GREAT LAKES REGION

SUBJ: MAINTENANCE OF STRUCTURAL TOWERS AND GUYS

GL 6930.7

1. PURPOSE. This orc.l.er provides procedures, technical standards and techniques to guide field personnel in the methods and use of equipment for maintenance of structural towers and related guys.

SUBJ: MAINTENANCE OF STRUCTURAL TOWERS AND GUYS

2. DISTRIBUTION. This order is distributed to the Airway Facilities .. ·. Division, Branch level and. above, and. to all Airway Facilities: field

.·. 'of:f'ices.

3. CANCELLATION. Order CE 6930.1 is cancelled.

4. SCOPE. This order is directed toward servicing microwave towers as most of the FAA tower maintenance wor~ is on these. Much of the material in thj,.s order can, however, be applied to.ward any guyed or

self-supporting tower.

5. BACKGROUND. Definite procedures have not previously been outlined for .maintenane:e .of .towers and tower guys •. These procedures are needed to provide the Regional Oi'fices with guidelines f.or proper tower maintenance and to provide a uniform tower maintenance program.

6. STANDARDS AND . TOLERANCES •

6. STANDARDS AND . TOLERANCES •

a. Mast Alignment. The top of the mast shall be vertically above the base , within a tolerance of not more than • 2% ( • 002 ) of the tower height. The tower legs shall not deviate from the straight line connecting the top and bottom of the tower by more than three inches.

b. Bolt Tension. The bolts shall be tensioned as indicated in Appendix 1, page 1.

c. · Guy. Cable Tension. The initial (no wind load) guy tensions shall . be . maintained within a maximum tolerance of + 300 pounds or + 7%

( .07) ·Of the specified initial tension, whichever is greater:- The

.~, specified ini t:Lal tensions are Shown on the tower erection drawings and should be available at each site.

Distribution: ·· RAF-3; .FAF-0 (No:rmal) Initiated By: AGL.,.445

. GL 6930.7

. I 20 Feb 73

Cable tensions increase approximately 10 pounds for each degree (F.) drop in temperature .and vice versa. All tension readi:p.gs should be corrected to·6o°F. before comparing them against specified tensions or previous tensions.

d. Guy Cable Grounds. The guy cable ground resistance Shall not exceed25ohms •. Ex:perience.indicates·that ground.resistance increases when the soil is dry. Ground resistance measurements should be made under extreme conditio~s to insure that ground resistance is Within tolerances.

. .. .: . . 7. . INSTRUMENTS AND EQUIPMENT FOR TOWER AND GUY ADJUSTMENTS.

a. · Cable Tension Indicator. Lever operated shunt type tension indicators (with Federal gauge) are on hand in each Region for checking guy tensions.. Calibration graphs are included. with each· indicator.

b •. Transit. ·A transit is required to check the vertical mast alignment

o:f·the tower.

c. In-Line Tensiometer (Dynamometer) •. Direct reading in-line gauges . are available in each Region for use in making major gtiy·cable adjustments and for recalibration of the tension indicators.

c. Working Equipment. The following working equipment is available in ·each Region:

(1) Klein· "Chicagon cable grips, 7/16" -: .5/8" (2) Klein "Chicago" cable grips, 3/5" (3) .. Coffing chain hoist "come along", 3 ton.

Note: All grips must have bronze lined jaws to prevent damage

to guys.

8. PROCEDURES FOR GUY ADJUSTMENTS.·

8. PROCEDURES FOR GUY ADJUSTMENTS.·

a. Cable Tension Indicator.

Page 2

(1) Indicator Use~ Refer to Washington Drawing No. D-5559 for the proper ope;rating• procedur~ ·of' the indi~ator., The .indicator

should be positioned on the cablte in a spot where the cable has

·•· not been nicked or deformed. Relad the dial indicator and refer to the conve.rsion graph to . obtai:n the tension in pounds. A minimum of 3. readings should be taken at different locations ·on the cable and an average usedo Note subparagraph 6c regarding correcting readings to 60°F. equivalent. ·

(2)

(3)

(4)

GL 6930.7

Indicator Care. The tension indicators are precision ·instruments' and should be treated with extreme care when handling ~d storing. Past experience shows that a spot of rust or a slight misalignment of the dial micrometer shaft wiU give erroneous readings. If inconsistent readings

are obt~iried, the instrument should be cleaned and a small amount of light oil placed on the micrometer shaft.

Recalibration of Iridicators. The tension indicators shall be checked for accuracy anriually by the use of a direct reading

-~-line gauge. Recalibration may be accomplished by attaching

the coffing chain hoist in series with the anchor, the in-line gauge and the cable grip as shown on Drawing No. :0-5559~ By releasing the t'urnbuck,le, the entire tension in the cable is transmitted through the chain hoist arid gauge. By varying the tension with the chain.hoist, one may obtain different readings for. comparison with the graph~

.Calibration Graphs. The calibration graphs included with the gaU:ges were prepared.in the Region using the in-line gauge.

Past. experience shows that the instrument must be calibrated · tind!;;lr field conditions to obtain an accurate graph. Graphs prepared in a laboratdry have proven unsatisfactory and it is there;f'ore impractical to send the instruments to·a laboratory for reca:libration. . It is. suggested, however, that. the direct in-line reading dynamometer U:sed for field calibration of the shunt dynaJ:nometer by laboratory calibrated once a year.

b. · . Cable·· Tensioning. ·

(1) ·:rrocedure. Cable testing· and any required retensioning shall be s:tarted .with ·the lowest set of guys first, and then work progressi veJ.Y uPwards toward the top level. Usually the

adjustmentcanbe·accomplished through the use of the turnbuckles. If the turnbuckles will not provide the take•up · distance requiredt then· chain hoists (come alongs) and · suitable cable grips will be required. Retensioning can usually_be best accomi>lished·when all three guys are handled .simulta.neous.ly or by caref'u.lly working back and forth between guys. If considerable adjustment is necessary, a chain hoist should

be used in parallel with the turnbuckle to release· the . tension and reduce wear on the turnbuckleo Wear on the turribucklesWfil also be .reduced by placing a stttall ainount t>f oil--on the threads.

Page 3

GL 6930.7 20 Feb 73

(2) Wea:t;ne;r Conditions. Cable test1ing .shall pref'erab.;Ly be accomplished when'the temperatures rimge·bet'Ween 50° and 80°F. and .winds are.tinder i5 MPH. When ~ecessary to operate in windy

weather~. check .the same cables ~n the wind and during lulls or

eai~y morning calms to determine wind ~ff'ects and adjust operatio:ns.accordi,ngly.. Cease ca'Qle. adjustment operations when · consistent results cannot. be obtained.

c. Vertical Alignment. Check. The tower; vertical alignment shall be checked with .a transit from at leas-q two directions 90° apart on square towers or 120° apart on tria~ towers. Three· sitings should be made on all triangular to~ers that prove . questionable . . after siting· on 2 corners. On a triangular guyed tower it is best to set up near an outside guy anchor or farther out to reduce·the maxim.Um. vertical angle. Siting shoUld normally pe ·on 1 leg from a

set-up on a radial through that leg., On some towers the site may be made on the center of the tower fronl. almost any location ..

(1)

(2)

Proced,ure. Leve~ the transit, site on the top of the tower, .;Lock _the hqr:Lzpntal plates, recheck to insure the . transit is on taf.get arid. the plate bubble 90~ to the site lin,e is exactly centered. Then lower the·telef!cope, siting .on the tower leg at leS,st at each guy level and at ;the bottom, noting the approximate deviations. ,

Trcmsit Accuracy Check.·. Regeay the operation with the transit reversed. (plate rotated 180 ~d the telescope upside down), plate bubbles. recentered., arid using the sa.m:e target at the top.

If the transit is out of adjustment, the site points below the top with transit direct and reversed will not coincide, but a point halfway between~ them wil~ be on the true vertical line below the top siting point. · If the two sit'i:ngs (direct and. rever.sed) coincide, the transit ~s in good adjustment and only ·direct.sitings will be satisfactory for the remainder of the day.

(3) . DeViations. Based on known dimensions of structural members, · deViations of ·the tower from p~umb may be .estimated. Where

deviat~on.s are excessive, at l~ast the bottom deviation. _should be measured. ' .

. . 9. SERVICE .AND. INSPECTION SCHEDULES.

a. Field ·Ipspecti-on and. Maintenanc~ :or: all guy:ed towers sb;all be per;..

formed ~emi-a.nnuall.y, preferablY sp:rin~. and, fall, f,or 't!le>first two · · . ' years ···a;tt;er erect:ion a.D;<i ~ua.l.ly thereafter or ,after a severe: ice · or windsto~. • A:Pp.end.ix '1 provid~s· a. list of ·items to che·ck :·wben

ins:peeti~ struct'ural tqwers and guys. · ·

Page 4

20 Feb 73 GL 6930.7

b. BOlt Tensions· should be checked on all boits approximately six months to one year after the tower is erected. This will provide

for tightening any bolts that may have been missed during original construction or which have loosened by the tower joints .flexing and settling during wind loading. Bolt loosening should not present a problem after the initial check; however, a visual check

of the bolts should be made during performance of annual field · maintenance. If a re-lamping contract is used on high towers, it may be desirable to include an item for a one-time complete bolt tension check, and specify a careful visual inspection for loose bolts or signs of movement at connections every time the lamps are serviced.

c. Obstruction Lights. On high towers it may be desirable to contract for periodic replacement of obstruction lamps at about So% of . normal lamp life. Such a contract should include inspection and cleaning of lamp fixtures and glassware.

d. Microwave Reflectors. Carefully inspect the microwave reflector and mounting bra,ckets for loose bolts and rivets .and cracked members.

The microwave reflector, framing and bracing members are constructed from aluminum. Although the tensile strength of the type aluminum used is quite high, the fatigue factor of the material is relatively low compared to steel. Wind currents tend to cause the reflectors and bracing to vibrate at high frequencies Which gradually cause some of the structural members to break. Past experience has proven the three deformed angles that are welded to the back side

of the reflector framing fail first. These three angles should be inspected closely for fine line cracks.

e. Experienced Crews. The work should :preferably be accomplished throughout the Region by the same :personnel, as a high degree of

skill and care is required. A crew will develop uniform procedures, accuracy, speed and safety with experience.

10. RECORDS. Appendix 2 (Guyed Tower Cable Tension Report, GL Form 6930-1) and.A:p:pendix 3 (Guy Tension Log, GL Form 6930;..2) offer a good method ofrecording the gl,l.y.tensions. One completed copy of eitherForfu.should be filed at the facility each time the cable tensions are checked~

AlAN H. GLASS·.

Chief, Airway Facilities Division

Page 5

20 Feb 73 GL 6930. 7 Appendix 1

APPENDIX 1. BOLT TENSIONS AND REQUIRED TORQUE VALUES.

When calibrated torque wrenches are used, they shall show by dial or automatic

release, the measure in foot-pounds of the torque induced by the wrench. The minimum torque for the siz.es of bolts shall conform to the values listed below.

Bolt Size

(in.)

BOLT TENSION AND TORQUE VALUE.:::.S … ,----::--- Recommended Bolt Required Required Tension for Cali- Bolt Tension Bolt Torque brating Wrenches (lb) (lb. (lb. ft.)

1/2 5/8 3/4

1/2 5/8 3/4

1/2 5/8 ~

STRUCTURAL GRADE BOLTS per ASTM Specification A307

4,500 3,900 7,150 6,250 10,550 . . 9,200 Per Federal Specification FF-B-575 (Type I Grade 2)

5,650 4,900 . 8,300 7,250 12,300 10,700 HIGH STRENGTH BOLTS per ASTM Specification A325

12,500 . 10,850 20,000 17,250 29,000 25,600

32 65 115

41 75 134

90 180 320

Locking nuts (pal nuts) shall be tensioned at 25% of the required bolt tension for structural grade bolts.·· The wrenches shall be properly calibrated and the nuts shall be. in motion When the torque is measured. ·

Note: Most high strength bolts will have been manufactured in accordance with ASTM ·spec:i.fication.:A;325 .and can .be identified by the Symbol A325 of the head of the bolt. other types .of high strength bolts will have different identifying symbols. Bolts with no identifying symbols are structural grade polts. High strength bolts are normally used only in special situations such as on the reflector supports of microwave towers.

CHECK LIST FOR STRUCTURAL TOWERS AND GUYS INSPECTIONS.

1. Vertical mast alignment. 2. Loose or missing bolts, nuts and pal nuts. 3. Missing, bent, cracked Or broken members. 4. Reflectors - check for broken rivets and separation of sheet metal from fra.nie. 5. Concrete base~settlement or cracks. 6. Tower anchors--frost heave--protection from livestock, erosion. 7. Guy cables--tensions, damage, rust. 8. Gu.v cable connections--check for damage, rust, loose bolts, served ends. 9. Tu.rnbuck1es-are they safety wired or jamb nut installed. 10. Tower insulators--ch'ipped or cracked and cleanJ.iiiess. 11. Grounds, tower .and guy-,-mechanical condition, resistance. 12. Loose. e1ectricalconduit or other attachinents. 13. Obstruction ;Lighting .;. See SM P 69:LO.l. 14. Moisture or dirt lli junction boxeso 15. Lightning rods~-check if'reqtdred and if properly installed~ 16 •. Paint--check color sche!lie, condition, coverage.

Page 1

-~

(JQ

(I)

1-'

GUYED TOWER CABLE TENSION REPORT

GUYED TOWER CABLE TENSION REPORT

ANCHOR' GUY CABLE SPEC. ·1ST 2ND 3RD FINAL LOCATION LEVEL SIZE LSS. ruoAbiNG READING READING READING

·R<; -

..

'

'

Facility Location DrawinQ No.

iWind VP.Inr.itv

Str.Jctural Condition Inc. Bolt Tension

Conditlon ofPaint

PartY ----------- GL Form 6930-1 {03/73) Supercedes CE Form 6930-!)

REMARKS

..

Heiaht I oat~ ,.

r.;,.l.tnP.No.

I Sianature

..

(\) 0

"':! ~

-;) w

.E'~ ld (1)0'\ t::i\0 P..W

~· .o

-;) 1\)

GL 6930.7 Appendix 2

Anchor # 1 • nearest front

of building Anchor #2 • clockwise from . . #1 .

Anchor #3 · clockwise from #2 ·

2

3

I

Both right and left cables

Exterior lntermediat~ Interior

5

4

3

2

1 .

As cable loc. ations vary at different sites in relation j'o the b.u.ilding, #l ~nchor .shall b. e consid. ered as the one approximately directly in front of the building. If no ai!Jchors are l.acated dire<:tly in frontofthe · building then the first encountered clockwise about the tower shall be called #1. . · . . Most microwave towers have double sets of. guys frqm the e.xterior ar:~chor to top of the towers. These · a(e to be indicated as to the top left and top right V!jhtm oqserved by standing at an l!ilchor and facing . the tower. · · .

GL Form E930-l (03/73)

Fag~ 2

, CABLE TYPE& "' SIZE INITIAL READING ~ --- ~ ~ ~ ~· ~ ---- ----- ~ … , _:;:.;::::= ~ ------ ~ ~ ~ ----- ------ ~ --- ~· ------ -----

i

CD

1-' Guy Location Key

GL Form 6930-2 (03/73)

GUY TENSIO"' LOG

GUY TENSIO"' LOG

CABLE TENSION

2nd 3rd AVERAGE CORR. -600

'

.,

- -

A .A1 A2

REMARKS (Include guys, turnbuckles, clamps, etc.}

ANCHOR A· Nea-~· Front of .Bldg. ANCHOR B • Clockwlora from A ANCHOR C • C\ockwlsefrom·B

Top level guys to be nOted as

Left & Right when facing Tower.

I I

CABLE TENSION

I I

1\) 0

t,rj ~ tj

tB'~ 10 (1)0\ ::;\.0 .p..w 1-'•0 1:>4 •

l-t.J~

GL 6930.7 ·Appendix 3

TOWER AND GUY TENSION lOG

Facility location~------------------'---------__:_ Date· …

·He.ight Drawing·No … Guage No.--'---'------

Wind Velocity.~··------------Direction_.: … ;_ ___ Temperature … ;__ __

TOWER AND GUY TENSION lOG

foundation (Cracks, etc.}·------,---------------------~-----

·Anchor Rods … : … , … --'------ … :..

Guy Anchors; … ~-----

Tower Condition (Rusting, etc.)_'----------------~~----_;_'----'-----'--

Straight (Straightened)_-'-- … :__-'---------------_: … ~..:...---'----,--

Painted … Condition ___ --------·------------ … :..---'--.,---

Bolts, Nuts, Pal Nuts (tight/torqued)·---------------Condition … : … ;_;;__;.._

lighting,...· -----:--:------lights Burning __ __; … Fiasher Unit … ;__

Conduit Condition … -,- … :.,...-____ -'-_Wire-'-----------~-.;_

Photo-Electric Controt … ~------'---,-------..,.---·GiassCover … , …

Other

Grounding (wire, rod, etc.) … : ____ ----". Resistance-'-------'---~

Condition of Antenna, Mounting Bracket~ etc~------~---,-------------'--'-----

Condition of Coax Cable, Connecticm.·~. ~-c::.··------'-----------___: … -.:. __

Ground wire bonded tO conduit_: … Bonding lugs ____ ...,.: …

lightning Rods, Grounds, etc … : … ;_ __ _

Additional Remarks

Partv.·--------------------Signatute_-------------~--

GL Form 6930-2 ( 03/73) Supercedes CE Form 6930-2 ·