Orders
Internal FAA directives, including 8900.1 and the air traffic orders.
All CurrentHistoricalCancelledProposed 11,321 documents
- Order JO 6180.13ANational Airspace Data Interchange Network (NADIN) Message Switch Network Equipment Maintenance HandbookCancelledJul 2, 2010
- Order JO 6180.14Maintenance of the Automated Weather Observing System (AWOS) Data Acquisition System (ADAS)CancelledJan 12, 2012
- Order JO 6180.18Maintenance of the United States NOTAM System (USNS)CancelledJun 24, 2024
- Order JO 6180.20Maintenance of the Temporary Flight Restriction Service (TFRS)CancelledJun 24, 2024
- Order JO 6180.22Maintenance of Defense Internet NOTAM Service (DINS)CancelledJun 24, 2024
- Order 6190.1At Responsibilities in Loading and Starting Arts Operational ProgramsCancelledDec 1, 1980
- Order 6190.1Electronic Equipment Maintenance Handbook - Aumated Radar Terminal System (ARTS EquipmentCancelledNov 1, 1971
- Order 6190.1Arts-Iii Fault LogCancelledApr 1, 1976
- Order AF 6190.1Maintenance of Center Radar Processing (CENRAP)CancelledMay 1, 1988
- Order 6190.1AAt Responsibilities in Loading & Unloading Arts Operational ProgramsCancelledJun 1, 1990
- Order 6190.1AFault Log IIICancelledOct 1, 1973
- Order 6190.1BArts Iiia and Earts Operating Temperature MeasurementCancelledMay 1, 1991
- Order 6190.1BCenter Radar Processing (CENRP)CancelledApr 1, 1986
- Order 6190.1CCenter Radar Processing (CENRP)CancelledFeb 1, 1990
- Order 6190.2Implementation and Commissioning of Radar Processing (CENRP) SystemsCancelledMay 1, 1991
- Order 6190.2Arts II Program Maintenance and DocumentationCancelledJun 1, 1982
- Order 6190.2Arts-Iii Brite A/n Carmera Alignment Ready Reference AidsCancelledOct 1, 1975
- Order 6190.2AAutomated Radar Terminal System Ii/iia Software Maintenance & DocumentationCancelledJun 1, 1990
- Order 6190.2BArts Iia and Arts Iiia Site Program Bulletins (SPB'S) and Site Technical Bulletins (STB'S)CancelledMay 1, 1991
- Order 6190.2CMaintenance of Automated Radar Terminal System (ARTS)CancelledJun 1, 1972
- Order 6190.3Arts III Program Maintenance and DocumentationCancelledJul 1, 1983
- Order 6190.3Repair of Arts III Deds Crt Insulation BootsCancelledMay 1, 1976
- Order 6190.3Integration Plan Automated Radar Terminal System Arts IICancelledNov 1, 1977
- Order 6190.3Arts II Fault LogCancelledMay 1, 1979
- Order 6190.3ARepair of ARTS III DEDS Cathode Ray Tube Insulation BootsCancelledFeb 1, 1998
- Order 6190.3AArts Iiia Program Maintenance and DocumentationCancelledJun 1, 1990
- Order 6190.3AArts Performance Monitor Utilizing the Data Reduct Ion and Analysis for Maintenance (DRAM) ProgramCancelledJul 1, 1982
- Order 6190.3BArts Performance Monitor Utilizing the Dram Pro- Gram (RIS: So AF 6190-1)CancelledMay 1, 1986
- Order 6190.3CArts Performance Monitor Utilizing the Data Reduction and Analysis Programs (dr&a or Dram)CancelledJun 1, 1987
- Order 6190.3DArts Performance Monitoring Utilizing the Data Reduction and Analysis Programs (dr&a or Dram)CancelledJul 1, 1990
- Order 6190.3DArts Performance Monitoring Utilizing the Data Reduction and Analysis Programs (dr&a 0r Dram)CancelledFeb 1, 1990
- Order 6190.3EArts Performance Monitor Utilizing the Data Reduction and Analysis ProgramsCancelledJul 1, 1992
- Order 6190.4Center Radar Arts Processing (CENRAP)CancelledMar 1, 1987
- Order 6190.4Fault Logs Arts IIICancelledJun 1, 1978
- Order 6190.4Maintenance of Center Radar Arts ProcessingCancelledAug 1, 1986
- Order 6190.4ELECTRONIC Equipment Modification Handbook Automated Radar Terminal System (ARTS-II)CancelledJun 1, 1979
- Order 6190.4Arts Iii/iiia Regional Technical Assistance and Coordination TeamCancelledAug 1, 1984
- Order 6190.5Earts Performance Monitor UEarts Performance Monitor Utilizing the Transportable Radar Analysis Comp. Sys. (TRACS)CancelledJun 1, 1990
- Order 6190.5Interim Maintenance & Certification Procedures During the Arts 111a Installation PeriodCancelledSep 1, 1979
- Order 6190.5BMaintenace of Automated Radar Terminal System (Arts Iia)CancelledJul 1, 1988
- Order 6190.5CMaintenance of Automated Radar Terminal System (Arts Iia)CancelledJul 1, 1991
- Order 6190.5DMaintenance of Automated Radar Terminal System (Arts Iia)CancelledOct 1, 1992
- Order 6190.5EMaintenance of the Automated Radar Terminal System (Arts Iia)CancelledJun 25, 1997
- Order 6190.6Arts Fault LogCancelledMay 1, 1980
- Order JO 6190.6BMaintenance of Automated Radar Terminal System and Remote Tower Alphanumeric Display SystemCancelledAug 17, 1995
- Order 6190.7Maintenance of Center Radar Arts Processing (CENRAP)CancelledMar 1, 1989
- Order 6190.7Earts EnhaEarts Enhancements System Implementation PlanCancelledOct 1, 1986
- Order 6190.7AEarts Enhancements System Implementation PlanCancelledAug 26, 1987
- Order 6190.8ARTS 11A/TPX-42 Project Implementation PlanCancelledJun 12, 1987
- Order 6190.10Maintenance of En Route Automated Radar Tracking SystemCancelledSep 17, 1990
- Order 6190.11Arts Iia Interface With Mode S/asr-9 Project Implementation Plan (PIP)CancelledNov 19, 1990
- Order 6190.12Maintenance of the Automated Radar Terminal Systems ExpansionCancelledMay 12, 1991
- Order 6190.12AMaintenance of the Automated Radar Terminal Systems Expansion (Arts Iiie)CancelledJun 1, 1996
- Order JO 6190.12BMaintenance of the Automated Radar Terminal System Expansion (Arts Iiie)CancelledApr 15, 1998
- Order JO 6190.12CMaintenance of The Automated Radar Terminal System Expansion (ARTS IIIE)CancelledOct 1, 2005
- Order JO 6190.12DMaintenance of the Automated Radar Terminal System Expansion (ARTS IIIE)CancelledMar 14, 2011
- Order JO 6190.12EMAINTENANCE OF THE AUTOMATED RADAR TERMINAL SYSTEM EXPANSION (ARTS IIIE)CancelledSep 6, 2013
- Order 6190.13Arts Iia Interim Support Plan Project Implementation PlanCancelledDec 18, 1992
- Order 6190.14Arts Iiia Interim Support Plan Project Implementation PlanCancelledFeb 1, 1993
- Order 6190.15Project Implementation Plan for Arts Iiia Mode C Intruder (MCI)CancelledFeb 7, 1994
- Order 6190.16Maintenance of Radar Bright Display Equipment Replacement Micro En Route Automated Radar TrackingCancelledSep 1, 1994
- Order 6190.16AMaintenance of Radar Bright Display Equipment Replacement Micro En Route Automated Radar TrackingCancelledNov 1, 1996
- Order 6190.16BMaintenance of Micro-En Route Automated Radar Tracking System (MEARTS)CancelledJun 17, 2000
- Order JO 6190.16CMaintenance of Micro En Route Automated Radar Tracking System (MEARTS)CancelledJun 21, 2004
- Order JO 6190.16EMaintenance of the Micro En Route Automated Radar Tracking System (MEARTS)CancelledFeb 27, 2009
- Order 6190.17EEM - Micro-EARTS Radar Bright Display Equipment (RBDER)CancelledFeb 1, 1995
- Order JO 6190.19Maintenance of the Automated Radar Terminal System (Arts IIe)CancelledOct 26, 1998
- Order JO 6190.19AMaintenance Of The Automated Radar Terminal System Expansion (ARTS IIE)CancelledMay 31, 2009
- Order JO 6190.20Standards and Guidelines to Define and (@) Standards and Guidelines to Define and Adapt Values for MSAW/CA Site Variables for Term Auto SysCancelledJan 26, 2006
- Order JO 6190.20AStandards and Guidelines to Define and Adapt Values for MSAW/CA Site Variables for Terminal Automation SystemsCancelledJul 14, 2010
- Order JO 6190.58Maintenance of the Automated Radar Terminal System Expansion (ARTS IE)CancelledMar 27, 2007
- Order JO 6190.59Maintenance of CARTS StuffCancelledFeb 28, 2008
- Order 6191.1Maintenance of Standard Terminal Automation Replacement System (STARS)CancelledAug 2, 2000
- Order 6191.3Standard Terminal Automation Replacement System (STARS) Maintenance Technical HandbookCancelledOct 6, 2006
- Order JO 6191.5Standard Terminal Automation Replacement System (STARS) Maintenance Technical Handbook (MTHB) Generation 4 (G4),CancelledNov 7, 2015
- Order JO 6191.6Standard Terminal Automation Replacement System (STARS) Enhanced Local Integrated Tower Equipment (ELITE) Maintenance Technical Handbook (MTHB)CancelledNov 7, 2015
- Order 6195.1Maintenance of the Capstone Communications Control System (CCCS)CancelledOct 30, 2003
- Order JO 6195.1AMaintenance of the Capstone Communications Control System (CCCS)CancelledApr 29, 2005
- Order JO 6195.1BMaintenance of the Capstone Communications Control System (CCCS)CancelledMar 4, 2009
- Order AF 6200.1Regional Test Equipment Loan Pool ManagementCancelledFeb 1, 1987
- Order AF P 6200.1Test Equipment Modification Handbook - GeneralCancelledJan 1, 1954
- Order 6200.1CTest Equipment Loan StockCancelledApr 1, 1980
- Order 6200.1DRegional Office Electronic/electrical Test Equipment PoolCancelledNov 1, 1990
- Order 6200.1DTest Equipment Loan StockCancelledMar 1, 1988
- Order 6200.1ERegional Test Equipment Loan StockCancelledDec 1, 1992
- Order 6200.1GRepair and Calibration of Test EquipmentCancelledMar 1, 1985
- Order 6200.2Dbm/dba Meter, Type 11-BCancelledAug 1, 1967
- Order 6200.3Regional Loan Stock of Test EquipmentCancelledJan 1, 1984
- Order 6200.3Bonding of Coaxial Cable ConnectorsCancelledAug 1, 1967
- Order 6200.4Test Equipment ProgramCancelledSep 1, 1985
- Order 6200.4Test Equipment InventoryCancelledAug 1, 1977
- Order 6200.4Care and Control of Airway Facilities Regional O Ffice Test EquipmentCancelledDec 1, 1980
- Order 6200.4AManagment and Control of AF Regional Office Loan Pool Test EquipmentCancelledDec 1, 1985
- Order 6200.4ATest Equipment InventoryCancelledNov 1, 1985
- Order 6200.4AProcedures for Requesting Test EquipmentCancelledNov 1, 1970
- Order 6200.4BTest Equipment Management HandbookCancelledNov 1, 1975
- Order 6200.4CTest Equipment Management HandbookCancelledSep 1, 1985
- Order 6200.4DTest Equipment Management HandbookCancelledFeb 1, 1989
- Order 6200.4ETest Equipment Management HandbookCancelledNov 1, 1991
- Order 6200.4FTest Equipment Management HandbookCancelledAug 20, 1997