Order 6500.12 Off-Frequency Transmitter CrOff-Frequency Transmitter Crystals
Text re-read from the scan: 7 of 7 passages.
- Date
- Nov 22, 2026
- Recorded
- Nov 22, 2026
- Passages
- 7 of 7 changed (was 5)
- Paragraphs
- 25 added or rewritten, 55 removed or rewritten
Read the current text Official source ↗
What changed in the text
Key: [removed: removed words] are struck through; [added: added words] are underlined. Each changed paragraph is labelled in the margin.
- Removed
[removed: l.] - Added
[added: ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GL 6500.12]
- Removed
[removed: 2.] - Added
[added: GREAT LAKES REGION]
- Removed
[removed: 3·] - Removed
[removed: 4.] - Removed
[removed: URP SE.] - Removed
[removed: IBUT ON.] - Removed
[removed: •] - Removed
[removed: .4~-;;.!: ·f:: '.] - Removed
[removed: DEPARTMENT OF TRANSPORTATION --ORDEI FEDERAl AVIATION ADMINISTRATION GL 6500. 12 GREAT LAKES REGION] 4/17/73
SUBJ: OFF-FREQUENCY TRANSMITTER CRYSTALS
- Changed
[added: 1. PURPOSE. ]This Order establishes a regional policy on utilization of
[removed: requ ncy][added: off-frequency] crystals for Air/Ground transmitters. - Changed
[removed: .This][added: 2. pISTRIBUTION. This] Order is distributed to all supervisors, Airway[added: Facilities] Division and to all Airway Facilities Field Offices. - Changed
[added: 3. CANCELLATION. ]Order CE 6500.10, Off-Frequency Transmitter Crystals, [added: date 8 April ]1970.
- Removed
[removed: The continued aviation growth, with the resultant increase] - Added
[added: 4. BACKGROUND. The continued aviation growth, with the resultant increase of air traffic and frequency congestion, requires an ever increasing reliability of our Air/Ground communication channels. Part of this heeded increase can be obtained by ensuring that maintenance operations cause a minimum of interruptions or down time to A/G channels. This spect of maintenance was recognized many years ago, when a policy was established for the use of off-frequency RCAG transmitter crystals. Howeyer, the issuance of new Washington handbooks has resulted in canellation of many older directives, and today there is no clear-cut policy on this matter.]
- Removed
[removed: eli bili y eed d in rease] - Added
[added: Althpugh technical evaluations and special studies indicate most sectors htilize off-frequency crystals, complaints are still received of interruptiohs or blocking of communication channels due to needless keying of FAA A/G transmitters. A 50-watt transmitter can provide a signal of $ micro-vplts.or more to high altitude aircraft over 200 miles away, and nusual propagation conditions can, and do, frequently extend this range.]
- Removed
[removed: t] - Added
[added: Thus, eveh though no signal is present from the local A/G receiver being monitored keying the associated transmitter may very well cause interferehce tφ distant aircraft. It is the intent of this order, that operation of A/G transmitters for maintenance or tune-up by Airway Facilities personnel should be accomplished in a manner that will minimize possible interference to both local and distant aircraft.]
- Removed
[removed: owe r,] - Added
[added: 5. ACTION.]
- Removed
[removed: oli y] - Added
[added: The Chiefof each Airway Facilities Sector shall take the necessary actioh to procure and/or tilize off-frequency crystals. Off-frequency prystals shall be used on all A/G transmitters where routine maintenance cannot be performed without causing interference. Distribution: RAF-5, FAF-O (normal) Initiated By: AGL-436]
- Removed
[removed: er ptio s f F A/] - Added
[added: FAA Form 1320–1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE: 1971-O-439–727]
- Removed
[removed: e ctio] - Added
[added: a en hne bejow.]
- Removed
[removed: ~f~a~.~r~t~r~ffic and frequency congestion, requires an ever increasing] - Added
[added: GL6500.12 4/17/73]
- Removed
[removed: of our Air/Ground communication channels. Part of this] - Added
[added: b. Airway Facilities personnel, (SMP, F&E,AF), shall not operate A/G transmitters for maintenance or tune-up purposes unless one of the following conditions can be met:]
- Removed
[removed: can be oqtained by ensuring that maintenance operations . a m nimum of interruptions or down time to A/G channels. This of maintenance was· recognized many years ago, when a policy was lish d for the use of off-frequency RCAG transmitter crystals.] - Added
[added: (1). Off-frequency crystals are installed, and dummy loads are used.]
- Removed
[removed: he issuance of new Washington handbooks has resulted in canell tion of many older directives, and today there is no clear-cut] - Added
[added: (2). Prior approval is obtained from applicable AT personnel for local keying on frequency.]
- Removed
[removed: on this matter.] - Added
[added: (3). Unusual conditions require that immediate action be taken to test or restore a frequency or channel.]
- Removed
[removed: echnical evaiuations and special studies indicate most sectors· f-frequency crystals, complaints are still received of in-] - Removed
[removed: or blocking of communication channels due to needless keying transmitters. A 50-watt transmitter can provide a signal of · ro-v lts or more to high altitude aircraft over 200 miles away, l propagation conditions can, and do, frequently extend this] - Removed
[removed: though no ~ignal is present from the local A/G receiver being ··keying the associated transmitter may very weil cause interdistant aircraft. It is the intent of this order, that . of A/G transmitters for maintenance or tune-up by Airway] - Removed
[removed: personnel should be accomplished in a manner that will minible interference to both local and distant aircraft.] - Removed
[removed: ief of each Airway Facilities Sector shall take the necessary] - Removed
[removed: to procure and/or 'l:tilize off-.frequency crystals-. Off..;frequen ryst ls shall be used on all A/G transmitters where routine] - Removed
[removed: int nance cannot be erfb~ed withdut causin interference. Distribution: RAF-5, FAF-0 (normal) Initiated By: AGL-436] - Removed
[removed: FAA Form 1320-1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE, 1971-o-439-727] - Removed
[removed: ' l\'' : " ~ ....] - Removed
[removed: ~] - Removed
[removed: G~ . 6500. ·:~g 4/17/73] - Removed
[removed: b•. Airway Facilities personnel, (S:MP, F&E,.AF), shall not operate A/G] - Removed
[removed: tranSmitters for maintenance or tune-up purposes unless one of the following conditions can be met:] - Removed
[removed: (1). Off-frequency crystals are installed, and dummy loads are] - Removed
[removed: used.] - Removed
[removed: (2). Prior approval is obtained from applicable AT personnel for] - Removed
[removed: local keying on frequency.] - Removed
[removed: (3). Unusual conditions require .that irotnediate action be taken to] - Removed
[removed: test or restore a frequency or channel.] (4). The frequency has not been commissioned.
- Changed
These requirements do
[removed: riot][added: not] apply where low-power transceiver must be momentarily[removed: 11peaked"][added: "peaked"] for satisfactory operation. Where deemed[added: necessary, one off-channel crystal should be obtained for extended bench tests of transceivers.] - Removed
[removed: necessary, one off-channel crystal should be obtained_for extended bench tests of transceivers.] - Added
[added: 6. GUIDELINES FOR ORDERING CRYSTALS. It is anticipated that in the future channel spacing will be reduced to 25 kHz for VHF, and 50 kHz. for UHF. To eliminate possible interference on any other channel, the off-frequency crystal should be such that the transmitter output falls midway between two such channels. The following deviations above or below the channel frequency are suggested:]
- Removed
[removed: 6. GUIDELINES FOR ORDERING CRYSTALS. It is anticipated that in the future,!] - Added
[added: VHF 87.5 kHz, 137.5 kHz]
- Removed
[removed: '] - Added
[added: UHF 175 kHz, 225.kHz]
- Removed
[removed: channel spacing will be reduced to 25 ~- for VHF, and 50 kHz . for UHF. · To eliminate possible interference on any other channel, the off-fre quency crystal should be such that the transmitter output falls midway between two such channels. The following deviations above or below the channel frequency are suggested:] - Removed
[removed: VFlF 87. 5 kHz ' 137. 5 kHz] - Removed
[removed: UHF 175 ldlz,, 225. kHz] Crystals now on hand should not be replaced merely to meet this criteria.
- Changed
All off-frequency
[removed: cr,Ysta~s][added: crystals] shall be conspicuously marked by painting the top of the crystal holder red or aviation orange. The transmitter output frequency shall be placed on the crystal holder for ready identification with the applicable transmitter(s). It is suggested that the transmitter type[removed: be-included][added: be.included] on the crystal holder for future reference[removed: :in][added: in] the event transmitters are exchanged or[removed: replaced• . ~- 12 4:-·1 '.... : ·" ,,,_. l ~ ! t; ·. -- i . , r ~ Jx/:t:::1:! GLASc;r][added: replaced.] - Removed
[removed: 1] - Added
[added: ALAN H. GLASS Chief, Airway Facilities Division]
- Removed
[removed: . y Chief, Airway Facilities Division] - Added
[added: Par 5b Page 2]
- Removed
[removed: i!!: •: :i)i: ',:;·!: ::1'.'] - Added
[added: -EVEN PAGE]
- Removed
[removed: __ ·j,~'~hL · Page 2]
Whole text before this change
l.
2.
3·
4.
URP SE.
IBUT ON.
•
.4~-;;.!: ·f:: '.
DEPARTMENT OF TRANSPORTATION --ORDEI FEDERAl AVIATION ADMINISTRATION GL 6500. 12 GREAT LAKES REGION
4/17/73
SUBJ: OFF-FREQUENCY TRANSMITTER CRYSTALS
This Order establishes a regional policy on utilization of requ ncy crystals for Air/Ground transmitters.
.This Order is distributed to all supervisors, Airway Division and to all Airway Facilities Field Offices.
Order CE 6500.10, Off-Frequency Transmitter Crystals, 1970.
The continued aviation growth, with the resultant increase
eli bili y eed d in rease
t
owe r,
oli y
er ptio s f F A/
e ctio
~f~a~.~r~t~r~ffic and frequency congestion, requires an ever increasing
of our Air/Ground communication channels. Part of this
can be oqtained by ensuring that maintenance operations . a m nimum of interruptions or down time to A/G channels. This of maintenance was· recognized many years ago, when a policy was lish d for the use of off-frequency RCAG transmitter crystals.
he issuance of new Washington handbooks has resulted in canell tion of many older directives, and today there is no clear-cut
on this matter.
echnical evaiuations and special studies indicate most sectors· f-frequency crystals, complaints are still received of in-
or blocking of communication channels due to needless keying transmitters. A 50-watt transmitter can provide a signal of · ro-v lts or more to high altitude aircraft over 200 miles away, l propagation conditions can, and do, frequently extend this
though no ~ignal is present from the local A/G receiver being ··keying the associated transmitter may very weil cause interdistant aircraft. It is the intent of this order, that . of A/G transmitters for maintenance or tune-up by Airway
personnel should be accomplished in a manner that will minible interference to both local and distant aircraft.
ief of each Airway Facilities Sector shall take the necessary
to procure and/or 'l:tilize off-.frequency crystals-. Off..;frequen ryst ls shall be used on all A/G transmitters where routine
int nance cannot be erfb~ed withdut causin interference. Distribution: RAF-5, FAF-0 (normal) Initiated By: AGL-436
FAA Form 1320-1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE, 1971-o-439-727
' l\'' : " ~ ....
~
G~ . 6500. ·:~g 4/17/73
b•. Airway Facilities personnel, (S:MP, F&E,.AF), shall not operate A/G
tranSmitters for maintenance or tune-up purposes unless one of the following conditions can be met:
(1). Off-frequency crystals are installed, and dummy loads are
used.
(2). Prior approval is obtained from applicable AT personnel for
local keying on frequency.
(3). Unusual conditions require .that irotnediate action be taken to
test or restore a frequency or channel.
(4). The frequency has not been commissioned.
These requirements do riot apply where low-power transceiver must be momentarily 11peaked" for satisfactory operation. Where deemed
necessary, one off-channel crystal should be obtained_for extended bench tests of transceivers.
6. GUIDELINES FOR ORDERING CRYSTALS. It is anticipated that in the future,!
'
channel spacing will be reduced to 25 ~- for VHF, and 50 kHz . for UHF. · To eliminate possible interference on any other channel, the off-fre quency crystal should be such that the transmitter output falls midway between two such channels. The following deviations above or below the channel frequency are suggested:
VFlF 87. 5 kHz ' 137. 5 kHz
UHF 175 ldlz,, 225. kHz
Crystals now on hand should not be replaced merely to meet this criteria.
All off-frequency cr,Ysta~s shall be conspicuously marked by painting the top of the crystal holder red or aviation orange. The transmitter output frequency shall be placed on the crystal holder for ready identification with the applicable transmitter(s). It is suggested that the transmitter type be-included on the crystal holder for future reference :in the event transmitters are exchanged or replaced• . ~- 12 4:-·1 '.... : ·" ,,,_. l ~ ! t; ·. -- i . , r ~ Jx/:t:::1:! GLASc;r
1
. y Chief, Airway Facilities Division
i!!: •: :i)i: ',:;·!: ::1'.'
__ ·j,~'~hL · Page 2
Whole text after this change
ORDER DEPARTMENT OF TRANSPORTATION FEDERAL AVIATION ADMINISTRATION GL 6500.12
GREAT LAKES REGION
4/17/73
SUBJ: OFF-FREQUENCY TRANSMITTER CRYSTALS
1. PURPOSE. This Order establishes a regional policy on utilization of off-frequency crystals for Air/Ground transmitters.
2. pISTRIBUTION. This Order is distributed to all supervisors, Airway Facilities Division and to all Airway Facilities Field Offices.
3. CANCELLATION. Order CE 6500.10, Off-Frequency Transmitter Crystals, date 8 April 1970.
4. BACKGROUND. The continued aviation growth, with the resultant increase of air traffic and frequency congestion, requires an ever increasing reliability of our Air/Ground communication channels. Part of this heeded increase can be obtained by ensuring that maintenance operations cause a minimum of interruptions or down time to A/G channels. This spect of maintenance was recognized many years ago, when a policy was established for the use of off-frequency RCAG transmitter crystals. Howeyer, the issuance of new Washington handbooks has resulted in canellation of many older directives, and today there is no clear-cut policy on this matter.
Althpugh technical evaluations and special studies indicate most sectors htilize off-frequency crystals, complaints are still received of interruptiohs or blocking of communication channels due to needless keying of FAA A/G transmitters. A 50-watt transmitter can provide a signal of $ micro-vplts.or more to high altitude aircraft over 200 miles away, and nusual propagation conditions can, and do, frequently extend this range.
Thus, eveh though no signal is present from the local A/G receiver being monitored keying the associated transmitter may very well cause interferehce tφ distant aircraft. It is the intent of this order, that operation of A/G transmitters for maintenance or tune-up by Airway Facilities personnel should be accomplished in a manner that will minimize possible interference to both local and distant aircraft.
5. ACTION.
The Chiefof each Airway Facilities Sector shall take the necessary actioh to procure and/or tilize off-frequency crystals. Off-frequency prystals shall be used on all A/G transmitters where routine maintenance cannot be performed without causing interference. Distribution: RAF-5, FAF-O (normal) Initiated By: AGL-436
FAA Form 1320–1 (7-71) supersedes previous edition U.S. GOVERNMENT PRINTING OFFICE: 1971-O-439–727
a en hne bejow.
GL6500.12 4/17/73
b. Airway Facilities personnel, (SMP, F&E,AF), shall not operate A/G transmitters for maintenance or tune-up purposes unless one of the following conditions can be met:
(1). Off-frequency crystals are installed, and dummy loads are used.
(2). Prior approval is obtained from applicable AT personnel for local keying on frequency.
(3). Unusual conditions require that immediate action be taken to test or restore a frequency or channel.
(4). The frequency has not been commissioned.
These requirements do not apply where low-power transceiver must be momentarily "peaked" for satisfactory operation. Where deemed necessary, one off-channel crystal should be obtained for extended bench tests of transceivers.
6. GUIDELINES FOR ORDERING CRYSTALS. It is anticipated that in the future channel spacing will be reduced to 25 kHz for VHF, and 50 kHz. for UHF. To eliminate possible interference on any other channel, the off-frequency crystal should be such that the transmitter output falls midway between two such channels. The following deviations above or below the channel frequency are suggested:
VHF 87.5 kHz, 137.5 kHz
UHF 175 kHz, 225.kHz
Crystals now on hand should not be replaced merely to meet this criteria.
All off-frequency crystals shall be conspicuously marked by painting the top of the crystal holder red or aviation orange. The transmitter output frequency shall be placed on the crystal holder for ready identification with the applicable transmitter(s). It is suggested that the transmitter type be.included on the crystal holder for future reference in the event transmitters are exchanged or replaced.
ALAN H. GLASS Chief, Airway Facilities Division
Par 5b Page 2
-EVEN PAGE