U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION WP-6540.2

U.S. DEPARTMENT OF TRANSPORTATION ORDER FEDERAL AVIATION ADMINISTRATION WESTERN-PACIFIC REGION WP-6540.2

7/9/87

MAINTENANCE OF THE GRANGER RADIO (MODEL 6O18) AND DTL MULTIPLEX MODEL (MODEL 73OO) AND RITRONS TELENEXUS RADIO COMMÚNICATION LINK (RCL) SYSTEMS SUBJ:

1. PURPOSE. This order establishes division guidelines for the administration of maintenance activities involving the Granger and the Ritron TELENEXUS (RCL) systems.

2. DISTRIBUTION. This order is distributed to Branch level and above in the Airway FaciTities and Air Traffic Divisions, with standard distribution to all Airway Facilities Sectors and their subordinate field elements.

3. BACKGROUND. As part of the network integration plan, the Western Pacific Region has installed RCL local area networks in the San Francisco and Los Angeles areas using Granger equipment. Ritron TELENExus systems have been installed at the Hector and Daggett VORTAC'S. Installation of Granger and Ritron RCL systems have been justified by reductions in lease lines as well as higher reliability. Current maintenance orders do not cover the Granger and Ritron systems.

4. CERTIFICATIUN. Granger and Ritron TELENEXUS RCL systems shall require service certification only. Certification parameters, intervals and log entries are summarized in Appendix 1 of this order. The service certification for RCL local area networks shall be the responsibility of the control terminal (associated ARTCC). Service certification will encompass all facilities connected to the loop networks. The service certification for point-to-point circuits will be done at the FAA RCL facility closest to the control facility.

5. LUGS. Each terminal and repeater station shall maintain a FAA Form 6U30-1 (or FAA Form 6U3U-2) 1og. This 1og shal1 be maintained per Urder 6000.15A, General Maintenance Handbook for Airway Facilities. Site visits, periodic maintenance, modifications, etc. shall be documented.

a. Shared Master Log. There is no requirement for a separate RCL log. RCL entries may be made in an existing facility master log. The RCL log may be the master if there are no other co-located facilities.

Distribution: A-X (AF/AT)-3, A-FAF-0 (STD) Initiated By: AWP -460

719/87 WP 6540.2

control terminal log. When an interruption requires restoring the RCL to service, the RCLR technician shall transmit the pertinent outage information b. Interruptions. All interruptions of the RCL shall be entered in the to the control terminal facility. c. Certification. All service certifications of the RCL shall be entered in the control terminal log.

6. MAINTENANCE. The Granger and the Ritron TELENEXUS systems shall be maintained with the MAINTENANCE OF THE 80's Philosophy in mind. These systems are designed and packaged to facilitate easy equipment maintenance.

a. Maintenance of the Granger system is divided into three categories: first, second and third levels. Reference the appropriate Granger instruction books. (1) First level maintenance (no loss of link service) consists of

Form 6000-8 Technical Performance Record. (Refer to Appendix 2 for a operational checks that can be accomplished using only the integral equipment meters and indicators. These results shall be recorded on FAA typical Technical Performance Record). Typical first level maintenance checks Appendix 3. First level maintenance shall be performed semi-annually as a minimum. (If the technician is visiting the site for other reasons, more (from the Model 6015 A/E protected terminal instruction book) are shown in

frequent first level maintenance is a recommended option). (2) Second level maintenance (minimal loss of link service)

consists of checks and adjustments necessary to insure the terminal is operating properly. These results shal1 also be recorded on FAA Form 6000-8 Technical Performance Record. Second level maintenance procedures appear in the Granger terminal instruction book. Specialized test equipment for second level checks may be obtained from sector, loan stock or rental inventory. (Contact Regional Test Equipment Coordinator, AwP-463.2, FTS 984-1097 for loan stock and rental information). As part of second

level maintenance, it is also recommended to: (a) Operate the system on standby batteries (to exercise the batteries). (b) Measure the channel frequency response (at 300, 1000 and 3000 Hz) from end terminal to end terminal. Three channels should be tested (to evaluate the MUX and RCL end to end performance). (c) Measure the unweighted baseband signal-to-noise ratio in

both directions (to evaluate the RCL). Connect a 75 Ohm dummy load to the baseband input at one end and measure the noise at the output of the other end. The noise ratio will be reference to a normal -15dBm (OdBm0). Second level maintenance shall be performed annually as a

minimum.

Par 5 Page 2

WP 6540.2 7/9/87

(3) Third level maintenance (major loss of link service) consists of procedures necessary to restore both terminals of each radio link to optimum performance following replacement of major sub-assembly or rechannelization of the terminal. For these maintenance procedures, refer to the Granger terminal instruction book. Specialized test equipment should be obtained as described in the previous paragraph on second level

maintenance. In general the sectors are responsible for third level maintenance. However, the Maintenance Operations Branch, AWP-460 may

recommend contracting of the third level maintenance if an individual problem appears beyond the resources of the sector. Third level maintenance shall be performed only as required.

b. Maintenance of the Ritron TELENEXUS system shall be on an as fail basis.

7. MODIFICATIONS. Many of the Granger Engineering Change Orders (ECO) only change the packaging of the components. Granger has agreed to notify AwP-460 of only those future modifications that change the system's performance. AwP-460 will evaluate these ECO'S and make a recommendation whether to purchase the ECO retrofit kits. Proposed field modifications should be submitted to AWP-460. Refer to Order 6000.15A para 88 for guidance on FAA modification policy.

8. TECHNICAL ASSISTANCE. Granger and Ritron's Customer Service Departments are available for technical assistance.

Granger: (408) 982-1481 Ritron: (317) 846-1201

9. SUPPLY SUPPORT. The Depot does not provide supply support for the Granger or Ritron systems. Spare replacement parts can be procured directly from the Granger or Ritron manufacturers. Defective circuit boards shall be sent directly to the manufacturers for repair or replacement.

Granger: (408) 982-1387 Ritron: (317)846-1201

a. A Purchase Order can be used to obtain needed repair work and parts.

b. All parts and repair work may be unconditionally guaranteed for a period of 90 days.

1U. MANUALS. Une set of manuals are included with each equipment order. Additionally manuals are available on an open market basis.

Par 6 Page 3

7/9/87 WP6540.2

be level A2. Both the San Francisco and Los Angeles area RCL networks are 11. FACILITIY RESTORATION. The Granger and Ritron systems shall normally hot standby systems that also have automatic switching to alternate paths. Air-ground channels using the RCL may also have BUEC back-ups via telco lines. A different restoration classification may be justified if there are no alternative paths for critical air traffic data. Reference Order 6U30.31D, Restoration of Operational Facilities, Sup 4, Appendix 1.

12. TRAINING. Training will be accomplished by factory and locally developed courses. Western-Pacific course #95256, Granger RCL, has been held in both the San Franciso and Los Angeles areas. Contact Regional Training Coordinator, AWP-462.3, FTS 984-1120 with your training

requirements.

the JAI of a new RCL installation. It is the responsibility of the sector 13. JOINT ACCEPTANCE INSPECTION (JAI). Each sector shall participate in

to identify tangible exceptions.

Alex Hagmond yManager, Airway Facilities Division

Par 11 Page

719/87 WP 6540.2 Appendix 1

APPENDIX 1. CERTIFICATION REQUIREMENTS

APPENDIX 1. CERTIFICATION REQUIREMENTS

TABLE 1. RCL SERVICE

Service Certification Parameter Reference Paragraph STDS and TOL/Limits

Communication Overall Certification is based on the knowledge that an acceptable level of communication service is being provided. There are no overall service certification parameters.

TABLE 1. RCL SERVICE

NORMAL CERTIFICATION INTERVAL. ..12 months

MAXIMUM CERTIFICATION INTERVAL.. ..15 MONTHS

PERSON RESPONSIBLE FOR CERTIFICATION … RCL technican and area Control center technican, jointly.

CERTIFICATION ENTRY IN FACILITY MAINTENANCE LOG....RCL Service Certified (i.e., as a communication service.)

MAXIMUM CERTIFICATION INTERVAL.. ..15 MONTHS

(CHUCK CAGE BAY TRACON RECOMMEND EA 6 MO.

TECHJJICAL PERFORMANCE RECORD IOCATION ACIL'TY BAY OAKLAND, CA TRACON EASTTX (AIC!, FSS, ARTCC, VOR, LOC, ETC.1 ICITY, STATE, ARPON. CTHEN PR OUT] VOLST. WA PAGE 1 OF5 EOUPMENIG/A CMLT TX "A&B DATES EASTTk·B" FROM (A/G. OF, COMPONENTS, ETC.) PR OUTI VOLT, to CONTINUATION OR TEMPORARY RECORD/REPORT FCRM SIGNATU SUPEIVISOR'S FRO. 24v P.5. 1740 MHZ FRONT PANEL METER MEMARKS 6015A/E NST DATA7-10-84 INITIALIZATION 7/9/87

$ RF BODY INDICATIONS 21

$ RF BODY INDICATIONS 21

1.1±0102.5.51.92.46.17.c2710105.51.71.60.65.10.01-21 25-8511015.46.941.9.64.96.011530m22..5.941.65.65.96.01 VOMNAL 174010895.51.892.66.97.0217.10108.75.51.971.40.65.9601-21 MHZMNZ MHZIMNA -21-112198 DA-A FEADNES -14.2RESET-IVDL: WAS (!-0,5vpC 1-14.2 WAITS EE:RF ELEMENT CI SRDER APPENDIX 2.

TYPICAL FAA FORM 6000-8 TECHNICAL

TYPICAL FAA FORM 6000-8 TECHNICAL

Page PERFORMANCE RECORD S Appendix 2 WP 6540 .2

4 5 3 2 First Lovel Maintemame Step $

WP 6540.2 Appendix

2

WOss

TROON

7/9/87

RECORDS APPENDIX

F E NTER 261

a

(01-6) 9

Si- PUT WATS (0.1-6) (+5-5) 2

M FRFR CAR. FHLI VSWR 0 0 (0.1-1) (9)

5 WATS 3 PR (01-b 2 (45S-5) 9

5 WATS 3 PR (01-b 2 (45S-5) 9

OAKNND

BAY

9

mIl CMMNNAL

719/87

NOLVZITVILINI RES

CONO OR OIORM 3161 EHW SJ a 17 (2-7) (01-6) ob1 DAA

(S-S5)

(0-0.) RRSIE (E-5) RX-YR

(0.1-6) DOAIZ- (4-99 DSASI- (.-55) -ARC (01-0.)

(-S.) SS

GATCON KLNDD OA 3 S8

101

WP 6540 .2 Appendix

toys.

2

3

8

7

7/9/87 WP 6540.2 Appendix

RECORDS APPENDIX TYPICAL

1N1 PA ER RNS

1N1 PA ER RNS

SHW SE91 FRONT 6

SICNATUN

OT- 6

JOASI-

<01-0) RX-SIG A (3-S) WOSs G FUR. HW

10.1-6 5 <0-9 (.-55.) RX-AFC CA

28. 3 FFREO BAy C

COCTION ON

Page

WP 6540 .2 7/9/87 Appendix 2

APPENDIX TYPICAL FAA FORM 6O0O-8 TECHNICAL PERFORMANCE RECORDS INIIAS 7-01-64

M G SE CH S OAT

BPE AMPS VOTS BATL

BPE AMPS VOTS BATL

WOU

RIPYE SdVIY ER VOTS 30 2

AY CON 8- SB-

IOCATION uvo

Page 6 TECHNICAL PERFORMANCE RECORD PAGE 1OF 3 FACIITY LOCATION BAY TRACON OAKLAND, CA (ATCI, FSS, ARTCC, VR, IOC, ETC.! ICITY, STATE. AMPCIDT CTHEDI LOUMNIG/A CMLT SYS. LEVELS DATES FOM (A/G, DF, COMPONFNIS, ETC.) CONTINUATION OR TEMPORARY RECORD/REPORT FORM SUMEOVROR'S SIGNATUR FHO. 200 KHE INITIALIZATION DATA Appendix 2 WP 6540.2

AY CON 8- SB-

MST:. STA. SENTING KEMOTE STA. KCVNG. REMARKS N8 3J15 wad UVG 2 YS109 000 15 1 TEERM PROM 15

-15 -15 APPENDIX 2.

TYPICAL FAA FORM 6O0O-8 TECHNICAL

PERFORMANCE RECORDS

FEAF0R= 60M-9 7/9/87

7/9/87

CONTINUATION OR TEMPORARY RECORD/REPORT FORM

TECHNICAL PERFORMANCE RECORD PAGE Z OF3

TECHNICAL PERFORMANCE RECORD PAGE Z OF3

BAY TRACON (ATCT, FSS, APTCC, VCR, LOC, PTC.1 LOCATION OAKLAND, CA CITV, STATE, AMPOR:, CINER LOSI:E T DEIATION

D F

-15 3-25-F5 TCM 0

Page

DATES SUNTOVISOP to SICNATUM FtC. INITIALIZATION LOUAMNMLT EAST/WEST SYS. LEVNS (A'G, DF, COMPONENTS, FIC.) KIE PATA

BEND STA. MUX CHIL(SARE) SET CSED LEVEL CONTROL nmawrs (1 23.5 kHž @5.1ram

FOA BESSEL EERC.

ERG :F MUX INTERFACED ITRRM IF NOT INTERFACEC

ERG :F MUX INTERFACED ITRRM IF NOT INTERFACEC

-15 25 19E DATA READINGS

YPICAL FAA FORM 6OOO-8 TECHNICAL PERFORMANCE RECORDS Appendix 2 WP 6540 .2

Page

Appendix 2 WP 6540.2

TECHNICAL PERFORMANCE RECORD TAGE OF CONTINUATION OR TEMPORARY RECORD/REPORT FORM

8 PACHITY BAY TRACON (ATCT, 9SS, ORTCC, VOP, IC, ETC.1 OCATION OAKLAN, CA ICITY, STATt, AMPCRT, CIHEM

TECHNICAL PERFORMANCE RECORD TAGE OF CONTINUATION OR TEMPORARY RECORD/REPORT FORM

JOMINAL

FAAzedm rrr ?

DL

DATES SUPTRVISOR'S FROM to SIGNATUE

FOLMPN GIA CMLT. Dr, COMPONENTS, ETC.1 GAST/WEST SYS. LEVEL FMO. IMTIALIZATON DATA

RE MARKS

BRG IF MUX INTERFACED TERM IF NOT INTERFACEE

APPENDIX 2.

TYPICAL FAA FORM 6000-8 TECHNICAL

PERFORMANCE RECORDS

7/9/87

7/9/87

INI

PERFORMANCE RECORDS

SICGNAATUN

CA

TCON BAY SSJ OAKAND,

APPENDIX 2.

PROBE

S Q1X

PUSE

(SJ ^P)

01

(1.S) VIVO/

5 UO.

AS aoD.

uva

WP 6540.2 Appendix 2

RECORDS

WP 6540 .2 7/9/87 Appendix 3

APPENDIX 3. TYPICAL FIRST LEVEL MAINTENANCE CHECKS

5.04 Other instrusents having the ssme 5. MAINTENANCE capabilities will serve equally 5.01 This section describes the main- 6015A/E Protected Terminsl. Mainte- nance is divided into three categories, dependent upon the complexity of the tenance procedures for the Model as well as those specified in either section. Items having G/A part numbers are available directly fron Granger Assoclates. See Sertes 6000 Service Manual for ordering informatton. procedure, terminal disassembly, and the test equipment. First Level Main- FIRST LEVEL MAINTENANCE tenance 1s limited to those procedures 5.05 First Level Maintenance consists which can be accosplished vithout dis- of operationsl checks that can be

APPENDIX 3. TYPICAL FIRST LEVEL MAINTENANCE CHECKS

meters and indicstors to obtain test assembly, using the built-in terminal data. Second Level Maintenance re- quires the use of test equipment, but does not require dissssembly. Addi- tional test equipeent and disassembly of the terminal is required for Third Level Maintenance. equipment, using only the integrsl accomplished without disassembly of the equipment meters and indicators. These operational checks should be performed on a regularly scheduled periodic basis and compared to the ETR to determine any tersinal deterioration. The results should be recorded in a per-

5.02 Effective maintenance can best be formance log. this sanusl are fully understood. Therefore, the principles of operation terainal should be thoroughly read and other technical informstion on the before attespting any corrective accomplished when the contents of 5.06 First Level Maintenance of the performance levels, using the panel meter built into each power supply and the baseband combiner indicating lasps, an detailed in the following proce- terminal is limited to checking ection. dures. RECOHHENDED TEST EQUIPHENT NOTE 5.03 Test equipsent for First Level panel meter built into the power supply. Table 5-l llsts the general Maintenance is limited to the For the purpose of checking per- formance levels, it is assumed that the terminal has been in operation, and that the frequency types of test equipzent required for both Second and Third Level Mainte- deteraining circuits have stabi- lized. nance, together with some specific exasples of each general type.

FIRST LEVEL HAINTKNANCE CHECKS

FIRST LEVEL HAINTKNANCE CHECKS

STEP PROCEDURE REMARKS 1 Check terminal performance by ob- serving the power supply meter indication with the suttch Si set Check "A" Pouer Supply and then repeat steps 2 through 8 with the "3" Pover Supply switch S!. to the positlons listed in steps 2 through 8.

WP 6540.2 7/9/87 Appendix 3

APPENDIX 3. TYPICAL FIRST LEVEL MAINTENANCE CHECKS

APPENDIX 3. TYPICAL FIRST LEVEL MAINTENANCE CHECKS

STEP PROCEDURE RIDHARKS

NOTE NOTE

Refer to following sections 'of this manual and to the sppropri- ate instruction manual, to correct Listed meter indication limits are typical only. Refer to the Terminal ETR for acceptable limits.

NOTE NOTE

any observed abnormal indications. Set power supply switch Si to 15v Indicates presence of -15 Vdc. position and verify that the meter indicates between 0.6 and 0.7. Set the power supply switch Sl to Indicates presence of -21 Vdc. 21v position and verify that the meter indicates between 0.9 and 1.0. Set pover supply switch Sl to TX-AFC and verify that the meter Indicates AFC/VCO in phase-lock condition. indicates between 0.45 and 0.55.

Set pover supply evitch Sl to TX-PR OUT and verify that the meter Indicates operation of transmitter If power amplifier circuits and rf pover indicates betveen 0.9 and 1.0. output. Set power supply switch Si to RX-I Indicates receiver mixer current. MXR and verify that the meter indicates between .35 and .75.

Set pover supply switch Sl to RX-RF SG and verify that the meter Indication of incoming rf signal strength (to receiver). indicates between 0.0 and 1.0.

Set power supply switch Sl to RX-AFC and verify that the meter Indicates AFC/VCO LO in phase-lock condition. indicates between 0.45 and 0.55. Ensure that all Baseband Coabiner manual select svitches are set to AUTO position.

Observe XT A and XMT B LED's on the Baseband Coabiner. One green LED should be ON and the other should be OFF for HST, and WST. Both LED's should be ON for FDT.

Observe REC A and REC B LED's on Both green LED's should be ON. the Baseband Combiner. Observe the fault (red) LED's o All red LED's sbould be OFF. the Baseband Cosbiner. Observe the FUSE ALARM indicator The indicator should be OFF. on the Baseband Coabiner.