Order 8110.4B Type Certification
This document is cancelled. It may have been replaced. Check the official source before relying on it.
ORDER 8110.4B
ORDER 8110.4B
TYPE CERTIFICATION
April 24, 2000
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
Distribution: A-W(IR/FS/EE)-3; A-X (CD/FS)-3; A-FFS-5,7(LTD); Initiated By: AIR-110 A-FAC-0; AMA-220 (10 copies); AMA-250 (500 copies) AFS-600 (50 copies); AEU-100/200 (1 copy); A-FDR-1D; A-FDR-2
RECORD OF CHANGES DIRECTIVE NO. 8110.4B
RECORD OF CHANGES DIRECTIVE NO. 8110.4B
CHANGE
TO
BASIC
SUPPLEMENTS OPTIONAL CHANGE
TO
BASIC
SUPPLEMENTS OPTIONAL
FAA Form 1320-5 (6-80) USE PREVIOUS EDITION
FOREWORD
This order establishes procedures for accomplishing the evaluation and approval of aircraft type design data and changes to approved type design data. The procedures contained in this order apply to Aircraft Certification Service personnel, Flight Standards Service personnel, persons designated by the administrator and organizations associated with the certification processes required by the Federal Aviation Regulations. Obviously, it is impractical to cover all situations or conditions that may arise and, hence, these instructions must be supplemented by good judgement in handling the particular problems involved.
SUPPLEMENTS OPTIONAL
Forward any deficiencies, clarifications needed, or suggested improvements regarding the content of this order to the Aircraft Certification Service, Automated Systems Branch, AIR-520, Attention: Directives Management Officer, for consideration. Your assistance is welcome. Federal Aviation Administration (FAA) Form 1320-19, Directive Feedback Information, is located on the last page of this order for your convenience. If you urgently need an interpretation, you may contact the Aircraft Engineering Division, Policy and Procedures Branch, AIR-110, for guidance, but you should also use the FAA Form 1320-19 as a follow-up to verbal conversation.
James C. Jones Manager, Aircraft Engineering Division
Page i (and ii)
TABLE OF CONTENTS
TABLE OF CONTENTS
CHAPTER 1. GENERAL
Paragraph Page
1-1 Purpose … 1 1-2 Distribution … 1 1-3 Cancellation … 1 1-4 Explanation of Changes … 1 1-5 Background and Discussion … 2
CHAPTER 2. TYPE CERTIFICATION PROCESS
2-1 General … 5 2-2 Certificate Definitions … 7 2-3 Application for TC, Amended TC, STC, and PC … 7 2-4 Establishment of TC Project … 8 2-5 Type Certification Boards (TCB) … 10 2-6 Type Certification Board Meetings … 11 2-7 Certification Program Plan … 13 2-8 Issue Paper … 13 2-9 Issues Book … 13 2-10 Type Certification Basis … 13 2-11 Type Certification Program … 19 2-12 Type Inspection Authorization (TIA) … 25 2-13 Operational and Airworthiness Evaluations … 26 2-14 Flight Manual … 30 2-15 Post Certification Activities … 30 2-16 Data Retention … 35 2-17 Documents Required of the TC/STC Holder and Licensee of a TC Holder … 36
CHAPTER 3. TYPE CERTIFICATES
CHAPTER 3. TYPE CERTIFICATES
3-1 General … 37 3-2 Type Certificate … 37 3-3 Type Certificate Data Sheet (TCDS) … 40 3-4 Preparation of TCDS and Specifications for Printing … 53 3-5 Changing a Specification Document to a TCDS … 54
CHAPTER 4. SUPPLEMENTAL TYPE CERTIFICATES
4-1 General … 55 Paragraph Page
4-1 General … 55 Paragraph Page
Page iii
4-2 Supplemental Type Certificate … 55 4-3 Certification Basis for Aviation Products Modified by STC … 59 4-4 Preparing FAA Form 8110-2, Supplemental Type Certificate … 59 4-5 Return to Service … 61 4-6 Aircraft Certification Office Report of STC … 61 4-7 Canadian Supplemental Type Certificate … 62 4-8 Other Foreign CAA Supplemental Type Certificates … 63
CHAPTER 5. MANUFACTURING AND ENGINEERING RESPONSIBILITIES
CHAPTER 5. MANUFACTURING AND ENGINEERING RESPONSIBILITIES
AND FUNCTIONS RELATIVE TO INSPECTION AND TEST
5-1 FAA Aviation Safety Inspectors (Manufacturing Inspectors) … 65 5-2 Request for Conformity and Type Inspection Authorization … 65 5-3 Processes … 70 5-4 Test Articles - General … 72 5-5 Witnessing Official Test … 72 5-6 Structural Test Articles - Aircraft … 72 5-7 Prototype Flight Test Articles - Aircraft … 73 5-8 Endurance Test Articles - Engines and Propellers … 73 5-9 Teardown Inspection … 73 5-10 Use of Engineering Data … 74 5-11 Ground Inspection - Aircraft … 75 5-12 Airworthiness Certification of Prototype Products … 77 5-13 Accounting for Engineering Changes … 78 5-14 Function and Reliability Testing … 78 5-15 Inspections to be Conducted Outside District Office … 79 5-16 Requests for Conformity Inspection from FCAAs … 79 5-17 Conformity Inspection Record Reporting … 79 5-18 Type Inspection Report (TIR) … 80 5-19 Completion of the TIR … 80 5-20 Supplemental Type Inspection Report (STIR) … 81
CHAPTER 6. ADDITIONAL INFORMATION ON SELECTED TOPICS
CHAPTER 6. ADDITIONAL INFORMATION ON SELECTED TOPICS
6-1 Restricted Category Aircraft … 83 6-2 Type Certification of Surplus Military Aircraft, § 21.27 … 87 6-3 Noise Certification … 87 6-4 Flight Test … 102
APPENDIX 1. FORMS AND GUIDANCE FOR TC PROJECTS
Figure Title … page Figure 1. Instructions for completion of FAA Form 8110-12, Application
APPENDIX 1. FORMS AND GUIDANCE FOR TC PROJECTS
for TC, PC, or STC … 1 Figure 2. Sample FAA Form 8110-12 … 2
Page iv
Figure Title … page Figure 3. Standardized Certification Project Notification Procedures … 3 Figure 4. Standardized Certification Project Notification Form … 4 Figure 5. ACOS Project, TC, and STC Numbering System … 5 Figure 6. Project Significance for ACO to ACO Coordination … 7
APPENDIX 2. ISSUANCE OF CERTIFICATES
APPENDIX 2. ISSUANCE OF CERTIFICATES
Figure 1. Instructions for Preparation of Form 8110-9, TC … 1 Figure 2. Sample Type Certificate, FAA Form 8110-9 … 2 Figure 3. Sample Supplemental Type Certificate, FAA Form 8110-2 … 4 Figure 4. Sample Written Permission Statements for STC … 6 Figure 5. Sample Type Certificate Data Sheet First Page with TC Holder
History Record Paragraph … 7
APPENDIX 3. LIST OF FAA FORMS … 1
APPENDIX 3. LIST OF FAA FORMS … 1
APPENDIX 4. CONFORMITY
Figure 1. Completion of FAA Form 8120-10, Request for Conformity … 1 Figure 2. Request for Conformity, FAA Form 8120-10 … 3 Figure 3. Completion of FAA Form 8100-1, Conformity Inspection Record … 4 Figure 4. Statement of Conformity, FAA Form 8130-9 from Applicant … 6 Figure 5. Statement of Conformity, FAA Form 8130-9 from Agent for Applicant … 7 Figure 6. Type Inspection Authorization, FAA Form 8110-1 … 8
APPENDIX 5. CANADIAN STC
APPENDIX 5. CANADIAN STC
Figure 1. Formal Canadian STC Application Request … 1 Figure 2. Transport Canada Regional Airworthiness Engineers … 2 Figure 3. Sample Letter of Request … 3
APPENDIX 6. LIST OF ACRONYMS … 1 APPENDIX 7. AIRCRAFT CERTIFICATION OFFICES … 1 APPENDIX 8. AIRCRAFT EVALUATION GROUP … 1 APPENDIX 9. AIRCRAFT CERTIFICATION SERVICE … 1 APPENDIX 10. DATA RETENTION
Figure 1. Project Records … 1 Figure 2. Type Design and Substantiating Data … 2 Figure 3. Working Papers … 3
APPENDIX 11. HISTORICAL BACKGROUND OF AIRCRAFT
APPENDIX 11. HISTORICAL BACKGROUND OF AIRCRAFT
AIRWORTHINESS REGULATIONS … 1
Page v
LIST OF ILLUSTRATIONS
Figure Title … page
2-1 Type Certification Process … 6 2-2 Special Conditions … 18 6-1 Applicability of part 36 for Transport Category Large Airplanes and Subsonic Turbojet Powered Airplanes … 94 6-2 Applicability of part 36 for Small Propeller-Driven Airplanes … 95 6-3 Applicability of part 36 for Helicopters … 96 6-4 Applicability of part 36 for Acoustical Change, Subsonic Transport Category … 97 6-5 Applicability of part 36 for Acoustical Change, Stage 2 Subsonic Transport Category … 98 6-6 Applicability of part 36 for Acoustical Change, Stage 3 Subsonic Transport Category … 99 6-7 Applicability of part 36 for Acoustical Change, Small Propeller Driven Airplanes … 100 6-8 Applicability of part 36 for Acoustical Change, Helicopters … 101
LIST OF ILLUSTRATIONS
Page vi
CHAPTER 1. GENERAL
1-1. PURPOSE. This order prescribes the responsibilities and procedures for Federal Aviation Administration (FAA) aircraft certification personnel responsible for the certification process required by Title 14 of the Code of Federal Regulations for civil aircraft, aircraft engines, and propellers.
CHAPTER 1. GENERAL
1-2. DISTRIBUTION. This order is distributed to Washington headquarters branch level of the Aircraft Certification Service, Flight Standards Service, and Office of Environment and Energy; to branch level of the regional aircraft certification directorates and regional Flight Standards Division; to all aircraft certification field offices, to the Brussels Aircraft Certification Division, all Aircraft Evaluation Groups (AEG) and to all Designated Engineering Representatives (DER).
1-3. CANCELLATION. Order 8110.4A, Type Certification Process, dated March 2, 1995, is canceled.
1-4. EXPLANATION OF CHANGES. This revision contains the following changes:
a. Paragraph 1-5 updates Aircraft Certification Service and Flight Standards Service office responsibilities for type certification.
b. Paragraph 2-1, 2-4, and 4-2 describe how Aircraft Certification Offices (ACO) will communicate and work together on certification projects.
c. Paragraphs 2-3, 2-11, and 4-2 address the use of foreign registered aircraft in certification programs.
d. Paragraph 2-4 addresses the requirements of the electronic Certification Project Notification (CPN) and CPN electronic bulletin board.
e. Paragraph 2-4, 3-3, 4-4, and Appendix 1 address the Aircraft Certification Office Subsystem (ACOS) project and certificate numbering system.
f. Paragraph 2-5 allows increased flexibility for Type Certification Board (TCB) meetings, further defines their purpose, and establishes the Aircraft Evaluation Group representatives as board members.
g. Paragraph 2-10 addresses current policy on establishing certification basis.
h. Paragraph 2-11 identifies a certification plan and compliance checklist as useful project tools that are the responsibility of the applicant and require the applicant to notify FAA Air Traffic Control before flying their aircraft.
i. Paragraphs 2-12h, 6-4b, and 6-4d address the flight test risk management process.
j. Paragraph 2-13b addresses the AEG TCB member's responsibilities.
k. Paragraph 2-13e addresses Maintenance Review Board (MRB) establishment and functions.
l. Paragraph 2-14c addresses flight manual supplement approval.
m. Paragraph 2-15c is expanded to address Instructions for Continued Airworthiness (ICA).
n. Paragraph 2-16 was added to address data retention by the FAA and applicant/certificate holder.
o. Paragraph 3-2h modifies the procedures for releasing data from surrendered type certificates and 3-2j deleted procedures for when the type certificate holder cannot be located.
p. Paragraph 3-3 specifies the requirement for a "TC Holder Record" paragraph on the Type Certificate Data Sheet (TCDS) and updated various TCDS requirements.
q. Paragraph 4-2 is modified to address single Supplemental Type Certificates (STC) applicable to more than one type certificated product, STC's applicable to one aircraft only, AEG responsibilities on STC's, revisions to performance data, non-interference STC's, and STC's involving foreign registered aircraft.
r. Paragraph 4-4 addresses the limitations and conditions to be stated on the STC such as the STC holder's responsibility to provide written evidence or permission for another person to use the STC and limitations and conditions for STC's that install provisions for equipment but don't install the equipment.
s. Paragraph changed Canadian Supplemental Type Approval (STA) to STC.
t. Chapter 5 was modified to address requests for conformity outside the project office and from Foreign Civil Aviation Authorities (FCAA) and to expand on completion of the Type Inspection Report (TIR) and Supplemental Type Inspection Report (STIR).
u. Chapter 6 provides guidance for restricted category certification procedures utilizing the focal point ACO for the model, airworthiness directive applicability, and continued airworthiness.
v. Paragraph 6-3e addresses approval of equivalent noise certification procedures by the office of Environment and Energy (AEE).
w. Appendix 1 incorporates forms and guidance for establishing TC projects.
x. Appendix 2 addresses issuance of certificates.
y. Appendix 4 addresses forms related to conformity.
1-5. BACKGROUND AND DISCUSSION.
a. Order 8110.4B, Type Certification, is published to provide updated guidance to the FAA and industry on procedures and policy for type certification of aircraft products.
b. The Federal Aviation Act of 1958 as replaced with 49 U.S.C. 40101 et seq. directs the FAA to promote safety of flight of civil aircraft in air commerce by prescribing and revising minimum standards governing the design, materials, workmanship, construction, and performance of aircraft, aircraft engines, and propellers. The Aircraft Certification Regulatory Program (ACRP) was developed to accomplish this mission. As part of the ACRP, the Aircraft Certification Service administers the type certification program to determine compliance with the prescribed regulations and to maintain certificate integrity (continued airworthiness). Appendix 11 provides a historical background of aircraft airworthiness regulations. The Aircraft Certification Service is composed of three headquarters divisions, an International Airworthiness Programs Staff, four certification directorates, and an Aircraft Certification Division located in Brussels, Belgium. The three headquarters divisions are: the Aircraft Engineering Division, the Production and Airworthiness Certification Division, and the Planning and Program Management Division. The four certification directorates are: the Small Airplane Directorate
(Central Region), the Transport Airplane Directorate (Northwest Mountain Region), the Rotorcraft Directorate (Southwest Region), and the Engine and Propeller Directorate (New England Region). Appendix 9 shows an organizational diagram of the Aircraft Certification Service. The Aircraft Certification Service's responsibility for administering the Federal Aviation Regulations is divided as follows:
(1) The Aircraft Engineering Division is responsible for:
(a) Overall policy and guidance for engineering portions of the Aircraft Certification Regulatory Program;
(b) Title 14 of the Code of Federal Regulations (14 CFR) Part 21, Certification Procedures for Products and Parts;
(c) 14 CFR Part 39, Airworthiness Directives;
(d) 14 CFR Part 183, Representatives of the Administrator; and
(e) All Special Federal Aviation Regulations pertaining to type certification.
(2) The Production and Airworthiness Certification Division is responsible for:
(a) Overall policy and guidance for manufacturing and airworthiness certification portions of the Aircraft Certification Regulatory Program;
(b) Part 21, Certification Procedures for Products and Parts;
(c) 14 CFR Part 43, Maintenance, Preventive Maintenance, Rebuilding, and Alteration;
(d) 14 CFR Part 45, Identification and Registration Marking;
(e) Part 183, Representatives of the Administrator; and
(f) All Special Federal Aviation Regulations pertaining to certification conformance, airworthiness certification, and production.
(3) The Planning and Program Management Division is responsible for:
(a) Coordination of the Service's strategic and tactical planning initiatives and processes.
(b) Service technical, general, and managerial training requirements.
(c) Administrative and program management guidance, coordination, and support for Service headquarters organizations.
(4) The Small Airplane Directorate (Central Region) is responsible for:
(a) 14 CFR Part 23, Airworthiness Standards: Normal, Utility, Acrobatic, and Commuter Category Airplanes;
(b) 14 CFR Part 31, Manned Free Balloons;
(c) Technical guidance for part 23 restricted category airplanes;
(d) Airworthiness standards for gliders and airships; and
(e) Technical guidance for Primary Category Airplanes.
(f) Part 23, Glider and airship import TC projects from Europe, Africa and Israel.
(5) The Transport Airplane Directorate (Northwest Mountain Region) is responsible for:
(a) 14 CFR Part 25, Airworthiness Standards: Transport Category Airplanes; and
(b) Technical guidance for part 25 restricted category airplanes.
(c) Part 25 import TC projects from Europe, Africa and Israel.
(6) The Rotorcraft Directorate (Southwest Region) is responsible for:
(a) 14 CFR Part 27, Airworthiness Standards: Normal Category Rotorcraft;
(b) 14 CFR Part 29, Airworthiness Standards: Transport Category Rotorcraft;
(c) Technical guidance for parts 27 and 29 restricted category rotorcraft;
(d) Powered lift aircraft; and
(d) Technical guidance for Primary Category Rotorcraft.
(e) Part 27 and part 29 import TC projects from Europe, Africa and Israel
(7) The Engine and Propeller Directorate (New England Region) is responsible for:
(a) 14 CFR Part 33, Airworthiness Standards: Aircraft Engines; and
(b) 14 CFR Part 35, Airworthiness Standards: Propellers.
(c) Technical guidance on Auxiliary Power Units (APU's).
(8) The International Airworthiness Programs Staff (AIR-4) is responsible for policy guidance on bilateral agreements, import and export of aeronautical products, and other international airworthiness issues, programs, and procedures.
(9) Aircraft Certification Office (ACO). Each directorate incorporates three or more ACO's within their geographical areas that do the actual certification of aircraft and products. They work directly with the applicant and provide the main interface between the public and the FAA.
(10) Aircraft Evaluation Group (AEG). A Flight Standards group that is co-located with each directorate and is responsible for determining operational acceptability and continuing airworthiness requirements of newly certified or modified aircraft, engines and propellers intended to be operated under the provisions of the Federal Aviation Regulations.
c. Discussion. The type certification process described in this order applies to type certificates (TC's), and supplemental type certificates (STC's) unless otherwise stated.
(1) The entire type certification process is provided in chapter 2 of this order. Supportive information and procedures are contained in the remaining chapters. Chapter 3 contains a discussion on TC's. Chapter 4 contains a discussion on STC's. Chapter 5 contains a discussion on manufacturing and engineering responsibilities and functions relative to inspection and test. Chapter 6 contains additional information on restricted category aircraft, surplus military aircraft, noise certification, and flight test.
(2) The office of primary responsibility for this order is the Certification Procedures Branch, AIR-110, under the Aircraft Certification Service Engineering Division, AIR-100.
CHAPTER 2. TYPE CERTIFICATION PROCESS
CHAPTER 2. TYPE CERTIFICATION PROCESS
2-1. GENERAL.
a. This chapter describes the type certification process for U.S. applicants under 14 CFR section 21.21. For imported products, see Advisory Circular 21-23, Airworthiness Certification of Civil Aircraft, Engines, Propellers, and Related Products Imported to the United States. Certification of products designed/manufactured in Joint Aviation Authority (JAA) member countries was addressed in Notice 8110.70, FAA/JAA Type and Post-Type Validation Principles. The permanent policy of this notice will be incorporated in an order that is scheduled to be issued by Mid-2000. The process prescribe in this chapter applies to TC's, amended TC's, and STC activities, although all of the steps/procedures may not apply to all certification activities, especially on small projects. Figure 2-1, Type Certification Process, provides an outline of the type certification process. Details of the process are provided in the text of this order. In addition to a TC or STC, it is necessary to have a production certificate (PC), or other FAA production approval prior to manufacturing the product. These approvals will require concurrent work between the Aircraft Certification Office (ACO) and Manufacturing Inspection District Office (MIDO). The MIDO may actually be a Manufacturing Inspection Satellite Office (MISO), Certificate Management Office (CMO), or Certificate Management Unit (CMU), as applicable.
b. Each aircraft certification directorate has an established AEG, which is part of the Flight Standards Region and is directly responsible for the operational and maintenance aspects of the certification process. This order describes the responsibilities of the AEG and reflects the close liaison required between the ACO and AEG in the certification process.
c. Certificate Management ACO (CMACO) is the ACO that manages the original type certificate project. The CMACO also manages the continued airworthiness of a product as long as it is in service.
d. Project ACO (PACO) may be any ACO working a certification project. If the project is a follow-up certification activity such as Supplemental Type Certificate (STC) or Parts Manufacturer Approval (PMA), coordination with the CMACO may be required.
e. PACO and CMACO Relationship. The CMACO will assist the PACO on certain follow up certification activity since the CMACO is most familiar with the certificated product and maintains contact with the certificate holder.
Type Certification Process
Applicant Applies for TC
FAA Establishes Project
AEG Assigns: FSB - Chairman FOEB - Chairman
MRB - Chairman
Directorate/ACO Assigns: Project Manager
Project Team Project Officer
FAA and Applicant Hold Familiarization/Preliminary TC Board Meeting
FAA Develops Certification Program Plan
FAA Establishes Certification Basis
FAA Considers Special Conditions
Applicant Submits Data for Approval
FAA Design Evaluation
FAA and Applicant Hold Specialists and Interim TC Meetings As Required
FAA Performs Conformity Inspections (Continues Throughout The TC Process) (Conformity to Engineering Data)
Engineering Compliance Determinations (Compliance with Federal Aviation Regulations)
FAA Issues Experimental Airworthiness Certificate (If Appropriate)
Pre-Flight TCB Meeting
Applicant Performs Ground Inspections, Ground Tests, and Flight Tests
FAA Reviews Manufacturer's Flight Test Results
FAA Issues TIA
FAA Performs Conformity Inspections and Witnesses Tests
FAA Performs Official Certification Flight Tests
and Flight Standards Evaluations
Functional and Reliability Testing
FAA Approves Flight Manual and TC Data Sheet
and Holds Final TCB Meeting
AEG Completes Continuing Airworthiness Determination
FAA Issues Type Certificate
AEG Issues Results of Operational
Acceptability Findings
Aircraft Enters Service
Post Certification Activities: FAA and Applicant Evaluate Service Difficulties
Figure 2-1. Type Certification Process
2-2. CERTIFICATE DEFINITIONS.
a. Type Certificate. A TC, as defined by § 21.41, includes the type design, the operating limitations, the type certificate data sheet (TCDS), the applicable regulations, and any other conditions or limitations prescribed by the Administrator.
b. Provisional Type Certificate. A provisional TC may be issued when all requirements for a TC are not complete but the applicant can show compliance with § 21.81 for a Class I, or § 21.83 for a Class II, provisional TC.
c. Amended TC. The holder of a TC may apply for an amendment of the original TC when the change to the type design is not so extensive as to require a new TC (reference § 21.19), and is classified as "major," as defined by § 21.93(a). Only a TC holder may apply for a TC amendment.
d. Supplemental Type Certificate. An STC is issued for major design changes to a TC when the change is not so extensive as to require a new TC (reference § 21.19). Minor changes do not require an STC. Minor and major changes are classified in § 21.93. Any person may apply for an STC (reference § 21.113).
e. Production Certificate. A PC is an authorization by the FAA for a manufacturer to manufacture a product in compliance with the Federal Aviation Regulations. A PC may be issued to either the holder of a TC, an STC, or to a licensee of a TC or STC holder, who meets the requirements of §§ 21.135, 21.139, and 21.143.
f. Product. A product is an aircraft, an aircraft engine, or a propeller. In regards to export airworthiness approvals, a product includes components and parts of aircraft, aircraft engines, and propellers; also parts, materials, and appliances, approved under the Technical Standard Order (TSO) system.
2-3. APPLICATION FOR TC, AMENDED TC, STC, AND PC.
a. Type Certificate Application. An aircraft TC application must be accompanied by a threeview drawing of that aircraft and available basic data. An aircraft engine TC application must have a description of the engine design features, operating characteristics, and the proposed operating limitations. A TC application is made on FAA Form 8110-12, Application for Type Certificate, Production Certificate, or Supplemental Type Certificate (reference Appendix 1, Figure 2). Complete blocks 1, 2, 3, 4, and 7 of the TC application in each of the following situations:
(1) Submit a TC application for design approval of a new model(s) aircraft (airplane, glider, rotorcraft, balloon, airship), aircraft engine, or propeller (reference §§ 21.15 and 21.19), or for extension(s) of time in accordance with § 21.17(d).
(2) Submit an amended TC application for approval of change(s) in model designation; for addition(s) of a new model(s) prior to the original issuance of the TC; and for approval of follow-on models after the initial issuance of the TC (reference §§ 21.91 through 21.101).
(3) Submit an application for a provisional TC (class I or II) when the provisional TC is desired before the standard TC is issued (reference §§ 21.75, 21.81, and 21.83).
(4) Submit an application for an amendment to a provisional TC for a follow-on model or a major change to a type certificated model, after a TC has been issued (reference §§ 21.25 and 21.85); and for changes to class I or II provisional TC (reference §§ 21.75, 21.83, and 21.85).
b. Supplemental Type Certificate Application. An STC application is made on FAA Form 8110-12, (reference Appendix 1, Figure 2). Submit an STC application to the geographically responsible ACO as listed in Appendix 7. Arrangements for technical support with other ACO's are made as required by the local ACO. Complete blocks 1, 2, 3, 6, and 7 for each of the following situations:
(1) Submit an STC application when a product is to be altered by introducing a major change in the type design in accordance with §§ 21.111 through 21.119. Supplemental type certificates are not issued for minor changes or for approval of replacement and modification parts meeting the provisions of § 21.303 (PMA) unless the installation represents a major change in type design or special instructions are necessary for safe installation.
(2) An STC holder may submit an application for an amended STC to include additional product models to the STC or to introduce significant changes in the modification or alteration previously approved.
(3) STC applications for projects using foreign-registered aircraft should include a letter from the civil aviation authority responsible for the aircraft (State of Registry) regarding their involvement with and acceptance of the proposed modification. Also if installation outside the U.S. is planned, the details of that installation should be included in the application package.
(4) To ensure the effective use of FAA resources when undertaking an STC project, ACOs should determine where manufacturing is occurring. If an applicant does not have manufacturing capability in the United States and plans to use foreign manufactured parts, the ACO should not accept the STC project (Reference 21.43).
c. Production Certificate Application. Complete blocks 1, 2, 3, 5, and 7 of FAA Form 8110-12 (reference Appendix 1) when applying for a PC. Application for a PC may be made at the same time application is made for a TC, an amended TC, or an STC, however, a PC cannot be obtained prior to issuance of the TC or STC.
2-4. ESTABLISHMENT OF TC PROJECT.
a. General. An applicant submits a TC, amended TC, or STC application to the geographically responsible ACO (reference AC 20-126, Aircraft Certification Service Field Office Directory).
b. Certification Project Notification. The ACO is responsible for assigning a project number, a project manager, and electronically notifying the accountable directorate of each project by completing a standardized Certification Project Notification (CPN) form as shown in Appendix 1, Figure 4. The CPN includes a brief description of the project, states the project's significance, and identifies whether or not NRS and AEG involvement is requested. The accountable directorate standards staff is responsible for posting the CPN on an FAA electronic bulletin board for NRS review. The accountable directorate assigns a project officer for significant projects. The project manager and the project officer are the focal points for the ACO and the accountable directorate, respectively. The applicant should direct
all correspondence on the project to the ACO where application is made (reference FAA Order 8100.5, Aircraft Certification Directorate Procedures, paragraph 400).
c. ACO to ACO Coordination. If the project is for an STC, PMA, or repair and the project ACO (PACO) is different from the certificate management ACO (CMACO) for the affected product, the project ACO must determine if the project is of a type listed in Appendix 1, Figure 6. If the project is of a type listed in Appendix 1, Figure 6, the PACO must also send the CPN to the CMACO and the project manager/project engineer must coordinate the project with the CMACO assigned engineer for that project. The PACO project manager/project engineer will discuss with the CMACO assigned engineer all issues involving the project and establish the level of involvement the CMACO will have, i.e. submission of data, attendance at meetings, etc. and assure that all technical issues are addressed. It will be the responsibility of the CMACO assigned engineer to obtain technical support from his/her office to assist in dealing with the PACO on the assigned project. The CMACO assigned engineer will participate in the TC board meetings and will coordinate on the certification program plan.
d. Project Number. The Aircraft Certification Office Subsystem (ACOS) is the automated system used to assign project numbers and track and manage certification programs. The ACOS assigned number reflects the type of project and the project ACO. (See Appendix 1 Figure 5, ACOS PROJECT, TC, AND STC NUMBERING SYSTEM, for details of the numbering system.) The assigned ACOS project number should be used by all personnel in all correspondence, reports, and other documents pertaining to the project. If the project is either cancelled or closed before completion, the assigned ACOS project number should be marked closed or cancelled.
e. Assignments and Duties of the Project Manager.
(1) The term "project manager" (reference FAA Order 8100.5, paragraph 103e) means an assigned individual in the ACO who is responsible for planning, reviewing, evaluating, and coordinating all aspects of a certification project in accordance with the Certification Program Plan (CPP).
(2) The project manager is responsible for initiating the CPP and coordinating with the project officer and CMACO if necessary. The final CPP is not prepared until the Preliminary Type Certification Board (TCB) meeting where detailed roles and responsibilities can be discussed with the applicant.
(3) Certification program notification procedures are delineated in FAA Order 8100.5, paragraph 400a.
(4) A project team is established for all projects that require significant involvement by technical personnel. The project manager coordinates with the appropriate manager(s) in the selection of other team members. The project team normally consists of the following:
(a) A project manager;
(b) Engineers or technical specialists;
(c) Pilots and/or flight test engineers;
(d) Manufacturing inspectors;
(e) Operations and/or airworthiness inspectors from the AEG; and,
(f) Project Officer and other persons at the discretion of the Accountable Directorate.
(5) An acknowledgment letter must be sent to the applicant identifying the project number and the project manager by name, unit identification, and telephone number.
f. Assignments and Duties of the Project Officer.
(1) The term "project officer" (reference FAA Order 8100.5, paragraph 103d) means the person in the accountable directorate designated to monitor a significant certification project in accordance with the CPP. The project officer provides project-specific rules and policy to the project team and is the focal point with the accountable Directorate for policy.
(2) The project officer works with the project manager in development of the CPP.
2-5. TYPE CERTIFICATION BOARDS (TCB).
a. General.
(1) A TCB is established for all aircraft and engine projects in which complete type certification is involved; for propellers, except fixed pitch; for projects involving changes to the type design; and for all significant projects (reference FAA Order 8100.5, paragraph 103j). Depending on the complexity of the project, TCB's are not always required for STC projects.
(2) Depending on the type and/or size of the project, all of the TCB meetings may not be necessary. Some meetings may be combined, and some meetings may be duplicated or divided by discipline or system as necessary. If the number of meetings is decreased or combined or the meetings are divided by discipline or system, the board chairman will be responsible for determining that all elements of the process were addressed, integrated, and completed.
(3) The purposes of a TCB are to acquaint the applicant and the FAA with the certification project, resolve significant problems, establish milestones and schedules for the overall accomplishment of the type certification program, review the applicant’s certification plan, review proposed certification basis, and assure all outstanding certification issues are resolved. Clear expectations and assignments will be an outcome of the TCB.
b. Type Certification Board Members. The ACO manager or her/his representative serves as chairman. The chairman convenes the TCB as necessary and notifies the appropriate representatives as to the time, date, and location of the meeting. A member, with concurrence of the chairman, may designate an employee to represent her/him at TCB meetings. The project manager is responsible for requesting technical assistance or guidance, if necessary for the project, from the accountable directorate. Such a request should be made as far in advance as possible to facilitate work scheduling. The project manager will coordinate with the cognizant AEG manager when establishing the TCB membership. The AEG manager will in turn, provide the project manager with the name of the AEG inspectors who will be assigned to the TCB. Members of the TCB should be familiar with the project during the development stages and in advance of TCB meetings. This ensures having knowledgeable participants in the TCB meetings. Members participate in specific phases of the TCB activity, as required by the project under consideration. It is not mandatory that members participate in every meeting. Members are:
(1) The ACO manager;
(2) The project officer (for significant projects);
(3) The project manager;
(4) The managers, supervisors, or senior personnel from the appropriate engineering disciplines, flight test, manufacturing inspection, and AEG; and
(5) Assigned AEG personnel.
c. Additional TCB Participants. A list of participants, other than the TCB members, who may be invited to participate on an advisory basis in the TCB meetings follows:
(1) ACO engineers, flight test pilots, and manufacturing inspectors;
(2) Washington Headquarters specialists;
(3) National Resource Specialists;
(4) Additional AEG and FSDO personnel;
(5) The project officer from the accountable directorate (if not serving as a board member);
(6) Representatives of other ACO's and/or directorates; and
(7) The applicant and their representatives.
2-6. TYPE CERTIFICATION BOARD MEETINGS.
a. Meetings. The following TCB meetings are discussed in this chapter.
(1) Familiarization TCB meeting;
(2) Preliminary TCB meeting;
(3) Interim TCB meeting;
(4) Pre-flight TCB meeting; and
(5) Final TCB meeting.
b. Minutes of a TCB meeting should be transmitted to the applicant and contain the following:
(1) Subject: Minutes of (Familiarization, Preliminary, Interim, Pre-flight, or Final) TCB Meeting;
(2) Manufacturer;
(3) Model and Project Number;
(4) Location and Date of Meeting;
(5) Personnel Present at Meeting;
(6) Purpose of Meeting;
(7) Discussion of Agenda Items; and
(8) Specialty Items: Include major problems and actions to be taken. Each item or subject discussed should be identified and summarized under a separate heading with the appropriate Federal Aviation Regulation referenced. These items should include a discussion, expectations, and conclusion.
Expectations should include action item assignment and a schedule for completing any actions items, as required. Individuals participating in discussions should be identified by titles only.
c. Familiarization TCB Meeting. The Familiarization TCB meeting between the FAA and the applicant is held to establish partnership with the applicant. It is an opportunity to develop mutual understanding of the type certification process as it applies to the applicant’s design. The meeting should explain the following:
(1) The need for certification;
(2) An overview of the certification process;
(3) The FAA's role; and
(4) The applicant's responsibilities.
The Familiarization TCB meeting may be combined with the Preliminary TCB meeting.
d. Preliminary TCB Meeting. The Preliminary TCB meeting is the initial formal meeting that establishes the basis for the Certification Plan. The meeting at a minimum should do the following:
(1) Acquaint FAA personnel with the project;
(2) Work to establish the certification basis;
(3) Permit discussion of design details and possible problem areas with specialists;
(4) Identify areas needing the formation of special compliance teams to attain the earliest possible resolution of potential problems;
(5) Identify novel or unique design features, materials, or processes; and
(6) Establish a schedule for the certification program.
e. Interim TCB Meeting. Interim TCB meetings may be required to resolve problems that arise during the type certification program. Interim meetings may be requested by the FAA or the applicant and need only involve the necessary participants, including specialists from the accountable directorate, needed to resolve problems. The project manager is responsible for setting up the meeting(s) and informing the necessary participants.
f. Pre-flight TCB Meeting. The Pre-flight TCB meeting is held to discuss and clarify any questions the applicant may have relative to the required flight testing of the aircraft, or the engine and propeller type testing program. This would be called the pre-type inspection authorization meeting for engines and propellers. This meeting should identify any outstanding conformity inspection issues and engineering compliance determinations. If all issues are resolved, the TIA is normally issued at this meeting. This meeting, like an interim meeting, may be requested by either the ACO or the applicant.
g. Final TCB Meeting. The Final TCB meeting is held when the ACO determines that the applicant has demonstrated compliance with all applicable airworthiness standards (certification basis) in accordance with technical policies established by the accountable directorate and the aircraft engineering division. The final TCB meeting is held to:
(1) Review all outstanding items, such as the TCDS, Aircraft Flight Manual, continued airworthiness program, and items on which there may be some question of compliance with the established airworthiness standard;
(2) Determine the status of any outstanding technical data;
(3) Formalize the decision to issue the TC; and
(4) Issue the TC, amended TC, or STC. The TC is signed when the ACO and the accountable directorate concur that all items are resolved.
2-7. CERTIFICATION PROGRAM PLAN. The CPP defines the working relationship between the accountable directorate and the geographic ACO, or within an accountable directorate during a specific TC project (reference FAA Order 8100.5, paragraphs 103g and 400b). The CPP is the principal program coordination tool and is updated throughout the program by the project manager, as required. The final CPP is not prepared until the Preliminary TCB meeting where detailed relationships can be discussed with the applicant. Approval of the CPP is through the ACO manager to the accountable directorate. An applicant's certification plan may take the place of the CPP if it includes all information that would be addressed in the CPP and is coordinated with the project officer.
2-8. ISSUE PAPER. An issue paper (reference FAA Order 8100.5, Appendix 3) provides a means for the identification and resolution of significant technical, regulatory, and administrative issues that occur during the certification process. Issue papers are primarily intended to provide an overview of significant issues, a means of determining the status of issues, and a post-certification summary statement on how issues were resolved.
2-9. ISSUES BOOK. The project manager assembles issue papers and publishes them in the form of an Issues Book. The Issues Book is distributed to the TCB members, project team members, applicant, and the accountable aircraft certification directorate. The Issues Book can be revised to add new issue papers or update existing papers without holding a formal TCB meeting, provided that the new or updated issue paper can be coordinated through the applicant and TCB.
2-10. TYPE CERTIFICATION BASIS.
a. General. The proposed certification basis is established by the FAA at the beginning of a TC program. Every effort is made to assure the certification basis is correct, and the applicant is advised of all aspects at the beginning of the program, including operational requirements. Once the certification basis has been established and agreed to by the FAA and the applicant new policy will not be introduced unless an unsafe condition is found to exist in a product that has design features affected by that policy.
b. Special Classes of Aircraft. Special classes of aircraft include airships, gliders, motor gliders, very light airplanes, and other non conventional aircraft for which airworthiness standards have not been issued under part 21 (reference § 21.17(b)). The procedures necessary to establish and receive approval for the certification basis for special classes of aircraft are provided in Advisory Circulars (AC) 21.17 1A, Type Certification - Airships; AC 21.17-2A, Type Certification-Fixed Wing Gliders (Sailplanes), Including Powered Gliders; and AC 21.17-3, Type Certification of Very Light Airplanes Under § 21.17(b). AC 21.17-1A also references a design criteria, FAA P-8110-2, Airship Design Criteria, which provides an airworthiness criteria for airships. AC 21.17-2A references Joint Aviation Requirements 22 (JAR 22), Joint Aviation Requirements
Sailplanes and Powered Sailplanes, which provides an airworthiness standard for sailplanes and powered sailplanes. AC 21.17-3 references Joint Aviation Requirements for Very Light Aeroplanes (JAR-VLA), which provides an airworthiness standard for very light airplanes. Powered Lift Aircraft are another special class of aircraft for which airworthiness standards have not been issued under part 21.
c. Applicable Regulations. The regulations that address certification basis are §§ 21.17, 21.101, and 21.115.
d. Changed Aviation Products. This procedure is applicable to changes to the type design of previously certified aircraft, aircraft engines and propellers whose change is significant but not so extensive as to require a new TC under § 21.19. This procedure applies to all changed products regardless of approval method such as amended TC or STC. The objective of this procedure is to enhance safety of changed products through the use of later amended airworthiness standards. It should be emphasized that the applicant is responsible for the whole product as altered, and not just for the change itself.
(1) Changes that Require an Updated Certification Basis. In accordance with 21.101(b), If the Administrator finds that a proposed change consists of a new design of a component, equipment installation, or a system installation and that the original certification basis for the product does not provide adequate standards with respect to the proposed change, the applicant must comply with the regulations in effect on the date of the application for the change that the Administrator finds necessary to provide a level of safety equal to that provided in the certification basis for the product. The applicant must also comply with any special conditions, and amendments to those special conditions that the Administrator determines necessary to provide a level of safety equal to that provided in the certification basis for the original product.
(2) Changes that do not Require an Updated Certification Basis . In accordance with Section 21.101(a), if the change is such that it does not require an updated certification basis as described in paragraph (1) above, the applicant is given the choice of complying with the original certification basis for the product or with the latest requirements plus any other amendments the Administrator finds to be directly related.
(a) Except as provided in paragraph (c) below, the FAA will encourage the applicant to update the certification basis for the changed product to the greatest extent practical for those portions of the design that are new. These later airworthiness standards reflect aviation safety knowledge gained over the years and enhance the level of safety. The certification basis should consist of the certification basis of the model being changed plus those requirements effective on the date of the application that are generally related to the components or areas affected by the change. These components and areas are those where there is a need for re-substantiation that include the change, components affected by the change, systems affected by the change, and all other matters relevant to certification which are affected by the change.
(b) FAA personnel should recognize the difference between an unsafe condition and upgrading a level of safety. The FAA can require correction of an unsafe condition for existing type designs. However, for those same type designs the FAA can only encourage an upgraded level of safety beyond that required for type certification.
(c) Updating to the requirements of the later standards, described by paragraph (a) above, need not be considered if the basic certification basis together with applicable service experience, provide a level of safety equivalent to that of the later standards. Applicable service experience is that reflecting the history of the existing components that are being changed or that are directly affected by the change. Additionally, the changed components must be sufficiently similar to the existing components, both in design and usage, so that it can be determined that the service history is applicable.
(d) The determination of which other amendments are applicable should be conducted and documented by the applicant, accepted by the FAA, and placed in the project file. This documentation should include the rationale for not complying with later standards.
(e) Because restricted category and limited category aircraft do not meet standard category airworthiness standards, compliance with this procedure may not be effective in enhancing the level of safety of changes to products of these categories. Therefore, this procedure should be used for these categories only where warranted. Additionally, this procedure should apply equally to applications for changes to type certificated products for both United States (U.S.) and non U.S. manufactured products.
(f) In accordance with § 21.19(a), aircraft certification engineers must determine whether proposed changes, such as these, are "so extensive that a substantially complete investigation of compliance with the applicable regulations is required". The following design changes are examples of changes to type designs, which, individually, do not necessarily require application for a new aircraft type certificate but should be evaluated for requirements of later standards in accordance with (1) above. If the later standards are not required an updated certification basis is still encouraged. An application for a new aircraft type certificate may, however, be required after consideration is given to the extent, number, and cumulative effect of these changes.
1 A design change that constitutes a new design or a substantially complete redesign of a component, equipment installation, or system installation. Such a change extensively invalidates the compliance demonstration of the original design.
2 A design change that significantly affects the basic loads.
3 A design change that introduces novel or unusual methods of construction or new materials, e.g., composites. If the later airworthiness regulations do not provide adequate standards with respect to the proposed change, special conditions may be necessary.
4 A design change that includes new state-of-the-art systems or components which have not been previously certificated.
(3) Because design changes vary in complexity and magnitude, each proposed change to a product must be evaluated on an individual case-by-case basis. In reviewing an application, focus on the magnitude of the change, not on the way in which the changed product is identified by name or model number.
(4) An applicant may be required to show that the product meets additional standards in order to receive type certification in a foreign country or to be eligible to operate under the provisions of 14 CFR part 91 (part 91), 14 CFR part 121 (part 121), or 14 CFR part 135 (part 135), or a foreign equivalent.
e. Additional Requirements:
(1) Special conditions deemed necessary under § 21.16;
(2) Equivalent level of safety findings (reference § 21.21);
(3) Applicable requirements of 14 CFR part 36 (part 36);
(4) Fuel Venting and Emission requirements of 14 CFR part 34 (part 34); and
(5) Exemptions (reference 14 CFR part 11 (part 11)).
f. Special Conditions.
(1) Basis for Issuance. The basis for issuance and amendment of special conditions is § 21.16. Under the provisions of § 21.16, a special condition is issued only if the existing applicable airworthiness standards do not contain adequate or appropriate safety standards for an aircraft, aircraft engine, or propeller because of novel or unusual design features of the product to be type certificated. The phrase "novel or unusual" applies to design features of the product to be certificated when compared to the applicable airworthiness standards. Special conditions will not be used to upgrade the applicable airworthiness standards when novel or unusual design features are not involved. A special condition contains only such airworthiness standards as are necessary to establish a level of safety equivalent to that established by the applicable regulations. Whenever the FAA determines that an upgrading of the airworthiness standards is warranted, the upgrading should be accomplished through the rulemaking process to amend the Federal Aviation Regulations.
(2) Issue papers. Issue papers are most often used for development of the basis, need, and wording of special conditions. A past example of a need for special conditions was the use of composites for primary structure on part 23 airplanes in the 1980's. In 1993, part 23 was revised to include appropriate standards so composite special conditions are no longer appropriate. Special conditions are unique to the specific certification program in which they are issued. The Administrator has delegated authority for their issuance to the directorates or to the Aircraft Engineering Division for areas of responsibility not assigned to a directorate.
(3) Procedures for Issuance.
(a) Detailed procedures for processing special conditions are contained in FAA Order 8100.5, paragraph 803. Proposed special conditions are drafted by an ACO in conjunction with an application for a TC, an amended TC, or an STC. The proposal is formulated with full participation by the applicant, the accountable directorate, and with any other interested persons deemed appropriate. The proposals, with full particulars and justification for each special condition, are forwarded to the accountable directorate. In cases where the design feature is covered by a specific objective rule, do not use a special condition as a particular method or technique to show compliance with the rule. In those cases where the FAA determines a special condition is appropriate, and the applicant indicates that they have or will voluntarily comply, the special condition nonetheless will be proposed. It is essential that the list of special conditions be complete. This establishes the certification basis and forms an exact record of the rules applicable to the product. When the application is for an amended TC or an STC, § 21.101(b) is applicable.
(b) An applicant requesting a change to a TC or an STC will comply with either the regulations incorporated by reference in the TC, or the applicable regulations in effect on the date of the
application and any other amendments the FAA finds to be directly related. If the FAA finds the regulations do not provide adequate standards with respect to the proposed change, the applicant will comply with the applicable provisions of part 21 and any special conditions, and amendments to those special conditions, prescribed by the FAA to provide a level of safety established in the regulations.
(4) Urgency of Action. At the time of the Preliminary TCB meeting, the ACO initiates the setting of a deadline date for establishing the initial special conditions. These special conditions may be modified and/or additional ones issued as technical information is developed during the type certification program. In certain cases, the importance or urgency of the program will require faster handling than is ordinarily scheduled. When the ACO believes it has such a case, it will recommend that arrangements be made to expedite the procedure by a meeting between the ACO, the accountable directorate, and the applicant. With the input from this meeting the accountable directorate should be able to expedite the rule making procedure for the special conditions.
(5) Justification. Incomplete information or insufficient justification can delay the processing of special conditions. Complete information from the ACO is needed in covering the general characteristics of the aircraft or other products and their unusual design features. The ACO preparing the special conditions shall include all the needed details and justification when forwarding the special conditions to the accountable directorate. The following is information which shall be included:
(a) The full certification basis, indicated in a manner similar to that which would be shown on the TCDS;
(b) A general description of the product, e.g., for an airplane, location of the wings, number and type of engines, maximum weight, speeds, seating capacity, etc.;
(c) Description of features requiring the issuance of special conditions;
(d) For an amended TC and a STC, a statement of the extent and features of the modification;
(e) The exact nature of the novel or unusual design feature, including an evaluation where appropriate, that the design feature would produce an unsafe condition unless the proposed special conditions were applied;
(f) The relationship between the design feature and the applicable regulations indicating how the standard is inadequate or inappropriate; and
(g) An evaluation that the proposed special condition establishes a level of safety that neither raises nor lowers the standard set in the applicable regulations.
(6) Changes. As technical information is developed during the design and testing of a product, it may become appropriate to modify a previously issued special condition or to adopt a new one. The same procedure is followed in amending a special condition or adding a new one, as is used for an original issuance.
(7) General Applicability. Special conditions, in their final format for a product, are to be referred to the respective accountable directorate for study to determine whether they are generally applicable. Periodically, special conditions which are found to be generally applicable are published in a Notice of Proposed Rulemaking (NPRM) as proposed amendments to the Federal Aviation Regulations.
Pending adoption of amendments, a special condition may be proposed by an ACO for application to any subsequent design case for which they would be appropriate.
(8) Flow Chart. The flow in the processing of a special condition, from the inception of the design feature by the applicant, to the action taken by the accountable directorate, is shown in Figure 2-2, Special Conditions.
ACO IDENTIFIES POTENTIAL SPECIAL CONDITION
ACO IDENTIFIES POTENTIAL SPECIAL CONDITION
AND NOTIFIES ACCOUNTABLE DIRECTORATE USUALLY IN THE FORMAT OF AN ISSUE PAPER
ACCOUNTABLE DIRECTORATE CONCURS AND
INITIATES A PROJECT
ACO DRAFTS WORDING OF SPECIAL CONDITION
AND COORDINATES WITH THE APPLICANT
ACO FORWARDS DRAFT TO DIRECTORATE
FOR REVIEW AND APPROVAL
FOR REVIEW AND APPROVAL
DIRECTORATE PREPARES NPRM OF PROPOSED SPECIAL CONDITIONS
AND SENDS TO COUNSEL WITH INFORMATION COPY TO AIR-100
DIRECTORATE COORDINATES THE NPRM WITH THE ACO AND OBTAINS CONCURRENCE OF THE DIRECTORATE REGIONAL COUNSEL
DIRECTORATE SENDS NPRM TO AGC-200 FOR REVIEW AND PUBLICATION IN THE FEDERAL REGISTER
WITH REQUEST FOR COMMENTS
WITH REQUEST FOR COMMENTS
AFTER COMMENT PERIOD THE DIRECTORATE AND ACO RESOLVE
COMMENTS, IF ANY, AND PREPARE FINAL SPECIAL CONDITIONS
AFTER THE SPECIAL CONDITIONS ARE PUBLISHED IN THE FEDERAL REGISTER THE DIRECTORATE PROVIDES A SIGNED
COPY TO THE ACO FOR TRANSMITTAL TO THE APPLICANT
COPY TO THE ACO FOR TRANSMITTAL TO THE APPLICANT
Figure 2-2. Special Conditions.
g. Equivalent Level of Safety Finding.
(1) Equivalent level of safety findings are made when literal compliance with a certification regulation cannot be shown and compensating factors exist which can be shown to provide an equivalent level of safety (reference § 21.21(b)(1) and Order 8100.5, paragraph 408.)
(2) The applicant submits to the ACO the proposed equivalent level of safety. The ACO then submits to the directorate the proposed equivalent level of safety with recommendations. The accountable directorate makes all equivalent level of safety findings.
(3) In documenting an equivalent level of safety:
(a) List the applicable regulation;
(b) Describe the features of the design that require the equivalent level of safety findings;
(c) Describe any design changes, limitations, or equipment imposed to make the equivalency; and
(d) Provide an explanation of how the actions taken provide an equivalent level of safety to that intended by the regulation.
(4) All equivalent level of safety findings must be listed on the TCDS or on the STC.
h. Exemptions. In a type certification program, any interested person may petition the FAA for a temporary or permanent exemption from a Federal Aviation Regulation. The petition for exemption is made to the accountable directorate through the ACO. The exemption petition is submitted as prescribed in § 11.25(b)(1) and (2), and includes information required by § 11.25(b)(3), (4), and (5). The FAA procedures for processing the petition for exemption are detailed in FAA Order 8100.5 paragraph 804. In a case where certification basis compliance is in question, the possibility of an equivalent level of safety finding should be considered prior to submitting a petition for exemption from those rules (reference § 21.21(b)(1)).
2-11. TYPE CERTIFICATION PROGRAM.
a. General. An applicant for a TC, amended TC, or STC submits to the FAA the type design, test reports, and computations necessary to show that the product to be certificated meets the applicable airworthiness, noise, and emission requirements of the Federal Aviation Regulations and any special conditions prescribed by the FAA. The FAA examines the data submitted by the applicant, makes inspections and test, and determines if it meets the airworthiness and noise requirements of the Federal Aviation Regulations. To be entitled to a TC, amended TC, or STC for an aircraft, the FAA must find that no feature or characteristic makes it unsafe for the category in which certification is being requested (reference § 21.21).
b. Noise Control Act Finding. In addition to the noise requirements of part 36, a Noise Control Act Finding must be made by the FAA, prior to issuance of any original TC (see paragraph 6-3 of this order).
c. Release and Reference to Technical Data.
(1) Disclosure of Technical Data. The policy for disclosure of FAA information is contained in FAA Order 1200.23, Public Availability of Information. Descriptive and substantive data received from applicants are proprietary and are not to be released by the FAA.
(2) FAA Use of Technical Data. FAA personnel may use an applicant's or certificate holder's data for reference or evaluation of any other applicant's submitted data as long as the information is used solely for that purpose. The FAA uses the data solely to minimize the time and effort needed for FAA's evaluation of data. This information will not be disclosed to third parties who have not obtained written permission for access from the applicant or certificate holder (reference § 21.49).
(3) Authorized Use of FAA Approved Data. An applicant who applies for a TC, amended TC, or an STC, and desires to make use of data that is not possessed by the current applicant but was submitted by a previous applicant or certificate holder, must obtain and submit to the FAA a written consent from the previous applicant or certificate holder. If the applicant does not obtain such consent, prior FAA approved data will not be considered.
(4) Applicant Provided Data. An applicant showing compliance to the applicable requirements may submit previously approved data without showing further compliance if the applicant:
(a) Provides sufficient evidence to substantiate that the data presented was in fact approved by the FAA;
(b) Establishes that the previously approved data are applicable to the applicant's design to the extent that any design deviations will have no effect on the airworthiness of the design or on showing compliance with the applicable regulations;
(c) Provides sufficient substantiation and descriptive data of its own alteration that a finding of compliance can be made; and
(d) Has sufficient engineering data necessary to provide continued airworthiness information should the alteration be the subject of a service difficulty or airworthiness directive (AD) and to produce duplicate detail parts and installations if multiple STC approval is requested.
(e) The FAA representative will not question the source or the method by which an applicant for a design approval obtains data submitted with an application.
(5) To reduce unnecessary administrative burdens upon the applicant and the FAA, once one applicant has demonstrated that a design change meets the airworthiness requirements necessary for FAA approval, subsequent applicants for a similar alteration may not be required to conduct all the same tests required of the previous applicant. This may permit a subsequent applicant to benefit from the work of a previous applicant. While needless duplication of testing and data gathering should be avoided, the agency's primary responsibility is to determine the airworthiness of the altered product. The FAA will not supply a subsequent applicant with information submitted by a previous applicant, either directly or indirectly. If the FAA minimizes or waives the need for the applicant to provide substantiating data for specific requirements based on prior FAA knowledge, a brief rationale explaining these findings will be made by the FAA and included in the project file. Substantiating data from a previous project file will not be copied and put in a current file to support findings.
d. Responsibility of the Applicant. An applicant is responsible for showing compliance to the Federal Aviation Regulations applicable to the specific product or operation. These requirements are as follows:
(1) An applicant submits the type design and substantiating data necessary to show that the product to be certificated meets the applicable airworthiness, aircraft noise, and emissions requirements of the Federal Aviation Regulations and any special conditions prescribed by the FAA (reference § 21.21).
(a) The type design consists of drawings and specifications; information on dimensions, materials, and processes; airworthiness limitations; and any other data necessary to describe the design of the product. Type design also includes any other data necessary to allow, by comparison, the determination of the airworthiness, noise characteristics, fuel venting, and exhaust emissions (where applicable) of later products of the same type (reference § 21.31).
(b) Substantiating data is additional data which is necessary to show compliance with the certification basis, e.g., test and analysis reports, ground and flight test reports, etc.
(c) No specific format is prescribed by the FAA for submitting technical data, however, if data is to be submitted in any form other than original paper copy, the format must be acceptable to the FAA. This will require a memorandum of agreement (MOA) between the applicant and the FAA.
(d) It is strongly recommended that an applicant make and submit to the FAA a certification plan for all type certification projects. The plan should be submitted early in the project and updated throughout the project. As a minimum, the Certification Plan should contain the following information:
1 General information including identification of the applicant, application date, model designation, etc.
2 A general description of the concept, system, etc. including sketches and schematics.
3 The certification basis including applicable Federal Aviation Regulation paragraphs and sub- paragraphs, exemptions, and special conditions.
4 How compliance will be shown (ground test, flight test, analysis, similarity, equivalent means of compliance, etc. and what will be submitted to show compliance.) This can be accomplished using a compliance checklist that addresses each section of the Federal Aviation Regulations applicable to the product. Using this tool, the applicant and FAA can identify certification basis problem areas early in the program.
5 Project schedule, including major milestones, preliminary hazard analysis submittal, detail submittals, when conformity and testing are required, and when final certification is expected.
NOTE: The applicant is responsible to meet their milestones in their certification schedule contained in the Certification Plan. Any slippage in the milestone dates may result in a delay in the program.
6 Identify all DER’s, who will sign the FAA Form 8110-3 if required, their specialties, and if the DER will be approving the data or recommending approval of the data.
7 Identify all DMIR's and DAR's expected to be used for conformities or airworthiness certifications
(2) An applicant submits a statement of conformity to the FAA for each aircraft engine and propeller presented for type certification, and for each aircraft or part presented for testing (reference § 21.53).
(3) An applicant must allow the FAA to make any inspection and any flight or ground test necessary to determine compliance with the applicable requirements of the Federal Aviation Regulations. However, the applicant makes all inspections and tests necessary to show compliance prior to presenting the product to the FAA for testing (reference § 21.33).
(4) The applicant accomplishes the requirements of § 21.35(a) prior to making flight tests, and upon showing compliance makes all flight tests that the FAA finds necessary. The applicant must provide a person holding an appropriate pilot certificate to make the flight tests (reference §§ 21.35 and 21.37).
(5) If an applicant presents a foreign registered aircraft as an article for inspection or test, the applicant must also provide evidence that the responsible civil aviation authority agrees to the modification of the aircraft.
(6) Prior to flying the aircraft the applicant will provide the following information to the Procedures Division, ATP-100, 800 Independence Avenue, SW, Washington D.C., 20591 FAX (202)267-5120:
(a) Aircraft Type Designator (777, A340 etc.)
(b) Number and type of powerplant (Piston, Jet Turboprop, Jet)
(c) Aircraft weight or weight classification (Heavy, Large, Small)
(d) Average rate of climb or descent (Feet per minute)
(e) Top cruising and landing speeds (MPH or MACH)
e. Responsibility of the FAA. The FAA is responsible for:
(1) Providing guidance to an applicant in the certification process;
(2) Coordinating and accepting the Applicant's Certification Plan;
(3) Establishing the certification basis;
(4) Establishing special conditions;
(5) Processing petitions for exemptions;
(6) Determination of Equivalent Levels of Safety;
(7) Approving drawings, reports, data, test plans, and flight manuals;
(8) Performing type inspection authorization (TIA) inspections and tests needed to verify compliance with the Federal Aviation Regulations and conformity with the type design;
(9) Preparing the type inspection report (TIR) and the TCDS;
(10) Issuing certificates; and
(11) Developing the Flight Standards Board (FSB), Flight Operations Evaluation Board (FOEB), and Maintenance Review Board (MRB) documents.
f. Evaluation and Approval of Design Data by the FAA.
(1) Review of Drawings, Specifications, and Reports. Design data consists of drawings, specifications, and reports necessary to define and substantiate the product. This includes information on configuration, materials, and processes. Data submitted for approval by an applicant should be complete and in a logical format for review by the FAA. The FAA may reduce its own participation in the project to the minimum necessary to substantiate compliance with the airworthiness requirements. For example, instead of making a complete evaluation, the FAA may make spot-check comparisons of the later applicant's data with the first applicant's data. The FAA is only responsible for the review of the data submitted by the applicant, not for the development of methods or calculations.
(2) Data Approval. An applicant should submit data as soon as it is complete so FAA review can be accomplished during the normal course of a certification program. During this review, the FAA determines compliance with specific paragraphs of the applicable airworthiness standards. The data is approved when completion of all inspections and necessary tests are accomplished in showing that the product conforms to the type design and complies with the applicable airworthiness and aircraft noise requirements. Data can be approved by an ACO or a designee within her/his authorization limitations.
(3) Applicant Test Plan and FAA Concurrence.
(a) The applicant should prepare a test plan when testing is necessary to show compliance to the Federal Aviation Regulations for design or modifications. The test plan should be submitted early enough to allow the FAA a reasonable amount of time to review and approve the test plan prior to the start of the test.
(b) The test plan is used as documentation to assure that orderly and complete testing is accomplished.
(c) As a minimum, the following items should be contained in the test plan:
1 A description of the item(s) to be tested;
2 A list of all test equipment necessary to conduct the test;
3 A description of how the equipment will be calibrated (calibration is required) and approved prior to the test;
4 Required conformities of the test article and test setup;
5 A list of the specific airworthiness standards and description of how compliance will be shown prior to the test; and
6 A test procedure written in a step-by-step format with pass/fail criteria defined.
(4) Conformity and Witnessing of Tests.
(a) The conformity of the test article, test setup, test procedures used, and the validity of the test results must be established for each test conducted to show compliance with a type certification requirement. If the test is lengthy, at least the initial part of the testing should be witnessed and a posttest examination conducted. If the cognizant FAA engineer is unable to witness the test, the engineer authorizes another qualified FAA engineer, Designated Engineering Representative (DER), or FAA inspector (reference paragraph 5-5) to witness the test.
(b) Upon FAA approval of the test plan, the cognizant engineer requests an FAA conformity inspection of the test specimen and test setup to assure conformance to the engineering drawing and test plan. The minimum participants for witnessing the test are:
1 An FAA engineer, FAA pilot, or authorized DER; and
1 An FAA engineer, FAA pilot, or authorized DER; and
2 An applicant's knowledgeable personnel capable of performing the test.
(c) After the FAA engineer, pilot, or authorized DER witnesses the test, she/he should write a report for the FAA files containing the following:
1 A description of the test;
2 A description of the results obtained;
3 The decisions reached; and
3 The decisions reached; and
4 The recommendations which have been made to the applicant.
(d) The applicant should prepare a test report detailing the data for each test and an explanation of the calculations necessary to evaluate the data. The report should include conclusions and recommendations and be presented to the FAA for approval, or DER approval, if delegated.
(e) Operational issues required for tests should be identified by AEG personnel and specified in an appropriate FAA document.
g. Conformity Inspections. A conformity inspection is required to ensure that the product being certificated complies with the type design. It is the responsibility of FAA engineering personnel to request required conformity inspections. Because of the complex nature of the conformity process and the necessity for parts conformity inspections early in the certification program, the responsible MIDO should be consulted early in the program. This will assure that necessary inspections are requested and scheduled at appropriate times. It is the responsibility of FAA manufacturing inspectors, designated manufacturing inspection representatives (DMIR's), or designated airworthiness representatives (DAR's) to determine that the product conforms with drawings, specifications, and special processes. An FAA conformity inspection should be successfully conducted before any official FAA tests (ground or flight) are conducted. Conformity inspections are requested by FAA engineering using FAA Form 8120-10, Request for Conformity; a memorandum; or FAA Form 8110-1, Type Inspection Authorization (reference paragraph 5-2a).
h. Engineering and AEG Compliance Inspections by the FAA.
(1) Any aspect of product design, for which compliance with the certification requirements cannot be ascertained through the review of drawings or reports, should receive an engineering compliance inspection.
(2) An engineering compliance inspection is to assure that an installation complies with the Federal Aviation Regulations. This inspection should not be confused with a conformity inspection done by manufacturing inspectors. A conformity inspection is done to determine conformity to engineering data, while an engineering compliance inspection is done to determine compliance to the Federal Aviation Regulations. An engineering compliance inspection provides an opportunity to review an installation and its relationship to other installations on a product.
(3) The product should conform to the type design prior to conducting the engineering compliance inspection. Findings are to be documented and included in the type design data file. Engineering compliance inspections may be delegated to DER's, however, they should be provided proper guidance in order to effectively make the findings on behalf of the FAA.
(4) Engineering compliance inspections for aircraft interiors are generally more complex than other compliance inspections. This is primarily due to the many varied Federal Aviation Regulations paragraphs that must be complied with, e.g., emergency lighting, emergency exit arrangement, ordinance signs, aisle widths, cockpit controls, waste containers, placards, and occupant protection. In accomplishing an interior compliance inspection, the certification team will make many determinations and, therefore, should be very familiar with current regulations and policy. Engineering compliance inspections for interiors are generally not delegated.
(5) Control system compliance inspections are accomplished to determine ease of control operation, strength of components, and detection of interference or deflection of control system linkages.
(6) Flammable fluid fire protection compliance inspection. The Federal Aviation Regulations require separation and isolation of flammable fluid carrying lines from ignition sources. A physical inspection of installations is required to assure compliance.
(7) Hydraulic/electrical system routing requires inspection to assure that proper support and separation is maintained.
(8) Determination of operational and maintainability acceptability to the Federal Aviation Regulations is done by AEG compliance inspections and may be conducted concurrently with engineering compliance inspections.
i. Notification of Noncompliance. An ACO will notify the applicant in writing when noncompliance items are found during ground or flight inspections and the type certification tests are not discontinued. The notification will include reference to the specific Federal Aviation Regulations. The applicant must satisfactorily resolve all noncompliance prior to the FAA issuing the TC, amended TC, or STC.
j. Discontinuance Letter. An ACO will notify the applicant by letter when it becomes necessary to discontinue official FAA type certification tests for any reason. The letter should cite the applicable Federal Aviation Regulations and advise the applicant to notify the ACO when the cause of the discontinuance has been corrected and a resumption of the type certification test is desired.
2-12. TYPE INSPECTION AUTHORIZATION (TIA).
a. General. The TIA is prepared by the ACO on FAA Form 8110-1 and is used to authorize official conformity, airworthiness inspections, and ground and flight tests necessary to fulfill certain requirements for TC, STC, and amended TC certification. In addition the TIA may contain a section
(Operational and Maintenance Requirements) that provides for certain other operational evaluations identified by the AEG.
b. Preparation and Issuance of TIA. The TIA is not prepared until coordination is accomplished with each appropriate engineering discipline such that all required information relative to the engineering discipline's portion of the inspection or authorization is included. The TIA is issued when the examination of the technical data required for type certification is completed or has reached a point where it appears that the aircraft or component being examined will meet the pertinent regulations.
NOTE: To assist the manufacturing inspector/designee the following information should be included in Block 18 part 1 of the 8110-1
Point of contact at conformity site: …
Phone number of point of contact: ____- …
Location of aircraft/conformity site: …
DAR requested by the applicant: … (as applicable)___
c. Letter of Notification. At the time of TIA issuance a letter of notification to the applicant should also be sent notifying the applicant that authorization for type inspection has been issued. A copy of the TIA should be provided to the applicant.
d. Coordination. The TIA and the letter of notification should be coordinated with the accountable directorate (for significant projects) and all persons concerned in the originating ACO and geographic MIDO. When appropriate, the AEG will be included in the coordination process.
e. Inspections. Conformity inspections are accomplished by FAA manufacturing inspection personnel or an FAA designee prior to official FAA certification flight tests (reference paragraph 5-2).
f. Tests. Official certification tests are conducted or witnessed by FAA personnel or FAA designees, when authorized, after the applicant has complied with § 21.35(a).
g. Outside ACO Requests. If the TIA conformity is to be conducted by FAA personnel outside the geographic area of the project MIDO, the project MIDO should make request of the geographically appropriate MIDO to perform the conformity inspection. If the TIA test is to be conducted by FAA personnel outside the geographic area of the responsible ACO, the ACO may delegate the witnessing at their discretion.
h. Flight Test Risk Management Process. The signed TIA should reflect adherence with ACO/Directorate established Flight Test Risk management Process in accordance with FAA Order 4040.26, Aircraft Certification Service Flight Safety Program, in order to ensure that the associated flight test risks are acceptable.
2-13. OPERATIONAL AND AIRWORTHINESS EVALUATIONS
2-13. OPERATIONAL AND AIRWORTHINESS EVALUATIONS
a. Aircraft Evaluation Group.
(1) The AEG's were established per FAA Order 8100.5 to provide all of the applicable Flight Standards technical services to elements of the directorate. The AEG's are responsible for the
operational and maintenance aspects of the aircraft type certification process and, once the aircraft enters service, become the coordination point for activities involving Flight Standards.
(2) The AEG's are comprised of operations and airworthiness inspectors who work directly with FAA aircraft certification personnel to contribute an operational perspective to engineering activities. The AEG's advise manufacturers of pertinent operational and maintenance requirements during the design and certification process. The AEG's have the primary responsibility for evaluation of the aircraft and its systems for operational suitability and continued airworthiness. During the certification process, the AEG's conduct operational suitability evaluations by analysis of type design data and by participation in the aircraft certification engineering compliance inspections and flight test programs.
(3) The AEG makes recommendations to FAA field offices regarding operations specifications, training and maintenance programs, and airmen qualification through management of several FAA boards such as the Flight Standardization Board (FSB), Flight Operations Evaluation Board (FOEB), and Maintenance Review Board (MRB).
(4) The AEG in accomplishing their responsibilities for operational and maintenance evaluations for TC products, perform the following functions related to certification:
(a) Participation in compliance and TIA testing to evaluate operational suitability of the aircraft and its systems;
(b) Review maintenance programs for continuing airworthiness and develop the MRB Report;
(c) Review flight manuals and revisions;
(d) Develop master minimum equipment lists (MMEL's);
(e) Establish type rating requirements;
(f) Participate in crew complement determinations;
(g) Participate in emergency evacuation demonstrations;
(h) Establish acceptance of flight crew sleeping quarters;
(i) Establish any unique or special training requirements;
(j) Participate in functional and reliability testing;
(k) Manage the FSB, FOEB, and MRB; and
(l) Serve as member of the TCB and Flight Review Board.
b. AEG Liaison.
(1) Each directorate AEG is responsible for those AEG functions dealing with the TC product for which its directorate has responsibility. The accountable directorate AEG may delegate some functions to another AEG or Flight Standards personnel in other Flight Standards District Offices (FSDO's).
(2) Following notice of a certification project's initiation and a determination on the degree of AEG participation, AEG operations and airworthiness personnel will communicate directly with ACO
personnel to carry out their assignments. The project manager is responsible for notifying AEG personnel of significant project milestones, progress, and meetings. The AEG TCB members will meet with each engineering TCB member to coordinate the maintenance and operations requirements for each of their disciplines, particularly those that are required for maintaining the continued airworthiness and operation of the type certified product.
(3) The AEG TCB members will meet with the applicant’s Technical Publications department as often as necessary to monitor the progression of the ICA publications; and to advise the applicant, as appropriate, on any noncompliance with the airworthiness standards and appendixes. These efforts will be coordinated with the ACO project manager.
(4) The AEG TCB members will report the status of the ICA and flight manuals to the project manager during the regular FAA internal meetings, and whenever there is a need or awareness of concerns. The AEG TCB members will also provide a status briefing on the ICA and flight manuals at each formal TCB Meeting.
(5) During the Type Certification process, the AEG airworthiness TCB member will, from known/past experience and current maintenance practices, select, when available, scheduled maintenance activities to validate the maintenance processes and the ICA. Intentional maintenance may be performed in order to validate a proposed maintenance procedure or document.
(6) The process for the issuance of STC is not as formal as the TC process; however, the requirements for determining the acceptability of ICA and flight manual supplements are unchanged. The project manager for the STC project will advise the AEG manager at the initiation of the project that AEG participation will be required. The duties of the AEG airworthiness and operations inspectors will mirror those in the Type Certification program.
(7) It is possible that an aircraft could be type certificated and not be determined to be operationally acceptable for operations under the applicable Federal Aviation Regulations. These inconsistencies are avoided by proper and timely AEG involvement. The AEG responsibility in evaluation of operational suitability and type rating requirements require that the AEG pilots fly the aircraft through prescribed type rating maneuvers using flight manual procedures. This may be accomplished during the certification flight test program and will require the allocation of flight time so that appropriate findings can be made.
c. Flight Standardization Board. An FSB determines the aircraft type rating requirement for both new and modified models of aircraft requiring type rating and develops the minimum training requirements used in flight crew member qualification. Board membership includes operations inspectors from district offices; representatives from the Air Transportation Division, FAA Headquarters; an alternate chairman; and a board chairman from AEG-Operations who performs/directs the tasks of the FSB. Some of the functions and responsibilities of the FSB are:
(1) Determination of operational suitability of the aircraft and its systems;
(2) Determination of flight crew training aids requirements;
(3) Determination of pilot type rating requirements;
(4) Determination of any unique/special training requirements;
(5) Determination of jumpseat, flight crew rest and sleeping quarters suitability;
(6) Determination of emergency evacuation capability;
(7) Determination of flight standards issue papers closure; and
(8) Other tasks as appropriate.
d. Flight Operations Evaluation Board. FOEB is a group of specialists responsible for matters related to a type of aircraft. The board's main responsibilities are developing a MMEL and accomplishing an operational evaluation of the aircraft. Board membership typically includes airworthiness inspector(s), an operations inspector, a flight test pilot, an FAA Headquarters representative, and, as chairman, an AEG operations inspector.
e. Maintenance Review Board. For those aircraft intended primarily for use in an air carrier environment, a manufacturer may use the procedures described in AC 121-22A, Maintenance Review Board (MRB), to develop and produce tasks and associated time-in-service intervals for the initial maintenance time limitations in an air carrier’s continuous airworthiness maintenance program. In addition, the manufacturer may use the appropriate tasks and time intervals produced by the MRB process to show compliance with the inspection program requirements of the certification rules. However, the manufacturer is not required to use the MRB process to produce either the inspection program tasks and time limitations required by type certification or the air carrier initial time limitations. As described in AC 121-22A, an MRB is comprised of FAA Flight Standards Inspector personnel, as well as Aircraft/Engine Certification Office (A/ECO) engineering personnel from the controlling FAA Directorate.
NOTE: The FAA Maintenance Review Board should not be confused or even associated with a manufacturer’s Material Review Board. These two entirely separate boards each perform a completely separate, as well as different function.
(1) The ACO engineer(s) assigned to the MRB will include the project engineer assigned to the type certification program for the particular model airplane.
(2) It is the responsibility of the MRB ACO engineer(s) to provide the appropriate engineering expertise with regard to design, inherent reliability, and required function information.
(3) It is the responsibility of the ACO engineer(s) to solicit expert engineering assistance for the MRB when needed, such as:
(a) The Aging Aircraft program and the associated specific AD and 14 CFR requirements.
(b) The Corrosion Prevention and Control Program (CPCP) and the associated specific AD and 14 CFR requirements.
(c) The management of Certification Maintenance Requirements in accordance with AC 25-19.
(d) The management of Airworthiness Limitations.
(e) The management of Damage Tolerance requirements in accordance with AC 25.571-1.
(4) ACO engineers, assigned as MRB members, are also expected to perform the following functions:
(a) Provide engineering guidance and advice to the FAA MRB chairperson, Working Group advisors and Working Group members.
(b) Attend MRB meetings.
(c) Attend Industry Steering Committee meetings, as invited by the MRB Chairperson.
(d) Review Working Group meeting minutes and provide comments to the MRB chairman, if appropriate. This review should encompass an assessment of the engineering aspects of Working Group activities, including a notification of any potential problem areas.
2-14. FLIGHT MANUAL.
a. General. A flight manual for each new aircraft is required (reference §§ XX.1581 and 21.5).
b. Flight Manual Approvals. The ACO responsible for the project approves flight manuals, including revisions and supplements. The flight manual should not be approved until:
(1) The FAA project flight test pilot and/or flight test engineer, the AEG operations specialist, and appropriate FAA engineers concur with the operational limitations and normal and emergency procedures;
(2) The FAA flight test engineer recommends approval of the performance section of the flight manual; and
(3) AEG has reviewed and coordinated on the flight manual.
c. Flight Manual Revisions or Supplements. Changes to flight manuals submitted by the TC holder will be handled by the FAA in the same manner as original manuals. Each revised page should bear a revision date or symbol so that required revisions may be properly identified. Changes to flight manuals submitted by other than the TC holder will be accomplished by the use of a flight manual supplement. Flight manual supplement approval will be handled by the ACO responsible for the project and in the same manner as the original manuals.
2-15. POST CERTIFICATION ACTIVITIES.
a. Certification Summary Report.
(1) The purpose of the certification summary report is to provide a single source document which summarizes the record of the FAA examination of a type design, discusses significant safety issues, and describes how the applicable airworthiness, noise, and emission requirements were complied with. The FAA prepares the certification summary report. Details of what is contained in the summary report are in FAA Order 8100.5. Not all projects require a summary report and the accountable directorate is responsible for determining which projects do. Summary reports should generally be prepared for:
(a) All new airplane models over 75,000 pounds maximum gross weight and significant modifications to those airplanes;
(b) All new transport category rotorcraft and significant modifications to those rotorcraft;
(c) Aircraft which involve significant technology issues;
(d) Aircraft which have unusual or novel features, or are of controversial design; or
(e) Projects that have potential for unusual public interest.
(2) The certification summary report, if required, should be in an acceptable draft form at the time of issuance of the TC, Amended TC, or STC.
b. Type Inspection Report.
(1) General. The TIR provides a record of the inspections and ground and flight tests conducted as authorized on the TIA, to show compliance with the applicable regulations (21.33 and 21.35). The TIR also provides a record of other information pertinent to each project for which a TIA has been issued. The TIR should:
(a) Be completed within 90 days after certificate issuance;
(b) Contain the results of all TIA inspections and tests;
(c) Contain a chronological list of all changes made to the prototype product during the test program and identified as "made by the applicant" or "required by FAA as a result of type certification tests showing noncompliance";
(d) Be approved by appropriate supervisors;
(e) Be retained by the certificating ACO for reference purposes (Except when the certificate and control of the project is transferred to another ACO); and
(f) Be provided to the certificate holder (courtesy copy).
(2) Type Inspection Report, Part I, Ground Inspection. Manufacturing inspection personnel prepare the TIR, Part I, Ground Inspection. The TIR provides a means of recording and reporting the configuration of the product and reporting all significant unsatisfactory conditions found as a result of the inspector’s and designee’s activities during the type inspection. All unsatisfactory items will normally be resolved prior to accomplishing Part II, Flight Test Report, of the TIA.
(a) Part I of the TIR should be completed as soon as possible after accomplishing all TIA inspections. The original TIR is filed in the project file and one copy of Part I is forwarded to the accountable directorate, if requested.
(b) FAA Form 8110-6, Type Inspection Report-Engines, and FAA Form 8110-7, Type Inspection Report-Propellers as applicable, are to be completed as soon as possible upon conclusion of the endurance testing and teardown inspections. The conformity inspection records, the results of the teardown inspection, and copies of the memoranda pertaining to the inspections should also be included in the TIR.
(c) FAA Form 8110-26, Supplemental Type Inspection Report (STIR), provides a means for the manufacturing inspector to record the results of inspections and tests conducted on modified products presented for supplemental type certification. This report will be completed in the same manner as the TIR.
(3) Type Inspection Report, Part II, Flight Test Report. FAA, applicant, or DER flight test personnel may totally or partially prepare Part II of the TIR in a format established by the ACO. Locally
approved formats, narrative reports, or applicable pages from the appropriate flight test guide are acceptable, provided all TIA items are addressed. The FAA engineering and flight test personnel will review the TIR to ensure adequate documentation is provided. In addition to test documentation, the following information should be presented in the TIR:
(a) Cover Page. The cover page should include, as a minimum, the following information:
1 Aircraft make and model;
2 Applicant;
3 Type Certificate number and date;
4 TIA number and date;
5 List of supporting documents/reports, unless the list is too extensive for inclusion on the cover page, in which case it should be listed in the administration portion of the TIR; and
6 Name and signature of person(s) preparing, reviewing, and approving the TIR.
(b) Administrative Information. Sufficient administrative or general flight test information should be presented to show compliance with part 21 requirements. The information should include, but not be limited to, the following:
1 Serial number and data sheet number (if applicable) of aircraft tested;
2 Where and when the aircraft was tested;
3 Details of alterations made during FAA flight testing;
4 Flight test log (excluding functional and reliability test and ferry time) with total official FAA flight test time; and
5 Total number of flight hours of functional and reliability test, if required, and an explanation for credit given to other than FAA flight time.
(c) Certification Information. Sufficient information should be presented to indicate:
1 Operation limitations including category (normal, utility, acrobatic) and type operations (visual flight rules, instrument flight rules, day, night, icing, etc.). Approved maneuvers may be presented if appropriate;
2 Equipment required for each type operation. This should agree with the limitation section of the flight manual;
3 Limitations for weight, center-of-gravity, airspeeds, powerplant operations, etc.; and
4 Recommended airspeeds for climbs, auto-rotations, approaches, etc.
(d) Compliance Information. Sufficient information should be presented to show compliance with TIA and Federal Aviation Regulations requirements. If the procedures deviate from an approved test plan or established test methods, the procedures used to show compliance should be documented. For type certification or extensive STC projects, the TIR may be divided into sections such as:
1 Equipment and flight operation;
2 Powerplant operation;
3 Performance; and
3 Performance; and
4 Handling qualities.
(e) Additional Information. Information necessary to show compliance with TIA and Federal Aviation Requirements should be presented as appendixes or attachments to the TIR and referenced on the TIR table of contents. The supporting information may include, but not be limited to, the following:
1 Flight test data;
2 Approved test plans;
3 Flight manual or supplement; and
3 Flight manual or supplement; and
4 TIA.
c. Continued Airworthiness.
(1) The Airworthiness Limitations section of the Instructions for Continued Airworthiness (ICA) are required for type certification because it is part of the type design defined in § 21.31 and also part of the TC as defined in § 21.41.
(2) The ICA are prepared in accordance with §§ XX.1529, 31.82, 33.4, or 35.4. The ICA are reviewed by AEG and engineering personnel but, only the airworthiness limitations section and the instructions for installing and operating the engine or propeller or only the airworthiness limitations section for other category products are FAA approved. The responsibilities of the AEG Airworthiness TCB members include determining the acceptability of ICA for operational and maintenance requirements. It should be noted that the ACO, per § 21.50, is responsible for the compliance findings for requirements of ICA as well as the manufacturer’s maintenance manuals having airworthiness limitations. It is the AEG’s role to assist the ACO in establishing the adequacy of the ICA and determining compliance with 14 CFR. This will also allow Flight Standards personnel during post type certification activities to determine 14 CFR Parts 91 and 121 operators’ compliance with the applicable operational rules.
As allowed in the applicable Federal Aviation Regulations, the ICA may be incomplete at the time of type certification. However, the airworthiness limitations are required (reference § 21.31) and must be FAA approved at the time of type certification (not necessarily in the final printed form). The ICA must be in final printed form when the first standard airworthiness certificate is issued, or prior to delivery of first product, whichever is later. Certification maintenance requirements (i.e., systems and powerplant maintenance requirements developed during the certification process which contain frequency and extent of inspections) should be included as part of the maintenance instructions portions of the ICA.
(3) Data such as stress analysis, damage tolerance assessment, or process specifications used to substantiate a major repair to primary structure can only be approved by:
(a) An ACO;
(b) A DER with authorization in the necessary engineering discipline;
(c) A Designated Alteration Station (DAS) when accomplished by an STC;
Continue reading ↓ 120 of 422 passages shown