Radar Vectors
FAA Order Current Issued Sep 19, 1972 AJM-231 2 pages Copy saved Nov 17, 2026

Order 6340.2A Reconditioning of Rigid Radomes in the National Airspace System (ris No. Sm 6340-1)

This supplement provides Southwest Reginal procedures for submitting Pre-DLM radome evaluation data.

Official source ↗ Open PDF

G U

W . .J

i->

a:

Fa

LL! fW h f,0w

U

U- +) li. m oc o _-

TURM

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION 6340 .2A SW SUP 1

RECONDITIONING OF RIGID RADOMES IN THE NATIONAL SU BJ : AIRSPACE SYSTEM (RIS : SM 6340-1)

1 . PURPOSE . This supplement provides Southwest Regional procedures for

FEDERAL AVIATION ADMINISTRATION 6340 .2A SW SUP 1

None

SOUTHWEST REGION FORT WORTH, TEXAS

submitting Pre-DLM radome evaluation data .

2 . EXPLANATION OF CHANGE . Regional requirements are established for the airway Facilities Sector offices to submit the Pre-DLM findings using FAA Form 6340-1 to the Airway Facilities Division, ASW-400, attention : Maintenance Operations Branch, ASW-460, prior to 1 August of each year .

SOUTHWEST REGION FORT WORTH, TEXAS

Remove Pages Dated

RICHARD R . STRYKER Chief, Airway Facilities Division

PAGE CONTROL CHART

INITIAL

--,_

cipl .

Insert Pages Dated

Pie 2-Sl

'facing page 2)

16 Nov 72

Cancellation

Date : When basic is canceled

Distribution : RAF/LG-2 ; FAF-2 (Minimum) Initiated By : ASW-460 AAF-210 (2 copies)

16 Nov 72

16 Nov 72

16 Nov 72 6340 .2A SW SUP 1

SW SUPPLEMENTAL PAGE

8a-S1 Sector Requirement for Submitting FAA Form 6340-1 . Sectors shall perform a yearly Pre-DLM survey on each rigid radome in service except those that have been or will be reconditioned during the report year . Report the findings using FAA Form 6340-1 to the Airway Facilities Division, ASW-400, attention : Maintenance Operations Branch, ASW-460, prior to 1 August of each year . The degree of deterioration of individual panels has been noted to vary from section to section of the radome . The condition of the base panels may not reflect the condition of the top most panels . To be of maximum effectiveness, this evaluation should not be restricted to one area of the radome surface .

SW SUPPLEMENTAL PAGE

Par 8-S1 Page 2-S1