Order 6910.15 Method of Keeping the Ge/hollingsworth and Westinghouse Als. Sys. in Oper.w Reg

Text re-read from the scan: 11 of 11 passages.

Date
Nov 24, 2026
Recorded
Nov 24, 2026
Passages
11 of 11 changed
Paragraphs
59 added or rewritten, 119 removed or rewritten

Read the current text Official source ↗

What changed in the text

Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.

  1. Changed

    [added: ORDER ]DEPARTMENT [removed: OF'][added: OF] TRANSPORTATION [removed: ·oRDER FEDERAl][added: FEDERAL] AVIATION ADMINISTRATION[removed: I GL 69i0.15 GREAT IAKES REGION]

  2. Added

    [added: GREAT LAKES REGION GL 6910.15]

  3. 8/15/73

  4. Changed

    METHOD OF KEEPING THE [removed: GENER{U:.][added: GENERAL] [removed: EI.iECTJ.t!C.,][added: ELECTRIC,] HOLLINGSWORTH, AND [removed: WESTING­][added: WESTING-] SUBJ: [removed: . ]HOUSE [removed: ElECTRIC.][added: ELECTRIC] [removed: AIB][added: ALS] SYSTEMS IN OPERATION WITH ONE [removed: REGUlATOR][added: REGULATOR] REMOVED

  5. Changed

    [removed: 1..][added: 1.] [removed: RJRPOSE.][added: PURPOSE.] The attached instruction will enable maintenance personnel to provide continuity of service to the Approach Lighting System in[added: case of one regulator failure.]

  6. Removed

    [removed: case of one regulator failure ..]

  7. Added

    [added: 2. DISTRIBUTION. This Order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities field offices.]

  8. Removed

    [removed: 2.. :OIS~ION., This Order is distributed to the Airway Facilities Division, Branch level a.nd above, and to all Airway Facilities field offices. ·]

  9. Added

    [added: 3. CANCELLATION.Order CE 6910.5. is cancelled.]

  10. Removed

    [removed: 3.. CANCELlATION•. Order CE 6910.; is cancelled.]

  11. 4. APPLICATION.

  12. Removed

    [removed: a.. :APpendix l. conta.in.s instructions applica.bl.e to the General.]

  13. Added

    [added: a Appendix 1 contains instructions applicable to the General Electric Approach Lighting System Substation, 175 KVA, 2400/4160 volt, Contract CCA-33958, CAA Specifications 1146 and 1147, G. E. Requisition Number 322-73550, GEI-6276. The Hollingsworth substation, Model FA-67WA-l612 is similar to the G. E. Substation.]

  14. Changed

    [removed: E1ectric][added: b.] [removed: Approa~h,Lighting][added: Appendix] [removed: S.ystem][added: 2] [removed: Substation,][added: contains] [removed: _175][added: instructions applicable to the Westinghouse Approach Lighting System Substations, 175] KVA, 2400/4160 volt, Contract [removed: CCA-33958,][added: FA-1772] [removed: CAA][added: (1-3153_, FAA] Specifications [removed: 1146][added: 1146A] and [removed: ll47,][added: 1147A.]

  15. Removed

    [removed: G. E~ Requisition NUmber 322-73550, aE!-6276. The Hollingsworth sul;)station, Model FA•67WA-l612 is similar to the G. E. Substation.]

  16. Added

    [added: alon H. Sloss]

  17. Removed

    [removed: b. .Appendix .2 contains instructiOJ;lS applicable to the Westinghouse]

  18. Added

    [added: ALAN H. GLASS Chief, Airway Facilities Division]

  19. Removed

    [removed: Approach Lightilig System Substations, 175 KVA, 2400/4160 volt,]

  20. Added

    [added: Distribution: RAF-3; FAF-O (Normal) Initiated By: AGL-445]

  21. Removed

    [removed: Contract FA-1772 (l-3153_, FAA Specifications ll46A and ll47A.]

  22. Added

    [added: 8/15/73 GL 6910 Appendix 1]

  23. Removed

    [removed: AL_#~ ~H. GrASS . Chief, Airway Facilities Division]

  24. Added

    [added: APPENDIX 1. EMERGENCY OPERATION OF G.E. SUBSTATION EMERGENCY OPERATTON OF GENERAL ELECTRIC ALS SUBSTATION WITH ONE REGULATOR FAILURE This method of providing continuity ofservice is applicable to the General Electric 175 KVA Substation, Contract CCA-33958, CAA Specifications 1146 and 1147, G. E. Requisition Number 322-72550, GEI-62786. When one is familiar with this procedure, this temporary method of operation can be setup in 30 minutes]

  25. Removed

    [removed: Distribution: RAF-3; FAF-0 . (Normal) Initiated By: AGL-445]

  26. Added

    [added: 2. PRECAUTION. a. Do not attempt any repair on the defective regulator while this temporary method is in operation. De-energize the commercial feeder at the terminal pole when any work becomes necessary Remove the fuse to the appropriate 50 KVAR capacitor whenever its associated regulator is disconnected. 3. SUPPLIES AND TOOLS. The following supplies and tools are required: Hand tools - Adjustable wrench, pliers, screwdriver. Supplies - Split-bolts for $6 wire, electrical tape, $6 5Kv insulated wire (2 pieces about 2 feet long). 4.PROCEDURE]

  27. Removed

    [removed: (.]

  28. Added

    [added: a. Turn Brightness Control switch to "Ofp" position. b. Turn Breaker Control switch to "Off" position. c. De-energize the incoaing commercial service at the terminal pole. d. Ground bus bars with shorting bars to assure capacitors are discharged. e. Disconnect the series loop on the defective regulator and SERIES this with a loop on a good regulator at the series cutouts in Comparteent 1D.]

  29. Removed

    [removed: 8/l5/73 GL 6910. Append.i.x 1]

  30. Added

    [added: f. Disconnect the defective regulator by removing the cover panel from the high voltage connection coapartment located behind the load monitor panel in the upper compartment in Unit 2 and disconnecting the wire fron the incoming power bushing (LI, L2, L3) on the defective regulator. Insulate this wire as necessary. (Reférence: Draving 131D856 in Instruction Manual for Unit 2.)]

  31. Removed

    [removed: ' :.- > ~-· :.'·;-~-i '.~·· ;_:]

  32. Added

    [added: GL 6910.15 8/15/73 Appendix1]

  33. Removed

    [removed: APP!JD:tt 1. ~- OftiAttON"OF G.!. SUBSTATIOM:,]

  34. Added

    [added: g. Remove the lower cover in the top section of the load monitor compartment. Block open the contacts of the Open Circuit Protector Relay on the defective regulator. See Figure 5 of GEI-64020 Instruction Book, relays 6, 10 or 17.]

  35. Removed

    [removed: 1. C)p GD!tw:. ELICTll:C ALS'"SUBS'l"AttON Wl'l'H''OD:' ··-~ ··<·imcuti'NI.:' ,..· Thb:aethod~of prnicU.nl_ continuity'· o ''ii~~ce irll appl' ciible··-to the' Gi"Miil Electd.c l15·'.J.VA Substatiob; C~traa~!;: CCA-33958, CAA Speeification8·11t.6' and' 1147; ·G.· E. l.equillllitiOft ·RUI!IIIber]

  36. Added

    [added: h. Remove glass cover of appropriate relay 30, 34 or 39, and energize dual indicating lights on load monitor door panel by blocking appropriate contact. Relays 30, 34 and 39 can be seen in photograph Figure 6 of Instruction Booklet GEI-64020 for Unit #2. This removes defective regulator alarm.]

  37. Removed

    [removed: 322•72550, GE~..6278~. . . . ~· <· ·i]

  38. Added

    [added: i.Energize incoming commercial service at the-terminal pole.]

  39. Removed

    [removed: ~- :';' - ... -. ' ; • ·; .' .• · .•'. .;"l wtten'one''ill &aUUt With thia ·;toeeiin;e~ thb t•poraey ath~]

  40. Added

    [added: j. Energize the ALS System.]

  41. Removed

    [removed: 1 -of _,.,,. -operiticm cn;:w··.··et .... ·ill30 -.ta.ate• .-··- , '-~]

  42. Added

    [added: k.Readings obtained on System:]

  43. Removed

    [removed: :;. ·..~ ! ·: ' ·.· ~~ . < • • •••• ;, ·_.). ~: --~]

  44. Added

    [added: (1) Output Voltages - Regulator voltage supplying the two loops will register high. It will normally read the sum of the two loops at. the appropriate brightness step.]

  45. Removed

    [removed: a. Do not'·-~i>uY'iepab··cm·ttte:defeetive rejutatorr-~Ui!!'·thia 1]

  46. Added

    [added: (2) Output Amperes - Normal on the operating regulators. No reading will.be obtained from the defective regulator.]

  47. Removed

    [removed: temponry •thM b in c:»pe'&'aticm. De•euraue the _cG~~~~~J~~~~arc~l fHder at the temial pole When ·any wm be~a·necuaary~ <<• ~-·;; · r]

  48. Added

    [added: (3) Micro Ammeter reading on load monitor panel - The readings obtained from the operating regulators will be normal. There will be a high reading from the defective regulator, but this can be ignored.]

  49. Removed

    [removed: b. leMW tbe fuse to the appnprute ~so· wAtt ea,aeitor ~ir u1a]

  50. Added

    [added: 1. Effect of modification on Monitor System - With the two loops combined, the monitor will alarm with the failure of six lamps; i.e., if the monitor was originally set to alarm with six lamps out in each loop, it will still alarm with six lamps out on the combined loop.]

  51. Removed

    [removed: aaaocuted reaulator ia dbcoxmected.]

  52. Added

    [added: The monitor alarm limits are thereby reduced from a total alarm condition of ll lamp failures on the individual loops to an alarm condition of 6 lamp failures on the combined loop. This reduced alarm limit is not considered objectionable for short periods.]

  53. Removed

    [removed: 1 ~.. :./~('' . :, ~·.' ; ~:·;·~ ~- i:. ,~. . •.:- ~-:~··:, … > ·:·. ··,::,,· ·';··} '!.. 3.·:·;'SUP1LIES A1Q) @L$~''' !ttae follni&~ ~U:ea:.ad toob are·'nquire..t:]

  54. Added

    [added: 5. LIMITATIONS. This method was field tested for two hours on Brightness Step 4 and no overheating occurred. While the system operated normally on Brightness Step 5 for short periods during this test, prolonged periods of operation at this step should be avoided for fear of overloading the regulator. While the transformers are rated at 50 KVA and it has been calculated that two average loops will draw 48 KW on step five, the number of lights in the loops at each site could differ which will vary the KW.]

  55. Removed

    [removed: :,. •• ·', ..· ::·.,,. <: ;: ' • •••. •.·· a. Rand teo.b .. .Adjustable ~b, pliera~ illc~rivu. • :;;:. ."·'.: -;.. ."•. ,. . • .~. •. f.. : ' .. : ..• .. • .' :. ~ ': •. \ :. ,i ..:· . .; . . ; .• • b. Supplies • ·~Hc:·~olts for ft wire,· electrlcal tlpe; 16 so]

  56. Added

    [added: Da re 2]

  57. Removed

    [removed: ~·u~ -win (2 pieQN about 2 feet lema) • ·:: ..:;.~.: .. ~~·.: :,:,:•··-~ ·.~" .. •. ·~·· ;;.''''•:­ 4.'·~.'t.· .. •' .. . : .·]

  58. Added

    [added: 8/15/73 GL 6910.15 Appendix 2]

  59. Removed

    [removed: (: . I • .~. : . '' t ; .• 1 l, ' ,: ']

  60. Added

    [added: APPENDIX 2. EMERGENCY OPERATION OF WESTINGHOUSE SUBSTATION]

  61. Removed

    [removed: 1 .-.· f ,· , I <. ; ' a. Tum Bd.gbtneaa Control switch to "Olr" puiticm. ' · '' :..]

  62. Added

    [added: EMERGENCY OPERATION OF WESTINCHOUSE ALS SUBSTATION WITH ONE REGULATOR PAILuRE. This method of providing continuity of service is applicable to the Westinghouse Electric Corporation 175 KVA Substation, Contract FA-1772 (1-3153), FAA Specifications 1146A and 1147A.]

  63. Removed

    [removed: ~··:;;;~r:,,b~. ''tum ltea"t cc>ntrol awi~Ch .to ":OW''· paition.]

  64. Added

    [added: en one is faailiar with this procedure, this temporary method of operation can be set up in 30 minutes]

  65. Removed

    [removed: ,·,;.'·'/ ; . ~~ ·; :··~·=~···~_;•' ,. :.;~ ··... · ....: . : ·.... :-· .]

  66. Added

    [added: 2. PRECAUTION]

  67. Removed

    [removed: ·· F··'':·c:. ··ne-~lier~~ae :_~he inc-wig c-~rd.al service ~.t the·· ten&hiit':'Pole.]

  68. Added

    [added: Do not attempt any repair on the defective regulator while this temporary method is in operation. De-energize the comercial feeder at the terminal pole vhen any work becomes necessary.]

  69. Removed

    [removed: ~ " • . ,• '.;>·. ·,. .:: d .... Groun~ ~ua k!a ~itb _illborti~ bara to assure capacitora ere _discharged.]

  70. Added

    [added: b. Remove the fuse to the appropriate 50 KVAR capacitor whenever its associated regulator is disconnected.]

  71. Removed

    [removed: <~ ~··.. ~. ··. ··... : :~· ·.' ....: .. <·! . . ·. . . . : .. : . . : ;.. ·.. ·."-' :;· ..·;-~· . ·e~-:. ''Dftt'cmm~ct':tne·~~ie•loOp<·on··the def~ti"'e rilulatot and'.-'SII.IES ;. ,•....·tti':b ··,;fib .• : loep ,:.on j· ieod' ·replatt:Oi'.at thi' Hriej. Ctttouf:art~tn . ··cou.putamt ~-~»~: · ·, :, · · ·. · · ···- · .. · -..-· , ·. . . -·~ 1'"]

  72. Added

    [added: SUPPLIES AND TOOLS. The folloving supplies and tools are required:]

  73. Removed

    [removed: ': ··f ~· ··lJiseomaect ·die··aef~e·uve~ ·tctgulator by removi-ng the co.Ve£::;~.iii£;:l · c ,_,,. ·· ~ ·"··: fr«.M]

  74. Added

    [added: Hand tools - Adjustable vrench, pliers, screwdriver.]

  75. Removed

    [removed: 1t:tie 'ltijll 'voltqf! c'~eeticm coaapartant · located''befifni tifli22 •· ·l~'d':~tt&r-•:.,aet t-D'the t!~i 'eoa.,a~~ ·in<ttni-t'2:'na;;;>::Jd ,_,·;.;:. . · ~-~ ::·~t-s:co~ef£ri~ ;:'ttl~ ~:wtre; ;fhillii·':·the ·,tiieoaitng pdwer :husnbig···(t.I•L·r't:.2 s"t.3) ,, ;...~"on·;~~,e~~e'fll~i~~·;;l!'~~~-~Of; ';l~'6:fate ~i.S Wi·re•aa'Jiei.:gaj;,~cti<~'l]

  76. Added

    [added: Supplies - Split-bolts for $6 wire, electrical tape, $6, 5kv insulated vire (2 pieces about 2 ft. long)]

  77. Removed

    [removed: . ,, . l """· , ...~~~~!~~c~f" ~~i~Wi~~ lfl,~D'.~.·ba· 'Ini'truC:ffori ·~·M•nual::fot '1J#if ·-~2. )it]

  78. Added

    [added: 4 PROCEDURE]

  79. Removed

    [removed: … ,.~.;'.:'~! .. ,.. • :.:.· (.,·. ~·~·-··v '···· ..., ~.~ ... ·..:·.. Y;f'.· .;··:y,,·,;: ': ;... .. ...~::-.. · ·, ~~·.:.:.:~;.!,: :-.~·rt:.: ~~ttl')'·;]

  80. Added

    [added: Turn Brightness Control switch to "Ofp" position]

  81. Removed

    [removed: Page 1]

  82. Added

    [added: b. Turn Breaker Control switch to "OFp" position.]

  83. Removed

    [removed: ,, tl]

  84. Added

    [added: De-energize the incoming comeercial service at the terminal pole.]

  85. Removed

    [removed: )]

  86. Added

    [added: Ground bus bars with shorting bars to assure capacitors are discharged.]

  87. Removed

    [removed: GL. 69lo .l5 8/l5/73 Appendi:x; l]

  88. Added

    [added: Disconnect the series loop on the defective regulator and SERIEs this with s loop on a good regulator at the series cutouts ir Coaparteent 1D]

  89. Removed

    [removed: g. Re~ve. the lower cover in the top sect,ion of the-: lodld mon,it:o~.]

  90. Added

    [added: f. Disconnect the defective regulator by removing the bolted panel marked "DANGER, HIGH VOLTAGE", on the regulator tank wall and disconnecting wire from line bushing marked "H3". Insulate this wire if necessary.]

  91. Removed

    [removed: ·;compartment. 8lock open the contacts of th.e Open c·~J:'cuif~r()~ector Relay on the defective. regulator. See Figure 5 of GEI..64020 · · ,.. , Instruction Book, relays 6, 10 or 17. "]

  92. Added

    [added: Por the location of the above mentioned panel, see the Instruction Book, Tab 12, Page 2 - Panel Marked "DANGER, HIGH VOLTAGE" on extreme right wall. See Drawing AT-52A-325, It. 6, Line Bushings at top of drawing.]

  93. Removed

    [removed: h. Reaove glass cover of appropriate relay 30, 34 or 39, and energize]

  94. Added

    [added: GL 6910 .15. 8/15/73 Appendix2]

  95. Removed

    [removed: · .d~al indicating· lights em load monito'l!' door panel i)y block~ng ·. appropriate contact. Relays 30, 34 and 39 canbe se~n in. phqtograph Figure 6 of Instruction Booklet GEI-64020 for Unit 12. This remove& defective regulator alarm. ··' ·]

  96. Added

    [added: g. Remove the trip feature of the short circuit (SC) Protective Relay on the defective regulator, by rewoving the two wires marked "AC" from socket pin #3 on the SC relay. The two removed wires must be connected together so that the remaining SC relays will continue to function normally.]

  97. Removed

    [removed: i.~ ·•. :En~rgbe incoming COI'!Dercial service at the· termi~utl pole· ']

  98. Added

    [added: Remove the trip feature of the Open Circuit (OC) Protective Relay on the defective regulator, by removing the two wires marked "AC" from socket pin #3 on the OC relay. The two removed wires must be connected together so that the remaining OC relays willcontinue. to function normally.]

  99. Removed

    [removed: ·~ ~--:';,';~.J;"·~· _;:·. j. Energize the .ALS System.]

  100. Added

    [added: See Drawing AT-52-D-514 and photograph in Instruction Book, Tab 12, Page 5 for location of the SC and OC relays.]

  101. Removed

    [removed: (1) Output Voltages - Regulator voltage supplying the two loops :;.;.; :--; "will register high. It will no~lly read .the !llum ()f the· ~.wo]

  102. Added

    [added: h. Re-energize the substation from terminal pole.]

  103. Removed

    [removed: loops at the appropriate brightness st&p.]

  104. Added

    [added: i. Readings obtained on system:]

  105. Changed

    [removed: . . .. . . . . (2)][added: (1)] Output [removed: Amperes][added: Amps] [removed: ..][added: -] [removed: Nomal][added: Normal] [removed: em][added: on] [removed: the][added: two] [removed: operating regulators.][added: loops.] No [removed: readi.rag][added: reading] [removed: will.][added: will] be obtained from [removed: the][added: disconnected] [removed: defective regulat()r.][added: loop.]

  106. Removed

    [removed: (3) Micro Ammeter reading on load ~onitor panel - The readings]

  107. Added

    [added: (2) Output Voltage - Regulator voltage supplying the two loops will register high. It will normally read the sum of the two loops at the appropriate brightness step.]

  108. Removed

    [removed: obtained from the operating r4'ula tors will be normaL. _.:t:here will be .a high reading from the defective reg¥.llator·, but this]

  109. Added

    [added: j. Effect of modification on Monitor System - With the two loops combined, the monitor will alarm with the failure of six lamps; i.e., if the monitor was originally set to alarm with six lamps out in each loop, it will still alarm with six lamps out on the combined loop.]

  110. Removed

    [removed: can be ignored • ·]

  111. Added

    [added: The monitor alarm limits are thereby reduced from a total alarm condition of ll lamp failures on the individual loops to an alarm condition of 6 lamp failures on the combined loop. This reduced alarm limit is not considered objectionable for short periods.]

  112. Removed

    [removed: 1. Effect of modification em Monitor S:xs~em .. Wj.th, the _two loops combined, the monitor will alarm with the failure of six lamps; i.e. • if the , ,_;,;,!·•~f:t()r .~as originally .set to alarm_ w~th. siJc ~-ps. ()l.lt .in ea~h_1oop,]

  113. Added

    [added: 5. LIMITATIONS. This method was field tested for two hours on Brightness Step 4 and no overheating occurred. While the system operated normally]

  114. Removed

    [removed: it will still alarm with six lamps out on the combined loop.]

  115. Added

    [added: on brightness step 5 for short periods during this test, prolonged periods of operation at this step should be avoided for fear of overloading the regulator.]

  116. Removed

    [removed: ~· "':'.} .;-: : :·~. "'f_ ' ; ,:, ~; The monitor alarm U.miu are thereby>- reduced from a total alarm]

  117. Removed

    [removed: :.z.r;;~q:m~i:~ion of 11 lamp failures on the ind_ividu_al.looparto an alarm]

  118. Removed

    [removed: .. c~d~tion of 6 lamp· failures on the c~ined l~op. This .re_duced]

  119. Removed

    [removed: alarm limit is not consid~red objectionable for shor,t. p'l'::i.ods.]

  120. Removed

    [removed: 5. LIK'lo'l'ATIONS. This method was field tested for, two hourl!l-~il ,~r.ightness]

  121. Removed

    [removed: St.~p 4,.and no overheating occur.re(i ~ ·wnue, the, syste~ ~rat~<i- normally on' Brigb.~I)eu Step 5 for short. pe:r:i~s ~u-r.in_g tq~s. te.st9 p~olq~ged \; ,_;p~ri,o<i&t of·. opera~ion ..-t this .s.tep. should ,be avoid~_.d f.Qr. ff!ar, e»,~ ._,over­]

  122. Removed

    [removed: . load~ng ..tqe regulator. While the, .tran~fo~;s _are. rat~d ..:at_,.S,O_~A and]

  123. Removed

    [removed: i~ ha~_,b,~en .,calculated that, tw.o .averag~'·:,toqp$, 1fi,,ll .. draw.. 4,8_J(:W ,on step five, 'the number of lights in the loops 'at each site could' (fiffer which wiil vary the KW.]

  124. Removed

    [removed: -~ ..- ... 6/15/.73 ~-: ,,. G,L 691(). ~ .15,]

  125. Removed

    [removed: ~penci~-~g ~.]

  126. Removed

    [removed: .m1~mu.. 2= .•.. ,...~~;~~-1:10N·orpsnmams aa•n.'-']

  127. Removed

    [removed: · ···~· ~ .. ,-p, uS~ ;Ai.S:~ sUU'l'AndN ... ·m o" .. ~TOR]

  128. Removed

    [removed: .. t?~)»r~ . \'~--c·~~n~~t:r.. of,a,ni'i~,--~,:.:~p)'licable ' weat'i~u:n !lectric'Corporation 115 KYA. S~bs.ta~i<m_, ~ontract]

  129. Removed

    [removed: . .]

  130. Removed

    [removed: ,,;·;;;p~~t'~l!.t~·=~~~~":!;~~ ~i!~ .~~~~ .aJ~ of]

  131. Removed

    [removed: ·'·~·- .. _ ,.,··.]

  132. Removed

    [removed: 1 •. ·· , -~. . . .~. · to FA•l772 (1•3153), FAA Specific:aticms 1146A and 1l4.7A.]

  133. Removed

    [removed: ~-- ~.;~~~; ,~,. ~P~t:~: ~· ~f~i.. "P~~or.:,;~i~~~]

  134. Removed

    [removed: this· t.~...ry·· -~:~ ·~,·~-··~--~~~~~- .~-.rg1&4! the, .~rcial feecier at the tanab.-al ·'·tt-l• *en d1 Wed: becOiHa neces.S~n:.Y.]

  135. Removed

    [removed: . . .·· ~ .]

  136. Removed

    [removed: ' . ': . _.,;. ' : ; ·.•• :..; ::.. '. ·,, .;; .... . :· ' . :: . ..··-.;' .'·: .' '- •. •' ,.. ..:~·· ;' ':.- ~ ...'·c-. ;,; ;:j ,, (; b. a~ tM, £ue· to the .•proptiate' ·so· Dll capacitor whenever]

  137. Removed

    [removed: its associated ntulatot>· 18 di-a~c,ted. . . ·]

  138. Removed

    [removed: ·, :'~"~~ ,, .~i'1tJIS; ~- ~~;· ;..•,~e ~~;tow~~- 8:\IPPJi~~ .•d ~~las, a.re. A!fU~red: a. Bud toob • Mj•t•l>te wrnch,_ ph:ers<,· ~ereWckiw:.:-~· ·.]

  139. Removed

    [removed: ~\:.·~Ntd~;ffr,~4~~~:Mttt;.t~~]

  140. Removed

    [removed: 1 . t.pe. l6.·:sn]

  141. Removed

    [removed: . . ·4. ~{.··.···· ' : ~: (:.]

  142. Removed

    [removed: . . .... . l . . . . . a: tun: Jri~tiae~•·.cmitrol __swt:f¢'&_')_':-o__·. ·.·.~~-l»."t.:t.i~·-.· .·_. ·.·. ·,,·. ~:t •.'-'! ,;\_:,~ ),, T' J,.l~. · ... ' · .; •. ;;., rutlt l~tef·c«m'ttolavttdi,t; ••orr;• peaiticm.]

  143. Removed

    [removed: -~~ .. De·~:rsiz•t.~e ift~._~ftl. ,;:~r.ci~l .eenic~ at. the., t•~iml,l pole •]

  144. Removed

    [removed: • ~: ''! .l •.' :· . '. ·•• . :, ',J ·.· t • '• •.• • ·' .. . • • ' … • • •]

  145. Removed

    [removed: ~)· . ..-·1: ..{ ··:r--.·· ...:··;' '.: /''.. ,: .~·;';·.:;.:...~ ··.:1,:·· . .~: ... ~..,'~: ·.~.:···.··. ,;.·.' :.. :...····.· ·.. : :·.:· .·.;.·,~····'{ · ; 4~ , .. 9.~~...~- Jn.aa·. ~ars ~i~h ahorU~ag. bars .to .. a'le1a~e capac.i.to.rs. a,re ' ... ''~i.~~~!-~d{ ' . . '···. '-: : " ' '; . . ' . ,. '• ' ' . ']

  146. Removed

    [removed: ... ,•. z·< ;.~· · .. ·.~:~'. "l· .. : … ··:· ·.. ·:..: ....,:.J<_:: •··•.:·.·~/. :...·: ·.-,.... ,.... i.:;... :···:·· ·> ;-t … ~':·:,'f:;;·,'S f. · llisCOMeet the. Clefectiw regulator. by r~~·~h.e bo,lte4:·:))~~~ urud· ·~, --HlGI.WLTAG!", on the regulator tank wall and dbeOilM<::tiq·wire· fr• liM 1»1dhing •rbd_ "13". Insulate thia .wire if aec:ee.aaty•.]

  147. Removed

    [removed: Per the lo~tion of. the above •ntioned .pa11el, see the Instruction Book, Tab U, Pqe 2 .. Panel Marked "DA!fG!R, HIGH VOLTAGE"' on extreae ri&ht waH. See Drntn1 AT•SU•l2S, It. 6, Line Buah1ngs at top of. drawms~]

  148. Removed

    [removed: Page 1]

  149. Removed

    [removed: r )']

  150. Removed

    [removed: \ \·]

  151. Removed

    [removed: \]

  152. Removed

    [removed: .J· GL 69J.O •J.5 . Appen9.ix:2]

  153. Removed

    [removed: ':g; … 'R~e the· t:dp feature of the. short circuit (SC) P~~tective lelay ... on the. detectiv.e reg~_lator, by !14'11!1V~n_g, the twc:» W:t.~,e• .~~ar.b.ct.."AC"]

  154. Removed

    [removed: .. :- ;,:'.-::'ti-oxii·lllacket· pin IJ:~~n the:sc .r~1•Y· .·'l'h~- ~cf re.~ef~ wit;es mu,at,t be]

  155. Removed

    [removed: -, ', '..·< -·~ . · 'c;cmnect'ed togethe_r ao that ~he :t~ining· Sc rela~ys' wi,U eont·~~ue~ to]

  156. Removed

    [removed: :.,.. , _;_,· .. :function nom•.dly •..· ,..]

  157. Removed

    [removed: Remove the trip feature of. the Open Circuit (OC) .Protec;tive .~lay -crt' the defecti;.re tegulatot'~ ))y rem~ing the tWo ~ir;es marked "AC"]

  158. Removed

    [removed: from socket pin #3 on the OC relay<·\' The ·two removed wfris aU'It be connected together so that the remaining OC relays wUl conti-que to function normally. ·. \ · · ·]

  159. Removed

    [removed: $.ee 'Drawing AT;.,52;.,1)...514 and photogr~ph in Instruct~on Book, Tab 12, .., ·~-~~ s for location of the s.c and· o¢ relays. . · · . ..· ·]

  160. Removed

    [removed: h. R~-C!l'lel:"giz_e the substation fr~ t~~ina~ pole.]

  161. Removed

    [removed: . . . i . · Read in&! obtained on syltea:]

  162. Removed

    [removed: (t) Ou'tput ape .. Nomal em two loops. No reading will be obtained from ~hconnected loop.]

  163. Removed

    [removed: (2) Output Voltage - Regulator voltage supplying the two loop$]

  164. Removed

    [removed: ·will register high. ·n wu1 n<.,matiy .tea~ the e'um of the two loops at the appr:oPrilite b:Hght~ess. ·~tep. ·]

  165. Removed

    [removed: j. Effect of modification on Monitor System .. With the· tw~·1o0})8]

  166. Removed

    [removed: combined, the monitor: will dana with. the failure of six ~amps;. i.e., if the monitor was originally· set to ·aiarlit with ·Iii~· lamps out in each loop, it wil~ still .alarm with six lamps o~t OJ' the c_ombined loop. · · · · ·.·· · ·]

  167. Removed

    [removed: rn~' monitor alarm limits are th.reby reduced from a. t~tal alarm condition of 11 lamp failures on the ind:f.vidual .loops to a.n alam condition: of 6 lamp faiiutel on·· the combined loop. ' 'rbts reduced alarm limit is not considered objectionable for short periOds.]

  168. Removed

    [removed: S. ;~ttkftAfiONS~ This •t\lod was field t~s~ed' f()r two hwt~ ~ B-r~ghtness]

  169. Removed

    [removed: St~p 4 and: no overheating oc~urred~ . While the sys~em op~ra~ed normally on brightness step 5. for short periods during this· te·sf, prolonged periods of operation at this step should be avoided for fear of over•]

  170. Removed

    [removed: t:C~a~Ing' the reg\Ha't~r. · . .. . .]

  171. Removed

    [removed: ~ . --'~ ~~ ']

  172. Removed

    [removed: :·.' ..]

  173. Removed

    [removed: ~\ .·]

  174. Removed

    [removed: .'~. ·. ,• ' ·····. '.::]

  175. Removed

    [removed: Page 2 .·]

Whole text before this change

DEPARTMENT OF' TRANSPORTATION ·oRDER FEDERAl AVIATION ADMINISTRATION I GL 69i0.15 GREAT IAKES REGION

8/15/73

METHOD OF KEEPING THE GENER{U:. EI.iECTJ.t!C., HOLLINGSWORTH, AND WESTING­ SUBJ: . HOUSE ElECTRIC. AIB SYSTEMS IN OPERATION WITH ONE REGUlATOR REMOVED

1.. RJRPOSE. The attached instruction will enable maintenance personnel to provide continuity of service to the Approach Lighting System in

case of one regulator failure ..

2.. :OIS~ION., This Order is distributed to the Airway Facilities Division, Branch level a.nd above, and to all Airway Facilities field offices. ·

3.. CANCELlATION•. Order CE 6910.; is cancelled.

4. APPLICATION.

a.. :APpendix l. conta.in.s instructions applica.bl.e to the General.

E1ectric Approa~h,Lighting S.ystem Substation, _175 KVA, 2400/4160 volt, Contract CCA-33958, CAA Specifications 1146 and ll47,

G. E~ Requisition NUmber 322-73550, aE!-6276. The Hollingsworth sul;)station, Model FA•67WA-l612 is similar to the G. E. Substation.

b. .Appendix .2 contains instructiOJ;lS applicable to the Westinghouse

Approach Lightilig System Substations, 175 KVA, 2400/4160 volt,

Contract FA-1772 (l-3153_, FAA Specifications ll46A and ll47A.

AL_#~ ~H. GrASS . Chief, Airway Facilities Division

Distribution: RAF-3; FAF-0 . (Normal) Initiated By: AGL-445

(.

8/l5/73 GL 6910. Append.i.x 1

' :.- > ~-· :.'·;-~-i '.~·· ;_:

APP!JD:tt 1. ~- OftiAttON"OF G.!. SUBSTATIOM:,

1. C)p GD!tw:. ELICTll:C ALS'"SUBS'l"AttON Wl'l'H''OD:' ··-~ ··<·imcuti'NI.:' ,..· Thb:aethod~of prnicU.nl_ continuity'· o ''ii~~ce irll appl' ciible··-to the' Gi"Miil Electd.c l15·'.J.VA Substatiob; C~traa~!;: CCA-33958, CAA Speeification8·11t.6' and' 1147; ·G.· E. l.equillllitiOft ·RUI!IIIber

322•72550, GE~..6278~. . . . ~· <· ·i

~- :';' - ... -. ' ; • ·; .' .• · .•'. .;"l wtten'one''ill &aUUt With thia ·;toeeiin;e~ thb t•poraey ath~

1 -of _,.,,. -operiticm cn;:w··.··et .... ·ill30 -.ta.ate• .-··- , '-~

:;. ·..~ ! ·: ' ·.· ~~ . < • • •••• ;, ·_.). ~: --~

a. Do not'·-~i>uY'iepab··cm·ttte:defeetive rejutatorr-~Ui!!'·thia 1

temponry •thM b in c:»pe'&'aticm. De•euraue the _cG~~~~~J~~~~arc~l fHder at the temial pole When ·any wm be~a·necuaary~ <<• ~-·;; · r

b. leMW tbe fuse to the appnprute ~so· wAtt ea,aeitor ~ir u1a

aaaocuted reaulator ia dbcoxmected.

1 ~.. :./~('' . :, ~·.' ; ~:·;·~ ~- i:. ,~. . •.:- ~-:~··:, … > ·:·. ··,::,,· ·';··} '!.. 3.·:·;'SUP1LIES A1Q) @L$~''' !ttae follni&~ ~U:ea:.ad toob are·'nquire..t:

:,. •• ·', ..· ::·.,,. <: ;: ' • •••. •.·· a. Rand teo.b .. .Adjustable ~b, pliera~ illc~rivu. • :;;:. ."·'.: -;.. ."•. ,. . • .~. •. f.. : ' .. : ..• .. • .' :. ~ ': •. \ :. ,i ..:· . .; . . ; .• • b. Supplies • ·~Hc:·~olts for ft wire,· electrlcal tlpe; 16 so

~·u~ -win (2 pieQN about 2 feet lema) • ·:: ..:;.~.: .. ~~·.: :,:,:•··-~ ·.~" .. •. ·~·· ;;.''''•:­ 4.'·~.'t.· .. •' .. . : .·

(: . I • .~. : . '' t ; .• 1 l, ' ,: '

1 .-.· f ,· , I <. ; ' a. Tum Bd.gbtneaa Control switch to "Olr" puiticm. ' · '' :..

~··:;;;~r:,,b~. ''tum ltea"t cc>ntrol awi~Ch .to ":OW''· paition.

,·,;.'·'/ ; . ~~ ·; :··~·=~···~_;•' ,. :.;~ ··... · ....: . : ·.... :-· .

·· F··'':·c:. ··ne-~lier~~ae :_~he inc-wig c-~rd.al service ~.t the·· ten&hiit':'Pole.

~ " • . ,• '.;>·. ·,. .:: d .... Groun~ ~ua k!a ~itb _illborti~ bara to assure capacitora ere _discharged.

<~ ~··.. ~. ··. ··... : :~· ·.' ....: .. <·! . . ·. . . . : .. : . . : ;.. ·.. ·."-' :;· ..·;-~· . ·e~-:. ''Dftt'cmm~ct':tne·~~ie•loOp<·on··the def~ti"'e rilulatot and'.-'SII.IES ;. ,•....·tti':b ··,;fib .• : loep ,:.on j· ieod' ·replatt:Oi'.at thi' Hriej. Ctttouf:art~tn . ··cou.putamt ~-~»~: · ·, :, · · ·. · · ···- · .. · -..-· , ·. . . -·~ 1'"

': ··f ~· ··lJiseomaect ·die··aef~e·uve~ ·tctgulator by removi-ng the co.Ve£::;~.iii£;:l · c ,_,,. ·· ~ ·"··: fr«.M

1t:tie 'ltijll 'voltqf! c'~eeticm coaapartant · located''befifni tifli22 •· ·l~'d':~tt&r-•:.,aet t-D'the t!~i 'eoa.,a~~ ·in<ttni-t'2:'na;;;>::Jd ,_,·;.;:. . · ~-~ ::·~t-s:co~ef£ri~ ;:'ttl~ ~:wtre; ;fhillii·':·the ·,tiieoaitng pdwer :husnbig···(t.I•L·r't:.2 s"t.3) ,, ;...~"on·;~~,e~~e'fll~i~~·;;l!'~~~-~Of; ';l~'6:fate ~i.S Wi·re•aa'Jiei.:gaj;,~cti<~'l

. ,, . l """· , ...~~~~!~~c~f" ~~i~Wi~~ lfl,~D'.~.·ba· 'Ini'truC:ffori ·~·M•nual::fot '1J#if ·-~2. )it

… ,.~.;'.:'~! .. ,.. • :.:.· (.,·. ~·~·-··v '···· ..., ~.~ ... ·..:·.. Y;f'.· .;··:y,,·,;: ': ;... .. ...~::-.. · ·, ~~·.:.:.:~;.!,: :-.~·rt:.: ~~ttl')'·;

Page 1

,, tl

)

GL. 69lo .l5 8/l5/73 Appendi:x; l

g. Re~ve. the lower cover in the top sect,ion of the-: lodld mon,it:o~.

·;compartment. 8lock open the contacts of th.e Open c·~J:'cuif~r()~ector Relay on the defective. regulator. See Figure 5 of GEI..64020 · · ,.. , Instruction Book, relays 6, 10 or 17. "

h. Reaove glass cover of appropriate relay 30, 34 or 39, and energize

· .d~al indicating· lights em load monito'l!' door panel i)y block~ng ·. appropriate contact. Relays 30, 34 and 39 canbe se~n in. phqtograph Figure 6 of Instruction Booklet GEI-64020 for Unit 12. This remove& defective regulator alarm. ··' ·

i.~ ·•. :En~rgbe incoming COI'!Dercial service at the· termi~utl pole· '

·~ ~--:';,';~.J;"·~· _;:·. j. Energize the .ALS System.

(1) Output Voltages - Regulator voltage supplying the two loops :;.;.; :--; "will register high. It will no~lly read .the !llum ()f the· ~.wo

loops at the appropriate brightness st&p.

. . .. . . . . (2) Output Amperes .. Nomal em the operating regulators. No readi.rag will. be obtained from the defective regulat()r.

(3) Micro Ammeter reading on load ~onitor panel - The readings

obtained from the operating r4'ula tors will be normaL. _.:t:here will be .a high reading from the defective reg¥.llator·, but this

can be ignored • ·

1. Effect of modification em Monitor S:xs~em .. Wj.th, the _two loops combined, the monitor will alarm with the failure of six lamps; i.e. • if the , ,_;,;,!·•~f:t()r .~as originally .set to alarm_ w~th. siJc ~-ps. ()l.lt .in ea~h_1oop,

it will still alarm with six lamps out on the combined loop.

~· "':'.} .;-: : :·~. "'f_ ' ; ,:, ~; The monitor alarm U.miu are thereby>- reduced from a total alarm

:.z.r;;~q:m~i:~ion of 11 lamp failures on the ind_ividu_al.looparto an alarm

.. c~d~tion of 6 lamp· failures on the c~ined l~op. This .re_duced

alarm limit is not consid~red objectionable for shor,t. p'l'::i.ods.

5. LIK'lo'l'ATIONS. This method was field tested for, two hourl!l-~il ,~r.ightness

St.~p 4,.and no overheating occur.re(i ~ ·wnue, the, syste~ ~rat~<i- normally on' Brigb.~I)eu Step 5 for short. pe:r:i~s ~u-r.in_g tq~s. te.st9 p~olq~ged \; ,_;p~ri,o<i&t of·. opera~ion ..-t this .s.tep. should ,be avoid~_.d f.Qr. ff!ar, e»,~ ._,over­

. load~ng ..tqe regulator. While the, .tran~fo~;s _are. rat~d ..:at_,.S,O_~A and

i~ ha~_,b,~en .,calculated that, tw.o .averag~'·:,toqp$, 1fi,,ll .. draw.. 4,8_J(:W ,on step five, 'the number of lights in the loops 'at each site could' (fiffer which wiil vary the KW.

-~ ..- ... 6/15/.73 ~-: ,,. G,L 691(). ~ .15,

~penci~-~g ~.

.m1~mu.. 2= .•.. ,...~~;~~-1:10N·orpsnmams aa•n.'-'

· ···~· ~ .. ,-p, uS~ ;Ai.S:~ sUU'l'AndN ... ·m o" .. ~TOR

.. t?~)»r~ . \'~--c·~~n~~t:r.. of,a,ni'i~,--~,:.:~p)'licable ' weat'i~u:n !lectric'Corporation 115 KYA. S~bs.ta~i<m_, ~ontract

. .

,,;·;;;p~~t'~l!.t~·=~~~~":!;~~ ~i!~ .~~~~ .aJ~ of

·'·~·- .. _ ,.,··.

1 •. ·· , -~. . . .~. · to FA•l772 (1•3153), FAA Specific:aticms 1146A and 1l4.7A.

~-- ~.;~~~; ,~,. ~P~t:~: ~· ~f~i.. "P~~or.:,;~i~~~

this· t.~...ry·· -~:~ ·~,·~-··~--~~~~~- .~-.rg1&4! the, .~rcial feecier at the tanab.-al ·'·tt-l• *en d1 Wed: becOiHa neces.S~n:.Y.

. . .·· ~ .

' . ': . _.,;. ' : ; ·.•• :..; ::.. '. ·,, .;; .... . :· ' . :: . ..··-.;' .'·: .' '- •. •' ,.. ..:~·· ;' ':.- ~ ...'·c-. ;,; ;:j ,, (; b. a~ tM, £ue· to the .•proptiate' ·so· Dll capacitor whenever

its associated ntulatot>· 18 di-a~c,ted. . . ·

·, :'~"~~ ,, .~i'1tJIS; ~- ~~;· ;..•,~e ~~;tow~~- 8:\IPPJi~~ .•d ~~las, a.re. A!fU~red: a. Bud toob • Mj•t•l>te wrnch,_ ph:ers<,· ~ereWckiw:.:-~· ·.

~\:.·~Ntd~;ffr,~4~~~:Mttt;.t~~

1 . t.pe. l6.·:sn

. . ·4. ~{.··.···· ' : ~: (:.

. . .... . l . . . . . a: tun: Jri~tiae~•·.cmitrol __swt:f¢'&_')_':-o__·. ·.·.~~-l»."t.:t.i~·-.· .·_. ·.·. ·,,·. ~:t •.'-'! ,;\_:,~ ),, T' J,.l~. · ... ' · .; •. ;;., rutlt l~tef·c«m'ttolavttdi,t; ••orr;• peaiticm.

-~~ .. De·~:rsiz•t.~e ift~._~ftl. ,;:~r.ci~l .eenic~ at. the., t•~iml,l pole •

• ~: ''! .l •.' :· . '. ·•• . :, ',J ·.· t • '• •.• • ·' .. . • • ' … • • •

~)· . ..-·1: ..{ ··:r--.·· ...:··;' '.: /''.. ,: .~·;';·.:;.:...~ ··.:1,:·· . .~: ... ~..,'~: ·.~.:···.··. ,;.·.' :.. :...····.· ·.. : :·.:· .·.;.·,~····'{ · ; 4~ , .. 9.~~...~- Jn.aa·. ~ars ~i~h ahorU~ag. bars .to .. a'le1a~e capac.i.to.rs. a,re ' ... ''~i.~~~!-~d{ ' . . '···. '-: : " ' '; . . ' . ,. '• ' ' . '

... ,•. z·< ;.~· · .. ·.~:~'. "l· .. : … ··:· ·.. ·:..: ....,:.J<_:: •··•.:·.·~/. :...·: ·.-,.... ,.... i.:;... :···:·· ·> ;-t … ~':·:,'f:;;·,'S f. · llisCOMeet the. Clefectiw regulator. by r~~·~h.e bo,lte4:·:))~~~ urud· ·~, --HlGI.WLTAG!", on the regulator tank wall and dbeOilM<::tiq·wire· fr• liM 1»1dhing •rbd_ "13". Insulate thia .wire if aec:ee.aaty•.

Per the lo~tion of. the above •ntioned .pa11el, see the Instruction Book, Tab U, Pqe 2 .. Panel Marked "DA!fG!R, HIGH VOLTAGE"' on extreae ri&ht waH. See Drntn1 AT•SU•l2S, It. 6, Line Buah1ngs at top of. drawms~

Page 1

r )'

\ \·

\

.J· GL 69J.O •J.5 . Appen9.ix:2

':g; … 'R~e the· t:dp feature of the. short circuit (SC) P~~tective lelay ... on the. detectiv.e reg~_lator, by !14'11!1V~n_g, the twc:» W:t.~,e• .~~ar.b.ct.."AC"

.. :- ;,:'.-::'ti-oxii·lllacket· pin IJ:~~n the:sc .r~1•Y· .·'l'h~- ~cf re.~ef~ wit;es mu,at,t be

-, ', '..·< -·~ . · 'c;cmnect'ed togethe_r ao that ~he :t~ining· Sc rela~ys' wi,U eont·~~ue~ to

:.,.. , _;_,· .. :function nom•.dly •..· ,..

Remove the trip feature of. the Open Circuit (OC) .Protec;tive .~lay -crt' the defecti;.re tegulatot'~ ))y rem~ing the tWo ~ir;es marked "AC"

from socket pin #3 on the OC relay<·\' The ·two removed wfris aU'It be connected together so that the remaining OC relays wUl conti-que to function normally. ·. \ · · ·

$.ee 'Drawing AT;.,52;.,1)...514 and photogr~ph in Instruct~on Book, Tab 12, .., ·~-~~ s for location of the s.c and· o¢ relays. . · · . ..· ·

h. R~-C!l'lel:"giz_e the substation fr~ t~~ina~ pole.

. . . i . · Read in&! obtained on syltea:

(t) Ou'tput ape .. Nomal em two loops. No reading will be obtained from ~hconnected loop.

(2) Output Voltage - Regulator voltage supplying the two loop$

·will register high. ·n wu1 n<.,matiy .tea~ the e'um of the two loops at the appr:oPrilite b:Hght~ess. ·~tep. ·

j. Effect of modification on Monitor System .. With the· tw~·1o0})8

combined, the monitor: will dana with. the failure of six ~amps;. i.e., if the monitor was originally· set to ·aiarlit with ·Iii~· lamps out in each loop, it wil~ still .alarm with six lamps o~t OJ' the c_ombined loop. · · · · ·.·· · ·

rn~' monitor alarm limits are th.reby reduced from a. t~tal alarm condition of 11 lamp failures on the ind:f.vidual .loops to a.n alam condition: of 6 lamp faiiutel on·· the combined loop. ' 'rbts reduced alarm limit is not considered objectionable for short periOds.

S. ;~ttkftAfiONS~ This •t\lod was field t~s~ed' f()r two hwt~ ~ B-r~ghtness

St~p 4 and: no overheating oc~urred~ . While the sys~em op~ra~ed normally on brightness step 5. for short periods during this· te·sf, prolonged periods of operation at this step should be avoided for fear of over•

t:C~a~Ing' the reg\Ha't~r. · . .. . .

~ . --'~ ~~ '

:·.' ..

~\ .·

.'~. ·. ,• ' ·····. '.::

Page 2 .·

Whole text after this change

ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION

GREAT LAKES REGION GL 6910.15

8/15/73

METHOD OF KEEPING THE GENERAL ELECTRIC, HOLLINGSWORTH, AND WESTING- SUBJ: HOUSE ELECTRIC ALS SYSTEMS IN OPERATION WITH ONE REGULATOR REMOVED

1. PURPOSE. The attached instruction will enable maintenance personnel to provide continuity of service to the Approach Lighting System in case of one regulator failure.

2. DISTRIBUTION. This Order is distributed to the Airway Facilities Division, Branch level and above, and to all Airway Facilities field offices.

3. CANCELLATION.Order CE 6910.5. is cancelled.

4. APPLICATION.

a Appendix 1 contains instructions applicable to the General Electric Approach Lighting System Substation, 175 KVA, 2400/4160 volt, Contract CCA-33958, CAA Specifications 1146 and 1147, G. E. Requisition Number 322-73550, GEI-6276. The Hollingsworth substation, Model FA-67WA-l612 is similar to the G. E. Substation.

b. Appendix 2 contains instructions applicable to the Westinghouse Approach Lighting System Substations, 175 KVA, 2400/4160 volt, Contract FA-1772 (1-3153_, FAA Specifications 1146A and 1147A.

alon H. Sloss

ALAN H. GLASS Chief, Airway Facilities Division

Distribution: RAF-3; FAF-O (Normal) Initiated By: AGL-445

8/15/73 GL 6910 Appendix 1

APPENDIX 1. EMERGENCY OPERATION OF G.E. SUBSTATION EMERGENCY OPERATTON OF GENERAL ELECTRIC ALS SUBSTATION WITH ONE REGULATOR FAILURE This method of providing continuity ofservice is applicable to the General Electric 175 KVA Substation, Contract CCA-33958, CAA Specifications 1146 and 1147, G. E. Requisition Number 322-72550, GEI-62786. When one is familiar with this procedure, this temporary method of operation can be setup in 30 minutes

2. PRECAUTION. a. Do not attempt any repair on the defective regulator while this temporary method is in operation. De-energize the commercial feeder at the terminal pole when any work becomes necessary Remove the fuse to the appropriate 50 KVAR capacitor whenever its associated regulator is disconnected. 3. SUPPLIES AND TOOLS. The following supplies and tools are required: Hand tools - Adjustable wrench, pliers, screwdriver. Supplies - Split-bolts for $6 wire, electrical tape, $6 5Kv insulated wire (2 pieces about 2 feet long). 4.PROCEDURE

a. Turn Brightness Control switch to "Ofp" position. b. Turn Breaker Control switch to "Off" position. c. De-energize the incoaing commercial service at the terminal pole. d. Ground bus bars with shorting bars to assure capacitors are discharged. e. Disconnect the series loop on the defective regulator and SERIES this with a loop on a good regulator at the series cutouts in Comparteent 1D.

f. Disconnect the defective regulator by removing the cover panel from the high voltage connection coapartment located behind the load monitor panel in the upper compartment in Unit 2 and disconnecting the wire fron the incoming power bushing (LI, L2, L3) on the defective regulator. Insulate this wire as necessary. (Reférence: Draving 131D856 in Instruction Manual for Unit 2.)

GL 6910.15 8/15/73 Appendix1

g. Remove the lower cover in the top section of the load monitor compartment. Block open the contacts of the Open Circuit Protector Relay on the defective regulator. See Figure 5 of GEI-64020 Instruction Book, relays 6, 10 or 17.

h. Remove glass cover of appropriate relay 30, 34 or 39, and energize dual indicating lights on load monitor door panel by blocking appropriate contact. Relays 30, 34 and 39 can be seen in photograph Figure 6 of Instruction Booklet GEI-64020 for Unit #2. This removes defective regulator alarm.

i.Energize incoming commercial service at the-terminal pole.

j. Energize the ALS System.

k.Readings obtained on System:

(1) Output Voltages - Regulator voltage supplying the two loops will register high. It will normally read the sum of the two loops at. the appropriate brightness step.

(2) Output Amperes - Normal on the operating regulators. No reading will.be obtained from the defective regulator.

(3) Micro Ammeter reading on load monitor panel - The readings obtained from the operating regulators will be normal. There will be a high reading from the defective regulator, but this can be ignored.

1. Effect of modification on Monitor System - With the two loops combined, the monitor will alarm with the failure of six lamps; i.e., if the monitor was originally set to alarm with six lamps out in each loop, it will still alarm with six lamps out on the combined loop.

The monitor alarm limits are thereby reduced from a total alarm condition of ll lamp failures on the individual loops to an alarm condition of 6 lamp failures on the combined loop. This reduced alarm limit is not considered objectionable for short periods.

5. LIMITATIONS. This method was field tested for two hours on Brightness Step 4 and no overheating occurred. While the system operated normally on Brightness Step 5 for short periods during this test, prolonged periods of operation at this step should be avoided for fear of overloading the regulator. While the transformers are rated at 50 KVA and it has been calculated that two average loops will draw 48 KW on step five, the number of lights in the loops at each site could differ which will vary the KW.

Da re 2

8/15/73 GL 6910.15 Appendix 2

APPENDIX 2. EMERGENCY OPERATION OF WESTINGHOUSE SUBSTATION

EMERGENCY OPERATION OF WESTINCHOUSE ALS SUBSTATION WITH ONE REGULATOR PAILuRE. This method of providing continuity of service is applicable to the Westinghouse Electric Corporation 175 KVA Substation, Contract FA-1772 (1-3153), FAA Specifications 1146A and 1147A.

en one is faailiar with this procedure, this temporary method of operation can be set up in 30 minutes

2. PRECAUTION

Do not attempt any repair on the defective regulator while this temporary method is in operation. De-energize the comercial feeder at the terminal pole vhen any work becomes necessary.

b. Remove the fuse to the appropriate 50 KVAR capacitor whenever its associated regulator is disconnected.

SUPPLIES AND TOOLS. The folloving supplies and tools are required:

Hand tools - Adjustable vrench, pliers, screwdriver.

Supplies - Split-bolts for $6 wire, electrical tape, $6, 5kv insulated vire (2 pieces about 2 ft. long)

4 PROCEDURE

Turn Brightness Control switch to "Ofp" position

b. Turn Breaker Control switch to "OFp" position.

De-energize the incoming comeercial service at the terminal pole.

Ground bus bars with shorting bars to assure capacitors are discharged.

Disconnect the series loop on the defective regulator and SERIEs this with s loop on a good regulator at the series cutouts ir Coaparteent 1D

f. Disconnect the defective regulator by removing the bolted panel marked "DANGER, HIGH VOLTAGE", on the regulator tank wall and disconnecting wire from line bushing marked "H3". Insulate this wire if necessary.

Por the location of the above mentioned panel, see the Instruction Book, Tab 12, Page 2 - Panel Marked "DANGER, HIGH VOLTAGE" on extreme right wall. See Drawing AT-52A-325, It. 6, Line Bushings at top of drawing.

GL 6910 .15. 8/15/73 Appendix2

g. Remove the trip feature of the short circuit (SC) Protective Relay on the defective regulator, by rewoving the two wires marked "AC" from socket pin #3 on the SC relay. The two removed wires must be connected together so that the remaining SC relays will continue to function normally.

Remove the trip feature of the Open Circuit (OC) Protective Relay on the defective regulator, by removing the two wires marked "AC" from socket pin #3 on the OC relay. The two removed wires must be connected together so that the remaining OC relays willcontinue. to function normally.

See Drawing AT-52-D-514 and photograph in Instruction Book, Tab 12, Page 5 for location of the SC and OC relays.

h. Re-energize the substation from terminal pole.

i. Readings obtained on system:

(1) Output Amps - Normal on two loops. No reading will be obtained from disconnected loop.

(2) Output Voltage - Regulator voltage supplying the two loops will register high. It will normally read the sum of the two loops at the appropriate brightness step.

j. Effect of modification on Monitor System - With the two loops combined, the monitor will alarm with the failure of six lamps; i.e., if the monitor was originally set to alarm with six lamps out in each loop, it will still alarm with six lamps out on the combined loop.

The monitor alarm limits are thereby reduced from a total alarm condition of ll lamp failures on the individual loops to an alarm condition of 6 lamp failures on the combined loop. This reduced alarm limit is not considered objectionable for short periods.

5. LIMITATIONS. This method was field tested for two hours on Brightness Step 4 and no overheating occurred. While the system operated normally

on brightness step 5 for short periods during this test, prolonged periods of operation at this step should be avoided for fear of overloading the regulator.