Order 8120.2E Production Approval and Certificate Management Procedures
This document is cancelled. Cancelled by 8120.2F. Check the official source before relying on it.
Text read by OCR from a scanned file. Check the original, as some words may be misread.
U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION 8120.2E National Policy
Effective Date: 5/29/07
SUBJ: Production Approval and Certificate Management Procedures
FOREWORD
This order was prepared to provide guidance for Aircraft Certification Service personnel in the accomplishment of certain agency responsibilities. These include the evaluation, approval, and certificate management of the production activities of manufacturers and their suppliers producing products or parts thereof in accordance with Title 14, Code of Federal Regulations.
The guidance in this order relates to the following four types of production approvals issued by the Federal Aviation Administration:
1. Production Certificate.
2. Approved Production Inspection System.
3. Parts Manufacturer Approval.
4. Technical Standard Order authorization.
This order has been organized into two functional areas: procedures for the evaluation and issuance of a production approval and procedures for certificate management of a production approval.
Frank P. Paskiewiez Manager, Production and Airworthiness Division, AIR-200
Distribution: A-W (IR/FS/VN) -3; A-X (CD/FS) -3; Initiated By: AIR-200 A-FFS-0 (LTD); A-FAC-0 (ALL); AMA-220 (10 copies); AMA-250 (10 copies); AFS-600 (10 copies); AVS-20 (ALL); AEU-100
TABLE OF CONTENTS
CHAPTER 1. INTRODUCTION
CHAPTER 1. INTRODUCTION
Paragraph
1. Purpose … 2. Distribution. 3. Cancellation. 4. Explanation of Major Changes. 5. Acronyms. 6. Definitions. 7. Forms. 8. Relation to Other Directives. 9. Requests for Information. 10. Authority To Change This Order. 11. Deviations. 12. Electronic Signature. 13. Records Management. 14.-19. Reserved.
Page
1 1
I 2 3 6 6 7 7 7 7 7 7
CHAPTER 2. PROCEDURES FOR ISSUING A PRODUCTION APPROVAL
CHAPTER 2. PROCEDURES FOR ISSUING A PRODUCTION APPROVAL
SECTION 1. INTRODUCTION
20. General.
9
SECTION 2. PRODUCTION UNDER A TYPE CERTIFICATE ONLY
(PART 21, SUBPART F)
PART 1. GENERAL
21. Applicability. 22. Privileges. 23. Advising the Applicant.
9 9 9
PART 2. FAA ACTIONS DURING THE SIX-MONTH PERIOD
PART 2. FAA ACTIONS DURING THE SIX-MONTH PERIOD
24. FAA Conformity Determinations. 25. Assessing the Applicant's Progress. 26. Extension of Six-Month Period. 27. APIS or PC Not Established Within Six-Month Period.
12 12 12 12 13
Figure 1. Sample FAA Form 8100-1, Conformity Inspection Record. Figure 2. Sample Letter of Authorization for Extension of § 21.123(c) Six-Month
Limitation.
iii
15
8120.2E 5/29/07
PART 3. PROCESSING AN APPLICATION FOR AN APIS
PART 3. PROCESSING AN APPLICATION FOR AN APIS
Paragraph Page
28. Application. 12 Figure 3. Sample FAA Form 8110-12, Application for Type Certificate, Production Certificate, or Supplemental Type Certificate. 16 29. Review of Production Inspection System Data. 17 30. Provisional Approval Procedures. 17 31. Preliminary DO Audit. 17 32. APIS Board. 18
PART 4. ISSUANCE OF AN APIS
PART 4. ISSUANCE OF AN APIS
33. APIS Approval Letter. 18 34. Initial Risk Management Assessment. 18 35.-40. Reserved. 18 Figure 4. Sample Letter for Approving a Manufacturer's Production Inspection System. 19
SECTION 3. PRODUCTION CERTIFICATE (PART 21, SUBPART G)
PART 1. GENERAL
PART 1. GENERAL
41. Applicability. 22 42. Privileges. 22 43. Advising the Applicant. 23
PART 2. PROCESSING AN APPLICATION FOR A PC
44. Application. 26 45. Preliminary DO Audit. 26 Figure 5. Sample PC Application Acknowledgement Letter. 27
PART 3. PRODUCTION CERTIFICATION BOARD
46. General. 28 47. PCB Member Responsibilities. 28 48. Conduct of the Board. 29 49. PCB Minutes. 30 50. PCB Adjourmment. 31
PART 4. ISSUANCE OF PRODUCTION CERTIFICATE AND PRODUCTION LIMITATION RECORD
PART 4. ISSUANCE OF PRODUCTION CERTIFICATE AND PRODUCTION LIMITATION RECORD
51. Preparation and Delivery of PC and PLR. 31 Figure 6. Sample FAA Form 8120-4, Production Certificate. 32 Figure 7. Sample FAA Form 8120-3, Production Limitation Record. 33 Figure 8. Sample PC Transmittal Letter. 34 52. Initial Risk Management Assessment. 35 53.-55. Reserved. 35 iv
SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION
SECTION 4. TECHNICAL STANDARD ORDER AUTHORIZATION
(PART 21, SUBPART O)
PART 1. GENERAL
Paragraph
56. Applicability. 57. Privileges. 58. Advising the Applicant.
Page
36 36 36
PART 2. PROCESSING AN APPLICATION FOR A TSO AUTHORIZATION
59. Application. 60. Design Approval. 61. Preliminary DO Audit.
PART 2. PROCESSING AN APPLICATION FOR A TSO AUTHORIZATION
39 39 39
PART 3. ISSUANCE OF A TSO AUTHORIZATION OR LETTER OF
TSO DESIGN APPROVAL
62. TSO Letter of Authorization. 63. Letter of TSO Design Approval. 64. Initial Risk Management Assessment. 65.-67. Reserved.
40 40 40 40
SECTION 5. PARTS MANUFACTURER APPROVAL (PART 21, SUBPART K)
PART 1. GENERAL
PART 1. GENERAL
68. Applicability. 69. Privileges. 70. Advising the Applicant.
PART 2. PROCESSING AN APPLICATION FOR A PMA
71. Applicant Responsibilities. Figure 9. Sample PMA Letter of Application. 72. MIDO Responsibility.
41 42 42
45 46 47
Figure 10. Sample TC, STC, or TSO Authorization Holder's
PART 2. PROCESSING AN APPLICATION FOR A PMA
PMA Assist Letter.
48
Figure 11. Sample PMA Supplement for Licensing Agreement and STC.
PART 3. ISSUANCE OF A PMA
73. Assignment of the PMA Number. 74. PMA Letter. Figure 12. Sample PMA Letter.
50
49 51 52
Figure 13. Sample Transmittal Letter of Subsequent PMA Supplement.
75. Initial Risk Management Assessment.
PART 3. ISSUANCE OF A PMA
V
55 51
PART 4. POST-PMA ACTIVITIES
Paragraph
76. Change in Location of the Manufacturing Facility. 77. Transferability. 78. Reuse of PMA Design Data. 79. Changes to the FIS. 80. Export Considerations. 81.-84. Reserved.
Page
51 51 51 51 56 56
SECTION 6. EXTENSION OF A PRODUCTION APPROVAL WITHIN THE
UNITED STATES
UNITED STATES
PART 1. GENERAL
85. Applicability. 86. Privileges. 87. Advising the Original PAH and the Associate Facility.
56 56 56
PART 2. PROCESSING A REQUEST FOR EXTENSION OF A PRODUCTION
APPROVAL
88. Request for Extension of a Production Approval. 89. Evaluating the Reque … 90. Coordination With the Geographic District Office.
PART 2. PROCESSING A REQUEST FOR EXTENSION OF A PRODUCTION
57 57 58 59
Figure 14. Sample Hand-Off Memo for Requesting a DO Audit and CM.
PART 3. APPROVAL OF THE REQUEST FOR EXTENSION OF A PRODUCTION
APPROVAL
91. Approval of the Request.
58 58
Geographic MIDO Responsibility After Approval of the Request for Extension.
92.
SECTION 7. NON-U.S. MANUFACTURING FACILITIES—DETERMINATION OF
UNDUE BURDEN AND NO UNDUE BURDEN
UNDUE BURDEN AND NO UNDUE BURDEN
93. Undue Burden and No Undue Burden. 94.-95. Reserved.
CHAPTER3. CERTIFICATE MANAGEMENT PROCEDURES
SECTION 1. INTRODUCTION
96. General. Figure 15. Certificate Management Life Cycle Process. 97. Assignment of CM Coordinator. 98. Status of a PAH. 99.-102. Reserved.
SECTION 1. INTRODUCTION
vi
62 62
63 64 65 65 65
SECTION 2. ONGOING CM RESPONSIBILITIES
PART 1. INTRODUCTION
Paragraph
103. General.
Page
66
Figure 16. Certificate Management Responsibilities (Ongoing) - Minimum
Requirements. 104. Certificate Management Plan. 105. Coordination of Audit Activities With Other CAAs. 106. Recording Noncompliances. 107. Reserved.
PART 2. RISK MANAGEMENT
PART 2. RISK MANAGEMENT
108. Risk Management Model. 109. Scope. 110. Risk Management Groups. 111. Risk Management Categories. 112. Risk Management Assessment of Facilities. Figure 17. Sample AIR Form 8120-9. 113. Identification of Risk Management Groups. 114. Modification of Risk Management Groups. 115. Risk Management Model Validation Plan. 116. Modification of the Risk Management Model. 117.-122. Reserved.
PART 3. SUPPLIER CONTROL
PART 3. SUPPLIER CONTROL
66 67 67 68 68
68 68 68 69 69 70 72 72 72 73 73
SUBPART A. DETERMINING SUPPLIER CONTROL BY A PAH
OR ASSOCIATE FACILITY
123. General. 124. Certificate Management Activity. 125. Determination of Supplier Control. 126.-128. Reserved.
SUBPART B. SUPPLIER CONTROL AUDIT
SUBPART B. SUPPLIER CONTROL AUDIT
129. General. 130. Supplier Selection. 131. Directorate Supplier Control Audit List. 132. Coordination of Supplier Control Audits Between Directorates. 133. Domestic Hand-Off Procedures. 134. Notifying a PAH or Associate Facility. 135. Conducting and Recording a Supplier Control Audit. Figure 18. Sample Supplier Control Audit Notification Letter. 136.-138. Reserved.
vii
73 75 75 75
75 76 77 78 78 80 80 81 82
PART 4. PRINCIPAL INSPECTOR EVALUATION
PART 4. PRINCIPAL INSPECTOR EVALUATION
Paragraph
139. General. 140. Recording a PI Evaluation. 141.-143. Reserved.
Page
82 84 84
PART 5. AIRCRAFT CERTIFICATION SYSTEMS EVALUATION PROGRAM
EVALUATION
144. General. 145.-147. Reserved.
PART 6. PRODUCT AUDIT
148. General. 149. Selection of Product Audit Characteristics. 150. Product Audit Areas. 151. Product Audit Criteria.
PART 6. PRODUCT AUDIT
84 85
85 86 86 86
Figure 19. Applicability of Product Audit Criteria to Product Audit Areas
(Minimum). 152. Recording Product Audit Results. 153. Recording Completion of a Product Audit. 154.-156. Reserved.
SECTION 3. RANDOM CM RESPONSIBILITIES
PART 1. INTRODUCTION
157. General. 158.-159. Reserved.
PART 1. INTRODUCTION
87 87 88 88
88 88
PART 2. EVALUATION OF CHANGES TO A PAH'S OR ASSOCIATE FACILITY'S
QUALITY OR INSPECTION SYSTEM
160. General. 161. Prioritization of Review. 162. Review of Changes. 163. Post-Review Actions. 164.-167. Reserved.
88 88 88 89 89
Figure 20. Sample Letter of Approval for Quality System Changes by a
QUALITY OR INSPECTION SYSTEM
PC or TSO Authorization Holder.
90
Figure 21. Sample Letter of Acknowledgement for Inspection System Changes
by an APIS or PMA Holder.
viii
91
PART 3. INVESTIGATION OF SERVICE DIFFICULTIES
Paragraph
168. General. 169. Investigation. 170. Corrective Action. 171. Reporting a Service Difficulty Investigation. 172. Foreign Manufacturers. 173.-175. Reserved.
PART 3. INVESTIGATION OF SERVICE DIFFICULTIES
Page
89 92 92 92 93 93
PART 4. INVESTIGATION OF REGULATORY VIOLATIONS
176. Enforcement Actions on Safety-Related or Systemic Noncompliances.
177. Enforcement Procedures. 178. Multiple Enforcement Actions. 179. Timeliness. 180. Invalid Alleged Violations. 181. Voluntary Disclosure Procedures. 182.-184. Reserved.
PART 5. CORRECTIVE ACTION
PART 5. CORRECTIVE ACTION
185. General. 186. Corrective Action Procedures. Figure 22. Corrective Action Flowchart. 187. Corrective Action Response. 188. Corrective Action Validation. 189.-191. Reserved.
93 94 94 94 94 94 95
95 95 96 98 99 99
PART 6. UNSCHEDULED AUDITS, EVALUATIONS, OR INVESTIGATIONS
PART 6. UNSCHEDULED AUDITS, EVALUATIONS, OR INVESTIGATIONS
192. General. 193. Non-Scheduled CM Audits/Evaluations. 194. Other Random Investigations. 195.-197. Reserved.
99 99 100 100
PART 7. PROVIDING GUIDANCE TO A PAH OR ASSOCIATE FACILITY
198. General.
101
APPENDIX 1. EVALUATION OF A PAH'S QUALITY OR INSPECTION SYSTEM
1. Purpose. 2. Data Review. 3. Data Approval/Acceptance Standards.
APPENDIX 1. EVALUATION OF A PAH'S QUALITY OR INSPECTION SYSTEM
ix
1 1 3
8120.2E 5/29/07
APPENDIX 2. FABRICATION INSPECTION SYSTEM
Paragraph Page
1. Establishment of the Fabrication Inspection System (FIS). 1 2. Section 21.303(h)(1). 1 3. Section 21.303(h)(2). 2 4. Section 21.303(h)(3). 2 5. Section 21.303(h)(4). 2 6. Section 21.303(h)(5). 3 7. Section 21.303(h)(6). 4 8. Section 21.303(h)(7). 5 9. Section 21.303(h)(8). 5 10. Section 21.303(h)(9). 5
APPENDIX 3. RISK MANAGEMENT INDICATOR ASSESSMENT CRITERIA
APPENDIX 3. RISK MANAGEMENT INDICATOR ASSESSMENT CRITERIA
1. Purpose. 1 2. Specific Guidance. 1 Figure 1. Risk Management Indicators 1
APPENDIX 4. CATEGORY PARTS LIST
1. Purpose. 1 2. Category Parts List. 1 3. Structure of the CPL. 1 4. CPL Revision Process. Figure 1. Sample Category Parts List. 2 Figure 2. CPL Revision Process Flowchart. 4 Figure 3. Sample Part Categorization Memo for Requesting an Addition to the CPL. 5 Figure 4. Sample Part Categorization Memo for Requesting a Change to the CPL. 6 Figure 5. Sample Part Categorization Memo for Requesting Removal of an Assembly/Part From the CPL. 7
APPENDIX 5. RISK MANAGEMENT REPORTS
APPENDIX 5. RISK MANAGEMENT REPORTS
1. Purpose. 1 2. Types of Reports. 1
APPENDIX 6. RISK MANAGEMENT MODEL VALIDATION PLAN
1. Purpose. 2. Risk Management Validations. 1
x
5/29/07 8120.2E
APPENDIX 7. PREPARATION INSTRUCTIONS FOR FAA FORM 8100-6, NONCOMPLIANCE RECORD
Paragraph Page
APPENDIX 7. PREPARATION INSTRUCTIONS FOR FAA FORM 8100-6, NONCOMPLIANCE RECORD
1. Purpose. 1 2. Specific Guidance. 1 Figure 1. Sample FAA Form 8100-6. 4
APPENDIX 8. PREPARATION INSTRUCTIONS FOR FAA FORM 8120-14, PRODUCTION APPROVAL/CERTIFICATE MANAGEMENT ACTIVITY REPORT
1. Purpose … 1 2. Specific Guidance. 1 Figure 1. Sample FAA Form 8120-14. 3
APPENDIX 9. FORMS LISTING
APPENDIX 9. FORMS LISTING
1. Purpose. Figure 1. Forms Available From FAA Logistics Center... 1 Figure 2. Forms Available Within CMIS. 1
xi (and xii)