Radar Vectors
Civil Air Regulation Historical Issued Aug 23, 1962 AIR-600-Policy and Innovation Division 1 pages Copy saved Nov 21, 2026

CAR 42 Amendment 42-43 Certificate Issuance

This document is historical. It may have been replaced. Check the official source before relying on it.

Official source ↗ Open PDF

Text read by OCR from a scanned file. Check the original, as some words may be misread.

UNITED STATES OF AMERICA

FEDERAL AVIATION AGENCY

WASHI NGTON, D.C.

Civil Air Regulations Amendment 42-43

Effective: August 23, 1962

Issued: August 17, 1962

[Reg. Docket No. 1349; Amdt. 42–43] to conduct the necessary inspections and

PART 42—IRREGULAR AIR CARRIER process their applications. Accordingly, a note is being added to § 42.5(a) indi-

AND OFF-ROUTE RULES cating that the processing of the appli-

Certificate Issuance cation may require up to 60 days from the date of filing with the appropriate As presently worded, Part 42 does not FAA Air Carrier District Office. contain any provision requiring a speci- Since this amendment is a general fied time interval between the flling of statement of agency practice, notíce and an application for an air carrier operat- public procedure hereon are unnecessary ing certificate and the date of intended and it may be made effective on less than operation. On several recent occasions 30 days' notice. requests have been made of the Agency In consideration of the foregoing, Part to complete the inspection and certífica- 42 of the Civil Air Regulations (14 CFR tion process within less time than is Part 42) is hereby amended by adding a actually necessary to determine whether note at the end of § 42.5(a) to read as the applicant for an air carrier operating follows, effective August 23, 1962:

§ 42.5 Certificate issuance

of conducting the proposed operations certificate for large aircraft is capable § 42.5 Certificate issuance.

in accordance with the applicable pro- (a) General. visions of this part. Note: The inspection and processing by the Experience within the Agency has FAA of an application for an air carrier opshown that in cases of applications erating certiñcate where large aircraft are to under Part 42 involving large aircraft, be used may require up to 60 days from

is required to enable the appropriate as opposed to small aircraft, more time the date of filing. An applicant should con- sider this in planning his operations.

FAA inspectors to make the necessary (Secs. 313(a), 601, 604; 72 Stat, 752, 775, 778, inspections of the applicant's aircraft, 49 U.S.C. 1354, 1421, 1424) operations, training programs, mainte- Issued in Washington, D.C., on Aunance facilities, and manuals. While gust 17, 1962. the Agency will continue to examine and process such applications as expedi- N. E. HALABY, tiously as possible, it is believed desirable Administrator. to have a note added to § 42.5(a) to [F.R. Doc. 62–8473; Filed, Aug, 22, 1962; insure that applicants are aware of the 8:52 a.m.] amount of time which may be required

(Published in the Federal Register [27 F.R. 84247 August 23, 1962)