Order 6560.29 New Generation Runway Visual Range System
This document is cancelled. It may have been replaced. Check the official source before relying on it.
Federal Aviation Administration
Memorandum
Date:
To: Neika Jones, Directive Program Manager, ASP-110 From: Malcolm Andrews, Director, Enterprise Services, AJM-3 Subject: Cancellation of FAA Orders
Navigation Programs is requesting the cancellation of the following FAA Orders. An internal review was conducted and justification for each cancelation is provided below.
Order Number Date Document Title OPR Reason for Cancellation 6820.13A 5/19/1993 Project Implementation Plan for Low Power TACAN Antenna
AJM-32 No longer relevant as the Distance Measuring Equipment (DME), Very High Frequency Omnidirectional Range (VOR) Tactical Air Navigation (TACAN) (DVT) Sustainment Program TACAN Antenna Procurement will address system replacement. 6560.29 3/26/1993 New Generation Runway Visual Range System
AJM-32 No longer relevant as standard drawings are currently established and maintained by the National Computer-Aided Engineering Graphics (CAEG) Program in accordance with Order 6000.5C, National Facility Drawing Library Procedure. 6830.4 9/21/1992 Microwave Landing System (MLS) Project Implementation Plan (PIP)
AJM-32 According to the FAA Public Regulation & Policy page, Order 6830.4 MLS PIP has been cancelled.
Should you have any concerns or questions, please contact Deborah Lawrence, Manager, Navigation Programs, at 202-267-3200.
MALCOLM ANDREWS
MALCOLM ANDREWS
Digitally signed by MALCOLM ANDREWS Date: 2021.04.13 10:12:49 -04'00'