CAR 41 Standards, Procedures, And Limitations Governing Establishment And Revision Of Overhaul Periods For Powerplants, Propellers, Accessories, And Componenets Thereof For Air Carrier Aircraft
This document is historical. It may have been replaced. Check the official source before relying on it.
FEDERAL AVIATrON AGENCY
FEDERAL AVIATrON AGENCY
FLIGHT STANDARDS SERVICE
{14 CFR Parts 40, 41, 4~
{Regulatory Docket No. 708; Reference Draft Releases Nos. 61-6 and 61-6A7
STANDARDS, PROCEDURES, AND LIMITATIONS GOVERNING ESTABLISHMENT
AND REVISION OF OVERHAUL PERIODS FOR POWERPLANTS, PROPELLERS, ACCESSORIES, AND COMPONENTS THEREOF FOR AIR CARRIER AIRCRAFT
STANDARDS, PROCEDURES, AND LIMITATIONS GOVERNING ESTABLISHMENT
Notice of Withdrawal of Proposed Rule Making
The Flight Standards Service of the Federal Aviation Agency has had
under consideration a proposal to provide a practical and orderly means
of establishing air carrier overhaul time limitations. The proposal put
forth new standards, procedures, and limitations governing the establish-
ment and revision of overhaul periods for engines, propellers, accessories,
and components thereof used on air carrier aircraft operated under the pro-
visions of Parts 40, 41, and 42 of the Civil Air Regulations. The reasons
therefor were set forth in the explanatory statement of a notice of pro-
posed rule making which was published in the Federal Register on April 6,
1961 (26 F.R. 2871), and circulated to the public as Civil Air Regulations eft Release -.~~ 6l~dated March 31, 1961. An extension of time for
comment on the proposal was published in the Federal Register on May 10,
1961 (26 F.R. 4018), and circulated as Civil Air Regulations Draft Release
( No. 6l-6A. ", ,,----- ---~ Upon further consideration and study, the Agency decided that the
standards, procedures, and limitations contained in the notice of proposed
rule making should not be ,adopted, in view of the development of the new
FAA air carrier propulsion system reliability program. This is a new con-
cept of standards encompassing a different field of requirements and
- 2 -
criteria for evaluating air carrier propulsion systems overhaul periods,
and gives consideration to the current state of propulsion systems
developments, operational experience, and maintenance practices, which
apply to all factors having an adverse influence on propulsion systems
in-flight reliability.
Termination of this notice of proposed rule making constitutes only
such action, and does not preclude the Agency from issuing another notice
in the future, or commit the Agency to any course of action in the future.
In consideration of the foregoing, the notice of proposed rule making,
entitled "Standards, Procedures, and Limitations Governing llstablishment
and Revision of Overhaul Periods for Powerplants, Propellers, Accessories,
and Components Thereof for Air Carrier Aircraft," published in the Federal
Register April 6, 1961 (26 F.R. 2B71) and May 10, 1961 (26 F.R. 401B),
and circulated as Civil Air Regulations Draft Releases No. 61-6 dated
March 31, 1961, and No. 61-6A dated May 3, 1961, is hereby withdrawn.
(Sec. 313(a) of the Federal Aviation Act of 1958 (72 Stat. 752; 49 U.S.C.
1354»
Issued in Washington, D. C., on 1
4f1a t 4ft/!( Director f Flight Standards
MA'i 4 ig~
Service