CAR 42 Amendment 42-43 Certificate Issuance
Text re-read from the scan: 4 of 4 passages.
- Date
- Nov 21, 2026
- Recorded
- Nov 21, 2026
- Passages
- 4 of 4 changed (was 3)
- Paragraphs
- 13 added or rewritten, 26 removed or rewritten
Read the current text Official source ↗
What changed in the text
Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.
- Removed
[removed: ll40] - Added
[added: UNITED STATES OF AMERICA]
- Removed
[removed: • UNITED STATES OF AMERICA] FEDERAL AVIATION AGENCY
- Changed
[removed: WASm][added: WASHI] NGTON, D.C. Civil Air Regulations Amendment 42-43
- Removed
[removed: lReg. Docket No. 1349; Amdt.42-43J] - Added
[added: Effective: August 23, 1962]
- Removed
[removed: PART 42-IRREGULAR AIR CARRIER] - Added
[added: Issued: August 17, 1962]
- Removed
[removed: AND OFF-ROUTE RULES] - Added
[added: [Reg. Docket No. 1349; Amdt. 42–43] to conduct the necessary inspections and]
- Removed
[removed: Certificate Issuance As presently worded, Part 42 does not contain any provision requiring a specified time interval between the filing of] - Added
[added: PART 42—IRREGULAR AIR CARRIER process their applications. Accordingly, a note is being added to § 42.5(a) indi-]
- Removed
[removed: an application for an air carrier operating certificate and the date of intended operation. On several recent occasions requests have been made of the Agency to complete the inspection and certification process within less time than is actually necessary to determine whether the applicant for an air carrier operating certificate for large aircraft is capable of conducting the proPosed operations in accordance with the applicable provisions of this part.] - Added
[added: AND OFF-ROUTE RULES cating that the processing of the appli-]
- Removed
[removed: Experience within the Agency has shown that in cases of applications under Part 42 involving large aircraft, as opposed to small aircraft, more time is required to enable the appropriate FAA inspectors to make the necessary] - Added
[added: Certificate Issuance cation may require up to 60 days from the date of filing with the appropriate As presently worded, Part 42 does not FAA Air Carrier District Office. contain any provision requiring a speci- Since this amendment is a general fied time interval between the flling of statement of agency practice, notíce and an application for an air carrier operat- public procedure hereon are unnecessary ing certificate and the date of intended and it may be made effective on less than operation. On several recent occasions 30 days' notice. requests have been made of the Agency In consideration of the foregoing, Part to complete the inspection and certífica- 42 of the Civil Air Regulations (14 CFR tion process within less time than is Part 42) is hereby amended by adding a actually necessary to determine whether note at the end of § 42.5(a) to read as the applicant for an air carrier operating follows, effective August 23, 1962:]
- Removed
[removed: inspections of the applicant's aircraft, operations. training programs, mainte-] - Added
[added: of conducting the proposed operations certificate for large aircraft is capable § 42.5 Certificate issuance.]
- Removed
[removed: nance facilities. and manuals. While the Agency will continue to examine and process such applications as expedi-] - Added
[added: in accordance with the applicable pro- (a) General. visions of this part. Note: The inspection and processing by the Experience within the Agency has FAA of an application for an air carrier opshown that in cases of applications erating certiñcate where large aircraft are to under Part 42 involving large aircraft, be used may require up to 60 days from]
- Removed
[removed: tiously as possible, it is believed desirable to have a note added to § 42.5(a) to insure that applicants are aware of the amount of time which may be required] - Added
[added: is required to enable the appropriate as opposed to small aircraft, more time the date of filing. An applicant should con- sider this in planning his operations.]
- Removed
[removed: Effective:] - Added
[added: FAA inspectors to make the necessary (Secs. 313(a), 601, 604; 72 Stat, 752, 775, 778, inspections of the applicant's aircraft, 49 U.S.C. 1354, 1421, 1424) operations, training programs, mainte- Issued in Washington, D.C., on Aunance facilities, and manuals. While gust 17, 1962. the Agency will continue to examine and process such applications as expedi- N. E. HALABY, tiously as possible, it is believed desirable Administrator. to have a note added to § 42.5(a) to [F.R. Doc. 62–8473; Filed, Aug, 22, 1962; insure that applicants are aware of the 8:52 a.m.] amount of time which may be required]
- Removed
[removed: Issued:] - Added
[added: (Published in the Federal Register [27 F.R. 84247 August 23, 1962)]
- Removed
[removed: August 23, 1962 August 17, 1962] - Removed
[removed: to conduct the necessary lnspections and process their applications. Accordingly,] - Removed
[removed: a note is being added to § 42.5(a} indicating that the processing of the application may require up to 60 dayS from the date of filing with the appropriate FAA Air Carrier District Office.] - Removed
[removed: Since this amendment is a general statement of agency practice, notice and public procedure hereon are unnecessary and it may be made effective on Jess than 30 days' notice. In consideration of the foregoing, Part 42 of the Civil Air Regulations (14 eFR Part 42) is hereby amended by adding a nate at the end of § 42.5(a) to read as follows, effective August 23, 1962:] - Removed
[removed: § 42.5 Cerrifieare issuance.] - Removed
[removed: (a) General. * ,.. to NOTS: The inspection and processing by the FAA of an appUcation for an a1l' carrier operating certificate where large aIrcraft are to be used may require up to 60 days from the date of fiUng. An applicant should consider thla in planning his operations.] - Removed
[removed: (Sees. 313(a), 601, 604; 72 Stat. 752, 775,778. 49 U.S.C. 1354, 1421, 1424) Issued in Washington, D.C., on August 17, 1962,] - Removed
[removed: N. E. HALABY,] - Removed
[removed: Administrator.] - Removed
[removed: (P.R. Doc. 62-8473~ Filed, Aug. 22, 1962;] - Removed
[removed: 8:&2 a.m.]] - Removed
[removed: (Published in the Federal Register [27 F.R. 842.!±7 August 23, 1962)]
Whole text before this change
ll40
• UNITED STATES OF AMERICA
FEDERAL AVIATION AGENCY
WASm NGTON, D.C.
Civil Air Regulations Amendment 42-43
lReg. Docket No. 1349; Amdt.42-43J
PART 42-IRREGULAR AIR CARRIER
AND OFF-ROUTE RULES
Certificate Issuance As presently worded, Part 42 does not contain any provision requiring a specified time interval between the filing of
an application for an air carrier operating certificate and the date of intended operation. On several recent occasions requests have been made of the Agency to complete the inspection and certification process within less time than is actually necessary to determine whether the applicant for an air carrier operating certificate for large aircraft is capable of conducting the proPosed operations in accordance with the applicable provisions of this part.
Experience within the Agency has shown that in cases of applications under Part 42 involving large aircraft, as opposed to small aircraft, more time is required to enable the appropriate FAA inspectors to make the necessary
inspections of the applicant's aircraft, operations. training programs, mainte-
nance facilities. and manuals. While the Agency will continue to examine and process such applications as expedi-
tiously as possible, it is believed desirable to have a note added to § 42.5(a) to insure that applicants are aware of the amount of time which may be required
Effective:
Issued:
August 23, 1962 August 17, 1962
to conduct the necessary lnspections and process their applications. Accordingly,
a note is being added to § 42.5(a} indicating that the processing of the application may require up to 60 dayS from the date of filing with the appropriate FAA Air Carrier District Office.
Since this amendment is a general statement of agency practice, notice and public procedure hereon are unnecessary and it may be made effective on Jess than 30 days' notice. In consideration of the foregoing, Part 42 of the Civil Air Regulations (14 eFR Part 42) is hereby amended by adding a nate at the end of § 42.5(a) to read as follows, effective August 23, 1962:
§ 42.5 Cerrifieare issuance.
(a) General. * ,.. to NOTS: The inspection and processing by the FAA of an appUcation for an a1l' carrier operating certificate where large aIrcraft are to be used may require up to 60 days from the date of fiUng. An applicant should consider thla in planning his operations.
(Sees. 313(a), 601, 604; 72 Stat. 752, 775,778. 49 U.S.C. 1354, 1421, 1424) Issued in Washington, D.C., on August 17, 1962,
N. E. HALABY,
Administrator.
(P.R. Doc. 62-8473~ Filed, Aug. 22, 1962;
8:&2 a.m.]
(Published in the Federal Register [27 F.R. 842.!±7 August 23, 1962)
Whole text after this change
UNITED STATES OF AMERICA
FEDERAL AVIATION AGENCY
WASHI NGTON, D.C.
Civil Air Regulations Amendment 42-43
Effective: August 23, 1962
Issued: August 17, 1962
[Reg. Docket No. 1349; Amdt. 42–43] to conduct the necessary inspections and
PART 42—IRREGULAR AIR CARRIER process their applications. Accordingly, a note is being added to § 42.5(a) indi-
AND OFF-ROUTE RULES cating that the processing of the appli-
Certificate Issuance cation may require up to 60 days from the date of filing with the appropriate As presently worded, Part 42 does not FAA Air Carrier District Office. contain any provision requiring a speci- Since this amendment is a general fied time interval between the flling of statement of agency practice, notíce and an application for an air carrier operat- public procedure hereon are unnecessary ing certificate and the date of intended and it may be made effective on less than operation. On several recent occasions 30 days' notice. requests have been made of the Agency In consideration of the foregoing, Part to complete the inspection and certífica- 42 of the Civil Air Regulations (14 CFR tion process within less time than is Part 42) is hereby amended by adding a actually necessary to determine whether note at the end of § 42.5(a) to read as the applicant for an air carrier operating follows, effective August 23, 1962:
of conducting the proposed operations certificate for large aircraft is capable § 42.5 Certificate issuance.
in accordance with the applicable pro- (a) General. visions of this part. Note: The inspection and processing by the Experience within the Agency has FAA of an application for an air carrier opshown that in cases of applications erating certiñcate where large aircraft are to under Part 42 involving large aircraft, be used may require up to 60 days from
is required to enable the appropriate as opposed to small aircraft, more time the date of filing. An applicant should con- sider this in planning his operations.
FAA inspectors to make the necessary (Secs. 313(a), 601, 604; 72 Stat, 752, 775, 778, inspections of the applicant's aircraft, 49 U.S.C. 1354, 1421, 1424) operations, training programs, mainte- Issued in Washington, D.C., on Aunance facilities, and manuals. While gust 17, 1962. the Agency will continue to examine and process such applications as expedi- N. E. HALABY, tiously as possible, it is believed desirable Administrator. to have a note added to § 42.5(a) to [F.R. Doc. 62–8473; Filed, Aug, 22, 1962; insure that applicants are aware of the 8:52 a.m.] amount of time which may be required
(Published in the Federal Register [27 F.R. 84247 August 23, 1962)