Radar Vectors
FAA Notice Cancelled Issued Jan 27, 2010 AIR-120 17 pages Copy saved Nov 22, 2026

Notice N 8110.110 Software Approval Guidelines

This document is cancelled. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

NOTICE U.S. DEPARTMENT OF TRANSPORTATION

NOTICE U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

National Policy

SUBJ: Software Approval Gu ide lines, Continued

1. Purpose of This Notice.

N 8110.110

Effective Date: January 27, 2010

Cancellation Date: January 27, 2011

a. We've written tins notice to supplement RTCNDO- I78B, Software Considerations in Airborne Syslems and Equipment Certification, to give you assistance in approving airbome software, and to help you ensure that an applicant establishes appropriate processes and procedures that result in compliance to RTCNDO-178B objectives.

FEDERAL AVIATION ADMINISTRATION

b. This guidance applies to your approving the software aspects of airbome systems and equipment related to type certificates (TC), supplemental type celtificates (STC), amended type certificates (A TC), amended supplemental type certificates (ASTC), and technical standard order authorizations (TSOA). This notice takes precedence whenever there is conflict with any other directives.

2. Audience. Managers and staff of the FAA Aircraft Celtification Service, including any persons designated by tile Adminish'ator, and organizations associated with the certification process required by 14 CFR

3. Where You Can Find This Notice. You can find tins notice on the Directives Management website at https://employees.faa.gov/tools resources/orders notices!'

4. Related References and Software Topics Covered in This Notice.

a. On .Tune 3, 2003, we published Order 8110.49, Sofiware Approval Guidelines, to help you evaluate and approve aU'bome software and changes to approved aU'bome software. This notice supplements, but doesn't replace, Order 8110.49.

b. Applicants may use Advisory Circular (AC) 20-1 15B, RTCA, inc., Document RTCAlDOi78B, to demonsh'ale compliance to regulations for the software aspects of airbome systems and equipment celtification and TSOA. AC 20-11 5B offers RTCND0178B as an acceptable means 10 gain FAA approval of software used in airborne systems and equipment installed on civil aircraft. In this notice, we likewise assume that applicants will propose RTCNDO-178B as their means of compliance. If an applicant has proposed a means of compliance other than RTCNDO-178B, we may need to develop additional FAA guidance, like an issue paper, on a project-by-project basis.

Distribution: Electronic Only Initiated By: AIR-120

01/27/10 N 81 10.11 0

c. The degree to which you use this policy may depend on the size and complexity of a pruticular celtification project. Confer with FAA system ruld softwme specialists as required. You may elect to use designees to perfoml oversight, after assessing their qualifications a!1d your level of involvement according to Order 8110.49, Software Approval Guidelines, Chapter 3. Because it's impractical to cover all situations or conditions that may ru·ise, supplement tlus policy with good judgnlent in ha!1dling the situation or condition.

d. In this notice, we supplemented RTCAlDO-178B, explauung how you erul ensure--

(1) The applicant is properly overseeing their suppliers (Chapter I);

(2) The applica!1t is properly implementing the use of softwme problem repOlts (Chapter 2);

(3) That databases ruld data items the applicant is using are appropriately assured (Chapter 3); a!1d

(4) That softwme development a!1d verification environments ru·e adequately managed (Chapter 4).

01/27/10 N8110110

Chapter 1. Properly Overseeing Suppliers

Chapter 1. Properly Overseeing Suppliers

1. When to Apply This Chapter. You must apply the policy contained in this chapter when an applicant uses suppliers and sub-tier suppliers to pelfoml system and software development, verification, and certification activities.

2. Contemporary Issues.

a. Many TC/STCrrSOA applicants have shifted system and software development, verification, and certification activities onto their aircraft system suppliers and sub-tier suppliers. In the past, these suppliers participated in compliance activities only at their respective system, subsystem, or component levels. With aU'bome systems becoming increasingly more complex and integrated, and suppliers and sub-tier suppliers accepting these new responsibilities, we are concemed that their lack of expe11ise could result in incomplete or deficient ce11ification activities.

b. Each responsibility that the applicant delegates to a supplier creates an intelface with that supplier that needs to be validated and verified to ensure that the h'ansition from the supplier's processes to the applicant's processes (or vice-versa) is accomplished correctly and accurately. Lack of proper validation and verification oflife cycle data at the transition point has resulted in issues with regard to requirements, problem repo11ing, changes, etc.

c. Some certification tasks and activities may be performed in foreign counh·ies. We can ask the certification authority of a COW1(TY with which we have a bilateral agreement to make a dete1111ination of compliance to the applicable FAA regulations for us. We can't, however, request the certification authority of a country with which we lack a bilateral agreement to make a determination of compliance to the applicable FAA regulations. We would consider it an undue burden on us if we were required to oversee compliance activities at foreign supplier facilities in non-bilateral countries (including conducting on-site reviews).

d. Finally, retention of substantiating data, such as software life cycle data and other celtification and compliance data, is a critical part of the certification process. When tlus data is retained by a foreign supplier, it may not be readily available to us. Tlus may also affect the continued operational safety of the aircraft and its systems, especially with regard to in-service problems (service diffIculties), problem resolution (service bulletins), and mandatory corrections (ailw0l1hiness directives).

3. Supplier Oversight Plans and Procedures.

a. The applicant should create oversight plans and procedures that will enSlU'e all suppliers and sub-tier suppliers will comply with all regulations, policy, guidance, agreements, and standards that apply to the certification program. The applicable publications include, but are not linuted to:

(1) Title 14 of the Code of Federal Regulations (14 CFR);

(2) Advisory circulars;

(3) FAA orders and notices;

(4) Issue papers;

(5) Special conditions;

(6) Applicant delegated organization authorization procedures, auworthiness representative procedLU'es, designated engineering representative (DER) procedmes, partnership for safety plans, memoranda of agreement;

(7) Applicant standards for system, hardware, and software development (including requirements, design, and coding standards);

(8) Applicant quality assmance plans, procedmes, and processes;

(9) Applicant configmation management plans, procedmes, and processes;

(10) System supplier standards, plans, procedures and processes; and

(I I) Applicant process for software change impact analysis.

b. The applicant's planning documents, such as celt ification plans and plans for software aspects of certification (PSACs), should describe how the applicant will have visibility into their suppliers' and sub-tier suppliers' activities. This includes commercial off-the-shelf software component suppliers and vendors. The applicant should submit these plans for yom review and approval, preferably early Ul the program. The applicant should avoid making changes to the plans late in the program. If late changes are LUlavoidable, the applicant must allow adequate time for your review and consideration.

4. Supplier Oversight: Review the Applicant's Plans.

a. The applicant should address the following concems in a supplier management plan or other suitable plannmg docwnents. As a project engineer, you review the plan(s) and see that the following areas are addressed to yom satisfaction:

(1) Visibility into compliance with regulations, policy, plans, standards, and agreements: The plan should address how the applicant will ensure that all applicable regulations, policy, plans, standards, issue papers, partnership for safety plans, and memoranda of agreement are conveyed to, coordinated with, and complied with by prime and sub-tier suppliers.

(2) Integration management: The plan should address how the system components will be integrated, and who will be responsible for validatulg and verifYmg the software and the integrated system. The plan should address:

(a) How requirements will be implemented, managed, and validated; including safety requirements, derived requirements, and changes to requu'ements;

(b) How the design will be controlled and approved;

(c) How the integration test environment will be controlled;

(d) How the software build and release process will be controlled (reconcile any differences between the supplier's and the applicant's release strategies);

(e) What product assmance activities that SUppOlt the celtification requirements will be conducted and who will be conducting them; and

(f) The applicant's strategy for integrating and velifYing the system, including requirements-based testing and structlu'al coverage analysis.

(3) Designee tasks and responsibilities: The plan should identifY who the designees are and what their responsibilities are, who the focal points are, and how their activities will be coordinated and cOl1Ul1Unicated. It should identifY who will approve or reconunend approval of software life cycle data.

(4) Problem reporting and resolution: The plan should establish a system to tTack problem reports. It should describe how problems will be repOlted between the applicant and all levels of suppliers. The problem repOlting system should ensure that problems are resolved, and that reports and the resulting changes are recorded in a configuration management system. The plan should describe how the designee(s) will oversee problem repOlting.

(5) Integration verification activity: The plan should identifY who will be responsible for ensuring that all integration verification activities between all levels of suppliers comply with applicable guidance. It should describe how the designee(s) will oversee the verification process.

(6) Configmation management: The plan should desctibe the procedures and tools to aid configmation management of all software life cycle data. It should describe how configuration control will be maintained across all sub-tier suppliers, including those in foreign locations, and how designees will oversee configuration management

(7) Compliance substantiation and data retention: The plan should describe how the applicant will ensme that all supplier and sub-tier supplier compliance findings are substantiated and retained for the program. The plan should address, at minimLUn, the following certification data:

(a) Evidence that compliance has been demonstrated;

(b) Velification and validation data; and

(c) Software life cycle data.

01 /27/10 N 8110.110

b. The applicant's supplier management plan (or equivalent plans) should address the concem identified in paragraph 2.b. regmding the transition oflife cycle data between the applicant's processes and the suppliers' processes. The plan should address the validation and verification of data with regard to all processes, including requirements management, problem repOlting, use of standards, change impact, reviews, etc.

c. The plans should state that cettification data will be retained at a facility in the United States, and that the data will be in English, since non-English certification data may create ambiguities when translated to English. Data located in a facility outside the United States may present an undue burden on us.

01/27/10 N 8110. 110

Chapter 2. Software Problem Reporting

Chapter 2. Software Problem Reporting

1. When to Apply This Chapter. You must apply the policy contained in this chapter when an applicant's suppliers and sub-tier suppliers will be responsible for managing problems detected during the development of aircraft systems implemented with software. This chapter also discusses your

involvement with assessing unresolved problems before celtification.

2. Supplier Involvement in Problem Reporting.

a. The software development and verification phases of complex and highly integrated systems are likely to result in a large nWllber of problem reports produced by the applicant and their suppliers. Tlus brings about the following concerns:

(I) The applicant's suppliers and sub-tier suppliers may not have the expeltise to detennine whether problems with their component(s) will have safety, functional, or operational impacts on the aircraft or airbome system in which they are used;

(2) The applicant may not have adequate visibility into supplier and sub-tier supplier problem repOIting processes; and

(3) There may be a large number of open problem reports, indicating a lack of software maturity and assurance at type inspection authorization (TIA) or celtification.

b. Due to these concems, the applicant will need to actively pruticipate in the oversight of problem reporting processes to ensme that problems are properly identified, repOIted, ruld resolved.

c. RTCNDO-178B, sections 7.2.3 through 7.2.7 and Table 7-1, provide guidance on problem repOIting ruld resolution. Additionally, section 11 .20 U) states that the Software Accomplishment SUl11mruy should contain a sUl11maJY of problem reports unresolved at the time of certification, including a statement of functional limitations.

3. Oversight of Problem Reporting.

a. In order to ensure that softwru'e problems ru'e consistently reported and resolved, and that software development assurance is accomplished before certification, the applicant should discuss in their Softwru'e Configmation Management Plrul, or other appropriate plaruung documents, how they will oversee their supplier's and sub-tier supplier's softwaJ·e problem reporting process. As a project engineer, you review the plans aJld verifY that they address the following to your satisfaction:

(1) The plans should describe each of the applicant's supplier's aJld sub-tier supplier's problem reporting processes that will ensure problems aJ·e reported, assessed, resolved, implemented, re-verified (regression testing and analysis), closed, aJld controlled. The plans should consider all problems related to software, databases, data items, and electronic files used in any systems ruld equipment installed on the aircraft.

(2) The plans should establish how problem reports will be categorized so that each problem report can be classified accordingly--

(a) Categories should identify problems with a potential impact on safety, functionality, performance, operation, or design assw·ance;

(b) Categories should identify problems that should be resolved before certification, and problems that could be defened beyond certification; and

(c) Each category should define the criteria for which deferring the problem is acceptable.

(3) The plans should describe how the applicant's suppliers and sub-tier suppliers will notify the applicant of any problems that could impact safety, pelfonnance, functional or operational characteristics, software assmance, or compliance.

(a) The applicant may enter such problems into their own problem repolting and tracking system. If so, the plan needs to describe how this is accomplished. If the supplier's problem repOlting system is not directly compatible Witll the applicant's system, the plan needs to describe a process for verifying the translation between problem reporting systems.

(b) The applicant may allow their suppliers and sub-tier suppliers to have access to their own problem repOlting system. Doing so may help the applicant ensure that they will properly receive and control their supplier's problem repOlts. If the applicant allows this, they should restrict who has such access in order to maintain proper configuration control, and their suppliers should be trained on the proper use of the reporting system.

(c) The plans should describe any tools that the applicant's suppliers or sub-tier suppliers plan to use for the purpose of recording action items or observations for the applicant to review and approve prior to entering them into the applicant's problem reporting system.

(d) The plans should state that suppliers will have only one problem reporting system in order to assure that the applicant will have visibility into all problems and that no problems are hidden fi·om the applicant.

(e) Any problems that may influence other applications, or that may have system-wide influence should be made visible to the appropriate disciplines.

(4) The plans should describe how flight test, human factors, systems, software, and other engineers of the appropriate disciplines will be involved in reviewing each supplier's and sub-tier supplier's problem report resolution process. They should also describe how these engineers will

participate in problem report review boards and change control boards.

(5) The plans should establish the criteria that problem repOlt review boar·ds and change control boards will use in detelmining the acceptability of any open problem repolts that the applicarlt will propose to defer beyond celtification.

(a) These boards should carefully consider the potential impacts of any open problem reports on safety, functionality, and operation.

(b) Since a significant number of unresolved problem rep0l1s indicate that the software may not be fiJlly mature and its assurance questionable, the applic!mt should describe a process for establishing an upper bowldary or target limit on the munber of problem reports allowed to be defelTed lmtil after type certification.

(c) The plan should establish a means of detennining a time limit that unresolved problem reports defelTed beyond ce11ification will be resolved. Tills applies to problem rep0l1s generated by the applicant, suppliers, and sub-tier suppliers.

b. As a project engineer, you should be involved in certain decisions related to open problem rep0l1s prior to TIA and certification. You should:

(I) Review, as appropriate, any problem rep0l1s that are proposed for deferral beyond certification. Tills review may require FAA flight test, systems, and other specialists. You may need to ask for more infomlation to make your assessment If you have concerns that safety might be impacted, you can disallow the defenal of specific problem reports.

(2) If the applicant is using previously developed software, ensure that the applicant has reassessed any open problem reports for their potential impact on the aircraft or system baseline to be ce11ified.

(3) Ensure that the applicant has considered the inter-relationships of multiple open problem repOlis and assessed whether any open problem repOli has become more critical when considered in conjunction with another related problem report.

(4) Ensure that the applicant has reviewed any open problem reports related to airw0l1hiness directives, service bulletins, or operating limitations and other Immdatory cOlTections or conditions. The applicant may need your help to determine which problems to resolve before ce11ification.

(5) Review any open problem rep0l1s with potential safety or operational impact to determine if operational limitations and procedures are required before FAA test pilots pat1icipate in test flights. You may need to involve teclllllcal expe11s in making your detemlination.

(6) Ensure that the applicatlt has complied with DO-178B, section 11.200).

Chapter 3. Assuring Airborne System Databases and Aeronautical Databases

Chapter 3. Assuring Airborne System Databases and Aeronautical Databases

1. When to Apply This Chapter. You must apply the policy contained in this chapter when the applicant's airborne systems and equipment is utilizing aeronautical databases or airbome system databases.

2. Databases and Their Design Assurance. There are three distinct types of databases used in airborne systems and equipment:

a. Aeronautical databases, which are used by an airborne system and whose development processes are typically approved using the guidance of RTCA DO-200A, Standards/or Processing Aeronautical Data; AC 20-153, Acceptance 0/ Data Processes and Associated Navigation Databases; and FAA Order 8110.55, How to Evaluate and Accept Process{or Aeronautical Database Suppliers.

(l) Aeronautical databases should be demonstrated to comply with RTCAlDO-200A or other acceptable means. RTCAlDO-200A defines requirements and an acceptable means of compliance for pruticipants processing aeronautical databases. [ffollowed, it provides assurrulce that the production of aeronautical databases meets the integrity requirements for intended function, based on design assllIrulce levels or software levels. It addresses specifics of the aeronautical data process, and aSSWlles that participating organizations have rul acceptable quality management system.

(2) AC 20-153 provides criteria for orgruuzations to apply for a letter of acceptance (LOA) for their aeronautical data process. The LOA identifies orgaluzations within the aeronautical data chain that demonstrate acceptable data processes, ruld fOlmally documents that a supplier's databases ru·e being produced according to RTCAlDO-200A.

(3) Order 8110.55 explains how you can evaluate and accept aeronautical data processes of a database supplier who complies with AC 20-153 and issue them an LOA.

b. Airborne system databases, wluch ru·e used by an airborne system and approved as part of the type design of the aircraft or engine. These databases may influence paths executed tlu·ough the executable object code, be used to activate or deactivate software components ruld functions, adapt the softwru·e computations to the aircraft configuration, or be used as computational data.

(1) Airborne system databases may consist of script files, interpretive languages, data structures, or configuration files (including registries, softwru·e options, operating program configliiation, aircraft configuration modules, and option-selectable software).

(2) Assurance of these databases is typically achieved in the context ofRTCAlDO- I78B airborne system 3l1d equipment software processes.

c. Other applications and databases, which are not prut of the type design of the aircraft or engine, and wluch are operationally approved by Flight Standru·ds. Tlus includes applications and databases defined as Type A and Type B in AC 120-76A, Guidelines/or the Certification, Airworthiness, and Operational Approval o/Electronic Flight Bag Computing Devices; and electrOluC checklists addressed in AC 120-64, Operational Use & Modification 0/ Electronic Checklists. User-

01/27/10 N 811 0. 11 0

Modifiable Software is also in this category (refer to DO-178B, section 2.4 and FAA Order 8110.49, Chapter 7). These applications and databases have no design assurance requirements and therefore are not addressed in this notice.

3. Assuring Aeronautical Databases. To ensure that the applicant and their airborne system suppliers have complied with all appljcable regulations and FAA guidance for aeronautical databases, you should:

a. Ensure that the applicant has followed the guidance provided in AC 20-1 53, section 10, or other acceptable means for aeronautical databases that comply with the requirements of RTCAlDO- 200A. A current Type 2 LOA (refer to AC 20-1 53) provides evidence that the aeronautical database complies with DO-200A in support of installation eligibility and operational authorization for llse.

b. Ensure that any aeronautical databases meet the appropriate assurance level requirements using RTCAlDO-200A (Appendix B), AC 20-153, or other acceptable means (refer to Order 8110.55).

4. Assuring Airborne System Databases. To ensure that the applicant and their airborne system suppliers have complied with all applicable regulations and FAA guidance for airborne system databases, you should:

a. Review the applicant's aircraft and system safety assessment(s) and verify that for each airborne system database:

(I) They have considered possible database enors and cOlTLIption for each system that will use each database;

(2) They have assigned appropriate software levels to each database (refer to AC xx. 1309, System Safety Analysis and Assessmentfor Part XX Airplanes; AC 33.28, Guidance Materialfor 14 CFR 33.28, Reciprocating Engine, Electrical and Electronic Engine Control Systems; SAE International's Aeronautical Recommended Practice (ARP) 4754, Certification Considerations for Highly-Integrated Or Complex Aircraft Systems; and ARP476 1, Guidelines and Methodsfor Conducting the Sqfety Assessment Process on Civil Airborne Systems and Equipment);

(3) They have based assigned database software levels on the worst-case potential hazard effect that enors or corruption could cause for the system and aircraft or engine; and

(4) You concur with the identified hazards and assigned software levels.

b. Ensure that each database is assured to the appropriate software level using RTCAIDO- I78B or other acceptable means, and that they are verified in the context of the flU1ctional software, the system, and the overall aircraft use.

(I) A level of verification coverage appropriate for the database software level should be achieved. This may be achieved by a combination of requirements-based testing, data coupling

analyses for data items that provide data only, and control coupling analyses for data items that influence software execution.

(2) Review the applicant's proposed verification coverage criteria for each database and either concur or provide rationale if you do not concur.

(3) Ensure that the applicant has applied robustness test conditions for databases, including those that influence software execution.

5. Actions Applicable to Aeronautical and Airborne System Databases.

a. Review any field-Ioadable software loading procedures for each database. Ensure that safeguards are established to detect database transmission and media enol'S, loading and content enors, mismatches between database part nWllbers and the aircraft systems or embedded software, and con'uption of database contents or memory during use. Refer to FAA Order 811 0.49, Chapters 5 and 6 for more guidance on approving field-Ioadable software.

b. Ensure that maintenance instructions and appropriate limitations are provided for database updates if the contents of the database are valid for use only within a specified time.

c. Ensure that the applicant has provided a process for updating each database. The process should include a means for obtaining airworthiness approval and/or operational authorization for use, such as STC, minor modification (mod level change), system part number roll, or software part number roll, as appropt1ate. The process should address databases with their own part number assigned, as well as databases considered part of the operational software.

Chapter 4. Managing the Software Development and Verification Environment

Chapter 4. Managing the Software Development and Verification Environment

1. When to Apply This Chapter. You must apply the policy contained in this chapter when the applicant is using a software development or verification environment that may not be completely representative of the target computer. In this chapter, we show you how to ensure that the applicant establishes and maintains configuration control of the software development and verification environment, and implements a structured problem reporting system for the environment

2. How Representative is the Environment? RTCAlDO-178B requires that the verification test activities take place on the target computer, a target emulator, or a host computer simulator. Software development and verification teams typically utilize an environment designed specifically to emulate the target computer to satisfY tlus requirement Because the enviroillilent may go through several iterations during software development and verification, it may not be clear how representative the environment is of the actual production hardware at any point in time in the verification process. Additionally, the envirol1l11ent may not be identical to the final production version of the hardware to be installed in the aircraft. Therefore, the applicant should establish and maintain configuration control of the environment, and implement a structured problem repOlting system for the environment available to users of the environment

3. Controlling the Development and Verification Environment. The applicant should address the following aspects in their Software Verification Plan and Software Configuration Management Plan. The applicant should convey these aspects to all pruticipating softwru'e suppliers, and ensure that they comply with them. As a project engineer, you review these plans and assess their adequacy.

a. The Software Verification Plan should include:

(I) A description of the software development ruld verification envirolllllent, and rul explanation oftlle differences between it and the production version of the system hardware and software to be installed on the aircraft.

(2) An explanation of how the software development and verification envirolll1lent will be used by system software suppliers and what RTCAIDO-178B objectives it will be used to show compliance with.

(3) An explanation of how the software development and verification envirolllnent will be used to show complirulce witll RTCAlDO- I78B objectives that involve verification of the software executable object code. This should address the entire executable object code, not just individual functional softwru'e components. If development tools are being used in the integrated environment, then verification should also be pelfonned in the integrated envirol1l11ent.

(4) A process for rumlyzing completed verification activities and assessing the need to repeat any of those activities after changes are made to the softwru'e development and verification environment. The process should ensure that all affected verification activities will be repeated, or ensure that a documented rulalysis is conducted showing why retesting is not required.

b. The Software Configmation Management Plan should include:

(I) A description of the configmation control system to be used for the software development and verification environment. The plan should identifY the person who is responsible for administering this system.

(2) A problem repOlting and assessing system for the software development and verification envirom11ent that is available to all users of the enviromnent (refer to Chapter 2 of this notice).

01/27/10 N 811 0.110

Chapter 5, Administrative Information

Chapter 5, Administrative Information

1. Distribution, Distribute tlus notice to the branch level in Washington headquarters Aircraft Celtification Service, section level in all Aircraft Celtification directorates, all cluet' scienti fic and technical advisors (CSTA), all aircraft certification offices (ACO), all manufacturing inspection offices (MIO), all manufacturing inspection district or satellite offices (MIDO/MISO), and all flight standards distTict offices (FSDO). Make additional limited distribution to delegated organization authorized representatives, designated engineering representatives, air carrier district oftices, the aeronautical quality assmance field offices, and the FAA Academy,

2, Suggestions for Improvement. If you find deficiencies, need clarification, or want to suggest improvements on tllis notice, send a copy of Federal Aviation Admllush'ation (FAA) Form 1320-19, Directive Feedback Infonnation (written or electrOlucally), to the Aircraft Celtification Service, Admilush'ative Services Branch, AIR-5 1 0, Attention: Directives Management Officer, for consideration. If you mgently need an interpretation, you may contact ilie Ail'craft Engineering Division, Software Specialist, AIR- I 20, for guidance. You should also use the FAA Form 1320-19 as a follow-up to verbal conversation. FAA Form 1320-19 may be found electrOlucally at htlps:!/employees.faa.gov/tools resources/forms!

~~ David W.1refnpe Manager Aircraft Engineering Division

01/27/10

Appendix A. Related Publications

Appendix A. Related Publications

N 811 0.110 Appendix A

The latest amendments of the following publications are the primary reference materials for this notice:

a. Code of Federal Regulations. Title 14 of the Code of Federal Regulations (14 CFR) part 21 , Certification Procedures for Products and Parts.

b. FAA Advisory Circulars (AC) and Orders. Copies of the fo llowing ACs and orders are available from the FAA website at http://www.airweb. J'aa.gov/rgL

- Advisory Circular 20-145, Guidance(or Integrated Modular Avionics (I MA) that Implement TSO-CJ53 Authorized Hardware Elements;

- Advisory Circular 20-148, Reusable Software Components;

- Advisory Circular 20-153, Acceptance of Data Processes and Associated Navigation Databases;

- Advisory Circular 21-23, Airworthiness Certification of Civil A ircFCrfi, Engine, Propellers, and Related Products Imported to the United States

- Advisory Circular 21-33, Quality Assurance of Software used in A ircraft or Related Products;

- Advisory Circular 23. 1309-1, System Safety Analysis and Assessmentfor Part 23 Airplanes;

Advisory Circular 25.1309-1, System Design and Analysis;

AdvisOlY Circular 27-1 (AC 27. 1309) Certification of Normal Category Rotorcrafi;

- AdvisOlY Circular 29-2 (AC 29.1309) Certification of Transport CategOlY Rotorcrafi;

- AdvisOlY Circular 33.28-2, Guidance Materialfor 14 CFR 33.28, Reciprocating Engine, Electrical and Electronic Engine Control Systems;

- Advisory Circular 120-64, Operational Use and Modification of Electronic Checklists;

- Advisory Circular 120-76, Guidelinesfor the Certification, Airworthiness, and Operational Approval of Electronic Flight Bag Computing Devices;

- FAA Order 8110.4, Type Certification;

A-I

01/27/10 N 81 10.1 10 Appendix A

- FAA Order 8100.11, Decision Paper Criteriafor Undue Burden and No Undue Burden Determinations Under 14 CFR Part 21;

- FAA Order 811 0.42, Parts Manufacturer Approval Procedures;

FAA Order 8110.49, Software Approval Guidelines;

FAA Order 8110.55, How to Evaluate and Accept Processesfor Aeronautical Database Suppliers.

c. Other FAA Documents.

- FAA Job Aid, Conducting Software Reviews Prior to Certification, dated January 16, 2004. A copy of this FAA Job Aid is available ii-Oln the FAA website at: http://www.faa.gov/aircrah/air cerUdesign approvals/air software/guide jobaid/

- AIR-100 Policy Memorandum #2001-01, Use of Designated Engineering Representatives in the Technical Standard Order Authorization Process, dated July 15, 2005. A copy of tillS policy memorandwn is available from the FAA website at htlp:l/www.airweb.faa.gov/Regulatory and Guidance Library/rgPolicy.nsll

d. RTCA, Inc. Documents. You can obtain copies on-line at ht1p:l/www.rtca.org. RTCA documents used in this notice are:

RTCAlDO-178B, Software Considerations in Airborne Systems and Equipment Certification;

RTCAlDO-200A, Standardsfor Processing Aeronautical Data;

RTCAlDO-20 IA, Standardsfor Aeronautical In/ormation;

RTCAlDO-272, User Requirements/or Aerodrome Mapping Information,

RTCAlDO-276, User Requirementsfor Terrain and Obstacle Data.

e. SAE, International Documents. Order copies of SAE documents fi'om SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001 USA. You can obtain copies on-line at http://www.sac.org. SAE documents used in tlus notice are:

- SAE ARP-4754, Certification Considerationsfor Highly-Integrated Or Complex Aircraft Systems;

- SAE ARP-4761 , Guidelines and Method5for Conducting the Safely Assessment Process on Civil Airborne Systems and Equipment.