Order 7100.10 Air Traffic Implementation Plan for the Use of the Global Positioning System
This document is cancelled. It may have been replaced. Check the official source before relying on it.
U.S.. DEPARTMENT OF TRAINSRBRT1WWN
U.S.. DEPARTMENT OF TRAINSRBRT1WWN
FEDERAL AVIATION ADMINSIMHIQM 7100.10 ORDER
moan/aa
SUBJ: A r e TRAFFIC IMPIFMFNTATTON PT.AN FOR THF. TTSF. OF THF Of OR AI POSITIfWINf: SVSTFM
1. PURPOSE. This order provides the overall strategy for the integration of the Gtttbdl Positioning System (GPSi)) into the air traffic control (ATC) system, and the appendices serve as the implementation plan to be used by Air Traffic to effect the integration.
FEDERAL AVIATION ADMINSIMHIQM 7100.10 ORDER
2. DISTRIBUTION. This order is distributed to branch levels in Washington and regional Air Traffic Divisions, FAA Academy. FAA Technical Center, all Air Traffic field offices and facilities.
3. BACKGROUND. This order provides the framework and guidance for the development of an air traffic system that uses satellite-based navigation and for the integration of the Global Positioning System into the National Airspace System. While the scope of the plan is strategic in nature, the objectives and associated
initiatives identify and establish areas that Air Traffic must focus on in order to immediately take advantage of existing capability and provide users with a return on their equipage investment. The mid- and far-term initiatives in the plan provide broad insight into the future of the Global Navigation Satellite System. The plan has sufficient flexibility and latitude to take advantage of the dynamics of satellite technology. The plan will be implemented by the Communications. Navigation, and Surveillance (CNS)) Staff. ATP-20.
4. RESPONSIBILITIES.
a. The Director. Air Traffic Rules and Procedures Service, (ATP-1))., through the following principal agents, has the overall responsibility for the implementation of this order.
(1) ATP-20 will serve as the focal point for those objectives and initiatives that have multifunctional responsibilities which preclude a single office of primary interest (OPI)) at the Air Traffic level. ATP-20 shall ensure that appropriate coordination is effected among the offices within the national headquarters, the regional Air Traffic Divisions, and, when applicable, air traffic field facilities.
(2) The Procedures Division (ATP4DK)) and the Airspace-Rules and Aeronautical Information Division (ATP-200) shall be responsible for ensuring that all taslcings and requirements for their respective offices, associated with an initiative or objective in this order, are accomplished.
b. The Office of Air Traffic System Effectiveness (ATH), through its principal agent, the Quality Assurance Division (ATH-200), shall be responsible for ensuring that quality assurance issues are addressed in all proposed changes in policy, separation standards, procedural development, and other areas which may have an impact on system effectiveness.
c. The Office of Air Traffic System Management (ATM), through its principal agents. Civil Operations Program (ATMKWJQ), the Air Traffic Control System Command Center (ATM-200), and Military Operations Program (ATM-400), shall be responsible for ensuring that all taskings and requirements for their respective offices, associated with an initiative or objective in this order, are accomplished.
Distribution: \.V(MfFP//mmmm)^5 A-X(JW))-$;; A-Z-1; Initiated By: XW--40 A-Y(AY))-3;; A-FAT-U)
M 0 ° - * ° 1 2 / 2 7 / 9 3
d. The Air Traffic Plans and Requirements Service (ATR), through its principal agent, the Advanced Systems and Facilities Division (ATR-300), shall be responsible for ensuring that all taskings and requirements for their respective offices, associated with an initiative or objective in this order, are accomplished.
e. The Office of Air Traffic Program Management (ATZ), through its principal agent, the Training Requirements Program (ATZ-100), shall be responsible for ensuring that all taskings and requirements for their respective offices, associated with an initiative or objective in this order, are accomplished.
Administrator for Air Traffic
Page 2
7100.10 12Z27Z93 Appendix 1
APPENDIX 1 - TABLE OF CONTENTS
APPENDIX 1 - TABLE OF CONTENTS
CONTENTS AM
APPENDIX 2
Y EXECUTIVE SUMMARY EXECUTIVE SUMMARY A2-1
APPENDK3
PLAN OVERVIEW
PLAN OVERVIEW AM
1.0 BACKGROUND AM
2J» PURPOSE A3-2
3JD OBJECTIVE A3-3
4.0 PLAN ORGANIZATION A3-3
5® PHASES OF IMPLEMENTATION A3-5
APPENDIX 4
PLAN OBJECTIVES PLAN OBJECTIVES A4-1
PLAN OBJECTIVES PLAN OBJECTIVES A4-1
LO DEVELOP ATC SERVICES AND PROCEDURES TO LOCATIONS WHERE GPS WILL PROVIDE A NEW OR EXPANDED CAPABILITY A4-E
1.11 Structure a flexible system of SID's and STAR"s to more efficiently transition to/from the en route structure A4-11
2J0 EXPLOIT THE USE OF GPS TO ESTABLISH A MORE EFFICIENT OCEANHCATCSBftSlEM A4-4
2 Jl Exploit the use of GPS to effect a reduction of longitudinal and lateral separation
2 Jl Exploit the use of GPS to effect a reduction of longitudinal and lateral separation
standards and to reduce separation between tracks A4-5
Appendix 1 P--1
7100.10 Appendix 1 12227Z93
2.2 Exploit GPS to increase the use of a flexible offset oceanic track/route capability that will increase capacity on or near high density tracks/routes e A4-7
Appendix 1 P--1
23 Establish ATC procedures for providing improved service to GPS-equipped aircraft operating in a mixed environment of aircraft with and without GPS equipment A4-$
2A Exploit GPS equipage to develop improved procedures to be utilized in transitioning to a full required navigational performance (RNPj) for oceanic airspace A4-M)
2.5 Restructure special use airspace (SIM)) to accommodate a GPS-based oceanic en route system A4-11
2.6 Establish an altitude stratum and track structure in oceanic airspace designated for GPS-equipped aircraft and update tracks based on GPS positional information A4-J2
3 0 EXPLOIT THE CAPABILITY OF GPS TO ESTABLISH A MORE EFFICIENT
3 0 EXPLOIT THE CAPABILITY OF GPS TO ESTABLISH A MORE EFFICIENT
DOMESTIC EN ROUTE STRUCTURE A4-177
3.1 Restructure existing airway system to accommodate GPS-based direct routing A4-H7
3.2 Exploit the use of GPS to reduce separation standards in domestic en route A4-1S airspace
3.3 Develop flexible alternate/parallel route capability and procedures that will relieve
3.3 Develop flexible alternate/parallel route capability and procedures that will relieve
saturation on high density routes A4-2S)
3A Restructure SUA to accommodate a GPS-based en route system A4-22
33 Establish an altitude stratum in domestic airspace designated for GPS-equipped aircraft :.KA^IV> 4j0 EXPLOIT THE USE OF GPS FOR TERMINAL AIR TRAFFIC CONTROL OPERATIONS ' … A4-2SB
4.1 Establish a GPS-based terminal route structure to include IFR, VFR, and SVFR
4.1 Establish a GPS-based terminal route structure to include IFR, VFR, and SVFR
criteria -..A^? 8
4.2 Use GPS capability to reduce terminal separation standards A4-3D
4 5 Use GPS to identify, track, and control aircraft and vehicles on an airport surface toana«BQi«acycctf)OBectdiflMeftBie(iejs A4--32 5J> USE THE CAPABILITIES OF GPS TO PROVIDE ENHANCED AND MORE PRECISE
AIR TRAFFIC SERVICES FOR ROTOBORAiHT OPERATIONS A4-3S
AIR TRAFFIC SERVICES FOR ROTOBORAiHT OPERATIONS A4-3S
5Jl Establish a direct routing capability for rotorcraft A4-25
S3. Develop "rotorcraft only" GPS approach procedures to facilitate simultaneous rotorcraft and fixed-wing operations A4-377
AM AfflMdixl
7100.10 12/27/93 Appendix 1
5.3 Estabbsh and certify "rotorcraft only" STAR's tosenttaaoo the ftowxrf bOtfa Sxed wing and rotorcraft traffic within the terminal area A4-39
5.4 Develop an intenm CNS capability to support offshore oil complexes A4-40
5.4 Develop an intenm CNS capability to support offshore oil complexes A4-40
APPENDLX 5
GLOSSARY (GfeOSSABY .^ m$-l
APPENDIX 6
ABBREVIATIONS/ACRONYMS lABBREWMraDNSMjCROMiSMS ttS-J
AEEENDIX7
REFERENCES RQBERENCEG *AK-J
Appendix 1 Al-3
7100.10 12Z27Z93 Appendix 2
APPENDIX 2 - EEOOHVE SUMMARY
APPENDIX 2 - EEOOHVE SUMMARY
The purpose of the Air Traffic Implementation Plan for the Use of the Global Positioning System (GPS)) is to identify the steps needed to enable the Federal Aviation Administration (FAA) to develop air traffic control (ATC) procedures which will exploit the navigational capabilities of GPS.. The plan contains five major objectives, each designed to be satisfied through the accomplishment of a series of Air Traffic initiatives. The methodology for accomplishment of each individual initiative is stated in that initiative" stechnical approach. The technical approach includes requirements for cost/benefit analyses, planning considerations, tests or demonstrations, procedural changes, and training, as well as coordination among the appropriate organizations within and outside the FAA.
The GPS is a satellite-based positioning, navigation, and time-transfer system developed by the Department of Defense (DOD). Using a constellation of 24 satellites, unaffected by weather, GPS provides highly accurate, en route, terminal, and approach navigational guidance to GPS-equipped users. The GPS navigational concept is based on accurate and continuous knowledge of the spatial position of each satellite in the system. Using great-circle-navigational concepts, GPS receivers automatically select the appropriate satellites in view and translate the signals into a three-dimensional position. This position is based on velocity, time, and referenced to a common grid (latitude/longitude) system. Without augmentations, such as differentials, the system provides civil users horizontal accuracies of 100 meters with 95 percent confidence and 300 meters with 99.99 percent confidence.
The inherent benefits of GPS to the overall ATC system will initially be limited but will steadily increase as the flying public increasingly adopts GPS and equips aircraft with approved GPS avionics. Oceanic ATC procedures will be the initial area where GPS will have a significant impact. As user equipage increases, the transition will continue exploiting the flexible nature of GPS to improve the flow of air traffic in oceanic, en route, and terminal environments, with specific applications in rotorcraft operations. The ultimate goal is the declaration of a GPS airspace based solely on this highly accurate satellite-based navigational system and not constrained by limitations of land-based navigational aids (NAVAID),
GPS will be introduced within the National Airspace System (NASj) in three phases:
First, GPS will be used as a supplemental navigational system in the NAS (Near Term 1994^. Current navigational systems will still be required on the ground and in the aircraft when GPS is being used. Early applications will include supplementing current area navigation (RNAV) capabilities and GPS overlays of current instrument approach procedures. Direct routes and helicopter routings based on GPS will be introduced during this phase.
In the second phase. GPS navigation will initially remain supplemental in nature but will steadily transition into a primary means of navigation in the NAS (Mid Term 1995-H99SJ). Initial augmentations to enhance accuracy and integrity, such as wide (WDS3KJ) and local (LDGPS) area differentials, will be used when available. Here Air Traffic initiatives will be designed to allow expanded use of GPS in the current VOR/DlME4iffl£Bau NAS but with reduced reliance on these land-based systems. During this phase. Category I and II approaches, tracking aircraft on the airport surface, reduced separation
standards, and the Aeronautical Telecommunications Network (ATN) will be implemented into the NAS.
Appendix 2 A24
Appendix 2 A24
7100.10 Appends 2 12Z27Z93
The final phase will equate to full conversion to GPS navigation, augmented for primary use in the NAS, without reliance on current land-based NAVAID's (Far-Term 199® and beyond). The airspace and air traffic structure should be based on GPS- Sole means GPS, enhanced with increased use of augmentations, will be used. This capability will be fully exploited in the areas of navigation, obstacle and terrain clearance, instrument approach, separation standards, and surveillance. Category III approaches, time separation, and domestic automatic dependent surveillance (ADS) implementation can be expected during this phase.
The plan stipulates that the FAA will implement an incremental and evolutionary process b y which the ATC system will meet the needs of an expanding GPS navigational capability by the users.
The five major objectives which this plan is designed to satisfy are as follows:
Develop ATC services and procedures at locations where GPS will provide a new or expanded capability. Enhance flexibility of GPS navigation, not constrained by line of sight or range limitations of land-based NAVAID's, through the expansion of instrument flight rules (IFR) services to a significant number of new locations. Identify required resources, especially additional controller personnel, to ensure the handling of additional requirements, that is. requests for expanded Class E airspace, new instrument procedures, etc. Establish a GPS-based terminal structure to include a flexible system of standard instrument departures (SIDl), standard arrival routes (STAR), and instrument approach procedures (IAP).
Exploit the use of GPS to establish a more efficient oceanic A T C system. Restructure the oceanic A T C system to include reduced separation standards and increased system capacity. Implement this objective through continuous coordination with adjacent ATC service providers and the International Civil Aviation Organization (ICAO).
Exploit the use of GPS to establish a more efficient domestic en route A T C system. Restructure the current ground-based-navigational-airway system to one that is satellite oriented, to provide several benefits which include: reduced separation standards, flexible/direct routes, and a more efficient use of airspace.
Exploit the use of GPS to establish a more efficient terminal A T C system. Reduced separation criteria benefits include reduced distance between runways for parallel operations and improved aircraft sequencing procedures, enhancing those initiatives set forth in FAA"s Center TRAGQN arrival sequencing (CTAS^) program. In addition, GPS with augmentations will be used to track aircraft and vehicles on an airport surface to an accuracy of 1 to 3 meters.
Use the capabilities of GPS to provide enhanced and more precise air traffic services for rotorcraft operations. Exploit GPS to allow rotorcraft to maximize the use of direct, efficient routing without adversely affecting fixed-wing traffic and ATC. This will include establishment of "rotorcraft only" STAR's. SID's, and IAP'ss with emphasis placed on steep angle approaches to enhance a simultaneous fixed-wing/tOtiDCatJift mix. Such will enhance public-use facilities, as well as police and hospital heliports, for example.
Air traffic controller training will be of paramount importance throughout the implementation of this plan. Preliminary briefings on GPS will begin in early 1994 when headquarters FAA personnel will provide informal GPS briefings on theory and operations to a selected number of large facilities. Videotapes and handouts will also be used to brief this information. The initial procedural training may be accomplished through FAA
A292 Aopendi 2
nm.w 12/27/93 Appends 2
Briefing Guides. As the incremental advances in GPS and other aspects of satellite technology occur, the development of formalized training courses must be given consideration. This plan specifies within each initiative where training must be developed and what coordination is required to accomplish each task.
FAA has established an office of primary interest. ATP-20, for ensuring the accomplishment of all implementation strategy through management, and implementation guidance and ensuring the identified actions of other involved organizations are completed.
ApDendx 2 A2-3
7100.10 12/27/93 Appendi 3
APPENDIX 3 • PLAN ©MSKWIEW
APPENDIX 3 • PLAN ©MSKWIEW
1.0 BACKGROUND
The FAA, in conjunction with ICAO, has acknowledged that the primary navigational system of the future will be provided by a Global Navigation Satellite System (GNS$). GNSS will be composed of one or more satellite constellations of which GPS is a viable candidate Since GPS is owned and operated by the United States, GPS is the focus of initial FAA satellite efforts To exploit the enhanced navigational capability of GPS, the FAA established the FM's Satellite Navigation Program This implementation plan is the blueprint for Air Traffic's support of this program
1.0 BACKGROUND
GPS Overview: The GPS is a satelhte-based-radio-navigational, positioning, and time-transfer system and is comprised of three major segments
• Space: When fully deployed, the space segment will contain 24 operational satellites in 6 orbital planes of 4 satellites each at an altitude of 10,98® nautical miles The satellites complete 1 orbit in approximately 12 hours The satellites are positioned in orbit so that a minimum of four satellites are observable by a user anywhere on earth Each satellite contains highly accurate atomic clocks for synchronization of the pseudocode messages used by the aircraft receivers to compute distance from the satellites which are used in position determination
• Control: The GPS control segment consists of a master control station located in Colorado Springs, Colorado, five monitor stations, and three ground antennas at various locations around the world The control segment controls the operation of the satellites through a series of techniques used to monitor satellite health, correct clock errors, maintain satellite location, and exchange and update navigational data, as well as other maintenance functions
• User: The user segment consists of the GPS receivers and equipment used by surface vehicles and aircraft The receivers, knowing the position of the satellites, can determine its position by measuring the time the satellite signal takes to reach the receiver and converting that length of time to distance Normally, measurements from four satellites are required for an accurate three dimensional (3DJ navigational solution
GPS, operated by the DOD, offers two levels of service, the standard positioning service (SPSJ and the precise positioning service (PPSj). However, PPS is limited to authorized U S and allied military, Federal Government, and specified civil users PPS uses an encrypted mode of transmission with significantly higher accuracy levels Civil users are authorized use of SPS and are guaranteed 100 meter accuracy with 95 percent confidence and 300 meter accuracy with 99.99 percent confidence GPS accuracy levels are degraded by DOD for national security reasons through a technique called
selective availability (SA).
The FAA's Flight Standards Service (APS)) has approved the use of GPS for oceanic, domestic en route, terminal IFR operations, and nonprecision approaches within U S airspace or other airspace as authorized by the FAA as stated in AFS-ll and AHH1 memorandum *IFR Approval of Use of Global Positioning System (GPSj) Operations ^ Declaration of an initial operational capability (IOC) of the GPS constellation is anticipated for early 1994. Prior to IOC, certain operations using GPS navigation have been authorized by FAA in accordance with the above-referenced memorandum To further
Appeudu j A3-1
7100.10 Appendi/ 3 12/27/93
clarify operator requirements, the FAA is scheduled to publish in early 1994 Advisory Circular (AC) No: 90-X3£, Guidelines for Using GPS Equipment for IFR En Route, Terminal and Nonprecision Instrument Approach Procedure Navigation in the U.S. National Airspace System (NAS).
Transition Projects: In accordance with the above FAA guidance, the following projects and development efforts are currently underway in order to maximize the initial use of GPS in conjunction with IOC and further efforts toward development of a GPS-airspace system
Fiji Project: The FAA is sponsoring a "proof of concept" demonstration in the nation of Fiji, where Fijian airspace is being used to validate the feasibility of a GPS-based airspace system. The project includes GPS-equipment installation in all domestically registered aircraft, establishment of GPS routes and cloudbreak procedures, implementation of special GPS-ffijght procedures, data collection requirements, validation of special air traffic procedures, and validation of waypoints for GPS navigation. The results of this demonstration will aid in determining the strategy to transition U.S airspace to a GPS-based system.
GPS Overlay Program: This program uses GPS to overlay current nonprecision approaches and is to be implemented in three phases. Phase I, which began in June 1993, is transparent to air traffic in that conventional avionics and ground-based NAVAID's must be available and operating for the pilot.' Phase II will occur after IOC and differ from phase I by only requiring the aircraft's avionics be available, but not operating, and that ground NAVAID's be operational. Phase III authorizes the procedures be flown with only GPS avionics and the term "G-P-S" be included in the phraseology when clearing an aircraft for the approach. These selected nonprecision IAP's must be named *GPS" approaches, in addition to the current published designations.
Differential Techniques: While the inherent accuracies of GPS make it more than satisfactory for nonprecision approach applications, other factors including atmospheric distortion and selective availability preclude use for precision approaches without augmentations to enhance accuracy and integrity. Various forms of differential concepts are being developed, which in effect transmit navigational corrections to the airborne receiver, resulting in accuracies suitable for precision applications. Satellite-based integrity broadcasts, GPS integrity channel (GIC), as well as wide and local area differential reference stations are current methods under development.
Special Category I Approaches (SCAT-1): In conjunction withttne Requirements and Technical Concepts for Aviation (RTCA), Incorporated*s Minimum Aviation Systems Performance Standards (MASBSj) for SCAI41 Approaches, initial applications of differential techniques will be used on a user-specific basis, where the users, providing their own differential reference station, will be allowed to perform precision approaches to Category I minimums. Initially. SCAIM. approaches are planned for Aspen and Steamboat Springs. Colorado; Houston and Dallas-Fort Worth. Texas: and Juneau. Alaska.
2 * PURPOSE
2 * PURPOSE
The purpose of this implementation plan is to exploit and implement GPS technology in the field of ATC- The plan addresses the implementation in three phases: (1) air traffic applications for the use of GPS as a supplemental navigational system in a NAS that is btill VOR/DME based: (2) air traffic
A3-2 Apoeidi J
7100.10 12/27/93 Appendix 3
applications for the use of GPS navigation augmented for supplemental and primary use in a NAS that is still VOR/DME based; and (3) air traffic applications for the use of GPS navigation augmented for primary use in the NAS. This plan identifies and examines the benefits of GPS to both user and provider and articulates in detail an implementation strategy that provides for a safe and orderly transition into the GNSS by Air Traffic.
The GNSS will be a worldwide-position and time-determination system. GNSS includes one or more satellite constellations, user receiver equipment, and a system of integrity monitoring function. The system will be augmented as necessary to support the required navigational performance (RNP) concept for a wide range of specific operations within en route (domestic and oceanic) and terminal airspace. GNSS is an evolving system and will provide the aviation community the primary navigational system for the 21st Century.
This plan also identifies, develops, and implements the necessary air traffic standards, rules, regulations, and procedures to provide operational benefits to those aircraft equipped with satellitebased navigational systems. This strategy specifies tasks, and milestones and provides for test and evaluation.
3 4 OBJECTIVE
3 4 OBJECTIVE
The overall objective of this plan is to define in detail an implementation strategy that utilizes GPS to enhance the ATC system by creating a seamless, continuous airspace with common procedures and standards to separate aircraft in the en route, terminal, and oceanic environments. The potential benefits will enhance the capacity, service, and safety, and will reduce delays within the current ATC system. Specific objectives include the following:
3lH Develop ATC services and procedures to locations where GPS will provide a new or expanded
capability .
3 2 Exploit the use of GPS to establish a more efficient oceanic ATC system.
3 3 Exploit the capability of GPS to establish a more efficient domestic en route structure.
3.4 Exploit the use of GPS for terminal ATC operations.
3 5 Use the capabilities of GPS to provide enhanced and more precise air traffic services for rotorcraft operations. 4 0 PLAN ORGANIZATION
This plan addresses the overall actions required to enable Air Traffic to meet each increase in user capability and navigational performance realized from GPS technology. During the development of the plan and coordination with the Air Traffic organizations, the Office of Air Traffic System Management, ATM-1, stated that close coordination would be required with all of the Air Traffic services to ensure that the resources needed to accomplish each initiative were available and that the time lines were realistic and considered the requirements of international coordination. The Office of Air Traffic System Effectiveness, ATH-1, stated its requirement to be involved and represented during discussions and planning for personnel/equipment requirements and all procedural changes. Although the individual initiatives do not specifically address the requirements stated by ATH-1 and ATM-1, the
A3-3
7100.10 Appendix . 12/27/93
broad language and overall strategy of the plan task ATP-20 to ensure that all appropriate coordination is effected.
4J. Each of the plan's five objectives is supported by a series of initiatives which are designed to satisfy the objective by addressing operational enhancements, constraints, and assumptions anticipated through the use of the new GPS-based navigational capability.
4 2 The process to fulfill and implement each initiative is stated through a recommended technical approach. The process lays out a methodology which addresses several areas which include: identification of costs versus benefits resulting from the initiative, t&t plan development, ATC procedural development, establishment of training requirements, and required coordination within and outside FAA. Overall management and oversight of the plan implementation will come from the FAA's CNS Staff, ATP-20.
4X3 Throughout each initiative, there are several prevalent institutional issues which may impact the accomplishment of the initiative, but due to their repetitive nature, they will not normally be stated in the technical approach. However, these issues must be addressed by the implementation team. They are as follows:
Environmental Considerations: The added flexibility of GPS navigation will affect the environmental examination process. The anticipated proliferation of new instrument procedures caused by the adoption of GPS will create new environmental challenges. This is due. in part, to the introduction of IFR flying to areas not previously exposed to low altitude aircraft operations. It is imperative that plan implementers fully examine the environmental impact of each step of the implementation process.
Collateral Technologies: GPS, a navigational sensor, will not, in and of itself, satisfy all the initiatives stipulated in this plan. Full exploitation of GPS, in many cases, requires integration with other technologies to fully achieve the goal established in each initiative. For example, GPS-based reductions of separation standards cannot fully be realized without combining
surveillance and communications enhancements, such as those contained in ADS, and reliance on aspects of the Air Traffic Advanced Automation System (AAS). Consideration of these collateral technologies is also consistent with establishment of the role GPS will play in the development of the GNSS.
Actions: The significant number of changes to airspace and route structures, as well as instrument approach and departure procedures precipitated by GPS, have the potential to cause a significant increase in rulemaking actions. Plan implementers must ensure that the potential for rulemaking actions be considered in the accomplishment of each initiative.
rn»n.^t»g Chang<& and Aerodrome Surveys: Many of the initiatives have the potential to create a significant demand for aerodrome surveys and major changes to aeronautical charts. Plan implementers must consider the impact of each initiative in these two areas, that is. survey teams are a limited resource, charting cycles are not easily changed, and adequate lead times are essential. Further, early identification of requirements is essential to ensure budgetary support. ATP-20 shall ensure that all appropriate coordination is effected with the Cartographic Standards Branch. ATP-220.
A3-4
7100.10
Appendix 3
Appendix 3
5 0 PHASES OF IMPLEMENTATION
The Air Traffic Implementation Plan for the Use of the GPS will be implemented in three phases:
5 1 Air traffic applications for the use of GPS as a supplemental navigational system in a NAS that is still VOR/DME based. (Near-Term (1993-1994) » This first phase addresses GPS as a supplemental navigational system. Receiver autonomous integrity monitoring (RAIM) or an equivalent integrity that is equal to or better, than RAIM will be required in GPS avionics in order to meet Technical Standard Order (TSCI)) C-128> specifications. Current navigational systems are still required on the ground and in the aircraft_yvhen GPS is being used. Early transition will start in a transparent configuration which will mirror present-day operations such as the nonprecision overlay project. During this timeframe, pure GPS nonprecision approaches will be developed and implemented, reaching full maturity in phase II. MASPS SCAT-1 approaches also emerge in this phase, but will only be available
5 0 PHASES OF IMPLEMENTATION
for private use. Minimum operational performance standards (MOPS) will be approved for use of GPS as a primary navigational source for oceanic flight but will not be used dramatically until oceanic automation materializes in phase II.
$ 2 Air traffic applications for the use of GPS navigation augmented for supplemental and primary use in a NAS that is still VOR/DME based. (Mid-Term (1995-1990)) - The second phase identifies Air Traffic initiatives designed to allow GPS as a supplemental and primary means of navigation in today's NAS that is based on VOR/DME. To encourage continued transition to satellite navigation, FAA approval of GPS equipment, as a substitution for conventional navigational equipment with the anticipated operational benefits for its use, will be the foremost driver to early voluntary equipage. The early transition must be based on voluntary equipage. To achieve an orderly and rapid transition to GPS, the parallel technologies of conventional and satellite navigation must be accommodated.
During this phase, the transition from supplemental navigation to primary means will expand. GPS will be approved for primary use over oceanic areas and will be used on a regular basis. Pure GPS approaches (nonprecision) will be common place. WDGPS will be implemented and Cat-I type approaches will begin to emerge using WDGPS for integrity and accuracy. Precision approaches will become available for public use using LDGPS.. GIC will begin to replace RAIM for integrity. Reductions in ATC separation standards will be initiated. Air traffic rules and procedures will be changed to take advantage of the full benefits of GPS.
Transition will require changes in the basic concept of operation in order to achieve maximum benefits of the GPS technology. The magnitude of this change necessitates a transition process that accommodates parallel operation of GPS and non-GPS during a defined period. To minimize the disruptive influence on current systems or services, operational implementation of GPS must be introduced in an evolutionary and incremental manner. Therefore, the use of GPS in the NAS must not be dependent upon total systemwide acceptance before commencing initial GPS operation.
S 3 Air traffic applications for the use of GPS navigation augmented for primary sole means use in the NAS. (Far-Term (1999 and beyond)) ~ The applications of sole means implementation of satellite navigation are those specific applications in which new technologies, to include augmentations and enhancements like ADS. ATN, and GPS differentials, can improve capacity, enhance efficiency, and improve the safety of air
ApDendi 3 A3-5
7100.10 : 3 12227Z93
operations beyond the near-term applications. These applications will be applied in the areas of navigation, obstacle clearance standards, instrument approach procedures, separation standards, surveillance, communications, and procedural identification and development.
During phase III, GPS will be authorized for sole means navigation. GPS, in association with ADS and pseudo-ADS, will begin to replace radar. Traditional NAVAID's will be decommissioned, and GPS will probably be mandated by Federal Aviation Regulations (FAR) changes. The tunnel concept will be in full operation allowing simultaneous parallel approaches to runways separated by less than 3,000 feet. Separation will be developed to take advantage of the precise time inherent in GPS. Four dimensional standards will begin to emerge. Automation will provide the capability for controllers to become system managers. Intervention by exception will become a standard requirement of ATC.
A3-6 Append.. 3
7100.10 i 12Z27Z93 Appends
APPENDIX 4 - PLAN GHUEGTIVES
APPENDIX 4 - PLAN GHUEGTIVES
L* DEVELOP ATC SERVICES AND PROCEDURES TO LOCATIONS WHERE GPS WILL PROVIDE A NEW OR EXPANDED CAPABILITY.
L I INITIATIVE: Structure a flexible system of SID's and STAR's to more efficiently transition to/from the en route structure.
1.1.1 This initiative takes advantage of the flexibility of GPS navigation through creation of potentially unlimited numbers of departure and arrival routes. limitSd only by environmental, terrain, and airspace considerations, and not constrained by NAVAID limitations. The overall benefit in developing these GPS-based profiles is to ease the transition between the en route and terminal airspace environments for arriving and departing aircraft. Not having the limitations of land-based NAVADD's, SID's based on GPS will be more flexible and add to the ease of entry into the en route flow. GPS arrival profiles will represent an extension of the profile descent concept and take advantage of the point-to-point nature of GPS navigation which is not dependent on land-based NAVAID's. This will provide an aircraft a direct route
from the en route structure to the final approach course, normally without intervention from the controller. (Near/Mid-Term)
1.1.2 TECHNICAL APPROACH: The flexibility that GPS affords should be the basis for development of universal models of GPS-fcased SID's and STAR's. A preliminary departure model has been established through the Eagle and Gunnison flight management system (FMS) trials. These trials, along with the interim criteria for establishing FMS and GPS instrument procedures (FAA Order 826012& (Draft)), should be the basis from which to expand procedural development. The adaptation of this model using the ideas taken from charted visual flight procedures is an aspect which also dictates further study. The accomplishment of this initiative will be heavily dependent on tests and simulation as well as an indepth airspace analysis on a national, regional, and local level.
1.1.2.1 Benefits and/or costs: Potential benefits include, but are not limited to:
• An effective method to provide efficient routing to aircraft from the terminal area to the en route structure which more effectively deals with the real-time concerns of en route weather avoidance, flow restrictions, preferred departure routes, etc.
• Enhanced service will be provided to outlying and satellite airports adjacent to the terminal area through GPS capabilities. This will yield an increase in IFR terminal capacity by taking advantage of increased runway availability at satellite facilities where GPS will provide departure and arrival navigation.
1.1.2.2 Develop a test plan/demonstration: ATP-20, in coordination with ATP, ATM, ATR, AFS, and the regions, will ensure the development of test plans, evaluation of criteria, and determine test locations, if required. Previous FMS testing should be used as a basis from which to continue development. Emphasis should be placed on exploiting the flexibility of a GPS-based SID/STAR structure. Modeling of the arrival profiles should be based on concepts derived from FMS-test data. Testing of this initiative should be integrated with current efforts underway in development of
Appendi 4 A*-l
7100.10 Appendix 4 12ir27293
Terminal Air Traffic Control Automation (TATCA). ATP-20 shall also ensure that this initiative is fully coordinated with the responsible FAA offices, appropriate agencies, and user groups outside the FAA. This coordination will include AFS and Aviation System Standards (AVSij) to ensure obstruction clearance criteria are developed for GPS-Haased SID's and STAR'sS. The test plan should include but not be limited to:
• Complete initial airspace analysis and cost/benefit study.
• Develop generic GPS-fosseo1 departure and arrival modejs, conduct simulation, and publish results.
• Conduct and publish results of operational tests at specified terminal facilities.
• Develop regional implementation plans for establishment of published GPSbased SID'S and STAR's through coordination among Air Traffic Divisions, ATM. AFS, AVN, and ATP.
1.1.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: Using the results of the survey and the GPS System Requirements Analysis Report, dated September 30, 1993, ATP-20 will ensure that studies are conducted to recommend editorial and procedural changes, to all FAA orders, manuals, and directives. ATP-20 shall ensure these changes are forwarded to ATP-200 for publication with sufficient lead time to meet planned navigational and equipment implementations. This will be an ongoing process accomplished in an incremental and evolutionary fashion consistent with advances in aircraft equipage as well as ATC facility enhancements.
1.1.2.4 Training requirements for air traffic controllers: ATP-20 will ensure coordination with ATZ to develop those recommended changes to procedures and directives resulting from these tests in sufficient time to develop and provide the required training directives and curriculum to the appropriate regional offices, field sites, and the FAA Academy.
1.1.2.5 Final coordination requirements: ATP-20 will maintain contact with all tasked offices and provide managerial oversight to ensure the task milestones in this initiative are met. Continuous coordination with the Terminal Procedures Branch. ATP-120 shall be maintained to ensure all aspects of the terminal ATC environment are addressed.
1.1.3 INITIATIVE CONSTRAINTS: The flexible aspects of GPS-based departure and arrival profiles in the terminal environment have the potential to expand, both horizontally and vertically, the terminal airspace structure. The environmental impact of creating routes over areas not previously subject to significant air traffic must be addressed in the airspace analyses.
A « Appmisk4
OBJECTIVE 1.0 - DEVELOP ATC SERVICES AND PROCEDURES TO LOCATIONS WHERE GPS WILL PROVIDE A NEW OR EXPANDED CAPABILITY j i is
^ i a a * F Y 1998 PI AN ACTIVITY * « » • F?1?*? F,y£!J,r * * » * » FYaOOO FV3BW1 F|??ee§2 7JWI«* s ^ » % ^ y •» t a - ' * ^ tjsra 4 l||2f3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 It Develop ATC Services Where ^ l GPS Will Provide New or Expanded ^r™ Capability
1.1 Structure Flexible System of SID*s and STAR'S to Transition . _ « r totfrom En Route Structure
CostfBwwHStudy J X
Develop Tests and/or J JL Demonstrations 'p ~"Y Procedural Changes I J^ V" "Y Training Requirements 1 J_
ZJ~ ~y
- 1 1 1-ftFM V l _ LCOCINU. 1 nR.IFP.TIVF'BH* 1 ' ' ' " llWTIATIVlE * * * ^ r i rrn
TFPH APP A ST?
TFPH APP A ST?
t
i
I
7100.10 Append^ 12227/53
2 * EXPLOIT THE USE OF GPS TO ESTABLISH A MORE EFFICIENT OCEANIC ATC
SYSTEM.
All the initiatives contained in this section pertain to international airspace. Their implementation involves and affects adjacent air traffic service (ATSj) providers, non-US-certificated aircraft, ICAO, and ICAO-ananfofir states.
To achieve maximum international compatibility with both equipment capabilities and procedures. ICAO, ICAO-memter states, and ATS-providcr states, as appropriate, should:
• Participate in developing and accomplishing tests/trials and/or demonstrations.
• Participate in evaluating the results of the tests and demonstrations.
• Ensure results are made available to member states, nonparticipating ATS providers and airspace users for their information and. where appropriate, for inclusion in their individual implementation plans and strategies.
• Coordinate a concurrent effective date for implementation of revised standards and/or procedures.
• Certify the use of GPS as a supplemental navigational system.
• Determine the requirement for an ICAO-approved flight plan identifier for GNSS-nawigaliondl equipage and reduced vertical separation minima (RV$8$) certified capability.
• Develop an annex amendment which requires operators of approved GNSS-capable aircraft and/or RVSM-cediilfiftll aircraft to include the assigned identifier as part of the filed flight plan.
• If deemed necessary, develop contingency procedures which should be followed by pilots operating with reduced separation minima in a mixed GPSfc/non-GPS environment, as well as a GPS-only environment, when flight conditions dictate immediate deviation from an ATC clearance.
• Review and modify, as appropriate. ATC and operator guidance material such as Document 4444, Procedures for Air Navigation Service (PANS) and Regional Supplementary Procedures, which contains ICAO approved/recommended procedures and standards and recommended practices.
Benefits derived from GPS equipage by airspace users and ATS providers will be limited in the near term. Benefits will increase as the ATC system is upgraded with new capabilities. New system capabilities include ADS. oceanic data link (ODL), enhanced situation display (ESD), conflict probe, and other automation enhancements. The new capabilities are planned to be phased in during the midand far-terms. Each system upgrade will enhance ATC system efficiency and provide increased benefits.
ATP-20, in initiating the technical approach identified in each initiative, shall accomplish the following:
• Identify and review all cost/benefit studies which have been completed by FAA. ICAO
M-4 2ppend±
7100.10 12/27/93 Appendix 4
member states, or airspace users. If additional studies are required. ATP-20 will coordinate with ATM-100, ATR-300 and other FAA offices, as appropriate, to establish study requirements and criteria.
• Review all tests and demonstrations that may have taken place by FAA, ICAO-menrfwr states, or airspace users. ATP-20, in conjunction with ATP-140, ATM-100, ATR-300 and ICAO (if required) will jointly develop test and/or demonstration plans and select test sites within FAA and/or ICAO regions. An evaluation of equipment and other resources, including financing, to support the test and/or demonstration will be conducted. New tests and demonstrations should include the results of any previous tests and/or demonstrations, GPStBQUJpagfi, the availability of other satellite-based technology, and. where applicable, ATC system integration of satellite and ground-based technology.
• Ensure that ATZ thoroughly understands the planned changes so all required training is identified, developed, and disseminated to affected regional and field sites within established timeframes.
The following initiatives outline a strategy to take advantage of the benefits GPS provides to improve the overall efficiency of the oceanic ATC system. While not specifically addressed in each initiative, plan implementers must also monitor and, if necessary, establish requirements to merge parallel advances in surveillance techniques to fully take advantage of GPS as it applies to the future CNS environment. Examples of these aspects of surveillance include ADS and pseudo-ADS and the individual components of these systems, such as data link, controller displays, communication systems, etc. Advances in the Advanced Oceanic Automation System (AQA$), ATN, ODL, ESD, telecommunications processor (TP), and similar Air Traffic initiatives must also be considered. Without application of these collateral technologies, the benefits of the enhanced navigational accuracy of GPS cannot be optimized.
2J. INITIATIVE: Exploit the use of GPS to effect a reduction of longitudinal- and lateralseparation standards and to reduce separation between tracks.
2.1.1 Reduced longitudinal- and lateral-separation criteria and reduced separation between tracks will permit ATC to increase the assignment of aircraft on. or closer to, prime (core) tracks, routes, and altitude/s resulting in increased system capacity and a more cost efficient flight operation. (Mid/Far-Term)
2.1.2 TECHNICAL APPROACH: ATP-20, in coordination with ATM-110, ATR-330, AFS-440, ATP-140, ARD-20, and ASE-6 (Oceanic Standards Team (OST)), in conjunction with ICAO, must evaluate and establish new longitudinal- and lateral-separation minima in oceanic airspace. The new separation minima must be supported by an acceptable target level of safety (TLS). FAA tests and demonstrations should be based on RNP criteria using GPS equipage and include satellite- and ground-based technology availability depicted in the
December 1992 FAA document '"Oceanic ATC Concept of Operations for 1995 at the New York. Oakland, and Anchorage Oceanic Centers." New separation standards may be
implemented at various stages as improved technology and/or ground enhancements become available.
2.1.2.1 Benefits and/or costs: User benefits will include cost savings due to more frequent assignment of flight operations on. or in close proximity to. optimum routes.
Append:/. 4 A4-3
7100,10 Appendix 4 12/27/93
tracks, and flight levels. Also, increased system capacity will permit additional flight scheduling capability.
2.1.2.2 Develop a test plan and/or demonstration: Results and progress to date of the ongoing ARD-20 Oceanic R&D Study No. 2.4 by the MITRE Corporation for achieving reduced oceanic separation standards should be included in tests and demonstrations developed to:
• Determine methodology for analyzing and developing two-way data link as the optimum mode for controller intervention. a
• Determine if conflict probe can be used as sole source for separation.
• Determine and establish new longitudinal- and lateral-separation minima.
• Separation minima should be reduced as system upgrades are fielded. For example, a reduction to 30 miles lateral and 5 minutes longitudinal should be considered for implementation in the mid-term with subsequent reductions based on mid- and far-term system upgrades.
• The new lateral-separation standard will be used to determine separation between tracks.
• Establish requirements for implementing cruise climb clearances.
• Ensure new separation minima are supported by an acceptable TLS.
• Develop strategy and timelines for implementing Initiative 2.1.
• Determine, while evaluating longitudinal-separation minima, if the application of DME-separatwMi minima currently being applied by ATC based on land NAVAID's could be applied based on GPS equipage.
• If required, determine cost/benefit to airspace user and ATC provider.
• Establish contingency procedures to ensure safety of flight is maintained in the event of a failure or reduction in system capability. Both airborne and ground failure or degradation must be considered.
ATP-20 and ATM-100 shall ensure results from test plans and/or demonstrations are incorporated into implementation plans and strategies.
2.1.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATM-100, ICAO, and ATP-140, shall ensure the development of procedures which will supplement ICAO Documents 4444 and 703® and FAA Order 7110.65 for use while conducting tests and demonstrations.
A4-6 Appenai- 4
7100.10 12/27/93 Appendix 4
Based on the results of joint FAA and ICAO-sponsomed tests, ATP-20 shall coordinate with ATP-140 to revise FAA Order 7110.65, Chapter 8, which contains longiteflmaland lateral-separation minima and separation between tracks information and procedures.
2.1.2.4 Training requirements for air traffic controllers: ATZ, in conjunction with ATP-20, shall determine what training curriculum for applying new procedures is required. ATZ shall ensure required dissemination and training are accomplished for revised separation standards and ATC procedures described in FAA orders, manuals, and directives. ~
2.1.2.5 Final coordination requirements: ATP-20 shall ensure, through ATP-140 and ATP-200, that all aeronautical charts and procedural and editorial changes are published and disseminated within the coordinated timeframes.
2.1.3 INITIATIVE CONSTRAINTS: The extended time requirements to accomplish required ICAO coordination will cause some delay in implementation. Also, in the near-term system, the lack of advanced oceanic automation and direct pilot/controller communications will limit the capacity of the system and will inhibit large separation reductions.
2 2 INITIATIVE: Exploit GPS to increase the use of a flexible offset oceanic track/route capability that will increase capacity on or near high density tracks/routes.
2.2.1 Because of reduced separation between tracks achieved by Initiative 2.1, new offset tracks/routes can be located in closer proximity to the core ATS routes. Offset tracks/routes established in this manner permit ATC service providers to increase system capacity and reduce mileage when reroutes are required. (Mid/Far-Term)
2.2.2 TECHNICAL APPROACH: ATP-20, in conjunction with appropriate ICAO panels, will establish ATC procedures to increase ATC usage of a flexible offset track/route system in oceanic airspace. ATP-20, in conjunction with ATM and ICAO, must initiate tests and demonstrations to evaluate and determine required procedures. Tests and demonstrations should be based on GPS equipage, the availability of other satellite-based technology, and ATC system integration of satellite- and ground-based technology.
2.2.2.1 Benefits and/or costs: Airspace users benefit by cost savings due to increased system capacity and reduction of undesirable and costly reroutes.
2.2.2.2 Develop a test plan and/or demonstration: Results and progress of the ongoing Oakland Center dynamic aircraft route planning trials, the ARD-20 Oceanic R&D Studies No. 2.2, DAKffffi and 4.1, End to End System Simulation, should be included in tests and demonstrations. The tests or demonstrations will be structured to:
• Consider using the trial amendment function Processing System to establish new routes.
of the Oceanic Display and
• Identify and develop improvements communications.
in air-to-ground and ground-to-ground
Appendix 4 A*7
Appendix 4 A*7
7100.10 Appendix 4 12Z27Z93
• Evaluate computer human interface.
• Develop ATC procedures for establishing ATS routes with associated offset routes.
• Develop implementation strategies and timelines for implementing this initiative.
• Develop contingency procedures to ensure safety of flight in the event of a failure or reduction in system capability. Both airborne and ground failure or degradation must be considered.
• As required, determine other costs/benefits to airspace user and ATC provider.
2.2.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATM, ICAO, and ATP-140, shall ensure the development of procedures which will supplement ICAO Document 4444 and FAA Order 7110.65 while conducting tests and demonstrations.
Based on the results of joint FAA and ICAO-spooscotsfl tests or demonstrations, ATP-20 shall coordinate with ATP-140 to revise FAA Order 7110.65.
2.2.2.4 Training requirements for air traffic controllers: ATZ, in conjunction with ATP-20, shall determine if a training curriculum for applying new procedures is
required. ATZ shall ensure required dissemination and training are accomplished for revised ATC procedures described in FAA orders, manuals, and directives.
2.2.2.5 Final coordination requirements: ATP-20 shall ensure, through ATP-140 and ATP-200, that all aeronautical charts and procedural and editorial changes are published and disseminated within the coordinated timeframes.
2.23 INITIATIVE CONSTRAINTS: There is a lack of advanced automation and limited communications capability for oceanic operation.
2 3 INITIATIVE: Establish ATC procedures for providing improved service to GPSequipped aircraft operating in a mixed environment of aircraft with and without GPS equipment.
2.3.1 During "transition, ""oceanic ATS providers must consider a "mixed environment" wherein GPS-equipped aircraft will be operating in the same airspace with non-GP$-tespiflr[psd aircraft. ATC will provide reduced separation minima between GPS-equipped aircraft and standard separation minima between all other aircraft. (Near- through Far-Term)
2.3.2 TECHNICAL APPROACH: ATP-20, in conjunction with ATM and ICAO, will establish procedures to provide improved ATC service for-GPS-equiffl&sfl aircraft in a mixed navigational equipage environment. ATP-20 with ATR-300 and ATM-100, in conjunction with other ATS providers, should initiate tests and demonstrations to evaluate and establish required procedures which permit reduced separation minima between GPS-equipped aircraft.
A44J Append:'. 4
7100.10 12/27/93 Appendix 4
Tests and demonstrations should include phases of incremental increases in GPS equipage, the availability of other satellite-based technology, and ATC system integration of satellite and enhanced ground-based technology.
2.3-2.1 Benefits and/or costs: Users will attain cost savings due to more frequent assignment of flight operations on, or in close proximity to, optimum routes, tracks, and flight levels. Also, increased system capacity will permit additional flight scheduling capability.
2.3.2.2 Develop a test plan and/or demonstration: The tests or demonstrations will be structured to evaluate and determine procedures for separating GPS-equipped aircraft from other GPS-equipped aircraft with reduced separation minima in the same area with noii<SQI8S«p«jippped aircraft. Non-GPS-equipped aircraft would be separated from GPS and non-GPS-equipped aircraft using standard separation minima. Through test and simulation:
• Evaluate the effect of separating GPS-equipped aircraft from other GPSequipped aircraft using a reduced separation minima.
• Evaluate the effects of assigning altitude strata for GPS-equipped aircraft only. Strata should be chosen which minimally affects non-GPS-eqm^pad aircraft.
• Determine feasibility of establishing routes for only GPS-equipped aircraft.
• Determine ways to minimize detrimental effects on non-GPS-eqa^flpftH aircraft.
• Consider that aircraft will be equipping with GPS over a phased period.
• Evaluate the conflict probe function as a controller aid.
• Standardize procedures between flight information regions/control areas (FIRK3E6)).
• Develop improved ATC intervention capability based on two-way data link.
• Develop strategies and timelines for implementing this initiative based on information derived from test and simulation.
• Revise or develop, as appropriate. ATC guidance material which contains procedures and separation minima to be applied by ATC service providers in a mixed-equipage environment.
• Review and develop, as necessary, contingency procedures to ensure safety of flight is maintained in the event of a failure or reduction in sy stem capability. Both airborne and ground failure or degradation must be considered.
Anpendix 4 A4-9
7100.10 Appendix 4 12/27/93
2.3.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATM, ICAO, and ATP-140, shall ensure the development of procedures which will supplement ICAO Document 4444 and FAA Order 7110.65 while conducting tests and demonstrations.
Based on the results of joint FAA and ICAO-sponsoied tests or demonstrations, ATP-20 shall coordinate with ATP-140 to revise FAA Order 7110.65.
2.3.2.4 Training requirements for air traffic controllers: ATP-20 shall coordinate with ATZ to ensure the development of a training curriculum for applying new procedures. ATZ shall ensure required dissemination and training have been accomplished for revised ATC procedures described in FAA orders, manuals, and directives.
2.3.2.5 Final coordination requirements: ATP-20 shall ensure through ATP-200 that all aeronautical charts and procedural and editorial changes are published and disseminated within the coordinated timeframes.
2.3.3 INITIATIVE CONSTRAINTS: Advanced automation capability and an improved ATC intervention capability are required.
234 INITIATIVE: Exploit GPS equipage to develop improved procedures to be utilized in transitioning to a full RNP oceanic airspace.
2.4.1 During the transition to a phase of "sole means," different RNP classifications may exist in oceanic airspace. Each regional oceanic airspace may have different separation standards based upon the RNP classification. (Mid/Far-Term)
2.4.2 TECHNICAL APPROACH: ATP-20, in conjunction with ATM and other ATS providers, should initiate tests and demonstrations to achieve maximum benefit from GPS equipage during this period and to standardize ATC procedures to be applied between FIRJOCA's based on regional RNP oceanic airspace classification and associated separation standards. Tests and demonstrations should include the availability of other satellite-based technology and ATC system integration of satellite and enhanced ground-based technology.
2.4.2.1 Benefits and/or costs: Airspace users benefit by cost savings due to increased system capacity and enhanced scheduling capability.
2.4.2.2 Develop a test plan and/or demonstration: The tests or demonstrations will be structured to achieve maximum benefit from GPS equipage through the development of standardized procedures between FIRCHEffi^s. Tests and/or demonstrations will be designed to:
• Evaluate the application of an advanced conflict probe function to aid the controller in conflict detection and resolution.
• Establish standardized ATC procedures between FIR"s for providing ATC service in different RNP environment/s.
A44S) Appendix 4
71011.10 12/27/93 Appendix 4
• Generate information for ATS providers to aid in the identification of resource requirements.
• Develop implementation strategies, plans, and time lines needed for implementation.
• Develop improved ATC intervention capability.
2.4.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATM, ICAO, and ATP-140, shall ensure the development of procedures which will supplement ICAO Document 4444 and FAA Order 7110.65 for use while conducting tests and demonstrations.
Based on the results of joint FAA and ICAO-sponsovad tests or demonstrations, ATP-20 shall coordinate with ATP-140 to revise FAA Order 7110.65..
2.4.2.4 Training requirements for air traffic controllers: ATP-20 shall coordinate with ATZ to ensure the development of a training curriculum for applying new standards and procedures. ATZ shall ensure required dissemination and training are accomplished for revised ATC procedures described in FAA orders, manuals, and directives.
2.4.3 INITIATIVE CONSTRAINTS: Advanced automation and an improved ATC intervention capability needs to be developed and fielded.
2 5 INITIATIVE: Restructure special use airspace (SUA) to accommodate a GPS-based oceanic en route system:
2.5.1 Aircraft equipped with GPS are able to navigate more accurately within and around SUA. Because GPS-equipped flights are able to remain clear of the SUA, the protection buffer around the SUA can be reduced. (Mid/Far-Term)
2.5.2 TECHNICAL APPROACH: ATP-20, in conjunction with ATM-400, will determine what SUA will be affected by the implementation of direct and flexible GPS routings. ATP-20 and ATM, through coordination with appropriate DOD authorities, shall initiate a study based on GPS equipage to review SUA requirements and provide recommendations for modifications, if possible. The study shall also include the feasibility of establishing/modifying coordination procedures required to establish dynamic rerouting through SUA.
2.5.2.1 Determine benefits and/or casks: Airspace user benefits will be cost savings due to assignment of flights in airspace not currently available.
2.5.2.2 Develop a test plan and/or demonstration: ATP-20 and ATM. in conjunction with appropriate DOD authorities, will jointly develop study objectives. The study will be designed to determine feasibility of:
• Reducing size of SUA.
Apperdi !• A431
7100.10 i^penckx 4 12/27/!93
• Reducing buffer protecting SUA.
• Establishing/modifying coordination procedures.
• Identifying controller and pilot aids to enhance aircraft capabilities to navigate around SUA.
2.5.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-28D shall ensure a review is conducted to identify all FAA orders, manuals, and directives which may require both editorial and procedural changes.
Based on the results of the study, and following coordination and agreement with DOD authorities, ATP-20 shall coordinate with ATM and ATP-140 to revise FAA Orders 7110.65 and 7610.4.
2.5.2.4 Training requirements for air traffic controllers: ATP-20 shall coordinate with ATZ to ensure the development of a training curriculum for implementing the new procedures. ATZ shall ensure required dissemination and training are accomplished for revised ATC procedures for operations in and around SUA described in FAA orders, manuals, and directives.
2.5.2.5 Final coordination requirements: ATP-20 shall ensure through ATP-140 and ATP-200 that all aeronautical charts and procedural and editorial changes are published and disseminated within the coordinated timeframes.
2.5.3 INITIATIVE CONSTRAINTS: One key constraint that must be dealt with is notification issues that are characteristic in the development of all SUA. A notification infrastructure will need to be in place to notify airspace users that a part of a dynamic SUA is active or has moved. This will require adaptation of the notice to airman (NOTAM| system and require an enhanced interface between the controlling agency (FAA facility) and the using agency. Dynamic airspace will also require expanded studies to consider the impact flexible movement of DOD activities has on shared use of airspace by differing weapon systems.
2M INITIATIVE: Establish an altitude stratum and track structure in oceanic airspace designated for GPS-equtpped aircraft and update the tracks based on GPS positional information.
2.6.1 Based on air traffic demand during peak traffic periods in core traffic areas, it may be advantageous to establish tracks and/or an altitude stratum available to only GPS-equipped flights. As weather reports derived from airborne flights navigating the routes become available, the route can be amended to take advantage of changing conditions.
(Mid/Far-Term)
2.6.2 TECHNICAL APPROACH: ATP-20, in coordination with ATR-330 and ATM-110, independently and in conjunction with ICAO, shall take steps to initiate experimentation, simulation, tests, and demonstrations to evaluate and determine the feasibility of an altitude stratum and/or track structure in oceanic airspace designated for GPS-equipped aircraft only.
A4-12 Append
7100.10 12/27/93 AppauJM
This initiative is very similar to the one in paragraph 2.3 except special track and/or altitude strata for GPS-equipped aircraft would only be implemented during peak traffic periods. The following considerations, addressed in paragraph 2.3, need not be duplicated:
• ATC and pilot procedures.
• Monitoring criteria.
• Contingency procedures.
2.6.2.1 Benefits and/or costs: Users will benefit due to assignment of flights on, or closer to, the most optimum route and receive increased flight scheduling capability. The ATS providers benefit by providing improved services and increasing system capacity on user preferred routingSu
2.6.22 Develop a test plan and/or demonstration: ATP-20, with ATR-300 and ATM-100, independently and in conjunction with ICAO, shall take steps to initiate experimentation, simulation, tests, and demonstrations to determine the feasibility of an altitude stratum and/or track structure in oceanic airspace designated for GPSequipped aircraft only during peak traffic periods. These tests and demonstrations will be designed to:
• Establish altitude stratum for GPS-equipped aircraft only.
• Establish track structure for GPS-equipped aircraft only.
• Determine ATC and pilot procedures.
• Consider separation standards.
• Determine traffic management procedures.
• Determine process for implementing and amending routes based on "real time" weather and position data received from airborne GPS-equipped flights.
• Determine effect on non-GPS-equipped aircraft.
• Determine controller intervention requirements.
2.6.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATM. ICAO, and ATP-140, shall ensure the development of procedures which will supplement ICAO Documents 4444 and 703® and FAA Order 7110.65 if tests and demonstrations are required.
Based on the results of FAA or joint FAA- and ICAO-sponsoiisii experiments, simulations, tests, or demonstrations, ATP-20 shall coordinate with ATP-140 to revise FAA Order 7110.65.
Appendix 4 A4-13
Appendix 4 A4-13
7100.10 Appendix 4 12/27/93
2.6.2.4 Training requirements for air traffic controllers: ATP-20 shall coordinate with ATZ to ensure the development of a training curriculum for implementing the new procedures. ATZ shall ensure required dissemination and training are accomplished for revised ATC procedures in FAA orders, manuals, and directives.
2.6.2.5 Final coordination requirements: ATP-20 shall ensure, through ATP-140 and ATP-200, that all aeronautical charts and procedural and editorial changes are published and disseminated within the coordinated time frames.
2.6.3 rMTIAnVE CONSTRAINTS: Advanced automation and impi6ved controller intervention capability are needed.
A4-14 Appendix
* OBJECTIVE 2.0 EXPLOIT THE USE OF GPS TO ESTABLISH A MORE EFFICIENT OCEANIC ATC SYSTEM
PLAN AEfltogy
FYHB881 1 2 3 4 Ftmm 1 2 3 4 FYIfflHH 1 2 3 4 Ftmm i 2 3 4
FYlfiESn 1 2 3 4 FYittffla 1 2 3 4 FY2tam 1 2 3 4 FYamii i 2 3 4
FY23D8H21 1 2 :) 4
FY21W1® 1 2 3 4 I
2.W Use GPS to Establish an Efficient OceanicATC System
2.1 Reduce Separation Standards sr
2.1 Reduce Separation Standards sr
i i i i I i i , I , I I i i • i Cost/Benefit Study L\
1 r7 Develop Tests and/or Demonstrations L\^
A V A7
Procedural Changes
Training Requirements I^
J i^
r
7 7
2.2 Develop Flexible Offset Oceanic Tracks/Routes i k
> '
Cost/Benefit Study
Develop Tests and/or Demonstrations
2.2 Develop Flexible Offset Oceanic Tracks/Routes i k
ProcedunttChanges
I \
r
V
JL
7
J
1 V r
r -\ 7
V7
LEGEND: OBJECTIVE M M
Training Requirements
/ v^
V7 INITIATIVE TECH.APP.
A
A
y
2.3 Establish Procedures for \ r Mixed Aircraft Navigation A k 1 Environment
Cost/Benefit Study
/
I A
V7 Develop Tests and/or Demonstrations z'^
A V \ 7
2.3 Establish Procedures for \ r Mixed Aircraft Navigation A k 1 Environment
Procedura IChanges
Training Requirements
/ y
I
, r1
•A
_v_
S
* OBJECTIVE 2.0 - EXPLOIT THE USE OF GPS TO ESTABLISH A MORE EFFICIENT OCEANIC ATC SYSTEM
PIAN ACTIVITY
FY 1994 1 2 3 4 FY 1995 1 2 3 4
FY 1996
1 2 3 4 FY 1997 1 2 3 4 FY 1998 1 2 3 4
FY 1999
1 2 3 4 FY 2000
1 2 3 4 FY 2001
PIAN ACTIVITY
1 2 3 4
FY 2002
1 2 3 4 FY 2003
1 2 3 4 p
2.0 Oceanic (continued)
2.4 Develop Standards to Transition to FullRNP
Cost /Benefit Study
Develop Tests and/or Demonstrations Procedural Changes
Training Requirements
J
L
l —
\ A V7
1 L ^
r
A-
r7
I^
A
V
T
5 v; V
2.5 Restructure Special Use Airspace
2.5 Restructure Special Use Airspace
Cost/Benefit Study
Develop Tests and/or Demonstrations Procedural Changes
Training Requirements
A
I^
\
A7
AH
I
v
\ r
7
\ r
-7T
2.6 Develop GPS Altitude and Track Structure
Cost/Benefit Study
Develop Tests and/or Demolish jefaiui Procedural Changes
Training Requirements
t t
/V
L\
2.6 Develop GPS Altitude and Track Structure
_i
- A 7
LJ
v7
LT~
1
*
^
.r; v
•a
&
7100.10 1212im Appendix^
3 J EXPLOIT THE CAPABILITY OF GPS TO ESTABLISH A MORE EFFICIENT DOMESTIC EN ROUTE STRUCTURE.
The following initiatives outline a strategy to take advantage of the benefits GPS provides to improve the overall efficiency of the en route ATC system. While not specifically addressed in each initiative, plan implementers must also monitor and, if necessary, establish requirements to merge parallel advances in surveillance techniques to fully take advantage of GPS as it applies to the future CNS environment. Examples of these aspects of surveillance include ADS. pseudo-ADS, and the individual components of these systems such as data link, controller displays, communication systems, etc. Advances in AAS, Initial Sector Suite System (ISSS)., ATN, and similar Air Traffic initiatives must also be considered. Without application of these collateral technologies, the benefits of the enhanced navigational accuracy of GPS cannot be optimized.
H INITIATIVE: Restructure existing airway system to accommodate GPS-based direct routings.
3.1.1 Routing need to be developed that will allow GPS-equipped aircraft to operate on routes that are not dependent on ground-based NAVAID'S- The present airway system is based on airways established between ground-based NAVAID's, In many instances, these airways are doglegged because of the geographical locations of NAVAID's.. GPS routimgB are not limited by terrestrial navigational aids and can be direct to any point on the earth.
(Mid/Far-Term)
3.1.2 TECHNICAL APPROACH: Air Traffic will develop an efficient GPS-based direct route structure. The steps that must be taken to realize this initiative include, but are not limited to, cost'benefit studies, coordination, test/demonstrations, data review, and procedural development, as described below.
3.1.2.1 Benefits and/or costs: ATP-2D shall ensure that an analysis is conducted determining what additional benefits or costs may be derived from this initiative other than those listed below:
• The user will realize cost savings resulting from less fuel consumption when flying the shorter, more direct routes.
• The service provider will realize a more efficient system when it is comprised of direct and/or random GPS routings..
3.1.2.2 Develop a test plan/demonstration: ATP-20 should ensure that coordination with AFS and AVM is accomplished to determine if criteria for GPS airway and route structure have been developed. ATP-20 shiM ensure:
• ATM determines where the test routings would be most advantageous. Consideration must be given to traffic complexity and impact on the NAS.
ATR determines that all air traffic requirements have been met before developing any GPS-direct routings test/demonstrations.
Appendix 4 A4H7
Appendix 4 A4H7
7100.10 Appendi/ 4 12Z27Z93
• All offices of primary interest establish timelines for training, publishing/printing, dissemination, and the effective dates of any new routings, procedures, or editorial changes to FAA orders, manuals, and directives.
• Interim procedures and recommended changes are developed to support the test/demonstration.
• The Fiji "proof of concept" tests are reviewed.
Regional Air Traffic Divisions, in coordination with ATP-20, shall develop test plans and select test sites within their respective regions. An evaluation shall be made of the equipment, resources, and financing that will be necessary to support the test/demonstration. This evaluation will be the responsibility of the regional Air Traffic Divisions.
Regional Air Traffic Divisions shall evaluate the collected results of the test/demonstration. The results will be used in developing air traffic procedures and routings that will be necessary to support this initiative.
3.1.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20 shall coordinate with ATP-100 and ATM-lOO/ZOOIfflul) to ensure that all necessary ATC procedures and editorial changes to the FAA orders, manuals, and directives are developed using the data collected during the test/demonstrations.
3.1.2.4 Training requirements for air traffic controllers: ATP-20, through the offices of primary interest, will forward any procedural changes to ATZ-100..
If necessary, ATZ-100 shall develop and disseminate a training curriculum on the new procedures within the previously established timeframes. Training will be completed within previously established timeframes.
3.1.2.5 Final coordination requirements: ATP-20 shall ensure, through ATP-200, that all procedural and editorial changes have been published and disseminated v\ ithin the coordinated timeframes.
3.1.3 INITIATIVE CONSTRAINTS: The user must be made aware that at IOC, GPS will not provide unlimited services. Predictable outages will occur in certain areas which could result in the requirement for other forms of navigational equipment. Also, the newly developed airway structure will cause environmental evaluations to be conducted.
3b2 INITIATIVE: Exploit the use of GPS to reduce separation standards in domestic en route airspace.
3.2.1 Nonradar separation standards are presently based on air- and groimuikimviigatnnaaiequipment accuracy. The accuracy of GPS exceeds that of any present ground-based en route navigational system in use and may allow the reduction of nonradar separation standards between GPS-equipped aircraft. Using the results of GPS-accuracy and GPS-intogrtty tests, an
A4-18 A^paHftJ
7100.10 12227?93 Appendix 4
analysis shall be made to determine what separation standards will be used in domestic en route airspace. Included in this analysis will be the possible reduction of minimum obstruction clearance altitudes (MOO$) and minimum en route altitudes (MEA) and the eventual elimination of minimum reception altitudes (MRA). (Mid/Far-Term)
3.2.2 TECHNICAL APPROACH: ATP-20 shall determine if the use of GPS can reduce separation standards for operations within domestic en route airspace. This will be accomplished through cost/benefit studies, coordination, test/demonstrations, and procedural development as indicated below.
3.2.2.1 Benefits and/or costs: ATP-20 shall ensure that an analysis is conducted to determine the benefits or costs that may be derived from this initiative which include, but are not limited to:
• Removing the user's requirement of carrying redundant navigational equipment aboard aircraft.
• Eliminating the user's need of cross-referencing equipment to make cockpit management easier.
• Increasing the service provider's capacity.
3.2.2.2 Develop a test plan/demonstration: ATP-20 shall ensure, through coordination with AFS/AVN, separation standards criteria for operations within GPS domestic en route airspace. This also includes criteria for required obstruction clearance (ROC). ATP-20 shall ensure that:
• ATM determines where the testing of GPS operations would be most advantageous. Consideration must be given to traffic complexity and impact on the NAS.
• Collision risk modeling is completed by AFS.
• Coordination with ATR is accomplished.
• Coordination with ATZ-100, ATP-100, and ATP-200 is accomplished in establishing timelines for training, publishing/printing, dissemination, and effective dates of any new ATC procedures or editorial changes to FAA orders, manuals, and directives.
• Interim procedures and recommended changes to be used in a test/ demonstration are developed.
Regional Air Traffic Divisions may, in coordination with ATP-20, be asked to develop test plans and select test sites within their regions to analyze GPS operations in domestic en route airspace.
Regional Air Traffic Divisions/AluP-SD shall analyze the results of the test/demonstrations. The collected data of the test/demonstrations will be used in
Appendi.. 4 A4419
7100.10 12Z27293
developing the necessary separation standards or the reduction of present separation standards which will allow GPS-equipped aircraft to operate in domestic en route airspace within the NAS.
3.2.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20, in coordination with ATP-100, shall ensure that all necessary ATC procedures and editorial changes to the FAA orders, manuals, and directives are developed to support this initiative.
3.2.2.4 Training requirements for air traffic controllers, ATP-20, through the offices of primary interest, shall forward any ATC procedural changes to ATZ-100.. If necessary, ATZ-100 shall develop and disseminate a training curriculum on the new procedures within the previously established timeframes. Training will be completed within established timeframes.
3.2.2.5 Final coordination requirements: ATP-20, through ATP-200, shall ensure that all procedural and editorial changes are published and disseminated within the coordinated timeframes.
3.2.3 INITIATIVE CONSTRAINTS: This initiative should allow more aircraft to enter the system which could exceed the system's current capacity. If the capacity is exceeded, additional personnel and equipment resources may be required.
3 3 INITIATIVE: Develop flexible alternate/parallel route capability and procedures that will relieve saturation on high density routes.
3.3.1 In the present day airway structure, predicated on ground-based navigational aids, high density areas become saturated causing extensive and costly delays. Flexible alternate/parallel routes and procedures need to be developed by Air Traffic now in anticipation of GPS being used as a primary system for IFR en route navigation. (Mid-Term)
3.3.2 TECHNICAL APPROACH: Flexible alternate/parallel routes, along with ATC procedures, will be developed by Air Traffic for identified high density areas to accommodate GPS-equipped aircraft. This initiative will be accomplished by cost/benefit studies, coordination within and outside of the FAA, establishing interim procedures, testing/demonstrating, gathering of data, and developing ATC procedures. The individual steps to accomplish this technical approach are listed below.
3.3.2.1 Benefits and/or costs: ATP-20 shall ensure that an analysis is conducted to determine what additional benefits or costs may be derived from this initiative other than those listed below:
• An increase in system capacity and a significant reduction o f delays.
• A cost savings to the user due to the reduction in system delays.
3.3.2.2 Develop a test plan/demonstration: ATP-20, through coordination with AFS and AVN, shall determine criteria for GPS airways, route structures, and ROC, ATP-20 shall ensure:
A4M0 Append?. 4
7iog.it 12Z27Z93 Appendix 4
• ATM determines where test routings would be most advantageous. Consideration must be given to traffic complexity and impact on the NAS.
• Coordination with ATR is accomplished.
• Coordination with ATZ-100, ATP-200, and ATP-100 is accomplished in determining timelines for training, publishing/printing, dissemination and the effective dates of any new routings, ATC procedures, or editorial changes to FAA orders, manuals, and directives.
y • Interim procedures and recommended changes are developed to be used in any test/demonstrations.
• The Fiji "proof of concept" tests in route structure are reviewed to determine applicability to this initiative.
Regional Air Traffic Divisions, in coordination with ATP-20, may be requested to develop test plans and select test sites within their regions. These tests will include developing flexible alternate/parallel routings and any ATC procedures necessary to support this initiative. An evaluation will be made of the equipment, resources, and financing necessary to support the test/demonstration.
Regional Air Traffic Divisions, in coordination with ATP-20, shall evaluate the collected data of the test/demonstrations. The results of the tests will be used in developing flexible alternate/parallel routings and ATC procedures to support this initiative.
3.3.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20 shall ensure, through ATP-100, ATM-100, and ATM-200, that all necessary ATC procedures and editorial changes to the FAA orders, manuals, and directives are developed to support this initiative.
Regional Air Traffic Divisions shall develop flexible alternate/parallel routimgs for their particular regions using the results of the tests and prescribed GPS criteria for establishing routings.
3.3.2.4 Training requirements for air traffic controllers: ATP-20, through ATP-100, ATM-100, and ATM-200, will forward any procedural changes to ATZ-100. If necessary. ATZ-100 shall develop and disseminate a training curriculum on the new ATC procedures within the previously established timeframes. Training will be completed prior to implementation.
3.3.2.5 Final coordination requirements: ATP-20, through the offices of primary interest, shall ensure all procedural and editorial changes are published and disseminated within the coordinated timeframes.
3.3.3 INITIATIVE CONSTRAINTS: Allowing additional aircraft into the system may exceed system and sector capacity which would require additional resources.
apperdi/ 4 AJM1
7100.10 Appendix 4 12Z27293
3.4 INITIATIVE: Restructure SUA to accommodate a GPS-based en route system.
3.4.1 The advent of a GPS-based NAS, where the current system of VORUfoE&Hedd '"victor" airways and jet routes is replaced by more direct and flexible GPS-based routes, will have an impact on the current SUA structure. GPS-based routes have the potential to enhance flexibility, to the extent that routes will be more direct and can be adjusted based on current conditions; for example, adverse weather, en route winds, flow restrictions, etc. This affords the opportunity for creation of dynamic airspace, primarily military operations areas (MOA) and air traffic controlled assigned airspace (ATCAA) which could be moved away from the en route flow. Military aircraft would no longer use very high frequency omnidirectional tactical air navigation (VORTAQ and tactical air navigation (TACANj) for area orientation but would use GPS to provide orientation and accurate area identification. The potential benefits would include better airspace utilization, less spill-outs, lower frequency of airspace denials, and more efficient and fuel saving routes for en route traffic. Similar benefits, although not as substantial, will be possible with restricted areas, warning areas, and military training routes that are dependent on the nature of the military activity being conducted. The advantages, GPS offers SUA management should also be merged into development of new SUA management tools, to include the DOD Military Airspace Management System (MAMS!) currently under development. The necessity of automated near-real-time airspace management tools like MAMS will be imperative to maximize the benefits offered by GPS within SUA. <Mid/Far-T«nrd)
3.4.2 TECHNICAL APPROACH: A significant portion of SUA could affect the future optimization of a GPS-based airspace structure in the NAS. The FAA and the DOD must conduct a joint analysis of all SUA to determine where SUA will adversely affect a GPS-based route structure and how to reduce or otherwise minimize the effect. This technical approach will be accomplished through environmental analyses, coordination, and procedural development listed below.
3.4.2.1 Benefits and/or costs: ATP-20 shall ensure that an analysis is conducted in concert with ATM and the DOD to determine and quantify any benefits for the user and the service provider.
3.4.2.2 Develop a test plan/demonstration: ATP-28L ATM, DOD, and the regional Air Traffic Divisions shall determine, through an analysis, the impact to SUA by the implementation of flexible, direct, and alternate/parallel routim^B. This effort shall be coordinated with all locally affected ATC facilities, military units, local FAA representatives/liaison officers where assigned, and the air route traffic control center (ARTCQ having jurisdiction over the affected airspace.
Regional Air Traffic Divisions shall negotiate all proposals of change to SUA as directed in accordance with FAA 7400J3B.
3.4.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: If necessary, ATP-20 shall ensure, through ATP-lOSi, that any ATC procedural development is accomplished.
3.4.2.4 Training requirements for air traffic controllers: ATP-2SB, through ATP-MBj, will forward all recommended procedures to ATZ-MH). If necessary.
A3-Z2 PpDendi 4
7100.10 12/27/93 Appendix 4
ATZ-100 will develop and disseminate a training curriculum on the new ATC procedures within the previously established time frames. Training will follow at a rate commensurate with procedure implementation.
3.4.2.5 Final coordination requirements: ATP-20 shall ensure that all coordination is accomplished to allow the implementation of this initiative consistent with the milestones and requirements stipulated within this plan.
3.4.3 INITIATIVE CONSTRAINTS: Two key constraints are notification and environmental issues characteristic in the development of all SUA. A Sattiification infrastructure will need to be in place to notify airspace users that a piece of dynamic SUA is active or has moved. This will require modification of the NOTAM system and will also require an enhanced interface between the controlling and using agency. Dynamic airspace will also require expanded environmental studies to consider the impact that flexible movement of DOD activities has on the environment combined with the impact of shared use of airspace by differing weapon systems.
&5 INITIATIVE: Establish an altitude stratum in domestic airspace designated for GPSequipped aircraft.
3.5.1 Designating altitudes that only GPS-equipped aircraft may operate within will establish a restricted environment in which to conduct evaluations of GPS accuracy. Testing of newly developed ATC procedures can be accomplished between GPS-equipped aircraft while allowing these aircraft early GPS use. The early usage of GPS should accelerate voluntary equipage and lessen controller workload by segregating GPS-equipped aircraft in the initial stage.
(Mid-Term)
3.5.2 TECHNICAL APPROACH: Designate an altitude stratum that will allow GPSequipped aircraft the benefit to operate in an environment providing the most direct routings without interference from non-GPS-equipped aircraft. This altitude stratum will allow the service provider the opportunity to test newly developed GPS ATC procedures. To accomplish this initiative requires that consideration be taken in the areas of cost/benefit analysis, coordination, test/demonstrations, and procedural development. These are but a few of the steps necessary to complete this initiative. The complete technical approach is listed below.
3.5.2.1 Benefits and/or costs: ATP-2D shall ensure that an analysis is conducted determining what additional benefits or costs may be derived from this initiative other than those listed below:
• The ability of the service provider to conduct procedural testing within a sterile environment.
• Early use for appropriately equipped aircraft.
• The user being allowed to operate on routes not made up of ground-based navigational aids which limit navigational ability.
A4M3
7100.10 Appendix 4 12227193
• Flights operating on more direct routes saving time, fuel, and operating expenses.
3.5.2.2 Develop a test plan/demonstration: ATP-20 shall ensure that coordination with AFS and AVN is accomplished in determining criteria for GPS-sepacatiom standards to include criteria for ROC. ATP-20 shall ensure:
• Coordination with ATM is accomplished to determine what altitude stratum (high, low, or both) would be most advantageous for test/demonstrations of GPS-separation standards. Consideration must be!£jivean to traffic complexity and impact on the NAS..
• Coordination with ATR is met.
• Coordination with ATP-100, ATP-200, and ATZ-100 is accomplished in determining timelines for training, publishing/printing, dissemination, and the effective dates of any new ATC procedures, or editorial changes to FAA orders, manuals, and directives.
• Interim procedures and recommended changes to FAA orders, manuals, and directives are developed that may be used in any test/demonstrations.
• The Fiji "proof of concept" tests results are reviewed to determine if they can be applied to this initiative.
Regional Air Traffic Divisions, in coordination with ATP-20, may be required to develop test plans, select test sites, and altitude stratums within their regions. These tests will include the application of any recommended GPS-separation standards that may have been developed in previous initiatives.
Regional Air Traffic Divisions shall conduct an evaluation of equipment, resources, and financing to support the test/demonstration.
Regional Air Traffic Divisions, in coordination with ATP-20, shall evaluate the collected data of the test/demonstrations. The results of the tests will be used in developing the necessary ATC procedures to be used to support this and possiblyother initiatives.
3.5.2.3 Develop necessary ATC procedural and/or editorial changes required to support the initiative: ATP-20 shall ensure, through ATP-100, that all necessary ATC procedures and editorial changes to the FAA orders, manuals, and directives are developed to support this initiative.
3.5.2.4 Training requirements for air traffic controllers: ATP-20, in coordination with the offices of primary interest, will forward all recommended procedures to ATZ-IOQ. If necessary, ATZ-100 will develop and disseminate a training curriculum on the new ATC procedures within the previously established timeframes. Training will be completed within established timeframes.
A4-24 Appendix 4
7100.10 12/27/93 Appends 4
3.5.2.5 Final coordination requirements: ATP-20 shall ensure, through ATP-200, that all procedural and editorial changes are published and disseminated within the coordinated timeframes.
3.5J INITIATIVE CONSTRAINTS: None anticipated.
?pperd_ A445
I
.•2
S OBJECTIVE 3.0- EXPLOIT THE CAPABILITY OF GPS TO ESTABLISH A MORE EFFICIENT EN ROUTE STRUCTURE
PLAN ACTIVITY
PLAN ACTIVITY
3.0 DOMESTIC EN ROUTE
3.1 Restructure Airways
Cost/Benefit Study
Develop Tests and/or Demonstrations
Procedural Changes
TrainiigRequirements
3.2 Reduce Separation Standards
Cost/Benefit Study
Develop Tests and/or Demonstrations Procedural Changes
Training Requirements
3.3 AltemaHtrwHnWI Routes
3.3 AltemaHtrwHnWI Routes
Cost/Benefit Study
Develop Tests andrbr Demonstrations
Procedural Changes
Training Requirements
£
FYDSBM FY1SS5 FY1HS6 FY 1997 FY1H98 FYBHN FYamo FY2ara» n a n a Fvanra
1 2 3 4 1 2 3 4 1 2 3 4 1 ;> 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 ? a '[ f 2:3 4 1 2 3 *
l r A I" "
- V T ZN 7
AH
A - F
7 £
JF
/V
s
V f\ y I
/V £ 5~ -A- -
Jc= • IL. y r"
,i L -* 7
P n FMns V7 } OBJECTIVE • • • • . \ >' ..
Ar*"h-J J INITIATIVE « « ^ • % * r / l' " y
TECH APR » A~^
TECH APR » A~^
1 OBJECTIVE 3.0 - EXPLOIT THE CAPABILITY OF GPS TO ESTABLISH A MORE EFFICIENT EN ROUTE STRUCTURE
PLAN ACTIVITY
3.0 DOMESTIC EN ROUTE (continued)
3.4 Restructure Special Use Airspace
Cost /Benefit Study
Develop Tests and/or Demonstrations Procedural Changes
Training Requirements
3.5 Develop GPS Altitude Stratum
3.5 Develop GPS Altitude Stratum
Cost/Benefit Study
Develop Tests andtar Demonstrations Procedural Changes
Training Requirements
F Y I H M
I 1 [2 3: 4
FYTJ99S
[1.2134 4
FYiffiBBa wmml
i 2 :33 ;4 ft 2 3 4 FYifieeen I 2 3 4
FYiaawt
1 a 3 4 1
FY2HBM
1 2 3 4
FYfflffiltl
1 2
FYfflBDEl
3 i l i l l
FYHMfflll |T *:«.•!
zfl
JL
( [1
r
\ I
7
\ .\ r
\
J z.
7 f1I J
^
r
r
7
I \
A V1iL
7 ( r A
/ V
V
V7
L.S -
l r
,
>
I
7100.10 dix 4 12Z27Z93
Am EXPLOIT THE USE OF GPS FOR TERMINAL AIR TRAFFIC CONTROL OPERATIONS.
The following initiatives outline a strategy to take advantage of the benefits GPS provides to improve the overall efficiency of the terminal ATC system. While not specifically addressed in each initiative, plan implementers must also monitor and, if necessary, establish requirements to merge parallel advances in surveillance techniques to fully take advantage of GPS as it applies to the future CNS environment. Examples of these aspects of surveillance include ADS, pseudo-ADS, and the individual components of these systems, such as data link, controller displays, communication systems, etc. Advances in AAS, ISSS, ATN, and similar Air Traffic initiatives must also be considered. Without application of these collateral technologies, the benefits of the enhanced navigalionril accuracy of GPS cannot be optimized.
4 1 INITIATIVE: Establish a GPS-based terminal route structure to include IFR, VFR, and SVFR criteria.
4.1.1 The increased navigational accuracy of GPS opens new avenues for more efficient management of the terminal airspace through the creation of GPS-based direct terminal routes. These direct routes, both VFR and IFR, will provide user aircraft the ability to transit through and around terminal airspace using published or randomly assigned point-to-point and airportto-airport routings via onboard aircraft navigation. The inherent flexibility of GPS will provide easier VFRJSVHR user access while not disrupting the IFR traffic flow. In addition, assigned routings will reduce vector requirements and not be dependent on placement of ground-based NAVART&. (Mid/Far-Term)
4.1.2 TECHNICAL APPROACH: "Proof of concept" testing conducted in Fiji validated the direct routing concepts that can be derived from a GPS-based terminal airspace. Based on those assumptions, terminal facilities and en route facilities with terminal responsibilities, under the direction of regional Air Traffic Divisions, will perform local airspace analyses to determine where the specific facilities can optimize airspace design to take advantage of the enhanced capabilities of GPS.
4.1.2.1 Benefits and/or costs: Potential benefits of developing a GPS-based terminal route structure include, but are not limited to:
• Reducing or eliminating vector requirements and overcoming the inherent limitations of ground-based NAVAID's which currently define the route structure.
• Increasing use of secondary airports.
• Enhancing weather avoidance capability .
• Special use purposes, such as more efficient ingress/egress routes to military training areas and routes, integrating special requirements of law enforcement, and clear identification of temporary flight restriction areas.
• Easier and more accurate identification of controlled airspace by the users.
A*-28 ADDeiaix 4
7100.10 12Z27Z93 Appendix 4
4.1.2.2 Develop a test plan/demonstration: A test plan shall be developed by ATP-20, in coordination with ATP, ATM, ATR, regions, and other services within FAA (AFS, AVN, AAF, etc.). ATP-20 will exercise managerial oversight to ensure that the plan is properly coordinated and that the plan identifies required staffing, appropriate test/demonstration procedures, and locations. The test plan should include but not be limited to the following:
• A cost/benefit analysis will be performed by ATP-20 to validate the anticipated benefits and estimate the potential costs, considering not only monetary and personnel resources, but operational periaftks/fdfnotsacy as well.
• The next actions in this initiative will be comprised of airspace analyses used primarily to determine the optimum route structure within the terminal airspace. The Fiji "proof of concept" test results may be used as a modeling tool for further testing of candidate airspace structures. FAA regions will direct their terminal facilities to perform airspace analyses to determine where GPS-based terminal routes could improve the efficiencies of traffic flow in and around their specific terminal areas. Regional Air Traffic Divisions will then provide regional implementation plans for establishment of a GPS terminal route structure for locations within their regions.
• Implementation of terminal routes based on GPS navigation will occur during the "transition"' phase at an incremental rate consistent with user equipage and airspace redesign. Consideration must be given to the use of GPS-enhanced FMS and future domestic application of ADS.
• Procedural changes and development of training curriculum for the controller force will be an ongoing process dependent upon the rate of user equipage and the commensurate rate of conversion to a GPS-based airspace.
4.1.2.3 Develop netastary ATC procedural and/or editorial changes required to support the initiative: Using the results of the test/demonstrations. ATP-20 will ensure changes to all FAA orders, manuals, and directives are forwarded to ATP-100. In addition, these changes will be forwarded to ATP-200 for publication with sufficient lead time to meet planned navigational and equipment implementations. This will be accomplished in an incremental and evolutionary fashion consistent with advances in aircraft equipage, as well as ATC facility and procedural enhancements.
4.1.2.4 Training requirements for air traffic controllers: ATP-20 will ensure coordination with ATZ to develop those recommended changes to procedures and directives resulting from these tests in sufficient time to develop and provide the required training directives and curriculum to the appropriate regional offices, field sites, and the FAA Academy.
4.1.2.5 Final Coordination Requirements: ATP-20 will maintain contact with all tasked offices and provide overall managerial oversight to ensure the task milestones in this initiative are met. Continuous coordination with ATP-120 shall be maintained to ensure all aspects of the terminal ATC environment are addressed.
Appendix 4 A439
Appendix 4 A439
7100.10 Appendix 44 12/27/93
4.1.3 INITIATIVE CONSTRAINTS: The flexible aspects of GPS routings in the terminal environment will expand controlled airspace, both horizontally and vertically. The potentially extensive environmental impact studies caused by creation of routes over areas not previously subject to significant air traffic must be addressed in the airspace analyses. The anticipated increases in airspace capacity and benefits from the establishment of GPS terminal routes cannot be realized without parallel efforts to increase airport capacity through advances in airport surface surveillance criteria and similar capacity enhancements stipulated in this plan.
42 INITIATIVE: Use GPS capability to reduce terminal separation, standards.
Continue reading ↓ 120 of 188 passages shown