AIRPORT SURVEILLANCE RADAR (ASR-8) STEEL TOWER DRAWINGS SUBJ:

1. PURPOSE. This order announces the issuance of the drawin~ * listed in appendix 1 . Drawing D-6083-6 is revised and dated 11/9/89. * 2. DISTRIBUTION. This order is distributed to division level in the Program Engineering, Advanced System Acquisition, and Systems Maintenance Services in Washington headquarters; to branch level

FEDERAL AVIATION ADMINISTRATION ORDER 6310.7C

in the regional Airway Facilities divisions; and the FAA Depot and Facility Support Division at the Mike Monroney Aeronautical Center; and to the Director level at the FAA Technical Center. * 3. CANCELLATION. Order 631 0. 7B, Airport Surveillance Radar (ASR­ 8) Steel Tower Drawings, dated 6/8/89, is canceled. *

4 . BACKGROUND .

a. The tower design has been revised to conform with the Occupational Safety and Health Administration (OSHA) Standards. The height of the platform guard rails is increased 6 inches and kick plates are added. The height of the stair handrail is lowered 2 inches.

b. The agency recognizes these devisions from the OSHA Standards in issuing Order 3900.32A, Agency Compliance With

Occu~:-~..:ional Safety and Health Administration Standards: Program Engineering and Maintenance Service National Abatement Plan. The non-standard conditions are listed as deminimuses. A deminimus is defined as a condition that is in voilation of an OSHA standard but presents no apparent hazard to employees' safety or health. No retrofit corrective action is required for a deminimus violation, and no funding is provided.

* c. Other minor revisions include changing the size of down conductor and increasing the height of the lightning air terminals to conform to Drawing D-6075-153, Lightning Protection of ASR Radar Tower; and increasing the floor grating area on the mezzanine level

to provide access to the ASR-9 radar antenna panel.

5. APPLICATION. These drawings shall be used for the fabrication and construction of all ASR-8 antenna towers. The drawings will be added to the specification currency list for procurement in the Air Traffic Control and Navigation System. Inquiries or comments regarding these drawings should be directed to the Manager, Facilities Integration Division, APS-100.

Distribution:A-W(PS/SM/SA)-2; A-X(AF)-3; A-Y(DE/FA)-3; A-Z-1 Initiated By: APS-120

6310.7C l/22/90

6. DEVIATION FROM STANDARDS. No deviation from the standard i; authorized without prior approval of the Director, Program Engineering Service. Regional site adaptation to accommodate terrain or soil conditions is authorized without further clearance. Dimensional errors, discrepancies, or suggestions for modification or additional details should be brought to the attention of the Manager, Facilities Integration Division, APS-100.

7 . CORRECTIONS TO STANDARPS. Corrections may be made by the Director, Program Engineering Service, without regional or interservice coordination. These may include misspelling, corrections of dimensional errors, and modification, addition, or deletion of minor details.

*8. DISTRIBUTION OF DRAWINGS. A reproducible copy of D-6083-6 is being forwarded to each region (except AEU), Attention: Airway Facilities Division; and the Mike Monroney Aeronautical Center, Attention: Facility Support Division. *

Program Engineering Service

.. .~ ...

Page 2 Par 6

1/22/90 6310.7C Appendix 1

APPENDIX 1. AIRPORT SURVEILLANCE RADAR (ASR-8) STEEL TOWER DRAWINGS

APPENDIX 1. AIRPORT SURVEILLANCE RADAR (ASR-8) STEEL TOWER DRAWINGS

Orawi ns; Number

D-6083-1 D-6083-2 · D-6083-3

0-6-84-4

D-6083-5 0-6083-6 D-6083-7 0-6083-8

0-6083-9

D-6083-1 0

D-6084-1

D-6084-2 D-6084-3 0-6084-4

D-6084-5 D-6084-6

0-6084-7

D-6084-8

D-6084-9

D-6084-10

0-6084-11

D-6084-12

D-6084-12A

0-6084-13

D-6084-14

D-6084-15

Date

11/28/88 2/25/88 2/13/89

2/25/88

2/25/88 1.1/9/89 l /16/80 11/3/76

11/3/76

11/3/76

2/25/88

2/25/88 2/13/89 2/25/88

2/13/89 2/13/89

2/13/89

2/13/89

2/13/89

2/13/89

2/13/89

2/25/88

2/25/88

2/13/89

2/13/89

2/13/89

Title

ASR-8 Tower, General Layout ASR-8 Tower, Main Floor Plan ASR-8 Tower, 'Mezz. Floor Plan and Stair Details ASR-8 Tower, Elevation of Top Tower Section, Misc. Details ASR-8 Tower, 10-Foot Extension Section ASR-8 Tower, Electrical Installation ASR-8 Tower, Foundation Plan and Details 37-Foot Tower, Pile Foundation Plan and Details 17-Foot Tower, Pile Foundation Plan and Details Tower, Loading Diagrams

ASR-8 Tower, Anchor Bolt Setting Plan and Col. Base Details ASR-8 Tower, 10-Foot Section Details ASR-8 Tower, 10-Foot Section Details ASR-8 Tower, Stair and Rail Below 10-Foot Sections ASR-8 Tower, Handrails for 10-Foot Section ASR-8 Tower, Floor Beams and Hangars at Mezz. Floor, Top Section ASR-8 Tower, Floor Beams at Mezz. Floor, Top Section ASR-8 Tower, Floor Beams Jt Mezz. Floor, Top

Section ASR-8 Tower, Floor Beams at Main Floor, and Vertical Bracing, Top Section ASR-8 Tower, Floor Beams at Main Floor, Top Section ASR-8 Tower, Floor Beams and Bracing at Main Floor, Top Section ASR-8 Tower, Cols. and Antenna Support

Platform, Top Selection ASR-8 Tower, Alternate Details for Antenna Support Platform, Top Section ASR-8 Tower, Handrail at r~af n Floor, Top Section ASR-8 Tower, Handrail at Mezz. Floor, Top Section ASR-8 Tower, Handrail and Ladder at Mezz. Floor. Kick. PLs and Ltn'g Rod at Main, Top

Section

Page l

6310.7C Appendix 1

Drawing Number 0-6084-16

D-6084-17

D-6084-18

0-6084-19

D-6085-El

D-6085-E2 D-6085-E3 D-6085-E4 D-6085-E5 D-6085-E6 D-6085-E7 D-6085-E8 D-6085-E9

D-6085-E2 D-6085-E3 D-6085-E4 D-6085-E5 D-6085-E6 D-6085-E7 D-6085-E8 D-6085-E9

D-6085-El 0 D-6085-Ell

D-6085-E12

D-6085-E13 D-6085-E14

D-6085-ElS D-6085-E16

Page 2

Date lTm/88

2/25/88

2/25/88

9/15/81

2/13/89

2/25/88 11/3/76 11 /3/76 11/3/76 11 /3/76 11 /3/76 11/28/88 2/13/89

11/28/88 2/25/88

2/1 3/89

9/15/81 2/13/89

2/13/89 2/13/89

l/22/90

Title ASR-8 Tower, Sta1r and Rails Below Main Floor, and Wave Guide Support Details, Top Section ASR-8 Tower, Stair and Rails Below Mezz. Floor, Top Section ASR-8 Tower, Door and Exp. ~1etal Cage, Top Section ASR-8 Tower, Work Platform

ASR-8, Erect. Dwg. for 17-Foot Tower, Top Section ASR-8, Erect. Dwg. for 27-Foot Tower ASR-8, Erect. Dwg. for 37-Foot Tower ASR-8, Erect. Dwg. for 47-Foot Tower ASR-8, Erect. Dwg. for 57-Foot Tower ASR-8, Erect. Dwg. for 67-Foot Tower ASR-8, Erect. Dwg. for 77-Foot Tower ASR-8, Main and Mezz. Floor Plan, Top Section ASR-8, Plan of Handrail at Mezz. Floor, Top Section ASR-8, Interior Truss Top Section ASR-8, Grating Arrangement and Detai1s,.Top Section ASR-8, Grating Arrangement and Details, Top Section ASR-8, Erect. Dwg. for 10-Foot Section ASR-8, Bill of Material for One 10-Foot Section ASR-8, Bill of Material, Top Section ASR-8, Bill of Material, Top Section