Order 6000.20A Alaskan National Airspace System Interfacility Communications System (ANICS) Maintenance Handbook
Distribution: A-X(AF)-3; PNW – 1 COPY; FAF-0 (LTD) Initiated By: AAL-470:
ORDER
AL 6000.20A
ALASKAN NATIONAL AIRSPACE SYSTEM INTERFACILITY COMMUNICATIONS SYSTEM (ANICS)
MAINTENANCE HANDBOOK
August 23, 2002
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
RECORD OF CHANGES DIRECTIVE NO. REC NO
CHANGE SUPPLEMENTS OPTIONAL CHANGE SUPPLEMENTS OPTIONAL TO BASIC
TO BASIC
Page i
FOREWORD
On July 7, 1997, the Federal Aviation Administration, Alaskan Region, assumed responsibility for the ANICS sites in Alaska and Washington State. In conjunction with manufacture’s instruction books and manuals, this order prescribes maintenance standards, procedures, and policy for those sites.
Alan L. Hanson Manager, Airway Facilities Division
Page ii
This page intentionally left blank.
Page iii
TABLE OF CONTENTS
Page
CHAPTER 1. GENERAL INFORMATION AND REQUIREMENTS 1
1. PURPOSE … 1 2. DISTRIBUTION … 1 3. CANCELLATION … 1 4. MAINTENANCE AND MODIFICATION POLICY … 1 5. FORMS … 1 6. COORDINATION OF MAINTENANCE ACTIVITIES … 1 7. CERTIFICATION REQUIREMENTS … 1 8. WAIVERS … 1 9. NONSTANDARD FACILITIES … 2
CHAPTER 2. TECHNICAL CHARACTERISTICS 3
SECTION 1. EQUIPMENT DESCRIPTION 3 9. GENERAL … 3 10. EQUIPMENT AREAS … 5 11. ANTENNA EQUIPMENT … 5 12. RF EQUIPMENT … 7 13. MODEMS … 8 14. DIGITAL MULTIPLEXING EQUIPMENT … 9 15. ANICS DEMARCATION POINT (ADP) … 10 16. TELCO DEMARCATION POINT (TDP) … 11 17. POWER GENERATION EQUIPMENT & UNINTERRUPTIBLE POWER SUPPLY (UPS) … 11 18. MECHANICAL TRANSFER SWITCHES … 11 19. GENERATORS … 12 20. UPS SYSTEMS … 12 21. NETWORK MONITORING AND CONTROL SYSTEM … 12 SECTION 2. SYSTEM THEORY 13 22. GENERAL … 13 23. ANTENNA ASSEMBLIES … 13 24. RF EQUIPMENT … 16 25. MODEMS … 17 26. DIGITAL MULTIPLEXING EQUIPMENT … 17 27. ANICS DEMARCATION POINT (ADP) … 18 28. POWER GENERATION EQUIPMENT & UNINTERRUPTIBLE POWER SUPPLY (UPS) … 19 29. NETWORK MONITORING AND CONTROL SYSTEMS … 19
CHAPTER 3. STANDARDS AND TOLERANCES 22
30. GENERAL … 22 31. ANTENNA ASSEMBLY … 22 32. UP CONVERTERS/ PAS/ LNA/DOWN CONVERTERS … 22 33. MODEMS … 24 34. MUMTIPLEXER … 25 35. CIRCUIT INTEGRITY … 25 36. LINK INTEGRITY … 25
CHAPTER 4. PERIODIC MAINTENANCE 26
37. GENERAL … 26
Page iv
SECTION 1. ON-SITE MAINTENANCE CHECKS (ALL SITES) 26 38. ANTENNA SYSTEMS … 26 39. CABLES AND CONNECTORS … 27 40. RF EQUIPMENT … 27 41. IF EQUIPMENT … 27 42. MULTIPEXER … 28 43. ANICS DEMARCATION POINT (ADP) … 28 44. ENGINE GENERATORS … 28 45. UNUNTERRUPTIBLE POWER SUPPLY … 28 46. SUPERVISORY CONTROL AND DATA AQUISITION (SCADA) … 28 47. MEBS AND RADOMES … 28 SECTION 2. NOCC MAINTENANCE ACTIVITIES 29 48. NOCC OPERATIONS … 29 SECTION 3. AS REQUIRED MAINTENANCE CHECKS 30 49. ANTENNA SYSYEM … 30 50. RF EQUIPMENT … 30 51. IF EQUIPMENT … 30 52. ANICS DEMARCATION POINT (ADP) … 30
CHAPTER 5. MAINTENANCE PROCEDURES 32
SECTION 1. INTRODUCTION 32 53. GENERAL … 32 SECTION 2. ANTENNA EQUIPMENT 32 54. SATELLITE ANTENNA DEICING TEST … 32 55. SATELLITE ANTENNA FEED PRESSURIZATION TEST (HUBS ONLY) … 33 56. BORESIGHT ANTENNA POSITIONING … 33 57. SATELLITE ANTENNA CROSS POLARIZATION ISOLATION TEST … 38 58. SATELLITE ANTENNA TRACKING AND CONTROL TEST … 39 SECTION 3. RADIO FREQUENCY (RF) EQUIPMENT 41 59. RF DISTIBUTION SYSTEM VOLTAGE STANDING WAVE RATIO (VSWR) TEST … 41 60. ONSITE UP CONVERTER FREQUENCY TEST … 43 61. UPCONVERTER TESTS … 44 62. SOLID STATE POWER AMPLIFIER TESTS … 46 63. POWER AMPLIFIER INTERMODULATION TEST … 48 64. LNA TESTS … 50 65. DOWN CONVERTER TESTS … 51 SECTION 4. MODEM EQUIPMENT 53 66. SATELLITE MODEM BIT ERROR RATE TEST … 53 67. PATH DIVERSITY TEST … 54 68. SATELLITE MODEM REDUNDANT SWITCH TEST (HUBS) … 55 SECTION 5. BASE-BAND EQUIPMENT 56 69. CHANNEL PHASE HITS, GAIN HITS, & INTER- MODULATION DISTORTION TEST … 56 70. DIGITAL CHANNEL TEST … 57 SECTION 6. LINK INTEGRITY 59 71. TRANSMIT CARRIER ASSIGNED POSITION … 59 72. CARRIER-TO-NOISE RATIO MEASUREMENT … 59 73. EB/NO MEASUREMENT … 60 SECTION 7. GENERAL 60 74. MODULAR EXPANDABLE BUILDING (MEB) ENVIRONMENTAL CONTROL ADJUSTMENTS ....60 75. ON-SITE CYBEREX ADJUSTMENT … 61 76. SCADA ENVIRONMENTAL ALARMS … 66
APPENDIX 1. SITE ACCEPTANCE TESTS 1
Page v
1. PURPOSE … 1 2. DISCUSSION … 1 3. SITE ACCEPTANCE TESTS … 1 4. SATELLITE ANTENNA ISOLATION TEST … 2 5. RF TRANSMIT EQUIPMENT TESTS … 3 6. RF SUBSYSTEM FAULT MONITOR TEST … 6
APPENDIX 2. GLOSSARY 1
LIST OF FIGURES
Figure 1. Block Diagram of Remote ANICS … 4
LIST OF FIGURES
Figure 2. ANICS Functional Areas … 5
Figure 3. 2 Port Orthomode Transducer … 16
Figure 4. DC Block Configuration … 34
Figure 5. Antenna Positioning using RX IF … 37
Figure 6. DC Block configuration … 38
Figure 7. Gain Flatness Test Configuration … 45
Figure 8. SSPA -1 db Gain Compression Test Configuration … 47
Figure 9. Gain Compression Point … 47
Figure 10. Power Amplifier Intermodulation Test Configuration … 49
Figure 11. LNA Bandwidth Test Configuration … 51
Figure 12. Down Converter Gain and Bandwidth Test Configuration … 52
Figure 13. Satellite Modem Bit Error Rate Configuration … 53
Figure 14. Satellite Modem Redundant Switch Test Configuration … 55
Figure 15. Digital Grade Channel Test Configuration … 58
Figure 16. Voltage Test Points Diagram … 64
Figure A-1. Satellite Antenna Isolation Configuration … 3
Figure A-2. -1 db Gain Compression Configuration … 4
Figure A-3. Gain Compression Point … 4
Figure A-4. Gain Linearity / Phase Noise Configuration … 5
Figure A-5. RF Subsystem Fault Monitor Configuration (Remote) … 6
Page vi
This page intentionally left blank.
8. WAIVERS.
CHAPTER 1. GENERAL INFORMATION AND REQUIREMENTS
1. PURPOSE. This handbook provides guidance and prescribes technical standards and tolerances and procedures applicable to the maintenance and inspection of the Alaskan National Airspace System Interfacility Communications System (ANICS). It also provides information on special methods and techniques that will enable maintenance personnel to achieve optimum performance from the equipment. This information augments information in instruction books and other handbooks and complements Order 6000.15C, General Maintenance Handbook for Airway Facilities.
2. DISTRIBUTION. This directive is distributed to branch level in the Airway Facilities Division; to all Airway Facilities field offices and facilities; and one copy to the Auburn SSC Telecommunications Unit.
3. CANCELLATION. Order 6000.20, Alaskan National Airspace System Interfacility Communications System (ANICS) Maintenance Handbook, dated July 24, 1997, is canceled.
4. MAINTENANCE AND MODIFICATION POLICY.
a. Order 6000.15C, General Maintenance Handbook for Airway Facilities, along with this order and the applicable equipment instruction book, shall be consulted and used together by the maintenance technician in all duties and activities for the maintenance of ANICS facilities and equipment. These documents shall be considered collectively as the single official source of maintenance policy and direction authorized by the Systems Maintenance Service. References located in the chapters of this handbook entitled, “Standards and Tolerances,” “Periodic Maintenance,” and “Maintenance Procedures,” shall indicate to the user whether this handbook and/or other handbook(s) shall be consulted for a particular standard, key inspection element or performance parameter, performance check, maintenance task, or maintenance procedure.
b. Order 6032.lA, Modifications to Ground Facilities Systems, and Equipment in the National Airspace System, contains comprehensive policy and direction concerning the development, authorization, implementation, and recording of modifications to facilities, systems, and equipment in commissioned status. It supersedes all instructions published in earlier editions of maintenance technical handbooks and related directives.
5. FORMS. FAA Form 6000-8. Technical Performance Record-Continuation or Temporary Record/Report Form or an approved automated data collection system shall be used.
6. COORDINATION OF MAINTENANCE ACTIVITIES. Maintenance activities shall be closely coordinated with operations personnel to preclude unanticipated interruption to the operation of ANICS facilities and equipment. This procedure is especially important where standby equipment is not immediately available. In all cases, where facility operation may be adversely affected by maintenance activities, advance notice shall be given so that appropriate Notices to Airmen (NOTAMS) can be issued. The information necessary for the preparation of such NOTAMS shall be furnished promptly. The responsible maintenance technician shall be close at hand during all scheduled shutdowns to restore service if necessary. Operations personnel are expected to recognize the need for releasing equipment for scheduled routine maintenance work and to offer cooperation in furtherance of practices that assure continuous and reliable operation.
7. CERTIFICATION REQUIREMENTS. Refer to Order 6000.15C, General Maintenance Handbook for Airway Facilities, for general guidance on the certification of systems, subsystems, and equipment. Refer to Chapter 3 of this handbook for the key performance parameters and/or key inspection elements for the ANICS equipment. The ANICS system has no specific certification requirements.
8. WAIVERS. Requests for waivers as prescribed in Order 1800.66, Appendix 1, Section 3.2, applies to equipment under configuration management as prescribed in the National Airspace System Configuration Management Document. Any changes to the documentation will be submitted to the Regional Configuration Control Board (RCCB).
9. NONSTANDARD FACILITIES.
9. NONSTANDARD FACILITIES. The instructions, descriptions, standards and tolerances, and procedures contained in this directive represent the Alaskan Region’s baseline and standard criteria concerning ANICS. Regional procurement of equipment and devices to be used for air traffic control or navigation for which specifications have not received prior approval is prohibited by Order 1100.5B, FAA Organization - Field. The inclusion of such nonstandard equipment in this directive is for maintenance purposes only and, as such, will not be used as justification for procurement, installation, or commissioning of additional or similar equipment.
9. GENERAL
CHAPTER 2. TECHNICAL CHARACTERISTICS
Section 1. EQUIPMENT DESCRIPTION
9. GENERAL
a. ANICS is a satellite based telecommunications network that provides circuit diversity in critical facilities for the Alaska Region using two satellite paths. ANICS functions as a satellite communication system under centralized network management and control. It is the primary carrier for data/traffic in all service areas: communications, weather, surveillance, remote monitoring and control, environmental and navigational aids. It also provides a reliable and cost effective means for essential and routine operational communications.
b. The ANICS network is composed of remote sites controlled by hubs at the Anchorage Air Route Traffic Control Center (ARTCC) and the three Automated Flight Service Stations (AFSS) at Kenai, Fairbanks, and Juneau. The Network Operations Control Center (NOCC) is located at the ARTCC and is the center of all normal control operations for all sites. The AFSS Hubs can each control the remote sites within their own subnet and provide a location for emergency or backup control should it be required. Remote sites feature completely diverse paths from the remote site A/B switch to the hubs including backup multiplexer cards. The hub locations have the complete path diversity and redundancy of a remote site and additionally feature primary and backup transceivers, switching and distribution electronics, backup modems, and amplifiers for each antenna.
c. All sites have Monitor and Control Computer and Supervisory Control and Data Acquisition (SCADA) equipment. The Hub and Remote Monitor and Control Computers (HMC or RMC) provide the interface between the site’s hardware and the ANICS Network Monitor and Control System computer and software. The ANICS Monitor and Control computers are networked to provide the overall system monitoring and control for the ANICS network. The SCADA equipment provides the interface to alarms (fire, smoke, and open door), the generator (when provided), and the automatic transfer switch at each site.
Tracking Controller &
Deicer Control
A/B Switch Demarc
Supervisory Comm
Modem
Modem
RF
RF MUX
Figure 1. Block Diagram of Remote ANICS
d. ANICS is composed of three segments; the Space Segment, the Ground Segment, and the Network Monitor and Control System (NMCS) Segment. The Space Segment includes leased transponders from two C-band communication satellites.
e. Both the primary and alternate satellites carry critical and essential traffic between earth stations. The primary satellite also carries routine traffic. This provides the two paths required to achieve the high availability required for the critical and essential FAA circuits within the Alaskan region. Each duplex path between earth stations uses a unique subcarrier frequency pair in the assigned transponder. The assignment of the unique frequency pairs constitutes the Frequency Domain Multiple Access (FDMA) for ANICS. The Space Segment also includes the satellites and associated Telemetry Tracking and Control station (provided by the satellite vendor).
f. The Ground Segment includes all required equipment in each ANICS facility. At each earth station, the Time Division Multiplex (TDM) equipment combines the assigned user circuits into an aggregate data stream (and separates the aggregate into user circuits) for one transmit RF path or carrier. To maintain reliable communications, ANICS incorporates very precise timing references at each hub. Any of the nodes in the network can accept the external reference and distribute that timing to all other nodes. ANICS uses Austron Stratum 1 clock sources at each hub to ensure effective continuous network synchronization. The stratum 1 clock, working with the Transport Management System (TMS-3000) autoclock function, assures automatic clock recovery and smooth planned transfer to another stratum 1 clock, should a reference clock fail. The ARTCC hub multiplexer reference clock is the ANICS primary timing reference. In the event of failure, the network TMS multiplexer has defined an algorithm that devolves the reference to another hub. In the event of a secondary node failure, the algorithm devolves to a third hub, and then to the fourth.
g. The NMCS Segment includes the equipment and software necessary to monitor and control the Ground Segment and the links to each site. The NMCS functionality is distributed between the Network Operations Control Center (NOCC) which is located at the ARTCC hub earth station in Anchorage, three AFSS hub earth stations, and remote earth stations. The NOCC's Network Management Computer (NMC) is linked to the ZAN Hub Monitor and Control (HMC) via an Ethernet Local Area Network (LAN) and routed to each HMC computer, using two (2) dedicated 56 KBPS channels, one each on the primary and the alternate link. Each remote earth station includes a Remote Monitor and Control (RMC) computer that monitors activity at the remote site and reports status to the HMC and to the NMC through a dedicated 4.8 kbps channel. These interfaces provide the detailed information required for trouble reporting and resolution.
11. ANTENNA EQUIPMENT.
10. EQUIPMENT AREAS. ANICS is divided into seven functional areas, each providing a specific function. The functional areas are antenna, radio frequency equipment, modems, multiplexers, ANICS demarcation point (ADP), power, and NMCS.
Figure 2. ANICS Functional Areas
11. ANTENNA EQUIPMENT.
a. The antenna assembly equipment includes feed horns, mountings, drive motors, resolvers, deicers, feed lines, and associated hardware. Each antenna, including supports and reflectors, is off-the-shelf and is designed for commercial satellite communications use in the wide range of environmental conditions experienced in Alaska. The hub antennas are 11.2-meters. The two remote sites at Seattle ARTCC (ZSE) and Adak have 6.1-meter Cassegrain fed antennas. All other remote site antennas are either 3.6-meter offset feed, or 4.5-meter symmetrical prime focus feed. All antennas feature feed horns with adjustable polarity. The feed assembly consists of the feed horn, the coaxial and waveguide components, the orthomode transducer (OMT), and a motor-driven polarization system. There are two feed assemblies in use:
(1) A two-port feed is used at the remote and hub sites, and on the alternate antenna at the Master Hub.
(2) A four-port feed is used at the Master Hub on the primary antenna.
b. Each antenna has azimuth, elevation, and polarization controls. Motors and resolvers are used to drive the antennas to the selected satellite positions. Each antenna also has a manual azimuth, elevation, and polarization adjustment capability. Antenna deicers are equipped with temperature and moisture sensors that will automatically activate the heating units to prevent icing. One of four types of heating units are used:
(1) Gas fired, forced air heaters (Anchorage, Kenai).
(2) Oil fired, forced air heaters (Fairbanks, Juneau, Yakutat).
(3) Electric heat, forced air (Biorka, Middleton Island).
(4) Electrical resistive tape (All others).
c. The antennas face south. The primary antenna is on the west and the alternate is on the east. The Network Management and Control System managed equipment under this functional area are:
(1) Antenna controllers made by Scientific Atlanta (SA) (only at Phase I sites, Phase II sites must be moved manually).
(2) Positioners (Indoor unit 8860), (outdoor unit 8862) (SA).
(3) Dehydrator: The Dehydrators are used at all Hubs on the Wave-Guides (SA).
(4) Antenna Deice Systems: Three heaters are provided at Anchorage and Kenai. Fairbanks and Juneau have single oil fired heaters.
d. Antenna Sizes and Locations.
(1) 11.2 meter Antenna.
(a) Scientific Atlanta Model 8007, 11.2-meter (37ft).
(b) Located at Anchorage ARTCC, Kenai, Fairbanks, and Juneau.
(c) Cassegrain fed dual reflector, high-efficiency 55 db signal gain.
(d) Integral LNA and switching assembly, dehydrators.
(2) 6.1 meter Antenna.
(a) Scientific Atlanta Model 8340, 6.1-meter (20ft).
(b) Prime focal-fed parabola single reflector, high efficiency 50 db signal gain.
(c) Located at Seattle and Adak.
(d) Radome located at Adak.
(3) 4.5 meter Antenna.
(a) Scientific Atlanta Model 8345, 4.5-meter (15ft).
(b) Located at Barrow, Cape Lisburne, Cold Bay, Dillingham, Dutch Harbor, Indian Mountain, King Salmon, Kotzebue, Shemya, Saint Paul, and all Phase II sites.
(c) Prime focal-fed parabola single reflector, high efficiency 47 db signal gain.
(d) Protected LNA and switching assembly.
(e) Radomes at Cape Lisburne, Cold Bay, Dutch Harbor, Indian Mountain and all Phase II sites.
(4) 3.6 meter Antenna.
(a) Scientific Atlanta Model 8136, 3.6-meter (12ft).
(b) Located at most remote sites.
(c) Offset fed, low side lobe, single reflector, 45 db signal gain.
(d) Protected LNA and switching assembly.
(e) 60’ radomes at Cape Newenham and Sparrevhon.
e. Antenna Controls.
12. RF EQUIPMENT.
(1) Scientific Atlanta Model 8860 Indoor (console) Antenna Controller.
(2) Microprocessor controlled, sends tracking commands to antenna.
(3) Controller can be accessed locally or remotely over the network by RMC at the Phase I and Hub sites.
(4) Scientific Atlanta Model 8862 Outdoor (converter) Antenna Controller.
(5) Receives electronic commands from 8860 for conversion to drive servos.
(6) Variable speed antenna AZ-EL motor position controller.
f. Dehydrators.
(1) Located at ZAN and Hub sites, requires periodic service for best performance.
(2) Removes all moisture from sealed internal waveguide chambers.
(3) Excessive moisture on transmit waveguide causes arcing and heat.
(4) Excessive moisture on receive waveguide causes high signal loss.
g. Deicing Systems.
(1) Allows earth terminal to sustain high quality links during severe weather.
(2) Ice on parabolic dish face distorts beam focal point and creates signal loss.
(3) Types: Natural gas fired, heating oil fired, electric strips, and Walton electric forced air heaters.
(a) ZAN and ENA heaters are natural gas fired units.
(b) JNU and FAI heaters are oil-fired units.
(c) ZAN and each Hub site have hot air capability to the sub deflector.
(d) Walton DDC-500 Electric forced air heaters are used at the following remotes: Biorka Island (BKA), and Middleton Island (MDO).
(e) Walton oil fired heater: Yakutat (YAK).
(f) Scientific Atlanta (SA) electric heat strips are used at the remainder of the remotes sites.
(g) Remote sites also have an electric heat strip on each feed assembly and heating to the feed aperture. The feed aperture heater is always powered on. AC voltage can be 120 or 208 VAC.
12. RF EQUIPMENT.
a. REMOTE SITE RF EQUIPMENT. The RF converter monitors and controls the solid-state power amplifiers (SSPA) and low noise amplifiers (LNA). These RF converters provide up conversion on the transmit path and down conversion on the receive path. The converter also provides 15 volts DC to the low noise amplifier.
(1) Vitacom wall mounted or exterior mounted units are used.
(2) Vitacom solid-state power amplifiers (SSPA) are used and can be 20, 30, and 50-watt amplifiers.
13. MODEMS.
(3) The Seattle site uses 150-watt VertexRSI (Maxtech) amplifiers.
(4) The SSPA’s are controlled and monitored by Vitacom RF Converters.
b. HUB SITE RF EQUIPMENT. The up and down converters are separate rack-mounted units. There are two units for each transmit and receive path. The 1:1 backup is accomplished via an interface between the converters, with no additional hardware required. The solid-state amplifiers are also configured 2 per link, with the 1:1 backup accomplished through an amp-to-amp interface and internal circuitry.
(1) Up and down converters are made by L3.
(2) The input and output of a converter pair is routed through combiners. Only one converter will process the signal. This is selectable through a GSIM at the NOCC.
(3) VertexRSI (Maxtech) 200 w SSPA’s are used at all hubs including ZAN.
(4) SSPA’s are switched in and out off the transmit path by combination coaxial/waveguide switches. This is selectable through a GSIM at the NOOC.
c. LOW NOISE AMPLIFIER (Scientific Atlanta or Kaman).
(1) High efficiency/gain and low noise initial stage downlink receive amplifiers.
(2) Located in the feed horn assemblies.
(3) Six (6) located at ARTCC (ZAN), four (4) at hubs and two (2) at remotes.
(4) Integrated switching assemblies will go to off-line unit automatically when primary fails or manually through network.
d. UP AND DOWN CONVERTERS (VitaCom and L3).
(1) “Up” converters receive (70Mhz) intermediate frequencies (IF) from modems for conversion to gigahertz frequencies prior to transmission over the uplink.
(2) “Down” converters receive gigahertz frequencies from downlink (LNA) in the antenna, and then convert the signal to (70Mhz) intermediate frequencies (IF) prior to being received by the modem.
(3) The Vitacom converters house both the up and down converters in the same unit.
(4) The rack-mounted L3 units house the up and down converters in separate units.
(5) ZAN has six (6) up converters and six (6) down converters, the hubs each have four (4) up converters and four (4) down converters, and remote sites each have two (2) up/down converters.
13. MODEMS.
a. The modems are full duplex, quadrature phase shift keying (QPSK) digital modulator-demodulator for frequency division multiple access (FDMA) satellite communication systems. Each modem contains a built-in scrambler/descrambler, a differential encoder/decoder, transmit and receive frequency synthesizer (IF unit), and a multi-rate forward error correction (FEC) convolution encoder with a Viterbi decoder. The 300 and 300A model modems also have Reed Solomon forward error correction. The modems provide high performance with narrow controlled bandwidth, automatic signal acquisition, and extensive on-line monitoring circuits.
b. The modems modulate a transmit aggregate (AGG) to IF frequency output of 70 MHz +/- 18 MHz. The demodulator receives 70 MHz +/- 18 MHz IF signal from the down converter and provides the receive aggregate to the multiplexer. The ANICS uses EF Data 650B and Comtech EF Data 300A satellite modems.
14. DIGITAL MULTIPLEXING (MUX) EQUIPMENT.
(1) There are four modems at each remote site, except for Shemya (SYA). It has only two modems both going to ZAN.
(2) All four modems at Seattle Air Route Traffic Control Center (ZSE) go to ZAN.
(3) Each remote (except SYA and ZSE) has two modems going to their Hub sites (ENA, JNU, FAI) and two modems going to ZAN.
(4) Each Hub and ZAN has two modems for each remote site. One modem is for the primary link, the other is for the alternate link. In addition, each Hub and ZAN modem rack contains a 1:8 backup modem (ZSE is an exception with two modems per satellite to ZAN only and SYA has one modem per satellite to ZAN only).
c. EF DATA REDUNDANCY SWITCH.
(1) The EF Data Redundancy switch (EF Switch) is used at the Hub sites and ZAN. Each EF Switch can control two spare modems for eight on-line modems.
(2) Whenever a new modem is brought on-line or a configuration change is made, the new configuration must be loaded in the EF Switch.
(3) The EF Switch monitors the modems for transmit, receive, and common faults.
(4) The EF Switch stores all eight modem configurations so that it can reprogram the back-up modem should any single on-line modem fail.
(5) The modems are numbered from the top to bottom. Number 1 is on top and number 8 is on the bottom. The backup priority is configurable within the modem switch.
d. MODEMS (EF Data).
(1) Modulates transmit digital baseband data from the multiplexer, to an intermediate frequency (70Mhz) for up conversion to the gigahertz frequency range in the converter.
(2) Demodulates receive intermediate frequency (70Mhz) from the down converter for the purpose of reconstructing digital baseband data for the multiplexer.
(3) Uses advanced signal conditioning and processing techniques, which enhance transmit and receive accuracy (error correction), disperses power density, and conserves transponder bandwidth (QPSK).
(4) Modems are configured such that the link is always up and available, regardless of whether the link is passing traffic or not.
14. DIGITAL MULTIPLEXING (MUX) EQUIPMENT.
a. ANICS employs commercial off-the-shelf (COTS) time division multiplexers (TDM). A multiplex system controller is located at the network operation control center (NOCC). The multiplex controller is used to make channel and aggregate assignments, and to route circuits between aggregates. It reports link status and multiplex alarms to the NMCS.
b. The mux receives the aggregate from the demodulator side of the modem and provides this data to the respective channel cards. There are Universal Data Card (UDC), Hyper UDC, Universal Voice Card (UVC), Codebook Excited Linear Predictive (CELP) and Very Low Bit Rate Voice (VLBRV) cards that provide to the respective customer services. On the transmit path voice and/or data is received into each channel card and routed through the mux to become transmit aggregate which is routed to the modulator side of the modem.
c. GDC TMS Controller. The TMS controller manages the GDC multiplexer network. It uses redundant x86based platforms and SCO XENIX and INFORMIX databases. The GDC multiplexer network is the backbone of the ANICS. Should the NMCS functional area fail, the multiplexer is still operational. The NMCS has no control over, and can only monitor the multiplexer.
15. ANICS DEMARCATION POINT (ADP).
d. GDC Megamux - TMS 3000.
(1) GDC Multiplexers are the foundation of the ANICS network which use time division multiplexing (TDM) to concentrate and send aggregate bit streams.
(2) Multiplexers combine discreet data and analog channels into one aggregate output bit stream. Aggregate bit streams for transmission are then provided to the Modem functional area.
(3) Incoming receive aggregate bit streams from the modem functional area are de-multiplexed back into discreet digital and analog channels.
(4) The Megamux framing structure consists of overhead bits and repeating groups of data words to maintain bit integrity and timing synchronization throughout the network.
(5) Megamux channel cards consist of: UDC, UVC, VLRBC, and CELP coding cards.
(6) TMS controllers use redundant x86-based platforms that manage the network with SCO XENIX command software using INFORMIX databases.
(7) The network monitor and control system (NMCS) has no control over the TMS multiplex network; it can only monitor the status of the Multiplexers.
(8) Network clock source is derived from a Loran-C receiver providing 10 MHz timing through the external timing connector.
15. ANICS DEMARCATION POINT (ADP).
a. The ADP functional area interfaces ANICS with external circuits. All circuits enter and exit ANICS through the ADP. ADC Telecommunication A/B patch switching system AB switches are used to route critical and essential analog/digital circuit information to and from the mux. When used, AB switches provide switching from the NMCS system to route critical and essential circuits to either the primary link or the alternate link, but not both links at the same time for a given circuit. When routers are used for bandwidth and priority management, traffic flows on both links at all times. Routine circuits use only the primary link. It is critical to ANICS operation that when AB switches are installed or moved that the aggregates table in the NMCS be updated for automatic switching.
b. The ADP is the interface between external equipment and the ANICS. The panel includes:
(1) Patch panels that distribute all assigned circuits.
(2) A/B switching equipment that provides switching between the primary and alternate channels for all critical and most essential circuits.
(3) Lightning Protection – Reliable electric dual gas tube protectors in type 66 blocks are used at the entrance point of ANICS circuits.
(4) Analog Patching – Six wire RJ11 patch module provides signal access and patching for ANICS voice and analog circuits.
(5) Digital Patching – ADC Patchmate modular digital patch systems provides access and patching of digital ANICS circuits. The system supports sixteen full duplex, RS-232, RS-422, or V.35 interfaces simultaneously.
(6) A/B Switching – Alternate path switching for critical and essential channels is accomplished with ADC four-wire patch switch system. Modules provide magnetic circuit switching with manual patch cord back up. The NMC and HMC’s can control the switching of up to 256 circuits with a single control link.
18. MECHANICAL TRANSFER SWITCHES.
16. TELCO DEMARCATION POINT (TDP). The TDP provides lightning protection, signal termination and distribution with type 66 blocks, and is also labeled as the station distribution frame (SDF).
17. POWER GENERATION EQUIPMENT AND UNINTERRUPTIBLE POWER SUPPLY (UPS).
a. The UPS and power generation equipment, where provided, are designed to provide reliable backup power to the ANICS site. The NMCS monitors prime power for loss and unacceptable levels. The UPS provides battery power when the AC power feed fails.
b. UPS and Battery Cabinet. The UPS provides continuous on-line regulated AC power to the critical equipment and provides a charging system for the batteries. The UPS is always online receiving power from the prime power source (commercial power or FAA generator) or the standby generator (when provided).
c. Standby Generator. The standby generator provides electrical power if prime power fails or is unacceptable.
d. The prime power is monitored by the Automatic Transfer Switch (ATS). The ATS will start the ANICS generator when prime power fails or falls below acceptable limits. The ATS will transfer the site load to the generator when the generator’s output quality is within acceptable limits.
e. The Cyberex UPS is used at Phase I remote sites. The UPS is a 5 KVA, single-phase unit.
f. Hubs use the facility UPS to feed the ANICS equipment.
g. The NMCS only monitors UPS status. It cannot control the UPS. (When encountering UPS monitoring problems, try stopping and restarting polling. If the problem still exists, suspect the UPS interface card.)
h. Government Furnished Equipment (GFE) UPS are not monitored by ANICS.
18. MECHANICAL TRANSFER SWITCHES. There are two types of mechanical transfer switches used in ANICS, the Generac automatic transfer switch (ATS) and ASCO.
a. ATS’s are used at all sites except Iliamna (ILI) and Port Heiden (PTH).
b. ASCO switches are used at ILI, PTH and ZAN. ZAN switches are located in the Tech/OPS facility and are of a different type than used at ILI and PTH.
c. ANICS transfer switches are monitored by the supervisory control and data acquisition (SCADA) interface.
d. GFE transfer switches are not monitored in ANICS.
e. ATS and ASCO switches control the ANICS generators that are monitored by the ANICS NMCS. Some facility power upgrades inhibit the ability of ANICS to monitor the system.
f. ASCO switches at ZAN are in the Tech/OPS building only and are used to feed critical power from two of three different critical power centers (CPC), CPC-A, CPC-B, and CPC-C.
g. CPC-D output is not used in ANICS.
21. NETWORK MONITORING AND CONTROL SYSTEM.
19. GENERATORS. Phase I ANICS sites with contractor-supplied generators use Generac generators. GFE generators are not Generac generators. There are two different size generators used at ANICS Phase I facilities. The 30 KW and 50 KW generators are used at remote sites and the facility engine generator is used at the hubs. Phase II sites have 15KW Lister-Petter diesel generators. Generators can be started and stopped remotely. If the ATS starts the generator, it cannot be stopped remotely by the NMCS. GFE generators are not monitored in ANICS. ZAN and ZSE use the ARTCC facility generators and UPS. Likewise, each hub site uses the AFSS facility generators and UPS.
20. UPS SYSTEMS. The UPS operates on batteries when neither commercial and/or generator power is present. If the transfer switch doesn’t switch the generator on-line, or the generator doesn’t start, the site has limited time to operate on batteries. Length of battery backup varies at remote sites and hubs.
a. Cyberex UPS systems used at Phase I remote sites have one to four hours of run time.
b. All hub sites and ZSE use both the local facility UPS and engine generator for standby power.
21. NETWORK MONITORING AND CONTROL SYSTEM.
a. The network management operational concept is based upon a hierarchical distributed computing configuration. This allows the processing load to be shared among the network’s elements, which include the Network Monitor and Control (NMC) computers, the Hub Monitor and Control (HMC) computers, and the Remote Monitor and Control (RMC) computers. These computers are allocated one or more of the following operations and maintenance tasks: Monitoring, Configuration and Access Control, Maintenance of Operational Records, Hardware Diagnostics, Repair and Reporting, System Performance, Analysis and Reporting.
b. Network Monitor Control System Function.
(1) Distributes management and control of ANICS.
(2) Monitors all functional areas for health and status.
(3) Gathers, filters, and reports alarms.
(4) Reports equipment faults and link outages to the NOCC.
(5) Allows remote maintenance and control of unmanned sites.
(6) Presents a unified graphics display in multiple locations.
c. NMCS Equipment.
(1) Remote Sites. RMC and Puleo SCADA unit with a 16-port hostess board and remote PC reset card.
(2) Hub Sites. HMC, Puleo SCADA unit, Cisco port terminal server, Cisco router, and RS-232 to RS-422 converter.
(3) ZAN. HMC, Puleo SCADA unit, Cisco port server terminal, RS-232 to RS-422 converters.
(4) NOCC. NMC, Cisco network router, color printer, and Sun work stations.
d. NMCS OPERATION.
(1) ANICS Ethernet equipment, HMC, NMC, routers, and terminal servers are monitored through the Simple Network Management Protocol (SNMP) by the NMC.
(2) RMC are controlled remotely through Serial Interface Process Communications (SIPC) over both links.
(3) TMS controller is monitored through the login port.
23. ANTENNA ASSEMBLIES.
(4) NMCS servers (RMC, HMC, and NMC) monitor the SCADA.
SCADA ALARMS
Green Systems operational within normal parameters.
Yellow Systems operational, but out of normal parameters
Red Systems non-operational and are not carrying traffic.
Section 2. SYSTEM THEORY
22. GENERAL. The following is a brief discussion on general ANICS theory essential for understanding the operation of the system. For a more detailed description of specific equipment, refer to the theory of operation section of the applicable equipment instruction book.
23. ANTENNA ASSEMBLIES.
a. The parabolic antennas are built for high gain and focus within a broad frequency spectrum to provide a narrow beam to a satellite. The feed horn of the antenna can be rotated by the antenna control and positioning equipment to provide orthogonal frequency band separation. A directional coupler divides the feed into transmit and receive paths. The antenna functional area of each earth station includes one or two antennas. Each antenna consists of structures (including supports, reflectors, and RF feed assemblies), controllers, drives, and deicing assemblies. Each antenna is an off-the-shelf item that is designed for commercial satellite communications use in the wide range of environmental conditions experienced throughout Alaska. Via Sat (formerly Scientific Atlanta) provides the majority of antennas used within ANICS.
b. Each antenna provides optimal gain, sidelobe patterns, and reflector surface stiffness. The ANICS antennas meet all regulatory requirements of EIA-411-A and comply with FCC CFR 47 Part 25, paragraph 25.209 in the transmit band. The antennas (identified by the diameter of the large reflector and by the form) selected for each site are:
(1) Hubs - 11.2-meter dual reflector.
(2) Remotes - 3.6-meter offset feed or 4.5-meter symmetrical prime focus.
(3) Seattle and Adak - 6.1-meter prime focus feed.
c. Antenna Structures. Each antenna structure consists of a support, one or two reflectors, and a RF feed assembly. The FAA has selected structures that are proven in the environmental extremes present in Alaska. Each fixed support includes a ground mount (foundations, piers, or platforms provided as part of the site preparation) and an antenna mount provided during installation.
d. Antenna Supports.
(1) Antenna supports used in the ANICS network include both ground mount and antenna mount, so that deep snow does not interfere with antenna operation. The antenna mount provides firm support in extreme weather conditions and establishes the fixed reference for the elevation over azimuth drive elements.
(2) As part of each site survey, the FAA has identified the proper ground mount for the conditions found at that site. The available ground mount styles include, but are not be limited to:
(a) Multiple piling ground mount.
(b) Grade slab ground mount.
(c) Frost pile ground mount.
(d) Permanent form caisson ground.
(e) Load frame ground mount.
(f) Rock anchored ground mount.
(3) The antenna mounts for the hub and remote antennas position the actuators well above the ground. The antenna mount for each of the selected antennas is steel. The antenna type, height of the activators above baseline, and mount style are:
3.6-meter King post and pipe type elevation over azimuth mount.
4.5-meter Tube constitution tripod support type elevation over azimuth mount.
6.1-meter King post and pipe type elevation over azimuth mount.
11.2-meter Truss frame structural steel tower (17’x10’) hot-dip galvanized ASTM-36 steel except lower azimuth bearing housing and azimuth turntable are cadmium plated with chromate conversion.
e. Antenna Reflectors. The antenna reflector assembly focuses the RF energy received from the satellite. Each reflector assembly includes the structural members to support the reflecting surface. The segmented reflectors are assembled on site. The reflector assemblies’ panels for each antenna type are described as follows:
3.6-meter Three stretch formed aluminum panels with industrial grade white enamel.
4.5-meter Twelve precision stretch stamped galvanized steel panels painted with high quality paint, structural backup ribs with tubular steel support struts.
6.1-meter Twelve precision stretch stamped galvanized steel panels painted with high quality paint, structural backup ribs with tubular steel support struts.
11.2-meter All aluminum including panels, backup structure, hub, subreflector and supports high reflective white paint over chromate conversion coating.
f. Antenna RF Feed Assemblies.
(1) The orthomode transducer (OMT) gives isolation between the uplink and the downlink. It operates as a duplexer providing bi-directional communication. The focus of the antenna is determined by the positioning of the feed horn. Vertical or horizontal polarization is selected to match the satellite transponder in use. The coaxial and waveguide components provide a low loss transmission path to and from the antenna.
(2) The manufacturer has applied proper coating (galvanizing) to prevent corrosion and electrolysis when dissimilar metals are used in conjunction. The reflector assembly moves in azimuth around the antenna mount and in elevation above the mount. The reflector structure also provides anchor points for supports of primary focus feeds or subreflectors.
(3) The RF feed assembly provides isolation between the uplink and the downlink and enables bi-directional (up and down) communication at the same time. The feed assembly includes the coaxial or waveguide transmission lines and provides a mount for the low noise amplifiers. The RF feed assembly may contain two or four RF ports to accommodate the two satellites and to provide for contingencies in the future. ANICS uses the RF feed assemblies as:
(a) Two-port feed: Primary and alternate antenna at each AFSS hub and each remote site, alternate at ZAN.
(b) Four-port feed: Primary antenna at ARTCC (ZAN). The four-port feed enables the simultaneous use of two differently polarized transponders on the same satellite.
(4) Some of the RF feed assemblies include support struts that position the feed properly in relation to the reflector. The struts also provide support for the coaxial and waveguide transmission lines. Each of the receive ports in the feed assembly allows effective mounting for the low noise amplifier and related switching that are part of the RF equipment functional area.
g. Antenna Deice Controls.
(1) This equipment provides for deicing the antenna, feed assembly, and for hub antennas, the sub-reflector. The 11.2-meter antenna uses three forced air heaters that heat the plenum on the back of the antenna and the feed assembly and sub-reflector. The 3.6 and 4.5-meter antennas use either forced air heaters or electric strip heaters. The electric strip heaters are wired such that the upper and lower heater panels can be turned on or off independently. The antenna feed heater is wired to the lower panel. The heater units use temperature and humidity sensors to turn the heaters on and off automatically.
(2) Arctic conditions found in Alaska have made it necessary for full dish deicing during each winter site visit. They will select either self-limiting electric heating strips or forced hot air deicing units. The system has controllers and sensors that energize the heaters when needed and allow the operator to override the control and command the deicing units "on" and "off" as desired from the NOCC. Each deice controller reports status to the NOCC.
h. Antenna Drives and Controls.
(1) Antennas are positioned by motors and resolvers with the microprocessor-based antenna control unit, or with the antenna-tracking controller. The antenna-tracking controller is a microprocessor-controlled unit that commands the antenna controller via switches on the front panel of the outdoor unit or remotely by the indoor antenna controller unit, RMC, HMC or NMC.
(2) ANICS provides three axes (azimuth, elevation, and polarization) of drive on each of the 3.6-meter, 4.5meter, 6.1-meter, and 11.2-meter antennas. Antenna drives use motors or motorized jackscrews on Phase I sites while Phase II sites have manual drives. Each drive is remotely controllable by the NOCC operators as needed or locally controllable by the site technician at the earth station. Control levels include:
(a) “jog”: Move on axis by a small angular increment on command.
(b) “go to”: Set the axis to defined angle.
(c) “tracking”: ANICS uses this only to keep the 11.2-meter antenna aimed at the proper satellite.
(3) When the antenna control is active at the local site, all remote commands are inactive for safety purposes.
(4) ANICS uses the Scientific Atlanta 8860/8862 control system with each of the Scientific Atlanta antennas. The 8862 is located at the antenna and communicates with the 8860. The 8860 communicates with the RMC, providing current status and control interfaces. It also has antenna-positioning control access for “jog,” “go to,” and “tracking functions.” At hub sites, the 8860 also receives an input from the beacon receiver to track the satellite and maintain position of the 11.2-meter antenna.
24. RF EQUIPMENT.
Polarization Drive Motor
LNA OMT
OMT
LNA
RX Coax
TX Coax
TX Coax
Bottom View
Side View
Flexible Wave Guide Section
Flexible Wave Guide Section
Figure 3. 2 Port Orthomode Transducer
24. RF EQUIPMENT.
a. The RF electronics functional area of each earth station includes two sets of transmit electronics, two sets of receive electronics, as well as RF electronics controls and distribution. Vitacom provides the majority of RF equipment. VertexRSI (Maxtech SSPA’s) are used at the hub sites and Seattle. L3 Communications up and down converters are used at the hub sites. Kaman (ITT) LNA’s are used at hub sites and a few remote sites. The LNA switches and up and down converters at the hub sites are controlled by a LNA channel select and monitor unit (LCS&M). The Vitacom G-7100 transceiver is the basic unit in all RF chains. ANICS provides redundant units in both transmit and receive electronics at the hub earth stations.
b. Transmit Electronics.
(1) Power amplifiers increase signal strength for transmission to the satellite of the up-converted RF signal of 5925 to 6425 MHz. Transmit electronics are similar at the hubs and the remotes. ANICS uses 200 W solid-state power amplifiers (SSPA’s) at the hubs, and 20, 30, 50 and 150 W SSPA’s at the remotes. The converter and SSPA are sometimes mounted on the antenna support structure at the remote sites and sometimes are mounted in the MEB.
(2) The up/down converter converts IF to RF for transmit and RF to IF for the receive signal. The 70 MHz IF output from the modem is connected to a double conversion up converter and the low level RF (in the 6 GHz band) is applied to the power amplifier (SSPA). The RF signal exiting the power amplifier is transmitted to the RF feed on the antenna using either low-loss coaxial cable or waveguide. The RF power level coming out of the power amplifier depends on the link budget and can be controlled remotely from the NOCC.
c. Receive Electronics. The 4 GHz downlink signal from the satellite is amplified by the low noise amplifier (LNA) and is coupled to the output port of the RF feed assembly of the antenna. The hub sites have a redundant LNA with appropriate switching. The LNA provides a 55 db gain of the 3700 to 4200 MHz received signal to the down converter. The remote sites have one LNA on each antenna. Coaxial cable carries the amplified RF signal to the dual conversion down converter. The converter 70 MHz (+/- 18 MHz), 75 ohm, IF output is sent to the IF distribution panel. The IF panel is a breakout
26. DIGITAL MULTIPLEXING EQUIPMENT.
point for maintenance and troubleshooting. All carries on the transponder are available on the downlink signal. From the IF panel, the signal goes to the appropriate modem IF input port.
25. MODEMS.
a. The modem converts multiplexed aggregate data into modulated intermediate frequency (IF) signals which are distributed via the IF distribution panel, switches, and combiners to the RF converters for uplink. It also converts the downlink modulated IF signal to baseband aggregate data for use by the multiplexers. The IF Distribution Panel provides intermodulation pass-band filtering along with the capability of selecting several combinations of path and equipment configurations.
b. ANICS uses E.F. Data modems at hub sites, the E.F. Data modem protection switches to provide "1 for n" redundancy protection and IF distribution. They also include any intermediate frequency (IF) distribution needed at the station within this functional area. The modem switch used at the hubs provides “1 for 8” redundancy protection.
c. Digital Modems. All units are E.F. Data modem models SDM 650B or 300/A. The modem accepts an aggregate data stream from the time division multiplexer (TDM), adds control data, forward error correction (QPSK), modulates a 70 MHz IF signal, and forwards it to the up converter. The modem also receives a QPSK modulated 70 MHz IF signal from the RF down converter, demodulates it, and sends a controlled aggregate data stream to the multiplexer. The modem unit collects status and issues messages to the RMC at remote sites and the HMC at the hubs.
d. Modem Protection Units and Controls. ANICS provides “1 for 8” protection for modems at each hub site. The E.F. Data 1:n Modem Protection Switch, model SMS 658, provides the control and switching of the aggregate, IF, and monitor and control signals from a failed modem to the on-line spare. Switching modules in the SMS 658 enable repair for one switch channel without interruption of the on-line modems. The modem protection switches can be configured manually from the control panel on the switch or remotely via the HMC. Each switch receives the aggregate and IF inputs and outputs for all modems within the switch. Link status, configuration data, and control signals for each modem is accomplished by an RS-232 connection between the switch and each modem. The switch controls the units and reports to the site as needed. At a remote site, each modem operates under direct control of the remote management computer (RMC). Modem protection is not used at Phase I remote sites because there are two complete equipment strings, primary and alternate. At Phase II sites, one for two modem protection switches are used.
26. DIGITAL MULTIPLEXING EQUIPMENT.
a. Multiplexing is the process where multiple channels are combined for transmission over a single transmission path. ANICS uses time division multiplexing (TDM). With TDM, multiple channels of data are converted into a common aggregate based upon time-share for transmission over a common trunk. Refer to the manufacturer’s operating and installation manual for a complete and detailed description of the multiplexer system functionality.
b. ANICS incorporates the General Data Comm (GDC) Megamux Transport Management System (TMS) for all ANICS applications. In addition, the multiplexer functional area uses Austron Stratum 1 clock sources at each hub. Redundant Megamux TMS system controllers in the ARTCC hub provide the interface with the ATNM network manager and independent control of all the multiplexer processes in the ANICS. The multiplexer equipment at each remote earth station comprises a "node." The hub sites have multiple nodes, one for each remote site. Seattle has two nodes (ZSE1 and ZSE2).
27. ANICS DEMARCATION POINT (ADP).
c. TDM Nodes.
(1) Each TMS Megamux node consists of a common logic shelf, common logic cards, aggregate control cards (ACC), channel interface cards (CIC), expansion cards, channel card chassis, and channel cards. Together these elements form a transport mechanism for ANICS voice and data circuits. The modular scalable architecture allows ANICS to use the same hardware for hub and remote earth station nodes. When the quantity of channels within a node exceeds the capacity of a single rack, additional sets of Aggregate and Channel Interface Cards are added in the common shelf, while the additional channel card chassis are added in an expansion rack.
(2) The ANICS multiplexer is modular and fault tolerant. Common logic cards and power supplies are redundant to enhance availability. Redundant aggregate cards are used on all primary path connections to provide the high availability for critical and essential circuits. The alternate path does not have a redundant ACC.
d. TDM Controls.
(1) ANICS achieves multiplexer network management via two TMS multiplexer controllers at the ARTCC hub connected to separate nodes. Both TMS controllers communicate with the ZAN HMC computer as well as with all mux nodes. The ANICS system provides alarm and status continually to the NOCC. The NOCC operator initiates all circuit reroute decisions and node configuration activities and the TMS controller executes the actions.
(2) One of the TMS controllers is designated the Master controller, all others operate as slaves or subordinates. Circuit and node configuration changes can only be done on the Master. Subordinates receive update information from the Master controller approximately every 15 minutes. When a controller is reconnected after being removed from the network for a time, the Master controller automatically updates the returning unit with the latest alarm and configuration data.
27. ANICS DEMARCATION POINT (ADP).
a. The ADP consists of analog and digital patching and A/B switching equipment. The multiplex equipment provides full duplex operation on each channel, routine, essential, and critical. The A/B switching equipment provides for switching to the redundant path for the essential and critical channels providing maximum circuit availability. Analog patching is provided with RJ11 patch panels and the digital patching is via RS-232, RS-422, and V.35 connectivity.
b. The ADP functional area consists of COTS equipment that protects and distributes all assigned channels at the ANICS location. Since the GDC mux is full duplex, half duplex circuits are converted prior to the mux.
c. The equipment in the ADP functional area includes racks, distribution panels, lightning protection, analog and digital patching, analog-to-digital and digital-to-analog conversion, 2-wire termination, auto-dial backup, and A/B switching. The actual connection of the elements depends on the type of channel. Typical connections are discussed and illustrated below. ANICS splits each critical and essential channel and provides redundant full duplex channels for high availability.
d. ADP Channel Equipment.
(1) ANICS protects each of the user circuits with a Reliable Electric dual gas-tube protector in a 66-type protector block at the physical interface. Prewired 66-type punch blocks provide signal termination, distribution, and crossconnection. The 66-type blocks comprise the ANICS site distribution frame (SDF) and the intermediate distribution frame (IDF).
(2) Sets of six-wire RJ11 patch modules provide signal access and patching for all digital and analog circuits. ADC PATCHMATE modular digital patch systems provide access and patching for all digital signals. The ADC PMCH-2 chassis supports RS232, RS422, and V.35 modules and the PMAC-C-CH supports RS449 modules.
(3) The Tellabs 6131X modular two-wire to four-wire conversion system (which is mounted in the GDC multiplexer rack) provides proper termination of two-wire circuits and ensures correct operation of E and M functions for all voice circuits.
(4) The FAA may identify some critical circuits and order standby autodial backup for those circuits, via a public switched telephone network or a private telephone system as designed and provided by the FAA. The MX-1-100, with MX-1-500 software at each hub, provides the capability to dial and control more than 1000 nodes (critical circuits).
29. NETWORK MONITORING AND CONTROL SYSTEMS.
e. ADP Control.
(1) Most of the equipment in the ADP is passive. The operating condition is set at installation. Patch panels are provided for local testing. When required, modems provide analog-to-digital and digital-to-analog conversion. The modem operating conditions are set at installation.
(2) The site RMC computer controls the A/B switching of critical and essential channels. The NOCC operator controls the switching to restore service. If the primary link has incurred a degraded status, traffic will be switched to the alternate link automatically, and will be returned to the primary link upon two hours of clean service.
28. POWER GENERATION EQUIPMENT AND UNINTERRUPTIBLE POWER SUPPLY (UPS).
a. Prime power is monitored by the Automatic Transfer Switch (ATS) for loss or degradation. Power for the critical electronics is fed through the UPS. Because of battery backup in the UPS, the critical equipment should never lose power. If the prime power exceeds preset values, the ATS will transfer to the standby source.
b. The ANICS power conditioning/UPS equipment draws power from the primary site utility during normal use. A surge suppressor protects the power system from serious excursions on the power source prior to distribution and use in the ANICS equipment. Depending on the site configuration, the transfer switch may select generator power or unconditioned power from the utility for short time use. A digital monitor system in the ATS senses the loss of the prime power and, after a short delay, activates the generator at sites so equipped. The system is designed to preclude erratic transfer and retransfer of power sources as well as frequent starting and stopping of the generator. The ANICS equipment operates from the UPS inverter output and there is no interruption on the critical power buss during loss or transient activity on the utility.
c. Power Conditioning Sets. The UPS provides conditioning of incoming power, prime or standby, to ensure the critical electronics are supplied with a continuous, stable power source. It provides battery backup to maintain the power to the critical equipment until power is restored. The number of batteries is determined by site load requirements. The power conditioning sets include a transfer switch and bypass control, main and tech power-distribution panels, surge suppressors, a line voltage regulator, and an uninteruptable power supply with battery backup. The tech power distribution provides protected power to the key electronic units while the main distribution supplies utility power to antennas positioning equipment and motors, etc., as well as providing a source for the power units that provide the protection and conditioning for the tech power. The UPS applies pulse width modulation (PWM) of the output power that is inherently tolerant of nonlinear loads that are typical of the switching power supplies common in modern electronic equipment. The UPS consists of rectifiers, battery chargers, inverters, a static transfer switch, a manual bypass switch, the digital monitoring system, and manual controls.
d. Battery Backup. The batteries are maintenance free, do not require venting, and operate well throughout the Alaskan temperature range. The number and connection of the battery banks depends on the load to be supported and the run-time requirement.
e. Generators.
(1) The engine generator is the standby power source for most remote sites. It will run and be shut down on command from the ATS. The generator can also be started and shut down from the NMCS (the NMCS cannot transfer station load to or from the generator at Phase I sites). The engine generator size varies and is determined by site load requirements. In-depth information is available in the equipment technical manuals.
(2) At Phase I sites, Generac generators were provided upon installation where required. Phase II sites were supplied with Lister-Petter generators. Facility upgrades have resulted in non-standard generators at some locations. The capacity of the generator depends on the expected load. Each of the generator sets is designed and rated for the Alaskan environment. The generator group includes a five-day fuel tank, heaters, enclosures, remote controls, and automatic status and fault monitoring. Each site configuration will define the needed environmental protection considerations.
29. NETWORK MONITORING AND CONTROL SYSTEMS.
a. The Network Monitor and Control System (NMCS) monitors all elements in the ANICS network. It also provides the network operator the capability to fully control the network. The reliability for circuits using the network is increased through automatic control of the A/B switching function to switch traffic from failed or degraded satellite paths to good satellite paths.
b. The NMCS is a distributed management process centrally controlled from the NOCC. The NMCS consists of the NMC, HMC in each of the four hub earth stations, RMC at each of the remote earth stations with the possibility of extending monitor and control functionality through various tail circuits. Each of these computers operates in the UNIX environment. The power of the network manager allows network “operation by exception." The NMCS accomplishes much of the ANICS operation without operator intervention.
c. The ANICS network operations control center (NOCC) is located at the Anchorage ARTCC (ZAN). The NOCC is the operations center for the ANICS. The NOCC equipment set includes the NMC, Ethernet backbone, workstations, printers, a bridge/router, built in test equipment (BITE), including a spectrum analyzer station, and a virtual instruments process called Labview. Labview is a software application designed to allow development of virtual instruments (VI) to enhance remote maintenance and monitoring control. A separate communication channel exists between the ARTCC and each AFSS hub. The HMC computer processes monitor and control of circuits and paths unique to a remote hub pair and exception alarms are sent to the NOCC.
d. The ATNM (Air Traffic Network Manager) network management and control system software is resident in the on-line NMC computer. The NMCS software provides, as a minimum, the circuit configuration control (CCC), equipment configuration control (ECC), and maintenance monitoring and control (MMC) processes and includes the modules needed for effective operation and support of ANICS.
e. Network Management Computer (NMC). The NMC manages the network globally. It responds to reported faults and anomalies that require system level response. The NMC provides all commands for circuit rerouting, reconfiguration, and coordination between sites. The NMC contains and controls the configuration database, provides all user interfaces, and generates reports.
f. Earth Station Monitor and Control Computers.
(1) The two types of earth station monitor and control computers are the remote monitoring computer (RMC) and the hub monitoring computer (HMC). The RMC is a Pentium based 300 MHz workstation and the HMC is a Sun Ultra 2 workstation.
(2) A remote monitoring computer provides both the human interface to the equipment for maintenance and the computer-to-computer interface between the network management computer and the remote earth station equipment. The RMC communicates with element controllers in the antennas, the antenna positioning controllers, de-icing equipment, RF equipment, modems, ADP, power equipment, and supervisory control and data acquisition equipment (SCADA).
(3) The HMC performs similar functions to the RMC, however, the number of units controlled is greater. The HMC also provides supervisory functions for assigned sub-nets of remote earth stations.
g. NOCC Communications Equipment. The distributed NMCS elements communicate over a standard bridged Ethernet. ANICS has allocated bandwidth on each satellite for primary communication between the NMCS computing platforms. An extension of the NMC Ethernet to the ARTCC HMC computer and bridge-routers communicating with the AFSS HMC computers ensure effective use of the distributed NMCS process. The terminal servers at each hub are connected to the HMC via a LAN Ethernet and communicate with the assigned RMC platforms using RS232 ports.
h. NOCC Peripheral Equipment.
(1) The workstations in the network operations control center (NOCC) are Sun Ultra 2 processors and operate on reduced instruction set code (RISC) based Sun SPARC terminals. The units implement the X-windows capability and are fully Motif compatible. ANICS operators can use either of the two workstations in the NOCC for operation and for maintenance. There are additional workstations in the ANICS area in the ZAN Tech-OPS wing basement.
(2) The NOCC equipment includes two printers. A HP bubble-jet color printer allows detailed capture of color graphic screens for off-line use. A HP Laser Jet printer provides draft and letter quality printing for reports. Each printer is connected to the network management computer.
i. Network Monitor and Control System Equipment.
(1) The HMC and RMC computers are high performance UNIX platform processors. The HMC is a Sun Ultra 2 commercial grade processor with the high-resolution 1024x768 color display; the HMC is fully compliant with the System VR4 UNIX and X-window standards. The RMC is a Pentium based HP workstation. The workstation includes 256 KB RAM cache, 32 MB RAM, 500-MB hard disk, and a 1024x768 graphics system.
(2) The NMC functional area equipment at the hub and remote earth stations also includes applicable SCADA equipment. The SCADA equipment consists of elements that monitor discrete contact closures, generate status words, and communicate with the HMC or RMC using a single RS232 interface. Contact closures report status from such devices as smoke detectors, intrusion sensors, temperature sensors, and other event and alarm indicators.
j. Network Timing Reference.
(1) Network synchronization is achieved through the placement of redundant stratum level 1 clock sources at each hub location. Loran C receivers supply the stratum level 1 clock source. ANICS uses both Austron and Locus Cs Sync and SatMate receivers. The external timing source is fed to ZAN Phase 1 nodes, 30 and 42, and all Phase 2 nodes. The Locus Cs Sync has the capacity to automatically tune to another Loran chain if the current chain should go down for any reason.
(2) Hub nodes that do not receive external timing are set to slave mode and receive timing from the external masters. All remote site nodes are designated Master Facility and, as such, receive timing via one of the aggregates. Each node selects the most stable aggregate for timing with a priority of ZAN primary, Hub primary, ZAN alternate, and finally, Hub alternate.
(3) There are currently 5 programmed clocking levels in the TMS-3000. The first level is the normal configuration with the external masters at each hub. The second level is ZAN 30 as an internal master for the whole network. Level 3 is a failure of the master timing source at ZAN, causing the network to fallback to internal master at Kenai AFSS, Fairbanks AFSS, or Juneau AFSS, in that order (order of fallback is programmable). In this way, any hub can be a level 1 network timing reference hub, assuring a level of performance that exceeds the network requirements.
(4) In the event of a single, up to all but one external master node loosing it’s external source, the affected nodes will step through a search sequence to reestablish stable timing.
(a) Determine if a neighbor node is phase locked to a higher timing level than itself. If so, the node will phase lock to the receive aggregate from that node.
(b) Should all neighbor nodes be on the same timing level, the node selects the aggregate that has the least hops between it and a master timing node.
(c) If all hop counts are equal, the node selects an aggregate based on a preference number programmable in the node configuration.
(5) In a situation of catastrophic level 1 timing source loss, the network can "fall through" levels of networking timing. If this occurs, each node becomes an "automaster" after falling through the lowest clock level. The node reverts to internal timing and remains so until it detects an automaster neighbor node with a lower node address. An automaster node with a higher node address always phase locks to an automaster node with a lower node address. Network timing is then resolved to phase lock to the lowest node address in the network or to some node that is configured as a master timing node.
30. GENERAL.
CHAPTER 3. STANDARDS AND TOLERANCES
30. GENERAL. This chapter prescribes the standards and tolerances for ANICS as defined and described in Order 6000.15C. All key performance parameters and/or key inspection elements are clearly identified by an arrow (→) placed to the left of the applicable item. Note: Only those items identified by (*) are done on-site, all other actions are accomplished remotely from the NOCC during equipment testing in the Training and Test facility (TTF) or at site acceptance.
Tolerance/Limit Parameter Reference Paragraph Standard Initial Operating 31. ANTENNA ASSEMBLY a. De-icing Equipment b. Waveguide Pressurization (11m ONLY) c. Isolation → (1) Cross Polarization (2) TX port to RX port * d. VSWR for antenna and feedlines 32. UP CONVERTERS/ PAs/ LNA/DOWN CONVERTERS a. Up Converters (1) IF input frequency (2) IF input level →(3) TX Frequency (4) Gain Flatness (5) Gain Slope
AL 6000.20A Para 54 AL 6000.20A Para 55 AL 6000.20A Para 57 AL 6000.20A App B IV AL 6000.20A Para 59 AL 6000.20 Para 61 AL 6000.20 Para 61 AL 6000.20 Para 61, (Para 60 onsite) AL 6000.20 Para 61 AL 6000.20 Para 61
Auto mode 18° - 42° F 0.25 to 0.5 psi. 30db Min. (operational) 35 db Min. (antenna only -site acceptance tests-) 30db Min. 1.5:1 Max. 50 - 90 MHz, 70 MHz nominal -30 to -5 dbm, -25 dbm nominal 5925 – 6425 MHz 2.5 db/500 MHz , +/- 1.0 db/36 MHz 0.1 db/MHz (typical)
+/- 5° F Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard +/- 600 Hz Same as standard Same as standard
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard +/- 4.5 kHz (90 days) Same as standard Same as standard
Tolerance/Limit Parameter Reference Paragraph Standard Initial Operating (6) Phase Noise (measured offset from carrier) (a) .1 kHz (b) 1 kHz
(c) 10 kHz (7) Spurious Output (max) b. Power Amplifiers (SSPA’s) (1) Bandwidth →(2) Saturated Power Output (a) 20 W amplifier (b) 30 W amplifier (c) 50 W amplifier (d) 150 W amplifier (e) 200 W amplifier
(3) Maximum Power Out (4) Output Power Monitoring (5) Intermodulation w/2 Equal Carriers (a) Saturation (b) 7 db below saturation (c) 14 db below saturation c. Low Noise Amplifier (1) Gain (2) Gain Flatness (3) Current
AL 6000.20 Para 61 Equipment manual AL 6000.20A Para 62 AL 6000.20A Para 62 AL 6000.20A Para 62 AL 6000.20A Para 62 AL 6000.20A Para 63 AL 6000.20A Para 64 AL 6000.20A Para 64 AL 6000.20A Para 64
-60 dbc/Hz -70 dbc/Hz -80 dbc/Hz Terminal RF receive band: -130 dbw 2nd harmonic: -100 dbw 3rd harmonic: -120 dbw 500 MHz + 43 dbm + 44.8 dbm + 46 dbm + 51 dbm + 53 dbm Saturation -3 db Coupled port -40 dbc (typical) C/I = -9 dbc C/I = -16 dbc C/I = -27 dbc 60 db min +/- 0.5 db 120 mA nominal
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard 110 to 320 mA
33. MODEMS
Tolerance/Limit Parameter Reference Paragraph Standard Initial Operating d. Down Converters
(1) RF Bandwidth (2) Output Frequency (3) Output Level (4) Gain Slope (5) Gain Flatness (6) Phase Noise (measured offset from carrier)
(a) 0.1 kHz (b) 1 kHz →(c) 10 kHz (7) Spurious Response 33. MODEMS a. Frequency Synthesizer →(1) Output Stability (2) Spurious Output b. Modulator (1) Output Level (2) Level Stability →(3) IF Output Frequency Range (4) Frequency Stability (5) Spurious Outputs c. Demodulator (1) Input Level (2) Acquisition Range
AL 6000.20A Para 65 AL 6000.20A Para 65 AL 6000.20A Para 65 AL 6000.20A Para 65 AL 6000.20A Para 65 AL 6000.20A Para 65 Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual Equipment Manual
500MHz 50-90 MHz 30 to -60 dbm, -40 typical 0.1 db/MHz 2 db max -60 dbc/Hz -70 dbc/Hz -80 dbc/Hz <-50 dbm/4 kHz @ IF output 1 x 10-6 -40 dbc in-band -35 dbc out of band -5 to -30 db -18 db (typical) +/- 0.5 db 50 MHz – 90 MHz +/- 10 ppm, (+/-.001 %) -50 dbc (50 – 90 MHz) in band -50 dbc out of band -60 dbc harmonics -30 to -60 db +/- 25 kHz
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard
36. LINK INTEGRITY
Tolerance/Limit Parameter Reference Paragraph Standard Initial Operating →d. Bit Error Rate e. Modem Redundant Switch →f. Modem Eb/No (1) 300/A (2) 650B 34. MUMTIPLEXER a. Data Transmission Rates (1) Synchronous (2) Asynchronous (3) Voice Transmission Rate (a) CELP (b) VLBRV 35. CIRCUIT INTEGRITY →a. Redundancy Switching b. Phase and gain hits intermodulation test c. Digital Channels NOTE: Evaluates 1.44Mbs or
more. 36. LINK INTEGRITY a. RF carrier to noise floor ratio. (down link view at NOCC)
(1) Hub transmits. (2) Remote transmits.
AL 6000.20A Para 66 AL 6000.20A Para 66 AL 6000.20A Para 73 Equipment Manual Equipment Manual Equipment Manual AL 6000.20A Para 68 AL 6000.22 AL 6000.20A Para 70 AL 6000.20A Para 72
1 x 10-5 error rate < 20 seconds for modem switching and lockup 12.0 db +/- 2.0 db 9.0 db to 9.7 db 1200 bps to 1,544 Mbps 300 bps to 19.2 kbps 16K bps to 64 kbps 9.6 kbps 9.6 kbps < 30 seconds maximum, 20 seconds average Chapter 3 Zero errors for five minutes at 4.8 kbps or faster data rate Zero errors for 10 minutes at 2.4 kbps Zero errors for 20 minutes at 1.2 kbps Zero errors for 80 minutes at 300 bps 20 db +/- 2db 14 db +/- 2 db
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard
Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard Same as standard As determined in link budget handbook As determined in link budget handbook
38. ANTENNA SYSTEMS - ANNUAL
CHAPTER 4. PERIODIC MAINTENANCE
37. GENERAL
a. This chapter establishes all the maintenance activities that are required for the ANICS system on a periodic basis, and the schedules for their accomplishment. It is divided into three sections. The first section identifies the on site performance checks (i.e., tests, measurements, and observations) of normal operating controls and functions, which are necessary to determine whether operation is within established tolerances/limits. The second section identifies the remote maintenance and various routine duties required to maintain the ANICS system on a day-to-day basis. The third section identifies tasks to be performed on an as-required basis, prevent deterioration and/or ensure reliable operation.
b. The activities and schedules listed below are intended to provide only the minimum maintenance required keeping the equipment in a satisfactory operating condition. Under some conditions, additional maintenance may be required. The schedules reflect the maximum permissible intervals between successive accomplishments to ensure that the performance of the equipment is reliable and within tolerance.
c. ALL on-site maintenance SHALL be coordinated through the NOCC prior to beginning work.
Section 1. ON-SITE MAINTENANCE CHECKS (All Sites)
Reference Paragraph Performance Checks Standards and
Tolerances
Maintenance
Procedures
38. ANTENNA SYSTEMS - ANNUAL
a. All Sites
(1) Corrosion control.
(2) Azimuth and elevation jack screws. Perform lubrication
service.
(3) Deicer. Verify operation within specified temperature
range.
(4) Feed horn fasteners. Inspect and verify torque values if
necessary.
(5) Feed horn mylar/plexiglass. Inspect for damage and mois-
ture.
(6) Azimuth/elevation resolvers and limit switches. Inspect
and verify proper operation and stop limits.
(7) Antenna in- and out-door controllers.
(a) Inspect and test 3-phase controllers.
(b) Test local and remote positioning.
N/A
N/A
31
N/A
N/A
N/A
N/A
N/A
Equipment Manual
Equipment Manual
54
Equipment Manual
Equipment Manual
Equipment Manual
Equipment Manual
Equipment Manual
Reference Paragraph Performance Checks Standards and
41. IF EQUIPMENT - ANNUAL
Tolerances
Maintenance
Procedures
b. Hubs only.
(1) Waveguide pressurization. Inspect and verify proper op-
eration.
(2) Tracking and control test. Inspect and verify proper track-
ing operation.
31
31
55
58
39. CABLES AND CONNECTORS - ANNUAL
a. Perform Anristsu cable tests on all IF and RF signal
paths.
b. Perform insulation and DC resistance tests.
c. Inspect for moisture and corrosion damage.
d. Inspect for loose connections.
e. Inspect/replace labeling.
N/A
N/A
N/A
N/A
N/A
59
40. RF EQUIPMENT - ANNUAL
a. All Sites.
(1) Solid state power amplifiers. Inspect and verify proper
fan operation.
(2) Up converter frequency. Measure up converter output
frequency.
b. VertexRSI (Maxtech) SSPA’s. Verify configuration settings
with NOCC.
c. Hubs only.
(1) Verify in service/standby configuration with NOCC.
(2) Verify up and down converter configuration settings with
NOCC.
N/A
32
N/A
N/A
N/A
Equipment Manual
60
Link Budget Handbook
N/A
Link Budget Handbook
41. IF EQUIPMENT - ANNUAL
a. All Sites.
(1) Inspect modem blowers for proper operation.
(2) Clean blower filters.
(3) Replace modem memory battery.
b. Hubs only. - Replace modem switch battery.
N/A
N/A
N/A
N/A
Equipment Manual
Equipment Manual
Equipment Manual
Equipment Manual
Reference Paragraph Performance Checks Standards and
47. MEBS AND RADOMES - ANNUAL
Tolerances
Maintenance
Procedures
42. MULTIPEXER - SEMI-ANNUAL
a. Inspect and clean filters.
b. Check blower and rack fans.
N/A
N/A
Equipment Manual
Equipment Manual
43. ANICS DEMARCATION POINT (ADP) - ANNUAL
a. RJ-11 connectors.
(1) Inspect for dust and corrosion and clean as necessary.
(2) Verify proper operation.
b. Orderwire. Test and verify proper operation where applica-
ble.
N/A
N/A
N/A
Equipment Manual
44. ENGINE GENERATORS - Sites with separate ANICS Engine Generators. - Refer to 6980.11C Section 2, Subsection 1, for all engine generator maintenance.
N/A
45. UNUNTERRUPTIBLE POWER SUPPLY – Remote Sites
a. QUARTERLY - Perform checks listed in 6980.29A para-
graph 407.
b. ANNUAL
(1) Perform system alignment.
(2) Perform checks listed in 6980.29A paragraph 409.
N/A
N/A
N/A
75
46. SUPERVISORY CONTROL AND DATA AQUISITION (SCADA) - ANNUAL
a. Inspect and verify connections.
b. Test and verify proper operation.
N/A
N/A
Equipment Manual
76
47. MEBS AND RADOMES - ANNUAL
a. Inspect for corrosion and clean as necessary.
b. Inspect for penetrations (leaks) and repair as necessary.
c. Inspect interior and exterior cabling and repair as necessary.
d. Replace fire alarm battery.
e. HVAC
(1) Inspect and test fans and repair as necessary.
(2) Inspect for corrosion and clean as necessary.
(3) Clean or replace filters.
N/A
N/A
N/A
N/A
N/A
N/A
N/A
Equipment Manual
74
48. NOCC OPERATIONS
Section 2. NOCC MAINTENANCE ACTIVITIES
Reference Paragraph Performance Checks Standards and
Tolerances
Maintenance
Procedures
48. NOCC OPERATIONS
a. DAILY AS REQUIRED
(1) System monitoring. Perform 24/7 system monitoring,
adjustments and remote troubleshooting as required to maintain system operation.
(2) Script management. Perform and verify operational
scripting.
(3) Database management. Perform database administration.
(4) System administration. Perform system administration.
(5) Network administration/security. Perform network ad-
ministration and security verification.
b. REOCCURING AS REQUIRED
(1) Link budget management. Perform link budget man-
agement.
(2) Equipment replacement. Perform equipment configura-
tion and verification with SSPA, converter, modem and LNA equipment replacement.
(3) Coordinate circuit cutover and removal activities.
(4) A/B switching for individual circuits. Perform A/B
switching.
(5) Multiplexer monitoring, control, and configuration.
1 Perform multiplexer switching.
2 Perform multiplexer bandwidth management.
3 Change aggregate data rates.
4 Create and remove circuit connectivity between nodes, per circuit orders.
5 Perform alarms backups.
6 Perform configuration backups.
7 Manage TMS.
(6) Modem configuration and switching.
1 Control and configure modems.
2 Control redundant modem switching.
(7) RF output parameter management and weather compen-
sation. (Link integrity)
N/A
N/A
N/A
N/A
N/A
36
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
NOCC Handbook
SPS Handbook
SPS Handbook
SPS Handbook
SPS Handbook
71, 72 & 73
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
52. ANICS DEMARCATION POINT (ADP) - CIRCUIT INTEGRITY
Reference Paragraph Performance Checks Standards and
Tolerances
Maintenance
Procedures
(8) Antenna management and control.
1 Perform antenna deicing.
2 Perform antenna positioning.
(9) Perform antenna polarization.
(10) Link switching. Perform link switching.
(11) RF interference management. Perform RF interference
management.
(12) Space configuration management. Perform configuration
management.
(13) UPS and generator. Perform UPS and generator moni-
toring and control.
N/A
N/A
31
N/A
N/A
N/A
N/A
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
NOCC Handbook
Section 3. AS REQUIRED MAINTENANCE CHECKS
Reference Paragraph Performance Checks Standards and
Tolerances
Maintenance
Procedures
49. ANTENNA SYSYEM - PARABOLIC DISH
a. Cross polarization. Test and adjust as needed for proper op-
eration.
b. Check torque values on all antenna fasteners.
31
N/A
57
Equipment Manual
50. RF EQUIPMENT
a. UP CONVERTERS - Perform up converter tests.
b. SSPA’S
(1) Perform power amplifier tests.
(2) Perform power amplifier intermodulation tests.
c. LNA - Perform LNA tests.
d. DOWN CONVERTER - Perform down converter tests.
32
32
32
32
32
61
62
63
64
65
51. IF EQUIPMENT -MODEMS
a. Modem bit error rate test (BERT).
b. Modem redundancy switch test.
33
33
66
68
52. ANICS DEMARCATION POINT (ADP) - CIRCUIT INTEGRITY
a. Phase and gain hits intermodulation test.
b. Digital grade channel test.
35
35
69
70
This page intentionally left blank.
54. SATELLITE ANTENNA DEICING TEST.
CHAPTER 5. MAINTENANCE PROCEDURES
Section 1. INTRODUCTION
53. GENERAL. This chapter establishes the procedures for accomplishing the essential maintenance activities not specifically cited in manufacturer manuals and handbooks. The ANICS network is a commercial off the shelf (COTS) system and contains a wide array of equipment manufactured by various vendors. When available, refer to the operators or equipment manual to the fullest extent possible. The primary goal of this chapter is to describe procedures involving performance measurements for the system overall with emphasis placed on individual components where required. This chapter is organized by functional area and divided into sections titled radio frequency equipment, modem equipment, antennas, baseband equipment and general.
Section 2. ANTENNA EQUIPMENT
54. SATELLITE ANTENNA DEICING TEST.
a. Objective. This procedure verifies that the antenna deicing system is fully functional and in compliance with the reference standards.
b. Discussion. The procedure will exercise the automatic and manual mode of operation. Manual operation will simply activate the system and verify that the heating elements are activated. Automatic operation will involve simulating the ice detector sensor and verifying operation of the elements.
c. Test Equipment. Canned cold spray.
d. Conditions. Normally operating facility.
e. Detailed Procedures.
(1) At the deicing unit controller, activate manual operation and turn the deicing elements on.
(2) At the antenna, verify that the heating element device is providing heat. On forced hot air systems, check to see that the blowers are providing warm air. On electric resistive strip heater systems, observe the antenna for indications (melting snow, ice, or frost) that the heaters are working. You may also feel the surface of the antenna to see if warm spots can be detected. If warm spots can’t be felt (because of ambient temperature, moisture, snow, or ice), measure the current in the wires feeding the strip heaters with a clamp-on ammeter to be sure that power is being supplied to the heater strips.
(3) At the deicing unit controller, turn the elements off and select automatic operation.
(4) At the deicing system sensor, simulate an icing condition. This may be done by the most convenient method, i.e., using cold spray application into sensor assembly or disconnecting the sensor cable and providing the ground or contact closure as required by the particular system. Heater operations require the presence of water in the sensor cup in conjunction with cold spray applied to the sensor body.
(5) At the antenna, verify that the heating element device is providing heat. At the controller, verify the proper alarm indication.
(6) Remove ice simulation.
(7) Return station equipment to its operational configuration.
56. BORESIGHT ANTENNA POSITIONING.
55. SATELLITE ANTENNA FEED PRESSURIZATION TEST (HUBS ONLY).
a. Objective. This procedure verifies that feed and waveguide pressurization is sufficient to maintain positive pressure at all sites with 11-meter antennas. The waveguide dew point must be maintained at less than the lowest expected outside ambient temperature. The pressurization system must supply a failure alarm.
b. Discussion. The basic approach for this test is to monitor the pressure at the dehydrator. Bleed the dehydrator and verify the alarm condition with the NMCS.
c. Conditions. Normally operating facility.
d. Detailed. Procedures.
(1) Ensure dehydrator is in proper working order and that 0.25 to 0.5 psi. pressurization is achieved and maintained. View dehydrator display.
(2) Verify no pressure alarms on the HMC.
(3) Bleed the dehydrator by removing hose at the waveguide transition above the RF rack until pressurization falls below .25 psi.
(4) Verify the HMC receives a low waveguide pressure alarm. Verify alarm with the NOCC.
(5) Upon verification of the alarm, reconnect the dehydrator hose and re-establish proper pressurization. The alarm in the HMC must clear. Verify the alarm clears with the NOCC.
(6) Ensure station equipment is returned to its operational status.
56. BORESIGHT ANTENNA POSITIONING.
a. Object. This procedure describes the steps necessary to place an antenna on the satellite from an undetermined start point.
b. Discussion. The antenna controllers store the coordinates of the satellites and the current position of the antenna. If this information is lost or becomes unusable for any reason, the antenna must be put back on the satellite manually. Several different methods of accomplishing this task are included.
c. Test Equipment.
(1) Inclinometer.
(2) Compass.
(3) Look angle for site.
(4) Spectrum analyzer with 4 GHz range.
(5) DC Block and ‘N’ type tee (for Vitacom LNA’s only).
d. Conditions. Reduced service outage on the affected links.
e. Detailed Procedures.
CAUTION: Ensure the transmit RF power is turned off and the transmit hairpin is removed before moving the dish!
(1) ROUGH ANTENNA POSITIONING.
(a) Use a compass to position the antenna in azimuth plane.
1 Align using the feed can and center seam from the front.
2 Compass reading is look angle +180 degrees.
3 Look angle and elevation can be found in the site FRDF, obtained from the NOCC or link budget.
(b) Use inclinometer to set elevation.
1 Center Feed Antennas.
aa. Set the inclinometer on top of the hub behind the dish.
bb. Adjust to the look angle as published.
2 Offset Antennas.
aa. Set the inclinometer on a flat part of the feed boom and adjust the dish to the published look angle.
bb. Lower the dish till you see the satellite, at approximately look angle – 6 degrees (see spectrum analyzer setup in ‘Peaking up AZ and EL’ steps 1 and 2).
(2) PEAKING THE ANTENNA.
(a) Using a DC block (for Vitacom LNA’s), view the receive signal between the LNA and the down converter.
1 Insert an ‘N’ type tee in the receive line between the LNA and down converter.
2 Connect the DC block to the 3rd port of the tee and the spectrum analyzer to the DC block (see figure 4).
Figure 4. DC Block configuration
CAUTION: DC voltage greater than 1 volt on the input of the spectrum analyzer will damage the front end of the spectrum analyzer. Use of the DC block is imperative when spectrum analyzer is used between the LNA and Converter!
NOTE: The DC block can be inserted either way: however, the center pin on end labeled LNA is connected to the wire terminals on the side of the block and the –15 vdc will be present on them if LNA end is connected to the tee.
(b) Use the following spectrum analyzer settings to view the satellite.
1 Frequency:
aa. Primary 3840.
bb. Alternate 4060.
2 Amplitude Ref Lvl -80 db.
3 Amplitude scale 5 db/div.
4 Span 500 Mhz.
5 Res B/W auto.
6 Vid B/W auto.
7 Sweep on auto (Note: should be around 10 sec).
(c) Several transponders should be visible (not to be confused with several carriers!).
(d) To refine the antenna position, you need to also refine your view of the satellite. There are two beacons on each satellite, one at 3700.5 MHz and the other at 4199.5 MHz.
(e) Set the spectrum analyzer to view the appropriate beacon as follows:
1 Frequency:
aa. Primary 4199.5.
bb. Alternate 3700.5.
2 Amplitude Ref Lvl -80 db (adjust as required to view noise floor).
3 Amplitude scale 2 db/div.
4 Span 150 KHz.
5 Res B/W 10 KHz.
6 Vid B/W 30 HZ.
7 Sweep time 2 sec.
8 Display Line to ‘On’ and set to peak of beacon.
(f) Peak up the dish using the jogging switches on the in or outdoor controller. Adjust the display line as necessary. Remember to allow time for the antenna movement between jogs.
(g) Adjust both azimuth and elevation twice, alternately, in this manner for max peak.
(h) Record the final position info in the FRDF and save it in the antenna controller. Also mark the azimuth and elevation pivot points on the dish itself also. (Note: This has already been marked on most Phase I sites.)
(3) ALTERNATE SPECTRUM ANALYZER VIEW.
(a) Use above set up procedures steps 56 (2) (a) through (d).
(b) Set the spectrum analyzer to view the appropriate beacon as follows:
1 Frequency:
aa Primary 4199.5.
bb Alternate 3700.5.
2 Amplitude Ref Lvl -80 db (adjust as required to view noise floor).
3 Amplitude scale 1 db/div.
4 Res B/W 10 KHz.
5 Vid B/W 30 Hz.
6 Sweep time 40 sec.
7 Span ‘Span Zero’.
(c) Center the beacon and put the marker at the peak, (with the span set to Span Zero, the signal displayed is almost a flat line that represents signal level at the point of the marker).
(d) Peak up the dish using the jogging switches on the outdoor controller. Move the antenna only in small increments.
(e) Adjust both azimuth and elevation twice, alternately, in this manner for max peak.
(f) Record the final position info in the FRDF and save it in the antenna controller. Also mark the azimuth and elevation pivot points on the dish itself also. (Note: This has already been marked on most Phase I sites.)
(4) PEAKING ANTENNA USING RECEIVE IF SIGNAL.
CAUTION: Ensure the TRANSMIT RF power is turned off and the TRANSMIT hairpin is removed before moving the dish!
NOTE: This procedure allows antenna to be peaked in the azimuth and elevation axis from inside the building. Contact the NOCC prior to using this method to have them put their modem in CW mode.
(a) Insert a tee at the appropriate receive input to the IF panel or modem. The signal here is ‘video’ (~70 Mhz).
(b) Connect the spectrum analyzer to the 3rd port of the tee (see figure 5).
Figure 5. Antenna positioning using RX IF
(c) Set up the spectrum analyzer as follows:
1 Frequency assigned modem frequency.
2 Amplitude Ref Lvl -60 db (adjust as required to view noise floor).
3 Amplitude scale 4 db/div.
4 Span 200 khz.
5 Res B/W 10 kHz.
6 Vid B/W 30 Hz.
7 Sweep time 2 sec.
8 Display Line to On and set to peak of modem CW.
(d) Peak up the dish using the jogging switches on the indoor controller. Adjust the display line as necessary. Remember to allow time for the antenna movement between jogs.
(e) Adjust both azimuth and elevation twice, alternately, in this manner for max peak.
(f) Record the final position info in the FRDF and save it in the antenna controller. Also mark the azimuth and elevation pivot points on the dish itself. (Note: This has already been marked on most Phase I sites.)
CAUTION
57. SATELLITE ANTENNA CROSS-POLARIZATION ISOLATION TEST
a. Objective. The cross-polarization check is to ensure that the antenna feed is properly polarized to transmit and receive maximum signal to the satellite. It also ensures no signal is transmitted that will interfere with the transponder of the same frequency on the opposite polarization. This procedure measures linear cross-polarization isolation of the site under test and adjusts the polarization such that the cross-polarized signal is at a value acceptable for transmission on the satellite.
b. Discussion. This procedure is done at the LNA/converter connection because the converter removes the signal from the two satellite beacons. The best case adjustments are made by minimizing the opposite polarity beacon while viewing the downlink. Same polarity beacon can be maximized; however, this method is not as precise.
c. DO NOT use the site transmit carriers to adjust cross polarization. This adjustment is made using receive signals only.
d. Test Equipment required.
(1) Spectrum analyzer.
(2) DC block.
e. Conditions. Reduced service outage on affected links.
f. Detailed Procedure.
CAUTION: Ensure the transmit RF power is turned off and the transmit hair pin is removed before proceeding.
(1) Using a DC block, view the receive signal between the LNA and the down converter.
(2) Insert an ‘N’ type tee in the receive line between the LNA and down converter.
(3) Connect the DC block to the 3rd port of the tee and the spectrum analyzer to the DC block (see figure 6).
Figure 6. DC Block configuration
58. SATELLITE ANTENNA TRACKING AND CONTROL TEST.
CAUTION: DC voltage greater than 1 volt on the input of the Spectrum analyzer will damage the front end of the Spectrum analyzer. Use of the DC block is imperative when Spectrum analyzer is used between the LNA and Converter!
NOTE: The DC block can be inserted either way; however, the center pin on end labeled LNA is connected to the wire terminals on the side of the block and the –15 vdc will be present on them if LNA end is connected to the tee.
(4) Use the following spectrum analyzer settings to view the satellite.
(a) Frequency: NOTE that the frequencies are reversed from azimuth and elevation peak procedure.
1 3700.5 for Primary.
2 4199.5 for Alternate.
(b) Amp Ref Lvl -75 (Adjust as required to view noise floor).
(c) Amplitude scale 1 db/div.
(d) Span 150 khz.
(e) Res B/W 10 kHz.
(f) Vid B/W 30 Hz.
(g) Sweep 2 sec.
(5) The beacon on the opposite polarity should now be visible if the antenna is not fully aligned for the correct polarity. If no signal is visible, you can verify your setup by selecting the opposite beacon. It should be approximately 10+db on the 3.6 dishes.
(6) If adjustment is necessary, set Amplitude Scale to 1 db/div and center the beacon. Now set Span to ‘Span Zero’ and Sweep to 40 sec.
(7) Drive Pol Feed 2 to minimum. Check the minimum by driving past and coming back to it.
(8) Verify the minimum level meets standards and tolerances in paragraph 31c(1).
(9) Disconnect test equipment, return site to operational status.
(10) This test may also be performed using a CW signal from ZAN and rotating the feed to obtain a maximum and a null.
58. SATELLITE ANTENNA TRACKING AND CONTROL TEST.
a. Objective. This procedure verifies that remote control of the antenna is possible via the antenna controller and demonstrates precise movement to a given position or satellite. In addition, the ability of the hub station antenna to perform step-track (auto-track) maneuvers will be shown. This tracking ability will ensure that the antenna is properly aimed at the satellite at regular intervals to ensure maximum signal level.
b. Discussion. First, the ability of the antennas to be moved in azimuth, elevation, and polarization will be tested. This can be done directly from the front panel of the antenna controller. Second, the ability of the antennas to be moved to a particular location and satellite remotely by the NOCC and by entering a value with the numeric keypad will be demonstrated. Finally, the auto-tracking ability of the antenna system at the hub sites will be demonstrated by moving the antenna off of its current position and allowing the tracking system to bring the antenna back to an optimized position based on the level of the satellite beacon.
c. Test Equipment. Spectrum analyzer.
d. Conditions. Reduced service outage on affected links.
e. Detailed Procedures.
(1) Enter the menu on the antenna controller that allows moving of the antenna in azimuth. Verify that movement in both the “up” and “down” directions is possible.
(2) Enter the menu on the antenna controller that allows moving of the antenna in elevation. Verify that movement in both the “up” and “down” directions is possible.
(3) Enter the menu on the antenna controller that allows moving of the polarization angle of the feed. Verify that movement in both the “up” and “down” positions is possible.
(4) Enter the “AZ” menu on the antenna controller from the main menu. Note the current position of the antenna, and subtract 10 degrees from this value. Move the antenna to this new position by entering the value using the numeric keypad. Verify that the antenna moves to this new position
(5) Enter the “EL” menu on the antenna controller from the main menu. Move the antenna to an elevation angle of 35º by entering this value using the numeric keypad. Verify that the antenna moves to the new position.
(6) Enter the “POL” menu on the antenna controller from the main menu. Note the current position of the antenna, and subtract 35º from this value. Move the antenna to this new position by entering the value using the numeric keypad. Verify that the feed moves to the new position.
(7) Using the antenna controller “Move to Satellite” menu, command the antenna to move to another satellite. Verify that the antenna moves to this position by viewing the azimuth and elevation indicators.
(8) Connect a spectrum analyzer to the RF patch panel, or to any other source of direct RF downlink signal.
(9) Command the antenna to move as in step e. (4).
(10) At the antenna controller, command the antenna to the mid-point of the azimuth axis and elevation axis.
(11) At the antenna controller, command the antenna to move to its azimuth limit in either direction.
(12) Observe the antenna and verify that it moves to its azimuth limit in the direction commanded.
(13) At the antenna controller, command the antenna to move its limit in the opposite direction.
(14) Observe the antenna and verify that it moves to its azimuth limit in the direction commanded.
(15) Return the antenna to its mid-azimuth position.
(16) At the antenna controller, command the antenna to move its elevation limit in either direction.
(17) Observe the antenna and verify that it moves to its elevation limit in the direction commanded.
(18) At the antenna controller, command the antenna to move to its limit in the opposite direction.
(19) Observe the antenna and verify that it moves to its elevation limit in the direction commanded.
(20) Return the antenna to its mid-elevation position.
(21) At the antenna controller, command the antenna to move to its polarization limit in either direction.
59. RF DISTIBUTION SYSTEM VOLTAGE STANDING WAVE RATIO (VSWR) TEST
(22) Verify that the polarization unit is at one of its limit positions.
(23) At the antenna controller, command the polarization unit to move to its limit in the opposite direction.
(24) Observe the polarization unit and verify that it moves to its travel limit in the direction commanded. Return unit to original polarization location after completion of test.
f. AUTO TRACKING - Hub sites only.
(6) Set the spectrum analyzer to view the applicable beacon (either 3700.5 MHz or 4199.5 MHz).
(7) Manually adjust the antenna for peak signal strength on the beacon using the movement controls as described earlier. Record the level of the voltage from the beacon receiver as indicated on the antenna controller. Also record the level of the beacon as indicated on the spectrum analyzer and the azimuth and elevation angle values.
(8) Using the beacon signal level as a guide, move the antenna until the beacon level is reduced by 2 dB from its maximum value.
(9) Initiate “auto track” mode for satellite item 1 using the “no search” option.
(10) When all antenna motion has stopped, record both the level of the beacon as indicated on the spectrum analyzer and the voltage level from the beacon receiver as indicated on the antenna controller. Also record the azimuth and elevation angles. Compare these values to the values obtained in step f. (2).
(11) Repeat steps f. (1) through (5) above for the other antenna system.
(12) Disconnect all test equipment and ensure that no alarms are present on the system status screen.
(13) Return station equipment to operational configuration.
Section 3. RADIO FREQUENCY (RF) EQUIPMENT
59. RF DISTIBUTION SYSTEM VOLTAGE STANDING WAVE RATIO (VSWR) TEST
a. Object. This procedure measures the RF Distribution System’s VSWR. The measured value must be within manufacturer’s specification and engineering link budget allocations. The specification applies to the antenna feed ports. The antenna contribution to the total VSWR is less than 1.3:1. On the transmit side at a hub site, waveguide goes from the feed port to the PA rack. On the transmit side at a remote, a heliax transmission line is connected to the feed. The VSWR of the combination of the waveguide and feed is measured in this procedure. On the receive side, the LNA is connected to the receive port of the feed. There are coaxial components and a heliax cable connected from the output of the LNA to the down converters. The VSWR of these components is measured in this procedure. The overall limit on the measured VSWR of these components is 1.5:1. Perform Anritsu test on the cable.
b. Discussion. The Anritsu Sitemaster 810A measures a cable by sending out a series of short CW pulses between the lower and upper frequencies set by the user. Therefore, the cable is tested at the operating frequencies it is used. The minimum frequency for the 810A is 3.3 GHz and the upper limit is 10.0 GHz. This covers the uplink and downlink frequencies of our C-band RF equipment. The frequency range chosen by the user is divided into 130 steps and a separate pulse is sent on each of these step frequencies.
c. The Sitemaster then measures the amplitude and phase of each echo that comes back. These measurements are displayed on charts which indicate the distance to, and characteristics of, each place in the cable where it is different from a new (undamaged) cable.