resistance is nominally zero. When testing small equipment plug wiring, the adjacent terminals to the connection being checked shall be tested for possible shorts caused by the cramped wiring in the connector housing.
34. INSIDE CABLE DUCTS.
a. General.
(1) A wide variety of methods for distributing interconnect cables and wiring are presently in use throughout the FAA. These methods include the following:
(a) Cabinet top open-type racks.
(b) Cabinet top enclosed ducts/trays (commercial and ,fabricated).
(c) Raised computer floor.
(2) In NDB installations the cable distribution method for the facilities shall be via the square duct or thin wall conduit as presented in drawings D-6186-001 and D-6186-002.
b. NDB Cable Ducts. The following guidelines shall be used in modifying or installing sections of the ducts.
Chap 5 Par 33 Page 87
6740.4 2/23/81
(1) Ducts procured from commercial sources should not have knockouts.
(2) Ducts procured from commercial sources should be assembled and installed using matching hardware.
(3) Fabricated ducts should be assembled and installed using properly selected hardware.
(4) Where cutting is required, the workmanship should be such that all edges will be smooth, fit well, and are aligned.
(5) Surfaces of duct work should be level, plumb and square.
(6) Duct work will be grounded throughout their length using bare copper No. 6 AWG wire. The ground wire shall be attached to each section of the duct work (exlcusive of couplings) and mechanically fastened to clean metal with copper or bronze Blackburn LB-70 or equal type connectors. The ground wire should be continuous to its termination at the building ground but need not necessarily be a single piece.
(7) Ducts shall be insulated from equipment racks, consoles, etc., with phenolic spacers and nylon attaching screws. This practice is recommended for prevention of ground loops which could result in additional circuit noise.
c. NDB Thin Wall Conduit. The following guidelines shall be used in installing thin wall conduit:
(1) Conduit procured from commercial sources should be assembled and installed using matching hardware.
(2) Where cutting is required, the workmanship should be that all edges will be smooth, fit well, and are aligned.
SECTION 3. GROUNDING, SHIELDING, AND BONDING
35. GENERAL. Optimum performance of electronic equipment with adequate protection against power system faults and lightning strikes requires proper operation of signal and equipment grounding systems, a lightning protection system, and a power distribution ground system. These systems provide proper grounding of the building and its contents, proper bonding of all system components, and proper shielding of equipment for personnel safety and equipment interference control. This section provides a brief overview of procedures for checkout of grounding, shielding, and bonding at existing FAA facilities and procedures for installing nondirectional beacon equipment into operational grounding systems. Additional information is available in FAA-STD- 019, Lightning Protection, Grounding, Bonding, and Shielding Requirements
Chap 5 Page 88 Par 34
2/23/81 6740.4
for Facilities; FAA-STD-020, Transient Protection, Grounding, Bonding, and Shielding Requirements for Equipment; and the latest edition of Order 6950.19, Practices and Procedures for Lightning Protection, Grounding, Bonding, and Shielding Implementation; Order 6950.20, Fundamental Considerations of Lightning Protection, Grounding, Bonding, and Shielding; and Order 6950.21, Structure Lightning Protection at FAA Facilities.
36. REQUIREMENTS FOR EXISTING FACILITIES. Before nondirectional beacon equipment is installed at existing FAA facilities the existing grounding, shielding, and bonding should be inspected for compliance with Order 6950.19, chapter 3. Any deficiencies should be corrected before the equipment is installed.
a. Earth Electrode System. The procedure for determining the components, configuration, and effectiveness of this system is presented in Order 6950.19, chapter 3, paragraph 97. The earth electrode system is the electrical connection between the facility and the body of the earth. The system provides a low-resistance connection to the earth for lightning and power fault protection and minimizes noise between interconnected facilities.
b. Lightning Protection System. The procedure for verification of system conformance with the National Fire Protection Association, Lightning Protection Code (NFPA 78) and the Installation Requirements for Master Labeled Lightning Protection Systems (UL 96A) is presented in Order 6950.19, chapter 3, paragraph 98. The lightning protection system provides a low-resistance path to the earth so that lightning discharges will enter or leave the earth only through the conducting parts of a structure.
c. Signal and Equipment Grounding Networks. The procedure for determining the configuration and effectiveness of the signal reference network (signal ground) and multipoint ground system (equipment ground) and instructions for evaluating and correcting these systems are presented in Order 6950.19, chapter 3, paragraphs 99 and 100. The signal ground provides a single-path connection to the earth electrode system and the equipment ground for low-frequency (less than 100 kHz) equipment. The equipment grounding network provides multiple, low-resistance paths for high-frequency (greater than 100 kHz) signals between various parts of the facility, the equipment, and the earth. electrode system. The equipment ground also supplements, but does not replace, the National Electric Code (NEC) required equipment grounding conductors. Except for an interconnection at the main ground plate, the equipment ground is electrically isolated from the signal ground.
d. Bond Evaluation and Resistance. The procedure for evaluating, and determining resistances in, facility bonds is presented in Order 6950.19, chapter 3, paragraph 101. High quality bonds between conducting elements of grounding and shielding networks ensure proper operation of these networks.
Chap 5 Par 35 Page 89
6740.4 2/23/81
e. Shielding Evaluation. The procedure for evaluating the presence, purpose, and condition of equipment and facility shields is presented in Order 6950.19, chapter 3, paragraph 102. Shielding protects equipment from unwanted coupling and protects personnel from electromagnetic radiation and electric shock.
f. Transient Protection. The procedure for evaluation of systems protecting solid-state electronic equipment from lightning-generated transients is presented in Order 6950.19, chapter 3, paragraph 103. Because solid-state electronic equipment is extremely susceptible to damage from small transients, greater care must be taken to ensure that transients are suppressed.
g. NEC Compliance Evaluation. The procedure for inspection of NEC-required grounding, bonding, and shielding and correction of deficiencies is presented in Order 6950.19, chapter 3, paragraphs 104 through 106. NEC equipment grounding provides fault protection and protects personnel from electric shock.
37. REQUIREMENTS FOR GROUNDING, BONDING, AND PROTECTION. GrOUnding, bonding, and shielding for the nondirectional beacon must be properly installed to ensure optimum operation of the equipment. General procedures for connection with the signal and equipment grounding systems, the lightning protection system, and the power distribution ground system are included in the following paragraphs. For further guidance see Order 6950.19, chapters 2 and 4.
a. Signal Grounding Network. The voice input cable shield shall be connected to the signal ground from the equipment end of the shield. A single 6 AWG insulated copper wire color coded green with a bright yellow tracer shall be used to connect the shield with the nearest signal ground plate. This wire should be routed to minimize path length and parallel runs with primary power conductors, lightning grounding system conductors, and other conductors that carry highamplitude currents.
b. Equipment Grounding System. All equipment chassis, cases, and housing and the ac ground (safety ground) shall be connected to the equipment grounding system. Where nondirectional beacon equipment is not properly grounded to other equipment, structural elements, racks, or other metallic objects properly connected to the equipment ground, a 14 AWG insulated copper wire shall be used to connect equipment with the nearest equipment ground plate. Equipment ground wires shall be color coded green with a bright orange tracer. In addition, nondirectional beacon equipment shall be connected with separate grounding conductors (color coded green) as required by the NEC.
c. Lightning Protection System. The two spark gaps on the RG 214/U RF cable at the nondirectional beacon transmitter and the antenna tuning unit shall be grounded to the lightning protection or earth electrode system. The spark gaps shall be connected to ground with 6 AWG bare copper ground wires (see drawing D-6186-010).
Chap 5 Page 90 Par 36
2/23/81 6740.4
d. Power Distribution Ground System. NEC grounding requires 14 AWG insulated copper wire color coded green to be connected to the ac ground (safety ground) and all equipment chassis, cases, and housings. This system shall be separate from, and installed in addition to, the equipment grounding system.
38. RESERVED.
Chap 5 Par 37 Page 91 (and 92)
2/23/81 6740.4
CHAPTER 6. SITE ENGINEERING
39. INTRODUCTION.
a. The purpose of this chapter, is to provide engineering information for selecting NDB sites, selection of antennas and transmitter output power, and calculation of expected coverage range. Formulas are provided for calculating the various quantities along with typical propagation curves. A completed example is also included.
b. NDBs operate in the frequency range of 190 to 535 kHz. At these frequencies, an efficient antenna would require an effective height of 600 to 220 feet, respectively. Tower structures of this size are neither economical nor practical when sited close to airport runways. The effective heights of antennas in common use vary between 20 and 100 feet. These short antennas are inefficient and reduce bandwidth. As a result, there are trade-offs between effective antenna height, antenna costs, and coverage range. These trade-offs are explained in the following paragraphs.
40. PROPAGATION.
a. The use of many different variables in the lf and mf field strength prediction methods is indicative of the complexity and uncertainty regarding the physical properties that are involved in long-distance sky-wave propagation. The International Radio Consultative Committee (CCIR) method is the most commonly used propagation prediction method for North America.
b. At lf and mf propagation, the antenna field radiation is comprised of two components:
(1) Ground wave is the field in the vicinity of the earth.
(2) Sky wave is the field radiated at angles above the horizontal.
During the hours of darkness, the sky wave is reflected back to the earth by the ionosphere. The CCIR method assumes that the maximum sky-wave field strength occurs about six hours after sunset, or approximately local midnight at the path midpoint.
c. Important points concerning lf and mf propagation are:
(1) The ground wave field strength increases with decreasing frequency.
(2) Because of ionospheric disturbances, the sky wave reflected back to earth varies in magnitude and phase, which will cause fading when its amplitude is comparable to that of the ground wave.
Chap 6 Par 39 Page 93
6740.4 2/23/81
(3) The attenuation of the ground wave by buildings and other installations within several wavelengths of the ground station transmitter is also a limiting factor. These objects will distort the coverage pattern and cause multiple reflected signals near the transmitter.
(4) Bearing errors can be caused by reflections, defraction, ducting, and shoreline effect. Bearing error is the most predominate limitation in mountainous terrain. Virtually nothing can be done to correct this problem.
d. Another limitation to coverage range is static noise. Atmospheric static noise is caused by lightning and other natural electrical disturbances and is propagated over the earth by the ionosphere. Static levels are stronger at night than during daytime periods. Warm tropical areas have higher static levels because storms are more frequent while the polar regions are far removed from the lightning storms and have lower static levels. The static noise also increases at the lower frequencies.
41. SITE SELECTION.
a. The desired coverage area will determine the type of antenna and transmitter power required to meet the minimum signal level at the coverage area boundaries. Another important parameter is ground conductivity within the desired coverage area.
b. When selecting a site, several potential sites should be surveyed for:
(1) Available area for installation of antenna.
(2) Available area for installation of radial ground plan.
(3) Known or predicted soil conductivity.
c. Consideration should be given to distortion of the radiation pattern because of the effect of buildings in close proximity to the antenna when operating at higher frequencies.
42. DETERMINATION OF EARTH GROUND.
a. The electrical characteristics of earth ground may be expressed by three constants:
(1) Relative permeability.
(2) Dielectric constant.
(3) Conductivity.
Chap6 Page 94 Par 40
2/23/81 6740.4
b. The complex dielectric constant can be expressed as follows:
ε' = ε - j 18000 σ/f = ε - j 60σλ
where:
σ = conductivity in mho/m f = frequency in MHz λ = free space wavelength in meters
The relative permeability can normally be regarded as unity, which leaves one concerned only with the dielectric constant and conductivity. These two constants jointly influence wave propagation. At a frequency of 3.6 MHz, the displacement and conduction current densities are equal. At frequencies below 1.2 MHz the displacement current, ε, is practically negligible.
43. FACTORS DETERMINING THE EFFECTIVE GROUND CONDUCTIVITY. The effective values of the ground conductivity are determined by the following:
a. Nature of Soil. The conductivity varies with the nature of the soil, but this variation is caused not so much by the chemical composition of the soil as by its ability to absorb and retain moisture. Normally loam has a conductivity_8f 10-2 mho/m, but when dried, the conductivity may be as low as 10-4 mho/m, which is of the same order as that of granite.
b. Moisture Content. As the moisture content is increased from a low value, the conductivity increases rapidly, reaching its maximum as the moisture content approaches the value normally found in such soils on site. At depths of one meter or more, the wetness of the soil at a particular site seems to be substantially constant year round and although it may increase during rains, the drainage of the soil and surface evaporation soon reduces it to its normal value after the rain has stopped. The moisture content may vary considerably from one site to another because of differences in geological formation.
c. Temperature. The temperature coefficient of conductivity is of the order of 2 percent per degree centigrade, with a large rapid change at the freezing point. Although these changes are appreciable, it must be realized that the range of temperature variation during the year decreases rapidly with depth, so that the temperature effects are important only at high frequencies where the penetration of the radio waves is small or when the ground is frozen to a considerable depth.
Continue reading ↓ 120 of 160 passages shown