Subject: MAINTENANCE OF AIRPORT VISUAL AID FACILITIES

Date: 4/4/2005 Initiated by: AAS-100

AC No: 150/5340-26A Change:

1. PURPOSE. This Advisory Circular (AC) provides recommended guidelines for maintenance of airport visual aid facilities. 2. APPLICABILITY. The standards and practices contained in this AC are recommended by the Federal Aviation Administration (FAA) for use by airports in the maintenance of airport owned lighted visual aid facilities. 3. CANCELLATION. AC 150/5340-26 Maintenance of Airport Visual Aid Facilities, dated August 26, 1982, is cancelled. 4. PRINCIPAL CHANGES. a. Safety procedures and potential hazards from series circuits have been expanded and clarified. b. Maintenance management has been updated and expanded to cover use of Original Equipment

Manufacturer Parts. c. Electrical test equipment has been updated to provide information on current types of testing equipment. d. Preventive maintenance has been revised to include procedures for more recently designed light

fixtures and requirements/recommendations for photometric testing of runway lighting systems. e. Added sections on airfield lighted guidance signs, Precision Approach Path Indicator (PAPI) and airport lighting control and monitoring systems (ALCMS). f. Deleted section on marking of paved areas on airports. g. Expanded section on troubleshooting of airport lighting series circuits. h. Added maintenance tolerances in Appendix A for elevated and in-pavement runway guard lights, stop

bar lights, CAT III taxiway centerline lighting and PAPI.

DAVID L. BENNETT Director of Airport Safety and Standards

Intentionally Left Blank

TABLE OF CONTENTS

TABLE OF CONTENTS

CHAPTER 1. INTRODUCTION … 1

1.0 GENERAL. … 1 1.1 SCOPE. … 1

CHAPTER 2. SAFETY … 3

2.0 GENERAL. … 3 2.1 COMMON CAUSES OF ACCIDENTS … 3 2.2 SAFETY PROCEDURES AND GUIDELINES … 3 2.3 ELECTRICAL HAZARDS OF SERIES LIGHTING CIRCUITS … 3 2.4 SAFETY PRACTICES … 5 2.5 SAFETY BOARDS … 6 2.6 SAFETY CHECKLIST … 7 2.7 SAFETY EQUIPMENT IN VEHICLES … 7 2.8 ELECTRIC SHOCK … 7 2.9 SAFETY TRAINING … 8 2.10 SAFETY WARNING SIGNS/DANGER TAGS … 8 2.11 GROUNDING AND BONDING … 9 2.12 CONFINED SPACES … 9 2.13 LIGHTNING … 9 2.14 TOXIC AGENTS … 10 2.15 FIRE EXTINGUISHERS … 11 2.16 FIRST AID … 13

CHAPTER 3. MAINTENANCE MANAGEMENT … 15

CHAPTER 3. MAINTENANCE MANAGEMENT … 15

3.0 MAINTENANCE PHILOSOPHY … 15 3.1 MAINTENANCE SCHEDULE … 15 3.2 MAINTENANCE RECORDS … 15 3.3 PREVENTIVE MAINTENANCE PROGRAM … 16 3.4 RECORD RETENTION … 17 3.5 REFERENCE LIBRARY … 17 3.6 SPARE PART PROVISIONING … 17

CHAPTER 4. TEST EQUIPMENT … 21

4.0 INTRODUCTION … 21 4.1 TYPES OF EQUIPMENT AND USAGE … 21

4.0 INTRODUCTION … 21 4.1 TYPES OF EQUIPMENT AND USAGE … 21

CHAPTER 5. PREVENTIVE MAINTENANCE … 27

5.0 GENERAL. … 27 5.1 AIRPORT LIGHTING VAULT … 27 5.2 CONSTANT CURRENT REGULATORS (CCRs) … 32 5.3 LIGHT FIXTURE AND BASE MAINTENANCE … 36 5.4 ILLUMINATED RUNWAY AND TAXIWAY GUIDANCE SIGNS … 46 5.5 ROTATING BEACONS … 46 5.6 LIGHTED WIND CONE ASSEMBLIES … 49 5.7 PRECISION APPROACH PATH INDICATOR (PAPI) SYSTEM … 51 5.8 VISUAL APPROACH SLOPE INDICATOR (VASI) … 54 5.9 RUNWAY END IDENTIFIER LIGHTS (REILs) … 56 5.10 MEDIUM APPROACH LIGHTING SYSTEM (MALS, MALSF, MALSR) … 60 5.11 HAZARD BEACONS AND OBSTRUCTION LIGHTS … 62 5.12 AIRPORT LIGHTING CONTROL AND MONITORING SYSTEMS (ALCMS) … 64 5.13 STANDBY AND EMERGENCY POWER SYSTEMS … 65

CHAPTER 5. PREVENTIVE MAINTENANCE … 27

i

CHAPTER 6. TROUBLESHOOTING PROCEDURES FOR SERIES LIGHTING CIRCUITS … 71

6.0 INITIAL FAULT INVESTIGATION … 71 6.1 LOCATING GROUND FAULTS IN THE FIELD … 72 6.2 LOCATING OPEN CIRCUIT FAULTS … 73 6.3 INTERCONNECTED CIRCUIT FAULTS … 74 6.4 INTENTIONAL GROUND TEST … 74 6.5 GROUNDED OUTPUT TEST FOR LOCATING OPEN CIRCUITS … 76 6.6 USING HEAT SENSING EQUIPMENT TO LOCATE GROUND FAULTS … 76 6.7 USING CABLE FAULT LOCATING EQUIPMENT TO LOCATE GROUND FAULTS … 77

APPENDIX A. STANDARDS AND TOLERANCES … 89

APPENDIX A. STANDARDS AND TOLERANCES … 89

ii

CHAPTER 1. INTRODUCTION.

1.0 GENERAL. This Advisory Circular (AC) provides guidance for the recommended minimum maintenance practices to be used in the maintenance of airport visual aid facilities. Use this circular in conjunction with information available in instruction books, equipment manuals, handbooks and other ACs. Since the function of such facilities is to assist in the safe and efficient movement of aircraft during landing, takeoff and taxiing maneuvers, it is essential that a high degree of operating reliability be maintained. To achieve this, it is necessary to establish and maintain an effective preventive maintenance program. This AC provides suggestions on establishing such a program but, due to the varying complexities of airports and facilities provided, such a program must be tailored to suit each individual airport’s particular needs. Since corrective and preventive maintenance procedures for specific equipment are adequately covered in manuals supplied with the equipment, this AC addresses maintenance topics of a more general nature.

1.1 SCOPE. This AC provides system maintenance information for establishing a preventive maintenance program for airport visual aid facilities. The information provided covers the following systems:

• Airport lighting vault and series lighting circuits • Constant current regulators • Runway and taxiway elevated edge lighting systems • Runway and taxiway in-pavement lighting systems • Runway guard lights and stop bar lights • Illuminated runway and taxiway signs • Rotating beacons • Lighted wind cone assemblies • Precision Approach Path Indicator (PAPI) system • Visual Approach Slope Indicator (VASI) • Runway End Identifier Lights (REIL) and Omni directional Approach Light System (ODALS) • Medium Intensity Approach Light System (MALS, MALS/F, MALS/R) • Hazard beacons and obstruction lights • Control systems • Standby engine generator systems In addition to these equipment topics, this circular also covers recommended safety practices and suggested troubleshooting procedures for airport series lighting circuits.

Intentionally Left Blank

CHAPTER 2. SAFETY.

2.0 GENERAL. This chapter contains information that will aid airport owners/operators in establishing an effective safety program. Safety is the responsibility of each individual, regardless of position. Safety must be practiced daily in every maintenance activity that is performed. Local operational procedures and OSHA requirements should also be followed. The safety program established at each airport should include preventive safety precautions used when servicing the equipment and first-aid procedures for use in the event of an injury.

2.1 COMMON CAUSES OF ACCIDENTS. Some common causes of accidents are listed below:

a. Working on equipment without adequate coordination with equipment users. b. Working on equipment without sufficient experience on that equipment. c. Failure to follow instructions in equipment manuals. d. Failure to follow safety precautions. e. Failure to properly lock out equipment. f. Using unsafe equipment. g. Becoming lax due to working in a familiar environment. h. Poor housekeeping of work areas. i. Working at unsafe speeds. The number one cause of accidents is working at unsafe speeds. This is often the main contributing factor in failing to follow proper safety guidelines in all the other causes outlined in the list above. The perception that there is not enough time to take proper safety precautions or think through the proper procedures has the potential for causing an accident. Even in emergency repair situations, care must be taken to make the time to follow proper safety procedures to avoid injury or death.

2.2 SAFETY PROCEDURES AND GUIDELINES. Most visual aids are exposed to weather and moisture and may develop electrical shock hazards through damage from lightning or insulation deterioration from exposure. Begin maintenance procedures only after a visual inspection has been made for possible hazards. Due to the danger of lightning, lighted navigational aids should not be serviced during periods of local thunderstorm activity. Develop and implement a set of action plans to follow in the event of an accident occurring. Ensure that positive responsive actions take place within moments of accident notification by establishing and having in place a known set of predetermined responses. Precious seconds are saved getting medical assistance to those in need when action plans are in place. Rehearse and review action plans regularly.

2.3 ELECTRICAL HAZARDS OF SERIES LIGHTING CIRCUITS. Airport lighting circuits, by their nature, are very dangerous. This is especially true for the uninformed electrician with little or no experience working on constant current series circuits. Airport lighting circuits can operate at potentials of several thousand volts depending on the size of the regulator driving the circuit and the load.

2.3.1 There are three basic rules to remember when working on and around airport lighting circuits:

1. ALWAYS assume that the circuit is energized until you have proven otherwise. ALWAYS check for current before disconnecting the series circuit connector, removing the S1 cutout, or opening the primary series circuit by any other means. Make it a required practice to check the circuit with an ammeter prior to breaking the connection – NO EXCEPTIONS. Never attempt to measure voltage in a series lighting circuit using ordinary volt meters. An inductive voltage measuring device (sometimes referred to as a “ticker”) such as is described in chapter 4 may be used to detect the presence of induced voltage on a series lighting cable after checking for the presence of current. Always use a true RMS clamp-on type ammeter to verify if the circuit is energized. ALWAYS check the operation of the test equipment on a known live circuit before and after measurements are taken.

2. NEVER under any circumstances break a live series circuit. The voltage generated in the circuit can reach levels many times normal before the regulator’s open circuit protection can shut it down. As long as a current flow can be maintained, even if it is through you, the regulator will continue to operate. This is one of the reasons that series circuits can be so hazardous to work around. By their nature, there is no personnel protection provided such as might be found on parallel interior wiring.

3. NEVER enter a manhole with energized conductors and never handle cables or transformers in light base cans while there is current present. Cables or connectors can have cracked insulation where it is not visible or may be deteriorated and fall apart, exposing you to circuit conductors. 2.3.2 Induced Voltages. Series circuits are typically run from the transformer vault in duct banks where the wires are lying parallel to each other in close proximity. Voltages may be induced in an otherwise un-energized conductor and may be a hazard when troubleshooting and testing. Circuits that have a load that varies due to flashing action of runway guard lights or REIL strobes are particularly prone to induce voltages in other conductors due to the pulsing characteristics of the voltage and current in these circuits. Always check for induced voltages before handling an airfield lighting series circuit conductor. 2.3.3 Re-lamping. The most common lighting maintenance task on the airfield is re-lamping of runway and taxiway lighting fixtures.

Depending on the type of fixture, this may be accomplished in the field or, as in the case of most inset lights, the entire fixture is removed, replaced, and brought to the maintenance shop for refurbishing. The greatest unseen danger to you is re-lamping or removing the fixture with the circuit energized. This has always been a common practice by airport electricians for convenience and the dangers are often overlooked. There are two primary hazards associated with this practice. The first occurs when an isolation transformer has a primary to secondary short in the windings. Remember that even though these are referred to as isolation transformers, they were not designed for personnel protection. They are merely designed to isolate the secondary from the primary circuit to allow the circuit to continue to operate with a lamp burned out. A transformer with a primary to secondary short may not cause a circuit malfunction and could therefore remain unnoticed in normal operation with a live primary.

This exposes you to the full voltage present on the primary circuit and can be especially dangerous if another short is present on the primary circuit. When that happens, you can become the path to ground for the full primary current, a circumstance which is almost always fatal. This condition is especially dangerous when working with inset lights and removing them from the light base can while the circuit is energized. As soon as the fixture is unbolted and lifted from the can, you become the path to ground. Some have tried to alleviate this hazard by attaching a ground wire from the bottom of the light fixture to a grounding lug on the inside of the can. However, you cannot know if the wire is truly connected until you remove the fixture, at which time it is too late. The second hazard encountered when re-lamping an energized light fixture is from the open circuit voltage present at the secondary of the transformer. The open circuit voltage present on the secondary of the transformer is proportional to the size of the transformer.

The open-circuit secondary voltage on a 300 watt transformer is approximately 110 volts. Moreover, depending on the materials used in the design of the isolation transformer and

the type of regulator powering the circuit, relatively high voltage peaks can be generated. Once again, the larger the transformer, the higher the peaks with as much as 200 volts being generated in some circumstances. The duration of this peak varies inversely with the size of the transformer (i.e. larger transformers have shorter durative spikes). Because of their size and duration, the peak voltages can create an unsafe condition for maintenance personnel. Therefore, we recommend that you perform re-lamping of the series lighting circuits with the circuits de-energized, especially during the re-lamping of fixtures with exposed contacts. If this is not practical, wear appropriate insulating gloves with leather gauntlets during re-lamping procedures. A final hazard that is present when re-lamping any type of fixture, whether in the field or at the maintenance shop, is the danger of cuts from broken lamps. Many times when an airfield lamp fails, the glass envelope becomes cracked or brittle and can break during the removal process. Always wear leather gloves when removing lamps to prevent your hands from being cut in the event of a lamp shattering.

2.4 SAFETY PRACTICES. When you perform maintenance on airport visual aids, use the following safety practices:

a. Ensure that workers are trained and familiar with electrical safety. b. Strictly observe safety rules. c. Ensure that commercial test equipment is Underwriters Laboratory (UL) approved and rated for the voltage under test or for the application. d. Prior to beginning any maintenance work on airport lighting circuits, coordinate the work schedule with

the tower, facility manager, or airport operations personnel. Make sure circuits will not be energized during maintenance by observing strict lock-out tag-out procedures for the equipment and obtain authorization for local control if equipment is normally operated from a remote control point. e. Where maintenance work is to be accomplished on a high-voltage circuit, assign at least two electricians, with at least one having a thorough knowledge of the layout of all airport high-voltage circuits. f. Because performing maintenance on many lighted visual aids requires workers to traverse the active airfield, all workers shall be fully knowledgeable of air traffic control and radio communication procedures. Workers shall be fully familiar with airport runway and taxiway layout to avoid any possibility of runway incursions. All air traffic control instructions shall be read back to the controller and if the worker has any question regarding the instructions of the controller, the worker shall ask the controller to repeat the message. All vehicles operated within the aircraft operations area shall be properly marked and lighted per FAA AC 150/5210-5, Painting, Marking and Lighting of Vehicles Used on an Airport. If you are the observer electrician, your duties include:

a. Keeping other personnel not involved in the work clear of the equipment. b. Being familiar with power disconnects and immediately disconnecting the power source in case of

emergency. c. Being qualified in first-aid and prepared to render emergency care if necessary. You should bear in mind that prevention of an electrical accident is of primary importance even though first-aid treatment is available. d. Observing the work being done to detect and warn against unsafe practices. 2.4.1 Personal Safety Precautions. Every electrician should adopt the following common sense safety precautions as standard procedure:

a. Know the location of main power disconnect devices. b. Know how to summon medical aid. c. De-energize circuits by removing necessary fuses using properly insulated fuse pullers or by turning off and locking out circuit breakers or other disconnecting means. Consult circuit diagrams to identify all

fuses, breakers or disconnects involved. Remember that removal of a fuse does not remove the voltage from the “hot” fuse clip. Discharge all capacitors. d. Do not depend on interlocks to remove power or on indicating lights to signal that power is off. Verify that

power is off by using a voltmeter and/or ammeter on the component after opening the power switch. Verify operation of voltmeter (or ammeter) on known live circuit before and after measurements are taken. e. Insulate your feet by standing on a dry rubber mat. Remember, however, that contact with the grounded equipment cabinet could nullify this protection. f. Stay clear of terminals, leads, or components that carry voltages of any magnitude. Also, avoid contact with components that are grounded, including the frame. g. Shut down and de-energize the equipment when it is necessary to reach into the equipment in locations

where rapid and direct withdrawal of the hand is not possible. In any case, only one hand should be exposed, with the other hand kept away from contact with voltages or ground. h. Be certain that there is no power applied to a circuit when making a continuity or resistance check (the

meter will be damaged and you could be injured). i. Ground test equipment to the equipment under test unless otherwise specified in instruction manuals. j. Place a warning sign, such as “DANGER - DO NOT USE OR OPERATE,” at the main switch or circuit breaker, and provide a lockout for the circuit on which you will be working. Follow direction of local facility lock-out tag-out procedures manual. k. Do not wear jewelry, wristwatches, or rings while working with electrical equipment. l. Keep clothing, hands, and feet dry if at all possible. m. Use the correct tool (screwdriver, alignment tool, etc.) for doing the job. n. Never use toxic or flammable solvents for cleaning purposes. o. Where air pressure is required for cleaning, use a low-pressure (30 psi or less) air source. Eye protection

(goggles or face mask) is necessary when using compressed air for cleaning. p. Wear goggles and safety shoes when around high voltage. q. Do not take anything for granted when working with inexperienced help.

2.5 SAFETY BOARDS. Locate a plywood board for posting safety procedures and a pegboard for mounting safety equipment in the airport lighting vault, switchgear rooms, engine generator rooms, and other appropriate locations. In addition, provide a telephone for emergency use as well as regular communications use. Recommended safety procedures and safety items to be included on or adjacent to safety boards are as follows:

a. Accident and fire procedures. b. Emergency telephone numbers, such as doctor, hospital, rescue squad, fire department, airport operations,

police and Air Traffic Control Tower (ATCT). c. Resuscitation instructions. d. Resuscitation equipment (Resuscitube or equivalent). e. First-aid kit. f. High-voltage disconnect (hot) stick. g. Non-conductive body rescue hook. h. Rubber gloves rated for maximum voltage present with leather gloves and protective storage bag. i. Insulated fuse puller. j. Non-metallic flashlight k. Grounding stick. l. Safety posters and bulletins. m. Portable non-conductive warning signs with non-conductive hangers. n. Fire extinguisher of proper type rating for electrical fires. o. Emergency eyewash station if not provided elsewhere in building. p. Automatic External Defibrillator

2.5.1 Safety Board Inspection. Inspect the equipment located on the safety board as indicated below:

a. Test rubber gloves in accordance with ASTM D120, Specification for Insulated Rubber Gloves. ASTM specifications may be obtained from the American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103. b. Testing may be performed by private testing labs, utility companies, and large military and Federal

establishments. c. Gloves should be proof-tested at the following intervals: • In daily use – 30 days. • Infrequently used – 180 days. d. Visually inspect hot sticks for paint smears, carbon paths, dirt smears, etc., and clean them, if required,

prior to use. Re-surface and test hot sticks that cannot be cleaned and/or have significant surface-coating ruptures. NOTE: Wear certified rubber gloves (ASTM D120) and protective leather gauntlets whenever hot sticks are used.

2.6 SAFETY CHECKLIST. Complete a safety inspection on a monthly basis to ensure that the safety boards contain all required items and that test equipment is in a safe operating condition. Retain the completed checklist on file for at least one year.

2.7 SAFETY EQUIPMENT IN VEHICLES.

All vehicles operated on the airfield should have a properly sized fire extinguisher and first aid kit. Equip all vehicles and/or personnel with radio communication to be available to summon help in an emergency. Mark and register all vehicles appropriately. Equip all vehicles with a lighted warning beacon and a copy of current Airport (ATC) Procedures and Ground Vehicle Guide to Airport, Signs and Markings.

2.8 ELECTRIC SHOCK. An electric shock is the passing of an electric current through a person. The amount of damage depends on the amount of voltage and current to which the person is subjected.

a. Voltages between 200 and 1000 volts at commercial powerline frequencies are particularly harmful since, under these conditions, heart muscle spasm and paralysis of the respiratory center occur in combination. However, lower voltages can also prove fatal, as evidenced by records of deaths caused by 32 volt farm lighting systems. The body response to current is a follows:

• 5 to 15 mA stimulates the muscles • 15 to 19mA can paralyze the muscles and nerves through which it flows • 25 mA and above may produce permanent damage to nerve tissues and blood vessels • 70 mA and above may be fatal.

b. The injurious effects suffered during electric shock depend upon the path of the current through the body.

The current path will take the most direct route through the body from the two points of contact. For this reason, any current path which involves the heart or the brain is particularly dangerous. Therefore, keeping one hand clear of the equipment will eliminate the possibility of a current path from arm to arm.

2.9 SAFETY TRAINING. Establish a safety training course and present to all employees. Present follow-up training on a periodic basis to ensure that employees are safety motivated. Include first aid and CPR (Cardio-Pulmonary Resuscitation) training in the safety training course. The safety course shall include driver safety training and proper procedures on contacting local emergency, police, and fire agencies.

2.10 SAFETY WARNING SIGNS/DANGER TAGS. The following discusses the use of warning signs on high voltage equipment. 2.10.1 “Danger – High Voltage” Sign. Permanently place “DANGER – HIGH VOLTAGE” signs on all fixed electrical equipment where potentials of 500 volts or more terminal-to-ground are exposed. Place signs in a conspicuous location, usually on the outside of the equipment.

Figure 2-1 “Danger – High Voltage” Sign 2.10.2 Lock-Out/Tag-Out and Danger Tags. Each airport electrical maintenance department should have a written lock-out/tag-out procedure. Equipment or circuits should never be worked on unless locked out and tagged by the person performing the work. Never trust anyone but yourself. Have your partner check behind you to make sure the proper equipment is turned off. The lock-out tag should only be removed by the person who signed it except in some circumstances when verbal permission has been granted to another person or when the worker who signed the tag is on vacation, etc. Never rely on the tower controllers to assure electrical safety. The controllers in the tower are relieved periodically and the next person may not know of the work that is going on. Always take whatever time is necessary to make sure that the circuit or equipment you are working on is safe. One of the primary reasons for accidents is when workers get in too great a hurry and don’t take proper precautions and follow proper safety procedures. The other main reason is when the electrician lets his/her guard down because they are working in a familiar environment and becomes negligent about safety procedures.

Figure 2-2 Danger Tag

2.10.3 Locks and Padlocks. Use built-in locks on switchgear and disconnecting switches whenever the equipment is tagged, and return the keys to the supervisor responsible for their control. Padlocks need not be used if it is decided that use and control of such locks would be difficult because of the type of switchgear and its location. However, use padlocks with “DANGER” tags when equipment or electrical lines remain out of service or when electrical work has been discontinued until a later date. When outside contractors are involved, each contractor should attach and control tags and locks independently.

2.11 GROUNDING AND BONDING. Never remove, alter, or attempt to repair conductors or conduit systems providing grounding or electrical bonding for any electrical equipment until all power is removed from equipment. Warn all personnel of the ungrounded/unbonded condition of the equipment. Display appropriate warning signs, such as danger tags, to warn personnel of the possible hazards.

2.12 CONFINED SPACES. Be sure to have a plan in place for dealing with confined spaces that conforms to OSHA standards. Make sure to test the air quality and use an approved blower to ventilate any confined spaces before entering. This includes any unventilated space especially manholes and storage tanks. Remember that gases produced by rotting materials, both vegetable and animal, will displace oxygen. These materials can be commonly found in airport lighting manholes. When working in manholes and storage tanks with vertical access, personnel must wear proper Class II or Class III harnesses and be connected to a rescue tripod-mounted winch mounted above the entrance. Use forced air blowers with flexible ducts to provide fresh air to confined spaces. Keep vehicles away from air intakes for blowers. Vehicle exhaust can quickly contaminate the quality of the forced air.

2.13 LIGHTNING. When personnel are subjected to direct lightning strikes, the results are nearly always fatal. Although extraordinary escapes from direct strikes have been reported, the shock is so great that survival is rare. The major portion of lightning casualties arises from secondary effects, such as side flashes and induced charges.

NOTE: IF ADMINISTERED IN TIME, FIRST-AID TREATMENT, ESPECIALLY ARTIFICIAL RESPIRATION OR CARDIO-PULMONARY RESUSCITATION MAY PREVENT DEATH FROM ANY DIRECT CHARGES. Observe the following rules for personal safety, if possible, during any thunderstorm:

a. Remain indoors unless absolutely unavoidable. Remember, when on the airfield YOU are the tallest object and therefore vulnerable to lightning strikes. Stay within a dry area of a building, preferably away from all metal objects.

b. If there is a choice of shelter, select the type of shelter in the following order:

• Large metal or metal-frame building • Dwellings or other buildings which are protected against lightning • Vehicles • Large unprotected buildings.

c. If remaining out-of-doors is unavoidable, keep away from the following: • Small sheds and shelters in an exposed location; in particular, any that house power equipment. • Wire fences, antennas, supporting structures, or lines; whether telephone, electric, or otherwise. • Hilltops and wide-open spaces. • Isolated trees.

2.14 TOXIC AGENTS. Toxic agents are poisonous substances that can cause injury by contact or injection. Substances termed “caustic” or “corrosive” cause the flesh to be eaten away on contact; the results of contact with these agents range from minor skin irritations to severe burns. There are materials that are toxic only if they are taken internally. Toxic agents also exist as a gaseous vapor and may be injurious immediately or over a long period of time. There are also a few substances used in electric equipment that are basically non-toxic agents, but under certain conditions can become highly toxic. 2.14.1 Carbon Tetrachloride. Never use carbon tetrachloride. Contact with liquid carbon tetrachloride destroys the natural oils of the skin, producing a whitish appearance on skin surfaces that are exposed. Continuous skin exposure may cause skin eruptions. Carbon tetrachloride fumes are highly toxic. 2.14.2 Trichloroethylene. This agent, used principally as a degreasing solvent, is a narcotic and anesthetic material.

Organic injury rarely results from overexposure, but repeated overexposure can cause anemia and liver damage. 2.14.3 Battery Acids. The most common battery acid is sulphuric acid. Sulphuric acid is a corrosive toxic agent; repeated or prolonged inhalation of its fumes can cause inflammation of the upper respiratory tract, leading to chronic bronchitis. Loss of consciousness with severe damage to the lungs may result from inhalation of concentrated vapors when the sulphuric acid is hot. The acid, in a highly concentrated form prior to adding water for battery use, acts as a powerful caustic, destroying skin and other tissue. This destruction appears as severe burns, and such exposure may be accompanied by shock and collapse. The fumes from highly concentrated sulphuric acid cause coughing and irritation of the eyes; prolonged exposure may produce chemical pneumonitis.

Batteries and battery acid also produce hydrogen gas, a by-product of the charging process. Hydrogen gas is highly flammable and can react explosively in conjunction with a spark or flame. All locations where lead-acid batteries are used or housed should have, as a minimum, an emergency eyewash station installed. If water is not readily available, portable emergency eyewash stations consisting of a wall mountable water bottle should be made readily available.

2.15 FIRE EXTINGUISHERS. Conveniently locate fire extinguishers of the proper type (see Paragraph 2.15.4), and in good working condition, near all high-voltage equipment. 2.15.1 A Brief Introduction to Fire Extinguishers and Fire Types. When used properly, portable fire extinguishers can save lives and property by putting out a small fire or containing it until the fire department arrives. Portable fire extinguishers, however, are not designed to fight large or spreading fires. Even for small fires, they are useful only under certain conditions:

• The operator must know how to use the extinguisher. There is no time to read directions during an emergency. • The extinguisher must be within easy reach and in working order, fully charged. • The operator must have a clear escape route that will not be blocked by fire. • The extinguisher must match the type of fire being fought. Extinguishers that contain water are unsuitable for use on grease and electrical fires. • The extinguisher must be large enough to put out the fire. Many portable extinguishers discharge completely in as few as 8 to 10 seconds. 2.15.2 How to Use Portable Fire Extinguishers. Remember the PASS system: P…Pull the Pin A…Aim the extinguisher nozzle at the base of the flames S…Squeeze trigger while holding the extinguisher upright S…Sweep the extinguisher from side to side ALWAYS make sure the fire department is called and inspects the fire site, even if you think you have extinguished the fire! 2.15.3 Should You Try to Fight the Fire? Before you begin to fight a fire:

• Make sure everyone has left or is leaving the building • Make sure the fire department has been called • Make sure the fire is confined to a small area and is not spreading • Make sure you have an unobstructed escape route to which the fire will not spread • Make sure you have read the instructions and know how to use the extinguisher. It is reckless to fight a fire in any other circumstances. Instead, leave immediately and close off the area.

2.15.4 Class of Fire Extinguishers. Fire extinguishers are divided into four categories, based on different types of fires. Each fire extinguisher also has a numerical rating that serves as a guide for the amount of fire the extinguisher can handle. The higher the number, the more fire-fighting power. The following is a quick guide to help choose the right type of extinguisher:

• Class A extinguishers are for ordinary combustible materials such as paper, wood, cardboard, and most plastics. The numerical rating on these types of extinguishers indicates the amount of water it holds and the amount of fire it can extinguish. • Class B fires involve flammable or combustible liquids such as gasoline, kerosene, grease and oil. The numerical rating for Class B extinguishers indicates the approximate number of square feet of fire it can extinguish. • Class C fires involve electrical equipment, such as appliances, wiring, circuit breakers and outlets. Never use water to extinguish Class C fires – the risk of electrical shock is far too great! Class C extinguishers do not have a numerical rating. The C classification means the extinguishing agent is non-conductive. • Class D fire extinguishers are commonly found in a chemical laboratory. They are for fires that involve combustible metals, such as magnesium, titanium, potassium and sodium. These types of extinguishers also have no numerical rating, nor are they given a multi-purpose rating – they are designed to Class D fires only. Some fires may involve a combination of these classifications. 2.15.5 Most Common Types of Fire Extinguishers.

• Water extinguishers or air-pressurized water (APW) extinguishers are suitable for Class A fires only. Never use a water extinguisher on grease fires, electrical fires or Class D fires – the flames will spread and make the fire bigger! Water extinguishers are filled with water and pressurized with oxygen. Again – water extinguishers can be very dangerous in the wrong type of situation. Fight the fire only if you are certain it contains ordinary combustible materials. • Dry chemical extinguishers come in a variety of types and are suitable for a combination of Class A, B and C fires. These are filled with foam or powder and pressurized with nitrogen.

a. BC - This is the regular type of dry chemical extinguisher. It is filled with sodium bicarbonate or potassium bicarbonate. The BC variety leaves a mildly corrosive residue which must be cleaned immediately to prevent any damage to materials.

b. ABC – This is the multipurpose dry chemical extinguisher. The ABC type is filled with

monoammonium phosphate, a yellow powder that leaves a sticky residue that may be damaging to electrical appliances such as a computer. Dry chemical extinguishers have an advantage over CO2 extinguishers since they leave a non-flammable substance on the extinguished material, reducing the likelihood of re-ignition.

• Carbon Dioxide (CO2) extinguishers are used for Class B and C fires. CO2 extinguishers contain carbon dioxide, a non-flammable gas, and are highly pressurized. The pressure is so great that it is not uncommon for bits of dry ice to shoot out the nozzle. They don’t work very well on Class A fires because they may not be able to displace enough oxygen to put the fire out, causing it to re-ignite. CO2 extinguishers have an advantage over dry chemical extinguishers since they don’t leave a harmful residue – a good choice for an electrical fire on a computer or other electronic device. It is vital to know what type of extinguisher you are using. Using the wrong type of extinguisher for the wrong type of fire can be life-threatening.

2.16 FIRST AID. First aid is what to do before the doctor comes. It is never a substitute for the medical help. The maintenance technician should take the lifesaving measures necessary in emergencies, but avoid doing harm. Many first-aid measures are quite simple and do not require “split-second speed” in their application. Haste without knowing what one is doing can be worse than doing nothing at all. At other times, immediate action is essential to save a life or prevent serious complications; this action can only be taken by someone who is on the scene when minutes are vital. Learn about first aid before emergencies happen. Be prepared to give help safely and beneficially when necessary. Contact the American Red Cross to provide refresher first-aid courses to maintenance personnel to keep them proficient.

Intentionally Left Blank

CHAPTER 3. MAINTENANCE MANAGEMENT.

3.0 MAINTENANCE PHILOSOPHY. The purpose of the maintenance management system is to ensure the maximum availability of any given system at a minimum cost in man-hours or funds. “Availability” and “costs” are relative terms; they must be interpreted for each airport. For example, a CAT I runway may still be considered operational with 15% of the edge lights out, while a PAPI system may be unserviceable with more than one lamp out per box. By the same reasoning, the cost of maintaining a spare regulator may be considered cost prohibitive, while stocking replacements for 10% of the runway edge lights may be considered a normal practice. In addition, operational factors are a major consideration in determining what maintenance is required. Airports with heavy traffic may require more frequent maintenance servicing than those used only by light traffic. The maintenance operations include maintenance planning, preventive maintenance inspection, visual inspection, repair, installation, calibration, and unscheduled maintenance procedures. Maintenance procedures, including the work order and documentation required, may vary between airports. The purpose of this document is to provide the minimum maintenance procedures required for safe and efficient movement of aircraft during takeoff, landing, and taxiing operations. Regardless of the actual maintenance routines decided upon, the following elements are essential to any controlled maintenance program. The maintenance procedures in this AC are considered minimum guidelines:

a. Document the service checks that comprise the maintenance program. b. Record the performance of each maintenance action, scheduled or unscheduled. c. Document repairs and troubleshooting performed on each piece of equipment and the results of those actions as well as the symptoms related to the malfunction. This allows for more rapid troubleshooting of similar problems at a later date.

3.1 MAINTENANCE SCHEDULE. Documenting the maintenance schedule by spelling out each item of routine maintenance is beneficial in several ways:

a. It allows planned allocation of man-hours to the maintenance function. b. It helps to establish spare part stock levels. c. It identifies the necessary maintenance routines to new employees, decreasing training time needed for system familiarization. d. It identifies the scope of the maintenance task in terms of man-hours and material requirements.

3.2 MAINTENANCE RECORDS. Maintenance records are an important part of an effective maintenance management system; they provide a service history of each piece of equipment, ensure regular maintenance without duplication of effort, and provide a data base for statistical analysis of lighting system performance. Without records, knowledge gained from regular inspections will not be retained, and preventive maintenance will be difficult. An effective records system should allow for the recording and retrieval of information with a minimum of effort. The records system should compile data that will document the effectiveness of the maintenance program. By checking the records, a manager should be able to determine whether a particular maintenance task is being done too frequently or not often enough. By such a trial-and-error process, a maintenance program uniquely tailored to the facility can be developed.

3.3 PREVENTIVE MAINTENANCE PROGRAM. Reliable functioning of airport lighted visual aids is essential to airport safety, capacity, and operation especially for low visibility operations. Therefore, it is essential that a preventive maintenance program be established to ensure reliable service and proper equipment operation. Properly scheduled inspections, testing, and calibrations are essential to the proper functioning of these systems. Airport lighting systems are designed to be dependable and may continue to operate for long periods of time even if maintenance is neglected. Eventually a failure will occur and, if the failure occurs at a critical time, safety may be jeopardized. Lighted visual aid maintenance should receive high priority to prevent equipment failure, false signals, and deterioration of the system. 3.3.1 Installation and Material. The first element in a preventive maintenance program is high quality, properly installed equipment. Preventive maintenance is difficult on equipment that has been installed haphazardly without consideration of maintenance requirements.

When such conditions exist, they should be brought to the attention of the proper authority and corrected rather than trying to establish a preventive maintenance program to compensate for the condition. Consult the electrical maintenance supervisor at an airport prior to and during the design of any installation of new or additional visual aid systems. By so doing, the airport can avoid costly problems during and after construction. Consideration should also be given to the method of selection and training of any contractor personnel involved in the installation of airfield lighting products. The need for specialized training for airport maintenance electricians applies to the contractor personnel also. 3.3.2 Personnel. The second element in a preventive maintenance program is trained experienced personnel. Maintenance personnel should have a thorough knowledge of the equipment, should have experience with high voltage, and should be able to make careful inspections and necessary repairs.

Special training is available and may be desirable, as most wellqualified electricians can be trained on-the-job if suitable supervision and instruction are provided. Considerable experience with the equipment and its operation is desirable. These individuals should be present, or on-call, during the operating hours of the airport to correct any deficiencies that may develop. In short, airport visual aid maintenance personnel should be specialists in the field. 3.3.3 Tools and Test Equipment. The third element in a preventive maintenance program is the tools and test equipment required to perform the maintenance. This includes specialized tools and test equipment, adequate working space, adequate storage space, spare parts, and applicable technical manuals. 3.3.4 Preventive Maintenance Inspection Program. The fourth element in a preventive maintenance program is an effective preventive maintenance inspection schedule for each visual aid. This schedule should also include all cable systems.

The preventive maintenance inspection (PMI) schedule is the foundation for the successful maintenance of the equipment. If the PMI is performed properly and at the scheduled time, it will ensure top system performance and will minimize unscheduled interruptions and breakdowns. Review of the inspection records, checks, tests, and repairs provides a constant awareness of the equipment condition and gives maintenance personnel advanced warning of impending trouble. 3.3.5 Preventive Maintenance Inspection Schedule. Scheduled inspections and tests are those accomplished on specific types of equipment on a periodic basis. The schedule may be based either on calendar or on hourly-use increments. The PMI schedules, based upon recommendations from the manufacturers and users of the equipment, are considered to be the typical requirements to keep the equipment in good condition. Adjust the frequency of a particular PMI after experience is gained under local operating conditions.

3.4 RECORD RETENTION. There is no set period of time that maintenance records should be kept, but in keeping within the goals mentioned above, a period of twice the longest period recorded would appear to be the minimum (i.e., 2 years in the case of annual maintenance action). Records of daily inspection will, of course, lose their significance much sooner, probably within a month. It should be noted however, that maintenance records should be retained permanently, if possible, as situations may develop years later in which those records can prove invaluable.

3.5 REFERENCE LIBRARY. Establish a reference library to maintain a master copy of all Equipment Technical Manuals (ETMs), ACs, as-built drawings, and other useful technical data. The electrical supervisor should establish and maintain responsibility for maintaining the technical reference library and ensure that technical manuals and drawings are kept up to date and not lost or damaged. 3.5.1 Equipment Technical Manuals (ETMs). ETMs and other manufacturer’s literature form an important part of the reference library. Obtain two copies of all technical manuals and related manufacturer’s literature. Retain a master copy in the reference library, and provide a separate copy for the shop. In addition, keep a copy of each equipment manual at the equipment location. This facilitates troubleshooting and repairs without the necessity of traveling back to the shop location to retrieve the manual. Do not remove the master copy of the technical manual from the reference library as it can easily become misplaced or lost.

In the event the shop copy is lost, make another photocopy of the technical manual from the reference library instead of releasing the master copy. 3.5.2 Advisory Circulars. Important reference information on installation, design tolerances, and operation of visual aid equipment may be found in FAA ACs. Include a copy of the ACs covering the equipment at the facility, along with a copy of this AC, in the reference library. 3.5.3 Other Technical Data. Other reference information that is occasionally useful should also be added to the library. This might include local electrical codes, engineer’s handbooks, test equipment manuals, and other general information publications. 3.5.4 As-Built Drawings. Maintain the master copy of all as-built (record) drawings as part of the reference library. Incorporate modifications to any equipment into the drawings as soon as the modification is completed.

Give a copy of the “as-built” lighting plan, showing the location of all cable runs, runway lights, etc., and including the wiring diagrams for the lighting, engine generator, and the visual aid system, to the field technicians as a working copy. Install or identify test points at appropriate locations in the field circuitry and record locations of these test points on the “as-built” drawings. Immediately update any notations regarding test points or discrepancies in the drawings made in the field on the master set in the reference library.

3.6 SPARE PART PROVISIONING. This paragraph contains guidelines on how to establish a stock of spare parts to be used for quick repair of lighting equipment that fails unexpectedly. The purpose of a spare parts system is to have the necessary part on hand when

a piece of equipment fails; this will minimize the time the system is out of operation. However, the greater the number of spare parts stored, the greater the inventory costs. The optimum spare part system balances the cost of system downtime (lost operation, tenant inconvenience, safety, etc.) with the cost of purchasing and storing spare parts. A small airport with few operations may suffer little inconvenience with the loss of their lighting system and may, therefore, choose to stock few spare parts. A large airport may rely heavily on its lighting system for low visibility operations and would, therefore, require a substantial quantity of spare parts. In the case of a large airport, the funds lost by the tenants due to interrupted operations and the impact on the safety and security of the traveling public must also be taken into consideration. A malfunction at a major airport can have a far reaching effect on the national airspace system. When establishing a spare parts inventory, two questions must be answered:

(1) What parts should be stocked?

(2) How many of each part? When new construction occurs or a project is funded for replacement of existing systems, fund and include a quantity of spare parts (fixtures, lamps, fuses, relays and spare CCR control boards, etc.) in the equipment furnished by the contractor. This gives the maintenance department a built-in stock of spare parts and lessens the time required to procure parts for the new equipment. This is especially true if the equipment being installed is different from what is currently in use. 3.6.1 Choosing Spare Parts. To answer the two questions posed above, several factors must be considered, including failure rate, part availability, and effect of the part failure. 3.6.2 Failure Rate. The failure rate (or replacement rate) is the product of the expected life of an item and the number of items in the system. For instance, if a lamp is expected to last six months, and we have 100 lamps in the system, then an average of 100 lamps will be replaced every six months or approximately four per week.

Accurate records of parts used over time will help immensely in determining a failure rate. 3.6.3 Part Availability. Part availability refers to the time it takes to secure a replacement part. This usually means procurement lead time. If a part can be readily procured from shelf stock of a local supplier, it might not be necessary to add the part to the spare parts inventory; as it could be purchased when needed or the number of spare parts in the inventory could be reduced. However, if there is a six-week lead time required by the supplier, then stock six times the weekly failure rate (24 lamps in the example above). Spare parts for constant current regulators and other special equipment fall into this category. For instance, a replacement printed circuit board or other assembly typically has a six to twelve week lead time and unless a spare regulator is maintained for emergency use, the loss of a circuit could have a serious effect on airport operations. There are methods of obtaining parts which may reduce the effect of a long lead time.

These include substitution (the use of a functionally equivalent part from another manufacturer), cannibalization (replacing one of a pair of adjacent failed lamps by “borrowing” a lamp from elsewhere in the system), and temporary fixes (such as the use of portable lights in place of the fixed light installation) while awaiting corrective maintenance. It should be noted, however, that these solutions should be considered only as an emergency measure and that proper spare parts provisioning will eliminate the need for such techniques. 3.6.4 Effect of the Failure. The effect of the failure of a particular spare part depends on how important the part is to the equipment it is installed in, and how vital the equipment is to airport operations. The failure of a lamp in an edge light would not lead to any system downtime, but the failure of a circuit board in a constant current regulator would cause the loss of the entire lighting circuit that it powers. The equipment manufacturer will give guidance on recommended spare

parts. As experience is gained with the system, other parts may be added or deleted from the inventory. The impact of a part’s failure should be considered when building a spare parts inventory. 3.6.5 Part Identification. An important part of maintaining a spare parts inventory is accurately cataloging the parts on hand by manufacturer’s part number. This is important to ensure that the correct part is used in a broken piece of equipment; many optical parts are visually similar but vary significantly in performance. The use of the manufacturer’s part number is also vital when reordering; if a part is ordered by its generic name, the manufacturer may send a later version of the part which is incompatible with the existing system. It is extremely important to maintain manufacturer’s data which reflects your equipment, describing the type, model number, and serial number details. 3.6.6 Use of Original Equipment Manufacturer (OEM) Part. The use of non-OEM parts or lamps in FAA approved equipment is strongly discouraged. The FAA has strict specifications for approval of all airport lighting equipment and use of non-OEM parts or lamps in such equipment or systems can render the equipment to be functionally non-FAA approved. This could possibly lead to serious liability consequences in case of an aircraft incident at an airport following these practices. In the case of runway and taxiway lighting fixtures, the use of a generic, non-approved lamp can render the photometric output of the fixture out of specification with disastrous results in light output and, consequently, safety of low visibility operations.

Intentionally Left Blank

CHAPTER 4. TEST EQUIPMENT.

4.0 INTRODUCTION. An average electrician may have little day-to-day use for anything more than a voltmeter; however, when maintaining airport lighting series circuits, the equipment needs become more demanding. An airport electrician needs to be able to perform many tasks involving troubleshooting and calibration that are typically out of the norm for the average wireman. Series circuits operate at potentially high voltages and are prone to develop shorts and opens that require an advanced knowledge of the use of ohmmeters and insulation resistance testers (meggers) to properly trace the problem and get the lighting circuits back up and operating in a minimum of time. There is also a need for current measurements at relatively low currents (<20 amps) that require highly accurate and calibrated equipment. A small change in the output current in a series circuit can have a large effect on light output and lamp life. At maximum output of 6.6 amps at the lamp, a current change (increase or decrease) of 1% can change the light output of the lamp by as much as 5%.

That same 1% change (increase) can result in a 20% decrease in lamp life. It is therefore obvious from these facts that accurate test equipment and proper knowledge of its usage are vital to the maintenance of the airfield lighting system. Due to the non-sinusoidal output waveform of many constant current regulators, it is imperative to verify the accuracy of all current measuring devices. Evaluate all equipment used for the calibration of regulators and have the equipment calibrated for the values to be measured (2.8 – 20 amps) by a certified calibration lab. For maintenance purposes it is therefore recommended that every airport acquire at least a volt-ohm-meter, an insulation tester and an accurate true RMS measuring clamp-on AC ammeter or true RMS digital multimeter with an accurate clamp-on ammeter probe. These units are useful for various maintenance routines and are necessary for troubleshooting and calibration of constant current regulators and series lighting circuits.

4.1 TYPES OF EQUIPMENT AND USAGE. 4.1.1 Volt-Ohm-Milliammeter (VOM). An analog VOM is a highly versatile piece of test instrument that is capable of measuring AC/DC voltages, resistance, and low values of DC current. The better quality units offer reasonable accuracy and ruggedness and are useful for making a large variety of measurements. The most common use of this instrument is for making resistance measurements on series circuits for the purpose of troubleshooting when a fault has occurred. An analog VOM is useful because of its ability to show fluctuating trends and rates and the ease with which it offers a go, nogo check when rapid troubleshooting is required. An analog VOM does have limitations however. Its relatively low-input impedance and susceptibility to interference make it unsuitable for some measurements, especially when dealing with electronic circuits or when working in an environment with RF (radio frequency) energy present. Also it must be remembered that a typical VOM should not be used for making current measurements in an airfield lighting series circuit because it does not possess the ability to make true RMS, high accuracy measurements. 4.1.1.1 Safety. Safety must always be considered when using a VOM. Know the voltage levels and shock hazards related to all equipment to be tested. Be sure that the VOM has been tested and calibrated. Inspect and calibrate portable test instruments at least once a year. Check the condition of the VOM test leads before making any measurement. General recommendations for specific uses of a VOM are contained in the manufacturer’s manual supplied with the equipment.

1. High-voltage measurements. Never try to take direct voltage measurements on power distribution circuits rated over 600 volts. Measurement of high voltage is accomplished by installing properly rated instrument transformers and meters.

2. Switch settings. When making voltage measurements on power and control circuits, be sure that the meter selector and range switches are in the correct position for the circuit under test before applying test leads to the circuit conductors. To prevent damage to the meter movement, always use a range that ensures less than full-scale deflection of the pointer. A 1/3 to mid-scale deflection of the pointer assures the most accurate readings. 3. Case insulation. Do not hold the VOM in the hand while taking the reading. Support the instrument on a flat surface. If holding the VOM is unavoidable, do not rely upon the insulation of the case. 4.1.2 Digital Multimeter (DMM). A digital multimeter is another piece of essential test equipment for the airport electrician’s toolbox. This versatile instrument can deliver high accuracy and, through the use of various accessories, the ability to make a wide range of measurements. The best advice when purchasing this or any type of test equipment is to buy the best you can possibly afford.

Always make sure that the DMM you use is a true RMS type and that the accessories are of the highest accuracy (see Paragraph 4.1.5). A DMM with a good quality amp-clamp accessory is a good combination for measuring the output current of constant current regulators. It is sometimes difficult to know whether the instrument you are using is accurate or not. Even though the DMM is rated as a true RMS instrument and has a high rated accuracy, the accessories may not be as accurate. Ensure that the accuracy of the DMM and all accessories are checked and calibrated annually by a certified calibration lab for the ranges to be measured. In the case of airport lighting series circuits, 2.8 to 20 amps is the range for verifying proper calibration. All safety precautions listed for VOMs also apply to DMMs. 4.1.3 Insulation Resistance Tester (MegOhmMeter). The insulation resistance tester or megohmmeter is a necessary tool for maintaining and troubleshooting underground airport lighting cables.

Insulation resistance testers come in a variety of styles from the traditional hand-crank models to battery and AC mains powered versions. These instruments are used for testing the insulation resistance-to-ground of underground cables; for testing insulation resistance between conductors; and for testing resistance-to-ground or between windings of transformers, motors, regulators, etc. The battery powered models are the most prevalent and come in all shapes and sizes in both analog and digital readout. Most of the digital models have an analog bar graph to supplement the digital reading. Another consideration in selecting an insulation resistance tester is the output voltage. Some battery and line powered units now have selectable output voltages that can range as high as 5000 volts DC. As a minimum, select an insulation resistance tester with an output of 1000 volts DC.

If possible, consider using a unit with higher maximum voltage output as this lends more possibilities of finding high resistance faults and more closely approximates the rated voltage of the cables and transformers. However, note that testing old cables in questionable condition and/or circuits that have been operating at much lower voltages may suffer damage from testing at voltages over 1000 volts. Exercise caution when testing older circuits for the first time. 4.1.3.1 Safety.

1. When preparing to make an insulation resistance test, first make a complete safety check. Make sure that equipment to be tested is disconnected from all power sources. Open all safety switches and lock out other control equipment so that the equipment cannot be accidentally energized. 2. If neutral or ground conductors must be disconnected, make sure they are not carrying current and that, when disconnected, no other equipment will lack protection. 3. Observe the voltage rating of the tester and take suitable precautions. 4. Large equipment and cable usually have sufficient capacitance to store a dangerous amount of energy from the test current. After taking resistance readings and before handling the test leads, allow any energy stored in the equipment to discharge by leaving the tester connected for at least 30 seconds before touching the leads. Many new testers will automatically discharge the equipment under test and give the user a

visual or audible indication when it is safe to remove the test leads. Consult the equipment manual for information on manufacturer’s instructions. 5. Do not use the tester in an explosive atmosphere. An explosion may result if slight sparking is encountered when attaching or removing test leads, or as a result of arcing through or over defective insulation.

4.1.4 Underground Cable/Fault Locators. A cable locator is an indispensable tool for quickly locating airport lighting cable and ducts. A cable locator normally consists of a transmitter which is either directly, or indirectly by means of an inductive coupler, attached to an underground cable and a receiver which is used to pick up the transmitted signal to follow the path of the cable. These devices are very handy for locating the path of a conductor while troubleshooting cables in PVC conduit and are even more necessary when dealing with direct buried cables. Whenever work on the airport requires digging of any kind it is necessary to utilize a locator to prevent inadvertent cutting of cables. Most of the receivers also incorporate the ability to locate 60 Hz AC cables without the necessity of applying a signal or tone to the conductor. If the airport circuits are supplied by direct-buried conductors or have direct-buried control cables, it is advisable to purchase a locator which also has the capability of locating ground faults.

It should be noted, however, that faults in cables installed in conduit cannot be located using these devices. Cable locators that include fault-finding capability are normally equipped with an A-frame probe that is used with the receiver to determine the direction of a fault between the conductor or shield to ground. 4.1.4.1 Safety. When using a direct connection to the conductor to be located or tested, always exercise care to ensure that the circuit supplying the conductor has been de-energized and locked out, and tagged. 4.1.5 Clamp-on Ammeter. The stand-alone clamp-on ammeter is useful for measuring AC and sometimes DC current. Most of the modern instruments of this type are provided with plug-in leads to permit the instrument to be used as a voltmeter or as an ohmmeter. Ensure that the unit is a true-RMS type so as to deal properly with the sometimes distorted waveform output of some constant current regulators. Also the same warnings apply to these devices as to the DMM/clampon combination when it comes to accuracy of the instrument.

Since most of these devices are rated to measure current far in excess of what you need to measure on airport lighting circuits, their accuracy at the low end of the measurement scale may be in question. Clamp-on devices having an accuracy of + or – 2 % or better should be used if at all possible as a small change in current can produce a large change in lamp light output. It may be beneficial to have a registered calibration laboratory check the instrument and calibrate it to the lower amp range. 4.1.5.1 Safety. A clamp-on ammeter reduces operator exposure to high voltage. However, the operator must observe normal safety precautions to prevent coming in contact with exposed conductors when taking current readings. 4.1.6 AC Proximity Voltage Tester. These small non-contact testers, sometimes referred to as “tickers,” can be handy for detecting voltage present in insulated cables. Depending on the model, they may have a wide measurement range. They should not, however, be used to determine if an airfield lighting series circuit is energized (4.1.6.1).

The reason for this is because of the behavior of voltage in a series circuit. The voltage is reduced by the various voltage drops (loads) present in the circuit until at some point near the middle of the circuit there is no measurable voltage although current flow is still present. Breaking the circuit at that point or at any point in the live series circuit can result in injury or death. See Paragraph 2.3.1.

4.1.6.1 Safety. Do not rely on these units as the only instrument used to protect oneself from coming into contact with energized conductors. A good quality clamp-on ammeter device is the only safe way to check for an energized series lighting conductor. After checking for the presence of current with a clamp-on ammeter, an inductive proximity voltage measuring device may be used to detect the presence of induced voltage. Also, as with all test instruments used for measuring voltage or current, make sure that you test the device on a known live circuit before and after making any measurement of this kind. 4.1.7 Time Domain Reflectometer. The Time Domain Reflectometer (TDR) was once a very expensive laboratory quality instrument used for testing control and coax cable systems. Now however, these instruments have evolved into less expensive hand-held units capable of pinpointing the location of opens or faults in long runs of twisted pair control cables.

If your facility is using long runs of telephone type twisted pair cables for control of airfield lighting equipment from a remote control tower location, it may be useful to invest in one of these devices for troubleshooting purposes. The TDR applies a signal to the cable pair in question and can give readout in feet indicating the distance to the cable fault as well as a visual display of the cable run. This can save many hours of troubleshooting when trying to find a bad splice in a long run of control cable. The newest models have settings for testing power cables, data cables, coax cables, as well as telephone and control cables. Some of these units are capable of measuring cable lengths of up to 48,000 ft. A similar device is the Optical Time Domain Reflectometer which is used to perform similar tests on optical fiber cable. With the advent of computerized control systems employing fiber optic networks for control of airfield lighting systems, the ability to troubleshoot these cable systems is becoming necessary.

At the time of this writing, these instruments are still extremely high in price and probably not a justifiable expense to the average airport maintenance department. In most cases it may be more economical to employ outside contractors to perform any troubleshooting and repairs on fiber optic cable systems. 4.1.7.1 Safety. As with other measurement devices that require direct connections to conductors, be sure to exercise a proper safety check to verify that the conductor or circuit under test has been de-energized and is locked-out and tagged. 4.1.8 Tone and Probe Tracing Sets. Normally used by technicians employed in the telephone industry, these devices can be a great addition to the airfield electrician’s toolbox. The kits are inexpensive and can be used for many purposes at an airport to identify individual conductors whether in a control cable or individual power cables in a manhole or vault. The simple transmitter is connected directly to any un-energized conductor and injects a tone on the conductor that can be heard by using an inductive probe. 4.1.8.1 Safety.

As with other measurement devices that require direct connections to conductors, be sure to exercise a proper safety check to verify that the conductor or circuit under test has been de-energized and is locked-out and tagged. 4.1.9 Infrared Thermometer. Infrared thermometers are hand-held devices that can give a direct temperature readout of any surface from several feet away. They can be aimed at the target via a laser target sight. In addition to identifying loose connections in panelboards, these instruments may be used for troubleshooting of ground faults in airfield lighting circuits. By measuring the temperature of different light bases on the runway or taxiway and comparing the temperature differential between light bases, it is possible to find the location of a ground fault if the cable and transformer assembly have been arcing and burning inside a light base.

4.1.9.1 Safety. Since the use of an infrared thermometer requires no contact with the surface of the object to be measured, these devices are generally very safe to use. Follow manufacturer’s instructions and avoid direct eye exposure to the laser sighting beam. 4.1.10 Portable Oil Dielectric Tester. Most older constant regulators are oil filled for cooling. The oil acts as an insulator and therefore must be maintained. Dirt, sludge, and other contaminants will reduce the dielectric strength of the insulating oil causing a potential for failure of the transformer. Sample and test the oil as indicated in Paragraph 5.2.5. A portable oil tester may be a justifiable expense if the airport maintains a large number of oil-cooled regulators. Some of these test apparatus may include accessories for testing of rubber “hot” gloves. As an alternative, samples may be sent out to a testing lab or local electric utility for testing. 4.1.10.1 Safety. Portable oil dielectric testers utilize high voltages up to 30 kV and extreme care must be taken operating this equipment.

Always follow all manufacturer’s operation and safety instructions. 4.1.11 Ground Rod Resistance Tester. Ground rod resistance testers come in several styles and are necessary for checking and maintaining the effectiveness of grounding systems and counterpoise systems at the airport. These testers measure the resistance between the grounding system and the earth ground. Some of the newer models are simple clamp-on units capable of giving the resistance-to-ground of ground rods or grounding conductors by measuring the ground leakage current without disconnecting the grounding conductor under test. Follow manufacturer’s instructions closely to obtain an accurate ground resistance reading, thus avoiding a false, lower than actual resistance-to-ground measurement that can result from incorrect use. The grounding system in question may be used for beacon towers, lighting vaults, engine generators, and for other lighted visual aids, or it may be a counterpoise system for underground cables. The maximum acceptable ground resistance is 25 ohms.

It is preferable that the resistance be 10 ohms or less. In many locations, the water table is gradually falling. In these cases, the ground electrode systems that were effective when initially installed are no longer effective. This emphasizes the importance of a continuous program to periodically check the grounding system. It is not sufficient to check the grounding system only at the time of installation. 4.1.11.1 Safety. A grounding system is a very important integral safety feature in airport lighting systems. To be effective, the grounding system must have a very low resistance-to-ground. The higher the inherent resistance of the grounding system, the greater the voltage that can build up on a grounded chassis or frame. When this built-up voltage discharges through a person, injury or death may result. For this reason, check the effectiveness of the grounding system regularly. 4.1.12 Mobile Photometric Measurement System.

Maintain the light output of runway lighting systems within specified limits to provide effective visual cues to the pilot while landing in low visibility conditions. Clean or service the lights when the brightness of the fixture is less than 70% of the minimum output required when operated at full intensity, per values listed for that fixture in AC 150/5345-46, Specification for Runway and Taxiway Light Fixtures. A fixture degraded below this is ineffective for high background brightness, low visibility conditions and should be targeted for maintenance. See Appendix A, Standards and Tolerances, Table 8. In the past, in situ photometric measurements were only possible using a hand held spot meter. This method has proven to be very ineffective and can only detect gross differences between lights and cannot account for alignment errors. Now, however, mobile systems are available which can test individual fixtures within a lighting system at

high speed and with a high degree of accuracy. Some of these systems can produce individual iso-candela diagrams of individual lights to aid in troubleshooting and maintenance as well as indicate misaligned fixtures. Some systems can also provide GPS coordinates for each light on the runway to aid in locating deficient fixtures for cleaning or repair. Equipment used for photometric measurements must be of the highest quality and be proven capable of high accuracy and repeatability to avoid the collection of erroneous data.

CHAPTER 5. PREVENTIVE MAINTENANCE.

5.0 GENERAL. This chapter discusses the preventive maintenance program for the visual aid facilities and equipment. It contains a Preventive Maintenance Inspection (PMI) schedule for each major item of equipment with step-by-step instructions for performing the PMI. The PMIs establish a recommended routine which may be altered to suit local conditions. General troubleshooting procedures for airport lighting systems are contained in Chapter 6. Corrective maintenance procedures for specific equipment will be found in the manufacturer's operating and maintenance instructions and are not included in this AC.

5.1 AIRPORT LIGHTING VAULT. To perform the PMIs, as shown in Table 5.2, proceed as follows: 5.1.1 Daily Checks. Check the operation of all controls. If the airport is equipped with a computer control system that allows control and monitoring from the maintenance shop or other remote location, verify the proper operation of all controls from that location. 5.1.2 Weekly Checks. (1) Cleanliness. Check the general cleanliness of the vault. Sweep out the vault regularly. Keep it free from dust, dirt, sand, spider webs, insect nests, etc. (2) Moisture. Check for any collection of moisture. If there is a drain in the floor, make sure that it is operating properly. Mop up moisture from the floor. (3) Screens. Check screens on all ventilators. Repair or replace, as necessary, to keep out wasps and other nestbuilding insects. Check operation of ventilation fans and thermostat controls. If vault is equipped with air conditioning, check for proper operation of system and thermostat control in warm weather months. (4) Storage. Check vault for improper use as a storeroom.

Avoid storing spare parts, rags, etc., near the highvoltage equipment. If the vault has an attached room, use this room for storing spare lamps, fuses, rags, spare parts, etc. 5.1.3 Monthly Checks. 5.1.3.1 Insulation-Resistance Test. Performing regular preventive maintenance checks on airfield lighting circuits is absolutely necessary for reliable operation of the system. Because of the potential of operating at very high voltages, the components of the series circuit are extremely susceptible to failure. Perform insulation resistance tests on all airfield circuits on a monthly basis as a minimum. If the airport has circuits that fail regularly due to age or other reasons, consider weekly checks. Many potential failures can be found during daylight hours before they become a problem by making weekly PM insulation resistance checks a habit. Keep records in the regulator vault with the circuit identified as well as the date and results of the test.

Provide space for notes as to special conditions such as weather conditions at the time of the test, recent lightning activity and to note failure locations and causes when found. A sample form is shown in Figure 5-1. Insulation resistance test sets can be purchased that are operated by hand-crank, batteries, or on 120 volt AC supply. The battery operated sets are the most versatile. Hand-crank units are the least accurate as the operation of the instrument can vary significantly between operators. Take care in selecting a test set and potential output voltages.

Figure 5-1: picture of page 33Figure 5-1 · page 33
Picture of the page from the copy saved here

As a minimum, the test set should have an output of 1000 volts DC. Test sets with outputs of 2500 VDC to 5000 VDC are also available and are superior at detecting high resistance faults. It should be noted, however, that when testing older circuits, especially circuits that normally operate at lower voltages, use of a 5000 VDC tester may show a fault in an otherwise undetected weak spot in a cable or transformer. It is therefore advisable, when testing at voltages higher than 1000 VDC, to be prepared to make immediate repairs if necessary. When performing insulation resistance tests for preventive maintenance, it is necessary to be consistent in the way the tests are carried out from one session to the next. Test results may vary due to a number of circumstances. For instance, the test should be administered for the same length of time each time it is performed and at the same test voltage so that the results may be accurately compared.

A very important consideration when performing insulation resistance tests is the time required for the reading of insulation resistance to reach a maximum. The primary cause of delay in reaching full charge is known as the dielectric absorption effect. It may be a matter of several minutes before this is completed and for the reading to reach an absolute maximum. It is best to establish a minimum time for conducting the tests based on experience. For short time readings of insulation resistance, operate the instrument for a definite length of time, either 30 seconds to 1 minute, and read at the end of that time. Make future tests with the same length of operating time. Other variables such as moisture, weather, and time of day may affect the readings. Readings should ideally be taken after circuits have been de-energized for several hours. Readings may appear higher immediately after operating the circuit. This is a sign of deteriorating insulation in transformers and possibly cable that is allowing moisture to enter.

Operating the circuits raises the temperature and drives moisture from the insulation resulting in an artificially higher reading. There is no ideal value for insulation resistance readings on series circuits due to factors such as circuit length, age, etc. The best rule here is to base this decision on past experience with your own facility. Each circuit may be different based on age, manufacturer of cable and equipment, installation methods (direct buried or installed in conduit), local weather conditions, and amount of moisture normally present in the system. The decision of when to consider a circuit failing and in need of preventive maintenance repairs may vary from one circuit to another at the same facility. Generally speaking, any circuit that measures less than 1 megohm is certainly destined for rapid failure. The time it takes for a circuit to fail is affected by the output voltage of the regulator, type of fault and presence of moisture at the location of the fault.

The larger the circuit size in kW, the higher the output voltage and hence, the more the condition of the insulation becomes critical. The important information is the deterioration of the resistance values from month to month and year to year. The resistance value inevitably declines over the service life of the circuit; a 10-20 percent decline per year may be considered normal. A yearly decline of 50 percent (4 percent monthly) or greater indicates the existence of a problem (such as a high resistance ground) or serious deterioration of the circuit insulation. In this instance the maintenance supervisor should consider performing troubleshooting to locate the problem (Chapter 6). A table for typical existing circuit loop resistance is shown in Table 5-1. It should also be noted that the insulation resistance that is required for new installations will have a great effect on the ability of the maintenance staff to maintain the series lighting circuits after installation and acceptance.

With newer cable installations being more frequently installed in conduit and base cans as opposed to direct burial, initial resistance values up to and in excess of 500 megohms are normally achievable and should be required.

Circuit Length in Feet Suggested minimum resistance to ground in megohms 10,000 or less 50 10,000 to 20,000 40 20,000 or more 30 Table 5-1. Suggested Resistance Values for Maintenance

5.1.3.2 Input Voltage. Measure the input voltage to the vault. Take this measurement at various times of the day and/or night since the demand on the commercial power network varies throughout the day. Record the input voltage of each phase for future reference. If it is out of tolerance, contact the power company and have them correct the problem.

AIRPORT LIGHTING CIRCUIT INSULATION RESISTANCE TEST RECORD VAULT OR SUBSTATION # … CIRCUIT IDENTIFICATION …

DATE OHMS WEATHER CONDITIONS AND COMMENTS INITIALS

DATE OHMS WEATHER CONDITIONS AND COMMENTS INITIALS

Figure 5-1. Sample Insulation Resistance Record

5.1.4 Semi-annual Checks. 5.1.4.1 Ground Resistance. Perform a ground-resistance measurement for each item of equipment using a ground resistance tester. Record the readings and compare with previous readings to discover deterioration in the grounding system. The lower the resistance value, the better; a value of 5 to 10 ohms is desirable. If the resistance is greater than 25 ohms, immediate action must be taken to lower the resistance. 5.1.4.2 Primary High-Voltage Buses and Ground Buses. Check the high-voltage bus installation with particular attention to the condition of the insulators, supports, and electrical connections. Keep the bus insulators wiped free of dust or any other deposits. Check the ground bus carefully throughout its entire length. If the bus or any ground connection to the bus is broken, make immediate repairs. De-energize the system before cleaning or repairing the bus. 5.1.4.3 Relays. Inspect the protective relay, circuit selector switches, and auxiliary relay panels when servicing the vault equipment.

Check the operation of these devices, clean the contacts, adjust release springs, and check contact arms and dash pots. Replace all unserviceable parts. 5.1.4.4 Oil Fuse Cutouts. Check operation and electrical connections of the oil fuse cutouts. Check the contacts and check the oil level. Add oil when necessary. If fuses with replaceable links have failed, replace them with fuse links especially manufactured for this purpose. If the oil fuse cutouts have a manual operating lever, check the operation of the locking arrangement. Be sure the manual operating handle is locked in the “OFF” position before servicing vault equipment that is being supplied through the oil fuse cutout. 5.1.4.5 Oil Switches. Check the operation of the oil switches. Be sure that the moveable handle on the oil switch, which has three positions, “MANUAL OFF,” “MANUAL ON,” and “AUTOMATIC,” is in the “AUTOMATIC” position at all times. This allows the switch to be remotely controlled. Check the contacts and oil level and service when necessary. 5.1.4.6 Power Transfer Switches.

Check operation of power transfer switches. Check contacts for dirt or corrosion. 5.1.4.7 Control Panel or Computer Control Equipment. In some cases, an auxiliary control panel is installed in the vault, or a computer controlled system is installed along with a monitor interface that may provide control capabilities from the vault. In such cases, carefully check the operation of all parts of the panel. Clean all contacts and make sure all electrical connections are in good condition. Clean the interior of the panel carefully. If computer-controlled, inspect and clean all air filters associated with the cooling fans for the computers and uninterruptible power supply units if so equipped. 5.1.4.8 Photoelectric Time Switch. If a photoelectric time switch is installed, maintain according to the manufacturer’s instructions. Check light levels with a photographic light meter to ensure that the control turns on and off at the proper ambient light levels.

5.1.4.9 Astronomic Time Switch. If this switch is installed, service according to the manufacturer’s instruction book. Inspect the operation, check clock for proper time, clean motor commutator and main switch contacts, and check all electrical connections. Since this is a precision instrument, the manufacturer or an authorized service representative should make repairs. 5.1.4.10 Radio-Control of Airport Lighting. Check the operation of radio-controlled airport lighting by keying a portable transmitter and observing the actuation of the switching mechanism. If a fault is detected, follow the manufacturer’s recommendation for repair or replacement. 5.1.4.11 Lightning Arresters. Check the lightning arresters for burning, scorching, or other signs of failure. Inspect lightning arresters for damage after each lightning storm in the area. 5.1.4.12 Miscellaneous. Inspect all miscellaneous vault items, such as circuit breakers, terminal blocks, potheads, vault lights, switches, etc. Make sure they are clean and all connections are tight.

Inspect all safety board equipment and fire extinguishers. 5.1.5 Annual Checks. 5.1.5.1 Dielectric Checks. Perform dielectric tests on oil in oil-filled equipment such as circuit breakers, regulators, and transformers as described in Paragraph 5.2. 5.1.5.2 Paint. Check the condition of the paint on the equipment and vault. Repaint as necessary. 5.1.6 Recommended Vault Procedures. 5.1.6.1 Airport Plan. Permanently post an airport plan in the vault to aid in testing and troubleshooting the field circuit loops. This airport plan (preferably behind glass) shows the field layout, marked with the location of all lights, cable runs, cable splices, and lighted visual aid equipment. Name and telephone number(s) of person(s) responsible for electrical maintenance for the airport should be located adjacent to the airport plan. 5.1.6.2 Schematic Diagram. Display up-to-date diagrams of all power and control circuits in the vault.

Display both a schematic diagram, which is a symbolic depiction of the logic of the circuit, and a wiring diagram, which is a detailed layout showing all wires and connections. 5.1.6.3 Vault Security. Lock the vault, except during maintenance, to keep unauthorized personnel out. Contact with the high-voltage buses in an airport lighting vault is nearly always fatal. Allow only authorized personnel, experienced in the hazards of high voltage, in the vault.

5.1.6.4 High-Voltage Warning Signs. Prominently display high-voltage warning signs, as described in Paragraph 2.10, at appropriate locations. 5.1.6.5 Safety Board. Install safety boards, as described Paragraph 2.5, in the vault.

Maintenance Requirement

D A I L Y

W K L Y

M T H L Y

S M A N Y

A N N L Y

U N S C H 1. Check control operation X 2. Check general cleanliness X 3. Check for moisture X 4. Check ventilator screens or air conditioner controls X 5. Inspect safety boards, safety equipment and fire extinguishers X 6. Check insulation resistance of all field circuits* X 7. Check input voltage to vault X 8. Check ground resistance X 9. Inspect and clean buses X 10. Check relay operation X 11. Check oil fuse cutouts X 12. Check oil switches X 13. Operate power transfer switches X 14. Check control panel or computer control equipment X 15. Check photoelectric switch X 16. Check astronomic time switch X 17. Check radio control of lighting equipment X 18. Check lightning arrestors X X 19. Inspect miscellaneous electrical equipment X 20. Test oil dielectric strength in transformers and regulators X 21. Paint equipment as necessary X X

* Weekly insulation resistance tests may be necessary for older circuits.

Table 5-2. Preventive Maintenance Inspection Schedule for Airport Lighting Vaults

5.2 CONSTANT CURRENT REGULATORS (CCRs). Constant current regulators come in two basic types, air cooled and liquid filled. The two basic types of regulators can be further classified as either magnetic or electronic. Magnetic types typically utilize either a resonant circuit or a saturable reactor principle. In a resonant network circuit, the current output is proportional to the input voltage and therefore any change in input voltage will cause a corresponding change in output current. Most resonant network regulators are only manufactured in sizes less than 10 kW. We recommend that manufacturer’s literature on the operation, theory of operation, and recommended maintenance procedures for the particular regulator(s) being used be obtained and kept on hand in the vault and maintenance office for reference. Most constant current regulators manufactured today are reliable and reasonably trouble-free. However, do not be lulled into complacency when considering preventive maintenance of these vital components in the airport lighting

electrical system. A regulator failure without a spare backup regulator or spare parts on hand can shut down a vital runway or taxiway indefinitely. Many times otherwise conscientious electricians have been surprised by a sudden failure or caught without spare parts for a piece of equipment. Unlike other elements in the electrical system that use commonly available parts, when a failure occurs of a component in a CCR, it is most likely an entire PC board that will have to be replaced and manufacturers may not have parts readily available. As a minimum, keep one type of each board and critical component such as silicon controlled rectifiers (SCRs) on hand for each type and size of CCR in use at the airport. This task has been made easier by some manufacturers as they make CCRs that use common control boards and components regardless of size, style, or type. 5.2.1 Daily Checks. 1. Check all control equipment for proper operation. Check remote control operation on each brightness step.

This has been made easier at many airports due to the upgrade to computer controlled systems with an interface terminal at the maintenance shop office. Before the end of each shift, the supervisor can energize the airport lighting systems and monitor the CCRs for proper operation. 5.2.2 Weekly Checks. 1. Pay a visit to each electrical vault or substation at least once a week to check for cleanliness and general condition. We recommend making the visit while the circuits are in operation so as to notice any unusual noises or smells that could lead to discovering a problem with one of the CCRs. If the airport has a weekly schedule of performing insulation tests on field circuits or testing emergency generators, test and inspect the CCRs at this same time. 5.2.3 Monthly Checks. 1. Check and record input voltage and current. If the voltage is not within + or – 5% of the design voltage, notify the power company to correct the input voltage. 2. Check and record the output current of each CCR on each brightness step. Compare the values with the tolerances listed in Tables 5-3 & 5-4.

Make sure you are using a high accuracy true RMS ammeter when making these measurements. If any are found to be out of tolerance, adjust CCR per manufacturer’s instructions. 5.2.4 Semi-annual Checks. 1. If it is suspected that a circuit may be overloaded, a measurement of the output load may be made at this time. Evidence of overloading could be overheating, failure to produce rated current (6.6 or 20 A) at maximum brightness setting, or erratic behavior when operated with a transient load such as runway guard lights or runway end identifier lights (REILs).

!!CAUTION!!

MEASUREMENTS OF THE OUTPUT LOAD OF A CCR REQUIRE TAKING VOLTAGE MEASUREMENTS AT THE LOAD OUTPUT TERMINALS OF THE CCR. A CCR CAN DEVELOP AS MUCH AS 4545 VOLTS IN THE CASE OF A FULLY LOADED 30 kW CCR. NEVER ATTEMPT TO MEASURE THE VOLTAGE ACROSS THE OUTPUT OF A REGULATOR WITHOUT A LOAD CONNECTED. IN OPEN CIRCUITED CONDITIONS, THE VOLTAGE CAN REACH EXTREMELY HIGH VALUES BEFORE OPEN-CIRCUIT SHUT DOWN OF THE REGULATOR OCCURS. ONLY QUALIFIED ELECTRICIANS EXERCISING EXTREME CAUTION AND USING THE CORRECT INSTRUMENTS AND SAFETY PRECAUTIONS SHOULD ATTEMPT THESE MEASUREMENTS.

Measure voltage across the output of the CCR using a potential transformer having a ratio of 40:1 and a primary voltage rating of at least 4800 volts. Use a high accuracy true-RMS digital multimeter or power analyzer to measure the output of the potential transformer. Alternatively, many newer control and monitoring systems have provision for constant monitoring of output voltage, current and circuit load. Before measuring output load, it is imperative that a check be made to ensure that all the lamps are operating in the circuit. Open secondary windings on series transformers impose an inductive load on the regulator which can result in erratic behavior of the regulator and inaccurate measurements. Measure the output voltage across the output terminals with the normal load connected and the regulator operating at the highest brightness step. Multiply the output current (normally 6.6 or 20 A) by the voltage measured across the output of the regulator to obtain the approximate load (i.e. 4545 volts x 6.6 amps = 30Kw).

This is a close approximation that assumes that the regulator is operating at a high power factor. Assure that the load value does not exceed the given kW rating of the regulator. 2. Visually inspect the regulator for any signs of loose connections or overheating. Be aware that many of the connections that should be inspected are not visible by merely opening the front access panel on the regulator. De-energize and lock out power to the regulator and remove the top, sides, or back panels depending on the type of CCR to access and inspect the connections. Pay special attention to line and load connections where high current is present and also inspect connections on capacitors closely. Look for any signs of discoloring that would indicate overheating and a loose connection and physically test any and all connections for tightness.

5.2.5 Annual Checks. 1. For regulators that are oil filled, make a dielectric strength test of the oil. Take at least a 1-pint sample of oil from the oil sampling or drain valve at the base of the regulator tank. Sediments may have settled to the bottom of the tank that could contaminate the sample. If such sediments are observed in the sample, take another sample to try to obtain a sample that is free of sediment or if possible, remove a sample from the top of the regulator tank. It is also very important to make sure that a clean vessel is used to obtain and store the sample so as not to contaminate it. An oil dielectric tester, as described in Chapter 4, may be used or if no facilities are available for making dielectric tests, contact the nearest power company equipped to perform these tests. If the oil is dirty or black, this is usually a sign of a major electrical problem within the tank which will require major work. If the oil dielectric strength is low, it should be replaced or filtered and dried to restore its dielectric strength.

Wash out sludge deposits on the core and coil assembly and in the tank with clean dry oil. Models with an internal primary switch will tend to collect more sludge due to arcing under oil. Fill with oil to the proper level with the type oil approved by the regulator manufacturer. Dielectric strength (kV) for new oil should be 30kV+. A normal range for oil being tested should be 26-30 with 22 kV as the minimum acceptable level. 2. Perform a short circuit test as follows: Turn off power to the regulator. Short the output terminals using No. 10 AWG wire (or larger) across the output terminals. Turn on the regulator and advance intensity through each step. Read the output current on each step using an accurate true RMS ammeter. The output current should be within the tolerances shown in Tables 5-3 & 5-4. 3. If the current output is not within limits, check the voltage input to the regulator. It should be within +/-5 percent of rated input voltage. Be sure the correct voltage tap is used (on dry-type transformers). Turn off the regulator and lock out and tag out the input supply.

Disconnect the short and reconnect output cables. Compare the short circuit values with those obtained from the monthly output current readings. If necessary, adjust output current according to the manufacturer’s equipment maintenance manual. 4. Perform an open circuit test as follows: Perform this test only on those regulators with open circuit protective devices. Turn off power to the regulator and lock out the primary supply circuit. Disconnect cables from output terminals. Turn on power to the regulator. Advance the brightness selector switch to any step. The open-circuit protective device should

automatically operate within two seconds to turn off the regulator. Turn off the selector switch. Reset the open-circuit protective device. If the test is satisfactory, turn off regulator power and lock out primary supply and reconnect the output cables. Re-energize primary power to the regulator and set selector switch for automatic (remote) operation. 5. Perform an over-current test: If the regulator is equipped with over-current protection, follow the manufacturer’s recommendations and procedures as outlined in the regulator manual for performing an over-current test.

Standard FAA CCR Output Currents vs. Allowable Range, Per FAA AC 150/5345-10E

Output Step Nominal Output Allowable Range 3 6.6 amps 6.40-6.70 2 5.5 amps 5.33-5.67 1 4.8 amps 4.66-4.94 Table 5-3. 3-Step CCR Output Tolerances Output Step Output 6.6 A Regulator Allowable

Range

Output 20 A Regulator Allowable

Range 5 6.6 amps 6.40-6.70 20.0 amps 19.40-20.30 4 5.2 amps 5.04-5.36 15.8 amps 15.33-16.27 3 4.1 amps 3.98-4.22 12.4 amps 12.03-12.77 2 3.4 amps 3.30-3.50 10.3 amps 9.99-10.61 1 2.8 amps 2.72-2.88 8.5 amps 8.24-8.76 Table 5-4. 5-Step CCR Output Tolerances

Maintenance Requirement

D A

I L Y

W

K

L Y

M

T H

L Y

S M

A N

L Y

A N N

L Y

U N S C H

1. Check control circuits on all brightness steps X 2. Check condition and operation of regulator X 3. Check input voltage and current X 4. Check output current on each brightness step X 5. Check output load on regulator if needed X 6. Check relays, wiring and insulation X 7. Check dielectric strength of cooling oil (if used) X 8. Perform a short-circuit test X 9. Perform an open-circuit test (only on regulators with open circuit protection.

X

10. Clean rust spots and repaint as necessary. X Table 5-5. Preventive Maintenance Inspection Schedule for Constant Current Regulators

5.3 LIGHT FIXTURE AND BASE MAINTENANCE. 5.3.1 Introduction. Airport lighting fixtures for runway and taxiway use are divided into two broad categories: elevated and inpavement. The maintenance requirements for each of these types are quite different. In-pavement lights generally require more maintenance than elevated lights to provide consistent performance and uniformity of light output. Elevated runway edge lights require more care in alignment so that the light output is aimed properly to meet photometric requirements. Several factors, however, are common to both types of fixtures. Dirt and other contaminants, particularly rubber on in-pavement lights, reduce light output and require periodic cleaning of the glassware or lens to assure optimum performance. Bases also require maintenance attention on a regular basis to ensure the integrity of the fixture/base assembly. 5.3.2 Runway and Taxiway Elevated Edge Lighting Systems.

Elevated lights, particularly taxiway lights, generally require less maintenance attention than the in-pavement lights such as runway centerline and touchdown zone lights. Taxiway edge lights normally only require periodic relamping. However, they are probably the most likely candidates for other types of damage on the airfield. Aircraft and ground vehicles, snow plows and mowers seem to have a particular affinity for running over elevated taxiway edge lights. It is for this reason that many airports are using in-pavement taxiway edge lights more frequently in areas of high traffic or frequent damage. The primary problems and hazards associated with the repair of elevated lights, when they have been run over or damaged, is from the glass and bare electrical conductors that may be exposed. Be sure to take proper safety precautions when handling these items (i.e. proper gloves and other safety equipment). Glass from broken taxiway globes is extremely sharp and poses a hazard both to the maintenance electrician and also as a significant Foreign Object Damage (FOD) hazard for aircraft.

Probably the single biggest problem with repairing damaged elevated taxiway or runway lights is the removal of the existing frangible coupling. Reduce this problem by applying a coating of anti-seize compound or aluminum anti-oxidant to the threads before installing a new coupling. Runway edge lights and threshold lights require more maintenance than taxiway lights. Runway edge lights may require periodic cleaning to remove dirt, mud, bird droppings, etc. The lenses of elevated runway edge lights can also become pitted and sand-blasted from jet blast and require replacement. When re-lamping or repairing runway edge lights, care must be taken to make sure that all lenses and filters are in their proper orientation and that the fixture itself is in the proper orientation relative to the runway. Most elevated runway edge light globes have an arrow on top that must be aimed perpendicular to the runway centerline. The beams of runway edge lights are aimed toward the runway centerline at 3.5 degrees. The beam is also aimed up 4 degrees from horizontal.

Proper orientation of the fixture is necessary for this toe-in and required photometric output to be maintained. When relamping any type of fixture, always check the lamp before installing to make sure that it is the correct type and wattage. Many lamps look alike. Never re-lamp fixtures with the circuit energized. Hazards associated with this practice are covered in Chapter 2 of this document. Also, never use any lamp other than the lamp approved by the original equipment manufacturer of the fixture. Failure to do so may affect photometric output of the fixture and cause the fixture assembly to no longer meet FAA requirements. 5.3.2.1 Preventive Maintenance Inspection Procedures. To perform the PMIs contained in Table 5-6, proceed as follows: 5.3.2.2 Daily Checks. 1. Perform a visual inspection of the system at twilight or night each day. This inspection consists of a driving patrol to visually check for dimly burning bulbs, burned-out lamps, and fixtures out of alignment. Record the locations of such fixtures and make corrections as soon as possible.

Replace dimly burning lamps and burnedout lamps when the system is deactivated. 2. Check lenses for cleanliness and clean as required.

5.3.2.3 Monthly Checks. 1. Check the orientation of all lenses. Make this check by viewing the lights at night or by performing testing as outlined in (2.) below. Misaligned light units will appear dimmer or brighter than those that are properly aligned. The lenses may get out of adjustment when replacing lamps or when mowers and other vehicles strike the elevated lights. 2. Intensity Checks / Photometric Testing. Test equipment is now available to allow for the rapid and accurate testing of the output of both in-pavement and elevated runway lighting fixtures (Paragraph 4.1.12). In regards to elevated lighting, this type of testing primarily applies to high intensity runway edge lighting (HIRL). Regular photometric measurements are the only practical way of determining if the lights are emitting the specified amount of light and for determining misalignment errors.

By the use of regular photometric measurements, maintenance of lighting fixtures may be targeted only where needed thereby saving resources and time while allowing the airport to be assured of meeting light output specifications, especially necessary in low-visibility conditions. Necessary frequency of photometric measurements will vary from facility to facility and from runway to runway depending upon the amount of traffic and age of the fixtures (see table 5-6). After some experience has been gained, the interval may be adjusted to operational needs. The frequency of measurement for a precision approach runway should be based on traffic density, the local pollution level, the reliability of the installed equipment and the continuous assessment of the results of the in-field measurements but in any case should not be less than twice a year. Photometric testing should be performed:

(a) Before cleaning, re-lamping, or realignment to establish whether maintenance is necessary, and

(b) After cleaning, realignment or repair, to check the effectiveness of the maintenance action. High intensity elevated runway edge lights that exhibit light output below 70% of the minimum light output required when operated at maximum intensity per AC 150/5345-46, Specification for Runway and Taxiway Light Fixtures, should be targeted for maintenance. Any light with measured output less than 70% of the minimum light output required per AC 150/5345-46 is ineffective for high background brightness, low visibility conditions. See Appendix A, Standards and Tolerances, Table 8. 3. Straighten, level, and align all lighting units that have been knocked out of alignment. 4. Check lamp sockets for cleanliness and good electrical connections. If moisture is present, replace the fixture gasket. 5. Inspect and clean the weep hole in the frangible coupling of stake-mounted lights. 5.3.2.4 Semi-annual Checks. 1. Check the ground elevation around lighting fixtures. The frangible point should be approximately 1 inch (2.5 cm) above the ground elevation.

Grade around the fixture where necessary to maintain this fixture/grade relationship. Also, maintain the elevation of all lights the same height above the runway/taxiway pavement edge. Check the elevation more frequently during times of frequent freeze/thaw cycles. The height of the lights should not exceed 14 inches (35 cm) when located within 5 feet (1.5 m) of the runway or taxiway edge. In snow regions, where the lights are located beyond 5 feet (1.5 m) from the runway or taxiway edge, the lights may be raised 2 inches (5 cm) for each foot beyond the 5 foot (1.5 m) point. At the 10 foot (3 m) position, the lights may have a maximum height of 30 inches (75 cm). The increase in height is permitted only if any overhanging part of an aircraft expected to use the runway or taxiway could clear the light by at least 6 inches (15 cm) when the plane’s main landing gear is located on any part of the runway or taxiway. 2. Check light bases and housings for evidence of moisture penetration. Check gaskets, seals, and clamps for deterioration and damage.

Check the torque of light base cover bolts.

3. Check fixtures, bases, and housing for corrosion, rust and peeling paint. 5.3.2.5 Annual Checks. 1. Check each light fixture carefully for cracking, corrosion, or shorts. 2. Clean the contacts and ensure that lamp fits firmly into receptacle. 3. Check condition of all connections. 4. Check all gaskets on a leaky light unit and replace with new rubber gaskets. 5.3.2.6 Unscheduled Maintenance. Remove snow from around the lighting fixtures as soon as possible after a snowfall so the light fixtures are not obscured. If heavy snowfalls are predicted, plant red flags or sticks of sufficient length adjacent to the edge lights to mark their location. The flags will facilitate snow removal and will lessen the damage to fixtures by snow removal equipment. 5.3.3 Maintenance Procedures. The following paragraphs discuss general maintenance procedures for the runway and taxiway units that are not functioning: 5.3.3.1 Lamp Replacement. With the lights operating, make a visual check to positively identify the lighting unit or units that are not functioning.

CAUTION: De-energize the circuit and lock out the circuit or regulator so that the circuit cannot be energized from the remote lighting panel or other means before starting

work on the lights. Remove S-1 switch cutouts if present. 1. Turn off the lights and lock out circuits. Install safety warning signs at appropriate locations. 2. With the replacement lamp at hand, open up the fixture and remove the old lamp. (a) Examine the old lamp to confirm the source of failure. (b) Compare the identification markings on the old and replacement lamps to verify that the replacement lamp

is the correct type. (c) Inspect the lamp socket, connections, and wire insulation. (d) Check the light unit and base for evidence of leakage or condensation and remove any water present. (e) Replace fused film disc cutout, if used. (f) Install new lamps, ensuring that the lamp face is clean and free of oils, fingerprints, etc. Use a clean, dry,

soft cloth and never touch the lamp with unprotected fingers. 3. Check filters, when used, for cracking or misalignment and replace or adjust as required. 4. Clean all reflectors, globes, filters, and covers as required. When hood or shield is used, check adjustment. 5. When closing the light, confirm that the gaskets are positioned for proper sealing. Tighten all screws, clamps, and fasteners. 6. Check frangible couplings for cracks. 7. Check the horizontal and vertical alignment of the lights for proper adjustment.