FAA OrderText changedNov 22, 2026

Order GL 6980.8A Test Run on Standby Engine Generators

Text re-read from the scan: 4 of 4 passages.

Date
Nov 22, 2026
Recorded
Nov 22, 2026
Passages
4 of 4 changed (was 2)
Paragraphs
11 added or rewritten, 10 removed or rewritten

Read the current text Official source ↗

What changed in the text

Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.

  1. Changed

    [added: ORDER ]DEPARTMENT OF TRANSPORTATION [removed: ORDER ]FEDERAL AVIATION ADMINISTRATION[removed: GL 6980.8A GREAT LAKES REGION]

  2. Added

    [added: GREAT LAKES REGION GL 6980.8A]

  3. 5/30/80

  4. SUBJ: Test Run On Standby Engine Generators

  5. Changed

    1. PURPOSE: This Order is to alert maintenance personnel of a potential [removed: prollera][added: problem] that exists when conducting test runs on standby engine generators while using [removed: $tation][added: étation] load.

  6. Changed

    2. DISTRIBUTION: This Order is distributed to the Airway Facilities [removed: Division^][added: Division,] Branch level and above, and to all Airway Facilities Field [removed: Offices!][added: Offices]

  7. Changed

    [removed: 3«][added: 3.] [removed: CANCELLATION;][added: CANCELLATION:] Order GL 6980.8, "Test Run on Standby Engine [removed: Generators",)][added: Generators] dated 1 Apr. 72 is cancelled.

  8. Changed

    4. BACKGROUND: Momentary [removed: Interruption][added: interruption] of power during transfer from commercial to engine or the reverse can [removed: cause][added: cause.] fuses to blow, breakers to[added: trip, equipment to malfunction, and result in a facility outage. A short interruption of a facility during peak air traffic activity can have a very seriousimpact.]

  9. Removed

    [removed: trii, equipment to malfunction, and result in a facility outage. A short interruption of a facility during peak air traffic activity can have a very serious Impact.]

  10. Added

    [added: 5. ACTION: All Airway Facilities Sectors are to review the air traffic level at each location and determine the optimum time in which the transfer to engine geņerators can be accomplished, when station load is used. Where practical, it shall be the policy to schedule test runs at a time that will have the least impact on air traffic and weather conditions do not require aircraft to be on instruments. This Order does not minimize the necessity of performance engine generator test runs in accordance with agency policy. These checks are the only means of assuring proper operation of a plant. Technical evaluations will include a check of both scheduled and actual test runs.]

  11. Removed

    [removed: 5. iACT ON: All Airway Facilities Sectors are to review the air traffic level ai each location and determine the optimum time _ In which the transfer _ … to Engine generators can be accomplished, when station load Is used* Where practical, 1: shall be the policy to schedule test runs at a time that will have the leapt impact on air traffic and weather conditions do not require]

  12. Added

    [added: 9. Jruhan TRUHAN]

  13. Removed

    [removed: aircraft to be on instruments. This Order does not minimize the necessity of performance engine generator test runs in accordance with agency policy. These checks are the only means of assuring proper operation of a plant. Technical evaluations will include a check of both scheduled and actual test runs.]

  14. Added

    [added: AGL-400]

  15. Changed

    Distribution:[added: A-XAF-3, FAF-O (Max.)] Initiated By: [removed: A G L_ 4 3 6 A-XAF-3, FAF-0 (Max.)][added: AGL-436]

  16. Removed

    [removed: FAA Form 1320-1 (?~tli *jp»r»«a>»» pravraus eStMn i,s, wwaNxrYr ».•>-,«., .,*Ka «>;• <>4i-..]

  17. Added

    [added: FAA Farm 1320-1 (7-71) suporseues previaus editon]

Whole text before this change

DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION GL 6980.8A GREAT LAKES REGION

5/30/80

SUBJ: Test Run On Standby Engine Generators

1. PURPOSE: This Order is to alert maintenance personnel of a potential prollera that exists when conducting test runs on standby engine generators while using $tation load.

2. DISTRIBUTION: This Order is distributed to the Airway Facilities Division^ Branch level and above, and to all Airway Facilities Field Offices!

3« CANCELLATION; Order GL 6980.8, "Test Run on Standby Engine Generators",) dated 1 Apr. 72 is cancelled.

4. BACKGROUND: Momentary Interruption of power during transfer from commercial to engine or the reverse can cause fuses to blow, breakers to

trii, equipment to malfunction, and result in a facility outage. A short interruption of a facility during peak air traffic activity can have a very serious Impact.

5. iACT ON: All Airway Facilities Sectors are to review the air traffic level ai each location and determine the optimum time _ In which the transfer _ … to Engine generators can be accomplished, when station load Is used* Where practical, 1: shall be the policy to schedule test runs at a time that will have the leapt impact on air traffic and weather conditions do not require

aircraft to be on instruments. This Order does not minimize the necessity of performance engine generator test runs in accordance with agency policy. These checks are the only means of assuring proper operation of a plant. Technical evaluations will include a check of both scheduled and actual test runs.

Distribution: Initiated By: A G L_ 4 3 6 A-XAF-3, FAF-0 (Max.)

FAA Form 1320-1 (?~tli *jp»r»«a>»» pravraus eStMn i,s, wwaNxrYr ».•>-,«., .,*Ka «>;• <>4i-..

Whole text after this change

ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

GREAT LAKES REGION GL 6980.8A

5/30/80

SUBJ: Test Run On Standby Engine Generators

1. PURPOSE: This Order is to alert maintenance personnel of a potential problem that exists when conducting test runs on standby engine generators while using étation load.

2. DISTRIBUTION: This Order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities Field Offices

3. CANCELLATION: Order GL 6980.8, "Test Run on Standby Engine Generators dated 1 Apr. 72 is cancelled.

4. BACKGROUND: Momentary interruption of power during transfer from commercial to engine or the reverse can cause. fuses to blow, breakers to trip, equipment to malfunction, and result in a facility outage. A short interruption of a facility during peak air traffic activity can have a very seriousimpact.

5. ACTION: All Airway Facilities Sectors are to review the air traffic level at each location and determine the optimum time in which the transfer to engine geņerators can be accomplished, when station load is used. Where practical, it shall be the policy to schedule test runs at a time that will have the least impact on air traffic and weather conditions do not require aircraft to be on instruments. This Order does not minimize the necessity of performance engine generator test runs in accordance with agency policy. These checks are the only means of assuring proper operation of a plant. Technical evaluations will include a check of both scheduled and actual test runs.

9. Jruhan TRUHAN

AGL-400

Distribution: A-XAF-3, FAF-O (Max.) Initiated By: AGL-436

FAA Farm 1320-1 (7-71) suporseues previaus editon