1
ORDER DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION 6490.9
7/7/81
SUBJ. FAA STANDARD DRAWINGS AND SPECIFICATION FOR A 10,000 SQUARE FOOT . AUTOMATED FLIGHT SERVICE STATION BUILDING
1. PURPOSE. This order directs the use of standard drawing series D-6196 and construction specification FAA-C-2710, Automated Flight Service Station
Building, for construction of a 10,000 square foot automated flight service station (AFSS) building. Appendix 1 lists the individual drawings implemented by this order. Appendix 2 specifies the adaptation of the standard design to a specific building location.
2. DISTRIBUTION. This order is distributed to the branch level in the Airway Facilities, Logistics, and Systems Research and Development Services in Washington headquarters; branch level in the regional Airway Facilities divisions (except AEU); and to Director level at the FAA Technical Center and the Aeronautical Center.
3. BACKGROUND. The 10,000 square foot AFSS building was developed in conjunction with the flight service automation program and is one in a series of building designs. The building will satisfy space requirements for an AFSS facility with up to 21 preflight briefing/data coordination positions, 6 inflight/en route flight advisory service (EFAS) positions, and 2 supervisor positions.
4. APPLICATION. Drawing series D-6196 and specification FAA-C-2710 eneompass the site, architectural, structural, mechanical, and electrical
requirements for the construction of a 10,000 square foot AFSS. The typical drawings in the series are intended to define site-work design parameters and the seope of site work to be associated with a specific building location. The standard drawings within the series and the specification shall be used in their entirety in conjunction with developed site drawings for construction documents and may be modified in accordance with appendix 2 and paragraph 6 below. Modification of the standard drawings by title block change is not authorized. Selection of design alternatives on a standard drawing shall be accomplished by blocking out unwanted options, identifying selection by an appropriate revision symbol, and adding site name and location to the standard title block.
5. AS-BUILTS. As-built conditions, elevations, details, and equipment catalog numbers may be added to standard drawings. All as-built revisions and additions shall be identified by an appropriate revision symbol. The site name and location may be added to the standard title block and regional
drawing file numbers may be added below the title block preceded by the words "as-built."
Distribution: A-W(AF/LG/RD)-3; A-X(AF)-3 (Ex~ept AEU);
A-YZ-l
Initiated By: AAF-510
2
6490.9 7/7/81
6. DEVIATION FROM STANDARD. No deviation from the standard design is authorized without prior approval of Director, Airway Facilities Service. All major modifications and any changes that will impact the operation of the facility will be coordinated with the Air Traffic Service. The Airway Facilities Service is the focal point for coordination with appropriate offices and services. Regional site adaptation of the design in accordance with appendix 2 to accommodate terrain, site layout, site access, soil conditions, and utility connections is, authorized without further clearance. Dimensional errors, discrepancies, conflicts, and suggestions for design modification or the addition of installation details should be brought to the attention of the Chief, Environmental Systems Division, AAF-500, Airway Facilities Service.
7. CORRECTIONS TO STANDARD. Corrections to the standard design may be made by the Director, Airway Facilities Service, without further regional or interservice coordination. These may include misspellings, corrections of dimensional errors, discrepancies, conflicts, and modification, addition, or deletion of minor installation details.
8. DISTRIBUTION OF DRAWINGS AND SPECIFICATION. Reproducible copies of the drawing series and the specification may be obtained from the Administrative ~g;;;;;:rrtce.
Director, Airway Facilities Service
Page 2 Par 6
3
APPENDIX 1.
DRAWING
D-6196-G-l
D-6196-C-2
D-6196-C-3
D-6196-C-4
D-6196-C-5/B
D-6196-C-6/A
D-6196-C-7
D-6196-C-8
D-6196-A-l
D-6196-A-2
D-6196-A-3/A
D-6196-A-4/A
D-6196-A-5/B
D-6196-A-6
D-6196-A-7/A
D-6196-A-8/A
D-6196-A-9/A
D-6196-A-10
D-6196-A-ll
D-6196-A-12/B
6490.9 Appendix 1
STANDARD AND TYPICAL DRAWINGS FOR THE 10,000 SQUARE FOOT AUTOMATED FLIGHT SERVICE STATION BUILDING
DATE
1-15-81
1-15-81
1-15-81
1-15-81
5-12-80
5-12-80
1-15-81
1-15-81
1-15-81
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
TITLE
Title Sheet
Typ'ical Site Plan
Typiaal Grading Plan
Typical Landscaping Plan
Equipment Area Plan and Details
Site Details
Site Details
Typical Utility Layout
Floor Plan
Elevations
Elevations
Building Se~tions
Room Finish, Door Schedule, and Door Elevations
Abbreviations, Legend, and Operable Wall
Wall Sections
Wall Sections
Wall Sections and Exterior Wall Details
Roof Plan
Roof Details
Scupper and Miscellaneous Details
Page 1
4
DRAWING
D-6196-A-13/A
D-6196-A-14/A
D-6196-A-15/A
D-6196-A-16/A
D-6196-A-17/A
D-6196-A-18/A
D-6196-A-19/A
D-6196-A-20
D-6196-A-21
D-6196-S-1
D-6196-S-2
D-6196-S-3
D-6196-S-4
D-6196-S-5
D-6196-S-6
D-6196-s-7/B
D-6196-M-1
D-6196-M-2/A
D-6196-M-3/D
D-6196-M-4/A
D-6196-M-5/ A
D-6196-M-6
D-6196-M-7/A
Page 2
DATE
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
1-15-81
1-15-81
5-12-80
1-15-81
1-15-81
1-15-81
5-12-80
5-12-80
1-15-81
5-12-80
5-12-80
5-12-80
5-12-80
1-15-81
5-12-80
TITLE
Glazing Details
Hollow Metal Door Details
Interior Door Details
Interior Wall Sections
Demountable Panel Details
Details
Restrooms and Kitchen Plan
Details
Typical Pilot Briefing Counter Details
Foundation and Floor Plan
Roof Plan and Steel Framing
Foundation Sections and Details
Foundation Sections and Details
Precast Panels and Connections
Framing Sections and Details
Framing Sections and Details
Typical Mechanical Site Plan
Plumbing Floor Plan
Plumbing Schedule and Water Riser Diagram
HVAC Floor Plan
HVAC Control Diagrams and Schedule
HVAC Schedules
Details
5
DRAWING
D-6196-E-l
D-6196-E-2/A
D-6196-E-3/ A
D-6196-E-4/B
D-6196-E-5/B
D-6196-E-6/A
D-6196-E-7
D-6196-E-8
DATE
1-15-81
5-12-80
5-12-80
5-12-80
5-12-80
5-12-80
1-15-81
1-15-81
TITLE
Typical Electrical Site Plan
Electrical Floor Plan-Lighting
Electrical Floor Plan-Power
Cable Tray Plan and Details
Lightning Protection and Grounding System
Electrical Distribution Diagram and Equipment
Schedule
Branch Panel Schedules
Fire Detection and Alarm System
Page 3
7
7/7/81 6490.9 Appendix 2
APPENDIX 2. SITE ADAPTATION FOR THE 10,000 SQUARE FOOT AUTOMATED FLIGHT SERVICE STATION BUILDING STANDARD DESIGN
SECTION 1. CONSIDERATIONS IN SITE ADAPTATION OF THE STANDARD DESIGN
1. SITE CONSIDERATIONS.
a. Site Location. The placement of the AFSS fa~ility on the airport will significantly determine the total success of the program and the design. While the spe~ific location of the building will not materially impact automated FSS operational procedures, building locations must enhance the FAA's "presence" to the general aviation public.
(1) Visibility. The AFSS should be loeated along a primary airport access route and preferably on a dominant terrain feature to ensure
visibility to airport users. Attempts at minimizing visual obstructions in the orientation of the building and siting should be made. Normally, the presentation of the longest building dimension to the approaching public will enhance visibility.
(2) Accessibility. The AFSS building should be accessible to the flying public using the airport. If automation benefits are to be realized by the FAA, walk-in pilot briefing traffic should not be encouraged but should be considered in building siting and site layout. Location of the building along the major airport entrance road ,would provide desirable
ac~essibility while not necessarily encourage walk-in briefings. Locations adjaeent to aireraft parking ramps or fixed base operators would tend to promote walk-in briefings, thereby diverting specialists from primary functions.
(3) Orientation. While the building design is intended to be
nondire~tional from an operational point of view, aesthetic appearan~e and visual presentation of the building must be considered in orientating the building on the site. Environmental aspects, such as sun angles in relation to windows and prevailing winds and weather exposures in relation to building entrances, should also be considered.
b. Site and Parking Lot Layout.
(1) General. As mu~h as potential sites will allow, the building should dominate the site with parking areas being screened from public view
by the building. Physical layout of the site must consider future expansion of both the building and parking areas.
(2) Parking Area and Access. The "Typical Site Plan" in the standard drawing package represents one solution to parking area layout based on single access to the site. Layout parameters should include:
Page 1
8
6490.9 Appendix 2
(a) Segregation of employee and visitor parking along with their location adjacent to respective building entrances. (The north building entrance is intended to be the primary employees entrance.)
(b) Provision of vehicular traffic access for the air conditioning unit, engine generator, and telephone maintenance.
(c) Provision for future expansion of facilities with minimal disruption to operations and services.
(3) Building Sign Locations.
(a) The facility identification sign should be located to achieve maximum visibility to the public entering the airport. The sign should be located adjacent to the site access drive and oriented to face the direction of traffic entering the airport.
(b) The directional signs for the parking area should be strategically located adjacent to site entrance drive.
(c) The parking signs should be located adjacent to appropriate parking spaces.
c. Site Grading and Drainage.
(1) Grading. The site must be graded to carry runoff away from the building. Requirements for handicapped access slopes are of prime consideration for applicable parking area and walkways.
(2) Drainage. The "Typical Grading Plan" incorporates curb cuts along with natural site gradients for site and parking area drainage. While this solution has been idealized as most "cost effective," utilization of catch basins and storm sewers may be required at specific locations based on adjacent development, topography, rainfall, and local ordinances.
d. Site Lighting. The "Typical Electrical Site Plan" depicts provisions for pedestrian circulation lighting with a minimum of lighting for pure site security. Site-adapted designs should consider physical security of the site and parking area based upon surrounding development, security patrols, and perceived risk in addition to pedestrian lighting.
e. Site Landscaping.
(1) Building enhancement is the primary objective in landscaping the site. This objective is generally achieved by using single or grouped plantings to highlight and accent major architectural features (such as windows and entrances) and to mask undesirable building perspectives.
Consideration must be given to plant size, shape, color, and texture in the selection and location process to preclude effectively masking the entire
building along major approaches to the site.
Page 2
9
7/7/81 6490. 9 Appendix 2
(2) Building expansion should be considered in the landscaping design. Relocation for expansion should be avoided where possible. Plant selection in potential expansion areas should be limited to small shrubs and ground cover which are easy to remove and represent minor replacement costs.
(3) Inital cost and continuing maintenance should be of prime consideration in determining the ,extent of landscaping along with types used. Some sites may require irrigation systems to maintain landscaping; therefore, concentration of landscaping in the immediate vicinity of the building is further mandated. All plants selected should be nursery varieties grown in the locality to assure they will be acclimated to the environment and require no special care or maintenance.
2. ARCHITECTURAL CONSIDERATIONS.
a. Exterior Finishes. The exterior finish of the precast concrete wall panels specified in the standard design is light, sandblasted, natural gray concrete. Other textures or colors may be considered depending basically on surrounding architecture. These finishes will tend to increase material cost and will require amendments to the standard specification.
b. Screen Wall Construction. The standard design includes a cast-inplace wall to screen exterior mechanical and electrical equipment. Other wall construction may be considered in site-adapted designs with predominate selection factors being compatible with the exte'rior architectural treatment of the building. Changes may require additional sections to the standard specification and will require modification of the drawings.
c. Architectural Changes. Modification of building architecture, including floor plan, elevation, sections, schedules, and details, is not authorized with exception of above-described options.
d. Local Building Codes. Local building codes shall be reviewed during site adaptation of standard design. Should local architectural material and construction quality requirements conflict with the standard 'design, change authorization must be approved through the waiver process.
3. STRUCTURAL CONSIDERATIONS.
a. Foundations. The foundations in the standard design is based on an allowable soil-bearing capacity of 2,500 psf, frost penetration of 24 inches, and Uniform Building Code (USC) criteria for seismic zone 3. Application of the standard design to a specific site must be verifed by
soil investigations accomplished by registered firms familiar with the local geological and soil conditions.
Page 3
10
717/81
b. Building Frame. The standard frame design is based on 39 psf wind loading, 40 psf snow loading, and Uniform Building Code (UBC) seismic zone 3 loading. The design was accomplished in accordance with the requirements of the Uniform Building Code. Design criteria of local building codes must be reviewed to determine adequacy of the standard design criteria. Redesign of the structural frame shall only be accomplished when local requirements or loading criteria exceeds standard design assumptions.
c. Precast Wall Panels. The standard panel design is based on 39 psf wind loading, UBC seismic zone 3 loading, and Uniform Building Code design criteria. Structural analysis and redesign of the panels and their connections shall be accomplished during site adaptation if local codes exceed this criteria.
d. Concrete Screen Wall. The standard cast-in-p1ace screen wall along with its foundation was designed based on 39 psf wind loading, UBC seismic zone 3 loading, allowable soil-bearing capacity of 2,500 psf, and frost penetration of 24 inches. Should local code requirements and soil conditions dictate, structural analysis and redesign should be accomplished during site adaptation.
e. Suspended Ceiling System. The bracing for the suspended ~ei1ing in the standard design was based on UBC seismic zone 3 loading. Analysis with potential redesign should be accomplished should 10ea1 requirements exceed this criteria.
f. Other Nonstructura1 Support Systems. Design o~ supports for mechanical equipment, electrical panels, raised floor, etc., must be addressed during adaptation of the standard design to the site. Modification shall be based on seismic loadings which exaeed standard
design.
4.. MECHANICAL CONSIDERATIONS.
a. Environmental Systems. The standard design includes heating, ventilation, and air conditioning options for the standard FAA climatic zones. These zones are:
(1) Zone I - Winter, below -20°F
Summer, dry bulb 95°F to 100°F
wet bulb 75°F to 80°F
(2) Zone II - Winter, -20°F to O°F
Summer, dry bulb 95°F to lOO°F
wet bulb 70°F to 75°F
(3) Zone III - Winter, O°F to 20°F
Summer, dry bulb 90°F to 95°F
wet bulb 75°F to 80°F
11
(4) Zone IV - Winter, 20°F to 40°F
Summer, dry bulb 90°F to 95°F
wet bulb 70°F to 75°F
(5) Zone V - Winter, Above 40°F
Summer, dry bulb 85°F to 90°F
wet bulb 75°F to 80°F
b. Site adaptation of the standard must include selection of the following appropriate options:
(1) Type of variable air volumn distribution boxes (REHEAT or Cool only).
(2) Capacity of the electric reheat coils for reheat distribution boxes.
(3) Heat recovery system.
(4) Electric wall heater for mechanical/electrical equipment room.
c. Water System. The standard domestic water distribution system design was based on 50 pounds per square inch (psi) service at the building. Modification of the system may be required dependent upon available local
service. Site adaptation should attempt to use the location of service entrance to the building shown on the standard plumbing plans.
d. Sanitary Waste System. Site adaptation of the standard design should attempt to use the location of service entrance to the building as shown on the standard plumbing plans. Modifications required by speeific site service should be shown on the utility plan and mechanical site plans prepared during site adaptation of the standard.
5. ELECTRICAL CONSIDERATIONS.
a. Service. The standard design is based on 120/208 volt, 3-phase, 4-wire service with a maximum building load of 300 kVA. Preparation of an Electrical Site Plan for the specific site, including service routing and
provisions, is to be accomplished during site adaptation of the standard.
b. Backup Power. The standard design provides for engine generator installation at the facility; however, engine generator installation plans and specification must be added to the standard design package upon site adaptation.
c. Electrical Distribution Options. The standard design includes power distribution provisions for heating, ventilating, and air conditioning distribution box reheat and heat recovery systems. Modification of standard electrical drawing will be required during site adaptation dependent upon specific mechanical options selected.
12
6490.9 Appendix 2
SECTION 2. AUTHORIZED MODIFICATIONS AND SUBSTITUTIONS TO STANDARD DESIGN DRAWING SET
6. Drawing D-6196-G-1, Title Sheet. This sheet is a typical drawing intended for inventory of standard drawings. A title sheet and drawing index must be prepared for each construction project package.
7. Drawing C-1, Location Maps. This sheet is not included in the standard drawing set and must be prepared, if applicable, for each construction project package.
8. Drawing D-6196-C-2, Typical Site Plan. This sheet is a typical drawing intended to indicate site layout parameters. A site specific layout sheet must be prepared for each contruction project package.
9. Drawing D-6196-C-3, Typical Grading Plan. This sheet is a typical drawing intended to indicate site grading parameters. A site specific grading plan must be prepared for each construction project package.
10. Drawing D-6196-C-4, Typical Landscaping Plan. This sheet is a typical drawing intended to indicate site landscaping parameters. A site specific plan must be prepared for each construction project package specifying plant size, plant location, seeding limits, and sodding (if applicable), including system details, head locations, valve locations, system controls, etc.
11. Drawing D-6196-C-S/B, Equipment Area Plan and Details. The only changes authorized on this standard drawing relate to screen wall construction options covered in 4.a. and site structural consideration covered in 3.a., 3.d., and 3.f.
12. Drawing D-6196-C-6/A, Site Details. This sheet is a standard site detail drawing on which duct banks, manhole elevations designation, and depth of manhole may be modified dependent on site requirements.
13. Drawing D-6196-C-7, Site Details. This sheet is intended to specify standard site sign details which are to be incorporated into site specific designs. Additions or modifications are authorized on this sheet, or standards may be incorporated on a substitute sheet prepared during site adaptation.
14. Drawing D-6196-C-S, Typical Utility Layout. This sheet shows general parameters to define sanitary and storm drainage structures and sewers. This sheet shall be replaced with a site specific drawing.
Page 6
13
7/7/81 6490.9 Appendix 2
15. Drawing D-6196-A-1, Floor Plan. No changes are authorized to this sheet except for building orientation (North Arrow) and notes in respect to wall orientation.
16. Drawing D-6196-A-2, Elevations. No changes to this sheet are authorized.
17. Drawing D-6196-A-3/A, Elevations. No changes to this sheet are authorized.
18. Drawing D-6196-A-4/A, Building Sections. No changes to this sheet are authorized.
19. Drawing D-6196-A-5/B, Room Finish, Door Schedule, and Door Elevations. No changes to this sheet are authorized with the exception of wall orientations.
20. Drawing D-6196-A-6, Abbreviations, Legend, and Operable Wall. No changes to this sheet are authorized.
21. Drawing D-6196-A-7/A, Wall Sections. No changes to this sheet are authorized.
22. Drawing D-6196-A-8/A, Wall Sections. No changes to this sheet are authorized.
23. Drawing D-6196-A-9/A, Wall Sections and Exterior Wall Details. No changes to this sheet are authorized.
24. Drawing D-6196-A-10, Roof Plan. Antenna supports and mounts are optional and may be deleted. Building orientation (North Arrow) must be site adapted. No other changes to this sheet are authorized.
25. Drawing D-6196-A-11, Roof Details. Antenna support and mount details are optional and may be blocked out. No other changes to this sheet are authorized.
26. Drawing D-6196-A-12/B, Scupper and Miscellaneous Details. No changes to this sheet are authorized.
27. Drawing D-6196-A-13/A, Glazing Details. No changes to this sheet are authorized.
28. Drawing D-6196-A-14/A, Hollow Metal Door Details. No changes to this sheet are authorized.
Page 7
14
29. Drawing D-6196-A-15/A, Interior Door Details. No changes to this sheet are authorized.
30. Drawing D-6196-A-16/A, Interior Wall Sections. No changes to this sheet are authorized.
31. Drawing D-6196-A-17/A, Demountable Panel Details. No changes to this sheet are authorized.
32. Drawing D-6196-A-18/A, Details. No changes to this sheet are authorized.
33. Drawing D-6196-A-19/A, Restroom and Kitchen Plan. No changes to this sheet are authorized.
34. Drawing D-6196-A-20, Details. No changes to this sheet are authorized.
35. Drawing D-6196-A-21, Typical Pilot Briefing Counter Details. This sheet is intended to show counter construction and must be substantially modified or replaced dependent on local requirements.
36. Console Installation Drawings. Sheets must be added to the standard drawings set if operations consoles are to be installed by the building
construction contract. Sheets should include console layout plan, console schedule, console power distribution system layout, and national standard console assembly drawings.
37. Drawing D-6196-S-1, Foundation and Floor Plan. No changes to this sheet are authorized provided design assumptions are valid for local site
conditions. (See paragraph 3.a.)
38. Drawing D-6196-S-2, Roof Plan and Steel Framing. No changes to this sheet are authorized provided assumed design loading exceed local site
requirements. (See paragraph 3.b.)
39. Drawing D-6196-S-3, Foundation Sections and Details. No changes to this sheet are authorized provided foundation design asumptions are adequate for local site conditions.
40. Drawing D-6196-S-4, Foundation Sections and Details. No changes to this sheet are authorized provided foundation design assumptions are adequate for local site conditions.
Page 8
15
7/7/81 6490.9 Appendix 2
41. Drawing D-6196-S-5, Precast Panels and Connections. No changes to this sheet are authorized provided panel design assumptions are adequate for local site conditions.
42. Drawing D-6196-S-6, Framing Sections and Details. No changes to this sheet are authorized provided design assumptions are adequate for local site
conditions.
43. Drawing D-6196-S-7/B, Framing Sections and Details. No changes to this sheet are authorized provided design assumptions are adequate for local site
conditions.
44. Drawing D-6196-M-l, Typical Mechanical Site Plan. This sheet indicates typical design parameters and must be substituted with a sheet prepared during site adaptation. The mechanical site plan is intended to be used in conjunction with the C-8 drawing and must specify water service
installation.
45. Drawing D-6196-M-2/A, Plumbing Floor Plan. No changes to this sheet are authorized.
46. Drawing D-6196-M-3/D, Plumbing Schedule and Water Riser Diagram. No changes to this sheet are authorized.
47. Drawing D-6196-M-4/A, HVAC Floor Plan. This sheet is to be modified dependent on climatic zone of the specific site.. Authorized modifications are: (1) deletion of blender systems in zones IV and V, (2) deletion of electric heater for room 122 in zones IV and V, and (3) modification of notes in accordance with appropriate selections. (See 4.a.)
48. Drawing D-6196-M-5/A, HVAC Control Diagrams and Schedule. This sheet is to be modified dependent on climatic zone of the specific site. (See 4.a.) Authorized changes are: blocking out of blender systems details, general notes 7 and 8, notes 6 and 7; and blender fans from the fan schedule in zones IV and V.
49. Drawing D-6196-M-6, HVAC Schedules. Selection of HVAC equipment is to be made on this sheet by blocking out inappropriate zoned options.
50. Drawing D-6196-M-7/A, Details. Air blender system details must be blocked out in climatic zones IV and V; other modifications are not authorized.
51. Drawing D-6196-E-l, Typical Electrical Site Plan. This sheet indicates typical exterior electrical design and lighting parameters and must be substituted with a drawing prepared during site adaptation.
Page 9
16
52. Drawing D-6196-E-2/A, Electrical Floor Plan - Lighting. No changes to this sheet are authorized.
53. Drawing D-6196-E-3/A, Electrical Floor Plan - Power. Modifications to this sheet are dependent upon climatic zone of the site and heating, ventilating, and air conditioning options selected. Modification is limited to wiring for terminal heaters in air distribution boxes, wiring for air blender systems, and feeder for the electric heater in room 122.
54. Drawing D-6196-E-4/B, Cable Tray Plan and Details. No changes to this sheet are authorized.
55. Drawing D-6196-E-5/B, Lightning Protection and Grounding System. No changes to this sheet are authorized.
56~ Drawing D-6196-E-6/A, Electrical Distribution Diagram and Equipment Schedule. No changes to this sheet are authorized.
57. Drawing D-6196-E-7, Branch Panel Schedules. Modifications to this sheet are dependent upon climatic zone of the site along with heating, ventilating, and air conditioning option selected and breakers provided for operations consoles should these be installed in building contract. Other modifications are not authorized.
58. Drawing D-6196-E-8, Fire Detection and Alarm System. No changes to this sheet are authorized.
SECTION 3. AUTHORIZED MODIFICATIONS AND SUBSTITUTIONS TO
STANDARD SPECIFICATION
59. Table of Contents. The Table of Contents of the specification must be revised to reflect the deletion or addition of sections during site adaptation.
60. Division 1 - General Requirements. The addition of the site name and location in section 1-1 is the only modification required to the division in site adaptation.
61. Division 2 - Site Work.
a. Section 2-1, Clearing. No changes are required.
b. Section 2-2, Site Grading. No changes are required.
c. Section 2-3, Excavation and Backfilling for Structures. Requirements could require modification dependent on local conditions.
Page 10
17
7/7/81 6490. 9 Appendix 2
d. Section 2-4, Trenching and Backfilling for Utilities. Requirements could require modification dependent on local conditions.
e. Section 2-5, Finish Grading. No changes should be required in this section.
f. Section 2-6, Pavement, Curbs, and Walkways. reviewed for compliance with state highway and paving to pavement design and installation requirements.
g. Section 2-7, Facility and Directional Signs. section should be required.
This section must be standards in regards
No changes to this
h. Section 2-8, Landscaping. A site specific section must be prepared during site adaptation to reflect requirements for local conditions.
i. Section 2-9, Irrigation System. A site specific section may be prepared dependent on requirements for local conditions.
j. Section 2-10, Exterior Water Lines. This section should not require change; however, it must be reviewed for compliance with local codes and requirements.
k. Section 2-11, Sanitary and Storm Sewers. This section should not require change; however, it must be reviewed for compliance with local codes and requirements.
1. Section 2-12, Drainage Structures. This section should not require change; however, it must be reviewed for compliance with local requirements and applicability to the site design.
m. Section 2-13. This section may be added to the specification to cover required special foundation systems.
62. Division 3 - Concrete. Modifications authorized to this division are limited to exterior screen wall construction and the addition of coloring and finish texture to architectural precast concrete section dependent upon architectural considerations of the specific site.
63. Division 4 - Masonry. This division may be added to the specification should masonry be selected for exterior screen wall construction.
64. Division 5 - Metals. No changes are authorized to this division.
Page 11
18
65. Division 6 - Wood and Plastics. No changes are authorized to this division with the exception of finish for pilot briefing counter.
66. Division 7 - Thermal and Hoisture Protection. No changes are authorized to this division.
67. Division 8 - Doors and Windows. No changes are authorized to this division.
68. Division 9 - Finishes. No changes are authorized to this division.
69. Division 10 - Specialities. No changes are authorized to this division.
70. Division 11 - Equipment. No changes are authorized to this division.
71. Divison 12 - Furnishing. No changes are authorized to this division.
72. Division 13 - Special Construction. Section covering console installation should be added if this work is to be included in the building construction contract.
73. Division 15 - Mechanical. No changes are authorized to this division.
74. Division 16 - Electrical. No changes are authorized to this division.
Page 12