Order 6970.8 Standby Power for Heating Equipment at Airtraffic Control Towers
This document is cancelled. It may have been replaced. Check the official source before relying on it.
DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION GL 6970 .8 GREAT LAKES REGION
23 Feb 73
SUBJ: STANDBY POWER FOR HEATING EQUIPMENT AT AIR TRAFFIC CONTROL TOWERS
1. PURPOSE* This Order outlines policy for connecting heating systems at agency-owned Air Traffic Control Towers to emergency standby power,
SUBJ: STANDBY POWER FOR HEATING EQUIPMENT AT AIR TRAFFIC CONTROL TOWERS
2. DISTRIBUTION. This Order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities field offices.
3. CANCELLATION. Order CE 6970.5 is cancelled.
U. BACKGROUND. Heat is not available at some towers during commercial power outages because under the original design certain components of the heating system were not connected to the standby emergency power plant. This has resulted in discomfort to personnel.
5* POLICY. The heating system may be connected to the standby power source provided the new total facility load does not exceed the rated capacity of the engine generator. Changing all the unit heaters in the tower from normal power panels to emergency panels could be a costly project. Hence, connect only the amount of equip ment that is necessary to provide a reasonable degree of personnel
comfort.
6. ACTION. Accomplish the work with local personnel, or, if this is not
possible, submit FMP or SMP work project requests. Correct all applicable station drawings after the work is accomplished and submit "as built" drawings to the Environmental Engineering Branch, AGL-kkO,
ALAN H. GLASS
ALAN H. GLASS
Chief, Airway Facilities Division
Distribution: RAF-3; FAF-0 (Normal) Initiated By: AGL-1*U5
-. & U.S. GOVERNMENT PRINTING OFFICE: 1972-754-260