ORDER 6750.54

ELECTRONIC INSTALLATION INSTRUCTIONS FOR INSTRUMENT LANDING SYSTEM (ILS) FACILITIES

FEDERAL

December 17, 1993

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

Distribution: A-W (NN/AS/SM/SE)-3; A-Z (CD)-3, Initiated By: ANN-400 A-FAF-O (Ltd)

RECORD OF CHANGES

CHANGE SUPPLEMENT TO BASIC

OPTIONAL

CHANGE TO BASIC

DIRECTIVE NO. 6750.54

SUPPLEMENTS OPTIONAL

FAA Form 1320-5 (6-80) USE PREVIOUS EDITION

Binder1 › 0332_001

FOREWORD

The material in this order is the result of a headquarters/regional group effort to consolidate and update a number of existing Instrument Landing Systems (ILS) orders that are outdated. This order identifies some new localizer antenna arrays. Also added in this order is information on the end-fire glide slope antenna system. Additional material has been added through the regional participants, based on their experience in installing ILS's.

Rodman Gill Program Director for Navigation and Landing

i (and ii)

12/17/93

TABLE OF CONTENTS

CHAPTER 1. GENERAL INFORMATION

Paragraph

1. Purpose 2. Distribution 3. Cancellation 4. Application 5. Directive Verbs 6. Procedures 7. Description of Operational Components Table 1-1. Frequency Allocation in MHz 8. RF Connectors .. Figure 1-1. Assembly of UG-1185 Connector Figure 1-2. Assembled UG-1185 Connector 9. Flight Inspection .

CHAPTER 2. LOCALIZER SYSTEMS

SECTION 1. TECHNICAL CHARACTERISTICS

200. System Description . . 201. Localizer Transmitting Equipment Figure 2-1. Typical Localizer Transmitter 202. Signal Cabling .. . 203. Localizer Antenna Systems Figure 2-2. V-Ring Antenna Figure 2-3. Single V-Ring Radiation Pattern . Figure 2-4. 15-Element V-Ring Composite Radiation Pattern Figure 2-5. 15-Element V-Ring Array Figure 2-6. 8-Element V-Ring Array

Page

1

1 1 1 1 1 3 4 7 7 8 8

9

9

9 9 10 11 11 13 14 15 16 17

Figure 2-7. 8-Element V-Ring (Once-Frequency) Localizer Antenna Array

Figure 2-8. Traveling Wave Antenna Vertical Radiation Pattern . Figure 2-9. Typical Ground-Mounted Traveling Wave Array-Type I Figure 2-10. LPD Antenna … Figure 2-11. Log Periodic Dipole Antenna Radiation Pattern Figure 2-12. Wide and Narrow Aperture Localizer Antenna Arrays Figure 2-13. 8-&14-Element LPDA Radiation Patterns, Antenna Spacing, Phase & Amplitude

18 19 21 22 23 24

25

iii

Paragraph Page

Figure 2-14. 8-Element LPDA (One-Frequency) Localizer Antenna Array 26 Figure 2-15. 14-Element LPDA (One-Frequency) Localizer Antenna Array 27 Figure 2-16. 14/6 Dual Frequency LPD Array Spacing and Distribution 28 Figure 2-17. 14/6 Dual Frequency Course Radiation Pattern (CSB + SBO) 29 Figure 2-18. 14/6 Dual Frequency Antenna Clearance Radiation Pattern (CSB + SBO) 30

204. Integral Monitoring 31

205.-208. Reserved 32

SECTION 2. ELECTRONIC INSTALLATION 33

209. Purpose 33 210. General 33 211. Tune Up Procedures 38 Figure 2-19. RF Transmission Path Length Test Setup and Distribution . . . 43 Figure 2-20. Monitor Path Length Test Setup (Vector Voltmeter) . 48 212. Flight Inspection 50 213.-216. Reserved 52

CHAPTER 3. GLIDE SLOPE 53

SECTION 1. TECHNICAL CHARACTERISTICS 53

300. System Description . . 53 301. Glide Slope Transmitters . 53 302. RF Coaxial Transmission Lines 53 303. Glide Slope Antenna Systems 53 Figure 3-1. Vertical Lobe Structure For Null-Reference Glide Slope 54 Figure 3-2. Null Reference Monitor Circuitry (Typical) . . . 55 Figure 3-3. Vertical Lobe Structure for Sideband-Reference Glide Slope 57 Figure 3-4. Composite Vertical Lobe Structure (Sideband Patterns) for Sideband-Reference Glideslope 58 Figure 3-5. Sideband Reference Distribution/Recombination Circuits 59 Figure 3-6. Carrier and Sideband Vertical Lobe Structure for Capture Effect Glide Slope 60 Figure 3-7. Clearance Signal Vertical Lobe Structure for Capture Effect Glide Slope . . . . 61 Figure 3-8. Composite Vertical Lobe Structure for Capture Effect Glide Slope . 62

iv

12/17/93

Paragraph

Page

Figure 3-9. Typical Capture-Effect Glide Slope Recombination Circuit

Figure 3-10. Vertical Patterns, End-Fire Array Table 3-1. Glide Slope Comparisons . Figure 3-11. Typical EFGS RF Distribution and Monitoring 304.-308. Reserved

SECTION 2. ELECTRONIC INSTALLATION

309. Site Selection . 310. Antenna Installation 311. Transmission Lines 312. Initial Tuneup/Setup for Null Reference Facilities

63 65 66 67 67

68

68 68 68 69

Table 3-2. Antenna and Offset for Null-Reference System for Level Terrain

Table 3-3. Antenna Offset (Multiplying Factor) 313.-317. Reserved 318. Tuneup for Sideband Reference Facilities Table 3-4. Antenna and Offset for Sideband Reference System Table 3-4A. Antenna Offset (Multiplying Factor). Table 3-5. Antenna Settings for 4 to 1 USB to LSB Null Ratio (For Level Terrain) . . . . Table 3-6. Antenna Settings for 2.5 to 1 USB to LSB Null Ratio (For Level Terrain) . .

70 71 74 74 75 76

77

78

Table 3-7. Calculation of USB and LSB Nulls and Antenna Heights .

319. Far-Field Ground Phasing . 320. Location of the Phasing Detector 321. Flight Inspection 322. Tuneup/Setup for Capture Effect Facilities Table 3-8. Antenna Height and Offset for Capture Effect System (For Level Terrain) . Table 3-8A. 323. Flight Inspection 324.-328. Reserved 329. Tuneup/Setup for End-Fire Facilities Figure 3-12. Antenna Curvature Computation Figure 3-13. Regarding Azimuth Coverage . 330.Flight Inspection . 331.-333. Reserved

79 80 81 82 84

84 85 88 89 90 91 92 93 94

CHAPTER 4. MARKER TECHNICAL DETAILS

400. Introduction . 401. Location of the ILS Markers 402. Transmit System. Table 4-1. Marker Indicator Key 403. RF Coaxial Transmission Lines 404. Antenna Patterns 405. Antenna Mounting Heights Figure 4-1. Major and Minor Axis Figure 4-2. Required Signal Strength and Coverage Figure 4-3. Coverage vs. Height Above Marker 406. Marker Beacon Adjustments and Flight Inspections

CHAPTER 5. COMPASS LOCATOR SYSTEMS

SECTION 1. TECHNICAL CHARACTERISTICS

500. System Description .

SECTION 2. INSTALLATION INSTRUCTIONS

501. Purpose 502. General. 503.-504. Reserved

CHAPTER 6. OTHER INFORMATION

SECTION 1. TECHNICAL CHARACTERISTICS

600. Remote Monitor and Control . 601. Remote Maintenance Monitoring 602. ILS Interlock Systems . . 603. Far-Field Monitor 604.-613. Reserved

SECTION 2. ELECTRONIC INSTALLATION

614. General.. 615. Equipment Layout and Installation 616. Remote Monitor and Control 617. Remote Maintenance Monitoring 618. ILS Interlock Systems .

vi

12/17/93

Page

95

95 95 95 95 96 96 96 96 97 98 98

99

99

101

101 101 101

103

103

103 103 104 104 104

105

105 105 105 106 106

Page

APPENDIX 1. MULTIPLE ILS INTERLOCK SYSTEMS 1

Paragraph

1. General .. 1 2. Equipment Description 1 3. ILS System Requirements 2 Figure 1. Interlock System Diagram 2 4. Technical Description . . . 3 Figure 2. Selector/Indicator Block Diagram 3 Figure 3. Control Unit Block Diagram 4 5. System Installation . . . . 5 Figure 4. Installation Wiring Table 6 Figure 5. Multiple ILS Interlock Selector/Indicator Schematic Diagram (Sheet 1 of 2) 7 Figure 6. Multiple ILS Interlock Selector/Indicator Schematic Diagram (Sheet 2 of 2) . . 8 Figure 6A. Multiple ILS Interlock Control Unit (FA-9427/2) Schematic Diagram . . . . 9 Figure 6B. +12 V DC Power Supply Schematic 9 Figure 7. Mark 1A (Wilcox) ILS (Localizer and Glide Slope) Schematic Diagram . . 10 Figure 8. Mark 1B (AIL) ILS (Localizer and Glide Slope) Schematic Diagram . . 11 Figure 9. Mark 1C (Wilcox) ILS (Localizer and Glide Slope) Schematic Diagram . . .. 12 Figure 10. Mark 1D (Wilcox) ILS (Localizer and Glide Slope) Schematic Diagram … 13 Figure 11. AN/GRN-27 (T.I. CAT II) ILS Localizer and Glide Slope Schematic Diagram . 14 Figure 12. FA-5791 ILS Solid-State 75 MHz Marker Schematic Diagram 15 Figure 13. Mark 1A (Wilcox) ILS 75 MHz Marker FA 8030-3 Schematic Diagram 16 Figure 14. FA-8102, 3, and 4 ILS 75 MHz Marker Schematic Diagram 17 Figure 15. Mark 1B (AIL) ILS 75 MHz Markers (FA-8603, 61, and 62) Schematic Diagram . 18 Figure 16. Mark 1C (Wilcox) ILS 75 MHz Markers (FA-8831-6) Schematic Diagram . . . 19 Figure 17. AN/GRN-28 (Texas Instruments) ILS 75 MHz Marker Schematic Diagram . . 20 Figure 18. AN/GRN-26 (Texas Instruments) ILS 75 MHz Marker Schematic Diagram 21

vii

CHAPTER 1. GENERAL INFORMATION

I. PURPOSE. This order sets forth national installation procedures and standards for use by technical personnel working on ILS equipment. In as much as uniform operating characteristics should be obtained for all facilities, it is necessary that standard installation, tuneup, and maintenance procedures be followed by all personnel. Personnel assigned the responsibility of installing and adjusting the ILS facilities should be skilled personnel who have been trained in proper installation techniques.

2. DISTRIBUTION. This order is being distributed to branch level in the offices of the Program Director for Navigation and Landing and Airport Safety and Standards; and the Systems Maintenance and NAS System Engineering Services; branch level in the Engineering, Research and Development Service at the FAA Technical Center; limited distribution to regional Airway Facilities field offices having localizer and glide slope facilities.

3. CANCELLATIONS. The following orders are canceled:

a. Order 6750.6B, Installation Instructions for Category I and Category II ILS Glide Slopes dated July 9, 1976.

b. Order 6750.35, Installation Instructions for Category I ILS Localizer, Marker Beacon, and Compass Locator Facilities, dated November 14, 1976.

4. APPLICATION. This order applies to new establishments or relocated facilities.

5. DIRECTIVE VERBS. The material in this order contains recommended practices, and other guidance material, which requires the use of certain directive verbs such as SHALL, SHOULD, WILL and MAY. In this order the meaning of the verbs is as follows:

a. SHALL. Action is mandatory.

b. SHOULD. Action is desirable or recommended.

c. WILL. Action is to be taken in the future.

d. MAY. Action is permissible.

6. PROCEDURES.

a. Safety. Personnel shall use care in working on ILS equipment, particularly radio transmitters, since the voltages present are dangerous to life. Observance of precautions necessary to avoid electrical shock is the direct responsibility of the individual. No one shall perform work on the equipment without full knowledge of the dangers involved. Work on high voltage circuits should not be attempted by an individual when it is possible to obtain the services of an assistant.

b. Uniformity of Measurements and Procedures. Adjustment procedures used during the initial tuneup of an ILS facility are of vital importance to the installation engineer and to the electronic maintenance personnel. To assure a maximum degree of standardization, the procedures presented in this order should be used by installation personnel.

c. Instruction Books. Instruction books are available for each type of equipment. These instruction books should be referred to for adjustment to specific units. The instruction books shall be kept current to reflect any corrections and additions required by equipment modifications issued by the Washington office. When any modifications to equipment are made, all applicable drawings must be revised. The installation engineer shall not consider the modification of equipment completed until appropriate changes have been made to the instruction books. Up-to-date instruction books shall be provided for all newly commissioned facilities.

d. Standards and Tolerances. The standards and tolerances for ILS are contained in Order 6750.49 Maintenance of Instrument Landing Systems (ILS) Facilities, and the applicable instruction books. Note that for installation purposes the initial tolerances shall apply.

e. Frequency Coordination. Installation personnel should obtain the ILS frequency assignments from the Regional Spectrum Manager.

f. Local FAA Coordination. Installation personnel should acquaint local maintenance and air traffic personnel of their work prior to their arrival at the site. The maintenance office should be given reasonable advance notice of the installation activity so that a liaison may be set up to:

(1) Assure that all materials and equipment are onsite, undamaged by shipment.

(2) Provide for local participation and familiarization with the equipment.

(3) Establish methods for moving about the airfield. Consult regional procedures for additional guidance in this area.

g. Cleanup. The installation sites should be cleared of debris and unused materials after the installation is completed. The shelter and equipment should be cleaned and any touch-up painting required to establish a professional appearance should be applied.

h. Joint Acceptance Inspection (JAI). Upon completion of the installation a JAI should be conducted in accordance with appendix 2 of Order 6030.45, Facility Reference Data File.

i. Notice to Airman (NOTAM). A NOTAM contains general information (except meteorological information) of an urgent nature, affecting the safety of air navigation. The NOTAM's are distributed as rapidly as possible to acquaint pilots with possible hazardous conditions. A NOTAM should be issued prior to commencement of modifications at existing facilities or turn-on at a new installation. At the time of commissioning of a facility, a NOTAM should be issued regarding runway, frequencies, and restrictions of the facility. Order 6750.16, Siting Criteria for Instrument Landing Systems,

outlines specific requirements for the issuance of a NOTAM at an airport equipped with more than one ILS.

j. Related Material. Prior to installation of the ILS equipment, a review of the latest edition of the following publications will enable a better understanding of the theory and practical operation of the ILS.

(1) Order 6030.45, Facility Reference Data File.

(2) ICAO Annex 10, Volume 1 Part 1, Equipment and Systems.

(3) Order 6740.2, Maintenance of Nondirectional Beacon (NDB).

(4) FAR part 77, Objects Affecting Navigable Airspace.

(5) Order AF P 6750.1, Navigational Aids Facilities and Equipment Modification - ILS.

(6) Order AF P 6750.4, Electronic Facility Instructions Navaids, ILS.

(7) Order 6750.16, Siting Criteria for ILS.

(8) Order 6750.49, Maintenance of Instrument Landing Systems (ILS) Facilities.

(9) Order OA P 8200.1, United States Standard Flight Inspection Manuai.

(10) Order 6750.36, Site Survey, Selection and Engineering Documentation for ILS and Ancillary Aids.

(1 1) Equipment Instruction Books.

7. DESCRIPTION OF OPERATIONAL COMPONENTS.

a. General. The ILS consists of three distinct and separate types of facilities: the localizer, the glide slope, and the markers (with or without COMLO's). The localizer and glide slope provide lateral and vertical guidance, available in the airplane in the form of crosspointer indications. The markers indicate to the pilot his/her position over significant positions along the approach.

b. Associated Facilities. Other facilities such as runway visual range (RVR), lighted aids, distance measuring equipment (DME) and non-directional beacons (NDB) may be part of an ILS. However, this order will not discuss the installation of these in detail.

c. ILS Channel Assignments. Forty channels have been provided for ILS use. The channels and the proper pairing between localizer and glide slope is shown in table 1-1.

12/17/93

TABLE 1-1 FREQUENCY ALLOCATION IN MHz

ILS

DME/TACAN

GROUND

AIR-TO

PULSE CODE

LOCALIZER 108.10 108.15 108.30 108.35 108.50 108.55 108.70 108.75 108.90 108.95 109.10 109.15 109.30 109.35 109.50 109.55 109.70

GLIDE SLOPE 334.70 334.55 334.10 333.95 329.90 329.75 330.50 330.35 329.30 329.15 331.40 331.25 332.00 331.85 332.60 332.45 333.20

CHANNEL 18X 18Y 20X 20Y 22X 22Y 24X 24Y 26X 26Y 28X 28Y 30X 30Y 32X 32Y 34X

TO-AIR 979 1105 981 1107 983 1109 985 1111 987 1113 989 1115 991 1117 993 1119 995

GROUND 1042 1042 1044 1044 1046 1046 1048 1048 1050 1050 1052 1052 1054 1054 1056 1056 1058

μS 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12

Chap 1 Par 7

12/17/93

TABLE 1-1 (Cont'd)

FREQUENCY ALLOCATION IN MHz (Cont'd) DME/TACAN

ILS

PULSE CODE

LOCALIZER 109.75 109.90 109.95 110.10 110.15 110.30 110.35 110.50 110.55 110.70 110.75 110.90 110.95 111.10 111.15 111.30 111.35 111.50 111.55 111.70 111.75 111.90 111.95

Chap 1 Par 6

GLIDE SLOPE 333.05 333.80 333.65 334.40 334.25 335.00 334.85 329.60 329.45 330.20 330.05 330.80 330.65 331.70 331.55 332.30 332.15 332.90 332.75 333.50 333.35 331.10 330.95

CHANNEL 34Y 36X 36Y 38X 38Y 40X 40Y 42X 42Y 44X 44Y 46X 46Y 48X 48Y 50X 50Y 52X 52Y 54X 54Y 56X 56Y

GROUND TO-AIR 1121 997 1123 999 1125 1001 1127 1003 1129 1005 1131 1007 1133 1009 1135 1011 1137 1013 1139 1015 1141 1017 1143

AIR-TO- GROUND 1058 1060 1060 1062 1062 1064 1064 1066 1066 1068 1068 1070 1070 1072 1072 1074 1074 1076 1076 1078 1078 1080 1080

μS 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30 12 30

d. Localizer. An ILS localizer furnishes horizontal guidance to an aircraft on an approach to an ILS runway. The localizer transmits in the very high frequency (VHF) band, specifically from 108 to 112 MHz. Guidance from the localizer is provided by amplitude modulating a radiofrequency (RF) carrier with two navigation tones (90 Hz and 150 Hz).

e. Glide Slope. An ILS glide slope furnishes vertical guidance to an aircraft on approach to the runway. The glide slope transmits in the ultrahigh frequency (UHF) band, specifically from 328 to 336 MHz. The glide slope also provides its guidance by amplitude modulating an RF carrier with 90 and 150 Hz tones.

f. Marker Beacons. Marker beacons are sited along the approach path to provide an indication of an aircraft's distance from the runway, and to indicate significant points along an instrument approach path. They are low power transmitters operating at 75 MHz with keyed tone modulation. As an approaching aircraft flies through the radiation pattern the signal is detected by a receiver on the aircraft. Information is displayed in the form of flashing lights and a keyed audio tone. In some cases, DME in lieu of an outer marker can be used.

g. Compass Locator (COMLO). The COMLO operates between 190 to 535 KHz in the low frequency band. While not strictly an integral part of the ILS, it may be included at the outer marker or the middle marker when required for approach procedures.

h. ILS Monitor and Control. Existing and future ILS's have several configurations of monitor and control, including some regional designs. Generally, landlines or through the air receivers are used. Through the air receivers provide monitoring capability only, (no control functions) and are generally used for Category I equipment only; Category II/III equipment use landline configurations and provides monitor and control functions.

i. Status Unit. In addition to the ILS monitor and control unit, a status unit is normally installed in the tower cab. It provides monitor capabilities to assist the air traffic personnel.

j. Remote Maintenance Monitoring (RMM). Some newer equipment designs contain embedded RMM. In addition, some equipment has been modified with an Airport Remote Monitoring System (ARMS) package. The purpose for ILS RMM is to automate and add remote capabilities to the maintenance operations for ILS equipment. RMM does not replace the ILS executive monitor (the monitor which causes equipment shutdown), or the remote status unit normally used by air traffic personnel.

k. ILS Interlock. Requirements for interlocks of ILS facilities are established in Order 6750.16, Siting Criteria for ILS. Appendix 1 contains schematic diagrams for some types of interlock equipment. This appendix does not establish a standard for interlock equipment, and is included for reference only.

1. Far Field Monitor (FFM). Category II/III localizers use an additional field monitor. This monitor is mounted in the far field, generally near the middle or inner marker and is used as an additional course position monitor for integrity purposes.

8. RF CONNECTORS. Proper RF connector installation is very important to the overall installation and is often overlooked. Confusion has occurred regarding the proper construction of these connectors, especially for UG-1185 connectors. When installing a UG-1185 connector a common mistake made is the placement of the two teflon insulators. The counter bore of each insulator should be facing AWAY from the shoulder of the pin as shown in figure 1-1. This arrangement provides the locking feature for the pin and will not allow the center conductor to slip. Figure 1-2 contains additional construction information.

FIGURE 1-1. ASSEMBLY OF UG-1185 CONNECTOR

R I G H T!

O

WR ONGI

0

FIGURE 1-2. ASSEMBLED UG 1185 CONNECTOR

JACKET WASHER THICK INSULATOR

BRAID SOLDER

±.015 .218 DIELECTRIC ±.005 .045 CENTER THIN INSULATOR .375 CONDUCTOR ±.015

9. FLIGHT INSPECTION. Installation personnel play an extremely important role in the life cycle of ILS's. This is nowhere more evident than in their role in the original or "commissioning" flight check. With the assistance of the responsible maintenance technician, this inspection will initially evaluate the systems performance and provide the reference data upon which all future periodic and monitor flight inspections will be based (see the "reference" flight check concept in chapter 2). Therefore it is imperative that all pertinent data be gathered and meticulously documented during this inspection. Installation personnel should acquaint themselves with section 217 of Order OA P 8200.1, United States Standard Flight Inspection Manual, prior to conducting the inspection.

CHAPTER 2. LOCALIZER SYSTEMS

SECTION 1. TECHNICAL CHARACTERISTICS

200. SYSTEM DESCRIPTION. A localizer system furnishes horizontal guidance to an aircraft on ILS transition approach by radiating a complex combination of VHF signals modulated with two (navigation) tones (90 and 150 Hz). The signals are radiated such that the amount of detected 90 and 150 Hz is equal on the localizer course, most often the runway centerline. The predominance of either tone varies linearly to an angle from the centerline termed the edge of course. At the edge of course, an aircraft receiver will show full deflection of the course deviation indicator (CDI), which requires 150 microamps of meter deflection current. The angular sector between the two edges of course is called the course width, and is usually tailored so that the course width is 700 feet at the threshold of the ILS runway. The angular sector between the edge of course and 35 degrees away from centerline is known as the clearance sector. In this sector, the CDI needle should remain "pegged," which requires greater than 150 microamps deflection current. The 90 Hz tone corresponds to a "fly-right" indication, and the 150 Hz tone a fly-left indication (as seen by the pilot). The usable coverage of a standard localizer is 18 miles up to 10 degrees either side of centerline, and 10 miles to 35 degrees either side of centerline. Some localizers have an extended service volume (ESV) of greater than 18 miles where required by Air Traffic procedures.

a. The major components of a localizer system include the transmitting equipment, signal cables (including RF coaxial lines), a horizontally polarized antenna system, monitoring equipment, and control equipment. The transmitter and part of the monitoring equipment are located in an equipment shelter. The antenna system is generally located on extended runway centerline, the exception being an offset localizer or localizer directional aid (LDA). Coaxial, power, and signal cabling run between the antenna system and the equipment shelter. The antenna array generally consists of an RF distribution unit, coaxial cabling to and from each antenna, an RF combining network, and a monitor combining network, which provides on course and off course outputs for the monitor. Some arrays also include provisions for antenna heating.

b. The primary difference between localizer types is the antenna array. While there are several antenna element types, the distinguishing characteristic of an array is usually the aperture and resulting beamwidth. Narrow beamwidth arrays have a wider aperture (aperture is the width of the array or the distance between the outer most left antenna element and the outer most right antenna element) and a larger number of elements, and are used at sites which have problems with reflections from buildings or terrain. Wide beamwidth arrays have a narrow aperture and a smaller number of elements, and are used at sites relatively free of possible reflectors. Dual-frequency arrays use the amplitude modulation (AM) capture-effect phenomenon to provide further immunity from multipath, and are used exclusively with narrow beamwidth, wide aperture arrays.

201. LOCALIZER TRANSMITTING EQUIPMENT. The localizer transmitting equipment is shown in block diagram form in figure 2-1. In general, RF energy is amplified and applied to an absorptive modulator - one in which some of the input RF carrier is used to generate the sidebands. These sidebands are combined with the remainder of the RF carrier to create an AM signal. The circuit techniques and technologies used by ILS manufacturers vary from generating the rotating sideband

vectors used in the classic description of amplitude modulation by actually digitally phase shifting an RF carrier, to collector-modulated RF amplifiers with feedback loops for modulation distortion control. These techniques are covered adequately in the equipment instruction books. Current equipment uses a crystal-controlled logic oscillator to generate the 90 and 150 Hz tones with high accuracy and stability, in contrast to earlier equipment using rotary mechanical techniques. Older equipment (e.g., Mark 1A/B/C) may have transmitters and modulators which are separate units, while more modern equipment combines the transmitter and modulator as an integral unit. Two-frequency or captureeffect localizer transmitting equipment is essentially made up of two single-frequency systems with the added provisions of a fixed frequency difference and phase-locking between the systems. Phase locking is usually accomplished by deriving the modulating 90 and 150 Hz tones from a common source (nominally the course transmitter). A fixed frequency difference can be assured by a variety of techniques, including high-accuracy, crystal oscillators. All localizer transmitters provide adjustments for output powers (carrier and sideband), modulation percentage, and RF phasing between carrier and sidebands. These adjustments are used to tailor the signal in space for each particular site.

FIGURE 2-1. TYPICAL LOCALIZER TRANSMITTER

SIDEBAND DIVIDER-DETERMINES 90 & 150 SIDEBAND EQUALITY

INPUT DIVIDER-USUALLY ADJUSTABLE-DETERMINES C38 MODULATION 8 CARRIER SIDEBAND 90 90-150 SIDEBANDS SBO 90+150

GENERATORS 150 ATTENUATOR PHASER COURSE CSB TO WIDTH SBO PHASE WATTMETERS w ADJUST CRYSTAL OSC. 90+150 SIDEBANDS & MULTIPLIERS

AMPLIFIERS CARRIER CARRIER +8B CSB 90+150

MODULATOR

202. SIGNAL CABLING. RF coaxial transmission lines are used to feed the carrier and sideband signals between the transmitter and the antenna array. Due to the large distance involved, low loss cables (such as RG-331/U or RG-333/U) are used. Physical protection for these cables must be provided, either by using cables rated for direct earth burial or by installing the cables in conduit to provide additional physical protection. Two coaxial cables are needed for single frequency systems, with one or more spares installed to provide for backup in case of physical damage, etc. Dual frequency localizer systems require four cables plus spares. Cable used within the antenna array must be flexible and phase stable with temperature changes. Cables internal to the antenna array (e.g., between RF distribution unit and each antenna) are generally RG-214/U phase swept or other flexible coaxial cables, which enable easy connection to the antenna. When installing the RG-214/U cables, care should be taken not to damage the cables. Further information on cable preparation and care are included in the installation section of this chapter. Multipair audio cable is used to feed direct current (DC) power to the antenna array, and to feed detected audio and other signals from the antenna array to the monitoring equipment. The applicable instruction book for the equipment should be consulted to determine the number of pairs and cable characteristics required for a particular system. Alternating Current (AC) power cable is used to provide power to the antenna array for obstruction lights, convenience outlets, and in some cases antenna heaters.

203. LOCALIZER ANTENNA SYSTEMS. All localizer antennas are essentially broadbanded throughout the 108-112 MHz localizer band. Nominally, the antennas are installed in multi-element arrays perpendicular to the desired approach course, which is normally the extended runway centerline. The antenna array includes an RF distribution unit, RF coaxial cables to and from each antenna, an RF combining unit, and a monitor combining network. The RF distribution unit provides for a specific amplitude and phase distribution to each antenna, which varies with the desired signal in space characteristics of each array. All current localizer systems utilize integral monitoring, where a combined sample of the radiated signal from each antenna is used to characterize the signal in space. Categories II & I type systems may use a "far-field" monitor, which provides additional monitoring of the signal in space.

a. V-Ring Antenna Systems.

(1) Background. The V-Ring antenna system was originally developed to provide a more directional array than the Alford loop type in order to combat problems with multipath. The V-Ring antenna displays directional characteristics in both the front and back course sectors. The V-Ring antenna is the only type currently in use that provides a back course capability. These antennas are configured in 8-, 14-, or 15-element arrays. The 15-element array was the original design, and the 8and 14-element designs were developed by the FAA to combat mutual coupling (parasitic) problems with the 15-element arrays. New 15-element arrays should not be installed. When major refurbishment of a 15-element array is planned, conversion to an 8- or 14-element array is recommended. The outermost antennas in all the arrays provide for built in obstruction lights. The V- Ring design also provides for heating capabilities where needed. The original heaters used 240 VAC, but all current systems have been modified to use 120 VAC to prevent the cables internal to the antenna ring from being overheated and damaged.

(2) Individual Antenna Characteristics. The V-Ring antenna consists of a loop or "ring" with a V shaped reflector attached to the rear of the antenna. Radio energy is fed to the ring through a coupler in the front of the ring. This coupler also provides a signal sample for integral monitoring purposes. The feed and monitor cables, as well as a heater are contained inside the ring. See figure 2-2 for a pictorial representation of a V-Ring antenna, and figure 2-3 for the radiation pattern of a single antenna.

(3) Front to Back Gain. The "V" shaped reflector portion of the antenna provides some gain in the forward direction. The front to back signal ratio for a V-Ring array is approximately 7 dB.

(4) Parasitics. The 15-element V-Ring array suffers from high parasitic mutual coupling, which can result in both radiated and monitored signal instability. The problems with parasitics are largely due to impedance mismatches within the system, and the center antenna which is fed a large portion of the total carrier power. The 8- and 14-element arrays do not have the center antenna, and the parasitic in these arrays do not pose a significant problem.

(5) Array Types.

(a) 15-Element. The 15-element V-Ring array is composed of seven pairs of antennas symmetrically spaced about the array centerline, and a center or "OC" antenna. This configuration is being phased out.

(b) 14-Element. The 14-element V-ring array is composed of seven antenna pairs, symmetrically spaced about the array centerline. The antennas of a pair are fed carrier energy in phase (SIP) and sideband energy out of phase (SOP). No horizontal front course radiation pattern for this array is shown here, but the patterm is similar to the 14-element log periodic dipole array, shown in figures 2-13 and 2-15. This array uses the same amplitude and phase distribution as the 14-element log periodic dipole array. This array is used for sites which require a back course, and that have a more challenging multipath environment. The 14-element and 15-element V-Ring are wide aperture, narrow beamwidth arrays.

(c) 8-Element. The 8-element V-Ring array is composed of four antenna pairs, symmetrically spaced about array centerline. The antennas of a pair are fed carrier energy in phase (SIP) and sideband energy out of phase (SOP). Figure 2-6 provides the antenna spacing and the array amplitude and phase distribution, and a graphical representation of the 8-element V-Ring array. Figure 2-7 provides a representative horizontal radiation pattern for this array. This array has an amplitude and phase distribution which is identical to the 8-element log periodic dipole array. In fact, the RF distribution unit provided for the log periodic array is used for the 8-element V-ring. This array is used for sites without significant multipath (reflection) problems, where there is a need for a backcourse approach capability. The 8-element array is a narrow aperture, wide beam width array.

FIGURE 2-2. V-RING ANTENNA

FIGURE 2-3. SINGLE V-RING RADIATION PATTERN

FIGURE 2-4. 15-ELEMENT V-RING COMPOSITE RADIATION PATTERN

FRONT COURSE

CARRIER

SIDEBAND

V-RING ANTENNA ARRAY

SIDEBAND

CARRIER

BACK COURSE

FIGURE 2-4 V-RING ARRAY COMPOSITE RADIATION PATTERN

12/17/93

FIGURE 2-5. 15-ELEMENT V-RING ARRAY

SPACING FROM CENTER

PAIR NUMBER SAND A BAND B BAND C

L1 56.360 INCHES 55.700 INCHES 55.050 INCHES L2 148.870 INCHES 147.100 INCHES 145.410 INCHES L3 237.340 INCHES 234.520 INCHES 231.820 INCHES L4 337.880 INCHES 033.920 INCHES 330.020 INCHES L5 434.440 INCHES 429.320 INCHES 424.330 INCHES L6 511.00 INCHES 524.720 INCHES 518.640 INCHES L7 627.560 INCHES 620.120 INCHES 612.950 INCHES

SAND A - 108.1 TO 109.3 MHz BAND 8 ~ 109.5 O 110.5 Hz

L7

L6

NOTE: *E* NUMBERS TO BE MARKED BY INSTALLATION CREW ON V-RING MAST APPROX, 4' UP MAST ON DISTRIBUTION UNIT SIDE OF ARRAY AND ON TOP OP V-RING ANTENNAS. USE 1 HIGH LETTER STENCIL WITH SLACK STENCIL INK. MARKINGS ARE FOR IDENTIFICATION AND RELOCATION, SHOULD MORE THAN ONE ANTENNA BE REMOVED AT A GIVEN TIME.

SEE NOTE

L3

BAND C - 110.7 TO 111.9 HHz

L2 L7

L4 L3

L1

ARRAY

6-10

7.-5.38'

8-8.62*

0-7.38

DIRECTION OF RADIATION

Chap 2

Par 203

FIGURE 2-6. 8-ELEMENT V-RING SPACING, AMPLITUDE,

AND PHASE DISTRIBUTION

TO RUNWAY

4L 1t IR JR 4R

32 32 32

112 16 -112

-193 5 93 32 273 273 5 8 8

csa DISTRIBUTION 8-ELEMENT 4L JL 2L 1L 18 2R 3R 48 AMP 0.055 10.143 0.363 [1.00d 1.00d 0.36: 10.059 PHASE 180° 0o 0o 0o 0o 0o 0o 180° S8O DISTRIBUTION AMP 0.419 |0.700 0.890 .000 1.000 0.890 .700 0.41$ PHASE C° 0o 0o 0o 1800 180° 1800 1800

Chap 2 Page 17

Par 203

12/17/93

FIGURE 2-7. 8-ELEMENT V-RING (ONE-FREQUENCY)

LOCALIZER ANTENNA ARRAY

LOCALIZER ANTENNA ARRAY RADIATION PATTERN PLOT

Antenna type: V-ring

Number of antennas: 8

Course width: 5

Antennas amplitude and degrees spacing:

CSB SBO Degrees

Pair 1 1.000 1.000 108

Pair 2 0.360 0.890 378

Pair 3 0.140 0.700 648

Pair -.055 0.420 918

RELATIVE AMPLITUDE, LINEAR SCALE

0.2

0.0

1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.1

DEG 35.0 34.0 33.0 32.0 31.0 30.0 29.0 28.0 27.0 26.0 25.0 24.0 23.0 22.0 21.0 20.0 19.0 18.0 17.0 16.0 15.0 14.0 13.0 12.0 11.0 10.0 9.0 8.0 7.0 6.0 5.0 4.0 3.0 2.0 1.0 0.0

CSB 0.23 0.23 0.23 0.23 0.23 0.22 0.22 0.21 0.21 0.21 0.21 0.21 0.22 0.24 0.26 0.28 0.32 0.35 0.40 0.44 0.49 0.54 0.60 0.65 0.70 0.75 0.79 0.84 0.87 0.91 0.94 0.96 0.98 0.99 1.00 1.00

SBO 0.21 0.22 0.24 0.24 0.25 0.25 0.24 0.24 0.23 0.21 0.20 0.19 0.18 0.18 0.19 0.20 0.23 0.27 0.33 0.39 0.46 0.53 0.60 0.67 0.73 0.78 0.80 0.81 0.79 0.74 0.67 0.57 0.45 0.31 0.16 0.00

0.0

0.5 0.4 0.3 0.2 0.1 DDM

C=CSB, S=SBO, D=DDM, and *=Line intersection.

Notes: DDM=0.4*SBO/CSB

Chap 2

Par 203

12/17/93

FIGURE 2-8. TRAVELING WAVE ANTENNA VERTICAL

RADIATION PATTERN

220o

:300

120°

250° 110°

260° 100°

270° 90°

280°

290°

300°

3:0°

320o

Chap 2

Par 203

210° 150°

50 50

3300 300

200° 160°

40 30

340° 20°

190° 170°

3500 100

180°

20

30

40

50

50

70

80

90

00

:70° 1900

:00 35C0

160° 200°

20° 3400

150° 210°

50 60

30° 3300

140° 220°

130° 230°

120° 240°

1100 250°

:00° 260°

70 90° 270°

80° 2800

70° 290°

60° 300°

50° 310°

40° 320°

b. Log Periodic Dipole (LPD) Antenna Systems.

(1) Background. The log periodic dipole antenna system was procured with the Mark I D/E/F localizer equipment manufactured by Wilcox Electric. Other manufacturers make log periodic antennas, but the Wilcox type is the most common within the FAA, and the others have similar signal in space characteristics. The log periodic is the only localizer antenna which is currently being procured by the FAA, and is used for facilities in all categories of operation. The LPD antenna does not provide a back course capability.

(2) Individual Antenna Characteristics. The log periodic dipole localizer antenna is a broadband antenna which consists of seven parallel, horizontally polarized dipole radiators fed from a common balanced transmission line inside the antenna. The transmission line is excited from the front and produces a traveling wave that progresses towards the rear of the antenna. The excitation of a particular dipole is dependent upon the electrical length at the operating frequency. Broadband characteristics are obtained by varying the dipole lengths and spacings such that the resonant element moves from one dipole to the next as the operating frequency changes. A pictorial representation of the antenna is provided in figure 2-10, and the antenna element radiation pattern is shown in figure 2-11. The half power beamwidth is approximately 46 degrees, and almost no energy is radiated at right angles to the antenna axis. The LPD antennas do provide for integral monitoring. Each antenna is mounted approximately 6 feet above the ground on two frangible supports. The antenna is approximately 9 feet long and 50 inches wide.

(3) Front to Back Gain. The LPD antenna provides a front to back ratio of nearly 23 dB, and radiates no significant energy in the back course sector.

(4) Parasitic. The log periodic dipole antenna arrays suffer from no significant parasitic, since the radiation at right angles to the antenna axis is approximately 30 dB down.

(5) Array Types.

(a) 8-Element. The 8-element log periodic dipole array is composed of four antenna pairs, symmetrically spaced about the array centerline. The antennas of a pair are fed carrier energy in phase and sideband energy out of phase. Figure 2-12 shows a pictorial representation of the array. Figure 2-13 shows the array spacing, as well as the horizontal radiation pattern for this array. An expanded horizontal pattern is provided in figure 2-14. Figure 2-13 provides the amplitude and phase distributions for the carrier and sideband signals. The 8-element array is a narrow aperture, wide beamwidth array.

FIGURE 2-9. TYPICAL GROUND-MOUNTED TRAVELING WAVE ARRAY-TYPE I

FIGURE 2-10. LPD ANTENNA

12/17/93

FIGURE 2-11. LOG PERIODIC DIPOLE ANTENNA

HORIZONTAL RADIATION PATTERN

220°

130°

240° 120°

250° 110°

100°

270o

280° 80°

290°

300° 60°

310°

320° 40°

Chap 2

Par 203

210° 1500

50

330° 30°

200° 160°

40 30

340° 20°

190° 170°

350° 100

180°

20

40

60

80

00

170° 190°

20

10° 350°

160° 200°

20° 3400

150° 210°

50 60

300 330°

140° 220°

130o 230°

120° 240°

110° 250°

100° 260°

70 90° 270°

80° 280°

70° 290°

600 300°

50° 310°

40° 320°

FIGURE 2-12. WIDE AND NARROW APERTURE LOCALIZER ANTENNA ARRAYS

FIGURE 2-13. 8- & 14-ELEMENT LPDA RADIATION PATTERNS,

ANTENNA SPACING, PHASE AND AMPLITUDE

TO RUNWAY

6L 4L 3L 21. 1L 1R 2R 3R 4R SR 7R

32 32 7 32 32

10-112 11 16 -112 11 16

-193 -193 5 32 32 273 8 5 273 5 8

354 3 -354 3 32 32 434 9 434 9 16 16 -515 32 1 515 32

CSB DISTRIBUTION 8 - ELEMENT NOTE; : PHANTOM ANTENNAS 4L 3L 2L IL 1R 2R 3R 4R USED ON WIDE APERTURE SYSTEM AMP Jo.055 0.143 0.363 1.000 1.000 0.363 0.143 0.055 ONLY PHASE 180° 0o 0o 0o 0o 0o 00 1800 SãO DISTRIBUTION AMP 10.415 10.700 [0.890 1.00d 1.000 0.B9d 0.70d 0.415 PRASE 0o 0o 0o 0o 180° 180° 180° 180°

CSB DISTRIBUTION 14 - ELEMENT 7L 6L 5L 4L 3L 2L 1L 1R 2R 3R 4R 5R 6R 7R AMP 0.06d 0.060 0.212 0.212 0.394 0.394 1.00d 1.000 0.394 0.394 0.212 0.212 10.06d 0.060 PHASE 0o 0o 00 0o 0o 0o 0° 0o 0o 0o 0o 0o 0o 0o SBO DISTRIBUTION AHP 10.138 0.379 0.276 0.586 0.414 0.759 1.000 1.000 0.759 0.414 0.580 0.276 0.379 0.138 PHASB 0o 0o 0o 0o 0o 00 0o 180° 180° 180° 180° 180° 180° 180°

8 - ELEHENT 1 4 - ELEMENT 1.0 1.0

0.9 0.9

0.8 0.8

0.7 0.7

0.6 0.6

0.5 0.4 AMLTUDE 0.5 0.4

LEGEND 0.3 0.3 CSB PATTERN 0.2 0.2

0.1 0.1 SBO PATTERN

0 0 0 10° 20° 30° 40° 50° 60° 70° 80° 90° 0 10°20° 30°40° 50°60° 70° 80°90° DEGREES DEGREES

12/17/93

FIGURE 2-14. 8-ELEMENT LPDA (ONE-FREQUENCY)

LOCALIZER ANTENNA ARRAY

LOCALIZER ANTENNA ARRAY RADIATION PATTERN PLOT

Antenna type: Log Periodic

Number of antennas: 8

Course width: 5

Antennas amplitude and degrees spacing:

CSB SBO Degrees

Pair 1 1.000 1.000 108

Pair 2 0.360 0.890 378

Pair 3 0.140 0.700 648

Pair 4 -.055 0.420 918

RELATIVE AMPLITUDE, LINEAR SCALE

0.0

1.0 0.9 0.8 0.7 0.5 0.4 0.3 0.2 0.1

DEG CSB SBO 35.0 0.11 0.11 34.0 0.12 0.12 33.0 0.13 0.13 32.0 0.13 0.14 31.0 0.13 0.15 30.0 0.13 0.15 29.0 0.14 0.15 28.0 0.14 0.15 27.0 0.14 0.15 26.0 0.14 0.15 25.0 0.15 0.14 24.0 0.16 0.14 23.0 0.17 0.13 22.0 0.18 0.14 21.0 0.20 0.15 20.0 0.23 0.16 19.0 0.26 0.19 18.0 0.30 0.23 17.0 0.34 0.28 16.0 0.38 0.34 15.0 0.43 0.40 14.0 0.49 0.47 13.0 0.54 0.55 12.0 0.60 0.62 11.0 0.65 0.68 10.0 0.71 0.74 9.0 0.76 0.77 8.0 0.81 0.78 7.0 0.85 0.77 6.0 0.89 0.73 5.0 0.92 0.66 4.0 0.95 0.56 3.0 0.97 0.45 2.0 0.99 0.31 1.0 1.00 0.16 0.0 1.00 0.00

0.0

0.5 0.4 0.3 0.2 0.1 DDM

C=CSB, S=SBO, D=DDM, and *=Line intersection.

Notes: DDM=0.4*SBO/CSB

Chap 2

Par 203

12/17/93

FIGURE 2-15. 14-ELEMENT LPDA (ONE-FREQUENCY)

LOCALIZER ANTENNA ARRAY

LOCALIZER ANTENNA ARRAY RADIATION PATTERN PLOT

Antenna type: Log Periodic

Number of antennas: 14

Course width: 5

Anternas amplitude and degrees spacing:

CSB SBO Degrees

Pair 1 1.000 1.000 108

Pair 2 0.394 0.759 378

Pair 3 0.394 0.414 648

Pair 4 0.212 0.586 918

Pair 5 0.212 0.276 1187

Pair 6 0.060 0.379 1457

Pair 7 0.060 0.138 1727

RELATIVE AMPLITUDE, LINEAR SCALE

1.0 0.9 0.8 0.7 0.6 0.4 0.3 0.1

0.0

0.5 0.2

0.5 0.4 0.3 0.2 0.1

DEG CSB SBO 35.0 0.09 0.07 34.0 0.09 0.08 33.0 0.09 0.09 32.0 0.09 0.10 31.0 0.09 0.11 30.0 0.09 0.11 29.0 0.09 0.11 28.0 0.10 0.11 27.0 0.10 0.11 26.0 0.11 0.10 25.0 0.12 0.10 24.0 0.13 0.10 23.0 0.13 0.10 22.0 0.14 0.11 21.0 0.15 0.12 20.0 0.15 0.14 19.0 0.16 0.16 18.0 0.17 0.17 17.0 0.18 0.17 16.0 0.19 0.17 15.0 0.19 0.16 14.0 0.20 0.15 13.0 0.20 0.14 12.0 0.21 0.15 11.0 0.21 0.17 10.0 0.23 0.20 9.0 0.27 0.26 8.0 0.32 0.32 7.0 0.40 0.39 6.0 0.49 0.44 5.0 0.60 0.46 4.0 0.72 0.44 3.0 0.83 0.39 2.0 0.92 0.29 1.0 0.98 0.15 0.0 1.00 0.00

0.0

DDM

C=CSB, S=SBO, D=DDM, and *=Line intersection.

Notes: DDM=0.4*SBO/CSB

Chap 2

Par 203

12/17/93

FIGURE 2-16. 14/6 DUAL FREQUENCY ANTENNA ARRAY

TO RONWAY

2L 1L 1R 2R JR

32 32 22

4112 11 16 16 11

-193 32 5 -193 32 5 -273 273 5 8 354 32 -354 32 3

-434 16 9 434 16 9

4R 5R 68 7R

-515

515 32

0.724

32

0.491

AMPLITUDE 0.1601 0.160] 0.491 0.491 0.714 0.1000] 0.893 0.893 0.1000 CSB PHASB 0° 0o 00 0o 00 0° 0o 0° 0o 0o

0.667 0.222

0.491 0.1601 0.1601 00 0° 0 00

1.000

CRS AHPLITUD8 0.367 0.555 0.889 1.000 1.000 0.222 0.667 1.000 S8O PHASB 0o 0o 00 0o 00 0o 0o 180° 180° 180°

CLR AKPLITODE 0.200 0.000 1.000 1.000] 0.000 0.200 CSs PHASE 00 0o 0o 0° 00 00

CLR AMPLITODE 0.139 0.333 1.000 1.000 0.333 0.139 SBO PHASE 00 0° 00 1B0° 180° 180°

0.889 0.555 0.367 180° 160° 180° 180°

Chap 2 Par 203

12/17/93

FIGURE 2-17. 14/6 DUAL FREQUENCY COURSE

0.8

0.6

-0

0o

Chap 2 Par 203

20o

RADIATION PATTERN (CSB + SBO)

40o 60° 1000 120° 140°

LEGEND CSB PATTESN SBO PATTERN

160° 180°

FIGURE 2-18. 14/6 DUAL FREQUENCY ANTENNA CLEARANCE RADIATION PATTERN (CSB + SBO)

0.8

0.6

AHUDE 0

-0

+0

-0 LEGEND CS8 PATTERN -0 SBO PATTERN

0o 20° 40° 60° 80o 100° 120° :40° :60° 180°

(b) 14-Element. The 14-element LPD array is composed of seven antenna pairs, symmetrically spaced about the array centerline. The antennas of a pair are fed carrier energy in phase (SIP) and sideband energy out of phase (SOP). Figures 2-13 and 2-15 provide the horizontal radiation pattern for this array. Figure 2-13 provides the amplitude and phase distribution for carrier and sideband signals, as well as the location of each antenna with respect to array centerline. This array is used at sites that have a more challenging multipath environment. The 14-element log periodic dipole array is a wide aperture, narrow beamwidth antenna array. No significant radiation is present outside of plus and minus 35 degrees from the array centerline.

(c) 14/6 Dual Frequency. The 14/6 dual frequency array has antenna spacing which is identical to the 14-element LPD array. This array utilizes the AM "capture-effect" phenomena to reduce the effects of reflections from structures outside the active localizer course. The "clearance' signals are phase locked to the course signals, and there is a fixed frequency difference of approximately 9 kHz between course and clearance signals. The course signal is fed to all 14elements, while the clearance signal is fed to the inner 6-elements (3 pairs). The course signal is approximately 10 dB stronger than the clearance signal on path, while in the clearance sector, the clearance signal predominates by 10 dB (approx.). This ensures that the aircraft receiver is "captured" on the course signal while on course, and clearance signals reflected onto the localizer course have little or no effect. For a more detailed discussion of capture-effect principles, see chapter 2 of Order 6750.49, Maintenance of ILS Facilities, or the equipment instruction book. Figure 2-16 provides the amplitude and phase distribution for this array. Figures 2-17 and 2-18 provide the horizontal radiation patterns for the course and clearance signals, respectively. This array is provided at some Category II/III facilities. For Category I facilities, this array is installed when there is an extremely challenging multipath environment. The 14/6 dual frequency array is a wide aperture, narrow beamwidth antenna array.

(d) Others. At the time of the publication of this order, there are two other types of log periodic dipole antenna arrays which are in use at a few sites or are under development. These arrays are wider aperture than the 14-element array, and are dual frequency "capture-effect" arrays. These arrays are for use at extremely challenging sites where a 14/6 dual frequency array does not provide satisfactory performance. No data on these arrays is included in this order. For details on these arrays, consult the applicable manufacturer's instruction book.

204. INTEGRAL MONITORING. All current FAA localizer antenna systems use integral monitoring techniques. A signal is sampled from each individual antenna and is fed to the RF combining unit. The RF combining unit combines these signals and provides carrier and sideband outputs, which are then fed to a monitor combining network. The monitor combining network combines the carrier and sideband signals to provide outputs which represent the far field conditions, typically one at the oncourse position, and one at the edge of course position. These RF outputs are then detected, and the detected audio is fed to the proper monitor channel. With the exception of the Mark IB equipment, the detection occurs in the distribution unit housing (at the antenna system), and the audio is fed from the antenna system to the shelter over audio cables. The Mark IB equipment feeds the RF signal back to the equipment shelter, and it is detected inside the monitor. The detectors used for all systems are linear envelope detectors, and the design varies with each type of equipment. While integral monitoring techniques will accurately detect changes in the signal due to electronics or antennas, it

will not account for signal errors due to physical changes in the array, multipath and other anomalies. A number of techniques have been implemented to augment the integral monitoring. Misalignment detectors are installed on localizer arrays that have a single pedestal supporting an element of the antenna array and usually consist of a cable strung through brackets on each antenna, connected to a switch assembly in the middle of the array. If an antenna falls over or changes position, the movement of the cable causes a misalignment alarm, shutting down the localizer. Cable fault monitoring is accomplished by placing a DC voltage on the center conductors of the coaxial cables. Far-field monitors are used on Category II/III systems to provide additional integrity monitoring. Due to the nature of these far-field monitors, a time delay is usually placed on the alarm, so that momentary aberrations caused by taxiing or landing aircraft do not cause an equipment shutdown. See the appropriate manufacturer's instruction book for detailed information on the operations of these monitors.

205.-208. RESERVED.

SECTION 2. ELECTRONIC INSTALLATION

209. PURPOSE. The purpose of this section is to provide guidance which is not specific to one type of localizer, but can be generalized to any type of localizer in use by the FAA. This information will supplement the installation and tuneup procedures contained in the equipment instruction books. The guidance in this section must be combined with the procedures in the instruction books, as well as regional guidance or standards that may be in place. The procedures in this section are not meant to be step by step, instruction book type procedures. For array specific details, consult the appropriate instruction book. The procedures herein assume that the reader is proficient in use of RF test equipment (vector voltmeter, signal generator, etc). For guidance in siting the localizer antenna array and equipment shelter, consult the latest version of Order 6750.16.

210. GENERAL.

a. Physical Construction Details.

(1) General. Physical construction details should be contained in the standard drawings for each type of system and in Order 6750.36, Site Survey, Selection, and Engineering Documentation for ILS and Ancillary Aids. Construction engineering personnel in the regions should be experienced in this area and should be consulted for appropriate regional drawings. Also included is some information which is not contained in the equipment instruction books. Prior to physically installing any RF hardware (including antennas, distribution/recombing networks), the checkout procedures contained in this section shall be accomplished on each piece of equipment.

(2) Construction of Localizer Supports. The localizer antennas may be installed on separate concrete piers, or a concrete pad may be used to support the entire array. Electronic installation personnel should pay particular attention to the placement of the antenna supports, since the supports can affect the physical alignment of the antenna array. Rebar in the concrete pad should be installed such that open areas are left where the antennas supports are to be bolted down to the concrete. This will allow drilling for the anchor bolts for each antenna to be accomplished without hitting any rebar. Several brass survey disks are usually placed in the concrete pad (or near the piers) to assist with the physical alignment of the array with respect to the desired approach path (centerline). These disks can be marked by a surveyor for extended runway centerline, etc. Disks are usually set in concrete both in front of and behind the array to mark runway centerline, and along the axis of the array to mark a line perpendicular to centerline.

The line perpendicular to centerline should be marked for both antenna supports in the case of a log periodic dipole array. Even when the concrete pad (or piers) for the array is pre-existing (e.g., when performing a 15-element to 8/14-element V-Ring conversion), a new survey of extended centerline and the lines perpendicular to centerline is highly recommended. It is not uncommon on a refurbish job to find that the existing array is a foot or more off from extended centerline, perhaps due to runway overlays, or misplacement of the original array. A qualified surveyor should be used for marking extended centerline. If possible, use the same surveyor which is used by the airport for surveying the runway. This surveyor will be familiar with the existing centerline markers.

(3) Antenna Array Physical Alignment. Physical alignment of the array should be done carefully, since tuneup procedures for the localizer equipment assume proper alignment of the array with respect to the desired approach path. All antennas should be level, and a line drawn through the array should be perfectly perpendicular to centerline. Consult the manufacturer's instruction book for further guidance on physical alignment of the array, and for step-by-step procedures on how to put the antenna array together.

(4) Cables. All cables between the equipment shelter and the antenna array shall be either rated for direct earth burial or installed in an appropriately sized conduit. The most commonly used cable is RG-331/U. However other cables such as phase swept RG-214U or heliax cables may be used. Proper engineering practice dictates that due consideration be given to installing spares for the coaxial and signal cables. Proper coordination must be accomplished when installing cables so that other cables on the airport are not damaged. Consult the manufacturer's instruction book to determine the number and type of cables needed for a particular localizer equipment type. Care shall be taken to assure that the RF coaxial cables installed between the shelter and the array are the same physical length. Cables should be properly marked at each end for ease of identification.

b. Electronics Preparation. The following subparagraphs shall be accomplished prior to final array tuneup.

(1) Transmitter Equipment. The transmitter, monitor, and associated electronics shall be installed in accordance with the manufacturer's instruction book. The procedures provided in those manuals are considered adequate, and no additional guidance is required here. Tuneup of the transmitting equipment should be accomplished prior to beginning any tuneup on the antenna array. This includes termination of (audio) signal cables, and completion of the RF transmission path between the transmitter and the antenna array. There will be a need for short lengths of flexible cables at either end of the rigid low loss cables between the shelter and the array. These cables are required to connect the rigid cable from where it enters the transmitter building or antenna array, to the transmitter and RF distribution unit, respectively. When preparing these cables, leave sufficient extra cable to allow for proper phasing to be accomplished (leave at least one extra wavelength).

(2) RF Hardware/Antenna Checkout. Prior to beginning the physical installation of the antenna array, all RF hardware and the antennas shall be thoroughly checked out using a vector voltmeter. The antennas should be checked for voltage standing wave ratio (VSWR), and for the phase and amplitude of the monitor return signal. The other RF hardware should be checked for VSWR, amplitude and phase on all ports. Examples of RF hardware include the RF distribution and combining units, the monitor combining network. If any parameters checked are found to be outside of the tolerance specified in the equipment instruction book, that unit should be replaced. Consult each equipment instruction book for detailed procedures on checking the RF hardware and the antennas, and for the tolerances for each particular piece of equipment.

NOTE: When using a vector voltmeter, observe the cautions on maximum input levels. The input probes are easily damaged by high signal levels. The maximum signal level is usually 0 dBm.

(3) RF Coaxial Antenna Cables. Since the proper operation of the localizer system depends in large part on the phase characteristics of the coaxial cables, care must be taken to properly prepare cables for installation and to prevent accidental damage. Time spent carefully verifying cable characteristics prior to use in the antenna array will result in a more stable system, and prevent problems in the long run. If the antenna feed and monitor lines are not supplied with the equipment (e.g., refurbish project), it will be necessary to prepare a set of cables. Whenever possible, all cables should be taken from the same reel so that the phase characteristics of the cables are uniform throughout the array. As a minimum, all feed cables should be from the same reel, all monitor cables from the same reel, etc. It is recommended that the cables be cut from the reel at the start of the installation, so that the cable has time to age during physical construction of the antenna array. The following procedures can also be applied to cables which are supplied by the equipment manufacturer. Cables from the manufacturer should have equal electrical lengths, and the installer should verify the lengths prior to installation in the antenna array. Take care not to step on the cables or otherwise damage them. Following are some steps which should be taken during cable preparation to ensure acceptable cable quality:

(a) Cut each cable from the reel to the proper physical length. All antenna monitor and feed cables should be the same physical length. Consult the equipment instruction book for the required length (which will vary with the width of the antenna array). Unroll the cable off the reel, and stretch the cables out flat. Make sure to designate an area for stretching out the cables where they can be protected from physical damage.

(b) If possible, the cables should be allowed to "age" outside prior to installation. Once cables are cut, alternately lay the cable out flat, then coil the cable each way. This will help to ensure that the dielectric characteristics are uniform throughout the length of each cable. Tape each end of these cables to prevent moisture damage.

(c) Run your hand along each cable and feel for any nicks, kinks, bulges in the cable, or other damage. A bulge in the cable may be caused during manufacture when the machine that weaves the braid (shielding) runs out of material, and a junction must be made. Replace any cables with bulges, kinks, etc. Prior to running the "end to end" cable check in the item below, a connector should be installed on one end of each antenna cable, and the cables cut to be the same electrical length. After installing a connector on each cable, measure the round trip electrical length of each cable using a vector voltmeter. Identify the shortest cable (most advanced phase), and cut all the cables to be within +/- 2 degree of that cable.

(d) An additional check of cable quality is to run an end to end comparison of electrical length. This requires that the coaxial connectors be installed on both ends of the cable. With a vector voltmeter, measure the round trip electrical length of each cable from both ends (alternately feed each end). If there is more than a few degrees difference in electrical length between the two ends, consider replacing that particular cable. Good cable should measure the same from end to end within a few degrees.

(4) Connectors. Connector construction can also have an effect on localizer system stability. The connectors should be put on very carefully. All connectors should be from the same

manufacturer. It is suggested that one person put connectors on all the feed and on all the monitor cables. This will ensure that each connector is done in the same manner. Refer to chapter 1, paragraph 8 for additional guidance on proper connector construction. If the antenna cables are supplied by the equipment manufacturer, the installer should sample the connectors for proper construction techniques. Remove several connectors and check that all connector parts are present and installed properly (e.g., washers on the right way). If any deficiencies are found, check all of the connectors on these cables.

(5) System Phasing. Prior to beginning antenna array tuneup, the system must be properly phased, and if the equipment provides for it, an in-line phasing detector installed. The following guidance is provided in those areas:

(a) CSB to SBO Phasing. The transmitter provides a phaser to allow for adjustment of the sideband only (SBO) to carrier (CSB) phasing. The cables between the transmitter and the antenna array should be trimmed so that when carrier and sideband signals are properly phased, the adjustment on the equipment phaser will be mid range (0 degrees). This procedure will be used to initially set up carrier to sideband phasing so that array optimization can begin. The procedure for confirming proper phasing is contained in Order 6750.49, Maintenance of ILS Facilities. The following steps provide a generalized procedure on accomplishing the initial CSB/SBO phasing:

NOTE: The SBO phaser on the transmitter may not be accurate throughout the full range of adjustment, and in this procedure it will only be used to initially determine how much extra line will be needed to optimize phasing. Extra line sections will be added until the phaser is centered. This is done to simplify cable cutting, since the extra line sections can easily be removed and measured with a vector voltmeter.

1 Complete the installation and checkout of all RF hardware at the array before proceeding.

2 At the antenna array, prepare and install jumper cables between the rigid cable at the antenna array and the RF distribution unit (one each is needed for CSB and SBO signals). These cables should be of equal length, and should provide enough extra cable to allow for later trimming.

3 Dummy load all antenna ports on the RF distribution unit except 3L.

4 On the RF distribution 3L port which is not loaded, install an RF body terminated with a dummy load. This may require fabrication of a short RF cable for use in physical connection of the in-line body. This cable should be of suitable length for use in the installation of the in-line phasing detector (see next section).

5 Turn off the transmitter, and dummy load the sideband output of the transmitter. Connect the CSB cable to its output port on the transmitter.

6 Turn on the transmitter, and connect a portable ILS receiver (PIR) to the RF body installed at the array. Verify that the reading is 0 DDM. Check modulation equality (modulation balance transmitter adjustment) if a non-zero DDM reading is present.

Z Turn off the transmitter, and connect the SBO cable to its output port on the transmitter output.

8 Center the transmitter main SBO phaser (set to mid-range or zero). Turn on the transmitter.

9 Observing the DDM reading on the PIR, adjust the main SBO phaser until zero DDM is read on the PIR. If zero DDM cannot be reached within the adjustment range of the main SBO phaser, add fixed line sections and adapters may be added in the sideband or carrier lines until zero DDM (quadrature phasing) can be reached by adjusting the main SBO phaser.

10 Install an elbow in the CSB line. (this has the effect of advancing the sidebands). Note the reading on the PIR. If the PIR reads predominantly 150 Hz, the sensing is reversed. Remove the elbow from the CSB line.

11 Note in which line the fixed sections were installed in step 10 (above), and whether or not reverse sensing was found in step 10 (above). Remove the fixed line sections and measure their electrical length with a vector voltmeter and note the reading. Add 180 degrees to this reading if reverse sensing was present. Cut the amount noted from the line in which the fixed line section was not installed (e.g., if fixed line sections were installed in the SBO line, cut the CSB line, and vice-versa).

(b) Phasing Detector. Some equipment provides for an in-line phasing detector, which allows monitoring of the carrier to sideband phasing from inside the equipment shelter. This is accomplished by installing an RF body and detector in one of the antenna lines (see instruction book for specific guidance). The detected audio is run to the equipment shelter using a spare audio pair. A jack can then be installed in the rack, or other appropriate place inside the shelter and used to conduct in-line phasing checks. Keep in mind that when the RF body is installed in one of the antenna lines, that line must be shortened by the length of the RF body and connecting cable in order to keep all antenna feedlines the same length. It is recommended that this detector be installed prior to final array tuneup. In line phasing can be used on all antenna arrays currently in use by the FAA. Consult the latest version of Order 6750.49 for guidance on use of the in-line phasing method.

(6) Preliminary Requirements. To assure that the optimization of the antenna array proceeds smoothly, the following shall be accomplished prior to beginning array optimization:

(a) The transmitter should be properly tuned for 20.0 percent modulation of the 90 and 150 Hz tones, and for modulation equality. Consult the equipment instruction book and/or Order 6750.49 for detailed procedures.

(b) Ensure that the PIR is calibrated and is in good working condition.

(c) Using a vector voltmeter, verify the condition of all dummy loads, phasers and attenuators that will be used during tuneup procedures. Discard any dummy loads which do not pass VSWR checks (minimum return loss of approximately 25 dB should be measured).

(d) Establish ground checkpoints in accordance with Order 6750.49

211. TUNE UP PROCEDURES

a. General Instructions. After the physical installation of the equipment has been accomplished, antenna system optimization can begin. Antenna system optimization will consist of measuring the amplitude and phase distribution to the antenna elements, and trimming cables and making other adjustments to obtain satisfactory signal in space performance. After antenna array optimization is complete, then the monitor can be optimized, and preparations for flight inspection completed.

NOTE: Do not start optimization until all procedures in paragraph 20 are completed.

b. General Procedures for Measuring Antenna Array Nulls. Optimization of most localizer antenna arrays requires that the null in the sideband signal from each antenna pair be measured, and the antenna feed lines cut to make the null coincident with the desired localizer course (most often the runway centerline). There are three methods for measuring antenna nulls which are commonly used. Some personnel may prefer one over another, but the important thing is to choose the method which you are most comfortable with, and that gives repeatable, predictable results for your installation job.

(1) All antenna null measurements should be made at a suggested distance of 1000', and an absolute minimum distance of 450'. All of the nulls should be measured at the same distance away from the array. The stop end of the runway is usually a convenient point, since the distance to the array is usually 1000'. Greater distances are permissible but null measurements are subject to multipath effects due to reflections from buildings, etc., which will be worse further away from the array. If results of a null check are questionable and you suspect multipath problems, some investigation may be warranted. Since multipath effects are a function of distance from the array, make a few null checks at varying distances from the array. The angular displacement of the null from centerline should be independent of the distance from the array (inches away from centerline divided by the distance from the array should be a constant value). If significant differences are found, a new location may need to be established to conduct null checks. Effects of multipath can be minimized by using a directional antenna, such as a yagi which is made for localizer frequencies.

(2) When measuring nulls, one person should be out at the measurement point with the PIR. Additional people should stand directly behind the person with the PIR to prevent effects on the null readings. Keep the PIR level, with the antenna oriented properly (parallel) with respect to the array. Personnel working at the array should be well behind the center of the array when null measurements are made. Note that nulls for inside antenna pairs (shortest spacing between antennas) will be very broad, while the nulls for outside pairs will be more narrow.

(3) When measuring a DDM or RF null, move the PIR back and forth, pausing incrementally to note RF or DDM dips which indicate a null. The transmitter should be adjusted so that the RF signal received by the PIR is at a low level, where minimum Automatic-Gain Control (AGC) action occurs. If the signal strength is too high to easily define a null, reduce the transmitter power in steps until nulls are more easily defined.

(4) DDM Method.

(a) Configure the facility normally, with the exception that only one antenna pair should be radiating.

(b) Dummy load all unused antennas, cables, ports.

(c) Proceed to the point chosen for null measurements. Walk across the localizer course with the PIR and look for the 0 DDM point. The point where zero DDM occurs will be coincident with the sideband RF null for that antenna pair. Record this value.

(d) Repeat this procedure as required for each antenna pair, and for the entire array (composite sideband null) with all antennas energized.

NOTE: This method requires that the transmitter be tuned properly, the CSB/SBO phasing is optimum, and that the PIR be properly calibrated.

(5) RF Bracket Method.

(a) Configure the facility to radiate carrier into the sideband port of the distribution unit, with only one antenna pair radiating at a time. The SBO transmitter output should be dummy loaded.

(b) Dummy load all unused ports, antennas, and cables.

(c) Proceed to the point chosen for the antenna null measurements. Walk across the localizer course (keeping a constant distance from the antenna array), and try to identify roughly where the null occurs by looking for the minimum signal indication on the RF level meter of the PIR. Note the level on the RF meter and mark this point on the ground temporarily (for reference only).

(d) Walk to one side of the null until you achieve an RF level suitable for use as a reference level (make sure that a reasonable change from the minimum RF level occurs). Note the RF level reading and mark this point on the ground.

NOTE: The null position found in subparagraph 21b(5)(f) should be reasonably close to that marked in subparagraph 21b(5)(c). If not, repeat the check.

(e) Walk to the other side of the null until the RF level again reads the reference level. Mark this point on the ground.

(f) The null position will be halfway between the two points where the reference RF level reading was found. Use a tape measure to mark the halfway point, and then determine the null offset from centerline. Record this value.

(g) Repeat this procedure as required for each antenna pair, and for the entire array (composite sideband null), with all antennas energized. The RF bracket method is particularly useful for the inside pairs, where the null is very broad and it is hard to accurately determine the minimum value on the RF meter.

(6) RF Null Method.

(a) Configure the facility to radiate CSB into the SBO port with one antenna pair connected. Turn off the 90 and 150 Hz modulation, and turn the 1,020 Hz indent tone to constant. Dummy load all unused ports, antennas, cables, etc.

(b) Proceed to the point selected for measurement of null position and connect a headset to the PIR.

(c) Walk across the localizer course at the selected distance, and use a headset (plugged into the PIR) to listen for the minimum of the 1,020 audio tone. The minimum audio tone will correspond to the position of the sideband null. Record the position of the null with respect to the desired approach course.

(d) Repeat this procedure as required for each antenna pair, and for the entire array (composite sideband null), with all antennas energized.

(e) For further discussion of the RF null method, see the measurement procedure for composite sideband null in the latest edition of Order 6750.49.

c. General Procedure For Antenna Array Optimization. This procedure is intended for use with any of the antenna arrays/types, with the exception of the 15 element V-Ring which is being phased out. Consult subparagraphs 21d and 21e for antenna and array specific guidance.

NOTE: All of these procedures require trimming of the antenna feed cables. When trimming cables, use extreme caution to avoid overcutting. Doublecheck calculations before the cut, being conservative in rounding off fractions. Measure the cable trim length with a scale graduated in tenths of inches.

(1) Pair to Pair Phasing of Antenna Tielines. One step that is left out of many optimization procedures is pair to pair phasing. Conduct this step just before you are ready to begin measuring and "cutting in" the antenna nulls. The goal of this procedure is to cut the tie lines on one side of the array to be the same length. Note that many pair to pair phasing procedures require measurement of the antenna feed cable length, but the signal path for the test equipment setups always include the RF

0333_001

distribution unit. What you will actually measure is the RF transmission path length, which includes all RF paths between the input to the distribution unit and the antennas.

NOTE: For V-Ring Arrays, this procedure, which measures the RF transmission path length from the input of the distribution unit to the input of the antenna can be used. However, you can also measure the phase using the hang on antenna probe. Measuring with the antenna probe will take into account the differences (which should be small) in radiated phase caused by the differences between antenna couplers. The phase measured by the hang on probe may be affected by parasitics. Use the hang-on probe only when one antenna is radiating at a time.

(a) Disconnect and dummy load all antennas except the cable under test.

(b) Set up the test equipment as shown in figure 2-20. (See 21c(1)(f))

(c) Configure the facility to radiate carrier into the sideband port of the distribution unit.

(d) Dummy load the SBO output of the transmitter.

(e) At the antenna, disconnect the cable whose path length needs to be measured. Both need the set up of the test equipment as shown in figure 2-20.

(f) Measure and record the electrical RF transmission path length for the subject antenna using a vector voltmeter. Repeat above measurements until the path length for each antenna has been measured.

NOTE: The test equipment setup in figure 2-20 measures open tielines, so the indicated phase meter measurement on the vector voltmeter will be twice the actual length (round trip length).

(g) Identify the shortest cable (path length) in the array (shortest cable will have the most advanced phase).

(h) For each cable on the same side of the array as the shortest cable, calculate the length of cable which needs to be cut to match the length of the shortest cable. (At localizer frequencies for RG-214/U, one inch is roughly equal to five electrical degrees).

(i) Trim all of the cables on the same side of the array as the shortest cable as required, per the calculations made the previous step. Be sure not to cut too much cable (be conservative).

(j) Using a vector voltmeter, remeasure all of the cables cut in the previous step. If the cable lengths on that side of the array are not equal within +/- 2 degrees, return to step 21c(1)(f). After the final cut, record all of the cable lengths for reference.

(2) Sideband Nulls. This procedure is used to establish the location of the nulls in the sideband patterns of both the individual antenna pairs and the entire array to be coincident with the desired approach path (nominally runway centerline). The tolerance for the (array) composite sideband null is established by Order 6750.49 at 1 inch per 100 feet (of distance to the point of measurement). This tolerance shall be used as a guideline for individual pairs. The most important result of this procedure is for the composite null to be in tolerance, and for the condition of the array to be as close to optimum as reasonably possible. It is highly recommended that the position of all individual sideband nulls be recorded in the facility records, including the distance away from the array that null measurements were made. Proceed with array optimization as follows:

(a) Configure the system as required for the preferred antenna null measurement method. (See paragraphs 21b(4), (5), or (6)).

(b) Radiate signals only from the antenna pair which needs to be optimized, with all others dummy loaded (radiate from all antennas when measuring the composite null).

(c) Measure and record the antenna null position. The null will be displaced towards the antenna with the lagging phase.

(d) Repeat the previous steps for each antenna pair, and for the entire array.

(e) Compare the null measurements to the initial tolerance indicated in the equipment instruction books. If the tolerances are met for all pairs and the composite, then proceed to the last step of this procedure. If tolerances are not met, continue the procedure.

(f) Determine which of the antennas in each pair must be shortened to shift the null towards the desired approach path (centerline). If the null is located on the 90 Hz side of centerline, then the feedline to the antenna on the 90 Hz side of the array must be shortened.

(g) To determine the amount of cable which needs to be cut from each pair, insert a right angle, type N coaxial adapter (or elbow) into the feed cable of the pair which does not need to be shortened. Repeat the null measurement, noting how the position of each null changed with the elbow installed. Calculate the amount each null shifted as a result of the addition of the elbow. Note that each null should have shifted towards centerline, if this did not occur then recheck your calculations. Because the elbow is approximately 6.5 electrical degrees at 110 MHz, the requiredamount of trim to place the null on centerline can be calculated using the following formula:

L = (1.3 × B)/A Where: L = Length of feed cable to be trimmed (inches) B = Original distance of null from centerline (inches) A = Distance that null moved with elbow (inches)

12/17/93

FIGURE 2-19. RF TRANSMISSION PATH LENGTH

TEST SETUP (VECTOR VOLTMETER)

CSB DIRECTIONAL P1 COUPLER

ANTENNA ARRAY

50 OHM LOAD

SBO INPUT

OUTPUT FWD REV

OUTPUT SBO LOAD OHM

ATTTOR

SAMPLING HEAD

VECTOR VOLTNETER

NOTES

THE CSB SIGNAL IS FED INTO THE ANTENNA ARRAY SBO INPUT

THIS END OF CABLE NORMALLY CONNECTED TO ANTENNA

NOTE: THIS PROCEDURE WILL MEASURE TWICE THE PATH LENGTH

Chap 2

Par 211

ANTENNA FEED CABLE

FROM DISTRIBUTION UNIT

2

4L

P2

p2

(22) P2

P2 50

(1R) P2 LOADS OHH

(28) P2

P2 w

(4R) P2

OTHER FEEDCABLES AND ANTENNAS DUMMY LOADED

(h) For each null which needs to be moved, calculate the amount of cable cut required using the above formula 21c(2)(g).

(i) If more than one antenna pair null must be shifted, trim the cable of the inside antenna pairs first, and work towards the outer pairs. Recheck the composite null after each cut before proceeding to the next pair. Complete all required cuts.

(j) Continue to repeat this procedure (start at subparagraph 21c(2)(b) until all individual pair nulls and the composite null meet the tolerance of one inch displacement per 100 feet away from the array. Confirm that the array has proper sensing using the PIR.

(k) Make a permanent record of all null positions with respect to the desired approach course (centerline). Be sure to note where the nulls were measured with respect to the antenna array.

d. Array Specific Tuneup.

(1) V-Ring Arrays. The following subparagraphs provide some general guidance regarding tuneup of the V-Ring arrays. The installers should note that it is extremely easy to damage antenna feed and monitor cables when installing a V-Ring array. The cables attach to the antenna on the bottom, and it is very easy to pinch the cable between the antenna and the support mast when placing the antenna on the mast. Placing the antenna on the mast will require two people. One person should grasp the cable at the bottom of the support mast and keep it pulled tight while the antenna is fit down into the mast. Sufficient slack must be left in the cables to prevent the cables from being stretched the next time the antenna is taken off the mast. Observing these cautions will prevent problems in the long run.

(a) 8-Element Array. The 8-element array tuneup is very straightforward, and can be found in TI manuals 6750.144, Localizer Station Book, and 6750.161, Localizer - 8-Element V-Ring Array. The tuneup procedure is essentially the same as the 8-element log periodic array, except that log-periodic-dipole (LPD) antennas require no tuning. V-Ring antennas require that the coupler be tuned for minimum VSWR prior to antenna null cutting. Installers of this array should note that the cable trough must be locally procured. The FAA designed this array, and no contract has been executed to provide a stock of array parts. Any sheet metal contractor should be able to provide the cable trough parts using the drawings and other information contained in TI 6750.161.

(b) 14-Element Array. The comments for the 8-element array also apply to the 14element array. The detailed installation procedures for this array are contained in TI 6750.144, Localizer Station Book.

(c) The 8- and 14-element arrays do require that a ferrite isolator be installed in the CSB and SBO feedlines to prevent signals from being reflected back towards the transmitter. Information on ordering these isolators is contained in the equipment instruction books.

(2) Log Periodic Dipole Arrays. No array specific information for LPD arrays is offered in this section. Consult the manufacturer's instruction book for more information on this array.

e. Dual-Frequency Antenna Arrays. All of the dual-frequency antenna arrays discussed in this order radiate the second frequency or "clearance" from a subset of the "course" antenna array. In other words, some of the antennas within the array radiate both course and clearance energy. Since the antennas have only one feedline and one monitor line, the tuneup for a dual-frequency array is the same as a single frequency, with the exception of some additional phasing checks, and establishment of the centerline "capture ratio." Each of the steps which is required in addition to the standard single-frequency array tuneup is discussed in subparagraphs 21e(1) through 21e(2).

(1) Clearance CSB to SBO Phasing. Dummy the course array (CSB and SBO) inputs to the RF distribution unit. Perform CSB to SBO phasing on the clearance array using the same phasing procedures used for the single frequency array. Be sure to confirm proper sensing of the clearance array.

(2) Centerline Capture Ratio. In order for the aircraft receiver to be fully captured on either frequency of the dual-frequency array, the stronger signal must be about 10 dB greater than the weaker signal. The course signal needs to be stronger on centerline, while the clearance signal must be stronger at wider angles (greater than 10 degrees). The initial setting of the clearance power should be accomplished as follows:

(a) Dummy load the clearance transmitter and set the course system up normally.

(b) On centerline using a PIR, record the RF level reading, converting to microvolts using the chart supplied with the PIR. If your PIR reads directly in dB, no conversion is necessary for the purposes of this check.

(c) Turn off the transmitter, and dummy load the course transmitter system. Set up the clearance transmitter to the initial settings as specified in the manufacturer's instruction book. Radiate clearance signals normally.

(d) Using a PIR on centerline, measure the RF level and convert this reading to microvolt. Calculate the capture ratio as follows:

Capture Ratio (dB) = 20 log (V-course/V-clearance)

NOTE: Voltages above need to be in microvolts, calculate the capture ratio directly if your PIR reads RF level in dB.

(e) If the capture ratio is at least 10 dB, then initial tolerances have been met. If not, then adjust the clearance transmitter power until the ratio is equal to or greater than 10 dB. A setting of 12 dB is recommended to ensure full capture of the aircraft receiver.

f. Monitoring System. Similar to the transmit portion of the localizer system, the monitor system requires that the cables from the antennas be trimmed for proper phase relationships of the signals reaching the monitor. This involves first trimming cables to minimize pair-to-pair phase spread, and then to achieve 0 DDM at the path output of the RF combining unit. The procedures in this section should be used in trimming the monitor cables. In the pair-to-pair phasing check, we will measure the "monitor path length," which includes the RF path from the RF distribution unit through antenna and monitor pickup, all the way back to the CSB output of the RF combining unit. Other pair-to-pair phasing procedures will probably refer to measuring the monitor cable length, but usually include the same RF signal path.

(1) Pair-to-Pair Phasing. Similar to the transmit cables, the monitor cables must be trimmed to minimize pair-to-pair phase spread. Conduct this procedure just before you are ready to begin trimming the monitor cables for zero DDM at the RF distribution unit.

NOTE: For monitor cables, measure the phase of the monitor return signal (length of monitor path) at the CSB output of the RF combining network. Measuring at this point will account for the phase distribution of the particular monitor RF combining network in use at this facility. Be sure to account for the 180 degree phase shift between cables of an antenna pair (introduced by the RF distribution unit) when calculating cable lengths. See figure 2-19 for a generalized test setup.

(a) Configure the facility to radiate carrier into the sideband port, with the SBO output dummy loaded. Radiate from one antenna at a time. Dummy load all other antenna inputs and feed cables. Connect all monitor cables to antennas, but dummy load all monitor cables not under test, at the distribution unit. Connect themometor cable under test to the proper combining unit port.

NOTE: Set up test equipment as shown in figure 2-21.

(b) Measure and record the monitor path length for each antenna monitor cable using a vector voltmeter. Record these values.

(c) Identify the shortest monitor path length in the array (shortest path will have the most advanced phase).

(d) For each cable on the same side of the array as the shortest monitor path, calculate the length of cable which needs to be cut to match the shortest monitor path length. (At localizer frequencies for RG-214/U, one inch is roughly equal to 5 electrical degrees).

(e) Trim all of the monitor cables on the same side of the array as the antenna with the shortest monitor path length so that all path lengths on that side are equal. Use the calculations made in the previous step. Be sure not to cut too much cable (be conservative).

(f) Using a vector voltmeter, remeasure all of the cables cut in the previous step. If the cable lengths on that side of the array are not equal within +/- 2 degrees, repeat the previous step. After the final cut, record all of the cable lengths for reference.

(2) Sideband Monitor Nulls. This procedure is used to establish the phase relationships of the sideband signals at the CSB output of the monitor RF combining network. The phase of these signals need to be adjusted such that the sideband signals cancel at this output of the RF combining network. Proceed as follows:

(a) Radiate with the transmitter power set to approximately 1 watt. Confirm modulation equality is 00.0 DDM.

(b) Connect the transmit and monitor cables from the antenna pair which needs to be optimized, with all others dummy loaded (radiate from all antennas when measuring the composite monitor null).

(c) Connect the PIR to the CSB output of the RF combining network. Measure and record the DDM indication on the PIR.

(d) Repeat subparagraphs 21f(2)(b) and 21(b)(2)(c) for each antenna pair, and for the entire array.

(e) The DDM readings must be less than +/- .008 DDM to meet initial tolerances. If the tolerances are met for all pairs and the composite, the procedure is complete. Otherwise, continue the procedure.

(f) Determine which of the antennas in each pair must be shortened to obtain zero DDM at the CSB output. If the DDM reading indicates a predominance of 90 Hz signals, then the cable on the 150 Hz side of the array needs to be cut, and vice versa.

12/17/93

FIGURE 2-20 MONITOR PATH LENGTH TEST SETUP (VECTOR VLTMETER)

DIRECTIONAL P1 COUPLER SBO 50 OHM LOAD

CSB

TEST CABLE

50 OHM LOAD

ANTENNA ARRAY

P2

P2

1

4L

P1

YLVANGLLY ATTENUATOR J008

SAMPLING HEAD

VECTOR VOLTMETER

NOTES

THE CSB SIGNAL IS PED INTO THE ANTENNA ARRAY SBO INPUT

DUMMY LOAD ALL ANTENNA PEEDCABLES (EXCEPT ONE BEING MEASURED)

3 CSB OUTPUT OF RF COMBINING UNIT

w

-ww

50 OHM 2 LOADS ww ww ww

ww

P1

P1

P1

P1

P1

P1

P1

P2

2L

1R

12R

4 3R

44R

J2

TO ALL OTHER ANTENNA MONITOR OUTPUTS

Chap 2 Par 211

(g) To determine the amount of cable which needs to be cut from each pair, insert a right angle, type N coaxial adapter (or elbow) into the feed cable of the pair which does not need to be shortened. Repeat subparagraphs 21f(2)(b) through 21f(2)(d) noting the DDM reading for each pair with the elbow installed. Calculate the amount of change in the DDM reading as a result of the addition of the elbow. Note that each DDM reading should have gone towards 0 DDM when the elbow was added, if this did not occur then the elbow was placed in the wrong cable. Return to subparagraph 21c(2)(g) and check your calculations. Because the elbow is approximately 6.5 electrical degrees at 110 MHz, the required amount of trim to achieve zero DDM at the CSB output can be calculated using the following formula:

L = (1.3 × O)/C Where: L = Length of feed cable to be trimmed (inches) O = Original DDM reading C = Change in DDM reading

(h) For each antenna monitor cable pair to be trimmed, calculate the amount of cable cut required using the above formula.

(i) If more than one antenna cable pair must be trimmed, start with the pair closest to the center of the array. Complete all required cuts.

(j) Continue to repeat this procedure (start at) until all individual antenna pairs and the entire array null meet the tolerance of .008 DDM at the CSB output of the RF combining unit.

(3) Monitor Combining Network. The purpose of the monitor combining network is to combine the CSB and SBO outputs of the RF combining unit in such a way as to represent the farfield conditions at an on-course location and an off course location (edge of course). These outputs are fed to "integral detectors", which provide detected audio outputs which can then be fed to the monitor. Due to differences in network topologies between various manufacturers, no generic procedures are included here for adjusting the monitor combining network. Refer to the equipment instruction book for detailed procedures on adjusting the monitor combining network. The integral detectors mentioned here are linear envelope detectors. A problem that has surfaced over the years with these detectors is that they can be overdriven easily. If they are overdriven, the detector diode can be biased out of the linear range of operation, and monitor instability can occur. In the past, no checks were conducted on the input level to these detectors.

Overdriving the detectors may result in drift in course, path, RF level, or modulation percentage monitoring. The input levels to the integral detectors should be no lower than -20 dBm, and no higher than 0 dBm. The installation crew shall measure the input level to the integral detectors, using either a vector voltmeter or other suitable test equipment. If the level is not between 0 and -20 dBm, an attenuator shall be installed directly in front of the integral detector. The attenuator should be sized to bring the input level to between 0 and -20 dBm, preferably in the middle of this range. No NAS Change Proposal shall be required to install this attenuator, but the input level and attenuator value should be documented in the Facility Reference Data File.

Par 211 Chap 2 Page 49

(4) Other Monitor Tuneup Procedures. All other monitor tuneup procedures are covered adequately in the equipment instruction books, and no further guidance is required here.

212. FLIGHT INSPECTION.

a. Commissioning Flight Inspection. Detailed information regarding flight inspection can be found in the current versions of Orders 6000.15, General Maintenance Handbook for Airway Facilities, 6750.49, and OA P 8200.1. The information provided here is meant to supplement the information contained in those documents, and to provide specific guidance with respect to commissioning flight inspections.

b. Reference Concept. Although installation personnel are not directly involved in maintenance, this section should be reviewed so that those personnel understand the maintenance philosophy and requirements. The current ILS maintenance philosophy is that the limits of the radiated signal, not the monitored signal be maintained. This requires that ground measurements for the ILS be accomplished using test equipment which is independent of the monitor equipment. These measurements will include wattmeter powers, PIR readings, etc. Flight inspections can be conducted with the monitor equipment turned off. All monitor alarm values are defined in terms of a measurement taken with independent test equipment (for example - wide alarm will be defined as a particular sideband power level).

(1) All ILS facilities are required to have traceability to flight inspection. Traceability means that for any characteristic of the signal in space measured by flight inspection, there shall be a record of the ground measurement which corresponds to the airborne measurement. Ground measurements are made by the facility technician and recorded on facility technical performance records provided for that purpose. Airborne measurements are made by flight inspection, and are provided to ground personnel on flight inspection reports. Traceability to flight inspection is the primary basis for certification of an ILS facility.

(2) The concept of a "reference" flight inspection is key to the current maintenance philosophy. A reference flight inspection establishes reference values for ground measurements (course width, wide and narrow alarms, etc.) which define the limits of the radiated signal in space as measured by flight inspection. Once reference values are established, they are used during all subsequent flight inspections to adjust the signal in space characteristics of the localizer. When reference values are established, the airborne parameter (e.g. course width) is held to an initial tolerance, which is purposely tighter than the operational tolerances used by flight inspection. These initial tolerances are contained in chapter 3 of Order 6750.49.

(3) The purpose of tighter initial tolerances for a reference flight inspection is to prevent out of tolerance readings from ever occurring (known as a flight inspection discrepancy) during a subsequent flight inspection. If a discrepancy is found on a particular facility, flight inspection is required to check the facility more often, causing an undesirable increase in flight inspection workload for that facility.

(4) After a reference flight inspection is established, the system is adjusted to the reference values (not monitor alarm lights) during all subsequent "monitors" flight inspections. It

should be pointed out that it is not necessary to meet the initial tolerances in Order 6750.49 during all flight inspections, only those which are to be used as a reference.

(5) Since the commissioning flight inspection will be a "reference" flight inspection, care should be taken to ensure that initial tolerances are met for all airborne characteristics of the ILS signal. For more information on establishing references, see Order 6750.49.

(6) Flight Inspection Adjustments. Prior to the arrival of flight inspection, review the adjustment procedures for course width, centerline alignment, etc. Procedures for making these adjustments are contained in Order 6750.49.

c. Commissioning Checklists. A commissioning flight inspection checklist for localizer and glide slope facilities can be found in Order OA P 8200.1. Familiarize yourself with the checklist, and be prepared to make all required adjustments.

d. Initial Sideband Power Settings. Adjust the sideband power level for the proper DDM readings (.155 nominal) at the edge of course ground check points. Final adjustments to sideband power will be made during the commissioning flight inspection for the proper course width. e. Ground Check Points. Ground check points shall be established using the procedures contained in Order 6750.49.

f. Pre-Flight Inspection Activities. The following parameters should be checked using the procedures in the equipment instruction books and/or Order 6750.49 prior to the arrival of flight inspection:

(1) Normal ground checks.

(2) RF power levels.

(3) Modulation percentage/balance.

(4) RF phasing.

(5) Identification (modulation percent and correct identifier).

(6) Frequencies.

(7) Equality between main and standby equipments (dual equipments only).

(8) Centerline capture ratio dual-frequency systems only.

(9) PIR calibration.

(10) Operation of VHF transceiver.

g. RF Power Levels. RF power levels should be established using the guidance provided in the equipment instruction books.

h. Modulation Percentages/Balance. The modulation should be checked using procedure contained in Order 6750.49.

213. - 216. RESERVED.

CHAPTER 3. GLIDE SLOPE

SECTION 1. TECHNICAL CHARACTERISTICS

300. SYSTEM DESCRIPTION. The glide slope system consists of a transmitter, antennas, coaxial line and associated electronics designed to give an aircraft on approach vertical guidance information. Procedurally, the glide slope is not stand alone equipment, meaning that the localizer's lateral guidance must be present before glide slope information is usable.

301. GLIDE SLOPE TRANSMITTERS. The glide slope transmitters provide aircraft guidance by amplitude modulating an RF carrier with 90 and 150 Hz navigation tones. Some glide slopes use the "capture effect" principle and have an additional transmitter which utilizes only the 150 Hz tone.

302. RF COAXIAL TRANSMISSION LINES. The antenna are connected to the transmitting equipment via 50 ohm low loss coaxial transmission lines. The most commonly used cable is phase swept RG214/U. However other cables such as RG-331/U or heliax cables may be used. Although the antenna heights are different, equal lengths of cable (both feed and monitor) to each antenna, should be used. This is to ensure that the environmental conditions are uniform on all cables to minimize monitor drift and to keep the cable attenuation consistent to all the antennas. All of the cables should be cut from the same roll, so that the aging properties of the cables are similar. Special care should be taken to ensure that the cable connectors are well moisture proofed following their installation. Very small amounts of water in a transmission line migrate up and down the line through capillary action causing monitor instability.

303. GLIDE SLOPE ANTENNA SYSTEMS. All glide slope systems now being installed, with the exception of end-fire systems, operate on the general principal of vertical RF lobe formation, using the ground as a reflecting surface. Geometric representations normally include an "image" antenna in lobe formation. This concept is used in applicable handbooks, instruction books, and other publications. The end-fire system is unique in that it does not utilize ground reflections to form patterns in space. However, illumination of low angle reflectors such as rising terrain, powerlines, and tall structures can contribute to derogation of the glide path. The glide path projected from the end-fire array is still compatible with existing airborne receiving equipment and may be used with existing glide slope transmitting equipment with some modification.

a. Null-Reference Antenna System. The null-reference glide slope is the most common type and uses a carrier antenna (radiating modulated carrier) and a sideband antenna (radiating sidebands only). The glide angle is usually standardized at 3 degrees except where certain procedures or conditions warrant an angle other than 3 degrees. The glide angle is determined by the height of the upper (sideband) antenna above the ground plane. With ideal terrain, this ranges from 24.2 feet to 33.7 feet for glide angles of 3.5° to 2.5° respectively. The glide angle projected is independent of path width adjustments. Because the course characteristics above and below the on-path line are formed by the lobe pattern from the upper antenna, the width above and below will be symmetrical, provided the carrier antenna is mounted at one-half the effective height of the sideband (upper) antenna. Both above and below the on-path line, DDM continues increasing well beyond the .175 DDM required to produce full scale deflection, thus providing well-defined course edges. The glide angle varies only

with change in sideband antenna height and the path width is an independent function of sideband power radiated from the upper antenna. There is no reason for changing percentages of modulation once they have been correctly adjusted. This provides uniform flag alarm current among facilities. Phasing is held constant on the approach path by physically offsetting the carrier and sideband antennas. In the null-reference system, dephasing results in a path width increase varying as a cosine function of the angle of dephasing. The vertical radiation patterns for a null reference facility are shown in figure 3-1.

FIGURE 3-1. VERTICAL LOBE STRUCTURE FOR NULL-REFERENCE GLIDE SLOPE

5.0

SH 4.0 C C

+150 -150 FIEELD 3.0 +90 -90

2.0 GLIDE ANLE BIS SE COE

1.0 +150 -150 +150 -150 -90 +90 -90 +90 0 3.0 6.0 9.0 12.0

∝ - ELEVATION ANGLE - DEGREES

b. Null Reference Integral Monitoring. To integrally monitor the path and width, it is necessary to simulate the amplitude and phase relationships that exist at specific angles in space. These are usually the path angle and the lower edge of path (the point at which 150 microamperes of cockpit meter current exists). Typical null reference monitoring schematic is shown in figure 3-2. For the width monitor, adjustments of the attenuator are normally made to achieve 0.175 DDM (150 microamperes), of 150 Hz sensing.

FIGURE 3-2. NULL REFERENCE MONITOR CIRCUITRY (TYPICAL)

ATTENUATOR

COMBINER 0.175 DDM TYP. SBO PHASER TO WIDTH MONITOR WIDTH DETECTOR (FROM MODULATOR) V

CSB MONITOR PROBES DIVIDER 0 DDM MONITOR TO PATH

PATH DETECTOR

c. Sideband-Reference Antenna System. The sideband-reference system uses lower antenna heights than the null-reference system, with the result that terrain requirements are somewhat less stringent. This system uses two antennas (spaced in a height ratio of approximately 3/1) to radiate sideband signals 180° out-of-phase. These sideband signals combine in space to produce a vertical lobe structure similar to the single null-reference lobe structure. Carrier signal is aiso fed to the lower antenna. A bridge is used to isolate the sideband and carrier feedlines. In some cases, this system results in a commissionable facility that would be unacceptable for null-reference operation. It has most of the advantages of the null-reference system mentioned previously. However, this system is more susceptible to changes in the reflecting surface. At sites where heavy snowfall considerably changes the ground level, this system would not be as stable as the null-reference system.

Conversion from the null-reference to sideband reference requires the addition of a sideband reference glide slope amplitude and phase control unit. Otherwise, the equipment requirements and adjustments are similar to the null-reference system. The vertical radiation patterns for a sideband reference facility are shown in figures 3-3 and 3-4. Since the CSB (lower) antenna is mounted much lower than the null reference glide slope CSB antenna, the maximum CSB signal strength occurs at approximately 6 degrees, rather than 3 degrees, with a first null at 12 degrees. Thus the CSB signal strength is asymmetrical about the path angle of 3 degrees. The SBO pattern from the upper antenna no longer has a null at 3 degrees as in the null reference system, because of the lower mounting height. In fact, if SBO signals were radiated from the upper antenna only the path angle would occur at 4 degrees.

To achieve the desired SBO null at 3 degrees, an SBO signal is introduced from the lower antenna such that its signal strength at 3 degrees is equal to but of opposite phase of the SBO signal from the upper antenna. With the SBO signals present from both antennas at 3 degrees, cancellation occurs, and the resultant SBO pattern has a null at the desired path angle.

d. Sideband Reference Monitoring. Some Sideband Reference installations use integral monitoring. Some may have a field mounted path detector. Figure 3-5 shows a typical recombining circuit used to produce integral path and width signals. The attenuators and phase shifters are used to duplicate the amplitude and phase relationships that would occur in space at the path angle and (usually) the lower edge of the path width, or .175 DDM (150 microamperes). Field monitoring for sideband reference glide slopes normally employ a field path monitor positioned at the 300 degree proximity error point, which is also the 270 degree proximity error point between the CSB and the vector sum of the two SBO signals. Because of the 270 degree phase error, the monitor normally sees quadrature condition (0 DDM) and is often called a phasing monitor, due to high sensitivity to changes in system phasing.

e. Capture Effect Antenna System. The capture effect glide slope system was developed for operation at facilities where terrain discontinuities in the approach area preclude the operation of a conventional null-reference or sideband-reference facility. It utilizes a wide aperture three-antenna image type array to achieve improvement in flyability. Low-angle signal cancellation is used to reduce the amount of path-forming energy striking discontinuities in the approach area. The resultant reduction of reflected energy improves the flyability at this type of site. The system provides for an auxiliary signal (clearance signal), slightly offset in carrier frequency, to ensure adequate clearance below path.

(1) The capture effect glide slope system consists of two transmitters feeding modulated energy to a common antenna array of three antennas. One of the transmitters generates the 90 Hz and